BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 4.1.
For Meeting of:April 6, 2021
ITEM TITLE: Resolution authorizing a contract with Industrial Construction of
Washington, LLC. for Project No. WF2526 Industrial Waste
Reactor Hot Water Line Replacement at the City of Yakima
Wastewater Treatment Plant
SUBMITTED BY: Scott Schafer, Director of Public Works
David Brown,Assistant Director of Public Works
Mike Price, Wastewater/Stormwater Division Manager, 249-6815
SUMMARY EXPLANATION:
City of Yakima (City) Project No. WF2526 replaces 1 ,000 linear feet of industrial waste reactor
hot water supply and return piping at the wastewater treatment plant. Corrosion of the reactor's
existing ductile iron hot water pipes is causing the pipes to develop leaks. The replacement
pipes will be composed of plastic to minimize future corrosion issues.
The contract with Industrial Construction of Washington, LLC will not exceed Two Hundred
Ninety-Three Thousand Six Hundred and Five Dollars ($293,605) and is attached for City
Council review. The project is funded by the Wastewater Capital Fund 478.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution.
ATTACHMENTS:
Description Upload Date Type
L resolution-111V Not Water Lire 3/1 /2021 resolution
ntrant 3/16/2021 ntrant
2
RESOLUTION NO. R-2021-
A RESOLUTION authorizing a contract with Industrial Construction of Washington, LLC. for
Project No. WF2526 Industrial Waste Reactor Hot Water Line
Replacement at the City of Yakima Wastewater Treatment Plant
WHEREAS, the City of Yakima owns, operates, and maintains the Yakima Wastewater
Treatment Plant in accordance with applicable Federal, State and Local regulations; and
WHEREAS, the industrial wastewater from fruit processing customers is treated in a
biological industrial waste reactor which requires hot water heating to maintain an effective
treatment temperature; and
WHEREAS, corrosion has caused leaks in the existing industrial waste reactor hot water
supply and return lines that jeopardize the reliable heating of the reactor; and
WHEREAS, under City Contract No. 2020-100, the City entered into an agreement with
Gray and Osborne, Inc. to prepare the plans and contract documents for the replacement of the
industrial waste reactor hot water supply and hot water return lines; and
WHEREAS, the City of Yakima Wastewater Division requires construction services for
the hot water lines replacement; and
WHEREAS, the City used the procedure established by the State of Washington for
competitively bidding projects; and
WHEREAS, Industrial Construction of Washington, LLC. submitted the lowest bid and
has the ability to perform the contract specified work; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with Industrial Construction of Washington, LLC. to perform
the work detailed in the contract documents for the replacement of the Industrial Waste reactor
hot water lines; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a contract between the City of Yakima
and Industrial Construction of Washington, LLC., attached hereto and incorporated herein by
this reference not to exceed Two Hundred Ninety-Three Thousand Six Hundred and Five
Dollars ($293,605) for the replacement of the industrial waste hot water lines at the Yakima
Wastewater Treatment Plant
ADOPTED BY THE CITY COUNCIL this 6th day of April, 2021.
Patricia Byers, Mayor
ATTEST:
Sonya Clear Tee, City Clerk
o
CONTRACT
THIS AGREEMENT, made and entered into in triplicate, this day of 2021, by and between the City of
Yakima,hereinafter called the Owner, and Industrial Construction of Washington, LLC e Washington Corporation,
hereinafter called the Contractor.
VVITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made o part m[this agreement,the parties
hereto covenant and agree amfollows:
|. The Contractor shall do all work and furnish all tools,materials,labor and equipment for THE BID AMOUNT OF:
$ 2S3 �O4 �S' � ,for PJV Hot Water Pipe Replacement Project,City Project No.WF2526,all in accordance with,and as
described in the attached plans and specifications and the 2020 Standard Specifications for Road,Bridge,and Municipal
Construction which are by this reference incorporated herein and made a port harenf,and mhuU perform any alterations in or
additions to the work provided under this contract and every part thereof.
Work shall start within ten (10) days after the Notice to Proceed and shall be substantially completed in Eighty(80)working
days and physically completed in Ninety(90) working days. If work has not commenced within the ten (10) days after the
notice to proceed,the first chargeable working day shall be the eleventh (11th)working day after the date on which the City
issues the Notice toProceed.
If said work is not completed within the time specified,the Contractor agrees to payto the Ownerthe sum specified in
Section 1-08.9 of the WSDOT Standard Specifications for each and every day said work remains uncompleted after
expiration of the specified time,as liquidated damages.
The Contractors shall provide and bear the expense of all equipment;work and labor of any soft whatsoever that may be
required for the transfer of materials and for constructing and completing the work provided for in this contract and every part
thereof,except such as are mentioned in the specifications to be furnished by the City of Yakima.
|i The City of Yakima hereby promises and agrees with the Contractor to employ,and does employ the Contractor to
provide the materials and to do and cause to be done the above described work and to complete and finish the same according
to the attached plans and specifications and the hennx and conditions herein contained and hereby contracts b pay for the same
according bothe o#ouhad specifications and the schedule ufunit or itemized phoao hereto attached,at the time and in the
manner and upon the conditions provided for in this contract.
|||. INDEMNIFICATION. The Contractor shall defend,indemnify,and hold harmless the City,its officers,elected
officia|o,employees and agents from and against any and all doimu,uuuoaa of action,damages,|000ao,and expenses of any
kind or nature whatsoever,including but not limited to,attorney's fees and court costs,arising out of,relating to,or resulting from
The Contractor's performance or non-performance of the services,duties and obligations required of it under this Agreement.
|V. The Contractor for himself,and for his hoim,oxaoubom,udministmtos,uummmoom,and ooxigna,does hereby
agree to the full performance of all the covenants herein contained upon the part of the Contractor.
V. It ia further provided that no liability shall attach bothe City ofYakima by reason of entering into this contract,
except au expressly provided herein.
IN WITNESS WHEREOF the parties hereto have nouxod this agreement to be executed the day and year first herein above
written.
Countersigned: CITY OFYAK|MA CONTRACTOR
this Uuy� 2U__ muu�na|nv»»�u«m'»mwaumnQt«»��C � Washington Corporation' ===c=tr=cto"
By:
City Manager
(Print Name)
`^ ^
City Clerk
(President,Owner,mo)
Addr
ess,
City ofYakima 123