HomeMy WebLinkAbout06/18/2013 10 2014-2019 Six-Year Transportation Improvement Plan (TIP); YUACP Capital Facilities Element Amendment�TM 4 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No.� For Meeting of: 6/18/2013 ITEM TITLE: Public Hearing and resolutions to consider: A) Adoption of the Six -year Transportation Improvement Program (TIP) for the years 2014 to 2019, and to amend the Metropolitan Transportation Plan, and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. SUBMITTED BY: Debbie Cook, PE, Director of Utilities and Engineering SUMMARY EXPLANATION: Attached is the 2014 — 2019 Six -year TIP, along with an explanation sheet that describes the information contained on the various columns of the Six -year TIP. One project has been added to the six -year TIP. The project is: #44 2014 Alley Paver Projects that that have been removed from the 2013 — 2018 TIP as they were completed or the funds were obligated include: #40 River Road — 6th Avenue to 16th Avenue #49 Citywide Safety Improvements Two projects were removed from the six -year TIP as a result of the June 6th Public Hearing. The two projects that have been removed are: #53 Washington Avenue Railroad Grade Separation, and #54 Mead Avenue Railroad Grade Separation Project No. 15, E. 'H' Street Extension — 1st Street to Yakima River, has been split into two projects: #15 E. 'H' Street Extension — 1 st Street to 10th Street, and #53 E. 'H' Street Extension — 10th Street to 1 -82 Project No. 16, N. 10th Street Extension —'R' Street to Lincoln Avenue, has been renamed and new limits given. It is now, Cascade Millsite Parkway —'H' Street to Lincoln Avenue. Attached also are comments received from Phil Hoge at the June 6th hearing addressing bicycle and pedestrian facilities. Two of the projects on his list have secured funding. The design of these projects address the issues he raised. The 64th Avenue Roadway Widening project is constructing 14 -foot wide shared vehicle /bike lanes (the requirements for a Type 2 Bicycle Facility) and the Lincoln Avenue Corridor Safety Improvements project will construct sidewalk on the north side of Lincoln between 20th Avenue and 23rd Avenue. The designs for the other projects contained on his submitted list, once funding is received, will also address his concerns. Council and the public are welcome to add other arterial system projects to the list. The six -year TIP project listing will be finalized at the June 18th hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six - year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. The current plan for 2014 — 2019 includes six projects that are funded. Funding for the remainder of the projects will continue to be sought. Six -vear Transportation Improvement Proaram (TIP) Backaround On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA -LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six -year transportation program. All local agencies are required to hold at least one public hearing during the development of the six -year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six -year TIP for 2014 to 2019. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year' change required under the laws of the Growth Management Act. Resolution: Other (Specify): Contract: Start Date: Item Budgeted: Funding Source /Fiscal Impact: Strategic Priority: Insurance Required? No Mail to: Phone: APPROVED FOR SUBMITTAL: RECOMMENDATION: Ordinance: Contract Term: End Date: Amount: Fund 142 Improve the Built Environment City Manager 1. Hold the Public Hearing to consider adoption of Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2. Adopt the Six -Year TIP and amend the Metropolitan Transportation Plan and Yakima Urban Area Comprehensive Plan Capital Facilities Element. ATTACHMENTS: Name: Description: �� df TIP Explanation Pages F-I 2014 TO 2019.gdf 2014-2019 STIP 0 Phil Hage Comments.pdf Phil Hoge comments RESOLUTION NO. R — 2013 - A RESOLUTION adopting the Six -Year Transportation Improvement Program for the period of 2014 through 2019 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at the regular meeting of the Yakima City Council on June 4, 2013 and June 18, 2013, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2014 through 2019 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2014 through 2019, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 18th day of June, 2013. Micah D. Cawley, Mayor ATTEST: City Clerk RESOLUTION NO. R — 2013 - A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six -year Transportation Improvement Program (TIP) for the period of 2014 through 2019. