Loading...
HomeMy WebLinkAbout08/06/2013 05A 2264 Beech Street Area Sewer Project, Final Payment, POW ContractingBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. .�°�- For Meeting of: 8/6/2013 ITEM TITLE: Final Contract Payment for POW Contracting - City Project 2264 Beech Street Area Sewer (Standard Motion V- B- Accept the project and approve the final payment) SUBMITTED BY: Debbie Cook - Director of Utilites and Engineering Brett Sheffield - Chief Engineer - 509 - 576 -6797 SUMMARY EXPLANATION: This project (City Project No.: WW2264) provided for the improvement of the sanitary sewer system by installing 2,210 linear feet of 36 -inch diameter sanitary sewer pipe, 346 linear feet of 12 -inch diameter sanitary sewer pipe, saw - cutting existing pavement, pavement repair, structure excavation, chain link fence, and other associated work. Final inspection for this project was made and the recommendation is that the project be accepted. The Council action is to accept the project and approve the final construction costs. Project Engineer: Brett Sheffield Contractor: POW Contracting Contract Award: 9/20/2012 Contract Cost: $594,709.13 Retainage Due: $25,063.22 The above total contract cost is for construction only and does not include engineering and other costs. Resolution: Ordinance: Other (Specify): Final Contract Payment Contract: Contract Term: Start Date: End Date: Item Budgeted: Amount: Funding Source /Fiscal Sewer Construction Impact: Strategic Priority: Insurance Required? No Mail to: Phone: APPROVED FOR SUBMITTAL: RECOMMENDATION: Accept the project ATTACHMENTS: Name: City Manager Description: Final City of Yakima City Engineering Division 129 N 2nd Street Yakima, WA 98901 TO. POW PROJECT TITLE City Project No Beech Street Area Sewer Project W W2264 Progress Estimate No FINAL Date July 8, 2013 I Total Item No. Description Unit Bid Quantity Unit Price Bid Contract Amount To Date Quantity % of Contract Amount Previous Quantity Previous Payments Quantity this period Amount Due Acct Def 1 SPCC Plan LS 1 $5,000.00 $ 5,000.00 1 100°% $ 5,000.00 0 $ 5,000.00 0 $ 2 Mobilization LS 1 $43,000.00 $ 43,000.00 1 100°% $ 43,000.00 1 $ 43,000.00 0 $ 3 Project Temporary Traffic Control LS 1 $5,000.00 $ 5,000.00 1 100% $ 5,000.00 0.80 $ 5,000.00 0.20 $ 4 Clearing and Grubbing LS 1 $58,500.00 $ 58 500.00 1 100% $ 58 500.00 1 $ 58 500.00 0 $ 5 Removal of Structure and Obstruction LS 1 $30,000.00 $ 30,000 00 1 100% $ 30,000.00 1 $ 30,000.00 0 $ 6 Saw -cut, per inch depth LF 275 $0.40 $ 11000 600 218°% $ 24000 600 $ 240.00 0 $ 7 Shoring or Extra Excavation Class A LS 1 $15,000.00 $ 15,000.00 1 100°% $ 15,000.00 1 $ 15,000.00 0 $ 8 Crushed Surfacing Base Course TON 350 $2800 $ 9,800.00 498.52 142°% $ 13,958.56 0 $ 13,958.56 49852 $ 9 A h l r T N 255 0 279.57 110% 17 612, 1 17 61 1 2 9 57 10 HMA CL. 112 IN, PG 64 -28 TON 135 100.00 13 500.00 175.48 130% 17 548.00 0 17 548.00 175.48 11 Manhole 48 In. Diam. Type 1 EA 2 $1,800.00 $ 3,600.00 2 100% $ 31600,00 2 $ 3,600.00 0 $ 1 nh I e 6 In. Diam Type 1 A 4 $3,000.00 $ 12 000.0 4 00 0 4 1 00.00 0 13 Manhole 70 In Diam Type 1 EA 4 $3,200.00 $ 12,800.00 4 100°% $ 12,800 00 4 $ 12,800.00 0 1 $ 14 Shoring or Extra Excavation Class B LF 2,556 $2.00 $ 5,112.00 2,225 87% $ 4,450.00 1 2,225 $ 4,450.00 0 $ 15 Select Backfill, as directed TON 300 $26.00 $ 7,800.00 675 225°% $ 17,550 00 0 $ 17,550.00 675 $ 16 36 -Inch Sanitary Sewer pipe, in place LF 2,235 $91.26 $ 203,966.10 2,235 100°% $ 203,966.10 2,235 $ 203,966.10 0 $ 17 12 -Inch Sanitary Sewer pipe, in place LF 440 $51 76 $ 22,774 40 401 91°% $ 20,755.76 401 $ 20,755.76 0 $ 18 Sewer Lift Station Decommission FA 1 $15,000.00 $ 15,000.00 8676.67 58°% $ 8,676.67 0 $ 8,676.67 8,676.67 $ 19 Existing Irrigation Well Work FA 1 $20,00000 $ 20,000.00 1329722 66% $ 13,297.22 0 $ 13,297.22 13,297.22 $ 20 Chain Link Fence, Type 3 LF 1 1,850 $1900 $ 35,150.00 1,922 104% $ 36,518.00 1,850 $ 36,518.00 72 $ 21 Temporary Fence LF 1,850 $2.00 $ 3,700.00 1,850 100% $ 3,700.00 1,850 $ 3,700.00 0 $ 22 Repair or Replacement FA 1 $25,000.00 $ 25,000.00 16,418 56 66°% $ 16,418.56 0 $ 16,418.56 16,418.56 $ 23 Liquidated Damages TBD 12 - $1,522.58 $ (18,270.96) -18,27096 100% $ (18,270.96) 0 $ (18,270.96) - 18,270.96 $ SUB TOTAL $ 562,877.50 $ 541,320.82 $ 541,320.82 $ STATE SALES TAX 8.2°% $ 46,155.96 $ 44,388.31 $ 44,388.31 $ ORIGINAL CONTRACT AMOUNT $ 609,033.46 96% $ 585,709.13 $ 585,709.13 $ CO No 1 Change Order /replace SD Line LS 1 $8,31793 $ 8,31793 1 100% $ 8,317.93 0 $ 8,317.93 1 $ NEW SUB TOTAL $ 571,195.43 $ 549,638.75 $ 549,638.75 $ - STATE SALES TAX 8 2% $ 46,838.03 $ 45,070.38 $ 45,070.38 $ NEW CONTRACT AMOUNT WITH C/O $ 618,033.46 96% $ 594,709.13 $ 594,709.13 $ I hereby certify that the foregoing is a true and correct statement of the work performed under this Contract. CITY ENGINEER /s/ Brett Sheffield