HomeMy WebLinkAbout04/20/1925 Business Meeting1
1
F,
I'll
April 20th,1925..
The City Corilmissi.on met in regular ses sioi; Mayor Dudley, and Commissioners Hedges and Traub
voting aye on roll i.call.
Moved by Dudley,seconded. by Hedges, that the minutes of
13th,1925, and ad. j ourned meeting thereof be approved-as
Traub voting aye on roll call.
Moved by -Hedges, seconded. by Dudley, that the following
authorized to issue warrants therefor; carried, Dudley,:
call.
2,55)
the regular meeting of Monday,April
read;- carried, Dudley,Hedges and
claims be allowed and. the City Clerk
Hedges and Traub voting aye on roll
11oved b Traub, seconded by.Hedges, that the bond o-f Hardy & Richings,contractors,..in the
SUM' of 911.53, for improving the East one-half of 28th Avenue by paving in Local - Improve-
ment District No..397, is hereby approved and filed with -the City Clerk and the Mayor.and
City Clerk are hereby authorized .to .inter into a contract therefor for said improvement.;
carried, Dudley,Hedges and Traub voting aye-on roll call.
Moved b Traub, seconded by Hedges, that the bond of Block and .Cooper,contractors, in the
sum of 893.78, for improveing So.Naches- Avenue- from Race Street to Adams Avenue. by con-
structing curbings, in Local Improvement District No.,398 is hereby approved and filed with
the City :Clerk, and the Mayor and. City-Clerk are �here.by authorized to enter into a contract
therefor for said improvement; carried,.- Dudley,Hedges and Traub -voting aye on roll call.
Moved by Traub,-seconded. by.Hedges, that this - being the time and place for the hearing on
Resolution No.B -873, and objections being raised by the property owners on 15th Avenue
between 'jest Yakima Avenue and 'lest -Chestnut Street to the width of a 32 ft.paving.as-
outlined in said resolution; an agreement was-reached for a 28 ft. paving for said. block
instead. of 32 feet as originally .planned; carried,Dudley,Hedges and .Traub voting aye on
roll call..
Moved by Traub, seconded b,,., Hedges, that the City Engineer having filed his report of the
completion of the improvement in Local Improvement District No. 394, for constructing a
sewer system on Summitview Avenue, et al, by the contractor, the Oregon Construction
Company in- the sum of $45,906.17; it is ordered that said improvement be accepted and the
City Engineer is hereby authorized to prepare an assessment roll for said district and
the City Clerk instruced to give notice of hearing on said roll for Monday,Ma.y 18th,1925,
at 9 o'clock A.T. carried., Dudley,Hedges and. Traub voting aye on roll ,call.
RESOLUTION NO.B- 874,BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF YAKIN- :A,71ASHINGTON:
That it is the intention of the City Commission to improve all that part of the City of
Yakima,Washingt-on, included, within the boundaries of the following district,to -wit:
Beginning on Pacific Avenue at :S -outh Naches Avenue,.-thence-west-along Pacific Avenue to
South Second. Street, thence northerly* along South Second Street to Race Street, thence
easterly along Race Street to South Naches Avenue, thence- °south to the place of beginning
by the construction-of vitrified clay pipe sewers, eight (8) inches .in inside diameter,
along the .following, lines: Beginning on Pacific Avenue,. and connecting with the sewer
heretofore constructed on said Avenue at the-alley east of South Naches Avenue; thence west
along-Pacific Avenuer�to a point'.7midway- between South 5-eco-nd Street and South .Thi.rd Street,
also beginning on pacific Avenue at -th.e. alley east of South Third Street, thence..nor.th
along said alley to a point 5 feet south of Race Street, �als.o beginning on Pacific.Avenue
at the alley east of South Fourth Street, thence north..along said alley to a point 5 feet
south of Race Street, said sewers to b.e.provided.with three brick manholes, three automatic
flush tanks, and one six inch wye branch for each lot or tract of land abutting upon the lin
of said sewers, and by doing all such other work as may be necessary in connection therewith
all in accordance -�;ith the plans and specifications therefor to be prepared by the City
Engineer and filed with the City Clerk.
