Loading...
HomeMy WebLinkAbout06/15/2021 08 Public hearing to consider: A) Resolution adopting the Six-Year Transportation Improvement Program for the period of 2022 through 2027, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Compr ti i..asxntntj kd d g$Ag aY ae.. x°'naa.x,,4n BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEM ENT Item No. 8. For Meeting of: June 15, 2021 ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year Transportation Improvement Program for the period of 2022 through 2027, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Scott Schafer, Public Works Director Bill Preston, City Engineer(509) 575-6754 SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The current plan for 2022 — 2027 contains a list of seven (7) funded projects that have yet to be constructed. The seven projects include: 1. North 1st Street Revitalization— Phase 3 2. Bravo Company Boulevard — Phase 1 3. 72nd Avenue and W. Washington Avenue Improvements 4. 34th Avenue & Fruitvale Boulevard, and 34th Avenue and River Road Roundabouts 5. Robertson Elementary School Safety Improvements 6. SummitviewAvenue Resurfacing 7. Box Culvert Installations Attached is the complete 2022 — 2027 Six-Year TIP, which describes each project. The City will continue to seek funding for the remainder of the projects included in the 2022-2027 TIP. City Council and the public are welcome to add other arterial system projects to the list. The Six- Year TIP project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the 2 Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter-modal transportation network in the State of Washington. The STI P contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element by incorporating the adopted Six-Year TI P for 2022 to 2027. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six-Year TI P and is not subject to the "once a year" change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima-area media, including to Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: No STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolutions ATTACHMENTS: Description Upload Date Type D Resolution G2/2021 Resolution D Resolution YUA CP Capital Fzoilitie; 6'212021 Resolution D TIP D212021 Exhibit 3 RESOLUTION NO. R-2021- A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the period of 2022 through 2027 for transportation improvements to arterial streets in the City of Yakima and amending the Transportation Systems Plan 2040. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040 to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of arterial streets in the City Of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on June 15, 2021, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six- Year Transportation Improvement Program for the period of 2022 through 2027 for transportation improvements to arterial streets in the City of Yakima; and, WHEREAS, adopting the Six-year Transportation Improvement Program and amending the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six-Year Construction Program for the period of 2022 through 2027, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six-Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Transportation Systems Plan 2040 along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 15th day of June, 2021. ATTEST: Patricia Byers, Mayor Sonya Clear Tee, City Clerk 4 RESOLUTION NO. R-2021- A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2022 through 2027. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- Year Transportation Improvement Plan for the period of 2022 to 2027 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP on June 15, 2021 with the proper public notice as required by RCW 35.77.010; and WHEREAS, the City Council of the City of Yakima, after reviewing the information and holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six-year Transportation Improvement Program for the period of 2022 through 2027 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 15th day of June, 2021. ATTEST: Patricia Byers, Mayor Sonya Clear Tee, City Clerk Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniF ID _ - 3 e y Fred ee:° a'�o'," �. — a a TW tbrth 1st Street PeNalization Phase] tbrth 1st Street Mprove North 1st Street byre habilnating the pa‘errient arid larremarkings rerrovng or!Meet primp instilling bike lanes replacing and widening sidewalk enhancing street lightng installing pedestnari lightng corinlicting median islands arid instilling‘anouspedenlari arid decorative elements ern Status Phase n Phase Year[`IVY VI FederalFund Code Federal Funds State And Code State Ands Local Total Expenditure Schedule Report