HomeMy WebLinkAboutR-2012-081 Railroad Grade Separations, Phase 3, Martin Luther King, Jr. Blvd [MOWAT]C LERKS Gc•pY os City of Yakima Engineering Division Yakima Railroad Grade Separations Phase 3 -Martin Luther King, Jr. Boulevard Construction Contract Specifications & Bid Documents Federal Aid No. STPX-NCPD-000S(062) State Contract No. TA -1407 City Project Number 1818 129 North Second Street Yakima. WA 98901 Phone (509) 575-6111 Fax (509) 576-6305 October 2012 gm um En imm EIN Num INE.Eim Num Nim - c BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 ENGINEERS' ESTIMATE Mowat Construction Company Woodinville, WA Selland Construction Wenatchee, WA Apollo, Inc. Kennewick, WA C. A. Carey Corporation Issaquah, WA ITEM NO. BID SECURITY QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT • UNIT PRICE AMOUNT UNIT PRICE AMOUNT ITEM MOBILIZATION 1 Mobilization 1 LS , $ 936,764.00 $ 936,764 00 $ 923 000.00 S 923.000.00 $ 849,000.00 $ 849,000.00 $ 859,400.00 ' $ 859,400.00 $ 980,000.00 $ 980,000 00 PREPARATION 2 Removal of Structure and Obstruction 1 LS $ 60 000.00 $ 60 000.00 $ 64.400.00 $ 64.400.00 $ 350,000.00 $ 350,000.00 $ 67,300.00 $ 67,300 00 $ 130,000.00 '$ 130,000.00 3 Removing Paint Line 900 LF $ 0.75 $ 675 00 $ 1.00 S. 900 00 $ 1.00 $ 900 00 $ 1 00 $ 900 00 $ 1 00 ' $ 900.00 4 Removing Painted Traffic Marking 4 EA ' $ 30.50 $ 122.00 $ 65.00 S 260.00 $ 65.00 $ 260.00 $ 68.00 .9 272.00 $ 175.00 $ 700 00 5 Removing Painted Crosswalk Line 400 • SF $ 3.00 $ 1,200.00 $ 0.65 0 260.00 $ 0.65 $ 260.00 $ 0 70 $ 280.00 $ 3.00 $ 1,200.00 GRADING 6 Roadway Excavation Incl. Haul 25500 CY $ 10.00 $ 255,000.00 $ 10.15 S 258.825.00 $ 13.00 $ 331,500.00 $ 8.83 '$ 225,165.00 $ 11.50 '$ 293,250.00 STORMWATER SYSTEM 7 Underdrain Pipe 4 In. Diam. 5886 ' LF $ 7.00 $ 41,202.00 '$ 8.25 S 48.559.50 $ 13.00 $ 76,518.00 $ 1.95 $ 11,477.70 $ 1000 $ 58,860.00 8 Drain Pipe 4 In. Diam. 80 ' LF $ 25.00 $ 2,000.00 S 15 00 $ 1.200.00 $ 10.00 $ 800.00 $ 1.75 $ 140.00 $ 25.00 $ 2,000.00 9 Catch Basin Type 1 31 EA '$ 800.00 $ 24,800.00 S 945.00 $ 29.295.00 $ 1,500 00 $ 46,500.00 $ 682 00 $ 21,142 00 $ 1,150 00 $ 35,650 00 10 Catch Basin Type 2, 48 In. Diam. 1 EA $ 2,500.00 $ 2,500.00 ' S 1.985.00 S 1.985.00 $ 3,000.00 $ 3,000.00 $ 2,850.00 .$ 2,850.00 $ 2,950.00 $ 2,950.00 11 Corrugated Polyethylene Storm Sewer Pipe 10 In Diam. 680 LF $ 20.00 $ 13,600.00 $ 21.70 S 14.756.00 $ 35.00 $ 23,800 00 $ 5.35 $ 3,638.00 $ 28 00 .$ 19,040.00 12 Corrugated Polyethylene Storm Sewer Pipe 12 In Diam. 450 . LF $ 25.00 $ 11,250.00 $ 22 70 $ 10.215.00 $ 37.00 $ 16,650.00 $ 7.15 $ 3,217.50 $ 30 00 "$ 13,500 00 13 Ductile Iron Storrn Sewer Pipe 8 In. Diam 590 LF $ 35.00 $ 20,650.00 5 38.90 '$ 22.951.00 $ 60.00 $ 35,400.00 $ 46.00 $ 27,140.00 $ 52.00 $ 30,680.00 , 14 Ductile Iron Storm Sewer Pipe 14 In. Diam 16 LF $ 75.00 $ 1,200.00 0 88.00 S 1.408.00 $ 500.00 $ 8,000.00 $ 31 60 $ 505.60 $ 90.00 $ 1,440.00 15 Testing Storm Sewer Pipe 1690 LF $ 2.00 $ 3,380 00 S 1.00 S 1.690.00 $ 1.00 $ 1,690 00 $ 0 01 $ 16.90 $ 4.00 :$ 6.760 00 16 Plain Conc., or V.C. Sewer Pipe 6 In. Diam 15 LF $ 20.00 $ 300.00 $ 30 00 $ 450.00 $ 70.00 $ 1,050.00 $ 71.00 $ 1,065.00 $ 60.00 $ 900 00 17 Structural Excavation Class B Incl. Haul 700 CY $ 20.00 $ 14,000.00 $ 9 50 5 6.650.00 $ 5.00 $ 3,500.00 $ 9.45 $ 6,615.00 $ 19.00 $ 13,300.00 18 Structural Excavation Class B Incl. Haul - Bottom Seal 436 CY .$ 150 00 $ 65,400.00 $ 16.00 $ 6.976 00 $ 5.00 $ 2.180.00 $ 39 95 $ 17.418.20 $ 18.00 $ 7,848.00 19 Shoring or Extra Excavation Class B 20 ' SF $ 5.00 $ 100.00 0 2.50 S 50 00 $ 5.00 $ 100.00 $ 1 00 $ 20.00 $ 150.00 $ 3.000 00 20 Gravel Backfill for Drain 80 CY $ 20.00 $ 1,600.00 $ 38.00 S 3.040,00 ' $ 40.00 $ 3,200.00 $ 27.80 $ 2,224.00 $ 38.00 $ 3,040.00 21 Controlled Density Fill 170 CY $ 100.00 $ 17,000 00 $ 90.00 LS 15.300 00 $ 120.00 $ 20,400.00 $ 90 00 $ 15,300.00 $ 105.00 $ 17,850.00 22 Construction Geotextile for Underground Drainage 825 SY '$ 5.00 $ 4,125.00 $ 2.20 $ 1.815 00 $ 1.00 $ 825.00 $ 0.75 $ 618.75 $ 2.00 $ 1,650.00 23 Connection to Drainage Structure 7 ' EA $ 500 00 ' $ 3,500 00 $ 950_00 S 6 650.00 $ 500.00 $ 3,500.00 $ 735 00 $ 5,145.00 $ 500.00 $ 3,500 00 24 Storm Sewer Bypass . 1 LS $ 5,000.00 $ 5,000 00 $ 30.000.00 S 30.000.00 $ 10,000.00 $ 10,000.00 $ 3,145.00 $ 3,145.00 $ 34,000.00 $ 34,000.00 25 Pump Station 1 LS $ 325,000 00 $ 325,000.00 $ 250 000.00 S 250.000.00 $ 250,000.00 $ 250,000.00 $ 181,000.00 $ 181,000.00 $ 390,000.00 $ 390,000.00 26 W etwell Shoring 1 LS $ 120,000 00 $ 120,000 00 $ 156 000.00 5 156.000.00 $ 14.00 $ 14.00 $ 130,000.00 $ 130,000 00 $ 100,000.00 $ 100.000 00 (continued on page 2) CITY ENGINEERS REPORT COMPETITIVE BIDS WERE OPENED ON Nov. 27, 2012. 4 CITY OF YAKIMA ALL BIDS HAVE BEEN REVIEWED BY THIS OFFICE. J - .•' +,vokr I RECOMMEND THE CONTRACT BE AWARDED T0: .l,°t Yakima Railroad Grade Separations, Phase 3 MOWAT CONSTRUCTION CO. Martin Luther King, Jr. Boulevard +`� ` 3+ a�AWARD MADE BY CITY MANAGER Fed. Aid No.: STPX-NCPD-000S(062) h,r -4.:°3 = PROJECT NO. 1818 "` 5 I t a fs.... ,•110"'" DATE: 1112712012 I Z -) $ L >�� . 3. „/`1i DATE CITY ENGINE=ER, DATE ' N/CG' R FILE:\\Cityen0\enpima0es\RiSSummariec\MI K Grade Separation SHEET 1 OF 12 smo N mil m Nim N sum-. BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 ENGINEERS' ESTIMATE ' Mowat Construction Company Woodinville, WA Selland Construction Wenatchee, WA Apollo, Inc. Kennewick, WA C. A. Carey Corporation Issaquah, WA ITEM NO. BID SECURITY QTY UNIT ITEM UNIT PRICE AMOUNT UNIT PRICE AMOUNT • UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT ' WATER LINES 27 Comb. Air Release/Air Vacuum Valve Assembly 2 In. 3 EA $ 3 500.00 $ 10 500.00 S 5.600.00 S 16.800.00 $ 3,000.00 $ 9 000 00 $ 5 035.00 $ 15,105.00 $ 3,500.00 $ 10,500.00 28 Service Connection 1 1/2 Diam. 1 EA $ 1 700.00 $ 1 700.00 $ 5.000 00 S 5.000.00 $ 2,500.00 $ 2,500.00 $ 3 500.00 - $ 3,500.00 $ 2,200.00 $ 2,200.00 29 Ductile Iron Pipe for Water Main 12 In. Diam. 230 LF $ 75.00 $ 17,250.00 $ 135.00 $ 31.050.00 $ 250.00 $ 57,500.00 $ 154.00 $ 35,420.00 $ 190.00 $ 43,700 00 30 Pipe Insulation 40 LF $ 100 00 ' $ 4,000.00 S 30.00 S 1.200 00 $ 100.00 $ 4,000.00 $ 95.00 $ 3.800.00 ' $ 100.00 $ 4,000.00 31 Connection to Existing Water Main 2 In. Temp. Blowoff 2 : EA $ 2,000.00 $ 4,000.00 S 1,200.00 S 2.400.00 $ 1,500.00 $ 3,000.00 $ 1,820.00 $ 3,640 00 $ 2.600.00 $ 5.200.00 32 Steel Casing 22 In. Diam. For Water Main 115 LF $ 390.00 $ 44,850.00 '$ 24000 S 27.600.00 '$ 500.00 $ 57,500.00 $ 241.00 $ 27,715.00 '$ 530.00 $ 60,950.00 33 Heat Tracing System 1 ' LS $ 1,00000 $ 1,000.00 $ 1.50000 $ 1500.00 $ 3,000.00 $ 3,000.00 $ 2,200.00 $ 2,200 00 $ 1,000.00 $ 1.00000 34 Galvanic Anode 2 EA '$ 500.00 $ 1000.00 $ 2.000.00 S 4000.00 $ 1,500.00 $ 3000.00 $ 790.00 $ 1580.00 $ 600.00 $ 1200.00 35 Shoring or Extra Excavation Class B 280 SF $ 5.00 $ 1,400.00 $ 3.00 S 840.00 $ 1.00 '$ 280.00 $ 1.00 $ 280.00 $ 10.00 $ 2,800.00 36 Plugging Existing Pipe 2 . EA $ 250.00 $ 500.00 $ 250.00 'S 500.00 $ 150.00 $ 300.00 $ 380.00 $ 760.00 $ 250.00 $ 500.00 Structure (CIP Cantilever Wall/Moment Slab) - $ - ' 37 Conc Class 4000 for Retaining Wall 230 CY '$ 510 00 $ 117,300.00 S 400.00 $ 92,000.00 '5 625.00 $ 143,750.00 $ 450 00 $ 103,500 00 $ 535.00 $ 123,050.00 38' St. Reinf. Bar for Retaining Wall 23800 LB $ 1.10 '$ 26,180.00 $ 1.00 S 23.800.00 $ _ 1.00 ' $' 23 800.00 $ 0.87 .$ 20,706.00 $ _ 1.15 $ 27 370.00 39 Conc. Class 4000 for Barrier 110 CY $ 680.00 $ 74,800.00 5 1,500.00 S 165.000.00 $ 1,550.00 $ 170,500.00 $ 1,345.00 $ 147,950.00 $ 760.00 $ 83,600.00 40 St. Reinf Bar for Barrier 29700 LB ,$ 0 90 $ 26 730 00 S 1 00 $ 29 700.00 $ 1.00 $ 29 700.00 $ 0.87 $ 25 839 00 $ 1.15 $ 34 155.00 ' 41 Bridge Railing Type BP for Wall Barrier 1490 LF $ 75.00 $ 111,750 00 $ 60.00 5 89.400.00 $_ _ 60.00 $ 89,400.00 $ 78.00 $ 116,220.00 $ 85.00 $ 126,650.00 ' 42 Conc. Class 4000 for Free -Standing Barrier 14 CY $ 800.00 $ 11,200.00 'S 1.000.00 S 14.000.00 $ 1,350.00 $ 18 900.00 $ 944.00 $ 13,216.00 $ 900.00 $ 12,600.00 ' 43 St. Reinf Bar for Free -Standing Barrier 3600 • LB .$ 0.90 $ 3,240 00 $ 0 90 S 3.240.00 ' $ 1.00 $ 3,600.00 $ 0.87 $ 3,132.00 $ 1.00 $ 3,600.00 44 Conc Class 4000 for Impact Attenuator Footing 2 CY '$ 500.00 $ 1 000.00 5 500 00 S 1.000.00 $ 1,250.00 $ 2,500.00 $ 360.00 $ 720.00 $ 1 025.00 $• 2 050.00 i 45 St. Reinf. Bar for Impact Attenuator Footing 200 LB $ 0.90 $ 180.00 $ 1.23 S 246.00 $ 1.00 $ 200.00 $ 0.87 $ 174.00 $ 2.00 $ 400.00 46 Single Slope Concrete Barrier 630 LF $ 85.00 $ 53,550 00 $ 100.00 $ 63.000 00 $ 110 00 $ 69,300.00 $ 130.00 $ 81,900.00 $ 115.00 $ 72,450.00 ' 47 Std Hand Rail Pedestrian Railing 650 ' LF $ 120.00 $ 78,000.00 $ 107.00 S 69.550 00 $ 50.00 $ 32,500.00 $ 115.00 $ 74,750.00 $ 125.00 $ 81;250.00 48 Single Slope Concrete Barrier Transition 2 EA $ 8 000.00 $ 16 000 00 $ 5.000.00 S 10.000.00 $ 10,000 00 $ 20,000.00 $ 4,150.00 $ 8 300 00 $ 1 200.00 $ 2 400.00 (EARTHWORK) $ - . 49 Structure Excavation Class A Incl. Haul 3200 CY $ 18.00 $ 57,600.00 $ 11.40 $ 36.480.00 $ 35.00 $ 112,000.00 $ 13.60 $ 43,520.00 $ 13.00 $ 41,600.00 ' 50. Shoirnq or Extra Excavation Class A 1 LS '$ 120,000.00 $ 120,000.00 $ 20.000 00 S 20,000.00 '$ 5,000.00 $ 5,000.00 $ 48,600 00 $ 48 600.00 $ 10 000.00 $ 10 000.00 51 Gravel Backfill for Wall • 700 CY $ 30.00 $ 21,000.00 $ 31.90 S 22.330.00 $ 40.00 $ 28,000.00 $ 40 40 $ 28,280 00 $ 34.00 $ 23,800.00 (WALL CAP) $ - 52 Conc. Class 4000 for Wall Cap 1670 CY $ 425.00 $ 709,750 00 $ 400 00 $ 668.000.00 $ 550.00 $ 918,500.00 $ 321.00 $ 536,070.00 $ 426.00 $ 711,420.00 ' 53 St. Reinf Bar for Wall Cap 284200 LB $ 0.80 $ 227,360.00 $ 1.14 $ 323.988 00 $ 1.00 $ 284200.00 $ 0.87 $ 247,254.00 $ 1.10 $ 312,620.00 (continued on page 3) CITY OF YAKIMA I ,?, Yakima Railroad Grade Separations, Phase 3 V �ti s ""� ", f Martin Luther King, Jr. Boulevard Fed. Aid No.: STPX-NCPD-000S(062) +h c OR ; •. lu'Y'V PROJECT NO. 1818 �tTt:D DATE: 11/27/2012 FILE: 11Citynnglengimages0BirtSummaries\MI K r'rade Separation SHEET2OF12 Imo N m I mi N E m m EI ....Imo m E Ili I N N ism BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 ENGINEERS' ESTIMATE Mowat Construction Company Woodinville, WA Selland Construction Wenatchee, WA Apollo, Inc. Kennewick, WA C. A. Carey Corporation Issaquah, WA ' ITEM NO. BID SECURITY QTY UNIT ITEM UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT ' UNIT PRICE AMOUNT UNIT PRICE AMOUNT (Soldier Pile Walls) 54 Shaft- 39 In. Diam. 660 LF $ 250.00 $ 165,000.00 $ 319.00 S 210.540.00 $ 320.00 $ 211,200.00 $ 264.00 $ 174,240.00 $ 365.00 $ 240,900.00 ' 55 Fumishinq Soldier Pile - W24X103 660 LF $ 110.00 $ 72 600.00 $ 57.00 $ 37.620.00 $ 60.00 $ 39,600.00 $ 71 50 $ 47,190.00 $ 66.00 $ 43,560.00 56 Lagging for Underpass Wall 2630 SF $ 15.00 $ 39,450.00 $ 11.70 $ 30.771.00 $ 12.00 $ 31,560.00 $ 8.95 $ 23,538.50 $ 14.00 $ 36,820.00 57 Concrete Fascia Panel 2630 SF ' $ 35.00 $ 92,050.00 $ 25.00 5 65 750.00 $ 42.00 $• 110,460 00 $ 25.30 $ 66,539.00 $ 38.00 $ 99,940.00 58 Removing Shaft Obstruction - Soldier Pile 1 DOL • $ 20,000.00 $ 20,000.00 $ 20.000.00 S 20.000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 (BNSF Shoring Wall) ' 59 Shaft - 36 In Diam. 340 LF $ 200.00 $ 68,000.00 $ 384.00 $ 130.560.00 $ 400.00 $ 136,00000 $ 240.50 $ 81,770.00 $ 265.00 $ 90,100.00 60 Furnishing Soldier Pile - W21X93 210 ' LF '$ 100.00 $ 21,000.00 $ 52.40 S 11.004.00 $ 55.00 $ 11,550.00 $ 64.70 $ 13,587.00 $ 58.00 $ 12,180.00 61 Furnishing Soldier Pile - W21X55 130 LF $ 65.00 $ 8,450.00 $ 31.50 •S 4,095.00 $ 32.00 $ 4,160.00 $. 44.70 $ 5,811.00 $ 58.00 $ 7,540.00 62 Lagging for BNSF Shoring 650 SF $ 15.00 $ 9,750.00 $ 17.00 $ 11.050.00 $ 16.00 $ 10,400 00 ' $ 11.05 $ 7,182.50 $ 12.00 $ 7,800.00 63 Removing Shaft Obstruction - Shoring Wall 1 DOL $ 10,000.00 $ 10,000.00 $ 10.000.00 $ 10.000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 '5 10,000.00 $ 10,000.00 (Shotcrete Facing) 64 Shotcrete Facing 11200 SF $ 20.00 $ 224.000 00 $ 25.00 S 280,000.00 $ 23.00 $ 257,600.00 ' $ 23.50 $ 263,200.00 $ 23.00 r $ 257,600.00 65 Prefabricated Drainage Material 1540 SY $ 15.00 $ 23,100.00 $ 12.00 S 18.480.00 $ 17.00 $ 26,180.00 ',$ 21.90 $ 33,726.00 $ 20.00 $ 30,800.00 (Secant Pile Wall) 66 Soil Excavation for Shaft Incl. Haul 3140 CY '5 130.00 $ 408,200.00 $ 267.00 ' $ 838 380.00 $ 325.00 $ 1,020,500.00 $ 148.53 $ 466,384.20 $ 305.00 $ 957,700.00 67 Furnishing and Placing Temp Casing for 4 Ft. Diam. Shaft 6890 LF $ 110.00 $ 757,900.00 $ 15.00 S 103.350.00 $ 16.00 $ 110,240.00 $ 56.80 '$ 391,352 00 $ 18.00 $ 124,020.00 68 Lean Concrete for Shaft 1440 CY '5 120.00 $ 172,800.00 $ 131.00 ' 0 188.640.00 $ 150.00 $ 216,000.00 $ 167.50 $ 241,200 00 $ 145.00 .$ 208,800.00 69 Conc. Class 4000P for Shaft 1770 CY $ 200.00 $ 354,000.00 $ 168.00 'S 297.360.00 $ 150.00 $ 265,500.00 $ 202.63 $ 358,655.10 $ 190.00 $ 336,300.00 70 St. Reinf. Bar for Shaft 424000 LB $ 0.85 $ 360,400 00 $ 0.96 ' $ 407.040.00 $ 1.00 $ 424,000.00 ' $ 0.87 $ 368,880.00 $ 1.00 $ 424,000 00 71 CSL Access Tube 15150 ' LF $ 5.00 $ 75,750 00 $ 10.00 ' S 151.500.00 $ 7.00 $ 106,050.00 $ 3 50 $ 53,025.00 $ 7.00 $ 106,050 00 72 CSL Test 162 EA $ 700.00 $ 113,400 00 $ 500.00 S 81,000.00 $ 500.00 $ 81,000.00 $ 627.00 $ 101,574.00 $ 575.00 ' $ 93,150 00 73 Removing Shaft Obstruction 1 DOL $ 100,000.00 $ 100,000.00 $ 100,000.00 S 100.000.00 $ 100,000.00 $ 100,000 00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 (Bottom Seal) 74 Tremie Seal Temporary Bracing 1 LS $ 45,000.00 $ 45,000.00 5 75.000.00 ' S 75.000.00 $ 40,000.00 $ 40,000.00 $ 39,000.00 $ 39,000.00 $ 26,000.00 ' $. 26,000 00 75 Tremie Seal Excavation Incl. Haul 3403 CY $ 15.00 $ 51,045.00 5 10.15 S 34.540,45 $ 22.00 $ 74,866 00 $ 10.40 $ 35,391.20 $ 13.00 ' $ 44,239 00 76 Lean Concrete for Tremie Seal 3403 CY $ 180.00 $ 612,540.00 5 125.00 S 425.375.00 $ 175.00 $ 595,525.00 $ 110.00 $ 374,330.00 $ 130.00 $ 442,390.00 77 Dulled Seal 1 LS $ 2,777,440.00 $ 2,777,440.00 $ 1 282 000,00 $ 1.282,000.00 $ 1,350,000.00 $ 1,350,000.00 $ 2,746,450.00 $ 2,746,450.00 $ 1,600,000.00 $ 1,600,000.00 ' 78 Additional Bottom Seal Leak Repair 1 DOL $ 30,000.00 $ 30,000.00 $ 30 000.00 $ 30.000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 (Struts) 79 Prestressed Conc Girder for Struct 290 LF $ 600.00 $ 174,000.00 5 770.00 S 223.300.00 $ 525.00 $ 152,250 00 $ 635.00 $ 184,150.00 $ 640.00 $ 185,600.00 (continued on page 4) " CITY OF YAKIMA yy' ..► •' fF,, tt4 , Yakima Railroad Grade Separations, Phase 3 , "' �' • ir� j • ' y i` --rip ,"" "' % • Martin Luther King, Jr. Boulevard Fed. Aid No.: STPX-NCPD-0005(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE' \C.4yenglengimages\RidSummanes\MI K Crede Separation SHEET 3 OF 12 BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 ENGINEERS' ESTIMATE Mowat Construction Company Woodinville, WA Selland Construction Wenatchee, WA Apollo, Inc. Kennewick, WA C. A. Carey Corporation Issaquah, WA ITEM NO. BID SECURITY QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT ITEM (Front Street Bridge) 80 Superstructure - Front Street Bridge 1 LS $ 201,700 00 $ 201,700 00 $ 300.000.00 S 300.000.00 $ 250,000.00 $ 250,000.00 $ 190,000.00 $ 190,000 00 $ 260,000.00 $ 260,000.00 81 Bridge Approach Slab 227 SY $ 250.00 $ 56,750 00 $ 215.00 5 48.805.00 $ 275.00 $ 62,425.00 $ 212.00 $ 48,124.00 $ 235.00 $ 53,345.00 (BNSF Bridge) 82 Superstructure - BNSF Bridge 1 LS $ 350,000.00 $ 350,000 00 $ 400.000.00 S 400 000 00 $ 275.00 $ 275.00 $ 315,000 00 $ 315,000.00 $ 235,000.00 $ 235,000.00 SURFACING • 83 Permeable Ballast 1500 TON '$ 25.00 $ 37,500.00 $ 20.00 $ 30.000.00 $ 20.00 $ 30,000.00 $ 24.00 $ 36,000.00 $ 36.00 $ 54,000.00 84 Crushed Surfacing Base Course 3000 TON '$ 17.00 $ 51,000 00 $ 18.20 'S 54.600.00 $ 22 00 $ 66.000.00 $ 20 15 $ 60,450.00 $ 26.00 $ 78,000.00 85 Construction Geotextile for Separation 3600 SY $ 2.00 $ 7,200.00 $ 1.60 $ 5.760.00 $ 2.00 $ 7,200.00 $ 1.30 $ 4,680.00 $ 3.00 ' $ 10,800.00 86 Crushed Surtacinq Top Course 120 TON $ 18.00 $ 2,160.00 S 24.00 S 2.880.00 $ 100.00- $ 12,000.00 $ 20.75 $ 2,490.00 $ 29.00 $ 3,480.00 HOT MIX ASPHALT PAVEMENT 87 Planing Bituminous Pavement 1400 SY $ 5.00 $ 7,000.00 $ 3.00 S 4.200.00 $ 5 00 $ 7,000.00 $ 5.45 $ 7,630.00 $ 8.00 $ 11,200.00 88 Slurry Seal 1 LS $ 5,000.00 $ 5,000 00 $ 15 400.00 $ 15 400.00 $ 15,000 00 $ 15,000.00 $. 15,000 00 $ 15,000.00 $ 29,000.00 $ 29,000 00 . 89 HMA Cl. 1/2 In. PG 64-28 2450 TON '$ 80.00 $ 196,000.00 S 87.00 5 213.150.00 $ 90.00 $ 220,500.00 $ 91.20 $ 223,440.00 $ 105.00 $ 257,25000 90 Job Mix Compliance Price Adjustment 1 CALC '$ (1.00) $ (1.00) S (1.00) $ (1 00) $ (1.00) $ (1.00) $ (1 00) $ (1.00) $ (1.00) $ (1.001 91 Compaction Price Adjustment 1 CALC $ (1.00) $ (1.00) .5 (1 00) $ 11 00) $ (1.00) $ (1.00) $ (1.00) $ (1.00) $ (1.00) $ (1 00) EROSION CONTROL AND PLANTING 92 ESC Lead 300 DAY $ 100.00 $ 30,000.00 S 25 00 S 7.500 00 $ 1.00 $ 300.00 $ 1.00 $ 300.00 $ 100.00 $ 30,000.00 93 Street Cleaning 300 HR $ 120.00 $ 36,000.00 $ 120 00 5 36.000 00 $ 100.00 $ 30,000.00 $ 78.00 $ 23,400.00 $ 150 00 $ 45,000.00 94 Inlet Protection 20 EA $ 55.00 $ 1,100.00 S 105.00 5 2.100.00 $ 20.00 $ 400.00 $ 75.00 $ 1,500.00 $ 120.00 $ 2,400.00 95 Stabilized Construction Entrance 670 SY $ 12.00 $ 8,040.00 5 14 00 $ 9.380.00 $ 10.00 $ 6,700.00 $ 13.25 $ 8,877.50 $ 12.00 $ 8,040.00 96 Erosion/Water Pollution Control 1 DOL $ 100,000.00 $ 100,000.00 $ 100.000.00 $ 100.000 00 .$ 100,000 00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000 00 97 SWPPP 1 LS $ 8,000.00 $ 8,000.00 $ 5,000.00 S 5.000.00 $ 100.00 $ 100.00 $ 1.00 $ 1.00 $ 2,000.00 $ 2,000.00 98 Dewatering 1 LS $ 150,000.00 $ 150,000.00 $ 80000.00 5 80.000.00 $ 50,000.00 $ 50,000.00 '$ 30,000.00 $ 30,000.00 $ 145,000.00 '5 145,000.00 TRAFFIC 99 Cement Conc. Traffic Curb and Gutter 425 LF $ 15.00 $ 6,375.00 $ 19.00 $ 8.075.00 $ 22.00 $ 9,350.00 $ 32.50 $ 13,812.50 $ 26.00 $ 11,050.00 100 Permanent Impact Attenuator 1 EA $ 20,000.00 $ 20,000.00 $ 15.000.00 S 15,000 00 $ 15,000.00 $ 15,000 00 $ 15,650.00 $ 15,650.00 $ 5,000.00 $ 5,000.00 101 Painted Traffic Arrow 8 EA $ 50 00 $ 400 00 5 55.00 $ 440.00 $ 55.00 $ 440.00 $ 58 00 $ 464 00 $ 82 00 $ 656.00 102 Paint Line 3100 LF $ 0.30 $ 930.00 $ 0.40 S 1.240.00 $ 0.40 $ 1,240.00 $ 0.40 $ 1,240.00 $ 0.40 $ 1,240.00 103 Painted Wide Line 1200 LF $ 0.35 $ 420 00 $ 0.55 ' $ 660 00 $ 0.55 $ 660.00 $ 0 60 $ 720 00 $ 0.50 $ 600 00 104 Painted Crosswalk Line 960 SF $ 3.50 $ 3,360.00 $ 0.90 S 864 00 $ 0.90 $ 864.00 '$ 0.95 $ 912.00 $ 4.00 $ 3,840.00 105 Painted Stop Line 80 LF $ 3 00 $ 240 00 $ 2.10 5 168.00 $ 2.00 $ 160.00 $ 2.20 $ 176.00 $ 6.00 $ 480.00 106 Painted Bicycle Lane Symbol 6 EA _$ 600.00 $ 3,600.00 $ 85.00 ' 5 510.00 • $ 85 00 $ 510.00 $ 89.00 $ 534.00 $ 82.00 $ 492.00 , CITY OF YAKIMA '� ti ,: Yakima Railroad Grade Separations, Phase 3 " iJ' 1'41 w) �a` 4""" Martin Luther King, Jr. Boulevard Fed. Aid No.: STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE' 1\C.ityPng\engiresg IRirlSummadnc\MI K (,rade Separatinrr SHEET 4OF12 11111111 MIN 1E11 M1111 MINI NM di 1111111 NMI 111111 Mill INN 111111 Id 111111 111111 OMB' BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 ENGINEERS' ESTIMATE Mowat Construction Company Woodinville, WA - Selland Construction Wenatchee, WA Apollo, Inc. Kennewick, WA C. A. Carey Corporation Issaquah, WA • ITEM BID SECURITY NO. ITEM QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT • UNIT PRICE AMOUNT • UNIT PRICE AMOUNT UNIT PRICE - AMOUNT 107 Permanent Signing 1 LS $ 20,000.00 $ 20,000 00 $ 20,000.00 S 20,000.00 $ 35,000.00 $ 35,000.00 $ 5,950.00 $ 5,950.00 $ 10,000.00 $ 10,000.00 108 Misc. Detour Signing Revisions 1 DOL $ 10,000.00 $ 10,000 00 $ 10.000.00 0 10.000.00 $ 10,000 00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10.000 00 109 Illumination System Complete 1 LS $ 110,000.00 $ 110,000.00 $ 49,000.00 S 49.000.00 $ 50,000.00 $ 50,000.00 $ 52,000.00 $ 52,000.00 $ 56,000.00 $ 56,000.00 110 Traffic Signal System 1st St. & MLK, Jr. Blvd., Complete 1 LS $ 140,000.00 $ 140,000 00 '5 46.000.00 $ 46.000.00 $ 50,000.00 $ 50.000.00 $ 49,000.00 $ 49,000.00 $ 53,000.00 $ 53,000.00 111 Traffic Signal System 1st Ave. & MLK, Jr. Blvd., Complete 1 LS $ 110,000 00 $ 110,000.00 $ 46,000.00 S 46,000.00 $ 48,000.00 $ 48.000.00 $ 48,000 00 $ 48,000.00 $ 53,000 00 $ 53,000 00 112 Project Temporary Traffic Control 1 LS $ 120,000.00 $ 120,000.00 $ 50,000.00 S 50.000.00 $ 20,000.00 $ 20,000.00 $ 72,300.00 $ 72,300.00 $ 25,000.00 $ 25,000.00 113 Thrie Beam Guardrail 1 LS $ 2,000.00 $ 2,000.00 $ 3 610.00 $ 3.610.00 $ 4,000.00 '$ 4,000.00 $ 3,800.00 $ 3,800.00 $ 4,000 00 $ 4,000.00 114 Detour Signing 1 LS $ 20,000.00 $ 20,000 00 $ 50 000.00 S 50.000.00 $ 5,000.00 $ 5.000.00 $ 15,800.00 $ 15,800.00 $ 20,000.00 $ 20,000 00 OTHER ITEMS 115 Structure Surveying 1 LS '$ 40,000.00 $ 40,00000 0 25,000.00 S 25,000.00 '$ 30,000.00 $ 30,000.00 $ 29,200.00 $ 29,200.00 $ 35,000.00 $ 35,000.00 • 116 Roadway Surveying 1 LS .$ 30,000.00 $ 30,000.00 ' 5 10 000 00 0 10.000.00 $ 10,000.00 ' $ 10,000.00 $ 9,400.00 $ 9,400.00 $ 15,000.00 $ 15,000.00 117 Licensed Surveying 1 DOL $ 10,000.00 $ 10,000 00 $ 10.000 00 $ 10.000.00 $ 10,000 00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 118 Poured Monument - Front Street Bridge 1 EA $ 800 00 $ 800.00 $ 200 00 $ 200.00 $ 2,500.00 $ 2,500.00 $ 269 00 $ 269.00 $ 2,000.00 $ 2,000.00 ' 119 Cement Conc. Sidewalk 662 SY $ 30.00 $ 19,860.00 $ 29 00 S 19,198.00 $ 45.00 $ 29,790.00 $ 46.00 $ 30,452.00 $ 42.00 $ 27,804.00 120 Cement Conc. Sidewalk Ramp Type 4a 2 EA $ 800.00 $ 1,600.00 $ 550.00 S 1.100.00 $ 1,000.00 $ 2,000.00 $ 2,300.00 $ 4,600.00 $ 1,000.00 $ 2,000 00 121 Cement Conc. Sidewalk Ramp Type 2 1 EA $ 800.00 $ 800.00 $ 55000 S 550.00 $ 1,000.00 $ 1,000.00 $ 1,990.00 •$ 1,990.00 $ 1000.00 $ 1,000.00 122 Cement Conc. Sidewalk Ramp Type 1 3 EA $ 800.00 $ 2,400.00 $ 550.00 5 1.650.00 $ 1,000 00 $ 3,000.00 $ 1,570.00 $ 4,710.00 $ 1,000.00 $ 3,000.00 123 Commercial Driveway Approach 1 EA $ 5,000.00 $ 5,000 00 0 1.215.00 S 1.215.00 $ 3,000.00 $ 3,000.00 $ 2,200.00 $ 2,200.00 $ 1,000.00 $ 1,000.00 124 Chain Link Fence Type 1 60 LF $ 25.00 $ 1,500 00 ' $ 20.00 0 1,200.00 $ 20.00 $ 1,200.00 $ 21 20 $ 1.272 00 $ 25.00 $ 1.500 00 • 125 End, Gate. Corner and Pull Post for Chain Link Fence 2 EA $ 300.00 $ 600.00 $ 550 00 0 1.100.00 $ 550.00 $ 1,100 00 $ 585 00 $ 1,170 00 $ 650.00 $ 1,300.00 ' 126 Double 20 Ft. Chain Link Gate 1 EA $ 1,600.00 $ 1,600.00 $ 700 00 S 700.00 $ 700.00 $ 700.00 $ 730.00 $ 730.00 $ 815.00 $ 815.00 127 Fence Termination 1 DOL '$ 1,50000 $ 1,500.00 $ 1.500.00 S 1,50000 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 128 Training 1000 HR $ 2.00 $ 2,000.00 $ 1.00 S 1,000.00 $ 5.00 $ 5,000.00 $ 1.00 $ 1,000.00 $ 3.00 $ 3,000.00 ' 129 Type C Progress Schedule 1 LS '$ 30,000.00 $ 30,000.00 $ 30.000.00 0 30.00000 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000,00 ' 130 Schedule Update 12 EA $ 1,000.00 $ 12,000 00 $ 1,000.00 S 12.000.00 $ 1,000.00 $ 12,000.00 $ 1,000.00 $ 12,000.00 $ 1,000.00 $ 12,000 00 131 Roadside Cleanup 1 DOL $ 40,000.00 $ 40,000.00 $ 40.000.00 S 40.000.00 $ 40,000.00 $ 40,000.00 $ 40,000.00 $ 40,000.00 $ 40,000.00 $ 40,000.00 132 Field Office Building 1 LS $ 20,000.00 $ 20,000 00 $ 15.000-00 S 15,000 00 .$ 20,000 00 $ 20,000.00 $ 5,800.00 $ 5,800.00 $ 25,000.00 $ 25,000.00 133 Minor Change 1 DOL $ 100,000.00 $ 100,000.00 S 100.000.00 0 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000 00 • 134 SPCC Plan 1 LS $ 5,000.00 $ 5,000.00 $ 500.00 S 500.00 $ 10.00 $ 10.00 $ 350.00 $ 350.00 $ 1,000.00 $ 1,000.00 135 Utility Potholing 1 DOL 5 15.000 00 $ 15,000 00 S 15.000 00 5 15.000.00 $ 15.000 00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000 00 (continued on page 6) - -, CITY OF YAKIMA /.. ••,. Yakima Railroad Grade Separations, Phase 3 0 J og�y,�H .4 .a„ Martin Luther King, Jr. Boulevard Fed. Aid No.. STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE'\\Cityeng\engimageslRi4Summaries\MI K (;rade Separalupt SHEET 5OF12 on mu mu En mil EN im mum En smi EN mom mi Nim Nis mil BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 ENGINEERS' ESTIMATE Mowat Construction Company Woodinville, WA Selland Construction Wenatchee, WA Apollo, Inc. Kennewick, WA C. A. Carey Corporation Issaquah, WA ' REM NO. BID SECURITY QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT ITEM 136 Fiber Optic Beam 1 LS $ 30.000.00 $ 30,000.00 $ 25.000.00 5 25,000.00 $ 20,000.00 $ 20,000.00 $ 23,500.00 $ 23,500.00 '$ 21,000.00 $ 21,000.00 137 Utility Conduit Installation - City of Yakima 1 LS $ 30,000.00 $ 30,000 00 $ 24,000.00 $ 24 000.00 $ 25,000.00 $ 25,000 00 $ 25,000 00 $ 25,000.00 $ 28,000.00 $ 28,000.00 138 Utility Conduit Installation - PP&L 1 LS .$ 60,000.00 $ 60,000.00 $ 36.000 00 $ 36 000.00 $ 38,000.00 $ 38,000.00 $ 38,000.00 $ 38,000.00 $ 42,000.00 $ 42,000.00 TOTAL: $ 12,732,516.00 $. 10,634,867.95 $' 11,074,540.00 $ 11,162,694.15 $ 11,486,362.00 _ l CITY OF YAKIMA I Yakima Railroad Grade Separations, Phase 3 04�`1` \h ; � �4 {iar - sa"","" Martin Luther King, Jr. Boulevard Fed Aid No : STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE' OCal.yen°\Pn0imagps\RidCommarips\MI K nrardp SPparatinr SHEET 6 OF 12 am mimi INN BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 Rotschy Inc. Vancouver, WA Tapani, Inc. Battle Ground, WA . ITEM BID SECURITY NO. ITEM QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT MOBILIZATION 1 Mobilization 1 LS $ 1,153,600.00 $ 1,153,600.00 $ 1,250,000.00 $ 1,250,000.00 PREPARATION 2 Removal of Structure and Obstruction 1 LS $ 125,000.00 .$ 125,000.00 $ 40,000.00 $ 40,000.00 3 Removing Paint Line 900 LF $ 1.50 $ 1.350 00 $ 0.96 $ 864 00 4 Removing Painted Traffic Marking 4 EA $ 75.00 $ 300.00 $ 56.50 $ 226 00 5 Removing Painted Crosswalk Line 400 SF $- 0.75 '$ 300.00 $ 3.70 $ 1,480.00 GRADING' 6 Roadway Excavation Incl. Haul 25500 CY .$ 15.00 $ 382,500.00 $ 10.00 $ 255,000.00 STORMWATER SYSTEM 7 Underdrain Pipe 4 In. Diam 5886 LF .$ 13.40 $ 78,872 40 $ 4.60 $ 27,075.60 8 Drain Pipe 4 In. Diam. 80 LF $ 16.00 $ 1,280.00 $ 100.00 $ 8,000.00 9 Catch Basin Type 1 31 EA $ 1,360.00 $ 42,160 00 $ 1,200.00 $ 37,200 00 ' 10 Catch Basin Type 2, 48 tn. Dram. 1 EA $ 2,150.00 $ 2,150.00 $ 2.500.00 $ 2,500.00 11 Corrugated Polyethylene Storm Sewer Pipe 10 In. Diam. 680 LF $ 42.00 $ 28,560 00 $ 31.00 $ 21 080.00 12 Corrugated Polyethylene Storm Sewer Pipe 12 In. Diam 450 LF $ 44.00 $ 19,800.00 $ 66.00 $ 29,700.00 13 Ductile Iron Storm Sewer Pipe 8 In. Diam 590 LF $ 60.00 $ 35,400.00 $ 47.00 $ 27,730.00 ' • 14 Ductile Iron Storm Sewer Pipe 14 In. Diam 16 LF '$ 450.00 $ 7,200.00 $ 584 00 $ 9,344.00 15 Testing Storm Sewer Pipe 1690 ' LF $ 2.00 $ 3,380 00 $ 1.90 $ 3,211.00 16 Plain Conc., or V.C.•Sewer Pipe 6 In Diam 15 LF $ 130.00 $ 1,950 00 $ 260.00 $ 3,900.00 17 Structural Excavation Class B Incl. Haul 700 CY $ 3.00 .$ 2,100.00 $ 5.85 $ 4,095.00 18 Structural Excavation Class B Incl. Haul - Bottom Seal 436 CY $ 3 00 $ 1,308.00 $ 6.55 $ 2,855 80 19 Shoring or Extra Excavation Class B 20 SF $ 5.00 $ 100.00 $ 141.00 $ 2,820.00 20 Gravel Backfill for Drain 80 CY '$ 35.00 $ 2,800.00 $ 32.00 $ 2,560.00 21 Controlled Density Fill 170 CY $ 122.00 $ 20,740 00 $ 123.00 $ 20,910.00 22 Construction Geotextile for Underground Drainage 825 SY $ 1.00 $ 825.00 $ 1.10 $ 907.50 23 Connection to Drainage Structure 7 EA $ 600.00 $ 4,200.00 $ 600 00 $ 4,200.00 24 Storm Sewer Bypass 1 LS $ 15,000.00 $ 15,000.00 $ 13,300.00 $ 13,300.00 25 Pump Station 1 LS $ 235,000.00 $ 235,000.00 $ 250 000.00 $ 250,000.00 26 Wetwell Shoring 1 LS $ 56,000.00 $ 56,000 00 $ 500 00 $ 500.00 (continued on page 2) ,,4 t CITY OF YAKIMA t , !,. Yakima Railroad Grade Separations, Phase 3 • -' f r 5 L , ?' I , � f _ . s Martin Luther King, Jr. Boulevard Fed. Aid No.: STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE orityen0Aengima0es\RidSimmadedMI K trade Separation SHEET 7 OF 12 um Nis mu mu INN Num ism am Nis mu mi BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 Rotschy Inc. Vancouver, WA Tapani, Inc. Battle Ground, WA ITEM BID SECURITY NO. ITEM QTY UNIT UNIT PRICE AMOUNT ' UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT WATER LINES 27 Comb. Air Release/Air Vacuum Valve Assembly 2 In. 3 EA $ 3,250.00 $ 9,750.00 $ 3,650.00 $ 10,950.00 • 28 Service Connection 1 1/2 Diam. 1 EA $ 1,500.00 $ 1,500 00 '$ 4,000.00 $ 4,000.00 29 Ductile Iron Pipe for Water Main 12 In. Diam. 230 LE $ 180.00 $ 41,400.00 $. 223.00 $ 51 290.00 ' 30 Pipe Insulation ' 40 . LF $ 130.00 $ 5,200 00 $ 140.00 $ 5,600.00 31 Connection to Existing Water Main 2 In. Temp. Blowoff ' 2 EA $ 1,345.00 $ 2,690 00 $ 1,500.00 $ 3,000.00 32 Steel Casing 22 In. Diam. For Water Main 115 LF $ 250.00 '5 28,750.00 $ 200.00 $ 23 000.00 33 Heat Tracing System 1 LS $ 3,400.00 $" 3,400 00 $ 5,650.00 $ 5,650.00 34 Galvanic Anode 2 EA '$ 2 100.00 $ 4,200.00 $ 1,800.00 $ 3,600.00 35 Shoring or Extra Excavation Class B 280 SF '5 1.00 $ 280.00 , $ 18 10 $ 5,068.00 36 Plugging Existing Pipe 2 EA $ 150.00 $ 300.00 ' $ 600.00 $ 1,200.00 Structure (CIP Cantilever Wall/Moment Slab) 37 Conc. Class 4000 for Retaining Wall 230 CY $ 262.00 5. 60,260 00 $ 510.00 $ 117,300.00 38 St. Reinf. Bar for Retaining Wall 23800 - LB '$ 1.00 $ 23,800 00 $ 0.93 $ 22,134.00 39 Conc. Class 4000 for Banier 110 CY •$ 900.00 $ 99,000 00 $ 1,462.00 $ 160,820.00 40 St Reinf. Bar for Barrier 29700 LB $ 1.00 $ 29,700 00 $ 1.30 $ 38,610.00 41 Bridge Railing Type BP for Wall Barrier 1490 LF '5 50.00 $ 74,500 00 $ 57.00 $ 84,930.00 42 Conc. Class 4000 for Free -Standing Barrier 14 CY $ 1,000.00 $ 14,000.00 $ 1,655.00 $ 23,170.00 43 St. Reinf. Bar for Free -Standing Barrier 3600 LB $ 1 00 $ 3,600.00 $ 1.20 $ 4,320.00 • 44 Conc Class 4000 for Impact Attenuator Footing 2 CY $ 600.00 $ 1,200.00 $ 780.00 $ 1,560.00 45 St. Reinf. Bar for Impact Attenuator Footing 200 LB $ 2.00 $ 400 00 .$ 1.20 $ 240.00 46 Single Slope Concrete Barrier 630 LF $ 108.00 $ 68,040 00 $ 136.00 $ 85,680.00 47 Std: Hand Rail Pedestrian Railing 650 LF $ 97.00 $ 63,050.00 'S 119.00 $ 77,350.00 48 Single Slope Concrete Barrier Transition 2 EA '5 8,000.00 $ 16,000 00 $ 11,261.00 $ 22,522 00 (EARTHWORK) 49 Structure Excavation Class A Ind. Haul 3200 CY $ 16.00 $ 51,200 00 $ 12.00 $ 38,400.00 50 Shoirnq or Extra Excavation Class A 1 LS .5 484,783 00 $ 484,783 00 $ 181,000.00 $ 181,000.00 51 Gravel Backfill for Wall 700 CY $ 60.00 $ 42 000.00 $ 41.00 $ 28,700.00 (WALL CAP) 52 Conc. Class 4000 for Wall Cap 1670 CY $ 305.00 $ 509,350.00 $ 350.00 $ 584,500.00 53 St Reinf. Bar for Wall Cap 284200 LB $ 1.00 $ 284,200.00 $ 1.15 $ 326,830.00 (continued on page 3) �t t 1`,, Y ,N . , , CITY OF YAKIMA ,y �L~t. `;. - : Yakima Railroad Grade Separations, Phase 3 sJ f1 * � t't zb i kPOR iT0 , Martin Luther King, Jr. Boulevard Fed. Aid No.: STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 • FILE-\1Cityeng\engimages\RirISummaries\MI KGrade Separation SHEET 8 OF 12 moi im um am mg mu m mu um mo mol um I um- am mu u. •1 BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 Rotschy Inc. Vancouver, WA Tapani, Inc. Battle Ground, WA ITEM BID SECURITY NO. ITEM QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT (Soldier Pile Walls) 54 Shaft - 39 In. Diam. 660 LF $ 219.00 $ 144,540.00 $ 237.00 $ 156,420 00 55 Fumishinq Soldier Pile - W24X103 660 LF $ 89.00 $ 58,740.00 $ 96 00 $ 63,360.00 56 Lagging for Underpass Wall 2630 . SF $ 13.00 $ 34,190.00 ' $ 17.00 $ 44,710.00 57 Concrete Fascia Panel 2630 SF $ 41.00 5 107,830 00 $ 21.00 $ 55,230.00 58 Removing Shaft Obstruction - Soldier Pile 1 DOL ' $ 20,000.00 $ 20,000.00 $ 20.000.00 r $ 20,000.00 (BNSF Shoring Wall) 59 Shaft - 36 In. Diam. 340 . LF $ 250.00 $ 85,000 00 $ 266.00 $ 90,440.00 60 Fumishinq Soldier Pile - W21X93 210 LF $ 73.00 $ 15,330.00 $ 80.00 $ 16,800.00 61 Fumishinq Soldier Pile - W21X55 130 ' LF $ 47.00 $ 6 110.00 $ 52.00 $ 6,760.00 62 'Lagging for BNSF Shoring 650 SF $ 42.00 $ 27,300.00 $ 17.00 $ 11,050 00 63 Removing Shaft Obstruction - Shoring Wall 1 DOL $ 10,000 00 $ 10 000.00 $ 10,000.00 $ 10,000.00 (Shotcrete Facing) 64 Shotcrete Facing 11200 ' SF '$ 29.00 $ 324,800.00 $ 20.00 •5 224,000.00 65 Prefabricated Drainage Material 1540 SY $ 11.00 $ 16,940 00 $ 9.00 $ 13,860.00 (Secant Pile Wall) 66 Soil Excavation for Shaft Incl. Haul 3140 ' CY $ 291.00 $ 913,740.00 $ 290.00 ' $ 910,600.00 67 Fumishinq and Placing Temp. Casing for 4 Ft Diam. Shaft 6890 LF $ 35.00 $ 241 150.00 $ 37.20 $ 256,308.00 ' 68 Lean Concrete for Shaft 1440 CY $ 166.00 $ 239,040.00 $ 181.00 $ 260,640 00 69 Conc. Class 4000P for Shaft 1770 CY $ 217.00 $ 384 090.00 $ 226.00 $ 400,020.00 70 St. Reinf. Bar for Shaft 424000 LB .$ 1.00 $ 424,000.00 $ 1 25 $ 530,000.00 71 CSL Access Tube 15150 LF .$ 14.00 $ 212,100.00 $ 5 75 $ 87,112.50 72 CSL Test 162 EA $ 819.00 $ 132,678.00 $ 564.00 $ 91 368.00 73 Removing Shaft Obstruction 1 DOL $ 100,000.00 .$ 100,000.00 $ 100,000.00 $ 100,000.00 (Bottom Seal) 74 Tremie Seal Temporary Bracing 1 LS $ 16,000.00 $ 16,000.00 $ 25,000.00 $ 25,000.00 75 Tremie Seal Excavation Incl. Haul 3403 CY $ 26.00 $ 88,478.00 $ 15.00 $ 51,045.00 76 Lean Concrete for Tremie Seal 3403 CY '$ 117.00 $ 398,151.00 $ 137.00 $ 466,211.00 77 Drilled Seal 1 LS $ 1,500,000.00 $ 1,500,000.00 $ 1,450,000.00 $ 1,450,000.00 78 Additional Bottom Seal Leak Repair 1 DOL $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 (Struts) 79 Prestressed Conc. Girder for Struct 290 LF $ 585.00 $ 169,650.00 $ 610.00 $ 176,900.00 (continued on page 4) /` CITY OF YAKIMA I' + . , Lr Yakima Railroad Grade Separations, Phase 3 ...S itrr,,4i;!) � , Martin Luther King, Jr. Boulevard ' Fed. Aid No.. STPX-NCPD-000S(062) _ PROJECT NO. 1818 To, f,� DATE: 11/2712012 FILE' 1\Cilyeng\engimagrs1RirlSummanrs\AAI K (;rade Separalien SHEET 9 OF 12 um I as m mu ma am ow m NE oim um RE am um mis BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 Rotschy Inc. Vancouver, WA Tapani, Inc. Battle Ground, WA ' ITEM BID SECURITY NO. ITEM QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT (Front Street Bodge) 80 Superstructure - Front Street Bridge 1 LS • $ 200 000.00 $ 200,000.00 $ 265,000.00 $ 265,000.00 81 Bridge Approach Slab 227 • SY $ 200.00 $ 45,400.00 • $ 225.00 $ 51,075.00 (BNSF Bridge). 82 Superstructure - BNSF Bridge 1 LS ' $ 275,000.00 $ 275,000.00 $ 365,000.00 $ 365,000.00 SURFACING 83 Permeable Ballast 1500 TON $ 22.00 $ 33,000 00 $ 23.00 $ 34,500.00 84 Crushed Surfacing Base Course 3000 TON $ 24.00 $ 72,000.00 $ 34.00 $ 102,000.00 - 85 Construction Geotextile for Separation 3600 SY '$ 1.00 $ 3,600.00 $ 1.60 $ 5,760.00 ' 86 Crushed Surfacing Top Course 120 TON $ 22.00 '$. 2,640.00 $ 85.00 $ 10,200.00 HOT MIX ASPHALT PAVEMENT 87 Planing Bituminous Pavement • 1400 SY $ 5.00 '$ 7,000.00 j$ 2.60 $ 3,640.00 • 88 Slurry Seal 1 • LS J$ 16,000.00 .$ 16,000.00 ' $ 5,700.00 $ 5,700 00 89 HMA Cl. 1/2 In. PG 64-28 2450 TON $' 87.00 '$ 213,150.00 $ 95.00 $ 232,750.00 • 90 Job Mix Compliance Price Adjustment 1 CALC $ (1.00) $ (1.00) $ (1.00) $ (1.00) ' 91 Compaction Price Adjustment 1 CALC $ (1.00) $ (1.00) $ (1.00) $ (1 00) EROSION CONTROL AND PLANTING 92 ESC Lead 300 DAY $ 25.00 $ 7,500.00 $ 6.50 $ 1,950.00 93 Street Cleaning 300 HR $ 95.00 '$' 28,500.00 $ 147.00 $ 44,100.00 ' 94 Inlet Protection 20 EA '.$ 68.00 $ 1,360.00 $ 68.00 $ 1,360.00 • 95 Stabilized Construction Entrance 670 SY $ 3 00 $ 2,010.00 $ 5.00 $ 3,350 00 96 Erosion/Water Pollution Control 1 DOL .$ 100,000 00 $ 100,000 00 .$ 100,000.00 $ 100,000.00 97 SWPPP 1 LS j$ 5,000.00 '$ 5,00000 $ 2,000.00 $ 2,000.00 • 98 Dewaterinq 1 LS $ 80,000.00 '$ 80,000.00 $ 280,000.00 $ 280,000.00 TRAFFIC • 99 Cement Conc. Traffic Curb and Gutter 425 LF $ 22.00 $ 9,350.00 $ 25.00 $ 10,625.00 100 Permanent Impact Attenuator 1 EA $ 10,000.00 ' $ 10,000.00 $ 17,200.00 $ 17,200.00 101 Painted Traffic Arrow 8 EA •$ 0.73 $ 5.84 $ 57.00 $ 456.00 102 Paint Line 3100 LF $ 0.30 $ 930.00 $ 0.40 $ 1,240.00 ' 103 Painted Wide Line 1200 LF '$ 0.45 $ 540 00 • $ 0.75 $ 900.00 ' 104 Painted Crosswalk Line 960 SF $ 3 75 $ 3,600.00 $ 2.00 $ 1,920.00 ' 105 Painted Stop Line 80 LF $ 5.00 $ 400 00 $ 3.00 $ 240.00 ' 106 Painted Bicycle Lane Symbol 6 EA '$ 72.00 $ 432.00 $ 96.00 $ 576.00 i,,,,� CITY OF YAKIMA 'f\ Yakima Railroad Grade Separations, Phase 3 s (} ; + a ° 9t t s; 'i :- „,... Martin Luther King, Jr. Boulevard Fed. Aid No.: STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE' 1K'dyenp\engimageslRidSummaries\MI K Crade Separation SHEET 10 OF 12 M 111111 MN MI 111111 11111 111111 1•11 INN 11111 1.11 BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 Rotschy Inc. Vancouver, WA Tapani, Inc. Battle Ground, WA ITEM NO. BID SECURITY QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT ITEM 107 Permanent Signing 1 LS $ 5,000.00 $ 5,000 00 $ 6,700.00 $ 6,700.00 108 Misc. Detour Signing Revisions 1 • DOL $ 10,000.00 $ 10,000 00 $ 10,000.00 $ 10,000.00 109 Illumination System Complete 1 ' LS ' $ 45,000.00 $ 45,000.00 $ 57,000.00 $ 57,000.00 110 Traffic Signal System 1st St. & MLK, Jr. Blvd., Complete 1 ' LS $ 40,000.00 ' $ 40,000.00 $ 62,000 00 $ 62 000.00 111 Traffic Signal System 1st Ave & MLK, Jr. Blvd., Complete 1 LS : $ 40,000.00 $ 40,000.00 $ 51,000.00 $ 51,000 00 112 Project Temporary Traffic Control 1 LS . $ 8,000.00 $ 8,000.00 $ 25,000.00 $ 25,000.00 113 Thrie Beam Guardrail 1 ' LS ' $ 3,000.00 $ 3,000 00 $ 4,000.00 $ 4 000.00 : 114 Detour Signing 1 LS $ 30,000.00 $ 30,000 00 $ 4,000.00 $ 4,000.00 OTHER ITEMS 115 Structure Surveying 1 . LS $ 44,000.00 $ 44,000 00 $ 10,000.00 $ 10,000.00 ' 116 Roadway Surveying 1 LS '$ 10,000.00 $ 10,000.00 $ 31,000.00 $ 31,000.00 117 Licensed Surveying 1 ' DOL $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10 000.00 ' 118 Poured Monument - Front Street Bridge 1 EA $ 700.00 $ 700.00 $ 564.00 $ 564.00 • 119 Cement Conc. Sidewalk 662 ' SY '$ 33.00 $ 21,846.00 $ 53.20 $ 35,218.40 ' 120 Cement Conc. Sidewalk Ramp Type 4a 2 EA $ 720.00 $ 1,440.00 $ 1,353.00 $ 2,706.00 121 Cement Conc. Sidewalk Ramp Type 2 1 EA $ 720.00 $ 720.00 $ 2,056.00 $ 2,056.00 122 Cement Conc. Sidewalk Ramp Type 1 3 EA $ 720.00 $ 2,160.00 $ 1,587.00 $ 4,761'.00 123 Commercial Driveway Approach 1 EA $ 1,420.00 $ 1,42000 $ 4,200.00 $ 4,200.00 124 Chain Link Fence Type 1 60 LF '$ 26.00 $ 1,560.00 $ 23.00 $ 1,380.00 125 End, Gate, Corner and Pull Post for Chain Link Fence 2 EA $ 160.00 $ 320.00 $ 627.00 $ 1,254.00 126 Double 20 Ft. Chain Link Gate 1 EA $ 1,500.00 $ 1,500.00 $ 780 00 $ 780.00 127 Fence Termination 1 DOL $ 1,500.00 $ 1,500 00 $ 1,500.00 $ 1,500.00 128 Training 1000 HR $ 15.00 $ 15,000 00 $ 5.00 $ 5,000 00 • 129 Type C Progress Schedule 1 LS $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 130 Schedule Update 12 ' EA $ 1,000.00 $ 12,000.00 $ 1,100.00 $ 13,200.00 131 Roadside Cleanup 1 DOL $ 40,000.00 $ 40,000.00 '$ 40,000.00 $ 40,000.00 132 Field Office Building 1 LS $ 5,000.00 $ 5,000 00 $ 12,300.00 $ 12,300.00 133 Minor Change 1 DOL $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 134 SPCC Plan 1 LS $ 5,000.00 $ 5,000.00 $ 1,500.00 $ 1,500.00 ' 135 Utility Potholing 1 DOL $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 (continued on page 6) CITY OF YAKIMA 4 4H rrll Yakima Railroad Grade Separations, Phase 3 —+ � ` s3/ yt * h'vt \ya . .„,„ Martin Luther King, Jr. Boulevard I Fed. Aid No.: STPX-NCPD-000S(062) PROJECT NO. 1818 DATE: 11/27/2012 FILE:\\Cityeng\enamages\Ri4Summaries\MI K (;rads Separahnn SHEET 11 OF 12 =I IIIII 11011 N i - - - i - - - M U E = ME- : -E BID SUMMARY Yakima Railroad Grade Separations, Phase 3 Martin Luther King, Jr. Boulevard Fed Aid No. STPX-NCPD-000S(062), City Project No. 1818 Rotschy Inc. Vancouver, WA Tapani, Inc. Battle Ground, WA ITEM BID SECURITY NO. ITEM QTY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT , UNIT PRICE AMOUNT UNIT PRICE AMOUNT 136 Fiber Optic Beam 1 LS $ 14,000.00 .$ 14.000.00 $ 30,000.00 $ 30,000.00 137 Utility Conduit Installation - City of Yakima 1 LS $ 25,000.00 $ 25,000.00 $ 36,000.00 $ 36,000.00 138 Utility Conduit Installation - PPBL 1 LS $ 37,000.00 $ 37,000.00 $ 47,000.00 $ 47,000 00 TOTAL: $ 11,537,867.24 $ 11,675,376.80 ,, CITY OF YAKIMA -, 1 4, Yakima Railroad Grade Separations, Phase 3 $ ._ ; ¢ Martin Luther King, Jr. Boulevard ' 0 r \' r"; Fed. Aid No.: STPX-NCPD-000S(062) ti� PROJECT NO. 1818 fit,-...R-"C1,.R TT its r ``,..,_�` DATE: 11/2712012 FILE- \\Cityeng\engima0- _ . ..... • .i .. • •.oration SHEET 12OF12 ADDENDUM #1 To the Construction Contract Specifications and Bid Documents for CITY OF YAKIMA Yakima Railroad Grade Separations Phase 3 - Martin Luther King, Jr. Boulevard City Project No. 1818 Federal Aid No. STPX-NCPD-000S(062) To the attention of all bidders for the above project: The following additions, revisions, and/or modifications are made to the Construction Contract Specifications and Bid Documents for this project. Item No. 1— Item Proposal Bid Sheet — Pages 323 through 333 Replace the Item Proposal Bid Sheet on pages 323 through 333 with the revised Item Proposal Bid Sheet attached to this addendum. Item No. 2 — Invitation to Bid — Page 7 The following language shall be added to the 6th paragraph: Questions will be accepted until 5:00 pm on Thursday November 15, 2012. Item No. 3 — 7-15 SERVICE CONNECTIONS — Page 188 Section 7-15.5 Payment Revise this section as follows: "Service Connection 1 %2 In. Diam.", per each. The unit Contract price per each for "Service Connection 1 1/2 In. Diam." shall be full pay for all Work to install the service connection, including but not limited to, excavation, laying and jointing the pipe and fittings and appurtenances, backfilling, testing, flushing, and disinfection of the service connection. Item No.4 — CEMENT CONCRETE DRIVEWAY ENTRANCES — Page 238 City of Yakima Standard Plan "R4 — DRIVEWAY APPROACHES is added to Appendix I. The following new section is added just prior to 8-11 GUARDRAIL on page 238: 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 8-06.1 Description Supplement this section with the following: Addendum No. 1 Page 1 of 3 13 November 2012 The work shall include the installation of commercial driveway approaches, and adjusting utility castings within the concrete apron of the approaches. 8-06.3 Construction Requirements Supplement this section with the following: Commercial Driveway approaches. Commercial Driveway Approaches shall be constructed as shown on the City of Yakima Standard Detail for Commercial Approach. The sidewalks and the ramps shown on each side of the approach detailed on the standard detail shall be paid for under Section 8-14 of the Standard Specifications. 8-06.4 Measurement Supplement this section with the following: Commercial Driveway Approaches shall be measured per each installed at the locations shown on the plans and in accordance with the standard detail. 8-06.5 Payment Supplement this section with the following: "Commercial Driveway Approaches", per each. The unit contract price per each for "Commercial Driveway Approaches" shall be full compensation for all work, equipment, materials and all other items necessary for the complete installation of the approaches where shown on the plans and in accordance with the City of Yakima standard detail. Item No. 5 — Plan Sheet SQ -01 One item description was revised. Item No. 6 — Plan Sheet UT -04 One note added to General Notes. Item No. 7 — Plan Sheet C-22 Callouts added for fence and corner of gate location. Item No. 8 — Plan Sheet 5-33 Callout for Section B added to cantilevered wall. Bar marked #304, #4 at 1'-6" revised to #5 at 6". Bar marked #305, #5 at 6" revised to #4 at 1'-6". Item No. 9 — Plan Sheet 5-34 Bar marked #344, #5 at 1'-6" revised to #4. This ADDENDUM is to be considered as much a part of the construction contract specifications and bid documents as if it were included in the original construction contract specifications and bid documents. All bidders shall acknowledge receipt of this ADDENDUM on the proposal form prior to bid opening. Addendum No. 1 Page 2 of 3 13 November 2012 Robert L. Fernandes BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, WA 98003 Addendum No. 1 Page 3 of 3 13 November 2012 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ITEM PROPOSAL BID SHEET Yakima Railroad Grade Separations, Phase 3 - Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S (062) State Contract No. TA -1407 City Project No. 1818 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 1 1 Mobilization L.S. 2 1 Removal of Structure and Obstruction L.S. 3 900 Removing Paint Line L.F. 4 4 Removing Painted Traffic Marking EA. 5 400 Removing Painted Crosswalk Line S.F. 6 25,500 Roadway Excavation Incl. Haul C.Y. 7 5,886 Underdrain Pipe 41n. Diam. L.F. 8 80 Drain Pipe 4In. Diam L.F. 9 31 Catch Basin Type 1 EA. 10 1 Catch Basin Type 2, 48 In. Diam EA. 11 680 Corrugated Polyethylene Storm Sewer Pipe 10 In. Diam. L.F. 12 450 Corrugated Polyethylene Storm Sewer Pipe 12 In. Diam. L.F. 13 590 Ductile Iron Storm Sewer Pipe 8 In. Diam L.F. 14 16 Ductile Iron Storm Sewer Pipe 141n. Diam L.F. 15 1,690 Testing Storm Sewer Pipe L.F. 16 15 Plain Conc, or V.0 Sewer Pipe 6 In. Diam L.F. 17 700 Structure Excavation Class B Incl. Haul C.Y. 18 436 Structure Excavation Class B Incl. Haul - Bottom Seal C.Y. 19 20 Shoring or Extra Excavation Class B S.F. 20 80 Gravel Backfill for Drain C.Y. 21 170 Controlled Density Fill C.Y. 22 825 Construction Geotextile for Underground Drainage S.Y. 23 7 Connection to Drainage Structure EA. 24 1 StormSystemBypass L.S. 25 1 Pump Station L.S. 26 1 Wetwell Shoring L.S. 27 3 Comb. Air Release/Air Vacuum Valve Assembly 2 In. EA. 28 1 Service Connection 11/2 In. Diam. EA. 29 230 Ductile Iron Pipe for Water Main 12 In. Diam. L.F. 30 40 Pipe Insulation L.F. 31 2 Connection to Existing Water Main 2" Temp. Blowoff EA. 32 115 Steel Casing 22 In. Diam. For Water Main L.F. 33 1 Heat Tracing System L.S. 34 2 Galvanic Anode EA. 35 280 Shoring or Extra Excavation Class B S.F. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 36 2 Plugging Existing Pipe EA. 37 230 Conc. Class 4000 for Retaining Wall C.Y. 38 23,800 St. Reinf. Bar for Retaining Wall LB. 39 110 Conc. Class 4000 for Barrier C.Y. 40 29,700 St. Reinf. Bar for Barrier LB. 41 1,490 Bridge Railing Type BP for Wall Barrier L.F. 42 14 Conc. Class 4000 for Free -Standing Barrier C.Y. 43 3,600 St. Reinf. Bar for Free -Standing Barrier LB. 44 2 Conc. Class 4000 for Impact Attenuator Footing C.Y. 45 200 St. Reinf. Bar for Impact Attenuator Footing LB. 46 630 Single Slope Concrete Barrier L.F. 47 650 Std. Hand Rail Pedestrian Railing L.F. 48 2 Single Slope Concrete Barrier Transition EA 49 3,200 Structure Excavation Class A Incl. Haul C.Y. 50 1 Shoring or Extra Excavation Cl. A L.S. 51 700 Gravel Backfill for Wall C.Y. 52 1,670 Conc. Class 4000 for Wall Cap C.Y. 53 284,200 St. Reinf. Bar for Wall Cap LB. 54 440 Shaft - 39" Diameter L.F. 55 660 Furnishing Soldier Pile - W24X103 L.F. 56 2,630 Lagging for Underpass Wall S.F. 57 2,630 Concrete Fascia Panel S.F. 58 1 Removing Shaft Obstruction - Soldier Pile DOL. $20,000.00 $20,000.00 59 180 Shaft - 36" Diameter L.F. 60 210 Furnishing Soldier Pile - W21X93 L.F. 61 130 Furnishing Soldier Pile - W21X55 L.F. 62 650 Lagging for BNSF Shoring S.F. 63 1 Removing Shaft Obstruction - Shoring Wall DOL. $10,000.00 $10,000.00 64 11,200 Shotcrete Facing S.F. 65 1,540 Prefabricated Drainage Material S.Y. 66 3,140 Soil Excavation for Shaft Incl. Haul C.Y. 67 6,890 Furnishing and Placing Temp. Casing for 4 Ft Diam Shaft L.F. 68 1,440 Lean Concrete for Shaft C.Y. 69 1,770 Conc. Class 4000P for Shaft C.Y. 70 424,000 St. Reinf. Bar for Shaft LB. 71 15,150 CSL Acces s Tube L.F. 72 162 CSL Test EA. 73 1 Removing Shaft Obstructions DOL. $100,000.00 $100,000.00 74 1 Tremie Seal Temporary Bracing L.S. 75 3,403 Tremie Seal Excavation Including Haul CY 76 3,403 Lean Concrete For Tremie Seal CY 77 1 Drilled Seal L.S. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 78 1 Additional Bottom Seal Leak Repair DOL. $30,000.00 $30,000.00 79 290 Prestressed Conc. Girder For Strut L.F. 80 1 Superstructure - Front St. Bridge L.S. 81 227 Bridge Approach Slab S.Y. 82 1 Superstructure - BNSF Bridge L.S. 83 1,500 Permeable Ballast TON 84 3,000 Crushed Surfacing Base Course TON 85 3,600 Construction Geotextile for Separation S.Y. 86 120 Crushed Surfacing Top Course TON 87 1,400 Planing Bituminous Pavement S.Y. 88 1 Slurry Seal L.S. 89 2,450 HMA Cl. 1/2" PG 6428 TON 90 1 Job Mix Compliance Price Adjustment CALC. -$1.00 91 1 Compaction Price Adjustment CALC. -$1.00 92 300 ESC Lead DAY 93 300 Street Cleaning HR. 94 20 Inlet Protection EA. 95 670 Stabili7Pd Construction Entrance S.Y. 96 1 Erosion / Water Pollution Control DOL. $100,000.00 $100,000.00 97 1 SWPPP L.S. 98 1 Dewatering L.S. 99 425 Cement Conc. Traffic Curb and Gutter L.F. 100 1 Permanent Impact Attenuator EA. 101 8 Painted Traffic Arrow EA. 102 3,100 Paint Line L.F. 103 1,200 Painted Wide Line L.F. 104 960 Painted Crosswalk Line S.F. 105 80 Painted Stop Line L.F. 106 6 Painted Bicycle Lane Symbol EA. 107 1 Permanent Signing L.S. 108 1 Misc. Detour Signing Revisions DOL. $10,000.00 $10,000.00 109 1 Illumination Sys tem Complete L.S. 110 1 Traffic Signal System First St.and MLK JR Blvd., Complete L.S. 111 1 Traffic Signal System 1st Ave. and MLK JR Blvd, Complete L.S. 112 1 Project Temporary Traffic Control L.S. 113 1 Thrie Beam Guardrail L.S. 114 1 Detour Signing L.S. 115 1 Structure Surveying L.S. 116 1 Roadway Surveying L.S. 117 Est. Licensed Surveying DOL. $10,000.00 $10,000.00 118 1 Poured Monument - Front St. Brdg. EA. 119 662 Cement Conc. Sidewalk S.Y. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 120 2 Cement Conc. Sidewalk Ramp Type 4a EA. 121 1 Cement Conc. Sidewalk Ramp Type 2 EA. 122 3 Cement Conc. Sidewalk Ramp Type 1 EA. 123 1 Commercial Driveway Approaches EA. 124 60 Chain Link Fence Type 1 L.F. 125 2 End, Gate, Corner and Pull post for Chain Link Fence EA. 126 1 Double 20 FT. Chain Link Gate EA. 127 1 Fence Termination DOL. $1,500.00 $1,500.00 128 1,000 Training HR. 129 1 Type C Progress Schedule L.S. 130 12 Schedule Update EA. 131 1 Roadside Cleanup DOL. $40,000.00 $40,000.00 132 1 Field Office Building L.S. 133 1 Minor Change DOL. $100,000.00 $100,000.00 134 1 SPCC Plan L.S. 135 1 Utility Potholing DOL. $15,000.00 $15,000.00 136 1 Fiber Optic Beam L.S. 137 1 Utility Conduit Installation - City of Yakima L.S. 138 1 Utility Conduit Installation - PP&L L.S. Total: mu No ism nisi in mg me ism iI N M M MN E N RP WIDTH PER YMC 8.64.070 SEE PLANS I II CONCRETE APRON 7' MIN. OR TO R/W LINE (WHICHEVER IS GREATER) 15 (MINI SEE P1AN PREFERRED RAMP CONFIGURATION RP COLD JOINT (TYP) pRi`F�-9 41 -to �rpT ti ALTERNATE RAMP CONFIGURATION NO. 1 CONCRETE A VALLEY GUTTER COMMERCIAL APPROACH - TYPE 1 RAISED CURBING MAY VALLEY GUTTER CONTINUE INTO SITE. FLOW LINE 0.5 CEMENT CONCRETE , RAMP RUNNING SLOPES SHALL BE 8.3% MAX. r Aar/ Agar 1' 3' VALLEY GUTTER NOTES MIN. 0.25' CSTC (COMPACTED DEPTH) SECTION A COLD JOINT (TYP) MIN. 0.25' CSTC (COMPACTED DEPTH) (INCLUDING APRON) 0.5' CEMENT CONCRETE (INCLUDING APRON) COMMERCIAL APPROACH - TYPE 2 RP ALTERNATE RAMP CONFIGURATION NO. 2 VALLEY GUTTER 1. COMMERCIAL APPROACH - TYPE 1 IS STANDARD FOR ALL COMMERCIAL APPROACH SITUATIONS WITH ANY COMBINATION OF THE FOLLOWING; ROADWAY SPEEDS OVER 30 MPH, HEAVY VEHICLE VOLUMES, HEAVY TRUCK TRAFFIC. 2. USE OF COMMERCIAL APPROACH - TYPE 2 BY APPROVAL OF CITY ENGINEER ONLY. 3. CURB & GUTTER, VALLEY GUTTER, & CONCRETE APPROACH SHALL BE SEPARATED BY 3/8" THICK EXPANSION JOINT MATERIAL. 4. THIS DETAIL INDICATES GENERAL CONFIGURATION REQUIREMENTS FOR COMMERCIAL DRIVEWAY APPROACHES. STYLE AND LOCATION OF HANDICAP RAMPS WILL DEPEND UPON SITE CONDITIONS AND SHALL BE CONSTRUCTED ACCORDING TO THE SPECIFIC PROJECT SITE PLAN APPROVED BY THE CITY ENGINEER. 5. WSDOT CLASS 3000 CONCRETE WITH COARSE AGGREGATE GRADING NO. 5. 6. DUE TO THE MINIMUM SIZE RADIUS OF 15', SPECIAL CONSIDERATIONS NEED TO BE MADE TO ALLOW FOR ADA REQUIREMENTS ON THE RAMPS. 15' RADIUS DESIGNS MUST 8E SUBMITTED AND APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. 7. ALL SIDEWALK WITHIN COMMERCIAL APPROACH LIMITS, FROM RADIUS POINT TO RADIUS POINT, SHALL BE 0.5' CEMENT CONCRETE ON 0.25 CSTC. 12 COLD JOINT (TYP) prs RrL C /4)1- 0 ,>0 COLD JOINT (TYP) MIN.0.17' CSTC (COMPACTED DEPTH) 0.5' CEMENT CONCRETE RESIDENTIAL APPROACH City Of Yakima Engineering Division 129 North Second Street Yakima, Washington City of Yakima - Standard Detail DRIVEWAY APPROACHES NOT TO SCALE Revision 5-2012 R4 ADDENDUM #2 To the Construction Contract Specifications and Bid Documents for CITY OF YAKIMA Yakima Railroad Grade Separations Phase 3 - Martin Luther King, Jr. Boulevard City Project No. 1818 Federal Aid No. STPX-NCPD-000S(062) To the attention of all bidders for the above project: The following additions, revisions, and/or modifications are made to the Construction Contract Specifications and Bid Documents for this project. Item No. 1— Item Proposal Bid Sheet — Pages 323 through 333 Replace the Item Proposal Bid Sheet on pages 323 through 333 with the revised Item Proposal Bid Sheet attached to this addendum. Item No. 2 — Invitation to Bid — Page 7 The bid opening date in the first paragraph is revised from November 20, 2012 to November 27, 2012. Item No. 3 — Special Provisions 1-07.18, Contractor's Right of Entry and Insurance Requirements — BNSF, Section 1.05 Protection of Railway Facilities and Railway Flagger Services — Page 119 Replace Section 1.05.03c with the following: 1.05.03c There will be no cost to the Contractor for the railroad protective services unless such services result from the Contractor's failure to comply with the terms and conditions of its contract with the Contracting Agency or with its Contractor's Right of Entry Agreements with the Railroad Companies. Item No. 4 — Special Provisions Appendix B, Exhibit C-1 Add the Section "BNSF Rail Guidelines" to Appendix B, Exhibit C-1. Item No.5 — Plan Sheet SQ -1 Two quantities were revised. Item No.6 — Plan Sheet C-12 Note 4 was revised. Item No.7 — Plan Sheet T-14 Revised J -Box Type. Item No.8 — Plan Sheet T-17 Revisions were made to the Foundations Depth on the Signal Mast Arm Data table. Item No.9 — Plan Sheet T-18 Revised J -Box type. Item No.10 — Appendix H, Prevailing Wage Rates Replace the Federal Wage Rates in Appendix H with the attached Federal Wage Rates. Addendum No. 2 Page 1 of 6 16 November 2012 This ADDENDUM is tbi ietonsiciered as:Much a part cif: the co!iStruttion.COntraCt specifitatiOns and:bid dpcpments.as:jf it were included inthe original construction contract specifications and bid documents. Ail bidders shall a0nocVle.dge receipt ofthis ADDENDUM On the proposai fOrni pricr:to bid opening, R�bertL Fernandes 13Tf.8c101\:/) 33301 9thAvenueSouth; Suite 306 Federal Way, WA 98003 Arttle.ndom Page 2 of 6 16 November 201J ADDENDUM #3 To the Construction Contract Specifications and Bid Documents for CITY OF YAKIMA Yakima Railroad Grade Separations Phase 3 - Martin Luther King, Jr. Boulevard City Project No. 1818 Federal Aid No. STPX-NCPD-000S(062) To the attention of all bidders for the above project: The following additions, revisions, and/or modifications are made to the Construction Contract Specifications and Bid Documents for this project. Item No. 1— Plan Sheet 5=43 Added Note 3 to Notes This ADDENDUM is to be considered as much a part of the construction contract specifications and bid documents as if it were included in the original construction contract specifications and bid documents. All bidders shall acknowledge receipt of this ADDENDUM on the proposal form prior to bid opening. Robert L. Fernandes BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, WA 98003 Addendum No. 3 Page 1 of 1 20 November 2012 City of Yakima Yakima Railroad Grade Separations, Phase 3 — Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S(062) State Contract No. TA -1407 City Project No. 1818 October 2012 SECTION INVITATION TO BID 7 STANDARD SPECIFICATIONS Standard Specifications Amendments to the 2012 Standard Specifications CONTENTS CITY OF YAKIMA Yakima Railroad Grade Separations, Phase 3 — Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S(062) City Project No. 1818 PAGE 9 CONTRACT PROVISIONS. Special Provisions 51 Description of Work 52 1-01 Definitions and Terms 52 1-02 Bid Procedures and Conditions 54 1-03 Award and Execution of Contract 60 1-04 Scope of Work 65 1-05 Control of Work 65 1-06 Control of Materials 76 1-07 Legal Relations and Responsibilities to the Public 77 1-08 Prosecution and Progress 127 1-09 Measurement and Payment 135 2-02 Removal of Structures and Obstructions 143 2-07 Watering 144 2-09 Structure Excavation 144 5-03 Slurry Seal 146 5-04 Hot Mix Asphalt 148 6-01 General Requirements For Structures 154 6-02 Concrete Structures 157 6-06 Bridge Railings 160 6-10 Concrete Barrier 161 6-16 Soldier Pie and Soldier Pile Tieback Walls 161 6-18 Shotcrete Facing 162 6=19 Shafts 163 6-20 Anti-Graffitti Coating 166 6-21 Bottom Seal 167 6-22 Leak Repair 175 6-23 Tremie Seal Temporary Bracing '176 7-01 Drains 177 3 7-04 Storm Sewers 177 7-06 Dewatering 179 7-09 Water Mains 181 7-12 Valves For Water Mains 186 7-14 Hydrants 187 7-15 Service Connections 188 7-16 Cathodic Protection 188 7-20 Storm Water Pump Station 191 7-21 Utility Casings 228 7-22 Heat Tracing System 230 8-01 Erosion Control and Water Pollution Control 233 8-05 Utility Relocations 236 8-11 Guardrail 238 8-12 Chain Link Fence and Wire Fence 239 8-13 Monument Cases 239 8-20 Illumination, Traffic Signal System and Electrical 240 8-21 Permanent Signing 266 8-23 Temporary Pavement Markings 267 8-31 Electrical and Telemetry System 267 8-33 Field Office Building 293 9-03 Aggregates 295 9-23 Concrete Curing Materials and Admixtures 295 9-28 Signing Materials and Fabrication 296 9-30 Water Distribution Materials 296 Standard Plans 299 Required Contract Provisions Federal Aid Construction Contract 307 Contract Form 309 Performance Bond Form 311 Informational Certificate of Insurance 313 Informational Additional Insured Endorsement 314 Designated Construction Project General Aggregate Limit 315 Minimum Wage Affidavit Form 317 PREVAILING WAGE RATES Prevailing Wage Rates 319 PROPOSAL Proposal Form 321 Item Proposal Bid Sheet 323 Bid Bond Form 335 Proposal Signature Sheet 337 E -verify Form 339 Non -Collusion Declaration 341 Certification for Federal -Aid Contract 343 Non -Discrimination Provision 345 Subcontractor List 347 Women and Minority Business Enterprise Policy 349 4 Council Resolution 351 Affirmative Action Plan 353 Disadvantaged Business Enterprise Utilization Certification 355 Disadvantaged Business Enterprise Written Confirmation Document 357 Bidder's Certification 359 Subcontractor's Certification 361 Contractor and Subcontractor or Lower Tier Subcontractor — Certification For Federal -Aid Projects 363 Materially and Responsiveness 365 Bidders Check List 367 APPENDICES Appendix A: Existing Utility As -Built Drawings, Sheets 6, 7, 9 (These are the relevant as -built drawings from utility relocations done in Phase 1 of this project in 2007. These plans are for reference notconstruction. Inclusion of these plans does not relieve the Contractor of any and all other Contract requirements for locating and protecting existing utilities? Appendix B: Exhibit "C-1"; Agreement between BNSF Railway and the Contractor Appendix C: Geotechnical Engineering Report of August 17, 2012 Appendix D: Wetwell Pump Test Form Appendix E: NOT USED Appendix F: BNSF Railway application for private crossing Appendix G: Modified Phase 1 Environmental Site Assessment of September 2005 Appendix H: Prevailing Wage Rates Appendix I: City of Yakima Standard Plans and Details Appendix J: Pacificorp Power Specifications 5 Appendix K: WSDOT Standard Plans — K Plans PLANS & DETAILS Project Details Standard Details Construction Plans 6 INVITATION TO BID NOTICE IS HEREBY GIVEN that sealed bids will be received by the City Clerk of the City of Yakima, 129 North 2nd Street, Yakima, Washington, 98901 until 3:00 p.m. on November 20, 2012 and will thenandthere be opened and publicly read for the construction of CITY OF YAKIMA Yakima Railroad Grade Separation, Phase 3 — Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S (062) State Contract No. TA -1407 City Project No. 1818 This project consists of furnishing all labor, materials and equipment to construct the Yakima Railroad Grade Separations, Phase 3 — Martin Luther King, Jr. Boulevard, including the undercrossing, two bridges and all related work. All work is to be in accordance with the plans and. specifications as prepared by the City Engineer of the City of Yakima. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Yakima. Complete digital project bidding documents are available at www.questcdn.com. You may download the digital plan documents for $20.00 by inputting Quest project #2292721 on the website's Project Search page. Please contact QuestCDN.com at (952) 233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. An optional paper set of project plans and specifications may be obtained at the Office of the City Engineer, (509) 575-6111, located at 129 North 2nd Street, Yakima, WA 98901, upon payment in the amount of $150.00 for each set, non-refundable. Project questions should be directed to Bob Desgrosellier at (509) 575-6228. Informational copies of maps, plans, and specifications are on file for inspection in the Office of the City Engineer of Yakima in Yakima, Washington and at plan centers in Yakima and Kennewick, Washington. There will be a pre-bid conference held to discuss this project and answer questions from prospective bidders. The meeting is scheduled for 10:00 am on November 7, 2012 in the Council Chambers in the Yakima City Hall at 129 North 2nd Street, Yakima, Washington. Attendance at this meeting is voluntary and will not be considered in the City's review of bids. The City of Yakima in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 .U.S.C. 2000d to 2000-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full 7 opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. The City reserves the right to reject any or all bids and proposals. DATED this 16`h day of October, 2012 PUBLISH: October 18, 2012 October 25, 2012 8 STANDARD SPECIFICATIONS The 2012 Standard Specifications for Road, Bridge, and Municipal Construction published by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, by this reference, are made a part of these Contract Documents. Except as may be amended, modified, or supplemented hereinafter, each section of the Standard Specifications shall be considered as much a part of these Contract Documents as if they were actually set forth herein. INTRODUCTION The following Amendments and Special Provisions shall be used in conjunction with the 2012 Standard Specifications for Road, Bridge, and Municipal Construction. AMENDMENTS TO THE STANDARD SPECIFICATIONS The following Amendments to the Standard Specifications are made a part of this contract and supersede any conflicting provisions of the Standard Specifications. For, informational purposes, the date following each Amendment title indicates the implementation date of the Amendment or the latest date of revision. Each Amendment contains all current revisions to the applicable section of the Standard Specifications and may include references which do not apply to this particular project. Section 1-01, Definition and Terms August 6, 2012 1-01.3 Definitions The definition for "Bid Documents" is revised to read: The component parts of the proposed Contract which may include, but are not limited to, the Proposal Form, the proposed Contract Provisions, the proposed Contract Plans, Addenda, and, for projects with Contracting Agency subsurface investigations, the Summary of Geotechnical Conditions and subsurface boring Togs (if any). The definition for "Superstructures" is revised to read: The part of the Structure above: 1. The bottom of the grout pad for the simple and continuous span bearing, or 2. The bottom of the block supporting the girder, or 3. Arch skewback and construction joints at the top of vertical abutment members or rigid frame piers. Longitudinal limits of the Superstructure extend from end to end of the Structure in accordance with the following criteria: 9 1. From the face of end diaphragm abutting the bridge approach embankment for end piers without expansion joints, or 2. From the end pier expansion joint for bridges with end pier expansion joints. Superstructures include, but are not limited to, the bottom slab and webs of box girders, the bridge deck and diaphragms of all bridges, and the sidewalks when shown on the bridge deck. The Superstructure also includes the girders, expansion joints, bearings, barrier, and railing attached to the Superstructure when such Superstructure components are not otherwise covered by separate unit measured or lump sum bid items. Superstructures do not include endwalls, wingwalls, barrier and railing attached to the wingwalls, and cantilever barriers and railings unless supported by the Superstructure. Section 1-02, Bid Procedures and Conditions January 2, 2012 1-02.4(2) Subsurface Information The first two sentences in the first paragraph are revised to read: If the Contracting Agency has made subsurface investigation of the site of the proposed work, the boring log data, soil sample test data, and geotechnical recommendations reports obtained by the Contracting Agency will be made available for inspection by the Bidders at the location specified in the Special Provisions. The Summary of Geotechnical Conditions, as an appendix to the Special Provisions, and the boring logs shall be considered as part of the Contract. Section 1-03, Award and Execution of Contract April 2, 2012 1-03.1(1) Tied Bids This section's title is revised to read: 1-03.1(1) Identical Bid Totals Section 1-05, Control of Work August 6, 2012 1-05.13(1) Emergency Contact List The second sentence in the first paragraph is revised to read: The list shall include, at a minimum, the Prime Contractor's Project Manager, or equivalent, the Prime Contractor's Project Superintendent, the Erosion and Sediment Control (ESC) Lead and the Traffic Control Supervisor. 10 Section 1-07, Legal Relations and Responsibilities to the Public June4,2012 1-07.1 Laws to be Observed The following two sentences are inserted after the first sentence in the third paragraph: In particular the Contractor's attention is drawn to the requirements of WAC 296.800 which requires employers to provide a safe workplace. More specifically WAC 296.800.11025 prohibits alcohol and narcotics from the workplace. Section 1-08, Prosecution and Progress April 2, 2012 1-08.1 Subcontracting In the eighth paragraph, "Contracting Agency" is revised to read "WSDOT". 1-08.3(1) General Requirements The following new paragraph is inserted after the first paragraph: Total float belongs to the project and shall not be for the exclusive benefit of any party. 1-08.7 Maintenance During Suspension The second paragraph is revised to read: At no expense to the Contracting Agency, the Contractor shall provide through the construction area safe, smooth, and unobstructed roadways and pedestrian access routes for public use during the suspension (as required in Section 1-07.23 or the Special Provisions.) This may include a temporary road, alternative pedestrian access route or detour. Section 1-09, Measurement and Payment August 6, 2012 1-09.1 Measurement of Quantities The following new sentence is inserted after the sentence ""Ton":2,000 pounds of avoirdupois weight": Items of payment that have "Lump Sum" or "Force Account" in the Bid Item of Work shall have no specific unit of measurement requirement. 1-09.2(5) Measurement The second sentence in the first paragraph is revised to read: The frequency of verification checks will be such that at least one test weekly is performed for each scale used in weighing contract items of Work. 11 Section 3-04, Acceptance of Aggregate April 2, 2012 3-04.3(7)D4 An Entire Lot The last sentence is deleted. 3-04.5 Payment In the second paragraph, the reference "Section 3-04.3(6)C " is revised to read "Section 3- 04.3(8)". In Table 1, the row containing the item "Gravel Borrow for Geosynthetic Retaining Wall" is revised to read: 9-03.14(4) Gravel Borrow for Geosynthetic 4000 2000 $30 $60 Retaining Wall Section 5-04, Hot Mix Asphalt August 6, 2012 5-04.3(10)B3 Longitudinal Joint Density The section including title is revised to read: 5-04.3(10)63 Vacant 5-04.3(11)D General The last sentence in the first paragraph is deleted. Section 6-02, Concrete Structures August 6, 2012 6-02.3(2) Proportioning Materials The Lean Concrete value in the column "Minimum Cemetitious Content (pounds)" in the table titled "Cementitious Requirement for Concrete" is revised to read: ****145 The following new note is inserted after the note "*** No maximum specified" in the table titled "Cementitious Requirement for Concrete": ****Maximum of 200 pounds 6-02.3(2)B Commercial Concrete The second paragraph is revised to read: Where concrete Class 3000 is specified for items such as, culvert headwalls, plugging culverts, concrete pipe collars, pipe anchors, monument cases, Type PPB, PS, I, FB and RM signal standards, pedestals, cabinet bases, guardrail anchors, fence post footings, sidewalks, curbs, and gutters, the Contractor may use commercial concrete. If commercial concrete is used for sidewalks, curbs, and gutters, it shall have a minimum cementitious 12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 material content of 564 pounds per cubic yard of concrete, shall be air entrained, and the tolerances of Section 6-02.3(5)C shall apply. 6-02.3(2)D Lean Concrete This section is revised to read: Lean concrete shall meet the cementitious requirements of Section 6-02.3(2) and have a maximum water/cement ratio of 2. 6-02.3(14)C Pigmented Sealer for Concrete Surfaces This section is revised to read: The Contractor shall submit the pigmented sealer manufacturer's written instructions covering, at a minimum, the following: 1. . Surface preparation 2. Application methods 3. Requirements for concrete curing prior to sealer application 4. Temperature, humidity and precipitation limitations for application 5. Rate of application and number of coats to apply The Contractor shall not begin applying pigmented sealer to the surfaces specified to receive the sealer until receiving the Engineer's approval of the submittal. All surfaces specified in the Plans to receive pigmented sealer shall receive a Class 2 surface finish (except that concrete barrier surfaces shall be finished in accordance with Section 6.02.3(11)A). The Contractor shall not apply pigmented sealer from a batch greater than 12 months past the initial date of color sample approval of that .batch by the Engineer. The pigmented sealer color or colors for specific concrete surfaces shall be as specified in the Special Provisions. The final appearance shall be even and uniform without blotchiness, streaking or uneven color. Surface finishes deemed unacceptable by the Engineer shall be re -coated in accordance with the manufacturer's recommendations at no additional expense to the Contracting Agency. 'For concrete surfaces such as columns, retaining walls, pier walls, abutments, concrete fascia panels, and noise barrier wall panels, the pigmented sealer shall extend to 1 foot below the finish ground line, unless otherwise shown in the Plans. 6-02.3(16) Plans for Falsework and Formwork Item No. 4 in the seventh paragraph is revised to read: 4. Conditions required by other Sections of 6-02.3(17), Falsework and Formwork. 13 Item's No. 5, 6, 7, and 8 in the seventh paragraph are deleted. The following paragraph is inserted after the seventh paragraph: Plan approval can be done by the Project Engineer for footings and walls 4 to 8 feet high (excluding pedestal height) provided: 1. Concrete placement rate is 4 feet per hour or less. 2. Facing is 3/4 -inch plywood with grades as specified per Section 6-02.3(17)1. 3. Studs, with plywood face grain perpendicular, are 2 by 4's spaced at 12 inches. 4. Walers with 3,000 pound safe working load ties spaced at 24 inches are two 2 by 4's spaced at 24 inches. 6-02.3(17)F Bracing In the first paragraph, the phrase "per Section 6-02.3(17)1" is revised to read "in accordance with Section 6-02.3(17)1". This section is supplemented with the following new sub -section: 6-02.3(17)F5 Temporary Bracing for Bridge Girders During Diaphragm and Bridge Deck Concrete Placement Prestressed concrete girders shall be braced to resist forces that would cause rotation or torsion in the girders caused by the placing of precast concrete deck panels and concrete for the bridge deck. Bracing shall be designed and detailed by the Contractor and shall be shown in the falsework/formwork plans submitted to the Engineer for approval. These braces shall be furnished, installed, and removed by the Contractor at no additional cost to the Contracting Agency. The Contractor may consider the bracing effects of the diaphragms in developing the falsework/formwork plans. The Contractor shall account for the added load from concrete finishing machines and other construction loadings in the design of the bracing. Falsework support brackets and braces shall not be welded to structural steel bridge members or to steel reinforcing bars. 6-02.3(17)F4 Temporary Bracing for Bridge Girders This section including title is revised to read: 6-02.3(17)F4 Temporary Bracing for Bridge Girders During Erection Steel girders shall be braced in accordance with Section 6-03.3(7)A. Prestressed concrete girders shall be braced sequentially during girder erection. The bracing shall be designed and detailed by the Contractor and shall be shown in the falsework/formwork plans submitted to the Engineer for approval. The Contractor shall furnish, install, and remove the bracing at no additional cost to the Contracting Agency. 14 At a minimum, the Contractor shall brace girders at each end and at midspan to prevent lateral movement or rotation. This bracing shall be placed priorto the release of each girder from the erection equipment. If the bridge is constructed with cast -in-place concrete diaphragms, the bracing may be removed once the concrete in the diaphragms hasbeen placed and cured for a minimum of 24 hours. 6-02.3(17)H Formwork Accesories The first paragraph is deleted and replaced with the following two new paragraphs: Formwork accessories such as form ties, form anchors, form hangers, anchoring inserts, and similar hardware shall be specifically identified in the formwork plans including the name and size of the hardware, manufacturer, safe working load, and factor of safety. The grade of steel shall also be indicated for threaded rods, coil rods, and similar hardware. Wire form ties shall not be used. Welding or clamping formwork accessories to Contract Plan reinforcing steel will not be allowed. Driven types of anchorages for fastening forms or form supports to concrete, and Contractor fabricated "J" hooks shall not be used. Field drilling of holes in prestressed girders is not allowed. Taper ties may be used provided the following conditions are met: 1. The structure is not designed to resist water pressure (pontoons, floating dolphins, detention vaults, etc.) 2. After the taper tie is removed, plugs designed and intended for plugging taper tie holes shall be installed at each face of concrete. The plug shall be installed a minimum of 1 1/2" clear from the face of concrete. 3. After the plug is installed, the hole shall be cleaned of all grease, contamination and foreign matter. 4. Holes on the exposed faces of concrete shall be patched and finished to match the surrounding concrete. 6-02.3(25)N Prestressed Concrete Girder Erection The third sentence in the fifth paragraph is revised to read: The girders shall be braced in accordance with Sections 6-02.3(17)F4 and 6-02.3(17)F5. 6-02.3(26)E5 Leak Tightness Testing The first sentence in the first paragraph is revised to read: The Contractor shall test each completed duct assembly for leak tightness after placing concrete but prior to placing post tensioning reinforcement. The second paragraph is revised to read: Prior to testing, all grout caps shall be installed and all vents, grout injection ports, and drains shall either be capped or have their shut-off valves closed. The Contractor shall pressurize the completed duct assembly to an initial air pressure of 50 psi. This pressure shall be held for five minutes to allow for internal adjustments within the assembly. After five 15 minutes, the air supply valve shall be closed. The Contractor shall monitor and measure the pressure maintained within the closed assembly, and any subsequent Toss of pressure, over a period of one minute following the closure of the air supply valve. The maximum pressure loss for duct assemblies equal to or less than 150 feet in length shall be 25 psig. The maximum pressure loss for duct assemblies greater than 150 feet in length shall be 15 psig. If the pressure Toss exceeds the allowable, locations of leakage shall be identified, repaired or reconstructed using methods approved by the Engineer. The repaired system shall then be retested. The cycle of testing, repair and retesting of each completed duct assembly shall continue until the completed duct assembly completes a test with pressure loss within the specified amount. Section 6-03, Steel Structures April 2, 2012 6-03.3(28)A Method of Shop Assembly The first sentence in Item 2.C. is revised to read: For Trusses and Girders — After the first stage has been completed, each subsequent stage shall be assembled to include: at least one truss panel or girder shop section of the previous stage and two or more truss panels or girder shop sections added at the advancing end. Section 6-05, Piling August 6, 2012 6-05.5 Payment The paragraph following the bid item, "Driving St. Pile", per each is revised to read: The unit Contract price per each for "Driving (type) Pile ( )" shall be full pay for driving the pile to the ultimate bearing and/or penetration specified. Section 6-06, Bridge Railings August 6, 2012 6-06.3(2) Metal Railings The third paragraph is revised to read: Anchor bolts shall be positioned with a template to ensure that bolts match the hole spacing of the bottom channels or anchorage plates. Section 6-07, Painting April 2, 2012 6-07.3(9)A Paint System The first sentence in the second paragraph is revised to read: All paint coating components of the selected paint system shall be produced by the same manufacturer. 16 1 1 6-07.3(10)H Paint System The first and second sentences in the second paragraph are revised to read: All paint coating components of the selected paint system shall be produced by the same manufacturer. Section 6-10, Concrete Barrier August 6, 2012 6-10.3 Construction Requirements This section is supplemented with the following: Steel welded wire reinforcement deformed, conforming to Section 9-07.7, may be substituted in concrete barrier in place of deformed steel bars conforming to Section 9-07.2, subject to the following conditions: 1. Steel welded wire reinforcement spacing shall be the same as the deformed steel bar spacing as shown in the Standard Plans. 2. The minimum cross sectional area for steel welded wire reinforcement shall be no less than 86 percent of the cross sectional area for the deformed steel bars being substituted. ' 3 Development lengths and splice lengths shall conform to requirements specified in the AASHTO LRFD Bridge Design Specifications, current edition. ' 6-10.5 Payment In the second paragraph, the bid item "Conc. Class 4000" is revised to read: "Conc. Class 4000" Section 6-15, Soil Nail Walls 1 January 2, 2012 6-15.2 Materials The referenced section for the following item is revised to read: Grout 9-20.3(4) 1 6-15.3(3) Submittals Item f. beneath item number 3 is revised to read: f. Mix design and procedures for placing the grout. ' 6-15.3(6) Soil Nailing This section is supplemented with the following: 1 17 1 The Contractor shall make and cure grout cubes once per day in accordance with WSDOT Test Method T 813. These samples shall be retained by the Contractor until all associated verification and proof testing of the soil nails has been successfully completed. If the Contractor elects to test the grout cubes for compressive strength, testing shall be conducted by an independent laboratory and shall be in accordance with the WSDOT FOP for AASHTO T106. Section 6-16, Soldier Pile and Soldier Pile Tieback Walls January 2, 2012 6-16.3(3) Shaft Excavation The third sentence in the seventh paragraph is revised to read: When efforts to advance past the obstruction to the design shaft tip elevation result in the rate. of advance of the shaft drilling equipment being significantly reduced relative to the rate of advance for the rest of the shaft excavation, then the Contractor shall remove the obstruction under the provisions of Section 6-16.5. 6-16.5 Payment This section is supplemented with the following: "Removing Soldier Pile Shaft Obstructions", estimated. Payment for removing obstructions, as defined in Section 6-16.3(3), will be made for the changes in shaft construction methods necessary to remove the obstruction. The Contractor and the Engineer shall evaluate the effort made and reach agreement on the equipment and employees utilized, and the number of hours involved for each. Once these cost items and their duration have been agreed upon, the payment amount will be determined using the rate and markup methods specified in Section 1-09.6. For the purpose of providing a common proposal for all bidders, the Contracting Agency has entered an amount for the item "Removing Soldier Pile Shaft Obstructions" in the bid proposal to become a part of the total bid by the Contractor. If the shaft construction equipment is idled as a result of the obstruction removal work and cannot be reasonably reassigned within the project, then standby payment for the idled equipment will be added to the payment calculations. If labor is idled as a result of the obstruction removal work and cannot be reasonably reassigned within the project, then all labor costs resulting from Contractor labor agreements and established Contractor policies will be added to the payment calculations. The Contractor shall perform the amount of obstruction work estimated by the Contracting Agency within the original time of the contract. The Engineer will consider a time adjustment and additional compensation for costs related to the extended duration of the shaft construction operations, provided: 1. the dollar amount estimated by the Contracting Agency has been exceeded, and; 2. the Contractor shows that the obstruction removal work represents a delay to the completion of the project based on the current progress schedule provided in accordance with Section 1-08.3. 18 1 Section 6-17, Permanent Ground Anchors August 6, 2012 6-17.3(3) Submittals The first sentence in the sixth paragraph is revised to read: 1 The Contractor shall submit the mix design for the grout conforming to Section 9-20.3(4) and the procedures for placing the grout to the Engineer for approval. 6-17.3(7) Installing Permanent Ground Anchors The following new paragraph is inserted after the sixth paragraph: ' The Contractor shall make and cure grout cubes once per day in accordance with WSDOT Test Method T 813. These samples shall be retained by the Contractor until all associated verification, performance and proof testing of the permanent ground anchors has been successfully completed. If the Contractor elects to test the grout cubes for compressive ' strength, testing shall be conducted by an independent laboratory and shall be in accordance with the WSDOT FOP for AASHTO T106. ' 6-17.3(9) Permanent Ground Anchor Acceptance Criteria The fourth paragraph is deleted. Section 6-19, Shafts August 6, 2012 t6-19.3(4)F Slurry Disposal This section including title is revised to read: ' 6-19.3(4)F Disposal of Slurry and Slurry Contacted Spoils The Contractor shall dispose of the slurry and slurry -contacted spoils as specified in the ' shaft installation narrative . in accordance with Section 6-19.3(2)B, item 8, and in accordance with the following requirements: U 1. Water slurry with no additives may be infiltrated to an upland area within the confines of the Contracting Agency _Right of Way for the project. Infiltration is allowed provided the ground -line at the disposal site is at least 5 feet above the 1 current water table, and that disposal operations conform to the temporary erosion and sedimentation control (TESC) requirements. established .for this project. For the purposes of water slurry disposal, upland is defined as an area that has no chance of discharging directly to waters of the State, including wetlands or ' conveyances that indirectly lead to wetlands or waters of the State. Spoils in contact with this slurry may be disposed of as clean fill. 2. Synthetic slurry and water slurry with polymer -based additives shall be contained and disposed of by the Contractor at an approved facility. The Contractor shall acquire all permits or approvals necessary for disposal of the slurry and shall ' provide copies to the Engineer. Spoils in contact with synthetic slurry or water slurry with polymer -based additives shall be disposed of in accordance with Section 2-03.3(7)C. With approval of the Engineer, the Contractor may re -use 1 • these spoils on-site. 19 1 3. Mineral slurry may be infiltrated to a temporary sediment trap located in an upland area within the confines of the Contracting Agency Right of Way for the project. Infiltration is allowed provided the ground -line at the disposal site is at least 5 feet above the current water table, and that disposal operations conform to the temporary erosion and sedimentation control (TESC) requirements established for this project. For the purposes of mineral slurry disposal, upland is defined as an area that has no chance of discharging directly to waters of the State, including wetlands or conveyances that indirectly lead to wetlands or waters of the State. Spoils in contact with mineral slurry shall be disposed of in accordance with Section 2- 03.3(7)C. With approval of the Engineer, the Contractor may re -use these spoils on- site. Section 7-02, Culverts August 6, 2012 7-02.2 Materials Note 3 in the table titled, "Culvert Pipe Schedules" is revised to read: 3Polypropylene pipe, 12 inch to 30 inch diameters approved for Schedule A and Schedule B, 36 inch to 60 inch diameters approved for Schedule A only. 7-02.5 The bid item "Steel Rib Reinforced Polyethylene Culvert Pipe revised to read: In. Diam.", per linear foot is "St. Rib Reinf Polyethylene CuIv. Pipe In. Diam.", per linear foot Section 7-04, Storm Sewers August 6, 2012 7-04.3(1)B Exfiltration Test — Storm Sewers The fifth column title "PE4" is revised to read "PP4" from the table titled, "Storm Sewer Pipe Schedules". Note 4 in the table titled, "Storm Sewer Pipe Schedules" is revised to read: 4PP = Polypropylene Pipe, 12 inch to 30 inch approved for Schedule A and Schedule B, 36 inch to 60 inch diameters approved for Schedule A only. 7-04.5 The bid item "Steel Rib Reinforced Polyethylene Storm Sewer Pipe In Diam", per linear foot is revised to read: "St. Rib Reinf Polyethylene Storm Sewer Pipe In. Diam", per linear foot 20 Section 7-05, Manholes, Inlets, Catch Basins, and Drywells April 2, 2012 7-05.3 Construction Requirements The third paragraph is supplemented with the following: Leveling and adjustment devices that do not modify the structural integrity of the metal frame, grate or cover, and do not void the originating foundry's compliance to these specifications and warranty is allowed. Approved leveling devices are listed in the Qualified Products List. Leveling and adjusting devices that interfere with the backfilling, backfill density, grouting and asphalt density will not be allowed. The hardware for leveling and adjusting devices shall be completely removed when specified by the Project Engineer. Section 7-08, General Pipe Installation Requirements August 6, 2012 7-08.3(2)D Pipe Laying — Steel or Aluminum The following new sentence is inserted after the first sentence in the second paragraph: The paint shall cover all the surface in contact with the concrete and extend one inch beyond the point of contact. Section 7-09, Water Mains August 6, 2012 7-09.3(19)A Connections to Existing Mains In the second paragraph, "Special Conditions" is revised to read "Special Provisions". Section 8-01, Erosion Control and Water Pollution Control August 6, 2012 8-01.3(2)D Mulching The following two new paragraphs are inserted after the fourth paragraph: Short -Term Mulch shall be hydraulically applied at the rate of 2500 pounds per acre and may be applied in one lift. Moderate -Term Mulch and Long -Term Mulch shall be hydraulically applied at the rate of 3500 pounds per acre with no more than 2000 pounds applied in any single lift. 8-01.3(2)E Soil Binders and Tacking Agents The first paragraph is revised to read: Tacking agents or soil binders applied using a hydroseeder shall have a mulch tracer added to visibly aid uniform application. This tracer shall not be harmful to plant, aquatic, or animal life. A minimum of 125 pounds per acre and a maximum of 250 pounds per acre of Short -Term Mulch shall be used as a tracer. 21 The last two paragraphs are deleted. 8-01.3(2)F Dates for Application of Final Seed, Fertilizer, and Mulch In the first paragraph, "Engineer" is revised to read "Project Engineer". Note 1 of the table in the first paragraph is revised to read: ' Where Contract timing is appropriate, seeding, fertilizing, and mulching shall be accomplished during the fall period listed above The third paragraph is deleted. 8-01.3(4) Placing Compost Blanket The first paragraph is revised to read: Compost blanket shall be placed to a depth of 3 inches over bare soil. Compost blanket shall be placed prior to seeding or other planting. An organic tackifier shall be placed over the entire composted area when dry or windy conditions are present or expected before the final application of mulch or erosion control blanket. The tackifier shall be applied immediately after the application of compost to prevent compost from leaving the composted area. 8-01.3(5) Placing Plastic Covering The second and third paragraphs are revised to read: Clear plastic covering shall be used to promote seed germination when seeding is performed outside of the Dates for Application of Final Seed in Section 8-01.3(2)F. Black plastic covering shall be used for stockpiles or other areas where vegetative growth is unwanted. The plastic cover shall be installed and maintained in a way that prevents water from cutting under the plastic and prevents the plastic cover from blowing open in the wind. 8-01.3(6) Check Dams This section is revised to read: Check dams shall be installed as soon as construction will allow, or when designated by the Engineer. The Contractor may substitute a different check dam, in lieu of what is specified in the contract, with approval of the Engineer. The check dam is a temporary or permanent structure, built across a minor channel. Water shall not flow through the check dam structure. Check dams shall be constructed in .a manner that creates a ponding area upstream of the dam to allow pollutants to settle, with water from increased flows channeled over a spillway in the check dam. The check dam shall be constructed to prevent erosion in the area below the spillway. Check dams shall be placed perpendicular to the flow of water and installed in accordance with the Standard Plans. The outer edges shall extend up the sides of the conveyance to prevent water from going around the check dam. Check dams shall be of sufficient height to maximize detention, without causing water to leave the ditch. Check dams shall meet the requirements in Section 9-14.5(4). 22 8-01.3(7) Stabilized Construction Entrance The first paragraph is revised to read: Temporary stabilized construction entrance shall be constructed in accordance with the Standard Plans, prior to beginning any clearing, grubbing, embankment or excavation. All quarry spall material used for stabilized construction entrance shall be free of extraneous materials that may cause or contribute to track out. 8-01.3(9)B Gravel Filter, Wood Chip, or Compost Berm The first paragraph is revised to read: Filter berms shall retain sediment and direct flows. The gravel filter berm shall be a minimum of 1 foot in height and shall be maintained at this height for the entire time they are in use. Rock material used for filter berms shall meet the grading requirements in Section 9-03.9(2), but shall not include anyrecycled materials as outlined in Section 9- 03.21. 8-01.3(9)C Straw Bale Barrier This section including title is revised to read: 8-01.3(9)C Vacant 8-01.3(11) Vacant This section including title is revised to read: 8-01.3(11) Outlet Protection Outlet protection shall prevent scour at the outlets of ponds, pipes, ditches or other conveyances. All quarry spall material used for outlet protection shall be free of extraneous material and meet the gradation requirements in Section 9-13.6. 8-01.3(13) Temporary Curb This section is revised to read: Temporary curbs shall divert or redirect water around erodible soils. Temporary curbs shall be installed along pavement edges to prevent runoff from flowing onto erodible slopes. Water shall be directed to areas where erosion can be controlled. The temporary curbs shall be a minimum of 4 inches in height. Ponding shall not be in roadways. 8-01.4 Measurement The third paragraph is revised to read: Check dams will be measured per linear foot one time only along the completed check dam. No additional measurement will be made for check dams that are required to be rehabilitated or replaced due to wear. The ninth paragraph is deleted. This section is supplemented with the following: 23 Outlet Protection will be measured per each initial installation at an outlet location. 8-01.5 Payment The bid item "Straw Bale", per each is deleted. This section is supplemented with the following: "Outlet Protection", per each. Section 8-02, Roadside Restoration August 6, 2012 In this section, "psiPE" is revised to read "PSIPE". 8-02.3(4)C Topsoil Type C In this section, "9-14.1(2)" is revised to read "9-14.1(3)". 8-02.3(8) Planting Item number 1 in the second paragraph is revised to read: 1. Non -Irrigated Plant Material West of the summit of the Cascade Range - October 1 to March 1. East of the summit of the Cascade Range - October 1 to November 15. 8-02.5 Payment The paragraph following bid item "Coarse Compost", per cubic yard" is revised to read: The unit Contract price per cubic yard for "Fine Compost", Medium Compost" or "Coarse Compost" shall be full pay for furnishing and spreading the compost onto the existing soil. Section 8-03, Irrigation Systems April 2, 2012 8-03.3(7) Flushing and Testing The fifth paragraph is deleted. Section 8-04, Curbs, Gutters, and Spillways April 2, 2012 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways This section is supplemented with the following new sub -section: 8-04.3(1)B Roundabout Cement Concrete Curb and Gutter Roundabout cement concrete curb and gutter and roundabout splitter island nosing curb shall be shaped and finished to match the shape of the adjoining curb as shown in the Plans. All other requirements for cement concrete curb and cement concrete curb and gutter shall apply to roundabout cement concrete curb and gutter. 24 8-04.4 Measurement This section is supplemented with the following: Roundabout splitter island nosing curb will be measured per each. 8-04.5 Payment The bid item, "Roundabout Truck Apron Cement Concrete Curb", per linear foot is deleted. This section is supplemented with the following: "Roundabout Cement Concrete Curb and Gutter", per linear foot The unit Contract price per linear foot for "Roundabout Cement Concrete Curb and Gutter" shall be full payment for all costs for the Work including transitioning the roundabout cement concrete curb and gutter to the adjoining curb shape. "Roundabout Splitter Island Nosing Curb", per each. '. The unit Contract price per each for "Roundabout Splitter Island Nosing Curb" shall be full payment for all costs for the Work including transitioning the roundabout splitter island nosing curb to the adjoining curb shape. Section 8-07, Precast Traffic Curb and Block Traffic Curb August 6, 2012 E This section's title is revised to read: 1 8-07 Precast Traffic Curb ' 8-07.1 Description This section is revised to read: This Work consists of furnishing and installing precast traffic sloped mountable curb or dual faced sloped mountable curb of the design and type specified in the Plans in accordance with these Specifications and the Standard Plans in the locations indicated in the Plans or as staked by the Engineer. 8-07.2 Materials The material reference "Block Traffic Curb 9-18.3" is deleted from this section. 8-07.3(1) Installing Curbs The fifth and seventh paragraphs are deleted from this section. 8-07.4 Measurement The first paragraph is deleted from this section. 8-07.5 Payment The'following bid items are deleted from this section: 1 25 "Type A Precast Traffic Curb", per linear foot. "Type C Precast Traffic Curb", per linear foot. "Type A Block Traffic Curb", per linear foot. "Type C Block Traffic Curb", per linear foot. Section 8-12, Chain Link Fence and Wire Fence April 2, 2012 In this Section "Engineer" is revised to read "Project Engineer". 8-12.1 Materials This section is supplemented with the following: Paint 9-08.1(2)B 8-12.3(1)A Posts The words "for Type 3 and Type 4 fences" and "on Type 3 and Type 4 fences" are deleted from this section. The first sentence of the fifth paragraph is revised to read: After the post is set and plumbed, the hole shall be filled with Grout Type 4. The third sentence in the sixth paragraph is replaced with the following two sentences: After the post is set and plumbed, the hole in the portion of the post in solid rock shall be filled with Grout Type 4. The grout shall be thoroughly worked into the hole so as to leave no voids. The seventh paragraph is deleted. The ninth paragraph is revised to read: Steep slopes or abrupt topography may require changes in various elements of the fence. It shall be the responsibility of the Contractor to provide all posts of sufficient length to accommodate the chain link fabric. The tenth paragraph is revised to read: All round posts shall have approved top caps fastened securely to the posts. The base of the top cap fitting for round posts shall feature an apron around the outside of the posts. 8-12.3(1)B Top Rail This section's content including title is deleted and replaced with: 8-12.3(1)B Vacant 8-12.3(1)C Tension Wire and Tension Cable This section's content including title is revised to read: 26 8-12.3(1)C Tension Wire Tension Wires shall be attached to the posts as detailed in the Plans or as approved by the Engineer. 8-12.3(1)D Chain Link Fabric The first three paragraphs are revised to read: Chain link fabric shall be attached after the cables and wires have been properly tensioned. Chain link fabric shall be placed on the face of the post away from the Highway, except on horizontal curves where it shall be placed on the face on the outside of the curve unless otherwise directed by the Project Engineer. Chain Zink fabric shall be placed approximately 1 -inch above the ground and on a straight grade between posts by excavating high points of ground. Filling of depressions will be permitted only upon approval, of the Project Engineer. The fourth sentence in the fourth paragraph is revised to read: The top and bottom edge of the fabric shall be fastened with hog rings to the top and bottom -tension wires as may be applicable, spaced at 24 -inch intervals. 8-12.3(1)E Chain Link Gates The third paragraph is deleted. 8-12.3(2)A Posts In the second paragraph, "commercial" is deleted. The first sentence of the fifth paragraph is revised to read: After the post is set and plumbed, the hole shall be filled with Grout Type 4. The fourth sentence in the sixth paragraph is replaced with the following two sentences: After the post is set and plumbed, the hole in the portion of the post in solid rock shall be filled with Grout Type 4. The grout shall be thoroughly worked into the hole so as to leave no voids. The tenth paragraph is revised to read: Where the new fence joins an existing fence, the 2 shall be attached in a manner satisfactory to the Project Engineer, and end or corner posts shall be set as necessary. The eleventh paragraph is deleted. 8-12.5 Payment The paragraph following the item "Chain Link Fence Type ", per linear foot is revised to read: 27 The unit Contract price per linear foot for "Chain Link Fence Type " shall be full payment for all costs for the specified Work including brace post installation and all other requirements of Section 8-12 for Chain Link Fence, unless covered in a separate Bid Item in this Section. The following paragraph is inserted after the item "End, Gate, Corner, and Pull Post for Chain Link Fence", per each: The unit Contract price per each for "End, Gate, Corner, and Pull Post for Chain Link Fence" shall be full payment for all costs for the specified Work. The following paragraph is inserted after the item "Single 6 Ft. Chain Link Gate", per each: The unit Contract price per each for "Double 14 Ft. Chain Link Gate", "Double 20 Ft, Chain Link Gate", and "Single 6 Ft. Chain Link Gate", shall be full payment for all costs for the specified Work. The paragraph following the item "Wire Fence Type ", per linear foot is revised to read The unit Contract price per each for "Wire Fence Type " shall be full payment for all costs for the specified Work including payment for clearing of the fence line. The following paragraph is inserted after the item "Double Wire Gate 20 Ft. Wide", per each: The unit contract price per each for "Single Wire Gate 14 Ft. Wide" and "Double Wire Gate 20 Ft. Wide" shall be full payment for all costs for the specified Work. The paragraph following the item "Access Control Gate", per each is revised to read: The unit contract price per each for "Access Control Gate" shall be full payment for all costs to perform the specified Work. Section 8-15, Riprap April 2, 2012 8-15.1 Description The second paragraph is revised to read: Riprap will be classified as heavy loose riprap, light loose riprap, and hand placed riprap. Section 8-20, Illumination, Traffic Signal Systems, And Electrical August 6, 2012 8-20.3(4) Foundations The first paragraph is revised to read: Foundation concrete shall conform to the requirements for the specified class, be cast -in- place concrete and be constructed in accordance with Sections 6-02.2 and 6-02.3. Concrete for Type II, III, IV, V, and CCTV signal standards and light standard foundations shall be Class 4000P. Concrete for pedestals and cabinets, Type PPB, PS, I, FB, and RM 28 signal standards and other foundations shall be Class 3000. Concrete placed into an excavation where water is present shall be placed using an approved tremie. If water is not present, the concrete shall be placed such that the free -fall is vertical down the center of the shaft without hitting the sides, the steel reinforcing bars, or the steel reinforcing bar cage bracing. The Section 6-02.3(6) restriction for 5 -feet maximum free -fall shall not apply to placement of Class 4000P concrete into a shaft. Steel reinforcing bars for foundations shall conform to Section 9-07. 8-20.3(9) Bonding, Grounding The first sentence in the second paragraph is replaced with the following two sentences: All conduit installed shall have an equipment ground conductor installed in addition to the conductors noted in the Contract. Conduit with innerducts shall have an equipment ground conductor installed in each innerduct that has an electrical conductor. Section 8-21, Permanent Signing August 6, 2012 8-21.2 Materials The third sentence is revised to read: Materials for sign mounting shall conform to Section 9-28.11. 8-21.3(9)A Fabrication of Steel Structures The first sentence in the first paragraph is revised to read: Fabrication shall conform to the applicable requirements of Section 6-03 and 9-06. This section is supplemented with the following: All fabrication, including repairs, adjustments or modifications of previously fabricated sign structure members and connection elements, shall be performed in the shop, under an Engineer approved shop drawing prepared and submitted by the Contractor for the original fabrication or the specific repair, adjustment or modification. Sign structure fabrication repair, adjustment or modification of any kind in the field is not permitted. If fabrication repair, adjustment or modification occurs after a sign structure member or connection element has been galvanized, the entire member or element shall be re -galvanized in accordance with AASHTO M 111. 8-21.3(9)B Vacant This section including title is revised to read: 8-21.3(9)B Erection of Steel Structures Erection shall conform to the applicable requirements of Sections 6-03 and 8-21.3(9)F. Section 8-21.3(9)F notwithstanding, the Contractor may erect a. sign bridge prior to completion of the shaft cap portion of one foundation for one post provided the following conditions are satisfied: 1. The Contractor shall submit design calculations and working drawings of the temporary supports and falsework supporting the sign bridge near the location of 29 the incomplete foundation to the Engineer for approval in accordance with Section 6-01.9. The submittal shall include the method of releasing and removing the temporary supports and falsework without inducing loads and stress into the sign bridge. 2. The Contractor shall submit the method used to secure the anchor bolt array in proper position with the sign bridge while casting the shaft cap concrete to complete the foundation. 3. The Contractor shall erect the sign bridge and temporary supports and falsework, complete the remaining portion of the incomplete foundation, and remove the temporary supports and falsework, in accordance with the working drawing submittals as approved by the Engineer. 8-21.3(9)F Foundations The following new paragraph is inserted after the second paragraph: Concrete placed into an excavation where water is present shall be placed using an approved tremie. If water is not present, the concrete shall be placed such that the free -fall is vertical down the center of the shaft without hitting the sides, the steel reinforcing bars, or the steel reinforcing bar cage bracing. The Section 6-02.3(6) restriction for 5 -feet maximum free -fall shall not apply to placement of Class 4000P concrete into a shaft. The eighth paragraph is replaced with the following three new paragraphs: After construction of concrete foundations for sign bridge and cantilever sign structures, the Contractor shall survey the foundation locations and elevations, the anchor bolt array locations and lengths of exposed threads. The Contractor shall confirm that the survey conforms to the sign structure post, beam, span and foundation design geometry shown in the Plans, and shall identify any deviations from the design geometry shown in the Plans. When deviations are identified, the Contractor shall notify the Engineer, and such notice shall be accompanied by the Contractor's proposed method(s) of addressing the deviations, including removal and reconstruction of the shaft cap portion of the affected concrete foundation as outlined in this Section, or fabrication repair, adjustment or modification, with associated shop drawings, in accordance with Section 8-21.3(9)A. If the Contractor's survey indicates that a concrete foundation has been constructed incorrectly for a sign structure that has already been fabricated, the Contractor may remove and reconstruct the shaft cap portion of the foundation, in accordance with Section 1-07.13, provided the following conditions are satisfied: 1. The Contractor shall submit the method and equipment to be used to remove the portion of the concrete foundation to be removed and reconstructed to the Engineer for approval in accordance with Section 1-05.3. The submittal shall include confirmation that the equipment and the method of operation is appropriate to ensure that the existing anchor bolt array and primary shaft vertical steel reinforcing bars will not be damaged. 2. All steel reinforcing bars, except for steel reinforcing bars extending from the bottom portion of the foundation to remain, shall be removed and disposed of in accordance with Sections 2-02.3 and 2-03.3(7)C, and shall be replaced with new 30 steel reinforcing bars conforming to the size, dimensions and geometry shown in the Plans. All concrete of the removed portion of the foundation shall be removed and disposed of in accordance with Sections 2-02.3 and 2-03.3(7)C. 3. The Contractor shall adjust the primary shaft vertical steel reinforcing bars as necessary in accordance with Section 6-02.3(24)C to provide clearance for the anchor bolt array. Sign structures shall not be erected on concrete foundations until the Contractor confirms that the foundations and the fabricated sign structures are either compatible with each other and the design geometry shown in the Plans, or have been modified in accordance with this Section and as approved by the Engineer to be compatible with each other, and the foundations have attained a compressive strength of 2,400 -psi.' Item number 4 in the ninth paragraph is revised to read: 4. Concrete shall be Class 4000P, except as otherwise specified. The concrete for the shaft cap (the portion containing the anchor bolt array assemblies above the construction joint at the top of the shaft) shall be Class 4000. Item number 3 in the tenth paragraph is revised to read: 3. Unless otherwise shown in the Plans, concrete shall be Class 4000P. 8-21.5 Payment This section is supplemented with the following: AH costs in connection with surveying completed concrete foundations for sign bridges and cantilever sign structures shall be included in the lump sum contract price for "Structure Surveying", except that when no Bid item is included. in the Proposal for "Structure Surveying" then such costs shall be included in the lump sum contract price(s) for "Sign Bridge No. " and "Cantilever Sign Structure No. ". Section 8-22, Pavement Marking August 6, 2012 8-22.3(6) Removal of Pavement Markings The following new sentence is inserted after the first sentence: Grinding to remove plastic marking is allowed to a depth just above the pavement surface, then water blasting or shot blasting shall be required to remove the remaining markings. 8-22.4 Measurement The items "Painted Wide Line" and "Plastic Wide Line" are deleted from the fourth paragraph. The sixth paragraph is revised to read: Diagonal lines used to delineate parking stalls that are constructed of painted or plastic 4 - inch lines will be measured as "Paint Line" or "Plastic Line" by the linear foot of line installed. Crosswalk line will be measured by the square foot of marking installed. 31 The following two new paragraphs are inserted after the sixth paragraph: Crosshatch markings used to delineate median and gore areas will be measured by the completed linear foot as "Painted Crosshatch Marking" or "Plastic Crosshatch Marking". The measurement for "Painted Crosshatch Marking" and for "Plastic Crosshatch Marking" will be based on the total length of each 8 -inch or 12 -inch wide line installed. 8-22.5 Payment The bid items "Painted Wide Line", per linear foot and "Plastic Wide Line", per linear foot are deleted from this section. This section is supplemented with the following two new bid items: "Painted Crosshatch Marking", per linear foot. "Plastic Crosshatch Marking", per linear foot. The following new paragraph is inserted after the last bid item in this section: The unit Contract price for the aforementioned Bid items shall be full payment for all costs to perform the Work as described in Section 8-22. Section 9-03, Aggregates April 2, 2012 9-03.14(1) Gravel Borrow Note 1 is deleted, including the reference in the table. 9-03.14(2) Select Borrow Note 1 is deleted. Note 2 is re -numbered Note 1, including the reference in the table. 9-03.14(4) Gravel Borrow for Geosynthetic Retaining Wall This section is revised to read: All backfill material for geosynthetic retaining walls shall consist of granular material, either naturally occurring or processed, and shall be free draining, free from organic or otherwise deleterious material. The material shall be substantially free of shale or other soft, poor durability particles, and shall not contain recycled materials, such as glass, shredded tires, portland cement concrete rubble, or asphaltic concrete rubble. The backfill material shall meet the following requirements for grading and quality: Sieve Size Percent Passing 1 1/4 " 1 99-100 1" 90-100 No. 4 50-80 No. 40 30 max. 32 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 No. 200 7.0 max. Sand Equivalent 50 min. All percentages are by weight Property Test Method Allowable Test Value Los Angeles Wear 500 rev. AASHTO T 96 35 percent max. Degradation Factor WSDOT Test Method 113 15 min. pH, permanent walls AASHTO T 289 4.5-9 pH, temporary walls AASHTO T 289 3-10 Wall backfill material satisfying these grading and property requirements shall be classified as.nonaggressive. 9=03.21.(1) General Requirements The first sentence in the first paragraph is revised to read: Hot Mix Asphalt, Concrete Rubble, Recycled Glass (glass cullet), and Steel Furnace Slag may be used as, or blended uniformly with naturally occurring materials for aggregates. 9-03.21(1)C Vacant This section including title is revised to read: 9-03.21(1)C Recycled Glass (Glass Cullet) Glass Cullet shall meet the requirements of AASHTO M 318 with the additional requirement that the glass cullet is limited to the maximum amounts set in Section 9-03.21(1)E for recycled glass. Prior to use the Contractor shall provide certification to the Project Engineer that the recycled glass meets the physical properties and deleterious substances requirements in AASHTO M-318. 9-03.21(1) E Table on Maximum Allowable Percent (By Weight) of Recycled Material The column heading "Recycled Glass" is revised to read "Recycled Glass (Glass Cullet) in the table. In the column "Recycled Glass (Glass Cullet)" all amounts are revised to read "20" beginning with the item "Ballast" and continuing down until the last item in the table. Section 9-04, Joint And Crack Sealing Materials January 2, 2012 9-04.2 Joint Sealants This section is supplemented with the following new sub -sections: 9-04.2(3) Polyurethane Sealant Polyurethane sealant shall conform to ASTM C 920 Type S Grade NS Class 25 Use M. 33 Polyurethane sealant shall be compatible with the closed cell foam backer rod. When required, .compatibility characteristics of sealants in contact with backer rods shall be determined by Test Method ASTM C 1087. 9-04.2(3)A Closed Cell Foam Backer Rod Closed cell foam backer rod for use with polyurethane sealant shall conform to ASTM C 1330 Type C. Section 9-05, Drainage Structures, Culverts, and Conduits August 6, 2012 9-05.24 Polypropylene Culvert Pipe, Polypropylene Storm Sewer Pipe, and Polypropylene Sanitary Sewer Pipe This sections content is deleted and replaced with the following: All joints for polypropylene pipe shall be made with a bell/bell or bell and spigot coupling and shall conform to ASTM D 3212 using elastomeric gaskets conforming to ASTM F 477. All gaskets shall be factory installed on the pipe in accordance with the producer's recommendations. Qualification for each producer of polypropylene storm sewer pipe requires joint system conformance to ASTM D 3212 using elastomeric gaskets conforming to ASTM F 477 and a formal quality control plan for each plant proposed for consideration. A Manufacturer's Certificate of Compliance shall be required and shall accompany the materials delivered to the project. The certificate shall clearly identify production Tots for all materials represented. The Contracting Agency may conduct verification tests of pipe stiffness or other properties it deems appropriate. This section is supplemented with the following new sub -sections: 9-05.24(1) Polypropylene Culvert Pipe and Storm Sewer Pipe Polypropylene culvert and storm sewer pipe shall conform to the following requirements: 1. For dual wall pipe sizes up to 30 inches: ASTM F2736. . 2. For triple wall pipe sizes from 30 to 60 inches: ASTM F2764. 3. For dual wall profile pipe sizes 36 to 60 inches: AASHTO MP 21, Type S or Type D. 4. Fittings shall be factory welded, injection molded or PVC. 9-05.24(2) Polypropylene Sanitary Sewer Pipe Polypropylene sanitary sewer pipe shall conform to the following requirements: 1. For pipe sizes up to 30 inches: ASTM F2736. 2. For pipe sizes from 30 to 60 inches: ASTM F2764. 34 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3. Fittings shall be factory welded, injection molded or PVC. Section 9-06, Structural Steel and Related Materials April 2, 2012 9-06.5(3) High Strength Bolts In this section, "AASHTO M 291" is revised to read "ASTM A 563". Section 9-10, Piling April 2, 2012 9-10.4 Steel Pile Tips and Shoes In the first paragraph "ASTMA A 148 Grade 60-90" is revised to read "ASTMA A 148 Grade 90- 60". Section 9-14, Erosion Control and Roadside Planting August 6, 2012 9-14.3 Fertilizer The second sentence in the first paragraph is revised to read: It may be separate or in a mixture containing the percentage of total nitrogen, available phosphoric acid, and water-soluble potash or sulfur in the amounts specified. 9-14.4(2) Hydraulically Applied Erosion Control Products (HECPs ) The first sentence in the third paragraph is revised to read: All HECPs shall be furnished premixed by the manufacturer with Organic or Synthetic Tackifier as specified in Section 9-14.4(7). The third and fourth rows in Table 1 is revised to read: Heavy Metals EPA 6020A Total Metals Antimony — < 4 mg/kg Arsenic — < 6 mg/kg Barium — < 80 mg/kg Boron — < 160 rng/kg Cadmium — < 2 mg/kg Total Chromium — < 4 mg/kg Copper — < 10 mg/kg Lead — < 5 mg/kg Mercury — < 2 mg/kg Nickel — < 2 mg/kg Selenium — < 10 mg/kg Strontium — < 30 mg/kg Zinc — < 30 mg/kg Water Holding Capacity ASTM D 7367 800 percent minimum 35 9-14.4(2)A Long Term Mulch In the first paragraph, the phrase "within 2 hours of application" is deleted. 9-14.4(4) Wood Strand Mulch The last sentence in the second paragraph is deleted. This section is supplemented with the following new paragraph: The Contractor shall provide Material Safety Data Sheet (MSDS) that demonstrates that the product is not harmful to plant life and a test report performed in accordance with WSDOT Test Method 125 demonstrating compliance to this specification prior to acceptance. 9-14.4(8) Compost The second paragraph is revised to read: Compost production and quality shall comply with WAC 173-350 and for biosolids composts, WAC 173-308. The third paragraph is to read: Compost products shall meet the following physical criteria: 1. Compost material shall be tested in accordance with U.S. Composting Council Testing Methods for the Examination of Compost and Composting (TMECC) 02.02-B, "Sample Sieving for Aggregate Size Classification". Fine compost shall meet the following gradation: Sieve Size Percent Passing Minimum Maximum 1" 100 5/8" 90 100 1/4" 75 100 Note Maximum particle length of 4 inches. Medium compost shall meet the following gradation: Sieve Size Percent Passing Minimum Maximum 1" 100 5/8" 85 100 1/4" 70 85 Note Maximum particle length of 4 inches. Medium compost shall have a carbon to nitrogen ration (C:N) between 18:1 and 35:1. The carbon to nitrogen ration shall be calculated using dry weight of "Organic Carbon" using TMECC 04.01A divided by the dry weight of "Total N" using TMECC 04.02D. 36 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Coarse compost shall meet the following gradation: Sieve Size Percent Passing Minimum - _Maximum 2" 100 1" 90 100 3/4" 70 100 1/4" 40 60 Note Maximum particle length of 6 inches. Coarse compost shall have a carbon to nitrogen ratio (C:N) between 25:1 and 35:1. The carbon to nitrogen: ratio shall be calculated using the dry weight of "Organic Carbon" using TMECC.04.01A divided by the dry weight of "Total N" using TMECC 04.02D. 2. The pH shall be between 6.0 and 8.5 when tested in accordance with U.S. Composting Council TMECC 04.11-A, "1:5 Slurry pH". 3. Manufactured inert material (plastic, concrete, ceramics, metal, etc.) shall be less than 1 percent by weight as determined by U.S. Composting Council TMECC 03.08-A "Classification of Inerts by Sieve Size". 4. Minimum organic matter shall be 40 percent by dry weight basis as determined by U.S. Composting Council TMECC 05.07A "Loss -On -Ignition Organic Matter Method (LOI)". 5. Soluble salt contents shall be less than 4.0 mmhos/cm when tested in accordance with U.S. Composting Council TMECC 04.10 "Electrical Conductivity." 6. Maturity shall be greater than 80 percent in accordance with U.S. Composting Council TMECC 05.05-A, "Germination and Root Elongation". ' 7. Stability shall be 7 -mg CO2—C/g OM/day or below in accordance with U.S. Composting Council TMECC 05.08-B "Carbon Dioxide Evolution Rate". 1 1 1 1 1 1 1 8. The compost product shall originate from organic waste as defined in WAC 173 350 as "Type 1 Feedstocks", "Type 2 Feedstocks", and/or "Type 3 Feedstocks". The Contractor shall provide a list of feedstock sources by percentage in the final compost product. 9. The Engineer may also evaluate compost for maturity using U.S. Composting Council TMECC 05.08-E "Solvita® Maturity Index". Fine compost shall score a number 6 or above on the Solvita® Compost Maturity Test. Medium and coarse compost shall score a 5 or above on the Solvita® Compost Maturity Test. 9-14.4(8)A Compost Approval This section's title is revised to read: 9-14.4(8)A Compost Submittal Requirements The first sentence in this section up until the colon is revised to read: 37 The Contractor shall submit the following information to the Engineer for approval: Item No. 2 in the first paragraph is revised to read: 2. A copy of the Solid Waste Handling Permit issued to the manufacturer by the Jurisdictional Health Department in accordance with WAC 173-350 (Minimum Functional Standards for Solid Waste Handling) or for biosolid composts a copy of the Coverage Under the General Permit for Biosolids Management issued to the manufacturer by the Department of Ecology in accordance with WAC 173-308 (Biosolids Management). 9-14.5(1) Polyacrylamide (PAM) The third sentence is replaced with the followingtwo new sentences: The minimum average molecular weight shall be greater than 5-mg/mole. The charge density shall be no less than 15 percent and no greater than 30 percent. 9-14.5(2) Erosion Control Blanket The second sentence in the first paragraph is revised to read: The Contractor shall supply independent test results from the National Transportation Product Evaluation Program (NTPEP) meeting the following requirements in Tables 6 and 7: 9-14.5(4) Geotextile Encased Check Dam This section including title is revised to read: 9-14.5(4) Check Dams All materials used for check dams shall be non-toxic and not pose a threat to wildlife when installed This section is supplemented with the following new sub -sections: 9-14.5(4)A Biodegradable Check Dams Biodegradable check dams shall meet the following requirements: Biodegradable Check Dams Materials Wattle Check Dam 9-14.5(5) Compost Sock Check Dam 9-14.5(6) Coir Log Check Dam 9-14.5(7) The Contractor may substitute a different biodegradable check dam as long as it complies with the following and is approved by the Engineer: 1. Made of natural plant fiber. 2. Netting if present shall be biodegradable. 38 1 1 9-14.5(4)B Non -biodegradable Check Dams Non -biodegradable check dams shall meet the following requirements: 1 1. Geotextile materials shall conform to section 9-33 for silt fence. 2. Other such devices that fulfill the requirements of section 9-14.5(4) and shall be 1 approved by the Engineer prior to installation. 9-14.6(1) Description In item No. C in the fourth paragraph, "22 -inch" is revised to read "2 -inch". Section 9-16, Fence and Guardrail 1 September 17, 2012 9-16.1(1)A Post Material for Chain Link Fence 1 The first paragraph is revised to read: Except as noted otherwise, post material shall conform to the requirements of AASHTO M 181, Type 1 (zinc -coated steel), Grade 1 or 2, and shall include all round and roll -formed material (line posts, brace posts, end posts, corner posts, and pull posts). 1 The last sentence in the fourth paragraph is deleted. 9-16.1(1)C Tension Wire and Tension Cable This section including title is revised to read: 9-16.1(1)C Tension Wire Tension wire shall meet the requirements of AASHTO M 181. Tension wire galvanizing shall ' be Class 1. 9-16.1(1)D Fittings and Hardware The second sentence in the first paragraph is deleted. 9-16.1(2) Approval This section is deleted. 1 9-16.2(2) Approval This section is deleted. 1 9-16.6(3) Posts This section is revised to read: 1 Line posts for Types 1 and 2 glare screens shall be 2 inch inside diameter galvanized steel pipe with a nominal weight of 3.65 pounds per linear foot. End, corner, brace, and pull posts ' for Type 1 Design A and B and Type 2 shall be 2 1/2 inch inside diameter galvanized steel pipe with a nominal weight of 5.79 pounds per linear foot. Intermediate pull posts (braced line posts) shall be as specified for line posts. The last paragraph is deleted. 1 1 39 The base material for the manufacture of steel pipes used for posts shall conform to the requirements of ASTM A 53, except the weight tolerance on tubular posts shall be applied as provided below. Posts provided for glare screen will have an acceptance tolerance on the weight per linear foot, as specified, equal to plus or minus 5 percent. This tolerance will apply to each individual post. All posts shall be galvanized in accordance with AASHTO M 181 Section 32. The minimum average zinc coating is per square foot of surface area. This area is defined as the total area inside and outside. A sample for computing the average of mass of coating is defined as a 12 -inch piece cut from each end of the galvanized member. 9-16.6(5) Cable This section including title is revised to read: 9-16.6(5) Vacant 9-16.6(6) Cable and Tension Wire Attachments This section including title is revised to read: 9-16.6(6) Tension Wire Attachments All tension wire attachments shall be galvanized steel conforming to the requirements of AASHTO M 232 unless otherwise specified. Eye bolts shall have either a shoulder or a back-up nut on the eye end and be provided with an eye nut where needed or standard hex nut and lock washer %-inch diameter for tension wire and of sufficient length to fasten to the type of posts used. Turnbuckles shall be of the shackle end type, 1/2 inch diameter, with standard take-up of 6 inches and provided with % inch diameter pins. 9-16.6(9) Fabric Bands and Stretcher Bars The first paragraph is. revised to read: Fabric bands shall be .% inch by linch nominal. Stretcher bars shall be 3/16 inch by 3/4 inch nominal or 5/16 inch diameter round bar nominal. A 5/16 inch diameter round stretcher bar shall be used with Type 1. Nominal shall be construed to be the area of the cross section of the shape obtained by multiplying the specified width by thickness. A variation of minus 5 - percent from this theoretical area shall be construed as "nominal" size. All shall be galvanized to meet the requirements of ASTM F 626. Section 9-18, Precast Traffic Curb and Block Traffic Curb August 6, 2012 This section's title is revised to read: 9-18 Precast Traffic Curb 9-18.3 Block Traffic Curb This section including title is revised to read: 40 1 9-18.3 Vacant Section 9-20, Concrete Patching Material, Grout, and Mortar January 2, 2012 ' 9-20.3(3) Grout Type 3 for Unconfined Bearing Pad Applications This section is revised to read: Grout Type 3 shall be a prepackaged material meeting the requirements of ASTM C 928 — Table 1, R2 Concrete or Mortar. 9-20.3(4). Grout Type 4 for Multipurpose Applications In the third sentence of the first paragraph, the reference "0.40" is revised to read "0.45". Section 9-23, Concrete Curing Materials and Admixtures April 2, 2012 ' 9-23.2 Liquid Membrane -Forming Concrete Curing Compounds In the first paragraph, "moisture loss" is revised to read "water retention". Section 9-28, Signing Materials and Fabrication 1 September 17, 2012 9-28.14(2) Steel Structures and Posts "AASHTO M 291" is revised to read "ASTM A 563". Section 9-29, Illumination, Signal, Electrical ' September 17, 2012 9-29.1(4) Non -Metallic Conduit This section is supplemented with the following new sub -section: 9-29.1(4)D Deflection Fittings 1 Deflection Fittings for use with rigid PVC conduit shall be as described in 9-29.1(2)A 9-29.2 Junction Boxes, Cable Vaults, and Pull Boxes 1 The section is supplemented with the following: The Contractor shall perform quality control inspection. The Contracting Agency intends to perform Quality Assurance Inspection. By its inspection', the Contracting Agency intends only to verify the quality of that Work. This inspection shall not relieve the Contractor of any responsibility for identifying and replacing defective material and workmanship. Prior to the ' start of production of the precast concrete units, the Contractor shall advise the Engineer of the production schedule. The Contractor shall give the .Inspector. safe and free access to the Work. If the Inspector observes any nonspecification Work or unacceptable quality 41 control practices, the Inspector will advise the plant manager. If the corrective action is not acceptable to the Engineer, the unit(s) will be rejected. 9-29.2(1) Standard Duty and Heavy -Duty Junction Boxes The third paragraph is deleted and replaced with the following new paragraphs: The Contractor shall provide shop drawings for all components, including the concrete box, and Lid and the shop drawings shall show placement of reinforcing steel. The shop drawing shall be prepared by (or under the direct supervision of) a Professional Engineer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural, and each sheet shall carry the following: 1. Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration. 2. The initials and dates of all participating design professionals 3. Clear notation of all revisions including identification of who authorized the revision, who made the revision, and the date of the revision. 4. Design calculations shall carry on the cover page, the Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration. For each type of junction box, or whenever there is a change to the junction box design, a proof test, as defined in this Specification, shall be performed and new shop drawings submitted. 