Loading...
HomeMy WebLinkAbout04/20/1925 Business Meeting1 1 F, I'll April 20th,1925.. The City Corilmissi.on met in regular ses sioi; Mayor Dudley, and Commissioners Hedges and Traub voting aye on roll i.call. Moved by Dudley,seconded. by Hedges, that the minutes of 13th,1925, and ad. j ourned meeting thereof be approved-as Traub voting aye on roll call. Moved by -Hedges, seconded. by Dudley, that the following authorized to issue warrants therefor; carried, Dudley,: call. 2,55) the regular meeting of Monday,April read;- carried, Dudley,Hedges and claims be allowed and. the City Clerk Hedges and Traub voting aye on roll 11oved b Traub, seconded by.Hedges, that the bond o-f Hardy & Richings,contractors,..in the SUM' of 911.53, for improving the East one-half of 28th Avenue by paving in Local - Improve- ment District No..397, is hereby approved and filed with -the City Clerk and the Mayor.and City Clerk are hereby authorized .to .inter into a contract therefor for said improvement.; carried, Dudley,Hedges and Traub voting aye-on roll call. Moved b Traub, seconded by Hedges, that the bond of Block and .Cooper,contractors, in the sum of 893.78, for improveing So.Naches- Avenue- from Race Street to Adams Avenue. by con- structing curbings, in Local Improvement District No.,398 is hereby approved and filed with the City :Clerk, and the Mayor and. City-Clerk are �here.by authorized to enter into a contract therefor for said improvement; carried,.- Dudley,Hedges and Traub -voting aye on roll call. Moved by Traub,-seconded. by.Hedges, that this - being the time and place for the hearing on Resolution No.B -873, and objections being raised by the property owners on 15th Avenue between 'jest Yakima Avenue and 'lest -Chestnut Street to the width of a 32 ft.paving.as- outlined in said resolution; an agreement was-reached for a 28 ft. paving for said. block instead. of 32 feet as originally .planned; carried,Dudley,Hedges and .Traub voting aye on roll call.. Moved by Traub, seconded b,,., Hedges, that the City Engineer having filed his report of the completion of the improvement in Local Improvement District No. 394, for constructing a sewer system on Summitview Avenue, et al, by the contractor, the Oregon Construction Company in- the sum of $45,906.17; it is ordered that said improvement be accepted and the City Engineer is hereby authorized to prepare an assessment roll for said district and the City Clerk instruced to give notice of hearing on said roll for Monday,Ma.y 18th,1925, at 9 o'clock A.T. carried., Dudley,Hedges and. Traub voting aye on roll ,call. RESOLUTION NO.B- 874,BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF YAKIN- :A,71ASHINGTON: That it is the intention of the City Commission to improve all that part of the City of Yakima,Washingt-on, included, within the boundaries of the following district,to -wit: Beginning on Pacific Avenue at :S -outh Naches Avenue,.-thence-west-along Pacific Avenue to South Second. Street, thence northerly* along South Second Street to Race Street, thence easterly along Race Street to South Naches Avenue, thence- °south to the place of beginning by the construction-of vitrified clay pipe sewers, eight (8) inches .in inside diameter, along the .following, lines: Beginning on Pacific Avenue,. and connecting with the sewer heretofore constructed on said Avenue at the-alley east of South Naches Avenue; thence west along-Pacific Avenuer�to a point'.7midway- between South 5-eco-nd Street and South .Thi.rd Street, also beginning on pacific Avenue at -th.e. alley east of South Third Street, thence..nor.th along said alley to a point 5 feet south of Race Street, �als.o beginning on Pacific.Avenue at the alley east of South Fourth Street, thence north..along said alley to a point 5 feet south of Race Street, said sewers to b.e.provided.with three brick manholes, three