Date:June 02,2021 Pagel Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniFio _ = 3 e S Fred ee:° a'�o'," �. — a a Bravo Oprrparly Boulevard Phase 1 Bravo Oprrparly Blvd R3ilroad-Irwin U Street Omstnct four lane roadwaysection wrth median bike lanes arid rouridaboNs install arb gNter sidewalk Meet lighting arid storm drainage ssterri along w rth water arid awersy9erris ern Status Phase n Phase Year[`IVY VI FederalFund Code Federal Funds State And Code State Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 2 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima rmne TIP io _ = 3 e S Project e 00 YAK 800000.,1 0000E21 28 1000 CE -es Optuiche Canyon Trail Powerhoua Road to Cmiche Canyon Lane Omstnot a pathway including pedenlan bndge over C.)wiche Creek Fundng Status Phase Phase Start Year nvvv] FederalFund Code Federal Funds c Stale Funds Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 3 $ ta1 Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima rmne TIP io _ e 3 e S Projecte 10 -,u98 0ed5E21 0ed5E21 21 OP81W 0050 CE -es Fundng Status Phase Phase Start Year nvvv] Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 4 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima rmn e TIP io _ = 3 e S 03 5 00n<�e 0 ,a:440ed5a1 0ed5a1 II OPSTW 0200 CE ,es Fundng Status Phase Phase StartYear[`IVY VI Pev.l Fv de Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 5 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred eta:° a'�o'," �. — a a Pobertmn Elementary Soho&Safety Improvements ‘arious streets rious locations to))a.ous Imams n«Nimo rovements in the minnyof Pobertmn Elementary School ach as new sidewalk arid coristncting ADArarrips Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code State Funs Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 6 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred eta:° a'�o'," �. — a a TIN °mid and oveday and ADAcurb ramp replacement Does not include N 48th Avenue to N 56th Avenue Fundng Status Phase Phase StartYear[`IVY VI rev.l Fv e Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 7 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima [curly Yakima eniPio _ = 3 e S Fred eta:° a'�o'," �. — a a Box Culvert Installations Wde hstall box Hollow Road O dj de Hollow Bhda.e reduce looding issues Joint project wrth Yalorra County Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code vale Funds Local Funds Total Funds Expenditure Schedule Phase IS End 3rd 4th an 86th CN 160000 0 0 0 0 Report Date:June 02,2021 Page 8 $ ta1.wn Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S v. D ErFred eta:° a'�o'," �. — a i Omstilictriew roadway inlcuding water sewer curb prtter sidewalk sreetlighting arid storm drainage walerri Fundng Status Phase Phase StartYear nvvv] Federal Funde Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Phase IS End 3rd 4th an 86th Report Date:June 02,2021 Page 9 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima [curly Yakima rmne TIP io _ = 3 e Bravo Oprrparly Boulevard Phase 2 Bravo Oprrparly Boulevard H Sreetto Railroad Tracks Omstnct four lane roadwaysection wah median bike lanes arid rouridaboNs install arb gNter sidewalk Meet lighting arid storm drainage ssterri along w(Eh water ern Status Phase n Phase Year[`IVY VI Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 10 $ ta1 Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred eta:° a'�o'," �. — a a ‘arious streets rious locations to))a.ous Imams safery improvements in the minnyof Nob Fill Berrientiry School ach as rretu sidewalk arid coristncting ADArarrps Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds ta Fund Code State Funs Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 11 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred ee:° a'�o'," — a a IN Browne Aferwe Sidewalk Browne Aferwe Replace damaged sidewalk panels Fundng Status Phase Phase StartYear[`IVY VI FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 12 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred ee:° a'�o'," — a a IN Paulo Aferwe Sidewalk Paulo Aferwe Fair Ent-amenJail Property OmsEnct sidewalk on mut side of roadway Fundng Status Phase Phase StartYear[`IVY VI FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 13 $ ta1 Six Year Transportation Improvement Program From 2022 to 2027 Agemy Yakima [curly Yakima eniPio _ = 3 e S :° a'�o'," �.rat — a a 03 14 Project 210306d5t11 06d5t11 03 COPTw CE -es E Nob Hill Blvd.4 Fair Are VS Mprovernents Ibb Hill Blvd E Nob Hill Blvdto Fair AR prtter sidewalk street lighting arid drainage Upgrade signal including mastarm stnotires Furidng Status Phase Phase Start Yearnwn a Federal Funds r r State Fund Code ate Funds