Current - Exuense
Parks &_ Play ro nd
Warrant No. Name,
Amount
Lffarrant No..N ze
Amount
No-35925
City Clerk
$,44--
No .1362
Ilan Bean
$11.06-
26
James_Perry
1.25-
63
Dan Roilly
1_.65'
27
James Perry
60.00• _
Total:. ...... ..
x12.71
28
Rensselear Valve Co.
307.5.0•
29
"410:00•
Cemetery
30
" "
307.50*
:
31
W.J. Ranken
5'00-
No.
1884
Hull - Miller Co.
$2.50 •-
32
Yakima Seed. Co.
1.30 .
33
Auto Isla int Co.
36-05'
Fiyed Estimate- .
34
S - G.Ad.ams Stamp Co..
7.46'
35
City Clerk
.75'
No.
1565
City Treas..
$10.00'
36
H.E. Hawkins
55.23 '
66
Yak-Valley Bank
11.00 '
37
Lenker Mfg Co.
2.00'
67
Lon Furniture. Co:
2. -
38
Merchants press Co.
7.25'
Total ......
5'23.70
39
Tony Peno
32.00'
40
quality Oil Co.
100.00'
Permanent
41
'U.J. Ranken
80.53'
42
Henry Traub
29.88-
No.
.1561 -
Har,dy & Richings
._$745.34
43
'Western Union
3.75'
44
wm.Ward
68.80 '
Road_ a d_grid -Ze
45
Yak.Bindery & Printing
Co,. 21.00'
46
Yak.Grocery':.Co.
10.00'
No.
1568
L.L.Buchanan
$535..00-
Total.............
$1547.69
69
Harcourt M.Taylor,
99.84•
Bond Snkin�
Irrigation
No.
1570
Yakima Valley Bank
$5,352.56'
No.1564
Frank F.Sinclair,Gd.n.
$45.63 '
Indebt�edneq
No.
1562
Mary F•S.Monroe-
$31.06,.
63
Geo.C:Sawyer
32.71•
11oved b Traub, seconded by.Hedges, that the bond o-f Hardy & Richings,contractors,..in the
SUM' of 911.53, for improving the East one-half of 28th Avenue by paving in Local - Improve-
ment District No..397, is hereby approved and filed with -the City Clerk and the Mayor.and
City Clerk are hereby authorized .to .inter into a contract therefor for said improvement.;
carried, Dudley,Hedges and Traub voting aye-on roll call.
Moved b Traub, seconded by Hedges, that the bond of Block and .Cooper,contractors, in the
sum of 893.78, for improveing So.Naches- Avenue- from Race Street to Adams Avenue. by con-
structing curbings, in Local Improvement District No.,398 is hereby approved and filed with
the City :Clerk, and the Mayor and. City-Clerk are �here.by authorized to enter into a contract
therefor for said improvement; carried,.- Dudley,Hedges and Traub -voting aye on roll call.
Moved by Traub,-seconded. by.Hedges, that this - being the time and place for the hearing on
Resolution No.B -873, and objections being raised by the property owners on 15th Avenue
between 'jest Yakima Avenue and 'lest -Chestnut Street to the width of a 32 ft.paving.as-
outlined in said resolution; an agreement was-reached for a 28 ft. paving for said. block
instead. of 32 feet as originally .planned; carried,Dudley,Hedges and .Traub voting aye on
roll call..
Moved by Traub, seconded b,,., Hedges, that the City Engineer having filed his report of the
completion of the improvement in Local Improvement District No. 394, for constructing a
sewer system on Summitview Avenue, et al, by the contractor, the Oregon Construction
Company in- the sum of $45,906.17; it is ordered that said improvement be accepted and the
City Engineer is hereby authorized to prepare an assessment roll for said district and
the City Clerk instruced to give notice of hearing on said roll for Monday,Ma.y 18th,1925,
at 9 o'clock A.T. carried., Dudley,Hedges and. Traub voting aye on roll ,call.