9-29.2(1)A Standard Duty Junction Boxes The sub -paragraph's titled "Concrete Junction Boxes" are revised to read: Concrete Junction Boxes The Standard Duty Concrete Junction Box steel frame, lid support, and lid shall be painted with a black paint containing rust inhibiters or painted with a shop applied, inorganic zinc primer in accordance with Section 6-07.3, or hot -dip galvanized in accordance with AASHTO M 111. All Standard Duty Concrete Junction Boxes placed in sidewalks, walkways, and shared -use paths shall have slip -resistant surfaces. Non -slip lids and frames shall be hot dip galvanized. Concrete used in Standard Duty Junction Boxes shall have a minimum compressive strength of 6,000 psi when reinforced with a welded wire hoop, or 4,000 psi when reinforced with welded wire fabric or fiber reinforcement. The frame shall be anchored to the box by welding headed studs % by 3 inches long, as specified in Section 9-06.15, to the frame. The wire fabric shall be attached to the studs and frame with standard tie practices. The box shall contain ten studs located near the centerline of the frame and box wall. The studs shall be placed one anchor in each corner, one at the middle of each width and two equally spaced on each length of the box. Materials for Type 1, 2, and 8 Concrete Junction Boxes shall conform to the following: 42 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Materials Requirement Concrete Section 6-02 Reinforcing Steel Section 9-07 Fiber Reinforcing ASTM C 1116, Type III Lid ASTM A 786 diamond plate steel Slip Resistant Lid ASTM A 36 steel Frame ASTM A 786 diamond plate steel or ASTM A36 steel Slip Resistant Frame ASTM A 36 steel Lid Support ASTM A 36, or ASTM A1011 Grade SS Handle & Handle support ASTM A 36 steel or ASTM A1011 Grade CS or SS Anchors (studs) Section 9-06.15 Bolts, Studs, Nuts, Washers ASTM F 593 or A 193, Type 304 or 316, or Stainless Steel grade 302, 304, or 316 steel in accordance with approved shop drawing Locking and Latching Mechanism Hardware and Bolts In accordance with approved shop drawings 9-29.2(1)B Heavy Duty Junction Boxes The section is revised to read: Heavy -Duty Junction Boxes shall be concrete and have a minimum vertical load rating of 46,000 pounds without permanent deformation and 60,000 pounds without failure when tested in accordance with Section 9-29.2(1)C. The Heavy -Duty Junction Box steel frame, lid support and lid shall be painted with aLlshop applied, inorganic zinc primer in accordance with Section 6-07.3. Materials for Type 4, 5, and 6 Concrete Junction Boxes shall conform to the following: Materials Requirement Concrete Section 6-02 Reinforcing Steel Section 9-07 Lid ASTM A 786 diamond plate steel, rolled from plate complying with ASTM A 572, grade 50 or ASTM A 588, and having a min. CVN toughness of 20 ft -Ib at 40 degrees F. Frame and stiffener plates ASTM A 572 grade 50 or ASTM A 588, both with min. CVN toughness of 20 ft -Ib at 40 degrees F Handle ASTM A 36 steel or ASTM A 1011 Grade CS or SS 43 Anchors (studs) Section 9-06.15 Bolts, Studs, Nuts, Washers ASTM F 593 or A 193, Type 304 or 316, or Stainless steel grade 302, 304, or 316 in accordance with approved shop drawing Hinges and Locking and Latching Mechanism Hardware and Bolts In accordance with approved shop drawings The lid stiffener plates shall bear on the frame, and be milled so that there is full even contact, around the perimeter, between the bearing seat and lid stiffener plates, after fabrication of the frame and lid. The bearing seat and lid perimeter bar shall be free from burrs, dirt, and other foreign debris that would prevent solid seating. Bolts and nuts shall be liberally coated with anti -seize compound. Bolts shall be installed snug tight. The bearing seat and lid perimeter bar shall be machined to allow a minimum of 75 percent of the bearing areas to be seated with a tolerance of 0.0 to 0.005 inches measured with a feeler gage. The bearing area percentage will be measured for each side of the lid as it bears on the frame. 9-29.2(1)C Testing Requirements The first paragraph is revised to read: The Contractor shall provide for testing of junction boxes, cable vaults and pull boxes. Junction boxes, cable vaults and pull boxes shall be tested by an independent materials testing facility, and a test report issued documenting the results of the tests performed. The second paragraph is revised to read: For concrete junction boxes, vaults and pull boxes, the independent testing laboratory shall meet the requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment. The test shall be conducted in the presence of a Professional Engineer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural, and each test sheet shall have the Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration. One copy of the test report shall be furnished to the Contracting Agency certifying that the box and cover meet or exceed the loading requirements for a concrete junction box, and shall include the following information: 1. Product identification. 2. Date of testing. 3. Description of testing apparatus and procedure. 4. All Toad deflection and failure data. 5. Weight of box and cover tested. 6. Upon completion of the required test(s) the box shall be loaded to failure. 7. A brief description of type and location of failure. 44 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 The third paragraph is revised to read: ' For non -concrete junction boxes the independent testing laboratory , shall meet the requirements of AASHTO R 18 for Qualified Tester and Verified Test Equipment. The test shall be conducted in the presence of a Professional Engineer, licensed under Title 18 1 RCW, State of Washington, in the branch of Civil or Structural, and each test sheet shall have . the .Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration. One copy of the test report shall be furnished to ' the Contracting Agency certifying that the box and cover meet or exceed the loading requirements for a non -concrete junction box, and shall include the following information: 1. Product identification. 2. Date of testing. ' 3. Description of testing apparatus and procedure. 4. All load deflection data. ' 5. Weight of box and cover tested. The first paragraph following the title "Testing for the Standard Duty Non -Concrete Junction Boxes" is revised to read: ' Non -concrete Junction Boxes shall be tested as defined in the ANSI/SCTE 77-2007 Tier 15 test method with test load minimum of 22,500 lbs. In addition, the Contractor shall provide a Manufacture Certificate of Compliance for each non -concrete junction box installed. 9-29.2(2) Standard Duty and Heavy -Duty Cable Vaults and Pull Boxes This section is revised to read: 1 Standard Duty and Heavy -Duty Cable Vaults and Pull Boxes shall be constructed as a concrete box and as a concrete lid. The lid for the Heavy -Duty and Standard Duty Cable Vaults and Pull Boxes shall be interchangeable and both shall fit the same box as shown in the Standard Plans. The Contractor shall provide shop drawings for all components, including concrete box, 1 Cast Iron Ring, Ductile Iron Lid, Steel Rings, and Lid. In addition, the shop drawings shall show placement of reinforcing steel, knock outs, and any other appurtenances. The shop drawing shall be prepared by or under the direct supervision of a Professional Engineer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural, and each sheet shall carry the following: ' 1. Professional 'Engineer's original signature, date of signature, original seal, registration number, and date of expiration. 2. The initials and dates of all participating design professionals 3. Clear notation of all revisions including identification of who authorized the revision, who made the revision, and the date of the revision. 45 4. Design calculations shall carry on the cover page, the Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration. For each type of box or whenever there is a change to the Cable Vault or Pull box design, a proof test, as defined in this Specification, shall be performed and new shop drawings submitted. 9-29.2(2)A Standard Duty Cable Vaults and Pull Boxes This section is revised to read: Standard Duty Cable Vaults and Pull boxes shall be concrete and have a minimum load rating of 22,500 pounds and be tested in accordance with Section 9-29.2(1)C for concrete Standard Duty Junction Boxes. Concrete for standard duty cable vaults and pull boxes shall have a minimum compressive strength of 4,000 psi. The lid frame shall be anchored to the vault/box concrete lid by welding headed studs % by 3 inches long, as specified in Section 9-06.15, to the frame. The wire fabric shall be attached to the studs and frame with standard tie practices. The vault/box concrete lid shall contain ten studs located near the centerline of the frame and wall. Studs shall be placed one anchor in each corner, one at the middle of each width and two equally spaced on each length of the vault/box. The steel frame, lid support, and lid shall be painted with a black paint containing rust inhibiters or painted with a shop applied, inorganic zinc primer in accordance with Section 6-07.3 or hot -dip galvanized in accordance with ASTM A 111. All Standard Duty Cable Vaults and Pull Boxes placed in sidewalks, walkways, and shared - use paths shall have slip -resistant surfaces. The steel frame, lid support, and lid for the Standard Duty Cable Vaults and Pull Boxes shall be hot -dip galvanized. Materials for Standard Duty Cable Vaults and Pull Boxes shall conform to the following: Materials Requirements Concrete Section 6-02 Reinforcing Steel Section 9-07 Lid ASTM A 786 diamond plate steel Slip Resistant Lid ASTM A 36 Steel Frame ASTM A 786 diamond plate steel or ASTM A36 Slip Resistant Frame ASTM A 36 Steel Lid Support ASTM A 36 Steel, or ASTM A 1011 Grade SS Handle & Handle Support ASTM A 36 steel or ASTM A 1011 Grade CS or SS Anchors (studs) Section 9-06.15 Bolts, Studs, Nuts, Washers ASTM F593 or A 193, type 304 or 316, or Stainless steel grade 302, 304, 316 per approvedshop drawing 46 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hinges and Locking Mechanism Hardware and Bolts Per approved shop drawings 9-29.2(2)B Heavy -Duty Cable Vaults and Pull Boxes This section is revised to read: Heavy -Duty Cable Vaults and Pull Boxes shall be constructed of concrete having a minimum compressive strength of 4,000 psi, and have a minimum vertical load rating of 46,000 pounds without permanent deformation and 60,000 pounds without failure when tested in accordance with Section 9-29.2(1)C for Heavy -Duty Junction Boxes. Materials for Heavy Duty Cable Vaults and Pull boxes shall conform to the following: Materials Requirements Concrete Section 6-02 Reinforcing Steel Section 9-07 Cover Section 9-05.15(1) Ring Section 9-05.15(1) Anchors (studs) Section 9-06.15 Bolts, Nuts, Washers ASTM F 593 or.A 193, Type 304 or 316, or Stainless steel grade 302, 304, 316 in accordance with approved shop drawing 9-29.6(2) Slip Base Hardware "AASHTO M 291" is revised to read "ASTM A 563". 9-29.6(5) Foundation Hardware "AASHTO M 291" is revised to read "ASTM A 563". 9-29.10 Luminaires The third paragraph is revised to read: All luminaires shall be provided with markers for positive identification of Tight source type and wattage. Markers shall be 3 inches square with Gothic bold, black 2 -inch legend on colored background. Background color shall be gold for high-pressure sodium and red for metal halide, and white for induction light sources. Legends shall be sealed with transparent film resistant to dust, weather, and ultraviolet exposure. 9-29.10(2) Decorative Luminaries The second sentence in the third paragraph is deleted. 9-29.13(7)B Auxiliary Equipment for NEMA Controllers In the first paragraph, item number's 8-13 are renumbered to read 9-14 respectfully. Item number 7 in the first paragraph is revised to read: 47 7. A "Display Panel" when noted in the Contract. The display panel shall depict a generic eight -phase operation. The panel shall be mounted on the inside of the front cabinet door and the mounting shall be of a design that allows positioning of the panel in four orientations 90 degrees from each other. The mounting shall be removable without use of any tools. Incandescent red, yellow, green, walk and don't walk indicator lights shall be provided for each phase. The indicator lights shall be connected to the associated field terminals. The connecting cable shall be long enough to allow for any mounting orientation. No diodes will be allowed in the display panel. A means of disconnecting all wiring entering the panel shall be provided. Switches shall be provided on the panel with labels and functions as follows: a. Display On — Signal indicator lamps will display the operation of the intersection. b. Test — All indicator lamps shall be energized. c. Display Off — All signal indicator lamps shall be de -energized. The following new numbered item is inserted after item number 7.: 8. A "Detector Panel", as specified in Section 9-29.13(7)D, shall be installed. The panel shall be mounted on the inside of the front cabinet door. The detector panel shall be constructed as a single unit. Detector switches with separate operate, test, and off positions shall be provided for each field detector input circuit. A high intensity light emitting diode (LED) shall be provided for each switch. The lamp shall energize upon vehicle, pedestrian or test switch actuation. The test switch shall provide a spring loaded momentary contact that will place a call into the controller. When in the OFF position, respective detector circuits will be disconnected. In the operate position, each respective detector circuit shall operate normally. Switches shall be provided on the panel with labels and functions as follows: a. Display On — Detector indicator lights shall operate consistent with their respective switches. b. Display Off — detector indicator lights shall be de -energized. A means of disconnecting all wiring entering the panel shall be provided. The disconnect shall include a means to jumper detection calls when the display panel is disconnected. All switches on the panel shall be marked with its associated Plan detector number. All markers shall be permanent. 9-29.13(7)E Type 170E, 170E -HC -11, 2070, 2070 Lite, ATC Controller Cabinets The following new title is inserted after the fifth sentence in the first paragraph: 9-29.13(7)F Ramp Meter, Traffic Data, and Warning Sign Cabinets 9-29.16(1)A1 Conventional Optical System This section's title is revised to read: 48 9-29.16(1)A1 Non -LED Optical System 9-29.16(1)D1 Electrical - Conventional This section's title is revised to read: 9-29.16(1)D1 Electrical — Non -LED 9-29.24 Service Cabinets In the first paragraph, the lettered items A -J are re -lettered to read B -K respectfully. The first paragraph is supplemented with the following new lettered item: A. Display an arc flash warning label that meets the requirements of ANSI Z535. 9-29.25 Amplifier, Transformer, and Terminal Cabinets In item No. 2.C., "Transformer 23.1 to 12.5 KVA" is revised to read "Transformer 3.1 to 12.5 KVA" and the height column value of 40" is revised to read "48". The first and second sentences in the first paragraph are revised to read: Amplifier and terminal and transformer cabinets shall be NEMA 3R and the following: Item number 5 is revised to read: 5. All cabinets shall provide a gasketed door flange Item number 7 is revised to read: 7. Insulated terminal blocks shall be 600 volt, heavy-duty, barrier type. The terminal blocks shall be provided with a field -side and a control -side connector separated by a marker strip. One spare 12 -position insulated terminal block shall be installed in each terminal cabinet and amplifier cabinet. Item number 8 is revised to read: 8. Each non -pad mounted Terminal, Amplifier and Transformer cabinet shall have 1/4 inch drain holes in back corners. Each pad mounted Terminal, Amplifier and Transformer cabinet shall drain to a sump and through a 3/8 inch diameter drain pipe to grade as detailed in the Standard Plans. Item number 10 is revised to read: 10. Transformer cabinets shall have twoseparate compartments, one for the transformer and one for the power distribution circuit breakers. Each compartment shall be enclosed with a dead front. Each breaker shall be labeled with the device name by means of a screwed or riveted engraved name plate. 49 Section 9-34, Permanent Marking Material April 2, 2012 9-34.2 Paint The second paragraph is revised to read: Blue and black paint shall comply with the requirements for yellow paint in Section 9- 34.2(4) and Section 9-34.2(5), with the exception that blue and black paints do not need to meet the requirements for titanium dioxide, directional reflectance, and contrast ration. 50 INTRODUCTION TO THE SPECIAL PROVISIONS (July 31, 2007 APWA GSP) The work on this project shall be accomplished in accordance with the Standard Specifications for Road, Bridge and Municipal Construction, 2012 edition, as issued by the Washington State Department of Transportation (WSDOT) and the American Public Works Association (APWA), Washington State Chapter (hereafter "Standard Specifications"). The Standard Specifications, as modified or supplemented by the Amendments to the Standard Specifications and these Special Provisions, all of which are made a part of the Contract Documents, shall govern all of the Work. These Special Provisions are made up of both General Special Provisions (GSPs) from various sources, which may have project -specific fill-ins; and project -specific Special Provisions. Each Provision either supplements, modifies, or replaces the comparable Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion of the Standard Specifications is meant to pertain only to that particular portion of the section, and in no way should it be interpreted that the balance of the section does not apply. The project -specific Special Provisions are not labeled as such.- The GSPs are labeled under the headers of each GSP, with the date of the GSP and its source, as follows: (May 18, 2007 APWA GSP) (August 7, 2006 WSDOT GSP) Also incorporated into the Contract Documents by reference are: • Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted edition, with Washington State modifications, if any • Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current edition • City of Yakima Details Contractor shall obtain copies of these publications, at Contractor's own expense. 51 DIVISION 1 GENERAL REQUIREMENTS DESCRIPTION OF WORK (March 13, 1995) This Contract provides for the improvement of *** Martin Luther King, Jr. Boulevard (MLK) by constructing an underpass to grade separate MLK and the BNSF Railroad mainline. The work includes excavating, constructing bridges, secant pile walls, a bottom seal, an underdrainage and storm water drainage system, installing surfacing, paving with hot mix asphalt *** and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. 1-01.3 Definitions (March 13, 2012 APWA GSP) Delete the heading Completion Dates and the three paragraphs that follow it, and replace them with the following: Dates Bid Opening Date The date on which the Contracting Agency publicly opens and reads the Bids. Award Date The date of the formal decision of the Contracting Agency to accept the lowest responsible and responsive Bidder for the Work. Contract Execution Date The date the Contracting Agency officially binds the Agency to the Contract. Notice to Proceed Date The date stated in the Notice to Proceed on which the Contract time begins. Substantial Completion Date The day the Engineer determines the Contracting Agency has full and unrestricted use and benefit of the facilities, both from the operational and safety standpoint, any remaining traffic disruptions will be rare and brief, and only minor incidental work, replacement of temporary substitute facilities, plant establishment periods; or correction or repair remains for the Physical Completion of the total Contract. Physical Completion Date The day all of the Work is physically completed on the project. All documentation required by the Contract and required by law does not necessarily need to be furnished by the Contractor by this date. Completion Date The day all the Work specified in the Contract is completed and all the obligations of the Contractor under the contract are fulfilled by the Contractor. All documentation required by the Contract and required by law must be furnished by the Contractor before establishment of this date. Final Acceptance Date The date on which the Contracting Agency accepts the Work as complete. 52 Supplement this Section with the following: All references in the Standard Specifications, Amendments, or WSDOT General Special Provisions, to the terms "State", "Department of Transportation", "Washington State Transportation Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", and "State Treasurer" shall be revised to read "Contracting Agency". All references to "State Materials Laboratory" shall be revised to read "Contracting Agency designated location". All references to "final contract voucher certification" shall be interpreted to mean the final payment form established by the Contracting: Agency. The venueof all causes of action arising from the advertisement, award, execution, and performance of the contract shall be in the Superior Court of the County where the Contracting Agency's headquarters are located. Additive A supplemental unit of work or group of bid items, identified separately in the Bid Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition to the base bid. Alternate One of two or more units of work or groups of bid items, identified separately in the Bid Proposal, from which the Contracting Agency may make a choice between different methods or material of construction for performing the same work. Business Day A business day is any day from Monday through Friday except holidays as listed in Section 1-08.5. Contract Documents See definition for "Contract". Contract Time The period of time established by the terms and conditions of the Contract within which the Work must be physically completed. Notice of Award The written notice from the Contracting Agency to the successful Bidder signifying the Contracting Agency's acceptance of the Bid Proposal. Notice to Proceed The written notice from the Contracting Agency or Engineer to the Contractor authorizing and directing the Contractor to proceed with the Work and establishing the date on which the Contract time begins. Traffic Both vehicular and non -vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and equestrian traffic. 53 1-02 BID PROCEDURES AND CONDITIONS 1-02.1 Prequalification of Bidders Delete this Section and replace it with the following: 1-02.1 Qualifications of Bidder (January 24, 2011 APWA GSP) Before award of a public works contract, a bidder must meet at least the minimum qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to be awarded a public works project. 1-02.2 Plans and Specifications (June 27, 2011 APWA GSP) Delete this section and replace it with the following: Information as to where Bid Documents can be obtained or reviewed can be found in the Call for Bids (Advertisement for Bids) for the work. After award of the contract, plans and specifications will be issued to the Contractor at no cost as detailed below: To Prime Contractor No. of Sets Basis of Distribution Reduced plans (11" x 17") 10 Furnished automatically upon award. Contract Provisions 10 Furnished automatically upon award. Large plans (e.g., 22" x 34") N/A Furnished only upon request. Additional plans and Contract Provisions may be obtained by the Contractor from the source stated in the CaII for Bids, at the Contractor's own expense. Examination of Plans, Specifications and Site of Work Section 1-02.4 is supplemented with the following: (January 2, 2012) The soils information used for study and design of this project is available for review by the bidder at the following location: ' Office of the City Engineer, 129 N. 2nd Street, Yakima, WA 98901 *"* The soils information includes the following: 54 1 1 1 1 1 1 1 1 1 1 1 1 1 ' Test pit locations and excavation results and project recommendations. *** 1-02.5 Proposal Forms (June 27, 2011 APWA GSP) Delete this section and replace it with the following: The Proposal Form will identify the project and its location and describe the work. It will also list estimated quantities, units of measurement, the items of work, and the materials to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal form that call for, but are not limited to, unit prices; extensions; summations; the total bid amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment of addenda; the bidder's name, address, telephone number, and signature; the bidder's D/M/WBE commitment, if applicable; a State of Washington Contractor's Registration Number; and a Business License Number, if applicable. Bids shall be completed by typing or shall be printed in ink by hand, preferably in black ink. The required certifications are included as part of the Proposal Form. The Contracting Agency reserves the right to arrange the proposal forms with alternates and additives, if such be to the advantage of the Contracting Agency. The bidder shall bid on all alternates and additives set forth in the Proposal Form unless otherwise specified. 1-02.6 Preparation of Proposal (June 27, 2011 APWA GSP) Supplement the second paragraph with the following: 4. If a minimum bid amount has been established for any item, the unit or lump sum price must equal or exceed the minimum amount stated. 5. Any correction to a bid made by interlineation, alteration,- or erasure, shall be initialed by the signer of the bid. Delete the last paragraph, and replace it with the following: The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner. A bid by a corporation shall be executed in the corporate name, by the president or a vice president (or other corporate officer accompanied by evidence of authority to sign). A bid by a partnership shall be executed in the partnership name, and signed by a partner. A copy of the partnership agreement shall be submitted with the Bid Form if any D/M/WBE requirements are to be satisfied through such an agreement. A bid by a joint venture shall be executed in the joint venture name and signed by a member of the joint venture. A copy of the joint venture agreement shall be submitted with the Bid Form if any D/W/MBE requirements are to be_satisfied through such an agreement. 55 Section 1-02.6 is supplemented with the following: (August 7, 2006) Progress Schedule Minimum Bid A minimum bid of $30,000 lump sum has been established for the item "Type C Progress Schedule." The Contractor's bid shall equal or exceed that amount. If the Contractor's bid is less than the minimum specified amount, the Contracting Agency will unilaterally revise the bid amount to the minimum specified amount and recalculate the Contractor's total bid amount. The corrected total bid amount will be used by the Contracting Agency for award purposes and to fix the amount of the contract bond. (December 1, 2008) A minimum bid of *** $1,000 *** per each has been established for the item "Schedule Update." The Contractor's bid shall equal or exceed that amount. If the Contractor's bid is Tess than the minimum specified amount, the Contracting Agency will unilaterally revise the bicl amount to the minimum specified amount and recalculate the Contractor's total bid amount. The corrected total bid amount will be -used by the Contracting Agency for award purposes and to fix the amount of the contract bond. 1-02.7 Bid Deposit (October 1, 2005 APWA GSP) Supplement this section with the following: Bid bonds shall contain the following: 1. Contracting Agency -assigned number for the project; 2. Name of the project; 3. The Contracting Agency named as obligee; 4. The amount of the bid bond stated either as a dollar figure or as a percentage which represents five percent of the maximum bid amount that could be awarded; 5. Signature of the bidder's officer empowered to sign official statements. The signature of the person authorized to submit the bid should agree with the signature on the bond, and the title of the person must accompany the said signature; 6. The signature of the surety's officer empowered to sign the bond and the power of attorney. If so stated in the Contract Provisions, bidder must use the bond form included in the Contract Provisions. 1-02.9 Delivery of Proposal (August 15, 2012 APWA GSP, Option A) Delete this section and replace it with the following: Each proposal shall be submitted in a sealed envelope, with the Project Name and Project Number as stated in the Call for Bids clearly marked on the outside of the envelope, or as otherwise required in the Bid Documents, to ensure proper handling and delivery. 56 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 If the project has FHWA funding and requires DBE Written Confirmation Documents or Good Faith Effort Documentation, then to be considered responsive, the Bidder shall submit with their Bid Proposal, written Confirmation Documentation from each DBE firm listed on the Bidder's completed DBE Utilization Certification, form 272-056A EF, as required by Section 1-02.6. The Contracting Agency will not open or consider any Bid Proposal that is received after the time specified in the Call for Bids for receipt of Bid Proposals, or received in a location other than that -specified in the Call for Bids. 1-02.12 Public Opening of Proposals Section 1-02.12 is supplemented with the following: (*****) Date of Opening Bids Sealed bids are to be received at the following location prior to the time specified: At the City Clerk's Office, City of Yakima, 129 N. 2nd Street, Yakima, WA 98901 until 3:00 pm of the bid opening date. The bid opening date for this project is as listed in the Invitation to Bid. Sealed Bids will be publicly opened and read after 3:00:59 pm Pacific Time on this date. 1-02.13 Irregular Proposals (March 13, 2012 APWA GSP) Revise item 1 to read: 1. A proposal will be considered irregular and will be rejected if: a. The Bidder isnot prequalified when so required; b. The authorized proposal form furnished by the Contracting Agency is not used or is altered; c. The completed proposal form contains any unauthorized additions, deletions, alternate Bids, or conditions; d. The Bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract; e. A price per unit cannot be determined from the Bid Proposal; f. The Proposal form is not properly executed; g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as required in Section 1-02.6; h. The Bidder fails to submit or properly complete a Disadvantaged Business Enterprise Certification, if applicable, as required in Section 1-02.6; i. The Bidder fails to submit written confirmation from each DBE firm listed on the Bidder's completed DBE Utilization Certification that they are in agreement with the bidders DBE participation commitment, if applicable, as required in Section 1- 02.6, or if the written confirmation that is submitted fails to meet the requirements of the Special Provisions; 57 The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, as required in Section 1-02.6, or if the documentation that is submitted fails to demonstrate that a Good Faith Effort to meet the Condition of Award was made; k. The Bid Proposal does not constitute a definite and unqualified offer to meet the material terms of the Bid invitation; or More than one proposal is submitted for the same proiect from a Bidder under the same or different names. 1-02.14 Disqualification of Bidders (March 25, 2009) Delete this Section and replace it with the following: A Bidder will be deemed not responsible if: 1. the Bidder does not meet the mandatory bidder responsibility criteria in RCW 39.04.350(1), as amended; or 2. evidence of collusion exists with any other Bidder or potential Bidder. Participants in collusion will be restricted from submitting further bids; or 3. the Bidder, in the opinion of the Contracting Agency, is not qualified for the work or to the full extent of the bid, or to the extent that the bid exceeds the authorized prequalification amount as may have been determined by a prequalification of the Bidder; or 4. an unsatisfactory performance record exists based on past or current Contracting Agency work or for work done for others, as judged from the standpoint of conduct of the work; workmanship; or progress; affirmative action; equal employment opportunity practices; termination for cause; or Disadvantaged Business Enterprise, Minority Business Enterprise, or Women's Business Enterprise utilization; or 5. there is uncompleted work (Contracting A gency or otherwise), which in the opinion of. the Contracting Agency might hinder or prevent the prompt completion of the work bid upon; or 6. the Bidder failed to settle bills for labor or materials on past or current contracts, unless there are extenuating circumstances acceptable to the Contracting Agency; or 7. the Bidder has failed to complete a written public contract or has been convicted of a crime arising from a previous public contract, unless there are extenuating circumstances acceptable to the Contracting Agency; or 8. the Bidder is unable, financially or otherwise, to perform the work, in the opinion of the Contracting Agency; or 9. there are any other reasons deemed proper by the Contracting Agency. As evidence that the Bidder meets the bidder responsibility criteria above, the apparent two lowest Bidders must submit to the Contracting Agency within 24 hours of the bid submittal deadline, documentation (sufficient in the sole judgment of the Contracting Agency) demonstrating compliance with all applicable responsibility criteria, including all documentation specifically listed in the supplemental criteria. The Contracting Agency reserves the right to request such documentation from other Bidders as well, and to request further documentation as needed to assess bidder responsibility. The basis for evaluation of Bidder compliance with these supplemental criteria shall be any documents or facts obtained by Contracting Agency (whether from the Bidder or third 58 parties) which any reasonable owner would rely on for determining such compliance, including but not limited to: (i) financial, historical, or operational data from the Bidder; (ii) information obtained directly by the Contracting Agency from owners for whom the Bidder has worked, or other public agencies or private enterprises; and (iii) any additional information obtained by the Contracting Agency which is believed to be relevant to the matter. If the Contracting Agency determines the Bidder does not meet the bidder responsibility criteria above and is therefore not a responsible Bidder, the Contracting Agency shall notify the Bidder in writing, with the reasons for its determination. If the Bidder disagrees with this determination, it may appeal the determination within 24 hours of receipt of the Contracting Agency's determination by presenting its appeal to the Contracting Agency. The Contracting Agency will consider the appeal before issuing its final determination. If the final determination affirms that the Bidder is not responsible, the Contracting Agency will not execute a contract with any other Bidder until at least two business days after the Bidder determined to be not responsible has received the final determination. 1-02.15 Pre Award Information (October 1, 2005 APWA GSP) Revise this section to read: Before awarding any contract, the Contracting Agency may require one or more of these items or actions of the apparent lowest responsible bidder: 1. A complete statement of the origin, composition, and manufacture of any or all materials to be used, 2. Samples of these materials for quality and fitness tests, 3. A progress schedule (in a form the Contracting Agency requires) showing the order of and time required for the various phases of the work, 4. A breakdown of costs assigned to any bid item, 5. Attendance at a conference with the Engineer or representatives of the Engineer, 6. Obtain, and furnish a copy of, a business license to do business in the city or county where the work is located. 7. A copy of State of Washington Contractor's Registration, or 8. Any other information or action taken that is deemed necessary to ensure that the bidder is the lowest responsible bidder. This section is supplemented with the following: Compliance with Immigration and Naturalization Act The City of Yakima supports the Federal Immigration, Reform and Control Act of 1986, as amended. The City requires that all contractors or business entities that contract with the City for the award of any City contract for public works in excess of Five Thousand Dollars ($5,000), or any other City contract in excess of Two Thousand Five Hundred Dollars ($2,500), enroll in the E -Verify program or its successor, and thereafter to verify its employees proof of citizenship and authorization to work in the United States. 59 E -Verify will be used for newly hired employees during the term of the contract only; it is not to be used for existing employees. The Contractor must remain enrolled in the program for the duration of the contract and be responsible for verification of every applicable subcontractor. If the contractor has not previously filed an E -Verify Compliance Declaration with the City, the contractor must sign the attached E -Verify Compliance Declaration and submit it to the City prior to being awarded the contract. Failure to do so may be cause for rejection of the bid. 1-03 AWARD AND EXECUTION OF CONTRACT This section is supplemented with the following: 1-03.1 Consideration of Bids (January 23, 2006 APWA GSP) Revise the first paragraph to read: After opening and reading proposals, the Contracting Agency will check them for correctness of extensions of the prices per unit and the total price. If a discrepancy exists between the price per unit and the extended amount of any bid item, the price per unit will control. If a minimum bid amount has been established for any item and the bidder's unit or lump sum price is less than the minimum specified amount, the Contracting Agency will unilaterally revise the unit or lump sum price, to the minimum specified amount and recalculate the extension. The total of extensions, corrected where necessary, including sales taxes where applicable and such additives and/or alternates as selected by the Contracting Agency, will be used by the Contracting Agency for award purposes and to fix the Awarded Contract Price amount and the amount of the contract bond. 1-03.3 Execution of Contract (October 1, 2005 APWA GSP) Revise this section to read: Copies of the Contract Provisions, including the unsigned Form of Contract, will be available for signature by the successful bidder on the first business day following award. The number of copies to be executed by the Contractor will be determined by the Contracting Agency. Within Fourteen (14) calendar days after the award date, the successful bidder shall return the signed Contracting Agency -prepared contract, an insurance certification as required by Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. Before execution of the contract by the Contracting Agency, the successful bidder shall provide any pre -award information the Contracting Agency may require under Section 1-02.15. Until the Contracting Agency executes a contract, no proposal shall bind the Contracting Agency nor shall any work begin within the project limits or within Contracting Agency - furnished sites. The Contractor shall bear all risks for any. work begun outside such areas and for any materials ordered before the contract is executed by the Contracting Agency. 60 If the bidder experiences circumstances beyond their control that prevents return of the contract documents within the calendar days after the awarddate stated above, the Contracting Agency may grant up to a maximum of Seven (7) additional calendar days for return of the documents, provided the Contracting Agency deems the circumstances warrant it. . This section is supplemented with the following: (*****) Escrow Bid Documentation Scope and Purpose The purpose of this specification is to preserve the Contractor's bid documents for use by the City in any litigation between the City and Contractor arising out of this contract. The Contractor shall submit a legible copy of all documentation used to prepare the bid for this contract to a banking institution designated by the City. Such documentation shall be placed in escrow with the banking institution and preserved by that institution as specified in the following sections of this specification. Bid Documentation The term "bid documentation" as used in this specification means any writings, working papers, computer printouts, charts, and any other data compilations which contain or reflect all information, data, and calculations used by the Contractor to determine the bid in bidding for this project. The term "bid documentation" includes but is not limited to Contractor equipment rates, Contractor overhead rates, labor rates, efficiency or productivity factors, arithmetic extensions, and quotations from Subcontractors and materialmen to the extent that such rates and quotations were used by the Contractor in formulating and determining the amount of the bid. The term "bid documentation" also includes any manuals which are standard to the industry used by the Contractor in determining the bid for this project. Such manuals may be included in the bid documentation by reference. The term does not include bid documents provided by the City for use by the Contractor in bidding on this project. Submittal of Bid Documentation The Contractor shall submit the bid documentation to the banking institution. The bid documentation shall be submitted to the banking institution within seven calendar days after the contract for this project has been executed by the City. The bid documentation shall be submitted in a sealed container. The container shall be clearly marked "Bid Documentation" and shall also show on the face of the container the Contractor's name, the date of submittal, the project title, and the contract number. Affidavit The sealed container shall contain, in addition to the bid documentation, an affidavit signed under oath by an individual authorized by the Contractor to execute bidding proposals. The affidavit shall list each bid document with sufficient specificity so a comparison can be made between the list and the bid documentation to ensure that all of the bid documentation listed in the affidavit has been enclosed in the sealed container. The affidavit shall show that the affiant has personally examined the bid documentation and that the affidavit lists all of the documents used by the Contractor to determine the bid for this project and that all such bid documentation has been enclosed in the sealed container. 61 Verification The banking institution upon receipt of the sealed container shall place the container in a safety deposit box, vault, or other secure.., place, and, immediately notify the City in writing that the container has been received. Upon receipt of such notice, the City will promptly notify the Contractor in writing that the City will open the sealed _container to verify that the affidavit has been enclosed and to compare the bid documents listed in the affidavit with the bid documents enclosed in the container to ensure that all of the bid documentation has been submitted and that the copies are legible. The notification will advise the Contractor of the date and time the container will be opened and the name of the City employee who will verify the contents of the container. The City employee verifying the contents of the escrow container will not be involved or connected with the review, evaluation, or resolution of any claim by the Contractor made to the City in connection with the contract for which the verification was made. The Contractor may have representatives present at the opening. Supplementation Documents listed in the affidavit but not enclosed in the sealed container through error or oversight shall be submitted in a sealed container within five calendar days after the opening of the original container. Also, any bid documentation that is illegible shall be replaced with legible copies and furnished within five calendar days after the opening of the original container. The face of the container shall show the same information as the original container except the container shall be marked "Supplemental Bid Documentation". The same procedure used in verifying the contents of the original container shall be used in verifying the contents of the supplemental submittal. Duration and Use The bid documentation and affidavit shall remain in escrow during the life of the contract and will be returned to the Contractor by the banking institution, provided that the Contractor has signed the final contract voucher certification and has not reserved any claims on the final contract voucher certification against the City arising out of the contract. In the event that claims against the City are reserved on the final contract voucher certification, the bid documentation and affidavit shall remain in escrow. If the claims are not resolved and litigation ensues, the City may serve a request upon the Contractor to authorize the banking institution, in writing, to release the bid documentation and affidavit in escrow to the City. The Contractor shall respond to the request within 20 days after service of the request. If the Contractor objects or does not respond to the request within 20 days after service of the request, the City may file a motion under the Civil Rules requesting the court to enter an order directing the banking institution to deliver the bid documentation and affidavit in escrow to the City. The Contractor shall respond to the request within the time required by the then applicable Civil Court Rules for the Superior Court of the State of Washington. If the Contractor objects or does not respond to the request within the time required by the then applicable Civil Rules, the City may file a motion pursuant to such rules requesting the court to enter an order directing the banking institution to deliver the bid documentation and affidavit in escrow to the City. The banking institution shall release the bid documentation and affidavit as follows: 1. To the City upon receipt of a letter from the Contractor authorizing the release; 62 2. To the City upon receipt of a certified copy of a court order directing the release of the documents; 3. To the court for an in camera examination pursuant to a certified copy of a court order; 4. The bid documentation and affidavit shall be returned to the Contractor if litigation is not commenced within the time period prescribed bylaw. The Contractor agrees that the sealed container placed in escrow and any supplemental sealed container placed in escrow contain all of the bid documentation used to determine the bid and that no other bid documentation shall be utilized by the Contractor in litigation over claims brought by the Contractor arising out of this contract unless otherwise ordered by the court. Remedies for Refusal or Failure to Provide Bid Documentation Failure or refusal to provide bid documentation shall be deemed a material breach of this contract. The City may at its option refuse to make payment for progress estimates under Section 1-09.9 until the Contractor has submitted the bid documentation required by this specification. The City may at its option terminate the contract for default under Section 1-08.10. These remedies are not exclusive and the City may take such other action as is available to it under the law. Confidentiality of Bid Documentation The bid documentation and affidavit in escrow are and will remain the property of the Contractor. The City has no interest in or right to the bid documentation and affidavit other than to verify the contents and legibility of the bid documentation unless litigation ensues between the City and Contractor over claims brought by the Contractor arising out of this contract. In the event of such litigation, the bid documentation and affidavit may become the property of the City for use in the litigation as may be appropriate subject to the provisions of any court order limiting or restricting the use or dissemination of the bid documentation and affidavit as provided in the preceding section entitled Duration and Use. Cost and Escrow Instructions The cost of the escrow will be borne by the City. The City will provide escrow instructions to the banking institution consistent with this specification. 1-03.4 Contract Bond (October 1, 2005 APWA GSP) Revise the first paragraph to read: The successful bidder shall provide an executed contract bond for the full contract amount. This contract bond shall: 1 Be on a Contracting Agency -furnished form; 2. Be signed by an approved surety (or sureties) that: a. Is registered with the Washington State Insurance Commissioner, and b. Appears on the current Authorized Insurance List in the State of Washington published by the Office of the Insurance Commissioner, 63 3. Be conditioned upon the faithful performance of the contract by the Contractor within the prescribed time; 4. Guarantee that the surety shall indemnify, defend, and protect the Contracting Agency against any claim of direct or indirect loss resulting from the failure: a. Of the Contractor (or any of the employees, subcontractors, or lower tier subcontractors of the Contractor) to faithfully perform the contract, or b. Of the Contractor (or the subcontractors or lower tier subcontractors of the Contractor) to pay all laborers, mechanics, subcontractors, lower tier subcontractors, material person, or any other person who provides supplies or provisions for carrying out the work; 5. Be accompanied by a power of attorney for the Surety's officer empowered to sign the bond; and 6. Be signed by an officer of the Contractor empowered to sign official statements (sole proprietor or partner). If the Contractor is a corporation, the bond must be signed by the president or vice-president, unless accompanied by written proof of the authority of the individual signing the bond to bind the corporation (i.e., corporate resolution, power of attorney or a letter to such effect by the president or vice-president). This section is supplemented with the following: (June 27, 2011) Release of Contract Bond will be 60 days following Contracting Agency Final Acceptance of Contract, provided following conditions are met: 1. Payment to the State with respect to taxes imposed pursuant to Title 82, RCW on Contracts totaling more than $ 35,000, a release has been obtained from the Washington State Department of Revenue. 2. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file with the Contracting Agency (RCW 39.12.040). 3. A certificate of Payment of Contributions Penalties and Interest on Public Works Contract is received from the Washington State Employment Security Department. 4. Washington State Department of Labor and Industries (per Section 1-07.10) shows the Contractor, Subcontractor(s) and any lower tier Subcontractor(s) are current with payments of industrial insurance and medical aid premiums. 5. All claims, as provided by law, filed against the Contract Bond have been resolved. 1-03.7 Judicial Review Revise the last sentence of this section to read: Such review, if any, shall be timely filed in the Superior Court of Yakima County, Washington. 64 1-04 SCOPE OF WORK 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications, and Addenda (March 13, 2012 APWA GSP) Revise the second paragraph to read: Any inconsistency in the parts of the contract shall be resolved by following this order of precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 1. Addenda, 2. Proposal Form, 3. Special Provisions, 4. Contract Plans, 5. Amendments to the Standard Specifications, 6. Standard Specifications, 7. Contracting Agency's Standard Plans or Details (if any), and 8. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 1-05 CONTROL OF WORK 1-05.3 Plans And Working Drawings This section is supplemented with the following: (August 2, 2004) When submittals require review by the railroad, the Engineer will require up to 60 calendar days from the date the submittals are received until they are returned to the Contractor. If a submittal is returned unapproved and then resubmitted, then an additional review time of up to 60 calendar days will be required. If more than 60 calendar days are required for the Engineer's review of any individual submittal or resubmittal, an extension of time will be considered in accordance with Section 1-08.8. (*****) Within 30 calendar days after the execution of the contact, the Contractor shall submit a list of all required submittals to the Engineer. In addition, all required submittals and their review periods shall be included in the progress schedule submitted by the Contractor. 1-05.4 Conformity With and Deviations from Plans and Stakes This section is supplemented with the following: Contractor. Surveying - Structure Copies of the Contracting Agency provided primary survey control data are available for the bidder's inspection at the office of the Project Engineer. 65 The Contractor shall be responsible for setting, maintaining, and resetting all alignment stakes, slope stakes, and grades necessary for the construction of bridges, shafts, retaining walls, secant walls, bottom seal and other structures. Except for the survey control data to be furnished by the Contracting Agency, calculations, surveying, and measuring required for setting and maintaining the necessary lines and grades shall be the Contractor's responsibility. The Contractor shall inform the Engineer when monuments are discovered that were not identified in the Plans and construction activity may disturb or damage the monuments. All monuments noted on the plans "DO NOT DISTURB" shall be protected throughout the length of the project or be replaced at the Contractors expense. Detailed survey records shall be maintained, including a description of the work performed on each shift, the methods utilized, and the control points used. The record shall be adequate to allow the survey to be reproduced. A copy of each day's record shall be provided to the Engineer within three working days after the end of the shift. The meaning of words and terms used in this provision shall be as listed in "Definitions of Surveying and Associated Terms" current edition, published by the American Congress on Surveying and Mapping and the American Society of Civil Engineers. The survey work by the Contractor shall include but not be limited to the following: 1. Verify the primary horizontal and vertical control furnished by the Contracting Agency, and expand into secondary control by adding stakes and hubs as well as additional survey control needed for the project. Provide descriptions of secondary control to the Contracting Agency. The description shall include coordinates and elevations of all secondary control points. 2. Establish, by placing hubs and/or marked stakes, the location with offsets of foundation shafts and piles. 3. Establish offsets to footing centerline of bearing for structure excavation. 4. Establish offsets to footing centerline of bearing for footing forms. 5. Establish wing wall, retaining wall, and noise wall horizontal alignment. 6. Establish retaining wall top of wall profile grade. 7. Establish elevation benchmarks for all substructure formwork. 8. Check elevations at top of footing concrete line inside footing formwork immediately prior to concrete placement. 9. Check column location and pier centerline of bearing at top of footing immediately prior to concrete placement. 10. Establish location and plumbness of column forms, and monitor column plumbness during concrete placement. 66 11. Establish pier cap and crossbeam top and bottom elevations and centerline of bearing. 12. Check pier cap and crossbeam top and bottom elevations and centerline of bearing prior to and during concrete placement. 13.. Establish grout pad locations and elevations. 14. Establish structure bearing locations and elevations, including locations of anchor bolt assemblies. 15. Establish box girder bottom slab grades and locations. 16. Establish girder and/or web wall profiles and locations. 17. Establish diaphragm locations and centerline of bearing. 18. Establish roadway slab alignment, grades and provide dimensions from top of girder to top of roadway slab. Set elevations for deck paving machine rails. 19. Establish traffic barrier and curb profile. 20. Profile all girders prior to the placement of any deadload or construction live load that may affect the girder's profile. 21. Establish offsets and grades for installation of Tremie Seal. 22. Establishoffsets and grades for each individual drilled seal column. 23. Conduct as -built survey of completed bottom seal surface as specified in Section 6-21 of these Special Provisions. The Contractor shall provide the Contracting Agency copies of any calculations and staking data when requested by the Engineer. To facilitate the establishment of these lines and elevations, the Contracting Agency will provide the Contractor with the following primary survey and control information: 1. Descriptions of two primary control points used for the horizontal and vertical control. Primary control points will be described by reference to the project alignment and the coordinate system and elevation datum utilized by the project. In addition, the Contracting Agency will supply horizontal coordinates for the beginning and ending points and for each Point of Intersection (PI) on each alignment included in the project. 2. Horizontal coordinates for the centerline of each bridge pier. 3. Computed elevations at top of bridge roadway decks at one-tenth points along centerline of each girder web. All form grades and other working grades shall be calculated by the Contractor. 67 The Contractor shall give the Contracting Agency three weeks notification to allow adequate time to provide the data outlined in Items 2 and 3 above. The Contractor shall ensure a surveying accuracy within the following tolerances: 1. Stationing on structures 2. Alignment on structures 3. Superstructure elevations 4. Substructure Vertical ±0.01 feet variation from plan elevation ±0.02 feet variation from Plan grades. Horizontal ±0.02 feet ±0.02 feet The Contracting Agency may spot-check the Contractor's surveying. These spot-checks will not change the requirements for normal checking by the Contractor. When staking the following items, the Contractor shall perform independent checks from different secondary control to ensure that the points staked for these items are within the specified survey accuracy tolerances: Piles Shafts Footings Columns The Contractor shall calculate coordinates for the points associated with piles, shafts, footings and columns. The Contracting Agency will verify these coordinates prior to issuing approval to the Contractor for commencing with the survey work. The Contracting Agency will require up to seven calendar days from the date the data is received to issuing approval. Contract work to be performed using contractor -provided stakes shall not begin until the stakes are approved by the Contracting Agency. Such approval shall not relieve the Contractor of responsibility for the accuracy of the stakes. Payment Payment will be made in accordance with Section 1-04.1 for the following bid item when included in the proposal: "Structure Surveying", lump sum. The lump sum contract price for "Structure Surveying" shall be full pay for all labor, equipment, materials, and supervision utilized to perform the Work specified, including any resurveying, checking, correction of errors, replacement of missing or damaged stakes, and coordination efforts. 68 Contractor Surveying - Roadway Copies of the Contracting Agency provided primary survey control data are available for the bidder's inspection at the office of the Project Engineer. The Contractor shall be responsible for setting, maintaining, and resetting all alignment stakes, slope stakes, and grades necessary for the construction of the roadbed, pump station, private utilities included in the Contract, drainage, surfacing, paving, channelization and pavement marking, illumination and signals, guardrails and barriers, signing and other elements included in the Contract. Except for the survey control data to be furnished by the Contracting Agency, calculations, surveying, and measuring required for setting and maintaining the necessary lines and grades shall be the Contractor's responsibility. The Contractor shall inform the Engineer when monuments are discovered that were not identified in the. Plans and construction activity may disturb or damage the monuments. All monuments noted on the plans "DO NOT DISTURB" shall be protected throughout the length of the project or be replaced at the Contractors expense. Detailed survey records shall be maintained, including a description of the work performed on each shift, the methods utilized, and the control points used. The record shall be adequate to allow the survey to be reproduced. A copy of each day's record shall be provided to the Engineer within three working days after the end of the shift. The meaning of words and terms used in this provision shall be as listed in "Definitions of Surveying and -Associated Terms" current edition, published by the American Congress on Surveying and Mapping and the American Society of Civil Engineers. The survey work shall include but not be limited to the following: 1. Verify the primary horizontal and vertical control furnished by the Contracting Agency, and expand into secondary control by adding stakes and hubs as well as additional survey control needed for the project. Provide descriptions of secondary control to the Contracting Agency. The description shall include coordinates and elevations of all secondary control points. 2. Establish, the centerlines of all alignments, by placing hubs, stakes, or marks on centerline or on offsets to centerline at all curve points (PCs, PTs, and PIs) and at points on the alignments spaced no further than 50 feet. 3. Establish clearing limits, placing stakes at all angle points and at intermediate points not more than 50 feet apart. The clearing and grubbing limits shall be 5 feet beyond the toe of a fill and 10 feet beyond the top of a cut unless otherwise ..shown in the Plans. 4. Establish grading limits, placing slope stakes at centerline increments not more than 50 feet apart. Establish offset reference to all slope stakes. If Global Positioning Satellite (GPS) Machine Controls are used to provide grade control, then slope stakes may be omitted at the discretion of the Contractor 69 5. Establish the horizontal and vertical location of all drainage features, placing offset stakes to all drainage structures and to pipes at a horizontal interval not greater than 25 feet. 6. Establish roadbed and surfacing elevations by placing stakes at the' top• of. subgrade and at the top of each course of surfacing. Subgrade and surfacing stakes shall be set at horizontal intervals not greater than 50 feet in tangent sections, 25 feet in curve sections with a radius less than 300 feet, and at 10 -foot intervals in intersection radii with a radius less than 10 feet. Transversely, stakes shall be placed at all locations where the roadway slope changes and at additional points such that the transverse spacing of stakes is not more than 12 feet.- If GPS Machine Controls are used to provide grade control, then roadbed and surfacing stakes may be omitted at the discretion of the Contractor. 7. Establish intermediate elevation benchmarks as needed to check work throughout the project. 8. Provide references for paving pins at 25 -foot intervals or provide simultaneous surveying to establish location and elevation .of paving pins as they are being placed. 9. For all other types of construction included in this provision, (including but not limited to channelization and pavement marking, illumination and signals, guardrails and barriers, and signing) provide staking and layout as necessary to adequately locate, construct, and check the specific construction activity. 10. The Contractor shall collect additional topographic survey data as needed in order to match into existing roadways such that the transition from the new pavement to the existing pavement is smooth and that the pavement and ditches drain properly. If changes to the profiles or roadway sections shown in the contract plans are needed to achieve proper smoothness and drainage where matching into existing features, the Contractor shall submit these changes to the Project Engineer for review and approval 10 days prior to the beginning of work. The Contractor shall provide the Contracting Agency copies of any calculations and staking data when requested by the Engineer. To facilitate the establishment of these lines and elevations, the Contracting Agency will provide the Contractor with primary survey control information consisting of descriptions of two primary control points used for the horizontal and vertical control, and descriptions of two additional primary control points for every additional three miles of project length. Primary control points will be described by reference to the project alignment and the coordinate system and elevation datum utilized by the project. In addition, the Contracting Agency will supply horizontal coordinates for the beginning and ending points and for each Point of Intersection (PI) on each alignment included in the project. The Contractor shall ensure a surveying accuracy within the following tolerances: 70 Slope stakes Subgrade grade stakes set 0.04 feet below grade Vertical Horizontal ±0.10 feet ±0.10 feet ±0.01 feet ±0.5 feet (parallel to alignment) ±0.1 feet (normal to alignment) Stationing on roadway N/A ±0.1 feet Alignment on roadway N/A ±0.04 feet Surfacing grade stakes ±0.01 feet ±0.5 feet (parallel to alignment) ±0.1 feet (normal to alignment) Roadway paving pins for surfacing or paving ±0.01 feet ±0.2 feet (parallel to alignment) ±0.1 feet (normal to alignment) The Contracting Agency may spot-check the Contractor's surveying. These spot-checks will not change the requirements for normal checking by the Contractor. When staking roadway alignment and stationing, the Contractor shall perform independent checks from different secondary control to ensure that the points staked are within the specified survey accuracy tolerances. The Contractor shall calculate coordinates for the alignment. The Contracting Agency will verify these coordinates prior to issuing approval to the Contractor for commencing with the work. The Contracting Agency will require up to seven calendar days from the date the data is received. Contract work to be performed using contractor -provided stakes shall not begin until the stakes are approved by the Contracting Agency. Such approval shall not relieve the Contractor of responsibility for the accuracy of the stakes. Stakes shall be marked in accordance with Standard Plan A10.10. When stakes are needed that are not described in the Plans, then those stakes shall be marked, at no additional cost to the Contracting Agency as ordered by the Engineer. Payment Payment will be made in accordance with Section 1-04.1 for the following bid item when included in the proposal: "Roadway Surveying", lump sum. The lump sum contract price for "Roadway Surveying" shall be full pay for all labor, equipment, materials, and supervision utilized to perform the Work specified, including any 71 resurveying, checking, correction of errors, replacement of missing or damaged stakes, and coordination efforts. (April 4, 2011) Licensed Surveyors The Contractor shall be responsible for reestablishing or locating legal survey markers such as GLO monuments or property corner monuments, conduct boundary surveys to determine Contracting Agency right-of-way locations, and obtain, review and analyze deeds and records as necessary to determine these boundaries. The Contracting Agency will provide "rights of entry" as needed by the Contractor to perform the work. The Contractor shall brush out or clear and stake or mark the right-of-way lines as designated by the Engineer. The Contractor shall inform the Engineer when monuments are discovered that were not identified in the Plans and construction activity may disturb or damage the monuments. All monuments noted on the plans "DO NOT DISTURB" shall be protected throughout the length of the project or be replaced at Contractors expense. When required, the Contractor shall prepare and file a Record of Survey map in accordance with RCW 58.09 and provide a recorded copy to the Contracting Agency. The Contracting Agency will provide all existing base maps, existing horizontal and vertical control, and other material available with Washington State Plane Coordinate information to the Contractor. The Contracting Agency will also provide maps, plan sheets, and/or aerial photographs clearly identifying the limits of the areas to be surveyed. The Contractor shall establish Washington State Plane Coordinates on all points required in the Record of Survey and other points designated in the Contract documents. Existing right of way documentation, existing base maps, existing horizontal and vertical control descriptions, maps, plan sheets, aerial photographs and all other available material may be viewed by prospective bidders at the office of the Project Engineer. The Contractor shall perform all of the necessary calculations for the contracted survey work and shall provide copies of these calculations to the Contracting Agency. Electronic files of all survey data shall be provided and in a format acceptable to the Contracting Agency. All survey work performed by the Contractor shall conform to all applicable sections of the Revised Code of Washington and the Washington Administrative Code. The Contractor shall provide all traffic control, signing, and temporary traffic control devices in order to provide a safe work zone. Payment Payment will be made in accordance with Section 1-09.6 for the following bid item when included in the proposal: "Licensed Surveying", Force Account. 72 For the purpose of .providing a common proposal for all bidders, the Contracting Agency has entered an amount for the item "Licensed Surveying" in the bid proposal to become a part of the total bid by the Contractor. 1-05.7 Removal of Defective and Unauthorized Work (October 1, 2005 APWA GSP) Supplement this section with the following: If the Contractor fails to remedy defective or unauthorized work within the time specified in a written notice from the Engineer, or fails to perform any part of the work required by the Contract Documents, the Engineer may correct and remedy such work as may be identified in the written notice, with Contracting Agency forces or by such other means as the Contracting Agency may deem necessary. If the Contractor fails to comply with a written order to •remedy what the Engineer determines to be an emergency situation, the Engineer may have the defective and unauthorized work corrected immediately, have therejected work removed and replaced, or have work the Contractor refuses to perform completed by using Contracting Agency or other forces. An emergency situation is any situation when, in the opinion of the Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk of loss or damage to the public. Direct or indirect costs incurred by the Contracting Agency attributable to correcting and remedying defective or unauthorized work, or work the Contractor failed or refused to perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from monies due, or to become due, the Contractor. Such direct and indirect costs shall include in particular, but without limitation, compensation for additional professional services required, and costs for repair and replacement of work of others destroyed or damaged by correction, removal, or replacement of the Contractor's unauthorized work. No adjustment in contract time or compensation will be allowed because of the delay in the performance of the work attributable to the exercise of the Contracting Agency's rights provided by this Section. The rights exercised under the provisions of this section shall not diminish the Contracting Agency's right to pursue any other avenue for additional remedy or damages with respect to the Contractor's failure to perform the work as required. 1-05.11 Final Inspection Delete this section and replace it with the following: 1-05.11 Final Inspections and Operational Testing (October 1, 2005 APWA GSP) 1-05.11(1) Substantial Completion Date When the Contractor considers the work to be substantially complete, the Contractor shall so notify the Engineer and request the Engineer establish the Substantial Completion Date. 73 The Contractor's request shall list the specific items of work that remain to be completed in order to reach physical completion. The Engineer will schedule an inspection of the work with the Contractor to determine the status of completion. The Engineer may also establish the Substantial Completion Date unilaterally. If, after this inspection, the Engineer concurs with the Contractor that the work is substantially complete and ready for its intended use, the Engineer, by written notice to the Contractor, will set the Substantial Completion Date. If, after this inspection the Engineer does not consider the work substantially complete and ready for its intended use, the Engineer will, by written notice, so notify the Contractor giving the reasons therefore. Upon receipt of written notice concurring in or denying substantial completion, whichever is applicable, the Contractor shall pursue vigorously, diligently and without unauthorized interruption, the work necessary to reach Substantial and Physical Completion. The Contractor shall provide the Engineer with a revised schedule indicating when the Contractor expects to reach substantial and physical completion of the work. The above process shall be repeated until the Engineer establishes the Substantial Completion Date and the Contractor considers the work physically complete and ready for final inspection. 1-05.11(2) Final Inspection and Physical Completion Date When the Contractor considers the work physically complete and ready for final inspection, the Contractor by written notice, shall request the Engineer to schedule a final inspection. The Engineer will set a date for final inspection. The Engineer and the Contractor will then make a final inspection and the Engineer will notify the Contractor in writing of all particulars in which the final inspection reveals the work incomplete or unacceptable. The Contractor shall immediately take such corrective measures as are necessary to remedy the listed deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption until physical completion of the listed deficiencies. This process will continue until the Engineer is satisfied the listed deficiencies have been corrected. If action to correct the listed deficiencies is not initiated within 7 days after receipt of the written notice listing the deficiencies, the Engineer may, upon written notice to the Contractor, take whatever steps are necessary to correct those deficiencies pursuant to Section 1-05.7. The Contractor will not be allowed an extension of contract time because of a delay in the performance of the work attributable to the exercise of the Engineer's right hereunder. Upon correction of all deficiencies, the Engineer will notify the Contractor and the Contracting Agency, in writing, of the date upon which the work was considered physically complete. That date shall constitute the Physical Completion Date of the contract, but shall not imply acceptance of the work or that all the obligations of the Contractor under the contract have been fulfilled. 1-05.11(3) Operational Testing It is the intent of the Contracting Agency to have at the Physical Completion Date a complete and operable system. Therefore when the work involves the installation of machinery or other mechanical equipment; street lighting, electrical distribution or signal 74 systems; irrigation systems; buildings; or other similar work it may be desirable for the Engineer to have the Contractor operate and test the work for a period of time after final inspection but prior to the physical completion date. Whenever items of work are listed in the Contract Provisions for operational testing they shall be fully tested under operating conditions for the time period specified to ensure their acceptability prior to the Physical Completion Date. During and following the test period, the Contractor shall correct any items of workmanship, materials, or equipment which prove faulty, or that are not in first class operating condition. Equipment, electrical controls, meters, or other devices and equipment to be tested during this period shall be tested under the observation of the Engineer, so that the Engineer may determine their suitability for the purpose for which they were installed. The Physical Completion Date cannot be established until testing and corrections have been completed to the satisfaction of the Engineer. The costs for power, gas, labor, material, supplies, and everything else needed to successfully complete operational testing, shall be included in the unit contract prices related to the system being tested, unless specifically set forth otherwise in the proposal. Operational and test periods, when required by the Engineer, shall not affect a manufacturer's guaranties or warranties furnished under the terms of the contract. 1-05.13 Superintendents, Labor and Equipment of Contractor (March 25, 2009 APWA GSP) Revise the seventh paragraph to read: Whenever the Contracting Agency evaluates the Contractor's qualifications pursuant to Section 1-02.14, it will take these performance reports into account. 1-05.14 Cooperation With Other Contractors This section is supplemented with the following: (March 13, 1995) Other Contracts Or Other Work It is anticipated that the following work adjacent to or within the limits of this project will be performed by others during the course of this project and will require coordination of the work: • Level 3 Utility Relocation, Joe Branton, (509) 731-0042 • Verizon Utility Relocation, Michael Fulmer, (206) 409-1260 • City of Yakima Water Division, providing water line tap to meter, James Dean, (509) 575-6196 • Pacific Power Utility Relocation, Mike Paulson, (509) 575-3158 • City of Yakima IS Division, fiber optic line, Ray Yocom, (509) 575-6036 • Yakima County Jail Facility Upgrade. Contractor shall contact Ron Rieker with Yakima County at (509) 574-2402 to coordinate this work 75 1-05.15 Method of Serving Notices (March 25, 2009 APWA GSP) Revise the second paragraph to read: All correspondence from the Contractor shall be directed to the Project Engineer. All correspondence from the Contractor constituting any notification, notice of protest, notice of dispute, or other correspondence constituting notification required to be furnished under the Contract, must be in paper format, hand delivered or sent via mail delivery service to the Project Enqineer's office. Electronic copies such as e-mails or electronically delivered copies of correspondence will not constitute such notice and will not comply with the requirements of the Contract. Add the following new section: 1-05.16 Water and Power (October 1, 2005 APWA GSP). The Contractor shall make necessary arrangements, and shall bear the costs for power and water necessary for the performance of the work, unless the contract includes power and water as a pay item. 1-06 CONTROL OF MATERIAL Section 1-06 is supplemented with the following: Buy America (August 6, 2012) In accordance with Buy America requirements contained in 23 CFR 635.410, the major quantities of steel and iron construction material that is permanently incorporated into the project shall consist of American-made materials only. Buy America does not apply to temporary steel items, e.g., temporary sheet piling, temporary bridges, steel scaffolding and falsework. Minor amounts of foreign steel and iron may be utilized in this project provided the cost of the foreign material used does not exceed one-tenth of one percent of the total contract cost or $2,500.00, whichever is greater. American-made material is defined as material having all manufacturing processes occurring domestically. To further define the coverage, a domestic product is a manufactured steel material that was produced in one of the 50 States, the District of Columbia, Puerto Rico, or in the territories and possessions of the United States. If domestically produced steel billets or iron ingots are exported outside of the area of coverage, as defined above, for any manufacturing process then the resulting product does not conform to the Buy America requirements. Additionally, products manufactured domestically from foreign source steel billets or iron ingots do not conform to the Buy America requirements because the initial melting and mixing of alloys to create the material occurred in a foreign country. 76 Manufacturing begins with the initial melting and mixing, and continues through the coating stage. Any process which modifies the chemical content, the physical size or shape, or the final finish is considered a manufacturing process. The processes include rolling, extruding, machining, bending, grinding, drilling, welding, and coating. The. action of applying a coating to steel or iron is deemed a manufacturing. process. Coating includes epoxy coating, galvanizing, aluminizing, painting, and any other coating that protects or enhances the value of steel or iron. Any process from the original reduction from ore to the finished product constitutes a manufacturing process for iron. Due to a nationwide waiver, Buy America does not apply to raw materials (iron ore and alloys), scrap (recycled steel or iron), and pig iron or processed, pelletized, and reduced iron ore. The following are considered to be steel manufacturing processes: 1. Production of steel by any of the following processes: a. Open hearth furnace. b. Basic oxygen. c. Electric furnace. d. Direct reduction. 2. Rolling, heat treating, and any other similar processing. 3. Fabrication of the products. a. Spinning wire into cable or strand. b. Corrugating and rolling into culverts. c. Shop fabrication. A certification of materials origin will be required for any items comprised of, or containing, steel or iron construction materials prior to such items being incorporated into the permanent work. The certification shall be on DOT Form 350-109EF provided by the Engineer, or such other form the Contractor chooses, provided it contains the same information as DOT Form 350-109EF. 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC 1-07.1 . Laws. to be Observed (October 1, 2005 APWA GSP) • Supplement this section with the following: 1 1 77 In cases of conflict between different safety regulations, the more stringent regulation shall apply. The Washington State Department of Labor and Industries shall be the sole and paramount administrative agency responsible for the administration of the provisions of the Washington Industrial Safety and Health Act of 1973 (WISHA). The Contractor shall maintain at the project site office, or other well known place at the project site, all articles necessary for providing first aid to the injured. The Contractor shall establish, publish, and make known to all employees, procedures for ensuring immediate removal to a hospital, or doctor's care, persons, including employees, who may have been injured on the project site. Employees should not be permitted to work on the project site before the Contractor has established and made known procedures for removal of injured persons to a hospital or a doctor's care. The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the Contractor's plant, appliances, and methods, and for any damage or injury resulting from their failure, or improper maintenance, use, or operation. The Contractor shall be solely and completely responsible for the conditions of the project site, including safety for all persons and property in the performance of the work. This requirement shall apply continuously, and not be limited to normal working hours. The required or implied duty of the Engineer to conduct construction review of the Contractor's performance does not, and shall not, be intended to include review and adequacy of the Contractor's safety measures in, on, or near the project site. (April 3, 2006) Confined Space Confined spaces are known to exist at the following locations: Wet well, STA. 30+81, 43.00' LT The Contractor shall be fully responsible for the safety and health of all on-site workers and compliant with Washington Administrative Code (WAC 296-809).. The Contractor shall prepare and implement a confined space program for each of the confined spaces identified above. The Contractors Confined Space program shall be sent to the contracting agency at least 30 days prior to the Contractor beginning work in or adjacent to the confined space. No work shall be performed in or adjacent to the confined space until the plan is submitted to the Engineer as required. The Contractor shall communicate with the Project Engineer to ensure a coordinated effort for providing and maintaining a safe worksite for both the Contracting Agency's and Contractor's workers when working in or near a confined space. All costs to prepare and implement the confined space program shall be included in the bid prices for the various items associated with the confined space work. 78 1-07.2 State Taxes Delete this section, including its sub -sections, in its entirety and replace it with the following: 1-07.2 State Sales Tax (June 27, 2011 APWA GSP) The Washington State Department of Revenue has issued special rules on the State sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The Contractor should contact the Washington State Department of Revenue for answers to questions in this area. The Contracting Agency will not adjust its payment if the Contractor bases a bid on a misunderstood tax liability. The Contractor shall include all Contractor -paid taxes in the unit bid prices or other contract amounts. In some cases, however, state retail sales tax will not be included. Section 1- 07.2(2) describes this exception. The Contracting Agency will pay the retained percentage (or release the Contract Bond if a FHWA-funded Project) only if the Contractor has obtained from the Washington State Department of Revenue a certificate showing that all contract -related taxes have been paid (RCW 60.28.051). The Contracting Agency may deduct from its payments to the Contractor any amount the Contractor may owe the Washington State Department of Revenue, whether the amount owed relates to this contract or not. Any amount so deducted will be paid into the proper State fund. 1-07.2(1) State Sales Tax — Rule 171 WAC 458-20-171, and its related rules, apply to building, repairing, or improving streets, roads, etc., which are owned by a municipal corporation, or political subdivision of the state, or by the United States, and which are used primarily for foot or vehicular traffic. This includes storm or combined sewer systems within and included as a part of the street or road drainage system and power lines when such are part of the roadway lighting system. For work performed in such cases, the Contractor shall include Washington State Retail Sales Taxes in the various unit bid item prices, or other contract amounts, including those that the Contractor pays on the purchase of the materials, equipment, or supplies used or consumed in doing the work. ti 1-07.2(2) State Sales Tax — Rule 170 WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or existing buildings, or other structures, upon real property. This includes, but is not limited to, the construction of streets, roads, highways, etc., owned by the state of Washington; water mains and their appurtenances; sanitary sewers and sewage disposal systems unless such sewers and disposal systems are within, and a part of, a street or road drainage system; telephone, telegraph, electrical power distribution lines, or other conduits or lines in or above streets or roads, unless such power lines become a part of a street or road lighting system; and installing or attaching of any article of tangible personal property in or to real property, whether or not such personal property becomes a part of the realty by virtue of installation. For work performed in such -cases, the Contractor shall collect from the Contracting Agency, retail sales tax on the full contract price. The Contracting Agency will automatically add this 79 sales tax to each payment to the Contractor. For this reason, the Contractor shall not include the retail sales tax in the unit bid item prices, or in any other contract amount subject to Rule 170, with the following exception. Exception: The Contracting Agency will not add in sales tax for a payment the Contractor or a subcontractor makes on the purchase or rental of tools, machinery, equipment, or consumable supplies not integrated into the project. Such sales taxes shall be included in the unit bid item prices or in any other contract amount. 1-07.2(3) Services The Contractor shall not collect retail sales tax from the Contracting Agency on any contract wholly for professional or other services (as defined in Washington State Department of Revenue Rules 138 and 244). (March 13, 1995) The work on this contract is to be performed upon lands whose ownership obligates the Contractor to pay Sales tax. The provisions of Section 1-07.2(1) apply. 1-07.5 Environmental Regulations This section is supplemented with the following: (September 20, 2010) Environmental Commitments The following Provisions summarize the requirements, in addition to those required elsewhere in the Contract, imposed upon the Contracting Agency by the various documents referenced in the Special Provision PERMITS AND LICENSES. Throughout the work, the Contractor shall comply with the following requirements: (August 3, 2009) The intentional bypass of stormwater from all or any portion of a stormwater treatment system is prohibited without the approval of the Engineer. 1-07.5(4) Air Quality This section is supplemented with the following: The local air pollution authority is the Yakima Regional Clean Air Authority, (509) 574-1410. 1-07.6 Permits And Licenses Section 1-07.6 is supplemented with the following: The Contractor shall have or obtain a valid City of Yakima Business license for the duration of this project. (September 20, 2010) The Contracting Agency has obtained the below -listed permit(s) for this project. A copy of the permit(s) is attached as an appendix for informational purposes. All contacts with the 80 1 1 1 1 1 1 1 1 1 1 1 1 1 1 permitting agency concerning the below -listed permit(s) shall be through the Engineer. The Contractor shall obtain additional permits as necessary. All costs to obtain and comply with additional permits shall be included in the applicable bid items for the work involved. Copies of these permits are required to be onsite at all times. Construction Stormwater General Permit 1-07.9 Wages 1-07.9(1) General Section 1-07.9(1) is supplemented with the following: (January 10, 2012) The Federal wage rates incorporated in this contract have been established by the Secretary of Labor under United States Department of Labor General Decision No. WA120001. The State rates incorporated in this contract are applicable to all construction activities associated with this contract. 1-07.9(5) Required Documents (January 24, 2011 APWA GSP) Supplement this section with the following: The Contractor or subcontractor directly contracting for "Off -Site, Prefabricated, Non - Standard, Project Specific Items" as defined below shall identify and report information required on the addendum to the "Affidavit of Wages Paid" form filed with the Department of Labor and Industries [form F700-164-000]. The Contractor shall include language in its subcontracts requiring subcontractors and lower -tier subcontractors to comply with the reporting requirements for "Off -Site, Prefabricated, Non -Standard, Project Specific Item" on the Affidavit of Wages Paid form addendum. The reporting requirement for Items shall apply for. all public works contracts estimated to cost over $1 million entered into by the Contracting Agency and Contractor between September 1, 2010 through December 31, 2013. "Off-site, prefabricated, nonstandard, project specific items" means products or items that are: 1. Made primarily of architectural or structural precast concrete, fabricated steel, pipe and pipe systems, or sheet metal and sheet metal duct work; and 2. Produced specifically for this Project and not considered to be regularly available shelf items;. and 3. Produced or manufactured by labor expended to assemble or modify standard items; and 4. Produced at an off-site location outside the State of Washington. The Contractor or subcontractor shall comply with the reporting requirements and instructions on the Affidavit of Wages Paid form, and shall report the following information 81 1 on the Affidavit of Wages Paid form submitted to the Department of Labor and Industries in order to comply with the reporting requirements for use of "Off -Site, Prefabricated, Non- Sta.ndard, Project Specific" items: 1. The estimated cost of the project; 2. The name of the Contracting Agency and the project title; 3. The contract value of the off-site, prefabricated, nonstandard, project specific items produced outside of Washington State, including labor and materials; and 4. The name, address, and federal employer identification number of the contractor that produced the off-site, prefabricated, nonstandard, project specific items. The Contracting Agency may direct the Contractor, at no additional cost to the Contracting Agency, to remove and substitute any subcontractor(s) found to be out of compliance with the "Off -Site Prefabricated Non -Standard Project Specific Items" reporting requirements more than one time as determined by the Department of Labor and Industries. 1 1-07.11 Requirements For Nondiscrimination This section is supplemented with the following: 1 (January 3, 2011) Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246) 1. The Contractor's attention is called to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specifications set forth herein. 2. The goals and timetables for minority and female participation set by the Office of Federal Contract Compliance Programs, expressed in percentage terms for the Contractor's aggregate work force in each construction craft and in each trade on all construction work in the covered area, are as follows: Women Statewide Timetable Goal Until further notice 6.9% Minorities - by Standard Metropolitan Statistical Area (SMSA) Spokane, WA: SMSA Counties: Spokane, WA 2.8 WA Spokane. Non -SMSA Counties 3.0 WA Adams; WA Asotin; WA Columbia; WA Ferry; WA Garfield; WA Lincoln, WA Pend Oreille; WA Stevens; WA Whitman. . 1 82 1 Richland, WA SMSA Counties: Richland Kennewick, WA WA Benton; WA Franklin. Non -SMSA Counties WA Walla Walla. 5.4 3.6 Yakima, WA: SMSA Counties: Yakima, WA 9.7 WA Yakima. Non -SMSA Counties 7.2 WA Chelan; WA Douglas; WA Grant; WA Kittitas; WA Okanogan. Seattle, WA: SMSA Counties: Seattle Everett, WA 7.2 WA King; WA Snohomish. Tacoma, WA 6.2 WA Pierce. Non -SMSA Counties 6.1 WA Clallam; WA Grays Harbor; WA Island; WA Jefferson; WA Kitsap; WA Lewis; WA Mason; WA Pacific; WA San Juan; WA Skagit; WA Thurston; WA Whatcom. Portland, OR: SMSA Counties: Portland, OR -WA 4.5 WA Clark. Non -SMSA Counties 3.8 WA Cowlitz; WA Klickitat; WA Skamania; WA Wahkiakum. These goals are applicable to each nonexempt Contractor's total on-site construction workforce, regardless of whether or not part of that workforce is performing work on a Federal, or federally assisted project, contract, or subcontract until further notice. Compliance with these goals and time tables is enforced by the Office of Federal Contract compliance Programs. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, in each construction craft and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project forthe sole purpose of meeting the Contractor's goal shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 83 3. The Contractor shall provide written notification to the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 or more that are Federally funded, at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address and telephone number of the Subcontractor; employer identification number of the Subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the contract is to be performed. The notification shall be sent to: District Director U.S. Department of Labor Office of Federal Contract Compliance Programs Seattle District Office 1111 Third Avenue, Suite 745 Seattle, WA 98101-3212 Additional information may be found at the U.S. Department of Labor website: http://www.dokoov/ofccp/TAquidesictaquide.htm 4. As used in this Notice, and in the contract resulting from this solicitation, the Covered Area is as designated herein. Standard Federal Equal Employment Opportunity Construction Contract Specifications Mcecutive Order 11246) 1. As used in these specifications: a. Covered Area means the geographical area described in the solicitation from which this contract resulted; b. Director means Director, Office of Federal Contract Compliance Programs, United States Department of Labor, or any person to whom the Director delegates authority; c. Employer Identification Number means the Federal Social Security number used on the Employer's Quarterly Federal Tax Return, U. S. Treasury Department Form 941; d. Minority includes: (1) Black, a person having origins in any of the Black Racial Groups of Africa. (2) Hispanic, a fluent Spanish speaking, Spanish surnamed person of Mexican, Puerto Rican, Cuban, Central American, South American, or other Spanish origin. (3) Asian or Pacific Islander, a person having origins in any of the original peoples of the Pacific rim or the Pacific Islands, the Hawaiian Islands and Samoa. 84 (4) American Indian or Alaskan Native, a person having origins in any of the original peoples of North America, and who maintain cultural identification through tribal affiliation or community. recognition. 2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted. 3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U.S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each Contractor or Subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other Contractors or Subcontractors toward a goal in an approved Plan does not excuse any covered Contractor's or Subcontractor's failure to take good faith effort to achieve the Plan goals and timetables. 4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7a through 7p of this Special Provision. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered construction contractors performing construction work in geographical areas where they do not have a Federal or federally assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified. 5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the Contractor has a collective bargaining agreement, to refer either minorities or women shall excuse the Contractor's obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto. 6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the Contractor during the training period, and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor. 7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its action. The 85 Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following: a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor's employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities. b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses. c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off -the -street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken. d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations. e. Develop on-the-job training opportunity and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the U.S. Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7b above. f. Disseminate the Contractor's EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed. 86 g. Review, at least annually, the company's EEO policy and affirmative action obligations under these specifications with all employees having .,any responsibility for hiring, assignment, layoff, termination or other employment decisions including specific review of these items with on-site supervisory personnel such as Superintendents, General Foremen, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the.subject matter. h. Disseminate the Contractor's EEO policy externally by including it. in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor's EEO policy with other Contractors and Subcontractors with whom the Contractor does or anticipates doing business. i. Direct its recruitment efforts, both oral and written to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor's recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process. Encourage present minority and female employees to recruit other minority persons and women and where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a Contractor's work force. k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR Part 60-3. I. Conduct, at least annually, an inventory andevaluation of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities. m. Ensure that seniority practices, job classifications, work assignments and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor's obligations under these specifications are being carried out. n. Ensure that all facilities and company activities are nonsegregated except that separate or single -user toilet and necessary changing facilities shall be provided to assure privacy between the sexes. o. Document and maintain a record of all solicitations of offers for subcontracts from minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor associations and other business associations. 87 p. Conduct a review, at least annually, of all supervisors' adherence to and performance under the Contractor's EEO policies and affirmative action obligations. 8. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or more of their affirmative action obligations (7a through 7p). The efforts of a contractor association, joint contractor -union, contractor -community, or other similar group of which the Contractor is a member and -participant, may be asserted as fulfilling any one or more of the obligations under 7a through 7p of this Special Provision provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensure that the concrete benefits of the program are reflected in the Contractor's minority and female work -force participation, makesa good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrate the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor's and failure of such a group to fulfill an obligation shall not be a defense for the Contractor's noncompliance. 9. A single goal for minorities and a separate single goal for women have been established. The Contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non -minority. Consequently, the Contractor may be in violation of the Executive Order if a particular group is employed in substantially disparate manner (for example, even though the Contractor has achieved its goals for women generally, the Contractor may be in violation of the Executive Order if a specific minority group of women is underutilized). 10,. The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin. 11. The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts pursuant to Executive Order 11246. 12. The Contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal Opportunity Clause, including suspensions, terminations and cancellations of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its implementing regulations by the Office of Federal Contract Compliance Programs. Any Contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended. 13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of this Special Provision, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications, the Director shall proceed in accordance with 41 CFR 60-4.8. 14. The Contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out, to submit reports 88 relating to the provisions hereof as may be required by the government and to keep records. Records shall at least include, for each employee, their name,, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, the Contractors will not be required to maintain separate records. 15. Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program). 16. Additional assistance for Federal Construction Contractors on contracts administered by Washington State Department of Transportation or by Local Agencies may be found at: Washington State Dept. of Transportation Office of Equal Opportunity PO Box 47314 310 Maple Park Ave. SE Olympia WA 98504-7314 Ph: 360-705-7090 Fax: 360-705-6801 http://www.wsdot.wa.gov/equalopportunity/default.htm (May 7, 2012) Disadvantaged Business Enterprise Condition of Award Participation The Disadvantaged Business Enterprise (DBE) requirements of 49 CFR Part 26 apply to this Contract. Demonstrating compliance with these specifications is a Condition of Award (COA) of this Contract. Failure to comply with the requirements of this specification may result in your bid being found to be nonresponsive and may be rejected. DBE COA Goal The Contracting Agency has established a COA Contract goal in the amount of: *** 5% ***. DBE Eligibility/Selection of DBEs A Directory of Certified DBE Firms denoting the Description of Work the DBE Contractors are certified to perform is available at: www.omwbe.wa.gov/certification/index.shtml. The directory provides plain language on the Description of Work that the listed DBE's have been certified by the Office of Minority and Women's Business Enterprises (OMWBE) to perform. The Bidder shall use the Directory of Certified 89 DBE Firms to confirm if a DBE is certified for the "Description of Work" the Bidder lists on the DBE Utilization Certification form # 272-056 EF (see form instructions) and therefore qualifies for credit towards the COA goal. Crediting DBE Participation Joint Venture When a DBE performs as a participant in a joint venture, only that portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work that the DBE performs with its own forces shall be credited. DBE Prime Contractor A DBE Prime Contractor may only take credit for that portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work that the DBE Prime performs with its own forces. DBE Subcontractor When a DBE firm participates as a Subcontractor only that portion of the total dollar value of the Contract equal to the distinct, clearly defined portion of the Work that the DBE performs with its own forces shall be credited. • Include the cost of supplies and materials obtained by the DBE for the Work in the Contract including supplies purchased or equipment leased by the DBE. o However, you may not take credit for supplies, materials, and equipment the DBE Subcontractor purchases or leases from the Prime Contractor or its affiliate. In addition, Work performed by a DBE, utilizing resources of the Prime Contractor or its affiliates shall not be credited. • In very rare situations, a DBE firm may utilize equipment and/or personnel from a non -DBE firm other than the Prime Contractor or its affiliates. Should this situation arise the arrangement must be short-term and have prior written approval from the Office of Equal Opportunity (OEO). • Count the entire value of fees or commissions charged by a DBE firm for providing a bona fide service, such as professional, technical, consultant, managerial services, or for providing bonds or insurance. • When a DBE subcontracts to another firm, the value of the subcontracted Work may be counted as participation only if the DBE's lower tier Subcontractor is also a DBE. Work that a DBE subcontracts to a non -DBE firm shall not be credited. • When non -DBE Subcontractor further subcontracts to a lower -tier Subcontractor or supplier who is a certified DBE, then that portion of the Work further subcontracted may be credited as DBE participation, provided it is a distinct clearly defined portion of the Work that the DBE is certified to perform and the DBE Subcontractor performs the Work with its own forces. 90 • If a firm is not certified as a DBE at the time of the execution of the contract, their participation cannot be counted toward any DBE goals. Trucking Use the following factors in determining DBE credit and whether a DBE trucking company is performing a commercially useful function: 1. The DBE must be responsible for the management and supervision of the entire trucking operation for which credit is being claimed. 2. The DBE must itself own and, with its own workforce, operate at least one fully licensed, insured, and operational truck used on the Contract. 3. The DBE receives credit only for the value of the transportation services it provides on the Contract using trucks it owns or leases, licenses, insures, and operates with drivers it employs. For purposes of this requirement a lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others provided it is with the consent of the DBE and the lease provides the DBE first priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE. 4. The DBE may lease trucks from another DBE firm including an owner - operator provided they are certified as a DBE for trucking. The DBE who leases trucks from another DBE may claim participation for the total value of the transportation services the lessee DBE provides on the Contract. 5. The DBE may also lease trucks from a non -DBE firm and may enter into an agreement with an owner -operator who is a non -DBE. The DBE shall only receive credit for the number of additional non -DBE trucks equal or less than the number of DBE trucks the firms owns or has leased/subcontracted through another DBE trucking company. The DBE must control the work of the non -DBE trucks. If the non -DBE is performing the work without supervision of that work by the DBE, the DBE is not performing a Commercially Useful Function (CUF). 6. In any lease or owner -operator situation, as described in requirement #4 and #5 above, the following rules shall apply: a. A written lease/rental agreement is required for all trucks leased or rented; documenting the ownership and the terms of the agreement. The agreements must be submitted and approved by the Contracting Agency prior to the beginning of the Work. The agreement must show the leaser's name, truck description and agreed upon amount and method of payment (hour, ton, or per load). All lease agreements shall be for a long-term relationship, rather than for the individual project. (This requirement does not apply to owner -operator arrangements.) b. Only the vehicle, (not the operator) may be leased or rented. (This requirement does not apply to owner -operator arrangements). Credit may only be claimed for DBE trucking firms operating under a subcontract or a written agreement approved by the Contracting Agency prior to performing Work. Expenditures paid to other DBEs Expenditures paid to other DBEs for materials or supplies may be counted toward DBE goals as provided in the following: Manufacturer You may claim DBE credit for 100 percent of value of the materials or supplies obtained from a DBE manufacturer. A manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the contract. A manufacturer shall include firms that produce finished goods or products from raw or unfinished material or that purchases and substantially alters goods and materials to make them suitable for construction use before reselling them. In order to receive credit as a DBE Manufacturer, the firm must be certified by OMWBE as a manufacturer in a NAICS code that falls within the 31XXXX to 33XXXX classification. Regular Dealer You may claim credit for 60 percent of the value of the materials or supplies purchased from a DBE regular dealer. Rules applicable to regular dealer status are contained in 49 CFR Part 26.55.e.2. To be considered a regular dealer you must meet the following criteria: • WSDOT considers and recognizes a regular dealer, as a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the materials or supplies required for the performance of the Contract and described by the specifications of the Contract are bought, kept in stock and regularly sold or leased to the public in the usual course of business. • Sixty percent (60%) of the cost of materials or supplies purchased from an approved regular dealer may be credited as DBE participation. Regular dealer status is granted on a contract -by -contract basis. A firm wishing to be approved as a regular dealer for WSDOT contracted projects or Highways & Local Program administered projects must submit a request in writing to OEO for approval, no later than seven days prior to bid opening. Once the OEO has received the request, an onsite review will be set up with the firm and a review conducted to determine the firm's qualifications. If it is determined that the firm qualifies as a regular dealer the OEO will list the firm on an Approved Regular Dealers List. The list may be accessed through the OEO Home website is at: www.wsdot.wa.gov/equalopportunity. Note: Requests to be listed as a regular dealer will only be processed if the requesting firm is certified by the Office of Minority and Women's Business Enterprises in a NAICS code that fall within the 42XXXX NAICS Wholesale code section. Materials or Supplies Purchased from a DBE With regard to materials or supplies purchased from a DBE who is neither a manufacturer nor a regular dealer you may claim credit for the following: 1. Fees or commissions charged for assistance in the procurement of the materials and supplies. 2. Fees or transportation charges for the delivery of materials or supplies. In either case you may not take credit for any part of the cost of the materials and supplies. Commercially Useful Function (CUF) The Prime Contractor has a responsibility and must treat the working relationship with the DBE such that the DBE is performing a commercially useful function. The Prime Contractor may only take credit for Work performed by a DBE that is determined to be performing a commercially useful function. • A DBE performs a commercially useful function when it is responsible for execution of a distinct element of Work and is carrying out its responsibilities by performing, managing and supervising the Work involved. The DBE must also be responsible with respect to materials and supplies used on the Contract. For example; negotiating price, determining quality, determining quantities, ordering, installing (if applicable) and paying for the material itself. • A DBE does not perform a commercially useful function if its role is limited to that of an extra participant in a transaction, Contract, or project through which funds are passed. Joint Checking Allowance Prime Contractors and DBEs must receive pre -approval by the OEO before using a joint check. Joint check requests shall be submitted by the Prime Contractor to the Contracting Agency for approval. When requesting approval for use of a joint checking allowance, the Contractor must distribute a written joint check agreement among the parties (including the 93 suppliers involved) providing full and prompt disclosure of the expected use of the joint checks. The agreement shall contain all the information concerning the parties' obligations and consequences or remedies if the agreement isnot fulfilled or a breach occurs. The joint check request shall be submitted to the Contracting Agency for approval prior to signing the contract agreement. The following are some general conditions that must be met by all parties regarding joint check use: a. It is understood that the Prime Contractor acts solely as the guarantor of a joint check. b. The DBE's own funds are used to pay supplier of materials. The Prime Contractor does not make direct payment to supplier. In order to be performing a Commercially Useful Function (CUF), the DBE must release the check to the supplier (paying for the materials it -self and not be an extra participant in a transaction). c. If the Prime Contractor makes joint checks available to one DBE Subcontractor, the service must be made available to all Subcontractors (DBE and non -DBE). d. The relationship between the DBE and its suppliers should be established independently of and without interference by the Prime Contractor. The DBE has final decision-making responsibility concerning the procurement of materials and supplies, including which supplier to use. e. The Prime Contractor and DBE shall be able to provide receipts, invoices, cancelled checks and/or certification statements of payment if requested by the Contracting Agency. f. The DBE remains responsible for all other elements of 49 CFR 26.55(c)(1). Failure by. the Prime Contractor to request and receive prior approval of a joint check arrangement will result in the joint check amount not counting towards the Prime Contractor's DBE goal. Disadvantaged Business Enterprise Utilization Certification FORM # 272-056 EF To be eligible for award of the Contract, the Bidder shall properly complete and submit a Disadvantaged Business Enterprise Utilization Certification with the Bidder's sealed Bid Proposal, as specified Section 1-02.9 Delivery of Proposal. The Bidder's Disadvantaged Business Enterprise Utilization Certification must clearly demonstrate how the Bidder intends to meet the DBE COA goal. A Disadvantaged Business Enterprise Utilization Certification (form # 272-056 EF) is included in your Proposal package for this purpose as well as instructions on how to properly fill out the form. In the event of arithmetic errors in completing the Disadvantaged Business Enterprise Utilization Certification the amount listed to be applied towards the goal 94 for each DBE shall govern and the• DBE total amount shall be adjusted accordingly. Note: The Contracting Agency shall consider as non-responsive and shall reject any Bid Proposal submitted that does not contain a Disadvantaged Business Enterprise Utilization Certification that accurately demonstrates how the Bidder intends to meet the COA goal. Disadvantaged Business Enterprise (DBE) Written Confirmation Document(s) FORM # 422-031 EF The Bidder shall submit a complete and accurate Disadvantaged Business Enterprise (DBE) Written Confirmation Document for each DBE firm listed in the Bidder's completed Disadvantaged Business Enterprise Utilization Certification as submitted with the bid. Failure to do so will result in the associated participation being disallowed, which may result in bid rejection. A Disadvantaged Business Enterprise (DBE) Written Confirmation Document (form No. 422-031 EF) is included in your Proposal package for this purpose. The form(s) shall be received as specified in the special provisions for Section 1- 02.9 Delivery of Proposal. It is prohibited for the Bidder to require a DBE tosubmit a Written Confirmation Document with any part of the form left blank. Should the Contracting Agency determine that a Written Confirmation Document was signed by a DBE that was not complete; the validity of the document comes into question and the associated DBE Participation may not receive credit. Selection of Successful Bidder/Good Faith Efforts (GFE) The successful Bidder shall be selected on the basis of having submitted the lowest responsive Bid, which demonstrates a good faith effort to achieve the DBE COA goal. Achieving the goal may be accomplished in one of two ways, as follows: 1. By meeting the goal The best indication of good faith efforts is to document, through submission of the Disadvantaged Business Enterprise Utilization Certification and supporting Disadvantaged Business Enterprise (DBE) Written Confirmation Document(s) that the Bidder has obtained enough DBE participation to meet or exceed the assigned DBE COA contract goal. That being the case no additional GFE documentation is required. Or; . 2. By documentation that it made adequate GFE to meet the goal The Bidder may demonstrate a GFE in whole or part through GFE documentation ONLY IN THE EVENT a Bidder's efforts to solicit sufficient DBE participation have been unsuccessful. In this case, the Bidder must supply GFE documentation in addition to the Disadvantaged Business Enterprise Utilization Certification, and supporting Disadvantaged Business Enterprise (DBE) Written Confirmation document(s). 95 Note: In the case where the Bidder was awarded the contract based on demonstrating adequate GFE the advertised DBE goal will not be reduced to the Bidder's partial commitment. The Bidder shall demonstrate a GFE during the life of the Contract to attain the DBE Condition of Award (COA) Goal as assigned to the project. Good Faith Efforts (GFE) Documentation GFE documentation shall be received, as specified in the special provisions for Section 1-02.9 Delivery of Proposal. Based upon all the relevant documentation submitted in Bid or as supplement to Bid, the Contracting Agency shall determine whether the Bidder has demonstrated a sufficient GFE to achieve DBE participation. The Contracting Agency will make a fair and reasonable judgment of whether a Bidder that did not meet the goal through participation, made adequate good faith efforts as demonstrated by the GFE documentation. The following is a list of types of actions, which would be considered as part of the Bidder's GFE to achieve DBE participation. It is not intended to be a mandatory checklist, nor is it intended to be exclusive or exhaustive. Other factors or types of efforts may be relevant in appropriate cases: 1. Attendance by the Bidder at any pre -solicitation or pre -Bid meetings that were scheduled by the Contracting Agency to inform DBEs of contracting and subcontracting or material supply opportunities available on the project; 2. Contacting local Tribes, Tribal Employment Rights Offices (TERO) concerning the subcontracting or supply opportunities in sufficient time to allow the enterprises to participate effectively; 3. Selection by the Bidder of specific economically feasible units of the project to be performed by DBEs in orderto increase the likelihood of participation by DBEs even if the Bidder preferred to perform these Work items as the Prime Contractor; 4. Advertising by the Bidder in general circulation, trade association minority and trade oriented, women focus publications, concerning the subcontracting or supply opportunities; 5. Providing written notice from the Bidder to a reasonable number of specific DBEs, identified from the OMWBE Directory of Certified DBE Firms for the selected subcontracting or material supply Work, in sufficient time to allow the enterprises to participate effectively; 6. Follow-up by the Bidder of initial solicitations of interest by contacting the DBEs to determine with certainty whether they were interested. Documentation of this kind of action shall include the information outlined below: a. The names, addresses, telephone numbers of DBEs who were contacted, the dates of initial contact, and whether initial solicitations of interest were followed-up by contacting the DBEs to determine. with certainty whether the DBEs were interested; b. A description of the information provided to the DBEs regarding the plans, specifications, and estimated quantities for portions of the Work to be performed; c. Documentation of each DBE contacted but rejected and the reason(s) for that rejection; 7., Providing, to interested DBEs, adequate information about the plans, specifications, and requirements for the selected subcontracting or material supply Work; 8. Negotiating in good faith with the DBE firms, and not, without justifiable reason, rejecting as unsatisfactory, Bids that are prepared by any DBE. The DBE's standing within its industry, membership in specific groups, organizations, or associations and political or social affiliations - union vs. non-union employee status - are not legitimate causes for the rejection or non -solicitation of bids in the Prime Contractor's efforts to meet the project goal; 9. Advertising and making efforts to obtain DBE participation that were reasonably expected to produce a level of participation sufficient to meet the goal or requirements of the Contracting Agency; 10. Making any other efforts to obtain DBE participation that were reasonably expected to produce a level of participation sufficient to meet the goal or requirements of the Contracting Agency; 11. Using the services of. minority community organizations, minority contractor groups, local, State, and federal minority business assistance offices and other organizations identified by WSDOT and advocates for disadvantaged, minority, and women businesses that provide assistance in the recruitment and placement of disadvantaged, minority, and women business enterprises; and 12. Using the WSDOT OEO DBE Supportive Services to assist you. For more information please contact the OEO by calling toll free at (888) 259-9143 or emailing dbess@wsdot.wa.gov. Administrative Reconsideration of GFE Documentation Any Bidder has the right to reconsideration but only for the purpose of reassessing their GFE documentation that was determined to be inadequate. • The Bidder must request and schedule a reconsideration hearing within seven calendar days of notification of being nonresponsive or forfeit the right to reconsideration. 97 • The reconsideration decision on the adequacy of the Bidder's GFE documentation shall be made by an official who did not take part in the original determination. • The Bidder shall have the opportunity to meet in person with the official for the purpose of setting forth the Bidder's position as to why the GFE documentation demonstrates a sufficient effort. • The reconsideration official shall provide the Bidder with a written decision on reconsideration within five business days of the hearing explaining the basis for their finding. Procedures between Award and Execution After Award and prior to Execution the Bidder shall provide the additional information described below. Failure to comply shall result in the forfeiture of the Bidder's Proposal bond or deposit. 1. Additional information for all successful DBE's as shown on the Disadvantaged Business Enterprise Utilization Certification: a. Correct business name, federal employee identification number (if available), and mailing address. b. List of all Bid items assigned to each successful DBE firm, including unit prices and extensions. c. Description of partial items (if any) to be sublet to each successful DBE firm specifying the distinct elements of Work under each item to be performed by the DBE and including the dollar value of the DBE portion. Total amounts shown for each DBE shall not be less than the amount shown on the Disadvantaged Business Enterprise Utilization Certification. A breakdown that does not conform to the Disadvantaged Business Enterprise Utilization Certification or that demonstrates a lesser amount of DBE participation than that included in the Disadvantaged Business Enterprise Utilization Certification will be returned for correction. 2. A list of all firms who submitted a Bid or quote in an attempt to participate in this project whether they were successful or not. Include the business name and a mailing address. Note: The firms identified by the Prime Contractor may be contacted by the Contracting Agency to solicit general information as follows: age of the firm and average of its gross annual receipts over the past three -years. Procedures after Execution Crediting DBE Participation toward Meeting the Goal Reporting All DBE work whether COA or race neutral participation is reported. The Prime Contractor shall submit a Quarterly Report of Amounts Credited as DBE Participation form (422-102 EF) on a quarterly basis for any calendar quarter in which DBE has accomplished Work or upon completion of the project, as appropriate. The dollars are to be reported as specified herein. In the event that the payments to a DBE have been made by an entity other than the Prime Contractor, as in the case of a lower -tier Subcontractor or supplier, then the Prime Contractor shall obtain the quarterly report, including the signed affidavit, from the paying entity and submit the report to the Contracting Agency. Changes in DBE COA participation Owner initiated Change Orders The Prime Contractor shall demonstrate a GFE to substitute COA DBE participation when the Contracting Agency deletes Work items by change order that impact a COA DBE's Work. When the Contract allows alternate Work methods which serve to delete or create under -runs in COA DBE Work then the Prime Contractor must provide documentation of negotiating the change with the DBE that was to perform the reduced Work and demonstrate a GFE to substitute other DBE COA participation. Original Quantity Under runs In the event that Work committed to a DBE firm as part of the COA under runs the original planned quantities the Prime Contractor shall demonstrate a GFE to substitute other DBE COA participation. Contractor -Initiated Proposals—General The Contractor cannot reduce the amount of work committed to a DBE firm at contract award without good cause and only with written concurrence from the OEO. Reducing a COA DBE's Work is viewed as a partial DBE termination, subject to the procedures below. DBE Termination A COA DBE Subcontractor may only be terminated in whole or part with the approval of the Contracting Agency (in coordination with OEO). Approval will be granted provided the Prime Contractor demonstrates that the termination is based on good cause. Good cause typically includes situations where the DBE Subcontractor is unable or has failed to perform the work of its subcontract in accordance with normal industry standards. While not all inclusive, some examples of good cause include the following circumstances: Good cause may exist if: 99 • The listed DBE Subcontractor fails or refuses to execute a written contract. • The listed DBE Subcontractor fails or refuses to perform the work of its subcontract in a way consistent with normal industry standards. • The listed DBE Subcontractor fails or refuses to meet the Prime Contractor's reasonable, nondiscriminatory bond requirements. • The listed DBE Subcontractor becomes bankrupt, insolvent, or exhibits credit unworthiness. • The listed DBE Subcontractor is ineligible to work on public works projects because of suspension and debarment proceedings pursuant 2 CFR Parts 180, 215 and 1,200 or applicable state law. • The listed DBE Subcontractor voluntarily withdraws from the project and provides to you written notice of its withdrawal. • The listed DBE is ineligible to receive DBE credit for the type of work required. • A DBE owner dies or becomes disabled with the result that the listed DBE is unable to complete its work on the contract. Good cause does not exist if: • The Prime Contractor seeks to terminate a COA DBE so that the Prime can self -perform the Work. • The Prime Contractor seeks to terminate a COA DBE so the Prime Contractor can substitute another DBE or non -DBE after contract award. • The failure or refusal of the DBE Subcontractor to perform its work on the subcontract results from the bad faith or discriminatory action of the Prime Contractor (e.g., the failure of the Prime Contractor to make timely payments or the unnecessary placing of obstacles in, the path of the DBE's Work). Prior to requesting termination, the Prime Contractor must give notice in writing to the DBE Subcontractor with a copy to the Contracting Agency of its intent to request to terminate DBE work and the reasons for doing so. The DBE Subcontractor shall have five (5) days to respond to the prime Contractor's notice. The DBE's response shall either support the termination or advise the Contracting Agency and the Prime Contractor of the reasons it objects to the termination of its subcontract. Decertification When a DBE is performing as a COA in any capacity and the DBE becomes decertified during the course of the Work for reasons other than graduation, the portion of the Work performed after the decertification shall not be credited and the Contractor is obligated to make a good faith effort to substitute other DBE participation to meet the goal. Counting payments Payments to a DBE firm will count toward DBE goals only if the participation is in accordance with these specifications. Prompt Payment Prompt payment to all Subcontractors shall be in accordance with Section 1- 08.1(1) of these Contract special provisions. Payment Compensation for all costs involved with complying with the conditions .of this specification and any other associated DBE requirements is included in payment for the associated Contract items of Work. Damages for Noncompliance The Prime Contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The Prime Contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of Contracts, which contain funding assistance from the United States Department of Transportation. Failure by the Prime Contractor to carry out these requirements is a material breach of this Contract, which may result in the Termination of this Contract or such other remedy as the Contracting Agency deems appropriate. If the Prime Contractor does not comply with any part of its Contract as required under 49 CFR part 26, and/or any other applicable law or regulation regarding DBE, the Contracting Agency may withhold payment, suspend the ability of the Prime Contractor to participate in future Contracting Agency contracts, impose sanctions or Terminate the Contract, and subject the Prime Contractor to civil penalties of up to ten percent of the amount of the Contract for each violation. In the case of WSDOT Contracts, prequalification may be suspended pursuant to WAC 468-16-180, and continuous violations (exceeding a single violation) may also disqualify the Prime Contractor from further participation in WSDOT Contracts for a period of up to three years. An apparent low Bidder must be in compliance with these Contract Provisions as a condition precedent to the granting of a notice of award by the Contracting Agency. The Prime Contractor is entitled to request an adjudicative proceeding with respect to the Contracting Agency's determination of Contract violation and assessed penalties by filing a written application within thirty days of receipt of notification. The adjudicative proceeding, if requested, will be conducted by an administrative law judge pursuant to the procedures set forth in RCW 34.05 and Chapter 10.08 of the Washington Administrative Code. 101 (August 2, 2010) Special Training Provisions General Requirements The Contractor's equal employment opportunity, affirmative action program shall include the requirements set forth below. The Contractor shall provide on-the-job training aimed at developing trainees to journeyman status in the trades involved. The number of training hours shall be ***1,000 ***. Trainees shall not be assigned less than 400 hours. The Contractor may elect to accomplish training as part of the work of a subcontractor, however, the Prime Contractor shall retain the responsibility for complying with these Special Provisions. The Contractor shall also ensure that this training provision is made applicable to any subcontract that includes training. Trainee Approval The Federal government requires Contracting Agencies to include these training provisions as a condition attached to the receipt of Federal highway funding. The Federal government has determined that the training and promotion of members of certain minority groups and women is a primary objective of this training provision. The Contractor shall make every effort to enroll minority groups and women trainees to the extent such persons are available within a reasonable recruitment area. This training provision is not intended and shall not be used to discriminate against any applicant for training, whether that person is a minority, woman or otherwise. A non - minority male trainee or apprentice may be approved provided the following requirements are met: 1. The Contractor is otherwise in compliance with the contract's Equal Employment Opportunity and On -the -Job Training requirements and provides documentation of the efforts taken to fill the specific training position with either minorities or females 2. or, if not otherwise in compliance, furnishes evidence of his/her systematic and direct recruitment efforts in regard to the position in question and in promoting the enrollment and/or employment of minorities and females in the craft which the proposed trainee is to be trained 3. and the Contractor has made a good faith effort towards recruiting of minorities and women. As a minimum this good faith effort shall consist of the following: • Distribution of written notices of available employment opportunities with the Contractor and enrollment opportunities with its unions. Distribution should include but not be limited to; minority and female recruitment sources and minority and female community organizations; • Records documenting the Contractor's efforts and the outcome of those efforts, to employ minority and female applicants and/or refer them to unions; 102 Records reflecting the Contractor's efforts in participating in developing minority and female on-the-job training opportunities, including upgrading programs and apprenticeship opportunities; • Distribution of written notices to unions and training programs disseminating the Contractor's EEO policy and requesting cooperation in achieving EEO and OJT obligations. No employee shall be employed as a trainee in any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman. The Contractor's records shall document the methods for determining the trainee's status and findings in each case. When feasible, 25 percent of apprentices or trainees in each occupation shall be in their first year of apprenticeship or training. For the purpose of this specification, acceptable training programs are those employing trainees/apprentices registered with the following: 1. Washington State Department of Labor & Industries — State Apprenticeship Training Council (SATC) approved apprenticeship agreement: a. Pursuant to RCW 49.04.060, an apprenticeship agreement shall be; i. an individual written agreement between an employer and apprentice ii. a written agreement between (an employer or an association of employers) and an organization of employees describing conditions of employment for apprentices iii. a written statement describing conditions of employment for apprentices in a plant where there is no bona fide employee organization. All such agreements shall conform to the basic standards and other provisions of RCW Chapter 49. 