automatic flush tanks, and one six inch wye branch for each lot or tract of land abutting upon the lin of said sewers, and by doing all such other work as may be necessary in connection therewith all in accordance -�;ith the plans and specifications therefor to be prepared by the City Engineer and filed with the City Clerk. Current - Exuense Parks &_ Play ro nd Warrant No. Name, Amount Lffarrant No..N ze Amount No-35925 City Clerk $,44-- No .1362 Ilan Bean $11.06- 26 James_Perry 1.25- 63 Dan Roilly 1_.65' 27 James Perry 60.00• _ Total:. ...... .. x12.71 28 Rensselear Valve Co. 307.5.0• 29 "410:00• Cemetery 30 " " 307.50* : 31 W.J. Ranken 5'00- No. 1884 Hull - Miller Co. $2.50 •- 32 Yakima Seed. Co. 1.30 . 33 Auto Isla int Co. 36-05' Fiyed Estimate- . 34 S - G.Ad.ams Stamp Co.. 7.46' 35 City Clerk .75' No. 1565 City Treas.. $10.00' 36 H.E. Hawkins 55.23 ' 66 Yak-Valley Bank 11.00 ' 37 Lenker Mfg Co. 2.00' 67 Lon Furniture. Co: 2. - 38 Merchants press Co. 7.25' Total ...... 5'23.70 39 Tony Peno 32.00' 40 quality Oil Co. 100.00' Permanent 41 'U.J. Ranken 80.53' 42 Henry Traub 29.88- No. .1561 - Har,dy & Richings ._$745.34 43 'Western Union 3.75' 44 wm.Ward 68.80 ' Road_ a d_grid -Ze 45 Yak.Bindery & Printing Co,. 21.00' 46 Yak.Grocery':.Co. 10.00' No. 1568 L.L.Buchanan $535..00- Total............. $1547.69 69 Harcourt M.Taylor, 99.84• Bond Snkin� Irrigation No. 1570 Yakima Valley Bank $5,352.56' No.1564 Frank F.Sinclair,Gd.n. $45.63 ' Indebt�edneq No. 1562 Mary F•S.Monroe- $31.06,. 63 Geo.C:Sawyer 32.71• 11oved b Traub, seconded by.Hedges, that the bond o-f Hardy & Richings,contractors,..in the SUM' of 911.53, for improving the East one-half of 28th Avenue by paving in Local - Improve- ment District No..397, is hereby approved and filed with -the City Clerk and the Mayor.and City Clerk are hereby authorized .to .inter into a contract therefor for said improvement.; carried, Dudley,Hedges and Traub voting aye-on roll call. Moved b Traub, seconded by Hedges, that the bond of Block and .Cooper,contractors, in the sum of 893.78, for improveing So.Naches- Avenue- from Race Street to Adams Avenue. by con- structing curbings, in Local Improvement District No.,398 is hereby approved and filed with the City :Clerk, and the Mayor and. City-Clerk are �here.by authorized to enter into a contract therefor for said improvement; carried,.- Dudley,Hedges and Traub -voting aye on roll call. Moved by Traub,-seconded. by.Hedges, that this - being the time and place for the hearing on Resolution No.B -873, and objections being raised by the property owners on 15th Avenue between 'jest Yakima Avenue and 'lest -Chestnut Street to the width of a 32 ft.paving.as- outlined in said resolution; an agreement was-reached for a 28 ft. paving for said. block instead. of 32 feet as originally .planned; carried,Dudley,Hedges and .Traub voting aye on roll call.. Moved by Traub, seconded b,,., Hedges, that the City Engineer having filed his report of the completion of the improvement in Local Improvement District No. 394, for constructing a sewer system on Summitview Avenue, et al, by the contractor, the Oregon Construction Company in- the sum of $45,906.17; it is ordered that said improvement be accepted and the City Engineer is hereby authorized to prepare an assessment roll for said district and the City Clerk instruced to give notice of hearing on said roll for Monday,Ma.y 18th,1925, at 9 o'clock A.T. carried., Dudley,Hedges and. Traub voting aye on roll ,call. RESOLUTION NO.B- 874,BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF YAKIN- :A,71ASHINGTON: That it is the intention of the City Commission to improve all that part of the City of Yakima,Washingt-on, included, within the boundaries of the following district,to -wit: Beginning on Pacific Avenue at :S -outh Naches Avenue,.