RESOLUTION NO.B- 874,BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF YAKIN- :A,71ASHINGTON:
That it is the intention of the City Commission to improve all that part of the City of
Yakima,Washingt-on, included, within the boundaries of the following district,to -wit:
Beginning on Pacific Avenue at :S -outh Naches Avenue,.-thence-west-along Pacific Avenue to
South Second. Street, thence northerly* along South Second Street to Race Street, thence
easterly along Race Street to South Naches Avenue, thence- °south to the place of beginning
by the construction-of vitrified clay pipe sewers, eight (8) inches .in inside diameter,
along the .following, lines: Beginning on Pacific Avenue,. and connecting with the sewer
heretofore constructed on said Avenue at the-alley east of South Naches Avenue; thence west
along-Pacific Avenuer�to a point'.7midway- between South 5-eco-nd Street and South .Thi.rd Street,
also beginning on pacific Avenue at -th.e. alley east of South Third Street, thence..nor.th
along said alley to a point 5 feet south of Race Street, �als.o beginning on Pacific.Avenue
at the alley east of South Fourth Street, thence north..along said alley to a point 5 feet
south of Race Street, said sewers to b.e.provided.with three brick manholes, three automatic
flush tanks, and one six inch wye branch for each lot or tract of land abutting upon the lin
of said sewers, and by doing all such other work as may be necessary in connection therewith
all in accordance -�;ith the plans and specifications therefor to be prepared by the City
Engineer and filed with the City Clerk.
bit 5 6
April 20th,1925.
All pe -sons. who may desire: to object, to said-proposed improvement are hereby
notified to appear, and present' such objections at a meeting of. the City Corp - mission to' be
held at its offices in the City-Office building in the City of Yakima,' +ashington, at the
hour of 9 o'clock A.M. on 111onday, the 11th day of Kay,1925, which time and place are hereby
fixed for the hearing of all matters relating to said proposed improvement, all - objections
thereto and for determining the.-,..method-of- payment therefor, and the City Clerk is "hereby
directed to give due notice of said hearing and-the intention to make'Ahe aforesaid improve-
ment.
The- cost .and expense of said improvemment shall be borne 'by and assessed- against
all of the - grope -:1ty legally and propertly assessible therefor, as provided: by law, and the
City Engineer is hereby directed to submit to the City Commission at or prior to the time
fixed herein for said hearing,-all of the data and other •information required by law to be
submitted. by him:
ADOPTED BY TIC CITY COMIUSSION THLIS 20th day 'of Apri1,1925.
gm.- B.Dudley,
Mayor .
Attest: Pearl Benjar:in,
City Clerk. (S E A L)
Moved by Traub, seconded by Dudley, that Rersolution No.B -874 be adopted as-read;- carried,
Dud.ley,Hedges and Traub voting aye on roll call..
HESOLUTION NO.B- 875,BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF YAKIMA,WASHINGTON:
That it -is- its inte.nti -on ,. to improve Browne. Avenue from Sixteenth Avenue Nortl: to
Eighteenth Avenue North., in the --City of Yakima, Washington, by -grad-i-ng the same, and. by
constructing concrete sidewalks and curbing along each side thereof 'and to improve Sixteent
Avenue North from:a line 57.4 feet south of Browne Avenue to a line -129 feet north of Browne
Avenue by constructing concrete sidewalks and curbing along the west:: side thereof, 'all of
such concrete- si dewalka -t-o be 5 feet i -n- width- excepting the sidewalk -on Sixteenth: Avenue.
North north. of -Browne Avenue, which �is to -be 6.5.feet =in - width, and by constructing' one
course Portland. - cement conerete._.pavement. in. the intersec -tion . of. Browne Ave.nue- and= Sixt -e -enth
Avenue North, from. the west .line.- of the existing .paveme.nt..to the west -line. of .said Sixteenth
Avenue North, and by doing all -.such other work as may be -ne.cessary -in connection therewith,..
all in accordance with the plans and specifications therefor to be prepared by the City
Engineer and filed. with the City Clerk; the district for said:.impr.over�ent to be bounded on
the north by a line parallel with and-130 feet north of the north .line. of Browne Avenue, on
the south by a line midway between Browne Avenue and SummitView Avenue, -and shall,extend fron
west .line of Sixteenth . Avenue North to east line.,of Eighteenth Avenue North.