2. Apprentices must be registered with U.S. Department of Labor — Bureau of Apprenticeship Training (BAT) approved program. Or 3. Trainees participating in a non-BAT/SATC program, which has been approved by the contracting agency for the specific project. 4. For assistance in locating trainee candidates, the Contractor may call WSDOT's OJT Support Services Technical Advisor at (360) 705-7088, (206) 587-4954 or toll free at 1-866-252-2680. Obligation to Provide Information Upon starting a new trainee, the Contractor shall furnish the trainee a copy of the approved program the Contractor will follow in providing the training. Upon completion 103 of the training, the Contractor shall provide the Contracting Agency with a certification showing the type and length of training satisfactorily completed by each trainee. Training Program Approval The Training Program shall meet the following requirements: 1. The Training Program (DOT Form 272-049) must be submitted to the Engineer for approval prior to commencing contract work and shall be resubmitted when modifications to the program occur. 2. The minimum length and type of training for each classification will be as established in the training program as approved by the Contracting Agency. 3. The Training Program shall contain the trades proposed for training, the number of trainees, the hours assigned to the trade and the estimated beginning work date for each trainee. 4. Unless otherwise specified, Training Programs will be approved if the proposed number of training hours equals the training hours required by contract and the trainees are not assigned less than 400 hours each. 5. After approval of the training program, information concerning each individual trainee and good faith effort documentation shall be submitted on (DOT Form 272-050.) 6. In King County, laborer trainees or apprentices will not be approved on contracts containing less than 2000 training hours as specified in this Section. In King County, no more than twenty percent (20%) of hours proposed for trainees or apprentices shall be in the laborer classification when the contract contains 2000 or more hours of training as specified in this Section. Trainees shall not be assigned less than 400 hours. 7. Flagging programs will not be approved. Other programs that include flagging training will only be approved if the flagging portion is limited to an orientation of not more than 20 hours. 8. It is the intention of these provisions that training is to be provided in the construction crafts rather than clerk -typists or secretarial -type positions. Training is permissible in lower level management positions such as office engineers, estimators, timekeepers, etc., where the training is oriented toward construction applications. Some off-site training is permissible as long as the training is an integral part of an approved training program. 9. It is normally expected that a trainee will begin training on the project as soon as feasible after start of work, utilizing the skill involved and remain on the project as long as training opportunities exist in the work classification or upon completion of the training program. It is not required that all trainees be on board for the entire length of the contract. The number trained shall be determined on the basis of the total number enrolled on the contract for a significant period. 104 10. Wage Progressions: Trainees will be paid at least the applicable ratios or wage progressions shown in the apprenticeship standards published by the Washington State Department of Labor and Industries. In the event that no training program has been established by the Department of Labor and Industries, the trainee shall be paid in accordance with the provisions of RCW 39.12.021 which reads as follows: Apprentice workmen employed upon public works projects for whom an apprenticeship agreement has been registered and approved with the State Apprenticeship Council pursuant to RCW 49.04, must be paid at least the prevailing hourly rate for an apprentice of that trade. Any workman for whom an apprenticeship agreement has not been registered and approved by the State Apprenticeship Council shall be considered to be a fully qualified journeyman, and, therefore, shall be paid at the prevailing hourly rate for journeymen. Compliance In the event that the Contractor is unable to accomplish the required training hours but can demonstrate a good faith effort to meet the requirements as specified, then the Contracting Agency will adjust the training goals accordingly. Requirements for Non BAT/SATC Approved Training Programs Contractors who are not affiliated with a program approved by BAT or SATC may have their training program approved provided that the program is submitted for approval on DOT Form 272-049, and the following standards are addressed and incorporated in the Contractor's program: • The program establishes minimum qualifications for persons entering the training program. • The program shall outline the work processes in which the trainee will receive supervised work experience and training on-the-job and the allocation of the approximate time to be spent in each major process. The program shall include the method for recording and reporting the training completed shall be stated. • The program shall include a numeric ratio of trainees to journeymen consistent with proper supervision, training, safety, and continuity of employment. The ratio language shall be specific and clear as to application in terms of job site and workforce during normal operations (normally considered to fall between 1:10 and 1:4). • The terms of training shall be stated in hours. The number of hours required for completion to journeyman status shall be comparable to the apprenticeship hours established for that craft by the SATC. The following are examples of programs that are currently approved: CRAFT HOURS Laborer 4,000 Ironworker 6,000 105 Carpenter 5,200-8,000 Construction Electrician 8,000 Operating Engineer 6,000-8,000 Cement Mason 5,400 Teamster 2,100 • The method to be used for recording and reporting the training completed shall be stated. • A numeric ratio of trainees to journeymen shall be established. It shall be consistent with proper supervision, training, safety and continuity of employment. The ratio language shall be specific and clear as to application in terms of job site and workforce during normal operations. Measurement The Contractor may request that the total number of "training" hours for the contract be increased subject toapproval by the Contracting Agency. This reimbursement will be made even though the Contractor receives additional training program funds from other sources, provided such other sources do not prohibit other reimbursement. Reimbursement to the Contractor for off-site training as indicated previously may only be made when the Contractor does one or more of the following and the trainees are concurrently employed on a Federal -aid project: • contributes to the cost of the training, • provides the instruction to the trainee, • pays the trainee's wages during the off- site training period. Reimbursement will be made upon receipt of a certified invoice that shows the related payroll number, the name of trainee, total hours trained under the program, previously paid hours under the contract, hours due this estimate, and dollar amount due this estimate. The certified invoice shall show a statement indicating the Contractor's effort to enroll minorities and women when a new enrollment. occurs. If a trainee is participating in a SATC/BAT approved apprenticeship program, a copy of the certificate showing apprenticeship registration must accompany the first invoice on which the individual appears. Reimbursement for training occurring prior to approval of the training program will be allowed if the Contractor verbally notifies the Engineer of this occurrence at the time the apprentice/trainee commences work. A trainee/apprentice, regardless of craft, must have worked on the contract for at least 20 hours to be eligible for reimbursement. Payment The Contractor will be reimbursed under the item "Training" per hour for each hour of training for each employee. Federal Agency Inspection Section 1-07.12 is supplemented with the following: 106 (July 30, 2012) Required Federal Aid Provisions The Required Contract Provisions Federal Aid Construction Contracts (FHWA 1273) Revised May 1, 2012 supersede any conflicting provisions of the Standard Specifications and are made a part of this Contract; provided, however, that if any of the provisions of FHWA 1273 are Tess restrictive than Washington. State Law, then the Washington State Law shall prevail. The provisions of FHWA 1273 included in this Contract require that the Contractor insert the FHWA 1273 in each Subcontract, together with the wage rates which are part of the FHWA 1273. Also, a clause shall be included in each Subcontract requiring the Subcontractors to insert the FHWA 1273 thereto in any lower tier Subcontracts, together with the wage rates. The Contractor shall also ensure that this section, REQUIRED FEDERAL AID PROVISIONS, is inserted in each Subcontract for Subcontractors and lower tier Subcontractors. For this purpose, upon request to the Project Engineer, the Contractor will be provided with extra copies of the FHWA 1273, the applicable wage rates, and this Special Provision. Utilities and Similar Facilities Section 1-07.17 is supplemented with the following: Locations and dimensions shown in the Plans for existing facilities are in accordance with available information obtained without uncovering, measuring, or other verification. Public and private utilities, or their Contractors, will furnish all work necessary to adjust, relocate, replace, or construct their facilities unless otherwise provided for in the Plans or these Special Provisions. Such adjustment, relocation, replacement, or construction will be done during theprosecution of the work for this project. It shall be the contractor's responsibility to investigate the presence and location of all utilities prior to bid opening and assess their impacts on his construction activities. The following addresses and telephone numbers of utility companies known or suspected of having facilities within the project limits are supplied for the Contractor's convenience: Century Link Oscar Cuevas 509-575-7185 Charter Communications 1005 N. 16th Ave., Yakima, WA 98902 509-469-2270 City of Yakima Water Div. 2301 Fruitvale Blvd., Yakima, WA 98902 509-575-6154 City of Yakima Streets Div. 2301 Fruitvale Blvd., Yakima, WA 98902 509-575-6005 City of Yakima Info. Systems 129 N. 2nd Street, Yakima, WA 98901 509-575-6098 City of Yakima Wastewater Div. 2220 E. Viola, Yakima, WA 98901 509-575-6077 Cascade Natural Gas Corp. 401 N. 1st Street, Yakima, WA 98901 509-457-5905 Pacific Power Mike Paulson 509-575-3158 Level 3 Communications James Crooker 503-553-4918 Verizon Business Michael Fulmer 206-409-1260 Noel Communications Shawn 509-575-4780 Integra Telecom Bob Robertson 425-922-1477 107 Yakima County Info. Systems Bruce Klingele 509-574-2034 The Contractor shall notify the Upper Yakima Valley Utilities Coordinating Council -Area 5, telephone number 1-800-553-4344, at least 72 hours prior to start of excavation so that underground utilities may be marked. No excavation shall begin until all known facilities, in the vicinity of the excavation area, have been located and marked. Utilities, new or old, may be renewed, relocated, or adjusted for the proposed construction. The Contractor shall, prior to beginning any work, meet with all utility organizations (public and private) in the field to familiarize himself with plans and schedules of the installations on new, relocated, or adjusted utilities. Both public and private utility organizations may be doing utility installations within the area. The proposed construction work must be coordinated with these utility installations. The Contractor shall coordinate his work with other contractors who may be working in the project area and cooperate with them. 1-07.18 Public Liability and Property Damage Insurance Delete this section in its entirety, and replace it with the following: 1-07.18 Insurance (January 24, 2011 APWA GSP) 1-07.18(1) General Requirements A. The Contractor shall obtain the insurance described in this section from insurers approved by the State Insurance Commissioner pursuant to RCW Title 48. The insurance must be provided by an insurer with a rating of A-: VII or higher in the A.M. Best's Key Rating Guide, which is licensed to do business in the state of Washington (or issued as a surplus line by a Washington Surplus lines broker). The Contracting Agency reserves the right to approve or reject the insurance provided, based on the insurer (including financial condition), terms and coverage, the Certificate of Insurance, and/or endorsements. B. The Contractor shall keep this insurance in force during the term of the contract and for thirty (30) days after the Physical Completion date, unless otherwise indicated (see C. below). C. If any insurance policy is written on a claims made form, its retroactive date, and that of all subsequent renewals, shall be no later than the effective date of this Contract. The policy shall state that coverage is claims made, and state the retroactive date. Claims -made form coverage shall be maintained by the Contractor for a minimum of 36 months following the Final Completion or earlier termination of this contract, and the Contractor shall annually provide the Contracting Agency with proof of renewal. If renewal of the claims made form of coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase an extended reporting period ("tail") or execute another form of guarantee acceptable to the Contracting Agency to assure financial responsibility for liability for services performed. D. The insurance policies shall contain a "cross liability" provision. 108 E. The Contractor's and all subcontractors' insurance coverage shall be primary and non- contributory insurance as respects the Contracting Agency's insurance, self-insurance, or insurance pool coverage. F. The Contractor shall provide the Contracting Agency and all Additional Insureds with written notice of any policy cancellation, within two business days of their receipt of such notice. G. Upon request, the Contractor shall forward to the Contracting Agency a full and certified copy of the insurance policy(s). H. The Contractor shall not begin work under the contract until the required insurance has been obtained and approved by the Contracting Agency. I. Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the Contracting Agency may, after giving five business days notice to the Contractor to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the Contracting Agency on demand, or at the sole discretion of the Contracting Agency, offset against funds due the Contractor from the Contracting Agency. J. All costs for insurance shall be incidental to and included in the unit or lump sum prices of the contract and no additional payment will be made. 1-07.18(2) Additional Insured All insurance policies, with the exception of Professional Liability and Workers Compensation, shall name the following listed entities as additional insured(s): • the Contracting Agency and its officers, elected officials, employees, agents, and volunteers • appointed officials The above -listed entities shall be additional insured(s) for the full available limits of liability maintained by the Contractor, whether primary, excess, contingent or otherwise, irrespective of whether such limits maintained by the .Contractor are greater than those required by this Contract, and irrespective of whether the Certificate of Insurance provided by the Contractor pursuant to 1-07.18(3) describes limits lower than those maintained by the Contractor. 1-07.18(3) Subcontractors Contractor shall ensure that each subcontractor of every tier obtains and maintains at a minimum the insurance coverages listed in 1-07.18(5)A and 1-07.18(5)B. Upon request of the Contracting Agency, the Contractor shall provide evidence of such insurance. 1-07.18(4) Evidence of Insurance The Contractor shall deliver to the Contracting Agency a Certificate(s) of Insurance and endorsements for each policy of insurance meeting the requirements set forth herein when the Contractor delivers the signed Contract for the work.. The certificate and endorsements must conform to the following requirements: 1. An ACORD certificate or a form determined by the Contracting Agency to be equivalent. 109 2. Copies of all endorsements naming Contracting Agency and all other entities listed in 1- 07.18(2) as Additional Insured(s), showing the policy number. The Contractor may submit a copy of any blanket additional insured clause from its policies instead of a separate endorsement. A statement of additional insured status on an ACORD Certificate of Insurance shall not satisfy this requirement. 3. Any other amendatory endorsements to show the coverage required herein. 1-07.18(5) Coverages and Limits The insurance shall provide the minimum coverages and limits set forth below. Providing coverage in these stated minimum limits shall not be construed to relieve the Contractor from liability in excess of such limits. All deductibles and self-insured retentions must be disclosed and are subject to approval by the Contracting Agency. The cost of any claim payments falling. within the deductible shall be the responsibility of the Contractor. 1-07.18(5)A Commercial General Liability A policy of Commercial General Liability Insurance, including: Per project aggregate Premises/Operations Liability Products/Completed Operations — for a period of one year following final acceptance of the work. Personal/Advertising Injury Contractual Liability Independent Contractors Liability Stop Gap / Employers' Liability Explosion, Collapse, or Underground Property Damage (XCU) Blasting (only required when the Contractor's work under this Contract includes exposures to which this specified coverage responds) Such policy must provide the following minimum limits: $1,000,000 Each Occurrence $2,000,000 General Aggregate $1,000,000 Products & Completed Operations Aggregate $1,000,000 Personal & Advertising Injury, each offence Stop Gap / Employers' Liability $1,000,000 Each Accident $1,000,000 Disease - Policy Limit $1,000,000 Disease - Each Employee 1=07.18(5)B Automobile Liability Automobile Liability for owned, non -owned, hired, and leased vehicles, with an MCS 90 endorsement and a CA 9948 endorsement attached if "pollutants" are to be transported. Such policy(ies) must provide the following minimum limit: $1,000,000 combined single limit 1-07.18(5)C Workers' Compensation 110 The Contractor shall comply with Workers' Compensation coverage as required . by the Industrial Insurance laws of the state of Washington. 1-07.18(5)F Excess or Umbrella Liability (May 10, 2006 APWA GSP) The Contractor shall provide Excess or Umbrella Liability coverage at limits of $5,000,000 per occurrence and annual aggregate. This excess or umbrella liability coverage shall apply, at a minimum, to both the Commercial General and Auto insurance policy coverage. This requirement may be satisfied instead through the Contractor's primary Commercial General and Automobile Liability coverage, or any combination thereof. (August 7, 2006) Relations with Railroad Railroad Company, as used in the following specifications, shall be the railroad company or companies, or railway company or companies specified in these Special Provisions. The following provisions, though referring to a single Railroad Company, shall be applicable to each of the following railroad companies or railway companies: BNSF Railway Company Protection of Railroad Property The Contractor shall exercise care in all operations and shall, at the Contractor's expense, protect the property of the Railroad Company and the Company's appurtenances, property in its custody, or persons lawfully upon its right of way, from damage, destruction, interference or injury caused by the Contractor's operations. The Contractor shall prosecute the work to not interfere with the Railroad Company or its appurtenances, or any of the Railroad Company's trains or facilities, and shall complete the work to a condition that shall not interfere with or menace the integrity or safe and successful operations of the Railroad Company or its appurtenances, or any of the Railroad Company's trains or facilities. The Contractor shall not transport equipment, machinery, or materials across the Railroad Company's tracks, except at a public crossing, without the written consent of the Railroad Company. The Contractor shall keep the right of way and ditches of the Railroad Company open and clean from any deposits or debris resulting from its operations. The Contractor shall be responsible for the cost to clean and restore ballast of the Railroad Company which is disturbed or becomes fouled with dirt or materials when such deposits or damage result from the Contractor's operations, except as provided elsewhere. The Contractor's work shall be conducted in such a manner that there will be a minimum of interference with the operation of railroad traffic. The Railroad Company will specify what periods will be allowed the Contractor for executing any part of the work in which the Railroad Company's tracks will be obstructed or made unsafe for operation of railroad traffic. 111 In the event that an emergency occurs in connection with the work specified, the Railroad Company reserves the right to do any and all work that may be necessary to maintain railroad traffic. If the emergency is caused by the Contractor, the Contractor shall pay the Railroad Company for the cost of such emergency work. Protective services to protect the Railroad Company's facilities, property, and movement of its trains or engines, including railroad flagging and other devices, may be required by the Railroad Company as a result of the Contractor's operations. The nature and extent of protective services, personnel and other measures required will in all cases be determined by the Railroad Company. Nothing in these specifications will limit the Railroad Company's right to determine and assign the number of personnel, the classes of personnel for protective services, nor other protective measures it deems necessary. When, in the opinion of the Railroad Company, the services of flaggers or security personnel are necessary for the protection of the Railroad Company's facilities by reason of the Contractor's operations, the Railroad Company will furnish such flaggers or security personnel as may be required. The Contractor shall notify the Railroad Company a minimum of thirty (30) calendar days in advance of whenever the Contractor is about to perform work adjacent to the tracks to enable the Railroad Company to provide flagging or other protective service. The Railroad Company's contact is: Andy Vulgas, 602 West 3rd, Ellensburg, WA 98926, (206) 625-6880 (office), (503) 799-4042 (cell), (509) 350-3200 (Nextel), Andy.vulgas@bnsf.com No act of the Railroad Company in supervising or approving any work shall reduce or in any way affect the liability of the Contractor for damages, expense, or cost which may result to the Railroad Company from the construction of this Contract. Unless otherwise provided, all personnel assigned by the Railroad Company, other than those engaged in performing work by the Railroad Company as listed under Construction Work by Railroad Company, will be considered protective personnel. In general, the Railroad Company will furnish protective services: a. For any excavation below the elevation of the track subgrade, if in the opinion of the Railroad Company's representative, the track or other railroad facilities may be subject to settlement or movement. For all work over or adjacent to the track if, in the opinion of the Railroad Company's representative, said work represents a hazard to the Railroad Company. b. During any clearing, grubbing, grading, or blasting in proximity to the facilities, which in the opinion of the Railroad Company's representative, may endanger or interfere with railroad facilities or operations. 112 c. When any of the Contractor's operations take place within or near railroad right of way and, in the opinion of the Railroad Company's representative, could endanger railroad facilities or create a hazard to railroad operations. Communications Linemen or Signalmen may be used to protect communications and signal facilities, if deemed necessary by the Railroad Company. There will be no cost to the Contractor for the railroad protective services unless such services result from the Contractor's failure to comply with the terms and conditions of its contract with the Contracting Agency or with its Contractor's Right of Entry Agreements with -the Railroad Companies. Construction Work by Railroad Company The work by the Railroad Company as described below will be performed by the Railroad Company with its own forces at no cost to the Contractor: (a) Construction of the Shoofly, including grading work; (b) Procurement of materials, equipment and supplies necessary for the railroad work; (c) Preliminary engineering, design, and contact preparation excluding the structure and Shoofly that have been designed by the Agency's consultants; (d) Furnishing flagging services as required, including furnishing, installing, maintaining, removing and reinstalling a temporary private crossing of the track for the Contractor's use; (e) Furnishing engineering and inspection as required in connection with the construction of the project; (f) Removal of the existing MLK Boulevard at -grade crossing, including removal of the automatic warning devices, and obliteration of the crossing between, the rails and two feet outside thereof after closure of MLK Boulevard to the public by the City; (g) Providing a contact project coordinator to serve as project manager for the Project; (h) Removal and replacement of approximately 100 feet of main track as required to build the structure. (i) Associated signal and track work required for installation of the bridge structure. All work which is performed by the Railroad Company at the Contractor's request and which is for the Contractor's benefit or convenience shall be at the Contractor's expense and the Contractor shall reimburse the. Railroad Company for all costs for such work. 113 The Contractor shall cooperate with the Railroad Company and so conduct operations that the necessary reconstruction of its facilities and the removal of existing facilities can be accomplished without interruption of service. Railroad Protective Liability Insurance The Contractor shall protect the Railroad Company and any other railroad company occupying or using the Railroad Company's rights of way or lines of railroad against all loss and damages arising from activities of the Contractor or the Contractor's forces or any of the Contractor's Subcontractors or agents. The Contractor shall furnish for each Railroad Company the original and three certified copies of a Railroad Protective Liability Insurance Policy, naming the Railroad Company as the insured and providing for protection to the Railroad Company in the manner and form described in the Railroad Protective Liability Form as set forth below. Said insurance shall be executed. by a corporation qualified to write insurance in the State of Washington in form and substance satisfactory to the Railroad Company and shall be delivered to the Engineer. The Engineer will submit the insurance to the Railroad Company for its approval. The Contractor shall not enter upon or use the Railroad Company's property until notified by the Engineer of the Railroad Company's approval. The various blank sections of the Railroad Protective Liability Form shall contain the following information: Named Insured: BNSF Railway Company 2650 Lou Menk Drive Fort Worth, TX 76131-2830 Limits of Liability: The combined single limit of the insurance company's liability under this policy to the insured shall be not less than $5,000,000 for all damages arising out of bodily injuries to or death of any person or persons and for all damages arising out of loss or destruction of or injury or damage to property in any one occurrence and $10,000,000 aggregate during the policy period. Said insurance policy executed by a corporation qualified to write the same in the State of Washington, shall be in form and substance satisfactory to the Railroad Company and shall be delivered to and approved by the Railroad Company prior to the entry upon or use of its property by the Contractor. All insurance specified above shall be carried until the physical completion date of the contract as described in Section 1-08.5 except as stated herein. When all the work involving construction activities within or immediately adjacent to the railroad right of way is completed, the Contractor may make a written request to the Engineer to be relieved of the responsibility to continue all or part of the insurance specified above. If the Engineer deems the portion of the work in that area is complete, the Engineer may approve the Contractor's request. However, if for any reason the Contractor resumes or starts any new work in that area (including being ordered to do so-by•the Engineer), the insurance shall be reinstated by the Contractor 114 before the work is started. If the insurance must be reinstated because of the Contractor's operations or failure of the Contractor to perform all the contract requirements, the costs shall be the responsibility of the Contractor. If the insurance must be reinstated because of changes to the contract, the costs will be considered in accordance with Section 1-04.4. Other Insurance Requirements As specified in the "Agreement Between BNSF Railway Company and the Contractor" contained in the appendices. Commercial General Liability Insurance A certificate of insurance providing proof of said Insurance, executed by a corporation qualified to write the same in the State of Washington, in form and substance satisfactory to the Railroad Company, shall be delivered to and approved by the Railroad Company prior to the entryupon or use of the Railroad Company's property by the Contractor. (August 7, 2006) Contractor's Right of Entry and Insurance Requirements - BNSF No work shall commence within BNSF Railway Company (BNSF) right of way until the Contractor has executed, delivered, and received in return the fully executed Contractor's Right -of -Entry Agreement from BNSF, and has obtained all of the insurance required by the Railroad. All work within BNSF's right of way shallbe in accordance with BNSF's Contractor Requirements and the Contractor's Right of Entry Agreement (See Appendices). The Contractor, its Subcontractors or agents, shall at its own expense, obtain and maintain in force all insurance required by BNSF until the completiondate of the contract as described in Section 1-08.5 except as stated herein. When all the work involving construction activities within or immediately adjacent to the Railroad right of way is completed, the Contractor may make a written request to the Engineer to be relieved of the responsibility to continue the insurance required by BNSF. If the Engineer deems the portion of the work in that area is complete, the Engineer may approve the Contractor's request. However, if for any reason the Contractor resumes or starts any new work in that area (including being ordered to do so by the Engineer), the insurance shall be reinstated by the Contractor before the work is started. If the insurance must be reinstated because of the Contractor's activities or failure of the Contractor to perform all the contract requirements, the costs shall be the responsibility of the Contractor. If the insurance must be reinstated because of changes to the contract, the costs will be considered in accordance with Section 1-04.4. (******) In addition to the above, the Contractor must also comply with the following requirements: 1.01 General • 1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY, hereinafter referred to as "Railway" where work is over or under on or adjacent to Railway property and/or right-of-way, hereafter referred to as "Railway Property", during the construction of the Martin Luther King, Jr. Boulevard (MLK) Underpass. 115 • 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies of the Exhibit "C-1" Agreement, in the form attached hereto, obligating the Contractor to provide and maintain in full force and effect the insurance called for under Section 3 of said Exhibit "C-1". Questions regarding procurement of the Railroad Protective Liability Insurance should be directed to Rosa Martinez at Marsh, USA, 214-303-8519. • 1.01.03 The Contractor must plan, schedule and conduct all work activities so as not to interfere with the movement of any trains on Railway Property. • 1.01.04 The Contractor's right to enter Railway's Property is subject to the absolute right of Railway to cause the Contractor's work on Railway's Property to cease if, in the opinion of Railway, Contractor's activities create a hazard to Railway's Property, employees, and/or operations. • 1.01.05 The Contractor is responsible for determining and complying with all Federal, State and Local Governmental laws and regulations, including, but not limited to environmental laws and regulations (including but not limited to the Resource Conservation and Recovery Act, as amended; the Clean Water Act, the Oil Pollution Act, the Hazardous Materials Transportation Act; CERCLA), and health and safety laws and regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for, from and against all fines or penalties imposed or assessed by Federal, State and Local Governmental Agencies against the Railway which arise out of Contractor's work under this Agreement. • 1.01.06 The Contractor must notify City of Yakima at (509) 575-6111 and Railway's Manager Public Projects, telephone number 206-625-6146 at least thirty (30) calendar days before commencing any work on Railway Property. Contractors' notification to Railway must refer to Railroad's file #099164S. 1.01.07 For any falsework above any tracks or any excavations located, whichever is greater, within twenty-five (25) feet of the nearest track or intersecting a slope from the plane of the top of rail 'on a 1 '/2 horizontal to 1 vertical slope beginning at eleven (11) feet from centerline of the nearest track, both measured perpendicular to center line of track, the Contractor must furnish the Railway five sets of working drawings showing details of construction affecting Railway Property and tracks. The working drawing must include the proposed method of installation and removal of falsework, shoring or cribbing, not included in the contract plans and two sets of structural calculations of any falsework, shoring or cribbing. All calculations must take into consideration railway surcharge loading and must be designed to meet American Railway Engineering and Maintenance -of -Way Association (previously known as American Railway Engineering Association) Coopers E-80 live loading standard. All drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. The Contractor must not begin work until notified by the Railway that .plans have been approved. The Contractor will be required to use lifting devices such as, cranes and/or winches to place or to remove any falsework over Railway's tracks. In no case will the Contractor be relieved of responsibility for results obtained by the implementation of said approved plans. • 1.01.08 Subject to the movement of Railway's trains, Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient manner. The 116 Contractor will have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by the Railway. 1.02 Contractor Safety Orientation • 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees may enter Railway Property without first having completed Railway's Engineering Contractor Safety Orientation, found on the web site www.contractororientation.com. The Contractor must ensure that each of its employees, subcontractors, agents or invitees completes Railway's Engineering Contractor Safety Orientation through Internet sessions before any work is performed on the Project. Additionally, the Contractor must ensure that each and every one of its employees, subcontractors, agents or invitees possesses a card certifying completion of the Railway Contractor Safety Orientation before entering Railway Property. The Contractor is responsible for the cost of the Railway Contractor Safety Orientation. The Contractor must renew the Railway Contractor Safety Orientation annually. Further clarification can be found on the web site or from the Railway's Representative. 1.03 Railway Requirements • 1.03.01 The Contractor must take protective measures as are necessary to keep railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting from his operations. Any damage to railway facilities resulting from Contractor's operations will be repaired or replaced by Railway and the cost of such repairs or replacement must be paid for by the Contractor. • 1.03.02 The Contractor must notify the Railway's Division Superintendent at 509-546-3252 and provide blastingplans to the Railway for review seven (7) calendar days prior to conducting any blasting operations adjacent to or on Railway's Property. • 1.03.03 The Contractor must abide by the following temporary clearances during construction: ■ 15' Horizontally from centerline of nearest track ■ 21'-6" Vertically above top of rail • . 27'-0" Vertically above top of rail for electric wires carrying less than 750 volts ■ 28'-0" Vertically above top of rail for electric wires carrying 750 volts to 15,000 volts • 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts • 34'-0" Vertically above top of rail for electric wires carrying more than 20,000 volts • 1.03.04 Upon completion of construction, the following clearances shall be maintained: • 25' Horizontally from centerline of nearest track • 23'-3 1/2" Vertically above top of rail • 1.03.05 Any infringement within State statutory clearances due to the Contractor's operations must be submitted to the Railway and to City of Yakima and must not be 117 1 undertaken until approved in writing by the Railway, and until the City of Yakima has obtained any necessary .authorization from the State Regulatory Authority for the infringement. No extra compensation will be allowed in the event the Contractor's work is delayed pending Railway approval, and/or the State Regulatory Authority's approval. • 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will have the option of installing tell -tales or other protective devices Railway deems necessary for protection of Railway operations. The cost of tell -tales or protective devices will be borne by the Contractor. • 1.03.07 The details of construction affecting the Railway's Property and tracks not included in the contract plans must be submitted to the Railway by City of Yakima for approval before work is undertaken and this work must not be undertaken until approved by the Railway. • 1.03.08 At other than public road crossings; the Contractor must not move any equipment or materials across Railway's tracks until permission has been obtained from the Railway. The Contractor must obtain a "Temporary Private Crossing Agreement" from the Railway prior to moving his equipment or materials across the Railways tracks. The temporary crossing must be gated and locked at all times when not required for use by the Contractor. The temporary crossing for use of the Contractor will be at the expense of the Contractor. • 1.03.09 Discharge, release or spill on the Railway Property of any hazardous substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous waste is prohibited and Contractor must immediately notify the Railway's Resource Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess of a reportable quantity. Contractor must not allow Railway Property to become a treatment, storage or transfer facility as those terms are defined in the Resource Conservation and Recovery Act or any state analogue. • 1.03.10 The Contractor upon completion of the work covered by this contract, must promptly remove from the Railway's Property all of Contractor's tools, equipment, implements and other materials, whether brought upon said property by said Contractor or any Subcontractor, employee or agent of Contractor or of any Subcontractor, and must cause Railway's Property to be left in a condition acceptable to the Railway's representative. 1.04 Contractor Roadway Worker on Track Safety Program and Safety Action Plan = 1.04.01 Each Contractor that will perform work within 25 feet of the centerline of a track must develop and implement a Roadway Worker Protection/On Track Safety Program and work with Railway Project Representative to develop an on track safety strategy as described in the guidelines listed in the on track safety portion of the Safety Orientation. This Program must provide Roadway Worker protection/on track training for all employees of the Contractor, its subcontractors, agents or invitees. This training is reinforced at the job site through job safety briefings. Additionally, each Contractor must develop and implement the Safety Action Plan, as provided for on the web site www.contractororientation.com, which will be made available to Railway prior to commencement of any work on Railway Property. During the performance of work, the Contractor must audit its work activities. The Contractor must designate an on-site Project Supervisor who will serve as the contact person for the Railway and who will maintain a copy of. the Safety Action Plan, safety audits, and Material Safety Datasheets (MSDS), at the job site. 118 1.05 Protection of Railway Facilities and Railway Flagger Services: • • 1.05.01 •The Contractor must give Railway's Roadmaster (telephone 20.6-625-6880) a minimum of thirty (30) calendar days advance notice when flagging services will be required so that the Roadmaster can make appropriate arrangements (Le., bulletin the flagger's position). If flagging services are scheduled in advance by the Contractor and it is subsequently determined by the parties hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working days advance notice so that appropriate arrangements can be made to abolish the position pursuant to union requirements. • 1.05.02 Unless determined otherwise by Railway's Project Representative, Railway flagger and protective services and devices will be required and furnished when Contractor's work activities are located over, under and/or within twenty-five (25) feet measured horizontally from centerline of the nearest track and when cranes or similar equipment positioned beyond 25 -feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions: • 1.05.02a When in the opinion of the Railway's Representative it is necessary to safeguard Railway's Property, employees, trains, engines and facilities. • 1.05.02b When any excavation is performed below the bottom of tie elevation, if, in the opinion of Railway's representative, track or other Railway facilities may be subject to movement or settlement. • 1.05.02c When work in any way interferes with the safe operation of trains at timetable speeds. • 1.05.02d When any hazard is presented to Railway track, communications, signal, electrical, or other facilities either due to persons, material, equipment or blasting in the vicinity. • 1.05.02e Special permission must be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable. • 1.05.03 Flagging services will be performed by qualified Railway flaggers. 1.05.03a Flagging crew generally consists of one employee. However, additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railways Representative. • 1.05.03b Each time a flagger is called, the minimum period for billing will be the eight (8) hour basic day. • 1.05.03c The cost of flagger services provided by the Railway, when deemed necessary by the Railway's representative, will be borne by the Contractor. The estimated cost for one (1) flagger is $800.00 for an eight (8) hour basic day with time and one-half or double time for overtime, rest days and holidays. The estimated cost for each flagger includes vacation allowance, paid holidays, Railway and unemployment insurance, public liability and property damage insurance, health and welfare benefits, transportation, meals, lodging and 119 supervision. Negotiations for Railway labor or collective bargaining agreements and rate changes authorized by appropriate Federal authorities may increase actual or estimated flagging rates. The flagging rate in effect at the time of performance by the Contractor hereunder will be used to calculate the actual costs of flagging pursuant to this paragraph. • 1.05.03d The average train traffic on this route is 7 freight trains per 24-hour period at a timetable speed 25 MPH and 0 passenger trains at a timetable speed of 0 MPH. 1.06 Contractor General Safety Requirements • 1.06.01. Work in the proximity of railway track(s) is potentially hazardous where movement of trains and equipment can occur at any time and in any direction. All work performed by contractors within 25 feet of any track must be in compliance with FRA Roadway Worker Protection Regulations. • 1.06.02 Before beginning any task on Railway Property, a thorough job safety briefing must be conducted with all personnel involved with the task and repeated when the personnel or task changes. If the task is within 25 feet of any track, the job briefing must include the Railway's flagger, as applicable, and include the procedures the Contractor will use to protect its employees, subcontractors, agents or invitees from moving any, equipment adjacent to or across any Railway track(s). • 1.06.03 Workers must not work within 25 feet of the centerline of any track without an on track safety strategy approved by the Railway's Project Representative. When authority is provided, every contractor employee must know: (1) who the Railway flagger is, and how to contact the flagger, (2) limits of the authority, (3) the method of communication to stop and resume work, and (4) location of the designated places of safety. Persons or equipment entering flag/work limits that were not previously job briefed, must notify the flagger immediately, and be given a job briefing when working within 25 feet of the center line of track. • 1.06.04 When Contractor employees are required to work on the Railway Property after normal working hours or on weekends, the Railroad's representative in charge of the project must be notified. A minimum of two employees must be present at all times. • 1.06.05 Any employees, agents or invitees of Contractor or its subcontractors under suspicion of being under the influence of drugs or alcohol, or in the possession of same, will be removed from the Railway's Property and subsequently released to the custody of a representative of Contractor management. Future access to the Railway's Property by that employee will be denied. • 1.06.06 Any damage to Railway Property, or any hazard noticed on passing trains must be reported immediately to the Railway's representative in charge of the project. Any vehicle or machine which may come in contact with track, signal equipment, or structure (bridge) and could result in a train derailment must be reported immediately to the Railway representative in charge of the project and to the Railway's Resource Operations Center at 1(800) 832-5452. Local emergency numbers are to be obtained from the Railway representative in charge of the project prior to the start of any work and must be posted at the job site. • 1.06.07 For safety reasons, all persons are prohibited from having pocket knives, firearms 120 or other deadly weapons in their possession while working on Railway's Property. • 1.06.08 All personnel protective equipment (PPE) used on Railway Property must meet applicable OSHA and ANSI specifications. Current Railway personnel protective equipment requirements are listed on the web site, www.contractororientation.com, however., a partial list of the requirements include: a) safety glasses with permanently affixed side shields (no yellow lenses); b) hard hats c) safety shoe with: hardened toes, above -the -ankle lace -up and a defined heel; and d) high visibility retro -reflective work wear. The Railroad's representative in charge of the project is to be contacted regarding local specifications for meeting requirements relating to hi-visability work wear. Hearing protection, fall protection, gloves, and respirators must be worn as required by State and Federal regulations. (NOTE — Should there be a discrepancy between the information contained on the web site and the information in this paragraph, the web site will govern.) • 1.06.09 THE CONTRACTOR MUST NOT PILE OR STORE ANY MATERIALS, MACHINERY OR EQUIPMENT CLOSER THAN 25'-0" TO THE CENTER LINE OF THE NEAREST RAILWAY TRACK. MATERIALS, MACHINERY OR EQUIPMENT MUST NOT BE STORED OR LEFT WITHIN 250 FEET OF ANY HIGHWAY/RAIL AT -GRADE CROSSINGS, WHERE STORAGE OF THE SAME WILL OBSTRUCT THE VIEW OF A TRAIN APPROACHING THE CROSSING. PRIOR TO BEGINNING WORK, THE CONTRACTOR MUST ESTABLISH A STORAGE AREA WITH CONCURRENCE OF THE RAILROAD'S REPRESENTATIVE. • 1.06.10 Machines or vehicles must not be left unattended with the engine running. Parked machines or equipment must be in gear with brakes set and if equipped with blade, pan or bucket, they must be lowered to the ground. All machinery and equipment left unattended on Railway's Property must be left inoperable and secured against movement. (See internet Engineering Contractor Safety Orientation program for more detailed specifications) • 1.06.11 Workers must not create and leave any conditions at the work site that would interfere with water drainage. Any work performed over water must meet all Federal, State and Local regulations. • 1.06.12 All power line wires must be considered dangerous and of high voltage unless informed to the contrary by proper authority. For all power lines the minimum clearance between the lines and any part of the equipment or Toad must be; 200 KV or below - 15 feet; 200 to 350 KV - 20 feet; 350 to 500 KV - 25 feet; 500 to 750 KV - 35 feet; and 750 to 1000 KV - 45 feet. If capacity of the line is not known, a minimum clearance of 45 feet must be maintained. A person must be designated to observe clearance of the equipment and give a timely warning for all operations where it is difficult for an operator to maintain the desired clearance by visual means. 1.07 Excavation • 1.07.01 Before excavating, the Contractor must determine whether any underground pipe lines, electric wires, or cables, including fiber optic cable systems are present and located within the Project work area. The Contractor must determine whether excavation on Railway's Property could cause damage to buried cables resulting in delay to Railway traffic and disruption of service to users. Delays and disruptions to service may cause business interruptions involving loss of revenue and profits. Before commencing excavation, the 121 Contractor must contact BNSF's Field Engineering Representative (206-625-6880). All underground and overhead wires will be considered HIGH VOLTAGE and dangerous until verified with the company having ownership of the line. It is the Contractor's responsibility to notify any other companies that have underground utilities in the area and arrange for the location of all underground utilities before excavating. • 1.07.02 The Contractor must cease all work and notify the Railway immediately before continuing excavation in the area if obstructions are encountered which do not appear on drawings. If the obstruction is a utility and the owner of the utility can be identified, then the Contractor must also notify the owner immediately. If there is any doubt about the location of underground cables or lines of any kind, no work must be performed until the exact location has been determined. There will be no exceptions to these instructions. • 1.07.03 All excavations must be conducted in compliance with applicable OSHA regulations and, regardless of depth, must be shored where there is any danger to tracks, structures or personnel. 1.07.04 Any excavations, holes or trenches on the Railway's Property must be covered, guarded and/or protected when not being worked on. When leaving work site areas at night and over weekends, the areas must be secured and left in a condition that will ensure that Railway employees and other personnel who may be working or passing through the area are protected from all hazards. All excavations must be back filled as soon as possible. 1.08 Hazardous Waste, Substances and Material Reporting • 1.08.01 If Contractor discovers any hazardous waste, hazardous substance, petroleum or other deleterious material, including but not limited to any non -containerized commodity or material, on or adjacent to Railway's Property, in or near any surface water, swamp, wetlands or waterways, while performing any work under this Agreement, Contractor must immediately: (a) notify the Railway's Resource Operations Center at 1(800) 832-5452, of such discovery: (b) take safeguards necessary to protect its employees, subcontractors, agents and/or third parties: and (c) exercise due care with respect to the release, including the faking of any appropriate measure to minimize the impact of such release. 1.09 Personal Injury Reporting 1.09.01 The Railway is required to report certain injuries as a part of compliance with Federal Railroad Administration (FRA) reporting requirements. Any personal injury sustained by an employee of the Contractor, subcontractor or Contractor's invitees while on the Railway's Property must be reported immediately (by phone mail if unable to contact in person) to the Railway's representative in charge of the project. The Non -Employee Personal Injury Data Collection Form contained herein is to be completed and sent by Fax to the Railway at 1(817) 352-7595 and to the Railway's Project Representative no later than the close of shift on the date of the injury. 122 NON-EMPLOYEE PERSONAL INJURY DATA COLLECTION INFORMATION REQUIRED TO BE COLLECTED PURSUANT TO FEDERAL REGULATION. IT SHOULD BE USED FOR COMPLIANCE WITH FEDERAL REGULATIONS ONLY AND IS NOT INTENDED TO PRESUME ACCEPTANCE OF RESPONSIBILITY OR LIABILITY. 1. Accident City/St 2. Date: Time: City: 3. Temperature: 4. Weather (if non -Railway location) 5. Social Security # 6. Name (last, first, mi) 7. Address: Street: City: St. Zip: 8. Date of Birth: and/or Age Gender: (if available) 9. (a) Injury: (b) Body Part: (i.e. (a) Laceration (b) Hand) 11. Description of Accident (To include location, action, result, etc.): 12. Treatment: ❑ First Aid Only ❑ Required Medical Treatment ❑ Other Medical Treatment 13. Dr. Name 30. Date: 14. Dr. Address: Street: City: St: Zip: 15. Hospital Name: 16. Hospital Address: Street: City: St: Zip: 17. Diagnosis: FAX TO RAILWAY AT (817) 352-7595 AND COPY TO RAILWAY ROADMASTER FAX 1.10 Telecommunication Lines 1 • 1.10.01 The Contractor is placed on notice that fiber optic, communication and other cable lines and systems (collectively, the "Lines") owned by various telecommunications companies may be buried on BNSF's property or right-of-way. The locations of these Lines have been included on the plans based on information from telecommunications companies. The contractor will be responsible for contacting BNSF's Engineering Representative Ben Steinkamp (206-625-6189), BNSF's Signal Representative Eric Shaffstall — 206-272-3771 and the telecommunications companies and notifying them of any work that may damage these Lines or facilities and/or interfere with their service. The contractor must also mark all Lines shown in the plans or marked in the field in order to verify their locations. The Contractor must also use all reasonable methods when working in the BNSF right-of-way or on BNSF property to determine if any other Lines (fiber optic, cable, communications or otherwise) may exist. • 1.10.02 Failure to mark or identify these Lines will be sufficient cause for BNSF's Engineering Representative, Ben Steinkamp, to stop construction at no cost to the Agency or BNSF until these items are completed. • 1.10.03 In addition to the liability terms contained elsewhere in this Agreement, the contractor hereby indemnifies, defends, and holds harmless BNSF for, from and against all cost, liability, and expense whatsoever,(including, without limitation, attorney's fees and court costs and expenses) arising out of or in any way contributed to by any act or omission of Contractor, its subcontractors, agents and/or employees that cause or in any way or degree contribute to (1) any damage to or destruction of any Lines by Contractor, agents and/or employees, on BNSF property or within BNSF's right-of-way; (2) any injury to or death of any person employed by or on behalf of any telecommunications company, and/or its contractors, agents and/or employees, on BNSF property or BNSF's right-of-way; and/or (3) any claim or cause of action for alleged Toss of profits or revenue by or loss of service by, a customer or user of such telecommunications company(ies). THE LIABILITY ASSUMED BY CONTRACTOR WILL APPLY ONLY TO THE EXTENT OF THE NEGLIGENCE OF CONTRACTOR, ITS AGENTS, OR EMPLOYEES, AND WILL NOT BE AFFECTED BY THE FACT, IF IT IS A FACT, THAT THE DAMAGE, DESTRUCTION, INJURY, DEATH, CAUSE OF ACTION, OR CLAIM WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF BNSF, ITS AGENTS, SERVANTS, EMPLOYEES, OR OTHERWISE, EXCEPT TO THE EXTENT THAT SUCH H CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL MISCONDUCT OR SOLE NEGLIGENCE OF BNSF. • 1.10.04 The Contractor will be responsible for the rearrangement of any facilities or Lines determined to interfere with construction. The Contractor must cooperate fully with any telecommunications company (ies) in performing such arrangements. 124 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-07.23 Public Convenience and Safety 1-07.23(1) Construction Under Traffic This section is supplemented with the following: (January 2, 2012) Work Zone Clear Zone The Work Zone Clear Zone (WZCZ) applies during working and nonworking hours. The WZCZ applies only to temporary roadside objects introduced by the Contractor's operations and does not apply to preexisting conditions or permanent Work. Those work operations that are actively in progress shall be in accordance with adopted and approved Traffic Control Plans, and other contract requirements. During nonworking hours equipment or materials shall not be within the WZCZ unless they are protected by permanent guardrail or temporary concrete barrier. The use of temporary concrete barrier shall be permitted only if the Engineer approves the installation and location. During actual hours of work, unless protected as described above, only materials absolutely necessary to construction shall be within the WZCZ . and only construction vehicles absolutely necessary to construction shall be allowed within the WZCZ or allowed to stop or park on the shoulder of the roadway. The Contractor's nonessential vehicles and employees private vehicles shall not be permitted to park within the WZCZ at any time unless protected as described above. Deviation from the above requirements shall not occur unless the Contractor has requested the deviation in writing and the Engineer has provided written approval. Minimum WZCZ distances are measured from the edge of traveled way and will be determined as follows: Regulatory'; Posted Spee.ed. ' "Distance:From Traveled.Way Feet 35 mph or less 10 40 mph 15 45to55mph 20 60 mph or greater 30 * or 2 -feet beyond the outside edge of sidewalk Minimum Work Zone Clear Zone Distance (August 7, 2006) Lane closures are subject to the following restrictions: As shown in the Plans. 125 If the Engineer determines the permitted closure hours adversely affect traffic, the Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in writing of any change in the closure hours. No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 PM (noon) on a day prior to a holiday or holiday weekend. Holidays that occur on Friday, Saturday, Sunday or Monday are considered a holiday weekend. 1-07.24 Rights of Way (October 1, 2005 APWA GSP) Delete this section in its entirety, and replace it with the following: Street right of way lines, limits of easements, and limits of construction permits are indicated in the Plans. The Contractor's construction activities shall be confined within these limits, unless arrangements for use of private property are made. Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of way and easements, both permanent and temporary, necessary for carrying out the work. Exceptions to this are noted in the Bid Documents or will be brought to the Contractor's attention by a duly issued Addendum. Whenever any of the work is accomplished on or through property other than public right of way, the Contractor shall meet and fulfill all covenants and stipulations of any easement agreement obtained by the Contracting Agency from the owner of the private property. Copies of the easement agreements may be included in the Contract Provisions or made available to the Contractor as soon as practical after they have been obtained by the Engineer. Whenever easements or rights of entry have not been acquired prior to advertising, these areas are so noted in the Plans. The Contractor shall not proceed with any portion of the work in areas where right of way, easements or rights of entry have not been acquired until the Engineer certifies to the Contractor that the right of way or easement is available or that the right of entry has been received. If the Contractor is delayed due to acts of omission on the part of the Contracting Agency in obtaining easements, rights of entry or right of way, the Contractor will be entitled to an extension of time. The Contractor agrees that such delay shall not be a breach of contract. Each property owner shall be given 48 hours notice prior to entry by the Contractor. This includes entry onto easements and private property where private improvements must be adjusted. The Contractor shall be responsible for providing, without expense or liability to the Contracting Agency, any additional land and access thereto that the Contractor may desire for temporary construction facilities, storage of materials, or other Contractor needs. However, before using any private property, whether adjoining the work or not, the Contractor shall file with the Engineer a written permission of the private property owner, and, upon vacating the premises, a written release from the property owner of each property disturbed or otherwise interfered with by reasons of construction pursued under this contract. The statement shall be signed by the private property owner, or proper authority acting for the owner of the private property affected, stating that permission has been 126 granted to use the property and all necessary permits have been obtained or, in the case of a release, that the restoration of the property has been satisfactorily accomplished. The statement shall include the parcel number, address, and date of signature. Written releases must be filed with the Engineer before the Completion Date will be established. 1-08 PROSECUTION AND PROGRESS Add the following new section: 1-08.0 Preliminary Matters (May 25, 2006 APWA GSP) Add the following new section: 1-08.0(1) Preconstruction Conference (October 10, 2008 APWA GSP) Prior to the Contractor beginning the work, a preconstruction conference will be held between the Contractor, the Engineer and such other interested parties as may be invited. The purpose of the preconstruction conference will be: 1. To review the initial progress schedule; 2. To establish a working understanding among the various parties associated or affected by the work; 3. To establish and review procedures for progress payment, notifications, approvals, submittals, etc.; 4. To establish normal working hours for the work; 5. To review safety standards and traffic control; and 6. To discuss such other related items as may be pertinent to the work. The Contractor shall prepare and submit at the preconstruction conference the following: 1. A breakdown of all lump sum items; 2. A preliminary schedule of working drawing submittals; and 3. A list of material sources for approval if applicable. Add the following new section: 1-08.0(2) Hours of Work (June 27, 2011 APWA GSP) Except in the case of emergency or unless otherwise approved by the Contracting Agency, the normal straight time working hours for the contract shall be any consecutive 8 -hour period between 7:00 a.m. and 6:00 p.m. of a working day with a maximum 1 -hour lunch break and a 5 -day work week. The normal straight time 8 -hour working period for the contract shall be established at the preconstruction conference or prior to the Contractor commencing the work. 127 1 Written permission from the Engineer is required, if a Contractor desires to perform work on holidays, Saturdays, or Sundays; before 7:00 a.m. or after 6:00 p.m. on any day; or longer than an 8 -hour period on any day. The Contractor shall apply in writing to the'Engineer for such permission, no later than noon on the working day prior to the day for which the Contractor is requesting permission to work. Permission to work between the hours of 10:00 p.m. and 7:00 a.m. during weekdays and between the hours of 10:00 p.m. and 9:00 a.m. on weekends or holidays may also be subject to noise control requirements. Approval to continue work during these hours may be revoked at any time the Contractor exceeds the Contracting Agency's noise control regulations or complaints are received from the public or adjoining property owners regarding the -noise from the Contractor's operations. The Contractor shall have no claim for damages or delays should such permission be revoked for these reasons. Permission to work Saturdays, Sundays, holidays, or other than the agreed upon normal straight time working hours Monday through Friday may be given subject to certain other conditions set forth by the Contracting Agency or Engineer. These conditions may include but are not limited to: It 0 0 0 The Engineer may require designated representatives to be present during the work. Representatives who may be deemed necessary by the Engineer include, but are not limited to: survey crews; personnel from the Contracting Agency's material testing lab; inspectors; and other Contracting Agency employees when in the opinion of the Engineer, such work necessitates their presence. On non -Federal aid projects, requiring the Contractor to reimburse the Contracting Agency for the costs in excess of straight -time costs for Contracting Agency representatives who worked during such times. Considering the work performed on Saturdays, Sundays, and holidays as working days with regard to the contract time. Considering multiple work shifts as multiple working days with respect to contract time, even though the multiple shifts occur in a single 24-hour period. Prosecution and Progress Subcontracting Section 1-08.1 is supplemented with the following: (October 12, 1998) Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor shall submit to the Engineer a certification (WSDOT Form 420-004 EF) that a written agreement between the Contractor and the subcontractor or between the subcontractor and any lower tier subcontractor has been executed. This certification shall also guarantee that these subcontract agreements include all the documentsrequired by the Special Provision Federal Agency Inspection. A Subcontractor or lower tier Subcontractor will not be permitted to perform any work under the contract until the following documents have been completed and submitted to the Engineer: 128 1. Request to Sublet Work (Form 421-012 EF), and 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal - aid Projects (Form 420-004 EF). The Contractor's records pertaining to the requirements of this Special Provision shall be open to inspection or audit by representatives of the Contracting Agency during the life of the contract and for a period of not less than three years after the date of acceptance of the contract. The Contractor shall retain these records for that period. The Contractor shall also guarantee that these records of all Subcontractors and lower tier Subcontractors shall be available and open to similar inspection or audit for the same time period. Subcontract Completion and Return of Retainage Withheld Section 1-08.1(1) is revised to read: (June 27, 2011) The following procedures shall apply to all subcontracts entered into as a part of this Contract: Requirements 1. The Prime Contractor or Subcontractor shall make payment to the Subcontractor not later than ten (10) days after receipt of payment from the Contracting Agency for work satisfactorily completed by the Subcontractor, to the extent of each Subcontractor's interest therein. 2. Prompt and full payment of retainage from the Prime Contractor to the Subcontractor shall be made within 30 days after Subcontractor's Work is satisfactorily completed. 3. For purposes of this. Section, a Subcontractor's work is satisfactorily completed when all task and requirements of the Subcontract have been accomplished and including any required documentation and material testing . 4. Failure by a Prime Contractor or Subcontractor to comply with these requirements may result in one or more of the following: a. Withholding of payments until the Prime Contractor or Subcontractor complies b. Failure to comply shall be reflected in the Prime Contractor's Performance Evaluation c. Cancellation, Termination, or Suspension of the Contract, in whole or in part d. Other sanctions as provided by the subcontractor or by law under applicable prompt pay statutes. Conditions This clause does not create a contractual relationship between the Contracting Agency and any Subcontractor as stated in Section 1-08.1. Also, it is not intended to bestow upon any Subcontractor, the status of a third -party beneficiary to the Contract between the Contracting Agency and the Contractor. 129 Payment The Contractor will be solely responsible for any additional costs involved in paying retainage to the Subcontractors. Those costs shall be incidental to the respective Bid Items. 1-08.3 Progress Schedule General Requirements The first sentence of Section 1-08.3(1) is revised to read: (August 6, 2006) The Contractor shall submit Type C Progress Schedules and Schedule Updates to the Engineer for approval. Progress Schedule Types Section 1-08.3(2) is supplemented with the following: (January 2, 2012) Type C Progress Schedule Type C Progress Schedules shall conform to all of the requirements of Section 1- 08.3(2)B and this Section. The Contractor shall submit a printed copy of a preliminary Type C Progress Schedule no later than the first working day as defined in Section 1-08.5. The preliminary schedule shall comply with all of these requirements and the requirements of Section 1-08.3(1), except that it may be limited to only those activities occurring within the first 60 working days of the project. The Contractor shall submit a printed copy of a Type C Progress Schedule no later than 60 calendar days after the date the contract is executed. Each time that a preliminary schedule, Progress Schedule, or Schedule Update is submitted, the Contractor shall provide the Engineer with an electronic copy (.xer file type extension) of that schedule. Each submitted progress and update schedule shall have a unique file name and date identifier. Regardless of the type of software used, the schedule data provided to the Engineer shall be saved on a CD-ROM in Primavera Project Manager Enterprise Version, P6 6.0 or later version. Type C Progress Schedules shall display at least the following additional information: 1. A time scaled logic diagram. 2. Activities for traffic detours and closures. 3. Milestones for required delivery of State furnished materials, if any. 4. Activities for State furnished traffic control resources, if any. 5. Activities for fabrication of materials longer than 90 calendar days lead time. 6. Fixed constraints shall be identified on the activity listing, supplemented with a written narrative describing why the constraint exists. 130 7. Milestones for interim or stage completion dates. 8. Activities for scheduled outages on illumination systems, ITS systems, traffic signal systems and other electrical service outages. 9. Nighttime activities shall be so coded. 10. Activities for all submittals requiring State review, including the allowable review duration. All calendars used shall be created as project calendars, not global or resource calendars. If multiple calendars are applied to the Progress Schedule, the Contractor shall submit a written narrative describing each one's purpose. Schedule files shall not contain User Defined Fields (UDF's), all activity codes shall be project level, no resources shall be assigned to activities and no project codes shall be assigned. If requested by the Engineer, the Contractor shall supplement the Progress Schedule with written explanations for each lead and lag time used, and a written explanation describing the assumed production rates and planned resource allocations to support the activity durations provided in the schedule. The written explanations shall be documented as a notebook topic under "Assumptions and Basis". 1-08.3(2)D Weekly Look -Ahead Schedule This section is supplemented with the following: In addition to Contractor and subcontractor work, the look -ahead schedules shall show work by others, such as utilities and the railroad. Look -ahead schedules shall cover the week just finished, as well as, the next two weeks. This provides a check on how well the actual work accomplished matches up to the predictions made on the previous Zook -ahead schedule. The look -ahead schedules shall show, for each task that has started, an indication of whether it is starting earlier, later, or on schedule according to the most current project schedule. Look -ahead schedules should refer to tasks by their unique IDs on the current project schedule. Schedule Updates Section 1-08.3(3) is revised to read: (January 2, 2012) The Contractor shall submit a printed copy of a Type C Schedule Update to the Engineer by the first business day of each month, starting the month after the Progress Schedule isaccepted, or some other mutually agreed upon submittal time. In addition to the other requirements of this Section, Schedule Updates shall reflect at least the following information: 1. The actual duration and sequence of as -constructed work activities, including changed work. 131 2. Approved time extensions. 3. Any construction delays or other conditions that affect the progress of the work. 4. Any modifications to the as -planned sequence or duration of remaining activities, supplemented with a written narrative describing each change and the reason for the change. 5. The physical completion of all remaining work in the remaining contract time. 6. Progress on partially completed activities shall be indicated using percent complete. Activity numbers on Schedule. Updates shall be the same as the Progress Schedule, with the exception of deleted or added activities. • Unresolved requests for time extensions shall be reflected in the Schedule Update by assuming no time extension will be granted, and by showing the effects to follow-on activities necessary to physically complete the project within the currently authorized time for completion. Measurement Section 1-08.3(4) is revised to read: (January 2, 2012) No specific unit of measurement shall apply to the lump sum item for Type C Progress Schedule. Schedule Updates will be measured per each for each update submitted and approved per the requirements of Section 1-08.3(3). Schedule updates that are returned for correction will not be measured. Payment Section 1-08.3(5) is revised to read: (December 1, 2008) Payment will be made in accordance with Section 1-04.1, for the following bid item when it is included in the proposal: "Type C Progress Schedule", lump sum. The Lump Sum price for "Type C Progress Schedule" shall be full payment for all costs for furnishing the Type C Progress Schedule and preliminary Type C Progress Schedule. "Schedule Update", per each. The unit Contract price per each "Schedule Update" shall be full payment for all costs required to complete the work specified in Section 1-08.3(3). 132 1 All costs for providing Weekly Look -Ahead Schedules are considered incidental to the contract and are to be included with other bid items. 1-08.4 Prosecution of Work 1 Delete this section in its entirety, and replace it with the following: 1-08.4 Notice to Proceed and Prosecution of Work ' (June 27, 2011 APWA GSP) Notice to Proceed will be given after the contract has been executed and the contract bond fl and evidence of insurance have been approved and filed by the Contracting Agency. The Contractor shall not commence with the work until the Notice to Proceed has been given by the Engineer. The Contractor shall commence construction activities on the project site within ten days of the Notice to Proceed Date, unless otherwise approved in writing. The 'I Contractor shall diligently pursue the work to the physical completion date within the time specified in the contract. Voluntary shutdown or slowing of operations by the Contractor shall not relieve the Contractor of the responsibility to complete the work within the time(s) �I specified in the contract. When shown in the Plans, the first order of work shall be the installation of high visibility �I fencing to delineate all areas for protection or restoration, as described in the Contract. Installation of high visibility fencing adjacent to the roadway shall occur after the placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). Upon 'I construction of the fencing, the Contractor shall request the Engineer to inspect the fence. No other work shall be performed on the site until the Contracting Agency has accepted the installation of high visibility fencing, as described in the Contract. II1-08.5 Time for Completion �I (March 13, 1995) This project shall be physically completed within 300 working days. �I (June 28, 2007 APWA GSP, Option A) Revise the third and fourth paragraphs to read: Contract time shall begin on the first working day following the 10th calendar day after the 'I Notice to Proceed date. If the Contractor starts work on the project at an earlier date, then contract time shall begin on the first working day when onsite work begins. I� Each working day shall be charged to the contract as.it occurs, until the contract work is physically complete. If substantial completion has been granted and all the authorized working days have been used, charging of working days will cease. Each week the �I Engineer will provide the Contractor a statement that shows the number of working days: (1) charged to the contract the week before; (2) specified for the physical completion of the contract; and (3) remaining for the physical completion of the contract. The statement will II also show the nonworking days and any partial or whole day the Engineer declares as unworkable. Within 10 calendar days after the date of each statement, the Contractor shall file a written protest of any alleged discrepancies in it. To be considered by the Engineer, the protest shall be in sufficient detail to enable the Engineer to ascertain the basis and 'I 133 amount of time disputed. By not filing such detailed protest in that period, the Contractor shall be deemed as having accepted the statement as correct. If the Contractor elects to work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as a working day, then the fifth day of that week will be charged as a working day whether or not the Contractor works on that day. Revise the sixth paragraph to read: The Engineer will give the Contractor written notice of the completion date of the contract after all the Contractor's obligations under the contract have been performed by the Contractor. The following events must occur before the Completion Date can be established: 1. The physical work on the project must be complete; and 2. The Contractor must furnish all documentation required by the contract and required by law, to allow the Contracting Agency to process final acceptance of the contract. The following documents must be received by the Project Engineer prior to establishing a completion date: a. Certified Payrolls (Federal -aid Projects) b. Material Acceptance Certification Documents c. Annual Report of Amounts Paid as MBE/WBE Participants or Quarterly Report of Amounts Credited as DBE Participation, as required by the Contract Provisions. d. Final Contract Voucher Certification e. Property owner releases per Section 1-07.24 Suspension of Work Section 1-08.6 is supplemented with the following: (August 7, 2006) Contract time may be suspended for verification of HMA mix designs or for procurement of critical materials (Procurement Suspension). In order to 'receive a Procurement Suspension, the Contractor shall within 30 calendar days after execution by the Contracting Agency, submit all HMA mix designs according to section 5-04.3(7)A or place purchase orders for all materials deemed critical by the Contracting Agency for physical completion of the contract. The Contractor shall provide a copy of the completed DOT Form 350-042 indicating the date the mix design was submitted, or copies of purchase orders for the critical materials. Such purchase orders shall disclose the purchase order date and estimated delivery dates for such critical material. The Contractor shall show mix design verification or procurement of the materials listed below as activities in the Progress Schedule. If the approved Progress Schedule indicates that the mix design verification or materials procurement are critical activities, and if the Contractor has provided documentation that mix designs are submitted or purchase orders are placed for the critical materials within the prescribed 30 calendar days, then contract time shall be suspended upon physical completion of all critical work except that work dependent upon the below listed critical materials: Luminaires Fiber Optic Beam 134 II IIRailing II Charging of contract time will resume upon. the Contractors' receipt of .a mix design verification report, delivery of the critical materials to the Contractor, notification that the critical materials are ready for delivery to the Contractor from the Contracting Agency's Materials Laboratory, or 120 calendar days after execution by the Contracting Agency, II whichever occurs first. No additional Procurement Suspension will be provided if the Contractors HMA mix designs IIdid not verify and are resubmitted. �I 1-08.7 Maintenance During Suspension (October 1, 2005 APWA GSP) Revise the second paragraph to read: At no expense to the Contracting Agency, the Contractor shall provide through the II construction area a safe, smooth, and unobstructed roadway, sidewalk, and path for public use during suspension (as required in Section 1-07.23 or the Special Provisions). This may include a temporary road or detour. 'I 1-08.9 Liquidated Damages (March 13, 2012 APWA GSP) 'I Revise the fourth paragraph to read: When the Contract Work has progressed to Substantial Completion as defined in the II Contract. The Engineer may determine that the work is Substantially Complete. The Engineer will notify the Contractor in writing of the Substantial Completion Date. For overruns in Contract time occurring after the date so established, the formula for liquidated II damages shown above will not apply. For overruns in Contract time occurring after the Substantial Completion Date, liquidated damages shall be assessed on the basis of direct engineering and related costs assignable to the project until the actual Physical Completion 'I Date of all the Contract Work. The Contractor shall complete the remaining Work as promptly as possible. Upon request by the Project Engineer, the Contractor shall furnish a written schedule for completing the physical Work on the Contract: 1-09 MEASUREMENT AND PAYMENT 1-09.6 Force Account (October 10, 2008 APWA GSP) �I Supplement this section with the following: The Contracting Agency has estimated and included in the Proposal, dollar amounts for all 'I items to be paid per force account, only to provide a common proposal for Bidders. All such dollar amounts are to become a part of Contractor's total bid. However, the Contracting Agency does not warrant expressly or by implication, that the actual amount of work will 'I 135 correspond with those estimates. Payment will be made on the basis of the amount of work actually authorized by Engineer. Payment For Material On Hand The last paragraph of Section 1-09.8 is revised to read: (August 3, 2009) The Contracting Agency will not pay for material on hand when the invoice cost is less than $2,000. As materials are used in the work, credits equaling the partial payments for them will be taken on future estimates. Each month, no later than the estimate due date, the Contractor shall submit a letter to the Project Engineer that clearly states: 1) the amount originally paid on the invoice (or other record of production cost) for the items on hand, 2) the dollar amount of the material incorporated into each of the various work items for the month, and 3) the amount that should be retained in material on hand items. If work is performed on the items and the Contractor does not submit a letter, all of the previous material on hand payment will be deducted on the estimate. Partial payment for materials on hand shall not constitute acceptance. Any material will be rejected if found to be faulty even if partial payment for it has been made. 1-09.9 Payments (March 13, 2012 APWA GSP) Supplement this section with the following: Lump sum item breakdowns are not required when the bid price for the lump sum item is less than $20,000. Delete the first four paragraphs and replace them with the following: The basis of payment will be the actual quantities of Work performed according to the Contract and as specified for payment. The Contractor shall submit a breakdown of the cost of lump sum bid items at the Preconstruction Conference, to enable the Project Engineer to determine the Work performed on a monthly basis. A breakdown is not required for lump sum items that include a basis for incremental payments as part of the respective Specification. Absent a lump sum breakdown, the Project Engineer will make a determination based on information available. The Project Engineer's determination of the cost of work shall be final. Progress payments for completed work and material on hand will be based upon progress estimates prepared by the Engineer. A progress estimate cutoff date will be established at the preconstruction conference. The initial progress estimate will be made not later than 30 days after the Contractor commences the work, and successive progress estimates will be made every month thereafter until the Completion Date. Progress estimates made during progress of the work are tentative, and made only for the purpose of determining progress payments. The 136 progress estimates are subject to change at any time prior to the calculation of the final payment. The value of the progress estimate will be the sum of the following: 1. Unit Price Items in the Bid Form — the approximate quantity of acceptable units of work completed multiplied by the unit price. 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum breakdown for that item, or absent such a breakdown, based on the Engineer's determination. 3. Materials on Hand - 100 percent of invoiced cost of material delivered to Job site or other storage area approved by the Engineer. 4. Change Orders — entitlement for approved extra cost or completed extra work as determined by the Engineer. Progress payments will be made in accordance with the progress estimate Tess: 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; 2. The amount of progress payments previously made; and 3. Funds withheld by the Contracting Agency for disbursement in accordance with the Contract Documents. Progress payments for work performed shall not be evidence of acceptable performance or an admission by the Contracting Agency that any work has been satisfactorily completed. The determination of payments under the contract will be final in accordance with Section 1-05.1. Retainage Section 1-09.9(1) content and title is deleted and replaced with the following: (June 27, 2011) Vacant Disputes and Claims Section 1-09.11 is revised to read: (August 2, 2010) When protests occur during a Contract, the Contractor shall pursue resolution through the Project Engineer. The Contractor shall follow the procedures outlined in Section 1-04.5. If the negotiations using the procedures outlined in Section 1-04.5 fail to provide satisfactory resolution of protests, then either party, Engineer or Contractor, may refer the dispute to the Disputes Review Board. Disputes Review Board Section 1-09.11(1) is deleted and replaced with the following: (August 2, 2010) In order to assist in the resolution of disputes arising out of the work of this project, the Contract provides for the establishment of a Disputes Review Board (DRB), hereinafter 137 called the "Board." The Board is created as part of the disputes resolution process to be utilized when normal Contracting Agency -Contractor dispute resolution is unsuccessful and prior to the filing of a Section 1-09.11(2) claim. The Board will consider disputes referred to it and furnish recommendations to the Contracting Agency and Contractor to assist in the resolution of the differences between them. The purpose of the Board response to such issues is to provide nonbinding findings and recommendations designed to expose the disputing parties to an independent view of the dispute. The Board members will be trained in disputes resolution or have experience in disputes resolution, and be knowledgeable in the type of construction involved in the Project and shall discharge their responsibilities impartially and independently considering the facts and conditions related to the matters under consideration and the provisions of the Contract. Disputes Review Board Membership Section 1-09.11(1)A is deleted and replaced with the following: (April 4, 2011) The Board shall consist of one member selected by the Contracting Agency and one member selected by the Contractor, with these two members to select the third member. The first two members shall be mutually acceptable to both the Contracting Agency and the Contractor. If one or both of the two members selected are not acceptable to the Contracting Agency or Contractor, another selection shall be made. The Contracting Agency and Contractor shall each select a member and negotiate an agreement, separate and apart from this .contract, with their respective Board member within the first 60 calendar days after execution of the contract. The agreements with these two Board members shall contain language imposing the "Scope of Work" and "Suggested Administrative Procedures" included in the Appendix to these Special Provisions. These negotiated agreements shall also include clauses that require the respective selected members to immediately pursue selection of a third member. The goal is to obtain a third Board member who will complement the first two by furnishing a needed expertise, which will facilitate the Board's operations. The Contracting Agency has entered into "standby" agreements with a number of potential third members. The qualifications of these potential members have been reviewed and deemed acceptable by both the State of Washington Department of Transportation and the Associated General Contractors of Washington. The names of these potential members will be provided to the first two members for consideration. If a selection can be made from the standby list, then the Board may be immediately seated with the execution of a task order under the corresponding standby agreement. Should the first two members decide to select a third member not on the list of standby candidates, then the selected person will be accepted to the Board after he or she executes a standby agreement (Third Party Member Disputes Review Board Consultant Agreement). The acceptable format for this agreement and all accompanying exhibits may be obtained by 138 contacting WSDOT Consulting Services at http://www.wsdot.wa.gov/Business/Consulting/Agreements/DisputesReview or may be obtained from the Project Engineer. The fee for the third member shall be included in a task order, issued by the Project Engineer, after the third member standby agreement is fully executed. In the event of an impasse in selection of the third member, either the Contracting Agency or the Contractor or both may appeal to the Thurston County Superior Court for selection of a third member by the court from a list or lists submitted to the court by the Contracting Agency and/or the Contractor. An impasse shall be considered to have been reached if the two members appointed by the Contracting Agency and the Contractor to the Board have been unable to appoint the third member in a period of 60 calendar days after the approval of the last of such two members. In case a member of the Board needs to be replaced, the replacement member will be appointed in the same manner as the replaced member was appointed. The appointment of a replacement Board member will begin promptly upon determination of the need for replacement and shall be completed within 30 calendar days. Service of a Board member may be terminated at any time with not less than 30 calendar days notice as follows: 1. The Contracting Agency may terminate service of the Contracting Agency. appointed member. 2. The Contractor may terminate service of the Contractor appointed member. 3. The third member's services may be terminated by agreement of the other two members. 4. By resignation of the member. Termination of a member will be followed by appointment of a substitute as specified above. No member shall have a financial interest in the Contract, except for payments for services on the Board. The Contracting Agency -selected member and the Contractor -selected member shall not have been employed by the party who selected them within a period of 1 -year; except that, service as a member of other Disputes Review Boards on other contracts will not preclude a member from serving on the Board for this Contract. Compensation for the Board members, and the expenses of operation of the Board, shall be shared by the Contracting Agency and Contractor in accordance with the following: 1. The Contracting Agency will compensate directly the wages and travel expense for its selected member. 139 2. The Contractor shall compensate directly the wages and travel expense for its selected member. 3. The Contracting Agency and Contractor shall share equally in the third member's wages and travel expense, and all of the operating expenses of the Board. These equally shared expenses shall be billed to and paid by the Contracting Agency. The Contractor's share will be deducted from monies due or coming due the Contractor. 4. The Contracting Agency, through the Engineer, will provide administrative services, such as conference facilities and secretarial services, to the Board and the Contracting Agency will bear the costs for this service. The Contracting Agency and Contractor shall indemnify and hold harmless the Board Members from and against all claims, damages, losses and expenses, including but not limited to attorney's fees arising out of and resulting from the actions and recommendations of the Board. Disputes Review Board Procedures Section 1-09.11(1)B is deleted and replaced with the following: (August 2, 2010) The Board, the Contracting Agency, and the Contractor shall develop by agreement the Board's rules of operation and procedures to be followed for the Project. The Agreement shall include the frequency of the Board's visits to the Project and its interactions with the Contracting Agency and the Contractor to keep abreast of the construction development and potential disputes. In developing the Agreement, the parties shall take into consideration their respective duties and responsibilities set forth in the "Scope of Work" section of their agreements, which is included in the Appendix of these Special Provisions. The parties may also consider the "Suggested Administrative Procedures" for the Board's operation included in their agreements, which is included in the Appendix of these Special Provisions. These Procedures express, in general terms, the policy for the creation and operation of the Board and are intended to supplement the Special Provisions to the extent that no conflict with such provisions is created. No dispute shall be referred to the Board unless the Contractor has complied with the procedures of Section 1-04.5. If the dispute is not resolved by the procedures outlined in 1-04.5, then the Board will consider the matter in dispute and provide recommendations concerning: 1. The interpretation of the Contract. 2. Entitlement to additional compensation or time for performance 3. Other subjects mutually agreed by the Contracting Agency and Contractor to be a Board issue. 140 Procedure for Consideration of Disputes 1 Once a protest has been denied as described in Section 1-04.5, the Board members will be contacted and advised of the existence of the dispute. A hearing will be scheduled to be conducted at the next regular project visit or at such other time, as agreed to by the parties. 2. The Contractor and the Contracting Agency shall each. be afforded an opportunity to be heard by the Board and to offer evidence. Either party furnishing any written evidence or documentation to the Board must furnish copies of such information to the other party a minimum of 15 calendar days prior to the date the Board sets to convene the hearing for the dispute. Either party shall produce such additional evidence as the Board may deem necessary to an understanding and determination of the dispute and furnish copies to the other party. 3. After the hearing is concluded, the Board shall meet in private and reach a conclusion supported by two or more members. Its findings and recommendations, together with its reasons shall then be submitted as a written report to both parties. The recommendations shall be based on the pertinent contract provisions and facts and circumstances involved in the dispute. The Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The Board shall make every effort to reach a unanimous decision. If this proves impossible, the dissenting member may prepare a minority report. 4. Within 30 calendar days of receiving the Board recommendations, both the Contracting Agency and the Contractor shall respond to the other in writing signifying that the dispute is either resolved or remains unresolved. Although both parties should place weight upon the Board recommendations, the recommendations are not binding. In the event the Board's recommendations do not lead to resolution of the dispute, all Board records and written recommendations, including any minority reports, will be admissible as evidence in any subsequent litigation. If the Board's assistance does not lead to resolution of the dispute, the Contractor must file a claim according to Section 1-09.11(2) before seeking any form of judicial relief. 1-09.13(3) Claims $250,000 or Less (October 1, 2005 APWA GSP) Delete this Section and replace it with the following: The Contractor and the Contracting Agency mutually agree that those claims that total $250,000 or less, submitted in accordance with Section 1-09.11 and not resolved by nonbinding ADR processes, shall be resolved through litigation unless the parties mutually agree in writing to resolve the claim through binding arbitration. 141 1-09.13(3)A Administration of Arbitration (October 1, 2005 APWA GSP) Revise the third paragraph to read: The Contracting Agency and the Contractor mutually agree to be bound by the decision of the arbitrator, and judgment upon the award rendered by the arbitrator may be entered in the Superior Court of the county in which the Contracting Agency's headquarters are located. The decision of the arbitrator and the specific basis for the decision shall be in writing. The arbitrator shall use the contract as a basis for decisions. 1-10 Temporary Traffic Control Traffic Control Management General Section 1-10.2(1) is supplemented with the following: (December 1, 2008) Only training with WSDOT TCS card and WSDOT training curriculum is recognized in the State of Washington. The Traffic Control Supervisor shall be certified by one of the following: The Northwest Laborers -Employers Training Trust 27055 Ohio Ave. Kingston, WA 98346 (360) 297-3035 Evergreen Safety Council 401 Pontius Ave. N. Seattle, WA 98109 1-800-521-0778 or (206) 382-4090 The American Traffic Safety Services Association 15 Riverside Parkway, Suite 100 Fredericksburg, Virginia 22406-1022 Training Dept. Toll Free (877) 642-4637 Phone: (540) 368-1701 Measurement Lump Sum Bid for Project (No Unit Items) Section 1-10.4(1) is supplemented with the following: (August 2, 2004) The proposal contains the item "Project Temporary Traffic Control," lump sum. The provisions of Section 1-10.4(1) shall apply. 142 DIVISION 2 EARTHWORK 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 2-02.3 Construction Requirements Section 2-02.3 is supplemented with the following: (February 17, 1998) Removal of Obstructions Add the following to section 2-02.3: Removal of Structures and Obstructions shall consist of the work listed below. The quantities listed are only approximate and not guaranteed to be accurate. Removing Sanitary Sewer Line Removing Sanitary Sewer Manhole Removing Storm Drain Line Removing Storm Drain Structure Removing Underground Power Line Removing Utility Box Removing. Water Line Removing Signal Existing Signal Pole Removing Pole and Guy Anchor Removing Luminaire, Foundation and J -Box Removing Railroad Signal Foundations Removing Fence Removing 12 inch Irrigation Pipe Remove Abandoned Gas Line Removing Cement Concrete Curb and Gutter — Front Street Removing Cement Concrete Curb and Gutter — MLK Removing Cement Concrete Sidewalk — Front Street Removing Asphalt and Cement Concrete Sidewalk — MLK 120 LF 1 EA 285 LF 5 EA 1,600 LF 13 EA 1,400 LF 2 EA 1 EA 8 EA 4 EA 11 LF 10 LF 240 LF 200 LF 1,800 LF 120 SY 2,200 SY (September 8, 1997) Removal of Pavement, Sidewalks, Curbs, and Gutters Section 2-02.3(3) is supplemented with the following: The approximate thickness of the asphalt concrete pavement on Martin Luther King Jr Boulevard is 9" and is included in the quantity for Roadway Excavation Including Haul. The approximate thickness of the pavement on Front Street is 6" and will be included in the quantity for Roadway Excavation Including Haul. 143 The quantities listed under Section 2-02.3 are approximate. It is the Contractor's responsibility to determine the actual quantities required to complete the work prior to bidding the project. No cost adjustment to the lump sum item for Removal of Structures and Obstructions will be made. 2-07 WATERING 2-07.3 Construction Requirements Add the following new section (******) 2-07.3(A) Water Supplied From Hydrants The Contractor shall contact the City of Yakima Water/Irrigation Division to secure a metered hydrant connection and comply with all requirements before obtaining water from fire hydrants. The Contractor shall notify the Engineer as soon as permit has been. obtained. The contractor shall only use hydrant wrenches to operate hydrants. The hydrant valve must be open full, since a partially opened valve may cause damage to the hydrant. The auxiliary valve on the outlet of the metered hydrant connection shall be used with for flow control purposes. Fire hydrant valves must be closed slowly to avoid pressure surges in the water system. The Contractor shall carefully note the importance of following these directions. If a hydrant or metered connection is damaged, the Contractor shall immediately notify the City of Yakima Water/irrigation Division so that the damage can be repaired as quickly as possible. Upon completing the use of the hydrants, the Contractor shall return the metered hydrant connection. The City of Yakima Water/Irrigation Division may inspect the hydrant for any possible damage. The contractor will be billed for repairing the damage to a hydrant or meter if resulting from improper use. The contractor shall convey the water from the nearest convenient hydrant at their own expense and as approved by the City of Yakima Water/Irrigation Division. The contractor shall be responsible for all costs associated with the use of the hydrant, including rental fees and metered water use. Any violation of these requirements may result in fines and damage costs to the contractor resulting from the malfunctioning of damaged fire hydrants, in the event of fire. 2-09 STRUCTURE EXCAVATION 2-09.1 Description Section 2-09.1 is supplemented with the following: This work also includes all sawcutting, chipping, excavating and disposing of all bottom seal material. 144 2-09.3 Construction Requirements Shoring And Cofferdams Section 2-09.3(3)D is supplemented with the following: (March 13, 1995) The Contractor shall protect the existing pavement from damage due to the Contractor's operations and shall shore all excavation adjacent . to the existing pavement. (******) The Contractor shall protect the existing track and facilities of the Railroad Company from damage due to the Contractor's operations, and shall shore all excavation adjacent to the existing railroad track. Shoring shall be steel piling designed for a Cooper •E-80 loading according to the A.R.E.A. Manual For Railway Engineering. Damage to the railroad track or railroad facilities, due to the Contractor's operations, will be repaired by the Railroad at the Contractor's expense. (March 13, 1995) Because of the nearness of the work to the existing track the Contractor shall protect the track during the construction activities. 2-09.4 Measurement Section 2-09.4 is supplemented with the following: The excavation limits shown for Structure Excavation Class B Incl. haul — Bottom Seal wIl be measured by the cubic yard as specified in Section 2-09.4 of the Standard Specifications or as modified by the Contract Plans. 2-09.5 Payment Section 2-09.5 is supplemented with the following: "Structure Excavation Class B Incl. Haul — Bottom Seal", per cubic yard. The unit Contract price per cubic yard for "Structure Excavation Class B Incl. haul — Bottom Seal" shall be full pay for all labor, materials, tools, and equipment necessary or incidental to complete the work as specified herein, including saw cutting the trench, chipping and or breaking, excavating, loading, hauling and disposing of the Bottom Seal material. END OF DIVISION 2 145 DIVISION 5 SURFACE TREATMENTS AND PAVEMENTS 5-03 SURRY SEAL (NEW SECTION) 5-03.1 Description This work consists of slurry sealing Martin Luther King Jr Boulevard from N 2nd Avenue to N 1St Avenue full width. The work also includes preparing the existing pavement prior to sealing. 5-03.2 Materials Asphalt Emulsion Armor Seal A-100 or approved equal. 5-03.3 Construction Requirements 5-03.3(1) Pavement Preparation and Cleaning It shall be the responsibility, of the Contractor to prepare pavement surfaces to ensure proper bonding. The surface shall be free of any loose dust, dirt, or debris. All cracks shall be free of organic and loose material. This shall include the joint between the curb/gutter and the pavement. Flame torch or mechanical means shall remove organic material. Chemical removal will not be allowed. All foreign and loose materials shall be completely removed with compressed air, flushing, sweeping, or other repairs as necessary to ensure cleanliness, immediately prior to slurry application. Inspection emphasis shall be placed on a clean street with all cracks free of organic matter. Oil, grease, or other materials detrimental to the adhesion of the slurry seal shall be removed with non-toxic chemical remover. The chemical shall be specifically formulated for oil and grease removal without damage to the pavement. The Contractor shall submit the proposed product name, sample label, and MSDS sheets to the City Project Manager for approval prior to use. The Contractor shall sweep and clean the street immediately prior to application of the slurry seal. Sweeping shall be done with a vacuum -type sweeper and be completed no more than 24 hours prior to application of the slurry seal. If the Contractor is delayed more than 24 hours between cleaning and sealing, the Contractor shall re -clean at no additional Cost. Flushing of streets shall be done as needed or as directed by the Engineer. 5-03.3(2) Protection of Utility Covers Before slurry seal is to be applied to any area, all utility lids, including manholes, catch basins, valve boxes, and vault covers shall be securely covered. The cover shall be secure and leak frees and shall protect the utility. The lids shall be cleaned as quickly as possible after the application of the slurry seal, and not later than the final set. If necessary, slurry residual shall be cleaned from the interior of the utilities. 146 5-03.3(3) Mixing and Spreading Equipment All machines, equipment, and tools used in the performance of this work shall be maintained in satisfactory working order at all times. In addition to the slurry application equipment, suitable surface preparation equipment, traffic control equipment, hand tools, and other needed support equipment shall be provided in sufficient quantity to perform the work. The slurry mix and spreading equipment shall be specifically designed and manufactured for slurry seal application. The slurry shall be mixed with a self-propelled slurry -mixing machine. The unit shall be capable of accurately delivering and proportioning the emulsified asphalt, mineral filler, control setting additive, and water to the mixing chamber. The mixing unit shall be capable of thoroughly blending all ingredients together. A positive displacement pump shall proportion the emulsion. A variable rate emulsion pump, if used, shall be equipped with a mechanism that locks the pump in its calibrated position. The mixing unit shall be equipped with a water pressure system and fog type spray bar. It shall be capable of completely logging the pavement surface with between 0.05 - 0.10 gal/sy of water. The fog spray shall precede the spreading equipment. The mixing unit shall have sufficient storage capacity for each material used in the mix design to maintain an adequate supply to die proportioning controls. The proportioning controls must be clean and easy to read and properly marked. The appropriate settings/readings will have been determined during calibration of die equipment. No slurry seal shall be applied until the slurry mixing and spreading units have been calibrated to the satisfaction of the Engineer. Excessive mixing shall not be permitted. The mixed slurry shall be discharged in a uniform continuous flow. 5-03.3(4) Rate of Application The rate of application shall be 50 square feet of pavement surface per gallon of emulsion. The maximum amount of water allowed in the mix shall be 20 percent. The pavement shall receive two coats of the slurry seal 5-03.3(5) Application of Slurry Seal Slurry seal shall only be applied when the atmospheric temperature is at least 50°F and rising. Slurry seal shall not be placed after 2:00 p.m. unless authorized by the Engineer. The slurry mixture shall have a smooth and uniform consistency upon leaving the mixer. The spreader shall be uniformly full, with no empty pockets, to insure complete coverage of the pavement surface. The application rate shall be as specified herein and the mixer -spreader truck's speed shall insure the application rate is met. In the case of a concrete gutter, the slurry seal shall cover the gutter line joint but shall not overlap onto the gutter. In the case of no concrete gutter, ensure a good seal at curb lines. The flow line at curbs shall allow storm runoff to flow to the catch basins without ponding. Streets crossing this project will not be slurry sealed 147 All incidental work, such as driveway aprons, street returns etc., shall be done concurrently with the street they abut. Approved hand squeegees with burlap drags shall be used to spread slurry in areas not accessible to the spreader. No construction equipment or other traffic will be allowed on the slurry sealed surface until 24 hours after placement. The City shall not be responsible for any damage to the slurry prior to approval to open the street. Any damage to the slurry shall be repaired at no additional cost to the City. The Contractor shall be responsible for immediate cleanup of any spills caused by the Contractor. Damage caused by the Contractor's operations shall be repaired or replaced to an equal to or better than existing condition, by the Contractor, at the Contractor's expense. Damage restoration must meet the approval of the Engineer. 5-03.4 Measurement No specific unit of measurement will apply to the lump sum item "Slurry Seal" 5-03.5 Payment The lurnp sum Contract price for "Slurry Seal" includes all cost to complete the work as described in this section. 5-04 HOT MIX ASPHALT 5-04.3 Construction Requirements Hot Mix Asphalt Pavers Material Transfer Device/Vehicle Section 5-04.3(3)A including title is revised to read: (August 3, 2009) Section 5-04.3(3)A is deleted in its entirety. 5-04.3(7)A Mix Design (March 10, 2010 APWA GSP) Delete this section and replace it with the following; 1. General. Prior to the production of HMA, the Contractor shall determine a design aggregate structure and asphalt binder content in accordance with WSDOT Standard Operating Procedure 732. Once the design aggregate structure and asphalt binder content have been determined, the Contractor shall submit the HMA mix design on 148 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DOT form 350-042 demonstrating the design meets the requirements of Sections 9- 03.8(2) and 9-03.8(6). HMA accepted by nonstatistical evaluation requires a mix design verification. For HMA accepted by commercial evaluation only the first page of DOT form 350-042 and the percent of asphalt binder is required. In no case shall the paving begin before the determination of anti -strip requirements has been made. Anti - strip requirements will be determined by: a. Testing by WSDOT in accordance with TM 718. b. Testing by Contractor in accordance with WSDOT TM 718. c. Historical aggregate source ant -strip use provided by WDOT. The mix design will be the initial Job Mix Formula (JMF) for the HMA being produced. Any additional adjustments to the JMF will require the approval of the Project Engineer and may be made per Section 9-03.8(7). 2. Mix Design Verification. Verification shall be accomplished by one of the following processes: a. Submit samples to WSDOT State Materials Lab for WSDOT verification testing in accordance with WSDOT Standard Specifications. b. The contracting agency will perform tests to verify the mix design in accordance with the Field Verification Testing Process. c. Reference a mix design that has been previously verified by the Field Verification Testing Process or verified by WSDOT State Materials Lab on a previous project. d Perform Field Verification Testing on a sample of HMA provided by the Contractor prior to paving. Mix design verification is valid for one year from the date of verification. At the discretion of the Engineer, agencies may accept mix designs verified beyond the verification year with certification from the Contractor that the materials and sources are the same as those shown on the original mix design. 3. Field Verification Testing Process. The Contracting agency will collect three Production Samples of HMA on the first day of paving per AASHTO T 168 sampling procedures. a. The Contracting agency will test one Production Sample in accordance with section 5-04.3(8)A for field verification per the requirements of Section 9-03.8(7). b. If the test results from the first Production Sample are within the tolerances of section 9-03.8(7), the mix design will be considered verified and the test results will be used as acceptance sample number one. c. If the test results from the first Production Sample are outside the tolerances of section 9-03.8(7), the other two samples will be tested and the results of all three tests will be used for acceptance in accordance with Section 5-04.5(1) and will be used in the calculation of the CPF the maximum CPF shall be 1.00. 4. Prior to the first day of paving, six Ignition Furnace Calibration Samples shall be obtained to calibrate the Ignition Furnaces used for acceptance testing of the HMA. 149 Calibration samples shall be provided by the Contractor when directed by the Engineer. Calibration samples shall be prepared in accordance with WSDOT SOP 728. 5-04.3(8)A1, General (March 10, 2010 APWA GSP) Delete these sections and replace them with the following: Acceptance of HMA shall be as defined under nonstatistical or commercial evaluation. Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA in the contract documents. Commercial evaluation will be used for Commercial HMA and for other classes of HMA in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, gores, prelevel, and pavement repair. Other nonstructural applications of HMA accepted by commercial evaluation shall be as approved by the Project Engineer. Sampling and testing of HMA accepted by commercial evaluation will be at the option of the Project Engineer. Commercial HMA can be accepted by a contractor certification letter stating the material meets the HMA requirements defined in the contract. 5-04.3(8)A4, Definition of Sampling Lot and Sublot (March 10, 2010 APWA GSP) Delete this section and replace it with the following: For the purpose of acceptance sampling and testing, a lot is defined as the total quantity of material or work produced for each job mix formula (JMF) placed. Only one lot per mix design will be expected to occur. The initial JMF is defined in Section 5-04.3(7)A Mix De:sign. The Contractor may request a change in the JMF in accordance with Section 9- 03.8(7). If the request is approved, all of the material produced up to the time of the change will be evaluated on the basis of tests on samples taken from that material and a new lot will begin. For proposal quantities less than 2500 tons sampling and testing for evaluation shall be performed as described in 5-04.3(7)A, item 3, Field Verification Testing Process. The verification sample referenced in item 3b may be used as an acceptance sample, additional testing will be at the discretion of the Engineer. When using a previously verified mix design, testing for volumetric properties may be waived at the engineer's discretion. At least one acceptance sample is required when using this method of acceptance. For proposal quantities greater than 2500 tons sampling and testing for evaluation shall be performed as described in 5-04.3(7)A, item 3, Field Verification Testing Process, for the first 2500 tons of mix placed. The verification sample referenced in item 3b may be used as an acceptance sample for the first 2500 tons of mix placed. Additional testing will be at the rate of one sample per 800 tons of mix placed or as directed by the Engineer. When using a previously verified mix design, testing for volumetric properties may be waived at the engineer's discretion. 5-04.3(8)A5, Test Results (March 10, 2010 APWA GSP) 150 Delete this section and replace it with the following: The Engineer will furnish the Contractor with a copy of the results of all acceptance testing performed in the field at the beginning of the next.paving shift. The Engineer will also provide the Composite Pay Factor (CPF) of the completed sublots after three sublots have been produced. The CPF will be provided by the midpoint of the next paving shift after sampling. Sublot sample test results (gradation and asphalt binder content) may be challenged by the Contractor. For HMA mixture accepted by statistical evaluation with a mix design that did not meet the verification tolerances, the test results in the test section including the percent air voids (Va) may be challenged. To challenge test results, the Contractor shall submit a written challenge within 7 -calendar days after receipt of the specific test results. A split of the original acceptance sample will be sent for testing to either the Region Materials Laboratory or the State Materials Laboratory as determined by the Project Engineer. The split of the sample with challenged results will not be tested with the same equipment or by the same tester that ran the original acceptance test. The challenge sample will be tested for a complete gradation analysis and for asphalt binder content. The results of the challenge sample will be compared to the original results of the acceptance sample test and evaluated according to the following criteria: Deviation U.S. No. 4 sieve and larger Percent passing ±4.0 U.S. No. 8 sieve Percent passing ±2.0 U.S. No. 200 sieve Percent passing ±0.4 Asphalt binder Percent binder content ±0.3 Va Percent Va ±0.7 If the results of the challenge sample testing are within the allowable deviation established above for each parameter, the acceptance sample test results will be used for acceptance of the HMA. The cost of testing will be deducted from any monies due or that may come due the Contractor under the Contract at the rate of $250 per challenge sample. If the results of the challenge sample testing are outside of any one parameter established above, the challenge sample will be used for acceptance of the HMA and the cost of testing will be the Contracting Agency's responsibility. 5-04.3(8)A7 Test Section — HMA Mixtures (March 10, 2010 APWA GSP) Delete this section. (January 5, 2004) Weather Limitations The first sentence of Section 5-04.3(16) is revised to read: HMA for wearing course shall not be placed on any travelled way between November 1 and March 31 of the following year without written approval from the Engineer. Payment for price adjustments for quality of HMA mixture and for quality of HMA compaction will be made as follows: "Job Mix Compliance Price Adjustments," by calculation 151 "Compaction Price Adjustments," by calculation Section 5-04.5 Payment Section 5-04.5 is supplemented as follows: (******) Payment for Anti -Strip Additive shall be included in the unit bid price for "HMA Cl. PG per ton. 5-04.5(1)A Price Adjustments for Quality of HMA Mixture (March 10, 2010 APWA GSP) Delete the first paragraph and table and replaced them with the following: „ Statistical analysis of quality of gradation and asphalt content will be performed based on Section 1-06.2 using the following price adjustment factors: Table of Price Adjustment Factors Constituent Factor "f" All aggregate passing: 1 1/2", 1", 3/4', 1/2", 3/8" and No. 4 sieves 2 All aggregate passing No. 8 15 All aggregate passing No. 200 sieve 20 Asphalt binder 52 Delete items 1-3 in Paragraph two and replaced with the following: A pay factor will be calculated for sieves listed in Section 9-03.8(7) for the class of HMA and for the asphalt binder. 1. Nonstatistical Evaluation. Each lot of HMA produced under Nonstatisical Evaluation and having all constituents falling within the tolerance limits of the job mix formula shall be accepted at the unit contract price with no further evaluation. When one or more constituents fall outside the nonstatistical acceptance tolerance limits in Section 9-03.8(7), the lot shall be evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The nonstatistical tolerance limits will be used in the calculation of the CPF and the maximum CPF shall be 1.00. When less than three sublots exist, backup samples of the existing sublots or samples from the street shall be tested to provide a minimum of three sets of results for evaluation. Commercial Evaluation. If sampled and tested, HMA produced under Commercial Evaluation and having all constituents falling within the tolerance limits of the job mix formula shall be accepted at the unit contract price with no further evaluation. When one or more constituents fall outside the commercial acceptance tolerance limits in Section 9-03.8(7), the lot shall be evaluated to determine the appropriate CPF. The commercial tolerance limits will be used in the calculation of the CPF and the maximum CPF shall be 1.00. When less than three sublots exist, backup samples of the existing sublots or samples from the street shall be tested to provide a minimum of three sets of results for evaluation. 152 For each lot of HMA produced under Nonstatistical or Commercial Evaluation when the calculated CPF is less than 1.00, a Nonconforming Mix factor (NCMF) will be determined. The NCMF equals the algebraic difference of CPF minus 1.00. multiplied by 60 percent. The Job Mix Compliance Price Adjustment will be calculated as the product of the NCMF, the quantity of HMA in the lot in tons, and the unit contract price per ton of the mix. If a constituent is not measured in accordance with these Specifications, its individual pay factor will be considered 1.00 in calculating the composite pay factor. 5-04.5(1)B Price Adjustments for Quality of HMA Compaction (March 10, 2010 APWA GSP) Delete this section and replace it with the following: The maximum CPF of a compaction lot is 1.00 For each' compaction lot of HMA when the CPF is less than 1.00, a Nonconforming Compaction Factor (NCCF) will be determined. THE NCCF equals the algebraic difference of CPF minus 1.00 multiplied by 40 percent. The Compaction Price Adjustment will be calculated as the product of the NCCF, the quantity of HMA in the lot in tons and the unit contract price per ton of the mix. END OF DIVISION 5 153 DIVISION 6 STRUCTURES 6-01 GENERAL REQUIREMENTS FOR STRUCTURES 6-02.2 Materials Section 6-02.2 is supplemented with the following: (June 26, 2000) Compression Seal Expansion Joint System Compression seal glands shall be selected from the approved products listed in the WSDOT Qualified Products List, latest edition, and sized as appropriate for the compression seal expansion joints shown in the Plans. (April 7, 2008) Fabric Pad Bearing Unless other materials are specified in the Plans, fabric pad bearing assembly components shall conform to the following requirements for those components shown and specified in the Plans: Steel Plates and Bars Steel plates and bars (keeper bars, sole plates, backing plates, and masonry plates) shall conform to ASTM A 36 and the dimensions shall conform to the details shown in the Plans. The backing plate and masonry plate surfaces in contact with the pre- formed fabric pad, and the surface within the recess of the backing plate, shall have an average surface roughness of 250 microinches or less. The surface of the sole plate in contact with the stainless steel sheet shall have an average surface roughness of 125 microinches or less. All other steel plate and bar surfaces in contact with other fabric pad bearing components shall have an average surface roughness of 500 microinches or less. Pre -formed Fabric Pad Pre -formed fabric pads shall be composed of multiple layers of duck, impregnated and bound with high quality oil resistant synthetic rubber, compressed into resilient pads of uniform thickness. The duck shall be of highest quality cotton or cotton -polyester 50- 50 blend, and shall weigh a minimum of eight ounces per square yard. The cotton warp and the filling yarn shall be 2 -ply. The cotton -polyester warp and fill shall be single yarn, with a minimum breaking strength by grab method of 150 pounds per inch width (piw) warp, and 140 piw fill. The filling count of the duck shall be 40± 2 threads per inch and the warp count shall be 50 ± 1 threads per inch. The number of plies shall be sufficient to produce . the specified thickness, after compression and vulcanization. The finished pads shall withstand compression loads perpendicular to the plane of the laminations of not less than 10,000 psi without any sign of failure after the load is removed. Failure is defined as any breakdown of the component materials or laminations. The pre -formed fabric pad shall have a shore A hardness of 90±5. 