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year Transportation Improvement Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six -year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six -year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six -year Transportation Improvement Plan for the period of 2014 to 2019 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, public hearings were held by the Yakima City Council on the Six -year TIP on June 4, 2013 and June 18, 2013, with proper public notice as required by RCW 35.77.010; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six -Year Transportation Improvement Program for the period of 2014 through 2019 for the City of Yakima shall be incorporated as an amendment to the Capital facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 18th day of June, 2013. Micah D. Cawley, Mayor ATTEST: City Clerk 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or - Major Collector RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 pop) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access Urban (Over 5000 pop) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial 17- Collector 19- Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. 01- New construction on new alignment 02- Relocation Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06- Other Enhancements Description 07 - Resurfacing 14 - Bridge Program - Special 08 - New Bridge Construction 21 - Transit Capital Project 09- Bridge Replacement 22- Transit Operational 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety /Traffic Operation /TSM 13 - Environmentally Related 25 23 - Transit Planning 24 - Transit Training /Admin. 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C -Cable TV G -Gas O -Other P -Power S - Sewer (other than agency- owned) T -Telephone W - Water 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month /day/year in MM /DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. BIA - Bureau of Indian Affairs BR - Bridge Replacement or Rehab. CDBG - Community Development 5309(FG) Block Grant (HUD) CMAQ - Congestion Mitigation Air Quality DEMO - ISTEA Demo Project (Selected) Discretionary - Ferry Boat Discretionary, Public REV Lands Highways, or Scenic Byways DOD - Dept. of Defense IC - Interstate Construction IM - Interstate Maintenance NHS - National Highway System 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 FTA Discretionary for Capital Expenditures 5307 - FTA Urban Areas 5309(Bus)- Bus 5309(FG) - Fixed Guideways 5309(NS) - New Starts 5310 - FTA Elderly /Disabled 5311 - FTA Rural Areas REV - Rural Economic Vitality Program STP(C) - STP Statewide Competitive Program STP(E) - STP Transportation Enhancements STP(S) - STP Safety Including Hazard and RR STP(R) - STP Rural Regionally Selected STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 CAPP - County Arterial Preservation Program CHAP - City Hardship Assistance Program TPP - Transportation Partnershis Program AIP - Arterial Improvement Program PSMP - Pedestrian Safety & Mobility Program PTST - Public Transportation Systems Progra PWTF - Public Works Trust RAP - Rural Arterial Program SCP - Small City Program WSDOT - WSDOT funding OTHER - All other unidentified state funding 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP Too" program.) 