L© l Funds TelFunds S en �< Federal Pmn d Report Date:June 02,2021 Page 14 $ ta1 Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yak no Gouty Yak no eniPio _ = 3 e S Fred eta:° a'�o'," �. — a a TW Teen [Me Pesurfacrig Teen Einve Onnd arid oveday and ADAcurb ramp replacement Fundng Status se Phase StartYear nvvv] Federal Furd Code Federal Furds State m o e vale Funds Local Furds Total Funds PE 0 0 110250 0 0 Report Date:June 02,2021 Page 15 $ ta1 Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniP ID _ - 3 e y Fred eta:° a'�o'," �. — a i Powerhoua Road Multi Ua Path Powerhoua Road Constnct 10 foot paved pathwayand install a crosswalk across Powerhouse Road at Cowiche Caripri Road Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code vale Funs Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 16 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred eta:° a'�o'," �. — a a IN eethMenue Sidewalk OmsEnct sidewalk on east side of roadway Fundng Status Phase Phase StartYear nvvv] FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Pagel] $ ta1.wn Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yak no [curly Yak no enivio _ = 3 e S Fred eta:° a'�o'," �. — a Fundng Status Phase Phase Start Year nvvv] Federal Furd Code Federal Furds State And Code vale Ands Local w Total Funds Report Date:June 02,2021 Page 18 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yak ma Gouty Yak ma enirio _ = 3 e S Fred eta:° a'�o'," �. — a Ian seeet underpass Yak ma Aenue Yak ma Aenue to 18th Street Funeng Status Phase Phase Start Year nvvv] Federal Furd Code Federal Furds State And Code State Ands Local F Total Funds Phase IS End 3rd 4th an 86th Report Date:June 02,2021 Page 19 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred ee:° a'�o'," �. — a a IN 19 Street Washington foerwe to Washington Avenue Realign intersenon wider! E Washington Ave for addrtional lane replace curb gNter sidewalk arid corinlictriew signal Fundng Status Phase Phase startearnwv] FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 20 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 A ge my Yakima Gouty Yakima eniP ID _ - 3 e y Fred eta:° a'�o'," �. — a a thprove the Wa shin gto n Alen we and Long the r Road intersen on b y constw ding an curb gutter ede.,iw.street I i,hting Sm�dni.,,e an fie. lashin g sign al Status P ha se Phase Start Year[WY VI F Federal n Local c Fed State Ad Code State AdsF Total Funds P PM P CN vm nPM Report Date:June 02,2021 Page 21 $ ta1.wn Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ = 3 e S Fred eta:° a'�o'," �. — a a TIN 16th Menue to"helm Owe Peonstnot and widen 16th Afenue and"helm Lime by adding lettum lanes for all Fundng Status Phase Phase StartYear[`IVY VI v.l Fv e Fed v n v n s State Ad Code ale Ads Local s Total nds P PE 2027 PO Co Federal PM P CN 2027 siPM Expenditure Schedule Report Date:June 02,2021 Page 22 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred eta:° a'�o'," �. — a a IN FairA‘erwe Sidewalk Paulo Aferwe to Nob Hill Boulevard OmsEnct sidewalk on west side of roadway Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Phase IS End 3rd 4th an 86th Report Date:June 02,2021 Page 23 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yak no Gouty Yak no eniPio _ e 3 e S Fred eta:° a'�o'," �. — a a IN NM HD Boule ard Fundng Status Phase Phase StartYear nvvv] Federal Furd Code Federal F State And Code vale Ands Local Furds Total Funds Expend\um Schedule Report Date:June 02,2021 Page 24 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred ee:° a'�o'," �. — a a IN Walnut Steen:. River Poad PeconsEnctroadwayincludingtrolleyprovsions Fundng Status Phase Phase StartYear[`IVY VI FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 25 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred ee:° a'�o'," �. — a a IN powerhou Road Englewood Mei-we to Englewood Aferwe Fundng Status Phase Phase StartYear nvvv] FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 26 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yakima Gouty Yakima eniPio _ e 3 e S Fred ee:° a'�o'," �. — a a IN Mead Aenue Pedestnan Signal Mead Aenue Fundng Status Phase Phase StartYear[`IVY VI FederalFund Code Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 02,2021 Page 27 Tyt.f Six Year Transportation Improvement Program From 2022 to 2027 Agerty Yak no Gouty Yak no eniPio _ e 3 e S Fred ee:° a'�o'," �. — a a IN Pver Road to J Street Omstnctsdetualk on west sde of roadway Fundng Status Phase Phase StartYear nvvv] Federal Furd Code Federal F State And Code vale Ands Local Furds Total Funds Expend\um Schedule Federal Furds State Funds Local Furds Total Funds Report Date:June 02,2021 Page 28