154 Polytetraflouroethylene (PTFE) Sheet PTFE shall be 100 percent virgin (unfilled) PTFE, fiberglass fiber filled PTFE, or dimpled PTFE conforming to Section 18.8.2 of the AASHTO LRFD Bridge Construction. Specifications, current edition and latest interims, and the following requirements: 1. PTFE sheet shall be composed of 100 percent virgin (unfilled) polytetrafluoroethylene resin, except where filled PTFE is specified in the Plans. 2. Filled PTFE, when specified in the Plans, shall be composed of PTFE resin uniformly blended with 15 percent maximum fiberglass fiber. 3. The substrate shall limit the flow (elongation) of the confined PTFE to not more than 0.009 inch under a pressure of 2,000 psi for 15 minutes at 78F for a two inch by three inch test sample. 4. Unfilled PTFE shall have a hardness of 50 to 65 Durometer D, at 78F, in accordance with ASTM D 2240. Stainless Steel Sheet Stainless steel sheet shall be no Tess than 14 gage meeting ASTM A 240 Type 304L specifications. Stainless steel in contact with the PTFE shall be polished to a Number 8 mirror finish. Welded Shear Connectors Welded shear connectors shall conform to Section 9-06.15. Bolts, Nuts and Washers Bolts, nuts and washers shall conform to Section 9-06.5(3), and shall be galvanized after fabrication in accordance with AASHTO M 232. Anchor Bolts, Nuts and Washers Anchor bolts, nuts and washers shall conform to Section 9-06.5(4). The top 1'-0", minimum, of the exposed end of the anchor bolts, and the associated nuts and washers, shall be galvanized after fabrication in accordance with AASHTO M 232. Concrete Inserts Concrete inserts shall be as specified in the Plans. Silicone Grease and Epoxy Gel Silicone grease shall conform to US Navy QPL AS8660-2. Epoxy gel shall be Type I, Grade 3, Class A, B, or C, conforming to Section 9-26.1. Submittals of Test Reports, Certifications, and Samples The Contractor shall submit to the Engineer the following test reports, certifications, and samples for review, testing, and approval, prior to installing the fabric pad bearings: 1. Manufacturer's certificate of compliance for the PTFE, pre -formed fabric pad duck, silicone grease, and epoxy gel. 155 2. Certified mill test reports for all steel and stainless steel in the bearing assemblies. 3. Certified test reports confirming that the pre -formed fabric pads meet the specified requirements of proof load. 4. Samples of the pre -formed fabric pads, size six inches by six inches by one inch, and PTFE sheet, size six inches by six inches by 1/8 inch, from the production material. The Engineer will require 15 calendar days to review and test the submitted certificates, test reports, and samples. If all or a portion of the submittal fail to meet the specified requirements, the Contractor shall correct the deficiencies and resubmit to the Engineer. An additional 15 calendar days may be required by the Engineer for review of each resubmittal. Bridge Supported Utilities (June 26, 2000) Inserts shall be of the type and model specified in the Plans. Inserts shall be galvanized in accordance with AASHTO M 111. (April 30, 2001) Hanger rods, and associated nuts and washers, shall conform to Section 9-06.5(1), and shall be galvanized in accordance with AASHTO M 232. Steel bars and plates shall conform to ASTM A 36 and shall be galvanized in accordance with AASHTO M 111. (June 26, 2000) Horizontal strut bolts, and associated nuts and washers, shall conform to Section 9-06.5(3), and shall be galvanized in accordance with AASHTO M 232. Pre -formed fabric pads shall be composed of multiple layers of duck, impregnated and bound with high quality oil resistant synthetic rubber, compressed into resilient pads of uniform thickness. The duck shall be of highest quality cotton or cotton -polyester 50-50 blend, and shall weigh a minimum of eight ounces per square yard. The cotton warp and the filling yarn shall be 2 -ply. The cotton -polyester warp and fill shall be single yarn, with a minimum breaking strength by grab method of 150 pounds per inch per width (piw) warp, and 140 piw fill. The filling count of the duck shall be 40± 2 threads per inch and the warp count shall be 50 ± 1 threads per inch. The number of piles shall be sufficient to produce the specified thickness, after compression and vulcanizing. The finished pads shall withstand compression loads perpendicular to the plane of the laminations of not Tess than 10,000 psi without any sign of failure after the load is removed. Failure is defined as any breakdown of the component materials or laminations. Pre -formed fabric pads shall have a shore A hardness of 90+5. 156 1 1 Pre -formed fabric pads for bridge utility supports will be accepted based on the manufacturer's certificate of compliance that the material furnished conforms to these specifications. The Contractor shall submit the manufacturer's certificate of compliance to the Engineer in accordance with Section 1-06.3. (June 26, 2000) Pipe rolls or pipe saddles shall be of the type and model specified in the Plans. 6-02 CONCRETE STRUCTURES 6-02.3 Construction Requirements Section 6-02.3 is supplemented with the following: Bridge Supported Utilities (June 26, 2000) The Contractor shall furnish and install inserts for the bridge utility supports as shown in the Plans. The Contractor shall verify that the hanger rods freely hang plumb in their inserts, and shall make adjustments to the inserts as necessary and as approved by the Engineer prior to utility installation. (June 26, 2000) The Contractor shall furnish and install the bridge utility supports, and the utility pipe or conduit pipe, as shown in the Plans. Expansion Joints Section 6-02.3(13) is supplemented with the following: (June 26, 2000) Compression Seal Expansion Joint System The compression seal expansion joint system shall be installed in accordance with the manufacturer's written recommendations. The Contractor shall submit the manufacturer's written installation procedure to the Engineer prior to installing the expansion joint system. After the joint system is installed, the joint area shall be flooded with water and inspected; from below the joint, for leakage. If leakage is observed, the joint system shall be repaired by the Contractor, as recommended by the manufacturer and approved by the Engineer, at no additional cost to the Contracting Agency. Finishing Concrete Surfaces Section 6-02.3(14) is supplemented with the following: Pigmented Sealer for Concrete Surfaces Section 6-02.3(14)C is supplemented with the following: (April 6, 2009) The color of the pigmented sealer shall be Washington Gray. 157 Grout for Anchor Bolts and Bridge Bearings Section 6-02.3(20) is supplemented with the following: (June 26, 2000) Grout placed at the following locations shall conform to the requirements of this section. BNSF Bridge Abutments Front St. Bridge Abutments 6-02.4 Measurement Section 6-02.4 is supplemented with the following: (June 26, 2000) Superstructure — BNSF Bridge contains the following approximate quantities of materials and work: St. Reinf. Bar. 1,590 LB Epoxy -Coated St. Reinf. Bar 14,344 LB Prestressed Precast Girders: WF42G Hybrid 275 LF Bottom Pan for Casting Non Standard Width Girder 1 LS Girder Erection 5 EA Concrete Class 4000 11 CY Concrete Class 4000D 50 CY Elastomeric Bearing Pad — Conc. Girders 10 EA Elastomeric Bearing Pad — Long. Stop 16 EA Grout Pads for Elastomeric Bearings 10 EA Deck Plates, Walkway Joints, Curb, Flashing, Armor Plate 3,511 LB Waterproofing 1,632 SF Bridge Railing Type Chain Link Fence 100 LF Diaphragm Anchor Inserts and Bolts 1 LS Pigmented Sealer 1 LS (June 26, 2000) Superstructure — Front St. Bridge contains the following approximate quantities of materials and work: St. Reinf. Bar. 1,500 LB Epoxy -Coated St. Reinf. Bar 13,296 LB Prestressed Precast Girders: WBT32G 207 LF Girder Erection 4 EA Concrete Class 4000 10 CY Concrete Class 4000D 51 CY Sidewalk 56 SY Curb 100 LF Elastomeric Bearing Pad — Conc. Girders 8 EA Elastomeric Bearing Pad — Long. Stop 12 EA Grout Pads for Elastomeric Bearings 8 EA Deck Inserts, Pipe Rollers, Brace Angles, Rods, Nuts, Plates and Washers 1 LS Compression Seal 80 LF 158 Traffic Barrier Bridge Railing Type BP Diaphragm Anchor Inserts and Bolts Compression Seal Pigmented Sealer 100 LF 100 LF 1 LS 80 LF 1 LS The quantities are listed only for the convenience of the Contractor in determining the volume of work involved and are not guaranteed to be accurate. The prospective bidders shall verify these quantities before submitting a bid. No adjustments other than for approved changes will be made in the lump sum contract price for Superstructure — BNSF Bridge and Superstructure — Front St. Bridge even though the actual quantities required may deviate from those listed. (BSP December 5, 2005) Prestressed Conc.Girder For Strut will be measured by the linear foot of girder specified in the Proposal, including adjustments to the Plan quantity made in accordance with Section 1-04.4. (******) St. Reinf. Bar For Wall Cap, St. Reinf. Bar For Barrier, St. Reinf. Bar For Free -Standing Barrier and St. Reinf. Bar For Impact attenuator will be measured in accordance with Standard Specification Section 6-02.4. (******) Single Slope Concrete Barrier Transition will be measured per each. 6-02.5 Payment Section 6-02.5 is supplemented with the following: (June 26, 2000) Bridge Supported Utilities All costs in connection with placing 12" Ductile Iron Water Line, 12" Storm Drain Pipe through the superstructure of Front St. Bridge as shown in the Plans, including all inserts, hangers, rods, and bracing, shall be included in the Lump Sum Bid Item "Superstructure — Front St. Bridge". (BSP November 5, 2006) "Prestressed Conc. Girder For Strut", per linear foot. The unit contract price per linear foot for "Prestressed Conc. Girder For Strut" shall be full pay for performing the work as specified, including shop drawing submittals, fabrication, storage, handling, shipping, erection (including all site preparation and restoration activities necessary for erection equipment access and support), furnishing and removing oak block wedges, furnishing and removing temporary bracing, furnishing and cutting .temporary strands and application of pigmented sealer. For deck bulb tee girders and PCPS members, all work related to equalizing girder camber, connecting weld -ties, and grouting keyways, shall also be included. For spliced prestressed concrete girders, all work related to cast -in-place concrete closures and post -tensioning shall be included. Payment will be made based on the quantity specified in the Proposal, unless changes are made to this 159 quantity in accordance with Section 1-04.4, in which case the quantity specified in the Proposal will be adjusted by the amount of the change and will be paid for in accordance with Section 1-04.4. (**'k***) "Si. Reinf. Bar For Wall Cap", "St. Reinf. Bar For Barrier", "St. Reinf. Bar For Free -Standing Barrier" and "St. Reinf. Bar For Impact Attenuator" shall be paid for in accordance with Standard Specification Section 6-02.5. The unit price for "Single Slope Concrete Barrier Transition" per each shall include all cost for labor, equipment and materials to construct the barrier as shown in the plans. This cost also includes furnishing and installing the Pedestrian Rail galvanized sleeves an associated epoxy and the application of pigment sealer. 6-06 BRIDGE RAILINGS 6-06.2 Materials Section 6-06.2 is supplemented with the following: (January 5, 2004) Chain link fence fabric shall conform to the Section 9-16.1(1)B requirements for Type 1 fence. Fittings, fabric bands, stretcher bars, tie wire, and other fence hardware, shall conform to Section 9-16.1. Pipe for posts and longitudinal members shall conform to ASTM A 53, Grade B, Type E or S, galvanized, and shall be Schedule 40 unless otherwise shown in the Plans. Steel bars, plates, and shapes shall conform to ASTM A 36, and shall be galvanized in accordance with AASHTO M 111, except that structural shapes may conform to ASTM A 992. Bolts, nuts, and washers shall conform to Section 9-06.5(3), and shall be galvanized after fabrication in accordance with AASHTO M 232. Resin bonded anchors shall conform to Section 6-02.2 as supplemented in these Special Provisions. 6-06.3 Construction Requirements Metal Railings Section 6-06.3(2) is supplemented with the following: (March 6, 2000) Bridge Railing Type Chain Link Fence The Contractor shall install anchor bolts for each post anchorage as shown in the Plans. Alternatively, the Contractor may install resin bonded anchors at each post 160 1 1 1 1 1 1 1 1 1 1 1 1 1 1 anchorage, in accordance with Section 6-02 as supplemented in these Special Provisions. Longitudinal members shall be connected to the steel posts as shown in the Plans. The Contractor shall install the chain link fence fabric in accordance with Section 8- 12.3(1)D, except as otherwise noted. The chain Zink fence fabric shall be fastened to the posts and longitudinal members at a maximum spacing of 14 inches. 6-06.5 Payment Section 6-06.5 is supplemented with the following: (March 6, 2000) All costs in connection with constructing Bridge Railing Type BP shall be included in the bid item "Superstructure — Front St. Bridge". All costs in connection with constructing Bridge Railing Type Chain Link Fence shall be included in the bid item "Superstructure — BNSF Bridge". 6-10 CONCRETE BARRIER 6-10.3 Construction Requirements 6-10.5 Payment Section 6-10.5 is supplemented with the following: (March 6, 2000) All costs in connection with constructing pedestrian barrier shall be included in the bid items "Superstructure — Front St. Bridge". 6-16 SOLDIER PILE AND SOLDIER PILE TIEBACK WALLS 6-16.4 Measurement Section 6-16.4 is supplemented with the following: (******) Lagging for Underpass Wall and Lagging for BNSF Shoring will be measured in accordance with Standard Specification 6-16.4. Shaft — 39" Diameter will be measured in accordance with Standard Specification 6-16.4. ' 6-16.5 Payment 1 1 1 1 Section 6-16.5 is supplemented with the following: (******) "Lagging for Underpass Wall", per square foot shall be paid in accordance with the item "Lagging" in Section 6-16.5. "Lagging for BNSF Shoring", per square foot shall be paid in accordance with the item "Lagging" in Section 6-16.5. 161 Payment for "Removing Shaft Obstruction - Soldier Pile" and "Removing Shaft Obstruction — Shoring Wall" shall be in accordance with the item "Removing Shaft Obstruction" in Section 6-19.5. The Cost for removing the BNSF Shoring Wall shall be included and incidental to the applicable bid items of work for the BNSF Shoring Wall. 6-18 SHOTCRETE FACING 6-18.2 Materials Section 6-18.2 is supplemented with the following: (August 1, 2005) Shotcrete Facing Portland cement shall be Type I or II in accordance with Section 9-01.2(1). Air entrainment shall be 6.0 percent, ± 1.5 percent. Water for mixing and curing shall be clean and free from substances which may be injurious to concrete or steel, and shall be free of elements which would cause staining. Aggregate for shotcrete shall meet the following gradation requirements: Sieve Size 1/2 inch 3/8 inch U.S. No. 4 U.S. No. 8 U.S. No. 16 U.S. No. 30 U.S. No. 50 U.S. No. 100 U.S. No. 200 Percent Passing by Weight 100 90 to 100 70 to 85 50 to 70 35 to 55 20 to 35 8 to 20 2 to 10 0 to 2.5 (April 5, 2004) Coloration for Shotcrete Facing Finishing Alternative C If shotcrete facing finishing Alternative C is specified, the Contractor shall provide shotcrete coloration for finishing the sculptured shotcrete to match the color of the natural surroundings. Approval of the final appearance of the coloration will be based on the pre- production test panel. Approval of the long-term properties of the coloration material shall be based on a manufacturer's certification which verifies the following to be true about the product: 1. Resistance to alkalis in accordance with ASTM D 543. 2. Demonstrates no change in coloration after 1,000 hours of testing in accordance with ASTM D 822. 162 3. Does not oxidize when tested in accordance with ASTM D 822. 4. Demonstrates resistance to gasoline and mineral spirits when tested in accordance with ASTM D 543. Additionally, the certification shall provide the product name, proposed mix design and application method, and evidence of at least one project where the product, using the proposed mix and application method, was applied and which has provided at least five years or more of acceptable durability and color permanency. 6-19 SHAFTS 6-19.1 Description Section 6-19.1 is revised to read: This work consists of constructing lagging and reinforced shafts in accordance with the Plans, these Specifications and as designated by the Engineer. 6-19.3(1)B Nondestructive Testing of Shafts Section 6-19.3(1)B is revised to read: The Contractor shall perform crosshole sonic testing of the shafts. 6-19.3(2) Submittals Section 6-19.3(2) is supplemented with the following: (January 2, 2012) Crosshole Sonic Log Testing Organization and Personnel Submittal At least seven calendar days prior to beginning shaft construction, the Contractor shall electronically submit the name of the independent testing organization, and the names of the personnel, conducting the crosshole sonic log tests to the Engineer for approval. The submittal shall include documentation that the qualifications specified below are satisfied. The independent testing organization and the testing personnel shall meet the following minimum qualifications: 1. The testing organization shall have performed crosshole sonic log tests on a minimum of three deep foundation projects in the last two years. 2. Personnel conducting the tests for the testing organization shall have a minimum of one year experience in crosshole sonic log testing and interpretation. 6-19.3(3)B Temporary and Permanent Shaft Casing Section 6-19.3(3)B is supplemented with the following: (January 2, 2012) The Contractor shall furnish and install casings as follows: Wall name and Station Limits Elev. Of Bottom Casing Type of Required Casing (feet) 163 Upper and Lower Elevation Limits for N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S NIS N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S N/S R2826 TO R2868 TO R2904 TO R2940 TO R2988 TO R3024 TO R3030 TO R3120 TO R3162 TO R3168 TO R3180 TO R3228 TO R3264 TO R3282 TO L2823 L2907 L2925 L2943 L2985 L2991 L3021 L3033 L3117 L3159 L3171 L3195 L3237 TO TO TO TO TO TO TO TO TO TO TO TO TO R2862 R2898 R2934 R2982 R3018 R3024 R3114 R3156 R3162 R3174 R3222 R3258 R3276 R3306 L2901 L2919 L2937 L2979 L2985 L3015 L3027 L3111 L3153 L3165 L3189 L3231 L3309 TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY TEMPORARY 1041.00 1038.00 1035.00 1036.50 1036.50 1036.50 1036.50 1036.50 1036.50 1030.50 1031.50 1034.50 1037.50 1040.50 1051.00 TO 1044.86 1044.38 TO 1043.44 1042.96 TO 1042.07 1036.50 TO 1036.50 1036.50 TO 1036.50 1036.50 TO 1036.50 1036.50 TO 1036.50 1036.50 TO 1036.50 1036.50 TO 1036.50 1036.50 TO 1036.50 1036.77 TO 1038.54 1039.14 TO 1042.69 1043.28 TO 1049.04 Concurrent Casing Placement with Excavation 1063.10 TO 1041.00 1061.78 TO 1038.00 1060.69 TO 1035.00 1060.69 TO 1036.50 1059.02 TO 1036.50 1060.26 TO 1036.50 1060.67 TO 1036.50 1058.32 TO 1036.50 1057.93 TO 1036.50 1057.93 TO 1030.50 1057.93 TO 1031.50 1057.93 TO 1034.50 1059.30 TO 1037.50 1059.97 TO 1040.50 1063.20 TO 1044.86 1060.69 TO 1043.44 1060.69 TO 1042.07 1060.69 TO 1036.50 1059.56 TO 1036.50 1059.02 TO 1036.50 1059.25 TO 1036.50 1060.59 TO 1036.50 1058.32 TO 1036.50 1058.11 TO 1036.50 1057.93 TO 1036.77 1057.93 TO 1039.14 1058.28 TO 1043.28 When installing required temporary or required permanent casings between the upper and lower elevation limits specified above, the casing shall be advanced prior to or concurrently with the excavation. Excavation in advance of the casing tip shall not exceed 0 feet, except that in no case shall shaft excavation and casing placement extend below the bottom of shaft excavation as shown in the Plans. (January 2, 2012) Shaft casing shall be equipped with cutting teeth or a cutting shoe, and installed by either rotating or oscillating the casting. Installing the casing by vibratory means will not be allowed. Temporary Telescoping Shaft Casing The second paragraph of Section 6-19.3(3)64 is revised to read as follows: (January 2, 2012) Temporary'telescoping casing will not be allowed for bridge end pier shafts. 164 6-19.3(7)A Concrete Class For Shaft Concrete Section 6-19.3(7)A is supplemented as follows: (******) Lean Concrete For Shaft shall conform to Section 6-02.3(2) and 6-02.3(2)D 6-19.3(9) Nondestructive Testing of Shafts Schedule of CSL Testing The first paragraph of Section 6-19.3(9)A is revised to read as follows: (January 2, 2012) The Contractor shall provide for crosshole sonic log testing and analysis on all completed shafts designated for testing by the Engineer. The testing and analysis shall be performed by the independent testing organization submitted by the Contractor and approved by the Engineer in accordance with Section 6-19.3(2) as supplemented in these Special Provisions. 6-19.3(9)C Engineer's Final Acceptance of Shafts This section is revised to read as follows: (January 2, 2012) The Contractor shall submit the results and analysis of the crosshole sonic log testing for each shaft tested to the Engineer for approval. The Engineer will determine final acceptance of each shaft, based on the crosshole sonic log test results and analysis for the tested shafts, and will provide a response to the Contractor within three working days after receiving the test results and analysis. 6-19.4 Measurement Section 6-19.4 is supplemented with the following: (January 2, 2012) CSL test will be measured once per shaft tested. Lean Concrete for Shaft will be measured by the cubic yards of concrete in place. The cubic yards will be computed by using the shaftdiameter shown in the Plans and the top and bottom elevations as shown in the Plans unless adjusted by the Engineer. The first paragraph of Section 6-19.4 is revised to read: (*****) Soil excavation for shaft, including haul, will be measured by the cubic yards of shaft excavated. The cubic yards will be computed using the shaft diameter shown in the Plans, the top of shaft elevation shown in the plans and the bottom of shaft elevation shown in the Plans, unless adjusted by the Engineer. The second paragraph of Section 6-19.4 is deleted. 165 6-19.5 Payment Section 6-19.5 is supplemented with the following: (January 2, 2012) "CSL Test", per each. (******) "Lean Concrete for Shaft ", per cubic yard. (******) All costs associated with providing, storing, treating and disposing of shaft drilling water and or slurry shall be included in the applicable bid items for drilled shafts. 6-20 ANTIGRAFFITI COATING (NEW SECTION) 6-20.1 Description This work consists of applying antigraffiti coating to the concrete designated in the Contract Plans. 6-20.2 Material The antigraffiti coating shall be clear, non -glossy, and shall not alter the concrete surface color. All antigraffiti products used on this project must also be non-toxic. The product shall be a non- sacrificial coating manufactured by Sherwin Williams, or approved equal. 6-20.3 Construction Requirements All surfaces that receive pigmented sealer as shown in the Plans shall receive an antigraffiti coating after the pigmented sealer has been applied and cured, as recommended by the manufacturer. The surface shall be dry, clean, and prepared in accordance with the manufacturer's written instructions. The Contractor shall submit four copies of the manufacturer's written instructions. The antigraffiti coating shall be applied in accordance with the manufacturer's written instructions for application, qualification of the applicator, rate of application, and number of coats to apply. Antigraffiti coating shall not be applied upon damp surfaces, nor shall it be applied when the air is misty, or otherwise unsatisfactory for the work, in the opinion of the manufacturer or the Engineer. The final appearance shall have an even and uniform color acceptable to the Engineer. 6-20.5 Payment The cost of antigraffiti coating shall be considered incidental to the construction of the concrete surfaces as shown in the Plans. 166 6-21 BOTTOM SEAL (NEW SECTION) 6-21.1 Description This work consists of constructing a bottom seal as designated in the Contract Plans. The bottom seal shall be constructed using Tremie Seal and Drilled Seal to the limits shown in the plans. The Tremie Seal shall be constructed by excavating to the bottom of seal elevation and backfilling with lean concrete. The Drilled Seal shall be constructed using continuous flight auger (CFA) method to construct a grid of 36 inch diameter, minimum, CFA columns to form a bottom seal. This work includes furnishing all materials, products, accessories, tools, equipment, services, transportation, labor and supervision required for the installation of the Tremie Seal and Drilled Seal. The components of the bottom seal and completed bottom seal must meet the test acceptance criteria specified herein. This work also includes construction of a drilled or tremie seal between the wetwell and secant pile wall to limit groundwater infiltration during drilling and installation of the connection pipe between the wetwell and underpass. 6-21.2 Materials — Tremie Seal and Drilled Seal Materials for Tremie Seal and Drilled Seal shall meet the requirements of the following sections of the Standard Specifications: Portland Cement, Type I or Type II 9-01 Coarse and Fine Aggregates 9-03 Concrete Admixtures 9-23.6 Fly Ash Type C or F 9-23.9 Water 9-25 Concrete used in the construction of the Tremie Seal portion of the bottom seal shall meet the requirements of Standard Specification 6-02.3(2) and as follow: Slump — 7 Inches max Minimum compressive strength at 7 days — 1,000 psi @ 28 days Minimum Unit Weight — 145 Lbs / CF Concrete used in the construction of Drilled Seal shall consist of a mixture of Portland cement, fly ash, water, coarse aggregate, fine aggregate (sand), water reducers, and if necessary, retarder, and shall conform to the following: 1. All solids shall remain in suspension in the concrete mix without excessive bleed - water. 2. Concrete slump shall be 8 in. ± 1 in as tested in accordance with Standard Specification 6-02.3(5)D. 3. Minimum concrete compressive strength @ 28 days shall be 1,000 psi. 167 4. Target Cement content shall be 180 pounds per cubic yard. 5. Target Fly Ash content shall be 420 pounds per cubic yard. 6. Maximum size of coarse aggregate shall be 3/8 inch. 7. Maximum water cement ratio shall be 0.54 6-21.3 Construction Requirements The Contractor shall construct the bottom seal to provide the finished grade profile shown in the Plans. In addition, the Contractor shall provide a deepened bottom seal at the locations of storm drain and catch basin excavations and a grout plug area able to be drilled through for the pipe to the wet well. 6-21.3(1) Quality Assurance / Acceptance The Contractor shall submit a Quality Control Plan, covering all operations and the field quality control to be performed by the Contractor. The Contractor shall provide the Engineer with Drilled Seal installation Togs within 24 hours of the end of each work shift. The minimum 28 day compressive strength of the Bottom Seal concrete shall be 1,000 psi The minimum weight per cubic foot Bottom Seal concrete shall be 145 pounds per cubic foot. The maximum groundwater inflow into the entire underpass shall not exceed 100 gallons per minute (GPH). This groundwater inflow is through the bottom seal, through the walls, through joints in the walls or joints in the bottoms seal. See Section 6-25 of these Special Provisions for further details on leak remediation. The maximum groundwater inflow within any 10 foot by 10 foot area of the surface of the Bottom Seal shall be 10 GPM. The final surface of the top of the bottom seal shall not vary by more than +0.1 foot or -0.10 foot from the plan elevation of top of seal. This shall be verified by a Contractor provided as built survey of the surface of the completed Bottom Seal. The survey shall be at 25 foot intervals along the roadway centerline and at 10 foot increments left and right of roadway centerline. 6-21.3(2) Qualifications The Drilled Seal Contractor shall be experienced in the construction of CFA piles and or shafts and shall provide documentation of a minimum of three projects performed in the five-year period preceding the bid date in which CFA piles and or shafts were installed successfully under subsurface and project conditions similar to those of the current project. The Drilled Seal Contractor shall also provide documentation that the designated job site supervisor (foreman or crew chief) has had a minimum of three years of experience in supervision of the installation of CFA piles or shafts. Drill rig operators shall be documented to have a minimum of three years experience installing CFA piles or shaft. 168 The Drilled Seal Contractor shall assign a Project Manager to supervise the work that has a minimum of three years experience with CFA projects of similar size and scope. The Project Manager shall be an employee of the Drilled Seal Contractor. The Drilled Seal Contractor shall not use consultants or manufacturers' representatives to satisfy the Project Manager requirements of this section. Three copies of the completed project reference list and personnel list shall be submitted by the Drilled Seal Contractor within 30 calendar days after Notice To Proceed and prior to starting work. The project reference list shall include a brief project description with the project Owner's name and current phone number. The personnel list shall identify the Drilled Seal Contractor, Project Manager, drill rig operators, and job site supervisor to be assigned to the project. The personnel list shall contain a summary of each individual's experience and be complete enough for the Engineer to determine whether each individual satisfies the required qualifications. The Engineer will approve or reject the Drilled Seal Contractor's qualifications within 14 calendar days after receipt of a complete submission. The work shall be performed by the personnel listed on the submittals. If personnel changes need to be made during the course of the project, work shall be suspended until the replacement personnel are approved by the Engineer. Additional time required due to incomplete submittals, unacceptable submittals, or obtaining approval of replacement personnel will not be cause for a time extension or delay claims. All costs associated with incomplete, replacement, or unacceptable submittals shall be borne by the Contractor. 6-21.3(3) Submittals At least 60 calendar days before the planned start of Bottom Seal construction, submit complete construction submittals to the Engineer for review and comment. The Engineer will review and comment on the Contractor's submittal within 14 calendar days after receipt of a complete submission. If revisions are necessary, make the necessary changes and resubmit. The Contractor will not be allowed to begin Tremie Seal or Drilled Seal work until the submittal requirements are satisfied and found acceptable by the Engineer. Changes or deviations from the approved submittals must be re -submitted for approval. No adjustments in contract time or delay claims will be allowed due to incomplete submittals. Bottom Seal Installation Plan The Contractor shall submit four copies of the Bottom Seal Installation Plan for approval by the Engineer. In preparing the narrative, the Contractor shall reference the available subsurface data provided in the contract test hole boring logs, the Summary of Geotechnical Conditions provided in the Appendix to the Special Provisions, and the geotechnical report(s) prepared for this project. The Bottom Seal Contractor shall demonstrate,. to the satisfaction of the Engineer, the dependability of the equipment, techniques, and source of materials to be used on the project. Reference to successful completion of projects with similar column sizes in similar soil conditions using the proposed equipment and procedures should be included. The components of the plan shall meet the requirements contained in this specification. This plan shall include; but not be limited to, the following items: 1. An overall detailed description of all construction operations associated with the bottom seal construction. The plan shall identify the proposed timing and sequence of the east and west Tremie Seal, as well as the timing and sequence of 169 the Drilled Seal. The description shall include a description of the work sequence for all utilities that will be relocated and sequencing of work with the railroad shoofly. 2. List and sizes of proposed equipment, including drilling rigs, augers and other drilling tools, pumps for grout or concrete, mixing equipment, automated monitoring equipment, and similar equipment to be used in construction, including details of procedures for calibrating equipment as required. The narrative shall describe why the equipment was selected, and describe equipment suitability to the anticipated site and subsurface conditions. The narrative shall include a project history of the drilling equipment demonstrating the successful use of the equipment on CFA shafts of 36 inches minimum diameter or greater size in similar soil conditions. 3. A plan of the sequence of individual CFA column installation. The plans shall include the column diameter (36 inch minimum), column spacing, column number and drill sequence. 4. Target drilling and concreting parameters (along with acceptable ranges) for CFA column installation, including auger rotation speed, drilling penetration rates, torque, applied crowd pressures, grout pressures, and grout volume factors; 5. Mix designs for Tremie Seal and Drilled Seal concrete to be used on the project, including slump Toss vs. time curves and strength development vs. time curves for mixes with fly ash. Concrete Mix Designs shall be submitted on WSDOT Form 350-040 EF. 6. Equipment and procedures for monitoring and recording auger rotation speed, auger penetration rates, auger depths, and crowd pressures during installation; 7. Equipment and procedures for monitoring and recording concrete pressures and volumes placed during installation; 8. Spoils removal plan for Tremie Seal and Drilled seal that includes discussion of any temporary stockpiling of spoils material. 9. Contingency plans for equipment failures during pouring of Tremie Seal or Drilled Seal concrete operations. 10. Details of Drilled Seal concrete placement, including proposed operational procedures for pumping methods, and a sample uniform yield form to be used by the Contractor for plotting the volume of concrete placed versus the depth of Drilled Seal column. 11. Details and procedure to provide a completed Bottom Seal that complies with the top of Bottom Seal vertical tolerance limits set forth in these Special Provisions. This may include placement of a lean concrete leveling shim poured on top of the Bottom Seal. 12. Bottom Seal groundwater inflow testing procedures to measure groundwater inflow in the completed bottom seal. 170 13. Procedures, equipment and materials for leak remediation of the completed Bottom Seal. 6-21.3(4) Pre -Construction Meeting A pre -construction meeting will be scheduled by the Engineer and held prior to the start of Bottom Seal construction. The Engineer, prime Contractor, applicable subcontractors, Inspectors, and geotechnical specialist shall attend the meeting. The pre -construction meeting will be conducted to clarify the construction requirements for the work, to coordinate the construction schedule activities and identify contractual relationships and delineation of responsibilities among the prime Contractor and various Subcontractors. 6-21.3(5) Concrete Sampling and Testing Acceptance testing for Bottom Seal concrete shall be in accordance with WSDOT Standard Specification 6-02. Testing will be performed for slump and 28 day compressive strength. 6-21.3(6) Auger Equipment The auger flights shall be continuous from the top of the auger to the bottom tip of the cutting face of the auger, with no gaps or other breaks. Gaps in the flighting are allowed only where auger sections are joined and may not exceed 1 in. (25 mm). The length of any auger, as well as the torque and power driving it, shall be such that the auger is capable of installing a column to a depth that is 20% greater than the depth of the column shown on the approved working drawings. The CFA column rig shall be capable of penetrating the ground without drawing surrounding soils laterally into the pile bore. The auger flighting shall be uniform in diameter throughout its length, and the outside diameter of the auger shall be at least 97% of the design diameter of the column. Only single helix augers shall be used. The hollow stem of the auger shall be maintained in a clean condition throughout the construction operation. In order to facilitate inspection, the leads shall be clearly marked every 1 ft (0.3 m) along its length so that such marks are visible to the unaided eye from the ground. The bottom of the auger flights and the cutting teeth attached thereto shall be constructed geometrically so that the bottom of the column will be as flat as feasible. The concrete injection port shall be fitted with a means of sealing it against ingress of water and soil during drilling. The auger shall be guided at the ground surface by a guide connected to the leads of the CFA rig. If the auger is over 40 ft (12 m) long, it shall also be guided by a guide to be located approximately half the length of the auger above the ground -surface guide. The leads that carry the rotary unit that power the auger should be restrained against rotation by an appropriate mechanism. 6-21.3(7) Automatic Measurement and Recording Equipment As a minimum, the following automatic measurements shall be made and recorded during the drilling operation: 1. auger rotation; 2. depth of the auger injection point; 3. torque delivered to the auger; and 171 4. crowd force (downward thrust on auger). All measurements shall be referenced to (or plotted against) the depth of the auger injection point. This shall be accomplished with a rotational position indicator on the auger head system and an electronic position indicator on the crane line or boom holding the auger. Torque and thrust Toad cells shall be positioned on the auger head system. As a minimum, the following automatic measurements shall be made and recorded during the concreting operation volume of concrete; 1. maximum and minimum concrete pressure; 2. auger rotation (if rotated); and, 3. depth of the injection point. 4. volume of concrete All measurements shall be referenced to (or plotted against) the depth of the auger injection point. This shall be accomplished with electronic flowmeters and electronic pressure transducers placed in the concrete pressure line, an electronic position indicator on the crane Zine or boom holding the auger, and a rotational position indicator on the auger system. Calibrel:ion shall be made on all measuring and recording equipment at the beginning of the project that will demonstrate that the values indicated by the measuring and recording equipment are within 3% of the values indicated. Calibrations shall be performed in accordance with the equipment manufacturer's specifications. All measuring and recording equipment shall also be recalibrated when the Engineer suspects that the drilling and concreting performance has changed. 6-21.3(8) Drilling The CFA column Contractor shall perform the drilling required for the piling, through whatever materials are encountered, to the dimensions and elevations required by the CFA column Contractor's approved working drawings. Drilling shall not commence until sufficient supply of concrete is present on the project site to complete the work. The drilling parameters (auger rotation speed, penetration rates, crowd, torque, etc.) for the CFA columns shall be within the ranges established in the Installation Plan. The auger shall not be extracted from the ground at any time during the construction of a column in such a way that would result in an open unsupported borehole or inflow of water into the borehole. The auger shall be advanced into the ground at a continuous rate and at a rate of rotation that prevents excess spoil from being transported to the ground surface. 6-21.3(9) Placement of Grout or Concrete The placement of concrete shall commence within 5 minutes after the auger has achieved the planned depth. Concrete shall be pumped through the hollow -stem auger with sufficient pressure (as measured at the top of the auger) as the auger is withdrawn to completely form the column and fill any soft or porous zones surrounding the column. At the beginning of concrete placement the sealing device (plug, or bottom cover plate at the tip of the auger) shall be removed by the application of grout or concrete pressure, or with a central reinforcing bar. As pumping begins, the auger shall be lifted from 6 to 12 in. (0.15 to 0.3 m) to 172 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 facilitate removal of the sealing device. Care shall be taken to ensure that the auger is lifted only within this specified range to initiate the flow of concrete, and that water inflow and soil movement at or near the base of the auger are minimized. After withdrawing.the auger to initiate the flow of concrete, the tip of the auger should be re-inserted to at least the original depth. The technique and equipment used to initiate and maintain the concrete flow shall be such that a column of the full design cross-section is obtained from the maximum depth of boring to the final top of seal elevation. The concrete shall be supplied to the column at a rate during auger withdrawal that ensures that a continuous monolithic shaft of at least the full specified cross- section is formed, and is free from soil inclusions or any concrete segregation. The auger shall be extracted at a smooth, steady rate while continuously pumping. If rotation of the auger occurs during auger extraction, it shall be positive, i.e. in the same direction as during drilling. Satisfactory coordination of auger withdrawal with pumping is indicated by maintaining a positive pressure in the concrete at the auger tip, 'and a sufficient volume or pressure of concrete to fill the column (with a small oversupply of volume). Satisfactory coordination shall be verified using automated monitoring equipment. The volume of concrete placed as a function of depth shall be measured and recorded at intervals not exceeding 2 ft (0.6 m) using automated monitoring equipment. The concrete volume factor of the column shall be within 7.5% of the target volume factor established in the Pile Installation Plan. Columns installed outside of this range shall be considered unacceptable. 6-21.3(10) Inspection and Records The Bottom Seal Contractor shall maintain accurate records for each CFA Drilled Seal Column constructed. Similar records will be maintained by the Engineer. These records shall show: 1. Column location; 2. Ground surface elevation. 3. Column bottom elevation; 4. Elevation of top of concrete; 5. Drilled Seal Column length. 6. Auger diameter; 7. Volume of concrete placed 8. Theoretical volume of drilled hole (theoretical diameter = diameter of auger); 9. Date/Time of beginning of drilling; 10. Date/Time of completion of drilling; 11. Date/Time ready -mix concrete truck arrived at project site, and copies of all concrete batch tickets used for the column construction; 173 12. Date/Time of beginning of concrete pumping; 13. Date/Time of completion of concrete pumping; 14. Weather conditions, including air temperature, at time of concrete placement; 15. All readings made by the automated measuring and recording equipment to include as a minimum: a. Auger rotation verses depth for every 2 ft (0.6 m) increment, or less, of pile advancement during the drilling process, and during placement of grout or concrete (if auger is rotated during this placement); b. Volume of grout or concrete placed versus depth of outlet orifice for every 2 ft (0.6 m) increment, or less, of pile placed; c. Average maximum and minimum pump stroke pressures at ground level for every 2 ft (0.6 m) increment, or less, of pile placed; d. Average maximum and minimum pump stroke pressure at or near the auger head for every 2 ft (0.6 m) increment, or less, of pile placed, if directed by the Engineer; and e. Additionally, the Engineer may also specify that torque and crowd force (downward thrust on auger) measurements be made for every 2 ft (0.6 m) increment, or less, of column advancement during the drilling process. These data shall be provided to the Engineer within 24 hours of the completion of the pile. Data collected by automated measuring and recording equipment shall be provided in numerical or graphical form. 6-21.3(11) Groundwater Inflow Testing The Contractor shall conduct groundwater inflow testing of the completed Bottom Seal for review by the Engineer. Prior to final inflow testing the Contractor shall conduct a survey of the locations of all leaks within the completed bottom seal. The survey shall be completed prior to placement of a leveling shim of Lean Concrete over the Bottom Seal if required. The survey shall include the roadway station, offset from centerline and approximate gallons per minute of the leak. This shall be submitted to the Engineer and the Engineer shall be allowed 5 working days to review and investigate the areas prior to the Contractor commencing with leak repair operations. The Engineer will forward written direction to the Contractor to commence with leak repairs. Once all Teaks are repaired the Contractor shall conduct groundwater inflow testing in accordance with the approved test procedure. The testing shall be documented by the Contractor and witnessed by the Engineer. If test results show that the Bottom Seal complies . with the leak criteria no further leak repair will be required by the Contractor. The Engineer may direct the Contractor to perform additional leak repair as identified in Section 6-22 of these Special Provisions. The Contractor shall allow for 5 working days in the project schedule accommodate additional leak repairs. Once all leaks are repaired to the satisfaction of the Engineer the Lean Concrete leveling shim can be placed over the bottom seal if required. 6-21.4 Measurement 174 Tremie Seal Excavation Including Haul will be measured by the neat line cubic yards of material excavated. The lateral limit shall be the faces of the adjacent secant pile walls, lower limit will be the bottom of seal elevations as shown in the plans and the upper limit shall be the top of seal elevation as shown in the plans. Lean Concrete For Tremie Seal will be measured by the neat line cubic yard of concrete placed. The lateral limit shall be the faces -of the adjacent secant pile walls, lower limit will be the bottom of seal elevations as shown in the plans and the upper limit shall be the top of seal elevation as shown in the plans. No specific unit of measurement will apply to the lump sum item "Drilled Seal" 6-21.5 Payment ' "Tremie Seal Excavation Including Haul ," per cubic yard, shall be full payment for all costs incurred for excavating, loading, hauling and disposing of the material. "Lean Concrete For Tremie Seal," per cubic yard, shall be full payment for providing, placing and curing of the concrete. All cost to achieve compliance with the leak criteria within the Special Provisions shall be included in the cost of this item. The lump sum Contract price for "Drilled Seal" shall include all cost to perform the work that will provide a completed seal that complieswith the leak criteria within this Special Provision. The unit price includes all cost for removal and disposal of spoils generated from Drilled Seal 1 operations. The unit price of this work also includes all seal work that may be needed between the secant pile wall and wetwell to allow installation of the underpass to wetwell drainage pipe as shown in the plans. ' 6-22 LEAK REPAIRNEW SECTION) ) 1 6-22.1 Description This work consists of repairing leaks in the bottom seal and walls as directed by the Engineer. 6-22.3 Construction Requirements ' Repair of leaks in the bottom seal and walls to remedy total infiltration of groundwater into the excavated area in excess of 100 gallons per minute (gpm) or 10 gallons per minute for any 10 foot by 10 foot area shall be the sole responsibility of the Contractor at no cost to the Contracting Agency. At its discretion, the Contracting Agency may pay the Contractor to repair leaks when the total infiltration of groundwater is Tess than 100 gpm. 6-22.5 Payment "Additional Bottom Seal Leak Repair", by force account. All costs of repairing leaks and other related work shall be paid for by force account as specified in Section 1-09.6. To provide a common Proposal for all Bidders, the Contracting Agency has 1 175 1 estimated the amount of force account for "Additional Bottom Seal Leak Repair" and has entered the amount in the Proposal to become a part of the total Bid by the Contractor. 6-23 TREMIE SEAL TEMPORARY BRACING (NEW SECTION) 6-23.1 Description This work consists of fabricating, furnishing, installing, moving and storing on site and removing the temporary bracing after the work is complete. 6-20.2 Material Materials for this item of work shall be as called out in the plans. 6-23.3 Construction Requirements The temporary bracing shall be in place as detailed in the plans prior to excavating for the ' tremie seal. It shall remain in place until 3 days after the pour of the tremie seal. 6-23.4 Measurement No specific unit of measurement will apply to the lump sum item "Tremie Seal Temporary Bracing" , 6-23.5 Payment The lump sum Contract price for "Tremie Seal Temporary Bracing" will include all cost to purchase, fabricate, transport, lift into position, bolt up and attach to the wall, patch the wall, store ori site for both the west side and east side tremie seal. This also includes removal and disposal from the site. END DIVISION 6 1 1 1 1 1 176 1 1 DIVISION 7 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER MAINS, AND CONDUITS 7-01 DRAINS 7-01.2 Materials Section 7-01.2 is supplemented as follows: (******) Drain Pipe 4 In. Diameter 9-05.1(6) Underdrain Pipe 4 In. Diameter 9-05.2(7) 7-01.4 Measurement Section 7-01.4 is supplemented with the following: (******) Drain Pipe 4 In. Diameter and Underdrain Pipe 4 In. Diameter will be measured in accordance with Standard Specification 7-01.4. 7-01.5 Payment Section 7-01.5 is supplemented with the following: (******) Drain Pipe 4 In. Diameter and Underdrain Pipe 4 In. Diameter shall be paid in accordance with Standard Specification 7-01.5. 1 7-04 STORM SEWERS 1 7-04.2 Materials Section 7-04.2 is supplemented with the following: (******) Ductile Iron Pipe 9-05.1(6) 1 7-04.3(2) Storm System Bypass Section 7-04.3 is supplemented with the following: - (******) It shall be the Contractor's responsibility to maintain operation of the existing storm sewer system throughout the life of the Contract. The Contractor shall divert all flows around each 1 segment of the pipe designated for replacement. The diversion shall consist of redirection the flow from an upstream catch basin or manhole and discharging it to a catch basin or manhole downstream of the replacement operation. This can be accomplished by a 1 combination of pumping and or gravity flow. After the pipe replacement work is complete and accepted flow shall be returned to the reconstructed or new storm system. 1 1 177 Bypass pumping, if used, shall be scheduled for continuous operations with back-up equipment available at all time for periods of maintenance and refueling or failure of the primary bypass pump(s) or diversion system. If the Contractor's operation requires bypass pumping at night, then the Contractor must provide personnel at all times to ensure the system remains functional. Bypass pumping shall be done in such a manner as not to damage private or public property, or create a nuisance or public menace. The pumped stormwater shall be in enclosed hoses or pipes that are adequately protected from traffic, and shall be redirected into the appropriate storm sewer system. The discharge of storm water to private property, city streets, sidewalks, sanitary sewer or any location other than an approved storm sewer is prohibited. The Contractor shall be responsible for all costs for any cleanup, damages or resultant property damage caused by any backups or overflows. The Contractor's bypass operation shall be sized at a minimum to handle the full pipe capacity in each subject line removed from service. If flow conditions are greater than full pipe, the Contractor may elect to wait until flow conditions subside prior to removing the subject line from service. Working days may be adjusted per Specification 1-08.5. Once the Contractor removes a section of line from service than the Contractor is responsible to bypass and all flow in the system during construction, even in the event the system surcharges and exceeds the full pipe capacity, until the line is returned to full service. The Contractor may elect to bypass the Front Street storm system into the stormwater pond. If that option is selected an approved water quality treatment feature must be installed prior to outfall into the pond. If this option is elected the Contractor shall be responsible for maintaining the water quality treatment feature in accordance with the manufactures recommendations and regulatory requirements until the flow is diverted into the new system. All pipes 12 inches and larger shall be diverted with hard pipe. The pipe shall not block any driveways or intersections. The Contractor shall submit a bypass plan in accordance with Section 1-05 and shall include but not be limited to a write up of the plan, the capacities of the pipes to be bypassed, capacities of any pumps, pump maintenance plan, pipes to be used, layout of diversion piping, locations of all catch basins to be used, type of water quality treatment feature if used and overall monitoring and maintenance plan for the diversion system. The Contractor shall submit the bypass plan to the City for review. The City will be allowed 14 calendar days to review the plan. Diversion work shall not commence until the City has reviewed and returned the plan. The review by the Engineer shall not relieve the Contractor of his responsibility and public liability. 7-04.4 Measurement Section 7-04.4 is supplemented with the following: Ductile Iron Storm Sewer Pipe 8 In. Diam. and Ductile Iron Storm Sewer Pipe 14 In. Diam. will be measured in accordance with Standard Specification 7-04.4. Corrugated Polyethylene Storm Sewer Pipe 10 In. Diam. will be measured in accordance with Standard Specification 7-04.4. No specific unit of measure will apply to Storm System Bypass 178 1 1 1 1 1 11 11 1 B 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7-04.5 Payment Section 7-04.5 is supplemented with the following: (**.***) "Ductile Iron Storm Sewer Pipe 8 In. Diam." and "Ductile Iron Storm Sewer Pipe 14 In. Diam. shall be paid in accordance with Standard Specification 7-04.5. "Corrugated Polyethylene Strom Sewer Pipe 10 In. Diam." per linear foot. The lump sum price for "Storm System Bypass" shall be full pay for mobilization, labor, tools, materials, equipment, and other work necessary to design, develop, construct, maintain and remove the bypass system. 7-06 DEWATERING (NEW SECTION) 7-06.1 Description The Contractor shall design, install, operate, maintain, and remove dewatering systems to facilitate excavation, roadwork and construction. Dewatering includes systems needed for construction of the storm sewer and pump station facilities below design groundwater elevation. Dewatering also includes removing and disposing of water from the underpass during and after final excavation until the pump station is operational. Turbid water will not be allowed to be pumped through the pump station pumps. Dewatering systems will include those facilities to control groundwater for construction of all parts of the project and will consist of all materials, equipment, labor, and operations. All dewatering operations will be integrated and coordinated with shoring operations. Any conflicts between dewatering and shoring shall be resolved by the Contractor at his expense and at no cost to the Agency. 7-06.3 Construction Requirements• 7-06.3(1) Dewatering Requirements — General A. The Contractor shall be responsible for the design and implementation of a construction dewatering system. The Contractor's design shall address all dewatering, including tremie seals if required, for installation of the wet well structure and piping. B. The Contractor shall include all costs in its lump sum bid to provide and operate all dewatering system facilities. C. Current permits for the dewatering system must provide for discharge of dewatering ground water, that meets suspended solids and other criteria provided in the NPDES Permit. D. The Contractor shall keep excavations in a hydrostatically -controlled condition during construction (i.e., no boils, quick conditions, etc.). 179 E. The Contractor shall dewater and dispose of the water so as not to cause injury to public or private property, or to cause a nuisance or a menace to the public. F. The Contractor shall have available at all times, competent workers, and spare equipment for the continuous and successful operation of the dewatering systems 24 hours per day, 7 days per week. G. The Contractor shall design the dewatering systems using accepted and professional methods of design and engineering as specified. H. The Contractor shall not commence any excavation below pre -pumping static groundwater levels until groundwater and piezometric levels are below design levels described in A as indicated in observation wells. 7-06.3(2) Dewatering System A. The dewatering system shall include a Groundwater Control Plan (GWCP). B. Dewatering shall consist of the design, furnishing, installation, operation, maintenance, monitoring, reporting, and removal of the dewatering system to achieve completion of work performed under this Contract. C. The Contractor, shall design, provide, install, operate and remove dewatering sumps and trenches as necessary to control un -drained and/or perched pockets of groundwater not collected by the pumped wells. D. Site grading shall promote drainage at all times. Surface runoff shall be diverted from excavations. Water entering the excavation from surface runoff shall be collected in shallow ditches around the perimeter of the excavation, drained to sumps, and be pumped or drained by gravity from the excavation to maintain a bottom free from standing water and treated prior to discharge. E. Dewatering shall at all times be conducted in such a manner as to preserve the undisturbed bearing capacity of the subgrade soils at the proposed bottom of excavation. 7-06.3(3) Submittals The Contractor shall submit a detailed dewatering plan and operation schedule for dewatering of excavations within 60 -days after Notice to Proceed: The GWCP shall include design drawings and complete design data, methods, schedule, materials and equipment the Contractor proposes for the dewatering systems, water treatment systems, monitoring systems, and a detailed description of how the GWCP conforms to these specifications and schedule. The GWCP shall provide information sufficient for the Engineer to understand the various systems designs and operation, and include at a minimum, but not be limited to, the following: 180 1. Design drawings indicating the location, size, and depth of dewatering pumps, dewatering trenches, treatment facilities and discharge lines. 2. Calculations and information supporting the dewatering systems' performance capability and adequacy of dewatering system pumps and water quality treatment facilities. 3. Information supporting the dewatering system's capability and capacity to support sump pumping volumes. 4. Dewatering systems installation schedule, phasing and sequencing, dewatering operations schedule, maintenance schedule, and removal and abandonment of the dewatering system. 5. Design drawings and description for the water treatment facilities including operations, maintenance and monitoring, treatment rates, points of discharge, and sampling methods for compliance with water quality standards for discharge from the dewatering system. Design drawings and description for water control facilities and water treatment facilities including operations, maintenance and monitoring, treatment rates, points of discharge, and sampling methods for compliance with water quality standards for discharge of water from trenches and excavations for construction of storm water facilities and pump station facilities. Prior to installation of the dewatering system,. the Contractor shall obtain acceptance by the Engineer for the design, materials, method, installation, and operation and maintenance of the dewatering system. Acceptance by the Engineer shall not in any way relieve the Contractor from responsibility for errors therein or from the entire responsibility for complete and adequate design, materials, installation, operation, maintenance and performance of the dewatering system. 7-06.4 Measurement No specific unit of measure will apply to Dewatering 7-06.5 Payment The lump sum price for "Dewatering" shall be full pay for mobilization, labor, tools, materials, equipment, and other work necessary to design, develop,construct, maintain and remove a complete dewatering system and shall include all costs associated with installation, operation, and maintenance and removal, including quality control, power supply and maintenance, water quality treatment and monitoring, permit fees, incidental sump pumping, all testing, and other work necessary to provide a properly functioning system. 7-09 WATER MAINS 7-09.1 DESCRIPTION Supplement this section with the following: (******) The City Water/Irrigation Division will operate all existing water valves required as part of the project. Existing valves within the project area shall remain accessible at all times. 181 All new water mains crossing nonpotable lines such as sanitary and storm sewer lines shall conform to the City of Yakima's Waterline Separation from Nonpotable Conveyance Systems standards. 7-09.1(1)C Gravel Backfill for Pipe Zone Bedding Add the following: I3edding shall be crushed gravel, placed and compacted in layers as directed by the Engineer and as shown on the City of Yakima Standard Detail for Typical Trench Section, W3. The crushed gravel backfill shall conform to crushed surfacing top course meeting the requirements of SECTION 9-03.9(3). 7-09.1(1)D Pipe Zone Backfill Add the following: Imported select backfill shall be crushed gravel, placed and compacted in layers as directed by the Engineer and as shown on City of Yakima Standard Detail for Typical Trench Section, W3. The crushed gravel backfill shall conform to crushed surfacing top course meeting the requirements of SECTION 9-03.9(3). 7-09.2 Material Insulation materials shall be per the Plans. 7-09.3(5) Grade and Alignment (******) Change the minimum depth of cover in the first sentence of third paragraph to 48 -inches. 7-09.3(9) Bedding the Pipe Delete the first sentence Revise the second sentence to read: Gravel backfill for pipe zone bedding shall be placed to the depths shown on the City of Yakima Standard Detail for Typical Trench Section, W3. 7-09.3(10) Backfilling Trenches Add the following: 182 ti s t 11 s 11 B 11 11 e e 1 11 0 1 1 (******) Street crossing trenches and other locations as shown on the plans or directed by ' the Engineer shall be backfilled for the full depth of the trench with Crushed Surfacing Top Course meeting the requirements of SECTION 9-03.9(3). 7-09.3(11) Compaction of Backfill Delete the first paragraph and add the following: 1 (******) The density of the compacted material shall be at least 95% of the maximum density as determined by ASTM D 698 Tests (Standard Proctor). Placement of courses of aggregate shall not proceed until density requirements have been 1 met. The first 500 feet of trench backfill operations shall be considered a test section for the Contractor to demonstrate his backfilling and compaction techniques. The Contractor shall notify the Engineer at least 3 working days prior to beginning trench excavation and backfill operations and the Engineer will arrange for in- place density tests to be taken on the completed test section in accordance with the above requirements. No further trenching will be allowed until the specified density is achieved in the test section. Passing in-place density tests in the.test 1 section will not relieve the Contractor from achieving the specified densities throughout the project. Existing Connection to g Main s 1 Add the following: (******) ' No connection to existing mains shall be allowed prior to a successful pressure test, disinfection, flushing and a satisfactory bacteriological test result is obtained. The Water/Irrigation Division shall furnish and install new tapping sleeves and valves to existing mains up to and including 12 -inch unless otherwise noted on the plans. Costs, including materials and labor, as determined by the Water 1 Distribution Supervisor, shall be paid at the Community and Economic Development Department, City Hall, 129 N. 2nd St. Yakima, WA. 98901, before materials are ordered and the work is scheduled. 1 Mechanical joint fittings, valves and fire hydrants shall be connected with a ROMAC "Grip Ring", or an approved equivalent. 1 7-09.3(22) Blowoff Assemblies Revise the first sentence to read: 1 1 183 Blowoff Assemblies shall be constructed at the locations shown on the Plans and in accordance with the City of Yakima Typical Blow Off Assembly Detail. 7-09.3(23) Hydrostatic Pressure Test Revise the first sentence to read: All water mains and appurtenances shall be tested under a hydrostatic pressure of 180 psi. Supplement this section with the following: (******) Test shall be made with main gate valves open. Upon completion of the test, each valve shall be tested by closing each in turn and relieving the pressure beyond. This test of the valve will be acceptable if there is no immediate loss of pressure on the gauge when the pressure comes against the valve being checked. The Contractor shall verify that the pressure differential across the valve does not exceed the rated working pressure of the valve. 7-09.3(23)A Testing Extensions From Existing Mains Delete this section 7-09.3(23)B Testing Section With Hydrants Installed Revise this section to read: When hydrants are included with the section of water main to be tested, the testing shall be conducted as described in Section 7-09.3(23) in two separate tests as follows: Test No. 1 — Hydrant auxiliary gate valves closed, with the hydrant operating stem valves and hose ports open. Test No. 2 - Hydrant operating the stem valves closed, with the hydrant auxiliary gate valves and hose ports open. 7-09.3(23)C Testing Hydrants Installed on Existing Mains Revise this section to read: For hydrants being installed and connected to an existing water main, the. hydrant connection shall be provided by the City of Yakima Water/Irrigation Division, including the auxiliary gate valve. In some cases, the City will also install the hydrant and all associated piping. The owner or contractor requiring 184 111 0 0 111 1 1 111 1 11 e 11 11 1 1 1 the new fire hydrant shall be responsible for all costs associated with the City's installation. Where the contractor installs the hydrant and piping, all materials shall be field chlorinated as described in 7-09.3(24)M prior to connecting to the auxiliary gate valve. Once connected, a visual inspection of all connections shall be performed prior to backfilling. If the distance between the auxiliary gate valve and hydrant is more than one full length of pipe, the hydrant and piping shall be pressure tested according to 7-09.3(23) and disinfected according 7-09.3(24) prior to being connected to the auxiliary gate valve and existing water main. 7-09.3(24) Disinfection of Water Mains Supplement this section with the following: A representative from the City of Yakima Water/Irrigation Division will collect all bacteriological samples for testing and pay the cost associated with the initial samples. If test results are unsatisfactory, contractor shall disinfect the water main as previously outlined. New bacteriological samples will be taken by a representative of the Water/Irrigation Division. The contractor will be responsible for all costs associated with subsequent disinfection and sample testing. 7-09.3(24)A Flushing Revise the first paragraph to read: (******) All filling, flushing and chlorinating of the new water system shall be done through a metered hydrant or blow -off connection with an approved double check assembly. Contractor shall secure the metered connection and double check assembly from the City of Yakima Water/Irrigation Division (see also 2-07.3(A) Water Supplied From Hydrants). Sections of pipe to be disinfected shall first be flushed to remove any solids or contaminated material that may have become lodged in the pipe. If a hydrant is not installed at the end of the new main, then a temporary blow -off shall be provided by the contractor large enough to develop a flow velocity of at least 2.5 fps in the water main. No portion of the temporary blow -off shall remain in place as partof the permanent water system. Delete the second paragraph 7-09.3(24)H Point of Application Delete this section 7-09.3(24)N Final Flushing and Testing Revise the last sentence in the third paragraph to read: 185 w 11111 ******) Samples will be collected and bacteriological tests obtained by the City of111 Yakima Water/Irrigation Division. 7-09.3(25) Plugging Existing Pipe The Contractor shall pothole and expose the fittings at the abandonment locations of the 12 -inch waterline at 1st Avenue and Front Street. The Contractor shall assume that an MJ plug shall be required to plug the existing fitting. Once fittings are potholed, the Contractor shall use the appropriate fittings necessary as directed by the Engineer. 7-09.4 Measurement e t (******) 11 Measurement for payment of pipe insulation will be per linear foot of installation installed. Measurement for payment of Connection to Existing Water Main 2" Temp. Blowoff will be per111 each. Measurement for payment of Plugging Existing Pipe will be per each. 7-09.5 Payment (******) "Pipe Insulation", per linear foot. The unit Contract price Bid per linear foot for "Pipe Insulation" will be full pay for all work to install, test, and adjust the insulation system. "Connection to Existing Water Main 2" Temp. Blowoff", per each. The unit Contract price Bid per each for "Connection to Existing Water Main 2" Temp. Blowoff" will be full pay for all Work to install the blowoff assembly, including but not limited to excavating, backfilling, laying and jointing pipe, tapping the main, corporation stop, pipe and fittings, gate valve, meter box, sanitize, test and cover and cleanup. "Plugging Existing Pipe", per each. The unit Contract price Bid per each for "Plugging Existing Pipe" will be full pay for all Work to pothole and expose the existing pipe junction and fittings, furnish and install the required fitting, including but not limited to excavating, backfilling, and cover and cleanup. 7-12 VALVES FOR WATERMAINS 7-12.3 Construction Requirements Add the following: 186 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Valve box tops and lids shall be placed so that the ears of the lid/notches of the top section are in-line with the direction of the main. Where valve boxes are installed in unpaved areas, the contractor shall install a 24 -inch square/diameter x 4 -inch thick pad of 3,000 psi concrete pad around valve box. The valve box and concrete pad shall be set flush to the surrounding surface. 7-12.3(1) Installation of Valve Marker Post Delete this section 7-14 HYDRANTS 7-14.3(1) Setting Hydrants Delete the fourth paragraph. Supplement this section with the following: The hydrant shall be set to the correct elevation on a concrete block base 12 -inch x 12 - inch x 6 -inch thick, which has been placed on undisturbed earth. Around the base of the hydrant, the Contractor shall place 0.25 C.Y. of drain rock ranging in size from 3/4 -inch to 11/2 -inch, said drain rock being for the purpose of allowing free drainage of the hydrant. Hydrants shall be installed according to City of Yakima Standard Detail for Hydrant Assembly, W1. 7-14.3(2)A Hydrant Restraint Revise this section as follows: (******) All mechanical joints associated with the hydrant (shoe, auxiliary gate valve, tee)shall be connected with ROMAC "Grip Ring" accessory packor approved equivalent. Where the length between the auxiliary valve and hydrant shoe is greater than 18 feet, a tyton joint "Field-lok" type gasket shall be used at the pipe joint for restraint. No concrete thrust blocking is required at the hydrant tee or at the hydrant shoe. 7-14.3(2)B Auxiliary Gate Valves and Valve Boxes Revise this section as follows: Auxiliary gate valves and valve boxes shall be installed in accordance with Section 7-12. 7-14.3(3) Resetting Existing Hydrants Revise this section as follows: (******) Where existing hydrants are shown on the Plans for adjustments to conform to a new street alignment or grade or both, the hydrant shall be relocated as necessary by the City of Yakima Water/Irrigation Division. 187 7-14.3(4) Moving Existing Hydrants Revise this section as follows: (******) Where existing hydrants are shown on the Plans to be moved, the hydrant shall be moved as necessary by the City of Yakima Water/Irrigation Division. 7-14.3(5) Reconnecting Existing Hydrants Delete this section 7-15 SERVICE CONNECTIONS 7-15.1 Description Revise this section as follows: City of Yakima Water/Irrigation Division will install all 2 -inch and smaller service connections from the main to and including the meter setter for the premises served. Service connections larger than 2 -inches shall be installed as shown and noted on the plans. No service shall be installed by the Water/Irrigation Division prior to a successful pressure test, disinfection, flushing and a satisfactory bacteriological test result is obtained. 7-15.5 Payment Revise this section as follows: "Service Connection 1 1 In. Diam.", per each. The unit Contract price per each for "Service Connection 1 1/2 In. Diam." shall be full pay for all Work to install the service connection, including but not limited to, excavation, tapping the main, laying and jointing the pipe and fittings and appurtenances, backfilling, testing, flushing, and disinfection of the service connection. 7-16 CATHODIC PROTECTION (NEW SECTION) 7-16.1 Description This section includes the work necessary to furnish and install a galvanic anode cathodic protection system on each end of the new buried 12 -inch, ductile -iron water pipe inside the steel casing The cathodic protection system consists of the installation of galvanic anodes and wires, thermite welding, and wire connections to pipes. 7-16.2 Materials 188 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Galvanic Anodes Composition: High -Potential Magnesium Alloy: Aluminum: 0.01 percent maximum Manganese: 0.5 to 1.3 percent Zinc: 0 Silicon: 0 Copper: 0.02 percent maximum Nickel: 0.001 percent maximum Iron: 0.03 percent maximum Total Others: 0.05 percent each or 0.3 percent maximum, total Magnesium: Remainder Dimensions: Length: 20 inches minimum Bare Weight: 32 pounds minimum Manufacturers and Products: Dow; Galvomag Amax; Maxmag Anode Wire: Furnish each anode with No. 12 AWG stranded copper wire with TW insulation, 10 feet long. Wire -to -Anode Connection: Manufacturer's standard. The anode connection shall be stronger than the wire. Backfill: Composition: Ground Hydrated Gypsum: 75 percent Powdered Wyoming Bentonite: 20 percent Anhydrous Sodium Sulfate: 5 percent Grain Size: 100 percent passing through a 20 -mesh screen and 50 percent retained by a 100 -mesh screen. Mixture: Thoroughly mixed and firmly packaged around the galvanic anode with the cloth bag or cardboard tube by means of adequate vibration. The quantity of backfill shall be sufficient to cover surfaces of the anode to the depth of 1 inch. Packaging and Shipping: Provide anodes packaged in a plastic or heavy paper bag of sufficient thickness to protect the anode, backfill, and cloth bag during normal shipping and handling. 189 Thermite Welds General: Molds: Thermite wire sleeves, welders, and weld cartridges according to the weld manufacturer's recommendations for each wire size and pipe or fitting size and material. Welding materials and equipment shall be the product of a single manufacturer. Interchanging materials of different manufacturers will not be acceptable. Graphite. Ceramic "One -Shot" molds not acceptable Cartridges: Cast iron thermite weld cartridges for cast and ductile iron pipe and fittings. Maximum Cartridge Size: 25 grams for steel and 32 grams for cast and ductile iron materials, respectively. Welding Materials Manufacturers: Erico Products Inc. (Cadweld), Cleveland, OH. Continental Industries, Inc. (Thermo -Weld), Tulsa, OK Thermite Weld Caps: Prefabricated weld cap with coating and suitable primer, such as Handy Cap II with Royston Primer 747, as manufactured by Royston Laboratories, Inc. 7-16.3 Construction Requirements Store prepackaged anodes off the ground and keep them dry. Protect against weather, condensation, and mechanical damage. Immediately remove from site wet or mechanically damaged prepackaged anodes. Handle anodes with care to prevent loss of backfill material. Do not lift or hold anodes by the lead wire. Install galvanic anodes as shown in the Plans. Provide a minimum anode spacing of 2 feet from other unprotected pipelines. Galvanic anodes packaged in a cardboard type chip -tube shall be thoroughly perforated just prior to installation. Install anodes at each end of the pipe outside the casing ends. Bury anode wires a minimum of 24 inches below finished grade. Wire Connections to Pipe Remove pipe coatings and clean metal surfaces as required for thermite welding. Some pipe coatings contain asbestos reinforcement. Comply with Federal, State, and local regulations pertaining to asbestos removal and disposal. Make electrical connection of copper wire to steel, ductile, and cast iron surfaces using the thermite weld method. Observe proper safety precautions, welding procedures, thermite weld materials selection, and surface preparation as recommended by the welder manufacturer. 190 Assure that the pipe or fitting wall thickness is of sufficient thickness that the themite weld process will not damage the integrity of the pipe or fitting wall or protective lining. Before connection is made, clean surface to bare metal by making a 2 -inch by 2 -inch window in the coating, and then filing or grinding the surface to produce a bright metal finish. Grinding shall be with a vitrified type grinding wheel; the use of a resin, rubber, or shellac impregnated type grinding wheel is not acceptable. The prepared metal surface shall be dry. Install wire sleeves on the ends of the wires before welding to the metal surface. Perform thermite welding in strict accordance with the manufacturer's written instructions. After the weld connection has cooled, remove slag and physically test wire connections by tapping with a hammer; remove and replace defective connections. Install a prefabricated thermite weld cap over each completed connection. Repair exposed metal surfaces not covered by the thermite weld cap in accordance with the coating manufacturer's recommendations. Repair damage to pipe lining in accordance with the lining applicator's recommendations. 7-16.4 Measurement Measurement for Galvanic Anodes will be per each for each anode installed. 7-16.5 Payment "Galvanic Anode", per each. The unit Contract price per each for "Galvanic Anode" shall be full pay for all labor, materials, tools, and equipment necessary or incidental to provide and install each anode, including but not limited to, excavation, backfill, wire and welded wire connections and other items necessary for the completion of the work as specified herein. 7-20 STORM WATER PUMP STATION (NEW SECTION) 7-20.1 Description This work consists of furnishing and constructing a.storm water pump station in accordance with the Drawings and these Special Provisions. The storm water pump station shall include a precast concrete wet well, submersible wastewater pumps, a valve vault and associated piping and valves. Unless otherwise noted in the Drawings and these Special Provisions, the applicable portions of the most currently adopted editions and revisions of the following standards shall be adhered to during construction of the storm water pump station. Washington State Department of Transportation Standard Specifications for Road, Bridge and Municipal Construction: 2012 (WSDOT Standard Specifications) City of Yakima — Lift Station Design Standards 7-20.1(1) Mechanical and Adhesive Anchors 191 Furnish and install all adhesive anchors and mechanical anchors where shown on the Drawings or where required. Anchor all equipment and appurtenant facilities in accordance with the requirements of the equipment manufacturer and these Special Provisions. 7-20.1(2) Precast Concrete Structure (Wet Well and Valve Vault) Furnish and install a precast concrete wet well for use with the pumping equipment, piping and appurtenances as shown on the Drawings and specified herein. The precast concrete wet well shall include a precast cover with an access hatch, precast sections and a precast base slab. Furnish and install a precast concrete valve vault for use with the pump discharge piping and valves as shown on the Drawings and specified herein. The precast concrete valve vault shall include a precast cover with an access hatch, a precast section and a precast base slab. Earthwork associated with installing the precast concrete valve vault shall be included in this work. The earthwork includes but is not limited to excavation, hauling, shoring, dewatering, backfilling, compaction, and grading necessary or required for the work as covered by these Special Provisions and indicated on the Drawings. 7-20.1(3) Protective Coatings Coat or paint all equipment where specified or required. 7-20.1(4) Not Used 7-20.1(5) Electric Motor Drives Furnish and install the electric motor drives as shown on the Drawings and specified herein. 7-20.1(6) Submersible Wastewater Pumps Furnish and install the submersible wastewater pumps, piping, fittings, and appurtenances as shown on the Drawings and specified herein. 7-20.1(7) Not Used 7-20.1(8) Piping, Valves, and Accessories Provide all piping, including fittings, valves, supports, and accessories as shown on the Drawings, described in these Special Provisions and as required to completely interconnect all equipment with piping for complete and operable systems, including equipment drains. Provide training on operation and maintenance of the equipment as specified herein. Earthwork associated with installing piping, valves, and accessories shall be included in this work. The earthwork includes but is not limited to excavation, hauling, shoring, dewatering, backfilling, compaction, and grading necessary or required for the work as covered by these Special Provisions and indicated on the Drawings. 192 v 1 111 v 0 11 11 111 0 0 a a 11 11 1 1 1 e 11 Drilling from catch basin 6 on sheet C-14 into the wet well is included in this work. This also includes any dewatering needed as a result of this drilling and the installation of the piping and seals between catch basin 6 and the wet well. 7-20.2 Materials 7-20.2(1) Not Used 7-20.2(2) Precast Concrete Structure (Wet Well and Valve Vault) Materials shall meet the requirements of the following WSDOT Standard Specifications sections: Concrete 6-02 Reinforcing Steel 9-07 Concrete Curing Materials and Admixtures 9-23 7-20.2(3) Not Used 7-20.2(4) Not Used 7-20.2(5) Not Used 7-20.2(6) Not Used 7-20.2(7) Not Used 7-20.2(8) Piping, Valve, and Accessories Materials shall meet the requirements of the following WSDOT Standard Specifications sections: Ductile Iron Pipe Restrained Joints Restrained Flexible Couplings 7-20.3 Construction Requirements 9-30.1(1), 9-30.2(1). 9-30.2(6) 9-30.2(8) 7-20.3(1) Mechanical and Adhesive Anchors Mechanical and adhesive anchors shall be used only where specifically called for on the Drawings, where specified, or where favorably reviewed by the Engineer. Neither adhesive anchors nor mechanical anchors shall be used as substitutes for cast -in-place anchor bolts. Submittals: Submit the information to the Engineer for favorable review prior to the installation of any anchors. Submit a sample of each type of adhesive anchor and each type of mechanical anchor proposed for use. Include with the samples a certification of load test capacity and the manufacturer's recommended installation procedures. Submit manufacturer's product information andcatalog cut sheets, including recommended installation procedures and precautions, on adhesive proposed for use. 193 Adhesive Anchoring Systems: Adhesive anchors shall be standard threaded studs inserted into holes drilled into existing concrete and secured with an epoxy adhesive. Where specifically called for on the Drawings, insert -type adhesive anchors shall be used. Insert -type adhesive anchors (Hilti HFA Inserts, or equal) shall use internally threaded shafts in place of threaded studs. All studs, inserts, nuts, and washers shall be Type 316 stainless steel. Adhesive anchors shall be the length and diameter specified on the Drawings or, if not specified, as called for by 1:he equipment manufacturer supplying the anchors. Length of anchors, if not specified, shall be sufficient to meet the embedment requirements noted in this specification. Epoxy: The epoxy adhesive shall consist of a two -component epoxy base resin and hardener material meeting the requirements of ASTM C-881 Types I, II, IV, and V, Grade 3, Classes B and C. The adhesive shall be supplied in manufacturer's standard side-by-side cartridge and dispensed through a static -mixing nozzle supplied by the manufacturer. Epoxy adhesive shall be HIT RE 500 as manufactured by HILTI Inc.; C6 Adhesive as manufactured by Ramset/Red Head; CIA - Gel 7000 as manufactured by Covert Operations, Long Beach, California; Power -Fast as manufactured by Power Fastening; or equal. Mechanical Anchoring Systems: Mechanical anchors shall be a type of concrete anchor consisting of a bolt with an enlarged end, and an expandable clip or wedge. Mechanical bonding of the anchor to the concrete shall be by the permanent expansion of the clip or. wedge against the side of the drilled hole upon tightening of the nut on the bolt. Mechanical anchors shall be of a type which cannot be removed once installed. Any type of anchor which can be released or which can be loosened by vibration is unacceptable. All components of mechanical anchors, including nuts and washers, shall be 316 stainless steel. Mechanical anchors shall be the diameter specified on the drawings or, if not specified, as called for by the equipment manufacturer supplying the anchors. Length of mechanical anchors shall be sufficient to meet the embedment requirements. Mechanical anchors shall be Ramset/Red Head Trubolt Wedge; Hilti HSL Expansion Anchor; or equal. Embedment: Total depth of embedment of all concrete anchors into sound concrete shall be not less than that shown on the Drawings or, where not shown, not less than the minimum required by Table 19-D of the 1997 Uniform Building Code for the diameter of the bolt installed. Adhesive Anchor Installation: The hole into which the anchor is to be inserted shall be core - drilled. The surfaces of the cored hole shall be roughened with a rotary drill. The hole shall be no more than 1/4 -inch larger in diameter than the diameter of the anchor. Just prior to setting the anchor, the drilled hole into which the anchor is inserted shall be clean and shall be free of dust, dirt, debris, standing water, or any substance which will not allow the epoxy to bond tenaciously to the concrete. The anchor shall also be clean and free of any substance which will not allow the epoxy to adhere to the anchor. Neat epoxy shall completely fill the space surrounding the anchor when the anchor rests on the bottom of the drilled hole. No air pockets shall be present in the epoxy. No load shall be applied to the anchor nor shall the anchor be moved, jiggled, or bumped until the epoxy has fully cured. The cure period shall be as required by the epoxy manufacturer. Once the epoxy has cured per the manufacturer's requirements, adhesive anchors shall be Toad tested per the following: Special Inspection, as used in Table 19-D of the 1997 Uniform Building Code, shall be defined as follows: 1) For anchors used for structural applications: tension testing of all of the anchors to twice the allowable tension value and 2) For anchors used for non- structural applications such as equipment anchorage: Tension testing of 50% of the anchors, or alternate bolts in a group, to twice the allowable tension value. 194 1 11 v 0 D 0 11 0 0 B 0 A B e 11 1 e t Mechanical Anchor Installation: Installation of mechanical anchors shall be in strict adherence to the anchor manufacturer's recommendations, these Special Provisions, and to the latest International Conference of Building Officials (ICBO) Evaluation Report on that product. The diameter of the drilled hole into which the anchor is inserted shall be as recommended by the anchor manufacturer. Just prior to setting the anchor, the drilled hole and the mechanical anchor shall be clean and free of dust or other substances which will not allow the proper seating of the anchor. Mechanical anchors shall be tightened to the minimum torque as recommended by the anchor manufacturer prior to placing any load on the anchor. Mechanical anchors shall be load tested per the following: Special Inspection, as used in Table 19-D of the 1997 Uniform Building Code, shall be defined as 1) For anchors used for structural applications: tension testing of all of the anchors to twice the allowable tension value and 2) For anchors used for non-structural applications such as equipment anchorage: Tension testing of 50% of the anchors, or alternate bolts in a group, to twice the allowable tension value. 7-20.3(2) Precast Concrete Structures (Wet Well and Valve Vault) Submittal: Before proceeding with the construction of the products, submit the information to the Engineer for approval. Submit descriptive details of the manufacturer's proposed standard products including precast sections, precast covers, precast base slabs, access hatches, and other hardware; minimum concrete 28 -day compressive strength; a cement certification. Submit shop drawings including design criteria, reinforcing steel location and concrete cover, layout of all inserts, attachments and openings, location, and type of joints. Quality Assurance: Provide products of a manufacturer who has been regularly engaged in the design and manufacture of the products. Demonstrate to the satisfaction of the Engineer that the quality is equal to the products made by those manufacturers specifically named herein, if an alternate product manufacturer is proposed. The access hatch shall conform to Applicable Occupational Safety and Health Regulations and Uniform Building Code, adopted edition. Design Criteria: The design and construction of the precast concrete wet well shall conform to ASTM C478. The design and construction of the precast valve vault shall conform to ASTM C857, C858. The structure and cover live load shall meet AASHTO Loading Class HS 20-44. The backfill material shall conform to WSDOT Standard Specifications Section 2-09.3(1)E. Design the precast concrete wet well for backfill with a material that has a density up to 150 lbs per cubic foot. Precast Sections: Construct the cover, sections, and the base slab in accordance with the dimensions as shown on the Drawings. The wet well base slab shall be integrated with the first precast section. Cement shall conform to ASTM C150, Type II, low alkali. The cover opening shall be sized to support the access hatch. Provide lifting eyes for each section. The precast wet well shall be as manufactured by Hanson Concrete Products, Inc., or equal. The precast valve vault shall be as manufactured by Utility Vault, or equal. Sealant Gaskets: The sealant gaskets shall be type of preformed, continuous rope form plastic material, protected by removable two-piece wrapper. The sealing compound shall be reinforced hydrocarbon resins blended with plasticizing compounds and reinforced with inert mineral filler. No solvents, irritating fumes or obnoxious odors. The adhesive and cohesive strength shall not be dependent on oxidizing, evaporating, or chemical action. The sealant gaskets shall conform 195 to Federal Specification SS -S-210. Provide RAM-NEK as manufactured by K. T. Snyder Company, Inc.; QUIKSEAL as supplied by Associated Concrete Products; or equal. Access Hatches: Provide access hatches in accordance with sizes and types as shown on the Drawings. Single leaf access hatches shall be Bilco Model "J"; Babcock -Davis Model AM; or equal. Double leaf access hatches shall be Bilco Model "JD"; Babcock -Davis Model GT; or equal. Door leaves shall be 1/4 -inch (6.35 mm) thick aluminum, diamond pattern, reinforced as required to withstand H2O loading where designated. The frame shall be 1/4 -inch (6.35 mm) thick aluminum channel with anchor flange around perimeter. Provide channel to collect drain water and provide 1 -1/2 -inch (38 mm) drainage coupling for connection to drainlines. Doors shall be equipped with heavy forged brass hinges, stainless steel pins, spring operators and an automatic hold -open arm with a positive automatic latch that will secure the door in the open position until the release handle is activated. Submit details of latch for review. Provide snaplock with removable handle. Provide aluminum recessed hasp to door and frame where required for padlock. Provide stainless steel hold -open pin through holes in hold -open arms to insure against accidental hatch closure. Attach pin to hatch with a short stainless steel chain to prevent loss. For each access hatch, provide a safety net spanning the entire opening to provide fall protection. The safety net must be supplied by the access hatch manufacturer and be of the type designed for access hatches. All hardware shall be stainless steel throughout. The finish shall be mill finish aluminum with bituminous coating applied to the exterior portion of the frame that will be concealed after installation. Provide a 10x12 -inch minimum size sign permanently attached to the underside of hatch doors reading: "Danger: Make Sure Hold - Open Latch is Positively Engaged Before Using. Insert Pin in Holes in Hold -Open Arms to Hold Door Open." Encapsulation System: Provide an encapsulation system for the precast concrete wet well. The encapsulation system shall be WrapidSeal by Canusa-CPS, or equal. The encapsulation system shall use a heat -shrinkable, wraparound sleeve to create a barrier to water infiltration and to protect the wet well support structure and frame from ground moisture, preventing corrosion and freeze -thaw damage. The system shall accommodate ground movement and resists soil stress. The material shall be irradiated and cross-linked polyethylene impermeable backing, coated with protective heat -activated adhesive. The material shall bond to primed concrete, metal, and fiberglass surfaces, and shall be compatible with concrete, steel, iron, and fiberglass. Separate closure seal shall secure sleeve in place during installation and seal overlap area. The functional performance of heat -shrinkable sleeves shall conform to the following Standards: Peel Strength: Lap Shear: Water Absorption: Low Temperature Flexibility: ASTM D 1000: 8.6 psi ASTM D 1002: 1.5 psi ASTM D 570: 0.05 % maximum ASTM D 2671: -40°F The physical properties of heat -shrinkable sleeves shall meet the following criteria: System Type: Supplied Thickness: Fully Recovered Thickness: Shrink Factor: High shrink 101 mils 125 mils 40%, minimum Sleeve adhesive: Softening point shall conform to ASTM E 28: 212° F. The sleeve backing shall meet the following standards: 196 0 111 a El 0 a D ti v B 11 11 e B 1 1 Tensile Strength: Elongation: Hardness: Abrasion Resistance: ASTM D 638: 2,900 psi ASTM D 638: 600% ASTM D 2240, Shore D: 46 ASTM D 1044: 35 mg The primer shall be used to prime steel, concrete, and fiberglass surfaces for installation of sleeve, and shall be compatible with common substrates and sleeve adhesive. Source Quality Control: For precast sections, verify concrete compressive strength test results are satisfactory for the sections supplied. State the curing method. Identify the start and end dates for the sections supplied. For frames and covers, verify cast test bar tensile strengths are satisfactory. Excavation and Backfill: Conform to WSDOT Standard Specifications Section 2-09. Precast Concrete Structure Installation: Install the products in strict conformance with manufacturer's installation instructions. Apply primer to joint surfaces in accordance with manufacturer's instructions. Make all joints watertight with sealant gaskets. Allow encapsulation sleeve to cool before backfilling. Prevent damage to sleeve by protecting sleeve with extruded polyethylene mesh or other suitable protective shield as approved by the Engineer. See Special Provision 2-08 for backfill requirements. Accurately locate and place the concrete cover to within 1/8 -inch vertical elevation in paved areas and to 1/2 -inch in other areas. Coordinate the activities of all trades so that this tolerance is achieved. Access Hatch Installation: Make sure all aluminum surfaces, which will be in contact with concrete, are coated with bituminous paint. Coordinate connection of drainage coupling to plumbing drainline prior to the concrete pour. Set frame level and true to plane at all four corners, and flush with adjacent finished surfaces. Doors, when closed, shall be flush with frames and flush with each other. Install warning sign. Inspection: Provide the Engineer a minimum of 3 working days advance notice prior to installation of the encapsulation system. Before installation, surfaces to be encapsulated will be inspected by the Engineer. Do not begin installation until defects or deficiencies identified by the Engineer have been corrected. Contractor shall visually inspect installed sleeve to ensure sleeve is in full contact with substrate including cone section and manhole frame; no cracks or holes in polyethylene backing; no voids below sleeve; and adhesive has flowed beyond sleeve edges. Field Quality Control: Verify all precast sections are continuously sealed with gaskets. Verify the access hatch fit quietly in the frames. Leak Test: Furnish and dispose of water used for testing. Hydraulically test the precast concrete structure installed prior to installation of the encapsulation system. After all pipes have been laid, backfilling has been completed, and after the testing of the pipes, plug the end of the pipe stubs in the structure with flexible -joint caps, or acceptable alternate, securely fastened. Fill the structure with water and measure leakage over a period of not less than one hour. Allowable leakage shall be less than one (1) gallon per hour per 10 -foot depth of wet well. When leakage from the structure exceeds the above amount, determine the source or sources of the leakage, and repair or replace defective materials and workmanship. The completed pipe and structure installation shall pass this test before the project can be accepted. 197 Site Adhesion Testing (Peel Tests): Perform site adhesion testing for the encapsulation system after leak testing. Frequency of test shall be 1 in every 100 sleeves. The surface temperature at time of test shall be 77 ± 10°F, unless environmental conditions will not allow and continuation of test is approved by the Engineer. The peel rate shall be 4 inches /minute. Perform testing using hand peel gauge on 1 -inch (25 mm) wide strip. Cut strip and induce initial failure by undercutting and peeling back strip until 2 -inch flap is created. Attach clamp to strip and hand peel gauge to clamp and peel back at a 90 degree angle to surface at specified peel rate. The passing minimum peel strength shall be 8.6 psi with cohesive failure of adhesive. 7-20.3(3) Protective Coatings Unless specifically excluded, all new surfaces shall be coated with one of the specified paint systems. Surfaces generally not requiring painting unless otherwise indicated are: 1) metal completely embedded in concrete (except aluminum), 2) piping buried in ground or encased in concrete, except as noted, 3) rubber, 4) stainless steel except ladders, 5) bronze and brass, 6) nameplates, Underwriter's labels, and fusible links, 7) factory finish coated items such as electrical panels, except for touch-up, or as noted, this does not include factory -primed surfaces, 8) concrete, except as noted herein, as specified elsewhere, or as shown on the Drawings, 9) plastic pipe (indoors and in utilidors). Definitions: Dry Film Thickness (DFT) - The prime coat and the sum of all fully cured applied coats for the paint system. Exterior Surface - Surface that is not inside a building or structure and is exposed to the weather. Epoxy surfaces that are affected by the ultraviolet rays from the sun shall be considered an exterior surface if the sun can shine on the surface. Stripe Coat - Coating applied to the edge, corner, welds, or bolts, which is applied prior to application of additional system coats. Submerged - Surfaces that are under water or the vertical extension of those walls that are partly under water during normal operating conditions. Submittals: Submit a complete schedule of coatings to be used for review prior to ordering. Include manufacturer's brand name, product name, catalog cuts including generic description, complete technical data, manufacturer's recommended surface preparation and application instructions, and designation number for each coat of each system to be used. Submit a detailed list of all surfaces and equipment items upon which the Contractor intends to apply protective coatings for review prior to commencing Work. For each paint product, provide the information including abrasion resistance, ASTM D4060, 1 kg Toad at 1000 cycles, CS -17 wheel, impact resistance, ASTM D2794, direct and reverse, moisture -vapor transmission, ASTM D1653, adhesion, ASTM D4541, salt fog, ASTM B117, QUV, ASTM G53 (exterior finish coat only), and fresh water immersion, ASTM D870 (immersed coatings only), humidity, ASTM D4585. If materials other than those listed are submitted, submit additional information to fully define the proposed substitution. Any proposed substitutions must be for a complete system that has exhibited successful performance. The Engineer may further require the Contractor to furnish additional test results from an independent paint laboratory comparing the proposed substitution with one of the named products, at no additional cost to the Owner. For substituted materials, provide a list of references, including contact person and phone number, where proposed substitute paint system has been used in similar exposures. Provide a minimum of five references (no duplicate owners or agencies). Submit a full range of the manufacturer's standard and let down finish colors for review and selection by the Owner. After final colors have been selected, submit three (3) 81/2' x 11" brush -out samples on cardboard of each color indexed as to manufacturer and color designation. No submittal of color cards is required for coal tar coatings. Color chips 3/4" x 1'/2' may be used for pipe codes. 198 v a 11 0 0 B 11 0 111 11 1 1 1 1 1 1 Product Information Submittal: Provide pipe and equipment color code charts, color formula for each selected color to facilitate future color matching, testing support equipment, Material Safety Data Sheets (MSDS) for all products, coating manufacturer's certification that coatings comply with the specified requirements and are suitable for the intended application. Applicator's References: Submit a list of a minimum of 5 successfully -completed projects of similar size and complexity to this work. For each projectinclude project name. and location, name and phone number of the Owner, name and phone number of the Engineer, name of coating manufacturer, type of coatings, and approximate area of coatings applied, date of completion. Independent Inspection: Submit the qualifications and references for required independent protective coatings inspection company and person performing inspection for Owner's approval. Coating manufacturer's qualifications: All protective coatings furnished under this Section shall be of a manufacturer who has been regularly engaged in the manufacture of protective coatings with a minimum of 10 years of successful experience, and demonstrate to the satisfaction of the Engineer successful performance on comparable projects. Applicator's qualifications: Experienced in application of specified protective coatings for a minimum of 5 years practical experience in application of the specified coatings and successfully completed a minimum of 5 projects of similar size and complexity within the last 3 years. Employ persons trained in the application of specified protective coatings. Contractor shall contract with an independent firm to perform quality control inspection of protective coating process. The inspection firm shall have personnel with either NACE or SSP certification for coating inspection and at least 5 years of experience in protective coating inspection. Inspection service shall include as a minimum surface inspection at the start of the project and prior to installing the prime coat, weekly inspection during coating application, and final inspection (including dry film thickness and holiday testing). Provide adequate heat, ventilation, and dehumidification to ensure that the coating manufacturer's environment requirements are met and to ensure no Toss of production days due to failure to meet coating manufacturer's environmental requirements. Air and Surface Temperatures: Prepare surfaces, apply, and cure coatings within air and surface temperature range recommended by coating manufacturer. Maintain surface temperature a minimum of 5°F above dew point. Relative humidity: Prepare surfaces, apply, and cure coatings within relative humidity range in accordance with coating manufacturer's instructions. Precipitation: Do not prepare surfaces or apply coatings in rain, snow, fog, or mist. Wind: Do not spray coatings if wind velocity exceeds coating manufacturer's limit. Ventilation: Provide ventilation during coating evaporation stage in confined areas in accordance with AWWA D102. Dust and Contaminants: Schedule work to avoid excessive dust and airborne contaminants. Protect work from excessive dust and airborne contaminants during coating application and 199 curing. Use temporary dust barriers to close off areas being painted from areas where other Work is being performed. Provide 40 to 50 foot-candles of illumination on all surfaces in areas to be painted including floors, walls, and ceiling even though they do not require painting. Apply not less than the number of coats or minimum dry film thickness (DFT) specified. Deliver all materials in unopened containers with manufacturer's label, which must include name, batch number, VOC content, and date. Store in assigned area onsite -with the concurrence from the coating manufacturers. Maintain storage area clean and fire safe. Dispose of used rags, thinner, and buckets daily. Store solvents in closed, approved storage containers. Submerge solvent soaked rags in water. Warnings: Be advised that application of paint, epoxy, coal tar, and protective coating materials may be hazardous. Take all necessary precautions to ensure the safety of workers and property. Be advised that as part of this work abrasive blasting is required. This may require the use of special equipment. Become familiar with the existing site conditions and take all steps necessary to protect adjacent facilities and personnel, at no additional cost to the Owner. In addition, abrasive blasting and painting is called for in, on, or around mechanical equipment that may be damaged by grit, dust, or painting overspray. Mask, wrap, enclose, and provide all protection required to safeguard the equipment at no additional cost to the Owner. Perform abrasive blasting activities in a manner that will not cause a nuisance to adjacent public and private property and equipment. Colors and Samples: Before starting Work, the Contractor shall obtain favorably reviewed color. Colors are to be factory mixed, using light -fast colorants proportioned by accurate measurement into proper type base. All coatings must perform well in the climate and environment typical of the plant location. All pigments shall be resistant to chlorine environments. Exterior deep -tone colors are to be factory ground into the pigment for maximum color fastness. Materials: Paints used in each system shall be the product of one manufacturer. Coatings used shall be top of the line and as recommended by the manufacturer for the intended use and surface. Shop applied prime coats shall be compatible with the systems included in these Special Provisions. Applicator shall include the date primed and coating manufacturer's required recoat window. Substituted coating systems shall be of the same generic type as those specified. Coating systems shall not contain lead. Coatings for use in potable water shall be certified per ANSI/NSF Standard 61. Abrasives shall not be classified a hazardous material. Paints and protective coatings listed in the Paint Systems and the Schedule in this Section refer to the following manufacturers and are specified as levels of quality. It is understood that the words "or equal" are included herein. Ameron (A) CRC Industries (CRC) Protecto Wrap (PW) Roto Metals (RG) Sherwin-Williams (SW) Tnemec Co. (T) Tapecoat (TC) Thermacote Welco (TW) Chemical Products Co. (ZRC) 200 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Paint Systems: Unless specified otherwise, all dry film thickness refers to the total DFT of the system System 2: Galvanized Metal Surface Repair To be unpainted: Eutectic type repair High zinc content To be painted: DFT = 2 mils (RG) ReGalv (TW) Gal -Viz (T) 90-97 Tneme-Zinc (ZRC) Cold Galv. Compound (CRC) Zinc It System 4A: Ductile iron: (Exposed to Atmosphere) 1st coat(s) Polyamide Epoxy (T) 66 Hi -Build Epoxoline DFT = 3 to 5 mils 2nd coat Polyamide Epoxy (T) 66 Hi -Build Epoxoline DFT=4to6mils Finish coat Aliphatic Polyurethane (T) 73 Endura -Shield DFT = 2 mils System 4B: Ductile iron: (Submerged Non Potable Water) 1st coat(s) Polyamidoamine Epoxy (T) N69 Epoxoline II DFT = 6 to 8 mils 2nd coat Polyamidoamine Epoxy (T) N69 Epoxoline II DFT = 6 to 8 mils System 5: Prefinished Machinery Coating One coat Aliphatic Polyurethane DFT = 2 mils System 6: Galvanized Surfaces and Non -Ferrous Metals 1st coat Polyamide Epoxy DFT =4to6mils 2nd coat Polyamidoamine Epoxy DFT = 6 to 10 mils Finish coat Aliphatic Polyurethane DFT = 3to 5 mils System 7: Miscellaneous Service Coating One full brush coat Coal Tar System 8: Plastic Surfaces (Exposed to Sunlight) 1st coat(s) Polyamide Epoxy DFT = 2 to 3 mils 2nd coat DFT = 2 to 3 mils Aliphatic Polyurethane (T) 73 Endura -Shield (T) 66 Hi -Build Epoxoline (T) N69 Epoxoline II (T) 73 Endura -Shield (T) 46-465 (T) 66 Hi -Build Epoxoline (T) 73 Endura -Shield Surface Preparation: Check that hardware, trim, plates, lighting fixtures, and similar items have been removed before starting Work. Coordinate Work with other trades. Check that equipment adjacent walls is disconnected and moved to permit wall surfaces to be painted before starting Work. Perform surface preparation as specified herein: For shop prime, all steel surfaces not subject to sandblasting. Clean surfaces in accordance with Structural Steel Painting Council 201 specifications SSPC-SP 2, "Hand Tool Cleaning", and SSPC-SP 3, "Power Tool Cleaning." For brush clean, remove dirt, dust, loose rust, and foreign matter in accordance with specification SSPC-SP 2, "Hand Tool Cleaning:" Sand to degloss all factory finishes. For degreasing/solvent clean, solvent clean metallic surfaces to be painted to remove all oils or grease in accordance with specification SSPC-SP 1, "Solvent Cleaning." Use solvents recommended by manufacturer of paint to be used in each area. In addition, lightly hand sand copper piping. For abrasive blast, conform to the requirements of SSPC-SP5, "White Metal Blast Cleaning", SSPC-SP10, "Near White Blast Cleaning," and SSPC-SP6, "Commercial Blast Cleaning." Paint all blasted surfaces within 8 hours of blasting unless the Engineer gives specific permission to do otherwise. Remove all weld splatter by grinding or chipping prior to sandblasting. When sandblasting ductile iron pipe use the following color description: Standard Description Brush off blast Commercial blast Near White blast Ductile Iron Color Description bluish -gray near black gray white Wash rnetal surfaces with mineral spirits to remove dirt or grease, and clean off rust or scale with wire brush or sandpaper. For high-pressure waterblasting, remove all dirt, dust, foreign matter, and all but the most tightly adhered rust, mill scale, and paint. Minimum waterblasting pressure and flow: 5,000 psi and 15 gpm. Application: All steel coating application shall be done in accordance with the latest revision of SSPC-PA. Apply all material in strict accordance with manufacturer's instructions. Apply first coat immediately after surface preparation. All paints shall be kept at a consistency and applied in accordance with the printed directions of the manufacturer. The painting shall be done by hand, spray, or roller as favorably reviewed by the Engineer in conformance to individual paint manufacturer's recommendations. The Engineer and paint supplier will review all surfaces to be painted on the job prior to application of any coatings. Once the Contractor begins undercoating or priming, this will be his guarantee that the surface is acceptable to paint. Painted surfaces shall be free from drips, ridges, and brush marks. Stipulations: Thinning permitted only when recommended by the manufacturer and only with thinner recommended for use with the particular product. The use of additives to improve working characteristics or to lengthen or shorten set time is prohibited. Items difficult or impossible to paint after installation shall be painted before installation and touched up after installation. Particular attention shall be paid to materials, which will be joined so closely as to effectively prohibit proper paint application after assembly. These surfaces shall be painted prior to assembly. All surfaces subject to corrosion shall be coated. Apply each coat to a uniform, even coating; lay material on in one direction and finish at right angles. Allow material to thoroughly dry between coats. Scuff sand and remove all runs, sags, overspray, surface roughness, and other defects between each coat. Dust and wipe surface clean before applying next coat. Cutting in is to be sharp and straight, free from overlaps or fuzzy edges. Redo any imperfect work. Apply not Tess than the number of coats or dry film thickness specified. Apply additional coats if required for uniform coverage, full hiding, and to achieve film mil thickness and continuity. Finished work shall be uniform in color, full coverage, smooth, and free of sags and brush marks. Do not apply coating when temperature is outside the coating manufacturer's recommended surface temperature range or when the temperature of the surface to be painted 202 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 is less than 5°F above the dew point temperature or humidity above 85 percent. Perform coating operations only under favorable environmental conditions. Take all steps necessary to protect and completely cure the work. -- Correct defective work to the full satisfaction of the Engineer. Apply the last finish coat on all work after all major construction is complete and the work areas have been cleaned up and are dust free. When successive coats of paint of the same colors are specified, tint alternate coats sufficiently to produce enough contrast to indicate complete coverage of the surface. Apply all coatings within the manufacturer's recommended recoat window. If a topcoat passes the recoat window, submit a letter from the coating manufacturer stating what is required before the topcoat can be applied. Do not apply topcoat until the corrective action has been favorably reviewed by the Engineer. Pinhole and Continuity Testing: After the application of the prime and finish coats of Systems 4 surface protective coating systems on metal surfaces, perform continuity and pinhole checking by means of a low -voltage electrical resistance meter and check thickness with a magnetic thickness gauge. Demonstrate to the Engineer's satisfaction that pinhole free condition and specified film thickness of the paint system has been achieved over all of the painted surfaces. Repair all deficiencies in film integrity and thickness. The Engineer or an independent testing consultant may perform its own continuity and pinhole checking and thickness checks in addition to the Contractor's required tests. The appropriate equipment and necessary support, if requested, is to be provided by the Contractor. Repair any additional deficiencies in film integrity and thickness per the manufacturer's instructions and to thesatisfaction of the Engineer. The Contractor's attention is directed to the fact that past use of this instrument has demonstrated that the painter must apply at least two and usually three or more stripe coats along all edges and angles and crevices formed by joining members in addition to the coats specified in order to achieve a pinhole -free surface. Adhesion Testing: Where there is a question of paint or coating adhesion to surfaces, demonstrate to the Engineer's satisfaction that the coating adhesion to the area in question is equal to or greater than that which the paint manufacturer literature states may be achieved by his product. Prepare a field test procedure utilizing the method of ASTM D413 and D429, modified for field-testing; submit to the Owner for review beforehand. Measure and record the temperature, dew point,and humidity daily (at the start of each day, prior to painting, and if conditions deteriorate). Maintain the records in a place where the independent coating inspector and Engineer can check them. Submit them to the Engineer at the end of the project. Testing Support: Provide scaffolding, ladders, lighting, and labor as required to facilitate the independent coating inspector's and Engineer's check. Repair any areas damaged during and by the testing operation. Prior to starting work, provide the testing equipment to the Engineer for the duration of the job. Equipment shall be new and unused. Provide similar equipment to the painters at the site for quality control. The testing equipment shall be 1) Visual Sandblasting Standards: One of Swedish Standards approved by SSPC and ASTM. 2) Surface Profile Comparative Equipment: Visual with 0.5, 1, 2, 3, and 4 mil wheels. Comparator shall be suitable for the blast abrasive. One Keane Tator Surface Profile Comparator Model 127 or equal. 3) Wet Film Thickness Gauge: Six of Nordson Wet Film Gauge or equal. 4) Dry Film Thickness Measuring - Gauge with Certified Thickness Calibration Standards: One of Magnetic, range shall be 0 to 40 mils, accuracy shall be ±0.1 mil for 0 to 5 mils, model shall be Elcometer 245 or equal. 5) Temperature Gauges: Two of steel surface temperature gauges. 6) Sling Psychrometer: One of Elcometer 116 or equal. 7) Wet Sponge Holiday Tester: One of Model 203 Elcometer 269, equivalent Tinker Razor model or equal, measuring range: 0 to 20 mils. 8) Elcometer Adhesion Tester. Cleaning and Completion: At the completion of this . portion of the Work, remove all debris, remove all paint and stains from work for which paint finish is not intended, touch up all marred surfaces, and leave all buildings and structures in a clean condition, ready for use. Refinish all damaged or imperfect painting to the satisfaction of the Engineer prior to final acceptance of the facility. Finish work, except waterproofing mastics, is to present an even, pleasing, and uniform color and appearance. Surfaces exhibiting coatings with shadows, streaks, overlap marks, sags, drips, roughness, or non-uniform sheen will be considered as improperly applied and will not be considered acceptable. Leave all machinery nameplate data tags clean and readable and all grease fittings clean and usable. Spare Paint: Furnish one -gallon (minimum) container of each type and color of finish product used. Label containers. Each product shall have a minimum of 11 months of shelf life at project completion. Provide MSDS sheet with each container. Application Schedule: Provide coatings in accordance with the following exposure schedule. Paint Exposure Surface Preparation System Note Galvanized metal surface repair Hand tool clean 2 1 Exposed ductile iron pipe (non -immersed) Commercial blast, clean, 4A 2 and dry Exposed ductile iron pipe (immersed) Near white blast, clean, 4B 3 and dry Machinery and equipment furnished with Brush clean, spot prime 5 4 shop enamel Exposed galvanized steel and other Degrease, lightly hand 6 5 non ferrous metals sand Metal mounted in contact with concrete and Brush clean CMU surfaces 7 6 Concrete vault exteriors and below grade Brush off blast exterior concrete surfaces of buildings 7 7 Exposed plastic piping Hand sand, rinse clean, 8 8 dry Factory finish coated items not requiring Touchup - 9 field painting Notes to Application Schedule: 1. Use galvanize -repair paint to repair -galvanize surfaces to be painted. Use eutectic -type to repair hot -dipped galvanized surfaces to remain unpainted. 2. Apply this system to all cast or ductile iron pipe, fittings, and valves that are exposed. All ductile or cast iron exposed to atmosphereshall be supplied without an asphaltic coating. Commercial blast or better for non -immersion service. Factory prime the pipe and fittings. 3. Apply this system to all cast and ductile iron pipe, fittings, and valves that are submerged in, or suspended over water. All such ductile or cast iron shall be supplied without an asphaltic coating. Near white blast or better for immersion service. Factory prime the pipe and fittiings. 204 4. This system applies to all pumps, drives, and machinery that have factory finish coats. This system provides for repair of above-named items and color uniformity with rest of field coat items. 5. Apply this system to all exposed galvanized ducts, galvanized piping, wall ventilators, exposed electrical conduits when conduit is fastened to a painted surface; and other galvanized.surfaces where adjacent to painted areas. Apply this system to exposed interior and exterior copper piping and other non-ferrous metals unless the coating is specified elsewhere. 6. Coat metal items that are surface mounted on exterior and concrete surfaces unless otherwise specified; specifically include electrical panels, and control cabinets. 7. Apply two coats -to the exterior below grade portion of precast concrete vaults. Allow concrete to cure a minimum of 28 days prior to coating 8. This system is to provide a protective coating against ultraviolet light for all outdoor plastic pipe. 9. All panels and equipment with factory finishes identified elsewhere as not requiring field paint, damaged during shipping, storage, or installation: touch-up in the field in a manner compatible with the factory coating with respect to paint type, color, and texture. Touch-up fusion epoxy -coated items only with material provided by the fusion epoxy fabricator. If more than 5% of the surface requires touchup, return the items to the fabricator for recoating. Paint equipment the same color as the attached piping. 7-20.3(4) General Equipment and Mechanical Requirements Standards for the Work: Provide pipe, fittings, wiring, and supports to produce complete, operable systems with all elements properly interconnected. If a specific dimensioned location is not shown for interconnections or smaller system elements, select appropriate locations and show them on Shop Drawing submittals for review. Provide equipment and material .new and without imperfections. Erect in a neat and workmanlike manner; aligned, leveled, cleaned, and adjusted for satisfactory operation; installed in accordance with the recommendations of the manufacturers and the best standard practices for this type of work so that connecting and disconnecting of piping and accessories can be readily made and so that all parts are easily accessible for inspection, operation, maintenance and repair. Locate oil and lubrication fittings clear of and away from guards, base, and equipment and within reach from the operating floor. Coordinate location of all motor connections in order to properly orient encased electrical conduits. In order to meet these requirements with equipment as furnished, minor deviation from the Drawings may be made as favorably reviewed by the Engineer. The recommendations and instructions of the manufacturers of products used in the work are hereby made part of these Special Provisions, except as they may be superseded by other requirements of these Special Provisions. Submittals: Submit Shop Drawings to the Engineer and receive favorable review prior to fabrication, construction, or delivery to the project site. Show sizes and arrangement of equipment, foundations and anchor bolts required, performance characteristics, pump curves, control diagrams, wiring diagrams, motor data sheets, methods of assembly, pipe hanging details, and connections to other work. Date and sign drawings as certified for use in construction of this project. The arrangement of mechanical equipment and appurtenant piping 205 shown on the Drawings may be varied as necessary to fit the favorably reviewed certified manufacturer's installation drawings. However, manufacturers' drawings shall not deviate in substance from the Contract Drawings and these Special Provisions as to location, size, type and design of equipment. All equipment submissions shall include at least overall dimensions, mounting arrangement and dimensions, description of materials, connection sizes and orientation, capacity and location of lifting eyes, motor arrangement showing location of electrical connections, rating data - mechanical and electrical as applicable, detail electrical wiring diagrams, showing component designation and rating, seismic design certifications and anchorage descriptions as required, motor data, list of special tools and/or spare parts to be furnished if any. Each piece of equipment, for which certified witnessed or non -witnessed performance tests are required, shall be accompanied by a completed form containing at least owner's name and location of project, contractor's name and subcontractor if applicable, name of item being submitted, specification reference by section, paragraph and page, data on item (manufacturer, general descriptive data, dimensions, size of connections, speeds, performance curves, serial number), a specific list of the test results plus a list, which shows the values that differ from Specifications, motor data, type, voltage, frequency, phase, full load amperes, starting method, frame size, enclosure insulation type (NEMA Code letter), dimensions, service factor, serial number, date and signature of person certifying the performance. Responsibility and Care Equipment: The Contractor shall be responsible for the equipment included in this Contract until it has been finally inspected, tested and accepted in accordance with the requirements of these Special Provisions. The Contractor shall make his own provisions for properly storing and protecting all material and equipment against theft, injury, or damage from any and all causes. Damaged material and equipment shall not be used in the work. Design: Design all equipment for the service intended, of rugged construction, of ample strength for all stresses which may occur during fabrication, transportation, erection and during continuous or intermittent operation. Adequately stay, brace and anchor, and install equipment in a neat and workmanlike manner. Give consideration to appearance and safety, as well as utility, in the design of details. Use cathodically compatible materials of construction. Controls: Unless noted otherwise, the design of the electric control of any equipment system and/or equipment package shall be the responsibility of the manufacturer of the equipment system and/or equipment package. The elementary control diagrams as shown on the Electrical Drawings and the diagrams shown on the Instrumentation Drawings are illustrative of control and monitoring requirements pertaining to various equipment of this project. The manufacturers shall design their own functional electric control devices and circuitry, in consultation with the specific elementary control diagrams and other project specifications, to meet the equipment control requirements. . Materials: Design, fabricate and assemble equipment and systems with new materials and in accordance with acceptable modern engineering and shop practices. Manufacture individual parts to standard sizes and gauges so repair parts can be installed in the field. Uniformity: Unless otherwise specified, equipment or material of the same type or classification used for the same purpose shall be the product of the same manufacturer and shall be the same model. Lubrication: Provide lubricants of types recommended by equipment manufacturers, in quantities sufficient for consumption prior to completion, testing, and final acceptance. 