16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded proiects but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required" for Federally funded proiects only.) 27 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Expenditure Schedule Fund Source Information Qn Project Identification (Local Agency) Projects Only 1 Y Federal Funding R /N/ U E A. PIN /Federal Aid No. B. Bridge No. 0 c t (a c z C. Project Title °J E c o a Phase State State Local Total Envir. Required Federal U D. Street /Road Name or Number > V o u � -1 v Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date C O E. Beginning MP or Road - Ending MP or Road �, a a +r _ o Code LL a F. Describe Work to Be Done E H N a Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 Yakima Railroad Grade Separations - Phase 4 01 P 0.2 T CN 10/1/2014 STP(U) 562 88 650 650 EA Yes Martin Luther King, Jr. Boulevard 06 P from: N. 1st Street to: N. 1st Avenue 07 G 9/1/2009 Install art as project aesthetics for therailroad grade 08 O separations. Totals 562 0 88 650 650 0 16 2 64th Avenue Roadway Widening 04 S 0.5 W CN 1/1/2014 STP(U) 749 176 925 925 CE Yes 64th Avenue 06 G from: Nob Hill Boulevard to: Tieton Drive 03 P 7/31/2013 T Widen roadway, install curb, gutter, sidewalk, lighting C and drainage. O Totals 749 176 925 925 14 3 North 1st Street Revitalization S 0.42 P CN 1/1/2015 STP(U) 2,663 416 3,079 3,079 CE No North 1st Street T from: 'N' Street to: SR 12 O C Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. Totals 2,663 416 3,079 3,079 14 4 E. Nab Hill Blvd. & Fair Ave. 1/S Improvements 03 S N/A P RW 1/1/2015 STP(U) 187 29 216 216 CE Yes Nob Hill Boulevard 04 T CN 6/1/2016 STP(U) 1,457 227 1,684 1,684 from: E. Nob Hill Blvd. to: Fair Ave. 31 W 1/1/2015 C Widen Nob Hill Boulevard through the intersection, O construct left -turn lane, curb, gutter, sidewalk, street lighting and drainage. Upgrade signal by installing mast arm structures. Totals 1,644 256 1,900 216 1,684 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, oa r_ 'o G a Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number o V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a �+ EL �= a, o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date LL a F. Describe Work to Be Done E H N H — a- I Phase (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 5 E. Lincoln Avenue & 10th Street Roundabout 03 P N/A P PE 1/1/2015 STP(U) 173 27 200 200 CE Yes Martin Luther King, Jr. Boulevard 05 RW 1/1/2016 STP(U) 433 67 500 500 from: E. Lincoln Ave. to: N. 10th Street 06 CN 1/1/2017 STP(U) 1,125 175 1,300 1,300 10/31/2015 Construct a roundabout at the intersection of Lincoln Avenue, 10th Street and MLK, Jr. Boulevard. Install curb, gutter, sidewalk, street lighting and drainage. Totals 1,731 269 2,000 200 500 1,300 12 6 SR 12 & 16th Avenue Interchange 03 P N/A O PE STP(U) 86 14 100 100 CE No Westbound ramps of SR 12 06 CN 11/1/20161 1/1/2017 STP(U) 779 1 1 121 900 1 900 from: 16th Avneue to: SR 12 Construct a roundabout where the westbound ramps intersect with N. 16th Avenue. Totals 865 135 1000 100 900 11 7 1 -82 & Lincoln Avenue Interchange 01 P N/A O PE 1/1/2016 STP(U) 260 40 300 300 CE Yes Lincoln Avenue P RW 1/1/2017 STP(U) 173 27 200 200 from: E. V Street to: 1 -82 G CN 6/1/2018 STP(U) 1,730 270 2,000 2,000 1/1/2017 Reconstruct /extend off -ramp from existing 1 -82 off - ramp for Lincoln Avenue to E. V Street. Totals 2,163 337 2,500 0 0 300 2,200 14 8 E. Yakima Ave. & Fair Ave. Signalization 12 P N/A P PE STP(U) 86 14 100 100 CE No Yakima Avenue T CN 11/1/20161 6/1/2017 STP(U) 519 1 1 81 600 1 1 600 from: E. Yakima Ave. to: Fair Ave. W Install traffic signal at the intersection of Yakima S Avenue and Fair Avenue. O Totals 605 95 700 100 600 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a- F. Describe Work to Be Done � ,,, o � +r :3 a- I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 9 S. 3rd Avenue & W. Washington Ave. Signal 12 P N/A P PE 4/1/2016 20 20 20 CE No S. 3rd Avenue T CN 9/1/2016 210 210 210 from: S. 3rd Ave. to: W. Washington Ave. Upgrade the traffic signalization system Totals 230 230 230 14 10 S. 1st