-thence-west-along Pacific Avenue to South Second. Street, thence northerly* along South Second Street to Race Street, thence easterly along Race Street to South Naches Avenue, thence- °south to the place of beginning by the construction-of vitrified clay pipe sewers, eight (8) inches .in inside diameter, along the .following, lines: Beginning on Pacific Avenue,. and connecting with the sewer heretofore constructed on said Avenue at the-alley east of South Naches Avenue; thence west along-Pacific Avenuer�to a point'.7midway- between South 5-eco-nd Street and South .Thi.rd Street, also beginning on pacific Avenue at -th.e. alley east of South Third Street, thence..nor.th along said alley to a point 5 feet south of Race Street, �als.o beginning on Pacific.Avenue at the alley east of South Fourth Street, thence north..along said alley to a point 5 feet south of Race Street, said sewers to b.e.provided.with three brick manholes, three automatic flush tanks, and one six inch wye branch for each lot or tract of land abutting upon the lin of said sewers, and by doing all such other work as may be necessary in connection therewith all in accordance -�;ith the plans and specifications therefor to be prepared by the City Engineer and filed with the City Clerk. bit 5 6 April 20th,1925. All pe -sons. who may desire: to object, to said-proposed improvement are hereby notified to appear, and present' such objections at a meeting of. the City Corp - mission to' be held at its offices in the City-Office building in the City of Yakima,' +ashington, at the hour of 9 o'clock A.M. on 111onday, the 11th day of Kay,1925, which time and place are hereby fixed for the hearing of all matters relating to said proposed improvement, all - objections thereto and for determining the.-,.­.method-of- payment therefor, and the City Clerk is "hereby directed to give due notice of said hearing and-the intention to make'Ahe aforesaid improve- ment. The- cost .and expense of said improvemment shall be borne 'by and assessed- against all of the - grope -:1ty legally and propertly assessible therefor, as provided: by law, and the City Engineer is hereby directed to submit to the City Commission at or prior to the time fixed herein for said hearing,-all of the data and other •information required by law to be submitted. by him: ADOPTED BY TIC CITY COMIUSSION THLIS 20th day 'of Apri1,1925. gm.- B.Dudley, Mayor . Attest: Pearl Benjar:in, City Clerk. (S E A L) Moved by Traub, seconded by Dudley, that Rersolution No.B -874 be adopted as-read;- carried, Dud.ley,Hedges and Traub voting aye on roll call.. HESOLUTION NO.B- 875,BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF YAKIMA,WASHINGTON: That it -is- its inte.nti -on ,. to improve Browne. Avenue from Sixteenth Avenue Nortl: to Eighteenth Avenue North., in the --City of Yakima, Washington, by -grad-i-ng the same, and. by constructing concrete sidewalks and curbing along each side thereof 'and to improve Sixteent Avenue North from:a line 57.4 feet south of Browne Avenue to a line -129 feet north of Browne Avenue by constructing concrete sidewalks and curbing along the west:: side thereof, 'all of such concrete- si dewalka -t-o be 5 feet i -n- width- excepting the sidewalk -on Sixteenth: Avenue. North north. of -Browne Avenue, which �is to -be 6.5.feet =in - width, and by constructing' one course Portland. - cement conerete._.pavement. in. the intersec -tion . of. Browne Ave.nue- and= Sixt -e -enth Avenue North, from. the west .line.- of the existing .paveme.nt..to the west -line. of .said Sixteenth Avenue North, and by doing all -.such other work as may be -ne.cessary -in connection therewith,.. all in accordance with the plans and specifications therefor to be prepared by the City Engineer and filed. with the City Clerk; the district for said:.impr.over�ent to be bounded on the north by a line parallel with and-130 feet north of the north .line. of Browne Avenue, on the south by a line midway between Browne Avenue and SummitView Avenue, -and shall,extend fron west .line of Sixteenth . Avenue North to east line.,of Eighteenth Avenue North. All persons who may desire to object to said proposed improve^..ent are hereby .notified., to a pear and present .st.ch objections ,at. a meeting.