206 Anchors: Each equipment manufacturer shall furnish an anchor bolt pattern and the required anchor bolts, nuts and washers of adequate design for securing bases and bedplates to concrete bases. Provide anchor bolts of length to allow for 1 -1/2 -inch of grout under baseplates and adequate anchorage into structural concrete unless otherwise shown or specified. Provide anchor and assembly bolts and nuts of ample size and strength for the purpose intended. All bolts shall be standard machine bolts, with cold pressed hexagon nuts. Provide suitable degauling compounds for bronze and stainless steel threaded components. Any space wholly or partially underground, or having a wall or ceiling forming part of a water channel, is classified as a moist location. Unless otherwise specified or noted on the Drawings, provide Type 304 stainless steel bolts and nuts in submerged locations or submerged and embedded in concrete or buried in earth; provide galvanized steel (hot -dipped), with oversize nuts, bolts and nuts for supports or equipment in dry or moist locations; use other bolting materials where specifically called for in these Special Provisions or. on the Drawings. Anchor all motor -driven equipment with cast -in-place anchor bolts or drilled -in anchors set with epoxy adhesive. Do not provide expansion type anchors for motor -driven equipment. Anchor all non -motor -driven equipment with cast -in-place anchor bolts or drilled -in anchors set with epoxy adhesive except that, where specifically allowed by note on the Drawing, expansion type anchors may be used. Lifting Eyes: Supply all equipment weighing over 100 pounds with lifting eyes. Parts of equipment assemblies which are normally serviced separately, such as motors, to have lifting eyes of their own. Drives: Provide all drive units with a AGMA rating and service factor suitable for 24 hours per day operation under the operating load. Nameplates: Furnish each piece of equipment and its driver with a corrosion -resistant metal nameplate fastened to the item in a readily readable position. This nameplate to contain the manufacturer's name, equipment rating, capacity, size, model, serial number and speed. All information written or printed to be in English. Furnish each piece of rotating equipment with a direction of rotation arrow. Label each piece of equipment using a plastic laminate label with the functional name and number of the equipment.- Fasten labels to the equipment, its base or other acceptable location. Letters shall be at least 1/2 -inch high with the border trim on all sides not less than 1/4 -inch. Color shall be green background with white letters. Fasteners shall be brass or stainless steel screwed into inserts, anchor shields or tapped holes in equipment or base. Protection Against Electrolysis: Where dissimilar metals are used in conjunction with each other, provide suitable insulation between adjacent surfaces so as to eliminate direct contact and any resultant electrolysis. Connections of dissimilar piping materials shall utilize dielectric unions, flanges, couplings, or bushings. Special Tools: For each type of equipment to be furnished, provide a complete set of all special tools (including grease guns or other lubricating devices) which may be necessary for the adjustment, operation, and maintenance of such equipment. Factory Painting: On pumps, motors, drives, starters, control panels and other similar self- contained or enclosed components, apply a factory protective paint system unless otherwise noted. Paint or otherwise protect surfaces that are inaccessible after assembly by a method which provides protection for the life of the equipment. 207 Shop Priming: Except where field sandblasting is required, apply one or more shop coats of metal primer on surfaces to be finish painted at the site of sufficient thickness to protect surfacers until finished. Primer shall be compatible with finish coat. Rust Preventive: Coat machined, polished, other ferrous surfaces, and non-ferrous surfaces, which are not to be painted with rust preventive compound. Factory Tests: Perform factory tests for each piece of equipment where specifically called for in the section specifying that equipment. Note that factory tests are inherent in many reference standards. The requirement for a factory test in a referenced standard is hereby made a part of these Special Provisions. Conduct factory tests at the same speeds and other conditions at which the equipment will operate in the field, except as noted. Where specifically noted, performance tests may be witnessed by the Engineer or his representative. Inform the Engineer in sufficient time to allow arrangements to be made for witness of such tests. When non - witnessed tests are performed, supply certified results. Perform factory testing of pumps in accordance with the requirements and standards of the Hydraulic Institute. Tests of other equipment shall conform to the requirements set forth in these Special Provisions. Examination: Inspect each item of equipment for damage, defects, completeness, and correct operation before installing. _ Preparation: Prior to installing equipment, ensure that the areas are clean. Maintain the areas in a broom -clean condition during installation operations. Clean, condition, and service equipment in accordance with the approved Instruction Manuals and specific recommendations of the equipment manufacturer. Equipment installation shall conform to approved Instruction Manuals. Employ skilled craftsmen experienced in installation of the types of equipment specified. Use specialized tools and equipment, such as precision machinist levels, dial indicators, gauges, and micrometers, as applicable. Produce acceptable installations free of vibration or other defects. Align and pin to common bedplate equipment and drivers connected by flexible couplings. Anchor Bolt Installation: Deliver bolts with templates or setting drawings and verify that bolts are correctly located before structural concrete is placed. Base and Bedplate Grouting: Do not place grout until initial fitting and alignment of connected piping is completed. Level and align equipment on the concrete foundations, then entirely fill the space under base or bedplates with grout. Bevel exposed grout at 45 degree angle, except round exposed grout at horizontal surfaces for drainage. Trowel or point exposed grout to a smooth, dense finish and damp cure with burlap for three days. When grout is fully hardened, remove jacking screws and tighten nuts on anchor bolts. Check the installation for alignment and level, and perform approved corrective work as required to conform to the tolerances given in the applicable Instruction Manual. Make an allowance of at least 1-1/2 inches for grout under the equipment bases, whether or not shown on the Drawings. Use steel shims to level and adjust the bases. Shims may be left embedded in the grout, in which case they shall be installed neatly and so as to be as inconspicuous as possible in the completed work. Unless otherwise approved, all grout shall be a favorably reviewed non -shrink, non-metallic grout. Dimensionally stable, inorganic, premixed and resistant to acids, alkalies, and salt water, and unaffected by water and oil. It shall have high strength, even when used as a pourable mixture, and shall bond well with steel and cured concrete or be compatible with a suitable bonding agent which shall then be used to effect the bond. Use in strict accordance with the 208 manufacturer's recommendations. Provide Five Star Grout as manufactured by U.S. Grout Corporation, Bonsai Construction Grout as manufactured by Bonsai Company, or equal. Submit for favorable review by the Engineer prior to use. Where practicable, place the grout through the grout holes in the equipment base and work outward and under the edges of the base and across the rough top of the concrete foundation to a peripheral form so constructed as to provide a suitable chamfer around the top edge of the finished foundation. Equipment Startup and Adjustment: Arrange for an authorized factory -trained representative of the company or companies supplying the various items of equipment to check the installation and adjust and test the equipment furnished before the acceptance of the work by the Engineer. Said representative shall be experienced and knowledgeable of the equipment being tested. Furthermore, he shall assist and instruct the operating staff in adjusting and operating the equipment during the initial plant operation period. Provide initial lubrication for all equipment. Test and demonstrate to the Engineer that all equipment operates properly and specified performance has been attained. For pumps, include measurement of suction and discharge pressure at the pump and measurement of pumping rate by volumetric means or through a suitably calibrated meter for two points on the performance curve. For adjustable -speed pumps, conduct tests at a minimum of two speeds. Furnish any test equipment or measuring devices required, which are not part of the permanent installation. In addition, demonstrate that the entire facility is in full operating condition prior to the acceptance of the work. Should any equipment or part thereof fail to operate as intended, immediately remove and replace it, all at the Contractor's expense. Pay for all tests involved in this Section. Pressure test equipment and connections thereto as required by these Special Provisions. Performance Tests: Upon completion of the work, and after all systems are set and balanced, conduct performance tests in accordance with Division 1 and other applicable sections of these Special Provisions. Submit test conditions, test data, and results to the Engineer for review. Sound Level Testing: Measure the sound level developed by all mechanical and electrical equipment provided. Perform testing in all rooms and spaces containing such equipment during the final operation test program with all equipment operating. Use OSHA approved instrument and record the highest sound level developed when measured according to OSHA standards in each room and space. Deliver a copy of records to the Engineer. Provide an inventory of tools and loose parts required to be supplied under the project. Turn over inventory and parts to the Engineer. The Engineer written acknowledgment of receipt is required for project completion. Loose parts are defined as items such as special tools, keys, safety equipment, and portable equipment. Refer to Section 01700 and relevant technical sections of these Special Provisions for additional instructions. Furnish a complete list of recommended spare parts and supplies for each equipment furnished with current prices and a source of supply. Provide a list of all recommended lubricants not listed in the O&M Manuals. 7-20.3(5) Electric Motor Drives Reference Standards: National Electrical Manufacturers Association (NEMA) Standard: MG 1 - Motors and Generators. Institute of Electrical and Electronics Engineers (IEEE) Standard: 112 - Test Procedure for. Polyphase Induction Motors and Generators. Underwriters Laboratories (UL) Publication: Recognized Component Directory. 209 Submittals: For each motor, includes manufacturer's name, manufacturer's type and frame designation, horsepower output, time rating, maximum ambient temperature rating, insulation system designation, rpm at full load, voltage, number of phases, frequency and full Toad amperes, code letter for locked rotor kVA, service factor at 40°C ambient, NEMA design letter, enclosure type, lubrication requirements, including type and frequency, KW input power and power factor at 75% and 100% of rated horsepower output, guaranteed minimum efficiency and nominal efficiency per MG1-12.55, nominal efficiency. Furnish installation, operation and maintenance instructions, and renewal parts list as required for maintenance manuals. Coordination: Coordinate motors with driven equipment requirements. Unless otherwise specified, equipment manufacturers or suppliers shall select and provide motors for their equipment in conformance with these Special Provisions. Give particular attention to coordination of requirements for power, starting torque, speed, bearing load, ambient temperature, frequency of starting, moisture exposure, and adjustable speed control. Suppliers of motors to be used with adjustable speed systems shall provide all relevant motor data to the adjustable speed control manufacturer for analysis. Provide motors in conformance with and compatible with the adjustable speed control manufacturer's equipment and requirements. Provide all relevant motor data to the pump manufacturer for vibration, reed critical frequency and other required analyses. Specific Requirements: The motor characteristics specified with the driven equipment in all cases include: speed, horsepower or supplier responsibility to determine, horizontal or vertical arrangement, indoor or outdoor location. Additional motor characteristics are specified with the driven equipment only where the required motor differs from the typical characteristics described below or where additional properties or characteristics are required that are not specified in this Section. Motors shall be designed, built, and installed in the driven equipment, to provide long, trouble- free life in industrial service and shall be rated in conformance with NEMA MG1. Motors rated 100 horsepower or less and rated 600V or less shall be listed in UL Recognized Component Directory or shall be listed and labeled by other organizations acceptable to the authority having code enforcement jurisdiction. Unless otherwise specified with the driven equipment, motors shall be single speed, and designed for continuous duty and full voltage starting. Motors shall provide standard starting torque. Voltage ratings shall be (a) 1/2 horsepower or less: 115 volts, single phase, 60 Hz, capacitor start. Small fan motors may be split phase or shaded pole type if standard for the equipment. (b) Above 1/2 horsepower: 460 volts, three phase, 60 Hz, squirrel cage induction motors. All motors shall have a service factor of 1.15 in an ambient temperature of 40°C except motors, which have special enclosures or winding configurations, may carry a Unity (1.0) Service Factor. Examples are totally enclosed, explosion proof, or submersible motors. Windings shall be copper. Provide ground lug inside the terminal box. Provide lifting eye on each motor weighing more than 50 pounds. Each motor shall be suitable for six starts per hour (5 minutes on and 5 minutes off, continuously) when powering the specific driven equipment required for this project. Each motor shall have an overall sound power level at no Toad not greater than given in NEMA MG1-12.49. Motors used with adjustable frequency drives shall have inverter duty .complying with NEMA MG -1, Section IV, Part 31. 210 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Nameplate: Provide stainless steel nameplate for each motor, attached to the motor by stainless steel screws or drive pins. Nameplates shall indicate clearly the information required by NEMA MG1, Part 10 and Part 12. When specifically called for in these Special Provisions for the driven equipment or required by Code for hazardous locations: Motors shall be explosion -proof and shall be UL listed for Class I, Division 1, Groups C and D locations; motors shall bear the UL label; for submersible: Motors shall comply with air filled or oil filled squirrel cage induction type,: service factor of 1.15 or better, Class H insulation, Class B temperature rise, and rated for 6 starts per hour minimum, listed by either UL or FM for Class 1, Division 1, Groups C and D hazardous locations, suitable for operating in free air continuously (i.e., not submerged in sewage), bearing L10 life 50,000 hours minimum, Tungsten carbide seals, and lower bearings of either the ball or roller type. If required by the manufacturer to not void the motor warranty, provide a moisture detection system and a motor winding thermostat system. These systems shall be complete, including all necessary interfaces, control panels, conduits, and wires, even though these may not be shown on the Drawings. Insulation: Unless otherwise specified with the driven equipment, provide motors with Class B or F insulation, non -hygroscopic. In motors to be used with adjustable frequency drives, provide Class F insulation with Class B temperature rise or better. In single phase motors 1/2 horsepower or smaller, provide Class A insulation or better. Where called for in these Special Provisions for the driven equipment, provide the moderate moisture resistant: provide extra dip and bake of epoxy or polyester varnish to resist somewhat higher than normal moisture in the atmosphere. Motor Horsepower: The maximum permissible motor loading: Motors with service factor 1.15 or greater: 100% of nameplate horsepower, Motors with service factor less than 1.15: 90% of nameplate horsepower. Probable motor horsepower ratings have been specified or shown on the Drawings. Changes from the specified horsepower may be accepted, if necessary to assure that motors do not exceed their maximum permissible loading, as defined above, under normal operation. Motor horsepower shall not be less than those specified in driven. equipment sections. If a larger horsepower rating is required by the driven equipment, provide all changes required to motor starting and control equipment and to the conduit and wiring system without any additional cost to the Owner. Locked Rotor kVA — Code Letter: Provide motors with locked rotor kVA values less than or equal to those corresponding to the following: iHorsepower; .::.: Odd= c5 M 7-1/2-10 H .15 G Thermal Protection: In each motor to be used with adjustable speed drives, in all motors 60 horsepower and larger, or where called for in these Special Provisions for the driven equipment, provide integral thermostats or other approved devices to protect the motor from overheating. Thermostats or other devices shall be normally closed and rated 125 Vac, 1 amp. 211 Factory Tests: Conduct factory tests on all motors in conformance with NEMA MG 1-12.55. All tests shall be made in accordance with IEEE Standard 112. Installation: Install motors in driven equipment in conformance with motor manufacturer's recommendations and requirements. Motor nameplate shall be visible when installed on the driven equipment. 7-20.3(6) Submersible Wastewater Pumps Submittal: Before proceeding with the construction of the products, submit the information to the Engineer for approval. Provide sufficient data to show that equipment conforms to Specification requirements, including a prototype pump performance curve for each application, motor clata and wiring and schematic diagrams. Submit certification that pumps and motors are suitable for adjustable speed service. Submit in a single complete initial package. Furnish manufacturer's installation, lubrication, operation and maintenance manuals, bulletins, and spare parts lists. Operation and maintenance manuals shall include safety considerations; instructions for startup, operation, and shutdown; maintenance instructions with list of necessary tools and equipment; maintenance schedule; troubleshooting information; wiring diagrams; and contact information for the manufacturer and local vendor. Furnish affidavits from the manufacturer stating that the pumps have been properly installed and tested, and each is ready for full time operation. Performance Testing: Submit certified non -witnessed factory performance tests in accordance with Hydraulics Institute Standards for each pump. Obtain favorable review from the Engineer prior to shipment of the pumps. Quality Assurance: All equipment furnished shall: (a) be of a manufacturer who has been regularly engaged in the design and manufacture of the equipment for at least 5 years; and (b) be demonstrated to the satisfaction of the Engineer that the quality is equal to equipment made by those manufacturers specifically named herein. Manufacturer shall provide contact information for no fewer than five separate municipalities in the Pacific Northwest where similar equipment has been installed and is operating. Service support shall be provided by an organization that, in the opinion of the Owner, is reasonably convenient to the project site. Warranty: Provide a written warranty stating that the equipment provided will remain free of defects for a period of two years and that if the equipment fails due to normal wear and tear during this warranty period, themanufacturer will furnish and install replacement parts and/or make corrections free of charge. The warranty period shall start from the date of final acceptance. Delivery, Storage and Handling: Pumping units to be furnished under this Contract shall be shipped to the site in enclosed, weather -tight, sealed containers in a manner designed to protect the equipment against normal stresses subjected during shipping. The containers shall provide adequate protection against excessive humidity and temperature, dirt, dust, and other contaminants. Equipment shall be handled and stored in a dry location protected from the elements according to the manufacturer's instructions. Provide pumps to meet the performance and design requirements listed in the following pump schedule: 212 :Item':; ` .,.....;: :Pump 1=2 Pumps :2.2 and 3=2'.; < .' Quantity of Pumps 1 2 Design Point 413 GPM @ 50.0 ft. TDH 250 GPM @ 40.7 ft. TDH Maximum Capacity 520 GPM @ 46.2 ft. TDH 373 GPM @ 34.8 ft. TDH Minimum Shutoff Head 69.5 ft. TDH 56.0 ft. TDH Maximum NPSH Required @ Maximum Capacity 15 ft. 10 ft. Maximum Speed 1800 RPM 1800 RPM Maximum Motor Horsepower 10 HP 5 HP Discharge Size 4 inch 4 inch Minimum Guaranteed Hydraulic Efficiency @ Design Point 60% 50% Gauge Range: Discharge 0-30 psi 0-30 psi Mix Flush Valve No Yes (Pump 3-2 Only) General: The pumps shall be heavy-duty, submersible, non -clog, centrifugal, quick disconnect sump pumps with close -coupled motors. The pumps shall be capable of operating under the conditions specified in the table above on a continuous basis with no detrimental effects to the pump or motor. Additionally, the pumps and appurtenances shall be capable of withstanding and operating under a continuous submergence of up to 40 feet. Non -submerged equipment shall be capable of withstanding a humid and corrosive environment. The pump motors shall be listed by either UL or FM for Class 1, Division 1, Groups C and D hazardous locations. The Contractor shall ensure that the selected pump is compatible with all system components required for a complete and operable pumping system as shown on the Drawings and specified herein. The pumps shall be designed to permit sump -top removal of pumping units from the wet well for inspection or service without disconnecting or disturbing the discharge piping. The pump connection shall be metal to metal. The design shall permit the pumps when lowered into place to be automatically connected to the discharge piping by positively locking the volute in position to prevent any axial or lateral movement. There shall be no need for personnel to enter the wet well when pump inspection .or service is required. Pump assembly, including motor, pump, and cable accessories must be rated for Class 1, Division 1 hazardous environment, explosion proof, group C & D. Provide all appurtenances required for a complete and operating pump system. Piping, Fittings, and Appurtenances: All appurtenances and hardware shall be Type 304 or 316 stainless steel. Each pump shall be furnished with quick -disconnect discharge elbow, stainless steel Schedule 40 pipe rails (or stainless steel cables), upper guide rail bracket, intermediate guide rail brackets (as shown on the Drawings), rail -guided lifting assembly, and stainless steel lifting chain and stainless steel wire rope of sufficient strength to raise and lower pump. All guide rail components and fasteners shall be Type 304 stainless steel. Provide a Type 304 stainless steel cable holder. Each pump shall be provided with 3 feet of stainless steel lifting chain connected to the pump and sufficient length of stainless steel wire rope to extract the pump from the installation and capable of supporting a load at least 50% greater than the weight of any pump. Furnish each submersible pump with a stainless steel "Grip -Eye" for use with a 213 mechanical lifting device. "Grip -Eye" shall be appropriately sized for weight of pump to be lifted and size of the stainless steel lifting chain. The stainless steel wire rope shall be connected to the end of the lifting chain. Ends of the stainless steel lifting chain and one end of the stainless steel wire rope shall be provided with stainless steel shackles for connecting. The other end of the stainless steel wire rope shall be supplied with a loop for hooking on the cable holder. The loop shall fit through the large eye of the stainless steel "Grip -Eye." Davit Crane: Provide a manual davit crane with socket for mounting as shown on the Drawings. The crane shall be capable of 360 degree rotation, manufactured of stainless steel, and include 60 feet of stainless steel wire rope. The winch shall be a stainless steel spur gear hand winch. The crane shall have a load rating in excess of the weight of the pump and a minimum hook height of 36 inches when the crane is perpendicular to the base. The crane shall be model 5122M3SS as manufactured by Thern or equal and provided with a stainless steel socket base. Flush Valve: Provide a mix -flush valve on Pump 3-2 that will produce a jet of water coinciding with pump start to scour grease and re -suspend solids in the wet well. The flush valve shall attach to the pump volute, making use of pump discharge to produce a jet of water. The flush valve shall close automatically after an adjustable period of flushing. Flush valves shall have cast iron body, include a check valve and contain no electrical parts. Pump and Base Elbow Castings: Castings shall be of cast iron or semi -steel of uniform quality and free from blowholes, porosity, hard spots, shrinkage defects, cracks and other injurious defects. Castings shall be factory coated by the manufacturer with a product designed to protect the pump and based elbow from corrosion in wastewater. The pump casings shall be designed to permit replacement of wearing parts. Joints shall be properly sealed with O -rings and shall not leak under a test pressure equal to 50 percent greater than the pump discharge pressure or the total dynamic head, whichever is greater. Passageways shall permit smooth flow and shall be free from sharp turns and projections. Impellers: Impellers shall be one-piece, multi -vane, non -clog design and constructed of cast iron, cast steel, or an alloy suitable for the service required. The impellers shall be smooth and free flowing and shall have sufficient clearance to permit objects in the sewage that enter the pump to pass into the discharge pipe. Each impeller shall be accurately fitted and keyed, splined, or threaded on the shaft, and locked in such a manner that lateral movement will be prevented and reverse rotation will not cause loosening. Wear Rings: Pumps utilizing wear rings are acceptable. Wear rings shall be renewable and installed on the impeller or casing and have wearing surfaces normal to the axis of rotation. Material shall be cast iron meeting ASTM A48 or 316 stainless steel. Balance: All rotating parts of the equipment shall be in such balance, mechanically and hydraulically, as to operate throughout the required range without excessive end thrust, vibration, or noise. Shafts: Shafts shall be stainless steel, shall be of sufficient size and strength to perform the work required, and shall be adequately provided with alignment bearings. Bearings: Bearings subject to submersion shall be ball or roller type bearings manufactured from high-grade bearing alloy. Bearing shall have a minimum L-10 life of 50,000 hours, as specified in ABME 9 or ABMA 11. 214 Cooling System: Motors shall be sufficiently cooled by the surrounding environment or pumped media. A water jacket shall not be required. Mechanical Seals: Each pump shall be equipped with two independent tungsten carbide or silicon carbide seals, each held in place with its own spring system. Seals requiring a constant pressure differential are not allowed. The shaft seal system shall be in a lubricant cooled reservoir. Electrical Motors: Submersible, 60 Hertz.. See Section 7-20.3(5) for detailed motor specifications. Nameplate motor horsepower shall not be exceeded at any flow up through the maximum operating point in the Pump Schedule. Motors for Pumps 2-2 and 3-2 shall be suitable for operation with an adjustable frequency drive (AFD) over the specified operating range of the pump. Each motor shall include moisture detection and motor winding thermostat systems, which shall be connected to the pump via the pump power cable. Relays for the moisture detection and motor winding thermostat systems shall be provided by the submersible pump manufacturer and installed in the pump station control panel. Power Cable: The power cable shall enter the pump through a heavy duty entry assembly that is sealed to prevent leakage. The cable shall be of sufficient length to reach the Pump Panel without requiring splicing. The outer jacket shall be oil resistant and UV stabilized capable of continuous submergence in wastewater up to 40 feet deep. Miscellaneous Metals: Bolts, nuts, anchors, washers, and all other types of supports necessary for the installation of the pumps and drive units shall be furnished and shall be of Type 304 or 316 stainless steel. Shop Painting: Apply manufacturer's standard factory paint finish. Finish must be suitable for protection from corrosion in wastewater. Pressure Gauges: Provide discharge pressure gauges for eachpump with features and accessories in accordance with Section 7-20.3(8). Gauge range shall be 0 to 30 psi as listed in the pump schedule. Installation: Equipment shall be installed in strict conformance with the manufacturer's installation instructions and as shown on the Drawings. Depending on the specific pumps selected, the Contractor may need to make alterations to the design to accommodate the selected pumps. Alterations may include, but are not limited to: access hatch size and location, davit crane size and location, flush valve orientation, pump location in the wet well, arrangement of the pump guide rails, wet well diameter, and pump wiring diagram. The Contractor shall be responsible for all costs associated with design alterations necessary to accommodate the selected pumps. Field Service and Training: The manufacturer of .the pumps shall supply a competent field service engineer for no Tess than two days to thoroughly check and inspect the pumps after installation, place the pumps in operation and make necessary adjustments, and train the Owner's personnel in proper operating and maintenance procedures before and after installation. A minimum of 4 hours of training shall be provided once the system is functionally complete and shall cover all topics included in the operation- and maintenance manual. In addition, the manufacturer shall have a 24-hour, 365-daytoll free hotline available, be capable of having a technician on site within 24 hours of notification, and be capable of delivering parts overnight or next day. 215 Field Painting: Apply a final color coat of paint to the pump units(s) in accordance with Section 7-20.3(3). Field Test: Prior to applying electrical power, the drive train shall be rotated by hand to demonstrate free operation of all mechanical parts. All pumps shall be field tested and will be witnessed by the Engineer and/or Owner's Representative. Field testing shall consist of a drawdown test of each pump, during which at a minimum the time, wet well level, discharge pressure and pump amperage are recorded over at least six different time intervals. If any deficiencies are revealed during any test, the deficiencies shall be corrected and the tests repeated. Prior to performing pumping tests, other tests shall have been satisfactorily completed including piping leakage tests, valve operation, checking for excessive noise and vibration, and electrical testing of circuits, controls and conductors. Also, refer to Section 7- 20.3(4). 7-20.3(7) Not Used 7-20.3(8) Piping, Valves and Accessories Submittals: Verify by excavation, inspection, and measurement all installation conditions, including existing utilities and structures, for all pipes before preparation of Shop Drawings. Submit field measurements and photos with Shop Drawings where exposed conditions are significantly different than indicated on the Drawings. Submit detailed installation drawings of all piping. Schematics may be submitted for piping 4 inches and smaller. The Drawings and schematics shall include pipe support locations and types, fittings, valves, other appurtenances. Submit data to show that the items conform to the Specification requirements including pipe, fittings, and accessories, fabricated pipe supports and other pipe supports, pipe couplings and flexible pipe pieces, valves and accessories. Submit samples of gaskets and other materials where required by the detailed specifications. Submit certified test reports as required herein and by the referenced standard specifications. Furnish manufacturer's installation and operation manuals, bulletins, and spare parts lists for valves. Furnish affidavits from the manufacturers for valves, and field test reports as required in this specification. Quality Assurance: Materials and equipment furnished under this Section shall be of manufacturers who have been regularly engaged in the design and manufacture of the materials and equipment for a period of at least 5 years. Demonstrate to the satisfaction of the Engineer that the quality is equal to the materials and equipment made by the manufacturers specifically named herein, if an alternate manufacturer is proposed. Trench Excavation and Backfill: Conform to WSDOT Standard Specifications Sections 7-08 and 7-17 Factory Quality Control: Test all products as noted herein and by the reference specifications. Perform leakage tests and be responsible for the costs of additional inspection and retesting by the Engineer resulting from noncompliance. 216 Appurtenances: Furnish and install all necessary guides, inserts, anchors and assembly bolts, washers and nuts, hangers, supports, gaskets, couplings, and flanges; all other appurtenant items as shown on the Drawings, specified or required for the proper installation and operation of the piping; devices included in or on the piping equipment; and piping accessories. Pipe Support for Piping 4 Inches and Larger: Pipe supports are shown on the Drawings for piping 4 inches and larger in diameter, where the piping is shown on layout drawings. Each pipe support used is designed to resist seismic loading except where the support is of the sliding type for thermal expansion. Other supports are provided to resist axial seismic loading of pipes designed for thermal expansion. Pipe supports that are considered seismic resistant are so noted on the pipe support details on the Drawings. The location and types of supports and braces are indicative and may be modified by the Contractor to suit field conditions, provided the modified support system conforms to the design criteria stated herein, and receives the favorable review of the Engineer. Where piping is shown schematically only, it shall be the Contractor's responsibility to support all such piping in accordance with the design criteria stated herein and using support details shown on the Drawings. Pipe supports have been designed assuming flanged joints on ductile iron pipe and steel pipe, unless otherwise indicated on the Drawings. If groove type mechanical couplings are used as an alternative, provide additional supports where required, particularly to resist rotation. Shop drawings of these additional supports shall be favorably reviewed by the Engineer prior to installation. Pipe Support for Piping Less Than 4 Inches: Pipe supports are generally not shown for piping less than 4 inches in diameter. Where supports are not shown, it shall be the Contractor's responsibility to support all such piping in accordance with the design criteria stated hereinafter and the support details shown on the Drawings. Piping 2-1/2 inches and larger shall be supported with pipe supports designed to resist seismic loads. Piping smaller than 2-1/2 inches with non -hazardous contents may be supported with non -seismic resistant supports. Where not detailed or otherwise indicated, pipe support types and spacing shall be in accordance with the Manufacturer's Standardization Society (MSS) Standard Practice No. SP -58 and No. SP -69, except as superseded by the requirements of these Special Provisions. Hangers and supports used as components of a fire protection system shall comply with NFPA Standard No. 13 and be listed and labeled by UL and FM. Pipe Support System Design Loads: Pipe suspension shall be such as to prevent excessive stress or excessive variation in supporting force while system is in operation. Pipe supports shall support the sum of the weight of the pipe, fittings, appurtenances, and contents. In addition, the pipe shall be anchored to resist internal pressure forces tending to separate any unrestrained joint at pressures 1-1/2 times the maximum working pressure for the applicable service. Pipe Support System Seismic Loads: Seismic loads, expressed as a percentage of the weight of the contributing length of pipe, fittings, appurtenances, and contents, are 45% in any direction within the horizontal plane of the pipe, and 23% up or down within the vertical plane of the pipe. Pipe Support System Location: All piping shall be supported in a manner that will prevent undue strain on any valve, fitting, or piece of equipment. In addition, pipe supports shall be provided at changes in direction or elevation, adjacent to flexible couplings, at all non -rigid joints, and where otherwise shown. Where piping connects to equipment, it shall be supported by a pipe support and not by the equipment. Maximum support spacing shall conform to the following table: 217 Pipe Size. Inches Pipe Material Maximum Spacing Feet 1" & smaller Iron or Steel Copper Plastic Tubing 6 4-1/2 continuous continuous 1-1/4to2" Iron or Steel Copper or Plastic 8 5 2-1/2 to 4" Iron or Steel Copper or Plastic 10 6 6 to 8" Iron or Steel Plastic 12 8 10" & larger Iron or Steel 15 Piping penetrations through concrete walls and slabs are considered to resist seismic loading, provided penetrations for pipes 3 inches in diameter and larger are complete with a wall flange. Branch piping is not considered to provide resistance to seismic forces. Anchors: Anchors for connecting pipe supports to concrete shall be in accordance with Section 7-20.3(1). Thermal Expansion Allowance: Provide one rigid pipe support for each straight run of pipe and between each pair of flexible couplings, flexible connectors, or expansion loops for pipes listed below. Provide other supports at the required spacing that allow sliding or rolling, as noted, along the pipe axis: PVC pipe larger than 1 -inch in diameter (sliding inside PVC sleeve). Provide vertical .support only, that is, no lateral support, within 4 feet of an angle or tee for pipes listed above. Pipe and valve sizes are nominal inside diameter unless otherwise noted., Construct vents of materials specified for the pipe system for which they serve. All materials delivered to the job site shall be new, free from defects, and marked to identify the material, class, and other appropriate data such as thickness for piping. Acceptance of materials shall be subject to strength and quality testing in addition to inspection of the completed product. Acceptance of installed piping systems shall be based on inspection and leakage tests as specified hereinafter. Gaskets: Except where specified otherwise, gaskets shall be SBR. Bolts and Tie Rods: Unless specified otherwise herein, flange bolts and nuts, coupling bolts and nuts, tie rods and other hardware shall be as: Electroplated zinc or cadmium steel for exposed, type 304 stainless steel for submerged (Minimum tensile strength: 60,000 psi), steel for concrete encased, type 304 stainless steel for buried (minimum tensile strength: 60,000 psi). Apply an anti-gauling compound to the threads of stainless steel bolts. Ductile Iron Bell and Spigot Pipe: Conform to AWWA C151. Provide minimum pressure class in accordance with the following table: Pipe Size;(inches) - . Minimum Pressure Class , 3-12 350 14-20 250 218 1 1 11 1 1 11 11 1 11 11 11 1 1 >_24 200 Joints shall be push -on AWWA C111 as modified, except where flanged joints are shown on the Drawings or where making connections to valves. Gaskets shall be SBR. Provide restrained joints for all connections. Provide restrained joints for pipe and fittings capable of deflection after restraint is installed. Joints shall not separate under an internal pressure of 250 psi. For push -on joints use TR -FLEX by United States Pipe & Foundry Company; equivalent product by American Cast Iron Pipe Company; or equal. Fittings shall be ductile iron with push -on joints and conform to AWWA C153. Special fittings not available in ductile iron or cast iron pipe may be fabricated of welded steel pipe with a design pressure of 350 psi, line and coat with fusion epoxy. Design and wall thickness shall be submitted to the Engineer for review. Lining shall be ceramic epoxy as specified below. Alternatively, fittings may be fusion epoxy lined and coated per AWWA C116. Buried pipe shall receive asphalt coating per AWWA C151 and wrapped with Polyethylene encasement per AWWA C105. Double wrap flanged fittings, mechanical joints, or other appurtenances with significantly different outside diameters from the pipe. Exposed or submerged pipe requiring protective coating per Section 09960 shall be shipped bare or shall be factory primed compatible with selected field paint system. Ductile Iron Pipe with Flange Ends: For flanged pipe, conform to AWWA C115 including Appendix A, minimum thickness Class 53. For grooved end pipe, conform to AWWA C151 with grooves in accordance with AWWA C606, Table 3, for rigid joints. Provide minimum thickness classes in accordance with AWWA C606. For joints, where flanges are shown on the Drawings, provide mechanical rigid grooved couplings up to 24 -inch or flanges, at the Contractor's option, except where grooved couplings are required in the Drawings. Provide flanges where required to connect to valves, equipment or certain pipe supports. Flanges shall be ductile iron, plain faced, and conform to AWWA C115. Submit certification that flanges comply with AWWA C115. Mechanical grooved couplings shall conform to AWWA C606, minimum pressure rating of 150 psi. Flanged fittings shall be ductile iron and conform to AWWA C110. Grooved end fittings shall be ductile iron and conform to AWWA C110 for materials, dimensions, and pressure ratings. Grooves shall be in accordance with AWWA C606, Table 3, for rigid joints. Lining shall be ceramic epoxy as specified below. Buried pipe shall receive asphalt coating per AWWA C151 and wrapped with Polyethylene encasement per AWWA C105. Double wrap flanged fittings, mechanical joints, or other appurtenances with significantly different outside diameters from the pipe. Exposed or submerged pipe requiring protective coating per Section 09960 shall be shipped bare or shall be factory primed compatible with selected field paint system. Ceramic Epoxy Lining: Pipe and fittings shall be previously unlined. Solvent clean and completely abrasive blast all areas to receive lining. The ceramic epoxy material shall be an amine cured novalac epoxy containing at least 20% by volume of ceramic Quartz. Lining shall be factory applied to the interior of pipe and fittings to a dry film thickness of 40 mils. Gasket areas and spigot ends shall be coated with 6 to 10 mils of ceramic epoxy joint compound, which shall also be used for field touchup of any damaged surfaces. Thickness test linings per SSPC- PA-2 using a magnetic film thickness gauge. Test interiors for pinholes with nondestructive 2,500 -volt test. Correct all defects before shipment. Ceramic epoxy lining shall meet the following test requirements: • 1) Permeability rating of 0.00 when tested per Method A of ASTM E-96, Procedure A with 30 -day test duration. 2) Salt spray (scribed panel) results equal to 0.0 undercutting after two Years per ASTM B- 117. 219 3) Cathodic disbondment 1.5 volts at 77°F equal to no more than 0.5 mm under cutting after 30 days per ASTM G-95. 4) !Immersion testing using ASTM D-714: (a) 20% sulfuric acid — no effect after two years. (b) 140°F 25% sodium hydroxide — no effect after two years. (c) 160 °F distilled water — no effect after two years. (d) 120°F tap water (scribed panel) 0.0 undercutting — after two years. 5) Abrasion resistance of no more than 3 mils loss after one million cycles per European Standard EN 598, section 7.8. PVC Sch40 Pipe: Schedule 40 polyvinyl chloride (PVC), gray, normal impact, Type 12454 B, ASTM D1784 and ASTM D1785. Pipe shall bear the National Sanitation Foundation (NSF) label. Joints shall. be solvent weld, except flanged permitted where required at equipment connections and where required on the Drawings. Fittings shall be solvent weld, socket type, of same material as the pipe, Schedule 80, ASTM D2467. Cement shall be solvent weld, ASTM D2564, as recommended by the pipe manufacturer for the schedule and size to be joined. Pipe Cleaner: As recommended by the pipe manufacturer for the schedule and size to be joined. Flexible Couplings: Sleeve shall be cast iron or fabricated steel. Followers shall be cast iron, ductile iron, or steel. Sleeve bolts shall be ASTM A325, Type 3; malleable iron; or equivalent, except for buried and submerged, which shall be Type 304 SS and Type 316 SS, respectively. Coating shall be fusion epoxy line and coat sleeve and followers. Pressure rating shall be the test pressure of the applicable service or 50 psi, whichever is greater. Longitudinal movement and angular deflection capabilities shall meet AWWA C-219. Manufacturers for flexible couplings connecting pipe with Identical outside diameters shall be Smith -Blair 411 or 441; Dresser Style 38 or 153; or equal. Manufacturers for flexible couplings connecting pipe with slightly different outside diameters shall be Smith -Blair 413 or R441; Dresser Style 162; or equal. Manufacturers for gaskets for oil and grease resistant shall be Smith -Blair Grade 60; Dresser Grade 42; or equal. Flange Adaptors: Flange adapters shall be used in lieu of threaded or welded flanges on plain end ductile and steel pipe. The restraints shall be manufactured of ductile iron conforming to ASTM A536. The restraint devices shall be coated. The bolt circles and bolt holes shall conforrn to ANSI/AWWA C110/A21.10. The screws shall have a Rockwell hardness of C40-45 converted from Brinnell. The flange adapter shall have a minimum working pressure of 250 psi. Manufacturers for flange adaptors shall be Ebaa Iron Series 1000 E -Z; or equal. Joint Restraint: Provide joint harnesses (tie rod lug or attachment plate assemblies) designed for the test pressure or 50 psi, whichever is greater, across all flexible couplings and flange coupling adaptors, except where specifically indicated otherwise on the Drawings. For steel pipe the joint harness shall conform to the requirements of Chapter 13 of AWWA M-11, paragraph 13.10, Table 13-6 - Tie Bolt Schedule for Harnessed Joints. Anchor studs may be used on flange coupling adapters for pipe up to 12 inches in diameter. Protection for Buried Couplings and Adaptors: Double wrap with polyethylene encasement, AWWA C105 and tape the edges of the encasement with PVC tape. 220 All valves of each type shall be the product of one manufacturer. All exposed valves shall be furnished with operators, handwheels, levers, or other suitable type wrench including handles as specified herein or as shown on the Drawings. All threaded stem valves shall open by turning the valve stem counter -clockwise. All exposed valves and valve operators shall have a non- bleeding shop coat, unless otherwise specified. Provide shutoff valves for all pressure gauges. Swing Check Valves 2 -inch and Larger: Rating shall be 175 psi up to 12 -inch. Type shall be swing, metal seats, outside spring and lever, AWWA C508. Connections shall be flanged, 125 - pound ANSI. Materials shall be cast iron, bronze trim. Manufacturers shall be M & H Style 259; equivalent by Clow; or equal. Plug Valves 2 -inch and Larger: Rating shall be 175 psi through 12 -inch. Type shall be resilient faced eccentric plug, lever operated 4 -inch and smaller, worm geared handwheel operated 6 - inch and larger as shown on the Drawings. Valves shall provide driptight shutoff in both directions. Connections shall be flanged, 125 -pound ANSI, except screwed connections may be used for 2 -inch valves. Materials shall be cast iron body, welded nickel seat, NBR or Buna-N coated plug, NBR or Buna-N packing or U -cup stem seal. Valves shall have interior and exterior metal surfaces other than the plug and valve seat coated with two coats of high -solids epoxy with total dry film thickness 12 mils minimum. Manufacturers shall be DeZurik PEC, no equal to match the City of Yakima's standard. Unless otherwise necessary for proper installation or permitted by Engineer, all eccentric plug valves shall be installed with shaft horizontal and with plug in upper half of body. Valves in sewage lines shall be installed with seat on upstream end. Pressure Gauges: Complete installation, unless otherwise shown, shall include 3/4 -inch plug valve isolation at the main, a gauge protector made specifically for solids handling service, a snubber or pulsation dampener and gauge. Provide a support plate to the nearest flange. Plug valve shall be DeZurik PEC; or equal. Connections shall be threaded. Protector shall be for slurry service with flushing connection. Body shall be steel or .cast iron. Diaphragm shall be removable of Type 316 stainless steel. -Complete unit shall be Trerice, M & G (U.S. Gauge), or equal. Pressure gauges shall have a dial size not Tess than 4-1/2 inches, phenolic or polypropylene flangeless liquid filled case, bronze brushed movement, phosphor bronze or stainless steel bourdon tube, 1`)/0 accuracy, friction mounted adjustable pointer, black figures on white dial, glass or acrylic window. Label face of dial to identify unit of measurement. Complete gauge shall be Ashcroft 1279; Trerice Series 450; or equal. Snubbers shall be stainless steel for the specific service involved, and shall be Chemquip 25B; Trerice No. 870; or equal. All protectors and gauge bourdon tubes shall be evacuated of air, glycerine filled at the factory and factory calibrated. Gauge range shall be 0 to 30 psi as listed in the pump schedule in Section 7-20.3(6). Pipe Service Saddles: Service saddles shall be provided where shown on the Drawings. Service saddles shall be fusion bonded epoxy ductile iron body, stainless steel double strap, and Nitrile gasket. All nuts, washers and studs shall be 304 stainless steel. Service saddles shall be suitable for use in service up to 150 psi working pressure and 150°F. Service Saddles shall be Smith -Blair 317 TaperSeal, or equal. Kor-N-Seal Boot: Kor-N-Seal Series 106 boot with wedge Korband by NPC; or equal. The boot shall be used to provide flexible watertight seal of the pipe between the catch basin and wet well, as shown on the Drawings. The boot shall be made from Nitrile NBR (Buna N) in compliance with ATSM .C923. The gasket shall also comply with the physical requirement of ASTM C923. All fasteners and bands shall be 316 stainless steel. Power Gear hose clamps 221 shall be used in lieu of standard hose clamps due to depth of application. The connector shall be sized specifically for the connecting pipe material and size. Installation shall be in accordance with manufacturer recommendations. Link -Type Seals: Link -type seals shall be interlocking synthetic rubber links connected by stainless steel bolts and nuts to form a continuous belt. Tightening of the bolts shall expand the rubber to form a watertight seal of the annular space between a pipe and the hole or sleeve in the wall. Valve Tags: Plastic, fiberglass, or plastic material, 2 -inch square with grommeted hole. The tags shall be attached to valves with a brass jack chain. For buried installations use a nylon strap. Lettering shall be stamped or cut into the tag at least 3/16 -inch high. Pipe Insulation: Insulation shall be a 1" thick, pre -molded fiberglass with a maximum "K" factor of 0.25 at 70°F and having a factory -applied jacket. Fittings shall be insulated with insulating cement or mitered section of pre -molded fiberglass. Fittings shall be covered with a Zeston, Thermazip, or equal jacket. Pipe insulation shall be Schuller "Micro -Lok 850 -AP" with foil scrim kraft jacket, with laps and butt straps secured with Benjamin Foster or Arobol adhesive; Owens Corning Fiberglas Type 25 ASJ/SSL; or equal. Apply insulation according to the manufacturer's instructions. Seal joints and seams to maintain vapor barrier. Seal penetrations for hangers, supports, and anchors. Keep insulation material dry during application. Whenever possible, slip insulation on pipe before making connections. Seal joints with adhesive. Where the slip-on technique is not possible, cut one side longitudinally and apply to the pipe. Seal seams and joints with adhesive. Heat Tape: Heat tape shall be self-regulating industrial grade heating cable to be applied to the piping in the valve vault. Cable shall be braided, with approximately 6 watts per foot capacity at 40°F using 120 volts, single-phase electrical wiring. Heating cable and components must be U.L. approved, and shall operate without the use of thermostats. System shall include all necessary components including power connection kits, tees, seals, tape, and labels. Cable shall be attached to supply piping by means of a fiberglass tape or nylon straps. A 1 -inch insulation shall be applied after cable has been installed and tested, as specified above. Installation and testing shall be strictly in accordance with manufacturer's instructions. Cable shall be Raychem, HWAT; or equal. Pipe supports shall to the maximum extent possible be standard factory fabricated units conforming to the typical supports and braces shown in the Drawings and as specified below. Where required support cannot be provided by standard factory fabricated units, and is not detailed on the Drawings, the Contractor shall provide special pipe supports. Supports shall be manufactured or special fabrications or combination as shown on the Drawings or specified. Provide 3/4 -inch chamfer on corners of all support elements and file or grind smooth. Supports designated to allow axial pipe movement shall have smooth and even contact surfaces. All support systems shall be galvanized steel except that those that are submerged or that are located within a tank, channel, or other structure designed to hold water, below the top of surrounding walkway elevation or tank wall top, or otherwise called out on the Drawings, shall be Type 304 stainless steel. Provide plastic caps with rounded corners on all exposed ends of channels. 222 Handling and Placing: Exercise great care to prevent injury to or scoring of the pipe lining and coating, as applicable, during handling, transportation, or storage. Do not store pipe on rough ground and do not roll the pipe on the coating. Any damaged pipe sections, specials, or fittings shall be repaired or replaced at the expense of the Contractor as satisfactory to the Engineer. Carefully inspect each pipe, fitting, valve, and accessory before installation to insure there is no defective workmanship or obstructions. Inspect the interior and exterior protective coatings and patch all damaged areas in the field or replace to the satisfaction -of the Engineer. Place or erect all piping to accurate line and grade and backfill, support, hang, or brace against movement as specified or shown on the Drawings, or as required for proper installation. Remove all dirt and foreign matter from the pipe interior. prior to installation and thoroughly clean all joints before joining. Use reducing fittings where any change in pipe size occurs. Do not use bushings unless specifically noted on the Drawings. Use eccentric reducing fittings wherever necessary to provide free drainage of lines. Maintain at least 1/2 -inch clearance between reinforcing steel and metal pipe in penetrations. Cover PVC pipe stored outside for more than two months with canvas or other opaque material. Provide for air circulation under the covering. Buried Pipe Installation: Trenching, bedding, and backfill for buried piping shall be as shown on the Drawings. Where pipe grade elevations are shown on the Drawings, install the pipe with straight grades between the indicated elevations. Where no pipe grade elevations are shown on the Drawings, install buried piping with at least 3 feet of cover to finished grade, unless shown otherwise on the Drawings. Provide 12 inches minimum separation between the buried pipes and ducts. Provide each pipe with a firm, uniform bearing for its full length in the trench except at field joints. Do not lay pipe in water or when trench conditions or weather are unsuitable for such work. Protect buried piping against thrust by use of restrained pipe joints and/or thrust blocks. All exposed free pipe ends shall be securely braced. Cap or plug pipe ends that are left for future connections as shown on the Drawings and in a manner favorably reviewed by the Engineer. Where piping leaves a structure or concrete encasement, provide a joint capable of angular deflection within 12 inches of the structure for pipes 12 -inch and smaller or as shown on the Drawings for larger pipe sizes. Conform to details on the Drawings where such details are shown. Do not pull bell and spigot, gasketed joints more than 50% of the maximum deflection permitted by the pipe manufacturer. Coat bolts on buried flanges or other buried appurtenances in accordance with Section 7-20.3(3). Wrap the appurtenance with polyethylene encasement and tape the encasement tightly closed to the pipe. Concrete Encasements: Where piping and conduits are installed under slabs or footings on earth or crushed rock and where shown on the Drawings, the piping, and conduits shall be encased in concrete not less than 6 -inch thickness on all sides and extending up to the bottom of the slab or footing, unless otherwise specifically noted on the Drawings. Encasement shall extend to within 6 inches of the first pipe joint beyond the slab or footing. Provide concrete encasement whether or not the encasement is shown on the Drawings. Provide encasement under slabs on earth or crushed rock even if the structure is supported on piles, caissons, or footings. Provide continuous concrete cradles where shown. Exposed Piping Installation: Unless shown otherwise, install piping parallel to building lines, plumb and level. Install piping without springing or forcing the pipe in a manner that would set up stresses in the pipe, valves, or connected equipment. Set all pipe flanges level, plumb, and aligned. All flanged fittings shall be true and perpendicular to the axis of the pipe. All bolt holes in flanges shall straddle vertical centerline of pipes. Flexibility and Expansion: Provide flexible couplings, flexible hose, or flexible spools for all piping connections to motor driven equipment and where otherwise shown. The Contractor may install additional flexible couplings at favorably reviewed locations to facilitate piping installation, provided that he submits complete 223 details describing location, pipe supports, and hydraulic thrust protection. Anchor piping subject to expansion or contraction in a manner permitting strains to be evenly distributed. Sleeves for branches through walls from adjacent mains shall be of sufficient size to allow for free side motion of covered pipe in sleeves. Install unions or flexible connections where shown on the Drawings, and at all non -motor -driven equipment to facilitate removal of the equipment. Provide valves wherever equipment drain connections are furnished and carry the discharge pipe to the nearest: floor drain, drain trench or sump. Where no receptacle for drain exists, install drain piping to 1 -inch above the floor. Drain piping and valve materials shall conform to the requirements of the system served. Where piping conveying liquids passes over motor control centers, electrical panels, and other electrical devices, install a protective drainage tray below the piping. Ductile Iron Bell & Spigot Pipe Installation: Install buried pipe in accordance with AWWA C600. Support and brace encased pipe to support the pipe and to prevent movement during testing and placement of the concrete encasement. The braces and supports shall be erected of materials and by methods that will prevent any future contact of the pipe with the environment surrounding the encasement. Wrap buried pipe with 8 mil polyethylene film in accordance with AWWA C105. Continuously seal and fasten seams and overlaps with tape. Seal and fasten circumferential overlaps with two turns of tape, half lapped. Gather excess polyethylene on top of pipe so as not to block backfill material from getting under bottom of pipe. Use caution so as not to rip or cut the polyethylene film. Seal and repair any rips or cuts in the film with tape. Pull the slack out of restrained joints after they are made up. Ductile Iron Flanged Pipe Installation: Flanged joints shall be made up tight with care being taken to avoid undue strain in the flanges, fittings, and other accessories. Bolt holes shall be aligned for each flanged joint. Bolts shall be full size for bolt holes; use of undersize bolts to make up for misalignment of bolt holes or for any other purpose will not be permitted. Adjoining flange faces shall not be out of parallel to such a degree that the flanged joint cannot be made watertight without overstraining the flange. Any flanged pipe or fitting whose dimensions do not allow the making of a proper flanged joint as specified herein shall be replaced by one of the proper dimensions. Clean flanges before jointing is started. Buried flanged pipe connections shall be made with the smallest practical "bell" hole. After the joint is completed take special care to completely fill the "bell" hole under and around the pipe with compacted backfill. Install mechanical grooved couplings in accordance with the manufacturer's instructions. Galvanized Steel Pipe Installation: Threaded joints shall have connections made metal to metal tight. Remove all burrs from ends of pipe, and clean threads of all oil and chips. Coat male threads with joint lubricant. Properly tape wrap joints of plastic coated pipe. PVC Sch40 Pipe Installation: Place PVC pipe within the installation areas at least 24 hours prior to installation to permit temperature equalization. Cut pipe ends squarely, ream and deburr inside and out. For solvent weld joints, clean pipe ends and sockets and join in strict conforrnance with the pipe manufacturer's instructions, make joints in accordance with ASTM D2855, and handle solvent cements and primers in accordance with ASTM F402. Threaded connections shall use a short nipple, threaded at one end, socket at the other. Provide thread sealant in accordance with the pipe manufacturer's recommendations. Take care not to overtighten the connection. No work shall be performed until the pipe manufacturer provides onsite installation training and certifies the installers are trained per ASTM D-2855. The Engineer shall be present for the training session. 224 Flexible Couplings and Flange Coupling Adaptors Installation: Prior to installation, thoroughly clean oil, scale, rust, and dirt from the pipe to provide a clean seat for the gasket. Wipe gaskets clean before they are installed. If necessary, flexible couplings and flanged coupling adapter gaskets may be lubricated with soapy water or manufacturer's standard lubricant before installation on the pipe ends. Install in accordance with the .manufacturer's recommendations. Tighten bolts progressively, drawing up bolt on opposite sides a little at a time until all bolts have a uniform tightness. Workers tightening bolts shall be equipped withtorque-limiting wrenches or other favorably reviewed type. Tie Rods Installation: Except where double nutting is required, install the nuts snug. Tighten the nuts gradually and equally at opposite sides of the pipe until snug to prevent misalignment and to ensure that all rods carry equal loads. If double nutting is required, double nut each end of each tie rod. The space between the pairs of nuts shall be 1/2 inch greater than the distance between the lugs. Provide double nutting at buried locations and where otherwise required on the Drawings. Valve Installation: Install valves and accessories such that all parts are easily accessible for maintenance and operation. Provide valve boxes for buried valves. Where valve handwheels are shown on the Drawings, valve orientation shall be as shown. Where valve handwheels are not shown, orient valves to permit easy access to the handwheels or handles and to avoid interferences. Provide a union adjacent to each screwed end valve and accessory with additional unions as necessary to facilitate removal. Connections between ferrous and non- ferrous piping, valves, accessories, or pipe supports shall be made using a dielectric coupling, union; or flange. Where valves or other pipeline items require metal full -face connecting flanges, provide intermediate flanges if the connecting flange is not adequate. Installpressure gauges and thermometers in a position to permit reading them from a point approximately 5 feet above floor level, except that pump pressure gauges shall be installed close to the pump elevation. Provide a shutoff valve below each pressure gauge, protective device, or air valve unless otherwise specified. Provide a suitable chrome plated escutcheon on pipes passing through walls, floors, ceilings and partitions in finished areas. Install link -type seals in cast -in-place metal sleeves or in smooth core drilled holes. Grout both sides flush with non -shrink grout unless otherwise shown on the plans. Installation of Pipe Supports: Install and adjust supports for each pipeline such that the pipeline is true to the indicated line and grade. Locate anchors and braces for any single support on a continuous structure; that is, not on two sides of a structural expansion joint. Tighten clamps to develop full friction along the pipeline except where loose fitting clamps are called for. Pipe and Valve Identification: Identify all exposed piping in this project by painting, banding, system name labels, and direction arrows. The color and banding shall be as selected by the Engineer. Exposed Pipe Identification: Before painting, banding and labeling, pipes shall be identified by the Contractor with temporary wired -on cardboard tags showing the. proposed marking for review by the Engineer. Piping: Paint all exposed pipes with the appropriate paint system as specified in Section 7- 20.3(3). 225 Valves: Provide each valve with a valve tag identifying the pipeline contents and either its valve number, or the area or item served by the valve for valves without a valve number. Provide access panel markersfor valves and control devices concealed behind access panels and above suspended ceilings. Locate markers on access doors and on ceiling T -bars. Markers for ceiling T -bar installation, blue, pressure -sensitive, self-adhesive, at least 3 mils thick, 3/8 -inch diameter. Markers for access doors: 1/16 -inch thick, engraved plastic -laminate, with abbreviated terms and numbers corresponding to the concealed item. Provide 1/8 -inch center attachment hole. Cleaning: Prior to testing, thoroughly clean the inside of each completed piping system of all dirt, loose scale, sand, and other foreign material. Cleaning shall be by sweeping, flushing with water or blowing with compressed air or oil -free nitrogen gas, as appropriate for the size and type of pipe. Flushing shall achieve a velocity of at least 3 feet per second. Install temporary strainers, temporarily disconnect equipment or take other appropriate measures to protect equipment while cleaning piping. Field Testing: Perform leakage tests on all pipe installed in. this project. Furnish all equipment, material, personnel, and supplies to perform the tests and make all taps and other necessary temporary connections. The test pressure, allowable leakage and test medium shall be as specified. Test pressure shall be measured at the highest point on the line, except that pressure at lowest point shall not exceed pipe manufacturer's rated test pressure, unless specifically noted otherwise. Leakage tests shall be performed on all piping at a time agreed upon and in the presence of the Engineer. Buried Pipe Testing: The leakage test for buried piping shall be made after all pipe is installed and backfilled. However, the Contractor may conduct preliminary tests prior to backfill. If the Contractor elects to conduct preliminary tests, provide any necessary temporary thrust restraint. Exposed Pipe Testing: All supports, anchors, and blocks shall be installed prior to the leakage test. No temporary supports or blocking shall be installed for final test. Encased Piping: The leakage test for encased piping shall be made after all pipe is installed and encased, and before any structures are constructed above it. However, the Contractor may conduct preliminary tests prior to encasement. If the Contractor elects to conduct preliminary tests, provide any necessary temporary thrust restraint. Accessories: It shall be the responsibility of the Contractor to block off or remove equipment, valves, gauges, etc., which are not designed to withstand the full test pressure. Testing Apparatus: Provide pipe taps, nozzles, and connections as necessary in piping to permit testing including valves to isolate the new system, addition of test media, and draining lines and disposal of water, as is necessary. These openings shall be plugged in a manner favorably reviewed by the Engineer after use. Provide all required temporary bulkheads. Correction of Defects: If leakage exceeds the allowable, the installation shall be repaired or replaced and leakage tests shall be repeated as necessary until conformance to the leakage test requirements specified herein have been fulfilled. All visible leaks shall be repaired even if the pipeline passes the allowable leakage test. 226 Reports: The Contractor shall keep records of each piping test, including: description and identification of piping tested, test pressure, date of test, witnessing by Contractor and Engineer, test evaluation, remarks to include such items as: Leaks (type, location) and repairs made on Teaks. Test reports shall be submitted to the Engineer. Venting: Where not shown on the Drawings, the Contractor mayinstall valved "tees" at high points on piping to permit venting of air. Valves shall be capped after testing is completed. Ductile Iron Bell & Spigot Pipe Testing: Duration shall be four hours. Testing pressure shall be 150 psi. Medium shall be water. Allowable leakage shall be: L - ND P"2 7400 Where: L = allowable leakage, gallon per hour, N = number of joints being tested, P = pressure, psi, D = nominal pipe diameter, inches. Ductile Iron Flanged Pipe Testing: Duration shall be four hours. Testing pressure shall be 150 psi. Medium shall be water. Allowable leakage shall be zero. Galvanized Steel Pipe Testing: Duration for pressure pipe service shall be four hours. Duration for drain pipe service shall be one hour. Testing pressure for pressure pipe service shall be 150 psi. Testing pressure for drain pipe service shall be 20 psi. Medium shall be water, except use air for the vacuum and operating air systems. Allowable leakage shall be zero. PVC Sch40 Pipe Testing for Liquid Service: Duration shall be four hours. Testing pressure shall be 100 psi. Medium shall be water. Allowable leakage shall be zero. 7-20.4 Measurement No specific unit of measurement shall apply to the lump sum "Pump Station". The lump sum bid item contains the approximate quantities and work: City of Yakima Mechanical Permit 1 EA Labor and Industries Electrical Permit 1 EA Submersible Wastewater Pump 3 EA Wetwell - 7 Ft diam, 40 Ft Deep 1 EA Valve Vault, Valves, Discharge Piping & Fittings 1 LS 14 In Diam. DIP Storm Sewer Inlet Pipe — 30 ft Deep 14 LF 8 In Diam. DIP and Fittings 20 LF 4 In Diam. DIP and Fittings 36 LF Wetwell Vertical Pipe 120 LF Pump Panel, Contol Panel, Air Level Monitor 1 LS Panel Foundations, Mounting Hardware, Conduit, Wire and Boxes 1 LS Site Work — Incl Grading and Paving 1 LS Excavation and Backfill of Pump Station Structures. 1 LS Final acceptance testing 1 LS The major quantities are listed only for the convenience of the Contractor in determining the volume of work involved and are not guaranteed to be accurate or inclusive. of II the various elements of the pump station or building. The prospective bidders shall verify these quantities 227 11 before submittinga bid. No other than for roved changes will be made in the adjustmentspp lump sum contract price for "Pump Station" even though the actual quantities and list of items required may deviate from those listed. e No specific unit of measure will apply to Wetwell Shoring. 7-20.5.1 Payment 11 The lump sum bid item "Pump Station", shall include all costs associated with providing labor, materials, and equipment to provide a completed operation pump station. The lump sum bid item "Wetwell Shoring" shall include all cost associated with providing II a shoring system in conformance to Standard Specification 2-09.3(3)D that will allow installation of the wetwell structure and 14 inch diameter pipe connection to the underpass. 1 7-21 UTILITY CASINGS (NEW SECTION) 1 7-21.1 Description This section covers the installation of casings, casing spacers, casing seals, and other work III associated with installation of the water main casing. 7-21.2 Materials 11 The following minimum requirements have been established by the Contracting Agency for utility casings on the project. The Contractor shall be responsible for providing materials that meet or exceed these requirements as necessary to work with the Contractor's proposed methods of installing the casings. Proposed materials shall be submitted for the Engineer's approval as specified under construction requirements below. Steel Pipe for Casing The steel pipe casings shall be capable of withstanding Cooper's E-80 (AREMA Cooper's loading Section 8-2-8) railroad loadings including diesel impact, jacking loads and other loads superimposed upon them. 1 Steel pipe casing shall meet ASTM Standards A53, Grade B, Type E or S with a specified yield strength of 35,000 pounds per square inch (psi). The casing shall have a nominal diameter of111 22 inches with a minimum wall thickness of 0.344 inches. The casing shall be galvanized in accordance with ASTM A123. Casing Spacers 1111 Cascade Waterworks Mfg. Co. and Calpico, Inc. are preapproved sources for this project. Other spacers may be submitted for approval consistent with the following specifications: 11 228 11 Casing spacers shall be bolt on style made in two sections of heavy T-304 stainless steel. The shell shall be lined with a heavy-duty PVC liner. All nuts and bolts are to be stainless steel. Runners shall be made of ultra high molecular weight polymer with inherent high abrasion resistance and a low coefficient of friction. Runners shall besupported by risers made of heavy stainless steel and welded to the shell. The height of supports and runners shall be sufficient to keep the carrier pip at least 0.75" from the casing pipe wall at all times. Runner height and ID of casing shall be coordinated to provide 1" minimum clearance between the runner and the top of casing wall to prevent jamming during installation. Spacer band width shall be 12" (min.) 7-21.3 Construction Requirements Submittals The casing diameter indicated in the Plans is a minimum nominal dimension. Its shall be the Contractor's responsibility to ensure that casing size, type and material is consistent with the size, type, and materials of the carrier pipe and casing spacers proposed for use in accordance with these special provisions. The Contractor shall submit catalog cuts of casing, casing spacers and end seals for review by the Engineer. Along with this submittal, the Contractor shall also prepare and submit shop drawings that clearly indicate controlling dimensions as specified for the Engineer's review. Installation of Casings The Contractor shall place a readily identifiable and suitable marker at each railroad property line where it is crossed by a water line. Backfilling Both ends of casings shall be supported by sandbags prior to backfilling. The sandbag supports shall be capable of carrying the weight of the pipe and backfill material without distortion of the casing end seals. Backfill shall be placed to a minimum 95% density in areas where utility trenches extend beyond the casings. Backfill in other areas shall be as required by the Engineer. Where practical, areas of excavation for casing operations shall be backfilled and compacted and then trenched for construction of the water main. Construction methods shall minimize the risk of creating voids, particularly in railroad embankment. Any voids around the pipe or casing resulting from the casing installation operation shall be filled by tamping a lean mix of sand and gravel into place, or by grouting, if required by the Engineer or the Railroad. Control of Line and Grade The water main casing shall be installed to the approximate line and grade indicated in the Plans. Deviations from this line and grade shall only be permitted with prior approval of the Railroad and the Engineer. Profiles for all casings shall meet the minimum cover requirements established by the Railroad. A minimum slope for casing self -drainage shall be 1 in. for every 250 ft. of lineal footage (1 in./250 ft.). The casings shall be constructed so as to not create any undue stresses on the carrier pipe. 229 Deviation from line and grade of the finished tunnel casing culvert shall be a maximum of 6 inches. Correction of casing pipe horizontal and vertical alignment shall be at a maximum rate of 3 inches per 100 ft. The Contractor shall maintain and control line and grade of the casing pipe. Grade and alignment for the casing pipe shall be set using laser equipment. The laser equipment shall be maintained and monitored throughout the installation of the casing. The Contractor shall correct any deviation from grade or alignment at no cost to the Contracting Agency. A survey of the as -built line and grade shall be provided to the Engineer within 24 hours of the completion of each casing installation. Settlement Over Alignment Any caving or settlement caused by the placement of the casing pipe shall be the Contractor's responsibility and the Contractor shall repair any area so affected and assume all costs for repairs or damages. Any damage to the railroad track structure resulting from the Contractor's operations, including but not limited to, track heave or settlement, shall be repaired by the Railroad at the Contractor's cost. 7-21.4 Measurement Steel casing shall be measured by the linear foot of steel casing installed. 7-21.5 Payment "Steel Casing 22 In. Diam. For Water Main", per linear foot. The unlit Contract price per linear foot for "Steel Casing 22 In. Diam. For Water Main" shall be full compensation for furnishing all labor, materials, tools, and equipment to complete the work as specified herein including excavation, pipe bedding, pipe blocking, backfill, compaction and casing spacers as specified herein. 7-22 HEAT TRACING SYSTEM (NEW SECTION) 7-22.1 Description This section covers the furnishing and installation of a complete system of heaters and components for pipe heat tracing. 7-22.2 Materials Heating cables shall be self-regulating, such that they vary their output in response to temperature variations along the length of a traced pipe. The following is a listing of requirements for the self-regulating heating cables: 1. Self-regulating heating cable design shall be capable of maintaining process temperatures up to 150°F (65°C) and continuous exposure to temperatures of 185°F (85°C) while de -energized. 230 2. Cable must be capable of being cut to a desired length to suit the installation conditions and must form a continuous heating circuit. 3. The heating cable shall consist of two parallel 16 AWG (minimum) nickel -plated copper bus wires embedded in a semi -conductive polymer core that forms a continuous matrix heating element. A polyethylene dielectric insulating jacket is extruded over the heating element core. 4. A metallic braid of tinned copper shall cover the basic cable. The braid shall provide a nominal coverage of 80% 5. The cable shall be further covered with a polyolefin overjacket. 6. Long-term stability shall be established by the service life performance test per IEEE Std. 515.1. 7. The supplier shall have a minimum of 10 years experience in the design and supply of pipe heat tracing systems and shall have an experienced engineering department who can provide engineering and design assistance when required. 7-22.3 Construction Requirements Installation Refer to the manufacturer's installation instructions and design guide for proper installation and layout methods. All installations and terminations shall conform to the National Electrical Code and any other applicable national or local code requirements. All heat tracing circuits shall be equipped with ground -fault equipment protection in accordance with applicable codes and standards. Heating cable shall be attached to pipes on maximum one -foot intervals. Heating cable shall be installed such that all in-line devices and equipment may be easily removed and reinstalled without cutting the heating cable. Heating cable shall be installed on the lower quadrant of horizontal pipe whenever possible to avoid mechanical damage. Cable shall be located on the outside radius of all 45° and 90° pipe elbows. Testing Heating cable shall be tested with a megohmmeter (megger) between the heating cable bus wires and the heating cable metallic braid. While a 2,500 Vdc megger test is recommended, the minimum acceptable level for testing is 500 Vdc. This test should be performed a minimum of three times: a. Prior to installation while the cable is still on reel(s). b. After installation of heating cable and completion of circuit fabrication kits (including any splice kits) but prior to installation of thermal insulation. c. After installation of thermal insulation, but prior to connecting cable to power. The minimum acceptable level for the megger readings is 20 megohms, regardless of the circuit length. Results of the megger readings shall be recorded and submitted to the Engineer on a Heating Cable Installation and Inspection Form. 231 7-22.4 Measurement No specific unit of measurement shall apply to the lump sum bid item "Heat Tracing System". 7-22.5 Payment "Heat Tracing System", per lump sum. The unit Contract price per lump sum for "Heat Tracing System" shall be full compensation for furnishing all labor, materials, tools, and equipment to furnish the material and complete the work as specified herein. END DIVISION 7 232 DIVISION 8 MISCELLANEOUS CONSTRUCTION 8-01 EROSION CONTROL AND WATER POLLUTION CONTROL Section 8-01.1 is supplemented with the following: This work shall consist of furnishing, installing, and maintaining stormwater pollution prevention facilities and erosion control facilities, and implementing procedures and measures that prevent sediment -laden runoff and other pollutants from discharging from the construction site. This work consists of temporarymeasures and activities shown in the plans, described in the project Surface Water Pollution Prevention Plan, required by the Construction Stormwater General Permit, and/or described in the Standard Specifications, Section 1-07.15, except as amended in this section. 8-01.3 Construction Requirements 8-01.3(1) General Section 8-01.3(1) is supplemented with the following: (April 3, 2006) Erodible Soil Eastern Washington The eighth paragraph of Section 8-01.3(1) is revised to read: Erodible soil not being worked whether at final grade or not, shall be covered within the following time period using an approved soil cover practice, unless authorized by the Engineer: July 1 through September 30 October 1 through June 30 30 days 15 days 8-01.3(1)A Submittals Section 8-01.1(1)A is supplemented with the following: (******) The temporary erosion control (TESC) plan shall be adopted or modified by the Contractor, shall meet all the requirements of Surface Water Pollution Prevention Plan (SWPPP), as required by the NPDES permit. The following items shall be submitted to and approved by the engineer at the time noted. 1. The SWPPP plan shall be submitted and approved by the Engineer prior to beginning construction. 2. An ESC Lead to be responsible for the project erosion and sediment control management shall be identified and 24-hour contact information provided to the Engineer prior to beginning construction. 3. An SPCC plan shall be completed and submitted for approval by the Engineer prior to beginning construction. 233 8-01.3(17) Protection of Surfacewaters Section 8-01.3(17) is new section: Sediment -laden runoff and other pollutants are to be prevented from discharging from the construction site and entering surface waters or properties located downstream, in accordance with City and State requirements. The Contractor shall implement all measures necessary for stormwater pollution prevention throughout the duration of construction and until the site is stabilized. The Contractor shall implement the measures and procedures specified in the Surface Water Pollution Prevention Plan (SWPPP), which are considered the minimum requirements under this contract. Other measures, including best management practices (BMPs), additional water quality structures, and erosion control measures, may need to be implemented in order to achieve the water quality requirements of Construction Stormwater General Permit. The temporary erosion control structures and stormwater pollution prevention measures shall remain in-place until the site is stabilized, at which time the Contractor shall remove the temporary structures and measures. 8-01.3(18) Surfacewater Pollution Prevention Plan (SWPPP) Maintenance Section 8-01.3(18) is new section: (******) The contractor shall keep up to date records of all inspections made, maintenance performed, sampling conducted, and revisions made to the project erosions control measures. Records shall be incorporated into the SWPPP, by the Contractor, as they are made. A copy of the up to date SWPPP shall be available on site for review by City representatives and Washington Department of Ecology personnel. As required by the Construction Stormwater General permit, the SWPPP shall be made available to the general public upon request. A copy of the Construction Stormwater General Permit shall be incorporated into the SWPPP and be available on site at all times. These documents will be provided by the City. 8-01.3(19) Maintenance Measures Section 8-01.3(20) is new section: The Contractor shall provide a Erosion and Sedimentation Control (ESC) lead person who shall be identified by the Contractor at the preconstruction meeting, and shall remain as the ESC Lead throughout the duration of construction. The ESC Lead shall implement the requirements identified in the TESC plans and the Stormwater Pollution Prevention Plan (SWPPP), the Construction Stormwater General Permit, the City of Yakima, and the Wash. Dept. of Ecology (WDOE) requirements. Implementation of the TESC and the SWPPP shall include, but is not limited to: 1. Installing, maintaining, inspecting and repairing all temporary and permanent erosion and spill control Best Management Practices (BMPs) included in the ESC and SWPPP plans. 234 2. Providing additional BMP measures, as necessary, to achieve the objectives of the SWPPP and the requirements of the Construction .Stormwater General Permit, throughout the duration of construction and until the site is stabilized. Keeping a record of the additional BMP measures used and implemented, by keeping the SWPPP up-to- date as construction progresses. 3. All BMPs shall be inspected, maintained, and repaired as needed to assure continued performance of their intended function. All on-site erosion and sediment control measures shall be inspected at least once every seven days and within 24 hours after any storm event greater generating runoff. Damaged or inadequate BMPs and measures shall be corrected within 24 hours of the inspection. 4. Proper storage and handling of petroleum products and other environmentally hazardous substances. 5. Spill prevention and cleanup procedures in the event of a spill. This includes having spill clean-up materials readily available and on the project site. The Contractor is to have trained staff on-site during construction, with a knowledge of how to use the spill clean- up materials. 6. The ESC Lead person shall conduct a walkthrough with the Engineer at least once per week. 7. The ESC Lead person shall maintain records of inspection and maintenance measures throughout the duration of construction and these records are to be kept on file by the Contractor until the project is completed. An inspection report shall be prepared for each inspection and shall be included in the SWPPP file. These records shall be kept on-site during construction, and retained as part of the SWPPP. The records are to be delivered by the Contractor to the City of Yakima after the site has undergone final stabilization under this phase of construction. The inspection report shall include, but not be limited to: • When, where and how BMPs were installed, removed or modified; • Repairs needed and made; • Dates of the inspections; • Observations of BMP effectiveness and proper placement; • Recommendations for improving performance of BMPs and follow -though actions taken. The Contractor is required to maintain erosion control preventative measures and stormwater pollution prevention measures throughout the duration of construction, in accordance with Construction Stormwater General Permit requirements and the City of Yakima requirements. Sediment and debris shall be periodically removed and properly disposed of from sediment removal BMPs. All pollutants that occur on-site during construction shall be handled and disposed of in a manner that does not cause contamination of stormwater or downstream channels. 8-01.4 Measurement Section 8-01.4 is supplemented as follows: 235 (******) No measurement will be made for periodically removing sediment and debris from ESC BMPs. No measurement will be made for stormwater pollution prevention and inspections, maintaining the erosion control facilities, recordkeeping and keeping the SWPPP up-to-date. No measurement will be made for stormwater sampling and reporting. 8-01.5 Payment Section 8-01.5 is supplemented as follows: "SWPPP", per lump sum. All costs for work associated with the SWPPP as specified including but not limited to plan submissions and modifications, record keeping and sampling shall be included in the lump sum price for "SWPPP". "Erosion/Water Pollution Control", by force account as provided in Section 1-09.6 and shall be full pay for all erosion control devices installed in accordance with the approved SWPPP shall be paid by force account if no bid item is provided. 8-05 (UTILITY RELOCATIONS (NEW SECTION) 8-05.1 Description This work consists of furnishing materials, labor and equipment to excavate and backfill utility trenches for various utilities including providing and installing conduits, casings, vaults and painted HSS Box Beam as shown in the plans. 8-05:2 Materials HSS Box Beam 6-03 HSS Box Beam Paint 6-07 Conduit 9-29.1 and Pacificpower Specifications Junction Boxes, Cable Vaults, Pull Boxes 9-29.2 and Pacificpower Specifications Singlemode Fiber Optic Cable 9-29.3 Ductile Iron Casing CL 50 9-30.1(1) 8-05.3 Construction Requirements 8-05.3(1) Pacific Power Conduit Instalaltion The Contractor shall install Pacificpower conduits and vaults as shown on the plans. All sweeps in PVC conduit runs shall be fiberglass in accordance with Pacificpower specifications. The conduit bedding material as called out in the Pacificpower specifications is revised to sand bedding. After the Contractor has completed a conduit 236 1 installation the run shall be mandrel tested by the Contractor in the presence of the Pacificpower site agent. 11 8-05.3(2) Fiber Optic Cable Cut Over and Splicing Cut and pull-back both ends of existing 24 strand fiber to the next existing pull box as shown on the plans. Fusion splice both ends of existing fiber to newly installed fiber placing the spliced fiber into water tight, vibration resistant splice boxes. Splicing shall take place after 5:OOpm with a maximum outage window of 2 hours and shall prioritize currently active fibers. The contractor shall coordinate with City IT staff to determine which fibers are currently active. Label all new fiber at all pull boxes as "City of Yakima Fiber Optic Cable". Coil and store 50' maintenance loops in the vaults containing the splice boxes. Installation procedures must meet or exceed cable manufacturer's recommendations, including but not limited to pull load and bend radius. Once spliced, all non-active fibers will be tested both directions with an Optical Time -Domain Reflectometer with the average signal loss of the two spices on each fiber not to exceed .1dB. aThe vendor will provide a printed and electronic copy of the test results to the Engineer. 8-05.3(2) Utility Potholing In no way shall the work described under Utility Potholing relieve the Contractor of any of the responsibilities described in Section 1-07.17 of the Standard Specifications and Special Provisions, and elsewhere in the Contract Documents. Utility Potholing is included as a bid item for use in determining the location of the existing Level D 3, Verizon, City of Yakima and PP&L conduits as directed by the Engineer prior to performing any utility relocation work. O8-05.4 Measurement No unit of measurement will apply to Fiber Optic Beam. The item contains the approximate rnfollowing quantities and work: HSS Painted Box Beam 65 LF Miscellaneous Hardware LS Paint LS No unit of measurement will apply to Utility Conduit Installation — City of Yakima . The item contains the approximate following quantities and work: I Pull Box — Traffic Bearing Lid 2 EA Junction Box Type 2 2 EA 2 -inch Sch. 40 PVC Conduit 2,600 LF I Fiber Optic Cable, 24 strand single mode 1,100 LF Excavation 130 CY Backfill — Sand Bedding 50 CY In Backfill — CSTC 70 CY 8 -inch Ductile Iron Casing 100 LF Marking Tape 800 LF HMA CI 1/2 PG 64-28 5TON III 237 No unit of measurement will apply to Utility Conduit Installation — PP&L. The item contains the approximate following quantities and work: Sectionalizer Vault and Padmount 1 EA 3 -Inch Sch 40 PVC Conduit 140 LF 4 -inch Sch 40 PVC Conduit 380 LF 6 -inch Sch 40 PVC Conduit 510 LF 4 -inch Rigid Galvanized Steel Conduit 120 LF 6 -inch Rigid Galvanized Steel Conduit 120 LF Excavation 230 CY Backfill — Sand Bedding 70 CY Backfill 130 CY CSTC 16 TON Marking Tape 800 LF HMA CL 1/2 PG 64-28 30 TON Fiberglass and RGS Sweeps LS The quantities are only listed for the convenience of the Contractor in determining the volume of work involved and are not guaranteed to be accurate. The prospective bidders shall verify these quantities before submitting a bid. No adjustments other than for approved changes will be made in the lump sum contract price for "Utility Conduit Installation — City of Yakima " and "Utility Conduit Installation — PP&L",even though the actual quantities and items of work required to complete the work may deviate from those listed 8-05.5 Payment "Fiber Optic Beam", lump sum will include all cost to furnish / fabricate, paint and install the beam including any temporary support of the beam prior to encasement in the walls. The following lump sum bids include all labor, equipment and materials to perform the work and provide a completed system for the applicable utility to splice over and pull fiber optic cable through: "Utility Conduit Installation — City of Yakima ", lump sum "Utility Conduit Installation — PP&L", lump sum. "Utility F'otholing", Force Account. Payment will be made at the discretion of the Engineer, for the force account bid item in accordance with Section 1-09.6 of the Standard Specifications and these Special Provisions. 8-11 GUARDRAIL This section is supplemented with the following: (******) 238 8-11.1 Description This work shall consist of installing Thrie Beam Guardrail with Type F Connections at sign structure location. 8-11.2 Materials All materials shall conform to Section 9-16.3. 8-11.3 Construction Requirements Design F (Thrie Beam) Terminals shall be installed in accordance with Standard Plan C -7a. 8-11.4 Measurement "Thrie Beam Guardrail" per lump sum will not be measured. 8-11.5 Payment "Thrie Beam Guardrail" per lump sum, shall be full pay for all costs to furnish and install the Thrie Beam Guardrail and Design F Connections at the locations shown on the plans and in accordance with these special provisions. 8-12 CHAIN LINK FENCE AND WIRE FENCE 8-12.1 Description This section is supplemented as follows: The Contractor shall fabricate the Fence Terminations as directed by the Engineer. Fabrication drawings shall be submitted by the Contractor prior to fabrication. 8-12.5 Payment This section is supplemented as follows: "Fence Termination", Force Account. Payment will be made at the direction of the Engineer, for the force account bid item in accordance with Section 1-09.6 of the Standard Specifications and these Special Provisions. 8-13 MONUMENT CASES This section is revised to read: 8-13.1 Description This work consists of furnishing materials, labor and equipment for installing monument in accordance with the WSDOT Standard Plan A-10.20-00 Concrete Installation and these specifications, in conformity with the lines and locations shown in the Plans or as staked by the Engineer. 239 8-13.2 Materials Brass Cap shall be in accordance with the City of Yakima standards. The cap shall be anchored in with Sikadur 32, Hi -Mod epoxy bonding/grouting adhesive or equivalent and shall be in accordance with the requirements of Section 9-26.1(1). Bronze markers shall be supplied by the contractor and shall conform to the City's standards. 8-13.3 Construction Requirements The Contractor shall construct the poured monument in accordance with WSDOT Standard Plan A-10.20-00 for concrete installation.The Contractor shall locate the monument in the bridge deck soffit prior to placing any rebar. Rebar may be adjusted so as not interfere with monument placement as approved by the Engineer. 8-13.4 Measurement Measurement of Poured Monument - Front St' Brdg will be per each. 8-13.5 Payment Payment will be made in accordance with Section 1-04.1 "Poured Monument — Front St Brdg" per each. The unit contract price per each for "Poured Monument — Front St Brdg" shall be fullpay for all labor, equipment, and materials required to furnish and install the monument, including removal of existing monuments and necessary pavement removal to accommodate the installation in accordance with the standard plan and specifications. This shall also include all work to establish said monument by surveying methods and registering said monument with the City and/or State, as applicable. 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, AND ELECTRICAL 8-20.1 DESCRIPTION Section 8-20.1 is supplemented with the following: This work consists of furnishing, installing and field testing all materials and equipment necessary to complete in place, fully functional system(s) of any or all of the following, types including modifications to an existing system, all in accordance with approved methods, the Plans, the Special Provisions and these Specifications: 1. Traffic Signal System 2. Illumination System Unless otherwise noted, the locations of signals, controllers, standards, and appurtenances shown in the Plans are approximate; and the exact location will be established by the Engineer in the field. 8-20.2 MATERIALS 240 Section 8-20.2 is supplemented with the following: 8-20.2(9-29.1) Conduit, Innerduct, and Outerduct Section 9-29.1 is supplemented with the following: (NWR August 10, 2009) Conduit Sealing Mechanical plugs for cabinet conduit sealing shall be one of the following: 1. Tyco Electronics - TDUX 2. Jackmoon — Triplex Duct Plugs 3. O -Z Gedney — Conduit Sealing Bushings The mechanical plug shall withstand a minimum of 5 psi of pressure. 8-20.2(9-29.2) Junction Boxes, Cable Vaults and Pull Boxes Section 9-29.2(4) is supplemented with the following: (NWR October 5, 2009) Junction Box Identification Junction boxes shall not be marked when the junction boxes are to be installed as part of a future raceway system in a bridge structure, vehicle barrier, pedestrian barrier, or roadway crossing and the future raceway system is not connected to an illumination, signal, interconnect, or ITS raceway system. 8-20.2(9-29.3(2)) Electrical Conductors and Cable Section 9-29.3(2) is supplemented with the following: (NWR October 5, 2009) Video Detection Cable Coaxial cable or combination (composite/Siamese) cable for video detection shall be RG59/U with a manufacturer's rating of 600 Volts (Non UL - manufacturer's voltage rating of the insulation is acceptable). Combination cable shall be in accordance with the video detection system manufacturer's recommendations for the length of cable required. 8-20.2(9-29.6) Light And Signal Standards Section 9-29.6 is supplemented with the following: (April 6, 2009) Light Standards with Type 1 Luminaire Arms Lighting standards shall be fabricated in conformance with the methods and materials specified on the pre -approved plans listed below, provided the following requirements have been satisfied: (a) Mounting heights shall be as specified in the Plans. 241 (b) Light source to pole base distances (H1) shall be determined or verified by the Engineer prior to fabrication. Fabrication tolerance shall be 06 inches. (c) All other requirements of the Special Provisions have been satisfied. Pre -Approved Plan Fabricator Mounting Hqt. Drawing No. DB00654 Rev. C Valmont Ind. Inc. 30', 40' & 50' Sheets 1, 2, 3 & 4 Drawing No. W3721-1 Rev. H & W3721-2 Rev. C Drawing No. NWS 3510 Rev. 6-27-08 or NWS 35108 Rev. 6-27-08 Drawing WS -SL -01 Revision 5 Drawing 71035-B39 Rev. 6 Sheets 1 & 2 of 2 and B100-6335 Rev. 1 Drawing 71035-B38 Rev. 7 Sheets 1 & 2 of 2 and B100-6335 Rev. 1 Drawing No. WSDOT-LP-01 Rev. 4, Sheets 1 and 2 or WSDOT - LP -01 -BE Rev 3 Sheets 1 and 2 or WSDOT - LP-01-C8B Rev 3 8-20.2(9-29.6) Light and Signal Standards Ameron Pole Prod. Div. Northwest Signal Supply, Inc. American Pole Structures, Inc. Union Metal Corp. Union Metal Corp. 40' & 50' 25', 30', 35', • 40', 45' & 50' 25', 30', 35', 40', 45', 50' 40' 50' West Coast 25', 30', 35', 40', Engineering 45', and 50' Group (August 3, 2009) Traffic Signal Standards Traffic signal standards shall be furnished and installed in accordance with the methods and materials noted in the applicable Standard Plans, pre -approved plans, or special design plans. All welds shall comply with the latest AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals. Welding inspection shall comply with Section 6-03.3(25)A Welding Inspection. Hardened washers shall be used with all signal arm connecting bolts instead of lockwashers. All signal arm AASHTO M 164 connecting bolts shall be tightened to 40 percent of proof load. 242 1 1 Traffic signal standard types and applicable characteristics are as follows: Type PPB Pedestrian push button posts shall conform to Standard Plan J -7a or to one of the following pre -approved plans: Fabricator Drawing No. Northwest Signal NWS 3540 Rev. 6-27-08 and Supply Inc. NWS 3540B Rev. 6-27-08 Valmont Ind. Inc. DB00655 Rev. F Ameron Pole M3723 Rev. G Prod. Div. Union Metal Corp. TA -10035 Rev. 3 West Coast Engineering Group WSDOT-PP-01 Rev. 1 Type PS Pedestrian signal standards shall conform to Standard Plan J -7a or to one of the following pre -approved plans: Fabricator Drawing No. Northwest Signal NWS 3540 Rev. 6-27-08 and Supply Inc. NWS 3540B Rev. 6-27-08 Valmont Ind. Inc. DB00655 Rev. F Ameron Pole M3723 Rev. G or W3539 Rev. B Prod. Div. Union Metal Corp. TA -10025 Rev. 14 West Coast Engineering Group WSDOT-PP-02 Rev. 1 American Pole Structures, Inc. WS -PP -03 Rev. 1C Type I Type I vehicle signal standards shall conform to Standard Plan J -7a or to one of the following pre -approved plans: Fabricator Drawing No. Northwest Signal NWS 3540 Rev. 6-27-08 and Supply Inc. NWS 3540B Rev. 6-27-08 Valmont Ind. Inc. Ameron Pole Prod. Div 243 DB00655 Rev. F M3723 Rev. G or W3539 Rev. B 1 Union Metal Corp. TA -10025 Rev. 14 West Coast Engineering Group WSDOT-PP-02 Rev. 1 American Pole WS -PP -03 Rev. 1C 1 Structures, Inc. Type FB Type FB flashing beacon standard shall conform to Standard Plan J- 1 7a or the following pre -approved plan: Fabricator Drawing No. 1 Union Metal Corp 50200-B58 Rev. 4 Valmont Ind. Inc. DB00655 Rev. F 1 Ameron Pole W3539 Rev. B Prod. Div. 1 Northwest Signal NWS 3540 Rev. 6-27-08 and Supply, Inc. NWS 3540B Rev. 6-27-08 Type RM Type RM ramp meter standard shall conform to Standard Plan J -7a or the following pre -approved plan: 1 Fabricator Drawing No. Union Metal Corp 50200-B58 Rev. 4 Valmont Ind. Inc. DB00655 Rev. F Ameron Pole W3539 Rev. B Prod. Div. Northwest Signal NWS 3540 Rev. 6-27-08 and Supply, Inc. NWS 3540B Rev. 6-27-08 Type CCTV Fabricator Drawing No. Valmont Industries, Inc. DB 00759 Rev. H Ameron Pole Product Div. W6CCTV1 Rev D West Coast Engineering Group AP-WSDOT-CP-01-Rev. 3 American Pole Structures, LLC WS -CP -01 Rev. 01C Type II Characteristics: Luminaire mounting height N.A. I Luminaire arms N.A. Luminaire arm length N.A. Signal arms One Only 1 244 1 Type II standards shall conform to one of the following pre -approved plans, provided all other requirements noted herein have been satisfied. Maximum (x) (y) (z) signal arm loadings in cubic feet are noted after fabricator. Signal Arm Length (max) Fabricator -(x) (y) (z) Drawing No. 65 ft. Valmont Ind. Inc. -(2894) 65 ft. Union Metal Corp. (2900) 65 ft. Ameron Pole -(2900) Prod. Div. 65 ft. Northwest Signal -(2802) Supply Inc. 45 ft. American Pole(1875) Structures, Inc. 65 ft. American Pole (2913) Structures, Inc. 65 ft West Coast Engineering Group 65 ft. Maico Industries (2894) Type 111 Characteristics: Luminaire mounting height. Luminaire arms Luminaire arm type Luminaire arm length (max.) Signal arms DB00625-Rev. M, Slits. 1, 2 & 3 71026-B86 Rev. 7 shts. 1, 2, & 3 W3724-1 Rev. 1 & W3724-2 Rev. F NWS 3500 Rev. 6/27/08 or NWS 3500B Rev. 6/27/08 WS -T2 -L Rev. 6 WS -T2 -H Rev. 6 WSDOT-TS-01 Rev. 3 Sheets 1, 2, and 3 WSDOTMA Rev. 3 Sheets 1, 2 and 3 30 ft., 35 ft., 40 ft., or 50 ft. One Only Type 1 16 ft. One Only Type 111 standards shall conform to one of the following pre - approved plans, provided all other requirements noted herein have been satisfied. Maximum (x) (y) (z) signal arm loadings in cubic feet are noted after fabricator. Signal Arm Length (max) Fabricator -(x) (y) (z) Drawing No. 245 65 ft. Valmont Ind. Inc. -(2947) DB00625-Rev. M, Shts. 1, 2 & 3 and "J" luminaire arm 65 ft. Union Metal Corp. (2900) 71026-B87 Rev. 8 Shts. 1, 2 & 3 65 ft. Ameron Pole -(2900) W3724-1 Rev. I & Prod. Div. W3724-2 Rev. F and "J" luminaire arm 65 ft. Northwest Signal -(2802) NWS 3500 Rev. 6/27/08 Supply Inc. or NWS 3500B Rev. 6/27/08 45 ft. American Pole (1875) WS-T3J-L, Sht. 1 of 2 Structures, Inc. Rev. 9, and Sht. 2 of 2 Rev. 4 65 ft. American Pole (2913) WS-T3J-H, Sht. 1 of 2 Structures, Inc. Rev. 8, and Sht. 2 of 2 Rev. 4 65 ft West Coast WSDOT-TS-01 Rev. 3 Engineering Group Sheets 1, 2, and 3 65 ft. Maico WSDOTMA Rev. 3 Industries (2947) Sheets 1, 2 and 3 and "J" luminaire arm Type IV Type IV strain pole standards shall be consistent with details in the plans and Standard Plan J -7c or one of the following pre -approved plans: Fabricator Northwest Signal Supply Inc. Drawing No. NWS 3520 or NWS 3520B, Valmont Ind. Inc. 5000-4 Ameron Pole Prod. Div. M3650 Rev. A Union Metal Corp. EA -10224 Rev. 8 American Pole Structures, Inc. 9000-12-037 Rev. A Maico Industries WA -SP -4, Sheets 1 and 2 of 2 Type V Type SD Type V combination strain pole and lighting standards shall be consistent with details in the plans and Standard Plan J -7c or one of the following pre -approved plans: Fabricator Northwest Signal Supply Inc. Valmont Ind. Inc. Ameron Pole Prod. Div. Union Metal Corp. American Pole Structures, Inc. Drawing No. NWS 3520 or NWS 3520B 5000-4 M3650 Rev. A EA -10225, Rev. 8 Shts. 1 & 2 9020-12-007 Rev. B Maico Industries WA -SP -5, Sheets 1 and 2 of 2 and "J" luminaire arm The luminaire arm shall be Type 1, 16 foot maximum and the luminaire mounting height shall be 40 feet or 50 feet as noted in the plans. Type SD standards require special design. All special design shall be based on the latest AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals and pre -approved plans and as follows: 1. A 90 mph wind loading shall be used. 2. The Design Life and Recurrence Interval shall be 50 years for luminaire support structures exceeding 50 feet in height, and 25 years for all other luminaire support structures. Fatigue design shall conform to AASHTO Section 11, Table 11-1 using fatigue category III. Complete calculations for structural design, including anchor bolt details, shall be prepared by a Professional Engineer, licensed under Title 18 RCW, State of Washington, in the branch of Civil or Structural Engineering or by an individual holding valid registration in another state as a civil or structural Engineer. All shop drawings and the cover page of all calculation submittals shall carry the Professional Engineer's original signature, date of signature, original seal, registration number, and date of expiration. The cover page shall include the contract number, contract title, and sequential index to calculation page numbers. Two copies of the 247 associated design calculations shall be submitted for approval along with shop drawings. Details for handholes and luminaire arm connections are available from the Bridges and Structures Office. Foundations for various types of standards shall be as follows: Type PPB Type PS Type I Type FB Type RM Type CCTV Type II Type III Type IV Type V Type SD As noted on Standard Plan J -7a. As noted on Standard Plan J -7a. As noted on Standard Plan J -7a. As noted on Standard Plan J -7a As noted on Standard Plan J -7a As noted in the Plans. As noted in the Plans. As noted in the Plans. As noted in the Plans and Standard Plan J -7c. As noted in the Plans and Standard Plan J -7c. As noted in the Plans. 8-20.2(9-29.10) Luminaires Section 9-29.10 is supplemented with the following: Conventional highway lighting shall be LED Type III medium distribution. 8-20.2(9-29.10(4)) Underdeck and Wall Mount Luminaires Section 9-29.10(4) is supplemented with the following: (NWR May 1, 2006) Underdeck Fixtures Underdeck fixtures shall be as specified on the plans and shall be wall mountable using a AA bracket. 8-20.2(9-29.12) Electrical Splice Materials Section 9-29.12 is supplemented with the following: (NWR April 19, 1995) Aerial Splice Enclosures Aerial splice enclosures shall meet the requirements of REA specification PE -52 and GTE Automatic Electric Specification GTS -8514. Aerial splice enclosures shall be re -enterable and resealable without requiring special tools or equipment. Conductor connections shall be sealed, moisture resistant telephone type connectors approved for outside use. The cable shields shall be bonded using an approved low resistance shield connector. 8-20.2(9-29.13) Traffic Signal Controllers 8-20.2(9-29.13(3)Emergency Preemption Section 9-29.13(3) is supplemented with the following: 248 (NWR May 1, 2006) Emergency Preemption Logic - NEMA The traffic signal controller shall have the capability of preempting normal traffic signal operation. The preemption logic shall be an internal software function of the traffic signal controller. The preemption system shall include the additional functions: When a preemption call is registered for the phase or phases the controller is presently serving, the controller shall remain in that phase until this call is dropped. During any preemption phase, "Don't Walk" or "Hand Symbol" shall be displayed on all pedestrian heads. (NWR August 10, 2009) Preemption: The system shall be capable of preempting the controller to the phases shown in the Plans when a signal is received from the field detector. Pre-emption equipment shall be either Opticom or Tomar. Opticom If Opticom pre-emption equipment is used, the Contractor shall furnish and install the following: 1. Pre-emption detectors shall be Opticom Model 711. 2. Discriminators shall be four -channel model 454 units. One is required at each controller. In addition, where auxiliary Opticom pre-emption is used, the Contractor shall furnish and install the following: 3. A 757 auxiliary optical detector wiring harness where more than one detector is called for per channel. 4. A twelve position terminal block of the barrier type rated for 20A at 600 volts RMS minimum and meeting the requirements of Chapter 11 of the Type 170 Hardware Specification, FHWA IP -78-16 as currently amended. Tomar Tomar equipment is allowed provided that it is able to receive and respond to Opticom emitter signals. If Tomar equipment is used, the Contractor shall furnish and install the following: 249 1. Pre-emption detectors shall be Tomar Model 2091 -SD complete with mount and mounting hardware. 2 Discriminators shall be Tomar Model 3080 four -channel units. One is required per controller. 3 The Contractor shall make all initial range adjustments. 4. The pre-emption function operation tests shall be performed using an Opticom emitter. (NWR November 16, 1995) Emergency Preemption Hardwire: Emergency preemption hardwire equipment installed by this contract shall activate the Emergency Preemption Logic in the traffic signal controller when a signal is received from a dry contact closure. The contact closure shall be activated by a 120 -volt input that is isolated from all controller circuitry. The equipment used to provide the contact closure shall be housed in a separate enclosure located within the controller cabinet. 8-20.2(9-29.13(7) Traffic Actuated Controllers Section 9-29.13(7) is supplemented with the following: (NWR July 22, 1999) Controllers The signal control unit shall be a fully actuated, eight -phase controller. Pedestrian functions on a minimum of four phases shall be provided. The following functions shall also be provided in the local signal control unit: 1. Guaranteed Yellow The Yellow interval for all phases shall be 3.5 seconds unless the operator sets a higher value for it. 2. Simultaneous Gap Out Two concurrently timing phases shall simultaneously reach a rest state prior to their termination by gap out and prior to advancing across the barrier. A phase in dual ring operation may re -time its gap from a rest state upon vehicle actuation. 8-20.2(9-29.13(7)B Auxiliary Equipment for NEMA Controllers Section 9-29.13(7)B is supplemented with the following: 250 11 (NWR February 22, 2005) NEMA Traffic Actuated Controllers The cabinet(s) shall contain the following accessories and auxiliary equipment: Modem: When a NEMA master controller is installed, it shall have an external modem with a minimum baud rate of 14.4 Kbit per second. The modem shall have auto answer and auto hang-up operation. Convenience Outlet & Lamp Socket: Two convenience outlets and a Tamp socket shall be furnished in the cabinet(s). The outlets shall be mounted one on each side of the cabinet, near the top shelf, not on the door. The outlet mounted on the right side shall be ground fault interrupted protected. A switch shall activate the lamp when the door is open. These circuits shall be protected by a circuit breaker rated at 25 Amps. An incandescent 150 -watt bulb shall be provided. The light shall be installed a minimum of 12 inches from the vent fan thermostat. Power Supply: A +24 volt DC regulated power supply capable of supplying 4.8 amperes continuously shall be provided. The power supply shall be shelf mounted and have a connector part number MS3102A-18-1 P with the following pinout: Pin 1 AC+ Pin 2 .AC - Pin 3 DC - Pin 4 +24V DC The supply shall be separate from the controller power supply and connected to the second channel of the conflict monitor. Schematics & Manuals: The cabinet(s) shall have a waterproof envelope with a side access attached to the inside of the door. At the time of delivery the envelope shall have two complete sets of schematics and manuals for all assemblies and sub -assemblies. In addition, the cabinet shall arrive with two sets of cabinet prints including circuit schematics for each model of the following: 1. Controller 2. Conflict Monitor 3. Preemption Equipment 4. Loop Amplifiers 5. Detection Fourth (D) Connector: A CPC black plastic fourth connector (part no. AMP 205842-1) shall be provided with the following pin assignments: 1 Emergency Preempt 4 Out 2 3 4 Special Function 2 Out 5 6 7 8 9 10 11 Flash Out 12 13 Auxiliary Detection #8 14 15 Special Function 3 Out . 16 251 17 18 Auxiliary Detection #4 19 System Enable 20 21 22 23 Emergency Preempt Railroad 24 25 on Special Function 2 In 26 27 Free/Coordinate Out 28 29 30 31 Auxiliary Detection #3 32 33 34 35 Special Function 3 In 36 37 Flash Status In 38 39 Auxiliary Detection #6 40 41 42 43 44 45 46 47 Auxiliary Detection #2 48 49 EVP -1 (In) 50 EVP -2 (In) 51 52 53 54 55 EVP -3 (In) 56 EVP -4 (In) 57 Railroad Preempt (In) 58 59 60 Flash Command In Auxiliary Detection #1 Emergency Preempt 2 Out Special Function 1 In Special Function 1 Out Auxiliary Detection #5 Emergency Preempt 1 Out Emergency Preempt 3 Out Auxiliary Detection #7 Service Panel Switches Power Switches: There shall not be a main power switch inside the cabinet(s) that shall render all control equipment electrically dead when turned off. There shall be a controller power switch that shall render the controller and load switching devices electrically dead while maintaining flashing operation for purposes of changing the controller or load switching devices. The switch shall be a general purpose bat style toggle switch with an approximately 11/16 in. long bat. The switch shall have a protective cover, which must be lifted to operate the switch. Stop Time Switch: There shall be a 3 position switch located inside the cabinet door identified as the Stop Time switch. Its positions shall be labeled "Normal" (up), "Off" (center), and "On" (down). With the switch in its Normal position, a stop timing command may be applied to the controller by the police flash switch or the conflict monitor unit. When the switch is in its "Off" position, stop timing commands shall be removed from the controller. The "On" position of the switch shall cause the controller to stop timing. The switch shall be a general purpose bat style toggle switch with an approximately 11/16 in. long bat. The switch shall have a protective cover, which must be lifted to operate the switch. Detector Disconnect/Test Switches: All eight controller phase inputs shall have disconnect/test switches. Pedestrian detection shall have disconnect/test switches by phase. These switches shall be located inside the cabinet door and labeled by associated phase number. The 3 positions of the switches shall be labeled "Normal" (up) which shall connect the controller to its detector output; "Off" (Center) which shall isolate the controller detection input; and "Test" (down) which shall provide a momentary logic ground to the controller detection input. A see-through Plexiglas cover shall cover all detector disconnect/test switches. 252 Police Panel Switches Red Flash Program: Flash operation must be programmable without removing field wiring (i.e. red/yellow jumpers). The cabinet shall be delivered programmed for all red flash. Load Switches: Load switching devices shall conformto the physical and electrical characteristics specified in NEMA Publication No. TS1-1976, Part 5 (TS1-5.01 - Triple -Signal Load Switching). They shall use modular solid state relays and have status indicators for each input and output. They shall be interchangeable. The load switches shall be rack -mounted and supported to relieve tension on the connections. Load switches shall be provided for all phases, not just phases used with the current configuration. The cabinet shall be furnished with a 16 position load bay. Load switches shall include indicator lights on both the input and output circuits. Conflict Monitor Unit: The conflict monitor shall be a unit capable of monitoring proper signal operation of 12 channels. It shall conform to the physical and electrical characteristics specified in the latest NEMA Publication and the following. The monitor shall have a LCD -type display with separate indications for red, yellow, green and walk intervals for each channel. The monitor shall clearly display the status of each input during normal operation and failure condition. No flashing indications will be accepted. The monitor shall log the type of failure, the channels involved, the time and the date for a minimum of 8 events. The monitor shall have a printer port available. All cables and software to communicate with the monitor shall be provided. Clearing the log shall be possible from the front panel. Pedestrian Detector Field Wiring: All pedestrian detectors shall be connected between logic ground and their appropriate field terminal. The terminals shall be grouped together and located in the lower left side panel. Cabinet Relays: All mechanical relays shall be commonly available from more than one manufacturer and have 24 Volt DC or 120 Volt AC relay coils. Every socket, which has the capacity of accepting a relay or load switch, shall have the appropriate relay or load switch installed. The relays shall be easily accessible, not covered by equipment or wiring. Preemption Equipment: Each call channel of the discriminators shall be wired through a disconnect/test switch, located on the service panel, which operates in the same manner as the Detector Disconnect/Test switches. The discriminators shall be located in the detector rack. No calls shall be placed on the non -preempt phases. Preempt calls shall be inhibited during Flashing operation. Loop Detectors: A total of 16 two channel loop detectors are required at each cabinet. Detectors shall be Reno A&E Type "01203" for NEMA cabinets. Field Wiring Terminals: There shall be terminal strips for field wiring in the controller cabinet. The terminals shall be numbered in accordance to the field 253 wiring chart included in these specifications. A common bus bar with a minimum of 15 spare terminals shall be available after the cabinet is fully wired. In addition, a 15 terminal bar shall be provided for the pedestrian common and a terminal shall be provided for each signal head neutral. The bus bars shall be located on the left side wall of the cabinet. Interference Suppressers: All power supplies of equipment used here shall have electrical interference immunity from other devices within the cabinet. Surge Protector (Lightning Arrester): The cabinet(s) shall have an input voltage surge protector that shall protect the controller power supply input from any voltage surges that could damage it. Interconnect cable terminal strips shall be equipped with lightning surge protectors. The cabinet shall be wired to Tight LED indicators when surge protection has been activated. The LED indicator shall be mounted facing the front to allow unobstructed view of the indicator. In addition, there shall be a metal oxide varactor (MOV) between ground and hot and between the neutral and ground. Power Panel Cover: The power panel shall be covered by an easily removable, clear Plexiglas cover. AC Delay Relay: A delay relay shall be provided which shall delay AC power to the controller and conflict monitor, programmable for 1 to 5 seconds delay, upon restoration of power to the cabinet. Detector Rack Configuration: Detector racks shall have a socket with a 44 pin wiring configuration. Detector racks shall be configured as follows: DETECTOR RACK Phase 1 Phase 1 Phase 5 Phase 5 PreEmpt Chan 1 816-817 818-819 856-857 858-859 Phase 6 Phase 6 Phase 2 Phase 2 866-867 963-964 826-827 923-924 DETECTOR RACK Phase 6 Phase 6 Phase 2 Phase 2 PreEmpt Chan 2 868-869 961-962 828-829 921-922 Phase 6 Phase 6 Phase 2 Phase 2 967-968 965-966 927-928 925-926 DETECTOR RACK Phase 3 Phase 3 Phase 7 Phase 7 PreEmpt Chan 3 836-837 838-839 876-877 878-879 Phase 8 Phase 8 Phase 4 Phase 4 886-887 983-984 846-847 943-944 DETECTOR RACK 254 Phase 8 Phase 8 Phase 4 Phase 4 PreEmpt Chan 4 888-889 981-982 848-849 941-942 Phase 8 Phase 8 Phase 4 Phase 4 987-988 985-986 947-948 945-946 All 800 series numbers are connected to the appropriate NEMA phase controller inputs through a service panel detector switch. All 900 series numbers are connected to the appropriate NEMA plus controller auxiliary detector inputs through a service panel detector switch. 8-20.2(9-29.13(7)D NEMA Controller Cabinets Section 9-29.13(7)D is supplemented with the following: (NWR January 23, 2006) Cabinet Construction Construction shall be of 0.125 -inch sheet aluminum (5052 alloy), with mill finish. The cabinet shall not be anodized and the exterior shall not be painted. The cabinet shall have a computer shelf 16 inches wide and 12 inches deep centered under the lower shelf. A green construction core shall be installedat each core lock. Upon contract completion two master keys for each cabinet shall be delivered to the Engineer. (NWR April 28, 1999) Cabinet Wiring The cabinet shall be wired for eight vehicle phases, four pedestrian phases, four overlaps, and use with a modem. The cabinet shall have a computer shelf 16 inches wide and 12 inches deep centered under the lower shelf. Where the Plans call for a master controller the cabinet shall be wired for use with the master controller. (NWR April 28, 1999) Adaptor Box The adaptor box shall be fabricated from .125 -inch aluminum (5052 alloy), with mill finish. The cabinet shall not be anodized and the exterior shall, not be painted. The Contractor shall verify foundation and cabinet dimensions and mounting bolt patterns prior to submitting shop drawings for the adaptor box to the Engineer. The shop drawings shall be submitted for approval 10 working days in advance of fabrication. 255 The new controller cabinet, if Contracting Agency -supplied, will be available for bolt pattern verification as identified under the subsection, Contracting Agency - Supplied Materials of this provision. 8-20.2(9-29.16)Vehicular.. Signal. Heads,. Displays and Housing. Section 9-29.16 is supplemented with the following: (NWR June 16, 2008) Back Plate Back plates shall be constructed of louvered anodized aluminum. The back plates shall have a minimum 1.5 -inch flat border between the louvers and the outside edge of the back plate. The yellow retro reflective sheeting applied around the perimeter of each back plate shall be 1.5 inches wide. (NWR March 8, 2000) Fiber Optic Signal Head A 12 -inch fiber optic signal section capable of alternately displaying a yellow arrow and a green arrow shall be furnished and installed where specified in the Plans. 8-20.2(9-29.16(2) Conventional Traffic Signal Heads 8-20.2(9-29.16(2)A Optical Units Section 9-29.16(2)A is supplemented with the following: (NWR March 8, 2004) LED Signal Displays LED type traffic signal displays shall be from one of the following manufacturers: Dialight Corporation 1913 Atlantic Avenue Manasquan, NJ 08736 Telephone: (732) 223-9400 Fax: (732) 223-8788 GELcore, LLC 6810 Halle Drive Valley View, OH 44125 Telephone: (216) 606-6555 Fax: (216) 606-6556 Precision Solar Controls, Inc. 2960 Market Street Garland, TX 75041 Telephone: (972) 278-0553 Fax: (972) 271-9583 256 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 Each LED signal module shall be designed to be installed in the door frame of a standard traffic signal housing. The lamp socket, reflector holder and lens used with an incandescent lamp shall not be used in a signal section in which a LED signal module is installed. The installation of an LED signal module shall not require any modification to the housing. The LED signal module shall be a single, self-contained device, not requiring onsite assembly for installation into an existing traffic signal housing. All red and yellow LED signal modules shall be manufactured with a matrix of AIInGaP LED light sources and green LED signal modules shall be manufactures with a matrix of InGaN LED light sources. The LED traffic signal module shall be operationally compatible with controllers and conflict monitors on this project. The LED lamp unit shall contain a disconnect that will show an open switch to the conflict monitor when less than 60% of the LEDs in the unit are operational. Each LED module shall conform to the current standards in Institute of Transportation Engineers (ITE) VTCSH Part 2 and a Certificate of Compliance with these standards shall be submitted by the manufacturer for each type of signal head. The certificate shall state that the lot of signal heads meets the current ITE specification. A label shall be placed on each LED signal module certifying conformance to this specification. The manufacturer shall provide a written warranty against defects in materials and workmanship for the LED signal modules for a period of 60 months after the installation of the modules. All warranty documentation shall be given to the Engineer prior to installation. 8-20.2(9-29.19) Pedestrian Push Buttons Section 9-29.19 is supplemented with the following: (NWR February 3, 2011) Polara Pushbutton Station Pedestrian pushbutton assembly equipment shall be the 2 -wire Navigator Pushbutton Station from the following manufacturer: Polara Engineering Inc. 9153 Stellar Court Corona, Ca 92883 http://www.polara.com/ The pushbutton. assemblies and adapters shall be Forest Green in color. The sign shall be 9 inch by 12 inch, option B (MUTCD R10 -3b), when used in conjunction with a non -countdown type pedestrian signal display or 9 inch by 15 inch, option G (MUTCD R10 -3e), when used in conjunction with a countdown type pedestrian signal display. The sign shall include a frame adapter plate. Each Navigator Pedestrian Signal system shall include one Navigator Central Control Unit. ` The -Central Control Unit shall include a rail mounting bracket 257 assembly and mounting hardware. A Navigator Configurator shall be furnished with each control unit. 8-20.2(9-29.20) Pedestrian Signals Section 9-29.20 is supplemented with the following: (NWR May 1, 2006) LED Pedestrian Signal All pedestrian signal displays shall be the Light Emitting Diode (LED) type. (NWR January 26, 2011) Countdown Pedestrian Signal All pedestrian signal displays shall be the countdown type signal display as follows and from the following manufacturer: Model: 430-6479-001 X Manufacturer: Dialight Corp. 1501 Route 34 South Farmingdale, NJ 07727 http://www.dialight.com/ 8-20.2(9-29.24) Service Cabinets Section 9-29.24 is supplemented with the following: (NWR August 10, 2009) Service Cabinet Construction Service cabinets shall be fabricated from 0.125 inch sheet aluminum (5052 alloy) with mill finish. The aluminum shall not be anodized and the exterior shall not be painted. A spring-loaded construction core lock capable of accepting a Best 6 -pin CX series core installed by others shall be installed on all doors accessing WSDOT equipment. Cabinet doors shall be four -hinged with a two -position door stop assembly and a three point latch. A three -position terminal block shall be installed between the main electrical service panel and the photocell assembly base. The cabinet bonding connection shall be a welded plate with stainless steel hardware, Belleville washers, cu/al lug, and antioxidant compound. The bolt shall be torqued to fully compress the Belleville washers. 8-20.2(1).Equipment List And Drawings Section 8-20.2(1) is supplemented with the following: 258 (NWR November 13, 1996) Manufacturer's data for materials proposed for use in the contract which require approval shall be submitted in one complete package. (NWR April 19, .1995) Pole base to light source distances (H1) for lighting standards with pre -approved plans will be determined or verified by the Engineer at the request of the Contractor prior to fabrication. (NWR June 6, 1996) If traffic signal standards, strain pole standards, or combination traffic signal and lighting standards are proposed, final verified dimensions including pole base to signal mast arm connection point, pole base to Tight source distances (H1), mast arm length, offset distances to mast arm mounted appurtenances, and orientations of pole mounted appurtenances will be furnished by the Engineer as part of the final approved shop drawings prior to fabrication. Final ground and roadway cross sections at the locations of the standards shall be submitted for approval along with the shop drawings. 