St. & E. Washington Ave. 1/S Improvements 03 P N/A P PE 1/1/2015 STP(U) 260 40 300 300 CE Yes South 1st Street 06 W RW 1/1/2016 STP(U) 260 40 300 300 from: S. 1st Street to: E. Washington Ave. S CN 1/1/2017 STP(U) 1,211 189 1,400 1,400 1/1/2016 Realign intersection, widen E. Washington Avenue to T accommodate an additional lane, replace curb, gutter O and sidewalk, and install a new traffic signalization system. Totals 1,731 269 2,000 300 300 1,400 17 11 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2015 STP(U) 223 35 258 258 CE Yes South 48th Avenue 05 T RW 1/1/2016 STP(U) 519 81 600 600 from: Summitview Ave. to: Nob Hill Blvd. W CN 1/1/2017 STP(U) 1,485 232 1,717 1,717 1/1/2016 Reconstruct and widen roadway to three lanes, install S curb, gutter, sidewalk, street lighting and drainage O system. Totals 2,227 348 2,575 258 600 1,717 14 12 S. 72nd Ave. & Mead Ave. 1/S Signalization 12 P N/A P PE SRTS 25 5 30 30 CE No S. 72nd Avenue T CN 11/1/20151 6/1/2015 SRTS 258 1 25 283 283 from: S. 72nd Ave. to: Mead Ave. W S Install traffic signal system. O Totals 283 30 313 313 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n r- -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a- F. Describe Work to Be Done � ,,, o � +r :3 a- I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 13 Zier Road Improvements 06 P 0.15 P PE 1/1/2015 SRTS 25 5 30 30 CE No Zier Road T CN 6/1/2015 SRTS 236 25 261 261 from: 75th Ave. to: 72nd Ave. C Install curb, gutter and sidewalk on the south side of S Zier Road. Totals 261 30 291 291 16 14 Tieton Dr. & S. 5th Ave. 1/S Improvements 12 P N/A P PE 1/1/2016 STP(U) 69 11 80 80 CE Yes Tieton Drive W RW 1/1/2017 STP(U) 104 16 120 120 from: Tieton Dr. to: S. 5th Ave. S CN 6/1/2018 STP(U) 865 135 1,000 1,000 1/1/2017 Remove existing traffic signal and construct a T roundabout, remove and replace curb, gutter, O sidewalk, street lighting and drainage Totals 1,038 162 1,200 80 1,120 16 15 E. 'H'StreetExtension, Ph. 1 01 P 0.55 P PE 1/1/2015 STP(U) 432 68 500 500 CE Yes E. 'H' Street 08 T RW 6/1/2016 STP(U) 432 68 500 500 from: 1st Street to: 10th Street W CN 1/1/2017 STP(U) 2,162 338 2,500 2,500 6/1/2016 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 3,026 474 3,500 500 500 2,500 17 16 Cascade Millsite Parkway 01 P 0.65 P PE 1/1/2015 STP(U) 350 54 404 404 CE Yes Fair Avenue 06 T RW 6/1/2016 STP(U) 2,750 425 3,175 3,175 from: 'H' Street to: Lincoln Ave. W CN 1/1/2018 STP(U) 3,950 486 4,436 4,436 12/1/2015 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 7,050 965 8,015 404 3,175 4,436 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U_ a- F. Describe Work to Be Done � ,,, o � +r :3 a- I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 17 Yakima Downtown Future Initiatives, Phase 5 06 P 0.15 P PE 1/1/2015 OTHER 500 500 500 CE No 12 T CN 4/1/2016 OTHER 5,500 5,500 5,500 from: 1st Street to: 9th Street C Install historic lighting, sidewalk modifications and S other improvements. Exact improvement area(s) to be determined Totals 6,000 500 5,500 17 18 75th Avenue Improvements 01 P 0.50 P PE 1/1/2017 STP(U) 87 13 100 100 CE No 75th Avenue 08 W RW 1/1/2018 STP(U) 173 27 200 200 from: Mead Ave. to: Nab Hill Blvd. S CN 1/1/2019 STP(U) 11038 162 1,200 1,200 T Construct a new two -lane roadway and widen O portions of existing roadway, install curb, gutter, sidewalk, street lighting and storm drainage system. Totals 1,500 1,500 14 19 Washington Ave. & Longfiber Rd. Intersection 03 P N/A C PE 1/1/2015 STP(U) 100 14 114 114 CE Yes Washington Avenue 05 T RW 1/1/2016 STP(U) 100 14 114 114 from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2018 STP(U) 700 95 795 795 1/1/2016 Improve the Washington Avenue and Longfiber Road S intersection by constructing an eastboung left -turn O lane on Washington and a northbound left -turn lane on Longfiber, install or replace curb, gutter, sidewalk, street lighting, storm drainage and safety flashing signal Totals 900 123 1,023 114 114 795 14 20 E. Nab Hill Blvd. & S. 18th Street 1/S