All persons who may desire to object to said proposed improve^..ent are hereby .notified.,
to a pear and present .st.ch objections ,at. a meeting.-of the .City Commission t.o be..held at its
offices in the City Office . Building in the City of Yakima, Washing.ton, at the hour; of nine
o °clock on Monday, the 11th day -of May,1925, which time and. place. are hereby fixed fo_r -the
hearing of all matters relating to said proposed improvement, all objections thereto, and
for dete.rmining.t.he method of payment therefor, and the City Clerk is hereby directed to
give due notice of said 'hearing and of .the..intention .to make the aforesaid improvement-
-The cost- and -expens-e of said improvement shall be borne by and assessed against all
of the- property legally and :properly .ass'e-ssible therefor, as. provided by law., and the City
Engineer is hereby directed to submit to the City Commission at or prior to the date fixed
herein for said hearing, all of the data and other. information required by law to.r:be
submitted by him.
Adopted. by the City Commission .this 20th day of April,1925.:
Attest: Pearl Benjamin,
City Clerk..
(SE AL)
Vlm. B.Dudley,
Mayor.
Moved by Traub, seconded. by Dudley, that Resolution No-B-875 be adopted as read; carried,
Dudley,Hedges and Traub-voting aye on roll call.
RESOLUTION NO.B- 8-76,BE IT RESOLVED BY TI7, CITY C011XISSION OF THE CITY OF YAKIMA,WASHINGTON:
That it is the intention of the City Commission to improve the following described
property in said City,to -wit: Lots One (1) to Twelve (12), both-inclusive,-in Homewood -
Addition in the. City of Yakima,`Pashington, by the construction of a vitrified clay pipe
sewer eight(8) inches in inside diameter, said sewer to begin at the end of the sewer here-
tofore constructed in Block One..-(-I). in Laurelhurs.t Addition to sai-d City of Yakima,
Washington, and to extend thence westward 340 feet, which said sewer is to be provided with
one flush tank, and by doing all such other work as may be necessary -in connection therewith;
all in accordance with. the plans and specifications therefor. to be prepared by the City
Engineer and filed with the City Clerk.
All persons who may desire .to ,obje.ct to said proposed improvement: are- hereby notified
to appear and present such objections at.a meeting of the City .Commis- si.on.to, be held at its
offices in the City Office Building in the City of Ya.kith.a,Washington, at-the hour. of 9
of clock A.Ia. on Monday .the 11th day of May, 1925, .which time and. place are .hereby fixed..for
the, hearing of all matters relating to said proposed. improvement, all objections thereto
and for determining the .method of payment therefor, and. the City. Clerk i s -hereby di rected
to give due notice of said hearing.and the intention to make the' - aforesaid. improvement. The
cost and expense of said improvement shall be borne by and assessed•.against all of the
property legally and properly assessible therefor, as provided, by law,k and the City Engineer
is hereby directed to submit to the City Commission at or prior to the time fixed herein for
said hearing, all of the data and other information required by law to be submitted by him.
1
1
1
1
1
1
1
April 20th,1925.
Adopted. by the City Corimission this 20th date of April,1025.
'Mm.B. Dudley,
f�'Ca.y o r .
(S E A,L)
AttestPearl•Benjamin,
City Clerk.
11oved by Traub, seconded by Dudley, that Resolution No.B =876 be adopted. as read; carried,
Dudley,Hedges and Traub voting aye on roll call.
Moved by Dudley, seconded by Hedges, that- we-do now adjourn; carried, Dudley,Hedges and
Traub voting aye on roll call..
Mayor
A (
ttest : Att���
�rTity Cle � �'