8-20.3 CONSTRUCTION REQUIREMENTS 8-20.3(1) General (NWR June 20, 1995) Pole Removal Poles designated for removal shall not be removed prior to approval of the Engineer. . (NWR January 11, 2005) Signal Display Installation Signal displays shall be installed no more than 30 days prior to scheduled signal turn on or. changeover. (NWR May 15, 2000) Electrical Equipment Removals Removals associated with the electrical system shall not be stockpiled within the job site without the Engineer's approval. (NWR April 18, 1996) Contracting Agency Owned Equipment A portion of the temporary or existing electrical equipment to be removed shall remain the property of the Contracting Agency. The following shall be disconnected, dismantled, and delivered to the Contracting Agency as specified in the subsection Delivery of Removed Items: Signs, Signal Poles, Signal Heads, Pedestrian Signal Heads, Pedestrian Push Buttons, Span Wires, Signals and Illumination Conductors, Luminaires, 259 Luminaire Bracket Arms, Detection Cameras, Signal Cabinet and Cabinet Components; and All Signal Equipment Mounts (NWR April 11, 2001) Wire Removal Remove all wires from salvaged light and signal standards. (NWR February 22, 2005) Delivery of Removed Items Removed electrical equipment which remains the property of the Contracting Agency shall be delivered to: City of Yakima Public Works 2301 Fruitvale Blvd Yakima, WA 98902 Five days written advance notice shall be delivered to both the Engineer and the Electronic Parts Specialist at the address listed above. Delivery shall occur during the hours of 8:00 a.m. to 2:00 p.m. Monday through Friday. Material will not be accepted without the required advance notice. Equipment damaged during removal or delivery shall be repaired or replaced to the Engineer's satisfaction at no cost to the Contracting Agency. The Contractor shall be responsible for unloading the equipment where directed by the Engineer at the delivery site. (NWR May 15, 2000) Surface Mounted Appurtenances Electrical appurtenances to be surface mounted on structures shall be mounted so that a minimum 1/4 inch space is maintained between the appurtenance and structure. 8-20.3(5) Conduit Section 8-20.3(5) is supplemented with the following: (NWR August 10, 2009) Conduit Seal, Detectable Tape and Location Wire Upon installation of wiring, all conduits entering pad mounted cabinets, all conduit entering ITS hubs, and all ITS conduit 2 inches in diameter or larger shall be sealed with an approved mechanical plug at both ends of the conduit run. Installation of mechanical plugs shall conform to the manufacturer's recommendations. Upon installation of wiring at other locations, conduit shall be sealed with duct seal. Upon installation of the pull string, spare conduit shall be plugged. A pull string rated for 200 lbs. or greater shall be installed in all spare conduits. Detectable underground warning tape shall be placed 12 -inches above all innerduct installed in trenches. 260 Location 14 AWG stranded orange USE insulated wire shall be placed in conjunction with all innerduct installed in trenches. The location wire shall be placed directly above the conduit containing innerduct in single conduit installations.or between the conduits containing innerduct in multiple conduit installations. Location wire routed into pull boxes or cable vaults shall be attached to the "C" channel or the cover hinge bracket with stainless steel bolts and straps. A 1 -foot loop of locate wire shall be provided above the channel as shown in the Plans. (NWR October 16, 2006) Boring In addition to the requirements for boring with casing, the Contractor shall submit to the Engineer for approval a pit plan and a proposed method of boring that includes, but is not limited to, the following: a. A pit plan depicting: 1. Protection of traffic and pedestrians. 2. The dimension of the pit. 3. Shoring, bracing, struts, walers, or sheet pile 4. Type of casing b. The proposed method of boring, including: 1. The boring system 2. The support system 3. The support system under and at the bottom of the pit. The shoring and boring pit plan shall be prepared by and bear the seal and signature of a Washington State licensed Professional Civil Engineer. Installed casing pipe shall be free from grease, dirt, rust, moisture and any other deleterious contaminants. Commercial concrete meeting the requirements of Section 6-02.3(2)B may be used to seal the casing. 8-20.3(6) Junction Boxes, Cable Vaults, and Pull Boxes Section 8-20.3(6) is supplemented with the following: (NWR March 22, 2010) Junction Box, Cable Vault and Pull Box Installation Unless otherwise noted in the Plans or approved by the Engineer, junction boxes, cable vaults and pull boxes shall not be placed within the traveled way or paved shoulders. 261 All junction boxes, cable vaults, and pull boxes placed within the traveled way or paved shoulders shall be heavy-duty. Wiring shall not be pulled into any conduit until all associated junction boxes have been adjusted to, or installed in, their final grade and location, unless installation is necessary to maintain system operation. If wire is installed for this reason, sufficient slack shall be left to allow for future adjustment. When junction boxes, cable vaults and pull boxes are installed or adjusted prior to construction of finished grade, pre -molded joint filler for expansion joints may be placed around the junction boxes, cable vaults and pull boxes. The joint filler shall be removed prior to adjustment to finished grade. Adjustments involving raising or lowering the junction boxes shall require conduit modification if the resultant clearance between top of conduit and the junction box lid becomes less than six inches or more than ten inches. Wiring shall be replaced if sufficient slack is not maintained. The six-inch gravel pad required in Standard Plan J-11 a shall be maintained. When existing junction boxes do not have this gravel pad, it shall be installed as part of the adjustment to finished grade. Where conduit and junction boxes are placed in barrier, the prime Contractor shall coordinate the work of the Contractor constructing the barrier and the electrical Contractor so that each junction box placed in the barrier is placed in correct alignment with respect to the barrier, with the face of the box flush. The junction box shall be parallel to the top of the barrier within a 1 -degree tolerance. If any point on the face of a junction box placed in barrier is recessed more than 1/8 inch from the surface of the barrier, the Contractor shall install a box extension per the Engineer's approval and grout around the extension or remove and replace the entire section of barrier.. Heavy-duty Type 4, 5 and 6 junction boxes, cable vaults and pull boxes shall be installed in accordance with the following: 1. Excavation and backfill shall be in accordance with Section 2-09. Excavation for junction boxes, cable vaults and pull boxes shall be sufficient to leave one foot in the clear between their outer surface and the earth bank. 2. Junction boxes, cable vaults and pull boxes shall be installed on a level 6 - inch layer of crushed surfacing top course, in accordance with 9-03.9(3), placed on a compacted or undisturbed foundation. The crushed surfacing shall be compacted in accordance with Section 2-09.3(1)E. 3. After installation, the lid/cover shall be kept bolted down during periods when work is not actively in progress at the junction box, cable vault or pull box. 4. Before closing the lid/cover, the lid/cover and the frame/ring shall be thoroughly brushed and cleaned of all debris. There shall be absolutely no visible dirt, sand or other foreign matter between the bearing surfaces. 262 5. When the lid/cover is closed for the final time, a liberal coating of anti -seize compound shall be applied to the bolts and nuts and the lid shall be securely tightened. 6. Hinges on the Type 4, 5 and 6 junction boxes shall be located on the side of the box, which is nearest to adjacent shoulder. Hinges shall allow the lid to open 180 degrees. 8-20.3(8) Wiring Section 8-20.3(8) is supplemented with the following: (NWR April 14, 2003) Wire Labels At each junction box, all illumination wires, power supply wires, and communication cable shall be labeled with a PVC marking sleeve. For illumination and power supply circuits the sleeve shall bear the circuit number. For communication cable the sleeve shall be marked "Comm.". (NWR March 13, 1995) Wire Splices All splices shall be made in the presence of the Engineer. (NWR May 1, 2006) Illumination Circuit Splices Temporary splices shall be the heat shrink type. (March 13, 1995) Field Wiring Chart 501 AC+ Input 502 AC- Input 503-510 Control -Display 511-515 Sign Lights Movement Number 1 Vehicle Head Red Yellow Green Spare Spare AC - Red Auxiliary Yellow Auxiliary 611 612 613 614 615 616 617 618 Green Auxiliary 619 Pedestrian Heads & Dets. Hand 711 Man 712 516-520 Railroad Pre-empt 5A1 -5D5 Emergency Pre-empt 541-580 Coordination 581-599 Spare 2 3 4 .5 621 622 623 624 625 626 627 628 629 631 632 633 634 635 636 637 638 639 641 642 643 644 645 646 647 648 649 6 7 8 9 651 661 652 662 653 663 654 664 655 665 656 666 657 667 658 668 659 669 671 672 673 674 675 676 677 678 679 681 682 683 684 685 686 687 688 689 691 692 693 694 695 696 697 698 699 721 731 741 751 761 771 781 791 722 732 742 752 762 772 782 792 263 AC - Detection Common -Detection Spare Spare Spare Spare Detection AC+ AC - Common -Detection Detection A Detection B Loop 1 Out Loop 1 In Loop 2 Out Loop 2 In Supplemental Detection Loop 3 Out 911 Loop 3 In 912 Loop 4 Out 913 Loop 4 In 914 Loop 5 Out 915 Loop 5 In 916 Loop 6 Out 917 Loop 6 In 918 Spare 919 713 714 715 716 717 718 719 811 812 813 814 815 816 817 818 819 723 733 724 734 725 735 726 736 727 737 728 738 729 739 821 831 822 832 823 833 824 834 825 835 826 836 827 837 828 838 829 839 921 931 922 932 923 933 924 934 925 935 926 936 927 937 928 938 929 939 743 753 744 754 745 755 746 756 747 757 748 758 749 759 841 842 843 844 845 846 847 848 849 941 942 943 944 945 946 947 948 949 851 852 853 854 855 856 857 858 859 951 952 953 954 955 956 957 958 959 763 764 765 766 767 768 769 861 862 863 864 865 866 867 868 869 961 962 963 964 965 966 967 968 969 773 783 774 784 775 785 776 786 777 787 778 788 779 789 871 872 873 874 875 876 877 878 879 971 972 973 974 975 976 977 978 979 881 882 883 884 885 886 887 888 889 981 982 983 984 985 986 987 988 989 793 794 795 796 797 798 799 891 892 893 894 895 896 897 898 899 991 992 993 994 995 996 997 998 999 8-20.3(9) Bonding, Grounding Section 8-20.3(9) is supplemented with the following: (NWR August 21, 2006) Junction Box Grounding Where shown in the Plans or where designated by the Engineer, the metal frame and lid of existing junction boxes shall be grounded to the existing equipment grounding system. The existing equipment grounding system shall be derived from the service serving the raceway system of which the existing junction box is a part. 8-20.3(13) Illumination Systems 8-20.3(13) Light Standards' Section 8-20.3(13)A is supplemented with the following: (NWR May 1, 2006) Slip Base When slip bases are installed, the conduit, anchor bolts, and other obstructions shall terminate at a height below the elevation of the top of the bottom slip plate. 264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 11 1 1 1 1 1 11 1 8-20.3(14) Signal Systems Section 8-20.3(14) is supplemented with the following: 8-20.3(14)B Signal Heads Section 8-20.3(14)B is supplemented with the following: (NWR December 3, 2010) Signal Heads Installation with Back Plates The first paragraph is revised to read as follows: Signal heads shall not be installed at any intersection until all other signal equipment is installed and the controller is in place, inspected, and ready for operation at that intersection, unless ordered by the Engineer. If the Engineer orders advance installation, the signal heads shall be covered to clearly indicate the signal is not in operation.. The signal head covering material shall be of sufficient size to entirely cover the display. The covering shall extend over all edges of the signal housing and shall be securely fastened at the back. The signal head covering material shall be of sufficient size to entirely cover the display. The covering shall extend over all edges of the signal housing and shall be securely fastened at the back. 8-20.5 Payment Section 8-20.5 is revised to read: Payment will be made in accordance with Section 1-04.1, for each of the following bid items that are included in the proposal: "Illumination System Complete", lump sum. "Traffic Signal System First Street and MLK JR Boulevard, Complete", lump sum. "Traffic Signal System 1' Avenue and MLK JR Boulevard Complete", lump sum. shall be full pay for the materials, labor, and construction of the complete electrical system, modifying existing systems, or both, as shown in the Plans and herein specified including excavation, backfilling, concrete foundations, foundation removal, tree removal to place temporary poles, temporary signal systems, temporary and permanent relocation of signal components, signs mounted on from signal poles or on mast arms, signs removed from signal poles or mast arms, signal controller modifications, service cabinets, conduit, wiring, restoring facilities destroyed or damaged during construction, salvaging existing materials, furnishing all pipe, pipe connections, elbows, bends, caps, reducers, conduits, and unions; for placing the pipe in accordance with the above provisions, including all excavation or jacking required, backfilling of trenches and pits, restoration of vegetation disturbed by the operation, chipping of pavement, and bedding of the pipe; and all other work necessary for the construction of the conduit and for making all required tests. All additional materials and --labor, not shown in the Plans or called for herein and which are required to complete the electrical system, shall be included in the lump sum contract price. 265 All costs for installing conduit containing both signal and illumination wiring shall be included in the contract prices for the signal system. All costs for illumination and signing attached to signal equipment at a signalized intersection shall be included in the contract prices for the signal system. All costs for installing junction boxes containing both illumination and signal wiring shall be included in the contract prices for the signal system. All costs for installing and removing temporary signal systems shall be included in the contract prices for the signal system. All costs for illumination elements integrated with structural elements including but not limited to: wiring, light fixtures, conduit, deflection fittings, expansion joints, and junction boxes shall be included in the contract price for the illumination system, complete. 8-21 PERMANENT SIGNING Description Section 8-21.1 is supplemented with the following: (******) The work also consists of furnishing, installing, maintaining and removing project detour signs in accordance with the plans. "Misc. Detour Signing Revisions" shall consist of installing, maintaining and removing any signing enhancements including variable message boards and/or as directed by the Engineer. 8-21.4 Measurement Section 8-21.4 is supplemented with the following: (******) No specific unit of measurement will apply to Detour Signing. 8-21.4 Payment Section 8-21.5 is supplemented with the following: (******) The lump sum contract price for "Detour Signing" shall be full compensation for furnishing all labor, materials, tools and equipment necessary for fabricating and installing all detour signing. The work includes covering the signs prior to opening of the detour, maintaining and repairing the signs as required and removing all signs and posts and backfilling all holes after posts are removed. Payment for "Misc. Detour Signing Revisions" shall be in accordance with Standard Specifications 1-09.6. 266 8-23 TEMPORARY PAVEMENT MARKINGS Description Section 8-23.1 first sentence is revised to read: The work consists of furnishing and installing temporary pavement markings for all stages of traffic control except for the initial pavement marking removal and the final pavement markings. 8-31 ELECTRICAL AND TELEMETRY SYSTEM 8-31.1 Description The work specified in this section includes the labor, materials, and equipment necessary to furnish, install, and place into operation the power, control, alarm, and associated electrical systems of the storm water pump station. Connect motors, controls, meters, and any other electrical devices provided as part of the storm water pump station. Mark and identify circuits, equipment/enclosures with wire numbers, nameplates, and warning signs. Test, adjust, and calibrate equipment and startup all electrical equipment, instrumentation equipment, and its associated mechanical attachments as necessary to place the storm water pump station into operation. Provide training on the instruments, controls, and programming as specified herein. The City of Yakima will be responsible for paying connection fees to the electrical utility. All work and equipment shall be furnished and installed to the satisfaction and approval of the local inspector of the State of Washington Department of Labor and Industries. 8-31.1(1) References This section references the latest revisions of the following documents. In case of conflict between the requirements of thissection and those of the listed documents, the requirements of this section shall prevail. National Electrical Code (NEC) National Electrical Safety code (NESC) Occupational Safety and Health Act (OSHA) Standards American National Standard Institute (ANSI) Electric Industry Association (EIA) Institute of Electrical and Electronics Engineers (IEEE) National Electrical Manufacturers Association (NEMA) 8-31.1(2) Quality Assurance Install electrical work in accordance with the latest edition of the NEC and local and state codes in legal force in the Project area. If the Contractor observes that the Plans and/or Specifications are at variance with such codes and regulations, Contractor shall promptly notify the Engineer in writing. Should the Contractor perform any work in non-compliance with the above-mentioned 267 codes and regulations without such notice to the Engineer, the Contractor shall bear all costs arising therefrom. The above codes are referenced to the established minimum requirements and wherever this Specification requires higher grades of material or workmanship than required by the codes, this_ Specification shall prevail. Submit certification for tests and inspections required by the electrical inspector having jurisdiction. Certification of approval that is issued shall be transmitted to the Contracting Agency with a copy to the Engineer. The Engineer may inspect the fabricated equipment at the factory before shipment to the job site. Provide the Engineer with sufficient prior notice so that an inspection can be arranged at the factory. Inspection of the equipment at the factory by the Engineer will be made after the manufacturer has performed satisfactory checks, adjustments, tests, and operations. Equipment approval at the factory only allows the manufacturer to ship the. equipment to the Project site. The Contractor shall be responsible to the satisfaction of the manufacturer and the Engineer. Cooperate with the Engineer and provide assistance at all times for the inspection of the electrical work performed under this contract. Remove covers, operate machinery, or perform any reasonable work, which, in the opinion of the Engineer, will be necessary to determine the completeness, quality, or adequacy of the work. 8-31.1(3) Submittals 8-31.1(3)A Shop Drawings Submit manuals containing detailed drawings, diagrams, and instructions for installing the material and equipment proposed for installation in the electrical work. All electrical submittals shall be approved by the Engineer before any electrical equipment is shipped to the Project site. Submit to the following equipment drawings: Connection diagram, section and elevation for each free-standing unit, bill of materials listing the manufacturer, rating, size, type, and identification of components, including breakers, meters, transformers, transmitters, and auxiliary components, and a listing of the nameplates and legend plates size and nomenclature. Provide shop drawings showing outline dimensions and type, voltage, and current ratings of device, wiring diagrams of power and control wiring, fusing and overload information and listing of nameplate and legend plate information. 8-31.1(3)B Factory Tests Submit reports of factory tests and adjustments performed by equipment manufacturers prior to field testing and adjustment of the equipment. These reports shall identify the equipment and show dates, results of tests, measured values, and final adjustment settings. Provide factory tests and adjustments for equipment where factory tests are specified in the equipment Specifications. Notify the Engineer and the Contracting Agency when field tests are to be performed so the test can be witnessed. 268 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8-31.1(3)C Field Tests All electrical equipment shall be tested after installation and before being placed in service. The testing shall be performed by an independent testing service company, Electrotest, General Electric Apparatus Services, or as approved by the contracting Agency, and shall be employed by the Contractor. All field tests shall be performed in the presence of the Engineer. The Contractor shall coordinate and prepare for all testing prior to requesting tests. If re -testing is required due to deficiencies in the work or preventable delays, the costs of re -testing or standby shall be paid by the Contractor. Testing shall be in accordance with the manufacturer's installation and testing instructions and the applicable electrical standards (Le., NEMA, IEEE, ISA, ANSI, or other) for the class of equipment. Provide instruments, other equipment, and material required for the tests. These shall be of the type .designed for the type of tests to be performed and shall be calibrated by a 'nationally recognized testing laboratory within three months prior to testing. The Field test shall include, but not be limited to the following: Test the equipment and electrical circuits for proper insulation value, continuity, and absence of undesirable shorts and grounds. Test wire and cable installation when complete and 72 hours prior to energization of the system. Check for continuity, visual damage, marking, and proper phase sequence before performing insulation testing. Megger bus work, switches, and breakers, and circuit phase -to -phase and phase -to - ground disconnecting and reconnecting equipment, which cannot be meggered as required. The minimum acceptable steady-state value is 50 megohms. Ambient temperature and humidity during testing shall be recorded. Properly calibrate, adjust, and operationally check all circuits and components, and demonstrate as ready for services. Verify all operating controls for proper function. Check all auxiliary devices on equipment, i.e., heaters, thermostats, lights, andall illuminated indicating devices and lamps, and all audible alarm devices to verify that they function properly. Check fuses with an ohmmeter. Ring out wiring and busing. Check operation of control and safety interlocks. Check grounding of potential transformers, current transformers, lightning arresters, and surge protective devices. Check control connections at terminal blocks, relays, meters, switches, etc. Test motor driven equipment motors before energization. Insulation test shall consist of megohmeter check phase -to -ground, per IEEE Standard 43 or manufacturer's recommendation. Nameplate ratings (type of motor), (horsepower), (speed), (voltage), (phase), (full load amperes). Measured load in amperes phase 1-2-3. 269 Equipment being driven. Note the suction and discharge operating conditions of pressure, temperature, humidity, etc., for pump motors at the time of the test, where such conditions affect load. Circuit breakers and motor. circuit protectors shall be checked for size per manufacturer's data, motor nameplate amperes, and service factor. Replace and/or adjust units, which are incorrectly sized with correctly sized units. The size shall be noted at this time on the test sheet. Test units to manufacturer's time current standards. Replace units that operate incorrectly. Demonstrate to the Contracting Agency that the electrical installation is working by operating all electrical systems and equipment. Simulate control and emergency conditions, artificially where necessary, for complete system tests. Operate the electrical systems until acceptance of the work. Instruct Contracting Agency's employees in the correct operation of all electrical and control systems. Rework or repair equipment, which needs to be corrected as a result of the testing at no additional expense to the Contracting Agency. The Contractor shall furnish to the contracting Agency at the time the Project is accepted, any special tools, calibration equipment, and testing apparatus specified or furnished by the equipment manufacturer for the proper adjustment and maintenance of the electrical equipment provided. Report all test results in writing. Where tests disclose problem areas, retest after the defect has been corrected. 8-31.1(4) Coordination Electrical drawings are partly diagrammatic, and it is not the intent to show in detail all features of work or exact physical arrangement of equipment. The location of equipment, inserts, anchors, motors, panels, pull boxes, manholes, conduits, sub -ups, fittings, lighting fixtures, power and convenience outlets, exterior lighting units, etc., are approximate unless dimensioned. Coordinate size of concrete foundations and placement of sleeves or supports in concrete structure. Place conduit correctly with respect to equipment connections. If equipment connections are relocated without appropriate changes in the electrical work and the resulting work is not coordinated, the work affected shall be removed and re -installed at the Contractor's expense, even if removal and replacement of structural and/or mechanical parts of the work are necessary. 8-31.1(5) Electrical Service Electrical service to the wet wells shall be 480V, 3cD. Wire shall be as shown on the Drawings and as noted below: 270 The Contractor shall coordinate with the Power Company (Pacific Power). Coordinate with Tracy Coleman (1-866-870-3419). All cost of all service, power, and installation shall be paid by the Contractor, except that the City of Yakima will pay connection fees to the utility: 8-31.2 Materials Provide new materials and equipment approved and labeled for the purpose for which they are to be used by a nationally recognized electrical testing laboratory. Similar items of equipment shall be of the same manufacturer and quality. The equipment and materials shall meet applicable NEMA, IEEE, and ANSI standards. Where voltage, current, power, temperature, or other ratings are specified that do not correspond to a selected manufacturer's standard ratings, the Contractor shall furnish, without extra cost, the next rating level, which increases the capacity of the device or material in question. Furnish materials, devices, equipment, or supplies of materials that are inherently non -corrosive or are coated or covered in manner acceptable to the Contracting Agency, which renders them non -corrosive. Do not install materials in a manner, location, or construction that produces galvanic action or any other materials corroding or eroding action. All electrical materials .and equipment, which do not have a corrosion resistant finish, shall be painted. All paint finishes shall include proper surface preparation, prime coat, and a final finish coat. All paint finishes shall have a minimum dry film thickness of two mils, except in wet locations, where the minimum dry film thickness shall be three mils. Any final finish, which has been damaged or is otherwise unsatisfactory, shall be repaired to the satisfaction of the Engineer. Equipment or devices fabricated in the field shall be equal in every respect to manufactured items used for the same purpose. Where cutting, drilling, grinding, etc., is done to galvanized or painted metal, it shall be re galvanized or painted to match original finish. Where the Contractor proposes changes in the work or substitutions in material, he shall be responsible for ensuring that sizes, weights, openings, etc., are provided that do not require change in the work outside his Contract, or he shall pay for all such changes. Project areas are classified with respect to electrical equipment requirements as described below: Hazardous Location, Class 1, Division 2: Areas below grade. 8-31.2(1) Metering, Protection, and Control Devices Devices, panelboards, control panels, etc., or mounted in individual enclosures, shall be provided as specified herein. Devices used throughout the Project shall be manufactured by a single manufacturer for each type of devices. 271 Circuit breakers shall meet NEMA Standard AB -1. Feeder breakers shall be molded case breakers with thermal magnetic trip. Motor circuit breakers shall be magnetic only trip with adjustable trip settings. Branch circuit breakers shall be molded case, thermal -magnetic trip, trip -free with non -interchangeable, non-adjustable trip unless otherwise noted. Breakers shall meet the integrated equipment ratings required for the available short circuit current at the equipment in which they are used if applicable. 8-31.2(1)A Motor Starters Each motor control shall consist of a manually operated circuit protective device and a magnetically operated motor starter mounted in a common NEMA 1 enclosure, complete with auxiliary devices for control of the circuit as indicated. Provide Allen-Bradley Bulletin 509, Cutler -Hammer Freedom Type; or equal. Operating handle of the circuit protective device shall physically indicate "on", "off" and "tripped" positions. Handle shall accept three padlocks with heavy duty, industrial type shackles. Motor circuit protectors shall have adjustable magnetic trips by a single dial with a moveable plug stop. Minimum fault interrupting capability shall be 16,000 amperes. Starters shall be NEMA rated and no smaller than Size 1. Each shall be equipped with an overload element in each phase and auxiliary contacts as indicated on the Drawings, with a minimum of two N.O. auxiliary contacts. Control power shall be fused, 120 volts, derived from a control power transformer. Control power transformer shall have sufficient capacity for all devices connected to the control circuit and not less than 50 VA more than the normal capacity required to operate the starter. Provide push buttons, selector switches, and indicating lights as shown on the Drawings. Provide a single CT and door -mounted ammeter for each motor as shown on the Drawings. Provide Compton 007 series, or equal. Provide a signal converter to provide a 4-20mA signal to the PLC as shown on the Drawings, Hawkeye H721 LC, or equal. Provide an engraved plastic nameplate for each combination starter identifying the motorized equipment it controls. An externally operable manual "reset" button shall be provided that is mechanically linked to the overload element within the enclosure. Automatic restart after overload shall not occur. 8-31.2(1)B Miscellaneous Protection and Control Devices Fuses: Power fuses, Class RK -5 silver element. Control fuses, Bussman FNQ or equal. Surge Protection Devices (SPD) shall be provided at each control power supply point and to external devices (e.g., one on the main service and one at each pump panel). They shall be General Electric Company Catalog No. 9L15ECA001 for single phase, 9L15ECC001 for 3 phases. Pilot devices (control units and stations): Allen-Bradley per NEMA ICS -1; pilot lights shall be push -to -test transformer type. 272 Running time meters shall be Eagle Signal six digit non -reset. Legend plates shall be provided for all front -mounted control devices, including pilot lights, sector switches, and push buttons. Legend plates shall be engraved with the nomenclature shown on the control wiring diagrams or with standard engraving such as "stop -start," "hand -off -auto," etc. where none is shown on the drawings. All relays shall be equipped with surge suppressers. IEC rated relays are not permitted. 8-31.2(2). Enclosures All exposed enclosures (i.e., enclosures not contained inside another enclosure) shall be NEMA 3R. Enclosures that are within another enclosure shall be NEMA 1.. The control panel enclosure shall be NEMA 3R and include a viewing window to check status of the PLC. Enclosures shall have nameplates attached to the enclosures. Nameplates shall be 1 -inch by 4 -inch STH 3/8 -inch letters except where smaller sizes are necessary for smaller enclosures. Nameplates shall be Lamacoid or equal plastic laminate or engraved metal plates. Lettering shall be black; background shall be white. No abbreviations are permitted unless approved by the Engineer. Inscription shall be subject to the Engineer's approval. Individual device enclosures for circuit breakers shall have external handles marked to indicate "OFF" and "ON" positions. The handle shall be lockable in the "OFF" position. These operating handles shall be interlocked with the enclosure door to prevent: opening the door with the device "ON" and closing the door with the door open. The interlock shall be screwdriver deferrable. A contact shall be provided to indicate when the device handle is in the "OFF" position. Major equipment items shall have enclosures as specified in their respective section of the Specifications. 8-31.2(3) Conduit Conduit shall be rigid, non-metallic (PVC 40) except that which enters the wet well and run above ground, which shall be PVC coated RMC with polyurethane inner coat. For flexible connections in areas where rigid steel conduit is used, provide liquid -tight flexible metal conduit at flexible connections. It shall be flexible galvanized steel convolutions covered by a liquid tight PVC layer with manufacturer's marking at 3 feet or less intervals. Connectors shall be UL approved for grounding and employ a ferrule, which covers the end of the conduit inside and out. Conduit shall be Electri-Flex Type LA or American Sealtite, Type UA. Where plastic conduit is permitted to be used, it shall be Schedule 40 PVC rigid conduit suitable for underground installation without concrete encasement, suitable for 90°C conductors, and shall meet NEMA TC -2 standards for plastic conduit, Carlon, Johns -Manville. Supports for individual conduits shall be galvanized malleable iron, one -hole type with conduit spacer. Raceway supports in "wet" areas shall be stainless steel or aluminum structural shapes and cast hardware. Plastic or wire. conduit clamps, nail -in clips, and/or metal tape are not permitted. 273 8-31.2(4) Conductors Power wiring for feeder and motor circuits shall be Class B stranded copper conductor with Type THHW insulation. Other sizes shall be THHW insulated. Minimum conductor size for all power wiring shall be No. 12 AWG. Control wiring shall be Class B stranded copper conductor with Type THHW insulation. Minimum conductor size shall be No. 14 AWG. Low voltage instrument wire shall be multi -conductor cable with overall neoprene or PVC jacket. Individual conductors shall be polyethylene/nylon insulated. Unshielded instrument cable shall be equal to Alpha Wire Company No. 1899 and 1899/3 or equal, Belden or NEC. Shielded instrument wire shall be equal to Alpha Wire Company No. 2258 and No. 2258/3 or equal, Belden or NEC. Grounding clamps shall be equal to T&B 3900 UB Series. Lugs for attachment of grounding conductors to sheet steel enclosures shall be of the binding post type, shall accommodate a range of standard copper cable from #2 AWG to #2/0 AWG, shall have a 1/2-13 NC stud size, and shall be attached to enclosures using a threaded or tapped boss welded to the sheet steel. These lugs shall be Burndy Type KC, Anderson Type KS, or equal. Utilize bolted pressure connectors for all other ground connections. Grounding wire and cable shall be solid copper for No. 4 or smaller diameter; stranded copper in the larger sizes. All conductors to be buried in the earth shall be medium -hard drawn bare copper; other conductors shall be soft drawn copper. Connectors for splicing copper conductors shall be "Scotchlok" insulated spring connectors for No. 18 through No. 6 AWG solid conductors; insulated, solid -barrel, crimp type plated copper alloy connectors for No. 18 through No. 6 AWG stranded conductors; plated copper alloy compressors splicing sleeves installed by high-pressure compression tools for No. 4 and larger size stranded conductors. Motor connectors shall be insulated, solid -barrel, crimp type, ring tongue plated copper alloy terminals bolted together and taped to insulation thickness of conductors. Wire markers shall be plastic sleeve type. Wire numbers shall be permanently imprinted on the ' markers. 1 1 1 1 1 1 1 1 1 1 1 1 8-31.2(5) Fiber Optic Cable Provide fiber optic cable from the existing Lincoln Avenue PLC Panel to the MLK Jr. Blvd PLC Panel, as shown on the Drawings. 8-31.2(5)A Fiber Optic Cable Factory -fabricated, single -channel, low -loss, glass-type, optical fiber, multimode and singlemode, graded -index cables for trunking, LAN, and distribution applications. Construction: Single fiber with a 62.5 micron core diameter and a 125 micron cladding diameter; 250 micron outside -jacket diameter. 274 1 1 1 1 Ratings: 3.5 dB/850-nm maximum attenuation, 200 MHz/km minimum bandwidth, 0.2 nominal numerical aperture, 1.0 dB/1500 nm maximum, 500 MHz/km minimum. Physical Characteristics: -7.5 kg/km, 500 N maximum installation Toad, 150 N maximum operational load, 30 mm minimum bending radius. Operating Temperature Range: - 20 to 70°C. Optical fiber shall be outdoor rated loose tube, 62.5/125 micron, all dielectric, fiber contained within a single sheath. Cable shall be marked with the OFNR designation. The cable will contain a minimum of 12 fibers. The manufacturer shall be Corning; Cable Systems; or equal. 8-31.2(5)B Fiber Optic Cable Connectors Ceramic optical fiber cable connectors capable of terminating optical fiber glass cables with diameters ranging from 125 microns. ST -type connectors with quick -connect features and with insertion Toss of not greater than 0.5 dB. . 8-31.2(6) Fittings and Boxes In all areas, boxes and fittings shall be as follows: Outlet and junction boxes shall be galvanized, cast iron alloy, or aluminum one piece, threaded hub similar to FS, FD, or GRF boxes with neoprene gaskets and galvanized, cast iron alloy covers. In wet areas, cast boxes shall be equipped with external .mounting Tugs. Gang boxes shall be used wherever more than one device is used at one location. Boxes 6 inches by 6 inches by 4 inches or larger may be code gauge fabricated steel continuously welded at seems and hot -dipped galvanized after fabrication with flange and rubber gasketed covers fastened with stainless steel screws at 2 -inch spacing. Boxes shall have drains and a grounding lug. Boxes shall have a factory or shop applied final paint finish except where installed in a "wet" location. Fittings shall be galvanized, cast iron alloy with threaded hubs, neoprene gasket, and galvanized casts iron alloy cover. Miscellaneous fittings shall be as follows: Escutcheons shall be equal to Beaton & Caldwell 3A, Grabler, or Fee & Mason. One hole clamps and clamp backs shall be galvanized cast iron alloy. Locknuts shall be extra -heavy, hot -dip galvanized steel through 2 inches trade size and hot -dipped galvanized malleable iron above that size. Busing shall be hot -dip galvanized iron with insulating thermosetting collar. Provide grounding connector on bushing where terminated at enclosures. Fittings for use with rigid non-metallic conduit shall be PVC and have solvent weld -type conduit connections. If such are not available, then the Specification for rigid steel fittings shall apply. 275 Fittings for flexible conduit shall be Appleton Type ST or O -Z Gedney Series 40. Union couplings for conduit shall be the Erickson type and shall be Appleton Type EC or O -Z Gedney 3 -piece Series 4. Threadless couplings shall not be used. 8-31.2(7) Anchors, Supports, and Attachments Where shown on the Drawings or specified, provide the required concrete installations for conduit encasement, and equipment foundations and housekeeping pads. Provide the required inserts, bolts, and anchors, and securely attach all equipment and materials to their supports. Fasteners for securing equipment to walls, floors, etc., shall be stainless steel. Attachments to building surfaces and structural shapes or members shall be as follows: Wood: Lag screws, Type A tapping screws. Masonry: Light bads, Rockwell "well -nut," heavy loads, thru-bolt with fender washers. Hollow Partitions: Molly or toggle bolts. Concrete: Self -drilling expansion drilling anchors with threaded studs. Structural shapes or members: Clamps or U -bolts. Other Steel: Machine screw-in tapped hole. Do not drill, tap, punch, or shoot structural metal or prestressed concrete structures, use clamping devices only to metal and expansion shields or inserts on concrete. Attachments shall be stainless steel or hot -dipped galvanized in locations where rigid steel conduit or NEMA 4 enclosures are required. 8-31.2(8) Instrumentation and Control 8-31.2(8)A Programmable Logic Controller PLC shall be Allen Bradley Micrologix 1400 model 1766-L32 with non-volatile battery backed RAM. The PLCs shall be provided with the following expansion modules: Discrete input module. Provide spare inputs and outputs so that a minimum of 15% of each type is spare, functional, and installed in the mounting racks. PLC shall be programmed using Allen Bradley RSLogix 500 software. See Part 8-31.3(10) for a written description of the control strategy. 8-31.2(8)B Level Sensing System - Bubbler Type The bubbler level sensing system shall be designed to operate on the back pressure caused by the Ievell of the liquid above a compression bell at the end of a sensing tube through which air is being discharged. The device shall be able to sense a rising or a falling level and shall translate this rise or fall into a proportional analog signal. All equipment required to meet the operational requirements set forth herein shall be included and connected to obtain a complete functional 276 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 1 11 system. The level sensing system shall be the Reactive Air Level Monitor manufactured by Tesco, which is the City of Yakima's standard. No equal. The bubbler level sensing system shall have a range of at least 0 to 35 feet and have an operating voltage of. 120 VAC. Accuracy of the system shall be +/- 1/8 inches with 0.2%,. repeatability. Air shall be delivered from the bubbler system using an oilless, direct -drive compressor with aluminum piston, TeflonTM sleeved aluminum cylinder, and a maximum discharge pressure of at least 250 psi. The bubbler system shall output a 4-20 mA signal proportional to the measured level and have adjustable interval and duration of purge used clear solids from the compression bell. All bubbler system components shall be housed in a NEMA 4X enclosure that includes a digital display of measured level and a push button to initiate manual purge. Interconnection of pneumatic components within the enclosure shall be made using 300 psi polyethylene instrument tubing. Provide sufficient slack in instrument tubing and electrical wiring to facilitate calibration, removal, and replacement of bubbler panel components. The compression bell shall be constructed of a high strength polymer that will resist corrosion and buildup of material. Provide two 300 psi polyethylene instrument tubing runs enclosed in steel conduit or equivalent protection from the bubbler panel to the sensing tube located in the wet well. One tubing run shall be the "bubbler" air flow line, and the other tubing run shall be for "static" air backpressure sensing. A "tee" with cleanout shall be provided to connect the tubing to the sensing tube. The cleanout shall be readily. accessible for cleaning. The sensing tube shall be Schedule 80 PVC and extend to 6 inches below the low water level and be supported on not more than 48 -inch centers on the wall. 8-31.2(8)C Float Switches Provide backup high water level (BHWL) float switches for backup control individual pumps. Float switch shall be of the tilting mechanical switch type. The mechanical switch shall be enclosed in a liquid -tight plastic casing with a cable, which is supplied with 5 feet of slack. It shall be suspended at the proper position to hang or float, depending on the liquid level. It shall have single -pole, single -throw contacts and be wired normally open or normally closed as shown on the Electrical Drawings. Float switch shall be Flygt Model ENM-10, or equal. Float switch shall be UL listed. 8-31.2(8)D Uninterruptible Power Supply - Provide a UPS system consisting of battery backup unit (BBU), battery system, inverter for 120 VAC loads and a 12 VDC power supply for 12 VDC loads, as shown on the Electrical Details Drawings; all of which shall be housed in the control panel. All components of the UPS system, with the exception of the batteries, shall be sized such that their design Toad in watts is not more than 75% of their rating. Rating: 1. UPS System: 120 volts, 1 phase, 60 Hz. UPS shall be Weidmuller, or equal. 2. DC Power Supply Output: 12 VDC. Power supply shall be Weidmuller, or equal. 3. UPS system shall be capable of operating all connected equipment for not less than 2 hours at 5°C. 277 4. Ambient Temperature: Equipment ratings shall be based on operation in an ambient temperature not exceeding 50°C. 8-31.2(8)E Ethernet Switch Provide a DIN rail mount Ethernet switch with a minimum 4 copper ports and one multi -mode fiber port with ST connector, removable terminal block, and LED indicators. The Ethernet switch is to be mounted in the control panel and suitable for 12 VDC input power. Ethernet switch shall be model EIR205-MT by B&B Electronics, or equal. 8-31.2(8)F Laptop Computer Provide one laptop computer for PLC programming, program storage, program downloading, and monitoring of process data, and equipment operating status. Laptop computer shall be provided with internal battery, AC power adapter and a padded shoulder bag for transport. Laptop computer shall be a Dell Latitude E6520 series, or equal. Minimum configuration requirements: Intel Core 2.20 GHz processor, 4 GB RAM at 1333 MHz, 250 GB Hard Drive, nVidia 512 MB graphics card, 10/100/1000, Gigabit Ethernet network interface adaptor, 8X DVD+R/W drive, 802.11 a/g Dual -Band Mini Card wireless LAN, built-in 15.6" HD LCD display. Provide compatible Windows OS (operating system) for PLC software (check with software supplier). Provide Microsoft Office software bundled with the laptop computer. Provide serial and Ethernet cables for downloading logic programs to the PLC. 8-31.2(9) Panels Panels shall be a shop fabricated unit completely assembled, wired, and tested before shipment to the job site. Panel construction shall, in general, meet JIC EMP -1- 1967 standards and applicable and IEEE standards. All control panels shall be UL listed. The panels shall bear the UL label. The label shall apply to the enclosure, the specific equipment supplied with the enclosure, and the installation and wiring of the equipment within and on the enclosure. Where intrinsically safe areas are shown on the Drawings, provide intrinsic safety barriers (aka, intrinsically safe relays) to limit current, voltage, and total energy delivered to instruments located in hazardous areas. The intrinsic safety barrier shall be DIN rail mounted by PEPPERL+FUCHS or equal. Provide an available 120 -volt receptacle for maintenance work in each panel. All equipment shall be NEMA standard rated; IEC rated or equivalent is not acceptable. The entire assembled panel shall be meggered and tested to be free from grounds and shorts. All controllers, circuits, and interlocks shall be rung out and tested to assure that they function 278 correctly before the panel is shipped. Revise all drawings upon completion of the work to show "as shipped" condition of the panel. Provide, at the time of shipment, copies of the revised drawings to the installer at the job site as well as the Engineer. Enclose panels in heavy-duty polyethylene envelopes or secured sheeting to provide complete protection from abrasion, dust, and moisture. Place dehumidifier inside the polyethylene covering. Show shipping weight on shipping tags, together with instructions for unloading, transporting, storing, and handling on job site. 8-31.2(9)A Panel Component Installation Provide panel wireways between each row of components and adjacent to each terminal strip. Wireways shall be a -minimum of 1 inch wide and 3 inches deep with removable snap -on covers and perforated walls for easy wire entrance. Wireways shall be constructed of non-metallic materials with a voltage insulation in excess of the maximum voltage carried therein. Wiring duct shall be Panduit "E" type LG, Panel Channel or equal. Provide terminals for the termination of external power, control, and instrument wiring. Terminal shall have brass screws with straps suitable for No. 12 through No. 18 AWG wire. They shall be Allen-Bradley or equal. 8-31.2(9)B Panel Wiring Panel wiring shall comply with National Electrical Code. 8-31.2(9)C Marking and Identification. Wire markers shall consist of yellow, slip-on elastic sleeves sized to tightly grip the wire insulation and marked in block printing with the letters or numbers to identify the circuit. Wire markers shall be BIC Industries. Provide a nameplate for each panel. It shall be 2 -inch by 10 -inch minimum size with 1/2 -inch minimum engraved letters. Provide nameplates for all relays, timers, transformers, fuses, terminal block, switches mounted internally, and other components, which are mounted to the internal mounting panel. These nameplates shall be sized to the scale of the device to which they refer. Nameplates shall be rigid phenolic plastic laminate with engrave lettering or engraved metal plate with filled lettering. Background shall be black, lettering shall be white. Edges shall be beveled showing a white border. Abbreviations are not permitted unless approved by the Engineer or specifically shown on the nameplates, schedules, or drawings. The engraving shall be as shown on the Drawings for the identification of each panel. 8-31.2(9)D Wiring Devices Duplex receptacles shall be heavy-duty per NEMA WD -1, with staked screw terminal for line, neutral and grounding connection and provisions for split bus operation. They shall be NEMA 5-15R or 5-20R type Arrow -Hart, Bryant, Hubbell. 279 8-31.2(9)E Panel Heater and Fan Both the Pump Panel and the Control Panel shall be provided with a heater and fan. Panel heaters shall have adjustable thermostats controlling the heat element. Heater shall have an internal fan, which shall run continuously regardless of the temperature or thermostat setting. Heat elements shall operate on 120 VAC. Panel heaters shall be manufactured by Hoffman Engineering Co., or equal. Panel fan shall have adjustable thermostat. Fan shall operate on 120 VAC. Panel fan shall be manufactured by Hoffman Engineering Co., or equal. 8-31.3 Construction Requirements Install the equipment and materials in a neat and workmanlike manner employing workmen skilled in the particular trade and in accordance with the manufacturer's instructions and industry standards. Maintain adequate supervision of the work by a person in charge at the site during any time that work under this division is in process or when necessary for coordination with other work. Do the work in a systematic manner and coordinate with other trades, code authorities, utilities, and the Engineer. Check work under this division for interference with work under other divisions and cooperate in locating equipment to avoid all such interferences. No extras will be allowed because of moving work required to avoid interference with work under other divisions of this contract. Organize this work to harmonize with the work of other trades so that all work may proceed as expeditiously as possible. Where two trades join together in an area, make certain that no electrical work is omitted. Coordinate the installation of built-in work, attaching items to buildings, and cutting and patching with other trades. Where connections must be made to existing installations, properly schedule all the required work, including the power shutdown periods. Schedule and carry out shutdowns so as to cause the least disruption to operation of the existing facilities and privately owned facilities. The general arrangement of outlets and other equipment, as shown on the plans, is diagrammatic and approximately correct as to locations. Where conflicts occur in locating the work, verify the location of conduit, fixtures, panels, control devices, etc., with the Engineer. Attention of the Contractor is directed to the coordination required between the mechanical equipment installation and the electrical connections to this equipment. The Contractor shall verify the location of all meters, valves, limit switches, etc., with installers prior to final conduit installation, etc., and shall make all necessary adjustments in the routing, without cost to the Contracting Agency. The Contractor shall be responsible for the accurate location of switches, outlets, etc., with respect to doors, partitions, cabinets, and the finished work of others. Verify dimensions and locations with the mechanical and instrumentation equipment drawings and trades before installing the work. Thoroughly clean all soiled surfaces of installed equipment and materials. Upon completion of electrical work, remove all surplus materials, rubbish, and debris that accumulated during the construction work. Leave the entire area neat, clean, and acceptable to the Engineer. 8-31.3(1) Grounding 280 Feeder circuits shall have a green insulated grounding conductor installed with each set of phase conductors. The grounding conductor shall be bonded full size to the equipment, which. the circuit connects, and to the raceway if it is metallic. PVC or other non-metallic conduit in any service on the Project shall have an insulated grounding conductor installed in it and bonded at each end of the non-metallic run to metallic raceway or equipment. Equipment grounding connections shall be checked by the Contractor in the presence of the Engineer with a Biddle ground ohmmeter. Resistance in excess of 25 ohms shall be reason to reject the continuity of the around system and require replacement. Make the grounding conductor connections to motors or equipment 10 horsepower and above, or 20 amperes and above, by soiderless terminal and a 5/16 -inch minimum bolt tapped to the motor frame or equipment housing. Ground connection to smaller motors and equipment may be made by fastening the terminal to a connection box. 8-31.3(2) Equipment Install manufactured equipment in accordance with manufacturers' and NEMA standard installation instructions. All equipment installed on the Project shall be anchored, tied, restrained, or attached to the structure in such a manner that the equipment will remain in place and functioning when subjected to seismic forces for the seismic zone in which the facilities are located. Direct all subcontractors and suppliers to furnish and install equipment and provide anchorage in a manner that will conform to these requirements. Perform tests outlined herein and as recommended by the equipment manufacturer..A written report of these tests and any repairs resulting from them shall be sent to the Engineer. The Contractor shall be responsible for the painted finish specified for individual equipment. Where deemed necessary by the Engineer, damaged finishes of equipment furnished by the Contractor shall be retouched or repainted without additional cost to the Contracting Agency. Install self-supporting equipment in a level and plumb manner, shimming with full width stainless steel shims, as necessary. Units shall be bolted to the floor with 3/8 -inch stainless steel expansion anchors and bolts or welded to embedded steel channels. Floor or pad shall be level within plus or minus 1/8 -inch in a square yard before installing equipment. Grout or caulk enclosure to floor or pad. Conduits entering from above or at the sides shall be bushed. Conduits entering from below shall have grounded insulating bushings bonded to the ground bus or pad. Protect enclosed electrical equipment such as control stations, circuit breakers, variable frequency drive, etc., during construction from moisture, dust, abrasion, or other damage or disfigurement, using plastic sheeting, kraft paper, space heaters, or other appropriate means. Field repair of material or equipment made defective by improper storage is not acceptable. Wall -mounted enclosures shall be mounted level and plumb. Enclosures shall be fastened with a minimum of three screws or bolts. Switches, starters, etc., shall be mounted 4 feet 6 inches to centerline of handle on walls or 3 feet 6 inches when strut supported at motors, etc. In wet locations, provide neoprene or polyethylene 1/2 -inch spacers behind equipment enclosures and connect all raceways to enclosure from below. 281 Enclosures, including control stations, shall be provided with permanently attached identification plates giving the panel designation and panel circuit number from which the motor is fed. The plates shall be laminated phenolic with 3/8 -inch high engraved white letters with black background. The following shall be done as a minimum before energizing equipment: Remove bracing, packing materials, tape on movable parts, etc., as necessary. Check for damage to enclosure, cracked porcelain, chipped bushings, etc. Assemble all shipping splits. Tighten all bus splices to the recommended torque's. Clean splice plates with Stoddard's Solvent before assembling. Check factory connections for proper torque. Tighten all structural connections, barriers, racking mechanisms, etc. Check alignment of plug-in devices with stationary parts. Check operating mechanism for binding, lubrication, etc. Check continuity and phase uniformity from unit to unit and for all control or metering circuits. Operate switches in the test and disconnected positions. 8-31.3(3) Raceway Rigid non-metallic conduit shall be used except for conduits going to the wet well. These conduits shall be PVC coated RMC. Electrical metallic tubing and intermediate steel conduit are not permitted. Flexible conduit shall be provided for connections to valves and other equipment, which are subject to vibration in normal service. Runs shall be kept as short as practical (less than 18 inches) and shall not be used in place of elbows, offsets, or fittings to attach to fixed equipment. Flexible conduit shall not be strapped to structures or other equipment. There shall be sufficient flex to allow for removal of the valve or equipment for maintenance and inspection. Circuits shall run in individual raceways unless specific combinations in one raceway are shown. Raceways shall not be ganged into wireways, pull boxes, junction boxes, etc., without specific approval. Conduit connections to enclosures shall be made at the nearest practicable point of entry to the enclosure area where the devices are located to which the circuits contained in the conduit will connect. Raceway shall run exposed unless shown otherwise on the drawings. Exposed raceway shall be installed in lines parallel or perpendicular to the building or structural members lines. Raceway shall be run level, even if the ceiling or structure is not level. The installation shall not result in cross -overs or offsets that can be avoided by installing the raceway in a different sequence or a uniform line. Parallel runs shall be symmetrical. 282 Raceway in "wet" areas shall have clamp backs or other appropriate spacers to hold them a minimum of 1/2 -inch off the surface. Conduit connections to motors, valves, or other equipment shall be supported independently of the valve or equipment. Runs shall drop or rise vertically to the nearest practicable point of connection to the unit. Vertical drops shall be run to the floor and be fastened with a floor flange. Unsupported .drops are not permitted. Horizontal runs on the floor or on equipment are not permitted, unless specifically shown on the Plans. Drop or rise at the appropriate closest location. Wherever practical, route conduit with adjacent ductwork or piping and support on common racks. Base required strength of racks, hangers, and anchors on combined weights of conduit and piping. Space electrical raceways a minimum of 6 inches from heat sources above normal ambient. Penetrate through building wall or surfaces with a PVC sleeve with at least 1/4 -inch greater interior diameter (ID) than conduit exterior diameter (OD), set flush with walls, pack with fiberglass and seal with silicone sealant, and cover with escutcheon plate. Penetrate through poured -in-place walls and free slabs with a cast iron or (above -grade only) Schedule 40 black pipe sleeve with retaining ring or washer. Sleeves shall be set flush with forms or edges of slab. Pack around conduit with fiberglass and seal with silicone sealant. For penetrations below exterior grade, provide a Gedney sealing fitting on the interior of the wall threaded onto the sleeve. Place raceway below slab on grade construction in a shallow trench. Raceway shall be placed so as to permit stub -up elbows to be installed without any portion of the radius being exposed. The trench for underground raceway runs shall be as straight as practicable. Changes in direction and/or grade shall be of sufficient length to allow a gradual change (3 -foot radius minimum). The trench shall be graded true and free from stones or soft spots. Slope all underground raceways to provide drainage. (For example, slope conduit from equipment located inside a building to the pullbox located outside the building). Three inches of fine sand shall be placed in the trench bottom and tamped into place. Provide pre -formed plastic spacers on 5 -foot intervals between conduits in the same run. Bends in 2 -inch and larger raceway shall have a minimum radius of 3 feet. Slight offsets may be made with 5 degree couplings. After the raceway is placed in the trench, native earth backfill passing a No. 8 sieve, free of stones shall be placed in the trench bottom and tamped around the sides of the conduit. Do not tamp on top of the conduit until the final backfill is placed to finish the grade. Each concealed below -grade conduit shall be mandreled with a non-metallic mandrel not more than 1/4 -inch smaller than the inside diameter of the raceway, followed by a wire brush and a swab. Direct buried conduit installed in trenches shall be marked by a strip of yellow marking tape. The marker shall be placed a minimum of 12 inches below grade during backfilling of the trench. Install raceway as a complete, continuous system without wires, mechanically secure, and electrically connected to all metal boxes, fittings, and equipment. Blank off all unused openings, using factory -made knockout seals. Keep conduits clean and dry until conductors 283 are installed using caps, bushings, and "penny" or other suitable means. Install a No. 12 TW pull wire or nylon cord in each empty conduit, leaving at least 8 inches slack at each. end. Close each end left exposed with caps or bushing and "penny. Provide double Iocknuts and insulating bushings at all conduit connections to boxes and cabinets. Bushings shall be grounding type where connecting to concentric or eccentric knockouts. In "wet" areas, Iocknuts shall be sealing type, or Myers hubs shall be used. Conduits shall connect to the enclosure at the location of the gutter into which the conductors they contain will be routed. Conduits to mechanical equipment shall be stubbed up or routed directly to the connection and located as close as possible to equipment terminals. Cut ends of conduit square with hand or power saw or approved pipe cutter. Ream cut ends to remove burrs or sharp ends. Thread cuts on conduit inthe field shall have same effective length and same thread dimensions and taper as specified for factory -cut threads. Transitions from plastic to steel shall be made with a threaded male adapter (plastic) to a steel conduit coupling. Provide anchors, hangers, supports, clamps, etc., to support the raceways from the structures in or ori which they are installed. Provide sufficient clearance to allow conduit to be added to racks, hangers, etc., in the future. Conduit : couplings, fittings, and boxes where threaded male to female connections are made shall be waterproofed and rustproofed by application of a watertight, conductive thread compound. Clean threads of cutting oil before applying thread compound and making up joint. 8-31.3(4) Conductors Insulated wire and cable shall be installed in raceway systems after the system is complete. Swab conduits before installing cables, and exercise care in pulling to avoid damage to conducl:ors. Damage due to missing bushings, burrs on conduit ends, etc., shall be cause to require removal and replacement of conductors. Damaged ends shall be considered sufficient indication of damaged insulation to require replacement. Cable lubricants, pulling sleeves, pullboxes, etc., shall be used to keep pulling tensions within allowable limits. No grease will be permitted in pulling cables. Pulling compounds shall be soapstone, talc, or approved UL compounds. Pulls shall be by hand using cable grips or wrapping extra conductor around to form an eye. Cable ends shall be cut off after pulling and all compound cleaned from conducl:ors before terminating. Service, feeder, and motor branch circuits shall be continuous without splices from equipment terminale to equipment terminal or motor lead. Instrumentation and control circuits shall be continuous except for termination on terminal strips in control panels: Branch circuits may be spliced at taps. Unless otherwise shown on the drawings or specified, leave at least 6 inches of free conductor at each connected outlet (outlet connected to equipment or device) and 9 inches of free conductors at each unconnected outlet. Tape free ends of conductors and coil neatly in outlet box. Identify each wire or cable with circuit numbers at each termination and in each pull box using numbered and lettered wire markers. All electrically common conductors shall have the same number. Each electrically different conductor shall be uniquely numbered. Conductors between 284 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 terminals of different numbers shall have both terminal numbers shown at each conductor end. The identification number closest to the end of the wire shall be the same as the terminal number. Color code conductors as follows: Basic color coding: Phase 240/120 Volts 480/277 Volts A Black Brown B Orange Orange C.. Red Yellow Neutral White Gray Ground Green Connect all circuit conductors of the same color to the same phase throughout the installation. Do not use white or green color for any conductor not intended for neutral or grounding purposes. This limitation applies to power and control wiring, except smaller gauge (No. 18 or less), low voltage control circuits. Use wire with the insulation of required color for conductors No. 8 AWG or smaller. For wire larger than No. 8 AWG and other types of wire of any size, which may not be available in specified colors, use self-adhesive, wrap-around cloth type markers of solid colors to color code the conductors. Where wire markers are used for color coding, mark each conductor at all accessible locations such as panelboards, junction boxes, pullboxes, auxiliary gutters, outlets, switches, and control centers. When viewing all equipment from the front, make connections so phase color sequence is in the same order as that for panelboards, etc. Control wiring must be of colors different from power wiring or be supplied with a trace of color in addition to the basic color of the insulation. In general, use same color throughout a given system for any signal or control wires performing the same function. The Contractor shall submit the control wiring color coding scheme he proposes for the Engineer's review. Install wire neatly in all enclosures. Bundle incoming wire and cables, No. 6 and smaller, in panels and variable frequency drives, tie at intervals not to exceed 6 inches, and neatly spread into trees and connect to their respective terminals. Bend or form wires in neat runs from conduits to terminals. Allow sufficient slack in cables for alterations in terminal connections. Perform lacing with plastic cable ties. Where plastic panel wiring duct is provided for cable runs, tying is not necessary when the cable is properly installed in the duct. Arrange wires so that they may be grouped by conduit or by function in the enclosure. Arrange wires to allow wire tags and numbers to be easily read without bending or flexing wiring. For cables crossing hinges, utilize extra flexible stranded wire, made up into groups not exceeding 12, and arranged so that they will be protected from chafing when the hinged member is moved. Terminate feeder circuits with compression indent barrel connectors with one- or two -hole spade lug ends. Terminate control wiring with indent, insulated spade connectors made 285 especially for the wire size and terminal size on which they are installed and.; crimped with approved pliers or tool for the connector. All splices made below grade in concrete pullboxes and in junction boxes located in specified areas shall be made with epoxy splice kits. Feeder and motor branch circuits shall be run in individual conduit. Where several circuits follow a common route, pullboxes or fittings shall be staggered, or if shown grouped in one box, each feeder shall be individually fireproofed. At each connection, except at motors, tag .for phase rotation; at motors, tag for winding lead numbers. Make all phase rotation changes for motor direction changes at the motor to maintain correct color phase sequence in equipment. General use branch circuits shall be installed as follows: In each enclosure or box where more than one ungrounded conductor is spliced or connected, tag for panelboard identification and pole number. Single phase branch circuits may be shown with separate home runs on the drawings. These home runs may be combinedwitha common neutral as permitted by code and when they are on adjacent poles of a panelboard. No more than three ungrounded conductors shall be permitted in one branch circuit conduit, unless otherwise shown. 8-31.3(5) Boxes, Wiring Devices, Control Stations, Etc. Symbols on the plans show approximate locations and care shall be taken to locate devices to coordinate with building and equipment installation. Boxes, cabinets, and enclosures in wet areas shall be surface mounted on channel iron stanchions or set with spacers on walls and shall be attached with clamps or feet (drilling or punching enclosure to mount through inside of box or enclosure is not permitted), and they shall have all conduit connections from below arranged to drain moisture away with suitable Crouse - Hinds EYD drains installed in. the bottom. Boxes and cabinets with concentric knockouts shall have bonding jumpers and grounding bushings installed on conduit terminations. Where devices are grouped, provide gang boxes of one-piece construction. 8-31.3(6) Anchors, Supports, and Attachments Install attachments to structures or building surfaces in a manner that does not damage the structure or surface. Trim all excess length of studs, rods, or bolts. Provide stainless steel or nylon fasteners in all outdoor, wet, below grade, or any location exposed to the process. Support each raceway or device independently. Racking of conduit runs shall be permitted only with special permission of the Engineer. Provide cap nuts on all unprotected ends of threaded devices. Provide double jam nuts or lock plus cap nuts on all fixtures or equipment hangers. 286 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8-31.3(7) Instrumentation Install and connect sensors, wiring, and raceway systems. Make all necessary adjustments to the systems and instruct the Contracting Agency's personnel in the proper operation of the systems. Test the control and instrumentation system as follows: Input analog signals to verify all instrument adjustments, operation, etc. Set zero and span on all devices to Engineer's initial values. Input contact devices to relays, annunciators, etc., to verify operation, of control components. Check, ring out, and verify all terminal connections per final drawings. 8-31.3(8) Control Panels 8-31.3(8)A Panel Component Installation Components mounted in the interior shall be fastened to an interior subpanel using machine screws plus adhesive to insure vibration -free attachment. No fastening devices shall project through the outer surfaces of the cabinet. Interior component mounting and wiring shall be grouped as much as possible by function and then by component type.- Interiors shall be so arranged that control relays, terminal blocks, fuses, etc., can be replaced or added without disturbing adjacent components. Spare mounting space equal to at least 20 percent of each type of component shall be provided for all components in the system except those mounted on the panel front. This provision applies primarily to relays, gutter space, internal selector switches, fuses, and similar component. Space front mounted components 1-7/8 inches minimum between horizontal rows. Space vertical columns of components 1-1/2 inches minimum. Components shall be grouped and/or located as indicated on the Drawings. In general, all indicating lights, pushbuttons, etc., shall be mounted in accordance with the sequence of operation from left to right and top to bottom. Devices, including relays, timers, and terminal blocks, installed on the panel subplate shall be provided with a minimum spacing between the component and the wire duct of 1 inch. Minimum spacing between adjacent components shall be 1 inch. A minimum of.2 inches shall be provided between terminal strips and wireways or between terminal strips. Where terminal blocks are used for low energy resistance, current, or voltage circuits, they shall be physically separated from line voltage circuit or current transformer secondary circuits. Where multiple terminals areshown for a given wire number, additional terminals shall be provided and jumpered as necessary to provide terminal spaces for each individual outgoing wire. Terminals shall be mounted on a flat steel channel or strut that raises them to the level of the adjacent wire gutters (1 to 3 inches above the subplate). Terminal numbers shall correspond to those shown on the elementary wiring diagram. Provide space for a minimum of 10 percent additional terminals distributed at each group of terminals. 287 8-31.3(8)B Panel Wiring Run wiring within the panel in wiring duct neatly tied and bundled with tie wraps or similar materials. All wires to internal components shall be connected to the "inside" or panel side of the terminal strip. All wires to external components shall be connected to the "outside" or field side of the terminal strip. Wires to enclosure door mounted components shall be considered as internal wires. No more than two wires shall be connected to any one control terminal point. Wiring crossing hinged surfaces shall be an 18 -inch "U" shaped hinge loop of extra flexible wires secured at both ends. Wiring inside the panel shall be arranged to separate low voltage control signals of the milliamp-millivolt or other low energy type from inductive power circuits, and all panel wiring shall be effectively shielded and grounded to a panel common, which will be grounded by the electrical contractor in the field. Shielding of instrumentation circuits shall be connected to insulated terminals provided adjacent to the circuit terminals (i.e., 3 terminals for 4-20 mA analog circuits). In general, analog circuit shall be run directly from instrument to instrument without termination. Loop wiring connections to devices shall be made by joining two runs of cable at the device, terminating on conductor of each cable on the device and splicing the other conductors. 8-31.3(13)C Marking and Identification Wiring, which is an internal part of a device and is not connected to external terminal blocks, may be wired using the manufacturer's standard wire designations. Wire, which connects to external circuits, to terminal blocks, or other devices, which are connected to external circuits, shall be identified by the numbers shown on the elementary wiring diagrams. Every wire termination, including all jumpers, shall be identified with wire markers. Wire markers shall be installed over wire terminators or directly adjacent to them. Markers shall be arranged to permit reading of identification without the flexing or twisting of wires. Nameplates shall be installed plumb and parallel to the lines of doors or structure to which they are attached. Nameplates shall be attached to the sheet metal structure by a thin coat of adhesive and sheet metal screws. Adhesive and screw application shall be made in a manner to avoid buckling or distorting nameplates due to use of excessive adhesive or over tightening of screws. 8-31.3(9) Training and Service The Contractor shall provide a minimum of 8 hours of training on the function of the pump station control system and integration with the existing telemetry system. This training shall occur immediately following startup of the pump station. The exact agenda for the training shall be as directed by the Owner's representative. The Contractor shall also provide follow-up visits at approximately 3 months, 6 months, and 12 months after the date of turn -on and substantial completion of the work. These visits shall provide a minimum of 2 hours further instruction, troubleshooting, discussion of problems, etc., with the Owner's representative. Any warranty or maintenance items that are routine within this 288 period shall be performed at these times. In addition to this, the vendor shall provide a minimum of two emergency basis trips to the job site at no additional cost to the Contracting Agency during the warranty period. These visits, if unused within the first year of operation, shall be provided as second year follow-up visits for further instruction and/or troubleshooting of the system in the period following the initial year of operation at approximately 18 and 24 months time. 8-31.3(10) Pump Station Control Strategy The MLK Jr. Blvd. Pump Station is located near intersection of MLK Jr. Blvd. and Front Street. The pump station receives storm water runoff and groundwater infiltration that collects at the low point of the underpass along MLK Jr. Blvd. The collected storm water runoff and groundwater infiltration is conveyed via gravity to a wet well, where it is then pumped using submersible pumps to a presettling basin, which is followed by a water quality pond and infiltration pond. - Operation of the pumps is controlled based on water level in the wet well. 8-31.3(10)A Operations Philosophy Normally, control logic in the programmable logic controller (PLC) will be used to control operation of the pumps. However, the pumps can also be operated manually without the PLC using the pump panel. The pump station control panel will be located near the wet well in a weatherproof enclosure. 8-31.3(10)B Control Description The pump panel will have a Hand -Off -Auto (HOA) switch for each pump. HOA switches for all pumps will normally be in the "Auto" position, which allows pumps to be controlled by the PLC based on measured water level in the wet well. When an HOA switch is in the "Hand" position,. the corresponding pump will run continuously, regardless of level in the wet well. When an HOA switch is in the "Off" position, the corresponding pump will not run, regardless of level in the wet well. The wet well level measurement system will continuously report water level in the wet well, regardless of the pump operation mode. The pump station will have three pumps: two small pumps and one larger pump. All pumps will operate at constant speed. Pumping will normally be limited to the two small pumps, except that the Targe pump will operate during significant storm events when runoff exceeds the capacity of both small pumps. The two small pumps will alternate as lead and lag pumps. 8-31.3(10)6.1 "Auto" Control The PLC will not attempt to start any pump unless that pump's HOA switch is in the "Auto" position. In general, the PLC will designate the lead pump as the pump that is not the "Last Running Pump". The PLC shall call the lead small pump to run once the water level in the wet well has reached the high water level (HWL) set point. If the water level continues to rise and reaches the high - high water level (HHWL) set point, the lag small pump will be called to run, in addition to the lead small pump already running. If the water level reaches the high -high -high water level (HHHWL), the large pump will also be called to run, such that all three pumps are running. When the water level drops to the low water level (LWL), all operating pumps will be 289 automatically stopped. After the pumps are stopped, the lead small pump becomes the lag small pump and the other small pump becomes the lead small pump. If the lead pump has been running continuously for longer than a set point duration, the lag pump will start, the lead pump will stop, and the lag pump will become the lead pump. 8-31.3(10)8.2 "Pump Fail" Alarm 1 If the PLC calls a pump to start and run feedback from that pump is not received within a set time period, then a "Pump Fail" alarm is set in the PLC and is also made visible at the pump control panel. There will be separate indication for each pump at the pump control panel. This "Pump Fail" condition includes not only when a pump is first called to run, but also if it is already running and then stops while the call to run is being asserted. Upon occurrence of a "Pump Fail" alarm, the PLC will remove the call to run for the lead pump and issue a call to run for the lag pump, if the lag pump is not already running. The "Pump Fail" alarm will remain until the alarm is reset, the pump's HOA is placed in "Hand" and the pump starts, or until the pump is called again. If the failed pump is called by the PLC and fails to start again, a new instance of the "Pump Fail" alarm will be set in the PLC. 1 1 1 In addition to a failure to run, a "Pump Fail" alarm can also be set in the PLC when signals from the pump motor thermostats indicate high motor temperature, in which case the pump will be automatically stopped. If a pump leak detection switch indicates moisture penetrating the pump mechanical seal, an alarm will be set in the PLC, but the pump will not be stopped. 8-31.3(10)B.3 Backup Float Switches In the event there is a failure of the level transmitter and/or PLC, backup float switches hard wired to the pump motor starters and timer relays will control level in the wet well. When the backup high water level (BHWL-3) float is switched, the Pump #3 will start. Once the water level drops and the BHWL-3 float is deactivated, the pump will continue to run for the duration of the timer relay set point. Once the timer relay set point is reached, the pump will stop. The timer relay shall have an adjustable set point with a default setting of 480 seconds. When the backup high -high water level (BHWL-2) float is switched, the Pump #2 will start. Once the water level drops and the BHWL-2 float is deactivated, the pump will continue to run for the duration of the timer relay set point. Once the timer relay set point is reached, the pump will stop. The timer relay shall have an adjustable set point with a default setting of 540 seconds. - When the backup high -high -high water level (BHWL-1) float is switched, the Pump #1 will start. Once the water level drops and the BHWL-1 float is deactivated, the pump will continue to run for the duration of the timer relay set point. Once the timer relay set point is reached, the pump will stop. The timer relay shall have an adjustable set point with a default setting of 240 seconds. The timer relays for the float switches are to be one-shot off timers that will start the countdown on the first trigger and not restart the countdown on subsequent triggers until the initial countdown is complete. 8-31.3(10)6.4 High Level Alarm 290 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 If the water level. in the wet well reaches the BHWL-1 set point for an adjustable time period (default of 2 minutes), a high water level alarm is set in the PLC. If all pumps are not already running, the PLC will issue a call to run all pumps. 8-31.3(10)6.5 Level Transmitter Fail Alarm The PLC will monitor the analog level input signal to verify it is within the correct 4 to 20 mA operating range. If the analog signal goes below 3.8 mA or above 20.2 mA for 3 seconds a "Level Transmitter Fail" alarm is set by the PLC and the indication is given that pump station operation is via the backup float switches. 8-31.3(10)6.6 Runtime The PLC will calculate runtime for all pumps. The user will be able to reset runtime in the PLC. 8-31.3(10)6.7 Flow Calculation The PLC will calculate and display estimated flow from the pumps at specified intervals using the change in wet well level over time. 8-31.3(10)6.8 Start Count The PLC will calculate the number of starts for each pump. The user will be able to reset the start count in the PLC. 8-31.3(10)6.9 Last Running Pump The PLC will record the last pump that was successfully called to run. 8-31.3(10)C PLC Input and Output Schedule Each Pump: Discrete Output: - Call to Stop (Auto) - Pump Fail Alarm - PLC Fail Alarm Analog Output: (None) Discrete Input: - Run Status - HOA in the AUTO Mode - HOA in the HAND Mode - Pump Overload - Leak Detection - High Motor Temperature - Backup High Water Level Analog Input: - Amps Wet Well: Discrete Output: - High Level Alarm 291 - Call Pump 3 to Run (BHWL-3 Float) - Call Pump 2 to Run (BHWL-2 Float) - Call Pump 1 to Run (BHWL-1 Float) - PLC Fail Alarm - Level Transmitter Fail Alarm Analog Output: (None) Discrete Input: - BHWL-3 Float Switch Contact (Pump 3) - BHWL-2 Float Switch Contact (Pump 2) - BHWL-1 Float Switch Contact (Pump 1) Analog Input: - Level Indication Power: Discrete Output: (None) Analog Output: (None) Discrete Input: - ATS connected to utility - ATS connected to utility - ATS utility source No. 1 - ATS utility source No. 2 - Power available - TVSS status Analog Input: (None) 8-31.3(10)0 Water Level Set Points source No. 1 source No. 2 Available Available Tag Name Function Elevation (feet) BHWL-1 (Backup Float) Backup High -High -High Water Level Run Pump #1, High Level Alarm (if level does not drop after set time period) 1,044.25 BHWL-2 (Backup Float) Backup High -High Water Level Run Pump #2, High . Level Alarm (if level does not drop after set time period) 1,043.25 BHWL-3 (Backup Float) Backup High Water Level Run Pump #3, High Level Alarm (if level does not drop after set time period) 1,042.25 HHHWL Set Point High -High -High Water Level Start Large Pump 1,041.25 HHWL Set Point High -High Water Level Start Lag Small Pump .1,039.25 HWL Set Point High Water Level Start Lead Small Pump 1,037.25 292 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Tag Name Function Elevation (feet) LWL Set Point Low Water Level Stop AM Pumps 1,033.25 8-31.3(10)E Telemetry The MLK Jr. Blvd. pump station will have an Ethernet connection (via fiber optic cable) to the existing Lincoln Avenue pump station installed. The MLK Jr. Blvd. pump station PLC shall be configured to communicate to the existing telemetry system at the Lincoln Avenue pump station. The Contractor is responsible for programming of the existing telemetry system at the Lincoln Avenue pump station to receive information from the MLK Jr. Blvd. pump station and send that information to the Owner's Collections System SCADA. Programming of the Collections System SCADA master station to communicate with the new MLK Jr. Blvd pump station will be performed by others. Coordinate with the Owner to provide IP addresses, data register addresses, etc. 8-31.4 Measurement No specific unit of measurement will apply to the lump sum item of pump station 8-31.5 Payment All work defined in this section shall be included in the lump sum bid item "Pump Station" as described in section 7-20 of these Special Provisions. Pump Station electrical work includes furnishing and installing in good working order, the control panel, reinforced concrete and reinforcing steel, new service connection including conduits, wiring, level sensor, float switch, testing, programming of the PLC, training for the control system, and including, all necessary excavation, backfill, bedding, and other work, all as specified herein and as further shown on the Drawings. This includes all conductors from the MLK Pump Station back to the Lincoln Pump Station. Pump Station telemetry work includes furnishing and installing, in good working order, communications to the existing telemetry system, contacts, annunciators, conduit, wiring, testing, appurtenances, programming for the existing telemetry system, training for integration of the telemetry system, and other work, all as specified herein and as further shown on the Drawings. 8-33 FIELD OFFICE BUILDING (NEW SECTION) 8-33.1 Description This work shall consist of furnishing and setting up a temporary office building for the sole use of the Contracting Agency. 293 8-33.3 Construction Requirements The building shall be set up, at the location designated by the Engineer, within the first ten (10) working days, unless the Engineer has approved a different schedule. = The building shall be weather -tight, installed plumb and level, and provided with the following as a minimum: 1. 400 minimum square feet of floor space, including two offices separated from a conference area. 2. Above ground floor 3. Heat and air conditioning 4. Electric lights 5. Telephone 6. Adequate windows T 6. square feet of shelving 8. Plan table: 3 feet 6 inches deep by 6 feet wide by 3 feet 3 inches high 9. Drafting stool 10. Conference table: 4 feet by 10 feet 11. Ten chairs 12.4 desks and chairs 13. Cylinder door lock and six keys 14. Sanitary facilities (unless existing facilities are available) 15. High speed Internet 8-33.4 Measurement No specific unit of measure will apply to the lump sum bid, item for field office building. 8-33.5 Payment "Field Office Building", per lump sum. The lump sum Contract price for Field Office Building shall be full pay for furnishing, installing, maintaining, and removing the facility, including all costs associated with all required utility hookups and disconnects, and monthly utility charges for all utilities including power, telephone and high speed internet. END DIVISION 8 294 1 1 9-03 AGGREGATES 9-03.8(2) HMA Test Requirements (March 10, 2010 APWA GSP) 11 1 1 1 1 11 11 11 11 DIVISION 9 MATERIALS Section 9-03.8(2) is supplemented with the following: ESAL's The number of ESAL's for the design and acceptance of the HMA shall be *** 8 '`** million. 9-03.8(7) HMA Tolerances and Adjustments (March 10, 2010 APWA GSP) Delete Item 1 and replace it with the following: 1. Job Mix Formula Tolerances. After the JMF is determined as required in 5-04.3(7)A, the constituents of the mixture at the time of acceptance shall conform to the following tolerances: These tolerance limits constitute the allowable limits as described in Section 1-06.2. The tolerance limit for aggregate shall not exceed the limits of the control points section, except the tolerance limits for sieves designated as 100% passing will be 99-100. The tolerance limits on sieves shall only apply to sieves with control 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 9-23.9 Fly Ash (RC) Section 9-23.9 is revised as follows: Fly ash shall not be used around water lines. 295 Nonstatistical Evaluation Commercial Evaluation Aggregate, percent passing • 1", 3/4", 1/2", and 3/8" sieves ±6% ±8% U.S. No. 4 sieve ±6% ±8% U.S. No. 8 sieve ±6% ±8% U.S. No. 200 sieve ±2.0% ±3.0% Asphalt Binder ±0.5% ±0.7% These tolerance limits constitute the allowable limits as described in Section 1-06.2. The tolerance limit for aggregate shall not exceed the limits of the control points section, except the tolerance limits for sieves designated as 100% passing will be 99-100. The tolerance limits on sieves shall only apply to sieves with control 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 9-23.9 Fly Ash (RC) Section 9-23.9 is revised as follows: Fly ash shall not be used around water lines. 295 9-28 SIGNING MATERIALS AND FABRICATION April 7, 2008 Sign Support Structures Section 9-28.14 is supplemented with the following: Manufacturers for Steel Sign Supports The Standard Plans lists several steel sign support types. These supports are patented devices and many are sole -source. All of the sign support types listed below are acceptable when shown in the plans. Steel Sign Support Type Manufacturer Type TP -A & TP -B Transpo Industries, Inc. Type PL, PL -T & PL -U Northwest Pipe Co. Type AS Transpo Industries, Inc. Type AP Transpo Industries, Inc. Type ST 1, ST 2, ST 3, & ST 4 Ultimate Highway Products, Allied Tube & Conduit, Inc., Northwest Pipe, Inc. Type SB -1, SB -2, & SB -3 Ultimate Highway Products, Xcessories Squared Development and Manufacturing Incorporated„ Northwest Pipe, Inc. 9-30 WATER DISTRIBUTION MATERIALS 9-30.1 Pipe 9-30.1(1) Ductile Iron Pipe The last sentence of paragraph 1 is replaced with the following: (******) Ductile iron pipe shall be Special Thickness Class 52 with cement mortar lining complying with, AWWA C151/A21.51 and C104/A21.4 most current editions. Paragraph 2 is replaced with the following: Non -restraining joints shall be rubber gasket, push -on type (Tyton Joint), conforming to ,ANSI/AWWA CIII/A21.11, most current edition. Paragraph 3 is replaced with the following: (******) Restrained joints shall be US Pipe "Field-Iok" gaskets or approved equal. 296 9-30.1(4) Steel Pipe Delete this section. 9-30.1(5) Polyvinyl Chloride (PVC) Delete this section. 9-30.1(6) Polyethylene (PE) Pressure Pipe (4 Inches and Over) Delete this section 9-30.2 Fittings 9-30.2(4) Steel Pipe Delete this section 9-30.2(5) Polyvinyl Chloride (PVC) Pipe Delete this section 9-30.2(6) Restrained Joints Revise this section to read: The restraining of ductile iron pipe, fittings, and valves shall be accomplished by the use of ROMAC "Grip Ring" follower gland or approved equal. Any device utilizing round point set screws shall not be permitted. All couplings installed underground to connect ductile iron shall be manufactured of ductile iron. 9-30.2(9) Grooved and Shouldered Joints Delete this section. 9-30.2(10) Polyethylene (PE) Pipe (4 Inches and Over) Delete this section. 9-30.2(11) Fabricated Steel Mechanical Slip -Type Expansion Joints Delete this section 9-30.3 Valves 9-30.3(1) Gate Valves Revise this section to read: 9-30.3(1) Gate Valves (2 -inches to 8 -inches) Gate valves, sized 2 -inch through 8 -inch, shall be resilient seated gate valves conforming to ANSI/AWWA C 509 latest edition. The valves shall have mechanical joint connections including accessories, or flanged connections, as noted on the Plans. The Contractor shall provide an affidavit of compliance stating that the valve furnished fully complies with AWWA C509 297 Approved gate valve manufacturers include: • Mueller Co. • Clow Valve Co. • M&H Valve Co. • Kennedy Valve Co. • American Flow Control 9-30.3(2) Gate Valve (14 Inches and 16 Inches) Delete this section. 9.30.3(3) Butterfly Valves Supplement this section with the following: All valves 12 -inches and over shall be butterfly valves conforming to ANSI/AWWA C504, latest edition. 9-30.3(4) Valve Boxes Supplement the first paragraph with the following The top section of the valve boxes shall be Rich Model 940-B, or equal, 18 inches high. The bottom section shall be a Rich Model R-36, or equal, 36 inches high. Extension section shall be Rich Model 044, or equal, 12 inches high. 9-30.3(5) Valve Marker Posts Delete this section 9-30.3(8) Tapping Sleeve and Valve Assembly Delete this section 9-30.5 Hydrants 9-30.5(1) End Connections Replace with the following: The end connection shall be mechanical joint, meeting the requirements of AWWA C110. Hydrants domes and nozzle caps to be painted black using Rustoleum's Paint No. 634 or approved equal. Hydrant nozzle body to be painted yellow using Rustoleum's No. 659 or approved equal. Nozzle caps and operating nut to be 1 -1/2 -inch pentagon point to flat. Hydrants to have weather caps installed on or over the operating nut. Hydrant pumper port to be supplied with 5 -inch Storz coupling nozzle x 4 -1/2 -inch NST connection with cap and cable. Approved hydrants include: 298 • Mueller Super Centurion 250 • M&H Style 129 • M&H Style 929 • East Jordan Iron Works WaterMaster 5CD250 9-30.6 Water Service Connections (2 Inches and Smaller) Delete this section END DIVISION 9 (August 6, 2012) Standard Plans The State of Washington Standard Plans for Road, Bridge and Municipal Construction M21-01 transmitted under Publications Transmittal No. PT 11-036, effective August 6, 2012 is made a part of this contract. The Standard Plans are revised as follows: B-10.20 and B10.40 Substitute "step" in lieu of "handhold" on plan C-5 Deleted C-13 Deleted C -13a Deleted C -13b Deleted C -13c Deleted. C -14a Deleted C -14b Deleted C -14c Deleted C -14d 299 Deleted C -14e • Deleted C-1 5a Deleted C -15b Deleted C-28.40 Deleted C-70.10-00 Elevation,. and Barrier Connection Detail, callout for premolded joint filler, revise 1/4" to 3/8" Note 1, revise 1/4" to 3/8". The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-75.10-00 Elevation, callout for premolded joint filler, revise 1/4" to 3/8", Note 1, revise 1/4" to 3/8". The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-75.20-00 Elevation, callout for premolded joint filler, revise '/d' to 3/8", Note 1, revise '/d' to 3/8". The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-75.30-00 Elevation, and Plan views, callout for premolded joint filler, revise 1" to 3/8" ", Note 1, revise '/d' to 3/8". The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-80.10-00 The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification 300 Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-80.20-00 The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-80.30-00 The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is -revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." C-80.40-00 The Welded Wire Reinforcing Substitution Option Table is deleted. The note, "*Optional Substitutions to Welded Wire Reinforcements shall conform to Standard Specification Sections 6-10 and 9-07" is revised to read: "Steel Welded Wire Reinforcement Deformed, for Concrete may be substituted for reinforcing steel in accordance with Standard Specification 6-10.3." D-3 Deleted D-3.10 Key Note 7, reference to 1130.04(5).06 is revised to 730.05(5) J -1f Deleted J -3b Sheet 2 of 2, Plan View of Service Cabinet, Boxed Note, "SEE STANDARD PLAN J -6C..." is revised to read: "SEE STANDARD PLAN J-10.10..." Sheet 2 of 2, Plan View of Service Cabinet Notes, references to Std. Plan J -9a are revised to J-60.05 (3 instances). J -7c Deleted J-12 Deleted J -16b Key Note 1, reference to J -16a is revised to J-40.36 J -16c Key Note 1, reference to J -16a is revised to J-40.36 301 J-50.16 Deleted J-75.40 Monotube Sign Structure, elevation, callout - EQUIPMENT GROUNDING CONDUCTOR SIZE PER NEC. MINIMUM SIZE # 8 Is revised to read; EQUIPMENT GROUNDING CONDUCTOR - SIZE PER NEC minimum size#4AWG Detail C, callout- EQUIPMENT GROUNDING CONDUCTOR - CLAMP TO STEEL REINFORCING BAR, SIZE PER NEC MIN. SIZE # 8 Is revised to read; EQUIPMENT GROUNDING CONDUCTOR CLAMP TO STEEL REINFORCING BAR, SIZE PER NEC minimum size # 4 AWG J-75.45 elevation, callout - EQUIPMENT GROUNDING CONDUCTOR - SIZE PER NEC. MINIMUM SIZE # 8 Is revised to read: EQUIPMENT GROUNDING CONDUCTOR - SIZE PER NEC minimum size # 4 AWG Detail D, callout- EQUIPMENT GROUNDING CONDUCTOR - CLAMP TO STEEL REINFORCING BAR, SIZE PER NEC. MIN. SIZE # 8 Is revised to read:. EQUIPMENT GROUNDING CONDUCTOR - CLAMP TO STEEL REINFORCING BAR, SIZE PER NEC minimum size # 4 AWG K-80.30 In the NARROW BASE, END view, the reference to Std. Plan C -8e is revised to Std. Plan K-80.35 The following are the Standard Plan numbers applicable at the time this project was advertised. The date shown with each plan number is the publication approval date shown in the lower right-hand corner of that plan. Standard Plans showing different dates shall not be used in this contract. A-10.10-00 8/7/07 A-30.35-00 10/12/07 A-50.20-01 ...9/22/09 A-10.20-00 10/5/07 A-40.00-00 8/11/09 A-50.30-00 11/17/08 A-10.30-00 10/5/07 A-40.10-02 6/2/11 A-50.40-00 11/17/08 A-20.10-00 8/31/07 A-40.15-00 8/11/09 A-60.10-01 10/14/09 A-30.10-00 11/8/07 A-40.20-01 2/7/12 A-60.20-02 6/2/11 A-30.15-00 11/8/07 A-40.50-01 6/2/11 A-60.30-00 11/8/07 A-30.30-01 6/16/11 A-50.10-00 11/17/08 A-60.40-00 8/31/07 B-5.20-01 6/16/11 B-30.50-01 4/26/12 B-75.20-01 6/10/08 B-5.40.01 6/16/11 B-30.70-03 4/26/12 B-75.50-01 6/10/08 B-5.60-01 6/16/11 B-30.80-00 6/8/06 B-75.60-00 6/8/06 B-10.20-01 2/7/12 8-30.90-01 9/20/07 B-80.20-00 6/8/06 302 B-10.40-00 6/1/06 B-10.60-00 6/8/06 B-1520-01 2/7/12 B-15.40-01 2/7/12 B-15.60-01 2/7/12 B-20.20-02 3/16/12 B-20.40-03 3/16/12 B-20.60-03 3/15/12 B-2520-01 3/15/12 B-25.60-00 6/1/06 B-30.10-01 4/26/12 B-30.20-02 4/26/12 B-30.30-01 4/26/12 13-30.40-01 4/26/12 C-1 6/16/11 C -la 10/14/09 C -lb 6/16/11 C -lc 5/30/97 C-1 d 10/31/03 C-2 1/6/00 C -2a 6/21/06 C -2b 6/21/06 C -2c 6/21/06 C -2d 6/21/06 C -2e 6/21/06 C -2f 3/14/97 C -2g 7/27/01 C -2h 3/28/97 C -2i 3/28/97 C -2j 6/12/98 C -2k 7/27/01 C -2n 7/27/01 C -2o 7/13/01 C -2p 10/31/03 C-3 6/27/11 C -3a 10/4/05 C -3b 6/27/11 C -3c 6/27/11 C -4b 6/8/06 C -4e 2/20/03 C -4f 7/2/12 D-2.04-00 11/10/05 D-2.06-01 1/6/09 D-2.08-00 11/10/05 D-2.14-00 11/10/05 D-2.16-00 11/10/05 D-2.18-00 11/10/05 B-35.20-00 6/8/06 B-80.40-00 6/1/06 B-35.40-00 6/8/06 B-82.20-00 6/1/06 B-40.20-00 6/1/06 B-85.10-01 6/10/08 B-40.40-01 6/16/10 B-85.20-00 6/1/06 B-45.20-00 6/1/06 6-85.30-00 6/1/06 B-45.40-00 6/1/06 B-85.40-00 6/8/06 B-50.20-00 6/1/06 B-85.50-01 6/10/08 B-55.20-00 6/1/06 B-90.10-00 6/8/06 B-60.20-00 6/8/06 B-90.20-00 6/8/06 B-60.40-00 6/1/06 B-90.30-00 6/8/06 B-65.20-01 4/26/12 B-90.40-00 6/8/06 B-65.40-00 6/1/06 B-90.50-00 6/8/06 B-70.20-00 6/1/06 B-95.20-01 2/3/09 B-70.60-00 6/1/06 B-95.40-00 6/8/06 C-6 5/30/97 C -6a 10/14/09 C -6c 1/6/00 C -6d 5/30/97 C -6f 7/25/97 C-7 6/16/11 C -7a 6/16/11 C-8 2/10/09 C -8a 7/25/97 C -8b 6/27/11 C -8e 2/21/07 C -8f 6/30/04 C-10 6/3/10 C -16a 6/3/10 C -16b 6/3/10 C-20.10-00 7/2/12 C-20.14-02 7/2/12 C-20.15-01 7/2/12 C-20.18-01 7/2/12 C-20.19-01 7/2/12 C-20.40-03 7/2/12 C-20.42-03 7/2/12 C-20.45.01 7/2/12 C-22.14-02 6/16/11 C-22.16-03 4/18/12 C-22.40-02 6/16/10 C-22,45.00 6/16/11 D-2.48-00 11/10/05 D-2.64-01 1/6/09 D-2.66-00 11/10/05 D-2.68-00 11/10/05 D-2.80-00 11/10/05 D-2.82-00 11/10/05 303 C-23.60-02 6/21/12 C.24.10-00 7/12/12 C-25.18-03 7/2/12 C-25.20-05 7/2/12 C-25.22-04 7/2/12 C-25.26-02 7/2/12 C-25.80-02 7/2/12 C-40.14-02 7/2/12 C-40.16-02 7/2/12 C-40.18-02 7/2/12 C-70.10-00 4/8/12 C-75.10-00 4/8/12 C-75.20-00 4/8/12 C-75.30-00 4/8/12 C-80.10-00 4/8/12 C-80.20-00 4/8/12 C-80.30-00 4/8/12 C-80.40-00 4/8/12 C-80.50-00 4/8/12 C-85.10-00 4/8/12 C-85.11-00 4/8/12 C-85.14-00 6/16/11 C-85.15-00 6/16/11 C-85.16-00 6/16/11 C-85-18-00 6/16/11 C-85.20-00 6/16/11 C-90.10-00 7/3/08 D-3.17-01 5/17/12 D-4 12/11/98 D-6 6/19/98 D-10.10-01 12/2/08 D-10.15-01 12/2/08 D-10.20-00 7/8/08 D-2.20-00 11/10/05 D-2.32-00 11/10/05 D-2.34-01 1/6/09 D-2.36-02 1/6/09 D -2A2-00 11/10/05 D-2.44-00 11/10/05 D-2.60-00 11/10/05 D-2.62-00 11/10/05 D-2.46-00 11/10/05 E-1 2/21/07 E-2 5/29/98 F-10.12-02 6/16/11 F-10.16-00 12/20/06 F-10.18-00 6/27/11 F-10.40-02 6/21/12 F-10.42-00 1/23/07 G-10.10-00 9/20/07 G-20.10-00 9/20/07 G-22.10-01 7/3/08 G-24.10-00 11/8/07 G-24.20-01 2/7/12 G-24.30-01 2/7/12 G-24.40-02 2/7/12 G-24.50-01 2/7/12 H-10.10-00 H-10.15-00 H-30.10-00 D-2.84-00 11/10/05 D-2.86-00 11/10/05 D-2.88-00 11/10/05 D-2.92-00 11/10/05 D-3.09-00 5/17/12 D-3.10-00 6/16/10 D-3.11-01 3/15/12 D-3.15-01 5/17/12 D-3.16-01 5/17/12 E-4 8/27/03 E -4a 8/27/03 F-10.62-01 9/05/07 F-10.64-02 7/3/08 F-30.10-01 6/3/10 F-40.12-01 6/3/10 F-40.14-01 6/3/10 G-24.60-01 6/16/11 G-25.10-03 3/15/12 G-30.10-01 6/16/11 G-50.10-00 11/8/07 G-60.10-01 6/27/11 G-60.20-01 6/27/11 G-60.30-01 6/27/11 G-70.10-01 6/27/11 D-10.25-00 7/8/08 D-10.30-00 7/8/08 D-10.35-00 7/8/08 D-10.40-01 12/2/08 D-10.45-01 12/2/08 D-15.10-01 12/2/08 D-15.20-02 6/2/11 D-15.30-01 12/02/08 F-40.15-01 6/3/10 F-40.16-01 6/3/10 F-45.10-01 6/21/12 F-80.10-02 3/15/12 G-70.20-01....6/27/11 G-70.30-01 6/27/11 G-90.10-01 5/11/11 G-90.20-016/27/11 G-90.30-016/2/11 G-90.40-01 10/14/09 G-95.10-01 6/2/11 G-95.20-02 6/2/11 G-95.30-02 6/2/11 7/3/08 H-32.10-00 9/20/07 H-70.10-01 2/7/12 7/3/08 H-60.10-01 7/3/08 H-70.20-01 2/16/12 10/12/07 H-60.20-01 7/3/08 H-70.30-02 2/7/12 1-10.10-01 1-30.10-01 1-30.15-01 1-30.20-00 1-30.30-00 8/11/09 1-30.40-00 10/12/07 1-50.20-00 8/31/07 8/11/09 1-40.10-00 9/20/07 1-60.10-00 8/31/07 2/7/12 1-40.20-00 9/20/07 1-60.20-00 8/31/07 9/20/07 1-50.10-00 9/20/07 1-80.10-01 8/11/09 9/20/07 J-3 8/1/97 J-22.15-00 10/14/09 J-40.30-02 5/11/11 J -3b 3/4/05 J-22.16-01 6/3/10 J-40.35-00 3/15/12 J -3c 6/24/02 J-26.10-02 3/15/12 J-40.36-00 6/3/10 J -3d 11/5/03 J-26.15-01 5/17/12 J-40.37-00 6/3/10 J-10 7/18/97 J-27.10-00 3/15/12 J-40.38-00 6/16/11 J-10.10-01 5/11/11 J-27.15-00 3/15/12 J-50.10-00 6/3/11 J-10.15-00 7/2/12 J-28.10-01 5/11/11 J-50.11-00 6/3/11 J-15.10-00 5/8/12 J-28.22-00 8/07/07 J-50.12-00 6/3/11 J-15.15-00 6/16/10 J-28.24-00 8/07/07 J-50.15-00 6/3/11 J -16b 2/10/09 J-28.26-01 12/02/08 J-50.20-00 6/3/11 J -16c.. 2/10/09 J-28.30-02 6/27/11 J-50.25-00 6/3/11 304 J-20.10-01 7/12/12 J-20.11-00 7/12/12 J-20.15-01 7/12/12 J-20.16-01 7/12/12 J-20.20-01 7/12/12 J-20.26-01 7/12/12 J-21.10-02 6/27/11 J-21.15-00 10/14/09 J-21.16-00 10/14/09 J-21.17-00 10/14/09 J-21.20-00 10/14/09 K-10.20-01 10/12/07 K-10.40-00 2/15/07 K-20.20-01 10/12/07 K-20.40-00 2/15/07 K-20.60-00 2/15/07 K-22.20-01 10/12/07 K-24.20-00 2/15/07 K-24.40-01 10/12/07 K-24.60-00 2/15/07 K-24.80-01 10/12/07 K-26.20-00 2/15/07 L-10.10-02 6/21/12 L-20.10-02 6/21/12 L-30.10-01 6/16/11 M-1.20-02 6/3/11 M-1.40-02 6/3/11 M-1.60-02 6/3/11 M-1.80-03 6/3/11 M-2.20-02 6/3/11 M-3.10-03 6/3/11 M-3.20-02 6/3/11 M-3.30-03 6/3/11 M-3.40-03 6/3/11 M-3.50-02 6/3/1.1 M-5.10-02 6/3/11 M-7.50-01 1/30/07 M-9.50-01 1/30/07 J-28.40-01 J-28.42-00 J-28.45-01 J-28.50-02 J-28.60-01 J-28.70-01 J-29.10-00 J-29.15-00 J-29.16-00 J-40.10-02 J-40.20-01 10/14/09 J-50.30-00 8/07/07 J-60.05-00 6/27/11 J-60.13-00 6/2/11 J-60.14-00 6/2/11 J-75.10-01 5/11/11 J-75.20-00 6/27/11 J-75.30-01 6/27/11 J-75.40-00 6/27/11 J-75.45-00 5/11/11 J-90.10-01 5/17/12 J-90.20-01 6/3/11 6/16/11 ..6/16/10 6/16/10 5/11/11 2/10/09 5/11/11 10/14/09 10/14/09 6/27/11 6/27/11 K-26.40-01 10/12/07 K-30.20-00 2/15/07 K-30.40-01 10/12/07 K-32.20-00 2/15/07 K-32.40-00 2/15/07 K-32.60-00 2/15/07 K-32.80-00 2/15/07 K-34.20-00 2/15/07 K-36.20-00 2/15/07 K-40.20-00 2/15/07 K-40.40-00 2/15/07 L-40.10-02 6/21/12 L-40.15-01 6/16/11 L-40.20-02 6/21/12 M-9.60-00 2/10/09 M-11.10-01 1/30/07 M-15.10-01 2/6/07 M-17.10-02 7/3/08 M-20.10-02 6/3/11 M-20.20-01 1/30/07 M-20.30-02 10/14/09 M-20.40-02 6/3/11 M-20.50-02 6/3/11 M-24.20-01 5/31/06 M-24.40-01 5/31/06 M-24.50-00 6/16/11 M-24.60-03 5/11/11 K-40.60-00 2/15/07 K-40.80-00 2/15/07 K-55.20-00 2/15/07 K-60.20-02 7/3/08 K-60.40-00 2/15/07 K-70.20-00 2/15/07 K-80.10-00 2/21/07 K-80.20-00 12/20/06 K-80.30-00 2/21/07 K-80.35-00 2/21/07 K-80.37-00 2/21/07 L-70.10-01 5/21/08 L-70.20-01 5/21/08 M-40.10-02 5/11/11 M-40.20-00...10/12/07 M-40.30-00 9/20/07 M-40.40-00 9/20/07 M-40.50-00 9/20/07 M-40.60-00 9/20/07 M-60.10-01 6/3/11 M-60.20-02 6/27/11 M-65.10-02 5/11/11 M-80.10-01 6/3/11 M-80.20-00 6/10/08 M-80.30-00 6/10/08 1 11 Required Contract Provisions Federal -Aid Construction Contracts Follow this Page REQUIRED CONTRACT PROVISIONS FEDERAL -AID CONSTRUCTION CONTRACTS FHWA-1273 -- Revised May 1, 2012. I. General II. Nondiscrimination III. Nonsegregated Facilities IV. Davis -Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water Pollution Control Act X. Compliance with Governmentwide Suspension and Debarment Requirements Xl. Certification Regarding Use of Contract Funds for Lobbying ATTACHMENTS A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only) I. GENERAL 1. Form FHWA-1273.must be physically incorporated in each construction contract funded under Title 23 (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower -tier subcontractor or service provider. Form FHWA-1273 must be included in all Federal -aid design -build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design -builder shall be responsible for compliance by any subcontractor, lower -tier subcontractor or service provider. Contracting agencies may reference Form FHWA-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower -tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with 11 11 11 the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 3. A breach of any of. the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA. 4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal -aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. The term Federal -aid highway does not include roadways functionally classified as local roads or rural minor collectors. II. NONDISCRIMINATION The provisions of this section related to 23 CFR Part 230 are applicable to all Federal -aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts. In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR 60, 29 CFR 1625-1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633. The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3. Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633. The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements. 1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35, 29. CFR 1630, 29 CFR 1625-1627, 41 CFR 60 and 49 CFR 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative actionstandards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this 2 contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO: a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. b. The contractor will accept as its operating policy the following statement: "It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, - age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruil:ment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre -apprenticeship, and/or on-the-job training." _ 2. EEC) Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so. 3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum: a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not Tess often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer. b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women. d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees. e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means. 4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived. 3 a. The contractor will, unlessprecluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees; and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration. b. In the, event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or. women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions. c. The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees. 5. Personnel Actions: Wages, working conditions, and employee benefits shall be established andadministered; and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability. The following procedures shall be followed: a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel. b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices. c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons. d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform, every complainant of all of their avenues of appeal. 6. Training and Promotion: a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved. 4 b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be -superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a). c. The contractor will advise employees and applicants for employment of available training. programs and entrance requirements for each. d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion. 7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below: a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment. b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability. c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information. d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency. 8. Reasonable Accommodation for Applicants / Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship. 5 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations. 10. Assurance Required by 49 CFR 26.13(b): a. The requirements of 49 CFR Part 26 and the State DOT's U.S. DOT -approved DBE program are incorporated by reference. b. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT -assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agency deems appropriate. 11. Records and Reports: The contractor shall keep such records as necessary to document compliance with.the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA. a. The records kept by the contractor shall document the following: (1) The number and work hours of minority and non -minority group members and women employed in each work classification on the project; (2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and (3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women; b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project, indicating the number of minority, women, and non - minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July. 6 III. NONSEGREGATED. FACILITIES This provision is applicable to all Federal -aid construction contracts and to all related construction subcontracts of $10,000 or more. The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single -user restrooms and necessary dressing or sleeping areas to assure privacy between sexes. IV. DAVIS-BACON AND RELATED ACT PROVISIONS This section is applicable to all Federal -aid construction projects exceeding $2,000 and to all related subcontracts and lower -tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal -aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects. The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 "Contract provisions and related matters" with minor revisions to conform to the FHWA-1273 format and FHWA program requirements. 1. Miniimum wages a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis -Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis -Bacon poster (WH -1321) shall be posted at all times by the contractor and its subcontractors at .the site of the work in a prominent and accessible place where it can be easily seen by the workers. b.. (1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: (i) The work to be performed by the classification requested is not performed by a classification in the wage determination; and (ii) The classification is utilized in the area by the construction industry; and (iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (2) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30 -day period that additional time is necessary. (3) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the_ questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for determination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30 -day period that additional time is necessary. (4) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs 1.b.(2) or 1.b.(3) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. 8 c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis -Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2. Withholding The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally -assisted contract subject to Davis -Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such. action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3. Payrolls and basic records a. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis -Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis -Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. 9 b. (1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers -and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee ( e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH -347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency.. (2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (i) That the payroll for the payroll period contains the information required to be provided under §5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under §5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete; (ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly_or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3; (iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH -347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph 3.b.(2) of this section. (4) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code. c. The contractor or subcontractor shall make the records required under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, 10 after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4: Apprentices and trainees a. Apprentices (programs of the USDOL). Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is riot individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not Tess than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. b. Trainees (programs of the USDOL). Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and 11 individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. c. Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30. d. Apprentices and Trainees (programs of the U.S. DOT). Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal - aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program. 5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract. 6. Subcontracts. The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5. 7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 12 8. Compliance with Davis -Bacon and Related Act requirements. All rulings and interpretations of the Davis -Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract. 9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. 10. Certification of eligibility. a. By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). b. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). c. The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. V. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT The following clauses apply to any Federal -aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. 1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1.) of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1.) of this section, in the sum of $10 for each calendar day on which such individual 13 was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1.) of this section. 3. Withholding for unpaid wages and liquidated damages. The FHWA or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same primecontractor, or any other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2.) of this section. 4. Subcontracts.. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1.) through (4.) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1.) through (4.) of this section. VI. SUBLETTING OR ASSIGNING THE CONTRACT This provision is applicable to all Federal -aid construction contracts on the National Highway System. 1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116). a. The term "perform work with its own organization" refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions: (1) the prime contractor maintains control over the supervision of the day-to-day activities of the leased employees; (2) the prime contractor remains responsible for the quality of the work of the leased employees; (3) the prime contractor retains all power to accept or exclude individual employees from work on the project; and 14 (4) the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements. b. "Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract. 2. The contract amount upon which the requirements set forth in paragraph (1) of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions. 3. The contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirernents, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract. 4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the contracting agency has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. - 5. The 30% self -performance requirement of paragraph (1) is not applicable to design -build contracts; however, contracting agencies may establish their own self -performance requirements. VII. SAFETY: ACCIDENT PREVENTION This provision is applicable to all Federal -aid construction contracts and to all related subcontracts. 1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR 1926) promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). 15 3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect orinvestigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C.3704). VIII. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS This provision is applicable to all Federal -aid construction contracts and to all related subcontracts. In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by-. engineers, contractors, suppliers, and workers on Federal -aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, Form FHWA-1022 shall be posted on each Federal -aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project: 18 U.S.C. 1020 reads as follows: "Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal -aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended and supplemented; Shall be fined under this title or imprisoned not more than 5 years or both." IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT This provision is applicable to all Federal -aid construction contracts and to all related subcontracts. 16 By submission of this bid/proposal or the execution of this contract, or subcontract, as appropriate, the bidder, proposer, Federal -aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows: 1. That any person who is or will be utilized in the performance of this contract is not prohibited from receiving an award due to a violation of Section 508 of the Clean Water Act or Section 306 of the Clean Air Act. 2. That the contractor agrees to include or cause to be included the requirements of paragraph (1) of this Section X in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements. X. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION This provision is applicable to all Federal -aid construction contracts, design -build contracts, subcontracts, lower -tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more — as defined in 2 CFR Parts 180 and 1200. 1. Instructions for Certification — First Tier Participants: a. By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below. b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default. d. The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. e. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. "First Tier Covered Transactions" refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or 17 general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds. (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.qov/), which is compiled by the General Services Administration. i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j. Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction,. in addition to other remedies available to the Federal Governmeht, the department or agency may terminate this transaction for cause or default. * 2. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion — First Tier Participants: a. The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals: (1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency; 18 (2) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (3) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and (4) Have not within.a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 2. Instructions for Certification - Lower Tier Participants: (Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200) a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below. b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. d. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. "First Tier Covered Transactions" refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or 19 voluntarily excluded from participation in this covered transaction, unless authorized by the, department or agency with which this transaction originated. f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective, participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.qov/), which is compiled by the General Services Administration. h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -- Lower Tier Participants: 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 20 XI. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING This provision is applicable to all Federal -aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20). 1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form -LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. 2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 3. The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such recipients shall certify and disclose accordingly. 21 ATTACHMENT A - EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS This provision is applicable to all Federal -aid projects funded under the Appalachian Regional Development Act of 1965. 1. During the performance of this contract, the contractor undertaking to do work which is, or reasonably may be, done as on-site work, shall give preference to qualified persons who regularly reside in the labor area as designated by the DOL wherein the contract work is situated, or the subregion, or the Appalachian counties of the State wherein the contract work is situated, except: a. To the extent that qualified persons regularly residing in the area are not available. b. For the reasonable needs of the contractor to employ supervisory or specially experienced personnel necessary to assure an efficient execution of the contract work. c. For the obligation of the contractor to offer employment to present or former employees as the result of a lawful collective bargaining contract, provided that the number of nonresident persons employed under this subparagraph (1 c) shall not exceed 20 percent of the total number of employees employed by the contractor on the contract work, except as provided in subparagraph (4) below. 2. The contractor shall place a job order with the State Employment Service indicating (a) the classifications of the laborers, mechanics and other employees required to perform the contract work, (b) the number of employees required in each classification, (c) the date on which the participant estimates such employees will be required, and (d) any other pertinent information required by the State Employment Service to complete the job order form. The job order may be placed with the State Employment Service in writing or by telephone. If during the course of the contract work, the information submitted by the contractor in the original job order is substantially modified, the participant shall promptly notify the State Employment Service. 3. The contractor shall give full consideration to all qualified job applicants referred to him by the State Employment Service. The contractor is not required to grant employment to any job applicants who, in his opinion, are not qualified to perform the classification of work required. 4. If, within one week following the placing of a job order by the contractor with the State Employment Service, the State Employment Service is unable to refer any qualified job applicants to the contractor, or Tess than the number requested, the State Employment Service will forward a certificate to the contractor indicating the unavailability of applicants. Such certificate shall be made a part of the contractor's permanent project records. Upon receipt of this certificate, the contractor may employ persons who do not normally reside in the labor area to fill positions covered by the certificate, notwithstanding the provisions of subparagraph (1c) above. 5.The provisions of 23 CFR 633.207(e) allow the contracting agency to provide a contractual preference for the use of mineral resource materials native to the Appalachian region. 6. The contractor shall include the provisions of Sections 1 through 4 of this Attachment A in every subcontract for work which is, or reasonably may be, done as on-site work. 22 CONTRACT THIS AGREEMENT, made and entered into in triplicate, this day of i Yakima, hereinafter called the Owner, and Mowat Construction Co., �Wash'�c. on Contractor. WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made hereto covenant and agree as follows: , 2013, by and between the City of Corporation, hereinafter called the a part of this agreement, the parties I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF: $10,634,867.95, for Yakima Railroad Grade Separations, Phase 3, Project No. 1818, all in accordance with, and as described in the attached plans and specifications and the 2012 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this contract and every part thereof. Work shall start within ten (10) days after the Notice to Proceed and shall be completed in Three Hundred (300) working days. If work has not commenced within the ten (10) days after the Notice to Proceed, the first chargeable working day shall be the 116 day after the date on which the City issues the Notice to Proceed. If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified in the Standard Specifications for each and every day said work remains uncompleted after expiration of the specified time, as liquidated damages. The Contractors shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima. II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. III. INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its officers, elected officials, employees and agents from and against any and all claims, causes of action, damages, losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and court costs, arising out of, relating to, or resulting from the Contractor's performance or non-performance of the services, duties and obligations required of it under this Agreement. IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein above written. Countersigned: this CO day of CITY OF YAKIMA CONTRA TOR MOWAT fit. T T I 0 L MP ' WA j Co 'oration �r.!lle•!