Improvements 01 P 0.10 C PE 1/1/2015 STP(U) 50 8 58 58 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2016 STP(U) 50 8 58 58 from: E. Nob Hill Blvd. to: S. 18th Street W CN 1/1/2017 STP(U) 346 54 400 400 1/1/2016 Widen south leg for double left turn from westbound S Nob Hill, install curb, gutter, sidewalk, upgrade traffic signal system Totals 446 70 516 58 58 400 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n r- -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a- F. Describe Work to Be Done � ,,, o � +r :3 a- I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 21 Powerhouse Rd. & Englewood Ave. 1/S 12 P N/A P PE 1/1/2016 STP(S) 43 7 50 50 CE Yes Powerhouse Rd. T RW 1/1/2017 STP(S) 87 13 100 100 from: Powerhouse Rd. to: Englewood Ave. C CN 1/1/2018 STP(S) 504 74 578 578 1/1/2017 Realign intersection, install curb, gutter, sidewalk and S safety flashing signal. Possibly construct a O roundabout. W Totals 634 94 728 0 50 678 14 22 S. 48th Ave. & Summitview Ave. Signalization 12 P N/A P PE 1/1/2016 STP(S) 25 4 29 29 CE Yes Summitview Avenue T RW 6/1/2016 STP(S) 25 4 29 29 from: Summitview Ave. to: S. 48th Ave. CN 1/1/2017 STP(S) 554 81 635 635 6/1/2016 Install traffic signal at the intersection of Summitview Avenue and 48th Avenue. Totals 604 89 693 58 635 14 23 W. Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2015 STP(E) 424 67 491 491 CE Yes W. Lincoln Avenue 12 T RW 1/1/2016 STP(E) 1,047 163 1,210 1,210 from: W. 5th Ave. to: Custer St. W CN 1/1/2017 STP(E) 1,801 281 2,082 2,082 1/1/2016 S O Realign W. Lincoln Avenue, install curb, gutter, P sidewalks, street lighting, drainage. G Totals 3,272 511 3,783 491 1,210 2,082 14 24 E. Nab Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2015 STP(C) 546 84 630 630 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2016 STP(C) 1,090 170 1,260 1,260 from: S. 6th Street to: S. 18th Street 06 W CN 1/1/2017 STP(C) 6,539 1,013 7,552 7,552 1/1/2016 S Reconstruct and widen roadway to 5 lanes with O intersection improvements, curb, gutter, sidewalk, P street lighting and drainage system G Totals 8,175 1,267 9,442 630 1,260 7,552 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n r- -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a- F. Describe Work to Be Done � ,,, o � +r :3 a- I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 25 S. 72nd Ave. & W. Washington Ave. 1/S 12 P N/A P PE 1/1/2015 STP(C) 91 14 105 105 CE Yes S. 72nd Avenue 06 T RW 1/1/2016 STP(C) 91 14 105 105 from: s. 72nd Ave. to: W. Washington Ave. O CN 1/1/2017 STP(C) 544 86 630 630 1/1/2016 Improve intersection by installing a traffic signal S system or roundabout. W Totals 726 114 840 105 105 630 17 26 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2015 STP(E) 86 14 100 100 CE Yes 66th Avenue 04 T RW 1/1/2016 STP(E) 173 27 200 200 from: Summitview Ave. to: Scenic Dr. W CN 1/1/2017 STP(E) 1,096 164 1,260 1,260 1/1/2016 Reconstruct and widen roadway to three lanes, install S curb, gutter, sidewalk, storm drainage system and O utilities. Totals 1,355 205 1,560 100 200 1,260 14 27 N. 40th Ave. & Summitview Ave. Intersection 12 P N/A P PE 1/1/2015 STP(U) 126 17 143 143 CE Yes N. 40th Avenue T RW 1/1/2016 STP(U) 130 20 150 150 from: N. 40th Ave. to: Summitview Dr. W CN 1/1/2017 STP(U) 692 108 800 800 1/1/2016 Improve the intersection by constructing larger S corner radii, lengthening the turn lanes, and O upgrading the traffic signal system. Totals 948 145 1,093 143 150 800 14 28 N. 40th Ave. & Englewood Ave. Intersection 12 P N/A P PE 1/1/2016 STP(U) 43 7 50 50 CE No N. 40th Avenue T CN 6/1/2016 STP(U) 260 40 300 300 from: N. 40th Ave. to: Englewood Replace traffic signal poles and upgrade controller. Totals 303 47 350 350 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n r- -o ° Phase State State Local Total Envir. Required Federal D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date U- a- F. Describe Work to Be Done � ,,, o � +r :3 a- I Phase (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 N. 