-of the .City Commission t.o be..held at its offices in the City Office . Building in the City of Yakima, Washing.ton, at the hour; of nine o °clock on Monday, the 11th day -of May,1925, which time and. place. are hereby fixed fo_r -the hearing of all matters relating to said proposed improvement, all objections thereto, and for dete.rmining.t.he method of payment therefor, and the City Clerk is hereby directed to give due notice of said 'hearing and of .the..intention .to make the aforesaid improvement- -The cost- and -expens-e of said improvement shall be borne by and assessed against all of the- property legally and :properly .ass'e-ssible therefor, as. provided by law., and the City Engineer is hereby directed to submit to the City Commission at or prior to the date fixed herein for said hearing, all of the data and other. information required by law to.r:be submitted by him. Adopted. by the City Commission .this 20th day of April,1925.: Attest: Pearl Benjamin, City Clerk.. (SE AL) Vlm. B.Dudley, Mayor. Moved by Traub, seconded. by Dudley, that Resolution No-B-875 be adopted as read; carried, Dudley,Hedges and Traub-voting aye on roll call. RESOLUTION NO.B- 8-76,BE IT RESOLVED BY TI7, CITY C011XISSION OF THE CITY OF YAKIMA,WASHINGTON: That it is the intention of the City Commission to improve the following described property in said City,to -wit: Lots One (1) to Twelve (12), both-inclusive,-in Homewood - Addition in the. City of Yakima,`Pashington, by the construction of a vitrified clay pipe sewer eight(8) inches in inside diameter, said sewer to begin at the end of the sewer here- tofore constructed in Block One..-(-I). in Laurelhurs.t Addition to sai-d City of Yakima, Washington, and to extend thence westward 340 feet, which said sewer is to be provided with one flush tank, and by doing all such other work as may be necessary -in connection therewith; all in accordance with. the plans and specifications therefor. to be prepared by the City Engineer and filed with the City Clerk. All persons who may desire .to ,obje.ct to said proposed improvement: are- hereby notified to appear and present such objections at.a meeting of the City .Commis- si.on.to, be held at its offices in the City Office Building in the City of Ya.kith.a,Washington, at-the hour. of 9 of clock A.Ia. on Monday .the 11th day of May, 1925, .which time and. place are .hereby fixed..for the, hearing of all matters relating to said proposed. improvement, all objections thereto and for determining the .method of payment therefor, and. the City. Clerk i s -hereby di rected to give due notice of said hearing.and the intention to make the' - aforesaid. improvement. The cost and expense of said improvement shall be borne by and assessed•.against all of the property legally and properly assessible therefor, as provided, by law,k and the City Engineer is hereby directed to submit to the City Commission at or prior to the time fixed herein for said hearing, all of the data and other information required by law to be submitted by him. 1 1 1 1 1 1 1 April 20th,1925. Adopted. by the City Corimission this 20th date of April,1025. 'Mm.B. Dudley, f�'Ca.y o r . (S E A,L) AttestPearl•Benjamin, City Clerk. 11oved by Traub, seconded by Dudley, that Resolution No.B =876 be adopted. as read; carried, Dudley,Hedges and Traub voting aye on roll call. Moved by Dudley, seconded by Hedges, that- we-do now adjourn; carried, Dudley,Hedges and Traub voting aye on roll call.. Mayor A ( ttest : Att��� �rTity Cle � �'