�!!lisD' A By: P Sandstrom CITY CONTRAC i NO RESOLUTION NO Its President (Print Name) (President, Owner, etc.) Address: POB 1330 309 Woodinville, WA 98072-1330 PERFORMANCE BOND BOND TO CITY OF YAKIMA KNOW ALL MEN BY THESE PRESENTS: Bond No. 023022441 That whereas the City of Yakima, Washington has awarded to Mowat Construction Company (Contractor) hereinafter designated as the "Principal" a contract for the construction of the project designated Yakima Railroad Grade Separations, Phase 3, Project No. 1818, all as hereto attached and made a part hereof and whereas, said principal is required under the terms of said contract to furnish a bond for the faithful performance of said contract: NOW, THEREFORE, we, the principal, and Liberty Mutual Insurance Company (Surety), a corporation, organized and existing under and by virtue of the laws of the State of MA , duly authorized to do business in the State of Washington, as surety, are jointly and severally held and firmly bound unto the City of Yakima, Washington, in the penal sum of $10.634.867.95 (Total Contract Amount) lawful money of the United States, the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents. THE CONDITIONS OF THIS BOND IS SUCH, that if the above bonded principal shall faithfully perform all of the provisions of said contract in the manner and within the time therein set forth, or within such extensions of time as may be granted under said contract, and shall pay all laborers, mechanics, sub -contractors and materialmen; the claims of any person or persons arising under the contract to the extent such claims are provided for in RCW 39.08.010; the state with respect to taxes imposed pursuant to Titles 50, 51 and 82 RCW which may be due; and all persons who shall supply said principal or sub -contractors with provisions and supplies for the carrying on of said work, and shall hold said City of Yakima, Washington, their employees, agents, and elected or appointed officials, harmless from any damage occasioned to any person or property by reason of any carelessness or negligence on the part of said principal, or any sub -contractor in the performance of said work, and shall indemnify and hold the City of Yakima, Washington, its employees, agents, and elected or appointed officials, harmless from any damage or expense by reason of failure of performance as specified in said contract, or from defects appearing or developing in the material or workmanship provided or performed under said contract after its acceptance thereof by the City of Yakima, Washington, and all claims filed in compliance with Chapter 39.08 RCW are resolved and all taxes pursuant to Titles 50 and 51 and 82 RCW have been paid, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Ordinances of the City of Yakima, Washington. IN WITNESS WHEREOF, the said principal and the said surety have caused this bond to be signed and sealed by their duly a , hori ed officers this j. day of .iQvlfAQry 2013,0 Appr.ved as to form: City Attorney) 311 Mow . ®ctio el. an / / 1 111V "ncipaif awed (Signature) V OW.) P sir 4 w-rizdy 1 By: (Print Name) PQESi Liberty B (Title) Darlene Jakielski Print Name) Attorney -In -Fact (Title) 1 1 JJC'CRL' CERTIFICATE OF LIABILITY INSURANCE MOWAT01 OP ID: RR DATE (MM/DD/YYYY) 01/16/13 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Hub International Northwest P. O. Box 3018 Bothell, WA 98041-3018 Dale G. Ahrens 425-489-4500 425-489-4501 CONTACT NAME: PHONE (NC. No, Ext): FAX (NC, No): E-MAIL ADDRESS: INSURER(S) AFFORDING COVERAGE NAIC # INSURER A : Zurich American Insurance Co. 16535 Il 1 1 1 INSURED Mowat Construction Company P.O. Box 1330 Woodinville, WA 98072 INSURER B: Navigators Insurance Company INSURER C : INSURER D : INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR LTR TYPE OF INSURANCE ADDL INSR SUBR WVD POLICY NUMBER POLICY EFF (MM/DDIYYYY) POLICY EXP (MM/DD/YYYY) LIMITS A GENERAL LIABILITY 1l (COMMERCIAL GENERAL LIABILITY GLA3999973 12/01/12 12/01/13 EACH OCCURRENCE $ 1,000,000 DAMAGE TO RENTED PREMISES (Ea occurrence) $ 300 000 MED EXP (Any one person) $ 10,000 CLAIMS -MADE X OCCUR PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 X WA STOP GAP PRODUCTS - COMP/OP AGG $ 2,000,000 GENII AGGREGATE 7 POLICY X LIMIT APPLIES jECT PER: LOC Emp Ben. $ 2,000,000 A AUTOMOBILE X LIABILITY ANY AUTO ALL OWNED AUTOS HIRED AUTOS SCHEDULED AUTOS NON -OWNED AUTOS GLA3999973 12/01/12 12/01/13 COMBINED SINGLE LIMIT (Ea accident) 1000,000 $ , BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) B X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE SE12EXC5449561V 12/01/12 12/01/13 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 $ DED RETENTION $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, descnbe under DESCRIPTION OF OPERATIONS below Y / N N / A GLA3999973 WA STOP GAP 12/01/12 12/01/13 WC STATU-0TH- TORY LIMITS y ER E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule if more space is required) ADDITIONAL INSURED(S) AS REQUIRED BY WRITTEN CONTRACT: THE CONTRACTING AGENCY AND ITS OFFICERS, ELECTED OFFICIALS, EMPLOYEES, AGENTS AND VOLUNTEERS AND APPOINTED OFFICIALS. COVERAGE IS PRIMARY & NON-CONTRIBUTORY. SEE ATTACHED ENDORSEMENT (S) . RE: YAKIMA RAILROAD GRADE SEPARATIONS, PHASE 3-MLK, JR. BOULEVARD. CERTIFICATE HOLDER CANCELLATION CITYOFY CITY OF YAKIMA DEPT. OF COMMUNITY & ECONOMIC DEVELOPMENT -ENGINEERING DIV. 129 NORTH SECOND STREET YAKIMA, WA 98901 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2010/05) © 1988-2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD 1 1 Additional Insured - Automatic - Owners, Lessees Or Contractors ZURICH - Policy No. Eft. Date o1 Pol. Exp. Date of Pol. Eff. Date of End. Producer No. Add'I. Prem Return Prem. GLA3999973-03 12/01/2012 12/01/2013 12/01 /2012 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part A. Section II — Who Is An Insured is amended to include as an insured any person or organization who you are required to add as an additional insured on this policy under a written contract or written agreement. B. The Insurance provided to the additional insured person or organization applies only to "bodily injury", "property damage" or "personal and advertising injury" covered under Section I - Coverage A - Bodily Injury And Property Damage Liability and Section I - Coverage B - Personal And Advertising Injury Liability, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf, and resulting directly from your ongoing operations or 'your work" as included in the "products -completed operations hazard", which is the subject of the written contract or written agreement, performed for the additional insured person or organization. C. However, regardless of the provisions of Paragraphs A. and B. above: 1. We will not extend any insurance coverage to any additional insured person or organization: a. That is not provided to you in this policy; or b. That is any broader coverage than you are required to provide to the additional insured person or organization in the written contract or written agreement; and 2. We will not provide Limits of Insurance to any additional insured person or organization that exceed the lower of: a. The Limits of Insurance provided to you in this policy; or b. The Limits of Insurance you are required to provide in the written contract or written agreement. D. The insurance provided to the additional Insured person or organization does not apply to: "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering or failure to render any professional architectural, engineering or surveying services including: 1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and 2. Supervisory, inspection, architectural or engineering activities. E. The additional insured must see to it that: 1. We are notified as soon as practicable of an "occurrence" or offense that may result in a claim; 2. We receive written notice of a claim or "suit" as soon as practicable; and Includes copyrighted material of Insurance Services Office. Inc., with its permission, U -GL -1175-C CW (07/10) Page 1 of 2 3. A request for defense and indemnity of the claim or "suit" will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity. This provision does not apply to insurance on which the additional insured is a Named Insured, if the written contract or written agreement requires that this coverage be primary and non-contributory. F. For the coverage provided by this endorsement: 1. The following paragraph is added to Paragraph 4.a. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is primary insurance as respects our coverage to the additional insured person or organization, where the written contract or written agreement requires that this insurance be primary and non-contributory with respect to any other policy upon which the additional insured is a Named Insured. In that event, we will not seek contribution from any other such insurance policy available to the additional insured on which the additional insured person or organization is a Named Insured. 2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis. G. This endorsement does not apply to an additional insured which has been added to this policy by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identified additional insured. All other terms and conditions of this policy remain unchanged. i1,'5-CCvdre37.1oi Plv, 20 2 roti/r''.Pube(i ii-lrengi su ii c,. ''r rvrt,q q )11,C#2. Inc_. w,lh itS hrlrr.Irsn)i7 Additional Insured — Automatic — Owners, Lessees Or Contractors -aor -o8 ZURICH Policy No Eff. Date of Pol. Exp Date of Pol. Eff. Date of End. Producer No Add'I. Prem Return Prem. GLA -3999903 01/31/2013 01/31/2014 01/31/2013 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Named Insured. Address (including ZIP Code)- This ode) This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part A. Section II — Who. Is An Insured is amended to include as an insured any person or organization who you are required to add as an additional insured on this policy under a written contract or written agreement. However, if you have entered into a construction contract or construction agreement with an additional insured person or organization, the insurance afforded to such additional insured only applies to the extent permitted by law B. The insurance provided to the additional insured person or organization applies only to "bodily injury", "property damage" or "personal and advertising injury" covered under Section I — Coverage A — Bodily Injury And Property Damage Liability and Section I — Coverage B — Personal And Advertising Injury Liability, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by 1. Your acts or omissions, or 2. The acts or omissions of those acting on your behalf, and resulting directly from your ongoing operations or "your work" as included in the "products -completed operations hazard", which is the subject of the written contract or written agreement C. However, regardless of the provisions of Paragraphs -A. and B. above - 1. We will not extend any insurance coverage to any additional insured person or organization: a. That is not provided to you in this policy; or b. That is any broader coverage than you are required to provide to the additional insured person or organization in the written contract or written agreement; and 2. We will not provide Limits of Insurance to any additional insured person or organization that exceed the lower of: a. The Limits of Insurance provided to you in this policy; or b. The Limits of Insurance you are required to provide in the written contract or written agreement. D. The insurance provided to the additional insured person or organization does not apply to "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering or failure to render any professional architectural, engineering or surveying services including: 1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications, and 2. Supervisory, inspection, architectural or engineering activities. U -GL -1175-E CW (04/12) Page 1 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. E. The following is added to Paragraph 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit of Section IV — Commercial General Liability Conditions. The additional insured must see to it that: 1. We are notified as soon as practicable of an "occurrence" or offense that may result in a claim; 2. We receive written notice of a claim or "suit" as soon as practicable; and 3. A request for defense and indemnity of the claim or "suit" will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity This provision does not apply to insurance on which the additional insured is a Named Insured, if the written contract or written agreement requires that this coverage be primary and non-contributory. F. For the coverage provided by this endorsement: 1. The following paragraph is added to Paragraph 4.a. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is primary insurance as respects our coverage to the additional insured person or organization, where the written contract or written agreement requires that this insurance be primary and non-contributory with respect to any other policy upon which the additional insured is a Named Insured. In that event, we will not seek contribution from any other such insurance policy available to the additional insured on which the additional insured person or organization is a Named Insured. 2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis G. This endorsement does not apply to an additional insured which has been added to this policy by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identified additional insured. All other terms and conditions of this policy remain unchanged. U -GL -1175-E CW (04/12) Page 2 of 2 Includes copyrighted material of Insurance Services Office, Inc., with its permission. r. POLICY NUMBER GLA3999973-03 COMMERCIAL AUTO CA 20480299 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective: 12/01/2012. Countersigned By: kb f�j (('i' (Authorized Representative) Named Insured: MOWAT CONSTRUCTION COMPANY SCHEDULE Name of Person(s) or Organization(s): ANY PERSON OR ORGANIZATION WITH WHOM YOU HAVE AGREED, THROUGH WRITTEN CONTRACT, AGREEMENT OR PERMIT, EXECUTED PRIOR TO THE LOSS, TO PROVIDE: ADDITIONAL INSURED COVERAGE. (If no entry appears above. information required to complete this endorsement v/ill be shown in the Declarations as applicable to the endorsement.) Each person or organization shown in the Schedule is an "insured" for Liability Coverage. but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. CA 20 48 02 99 Copyright, Insurance Services Office, Inc.. 1998 Page 1 of 1 0 N15m !.,ll;9 POLICY NUMBER GLA3999973-03 COMMERCIAL GENERAL LIABILITY CG 25 03 05 09 THIS ENDORSEMENT CHANGES THE POUCY. PLEASE READ IT CAREFULLY. DESIGNATED CO NSTRUCTIO N PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): A GENERAL AGGREGATE LIMIT APPLIES TO EACH CONSTRUCTION PROJECT WHERE THE NAMED INSURED IS PERFORMING OPERATIONS, HOWEVER, A GENERAL AGGREGATE LIMIT DOES NOT APPLY TO ANY CONSTRUCTION PROJECT WHERE THE NAMED INSURED IS PERFORMING OPERATIONS THAT ARE INSURED UNDER A WRAP UP OR ANY OTHER CONSOLIDATED OR SIMILAR INSURANCE PROGRAM. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I —Coverage A, and for all medical expenses caused by accidents under Section I —Coverage C, which can be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. A separate Designated Construction Project General Aggregate Limit applies to each designated construction project, and that limit is equal to the amount of the General Aggregate Limit shown in the Declarations. 2. The Designated Construction Project General Aggregate Limit is the most we will pay for the sum of all damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products - completed operations hazard", and for medical expenses under Coverage C regardless of the number of: a. Insureds: b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". CG 25 03 05 09 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Designated Construction Project General Aggregate Limit for that designated construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated Construction Project General Aggregate Limit for any other designated construction project shown in the Schedule above. 4. The lirrets shown in the Declarations for Each Occurrence, Damage To Premises Rented To You and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated Construction Project General Aggregate Limit. Insurance Services Office. Inc., 2008 Page 1 of 2 Cl _e,nt :;ov B. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I —Coverage A, and for all medical expenses caused by accidents under Section I —Coverage C, which cannot be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products -completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. C. When coverage for liability arising out of the "products -completed operations hazard" is provided, any payments for damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated Construction Project General Aggregate Limit. D. If the applicable designated construction project has been abandoned, delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. The provisions of Section III —Limits Of Insurance not otherwise modified by this endorsement shall continue to apply as stipulated. Page 2 of 2 © Insurance Services Office. Inc.. 2008 CG 25 03 05 09 0 MINIMUM WAGE AFFIDAVIT STATE OF WASHINGTON) ) ss COUNTY OF YAKIMA ) I, the undersigned, having been duly sworn, depose, say and certify that in connection with the performance of the work, payment for which this voucher is submitted, I have paid the following rate per hour to each classification of laborers, workmen, or mechanics, as indicated upon the attached list, now referred to and by such reference incorporated in and made an integral part hereof, for all such employed in the performance of such work; and no laborer, workman or mechanic so employed upon such work has been paid less than the prevailing rate of wage or less than the minimum rate of wages as specified in the principal contract; that I have read the above and foregoing statement and certificate, know the contents thereof and the substance as set forth therein is true to my knowledge and belief. Subscribed and sworn to before me on this Contractor day of , 201 Notary Public in and for the State of Washington residing at 317 PREVAILING WAGE RATES The prevailing rate of wages to be paid to all workmen, laborers, or mechanics employed in the performance of any part of this contract shall be in accordance with the provisions of Chapter 39.12 RCW, as amended. The rules and regulations of the Department of Labor and Industries are by reference made a part of this contract as though fully set forth herein. The current schedule of prevailing wage rates for the locality or localities where this contract will be performed, as determined by the Industrial Statistician of the Department of Labor and Industries, are included in these contract documents. Inasmuch as the contractor will be held responsible for paying the prevailing wages, it is imperative that all contractors familiarize themselves with the current wage rates, as determined by the Industrial Statistician of the Department of Labor and Industries, before submitting bids based on these specifications. In case any dispute arises as to what are the prevailing rates of wages for work of a similar nature and such dispute cannot be adjusted by the parties in interest, including labor and management representatives, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State and his decision therein shall be final and conclusive and biding on all parties involved in the dispute as provided for by RCW 39.12.060 as amended. Current prevailing wage rules and data can be furnished by the Industrial Statistician upon request. You may submit your request to: Department of Labor and Industries ESAC Division PO Box 44540 Olympia, Washington 98504-4540 Telephone: 360-902-5335 319 Page 11 General Decision Number: WA120001 11/16/2012 WA1 Superseded General Decision Number: WA20100001 State: Washington Construction Type: Highway Counties: Washington Statewide. HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin Counties) Modification Number Publication Date Modification Number Publication Date 0 01/06/2012 13 07/20/2012 1 01/13/2012 14 08/03/2012 2 02/10/2012 15 08/10/2012 3 02/17/2012 16 09/07/2012 4 03/23/2012 17 09/21/2012 5 04/06/2012 18 10/05/2012 6 04/13/2012 19 11/16/2012 7 04/27/2012 8 05/04/2012 9 06/08/2012 10 - 06/15/2012 11 06/29/2012 12 07/06/2012 CARP0001-008 09/01/2009 Rates Fringes Carpenters: COLUMBIA RIVER AREA - ADAMS, BENTON, COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GRANT, OKANOGAN (EAST OF THE 120TH MERIDIAN) AND WALLA WALLA COUNTIES GROUP 1• $ 27.73 10.56 GROUP 2• $ 29.73 10.56 GROUP 3• $ 28.00 10.56 GROUP 4• $ 27.73 10.56 GROUP 5• $ 63.50 10.56 GROUP 6 $ 30.75 10.56 GROUP 7 $ 31.75 10.56 GROUP 8 $ 28.00 10.56 GROUP 9 $ 33.75 10.56 WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 12 SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS AND WHITMAN COUNTIES GROUP 1• $ 26.06 10.56 GROUP 2• $ 28.06 10.56 GROUP 3• $ 26.32 10.56 GROUP 4• $ 26.06 10.56 GROUP 5• $ 60.14 10.56 GROUP 6• $ 29.07 10.56 GROUP 7 $ 30.07 10.56 GROUP 8 $ 27.32 10.56 GROUP 9 $ 33.07 10.56 CARPENTER & DIVER CLASSIFICATIONS: GROUP 1: Carpenter GROUP 2: Millwright, machine erector GROUP 3: Piledriver - includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling GROUP 4: Bridge carpenters GROUP 5: Diver Wet GROUP 6: Diver Tender, Manifold Operator, ROV Operator GROUP 7: Diver Standby, Bell/Vehicle or Submersible operator Not Under Pressure GROUP 8: Assistant Tender, ROV Tender/Technician GROUP 9: Manifold Operator -Mixed Gas ZONE PAY: ZONE 1 0-40 MILES FREE ZONE 2 41-65 MILES $2.25/PER HOUR ZONE 3 66-100 MILES $3.25/PER HOUR ZONE 4 OVER 100 MILES $4.75/PER HOUR DISPATCH POINTS: CARPENTERS/MILLWRIGHTS: PASCO (515 N Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS/PILEDRIVER: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite). WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 13 DEPTH PAY FOR DIVERS BELOW WATER SURFACE: 50-100 feet $2.00 per foot 101-150 feet $3.00 per foot 151-220 feet $4.00 per foot 221 feet and deeper $5.00 per foot PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT: 0-25 feet Free 26-300 feet $1.00 per Foot SATURATION DIVING: The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. HAZMAT PROJECTS: Anyone working on a HAZMAT job (task), where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows: LEVEL D + $.25 per hour - This is the lowest level of protection. No respirator is used and skin protection is minimal. LEVEL C + $.50 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B + $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit". LEVEL A +$1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line. WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 14 CARP0003-006 10/01/2011 SOUTHWEST WASHINGTON: CLARK, COWLITZ, KLICKITAT, LEWIS(Piledriver only), PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the Pacific Ocean), SKAMANIA AND WAHKIAKUM COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY SEE ZONE DESCRIPTION FOR CITIES BASE POINTS ZONE 1: Rates Fringes Carpenters: CARPENTERS $ 32.04 14.18 DIVERS TENDERS $ 36.34 14.18 DIVERS $ 77.08 14.18 DRYWALL $ 27.56 14.18 MILLWRIGHTS $ 32.19 14.18 PILEDRIVERS $ 33.04 14.18 DEPTH PAY: 50 TO 100 FEET $1.00 PER FOOT OVER 50 FEET 101 TO 150 FEET $1.50 PER FOOT OVER 101 FEET 151 TO 200 FEET $2.00 PER FOOT OVER 151 FEET Zone Differential (Add up Zone 1 rates): Zone 2 - $0.85 Zone 3 - 1.25 Zone 4 - 1.70 Zone 5 - 2.00 Zone 6 3.00 BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND VANCOUVER, (NOTE: All dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point.) ZONE 1: Projects located within 30 miles of the respective city hall of the above mentioned cities ZONE 2: Projects located more than 30 miles and less than 40 miles of the respective city of the above mentioned cities ZONE 3: Projects located more than 40 miles and less than 50 miles of the respective city of the above mentioned cities ZONE 4: Projects located more than 50 miles and less than 60 miles of the respective city of the above mentioned cities ZONE 5: Projects located more than 60 miles and less than 70 miles of the respective city of the above mentioned cities ZONE 6: Projects located more than 70 miles of the respected city of the above mentioned cities WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 15 CARP0770-003 06/01/2010 Rates Fringes Carpenters: CENTRAL WASHINGTON: CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN),KITTITAS, OF THE 120TH MERIDIAN) AND YAKIMA COUNTIES CARPENTERS ON CREOSOTE MATERIAL $ 35.49 12.60 CARPENTERS $ 35.39 12.60 DIVERS TENDER $ 39.15 12.60 DIVERS $ 87.20 12.60 MILLWRIGHT AND MACHINE ERECTORS $ 36.39 12.60 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING $ 35.59 12.60 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS OKANOGAN (WEST Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Auburn Renton Aberdeen-Hoquiam Ellensburg Centralia Chelan Zone Pay: 0 -25 radius 26-35 radius 36-45 radius 46-55 radius miles miles miles miles Olympia Bremerton Shelton Tacoma Everett Mount Vernon Pt. Townsend Over 55 radius miles Free $1.00/hour $1.15/hour $1.35/hour $1.55/hour Bellingham Anacortes Yakima •Wenatchee Port Angeles Sunnyside (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles 26-45 radius miles Over 45 radius miles Free $ .70/hour $1.50/hour WA120001 Modification 19 Federal Wage Determinations for Highway Construction CARP0770-006 06/01/2010 Page 16 Rates Fringes Carpenters: WESTERN WASHINGTON: CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS (excludes piledrivers only), MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES BRIDGE CARPENTERS $ 35.39 13.08 CARPENTERS ON CREOSOTE MATERIAL $ 35.49 13.08 CARPENTERS $ 35.39 13.08 DIVERS TENDER $ 39.15 13.08 DIVERS $ 87.20 13.08 MILLWRIGHT AND MACHINE ERECTORS $ 36.39 13.08 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING $ 35.59 13.08 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Auburn Renton Aberdeen-Hoquiam Ellensburg Centralia Chelan Zone Pay: 0 -25 radius 26-35 radius 36-45 radius 46-55 radius miles miles miles miles Olympia Bremerton Shelton Tacoma Everett Mount Vernon Pt. Townsend Over 55 radius miles Free $1.00/hour $1.15/hour $1.35/hour $1.55/hour Bellingham Anacortes Yakima Wenatchee Port Angeles Sunnyside (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles 26-45 radius miles Over 45 radius miles Free $ .70/hour $1.50/hour WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 17 * ELEC0046-001 07/02/2012 CLALLAM, JEFFERSON, KING AND KITSAP COUNTIES Rates Fringes CABLE SPLICER $ 45.66 3%+15.71 ELECTRICIAN $ 41.51 3%+15.71 ELEC0048-003 07/02/2012 CLARK, KLICKITAT AND SKAMANIA COUNTIES Rates Fringes CABLE SPLICER $ 40.75 18.41 ELECTRICIAN $ 37.05 18.41 HOURLY ZONE PAY: Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria Zone Pay: Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour *These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus. ELEC0048-029 07/02/2012 COWLITZ AND WAHKIAKUM COUNTY Rates Fringes CABLE SPLICER $ 40.75 15.36 ELECTRICIAN $ 37.05 15.36 ELEC0073-001 07/01/2012 ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN COUNTIES Rates Fringes CABLE SPLICER $ 31.70 15.39 ELECTRICIAN $ 28.82 15.39 WA120001 Modification 19 Federal Wage Determinations for Highway Construction ELEC0076-002 09/01/2011 Page 18 GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON COUNTIES Rates CABLE SPLICER $ 37.54 ELECTRICIAN $ 34.13 Fringes 21.62 21.62 ELEC0112-005 06/01/2011 ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA WALLA, YAKIMA COUNTIES Rates Fringes CABLE SPLICER $ 37.70 35+14.63 ELECTRICIAN $ 35.90 3%+14.63 ELEC0191-003 07/01/2011 ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES Rates Fringes CABLE SPLICER $ 42.91 15.39 ELECTRICIAN $ 39.01 15.39 ELEC0191-004 07/01/2011 CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES Rates Fringes CABLE SPLICER $ 39.28 15.24 ELECTRICIAN $ 35.71 15.24 WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 19 ENGI0302-003 06/01/2011 CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES PROJECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS SHOWN BELOW) Zone 1 (0-25 radius miles): Rates Power equipment operators: Group lA $ 35.79 Group IAA $ 36.36 Group lAAA $ 36.92 Group 1 $ 35.24 Group 2 $ 34.75 Group 3 $ 34.33 Group 4 $ 31.97 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30 Fringes 15.15 15.15 15.15 15.15 15.15 15.15 15.15 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP lAAA - Cranes -over 300 tons, or 300 ft of boom (including jib with attachments) GROUP IAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders -overhead, 8 yards and over; Shovels, 'excavator, backhoes-6 yards and over with attachments WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 110 GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers -self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane -overhead, bridge type -20 tons through 44 tons; Chipper; Concrete Pump -truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power); Drilling machine; Excavator, shovel, backhoe-3yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders -overhead under 6 yards; Loaders -plant feed; Locomotives -all; Mechanics -all; Mixers -asphalt plant; Motor patrol graders -finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper -self propelled, hard tail end dump, articulating off-road equipment -under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine -shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; A -frame crane over 10 tons; Drill oilers -auger type, truck or crane mount; Dozers -D-9 and under; Forklift -3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists -(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader -elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps -concrete; Roller, plant mix or multi -lift materials; Saws -concrete; Scrpers-concrete and carry -all; Service engineer -equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 111 GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes -A frame -10 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; Pumps, water; Rigger and Bellman; Roller -other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator Category B Projects: 95% of the basic hourly reate for each group plus full fringe benefits applicabl-e to category A projects shall apply to the following projects. A Reduced rates may be paid on the following: 1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no•building is involved. Surfacing and paving included, but utilities excluded. 3': Marine projects (docks, wharfs, etc.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on outfitted with protective "C" Suit "B" Suit "A" Suit H-2 Class H-3 Class H-4 Class Base Base Base a hazardous clothing wage wage wage rate rate rate waste plus $ plus $ plus $ Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $ .70 Zone 3 (Over 45 radius miles) - $1.00 site .25 .50 .75 per per per when not hour. hour. hour. BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima WA120001 Modification 19 Federal Wage Determinations for. Highway Construction POWER EQUIPMENT OPERATORS CLASSIFICATIONS Page 112 GROUP lAAA - Cranes -over 300 tons, or 300 ft of boom (including jib with attachments) GROUP IAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders -overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers -self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane -overhead, bridge type -20 tons through 44 tons; Chipper; Concrete Pump -truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power); Drilling machine; Excavator, shovel, backhoe -3 yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders -overhead under 6 yards; Loaders -plant feed; Locomotives -all; Mechanics -all; Mixers -asphalt plant; Motor patrol graders -finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper -self propelled, hard tail end dump, articulating off-road equipment -under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine -shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 113 GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; A -frame crane over 10 tons; Drill oilers -auger type, truck or crane mount; Dozers -D-9 and under; Forklift -3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists -(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader -elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps -concrete; Roller, plant mix or multi -lift materials; Saws -concrete; Scrpers-concrete and carry -all; Service engineer -equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes -A frame -10 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; Pumps, water; Rigger and Bellman; Roller -other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator CATEGORY B PROJECTS: 95% OF THE BASIC HOURLY RATE FOR EACH GROUP PLUS FULL FRINGE BENEFITS APPLICABLE TO CATEGORY A PROJECTS SHALL APPLY TO THE FOLLOWING PROJECTS. REDUCED RATES MAY BE PAID ON THE FOLLOWING: 1.•;Projects involving work on structures such as buildings and ...bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less involved. Surfacing utilities excluded. 3. Marine projects than $1 million where no building is and paving including, but (docks, wharfs, ect.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designed hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H -i Base wage rate when on a hazardous waste site when not outfitted with protective clothing. H-2 Class "C" H-3 Class "B" H-4 Class "A" Suit - Base wage rate plus $.25 per hour. Suit - Base wage rate plus $.50 per hour. Suit - Base wage rate plus $.75 per hour. WA120001 Modification 19 Federal Wage Determinations for Highway Construction ENGI0370-002 06/01/2011 Page 114 ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES ZONE 1: Rates Fringes Power equipment operators: GROUP lA $ 24.41 12.05 GROUP 1 $ 24.76 12.05 GROUP 2 $ 25.08 12.05 GROUP 3 $ 25.69 12.05 GROUP 4 $ 25.85 12.05 GROUP 5 $ 26.01 12.05 GROUP 6 $ 26.29 12.05 GROUP 7 $ 26.56 12.05 GROUP 8 $ 27.66 12.05 ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1A: Boat Operator; Crush Feeder; Oiler; Steam Cleaner GROUP 1: Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel, or electric power); Deck Hand; Drillers Helper (Assist driller in making drill rod connections, service drill engine and air compressor, repair drill rig and drill tools, drive drill support truck to and on the job site, remove drill cuttings from around bore hole and inspect drill rig while in operation); Fireman & Heater Tender; Hydro -seeder, Mulcher, Nozzleman; Oiler Driver, & Cable Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler -Driver (CLD required) & Cable Tender, Mucking Machine WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 115 GROUP 2: A -frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog; Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator Hoisting Materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, hydra -lift & similar; Gin Trucks (pipeline); Hoist, single drum; Loaders (bucket elevators and conveyors); Longitudinal Float; Mixer (portable -concrete); Pavement Breaker, Hydra -Hammer & similar; Power Broom; Railroad Ballast Regulation Operator (self-propelled); Railroad Power Tamper Operator (self-propelled); Railroad Tamper Jack Operator (self-propelled; Spray Curing Machine (concrete); Spreader Box (self-propelled); Straddle Buggy (Ross & similar on construction job only); Tractor (Farm type R/T with attachment, except Backhoe); Tugger Operator GROUP 3: A -frame Truck (2 or more drums); Assistant Refrigeration Plant & Chiller Operator (over 1000 ton); Backfillers (Cleveland & similar); Batch Plant & Wet Mix Operator, single unit (concrete); Belt -Crete Conveyors with power pack or similar; Belt Loader (Kocal or similar); Bending Machine; Bob Cat (Skid Steer); Boring Machine (earth); Boring Machine (rock under 8 inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete); Chipper (without crane); Cleaning & Doping Machine (pipeline); Deck Engineer; Elevating Belt -type Loader (Euclid, Barber Green & similar); Elevating Grader -type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel or electric); Gunnite Combination Mixer & Compressor; Locomotive Engineer; Mixermobile; Mucking Machine; Posthole Auger or Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Dozer/Tractor (up to D-6 or equivalent) and Traxcavator; Traverse Finish Machine; Turnhead Operator GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump- crete, Whitman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond); Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist); Loaders (overhead & front-end, under 4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton); Rubber -tired Skidders (R/T with or without attachments); Surface Heater & Plant Machine; Trenching Machines (under 7 ft. depth capacity); Turnhead (with re -screening); Vacuum Drill (reverse circulation drill under 8 inch bit) WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 116 GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under 3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes (25 tons & under), all attachments including clamshell, dragline; Derricks & Stifflegs (under 65 tons); Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar); Hoe Ram; Piledriving Engineers; Paving (dual drum); Railroad Track Liner Operaotr (self-propelled); Refrigeration Plant Engineer (1000 tons & over); Signalman (Whirleys, Highline Hammerheads or similar); Grade Checker GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches & Trimmers) (Autograde, ABC, R.A. Hansen & similar on grade wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes & Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units); Batch & Wet Mix Operator (multiple units, 2 & incl. 4); Blade Operator (motor patrol & attachments); Cable Controller (dispatcher); Compactor (self-propelled with blade); Concrete Pump Boom Truck; Concrete Slip Form Paver; Cranes (over 25 tons, to and including 45 tons), all attachments including clamshell, dragline; Crusher, Grizzle & Screening Plant Operator; Dozer, 834 R/T & similar; Drill Doctor; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Quad -Track or similar equipment; Rollerman (finishing asphalt pavement); Roto Mill (pavement grinder); Scrapers, all, rubber -tired; Screed Operator; Shovel(under 3 yds.); Trenching Machines (7 ft. depth & over); Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Operator (REcycle Train); Lime Brain Operator (Recycle Train); Mobile Crusher Operator (Recycle Train) GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds & over); Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic; Cableway Operators; Concrete Cleaning/Decontamination machine operator; Cranes (over 45 tons to but not including 85 tons), all attachments including clamshell and dragine; Derricks & Stiffleys (65 tons & over); Elevating Belt (Holland type); Heavy equipment robotics operator; Loader (360 degrees revolving Koehring Scooper or similar); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber -tired Scrapers (multiple engine with three or more scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform Trailers (Goldhofer, Shaurerly andSimilar); Ultra High Pressure Wateriet Cutting Tool System Operator (30,000 psi); Vacuum Blasting Machine Operator WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 117 GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower), all attachments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over); Helicopter Pilot BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ENG10612-006 06/01/2011 LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line extending west from the northern boundary of Wahkaikum County to the sea) AND THURSTON COUNTIES •;. ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. Zone 1 (0-25 radius miles): Rates Fringes Power equipment operators: GROUP lA $ 35.79 15.15 GROUP IAA $ 36.36 15.15 GROUP 'AAA $ 36.92 15.15 GROUP 1 $ 35.24 15.15 GROUP 2 $ 34.75 15.15 GROUP 3 $ 34.33 15.15 GROUP 4 $ 31.97 15.15 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) = $ .70 Zone 3 (Over 45 radius miles) - $1.00 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1 AAA - Cranes -over 300 tons or 300 ft of boom (including jib with attachments) GROUP IAA - Cranes- 200 tonsto 300 tons, or 250 ft of boom (including jib with attachments; Tower crane over 175 ft in height, bas to boom WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 18 GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders -overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1 - Cableway; Cranes 45 tons thru 99 tons under 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers - self -propelled 45 yards and over; Slipform pavers; Transporters, all track or truck type GROUP 2 - Barrier machine (zipper); Batch Plant Operator - concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane -Overhead, bridge type, 20 tons through 44 tons; Chipper; Concrete pump -truck mount with boom attachment; Crusher; Deck engineer/deck winches (power); Drilling machine; Excavator, shovel, backhoe -3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders -plant feed; Locomotives -all; Mechanics- all; Mixers, asphalt plant; Motor patrol graders, finishing; Piledriver (other than crane mount); Roto -mill, roto - grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper -self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer; Tractors, backhoe over 75 hp; Transfer material service machine -shuttle buggy, Blaw Knox- Roadtec; Truck Crane oiler/driver-100 tons and over; Truck Mount Portable Conveyor; Yo Yo pay GROUP 3 - Conveyors; Cranes through 19 tons with attachments; Crane -A -frame over 10 tons; Drill oilers -auger type, truck or crane mount; Dozer -D-9 and under; Forklift -3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside Hoists -(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders -elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pump -Concrete; Roller, plant mix or multi-lfit materials; Saws -concrete; Scrapers, concrete and carry all; Service engineers -equipment; Trenching machines; Truck crane oiler/driver under 100 tons; Tractors, backhoe under 75 hp WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 119 GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete Finish Machine -laser screed; Cranes A -frame 10 tons and under; Elevator and manlift (permanent and shaft type); Forklifts -under 3000 lbs. with attachments; Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger -mechanical; Power plant; Pumps -water; Rigger and Bellman; Roller -other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator FOOTNOTE A- Reduced rates may be paid on the following: 1. Projects involving work on structures such as buildings and bridges whose total value is less than $1 5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded. 3. Marine projects (docks, wharfs, etc.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing H-2 Class "C" Suit - Base wage rate plus $ .25 per hour. H-3 Class "B" Suit - Base wage rate plus $ .50 per hour. H-4 Class "A" Suit - Base wage rate plus $ .75 per hour. ENGI0701-002 01/01/2012 CLARK, COWLITZ, KLICKKITAT, PACIFIC (SOUTH), SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1 Rates Fringes Power equipment operators: (See Footnote A) GROUP 1 $ 37.27 12.08 GROUP lA $ 39.13 12.08 GROUP 1B $ 41.00 12.08 GROUP 2 $ 35.64 12.08 GROUP 3 $ 34.64 12.08 GROUP 4 $ 33.71 12.08 GROUP 5 $ 32.60 12.08 GROUP 6 $ 29.61 12.08 Zone Differential (add to Zone 1 rates): Zone 2 - $3.00 Zone 3 - $6.00 WA120001. Modification 19 Federal Wage Determinations for Highway Construction Page j20 For the following metropolitan counties: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens "Blast Zone" shall receive Zone I pay for all classifications. All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications. For the following cities: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 121 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CONCRETE: Batch Plant and/or Wet Mix Operator, three' units or more; CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments; FLOATING EQUIPMENT: Floating Crane, 150 ton but less than 250 ton GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or,tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; FLOATING EQUIPMENT: Floating Crane 250 ton and' over GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over; FLOATING EQUIPMENT: Floating Crane 350 ton and over GROUP 2: ASPHALT: Asphalt Plant Operator (any type); Roto Mill, pavement profiler, operator, 6 foot lateral cut and over; BLADE: Auto Grader or "Trimmer" (Grade Checker . required); Blade Operator, Robotic; BULLDOZERS: Bulldozer .operator over 120,000 lbs and above; Bulldozer operator, twin engine; Bulldozer Operator,tandem, quadnine, D10, D11, and similar type; Bulldozere Robotic Equipment (any type; CONCRETE: Batch Plant and/or Wet Mix Operator, one and two drum; Automatic Concrete Slip Form Paver Operator; Concrete Canal Line Operator; Concrete Profiler, Diamond Head; CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; CRUSHER: Crusher Plant Operator; FLOATING EQUIPMENT: Floating Clamshell, etc.operator, 3 cu. yds. and over; Floating Crane (derrick barge) Operator, 30 tons but less than 150 tons; LOADERS: Loader operator, 120,000 lbs. and above; REMOTE CONTROL: Remote controlled earth -moving equipment; RUBBER -TIRED SCRAPERS: Rubber - tired scraper operator, with tandem scrapers, multi -engine; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Shovel, Dragline, Clamshell, operator 5 cu. yds and over; TRENCHING MACHINE: Wheel Excavator, under 750 cu. yds. per hour (Grade Oiler required); Canal Trimmer (Grade Oiler required); Wheel Excavator, over 750 cu. yds. per hour; Band Wagon (in conjunction with wheel excavator); UNDERWATER EQUIPMENT: Underwater Equipment Operator, remote or otherwise; HYDRAULIC HOES -EXCAVATOR: Excavator over 130,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 122 GROUP 3: BULLDOZERS: Bulldozer operator, over 70,000 lbs. up to and including 120,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane -50 through 89 tons (and less than 150 feet boom); FORKLIFT: Rock Hound Operator; HYDRAULIC HOES -EXCAVATOR: excavator over 80,000 lbs. through 130,000 lbs.; LOADERS: Loader operator 60,000 and less than 120,000; RUBBER -TIRED SCRAPERS: Scraper Operator, with tandem scrapers; Self -loading, paddle wheel, auger type, finish and/or 2 or more units; SHOVEL, DRAGLINE, CLAMSHELL,SKOOPER OPERATOR: Shovel, Dragline, Clamshell operators 3 cu. yds. but less than 5 cu yds. GROUP 4: ASPHALT: Screed Operator; Asphalt Paver operator (screeman required); BLADE: Blade operator; Blade operator, finish; Blade operator, externally controlled by electronic, mechanical hydraulic means; Blade operator, multi -engine; BULLDOZERS: Bulldozer Operator over 20,000 lbs and more than 100 horse up to 70,000 lbs; Drill Cat Operator; Side -boom Operator; Cable -Plow Operator (any type); CLEARING: Log Skidders; Chippers; Incinerator; Stump Splitter (loader mounted or similar type); Stump Grinder (loader mounted or similar type; Tub Grinder; Land Clearing Machine (Track mounted forestry mowing & grinding machine); Hydro Axe (loader mounted or similar type); COMPACTORS SELF-PROPELLED: Compactor Operator, with blade; Compactor Operator, multi -engine; Compactor Operator, robotic; CONCRETE: Mixer Mobile Operator; Screed Operator; Concrete Cooling Machine Operator; Concrete Paving Road Mixer; Concrete Breaker; Reinforced Tank Banding Machine (K-17 or similar types); Laser Screed; CRANE: Chicago boom and similar types; Lift Slab Machine Operator; Boom type lifting device, 5 ton capacity or less; Hoist Operator, two (2) drum; Hoist Operator, three (3) or more drums; Derrick Operator, under 100 ton; Hoist Operator, stiff leg, guy derrick or similar type, 50 ton and over; Cableway Operator up to twenty (25) ton; Bridge Crane Operator, Locomotive, Gantry, Overhead; Cherry Picker or similar type crane; Carry Deck Operator; Hydraulic Crane Operator, under 50 tcns; LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; CRUSHER: Generator Operator; Diesel -Electric Engineer; Grizzley Operator; Drill Doctor; Boring Machine Operator; Driller -Percussion, Diamond, Core, Cable, Rotary and similar type; Cat Drill (John Henry); Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Diesel-electric Engineer; Jack Operator, elevating barges, Barge Operator, self - unloading; Piledriver Operator (not crane type) (Deckhand required); Floating Clamshelll, etc. Operator, under 3 cu. yds. (Fireman or Diesel -Electric Engineer required); Floating Crane (derrick barge) Operator, less than 30 tons; GENERATORS: Generator Operator; Diesel-electric Engineer; GUARDRAIL EQUIPMENT: Guardrail Punch Operator (all types); Guardrail Auger Operator (all types); Combination Guardrail machines, i.e., punch auger, etc.; HEATING PLANT: Surface Heater and Planer Operator; HYDRAULIC HOES EXCAVATOR: WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 123 Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Excavator Operator over 20,000 lbs through 80,000 lbs.; LOADERS: Belt Loaders, Kolman and Ko Cal types; Loaders Operator, front end and overhead, 25,000 lbs and less than 60,000 lbs; Elevating Grader Operator by Tractor operator, Sierra, Euclid or similar types; PILEDRIVERS: Hammer Operator; Piledriver Operator (not crane type); PIPELINE, SEWER WATER: Pipe Cleaning Machine Operator; Pipe Doping Machine Operator; Pipe Bending Machine Operator; Pipe Wrapping Machine Operator; Boring Machine Operator; Back Filling Machine Operator; REMOTE CONTROL: Concrete Cleaning Decontamination Machine Operator; Ultra High Pressure Water Jet Cutting Tool System Operator/Mechanic; Vacuum Blasting Machine Operator/mechanic; REPAIRMEN, HEAVY DUTY: Diesel Electric Engineer (Plant or Floating; Bolt Threading Machine operator; Drill Doctor (Bit Grinder); H.D. Mechanic; Machine Tool Operator; RUBBER -TIRED SCRAPERS: Rubber -tired Scraper Operator, single engine, single scraper; Self -loading, paddle wheel, auger type under 15 cu. yds.; Rubber -tired Scraper Operator, twin engine; Rubber -tired Scraper Operator, with push- ull attachments; Self Loading, paddle wheel, auger type 15 cu. yds. and over, single engine; Water pulls, water wagons; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Diesel Electric Engineer; Stationay Drag Scraper Operator; Shovel, Dragline, Clamshell, Operator under 3 cy yds.; Grade -all Operator; SURFACE (BASE) MATERIAL: Blade mounted spreaders, Ulrich and similar types; TRACTOR-RUBBERED TIRED: Tractor operator, rubber -tired, over 50 hp flywheel; Tractor operator, with boom attachment; Rubber -tired dozers and pushers (Michigan, Cat, Hough type); Skip Loader, Drag Box; TRENCHING MACHINE: Trenching Machine operator, digging capacity over 3 ft depth; Back filling machine operator; TUNNEL: Mucking machine operator WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 124 GROUP 5: ASPHALT: Extrusion Machine Operator; Roller Operator (any asphalt mix); Asphalt Burner and Reconditioner Operator (any type); Roto -Mill, pavement profiler, ground man; BULLDOZERS: Bulldozer operator, 20,000 lbs. or less or 100 horse or less; COMPRESSORS: Compressor Operator (any power), over 1,250 cu. ft. total capacity; COMPACTORS: Compactor Operator, including vibratory; Wagner Pactor Operator or similar type (without blade); CONCRETE: Combination mixer and Compressor Operator, gunite work; Concrete Batch Plant Quality Control Operator; Beltcrete Operator; Pumperete Operator (any type); Pavement Grinder and/or Grooving Machine Operator (riding type); Cement Pump Operator, Fuller -Kenyon and similar; Concrete Pump Operator; Grouting Machine Operator; Concrete mixer operator, single drum, under (5) bag capacity; Cast in place pipe laying machine; maginnis Internal Full slab vibrator operator; Concrete finishing mahine operator, Clary, Johnson, Bidwell, Burgess Bridge deck or similar type; Curb Machine Operator, mechanical Berm, Curb and/or Curb and Gutter; Concrete Joint Machine Operator; Concrete Planer Operator; Tower Mobile Operator; Power Jumbo Operator setting slip forms in tunnels; Slip Form Pumps, power driven hydraulic lifting device for concrete forms; Concrete Paving Machine Operator; Concrete Finishing Machine Operator; Concrete Spreader Operator; CRANE: Helicopter Hoist Operator; Hoist Operator, single drum; Elevator Operator; A -frame Truck Operator, Double drum; Boom Truck Operator; HYDRAULIC CRANE OPERATOR: Hydraulic Boom Truck, Pittman; DRILLING: Churm Drill and Earth Boring Machine Operator; Vacuum Truck; Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Fireman; FORKLIFT: Fork Lift, over 10 ton and/or robotic; HYDRAULIC HOES EXCAVATORS: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type); Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; LOADERS: Loaders, rubber- tired type, less than 25,000 lbs; Elevating Grader Operator, Tractor Towed requiring Operator or Grader; Elevating loader operator, Athey and similar types; OILERS: Service oiler (Greaser); PIPELINE -SEWER WATER: Hydra hammer or simialr types; Pavement Breaker Operator; PUMPS: Pump Operator, more than 5 (any size); Pot Rammer Operator; RAILROAD EQUIPMENT: Locomotive Operator, under 40 tons; Ballast Regulator Operator; Ballast Tamper Multi -Purpose Operator; Track Liner Operator; Tie Spacer Operator; Shuttle Car Operator; Locomotive Operator, 40 tons and over; MATERIAL HAULRS: Cat wagon DJBs Volvo similar types; Conveyored material hauler; SURFACING (BASE) MATERIAL: Rock Spreaders, self-propelled; Pulva-mixer or similar types; Chiip Spreading machine operator; Lime spreading operator, construction job siter; SWEEPERS: Sweeper operator (Wayne type) self-propelled construction job site; TRACTOR -RUBBER TIRED: Tractor operator, rubber -tired, 50 hp flywheel and under; Trenching machine operator, maximum digging capacity 3 ft depth; TUNNEL: Dinkey WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 125 GROUP 6: ASPHALT: Plant Oiler; Plant Fireman; Pugmill Operator (any type); Truck mounted asphalt spreader, with screed; COMPRESSORS: Compressor Operator (any power), under 1,250 cu. ft. total capacity; CONCRETE: Plant Oiler, Assistant Conveyor Operator; Conveyor Operator; Mixer Box Operator (C.T.B., dry batch, etc.); Cement Hog Operator; Concrete Saw Operator; Concrete Curing Machine Operator (riding type); Wire Mat or Brooming Machine Operator; CRANE: Oiler; Fireman, all equipment; Truck Crane Oiler Driver; A -frame Truck Operator, single drum; Tugger or Coffin Type Hoist Operator; CRUSHER: Crusher Oiler; Crusher Feederman; CRUSHER: Crusher oiler; Crusher feederman; DRILLING: Drill Tender; Auger Oiler; FLOATING EQUIPMENT: Deckhand; Boatman; FORKLIFT: Self-propelled Scaffolding Operator, construction job site (exclduing working platform); Fork Lift or Lumber Stacker Operator, construction job site; Ross Carrier Operator, construction job site; Lull Hi -Lift Operator or Similar Type; GUARDRAIL EQUIPMENT: Oiler; Auger Oiler; Oiler, combination guardrail machines; Guardrail Punch Oiler; HEATING PLANT: Temporary Heating Plant Operator; LOADERS: Bobcat, skid steer (less than 1 cu yd.); Bucket Elevator Loader Operator, BarberGreene and similar types; OILERS: Oiler; Guardrail Punch Oiler; Truck Crane Oiler -Driver; Auger Oiler; Grade Oiler, required to check grade; Grade Checker; Rigger; PIPELINE -SEWER WATER: Tar Pot Fireman; Tar Pot Fireman (power agitated); PUMPS: Pump Operator (any power); Hydrostatic Pump Operator; RAILROAD EQUIPMENT: Brakeman; Oiler; Switchman; Motorman; Ballast Jack Tamper. Operator; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER, ETC. OPERATOR: Oiler, Grade Oiler (required to check grade); Grade Checker; Fireman; SWEEPER: Broom operator, self propelled, construction job site; SURFACING (BASE) MATERIAL: Roller Operator, grading of base rock (not asphalt); Tamping Machine operartor, mechanical, self-propelled; Hydrographic Seeder Machine Operator; TRENCHING MACHINE: Oiler; Grade Oiler; TUNNEL: Conveyor operator; Air filtration equipment operator WA120001 Modification 19 Federal Wage Determinations for Highway Construction IRON0014-005 01/01/2012 Page 126 ADAMS, ASOTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND ORIELLE, SPOKANE, STEVENS, WALLA WALLA AND WHITMAN COUNTIES Rates Fringes IRONWORKER $ 31.35 20.10 IRON0029-002 01/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKAIKUM COUNTIES IRONWORKER Rates $ 33.87 Fringes 20.10 IRON0086-002 07/01/2012 YAKIMA, KITTITAS AND CHELAN COUNTIES Rates IRONWORKER $ 31.35 Fringes 20.10 IRON0086-004 CLALLAM, GRAYS MASON, PIERCE, 01/01/2012 HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, SKAGIT, SNOHOMISH, THURSTON, AND WHATCOM COUNTIES Rates IRONWORKER $ 37.89 Fringes 20.10 WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page X27 LAB00001-002 06/01/2009 ZONE 1: Rates Fringes Laborers: CALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (NORTH OF STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN), PIERCE, SAN JUAN,SKAGIT, SNOHOMISH,THURSTON AND WHATCOM COUNTIES GROUP 1 $ 21.77 9.07 GROUP 2 $ 24.86 9.07 GROUP 3 $ 30.96 9.07 GROUP 4 $ 31.70 9.07 GROUP 5 $ 32.21 9.07 CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN), KITTITAS AND YAKIMA COUNTIES GROUP 1 $ 17.95 9.07 GROUP 2 $ 20.58 9.07 GROUP 3 $ 22.54 9.07 GROUP 4 $ 23.09 9.07 GROUP 5 $ 23.48 9.07 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 radius miles from the respective city hall ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.25, WA120001 Modification 19 Federal Wage Determinations for Highway Construction LABORERS CLASSIFICATIONS GROUP 1: Landscaping and Planting; Watchman; Window Washer/Cleaner (detail clean-up, such as but not limited to cleaning floors, ceilings, walls, windows, etc., prior to final acceptance by the owner) GROUP 2: Batch Weighman; Crusher Feeder; Fence Laborer; Flagman; Pilot Car GROUP 3: General Laborer; Air, Gas, or Electric Vibrating Screed; Asbestos Abatement Laborer; Ballast Regulator Machine; Brush Cutter; Brush Hog Feeder; Burner; Carpenter Tender; Cement Finisher Tender; Change House or Dry Shack; Chipping Gun (under 30 lbs.); Choker Setter; Chuck Tender; Clean-up Laborer; Concrete Form Stripper; Curing Laborer; Demolition (wrecking and moving including charred material); Ditch Digger; Dump Person; Fine Graders; Firewatch; Form Setter; Gabian Basket Builders; Grout Machine Tender; Grinders; Guardrail Erector; Hazardous Waste Worker (Level C: uses a chemical "splash suit" and air purifying respirator); Maintenance Person; Material Yard Person; Pot Tender; Rip Rap Person; Riggers; Scale Person; Sloper Sprayer; Signal Person; Stock Piler; Stake Hopper; Toolroom Man (at job site); Topper-Tailer; Track Laborer; Truck Spotter; Vinyl Seamer GROUP 4: Cement Dumper -Paving; Chipping Gun (over 30 lbs.); Clary Power Spreader; Concrete Dumper/Chute Operator; Concrete Saw Operator; Drill Operator (hydraulic, diamond, aiartrac); Faller and Bucker Chain Saw; Grade Checker and Transit Person; Groutmen (pressure) including post tension beams; Hazardous Waste Worker (Level B: uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit"); High Scaler; Jackhammer; Laserbeam Operator; Manhole Builder-Mudman; Nozzleman (concrete pump, green cutter when using combination of high pressure air and water on concrete and rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster); Pavement Breaker; Pipe Layer and Caulker; Pipe Pot Tender; Pipe Reliner (not insert type); Pipe Wrapper; Power Jacks; Railroad Spike Puller -Power; Raker -Asphalt; Rivet Buster; Rodder; Sloper (over 20 ft); Spreader (concrete); Tamper and Similar electric, air and glas operated tool; Timber Person -sewer (lagger shorer and cribber); Track Liner Power; Tugger Operator; Vibrator; Well Point Laborer GROUP 5: Caisson Worker; Miner; Mortarman and Hodcarrier; Powderman; Re-Timberman; Hazardous Waste Worker (Level A: utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line). WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page X28 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4, Page I 29 • LAB00238-004 06/01/2012 PASCO AREA: ADAMS, BENTON, COLUMBIA,DOUGLAS (East of 120th Meridian), FERRY, FRANKLIN, GRANT, OKANOGAN, WALLA WALLA SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS & WHITMAN COUNTIES Rates Fringes LABORER (PASCO) GROUP 1 $ 21.71 10.30 GROUP 2 $ 23.81 10.30 GROUP 3 $ 24.08 10.30 GROUP 4 $ 24.35 10.30 GROUP 5 $ 24.63 10.30 LABORER (SPOKANE) GROUP 1 $ 21.41 10.30 GROUP 2 $ 23.51 10.30 GROUP 3 $ 23.78 10.30 GROUP 4 $ 24.05 10.30 GROUP 5 $ 24.33 10.30 •'Zone Differential (Add to Zone 1 rate): $2.00 ,BASE POINTS: Spokane, Pasco, Lewiston *Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office. WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page I 30 LABORERS CLASSIFICATIONS GROUP 1: Flagman; Landscape Laborer; Scaleman; Traffic Control Maintenance Laborer (to include erection and maintenance of barricades, signs and relief of flagperson); Window Washer/Cleaner (detail cleanup, such as, but not limited to cleaning floors, ceilings, walls, windows, etc. prior to final acceptance by the owner) GROUP 2: Asbestos Abatement Worker; Brush Hog Feeder; Carpenter Tender; Cement Handler; Clean-up Laborer; Concrete Crewman (to include stripping of forms, hand operating jacks on slip form construction, application of concrete curing compounds, pumperete machine, signaling, handling the nozzle of squeezcrete or similar machine,6 inches and smaller); Confined Space Attendant; Concrete Signalman; Crusher Feeder; Demolition (to include clean-up, burning, loading, wrecking and salvage of all material); Dumpman; Fence Erector; Firewatch; Form Cleaning Machine Feeder, Stacker; General Laborer; Grout Machine Header Tender; Guard Rail (to include guard rails, guide and reference posts, sign posts, and right-of-way markers); Hazardous Waste Worker, Level D (no respirator is used and skin protection is minimal); Miner, Class "A" (to include all bull gang, concrete crewman, dumpman and pumperete crewman, including distributing pipe, assembly & dismantle, and nipper); Nipper; Riprap Man; Sandblast Tailhoseman; Scaffold Erector (wood or steel); Stake Jumper; Structural Mover (to include separating foundation, preparation, cribbing, shoring, jacking and unloading of structures); Tailhoseman (water nozzle); Timber Bucker and Faller (by hand); Track Laborer (RR); Truck Loader; Well -Point Man; All Other Work Classifications Not Specially Listed Shall Be Classified As General Laborer GROUP 3: Aspahlt Raker; Asphalt Roller, walking; Cement Finisher Tender; Concrete Saw, walking; Demolition Torch; Dope Pot Firemen, non-mechanical; Driller Tender (when required to move and position machine); Form Setter, Paving; Grade Checker using level; Hazardous Waste Worker, Level C (uses a chemical "splash suit" and air purifying respirator); Jackhammer Operator; Miner, Class "B" (to include brakeman, finisher, vibrator, form setter); Nozzleman (to include squeeze and flo-crete nozzle); Nozzleman, water, air or steam; Pavement Breaker (under 90 lbs.); Pipelayer, corrugated metal culvert; Pipelayer, multi- plate; Pot Tender; Power Buggy Operator; Power Tool Operator, gas, electric, pneumatic; Railroad Equipment, power driven, except dual mobile power spiker or puller; Railroad Power Spiker or Puller, dual mobile; Rodder and Spreader; Tamper (to include operation of Barco, Essex and similar tampers); Trencher, Shawnee; Tugger Operator; Wagon Drills; Water Pipe Liner; Wheelbarrow (power driven) WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page J31 GROUP 4: Air and Hydraulic Track Drill; Brush Machine (to include horizontal construction joint cleanup brush machine, power propelled); Caisson Worker, free air; Chain Saw Operator and Faller; Concrete Stack (to include laborers when laborers working on free standing concrete stacks for smoke or fume control above 40 feet high); Gunite (to include operation of machine and nozzle); Hazardous Waste Worker, Level B (uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit"); High Scaler; Laser Beam Operator (to include grade checker and elevation control); Miner, Class C (to include miner, nozzleman for concrete, laser beam operator and rigger on tunnels); Monitor Operator (air track or similar mounting); Mortar Mixer; Nozzleman (to include jet blasting nozzleman, over 1,200 lbs., jet blast machine power propelled, sandblast nozzle); Pavement Breaker (90 lbs. and over); Pipelayer (to include working topman, caulker, collarman, jointer, mortarman, rigger, jacker, shorer, valve or meter installer); Pipewrapper; Plasterer Tender; Vibrators (all) GROUP 5 - Drills with Dual Masts; Hazardous Waste Worker, Level A (utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line); Miner Class "D", (to include raise and shaft miner, laser beam operator on riases and shafts) GROUP 6 - Powderman LAB00238-006 06/01/2012 ,COUNTIES EAST OF THE 120TH MERIDIAN: ADAMS, ASOTIN, BENTON, ,CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND OREILLE, STEVENS, SPOKANE, WALLA WALLA, WHITMAN Rates Fringes Hod Carrier $ 23.78 10.30 LAB00335-001 06/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN), SKAMANIA AND WAHKIAKUM COUNTIES Rates Fringes Laborers: ZONE 1: GROUP 1 $ 28.24 9.70 GROUP 2 $ 28.84 9.70 GROUP 3 $ 29.28 9.70 GROUP 4 $ 29.66 9.70 GROUP 5 $ 25.74 9.70 GROUP 6 $ 23.32 9.70 GROUP 7 $ 20.12 9.70 WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 132 Zone Differential (Add to Zone 1 rates): Zone 2 $ 0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 BASE POINTS: GOLDENDALE, LONGVIEW, AND VANCOUVER ZONE 1: Projects within 30 miles of the respective city all. ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall. LABORERS CLASSIFICATIONS GROUP 1: Asphalt Plant Laborers; Asphalt Spreaders; Batch Weighman; Broomers; Brush Burners and Cutters; Car and Truck Loaders; Carpenter Tender; Change -House Man or Dry Shack Man; Choker Setter; Clean-up Laborers; Curing, Concrete; Demolition, Wrecking and Moving Laborers; Dumpers, road oiling crew; Dumpmen (for grading. crew); Elevator Feeders; Median Rail Reference Post, Guide Post, Right of Way Marker; Fine Graders; Fire Watch; Form Strippers (not swinging stages); General Laborers; Hazardous Waste Worker; Leverman or Aggregate Spreader (Flaherty and similar types); Loading Spotters; Material Yard Man (including electrical); Pittsburgh Chipper Operator or Similar Types; Railroad Track Laborers; Ribbon Setters (including steel forms); Rip Rap Man (hand placed); Road Pump Tender; Sewer Labor; Signalman; Skipman; Slopers; Spraymen; Stake Chaser; Stockpiler; Tie Back Shoring; Timber Faller and Bucker (hand labor); Toolroom Man (at job site); Tunnel Bullgang (above ground); Weight -Man- Crusher (aggregate when used) GROUP 2: Applicator (including pot power tender for same), applying protective material by hand or nozzle on utility lines or storage tanks on project; Brush Cutters (power saw); Burners; Choker Splicer; Clary Power Spreader and similar types; Clean- up Nozzleman-Green Cutter (concrete, rock, etc.); Concrete Power Buggyman; Concrete Laborer; Crusher Feeder; Demolition and Wrecking Charred Materials; Gunite Nozzleman Tender; Gunite or Sand Blasting Pot Tender; Handlers or Mixers of all Materials of an irritating nature (including cement and lime); Tool Operators (includes but not limited to: Dry Pack Machine; Jackhammer; Chipping Guns; Paving Breakers); Pipe Doping and Wrapping; Post Hole Digger, air, gas or electric; Vibrating Screed; Tampers; Sand Blasting (Wet); Stake -Setter; Tunnel-Muckers, Brakemen, Concrete Crew, Bullgang (underground) WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page X33 GROUP 3: Asbestos Removal; Bit Grinder; Drill Doctor; Drill Operators, air tracks, cat drills, wagon drills, rubber -mounted drills, and other similar types including at crusher plants; Gunite Nozzleman; High Scalers, Strippers and Drillers (covers work in swinging stages, chairs or belts, under extreme conditions unusual to normal drilling, blasting, barring -down, or sloping and stripping); Manhole Builder; Powdermen; Concrete Saw Operator; Pwdermen; Power Saw Operators (Bucking and Falling); Pumperete Nozzlemen; Sand Blasting (Dry); Sewer Timberman; Track Liners, Anchor Machines, Ballast Regulators, Multiple Tampers, Power Jacks, Tugger Operator; Tunnel -Chuck Tenders, Nippers and Timbermen; Vibrator; Water Blaster GROUP 4: Asphalt Raker; Concrete Saw Operator (walls); Concrete Nozzelman; Grade Checker; Pipelayer; Laser Beam (pipelaying) -applicable when employee assigned to move, set up, align; Laser Beam; Tunnel Miners; Motorman -Dinky Locomotive -Tunnel; Powderman-Tunnel; Shield Operator -Tunnel GROUP 5: Traffic Flaggers GROUP 6: Fence Builders ,%k, GROUP 7: Landscaping or Planting Laborers .;LAB00335-019 06/01/2012 Rates Fringes Hod Carrier $ 30.30 9.70 .;PAIN0005-002 01/01/2012 STATEWIDE EXCEPT CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH), SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Painters: STRIPERS $ 27.96 12.77 PAIN0005-004 03/01/2009 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES Rates Fringes PAINTER $ 20.82 7.44 WA120001 Modification 19 Federal Wage Determinations for Highway Construction PAIN0005-006 07/01/2012 Page I 34 ADAMS, ASOTIN; BENTON AND FRANKLIN (EXCEPT HANFORD SITE); CHELAN, COLUMBIA, DOUGLAS, FERRY, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA COUNTIES Rates Fringes Painters: Application of Cold Tar Products, Epoxies, Polyure thanes, Acids, Radiation Resistant Material, Water and Sandblasting $ 25.99 9.99 Over 30'/Swing Stage Work$ 22.20 7.98 Brush, Roller, Striping, Steam -cleaning and Spray$ 20.99 9.99 Lead Abatement, Asbestos Abatement $ 21.50 7.98 *$.70 shall be paid over and above the basic wage rates listed for work on swing stages and high work of over 30 feet. PAIN0055-002 07/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Painters: Brush & Roller $ 20.61 8.42 High work - All work 60 ft. or higher $ 21.36 8.42 Spray and Sandblasting $ 21.21 8.42 PAIN0055-007 07/01/2011 CLARK, COWLITZ, KLICKITAT, SKAMANIA and WAHKIAKUM COUNTIES Rates Fringes Painters: HIGHWAY & PARKING LOT STRIPER $ 33.19 9.05 WA7.20001 Modification 19 Federal Wage Determinations for Highway Construction Page 135 PLAS0072-004 06/01/2012 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER ZONE 1 $ 25.43 11.97 Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston; Wenatchee Zone 1: 0 - 45 radius miles from the main post office Zone 2: Over 45 radius miles from the main post office PLAS0528-001 06/01/2012 CLALLAM, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON, WAHKIAKUM AND WHATCOM COUNTIES Rates Fringes Cement Masons: CEMENT MASON $ 35.88 14.25 COMPOSITION, TROWEL MACHINE, GRINDER, POWER TOOLS, GUNNITE NOZZLE $ 36.38 14.25 TROWLING MACHINE OPERATOR ON COMPOSITION $ 36.38 14.25 PLA50555-002 06/01/2012 CLARK, KLICKITAT AND SKAMANIA COUNTIES ZONE 1: Rates Fringes Cement Masons: CEMENT MASONS DOING BOTH COMPOSITION/POWER MACHINERY AND SUSPENDED/HANGING SCAFFOLD$ 30.58 17.76 CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD $ 30.58 17.76 CEMENT MASONS $ 29.98 17.76 COMPOSITION WORKERS AND POWER MACHINERY OPERATORS$ 31.18 17.76 WA120001 Modification 19 Federal Wage Determinations for Highway Construction Zone Zone Zone Zone Zone Differential (Add To 2 - $0.65 3 - 1.15 4 - 1.70 5 - 3.00 Zone 1 Rates): Page 136 BASE POINTS: BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER ZONE 1: Projects within 30 miles of the respective city hall ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 respective city hall. ZONE 4: More than 50 respective city hall. ZONE 5: More than 80 miles from the respective city miles but less than 50 miles from the miles but less than 80 miles from the hall TEAM0037-002 06/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Truck drivers: ZONE 1 GROUP 1 $ 26.90 GROUP 2 $ 27.02 GROUP 3 $ 27.15 GROUP 4 $ 27.41 GROUP 5 $ 27.63 GROUP 6 $ 27.79 GROUP 7 $ 27.99 Zone Differential (Add to Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 Zone 1 Rates): 13.25 13.25 13.25 13.25 13.25 13.25 13.25 BASE POINTS: ASTORIA, THE DALLES, LONGVIEW AND VANCOUVER ZONE 1: hall. ZONE 2: More than 30 respective city hall. ZONE 3: More than 40 respective city hall. ZONE 4: More than 50 respective city hall. ZONE 5: More than 80 Projects within 30 miles of the respective city miles but less than 40 miles from the miles but less than 50 miles from the miles but less than 80 miles from the miles from the respective city hall: WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 137 TRUCK DRIVERS CLASSIFICATIONS GROUP 1: A Frame or Hydra lifrt truck w/load bearing surface; Articulated Dump Truck; Battery Rebuilders; Bus or Manhaul Driver; Concrete Buggies (power operated); Concrete Pump Truck; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations there of: up to and including 10 cu. yds.; Lift Jitneys, Fork Lifts (all sizes in loading, unloading and transporting material on job site); Loader and/or Leverman on Concrete Dry Batch Plant (manually operated); Pilot Car; Pickup Truck; Solo Flat Bed and misc. Body Trucks, 0-10 tons; Truck Tender; Truck Mechanic Tender; Water Wagons (rated capacity) up to 3,000 gallons; Transit Mix and Wet or Dry, Mix - 5 cu. yds. and under; Lubrication Man, Fuel Truck Driver, Tireman, Wash Rack, Steam Cleaner or combinations; Team Driver; Slurry Truck Driver or Leverman; Tireman" GROUP 2: Boom Truck/Hydra-lift or Retracting Crane; Challenger; Dumpsters or similar equipment all sizes; Dump Trucks/Articulated Dumps 6 cu to 10 cu.; Flaherty Spreader Driver or Leverman; Lowbed Equipment, Flat Bed Semi -trailer or doubles transporting equipment or wet or dry materials; Lumber Carrier, Driver -Straddle Carrier (used in loading, ,:unloading and transporting of materials on job site); Oil Distributor Driver or Leverman; Transit mix and wet or dry ',,:mix trcuks: over 5 cu. yds. and including 7 cu. yds.; Vacuum Trucks; Water truck/Wagons (rated capacity) over 3,000 to 5,000 gallons ',GROUP 3: Ammonia Nitrate Distributor Driver; Dump trucks, ,side, end and bottom dumps, including Semi Trucks and •tTrains or combinations thereof: over 10 cu. yds. and including 30 cu. yds. includes Articulated Dump Trucks; Self -Propelled Street Sweeper; Transit mix and wet or dry mix truck: over 7 cu yds. and including 11 cu yds.; Truck Mechanic -Welder -Body Repairman; Utility and Clean-up Truck; Water Wagons (rated capacity) over 5,000 to 10,000 gallons GROUP 4: Asphalt Burner; Dump Trucks, side, end and bottom cumps, including Semi -Trucks and Trains or combinations thereof: over 30 cu. yds. and including 50 cu. yds. includes Articulated Dump Trucks; Fire Guard; Transit Mix and Wet or Dry Mix Trucks, over 11 cu. yds. and including 15 cu. yds.; Water Wagon (rated capacity) over 10,000 gallons to 15,000 gallons GROUP 5: Composite Crewman; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 50 cu. yds. and including 60 cu. yds. includes Articulated Dump Trucks GROUP 6: Bulk Cement Spreader w/o Auger; Dry Pre -Batch concrete Mix Trucks; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains of combinations thereof: over 60 cu. yds. and including 80 cu. yds., and includes Articulated Dump Trucks; Skid Truck WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 138 GROUP 7: Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 80 cu yds. and including 100 cu. yds., includes Articulated Dump Trucks; Industrial Lift Truck (mechanical tailgate) TEAM0174-001 06/29/2012 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES Rates Fringes Truck drivers: ZONE A: GROUP 1• $ 31.68 16.23 GROUP 2• $ 30.84 16.23 GROUP 3 $ 28.03 16.23 GROUP 4 $ 23.06 16.23 GROUP 5 $ 31.23 16.23 ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates. ZONE C (over 45 miles from centr .of listed cities*): Add $1.00 per hour to Zone A rates. *Zone pay will be calculated from the city center of the following listed cities: BELLINGHAM CENTRALIA RAYMOND OLYMPIA EVERETT SHELTON ANACORTES BELLEVUE SEATTLE PORT ANGELES MT. VERNON KENT TACOMA PORT TOWNSEND ABERDEEN BREMERTON TRUCK DRIVERS CLASSIFICATIONS GROUP 1 - "A -frame or Hydralift" trucks and Boom trucks or similar equipment when "A" frame or "Hydralift" and Boom truck or similar equipment is used; Buggymobile; Bulk Cement Tanker; Dumpsters and similar equipment, Tournorockers, Tournowagon, Tournotrailer, Cat DW series, Terra Cobra, Le Tourneau, Westinghouse, Athye Wagon, Euclid Two and Four -Wheeled power tractor with trailer and similar top -loaded equipment transporting material: Dump Trucks, side, end and bottom dump, including semi -trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment; Explosive Truck (field mix) and similar equipment; Hyster Operators (handling bulk loose aggregates); Lowbed and Heavy Duty Trailer; Road Oil Distributor Driver; Spreader, Flaherty Transit mix used exclusively in heavy construction; Water Wagon and Tank Truck -3,000 gallons and over capacity WA1.20001 Modification 19 Federal Wage Determinations for Highway Construction Page X39 GROUP 2 - Bulllifts, or similar equipment used in loading or unloading trucks, transporting materials on job site; Dumpsters, and similar equipment, Tournorockers, Tournowagon, Turnotrailer, Cat. D.W. Series, Terra Cobra, Le Tourneau, Westinghouse, Athye wagon, Euclid two and four -wheeled power tractor with trailer and similar top -loaded equipment transporting material: Dump trucks, side, end and bottom dump, including semi -trucks and trains or combinations thereof with less than 16 yards capacity; Flatbed (Dual Rear Axle); Grease Truck, Fuel Truck, Greaser, Battery Service Man and/or Tire Service Man; Leverman and loader at bunkers and batch plants; Oil tank transport; Scissor truck; Slurry Truck; Sno-Go and similar equipment; Swampers; Straddler Carrier (Ross, Hyster) and similar equipment; Team Driver; Tractor (small, rubber -tired) (when used within Teamster jurisdiction); Vacuum truck; Water Wagon and Tank trucks -less than 3,000 gallons capacity; Winch Truck; Wrecker, Tow truck and similar equipment GROUP 3 - Flatbed (single rear axle); Pickup Sweeper; Pickup Truck. (Adjust Group 3 upward by $2.00 per hour for onsite work only) .GROUP 4 - Escort or Pilot Car •GROUP 5 - Mechanic HAZMAT PROJECTS Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit." LEVEL A: +$.75 per hour - This level utilizes a fully - encapsulated suit with a self-contained breathing apparatus or a supplied air line. WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 140 TEAM0760-002 06/01/2009 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA COUNTIES Rates Fringes Truck drivers: (ANYONE WORKING ON HAZMAT JOBS SEE FOOTNOTE A BELOW) ZONE 1: GROUP 1 $ 20.02 10.86 GROUP 2 $ 22.29 10.86 GROUP 3 $ 22.79 10.86 GROUP 4 $ 23.12 10.86 GROUP 5 $ 23.23 10.86 GROUP 6 $ 23.40 10.86 GROUP 7 $ 23.93 10.86 GROUP 8 $ 24.26 10.86 Zone Differential (Add to Zone 1 rate: Zone 2 - $2.00) BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: Outside 45 radius miles from the main post office TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Escort Driver or Pilot Car; Employee Haul; Power Boat Hauling Employees or Material GROUP 2: Fish Truck; Flat Bed Truck; Fork Lift (3000 lbs. and under); Leverperson (loading trucks at bunkers); Trailer Mounted Hydro Seeder and Mulcher; Seeder & Mulcher; Stationary Fuel Operator; Tractor (small, rubber -tired, pulling trailer or similar equipment) GROUP 3: Auto Crane (2000 lbs. capacity); Buggy Mobile & Similar; Bulk Cement Tanks & Spreader; Dumptor (6 yds. & under); Flat Bed Truck with Hydraullic System; Fork Lift (3001-16,000 lbs.); Fuel Truck Driver, Steamcleaner & Washer; Power Operated Sweeper; Rubber -tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driver; Straddle Carrier (Ross, Hyster, & similar); Tireperson; Transit Mixers & Truck Hauling Concrete (3 yd. to & including 6 yds.); Trucks, side, end, bottom & articulated end dump (3 yards to and including 6 yds.); Warehouseperson (to include shipping & receiving); Wrecker & Tow Truck GROUP 4: A -Frame; Burner, Cutter, & Welder; Service Greaser; Trucks, side, end, bottom & articulated end dump (over 6 yards to and including 12 yds.); Truck Mounted Hydro Seeder; Warehouseperson; Water Tank truck (0-8,000 gallons) WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 141 GROUP 5: Dumptor (over 6 yds.); Lowboy (50 tons & under); Self- loading Roll Off; Semi -Truck & Trailer; Tractor with Steer Trailer; Transit Mixers and Trucks Hauling Concrete (over 6 yds. to and including 10 yds.); Trucks, side, end, bottom and end dump (over 12 yds. to & including 20 yds.); Truck -Mounted Crane (with load bearing surface either mounted or pulled, up to 14 ton); Vacuum Truck (super sucker, guzzler, etc.) GROUP 6: Flaherty Spreader Box Driver; Flowboys; Fork Lift (over 16,000 lbs.); Dumps (Semi -end); Mechanic (Field); Semi- end Dumps; Transfer Truck & Trailer; Transit Mixers & Trucks Hauling Concrete (over 10 yds. to & including 20 yds.); Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.); Truck and Pup; Tournarocker, DWs & similar with 2 or more 4 wheel -power tractor with trailer, gallonage or yardage scale, whichever is greater Water Tank Truck (8,001- 14,000 gallons); Lowboy(over 50 tons) GROUP 7: Oil Distributor Driver; Stringer Truck (cable oeprated trailer); Transit Mixers & Trucks Hauling Concrete (over 20 yds.); Truck, side, end, bottom end dump (over 40 yds. to & including 100 yds.); Truck Mounted Crane (with .load bearing surface either mounted or pulled (16 through 25 tons); :GROUP 8: Prime Movers and Stinger Truck; Trucks, side, end, bottom and articulated end dump (over 100 yds.); Helicopter Pilot Hauling Employees or Materials Footnote A - Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in additon to the classification working in as follows: LEVEL C -D: - $.50 PER HOUR (This is the lowest level of protection. This level may use an air purifying respirator or additional protective clothing. LEVEL A -B: - $1.00 PER HOUR (Uses supplied air is conjunction with a chemical spash suit or fully encapsulated suit with a self-contained breathing apparatus. Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours. WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 42 NOTE: Trucks Pulling Equipment Trailers: shall receive $.15/hour over applicable truck rate WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)) . The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four -digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. 0000/9999: weighted union wage rates will be published annually each January. WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page X43 Non -Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and, will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * .an existing published wage determination * a survey underlying a wage determination * ,a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On,,survey related matters, initial contact, including requests for. summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations.; Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 WA120001 Modification 19 Federal Wage Determinations for Highway Construction Page 144 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION WA120001 Modification 19 Federal Wage Determinations for Highway Construction PROPOSAL To the City Clerk Yakima, Washington This certifies that the undersigned has examined the location of: City of Yakima Yakima Railroad Grade Separations, Phase 3 — Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S(062) State Contract No. TA -1407 City Project No. 1818 and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work, is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the money available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices. NOTE: Unit prices for all items, all extensions, and total amount of bid, shall be shown, and be written in ink or typed. Show unit prices in figures only. Figures written to the right of the dot (decimal) in the dollars column shall be considered as cents. 321 ITEM PROPOSAL BID SHEET Yakima Railroad Grade Separations, Phase 3 - Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S(062) State Contract No. TA -1407 City Project No. 1818 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 1 I Mobilization L.S. Qz,Me Vz, � 2 1 Removal of Structure and Obstruction L.S. �j� zip'%= 6e/ e/ _ 3 900 Removing Paint Line L.F. / 1 4 4 Removing Painted Traffic Marking EA. 65-'2-7,160� 5 400 Removing Painted Crosswalk Line S.F. QGS � ,246 — 6 25,500 Roadway Excavation Incl. Haul C.Y. /0 1` g2C2-5. i r 7 5,886 Underdrain Pipe 4In. Diam L.F. 2� — 4/gd 6-57E? 8 80 Drain Pipe 4 In. Diam L.F. f aG't�°=' C — 9 31 Catch Basin Type 1 EA. 4s--`� a /! pJ 10 1 Catch Basin Type 2, 48 In. Diam. EA. /' ?alb [/ f/ Qg. I1 680 Corrugated Polyethylene Storm Sewer Pipe 10 In. Diam. L.F. /,. 7,1"G- p� 12 12 450 Corrugated Polyethylene Storm Sewer Pipe 12 In. Diam. L.F. ) /0` 12(S 13 590 Ductile Iron Storm Sewer Pipe 8 In. Diam L.F. QD 3gr— Oo' Z2 �5 — 14 16 Ductile Iron Storm Sewer Pipe 14 In. Diam L.F, g g dors it 4/1 ca — 15 1,690 Testing Storm Sewer Pipe L.F. / Om / 6'QO Oo 16 15 Plain Conc, or V.0 Sewer Pipe 6In. Diam L.F. 3DB 445-Z2 17 700 Structure Excavation Class B Incl. Haul C.Y. 4/ 6S"27 ` 18 436 Structure Excavation Class B Incl. I-Iaul - Bottom Seal C.Y. /6.52-..-7 6' f7 dv 19 20 Shoring or Extra Excavation Class B S.F. .,2V SO °'' 20 80 Gravel Backfill for Drain C.Y. 3�� Si ( 7 111- 21 170 Controlled Density Fill C.Y. 7022 /57 Sag— 22 825 Construction Geotextile for Underground Drainage S.Y. ;7 Le /✓ R/S—,4:, 23 7 Connection to Drainage Structure EA. f5_0, ( 60c= 24 1 Storm System Bypass L.S. 30, cOO '00/ 000 -- 25 1 Pump Station L.S. �,,,�G�25v, elno err 26 1 Wetwell Shoring L.S. 1t 27 3 Comb. Air Release/Air Vacuum Valve Assembly 2 In. EA. 15; ( 'J /41 ?CC 28 1 Service Connection 11/2 In. Diam. EA. ,c'QCC' ge 29 230 Ductile Iron Pipe for Water Main 12 In. Diann. L.F. /35 — 3! C t) 2°' J 30 40 Pipe Insulation L.F. ffe)"42 j,2c j -' 31 2 Connection to Existing Water Main 2" Temp. Blowoff EA. 4,2eo lt a/ gm, =e 32 115 Steel Casing 22 In. Diam. For Water Main L.F. 0710 `= .2-,, 600-°--e 33 1 Heat Tracing System L.S. l s-coms /. ?3' '!44 34 2 Galvanic Anode EA. 2� °� 00f, 9j- 35 280 Shoring or Extra Excavation Class B S.F. 3 od 8410 O° Addendum No. 2 Page 3 of 6 16 November 2012 1 1 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 36 2 Plugging Existing Pipe EA. ,2, 5 Z) 9-2--. 5Z.Z) 37 230 Conc. Class 4000 for Retaining Wall C.Y. (���� ov V,D00— 38 23,800 St. Reinf. Bar for Retaining Wall LB. an- 39 110 Conc. Class 4000 for Barrier C.Y. /tt(bt5 /�jeet0� 40 29,700 St. Reinf. Bar for Barrier LB. /e? 27, ("o' 41 1,490 Bridge Railing Type BP for Wall Barrier L.F. et 9 D a_ 42 14 Conc. Class 4000 for Free -Standing Barrier C.Y. 5 /,Dc 00 � /y, OW -- 43 3,600 SE Reinf. Bar for Free -Standing Barrier LB. 9D f✓ ^.� v 3i�� U- 44 2 Conc. Class 4000 for Impact Attenuator Footing C.Y. ,5 -CO°= /1 Oa, 922 45 200 St. Reinf. Bar for Impact Attenuator Footing LB. /' __ aV6 �' 46 630 Single Slope Concrete Barrier L.F. /Q0°-?- 63100,4"' 47 650 Std. Hand Rail Pedestrian Railing L.F. /07-42 do 69 me 48 2 Single Slope Concrete Barrier Transition EA -5;06109-e-' /0 4019 12. / 49 3,200 Structure Excavation Class A Incl. Haul C.Y. // 419E0 a._.cs P 50 1 Shoring or Extra Excavation Cl. A L.S. 20, GID.22 51 700 Gravel Backfill for Wall C.Y. 3/ ZO �Mtf'i 52 1,670 Cone. Class 4000 for Wall Cap C.Y. GJ o9 6655 006 ^- 53 284,200 St. Reinf. Bar for Wall Ca p LB. � t� f 3�3, !3$oD 54 660 Shaft - 39" Diameter L.F. 3/9°=° _2/0„.5 b 55 660 Furnishing SoldierPile- W24X103 L.F. 5-711-19- 37-, 42 °O 56 2,630 Lagging for Underpass Wall S.F. //f 30, 774 57 2,630 Concrete Fascia Panel S.F. ,?..s --It' 63 7Sd °m 58 1 Removing Shaft Obstruction - Soldier Pile DOL. $20,000.00 $20,000.00 r 59 340 Shaft - 36” Diameter L.F. 38 08 /IC 5-40122 60 210 Furnishing Soldier Pile - W21X93 L.F. lie) IIS Q( D® 61 130 Furnishing Soldier Pile - W21X55 L.F. 3/ 6-P-5/ 09�� 62 650 Lagging for BNSF Shoring S.F. /7'?! (,Z,- • 63 1 Removing Shaft Obstruction - Shoring Wall DOL. • $10,000.00 $10,000.00 64 11,200 Shotcrete Facing S.F. ��o owb egg' oet, — 65 1,540 Prefabricated Drainage Material S.Y. /2Oa /Vi !/e 66 3,140 Soil Excavation for Shaft Incl. Haul C.Y. 20-12-° S3Z 33 °m• 67 6,890 Furnishing and Placing Temp. Casing for 4 Ft Diam Shaft L.F. ArSe! Oa /03, -.<041 -4 -): 68 1,440 Lean Concrete for Shaft C.Y./3/°© /STS, 6i401..-"'- o 69 1,770 Conc. Class 4000P for Shaft C.Y. /(g •7., 360 "—. 70 424,000 St. Reinf. Bar for Shaft LB. 07, OebTif 71 15,150 CSL Access Tube L.F. /0 51 /S/ soo `� 72 162 CSL Test EA. ,s"eetl?' g'irp0 73 1 Removing Shaft Obstructions DOL. $100,000.00 $100,000.00 74 1 Tremie Seal Temporary Bracing L.S. 15;600 7S ocQ',-' 75 3,403 Tremie Seal Excavation Including Haul CY /0 /S 3j se/0 Ys 76 3,403 Lean Concrete For Tremie Seal CY asp VAS; 3 ' 77 1 Drilled Seal L.S. 402422d2 /,28Z,c,co Addendum No. 2 Page 4 of 6 16 November 2012 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 78 1 Additional Bottom Seal Leak Repair DOL. $30,000.00 $30,000.00 79 290 Prestressed Conc. Girder For Strut L.F. 7-70 3 ,3C a 80 1 Superstructure - Front St. Bridge L.S. le �,y� - 360, '- 81 227 Bridge Approach Slab S.Y. .2/.5"-.-& 16,105— el -e' 82 1 Superstructure - BNSF Bridge L.S. 4/e4 000616i 10C, 0804•1 83 1,500 Permeable Ballast TON 20 °b 30,, 000 84 3,000 Crushed Surfacing Base Course TON /' 2d 51/4100 '= i 85 3,600 Construction Geotextile for Separation S.Y. / W S 740 92 86 120 Crushed Surfacing Top Course TON ,Zq — 2, $trO 87 1,400 Planing Bituminous Pavement S.Y. 9-e? 3 p o0 �6(' — 1 Slurry Seal L.S. /1/C2 fi,88 AS: VOCY-7' 89 2,450 HMA Cl. 1/2" PG 64-28 TON 137-°1.-t-" ,V3, 1S0 22.- 90 1 Job Mix Compliance Price Adjustment CA LC. -$1.00 - / di 91 1 Compaction Price Adjustment CALC. -$1.00 pa 92 300 ESC Lead DAY 23- --, St 2 93 300 Street Cleaning HR /2C?" 0 3<., Gl©0• 94 20 Inlet Protection EA. /Ds -e" 2, /00 00 95 670 Stabilized Construction Entrance S.Y. /4/21-1'7✓ 3 co, 96 1 Erosion / Water Pollution Control DOL. $100,000.00 $100,000.00 97 1 SWPPP L.S. S7000 -61? Ver, do, 98 1 Dewatering L.S. f;t7,QCO°� K'Q 99 425 Cement Conc. Traffic Curb and Gutter L.F. /9�2' Q -�- 100 1 Permanent Impact Attenuator EA. /S'(,0p°e. `S' °� 101 8 Painted Traffic Arrow EA. S:5 -°12'90 'L°-- 102 3,100 Paint Line L.F. D le / •24/Q 2- 103 1,200 Painted Wide Line L.F. n 5-•.-- 6.60 104 960 Painted Crosswalk Line S.F. Q?d IG 5/12- 105 80 Painted Stop Line L.F. 21...2 /6' g522 106 6 Painted Bicycle Lane Symbol EA. ±16--1 5 107 1 Permanent Signing60 L.S. 20COCP- ‘,101005aio 108 1 Misc. Detour Signing Revisions DOL. 0 $10,000.00 $10,000.00 109 1 Illumination System Complete L.S. 0 el'elf COO 110 1 Traffic Signal System First St.and MLK JR Blvd., Complete L.S. v6, (aj'`i go, ,(j(;0 4- 111 1 Traffic Signal System 1st Ave. and MLK JR Blvd, Complete L.S. yt/()Q� 9€01600e' 112 1 Project Temporary Traffic Control L.S. .,,c,qVCO SC/ OCo —1 113 1 Thrie Beam Guardrail L.S. 3/ (p/p °m 3, (p/O 11°- 114 1 Detour Signing L.S. ..S j,, QC0t9 <.5'2, 000 ae ' 115 I Structure Surveying L.S. 2S; X o 2.1-; CVO 116 1 Roadway Surveying L.S. /4 000 °P.- l.O. COO ao 117 Est. Licensed Surveying DOL. $10,000.00 $10,000.00 118 1 Poured Monument - Front St. Brdg. EA. 200 93 200 119 662 Cement Conc. Sidewalk S.Y. 29 /y /9g Addendum No. 2 Page 5 of 6 16 November 2012 1 Item No. Total Quantity Item Description Unit Unit Cost Total Cost 120 2 Cement Conc. Sidewalk Ramp Type 4a EA. -j) l /00 vo 121 1 Cement Conc. Sidewalk Rainp Type 2 EA. ..1-3-0-4-' S3"a ori 122 3 Cement Conc. Sidewalk Ramp Type 1 EA . pp SSD.— r 7, 6..cO 422P - 123 123 1 Commercial Driveway Approaches EA. //,,M. /, ,VS ---t? 124 60 Chain Link Fence Type 1 L.F. 2,6 6-5-' /, 200 2 125 2 End, Gate, Corner and Pull post for Chain Link Fence EA. S,°� I, /00 °=° 126 1 Double 20 FT. Chain Link Gate EA. °� 127 1 Fence Termination DOL. $1,500.00 $1,500.00 128 1,000 Training HR. /2—e° oo /� t00 — 129 1 Type C Progress Schedule L.S. .30, 000.72 30coo "F' 130 12 Schedule Update EA, / 131 1 Roadside Cleanup DOL. $40,000.00 $40,000.00 132 1 Field Office Building L.S. /S Uo; /S 000 133 1 Minor Change DOL. $100,000.00 $100,000.00 134 1 SPCC Plan L.S. SW 91-- "1D 135 1 Utility Potholing DOL. $15,000.00 , $15,000.00 136 1 Fiber Optic Beam L.S. 090 m �S,p� 137 1 Utility Conduit Installation -City of Yakima L.S. ell, 0(",— _29, ©Q:9 — 138 1 Utility Conduit Listallation - PP&L L.S. oei .34,E 34 AOC °1� Total /0/ G31/, Sc1\- Addendum No. 2 Page 6 of 6 16 November 2012 BID BOND FORM Herewith find deposit in the form of a certified check, cashiers check, or cash in the amount of $ which amount is not less than five percent of the total bid. Sign Here BID BOND KNOW ALL MEN BY THESE PRESENTS: * Martin Luther King Jr. Boulevard, State Contract No. TA -1407, City Project No. 1818. Federal Aid No. STPX-NCPD-000S(062) That we, Mowat Construction Company , as principal, and Liberty Mutual Insurance Company, as Surety, are held and firmly bound unto the City of Yakima, as Obligee, in the penal sum of Five Percent (5%) of Amount Bid Dollars, for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. The condition of this obligation is such that if the Obligee shall make any award to the Principal for Yakima Railroad Grade Separations Phase 3 * , according to the terms of the proposal or bid made by the Principal therefore, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay and forfeit to the Obligee the penal amount of the deposit specified in the call for bids, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect and the Surety 1 hall forthwith pay and forfeit to the Obligee, as penalty and liquidated damages, the amount of thi,uond. / SIGNED, SEALED AND DATED THIS 20th r . • , ov -y . er „t 12 Sur ',satiipal P sid - /. L/ i d_ncd liAL* ; tY Darlene Jakie ttorney-In-Fact • 20 Received return of deposit in the sum of 335 ■NT;HIS?POWER'OF-ATTORNEY-IS NOT%VALID, UNLESS ITIS PRIN:T;ED ON RED BACKGROUND. :' •54342,73 _ This Power of.Attornehmits.theacts.of.those nametltih"erein; and.theyhave:no autliontyto'bmd•;the.C�ompany`except:In the ma nn er and to the.eztenf fierem stated.'U Certificate:No�/' _� f,� v�American F,Ire:and Casualty_Colnpany�Llberty-Mutual_Insurance:Company �T:he•Ofiio:Cas tlaudns ace Company �P rless Insur e C West-Amencan-I nsurance:Company �POWER�OF�AT-T`ORNEY' I..„..._ K \ i�vOWN ALL PERSONSBY THES;PRESENTS �ThatAmen an se:B Casual -Coma ann d Th Oh •Casual :Insurance:Com n .a a co orations dui :o anized:under th aws ofd �i-;.,...7_,,_„-„-__-,------•:.--.:.,:-.;:-.,,::-..-----:---- �.^.��-.-------.‘-,---..---,--;--..-,-.•,,,,,,=-,.:-..,-.....--..- tyP Yh Pa .Y rP Y - _ ^ _ �-r the:State:of:Ohio; tat:Liberty Mutual:lnsurance'Com anis a cooratin uoaiee..---s----- tle ws of thState of Massachusettst at Peerless:In a Com an is•a .-...,:r.:-;<=!,-.-.1,-/,..- ..„oo tion .---,--- i-\=,--\ �,, �'-.:/^.� :� ..,_ 2.-� P Y..,; �,-_ �_i — _- --.., � i-•—'./�� :".--.1,=7,-,`,.-2-7::"-,,--.1.-^277,:-.1-7",. /1",."--/-7.,Z---;--7",:-./7.....'� -- , P- y--. /'� /�,l-- W_, uly,,---^zed under the;I^„ofatthS\ate ofNew Ha�pshire ;a West� merit v u nc ompany ---�ror on,dalyorganzednder\hev...-„, e,--,.•.o�filnd�ana:(herei_„- ooIlectivel called t\he-Tompom ies pursuantto and- authonyherem�set.forth does.herebymame; constitute:an.--,,z.,--,,,,..-::,--„••,:_-„,„.....-...,„„,-,....- appNDY iR i BTrycox; BRANDON•K BUSH � U BRETTN: MEIER.,CHAD•M: EPP,LE-DARL•ENE:JAKIELSKI; ELLEN•M`BEL•L;;JIM: r ^ N;.. ^�^ %v ���S. �/\ / ..,--,--k_,:„...., S.'KUvCH; JIM.Wv, '--- ,:J .... •M.-GLOVER�M. J COISON;.MICHAEL'Ay-MURPHY _NANCY J?OSBORNE;N S: IN SCOTT;•STEVE;WAGNER;•STEVEN'K .BUSH; THERESAIA-IAMB- ^ ,-. ^ �-, __ ^ �r I`:o fthe-diity of^ BOTHEC,- , sttaM1te of waa� � c.ind v d ly int ehVe: o thano� a ed;.if tru a d- awfu ttomey-__.•:s.--,.-.----..-.:,-.2.„...-_-_,-in'-fact.to make,,-. ecute seal; acknowledge /1l\l�a�. ..,----„...-__;.-- I \l \nd^Iver,`�r a dvon Its:behal s ... _i^,---.....;!--,.------ it and"d ; sny-and all unde - -,--- ;.bo'- --- - cog- zan-"and other--- -- y�oblig'a`ion:p rsuance:of -----esents�and•shal INbe as:bintling:uponvtfie:Com-` �nies�asey have:been:dulyslgned'by tf`a:president•and:attested:by.th�se ta`ry of•t- he Copan - arrthelrvown.p�ope persons: /-� r r\'.-/.,`-jam=.'�^.`✓,✓,,.,...�= .�` r-. r. ,� -� r\ .-...-^. s-� i.i\ _-,- . /•\\/,_ ...-:-..,,,_...‹-:::-......-_-_-:,......-z•-. /\.--, V � /� IN:WITNESSW�ERE,,F; Pu ofA^�eyhasb s\bsc bed-,„;„- utho\zed'ovicero offi�i, 'the:Compan�igsan,..-..orporateseals`oftheGompariiesaveeenaffixedtheretothis f j\�^14th:',Aa):Of!�June-���2012 V ,---..---,---,"--.S-1,--,----,:.-,,- ...moi-�`if\� `77� \i"./ . , . ,� n �� ti�;c�ss r f p� r INSU `u� ;� \u " glSUR4NCF ;A#tERic„'\../\/`mss ^ I�,�^�j^. Ca sualty�CompanYN .` -a y� .� .� y�� o �` y� -,.._/..„ ha rQ 0 `�._ cQ 4' - .^- The;Ohio Casualty:lnsurance Com-----.L.,-.„."--,_,any: rn 0-`\ ` ,‹ oa F . Q -�oav u�r ��U� a .. mar -.-.7-.--,,27-. :� . 1 H1 \ / . F _ ^ /' ^-/ �O - ar , iertMutual;lnsurance Com'an \ /\,\ m Q-� .. '=�E o i, - n- tet? �.9QlJ+a ; .�Y�. ^./�.. P. yv vv 1 d� r -�iE: i a . _ �V�=Peerless,lnsurance:Gom an' � _ Y a>\ ��Y:c°4 \�i�y��`'��ij a .�.�hFfnrE;��r^��4MCE Gose ' Wes�Ame I`caJlns\ uranee_GOmpany --i- ;STATE:OF WASHINGTO--i tic "1° ;COUNTY OF KING _C1 y d1 L -o:a ZZ Q:M Oiii L cu.. -:c 3=1 0= cyJO _:oi ;On:thiss..lath n;Ca�•sualty—;C_o�mp!,aeidnay_Loilfti_::e.R-- . 2.— 14- %• —me- gy: :er'\onallia�pearedGr o wry -Ws -s` avtln Pof whoacknowleehim Iuto the'Aes:slsan`fS�✓cr tary;ro AmaicarnFir a\& ) T-o—p--eereTi/taa✓�C—omp\a,.nu'--- Sire ncvCma^na�-dahesucheg�authonz so'tod-acute heforegoinginsramentforthepuposes herein:contained:by.sigomg;onbehalfothecorporations; PROPOSAL Yakima Railroad Grade Separations, Phase 3 — Martin Luther King, Jr. Boulevard Federal Aid No. STPX-NCPD-000S(062) State Contract No. TA -1407 City Project No. 1818 The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein. A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto: 0 CASH 0 CASHIER'S CHECK 0 CERTIFIED CHECK PROPOSAL BOND IN THE AMOUNT OF DOLLARS PAYABLE TO THE CITY OF YAKIMA ($ IN THE AMOUNT OF 5% OF THE BID ** Receipt is hereby acknowledged of addendum(s) No.(s) one , two PROPOSAL MUST BE SIGNED - 425.398.0205 PHONE NUMBER SIGNAT TQR & three Mark L. Mowat, Chairman FIRM NAME Mowat Construction Company (ADRESS) PO Box 1330 Woodinville, WA 98072 STATE OF WASHINGTON CONTRACTORS LICENSE NUMBER MOWATCC942BC 19 1 1 1 1 1 6 1 2 1 2 L5 1 9 1 9 1 Note: FEDERAL ID No. WA STATE EMPLOYMENT SECURITY REFERENCE NO. 320554 00 7 (1) This proposal form is not transferable and any alteration of the firm's name entered hereon without prior permission from the Secretary of Transportation will be cause for considering the proposal irregular and subsequent rejection of the bid. (2) Please refer to section 1-02.6 of the standard specifications, re: "Preparation of Proposal," or "Article 4" of the Instructions to Bidders for building construction jobs. (3) Should it be necessary to modify this proposal either in writing or by electronic means, please make reference to the following proposal number in your communication. 337 COMPLIANCE WITH IMMIGRATION AND NATURALIZATION ACT The City of Yakima supports the Federal Immigration, Reform and Control Act of 1986, as amended. The City requires that all contractors or business entities that contract with the City for the award of any City contract for public works in excess of Five Thousand Dollars ($5,000), or any other city contract in excess of Two Thousand Five Hundred Dollars ($2,500), enroll in the E -Verify program or its successor, and thereafter to verify its employees' proof of citizenship and authorization to work in the United States. E -Verify will be used for newly hired employees during the term of the contract ONLY: it is NOT to be used for existing employees. The Contractor must remain enrolled in the program for the duration of the contract and be responsible for verification of every applicable subcontractor. The contractor shall sign and return with their bid response the E -Verify Declaration below. Failure to do so may be cause for rejection of bid. E -VERIFY COMPLIANCE DECLARATION The undersigned declares, under penalty of perjury under the laws of Washington State that: 1. By submitting this Declaration, I certify that I do not and will not, during the performance of this contract, employ illegal alien workers, or otherwise violate the provisions of the Federal Immigration Reform and Control Act of 1986. 2. I agree to enroll in E -Verify prior to the start date of any contract issued by the City of Yakima to ensure that my workforce is legal to work in the United States of America. I agree to use E -Verify for all newly hired employees during the length of the contract. 3. I certify that I am duly authorized to sign this declaration on behalf of my company. 4. I acknowledge that the City of Yakima reserves the right to require evidence of enrollment of the E -Verify program at any time and that non-compliance could lead to suspension of this contract. Firm Name: Mowat Construction Company Dated this 27th day of J Nove, 20 12Signature: Printed Name: Mark L. Mowat, Chairman Phone #: 425.398.0205 Email Address: ryan.olson@mowatco.com 339 NON -COLLUSION. DECLARATION I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United States that the following statements are true and correct: 1. That the undersigned person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted. 2. That by signing the signature page of this proposal, I am deemed to have signed and have agreed to the provisions of this declaration. NOTICE TO ALL BIDDERS To report bid rigging activities call: I -800=424-9071 The U.S. Department of Transportation (USDOT) operates the above toll-free "hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., Eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such activities. The "hotline" is part of USDOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the USDOT Inspector General. All information will be treated confidentially and caller anonymity will be respected. 341 Local Agency Certification for Federal -Aid Contracts The prospective participant certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form -LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. This certification is material representation of the fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly. SR DOT Form 272-040A EF 07/2011 NON-DISCRIMINATION PROVISION During the performance of this contract, the contractor agrees as follows: (1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion,' sex or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of payor other forms of compensation; and selection for training, including apprenticeship: The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause. *(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin. *(3) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. "(4) The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. *(5) The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. "(6) In the event of the contractor's noncompliance with the nondiscrimination clauses of this contract or with any such rules, regulations,•or orders, this contract may be canceled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies involved as provided in Executive Order No. 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. "(7) The contractor will include the provisions of Paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders 01 the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as the contracting agency may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided however, that in the event the contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of . such direction by. the contracting agency, the contractor may request the United States to enter into such litigation to protect the interests of the United States." 345 Local Agency Name Local Agency Address Local Agency Subcontractor List Prepared in compliance with RCW 39.30.060 as amended To Be Submitted with the Bid Proposal Project Name Yakima Railroad Grade Separations, Phase 3 - Martin Luther King, Jr. Boulevard Failure to list subcontractors who are proposed to perform the work of HVAC (heating, ventilation and air conditioning), plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW, or naming more than one subcontractor to perform the same work will result in your bid being non- responsive and therefore void. Subcontractor(s) that are proposed to perform the work of heating, ventilation and air conditioning, plumbing, as described in chapter 18.106 RCW, and electrical as described in chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name. The requirement to name the prime contract bidder's proposed HVAC, plumbing and electrical subcontractors applies only to proposed HVAC, plumbing, and electrical subcontractors who will contract directly with the prime contract bidder submitting the bid to the public entity. If no subcontractor is listed below, the bidder acknowledges that it does not intend to use any subcontractor to perform those items of work. Subcontractor Name 40013- S _4-G 4 /'fes • Work to be Performed Subcontractor Name Work to be Performed Subcontractor Name Work to be Performed Subcontractor Name Work to be Performed Subcontractor Name Work to be Performed Bidder's are notified that in the opinion of the enforcement agency PVC or metal conduit, junction boxes, etc, are considered electrical equipment and must be installed by a licensed electrical contractor, even if the installation is for future use and no wiring or electric current is connected during the project. A licensed electrical contractor must be listed to perform the work. SR 347 DOT Form 271-015A EF 07/2011 • WOMEN AND MINORITY BUSINESS ENTERPRISE POLICY It is the policy of the City of Yakima that women and minority business enterprises shall have • the maximum opportunity to participate in the performance of work relating to the City's activities. To this end, the City is committed to take all necessary and reasonable steps in accordance with state and federal rules and regulations to ensure women and minority business enterprises the maximum opportunity to compete for and to perform contracts. In order to enhance opportunities for -women and minority businesses to participate in certain contractor opportunities with the City of Yakima, and -as a recipient of federal and state financial assistance, the City is committed to a women and minority business enterprise utilization program. The City is determined to maximize women and minority business opportunities through participation in the competitive bidding process through women and minority business enterprise affirmative action programs administratively established by the City Manager and monitored and implemented in accordance with state and federal rules and regulations. All women and minority business enterprise programs shall include specific goals for participation of women and minority businesses in City projects of at least ten percent (10%) of the total'dollar value of City contract over $10,000. Goals shall be reviewed and updated annually by the City Manager for applicability and to ensure that the intent of this policy is accomplished. This statement of policy will be widely disseminated to all managers, supervisors, minorities and women employed by the City of Yakima as well as to contractors, vendors, suppliers, minorities and women who may seek the City's procurement and construction contracts related to the women and minority business enterprise programs. Contractors associations will be made aware of construction projects affected by this policy through all available avenues to assure that plans/specifications, bid forms, and invitations to bid are as widely distributed as possible. 349 . RESOLUTION NO. D 4 8 1 6 A RESOLUTION adopting a "Women And Minority Business Enterprise Policy" for the City of Yakima. WHEREAS, the City of Yakima is the recipient of federal and state assistance which assistance carries with it the obli- gation of contracting with. Women And Minority Business Enter- prises for the performance of public works, and WHEREAS, it is the intention of the City of Yakima that Women And Minority Business Enterprises shall have the maximum practicable opportunity to participate in the performance of such public works, and WHEREAS, the City of Yakima is determined to maximize Women And Minority Business Enterprise opportunities for parti- cipation in its competitive bidding process through the adoption of the "Women And Minority Business Enterprise Policy" statement attached hereto, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Council hereby adopts the "Women And Minority Business Enterprise Policy", a copy of which is attached hereto and by reference made a part hereof. fQJ ADOPTED BY THE CITY COUNCIL this . i day of 1983. 4 A. CAJOlQ Mayor ATTEST: City Clerk 351 1 AFFIRMATIVE ACTION PLAN I The bidders, contractors and subcontractors will not be eligible for award of a contract under this Advertisement for Bids unless it certifies as prescribed, that it adopts the minimum goals and timetable of minority and women workforce utilization and specific affirmative action steps as set forth by the City of -Yakima, This is directed at increasing minority and women workforce utilization by means of applying good faith efforts to carrying out such Il steps. However, no contractor or subcontractor shall be found to be in noncompliance solely on account of its failure to I meet its goals within its timetables, but such contractor shall be given the opportunity to demonstrate that it has instituted all of the specific affirmative action steps specified by the City of Yakima, and has made every good faith effort to make these steps work toward the attainment of its goals, all to the purpose of expanding minority and women workforce utilization on all of its projects in the City of Yakima, Washington. In all cases, the compliance of a bidder, contractor or subcontractor will be determined in accordance with its respective obligations under the terms of these Bid Conditions. 1 All bidders and all contractors and subcontractors performing or to perform work on projects subject to these Bid Conditions hereby agree to inform their subcontractors of their respective obligations under the terms and requirements of these Bid Conditions, including the provisions relating to goals of minority and women employment and training. 1 Specific Affirmative Action Steps I Bidders, contractors and subcontractors subject to this contract must engage in affirmative action directed at increasing minority and women workforce utilization, which is at least as extensive and as specific as the following steps: I a. The contractor shall notify community organizations that the contractor has employment opportunities available and shall maintain records of the organizations' response. I b. The contractor shall maintain a file of the names and addresses of each minority and women worker referred to him and what action was taken with respect to each such referred worker; and if the worker was not employed, the reasons therefore. If such worker was not sent to the union hiring hall for referral or if such worker was not employed by the contractor, the contractor's file shall document this I and the reasons therefore. c. The contractor shall promptly notify the City of Yakima Engineering Division an Contract Compliance I Officer when the union or unions with whom the contractor has collective bargaining agreement has not referred to the contractor a minority or woman worker sent by the contractor or the contractor has other information that the union referral process has impeded him in his efforts to meet his goal. I d. The contractor shall participate in training programs in the area, especially those funded by the Department of Labor. I e. The contractor shall disseminate his EEO policy within his own organization by including it in any policy manual; by publicizing it in company newspapers, annual reports, etc., by conducting staff, employee and union representatives' meetings to explain and discuss the policy; by posting of the policy; and by specific review of the policy with minority employees. If. The contractor shall disseminate his EEO policy externally by informing and discussing it with all recruitment sources; by advertising in news media, specifically including minority news media; and by Inotifying and discussing it with all subcontractors and suppliers. g. The contractor shall make specific efforts and constant personal (both written and oral) recruitment efforts directed at all minority or women organizations, schools with minority students, minority I353 recruitment organizations and minority training organizations, within the contractor's recruitment areas. h. The contractor shall make specific efforts to encourage present minority employees to recruit their friends and relatives. i. The contractor shall validate all man specifications; selection requirements, tests, etc. J• The contractor shall make every effort to promote after school, summer and vacation employment to minority youth. k. The contractor shall develop on-the-job training opportunities and participate and assist in any association or employer group training programs relevant to the contractor's employee needs consistent with its obligations under this bid. 1. The contractor shall continually inventory and evaluate all minority and women personnel for promotion opportunities and encourage minority and women employees to seek such opportunities. m. The contractor shall make sure that seniority practices, job classifications, etc., do not have a discriminatory effect. n. The contractor shall make certain that all facilities and company activities are non -segregated. o. The contractor shall continually monitor all personnel activities to ensure that his EEO policy is being carried out. p. The contractor shall solicit bids for subcontracts from available minority and women subcontractors, engaged in the trades covered by these Bid Conditions, including circulation of minority and women contractor associations. q. Non cooperation: In the event the union is unable to provide the contractor with a reasonable flow of minority and women referrals within the time limit set forth in the collective bargaining agreements, the contractor shall, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex or national origin, making full efforts to obtain qualified and/or qualifiable minorities and women. (The U.S. Department of Labor has held thatitshall be no excuse that the union with which the contractor has a collective bargaining agreement providing for exclusive referral failed to refer minority or women employees.) In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246 and 23 CFR Part 230 as amended, and the Standard Specifications, such contractor shall immediately notify the City of Yakima Engineering Department or the City of Yakima Compliance Officer. 354 Local Agency Disadvantaged Business Enterprise Utilization Certification To be eligible for award of this contract the bidder must fill out and submit, as part of its bid proposal, the following Disadvantaged Business Enterprise Utilization Certification relating to Disadvantaged Business Enterprise (DBE) requirements. The Contracting Agency shall consider as non-responsive and shall reject any bid proposal that does not contain a DBE Certification which properly demonstrates that the bidder will meet the DBE participation requirements in one of the manners provided for in the proposed contract. The Bidder must submit_good faith effort documentation only in the event the bidder's efforts to solicit sufficient DBE participation has been unsuccessful. The successful bidder's Disadvantage Business Enterprise Utilization Certification shall be deemed a part of the resulting contract. Information on certified firms is available from OMWBE, telephone 360-664-9750 or Toll Free 1-866-208-1064. Mowat Construction'Company (Box 1) Name of Bidder Firms listed below have been contacted regarding participation on this project. If this bidder is successful on this project and is awarded the contract, it shall assure that subcontracts or supply agreements are executed with those firms where an "Amount to be Applied Towards Goal" is listed. (If necessary, use additional sheet.) certifies that the Disadvantaged Business Enterprise (DBE) { �°' . � `� r Column 1 ` ' `'=°` kt 6 � : } F Name of DBE , ,f Certificate Number t Column 2 ., �• r �, * Project Role N', (Fume; Joint Venture }F Subcontractor, Manufacturer, Regular Dealer) ... .. " -�� ,� b �: k � , gColumn3 , > a �, - kA_� ' b� 5�q'r i = u Descriptlonof Work ".,� „� `.,.. ,mzw � x � ** Column;4.��• �r ,�� �-�� &• 1&. Amount t0 , be.'Applied' T ,rte > Towards Goal ". 415'08 1. &Ail --TAnze.a.ProA4t, —.VW_ • fo&te .IivsIgtaio-ase aA.7 A/441..,#), Ae/b66-; je,Ra-vrte ucxvP i. OCP DCO — 2/2 A- &CCP 414/0 2. 3. 4. 5. 6. 7. 8. 9. 10. Disadvantaged Business Enterprise Subcontracting Goal: * —S— • DBE Total $ dee), COQ om Box 2 Box 3 Regular Dealer status must be approved prior to bid submittal by the Office of Equal Opportunity, Wash. State Dept. of Transportation, on each contract. ** See the section "Crediting DBE Participation Toward Meeting the Goal" in the Contract Document. *** The Contracting Agency will utilize this amount to determine whether or not the bidder has met the goal. In the event of an arithmetic difference between this total and the sum of the individual amounts listed above, then the sum of the amounts listed shall prevail and the total will be revised accordingly. Participation in excess of the.goal amount will be considered voluntary or race -neutral participation. SR 355 DOT Form 272-056A EF 07/2011 11/27/2012 15:28 FAX 425 398 0226 IMF tteriont Thrinsiscortatfoni MOY1AT CONSTRUCTION CO. CJ002/002 Disadvantaged Business Enterprise (DBE)' Written Confirmation Document As an authorized representative of the Disadvantaged: Business Enterprise (DBE), I confirm that we have been contacted by the referenced bidder with regard to the referenced project and if the bidder is awarded the contract we will enter into an agreement with the bidder to participate in the project consistent with the information provided in the bidder's Disadvantaged Business Enterprise Utilization Certification. Contract Title: VAT{1MA RR CRAT)P,, gRRARATION PH 3 Bidder's Business Name: P7 DBE's Business Name: Jigitional, lne DBE's Signature,:. DBE's Title: Vice President Date: 11/27/12 The entries must he consistent with what is shown on the bidder's Disadvantaged Business Enterprise Utilization Certification. Failure to do so will result in bid rejection. See contract provision; Disadvantaged Business Enterprise Condition of Award Participation, Description of Work: Amount to be Applied Towards Goat: Rebar Installarion on highway, bridgo, elcvatcd structures SR DOT Form 422-031 EF 0712011 BIDDER'S CERTIFICATION A bidder will not be eligible for award of a contract under this invitation for bids unless such bidder has submitted as a part of its bid the following certification, which will be deemed a part of the resulting contract: Mowat Construction Company (BIDDER) certifies that: 1. It intends to use the following listed construction trades in the work under the contract Carpenters, Cement Masons, Laborers, Operators, Electricians, and Ironworkers and; as to those trades for which it is required by these Bid Conditions to comply with these Bid Conditions, it adopts the minimum minority and women workforce utilization goals and the specific affirmative action steps for all construction work (both federal and non-federal) in the Yakima, Washington area subject to these Bid Conditions, those trades being: Carpenters, Cement Masons, Laborers, Operators, Electricians, and Ironworkers and; 2. It will obtain from each of its subcontractors and submit to the contracting or administering agency prior to the award of any sui tract unde,C thisact thee n ractor Certification required by these Bid Conditions. (Signature .f Authorized Representative of Bidder) 359 SUBCONTRACTOR CERTIFICATION Subcontractors' Certification is not required at the time of bid. This Certification must be completed by each subcontractor prior to award of any subcontract. certifies that: (SUBCONTRACTOR) 1. It intends to use the following listed construction trades in the work under the subcontract and; As to those trades for which it is required by these Bid Conditions to comply with these Bid Conditions, it adopts the minimum minority and women workforce utilization goals and the specific affirmative action steps for all construction work (both federal and non-federal) in Yakima, Washington, subject to these Bid Condition, those trades being: and; 2. It will obtain from each of its subcontractors prior to the award of any subcontract under this subcontract the Subcontractor Certification required by these Bid conditions. (Signature of Authorized Representative of Subcontractor 361 I....ymAal Washington State V� Department of Transportation Contractor and Subcontractor or Lower Tier Subcontractor - Certification for Federal -Aid Projects (Required for each Subcontractor or Lower Tier Subcontractor on all Federal -Aid projects) Contract Number Federal -Aid Number State Route Number Subcontractor or Lower Tier Subcontractor To be signed by proposed subcontractor or lower tier subcontractor The contract documents for this subcontract include as part of the subcontract a special provision entitled "Required Federal -Aid Provisions", the "Required Contract Provisions Federal -Aid Construction Contracts (FHWA 1273)", and the minimum wage rates. I certify the above statement to be true and correct. Company Signature Title Date Contractor Certification To be completed and signed by the contractor 2. A written agreement has been executed between my firm and the above subcontractor. A written agreement has been executed between (the subcontractor) and the above lower tier subcontractor. All documents required by the special provision entitled "Required Federal -Aid Provisions" are included in the agreement for (1) or (2) marked above. I certify the above statements under Contractor Certification to be true and correct. Company Signature Title Date ' DOT Form 420-004 EF Revised 03/2008 Materially and Responsiveness The certification required to be made by the bidder pursuant to these Bid Conditions is material, and will govern the bidder's performance on the project and will be made a part of his bid. Failure to submit the certification will render the bid non responsive. Compliance and Enforcement. Contractors are responsible for informing their subcontractor (regardless of tier) as to their respective obligations under the conditions of the contract here (as applicable). Bidders, contractors and subcontractors hereby agree to refrain from entering into any contract or contract modification subject to Executive Order 11246, as amended on September 24, 1965, with a contractor debarred from, or who is determined not to be a responsible' bidder for, government contracts and federally assisted construction contracts pursuant to Executive Order. The bidder, contractor or subcontractor shall carry out such sanctions and penalties for violation of the equal opportunity clause including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered by the administering agency, the contracting agency or the Office of Federal Contract Compliance pursuant to the Executive Order. Any bidder, or contractor or subcontractor who shall fail to carry out such sanctions and penalties shall'be deemed to be in non-compliance with these Bid Conditions and Executive Order 11246, as amended. Nothing herein is intended to relieve any contractor or subcontractor during the term of its contract on this project from compliance with Executive Order 11246, as amended, and the Equal Opportunity Clause of its contract. Violation of any substantial requirement in the affirmative action plan by a contractor or subcontractor covered by these Bid Conditions including the failure of such contractor or subcontractor to make a good faith effort to meet it fair share of the trade's goals of minority and women workforce utilization, and shall be grounds forimposition of the sanctions and penalties provided at Section 209 (a) of Executive Order 11246, as amended. Each agency shall review its contractors' and subcontractors' employment practices during the performance of the contract. If the agency determines that the affirmative action plan no longer represents effective affirmative action, it shall so notify the Office of Federal Contract Compliance which shall be solely responsible for any final determination of that question and the Consequences thereof. In regard to these conditions, if the contractor or subcontractor meets its goals or if the contractor or subcontractor can demonstrate that it has made every good faith effort to meet those goals, the contractor of the subcontractor shall be presumed to be in compliance with Executive Order 11246, as amended, the implementing regulations and its obligations under these Bid Conditions and no formal sanctions or proceedings leading toward sanctions shall be' instituted unless the agency otherwise determines that the contractor or subcontractor is not providing equal employment opportunities. In judging whether a contractor or subcontractor has met its goals, the agency will consider each contractors or subcontractor's minority and women workforce utilization and will not take into consideration the minority and women workforce utilization of its subcontractors. Where the agency finds that the contractor or subcontractor has failed to comply with the requirement of Executive Order 11246, as amended, the implementing regulations and its obligations under these Bid Conditions, the agency shall take such action and impose such sanctions as may be appropriate under Executive Order and the regulations. When the agency proceeds with such formal action, it has the burden of proving that the contractor has not met the requirements of these Bid Conditions, but the contractor's failure to meet his goals shall shift to him the requirement to come forward with evidence to show that he has met the "good faith" requirements of these Bid Conditions by instituting at least the Specific Affirmative Action M p&Jisted above and bymaking every good. faith effort to make those steps work toward the attainment of its goals within its timetables. The pendency ofsuch formal proceedings shall be taken into consideration by Federal agencies in determining whether such contractor or Subcontractor can comply with the requirements of Executive Order 11246, as amended, and is therefore a "responsible prospective contractor" within the meaning of the Federal Procurement Regulations. It shall be no excuse that the union with which the contractor has a collective bargaining agreement providing for exclusive referral failed to refer minority and women employees. 365 The procedures set forth in these conditions shall not apply to any contract when the head of the contracting or administering agency determines that such contract is essential to the national security and that its award without following such procedures is necessary to the national security. Upon making such a determination, the agency head will notify, in writing, the Director of the Office of Federal Contractor Compliance within thirty days. Requests for exemptions from these Bid Conditions must be made in writing, with justification, to the: Director Office of Federal Contractor Compliance U.S. Department of Labor Washington, D.C. 20210 and shall be forwarded through and with the endorsement of the agency head. Contractors and subcontractors must keep such records and file such reports relating to the provisions of these Bid Conditions as shall be required by the contracting or administering agency or the Office of Federal Contractor Compliance. 366 BIDDER'S CHECK LIST The bidder's attention is especially called to the following forms, which must be executed, as required, and submitted on the form purchased from the City and bound in the. Contract Documents:. A. PROPOSAL The unit prices, extensions and total amounts bid must be shown in the spaces provided. B. BID BOND ACCOMPANYING BID This Bid Bond form is to be executed by the bidder and the surety company unless bid is accompanied by a certified check. The amount of this bond shall be not less than 5% of the total amount bid and may be shown in dollars or on a percentage basis. C. BIDDER'S CERTIFICATION D. PROPOSAL SIGNATURE SHEET Must be filled in and signed by the bidder. E. SUBCONTRACTOR LIST DOT Form 271-015 EF F. DBE UTILIZATION CERTIFICATION DOT Form 272-056 EF G. DBE WRITTEN CONFIRMATION DOCUMENT DOT Form 422-031A. Required for all DBE's listed on DBE Utilization Certification The following forms are to be executed after the contract is awarded: A. CONTRACT This agreement is to be executed by the successful bidder. B. PERFORMANCE BOND To be executed by the successful bidder and his/her surety company. C. CERTIFICATE OF INSURANCE Refer to attached Informational Certificate of Insurance and Additional Insured Endorsement. Also refer to Section 1-07.18 (APWA) of the Standard Specifications and Special Provisions. D. E -VERIFY COMPLIANCE DECLARATION Refer to Section 1-02.15. A signed E -Verify Compliance Declaration must be submitted or on file with the City. E. DOT Form 420-004 EF Refer to Required Contract Provisions for Federal Aid Construction Contracts FHWA7_12,73. 367 This Page Intentionally Left Blank 1 1 1 1 1 SAM Search Results List of records matching your search for Mowat* Construction* Company* Status:Active ENTITY MOWAT CONSTRUCTION COMPANY DUNS: 825852189 +4: CAGE Code: 1EJA8 DoDAAC: Has Active Exclusion?: No Delinquent Federal Debt?: No Address: 20210 142ND AVE NE City: WOODINVILLE State/Province: WASHINGTON ZIP Code: 98072-1330 Country: UNITED STATES Status:Active ENTITY MOWAT CONSTRUCTION COMPANY DUNS: 825852189 +4: 1964 CAGE Code: 5KEJ9 DoDAAC: Has Active Exclusion?: No Delinquent Federal Debt?: No Address: 20210 142ND AVE NE City: WOODINVILLE State/Province: WASHINGTON ZIP Code: 98072-1330 Country: UNITED STATES November 28, 2012 2:49 PM Page 1 of 1 1 1 1 1 OMWBE Directory Profile Page 1 of 1 OMWBEDirectoryProfile: REBAR INTERNATIONAL INC Name: REBAR INTERNATIONAL INC Business Description: SPECIALTY CONTRACTOR PERFORMING ALL TASKS NECESSARY TO SUPPLY & INSTALL STEEL REINFORCING BARS/ REBAR ON HWY, BRIDGE, ELEVATED STRUCTURES PROJECTS, COMMERCIAL AND INSTITUTIONAL BLDGS, INCL MISC METALS & STRUCTURAL STEEL ELEMENTS SUCH AS FENDERS & GATES NAICS Index Entries: 237310- ELEVATED HIGHWAY CONSTRUCTION; 237310 - ABUTMENT CONSTRUCTION; 237310- AIRPORT RUNWAY CONSTRUCTION; 237310- BRIDGE APPROACH CONSTRUCTION; 237310- BRIDGE CONSTRUCTION; 237310- BRIDGE DECKING CONSTRUCTION; 237310- CULVERTS, HIGHWAY, ROAD AND STREET, CONSTRUCTION; 237310- CURBS AND STREET GUTTERS, HIGHWAY, ROAD AND STREET, CONSTRUCTION; 237310 - HIGHWAY CONSTRUCTION; 237310 - OVERPASS CONSTRUCTION; 237310 - UNDERPASS CONSTRUCTION; 237990 - OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION, INSTALLATION OF REINFORCING STEEL BARS; 236220 - COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION, INSTALLATION OF REINFORCING STEEL BARS; 237110 - WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION, INSTALLATION OF REINFORCING STEEL BARS; 423510 - STRUCTURAL ASSEMBLIES, METAL, MERCHANT WHOLESALERS; 423510 - CONCRETE REINFORCING BARS MERCHANT WHOLESALERS Street: 2604 MERIDIAN AVE E City: EDGEWOOD State: WA Zip: 98371 Voice: (253) 840-1117 Fax: (253) 840-1118 E- mail: JODIE@REBARINTERNATIONAL.COM Contact: YOUNT MYRNA Owner: YOUNT MYRNA Certification No.: D2F2606440 Washington Cert.: WBE Federal Cert.: DBE Prime NAICS: 237310 2nd NAICS: 237310 3rd NAICS: 237310 4th NAICS: 237310 5th NAICS: 237310 6th NAICS: 237310 7th NAICS: 237310 8th NAICS: 237310 Copyright 1995-2008BIP Software, Inc. All Rights Reserved. http://www.omwbe.wa.gov/biznetwas/profile.asp?BUSNO=2148 11/28/2012 1,1 Washington State Department of Transportation Paula J. Hammond,,PE. Secretary,of Transportation November28,, 2012 Mr. Douglas Mayo, P.E. City Engineer City of Yakima 129 N 2nd Street Yakima, WA 98901-263,7 South Central Region. 2809 Rudkin.Road,.Union:Gap P.O. Box 12560 Yakima, WA 98909-2560 509-577-1600. TTY: 1;-800-833=6388 www.wsdot:wa.gov Re: STPX-NCPD-000S(062) Yakima Railroad Grade Separation, Phase 3, Martin Luther King, Jr. Blvd Dear Douglas: Lreceived the bid tabs, the DBE Utilization Certification, and the DBE Written Confirmation for the above referenced City of Yakima project. H&LP has reviewed the above documents; SCR Local Programs has received confirmation, and concurs with the award. If you have any questions please give me a call at 509-577-1.780. Sincejly, Roger L. Arms, P.E. Local Programs Engineer RLA:pa .