16th Avenue & Fruitvale Blvd. 1/S 12 P N/A P PE 1/1/2015 STP(U) 126 18 144 144 CE Yes N. 16th Avenue T RW 1/1/2016 STP(U) 173 27 200 200 from: N. 16th Ave. to: Fruitvale Blvd. O CN 1/1/2017 STP(U) 400 62 462 462 1/1/2016 Improve the intersection by constructing larger curb S radii, installing ADA ramps, and upgrading the traffic W signal system. Totals 699 107 806 144 200 462 14 30 N. 1st Street& '1'StreetSignal Upgrade 12 P N/A P PE 1/1/2016 STP(U) 32 5 37 37 CE No N. 1st Street T CN 6/1/2016 STP(U) 126 17 143 143 from: N. 1st Street to: '1' Street W S Replace and upgrade traffic signal system O Totals 158 22 180 180 17 31 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2015 STP(C) 109 27 136 136 CE No Rudkin Road 06 T CN 1/1/2016 STP(C) 945 TPP 945 106 1,996 1,996 from: E. Viola Ave. to: Rainier PI. W S Reconstruct roadway, install curb, gutter, sidewalk and storm drainage. Partner with Union Gap to install additional sewer force main. Totals 1,054 133 2,132 136 1,996 0 16 32 E. Mead Avenue Reconstruction 03 P 0.76 P PE 1/1/2016 STP(S) 122 TPP 23 7 152 152 CE No E. Mead Avenue 06 T CN 1/1/2017 STP(S) 1,730 TPP 206 70 2,006 2,006 from: Rudkin Rd. to: Fair Ave. S Partner with Union Gap to reconstruct E. Mead C Avenue, install curb, gutter, sidewalk and storm G drainage system. O Totals 1,852 229 77 2,158 152 2,006 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �o r- -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U- a- F. Describe Work to Be Done � 'n o � +r :3 a- I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 33 S. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2017 AIP 131 20 151 151 CE Yes S. 80th Avenue T RW 1/1/2018 AIP 382 59 441 441 from: Tieton Drive to: Zier Road O CN 1/1/2019 AIP 1,667 260 1,927 1,927 1/1/2018 S Widen roadway to three lanes, install curb, gutter, W sidewalk, street lighting and storm drainage system. C Totals 2,180 339 2,519 2,519 17 34 Englewood Avenue Improvements 05 P 1.00 P PE 1/1/2017 STP(C) 272 43 315 315 CE Yes Englewood Avenue 06 T RW 1/1/2018 STP(C) 349 55 404 404 from: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2019 STP(C) 21352 340 2,692 2,692 1/1/2018 S Widen roadway to three lanes, install curb, gutter, O sidewalk, street lighting and storm drainage system. C Totals 2,973 438 3,411 3,411 17 35 Englewood Avenue Improvements 05 P 0.50 P PE 1/1/2017 STP(U) 136 21 157 157 CE Yes Englewood Avenue 06 T RW 1/1/2018 STP(U) 173 27 200 200 from: N. 16th Ave. to: N. 24th Ave. W CN 1/1/2019 STP(U) 1,164 182 1,346 1,346 1/1/2018 S Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. Totals 1,473 230 1,703 1,703 14 36 Nab Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2017 STP(S) 55 8 63 63 CE Yes Nob Hill Boulevard T RW 1/1/2018 STP(S) 107 19 126 126 from: S. 16th Ave. to: S. 6th Street S CN 1/1/2019 STP(S) 321 57 378 378 1/1/2018 Construct sidewalk in locations where it doesn't exist W on the south side of Nob Hill Totals 483 84 567 567 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W z C. Project Title �, a, �n r_ -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U_ a- F. Describe Work to Be Done � 'n o � +r :3 a- I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 37 N. 34th Ave. & Fruitvale Blvd. 1/S Improvements 12 P N/A P PE 1/1/2016 STP(U) 63 5 68 68 CE Yes Fruitvale Boulevard T RW 1/1/2017 STP(U) 87 13 100 100 from: Fruitvale Blvd. to: N. 34th Ave. O CN 1/1/2018 STP(U) 567 76 643 643 1/1/2017 S Improve intersection by installing a traffic signal W system, curb, gutter and sidewalk. Widen leg south of Fruitvale to inlcude a left -turn lane Totals 717 94 811 68 743 17 38 Englewood Avenue Improvements 03 P 1.00 P PE 1/1/2017 STP(U) 218 34 252 252 CE Yes Englewood Avenue 05 T RW 1/1/2018 STP(U) 327 51 378 378 from: N. 24th Ave. to: N. 40th Ave. 06 W CN 1/1/2019 STP(U) 2,980 244 3,224 3,224 1/1/2018 S Reconstruct and widen roadway, install curb, gutter, O sidewalk, street lighting and storm drainage system. Totals 3,525 329 3,854 31854 14 39 North /South Connector to West Valley 01 P 6.00 P PE 1/1/2016 STP(U) 432 68 500 500 CE Yes Unknown Road 04 T from: Ahtanum Rd. to: Summitview Ext. 06 W S Corridor study to determine the best location for a C north /south limited access route in West Valley. City G and County joint project. O Totals 432 68 500 500 14 40 18th Street Underpass 12 P N/A P PE 1/1/2016 BRAC 240 60 300 300 CE No Yakima Avenue T CN 1/1/2017 BRAC 2,288 572 2,860 2,860 from: Yakima Ave. to: 18th Street O Replace the bridge on E. Yakima Avenue that crosses S over 18th Street. W Totals 2,528 632 3,160 300 2,860 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W E z C. Project Title �, a, �n r_ -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U_ a- F. Describe Work to Be Done � 'n o � +r :3 a- I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 41 88th Avenue Improvements 06 P 0.48 P PE 1/1/2016 STP(U) 50 0 50 50 CE Yes 88th Avenue 12 T RW 1/1/2017 STP(U) 60 0 60 60 from: Tieton Dr. to: Summitview Ave. C CN 6/1/2017 STP(U) 355 10 365 365 1/1/2017 G Construct curb, gutter, sidewalk and storm drainage system on the east side of 88th Avenue. Totals 465 10 475 50 425 16 42 64th Avenue Improvements 03 P 1.00 P PE 1/1/2016 STP(U) 200 32 232 200 CE No 64th Avenue 04 T CN 1/1/2017 STP(U) 1,600 249 1,849 1,849 from: Washington Ave. to: Nob Hill Blvd. 06 W C Widen roadway to three lanes, install curb, gutter, G sidewalk, street lighting and storm drainage system. O Totals 1,800 281 2,081 200 1,849 14 43 North 1st Street Revitalization 06 P 0.50 P PE 1/1/2017 STP(U) 605 95 700 700 CE No N. 1st Street 12 T CN 1/1/2018 STP(U) 5,165 806 5,971 5,971 from: M LK Blvd. to: 'N' Street G C Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. Totals 5,770 901 6,671 6,671 00 44 2014 Alley Paver 07 S 3.5 P PE 1/1/2014 CMAQ 35 5 40 40 CE No Alleys between Folsom Ave. and Fruitvale Blvd. T CN 6/1/2014 CMAQ 353 57 410 410 from: 16th Avenue to: 6th Avenue C Improve the air quality throughout this section of the O City by paving gravel alleys. Totals 388 62 450 450 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W E z C. Project Title �, a, �n � -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U_ a- F. Describe Work to Be Done � 'n o � +r :3 a- I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 45 Tieton Dr. & 64th Ave. 1/S Improvements 13 P N/A P PE 1/1/2015 STP(U) 87 13 100 100 CE Yes Tieton Drive 05 T RW 1/1/2016 STP(U) 260 40 300 300 from: Tieton Dr. to: 64th Ave. 12 O CN 1/1/2017 STP(U) 692 108 800 800 1/1/2016 S Improve intersection by constructing a left -turn lane W on Tieton Drive, installing a traffic signal system, curb, C gutter, sidewalk and street lighting. G Totals 1,039 161 1,200 100 300 800 16 46 S. 80th Avenue Bridge 01 P 0.25 P PE 1/1/2015 STP(U) 44 6 50 50 CE No S. 80th Avenue T CN 1/1/2016 STP(U) 433 67 500 500 from: Wide Hollow Rd. to: Plath O Replace existing two lane bridge over Wide Hollow Creek with three lane bridge. Joint project with the County. Totals 477 73 550 50 500 14 47 1st /Main & Nob Hill Corridor Safety Improvements 07 S N/A P CN 1/1/2014 HSIP 350 0 350 350 CE Nob Hill Boulevard /1st Street T from: 64th Ave /SR12 to: I- 82 /C /L O Make various, relatively inexpensive fixes to improve safety. Improvements inclulde items, such as: larger signal lenses, larger street signs, improved lighting, etc. Also included in this project are elements of education and enforcement. Totals 350 0 350 350 14 48 Lincoln Avenue Corridor Safety Improvements 07 S N/A P CN 4/1/2014 HSIP 300 0 300 300 CE Lincoln Avenue T from: N. 32nd Ave. to: N. 5th Ave. O Improve safety by installing larger signal lenses, installing ADA compliant ramps, repairing damaged sidewalk, installing new sidewalk, installing overhead school flashers, etc. Totals 0 300 300 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification Expenditure Schedule projects Only Fund Source Information ci E A. PIN /Federal Aid No. B. Bridge No. a cu o (Local Agency) Federal Funding R/W Fa z C. Project Title E a, U r- 'o G a Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number o V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a �+ EL �= a, o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL a F. Describe Work to Be Done E H N H — 1 :3 a- I Phase 6th (M M /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 49 16th Avenue Corridor Improvement 04 P 3.50 P PE 1/1/2016 STP(U) 120 17 137 137 16th Avenue T from: SR 12 to: Washington Ave. W C G Study to determine strategies for improving the 16th O Avenue corridor S Totals 120 17 137 137 14 50 40th Avenue Corridor Improvements 04 P 3.20 P PE 1/1/2016 STP(U) 120 17 137 137 40th Avenue T from: SR 12 to: Washington Ave. W C G Study to determine strategies for improving the 40th O Avenue corridor. S Totals 17 137 137 14 51 Nab Hill Boulevard Corridor Improvements 03 P 2.70 P PE 1/1/2016 STP(U) 120 17 137 137 Nob Hill Boulevard 04 T from: 1 -82 to: 16th Ave. O S W Study to determine strategies for improving the Nob C Hill Boulevard corridor. G Totals 120 17 137 137 14 52 S. 1st Street /Main Street Corridor Improvements 01 P 2.00 P PE 1/1/2015 STP(U) 120 17 137 137 S. 1st Street /Main Street T from: Nob Hill Blvd. to: Barker Mill Bridge O S Joint project with Union Gap. Stucy to determine W strategies for improving the 1st Street /Main Street C corridor. G Totals 120 17 137 137 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: 6/4/13 & 6/18/13 From 2014 to 2019 Adoption Date: Resolution No.: 6/18/2013 Project Costs in Thousands of Dollars Federally Funded Qn Project Identification 1 Expenditure Schedule Projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. EA a, cu (Local Agency) Federal Funding R/W -Fa z C. Project Title �, a, �n r- -o ° Phase State State Local Total Envir. Required Federal 4th D. Street /Road Name or Number > V u Start Federal Fund o E. Beginning MP or Road - Ending MP or Road a a +o o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date U- a- F. Describe Work to Be Done � 'n o � +r :3 a- I Phase 6th (MM /YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 53 E. 'H'StreetExtension, Ph. 2 01 P 0.55 P PE 1/1/2016 STP(U) 432 68 500 500 CE Yes E. 'H' Street 08 T RW 1/1/2018 STP(U) 432 68 500 500 from: 10th Street to: 1 -82 W CN 1/1/2019 STP(U) 2,162 338 2,500 2,500 1/1/2018 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage system. 474 3,500 500 3,000 O 'IT Phil Hoge 1512 Folsom Ave. Yakima, WA 98902 '13 JUN -6 AS :19 I. " , -; 1 1 June4,2013 'Y'i , t indicated in bold underlinel I ON 6 M ,11-n Mr, which was adopted by the council in 2006, 1 am interested to see that the comprehensive plan is implemented and does not simply take up space on the shelf. 11, N 11 transportation facilities., Priority Project Identification Comment Number 2 64'h Avenue Roadway Widening The city's comprehensive plan: From Nob Hill Blvd to Tieton Dr * Designates this road as a Type 2 Bicycle Facility (Map VI- 2). It should be designed accordingly. * Adopted by reference the Greenway Master Plan gpdate , which identifies a regional north 1995 -south pathway connecting to the Cowiche Canyon A endix It a e 7 A pathway along this road should be included, as indicated in the West Valley Neighborhood Plan (Map 9). 11 481' Avenue The city's comprehensive plan designates this road, between From Surn mitview Ave. to Nab Tieton Drive and Nob Hill Blvd, as a Type 2 Bicycle Facility Hill Blvd. (Map VI-2). It should be designed accordingly. 13 tier Road Design should consider that the West Valley Neighborhood From 75th Ave to 72nd Ave. Plan designates a Type 1 Bicycle facility on Zier Road west of this segment, recognizing the schools in the area and medium density land use designation on adjacent land. 15 &55 H Street Include pathway as contemplated by Map VI -2 of the city's From V Street to 10'h Street, & comprehensive plan. This pathway is envisioned as an fMM le _Street to 1-82 extension to connect the Powerhouse Canal Pathway and William 0. Douglas Pathway to Terrace Heights and the Greenway Pathway. mmum -Pi ;Q 4e- MMIM