-E r'cl t-�o rel 2012 ,\ CHANGE ORDER NO.2 C.O Title: Added Item -Ductile Iron Storm Sewer Pipe 12" Diameter Date: 3/15/2013 Project Name. Yakima Grade Separations - Phase 3 — MLK Jr. Blvd Project No: 1202701 Contractor: Mowat Construction Co. Federal Aid .No STPX NCPD OOOS(062) Owner: City of Yakima Change Order Description: This Change Order adds an item for the Ductile Iron Storm Sewer Pipe 12" Diameter to the contract. The cause for this change order is due to the fact that although shown on the Plans, Ductile Iron Storm Sewer Pipe 12 Inch Diameter was inadvertently left out of the Bid Proposal. Section 1-04.2(2) of the Standard Specifications for Road, Bridge and Municipal Construction details how to address these types of situations. "When the Contract specifies Work that has no Bid item, and the Work is not specified as being included with or incidental to other Bid Items, an equitable adjustment will be made in accordance with Section 1-04.4 unless that work is customarily considered as incidental to other items." Section 1-04.4 requires, in cases like these, that the item be added by change order. On sheet C-23 of the Plans it calls for 76 linear feet of ductile iron storm sewer pipe 12 inch diameter, The agreed upon price for this pipe is $89.60/linear foot. Measure & Payment for this item will be in accordance with Section 7-09 of the Standard Specifications. The Contract is Modified as, Follows: Contractor is hereby directed to, upon receipt of an approved copy of this change order,make changes in the Contract Documentsand execute the work as detailed herein The work covered by the Change Order shall be performed under the same terms and conditions as those included in the original Contract, unless otherwise described herein The payment and/or additional time specified and agreed to in this Change Order constitutes full adjustment for, and settlement of, all costs and time relating to the performance of the Work described herein. Original Contract Amount: Current Contract Amount: Amount of this Change: Revised Contract Amount: $10,634,867.95 $10,773,734.52 $6,809.60 $10,780,544.12 Contract time is' ®Unchanged ❑Increased ❑Decreasedby +/- days ❑Work Days ❑Cal. Days New Contract Duration- +1- days❑ Work Days❑Calendar Days APPROVED OY(Not valid until signed by Owner). 'Approval Recommended '=;Resident Engineer (RE) James K Tobin R.E. (Print name) Approved by Owner Debbie Cook, PE, Director of U & E (Print name & title) Contractor ' Brock Lindsay P.M. (Print name & title) Signature ignature 1 of 2 is Date 1(1 13 Date ‘4_1113.1 P-04 (Rev 6/11) CHANGE ORDER # , CONT. JustitiO0fion of Change: This Change Order is required In Accordance with Section 1-04.2(2) due to the lack of a pay item in the original Contract proposal. The need for this size of pipe was verified by Berger Abam (see transmittal 00030 dtd 3/5/13) Attached Changes to the Contract Documents:[cite attachments, if any] Plans Sheet # Change Sh # Sh # Brief description of change Brief description of change Sh Brief description of change . „ Contract PrOons:Tproject Martual, Section # Change. Sect # Brief description of change Sect # Brief description of change Basis of Payment for this Chan e -Order - Sunimary . I Tax Incl. • • . ; in Unit ' Item# 1 Description . Price? Unit Est. Qty _ Unit Price Amount Existing Bid Item •Iiicieae...!Or-DeCOase2':'„ "*: ,'-'',',',.:•. -., '': ;:':-,'', —:-, i ':-.':,,,,.:, ,'-, ,:''-5 ,,:'_','-- ':,:,:,',...,-,, -, '-' • : ' ' , ' - ' - BI # Description Y/N Unit Qty $000.00 $000.00 BI # Description Y/N Unit Qty $000.00 $000.00 BI # Description Y/N Unit Qty $000.00 $000.00 BI # Description Y/N Unit Qty $000 00 $000.00 IsewitemS` 2-1 Ductile Iron Storm Sewer Pipe 12 in. dia. Yes LF 76 LF $89.60 $6,809.60 BI # Description Y/N Unit 0 $000 00 $000.00 BI # Description Y/N Unit Qty $000.00 $000.00 BI # Description Y/N Unit Qty $000.00 $000.00 Subtotal: Apply current sales tax rate for items marked "no" under the Tax column Tax: Total: $000.00 $000 00 $6,809.60 Attachments: list attachments Copies: Contractor(Original & PDF) Owner (Original & PDF) File 2 of 2 P-04 (Rev. 6/11) j BergerABAM Transmittal PROJECT: Yakima MLK CSS A13.0241 33.:'.01 Nin_`, f- ve+n:ae Scutin. Suite 300. Federal Way, Washington 9KOS-2000 200,431-2300 • 206/431-2250 Fax • r,nv.:.aban).com DATE: 3/5/2013 SUBJECT: Questions regarding the Stromdrainage design TRANSMITTAL ID: 00030 PURPOSE: For your use and distribution FROM VIA: Email NAME EMAIL PHONE Dana Salyer 33301 Ninth Avenue South, Suite 300 Federal Way, WA 98003-2600 United States Dana.Salyer@abam.com 206-431-2359 TO NAME EMAIL PHONE Brett Sheffield City of Yakima 129 North Second Street, 2nd Floor Yakima, WA 98901 United States brett.sheffield@yakimawa.gov 509-576-6797 Bob Degrosellier City of Yakima 129 North Second Street, 2nd Floor Yakima, WA 98901 United States Bob.Desgrosellier@yakimawa.gov 509-576-6678 Doug Mayo City of Yakima 129 North Second Street, 2nd Floor Yakima, WA 98901 United States doug.mayo@yakimawa.gov 509-576-6678 REMARKS: Question #1 The notes on sheet C 21 and C 23 indicated that the storm trench backfill for storm drain is per WSDOT Standard Plate B 55.20.00. On sheet C24 Detail B shows that CDF is to be placed from center of pipe to top of trench. Please clarify when CDF is to be used in place of Gravel Backfill? Question # 1 response Catch basins installed within the limits of the bottom seal should be backfilled Transmittal DATE: 3/5/2013 TRANSMITTAL ID: 00030 with CDF. Catch basins installed along SM and NM lines can be backfilled per WSDOT standard plate B-55.20.00. Question #2 Sheet C-23, Drainage Profile, Structure Codes C22-17, 18, 19 and 20 indicate 12" DI pipe. There is no bid item for 12" DI pipe. Can 12" corrugated polyethylene pipe be used? Or do we need to add the item 12" Ductile Iron Pipe? Question #2 response We will need to use 12" Ductile Iron Pipe for structures C22-17, C22-18, C22- 19, C22-20 since they are shallow. We will need to add 12" Ductile Iron Pipe to bid item list. If you have any further questions, please don't hesitate to call. COPIES: MLK_review@abam.com - Page 2 of 2 \ " Lt', 4.- r--0 L eTh cz- *\Q- c4-40—,) t,72--OcCa.-- YAS-T- -G. Unit Bid Analysis -Standard Items Report Page 1 of2 Wast'im9tvn Stott Dep-,irtm-ent of Tran:aportation TRAFFIC 8 ROADS News Search ContactlNSDGT�4V5DGTlionte PROJECTS BUSINESS ENVIRONME TAL MAPS & DATA Bid Item Unit Price Tabulation Standard Items Region: State Wide Contracts awarded from 3/22/2010 thru 3/22/2013 Standard Item Unit of Number Measure Item Description NWR 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I NWR AVERAGE LOW BID is $109.98 State AVERAGE LOW BID is $91.85 OR 3869 3869 3869 L.F L.F L.F OR AVERAGE LOW BID is DUCTILE IRON PIPE FOR WATER MAIN 12 I DUCTILE IRON PIPE FOR WATER MAIN 12 I DUCTILE IRON PIPE FOR WATER MAIN 12 I $96.80 State AVERAGE LOW BID is $91.85 SWR 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I SWR AVERAGE LOW BID is $75.90 State AVERAGE LOW BID is $91.85 SCR http://www.wsdot.wa.gov/biz/contaa/uba/sreport.cfm Total records found: 11 New Search Job Contract Planned Second Number Number AD Date Quantity Low Bid Bid 09A802 007936 10A008 007948 10A017 008053 11A009 008379 09C526 007926 09C521 008095 110516 008199 10X304 008105 11X314 008246 12X304 008272 4/12/2010 517 00 4/26/2010 380 00 11/22/2010 455 00 10/1/2012 826.00 3/22/2010 2,117.00 2/14/2011 2,919.00 6/20/2011 2,919 00 3/7/2011 351 00 1/9/2012 296.00 3/19/2012 1,107 00 $64 00 $80 00 $160 00 $125 00 $150 00 $90 02 $65.00 $90 00 $70 00 $73.00 $64.50 $58.00 $135.00 $130 00 $150.00 $70 00 $78.00 $85 00 $74 00 $60 50 Third Bid $68.00 $58.00 $155 00 $120 00 $280 00 $65 00 $88.00 $85 00 $70 00 $73 00 Z/'')/'ni z New Search l unit Bin Analysis -Standard Items Report Page 2 oft - Standard Item Unit of Job Contract Planned Second Number Measure Item Description Number Number AD Date Quantity Low Bid Bid Third Bid 3869 L.F DUCTILE IRON PIPE FOR WATER MAIN 12 I 10Y008 008029 10/4/2010 1,147 00 $47.50 $60 00 $53 05 SCR AVERAGE LOW BID is $47.50 State AVERAGE LOW BID is $91.85 Copyright WSDOT © 2001 Traffic & Roads I Site Index I Contact WSDOT I WSDOT Business I WSDOT Home Intp://www.wsdot.wa.gov/biz/contaa/uba/srenort.cfm n /nn /nn, n CONTRACT THIS AGREEMENT, made and entered into in triplicate, thisc:25day of .,A..„;` , 2013, by and between the City of Yakima, hereinafter called the Owner, and Mowat Construction Co.,�1'Washir_ on Corporation, hereinafter called the Contractor. WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows: I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF: $10,634,867.95, for Yakima Railroad Grade Separations, Phase 3, Project No. 1818, all in accordance with, and as described in the attached plans and specifications and the 2012 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this contract and every part thereof. Work shall start within ten (10) days after the Notice to Proceed and shall be completed in Three Hundred (300) working days. If work has not commenced within the ten (10) days after the Notice to Proceed, the first chargeable working day shall be the 11 th day after the date on which the City issues the Notice to Proceed. If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified in the Standard Specifications for each and every day said work remains uncompleted after expiration of the specified time, as liquidated damages. The Contractors shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima. II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. III. INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its officers, elected officials, employees and agents from and against any and all claims, causes of action, damages, losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and court costs, arising out of, relating to, or resulting from the Contractor's performance or non-performance of the services, duties and obligations required of it under this Agreement. IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor V It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year first herein above written. Countersigned: CITY OF YAKIMA this • day of b 2013._ MOWAT C By: J stvo " Ove 1� *Y ty Clerk cn,% V CITY CONTRAC f N049e3s3 RESOLUTION NO:1-... °/'2' SJ CONTRACTOR Corporation (li"k Its President (Print Name) (President, Owner, etc.) Address: POB 1330 309 Woodinville, WA 98072-1330 a PERFORMANCE BOND BOND TO CITY OF YAKIMA KNOW ALL MEN BY THESE PRESENTS: Bond No. 023022441 That whereas the City of Yakima, Washington has awarded to Mowat Construction Company (Contractor) hereinafter designated as the "Principal" a contract for the construction of the project designated Yakima Railroad Grade Separations, Phase 3, Project No. 1818, all as hereto attached and made a part hereof and whereas, said principal is required under the terms of said contract to furnish a bond for the faithful performance of said contract: NOW, THEREFORE, we, the principal, and Liberty Mutual Insurance Company (Surety), a corporation, organized and existing under and by virtue of the laws of the State of MA , duly authorized to do business in the State of Washington, as surety, are jointly and severally held and firmly bound unto the City of Yakima, Washington, in the penal sum of $10.634.867.95 (Total Contract Amount) lawful money of the United States, the payment of which we jointly and severally bind ourselves, our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents. THE CONDITIONS OF THIS BOND IS SUCH, that if the above bonded principal shall faithfully perform all of the provisions of said contract in the manner and within the time therein set forth, or within such extensions of time as may be granted under said contract, and shall pay all laborers, mechanics, sub -contractors and materialmen; the claims of any person or persons arising under the contract to the extent such claims are provided for in RCW 39.08.010; the state with respect to taxes imposed pursuant to Titles 50, 51 and 82 RCW which may be due; and all persons who shall supply said principal or sub -contractors with provisions and supplies for the carrying on of said work, and shall hold said City of Yakima, Washington, their employees, agents, and elected or appointed officials, harmless from any damage occasioned to any person or property by reason of any carelessness or negligence on the part of said principal, or any sub -contractor in the performance of said work, and shall indemnify and hold the City of Yakima, Washington, its employees, agents, and elected or appointed officials, harmless from any damage or expense by reason of failure of performance as specified in said contract, or from defects appearing or developing in the material or workmanship provided or performed under said contract after its acceptance thereof by the City of Yakima, Washington, and all claims filed in compliance with Chapter 39.08 RCW are resolved and all taxes pursuant to Titles 50 and 51 and 82 RCW have been paid, then and in that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Ordinances of the City of Yakima, Washington. IN WITNEKSS WHEREOF, the said principal and the said surety have caused this bond to be signed and sealed by their duly a , hori ed officers this Jafdayof JQntAAvy ,2012t, Appr•ved as to form: City Attorney) Mow By •ncipal) (Signature) ow.) P SltNO W112dW1 (Print Name) ekeSt Liberty, By: (Title) (Signatu Darlene Jakielski (Print Name) Attorney -In -Fact (Title) business d TIiIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Certificate No 5745003 American Fire and Casualty Company Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of the State of New Hampshire. that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint Betty A. Cox; Ellen M. Bell; Theresa A. Lamb; S. M. Scott; Chad M. Epple; M. J. Cotton; Jim W. Doyle; Julie M. Glover; Darlene Jakielski; Jim S. Kuich; Michael A. Murphy; Nancy J. Osborne; Andy D. Prill; Steven K. Bush; Brandon K. Bush; Brett N. Meier; Steve Wagner all of the city of Bothell , state of WA each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings. bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 1st day of December 2012 By: STATE OF WASHINGTON ss COUNTY OF KING American Fire and Casualty Company The Ohio Casualty Insurance Company Liberty Mutual Insurance Company West American Insurance Company Gregory . Davenport, Assistant Secretary On this 1st day of December 2012 , before me personally appeared Gregory W. Davenport, who acknowledged himself to be the Assistant Secretary of American Fire and Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Seattle, Washington, on the day and year first above written. By: KD Riley , Not Public This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV -OFFICERS - Section 12. Power of Attorney Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE XIII - Execution of Contracts - SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Gregory W. Davenport, Assistant Secretary to appoint such attorneys -in -fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I. David M. Carey, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company. and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this ii day of To. n'..-"-% 20 l 3 . LMS_12873_092012 By: David M Carey, Assistant Secretary 104 of 200 MOWAT01 OP ID: RR Jk4 'moi' CERTIFICATE OF LIABILITY INSURANCE °----r' DATE(MM/DD/YYYY) 01/16/13 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 425-489-4500 Hub International Northwest425-489-4501 P. O. Box 3018 Bothell, WA 98041-3018 Dale G. Ahrens ACT NAME: PHONE FAX INC. No, Ext): (NC, No): E-MAIL ADDRESS. INSURER(S) AFFORDING COVERAGE NAIC # INSURER A . Zurich American Insurance Co. 1655355 INSURED Mowat Construction Company P.O Box 1330 Woodinville, WA 98072 INSURER B Navigators Insurance Company 12/01/12 INSURERC EACH OCCURRENCE INSURER D : DAMAGES ( Ea RENTEDoccurrence) PREMISES ( INSURER E : INSURER F : CLAIMS -MADE COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSR SUBR WVD POLICY NUMBER POLICY EFF JMMIDD/YYYY) POLICY EXP (MM/DD/YYYY) LIMITS A GENERAL LIABILITY JC I COMMERCIAL GENERAL LIABILITY GLA3999973 12/01/12 12/01/13 EACH OCCURRENCE $ 1,000,000 DAMAGES ( Ea RENTEDoccurrence) PREMISES ( $ 300 �000 CLAIMS -MADE X OCCUR MED EXP (Any one person) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 X WA STOP GAP GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE 7 POLICY X LIMIT APPLIES 1 PER: LOC PRODUCTS - COMP/OP AGG $ 2,000,000 Emp Ben. $ 2,000,000 A AUTOMOBILE X LIABILITY ANY AUTO ALL OWNED AUTOS HIRED AUTOS _ SCHEDULED AUTOS NON -OWNED AUTOS GLA3999973 12/01/12 12/01/13 COMBINED SINGLE LIMIT (Ea accident) 1 000 000 $ , , BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ $ B X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE SE12EXC5449561V 12/01/12 12/01/13 EACH OCCURRENCE $ 5,000,000 AGGREGATE $ 5,000,000 DED RETENTION $ $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y / N N / A GLA3999973 WA STOP GAP 12/01/12 12/01/13 WC STATU- TORY LIMITS X OTH- ER E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.L DISEASE - POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule if more space is required) ADDITIONAL INSURED(S) AS REQUIRED BY WRITTEN CONTRACT: THE CONTRACTING AGENCY AND ITS OFFICERS, ELECTED OFFICIALS, EMPLOYEES, AGENTS AND VOLUNTEERS AND APPOINTED OFFICIALS. COVERAGE IS PRIMARY & NON-CONTRIBUTORY. SEE ATTACHED ENDORSEMENT(S). RE: YAKIMA RAILROAD GRADE SEPARATIONS, PHASE 3-MLK, JR. BOULEVARD. CERTIFICATE HOLDER CANCELLATION CITYOFY CITY OF YAKIMA DEPT. OF COMMUNITY & ECONOMIC DEVELOPMENT -ENGINEERING DIV. 129 NORTH SECOND STREET YAKIMA, WA 98901 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2010/05) © 1988-2010 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Additional Insured - Automatic - Owners, Lessees Or Contractors ZURICH Policy No. Eff Date of Pol Exp. Date of Pol. Eft. Date of End Producer No. Add'I Prem Return Prem. G LA3999973-03 12/01/2012 12/01/2013 12/01/2012 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part A. Section II — Who Is An Insured is amended to include as an insured any person or organization who you are required to add as an additional insured on this policy under a written contract or written agreement. B. The insurance provided to the additional insured person or organization applies only to "bodily injury", "property damage" or "personal and advertising injury" covered under Section I - Coverage A - Bodily Injury And Property Damage Liability and Section I - Coverage B - Personal And Advertising Injury Liability, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf, and resulting directly from your ongoing operations or 'your work" as included in the "products -completed operations hazard", which is the subject of the written contract or written agreement, performed for the additional insured person or organization C. However, regardless of the provisions of Paragraphs A. and B. above. 1. We will not extend any insurance coverage to any additional insured person or organization• a. That is not provided to you in this policy; or b. That is any broader coverage than you are required to provide to the additional insured person or organization in the written contract or written agreement; and 2. We will not provide Limits of Insurance to any additional insured person or organization that exceed the lower of: a. The Limits of Insurance provided to you in this policy, or b. The Limits of Insurance you are required to provide in the written contract or written agreement, D. The insurance provided to the additional Insured person or organization does not apply to: "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering or failure to render any professional architectural, engineering or surveying services including 1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications, and 2. Supervisory, inspection, architectural or engineering activities E. The additional insured must see to it that 1. We are notified as soon as practicable of an "occurrence" or offense that may result in a claim; 2. We receive written notice of a claim or "suit" as soon as practicable; and Includes copyrighted material of Insurance Services Office, Inc , with its permission. U -GL -1175-C CW (07/ 10) Page I of 2 3. A request for defense and indemnity of the claim or "suit" will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity This provision does not apply to insurance on which the additional insured is a Named Insured, if the written contract or written agreement requires that this coverage be primary and non-contributory F. For the coverage provided by this endorsement• 1. The following paragraph is added to Paragraph 4.a. of the Other Insurance Condition of Section IV — Commercial General Liability Conditions: This insurance is primary insurance as respects our coverage to the additional insured person or organization, where the written contract or written agreement requires that this insurance be primary and non-contributory with respect to any other policy upon which the additional insured is a Named Insured In that event, we will not seek contribution from any other such insurance policy available to the additional insured on which the additional insured person or organization is a Named Insured 2. The following paragraph is added to Paragraph 4. b. of the Other Insurance Condition of Section IV—Commercial General Liability Conditions: This insurance is excess over• Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same "occurrence", offense, claim or "suit" This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis G. This endorsement does not apply to an additional insured which has been added to this policy by an endorsement showing the additional insured in a Schedule of additional insureds, and which endorsement applies specifically to that identified additional insured. All other terms and conditions of this policy remain unchanged -I'''II:'1es cufrfrn.]hted innfe!i,7117f i sui ince ' ry r; s Office 111,.: 'Nig' Its perflis iol) I.J I.L. ;1 '5-C (;`v (07 10) f'?l)C 2 of 2 f POLICY NUMBER GLA3999973-03 COMMERCIAL AUTO CA 20480299 THIS ENDORSEMENT CHANGES THE POUCY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FOFfvt GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are "insureds" under the Who Is An Insured Provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective: 12/01/2012 Named Insured MOWAT CONSTRUCTION COMPANY Countersigned By: (Authorized Representative) SCHEDULE Name of Person(s) or Organization(s): ANY PERSON OR ORGANIZATION WITH WHOM YOU HAVE AGREED, THROUGH WRITTEN CONTRACT, AGREEMENT OR PERMIT, EXECUTED PRIOR TO THE LOSS, TO PROVIDE_ ADDITIONAL INSURED COVERAGE. (If no entry appears above, information required to complete this endorsement will he shown in the Declarations as applicable to the endorsement.) Each person or organization shown in the Schedule is an "insured" for Liability Coverage. but only to the extent that person or organization qualifies as an ''insured" under the Who Is An Insured Provision contained in Section fI of the Coverage Form. CA 20 48 02 99 Copyright, Insurance Services Office, Inc , 1998 Page 1 of 1 17 47en, ,.Wr/ POLICY NUMBER GLA3999973-03 COMMERCIAL GENERAL LIABILITY CG 25030509 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designated Construction Project(s): A GENERAL AGGREGATE LIMIT APPLIES TO EACH CONSTRUCTION PROJECT WHERE THE NAMED INSURED IS PERFORMING OPERATIONS, HOWEVER, A GENERAL AGGREGATE LIMIT DOES NOT APPLY TO ANY CONSTRUCTION PROJECT WHERE THE NAMED INSURED IS PERFORMING OPERATIONS THAT ARE INSURED UNDER A WRAP UP OR ANY OTHER CONSOLIDATED OR SIMILAR INSURANCE PROGRAM. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I —Coverage A, and for all medical expenses caused by accidents under Section I —Coverage C, which can be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. A separate Designated Construction Project General Aggregate Limit applies to each designated construction project, and that limit is equal to the amount of the General Aggregate Lint shown in the Declarations. 2. The Designated Construction Project General Aggregate Lint is the most we will pay for the sum of all damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products - completed operations hazard", and for medical expenses under Coverage C regardless of the number of. a. Insureds: b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". CG 25 03 05 09 3. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the Designated Construction Project General Aggregate Limit for that designated construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations nor shall they reduce any other Designated Construction Project General Aggregate Limit for any other designated construction project shown in the Schedule above. 4. The lints shown in the Declarations for Each Occurrence, Damage To Premises Rented To You and Medical Expense continue to apply. However, instead of being subject to the General Aggregate Limit shown in the Declarations, such limits will be subject to the applicable Designated Construction Project General Aggregate Limit. Insurance Services Office. Inc., 2008 Page 1 of 2 D hent Copy B. For all sums which the insured becomes legally obligated to pay as damages caused by "occurrences" under Section I —Coverage A, and for all medical expenses caused by accidents under Section I — Coverage C, which cannot be attributed only to ongoing operations at a single designated construction project shown in the Schedule above: 1. Any payments made under Coverage A for damages or under Coverage C for medical expenses shall reduce the amount available under the General Aggregate Limit or the Products -completed Operations Aggregate Limit, whichever is applicable; and 2. Such payments shall not reduce any Designated Construction Project General Aggregate Limit. Page 2 of 2 C. When coverage for liability arising out of the "products -completed operations hazard" is provided, any payments for damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard" will reduce the Products -completed Operations Aggregate Limit, and not reduce the General Aggregate Limit nor the Designated Construction Project General Aggregate Limit. D. If the applicable designated construction project has been abandoned. delayed, or abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. E. The provisions of Section III —Limits Of Insurance not otherwise modified by this endorsement shall continue to apply as stipulated. Insurance Services Office. Inc , 2008 CG 25 03 05 09 ❑ CHANGE ORDER NO.1 G:0 Title RR Shoofly Construction & Removal BY Contractor ..Date` •. 2/28/2013 ProjectName:•, Yakima Grade Separations - Phase 3 — MLK Jr Blvd • 'Pr."oject.No 1202701 - Contractor: Mowat Construction Co ,FederalAid No:: STPX-NCPD-000S(062) Owner City of Yakima Change;OrderDescriptiori:._. This Change Order provides compensation, to the contractor, in the amount of $138,866.57, for all work related to the construction and removal of the Railroad Shoofly detailed on sheets SF 01 and SF 02 of the contract plans through the subballast. This work includes necessary excavation and reestablishment of the mainline grade through subballast. 'The.Contract'is`IWodifed asFollows:; - Contractor is hereby directed to, upon receipt of an approved copy of this change order, make changes in the Contract Documentsand execute the work as detailed herein The work covered by the Change Order shall be performed under the same terms and conditions as those included in the original Contract, unless otherwise described herein The payment and/or additional time specified and agreed to in this Change Order constitutes full adjustment for, and settlement of, all costs and time relating to the performance of the Work described herein Original Contract Amount: Current Contract Amount: Amount of this Change: Revised Contract Amount: $10,634,867 95 $10,634,867 95 $138,866.57 $10,773,724 61 Contract timeis ®Unchanged ['Increased ❑Decreasedby +/- days ❑Work Days ❑Cal Days New Contract Duration +/- days❑ Work Days❑Calendar Days APPROVED BY(Not1 valid until signed by Oivnei) Approval James K Tobin R.E esident ngineer L / Signature �i Cil Rner . c �[ C Q u f t f x'15 t q.00 OwNamel Vt (Print name & title) Contractor, Contractor Namt (Print name & title) CITY CONTRAC r NO: y�l -vir- RESOLUTION NO:Oi? -7/ 1 of 2 ignature Signature 3/4/ / 3 Date 3/22(3 Date \3 bate P-04 (Rev 6/11) CHANGE ORDER # This change order is a result of BNSF determining that they preferred the contractor perform this work. Labor and equipment and markups per contractors project submittal. Excavation and crushed materials verified using WSDOT Average Unit Bid Analysis for Eastern Washington , CONT. Changes to the Contract Documents:[cite attachments, if any] Plans '4{t. Sheet # Change Sh # SF 01 Sh # Change Note 1 "All work to construct and remove the Shoofly to top of subballast is by BNSF" to Contractor Brief description of change Sh # Brief description of change 0Oriti,',i4ti:0‘00.94.1.10040:60100004C11!, Section # Change Sect # Brief description of change Sect # Brief description of change ,•••; 4,'AX,22!' .77; ' Basiit'.61Paymentiforthis,Change, r er • Tax Incl. in Unit Item# Description Price? Unit Est. Qty Unit Price Amount I'M, .*toy.':';O:Tr",1.t1.,7,*.W.'4,141' ;",.',''''I,:i C. 000 0:90,1P 1!411teT,!11 0 §04,,.0 cT, plec!,000'7- `1'..,;,?77447,4; 7,1!',''. , 7`7 '4: „ . , • . BI # Description Y/N Unit Qty $000 00 $000 00 BI # Description Y/N Unit Qty $000.00 $000 00 BI # Description Y/N Unit Qty $000 00 $000 00 BI It Description Y/N Unit Qty $000 00 $000 00 40,.Items&; c. ;,AD'Z'-1 ''f'4. ' tff,. 1-1 Install & Remove RR Shoofly to the top of subballast Yes LS $138,866.57 $138,866 57 BI # Description Y/N Unit 0 $000 00 $000 00 BI # Description Y/N Unit Qty $000 00 $000 00 BI # Description Y/N Unit Qty $000 00 $000 00 Apply current sales tax rate for items marked "no" under the Tax column Subtotal: Tax: Total: $000 00 $000 00 $138,866.57 Attachments: list attachments Copies: Contractor(Originat & PDF) Owner (Original & PDF) File 2 of 2 P-04 (Rev 6/11) MOWAT CONSTRUCTION COMPANY February 22, 2013 City of Yakima C/o KBA Jim Tobin 2 S 15t Ave Suite 1 Yakima, WA 98902 RE. City of Yakima Project No. 1818 Yakima RR Grade Separations — Phase 3 — MLK Jr. Blvd Dear Mr Tobin, The attached is the pricing regarding the installation and removal of the shoofly work through the subballast. The following conditions are contingent upon this offer: • The rail will be left intact and all work will be performed around the rail. No splicing of the rail will take place. • Railroad protection is excluded. • Per conversation with the City of Yakima, it is assumed that the asphalt removal is included in the shoofly excavation and the price is representative of the quantity • No replacement of asphalt, paving, concrete or structures has been accounted for in this change order. • Ballast, railroad ties, rail and related items are excluded • An expedited turn around on all submittals related to this work. Mowat is requesting $139,986.56 for this change. We feel this is the most efficient and inexpensive way to accomplish this work given the proposed parameters. If you have any questions please feel free to contact me. We respectfully request direction as soon as possible so that we can complete this work on time and within the given price Sincerely, MOWAT CONSTRUCTION COMPANY Brock Lindsay Project Manager 20210 — 142" Avenue NE • PO Box 1330 • Woodinville, WA 98072-1330 Phone (425) 398-0205 • TTY/TDD 800-833-9384 • Fax (425) 398-0226 WA Lic #MOWATCC942BC • OR Lic #167954 • AK Lic #28319 • ID Lic #14164 Member AGC An Equal Opportunity Employer A -to City of Yakima Engineering Division Yakima Railroad Grade Separations Phase 3 -Martin Luther King, Jr. Boulevard 129 North Second Street Yakima, WA 98901 Appendices Federal Aid No. STPX-NCPD-000S(062) State Contract No. TA -1407 City Project Number 1818 Phone (509)575-6111 Fax (509) 576-6305 October 2012 APPENDIX A Existing Utility As -built Drawing Sheets 6, 7, 9 0 10 20 40 N1 STA. 30+24, 40' LT. INSTALL_1.2" x_8" TAP__ SLEEVE,__8'-FLG__ x MJ TAP. VALVE BOX AND BLOCKING. INSTALL 11 1/4' MJ RESTRAINED JOINT ELBOWS ON NEW 8" AND 12" RESTAINED JOINT DI WATERMAINS 0 STA. 30+24, 40' .LT. TO 32+77, 35' LT. INSTALL APPROX. 255 LF NEW 8" DI RESTRAINED JOINT WATERMAIN. SEE N2 1 181324-11401 ) HOLLINGBERY CA & COLD STORAGE 100,00' eOLUNGORRY th1NO WATER IEI.. 4' PVC fo- tuff (2) 4' Pon OdIN. 01 NC =ME cavo r 3' STEEL 4' MP 10. STA. 35+00 MATCHUNE �N4 STA. 32+, 35' LT. IN.STALL_8 vlJ_x_8" MJ_x_6" MJ TEE, 6" MJ GATE VALVE, 10 L.F. 6" DI WATERMAIN, HYDRANT ASSEMBLY, AND BLOCKING. INSTALL 8" MJ PLUG AND BLOCK EAST LEG OF TEE. SALVAGE EX. FIRE HYDRANT TO CITY. REMOVE EX. HYDRANT LEAD BACK TO VALVE, PLUG AND BLOCK. INSTALL GUARD POSTS. N5 STA. 30+21, 30' RT. CUT INTO EX. 12" WATERMAIN, AND INSTALL NEW 12" MJ x 12" MJ x 12" MJ TEE, 2 EACH 12" MJ BUTTERFLY VALVES, VALVE BOXES, AND BLOCKING_ Ne STA. 30+21, 30' RT. TO 34-400, 35' RT. INSTALL NEW 12" RESTRAINED JOINT DI WATERMAIN 5' FROM R/W. PLUG AND BLOCK AT EAST END W/ 2" BLOW—OFF. N7 STA. 32+95, 35' RT. INSTALL NEW 12" MJ x 12" MJ x 6" NJ TEE , 1 EA. 6" MJ GATE VALVE AND BLOCKING. INSTALL 20 L.F. 6" DI WATERMAIN AND FITTINGS TO CONNECT TO EX. 6" WATERMAIN. REMOVE EX. 6" MAIN BACK TO EX. 8" MAIN. PLUG AND BLOCK. SCHEDULE WORK AFTER TRACK 29 BUSINESS HOURS. Ne PRESERVE & PROTECT EX. FIBER OPTIC AND STREET LIGHT POWER CONDUITS. WO P,DAND N DC 1 1/2" WATER OERViCE AT ,vtAItI' TO ON.r :MITI HOUSE. RECORD DRAWINGS LINCOLN AVE. 3EE C IEET 4. CIT ,' TO REMOVE METER AND rCLOCATC TO NEW GERVICE LOCATION 014 LINCOLN AVE. N10 REMOVE EX. TREE AND ROOT BALL IN ENTIRETY.. BACKFILL W/ SELECT BACKFILL. 11 STA. 34+699035' RT. TO 35+00 35' RT. INSTALL 12" DI RESTRAINED JOINT WATERMAIN. PLUG AND BLOCK WEST END WITH 2" BLOW—OFF. CSA. 311C3, 3C' ..^,T., 31+64, 30' LT., 321 2C, :0' ^T., 32+91, 30' LT., 331 S0, 30' RT., 34+59, 30' LT. REMOVE EX. STREET LIGHT POLE, BASE, ARM AND FIXTURE. SALVAGE THREE STREET LIGHTS TO CITY. STA. 32+91, 33+59, AND 34+59 INSTALL NEW STREET LIGHT POLE BASE AND J—BOX. RESET EX. LIGHT POLES. RUN NEW CONDUIT AND CONDUCTORS FROM EX. J—BOX TO NEW BOX AND STREET LIGHT. REMOVE R/R TRACKS SUFFICIENT TO INSTALL NEW 8" & 12" DI WATERMAINS. STA. 30+21 TO 34+&435' RT. FUTURE 12" DI RESTRAINED JOINT WATERMAIN. (NOT INCLUDED IN THIS CONTRACT) STA. 30+42, RT. TO 34+00, 37' RT. INSTALL (2)72" DIAM LEC -CONDUITS FROM EX. —BOX TO NEW TYPE 1 J—BOX AT STA. 34+00. TO ENCASE PROVIDE 6" DIAM. STEEL CONDUIT CASING FOR BOTH. STA. 32+27 TO 34+00 N17 STA. 34+60, 37' RT. TO 35+00, 37' RT. INSTALL NEW TYPE 1 J --BOX AT SIDE— WALK GRADE AND (2) 2" DIAM. ELEC. 6" DIAM. STEEL CONDUIT CASING. AFTER TRACK 29 AND JAIL ANNEX ARE CONNECTED TO NEW WATERMAINS. REMOVE EX. 8" VALVE AND VALVE BOX INSTALL NEW 8" PLUG AND BLOCKING. ABANDON AND LEAVE IN PLACE. TO REMAIN IN SERVICE. 30+00 31+00 32+00 • Huibregtse, Lowman Associates, Inc. CIVIL ENGINEERING • LAND SURVEYING • PLANNING 801 -North 39th Avenue ♦Ynidmo, WA 96902 (509) 966-7000 •FAX (509) 965-3800 33+00 1065 080 LIQ t''14'' +ora l T! I' 1� —�--' ;i..�-,1 � ( } ' � 1 '�i 34+00 .100 NUMBER: 06106 DAIE: 05-07-07 FILE NAMES: DRAVMNG: SHEES.dwg PLAN: 06106.dwg PROFILE: RCPRFO2D.dwg 1055 35+00 CITY OF YAKIMA. Lincoln Ave. and MLK Jr: Blvd. Grade Separations. Phase 1 - Utility Relocation and. Historic District Reconstruction REVISION DALE DESIGNED BY: DIMMED BY: GWS EPG PLAN AND PROFILE MLK JR. BLVD. STA. 25+00 TO 30+00 SHEET B` OF 21 0 10 —20 40 (191319-22407) YAKIMA COUNTY •.. 1.�w..�...�..._-.. n r J-�i�iiiiri..ii.��.s:.:.�.::�!ism%/�i"�///f//�%..//////////%�.�%//////�.o////%/ am. _ a Co 4 4D 12) w - � CLAY 0 .3,'Ik, 1'.ic� Ea-) Q (ONE—WAY EAST) �'%!l/!�/%/%%//--. f//!/�f �//%i%/..-%%'%//////5:i////////////� %//%f lIZ) 1� =-,. T-..3 MUCK Y .•tom•tg., _. iwwraYd :tea ar• •r.w.w.. �'_ '.� .� �:.ra.r.r.v .r. �. •r.a •�..m.�� w.r.r ^ r ate -Ili.' DYED AND (2 . COa000 2 (191319-22488) YAKIMA COUNTY 0''61t0UNt1;'33'rRIG TTI�:""F: - 7,, :,� � :I' iYa 741' •Ili 7lrfr■frr •ate -=ti -i -r.--71 y4JT .'t 1 .,1..... 1— -.: ' �-. , .. :: �- i„ ; 'r 1 i_iP,..1..r...r:a1'■�.... -.-�:. R,"::6-�1 -.�....- ._ - - 'i''e.14-1-'4: -; u+ 1 r4_. li.. -■ -.- ■saaxr�r'a�rra■rrin■ru. 16421 '..:+s:Y=r ;s,�rs:.. z..., rr- -r--rnrc"nt� rcGofita0ir71 ce u " J1'C/CJE87,(9T• _ :.�1:..L_ .:. f : ! �_ '{L�yI ,T ri- Li-I-Li.TTE" +,-ur. �I : 1 t ; • . •QI I i•-• . : ; ,-rt.'`ilT 1441M- _ .•E .. a .-:I. �Y+ ■Y .�:_—}A '+■1H. ' : + `.: 1 ; I ! •:-i : ; . . __I..=! -ice: ' ' .1.17, ' : '—fi=r' iuSi�-rr4:�/'7 L41 *w.0 t i,_. . !-L ■_ .^j ' L1crp ..' E1-1 +�..�s�. �',-J ":O ESla-1 I�-:J ;.' -.rJ' • 1�� 1 } : rn-7-'- . 1+• :: , 1 : j ` I . - r . I ! 1 1 f T I °I},ar�i� .r�-�r.__• - "- i -rs, µrliTt�'i,�fTl ; T� TT�r �: S r:a•-1y_i-- -•,L;•i'"rJLyr 1-1-..,-f•i--'- -1 T r ..174.4.,,i_j:;4.11 i -+Y- F�+4-41-t1 d... ® NEW 12" DI WATERMAIN. SEE SHEET 9. Qty S -T -A-35+59, 35' RT. INSTALL CAP ON NORTH LEG OF NEW 12" MJx12'MJx12' MJx12" MJ CROSS AND BLOCK. SEE SHEET 2 FOR PROPER SEQUENCE OF WORK. N3 STA. 35+59, 35' RT. TO 39+00, 12' RT. INSTALL NEW 12" DI RESTRAINED JOINT WATERMAIN 5' FROM R/W EXCEPT AT EAST END. 0 STA. 37+34, 35' RT. INSTALL 12" MJ BUTTERFLY VALVE ON NEW 12" WATERMAIN. N5 STA. 37+22, 35' RT. INSTALL 12" MJ x 12" MJ x 6" MJ TEE AND 6" MJ GATE VALVE AND CONNECT TO EX. 6" FIRE SERVICE (SEE DETAIL). CONNECT TO EX. 6" FIRE SERVICE UNE NEAR BUILDING UNE. NB STA. 37+27, 35' RT. INSTALL 12" MJ x 12" MJ x 4" MJ TEE AND 4" MJ GATE VALVE AND NEW 4" COMPOUND METER ASSEMBLY AND VAULT, CONNECT TO EX. 4" DOMESTIC SERVICE LINE. N7 STA. 38+74, 40' LT. CITY TO INSTALL NEW 1" IRRIG. SERVICE AND METER. INSTALL DOUBLE CHECK VALVE AND J -BOX BEFORE CONNECTION TO EXISTING IRRIGATION SYSTEM. PLUG END OF ABANDONED SERVICE. NB CITY TO -RELOCATE METER AFTER NEW IRRIGATION SERVICE IS COMPLETED. CAP 1 1/2" COPPER LINE OUTSIDE OF VAULT. REMOVE VAULT AND BACKFILL WITH SELECT BACKFILL. N9 REMOVE TREE & ROOT BALL IN ENTIRETY. BACKFILL WITH SELECT BACKFILL STA. 35+65, 20' LT. AFTER 12" WATERMAIN TO THE SOUTH IS ABANDONED, PLUG AND BLOCK TEE TO SOUTH. SEE SH. 2 FOR SEQUENCE. PRESERVE AND PROTECT EX. FIBER OPTIC COMMUNICATIONS CONDUITS. 1 ACCESS FOR JAIL DELIVERIES MUST 1085 BE MAINTAINED AT ALL TIMES OR ARRANGEMENTS MADE WITH JAIL _ ADMINISTRATION. N13 STA. 35+00 TO 35+60, 35' RT. 1080 INSTALL NEW 12" DI RESTRAINED JOINT WATERM AI N. STA. 39+00, 12' RT. INSTALL NEW 12" MJ 45' ELBOW, CONC. 1075 BLOCKING, 12" MJ x 8" MJ REDUCER AND CONNECT TO EX. 8' DI WATERMAIN. 15 STA. 38+76, 35' RT. INSTALL NEW 12" MU 45' ELBOW AND 1070 BLOCKING. REUSE REMOVE AND SALVAGE TO CITY. 4" COMP-OUN.D_M ETER-ASSEMBLY,_REMOVE— VAULT AND BACKFILL WITH SELECT BACKFILL REMOVE ADANDCNGD C" AND S" SERVICE LINES TO VALVED AT MAIN. STA. 35+00, 37' RT. TO 39+02, 40' RT. INSTALL (2) 2" DIAM. ELEC. CONDUITS 1000 W/ TYPE 1 J -BOXES ON BOTH SIDES OF FRONT ST. CONNECT TO EX. J -BOX AT STA. 39+02. INSTALL 6" DIAM. STEEL CONDUIT CASING. STA. 35+00 TO NEW 1055 J -BOX ON WEST SIDE OF FRONT STREET AFTER TRACK 29 AND JAIL ANNEX ARE ON NEW WATERMAINS, CLOSE ALL THREE VALVES AT CROSS, REMOVE BOXES AND REPAIR PAVEMENT. ABANDON AND LEAVE IN PLACE. >�-ITt ; T, 4-ri 35+00 36+00 37+00 38+00 40+00 401** Huibregte, Lonmat Associates, Inc: CIVIC ENGINEERING:, LAND' SURVEYING-: PLANNING 1301 North 39th Avenue *Yoldmo. WA 98902 JOB NUMBER: 06106 COMM • 111.1 0, 2022 05-07-07 FILE NAMES DRAWING: SHEETS.drg PLAN: 08106.dwg PROFILE: RCPRF020.dwg DESIGNED BY: ENTERED BY: CITY OF YAKIMA Lincoln Ave: and MLK Jr. Blvd. Grade Separations Phase 1- Utility Relocation and Historic District Reconstruction PLAN AND PROFILE MLK JR. BLVD. STA. 35+00 TO 40+00 SHEET 7 OF 21 191319-22312) (191319-23015 BNSF RAILROAD BRICK P RKiNO LOT ASPHALT PARTING IAT • Ebt - • BRICK eraCK qq rpYfA Cp40UIT r-1 o U) 6• SANITARY SEVER PUIGRED e sARTARY sem sieRik w„; 0 0 w z J LAV0 • IMO . •. ••.•.•,,::„,•,.,.•.•.•,:::.....•..::,V.. "t RECORD DRAWINGS. HUIBREGTSE, LOUMAN ASSOCIATES, INC. 11 27/07 `BYG.W.S./E.P.0 19131942488) YAKIMA COUNTY I 0 YAKIMA COUNTY 0 U) trr 10 20 Ni STA. 55+50, D' RT. TO 59+35,• 0' RT. INSTALL APPROX. 385 LF OF 12” DI WATERMAIN. N2 STA. 55+S3, 10' LT. PLUG PIPE NORTH WITH CONCRETE. FILL NORTH CHANNEL LEG IN MANHOLE. RADIUS, CHANNEL TO SOUTH. N3 STA. 56-1-19 INSTALL 12" TEE AND 4" CONNECT TO SERVICE UNE STA. 56+37 INSTALL 12" TEE AND 8" CONNECT TO LINE. STA. 59+35, 7' RT. INSTALL 12" MJ x 12" MJ x 12" MJ x 12" MJ CROSS WITH 3 EACH 12" BUTTERFLY VALVES ON WEST, NORTH, AND SOUTH LEGS. CAP AND BLOCK NORTH LEG. ALL JOINTS FOR CROSS SHALL BE RESTRAINED JOINTS. MJ x 12" MJ x 4" MJ MJ GATE VALVE. EX. 4" COMPOUND MJ x 12" MJx8"MJ MJ GATE VALVE. EX. 8" FIRE SERVICE 0 STA. 60+15, 9' LT. ABANDON EXISTING SANITARY SEWER MANHOLE. REMOVE CASTING AND CONE SECTION. FILL MANHOLE WITH COMPACTED NATIVE BACKFILL (TYPICAL). U.i. • , , 1 , , .. - - - LI . -6-i ! E: f-i-��i+�--Izi. 3-,�-ki-':^'.-f-'' -.rt ' �.S-ice.. 1-l. -{-`-s•'':-•`.-!`i-:: '-i-4^T^. h _r: •'; ; *-I-41-.)-'` tom. 1_L, -14-1-•.-`f , rf= -.. ,-iJ_._- , -i-I_i', . -•-F-,1-r:. ' n __ '.11:.1: r:_ "'I= : r . rt .4-41-'4' r • + •--•....-' : 1_• 1_ {�T.e.:. ■_ �ii-, ' H ar -+;,=r'=: __ r r_ �-i- _f_ r 'f ■ ' - ■. .,c#. ' r , yf : T ;r , i r : 1 i.11! IT^+:- _ ;-c-1'r . ; :+ i� . I -f ' _ , I -"i -i-.. r � :-i ( 1075 { 1070 r 1 !. 'ice■ 1 - - .1.1' - n-, Q. _ .i?' - - ����y!y, a I _ 1... ._-C _ '. _ - :L_, .4,-: —, _ - { i' 1 �'}"j-t�!- ,,-7.4u I•+ r+' _ - i-ri ± h�J�. +'- .` .,•,-r-', 1L..:iL• I_l-•-r -{ ; f f a 1_�. -r-i+ I-� `*r':-':-�-H 4-4-I'i }. _ - f . _�• '-i-i': _ i-1-1-: , i -d -r !-r--�7 t - - - -i1- t ! , r' •_� h 'f . t 1-- - '-4.L f'f-+ :1r� 'q•� :'t - ' _L' 1i, `- : 1' t . t.l -4-I���RIYI�'1r4-�ktli='i•R�E.{"_; : � � .. t t - iT- � y_.. f }- 8.0447 _.L'...' i'1 f t , - •+:'F__T• rl-t-i': i": �'f . 1 ; i • ' . t . < : r . f 1 'Jj : r r ' +tyr J . )i• ...-} i 1 o i�, -1•f.4,..,..L,—.J.-52,7.-4.1-'-n_ 1--1= 24i.,1_,. I+n� Tlii �,�. •i ` L :i� 1 ' -F-1 T_'�.- f ' _ _ _ _ _ _ _ �I•J•�- hj r. _ i' �,Hr' �t }Tt-:Tt•,-' r__, . 1-'47it-h '!h �r�('-j� 1 1 1 1 : �}.` ' ` }_: ; i _ l ,=,- +� + 1-I-1 ' .}J- Ti , t - - �.. t. _ - !. F,t{i t rf' + (! L ilTr 1-1,-i-ly '1 J *: r, -; �7. _r1,:;- �� ;L{J � . i•i - Ti ' ■.! � ■ .4-4-1- '+ 1iJ � 'i -r- a.� i+ '1' "�.-;. /ln 1 J y t{ '--{- r x._ ' i 1 ■-h'f't' _ ■ • , .--L,_L-41. _ _ ;...J. l" r�,r ■ n F .�■■ -•r.-; , , sr' r : E H" _ t - f ;-I"-rt� _ . NM _ - I : �^ • _T: _ 1. r TT{ r a 'tTrf r i _ -..-1- _ -1-�^ --t+ f tI 1 TT' _{_ itIll , r f ITT ,T� r A '+• r 1 � r - �f't-"Y' rr' ^N -Ft i r'T'L'i . ■H■ � i �-, M -t--: '-rL i+' ; ■_ '.1JL-.7,-.":1 r, , -•-�-' -1-.' _ _ { i ; I ; �r� 7-FTL 'r�-;•r'; i��j { •T `Tt.. , t"_' ;^-I i -r' ` 1'• - � -H r r I t , Lr HT: Tri , �i i' ,1x 1 - : t'I+ �T'. �_t1 f r ' ' ' : 1 fi�. -, _1' i I_f-t' '_h' i +4Lr-i 1075 +- r r. .-r L:" T !-',`ji![±�PEC.I` T.-�-'r%'. A�.-��;...'L��irO,=-t-.� �' .. =:,__ u_ - .' ,l'i.c'.t-! .w.7.-t'.4_,_,_,,t," -i-rf. T. ,-?-+f'. rl ,"{^.'7T,'/ � , `h , 1 I.. ' ,. 1 • � , :."l�. '. - ;-k- •t-- �� -*•,-. ..I, �,.k»- :.�-z':' �� ` '`47c, LFL 1 ' t_�. �1..' `t 1 r�_I. �_1 1.C_+A.,H-.L.:.l:l..:' _i': , i Pri +1i i :'; - `: : •1-r•f+r • i .�J�1. 1-LLl_:, - • , j_ ., r.u-: =1. y _._t ! _t1 ` �--1 , ' L2_ _� 1.,�-�.�_ E, 'T+!-- i , �+; ;1'f -1'r:-: �'I.i i'f", :'f �� . ' ' I , s . { •r : 1 r-, . r ill. '■ + i-1 : i I' +t; . Z _ -.y-I. J..}. rt � r �..{ f- 1 , , �f/•t •a r ` -f �� IV:E r r .. - - � ---,ce .'r.�t? h . i :1 _ `';:.': u •1■• _ -hi 'u10■■) .' • . .`°�.'•t.'1� ■■uu■■�� ,+�'i1�i lawn - 07-1H-,1-71-,1 �•'�-', J -I L .. .." ,-__ ___ _-.,,--_ . 1 .1 -,, •^-•7�$-r , !-T : r :-t . : t r c•f , ! { ; _ ' _._-___.___ .___.. __ ,_4, -. - _ rr� �,-- r• f -�'} r�i -,y: rte, r'hrk �. ,o f'r'-1+L1.. '-1_J. f , _ i 'fJ_}.{' tl ri �® ! . ,-:f-"1-t f—r- •�, , .1T` -11 -1 -1 : ly i T- .t : I --r -1-1 -47. -I -4,1 -.ti` iJ-L i 1- , . I t j i } -t'. f+; )Las}l a- 6ROtl JO • t i . , 1 .aa T ,a■ti■ , _•.;- -�- � , 1 '1- ;-'•ki • ' ' ' ' ' ; .. . . , . . - .. ... .. --k ' L> a - um T.... 6N Ism , r .. :.!-' _ _-'" -,-Fr. ' r 1 `-,+r;• +- (i r°' r < • 1jn/■�■■■ 1070 W , T r • l t r I :T � - _ T -Ft r I , . f, Tl n ■ • \u L,.: 1 . 1 ! } r �tl - r i , r . . (-. , T -•r.:_ "_' ■ ;� , , • - ii • �� :i • nn n r� W r■■ W ' „t- 'i■ t,� ■iI .i u n■ Ti-�' ■n' s . - � `'J-1-" : 5 e ■ ' y r -IJ hf-'1+ :jJ , , r -r ' ■m •f 1 � 1 u = . r 1 : 1 " ' I i , Li.' I ' ' 1 'i■ `in 1065 _• , —� !O•)-.-1+3- L i__.._,:11n ■ 1 � � l' 1 •'1 �-, "t-t'rr-1-j �W _ ;.. Ma■'i +--I_ • • : �,1[.,j: 1 jy�1[1'i't- 1 1 1•, r �J,s-. r' -t r i •777 - fi-- . r+ li- -rrr l� ■ 'rrt L44-4-4 ■■+■�.' i ' 11 s . , . t : 1 t 1 1 , : � i : �4 t :-`� i"• r. i f r • 1- . . ; l t l }(�+ i •T �'-r(-+ 1 t�'1yt- Ti-f'T t :T- a ■ r+t +:1 ; I• r i : ��-5- �-n :'h-..J� i t f i �f r f ! I -t � i. ■ :?�-2' � 1 ' 1 1 . Ti 1 Tj �r]T� T � . '�I-:-`�f-"'_ r ---1-i^ "a_, : y 1 ,� ' e 0.4.-14-1, : i, _ ^r -.r . t' I ■ri_.7 ' �., .:.-t__._-l� 1^ r1-'�y-44- - r , '1 7T•-•••,-;-77-;y--._rt • '- i ce r I i' r f 1 L -t''_i ; ; !�_•_ -:-h •■ ,art �._}_ tt ' : 1 T : 1 i I ' %l,- •-1 { f I ' I i I. 11,T) i' 7 ,■NUN -' - - I - �- I. r _`LJ__ C''tT'- -y-�� i . L f a ' 4'1 {' i, �, � .t { : { ■ .i-.. r -I- : i •' L' i f_1 _ r _^•�-,- -n 1 i i 4, r ■t.,.i_ ' -i+i-L • III�,u' ! _r_:1_71 _ +, e t , : i 1 . t i"•,�. • r T!7;• , I' I I.�}�,'•.,_ -H-i- ki=' -,.k , r: -i ; f : 11 T, ' : 1 r:-rt:rte_ W *� 1 +1 e , - ■lruw■ws■n�ir■■r' � i' : : ' ■awl■ as T:r 1065 sans .,_:_ _ =1 '.Iif-i: i I -1'.. (.t_i-' - ... n ■ ' 1' I I. L'1_' lyl_ rrr 1' . f l r l r l -!': ....... IT ' r 1 , t , : . , , ,', r •� '--"- --- . f 4. 't+ ; '^i ` f•i'i' :444. . n ■al ...' ' .1 0� ,.,,"m■ . L -ir' 't ' L:4_, r i ,1, 4'r tom, : ` .. 5 ■■■ `;,1-I IRr U.S1+;••• I:M! .fes', •YjA' Itt Wtl oiaii 4! L. , ix: `n •trt I a �H •-G`-n+I ■rW F'= 1-,1 v■■■"711 ar. . ' • i �Th i ii ■■u 1 -*-4,- , 1, ■•r. , r h,+-. , W` • )■ a!■H ' r -r W �r : i_•i•I rj 106D 'i" a■ k: 1-r ... ` f ;:H' 11_ '� -.1- {.!-r, 1 - i T''_.ii� rr' r -1-f -ri o t 1_N' �i�-� : h,---' -F'. .,,��• • ' •--ti u. ! ■ 1 . 3 , ■ a r a•T 1 ' , - , 1(.4,-4-4,- . r r ti \ � • T i � � _ - • �-r• ,-t-. • 1 1'1 r.+}-'^ __I_. •- �.,=.�:.: Ysr� -_. i � _ ._i.. _ ..� ..� _l.: 1- - . ■ � '1-'14. •c -:t .1�T t-X°1T -N 1 s ■ � ■ =' o° 'a .1: , i -ti- =rr+ .� -. 1 r ■eeom,t•r _^' -r".. f 1 1.1.:H- .1!-� I - -i�=t- 4-:-.• . =-;Tt-I- .1 t . f T ..„...,....L. _ .�_ : ;'t-1 ;? . t , . :-,-:',- r r,--� -•-1 --! rl -,-,! ..r,--.`.--,--,-+-`--- - :ice:.• - -• O� - m i,- 1 :: + a __ 'r'i p i■'o spa p' +f+. T', , -1-H±I ±t v: +' ..• ti T i 'r 't -a I f. i -r-rt , ' • l_',:_, ..:.-r,.r-y ■u■ s®■ate■...i. ,i_It" l.: -r-,-• -•-- _ .... __. ; ' o ; ; l{■■n' : ,1 ' r T??T ' L,r { '.1-,.......2..--- , t a�-- - - r 1060 ; i-1^�■` - --a - a ,-'. , , , . _ , min n■ t� 1i I f T 1 r� Qi 5 NW ■ t� 1 .J�: • Eif`�I,rAIN , •' _tel �' ■'■■�� ■ rHn1� , la 1 r ■ • Ig. r T•'}'k' ' £1C i H 1 - ,y, BFfBTA D (�__ , �I. , or Jm' • -i ■ i_. : {■{■■a .'_I_�- 1055 1050 :�� IT�: 1 .! y`1L r f , (J`T� r i..-7-4.14 r `i ��._f_^ 'au :"; I^ .•`: r --I r i'1 j'-,�I_f T 1 1r Tl r , 1 • fit rt",T'• •^ I 1 • L r■ h' I- 1 1� , F, ----f'rs,� -f T.L .l 1�,�. -,42I 7HTri-c- r anwi , F. -r?' `.: r •--�+• .-r-= `T -r_: 1' U■' �...,. r Ili➢ ■. {n■■■ F i i". •• t T1•�-1-1 Tr n r t:rr.r (-rf-t•f^-H'f-- m�r{� ■■■■fir - :is■1■\11■77■H I"'• _ W■■ �■ CT i- �a ■ ■� 1 i-fi1tYa k' ■ ■ ■ Fl ' :a■ a■La•tl rr t "non' ■ iir'ii ■n ■!O7■■/■n _ n■aW '•t; -1-1- - TT i_E �; : r p■�{�-t WO■■,■[■�■���■��r.' -1' - 1` ...s - (. -� ii■ 1-i , • T T t_+Fr+!iIIf rF�r r t� 'y • r -tri -,-F,, T .I I -r Fr ■a®~ ■ 1 , : ! ' - r•l_'yJ-+ ailing 1-':::::- ■aaW �• ■ 1- i I - 3`ArlflT11iia1:.1 LIN GLYSii- _ - PIITOLA BA-NDpN AL:o_. ** ,-1-i'r'.—T, EWERMAlhaN08IH I. µ. t 1 T r i l ni ;E��■• ! I . , is• j - !-H . �p �■i■�■■p{��11H�■■■■n (fit. t. > , ,� ;Jrr --I Is ril r,' _� 3:.L-F:t 1-, ,`• r , ti--'-Ft=-I� - rt -I -7-, L-4.-; i ! '". 1055 ' iJ- t-:-' ■�!, ti�■!a7a■/��■��J ;}+f -T rn-�-. 1 t : v■ `_j1,..}r't i f-.. 1-4- .!' I_ _o.'.-14-) (-1-■a,7: :' �T` • • • r.'I-' '\. +T:'Lr'1.'r■a -t} _: ?-F; i .ti �utlraa■■ll�� :-f-:'_I l t , t . i t rf r n■ '�-r•(�'."l T' `1.''f--'- 'r> Y / 1 r r . r T(. 2��(� ■ '■■ W■■■ ■{■fur Wall■ ■1■■ ILLn ■■ Bip�ItnW • a0 no■■' , ' i : ■■.■E#■■1[ : ti �r-iLt 1050. : �-fs +rrti n■ :-, -rri- -■ r -t . i. '.s.' • �i 1 -i , -•-1 rt.l...t,_4r 1 :Jll'4i 1 :�J_,..r111 r , : . r -r + J_ .;. 171:i.: �I-f-,: i : 1 f ' - 1 . �+'t_!' r r _ I r. ; 'rl -` } i* !I •+c -i- , r; L . n ■ _rte ' ram l moi. -i•ia't'•,.+-4 1-L:_ r r I -r -t- 1'- :{+H ■ 1 -rl-t-r$ --;-rr' i -f• - TJy i T:. _ I :.t =7 1 , :'1 ; ' -r i,:, ?T_., is ' r 1 t -l. f ■rr �\ aifi7Co` Lam• 4J ' 1 ; :, ! ` o -r ■u� .y.� ■■�■■ I r'u■_ f-' : ■■ _-1-I-i�L i ;i_ 3�i 1@ � : . ,�'1 r tea�1 , Fr - 2 tT�I +`fes". ■ "��: 1 ■aa■i • 1� • 1 __ -j. , 1� a- ` r, ';+ i 1 I ` a� - ■ t 1 J _L� _ 1.7 ' } ^-i- ��r 1 ! + ' {. = ' .' r r' ' L.i_ T .rfFT. - F ■ au■ .11� ■1.44_,L14 .Inn t riili�•■ : - . i i : '- i- i-,-..-4,-,-1.-1-14-rt '11 -rt; . ) 1 ___ tl- i a■aas■r'mu .. r 1�-'r{.:i-- `' .4 . 'i ' 4 r ',T,-i-�-f'{-` - ` HI -I- U '� ��1 '''' ° li•'-I=H-ti- I i rl i■i■.^-•.• l.l■1 r , ■i■ r, , 1 . y- i�' ]_ ..: tl -_ ■'rla■ - ++'1 `t.rF- i4. 1 wvs■ -•,-Hirt-: , �,1 ; \aa■a�u ,a r '=i -f i t-`.4.-;,-I-i 'u 1 I:, :T1et • ■>v ■lig u�OY frl■■luWltlp �It■il 't --- r iir: _?t- -u_ ._lam f-■ ■■1 i. nn ^ _ +f -H- ■i - r i' -, i i. ,T �i . ('f''' 1 ` : , ' • • 144 1045 • { ; r . .: - i # : ' i ; _ _ _ .{ i"1_rri -Fri-. i S.� Lfa. ■ .1i_1 Ll.:_L' I 1 1. J.1447-1-''• . F T: r _ 1 - -!-1-4411-41-1-4 +1=T+,'. -' "�,= • .IT. ..,__Li_ .y' 1 i -' .} z... �h �y i i i.L_! L , .,'�' ,J_ _ ■ _,� r ` .' F Li.-■-'^l1-f-T; ' ■ f- . ;-F �'i-1 f . ■ rr, r 1-• .•r1Tr I :'T . ^t ,,-�•, L r , r r r �T■ '�-f•^T,:::.!,..÷--1-±_,,_,,,k.:, .LLL: -..f:i ' ,_' . ( ' '-1 L II f : •i'i' .■�'' - ••_'+"_Tr _ _ -!"I ' .t.11 _! 1 . Y_f_ '_Q� r+:' i ! 1 I J -]-:1_-._r_• _r -r ' LrLr.:.'1.1..4 .t-i-t•r r .L- r l 1. :•{.rF'-i ' _4 S r r . t.` i'7' ��,\' :-I ; ...i.. f... , {}.L�' 1 _ w , ,1 Art! JJ li ; J_ . ' 1 '_1 iis':-.7..._ ■ ' ;}I', Tk„y _ _:L t�, f ._t -I. .y -.TP 1045 : • G-. )-r . ■a...1= r •ql_, , t t 'T --H-' 7 -' ' r L! .t_..-i—L'— -k' .-• 'r -4-i {--4 ! '_t -i -H ,TI r - +-Hi ' -rlFr ;T-. :-f ' - _ rl�r -• �-t - : • ;T- .-1-f +i ; •-1- ' i r : I i-1 : 1-: •■ar 1 ' Mffn � ■n i ■ Ina', -'f4 -i ----74i-1,•; , • -.- 'J'.' t rl-' r r. rFr : -` f 1 r r r:>c.1. a _ma .. 1 r . , } t -s..:_.._., L a f� - ±r 1'-•: •' -k- h. m�s���l■a11 a■1■■ 1 a■■■ • ■r■ _ : T'I"' .:!:,_,....,...j.: •..Lt-' J1 ' L ma■a. ■a �ayni ' r , i r 1T L ` 1 •i . t_" 'T' i•; ~ I" ■vnW 'i't'rT ' ; + 'aa ■t+nf'W� _'T'f"'J"L' ' ■■■nan■■ i ' J �T l_1_ (, rel Ti -1 r IMO t--1-\ Tr 1• ,^.T1'• . 1 ' '■iaf■ .. } t� :: ' -4+'J-1"�- I.r.'11 i.; :1 t r :Tk;T'fu ry�i_ T•TrIT 41+f i- ^Tvt Y r , i al rr r_ J: r f+ i- �r -r r 7 hT' IH ' f' �--. l-'' , - -i 1_. r 11, r -+ft , -1.ti�i`t-i' r- lr- 1 i ■ ,Z.' ■ F rt -•-1 ��I ry , \- +TT! f ' -h1 . N ■ ■ ■aa _ - r , ■ ' ■ r: ' • r t __ L_'�. . 11 .-1-:: 'h i r h phi , - . i '-i •• W '.J?. r i r y , , -it- Tr Z+i. _t t■ •L i^..t1..#T 'f• li' se i 1rgan 4:.. Wall 'f -r ■n■aH■pa{ ..f., 'a1t11 f -t-• r -F, ■ ■ , '11 ti-.. s =—i_' .1�1 �_--s•; : , JT. -r, ' i ' ,'. , ' :. �' ' re . 5 tion■ 'rT - I "i . W 1_`r• ' -":1 L W •�.r.. :14./+,.-_-i --4 J-`• ■■ -}1' I -14 ■l t' 1-1;1't•' '.1-.,i......-, . p ran lavaia■■aWa aryl■■a on ■aUW T -•'•+„-h , _ . h i IaPanr �■ _ i a_;.. 1� ' _ " ' ri '�1 int l •yf; l • .■ ■■ lifTi-. ■ • a■n r r r r r . r (y'rr' 1•T' F'T�.l 1 • �y , , i• t'r ', Tr j ` 1 ' L_ ' .-i hr ! r '.yT 7 _ fv- T.- - �� .. r ■0 111 ' T'y hf+r t , : is t__ _.._t1 _ _ ;� s .'' , fl . 'yTll'r _ r'- r r ' ■W ■aa■■Yn -4T-'=F' 1.' s.' a1.' I-' , , - n 1 i■ aI■ f ■tl - - r r1 t't-r' L....714.0trTl'ii hL_:T'; , ' '-Lt:-t - -1 _ _P+14+`11-1-1714-717.11 ' t+ t:11"4--, :-r:TT1 , 'L' --•-f;_ __ , .:.1 +'I'F� ' ''T{-{• 'r .. . , i .. .-1'Th-'1 1T!'T7� i ,'-t-i I , , , . r r . , :lit i !-r: r . I . lit ■ .T"-T.l W■1'■n1 r } r .. W■Waaa�■an■aaHtoaai .. r . r 55+50 56+00 Hulbregtse, Loumau`-Associates, Inc.. CIVIL ENGINEERING. • LAND SURVEYING • PLANNING 801 North 39th Avenue+Yakima, WA 98902 (509) 966-7000 ••FAX (509) 965-3600 57+00 _IEwcas %L.( (7, /01). I 58+00 59+00 JOB NUMBER: DATE: 06108 05-07-07 FELE NAMES: ORAI9NG: SFIEETS.dwg PLAN: 06106.dwg PROFILE RCPRF030.dwg REVISION DATE DESIGNED BY: ENTERED BY: 085 EPC 60+00 60+50 SEE SHEET 7. STA. 59+10, 0' RT. INSTALL NEW 12" MJ x 12" MJ x 6" MJ TEE, 6" MJ GATE VALVE, VALVE BOX, AND BLOCKING. INSTALL 21 L.F. NEW 6" DI WATERMAIN AND NEW HYDRANT ASSEMBLY. STA. 60+10, 0' RT. TO 60+50, 0' RT. INSTALL 40 L•F. OF 12" Di WATERMAIN PLUG END AT STA. 60+10, NO DL MING. BLOCK W/ 2" BLOW -OFF. STA. 59+20, 6' RT. REMOVE EX. FIRE HYDRANT AND SALVAGE TO CITY. REMOVE VALVE BOX AND REPAIR PAVEMENT. -FIELD VE-RIF-IAB-Y-P-O-THOLING-EX-1-2" WATERMAIN DEPTHS TO DETERMINE NEW WATERMAIN DEPTH NEEDED TO ACCOMODATE SERVICE, HYDRANT, AND CROSSING .CONNECTIONS. ABANDON AND LEAVE IN PLACE. TO REMAIN IN SERVICE. CITY OF' YAKIMA Lincoln Ave. and MLK Jr. Blvd. Grade Separations. Phase 1 - Utility Relocation and Historic District Reconstruction PLAN AND PROFILE FRONT STREET STA. 55+50 TO 60+50 9 OF 21 APPENDIX B Exhibit "C-1": Agreement between BNSF Railway and the Contractor UNDERPASS AGREEMENT LAW DEPARTMENT APPROVED MARTIN LUTHER KING, JR. BOULEVARD UNDERPASS U.S. D.O.T. No. 099164S This Agreement ("Agreement"), is executed to be effective as of this /9 - day of jc).-) y-u�iu� ojv.2DQ ("Effective Date"), by and between BNSF RAILWAY COMPANY, a Delaware corporation ("BNSF"), and the City of Yakima, a municipal corporation of the State of Washington ("Agency"). RECITALS: WHEREAS, BNSF owns and operates a line of railroad in and through the City of Yakima, State of Washington; WHEREAS, Agency desires to improve the existing Martin Luther King, Jr. Boulevard at -grade crossing by constructing a new crossing at separated grades to be known as the Martin Luther King, Jr. Boulevard Underpass, D.O.T. No. 099164S; and WHEREAS, The existing Martin Luther King, Jr. Boulevard at -grade crossing will be permanently closed. vacated, and removed upon completion of construction and the placing in service of said underpass; NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE I - SCOPE OF WORK 1. The term "Project" as used herein includes any and all work related to the construction of the proposed Martin Luther King, Jr. Boulevard Underpass (hereinafter referred to as the "Structure"), more particularly described on the Exhibit A attached hereto and incorporated herein, including, but not limited to, any and all changes to telephone, telegraph, signal and electrical lines and appurtenances, temporary and permanent track work, fencing, grading, alterations to or new construction of drainage facilities, preliminary and construction engineering and contract preparation, During construction of the Structure, vehicular traffic may be excluded from the Martin Luther King, Jr. Boulevard construction site, and traffic may not be allowed to access the area until the project is completed and the new roadway is adequately completed to safely accommodate automobile traffic assign underneath the BNSF tracks at the new Martin Luther King, Jr. Boulevard Underpass. Additionally, temporary controls during construction must be in compliance with Section 8A-5, "Traffic Controls During Construction and Maintenance" of the Uniform Traffic Control Devices Manual, U.S. Department of Transportation. 2. The following work items related to the "Project" are planned under this agreement By BNSF forces: (a) Installation of Shoofly, including grading work; Removal of main line and redirecting railroad traffic. (b) Furnishing flagging services as required and set forth in further detail on Exhibit C; (c) Reinstallation and reopening of mainline, removal of Shoofly. Form 0105 Rev. 06/01/05 l,di Removal of the -grade crossing including signals and pavement within 2 outside the tracks after Martin Luther King. Jr. Boulevard is permanently closed to the Public. By City's Contractor: (a) Roadway excavation underneath the BNSF structure. (b) Construction of slope protection and pier encasements. (c) Construction of new BNSF railroad bridge (d) Construction of new Front Street bridge (e) Construction of new Martin Luther King, Jr. Boulevard under BNSF structure and routing of the vehicular traffic to the newly aligned Martin Luther King, Jr. Boulevard under the new BNSF structure. (f) Permanent closure, vacation, and removal of the existing at grade crossing pavement beyond 2' outside the tracks and permanent closure of access to "At Grade" crossing. ARTICLE II — BNSF OBLIGATIONS In consideration of the covenants of Agency set forth herein and the faithful performance thereof BNSF agrees as follows: 1. In consideration of the faithful performance of the Agencys covenants contained herein, BNSF hereby grants to Agency, its successors and assigns, upon and subject to the terms and conditions set forth in this Agreement, a temporary non-exclusive license (hereinafter called, `Temporary Construction License") to construct the Structure across or upon the portion of BNSF's right-of-way described further on Exhibit A, excepting and reserving BNSF's rights, and the rights of any others who have obtained, or may obtain, permission or authority from BNSF, to do the following: (a) Operate, maintain, renew and/or relocate any and all existing railroad track or tracks, wires, pipelines and other facilities of like character upon, over or under the surface of said right-of- way; (b) Construct, operate, maintain, renew and/or relocate upon said right-of-way, without limitation, such facilities as the BNSF may from time to time deem appropriate, provided such facilities do not materially interfere with the Agency's use of the Structure; (c) Otherwise use or operate the right-of-way as BNSF may from time to time deem appropriate, provided such use or operations does not materially interfere with the Agency's use of the Structure. Prior to commencing any work on BNSF's property or right-of-way, Agency must pay BNSF the sum of Forty -Five Hundred and No/100 Dollars (S4500.00) as compensation for the Temporary Construction License. The term of the Temporary Construction License begins on the Effective Date and ends on the earlier of (i) substantial completion of the Structure, or (ii) thirty-six (36) months following the Effective Date; . The Temporary Construction License and related rights given by BNSF to Agency in this provision are without warranty of title of any kind, express or implied, and no covenant of warranty of title will be implied from the use of any word or words herein contained. The Temporary Construction License is for construction of the Structure only and shall not be used by Aoencv for any other purpose. Agency acknowledges and agrees that Agency shall not have the right, under the Temporary Construction License, to use the Structure. In the event Agency is evicted by anyone owning, or claiming title to or any interest in said right-of-way, BNSF will not be liable to Agency for any damages, losses or any expenses of any nature whatsoever. The granting of similar rights to others, subsequent to the date of this Agreement, will not impair or interfere with the rights granted to Agency herein. Form 0106 Rev. 0E101/05 C Upon receiving the payment from Agency described in the subsequent sentence and provided Agency is in compliance with the terms and conditions of this Agreement. BNSF will grant to Agency, its successors and assigns, an easement (hereinafter called, the "Easement") to enter upon and use that portion of BNSF's right-of-way as is necessary to use and maintain the Structure, substantially in the form of Exhibit B attached to this Agreement. Agency must pay BNSF the sum of One Hundred and Seventy Thousand and No/100 Dollars ($170,000.00) as compensation for the Easernent within thirty (30) days of issuing a Notice to Proceed pursuant to Article Ill, Section 16 of this Agreement. If Agency fails to pay BNSF within the thirty day time period set forth in the preceding sentence, BNSF may stop construction of the Project until full payment is received by BNSF. 2. BNSF will furnish all labor, materials, tools, and equipment for railroad work required for the construction of the Project, such railroad work and the estimated cost thereof being as shown on Exhibit D attached hereto and made a part hereof. In the event construction on the Project has not commenced within twenty-four (24) months following the Effective Date, BNSF may, in its sole and absolute discretion, revise the cost estimates set forth in said Exhibit D to reflect estimated cost increases Projected by BNSF for said work. In such event, the revised cost estimates will become a part of this Agreement as though originally set forth herein. Any item of work incidental to the items listed on Exhibit D not specifically mentioned therein may be included as a part of this Agreement upon written •approval of Agency, which approval will not be unreasonably withheld. Construction of the Project must include the following railroad work by BNSF,: (a) Construction of the Shoofly, including grading work. (b) Procurement of materials, equipment and supplies necessary for the railroad work; (c) Preliminary engineering, design, and contract preparation excluding the structure and Shoofly that have been designed by the Agency's contractors; (d) Furnishing flagging services as required and set forth in further detail on Exhibit C: (e) Furnishing engineering and inspection as required in connection with the construction of the Project; (f) (g) Removal of the existing Martin Luther King, Jr. Boulevard at -grade crossing, including removal of the automatic warning devices, and obliteration of the crossing between the rails and two feet outside thereof after closure of Martin Luther King, Jr. Boulevard to the public by the City; Providing a contract project coordinator, at Agency's expense, to serve as a project manager for the Project; (h) Removal and replacement of approximately 100' of main track as required to build the structure; (i) Associated signal and track work required for installation of the bridge structure. This signal work, in addition to that in (f) above, includes, but is not limited to, work on the wayside signal systems. 3. BNSF will do all railroad work set forth in Article II, Section 2 above on an actual cost basis, when BNSF, in its sole discretion, determines it is required by its labor agreements to perform such v'ork with its own employees working under applicable collective bargaining agreements. 4. Agency agrees to reimburse BNSF for work of an emergency nature caused by Agency or Agency's contractor in connection with the Project which BNSF deems is reasonably necessary for the immediate restoration of railroad operations, or for the protection of persons or BNSF property. Such work may be performed by BNSF without prior approval of Agency and Agency agrees to fully reimburse BNSF for ail such emergency work. Form 0:06 Rev. 06/01!05 3 6. BNSF may charge Agency for insurance expenses, including self-insurance expenses when such expenses cover the cost of Employer's Liability (including, without limitation, liability under the Federal Employer's Liability Act) in connection with the construction of the Project. Such charges will be considered part of the actual cost of the Protect, regardless of the nature or amount of ultimate liability for injury, loss or death to BNSF's employees, if any. 6. During the construction of the Project, BNSF will send Agency progressive invoices detailing the costs of the railroad work performed by BNSF under this Agreement. Agency must reimburse BNSF for completed force -account work within thirty (30) days of the date of the invoice for such work. Upon completion of the Project, BNSF will send Agency a detailed invoice of final costs, segregated as to labor and materials for each item in the recapitulation shown on Exhibit D. Pursuant to this section and Article IV, Section 7 herein, Agency must pay the final invoice within ninety (90) days of the date of the final invoice. BNSF will assess a finance charge of .033% per day (12% per annum) on any unpaid sums or other charges due under this Agreement which are past its credit terms. The finance charge continues to accrue daily until the date payment is received by BNSF, not the date payment is made or the date postmarked on the payment. Finance charges will be assessed on delinquent sums and other charges as of the end of the month and will be reduced by amounts in dispute and any un -posted payments received by the month's end, Finance charges will be rioted on invoices sent to Agency under this section. ARTICLE III — AGENCY OBLIGATIONS In consideration of the covenants of BNSF set forth herein and the faithful performance thereof, Agency agrees as follows: 1. Agency must furnish to BNSF plans and specifications for the Project. Said plans together with copy of calculations, and copy of specifications in English Units, must be submitted electronically in "PDF" format, to BNSF for approval prior to commencement of any construction. BNSF will give Agency final written approval of the plans and specifications substantially in the form of Exhibit E, attached to this Agreement and made a part hereof. Upon BNSF's final written approval of the plans and specifications, said plans and specifications will become part of this Agreement and are hereby incorporated herein. Any approval of the plans and specifications by BNSF shall in no way obligate BNSF in any manner with respect to the finished product design andior construction. Any approval by BNSF shall mean only that the plans and specifications meet the subjective standards of BNSF, and such approval by BNSF shall not be deemed to mean that the plans and specifications or construction is structurally sound and appropriate or that such plans and specifications meet applicable regulations, laws, statutes or local ordinances and/or building codes. 2. Agency must make any required application and obtain all required permits and approvals for the construction of the Project. 3. Agency must provide for and maintain minimum vertical and horizontal clearances, as required and approved by BNSF as part of the plans and specifications for the Project. 4. Agency must acquire all rights of way necessary for the construction of the Project. 5. Agency must make any and all arrangements for the installation or relocation of wire lines, pipe lines and other facilities owned by private persons, companies, corporations, political subdivisions or public utilities other than BNSF which may be necessary for the construction of the Project. 6. Agency must construct the Project as shown on the attached Exhibit A and do all work ("Agency's Work") provided for in the plans and specifications for the Project, except railroad work that will be performed by BNSF hereunder. Agency must furnish all labor, materials, tools and equipment for the performance of Agency's Work. The principal elements of Agency's Work are as follows: Form 0106 R3v 06.101'05 (a) Structure. This will be done by Aaencv's Contractors with rail traffic re-directec to the Shoofly. (b) Construction of all items associated with the project not identified in Article II above, or required to be performed by BNSF as stated elsewhere in this agreement; (c) Establishment of all highway traffic control for the project; (d) (e) (f) Obliteration of the existing Martin Luther King, Jr. Boulevard at -grade crossing upon permanently closing, vacating, and removing Martin Luther King, Jr. Boulevard to the public by the Agency. Agency shall remove the roadway approaches and restore railway- drainage ditches. Agency shall install and keep in place appropriate MUTCD warning devices (i.e. Type Ill barricades) at the ends of the former roadway until the new road is opened to traffic. Excavation of earth under the structure to create roadway underpass for use by traveling public. Prior to any earth being excavated by Agency on BNSF property, Agency shall conform to all State and Federal environmental policies and requirements for removal of earth; Job site cleanup including removal of all construction materials, concrete debris, surplus soil, refuse, contaminated soils, asphalt debris, litter and other waste materials, all to the extent caused by construction activities, to the satisfaction of BNSF; 7. Agency must apply and maintain said D.O.T. Crossing number 099164S in a conspicuous location on the Structure. 8. Agency's Work must be performed by Agency or Agency's contractor in a manner that will not endanger or interfere with the safe and timely operations of BNSF and its facilities. 9. Agency must require its contractor(s) to notify BNSF's Roadmaster at least thirty (30) calendar days prior to requesting a BNSF flagman in accordance with the requirements of Exhibit C attached hereto. Additionally, Agency must require its contractor(s) to notify BNSF's Manager of Public Projects thirty (30) calendar days prior to commencing work on BNSF property or near BNSF tracks. 10. Agency or its contractor(s) must submit copy of any plans, electronically in "PDF" format. (including calculations in English Units) for proposed shoring or cribbing to be used over; under, or adjacent to BNSF's tracks to BNSF's Manager of Public Projects for approval. The shoring or cribbing used by Agency's contractor shall comply with BNSF Bridge Requirements set forth on Exhibit F attached to this Agreement and incorporated herein. Additionally, the shoring and cribbing must comply with all applicable requirements promulgated by state and federal agencies, departments, commissions and other legislative bodies. 11. Agency must include the following provisions in any contract with its contractor(s) performing work on said Project: (a) The Contractor is placed on notice that fiber optic, communication and other cable lines and systems (collectively, the "Lines") owned by various telecommunications companies may be buried on BNSF's property or right-of-way. The locations of these Lines have been included on the plans based on information from the telecommunications companies. The contractor will be responsible for contacting BNSF's Engineering Representative. Rusty Olson (206-625-6189) and/or the telecommunications companies and notifying them of any work that may damage these Lines or facilities and/or interfere with their service. The contractor must also mark all Lines shown on the plans or marked in the field in order to verify their locations. The contractor must also use all reasonable methods when working in the BNSF right-of-way or on BNSF property to determine if any other Lines (fiber optic, cable, communication or otherwise) may exist. 0 Form 01066 Rev. 06%01/05 (h) Failure to mark or identify these Lines will be sufficient cause for BNSF's engineering representative Rusty Olson to stop construction at no cost to the Aoency or BNSF until these items are completed. (c) In addition to the liability terms contained, elsewhere in this Agreement, and subject to the provisions of Section 4.24. 115 of the Revised Code of Washington, the contractor shall indemnify and hold BNSF harmless against and from all cost, liability, and expense whatsoever (including, without limitation, attorney's fees and court costs and expenses) arising out of or in any way contributed to by any act or omission of contractor, its subcontractors, agents, and/or employees that cause or in any way or degree contribute to (1) any damage to or destruction of any Lines by contractor and/or its subcontractors, agents and%or employees, on BNSF's property or within BNSF's right-of-way; (2) any injury to or death of any person employed by or on behalf of any telecommunications company, and/or its contractor, agents; and/or employees, on BNSF's property or within BNSF's right-of-way; and/or (3) any claim or cause of action for alleged loss of profits or revenue by, or loss of service by, a customer or user of such telecommunication company(ies). (d) Contractor shall have a background investigation performed on all of its employees, subcontractors and agents who will be performing any services on railroad property under this Agreement. The background screening shall at a minimum meet the criteria defined by the e- RAILSAFE prooram outlined at httrD://www.E--!-raiisafe.com in addition to any other applicable regulatory requirements. The e-RAILSAFE program uses rail industry background screening standards. Contractor shall obtain consent from all employees screened in compliance with the e-RAILSAFE program criteria to release completed background information to BNSF. Contractor shall be subject to periodic audit to ensure compliance. Contractor shall not permit any of its employees, subcontractors or agents to perform services on property hereunder who are not approved under e-RAILSAFE program standards. Railroad shall have the right to deny entry onto its premises to any of Contractor's employees, subcontractors or agents who do not display the authorized identification badge issued by a background screening service meeting the standards set forth for the e-RAILSAFE program or who pose a threat, in Railroad's reasonable opinion, to the safety or security of Railroad's operations. Contractors shall ensure its employees, subcontractors and agents are United States citizens or legally working in this country under a work VISA. (e) The Contractor will be responsible for the rearrangement of any facilities or Lines determined to interfere with the construction. The Contractor must cooperate fully with any telecommunications company(ies) in performing such rearrangements. 12. Agency must incorporate in each prime contract for construction of the Project, or the specifications therefor (i) the provisions set forth in Article 111, Sections 8, 9, 10, 11, and 13; (ii) the provisions set forth in Article IV, Sections 3, 4, 10 and 11; and (iii) the provisions set forth in Exhibit C and Exhibit C -I, attached hereto and by reference made a part hereof, 13. Except as otherwise provided below in this Section 13, all construction work performed hereunder by Agency for the Project will he pursuant to a contract or contracts to be let by Agency, and all such contracts must include the following: (a) All work performed under such contract or contracts within the iimits of BNSF's right-of- way must be performed in a good and workmanlike manner in accordance with plans and specifications approved by BNSF; Form 0106 Rev. o0ini1i05 e (o) Changes or modifications during construction that affect safety or BNSF operations will be subject to BNSF's approval; (c) No work will be commenced within BNSF's right-of-way until each of the prime contractors employed in connection with said work must have (i) executed and delivered to BNSF a letter agreement in the form of Exhibit C -I, and (ii) delivered to and secured BNSF's approval of the required insurance; and If it is in Agency's best interest, Agency may direct that the construction of the Project be done by day labor under the direction and control of Agency, or if at any time, in the opinion of Agency, the contractor has failed to prosecute with diligence the work specified in and by the terms of said contract, Agency may terminate its contract with the contractor and take control over the work and proceed to complete the same by day labor or by employing another contractor(s) provided; however, that any contractor(s) replacing the original contractor(s) must comply with the obligations in favor of BNSF set forth above and, provided further, that if such construction is performed by day labor, Agency will, at its expense, procure and maintain on behalf of BNSF the insurance required by , Exhibit C-1. • To facilitate scheduling for the Project; Agency shall have its contractor give BNSF's representative Six (6) weeks advance notice of the proposed times and dates for work windows. BNSF and Agency's contractor will establish mutually agreeable work windows for the Project. BNSF has the right at any time to revise or change the work windows, due to train operations or service obligations. BNSF will not be responsible for any additional costs and expenses resulting from a change in work windows. Additional costs and expenses resulting from a change in work windows shall he accounted for in the contractor's expenses for the Project. (d) (e) (f) The plans and specifications for the Project must be in compliance with the Bridge Requirements set forth on Exhibit F. 14. Agency must advise the appropriate BNSF Manager of Public Projects, in writing, of the completion date of the Project within thirty (30) days after such completion date. Additionally, Agency must notify BNSF's Manager of Public Projects, in writing, of the date on which Agency and/or its Contractor will meet with BNSF for the purpose of making final inspection of the Project. 15. To the fullest extent permitted by law, Agency shall release, indemnify, defend, and hold harmless BNSF, its affiliated companies, partners, successors, assigns, legal representatives, officers, directors, shareholders, employees, and agents for, from, and against any and all claims, liabilities, fines, penalties, costs, damages, losses, liens, causes of action, suits, demands, judgments, and expenses (including, without limitation, court costs and attorneys' fees) of any nature, kind, or description of any person (including, without limitation, the employees of the parties hereto) or entity directly or indirectly arising out of, resulting from, or related to (in whole or in part) (i) the use, occupancy, or presence of Agency, its contractors, subcontractors, employees, or agents in, on, or about the construction site within the Easement Area, (ii) the performance, or failure to perform, by the Agency, its contractors, subcontractors, employees, or agents, its work or any obligation under this Agreement, or (iii) the sole or contributing acts or omissions of Agency, its contractors, subcontractors, employees, or agents in, on, or about the construction site. 16. Agency must give BNSF's Manager of Public Projects written notice to proceed with the railroad work after receipt of necessary funds for the Project. BNSF will not begin the railroad work (including, without limitation, procurement of supplies, equipment or materials) until written notice to proceed is received from Agency. 17. Upon completion of the structure the crossing will be fully closed and vacated. Agency must perform all necessary work to obtain the permanent closure and vacation of Martin Luther King, Jr. Boulevard across BNSF's right-of-way and must barricade the road approaches prior to commencement Form 0 106 Rev. 06701/05 of the Project. BNSF will cooperate w:th Agency to achieve the closure and vacation of Martin Luther King, Jr. Boulevard d and 'will remove the crossing surface within its right -of -\gay. ARTICLE IV — JOINT OBLIGATIONS IN CONSIDERATION of the premises, the parties hereto mutually agree to the following: 1. All work contemplated in this Agreement must be performed in a good and workmanlike manner and each portion must be promptly commenced by the party obligated hereunder to perform the same and thereafter diligently prosecuted to conclusion in its logical order and sequence. Furthermore, any changes or modifications during construction which affect BNSF will be subject to BNSF's approval prior to the commencement of any such changes or modifications. 2. The work hereunder must be done in accordance with the Bridge Requirements set forth on Exhibit F and the detailed plans and specifications approved by BNSF. 3. Agency must require its contractor(s) to reasonably adhere to the Project's construction schedule for all Project work. The parties hereto mutually agree that BNSF's failure to complete the railroad work in accordance with the construction schedule due to inclement weather or unforeseen railroad emergencies will not constitute a breach of this Agreement by BNSF and will not subject BNSF to any liability. Regardless of the requirements of the construction schedule, BNSF reserves the right to reallocate the labor forces assigned to complete the railroad work in the event of an emergency to provide for the immediate restoration of railroad operations (BNSF or its related railroads) or to protect persons or property on or near any BNSF owned property. BNSF will not be liable for any additional costs or expenses resulting from any such reallocation of its labor forces. The parties mutually agree that any reallocation of labor forces by BNSF pursuant to this provision and any direct or indirect consequences or costs resulting from any such reallocation will not constitute a breach of this Agreement by BNSF. 4. BNSF will have the right to stop construction work on the Project if any of the following events take place: (i) Agency (or any of its contractors) performs the Project work in a manner contrary to the plans and specifications approved by BNSF; (ii) Agency (or any of its contractors), in BNSF's opinion, prosecutes the Project work in a manner which is hazardous to BNSF property, facilities or the safe and expeditious movement of railroad traffic: (iii) the insurance described in the attached Exhibit C-1 is canceled during the course of the Project; or (iv) Agency fails to pay BNSF for the Temporary Construction License or the Easement pursuant to Article II, Section 1 of this Agreement. The work stoppage will continue until all necessary actions are taken by Agency or its contractor to rectify the situation to the satisfaction of BNSF's Division Engineer or until additional insurance has been delivered to and accepted by BNSF. In the event of a breach of (i) this Agreement, (ii) the Temporary Construction License, or (iii) the Easement, BNSF may terminate the Temporary Construction License or the Easement; provided that any claim of breach by BNSF as justification for termination of this Agreement; the Temporary Construction License, or the Easement shall be preceded by prior written notice of same to Agency and further provided that Agency shall be allowed the opportunity to cure any such claimed breach before any further work is performed and, in the event that Agency effectuates a reasonable cure thereof, BNSF shall have no right to terminate the Agreement. the Temporary Construction License, or the Easement, as the case may be. Any such work stoppage under this provision will not give rise to any liability on the part of BNSF. BNSF's right to stop the work is in addition to any other rights BNSF may have including, but not limited to, actions or suits for damages or lost profits. in the event that BNSF desires to stop construction work on the Project, BNSF agrees to immediately notify the following individual in writing: Douglas Mayo, PE City Engineer 129 N 2nd Street City of Yakima Form 010:; Re.. 06.O1!o5 8 5. Agency must supervise and inspect the operations of all Agency contractors to assure compliance with the plans and specifications approved by BNSF, the terms of this Agreement and all safety requirements of the BNSF railroad. If BNSF determines that proper supervision and inspection is not being performed by Agency personnel at any time during construction of the Project, BNSF has -the right to stop construction (within or adjacent to its operating right-of-way). Construction of the Project will not proceed until Agency corrects the situation to ENSF's reasonable satisfaction. If BNSF feels the situation is not being corrected in an expeditious manner, BNSF will immediately notify Douglas Mayo for appropriate corrective action. 6. BNSF will contribute Seven Hundred and Twenty -Nine Thousand, Four Hundred and Eighty -Nine and No/100's Dollars .c 29 9TA0) (hereinafter referred to as "BNSF's Share") based on the Agency's Construction Estimate at 100% Final Engineering of the Project. BNSF's Share 'will be based on the costs for preliminary engineering, right-of-way and construction within the following limits: (a) Where a grade crossing is eliminated by grade separation, the structure and approaches required to transition to a theoretical highway profile which would have been constructed if there were no railroad present, for the number of lanes on the existing highway and in accordance with the current design standards of the appropriate state highway agency; and (b) Where another facility, such as a highway or waterway, requiring a bridge structure is located within the limits of a grade separation project, the estimated cost of a theoretical structure and approaches as described in 23 CFR 646.210(c)(1) to eliminate the railroad -highway grade crossing without considering the presence of the waterway or other highway. Additionally, local, state and federal funds will be used in the construction of the Project. The total actual cost of construction for the Project is presently estimated to be $24 million, more particularly described (together with BNSF's Share) on Exhibit G attached hereto and incorporated herein. 7. Pursuant to this section and Article II, Section 6 herein, Agency must, out of funds made available to it for the construction of the Project, reimburse BNSF in full for the actual costs of all work performed by BNSF under this Agreement, less BNSF's Share as set forth in Article IV, Section 6 herein. BNSF's Share must be paid upon final completion of the Project. 8. All expenses detailed in statements sent to Agency pursuant to Article II, Section 6 herein will comply with the terms and provisions of the Federal Aid Highway Program Manual, U.S. Department of Transportation, as amended from time to time, which manual is hereby incorporated into and made a part of this Agreement by reference. The parties mutually agree that BNSF's preliminary engineering, design, and contract preparation costs described in Article II, Section 2 herein are part of the costs of the Project even though such work may have preceded the date of this Agreement. 9. This item intentionally left blank. 10. Subject to the restrictions imposed by Article IV, Section 9 above, the construction of the Project will not commence until Agency gives BNSF's Manager of Public Projects thirty (30) days prior written notice of such commencement. The commencement notice will reference BNSF's file number and D.O.T. Crossing No. 0991645 and must state the time that construction activities will begin. 11. In addition to the terms and conditions set forth elsewhere in this Agreement, including, but not limited to, the terms and conditions stated in Exhibit F, BNSF and Agency agree to the following terms upon completion of construction of the Project: (a) BNSF will, at its sole cost and expense. accept, own, and maintain its roadbed, track, the railroad bridge superstructure, any access gates installed pursuant to the Project, railroad drainage, and all other railroad facilities. (b) Agency will own and maintain, at its sole cost and expense, the structure (not including the railroad bridge superstructure), highway approaches, and appurtenances thereto, Form 0106 Rev. 06/01/05 9 i ahtin'c and drainage, The Agency'' mai, at its option, perform necessary yep?: to the portions of the Structure that if not corrected may adversely impact the safety of traveling public underneath. The Agency will notify BNSF prior to performing such maintenance. in the event such maintenance involves emergency repairs, the Agency will notify BNSF at its earliest opportunity. The Agency shall be solely responsible for the costs of maintenance performed by the Agency pursuant to the subsection (b). BNSF may, at its option, perform maintenance on the Structure in order to avoid conflicts with train operations. BNSF will notify Agency prior to performing any such maintenance on the Structure. In the event such maintenance involves emergency repairs, BNSF will notify Agency at its earliest opportunity. Agency will be solely responsible for the costs of maintenance performed by BNSF pursuant to this subsection (b). Additionally. Agency and BNSF shall perform the necessary work to obtain the permanent closure of i`c,'iartin Luther King, Jr. Boulevard. Agency may. at Agency's sole cost and expense, keep the Structure painted and free from graffiti. Agency must apply and maintain vertical clearance signs which consistently and accurately describe the minimum actual vertical clearance from the bottom of the Structure to the top of any pavement. Agency shall be responsible for reimbursing BNSF for the cost of track surfacing due to settlement caused by the construction of the Structure for a period not to exceed two (2) years from the date of final inspection pursuant to Article III, Section 14. In accordance with applicable law, Agency must provide BNSF with any and of necessary permits and maintain roadway traffic controls, at no cost to BNSF, whenever requested by BNSF to allow BNSF to inspect the Structure or to make emergency repairs thereto. It is expressly understood by Agency and BNSF that any right to install uti'.ities will be governed by a separate permit or license agreement between the parties hereto. Agency may, at Agency's sole cost and expense, keep the Structure and surrounding areas clean and free from birds, pigeons, scavengers, vermin, creatures and other animals. If Agency (including its contractors and agents) or BNSF, on behalf of Agency. performs (i) alterations or modifications to the Structure, or (ii) any maintenance or other work on the Structure with heavy tools, equipment or machinery at ground surface level horizontally within 25'-0" of the centerline of the nearest track, or (iii) any maintenance or other work to the superstructure of the Structure, then Agency or its contractors and'or agents must arrange for flagging protection and procure and maintain the following insurance coverage: Railroad Protective Liability insurance naming only the Railroad as the Insured with coverage of at least $2,000,000 per occurrence and 56,000,000 in the aggregate. The polio- must be issued on a standard ISO form CO 00 35 10 93 and include the following: o Endorsed to include the Pollution Exclusion Amendment (ISO form CO 28 31 10 93) o Endorsed to include the Limited Seepage and Pollution Endorsement. s Endorsed to remove any exclusion for punitive damages. o No other endorsements restricting coverage may be added. o The original policy must be provided to the Railroad prior to performing any .vary or services under this Agreement Form 010,3 Rey 0.3/01/05 _5 io As used tn this paragraph, "Rai/road" means "Burlington Northern Santa Fe Corporation", "BNSF RAILWAY COMPANY" and the subsidiaries. successors, assigns and affiliates of each. In lieu of providing a Railroad Protective Liability Policy. Agency may participate in BNSF's Blanket Railroad Protective Liability Insurance Policy if available to Agency or its contractors. The limits of coverage are the same as above. 12. Agency hereby grants to BNSF, at no cost or expense to BNSF, a permanent richt of access from Agency property immediately adjacent to the Structure to BNSF tracks for maintenance purposes. 13. Agency must provide one set of as built plans, electronically in `PDF" format, (prepared in English Units) to BNSF; as well as one set of computer diskettes containing as built CAD drawings of the Structure and identifying the software used for the CAD drawings. The "as built plans" must comply with the Bridge Requirements set forth on Exhibit F and depict all information in BNSF engineering stationing and mile post pluses. The "as built plans" must also include plan and profile, structural bridge drawings and specifications, and drainage plans. All improvements and facilities must be shown. 14. Agency must notify and obtain prior authorization from BNSF's Manager of Public Projects before entering BNSF's right-of-way for maintenance purposes. If the construction work hereunder is contracted, Agency must require its prime contractor(s) to comply with the obligations set forth in Exhibit C and Exhibit C-1, as the same may be revised from time to time. Agency will be responsible for its contractor(s) compliance with such obligations. 15. BNSF may, at its expense, make future changes or additions to the railroad components of the Structure if necessary or desirable, in BNSF's sole discretion, including, without limitation the following: (i) the right to raise or lower the grade or change the alignment of its tracks; (ii) the right to lay additional track or tracks, or (iii) the right to build other facilities in connection with the operation of its railroad. Such changes or additions must not change or alter the highway components of the Structure. If it becomes necessary or desirable in the future to change, alter, widen or reconstruct the highway components of the Structure to accommodate railroad projects, the cost of such work, including any cost incidental to alteration of railroad or highway facilities made necessary by any such changes to the Structure, will be divided between BNSF and Agency in such shares as may be mutually agreed to by the parties hereto. 16. Agency may, at Agency's sole expense, alter or reconstruct the highway components of the Structure if necessary or desirable, due to traffic conditions or pedestrian or other recreational traffic; provided, however, that any such alteration or reconstruction must not encroach further upon or occupy the surface of BNSF's right-of-way to a greater extent than is contemplated by the plans and specifications to be approved by BNSF pursuant to Article III, Section 1 herein, without obtaining BNSF's prior written consent and the execution of a supplement to this Agreement or the completion of a separate agreement. 17. Any books, papers, records and accounts of the parties hereto relating to the work hereunder or the costs or expenses for labor and material connected with the construction will at all reasonable times be open to inspection and audit by the agents and authorized representatives of the parties hereto, as well as the State of Washington and the Federal Highway Administration for a period of three (3) years from the date of final BNSF invoice under this Agreement. 18. The covenants and provisions of this Agreement are binding upon and inure to the benefit of the successors and assigns of the parties hereto. Notwithstanding the preceding sentence, neither party hereto may assign any of its rights or obligations hereunder without the prior written consent of the other party. 19. In the event construction of the Project does not commence within twenty-four (24) months of the Effective Date, this Agreement will become null and void. Form 0106 Rev. 06/0i/O5 20. Neither termination nor expiration of this Agreement will release either party from any liability or obliaation under this Agreement; whether of indemnity or otherwise, resulting from any acts. omissions or events happening prior to the date of termination or expiration. 21. To the maximum extent possible, each provision of this Agreement will be interpreted in such a manner as to be effective and valid under applicable law. if any provision of this Agreement is prohibited by, or held to be invalid under, applicable law, such provision will be ineffective solely to the extent of such prohibition or invalidity and the remainder of the provision will be enforceable. 22. This Agreement (including exhibits and other documents. manuals, etc. incorporated herein) is the full and complete agreement between BNSF and Agency with respect to the subject matter herein and supersedes any and all other prior agreements between the parties hereto. 23. Any notice provided for herein or concerning this Agreement must be in writing and will be deemed sufficiently given when sent by certified mail, return receipt requested; to the parties at the following addresses: 24. Governing Law: This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. Venue: The venue for any action to enforce .or interpret the Agreement shall lie in the Superior Court of Washington in and for Yakima County. BNSF Railway Company: Agency: 12 Richard W Wagner BNSF's Manager of Public Projects 2454 Occidental Ave S #1-A Seattle, WA 98134 Douglas Mayo, PE City Engineer 129 N 2rd Street City of Yakima Form 0106 R=.. 08(01105 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by its duly qualified and authorized officials as of the day and year first above written, BNSF RAWAY COMFY By: Printed Name: Title:6/e4LE,et fit/6> //e/cv AVia G, yc AGENCY CITY OF YAKIMA, WASHINGTON By: Printed Name: Title: V� (`nQ",,NvIi."-\ Form 0106 Rev. 06/01105 EXHIBIT "C" CONTRACTOR REQLIREM-iENTS 1.01 General LAW DEPARTMENT APPROVED • i.111.01 The Con raetor must cooperate with liV'SF RAILWAY CO1t'ii'-1\'. hereinafter referred t,_ as Railway" :,'here work is over of under on or adjacent to Railway property and or right-of-way. hereafter referred to as `Railway Properly". during the construction of the Martin Luther King.Jr. Boulevard Underpass. • 1.01.02 The. Contractor must execute and deliver to the Railway duplicate Copies of the Exhibit "C-1" Agreement, in the form attached hereto, obligating the Contractor to provide and maintain in full force and effect the insurance called for under Section 3 of' said Exhibit 'C-1". Questions regarding procurement of the Railroad Protective Liability Insurance should be directed to Rosa 11 -mine., at Marsh, USA211-303-8519. • 1.01.03 The Contractor must plan, schedule and conduct all svo'';e Contractor P l tr activities so ;:; not to interfere vv -iii iu� movement of any trains on Railway Property. • 1.01.0 k The Contractor's right to enter Railway's Propene is subject to the absolute right of Railway to cause the Contractor's work on Railway's Property to cease if in the opinion of Railway, Contractor's activities create a hazard to Railway's Property, employees, and/or operations. 1.01.05 The Contractor is responsible for determining and complying with all Federal. State and Local Governmental laws and regulations. includillg, hut not limited to environmental laws and regulations (including g but not limited to the Resource Conservation and Recovery Act, as amended: the CleanWater Act, the Oil Pollution Act. the Hazardous Materials Transportation Act, CERCLA I. and health and safety is V,'y anti regulations. The Contractor hereby indemnifies, defends and holds harmless Railway for. front and a<_*ainst all Ones of penalties imposed or assessed by Federal. State and Local Governmental. Agencies against the Railway which arise out of Contr'actor's work under this Agreement. • 1.01.06 The Contractor must notify City of Yakima at (50g) 57 -61 i 1 and Railway's Manager Puhli� Projects. l^ [ rc. icer;. telephone number 206-625-6146 at least thirty l 0j calendar days before commencing itt work on Railway Propern'. Contractors' notification to Railway must refer to Railroad's file • 1.01.0' For any falsework above aha' tracks or any excavations located, whichever is greater, within twenty-five (25) feet of the nearest track or intersecting a slope from the plane of the top of rail on a 1H. horizontal to i vertical slope beginning at eleven 1,11) feet from centerline of the nearest track, both measured perpendicular to center line of track. the Contractor must furnish the Railway five sets of working drawings showing details of construction affecting Railway Property and tracks. The working drawing must include the proposed method of installation and removal of falsework, shoring or cribbing, not included in the contract plans and two sets of structural calculations of any falsework, shoring or cribbing. Ail calculations must take into consideration railway surcharge loading and must be designed to sleet American RailvV:ly Engineering and Maintenance -or -Way Association (previously known as American Raiisvay Engineering Association') Coopers E -SO live loading standard. All drawings and calculations must be stamped by a registered professional engineer licensed to practice in the state the project is located. The Contractor must not begin work until notified b\' the Railway that plans have been approved. The Contractor trill .be required to use lining devices such as, cranes and/or winches to place or to remove any falsework over Railway's tracks. in no case will the Contractor be relieved of responsibility Mr results obtained by the implementation of said approved plans. • 1.01.08 Subject to the movement of Railway's trains. Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient planner. The Contractor will have no claim whatsoever for any type of damages or for extra or additional compensation in the event his work is delayed by the Railway. tont. 106 R _ 06/01/05 L,trs,' DemIrmicent :Approved 1.02 Contractor Safety Orientation • 1.02.01 No employee of the Contractor, its subcontractors, agents or invitees may enter Railway Property without first having completed Railway's Engineering Contractor Safety Orientation, found on the web site vvwr..contractororient ation.crm . The Contractor must ensure that each of its employees. subcontractors, agents or invitees completes Railway's Engineering Contractor Safety Orientation through internet sessions before any work is performed on the Project. Additionally, the Contractor must ensure that each and every one of its employees, subcontractors, agents or invitees possesses a card certifying completion of the Railway Contractor Safety Orientation before entering Railway Property. The Contractor is responsible for the cost of the Railway Contractor Safety Orientation. The Contractor roust renew the Railway Contractor Safety Orientation annually. Further clarification can he found on the web site or from the Railway's Representative. 1.03 Railway Requirements • 1.03.01 'the Contractor must take protective measures as are necessary to keep railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting from his operations. Any damage to railway facilities resulting from Contractors operations will he repaired or replaced by Railway and rhe cost of such repairs or replacement must be paid for by the Contractor. • 1.03.02 The Contractor roust notify the Railways Division Superintendent at 509-546-3252 and provide blasting, plans to the Railway for review seven (7) calendar days prior to conducting any blasting operations adjacent to or on Railway's Property. • 1.03.03 The Contractor must abide by the following temporary clearances during construction: ▪ 15' • 21'6,, ;0'_0„ 41'-0'. Horizontally from centerline of nearest track Vertically above top of tail Vertically above top of rail for electric wires can' 'in, less than 750 volts Vertically above top of rail for electric wires carrying 750 volts to 15.000 volts Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 volts Vertically above top of rail fOr electric wires carrying more than 20,000 volts 1..03.44 Upon completion of construction, the followin? clearances shall be maintained: ▪ 7'3'-3 Horizontally from centerline of nearest track Vertically above top of rail • 1.03.05 Any infringement within State statutory clearances due to the Contractor's Operations must be submitted to the Railway and to City of Yakima and must riot be undertaken until approved in writing by the Railway, and until the City of Yakima has obtained any necessary authorization from the State Regulatory Authority for the infringement. No extra compensation will be allowed in the event the Contractors work is delayed pending Railway approval, and/or the State Regulatory Authority's approval. • 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will have the option of installing tell -tales or other protective devices Railway deems necessary for protection of Railway operations. The cost of tell -tales or protective devices will he borne by the Contractor. • 1.03.07 The details of construction affecting the Railway's Property and tracks not included in the contract plans must be submitted to the Railway by City of Yakima for approval before work is undertaken and this work must not be undertaken until approved by the Railway. • 1.03.08 At other than public road crossings. the Contractor must not move any equipment or materials across Railway's tracks until permission has been obtained from the. Railway. The Contractor must obtain a "Temporary Private Crossing Agreement" from the Railway prior to moving his equipment or materials across Form 0106 Rev. 0E3/01/05 I. apepartrilCm 'ecU the Rai tracks. The temporer:. - ossinL, intist he ?ated and locked Cl all iimes when mi required for use be the Contractor. rite Temporars,., cr,.-)ssing lor use hide Contractor will be at the cxpense ot'Itie Contractor. • 1.03.0g Discharge. release or spill on the Railway Property of ally hazardous substances, oil. petroleum, constituents., pollutants, contaminants, or any hazardous waste is prohibited and Contractor must immediately notify the Railway's Resource Operations Center at I i:800) 832-5451 of any discharge, release or spills in excess Cl a reportable quantity. Contractor must not allow Railway Property to become a Ireannem, Storage transfer facility as those tem -is are defined in thQ RCSOtili:O Conservation and Recover:kat or any analcv,fue. • I.03.10 The Contractor upon completion or the work covered by this contract, toust iproinp1Jv rfnov,-f. from tile Railway's Ploperiy ;di of Contractor.,,,, tools. equipment. implements end other materials. whether brought upon said property by said Contractor or any Subcontractor. employee or agent of (Contractor or of. any Subcontractor, and must cause Railways Propeny to be led t in a condition acceptable ":0 I:1'J: Railway's representative. 1.04 Contractor Roadway Worker on Track Safety Program and Safety Action Plan • I.04.0l Each Contractor that will perform work within 25 lbet of the centerline of a trick inust develop and implement a Roadway Worker Protection/On Track Safety Program and work with Rail \vay Project Representative to develop an on track safety strategy as described in the guidelines listed in the on track safery portion of the Safet'yOrientation. This Program Must provide Roadway Worker protection/on track Mainim, for all employees of the. Contractor, its subcontractors, agents c.,1- invitees. This training is reinforced at the job she through lob safety briefings. Additionally. each Contractor must develop and implement the Safety Action Plan, as provided for on the web site ',,vww.c“ntractororietilniion.c.•::m. which will be made available in Railway prior to commencement of any work on Railway Property. During the performance of work. the Contract Or Ioust audit its work activities. The Contractor must designate an on -she Project Supervisor who will serveis time contact person for the Railway and who will maintain a copy of the Safety Action Plan. safety audits. and l)s-laterial Safety Datasheets tA1SDS), at the job site. 1.05 Protection of Railway Facilities and Railway Flaer Services: • .05.01 The Contractor must give Railwavrs Roadmaster ttelephone 206-625-6880) a minimum c -f thirty i:30) calendar clays advance notice when nagging set -vices will be required so that the R.oadmaster can make appropriate arrangements (i.e.. bulletin the position). 11' flaging set -vices are scheduled in advance by the Contractor and it is subsequently determined by the panics hereto that such services are no longer necessary, the Contractor must give the Roadmaster five (5) working, days advance notice so that appropriate arrangements can be made to abolish the position ptit'SliaTIT tO • I.05.02 Unless determined otherwise by Railway's Project Representative. Railway flagger and protc•ctive services and devices will be required and fnmished when Contractor's work activities are located over, under and/or within twentv-five (25) feet measured horizontally from centerline of the nearest tract -and when cranes or similar equipment positioned beyond 25 -feet from the track centerline could foul the track in the event of tip over or other catastrophic occurrence, but not limited thereto for the following conditions: time opinion of the Railway's Representative it is necessary to safeguard Railwa\ 's Property. employees, trains, engines and facilities. • 1.115.02h When any excavation is performed below rue bottom of tie elevation, ill in the opinion of Railway's representative, muck: or other Railway facilities may be subject to movement or settlement. • I .05.02c When stork in ally wily interferes \vith the safe operation of trains it timetable speeds. • I.05.02d When any hazard is presented to Railway track, communications, signal, electrical, or other l'acilities either due to persons. material, equipment or blasting in the vicinity. Form 01DE; Psv. itiCilOtIOE Lal, Deparnnent Approved ° 1.05.02e Special permission must be obtained from the Ra!l:cav before moving heavy or cumbersome objects ar equipment which might result in making the track impassable. • 1.05.03 Flagging services will be pet -Rini -led by qualified Railway naggers. • 1.05.03a Flagging crew generally consists of -one employee. However. additional personnel may be required to protect Railway Property and operations. if -deemed necessary by the Railways Representative. • I.05.03b Each time a flagger is called. the minimum period for billing will be. the eight (f) hour basic clay. • 1.05.03c The cost of nagger services provided by the Railway, when deemedtheRailway's necessary h�, representative, will be borne by the Contractor. The estimated cost for one (I) nagger is 5800.00 for an eight (8) hour basic day with time and one-half or double time for overtime. rest days and holidays. The estimated cost for each nagger includes vacation allowance, paid holidays, Railway and unemployment insurance, public liability and property damage insurance, health and welfare benefits, transportation. meals. lodging and supervision. Negotiations for Railway labor or collective bargaining agreements and rate changes authorized by appropriate Federal authorities may increase actual or estimated flagging rates. The nagging rate in effect at the time of performance by the. Contractor hereunder will be used to calculate the actual costs of nagging pursuant to this paragraph. • 1.05.03d The average train traffic on this route is 7 freight trains per 24-hour period at a timetable speed 2f MPH and 0 passenger trains at a timetable speed of 0 MPH. 1.06 Contractor General Safety Requirements 1.06.01 Work in the proximity of railway track(s) is potentially hazardous where movement of trains and equipment can occur at any time and in any direction. All work performed by contractors within 25 feet of any track must be in compliance with ERA Roadway Worker Protection Regulations. • 1.06.02 Before beginning any task on Railway Property, a thorough job safety briefing must be conducted with all personnel involved with the task and repealed when the personnel or task changes. If the task is within 25 feet of any track, the job briefing must include. the Railway's flagger, as applicable, and include the. procedures the Contractor will use to protect its employees, subcontractors, agents or invitees front moving any equipment adjacent to or across any Railway track(s). • 1.06.03 Workers must not work within 25 feet of the centerline of any track without an on track safety strategy approved by the Railway's Project. Representative. When authority is provided, every contractor employee must know: (I) who the Railway flogger is, and how to contact the flagger, (2) limits of the authority, (3) the method of communication to stop and resume work, and (4) location of the designated places of safety. Persons or equipment entering flag/work limits that were not previously job briefed, must notify the flogger immediately, and be given a job briefing when working within 25 feet of the center line of track. • 1.06.04 When Contractor employees are required to work on the. Railway Property after normal working hours or on weekends, the Railroad's representative in charge of the project must he notified. A minimum of two employees must be present at all times. • 1..06.05 Any employees, agents or invitees of Contractor or its subcontractors under suspicion of being under the influence of drugs or alcohol, or in the possession of sante. will be removed from the Railway's Property and subsequently released to the custody of a representative of Contractor management. Future access to the Railway's Property by that employee will be denied. • 1.06.06 Any damage to Railway Property, or any hazard noticed on passing n-abts must be reported immediately to the Railway's representative in charge. of the project. Any vehicle or machine which may come in contact with track. signal equipment, or structure (bridge.) and could result in a train derailment must he Form 0106 Rev. 06/01/05 Det)anintnit reported immediateb.r to the Railway representative in charge of the proiect and to the Rail..\ ay's Resource Operations Center at if.800n 832-5452. Local einergencv nunthers arc to he obtained from the Railway representative in charge of the project prior to the star of any work and must he posted at the job site. • 1.06.07 For safety reasons. all persons at prohibited from having pocket knives, firearms or other ,deacily weapons in their possession while working on Railv.,a's Property. • 1.06.08 All personnel protective equipment IPPE1 used on Railway Property must meet applicaNc OSHA and ANSI speciflcadons. Current Railway personnel proteclive equipment requirements are listed on the web site. howev-er 0 partial list of the requirements include: 2.1 safety classes with permanently affixed side shields no yellovr lenses): b) hard hats ct safety shi.,e with, hardened toes. above -the -ankle lace -up and a defined heel: and d) high visibility retro -reflective work wear. The Railroad's representative in charge of the project is to he contacted regarding local specifications for meeting requirements relating to hi -visibility work wear. Hearing protection, all protection, gloves, and respirators must be wont as required by State and Federal regulations. (NOTE - Should there be a discrepancy between the information contained on the web site and the information in this paranraph. the web site will novern.1 • 1.06.09 THE CONTRACTOR MUST NOT PILE OR STORE ANY MATERIALS. MACHINERY OR EQUIPMENT CLOSER THAN 25'-0- TO THE CENTER LINE OF THE NEAREST RAILWAY TRACK. MATERIALS. MACHINERY OR EQUIPMENT MUST NOT RE STORED OR LEFT WITHIN 250 FEET OF ANY HIGHWAI/RAIL AT -GRADE CROSSINGS, WI-JERE STORAGE OF THE SAME WILL OBSTRUCT THE VIEW OF A TRAIN APPROACHING THE CROSSING. PRIOR TO BEGINNING WORK, THE CONTRACTOR MUST ESTABLISH A STORAGE AREA WITH CONCURRENCE OF THE RAILROAD'S REPRESENTATIVE. • 1.06.10 Machines or vehicles must not be left unattended with the engine running. Parked machines or equipment must be in gear with brakes set and if equipped with blade. pan or bucket, they Joust be lowered to the ground. All machinery and equipment left unattended on Railway's Property must be left inoperable and secured against movement. (See internet Engineering Contractor Safer Orientation program lot more detailed specifications') • 1.06.11 Workers must not create and leave any conditions at the work site that would interfere with water drainage. Any work performed over water must meet all Federal. State and Local regulations. • 1.06.12 All power line wires must be considered dangerous and of high voltage unless informed to the contrary by proper authority. For ail Dower lines the tninimum clearance between the lines and any pan of the equipment or load must be; 200 KV or below - 15 feet; 200 to 350 KV - 20 feet; 350 to 500 KV - 25 feet, 500 to 750 KV - 35 feet: and 750 to 1000 KV -45 feet. If capacity of the line is riot known, a minimum clearance of 45 feet must he maintained. A person must be designated to observe clearance, of the equipment and give a timely warning for all operations where it is difficult for an operator to maintain the desired clearance by visual means. 1.07 Excavation • 1.07.01 Before excavating, the Contractor must determine whether any underground pipe lines, electric wires, or cables, including fiber optic cable systems are present and located within the Project work area. The Contractor must determine whether excavation on Railway's Property could cause damage to buried cables resulting in delay to Railway traffic and disruption of service to users. Delays and disruptions to service. mar cause business interruptions involving loss of revenue and profits. Before commencing excavation, the Contractor must contact Ts.7n-eseritm"i't,e ::2.06-62f.:-.6189). All underground and overhead wires will he considered HIGH VOLTAGE and dangerous until verified with the company having ownership of the line. It is the Contractor's responsibility to notify any other companies that have underground utilities in the area and arrange for the location of all underground utilities before excavating. • 1.07.02 The Contractor must cease all work and notify the Railway immediately before continuin2 excavation Form 0106 Rev. obrotios Law Deparnnent Apuroved a the area. if obstructions are encountered which do not appear on drawings. It the obstruction is a utility and the owner of the utility can be identified, then the Contractor must also notify the owner immediately. if there is any doubt about the location of underground cables or lines of any kind, no work must he performed until the exact location has been determined. There will he no exceptions to these instructions. • 1.07.03 All excavations must he conducted in compliance with applicable OSHA regulations and, regardless of depth, must be shored where there is any danuer to tracks. structures or personnel. • 1.07.04 Any excavations, holes or tranches on the Railway's Property must he covered, guarded and/or protected when not beim, svorked on. When leaving work site areas at night and over weekends, the areas must be secured and left in a condition that will ensure that Railway employees and other personnel who may be working or passing through the area are protected from all hazards. Ali excavations must he hack filled as soon as possible. 1.08 'Hazardous Waste, Substances and Material Reporting • 1.08.01 If Contractor discovers any hazardous waste, hazardous substance, petroleum or other deleterious material, includint, hut not tirnite.d to any non -containerized commodity or'material. on or adiaccnt to Railway's Property, in or near- any surface water, swamp, wetlands or waterways, while. performing any work under this Agreement, Contractor must immediately: (a) notify the Railway's Resource Operations Center at l (800) 832-5452, of such discovery: (b) take safeguards necessary to protect its employees, subcontractors, agents and/or third parties: and (c) exercise due care with respect to the release, including the takinc of any appropriate measure to minimize the impact of such release. 1.09 Personal Injury Reporting 1.09.01 The Railway is required to report certain injuries as a part of compliance with Federal Railroad Administration (FRA reporting requirements. Any personal injures• sustained by an employee of the Contractor, subcontractor or Contractor's invitees while on the Railway's Property must be reported immediately (by phone mail if unable to contact in person) to the Railway's representative in charge of the project. The Non -.Employee. Personal injury Data Collection Form contained herein is to be completed and sent by Fax to the Railway at 1(817) 352-7395 and to the Railway's Project Representative no later than the close of shift on the date of the injury. Form 0106 Rev. 06101!05 1)erum ArTrovii 7\10N-EN1P 1 OYE1-1 PERSONAL 1,11:1•01 D Al A COLLECTION INF(..)P,N1..ATION REQUIRED TO BE ODLLECTED PURSUANT To io )LR -\L REGT,M.,\TIC.)N. IT SHOULD 1.TSED FOR COMPLIANCE WITH FEDERAL REGI 7I...,,C11ONS ONLY AND IS NC I- INTENDED TO PRESUME CCEPTANCF [2.)F RESPONSIBILITY (:)R LiAHILITN. I. .Accicirn. CnyiSt (if non-kanw2y Sociai 6. N' fl1:31. first. mi.) 7. .Adcirtss.. "Strt:a..!.1: Dan:! of rBir[i-i: 2.Inn. lime 3. Tcn1-altir..7 4. \Vcatlici- 9. injury: (ii I rcerntioi. CD) Hand') aili.1,or (if .n.ailahl) I Dtn;cription of .Ao.c.icienT in include location. 2 Son.Aid Only Scored 17eatin.:01 Trcalme.nt 13. Dr. 14. Dr..Addrt!'ss: Stre.et: 15. Hospital (1.-!', Body lee Zip I N. Hospital .Address: COV: Zip: 17. Diainosis: FAX TO RAILWAY AT (SIT; 352-7595 AND COPY TO R41LWAT ROADMASTER FAX Form 0106 Rev. 061C..)1/05 La„ Department Approved BNSF RAILWAY COMPANY Attention: Manatter Public Projects Railway File: EXHIBIT "C-1" Agreement Between BNSF RAILWAY COMPANY and the CONTRACTOR Agency Project: Martin Luther king. Jr. Boulevard Underpass Gentlemen: The undersigned (hereinafter called, the "Contractor"), has entered into a contract (the "Conn'act")dated , 200. with City of Yakima for the performance of certain work in connection with the following project Martin Luther King, Jr. Boulevard Underpass. Performance of such work will necessarily require contractor to enter BNSF RAILWAY COMPANY ("Railway") right of way and property ("Railway Property.'). The Contract provides that no work will he commenced within Railway Property until the Contractor employed in connection with said work for City of Yakima (i) executes and delivers to Railway an Agreement in the form hereof, and (ii) provides insurance of the coverage and limits specified in such Agreement and Section 3 herein. if this Agreement is executed by a party who is not the Owner. Genera) Partner. President or Vice President of Contractor. Contractor must furnish evidence to Railway certifying that the signatory is empowered to execute this Agreement on behalf of Contractor. Accordingly, in consideration of Railway granting permission to Contractor to enter upon Railway Property and as an inducement for such entry. Contractor. effective on the date of the Contract, has agreed and does hereby agree with Railway as follows: Section 1. RELEASE OF LIABILITY AND INDEMNITY Contractor hereby waives, releases, indenmifics, defends and holds harmless Railway for all judgments, awards, claims, demands, and expenses (including attorneys' fees), for injure or death to all persons, including Railway's and Contractor's officers and employees, and for loss and damage to property belonging to any person, arising in any manner from Contractor's or any of Contractors subcontractors' acts or omissions or any work performed on or about Railway's property or right-of-way. THE LIABILITY ASSUMED BY CONTRACTOR WILL NOT BE AFFECTED BY THE FACT, IF IT IS A FACT, THAT THE DESTRUCTION, DAMAGE, DEATH, OR INJURY WAS OCCASIONED BY OR CONTRIBUTED TO BY THE NEGLIGENCE OF RAILWAY, iTS AGENTS, SERVANTS, EMPLOYEES OR OTHERWISE, EXCEPT TO THE EXTENT THAT SUCH CLAIMS ARE PROXIMATELY CAUSED BY THE INTENTIONAL MISCONDUCT OR GROSS NEGLIGENCE OF RAILWAY, THE INDEMNIFICATION OBLIGATION ASSUMED BY CONTRACTOR INCLUDES ANY CLAIMS, SUITS OR JUDGMENTS BROUGHT AGAINST RAILWAY UNDER THE FEDERAL EMPLOYEE'S LIABILITY ACT, INCLUDING CLAIMS FOR STRICT LIABILITY UNDER THE SAFETY APPLIANCE ACT OR THE BOILER INSPECTION ACT, WHENEVER SO CLAIMED. Contractor further agrees, at its expense, in the name and on behalf of Railway, that it will adjust and settle all claims made against Railway, and will, at Railway's discretion, appear and defend any suits or actions of law or in equity brought against Railway on any claim or cause of action arising or growing out of or in any manner connected with any liability assumed by Contractor under this Agreement for which Railway is liable or is alleged to be liable. Railway will give notice to Contractor, in writing, of the receipt or dependency of such claims and thereupon Contractor must proceed to adjust and handle to a conclusion such claims, and in the event of a suit being Form 010E Rev. 06/01/05 1)epartnient :'oueiit sins: Railway. Roilsas ios brward sumninms ;nici COMpiailli or other FWOCt2SS in connection therewith to Contractor. and Contractor. at Railway's discretion, must defend, adjust, or seule such suits and protect, indemnify. and SaVC2 harmless Railway front and against all damages, judgments, decrees. attorney's fees. costs. and expenses growing out of or resulting From or incident to any such clainis or suits. it is mutually understood and agreed that the assumption of liabilities and indemnification provided for in this Agreement survive any tertinination of this Agreement. Section 2. TERM This .Agreement is effective from flit date of the Contract until I:F) the completion of the project set fOrth herem, and (ii.) full and complete payment to Railway of any and all sums or other amounts owing and due hereunder. Section 3, INSUR,ANCE Contractor must, at its sole cost and expense, procure and maintain during the life of this Agreement the following insurance coverage: A. Commercial General Liability insurance. This insurance must contain broad form contractual liability with a combined single limit of a minimum of 52.000,000 each occurrence and an aggregate limit of at least $4,000,000. Coverage must be purchased on a post I 99S ISO occurrence /OM or equivalent and include coverage for. but not limit to the following: • Bodily Injury and Pro!_-)erry Damage: • Personal Injury and Advertising Miury • Fire legal liability • Products and completed operations This policy must also contain the following endorsements. which Inust be indicated on the certificate of insurance: • It is agreed that any workerscompensation exclusion does not apply io Railroad payments related to the Federal Employers Liability Act or a Railroad Wage Continuation Program or similar programs and any payments 'node are deemed 110i to be either payments 'node or obligations assumed under any Workers Compensation, disability benefits, or unemployment compensation iaw or similar law. • The. definition of insured contract must be amended to remove any exclusion or other limitation for any work being done within 50 Feet of railroad property. • Any exclusions related to the explosion. collapse and underground hazards must be removed. No other endorsements limiting coverage as respects obligations under this_Agreement may be included on the policy. B. Business Automobile Insurance. This insurance must contain a combined single limit of at least $1.000.000 per occurrence, and include coverage for, but not limited to the following: • Bodily injury and property damage • Any and all vehicles owned, used or hired C. Workers Compensarion and Employers Liability insurance including coverage for, but not limited to: • Washington's statutory' liability under the worker's compensation laws of the state(s) in which the work is to he performed. If optional under State law, the insurance must cover all employees anyway. • Employers' Liability (Part B) with limits of at least $500,000 each accident. 5500.000 by disease policy limit. S500,000 by disease each employee. Form 0106 Rev. 06/01.105 Law Department Approved D. Railroad Protective Liability insurance naming only the Railroad as the insured with coverage of at least 32.000,000 per occunience and 36.000.000 in the aggregate. The policy Must be issued on a standard ISO form CO 00 35 10 93 and include the following: • Endorsed to include the Pollution Exclusion Amendment (ISO form CO 28 3 1 10 93) • Endorsed to include the Limited Seepage and Pollution Endorsement. • Endorsed to remove any exclusion for punitive damages. • No other endorsements restricting coverage niav be added. • The original policy must be provided to the Railroad prior to performing any work or services under this Agreement Other- Requirements: All policies (applying to coverage listed above) must not contain an exclusion for punitive damages and certificates of insurance must reflect that no exclusion exists. Contractor agrees to waive its right of recovery against Railroad for all claims and suits against Railroad. In addition, its insurers, through the terms of the policy or policy endorsement, waive their right of subrogation against Railroad for all claims and suits. The certificate of insurance must reflect the waiver of subrogation endorsement. Contractor further waives its right of recovery, and its insurers also waive their right of subrogation against Railroad for loss of its owned or leased property or property under contractor's care. custody or control. Contractor's insurance policies though policy endorsement, must include wording which states that the policy is primary and non-contributing with respect to any insurance can-ied by Railroad. The certificate of insurance must reflect that the above wording is included in evidenced policies. All policy(ies) required above (excluding Workers Compensation and if applicable, Railroad Protective) must include a severability of interest endorsement and Railroad must be named as an additional insured with respect to work performed under this agreement. Severability of interest and naming Railroad as additional insured must be indicated on the certificate of insurance. Contractor is not allowed to self -insure without the prior written consent of Railroad. If granted by Railroad, any deductible, self-insured retention or other financial responsibility for claims must be covered directly by contractor in lieu of insurance. Any and all Railroad liabilities that would otherwise, in accordance with the provisions of this Agreement, be covered by contractor's insurance will be covered as if contractor elected not to include a deductible, self-insured retention or other financial responsibility for claims. Prior to commencing the Work, contractor must furnish to Railroad an acceptable certificate(s) of insurance including an original signature of the authorized representative evidencing the required coverage, endorsements, and amendments and referencing the contract auditlfolder number if available. The policy(res) must contain a provision that obligates the insurance cotnpany(ies) issuing such policv(ies) to notify Railroad in writing at least 30 days prior to any cancellation, non -renewal, substitution or material alteration. This cancellation provision must be indicated on the certificate of insurance. Upon request front Railroad, a certified duplicate original of any required policy must be furnished. Contractor should send the certificate(s) to the following address: BNSF RISK MANAGEMENT 2500 Lou Menk Drive AC/B-1 Fort Worth. TX 76131-2828 Fax: 817-352-7207 Any insurance policy must be written by a reputable insurance company acceptable to Railroad or with a current Best's Guide Rating of A- and Class VII or better, and authorized to do business in the state(s) in which rhe service is to be provide. Form 0106 Rev. 06/01/05 Las%% Lienart hent Appy. \ ed Contractor represents that this Agreement has been thoroui2,hiv reviewed be- contractor's insUra71Ce ?en (srbroiset-1s). who have been instructed he contractor to procure die insurance coverage reedited by this Agreement Allocated Loss Expense must be in addition to all policy limits for coverages referenced above. Not more ire0uetttly than once every t \ . ,'ears, Railroad may reasonably modify. the required insurance coverage to reflect then -current risk management practici.,in the railroad induslri and underwriting practices in the insurance nlidUSr(V. - its any portion of the operation is to he subcontracted by ctintrac-io r. contractor must require that the subcontractor provide and maintain the insurance Coverages set forth herein. minllnc Railroad as an additional insured, and requiring that the subcontractor ctor release, defend and indemniP,' Railroad to the same extent and under the; ante tcritis and conditions as contractor is required to release, defend and indemnify Railroad herein. Failure to provide evidence as rcauire-d by this section will entitle. but not requir. Railroad to terminate this Agreement immediately. itely. Acceptance of a certificate that does not comp;_' with this section ss ill not operate as a waiver of contractor's obligations hereunder. The fact that insurance (including, without limitation, self-insurance) is obtained be contractor will not be deemed to release or diminish the liability of contractor including. without limitation. liability under the indemnite' provisions of this Agreement. Damages recoverable by Railroad will not be limited b; the amount of the required insurance coverage. For purposes of this section, Railroad means -Burlington Northern Santa Fe Corporation-. " RNSF RAILWAY t -Uy4PANI" and the subsidiaries, successors.assigns and affiliates of each. Section 4. EXHIBIT "C" CONTRACTOR REQUIREMENTS The Contractor must observe and comply with all provisions, obligations. requirements and limitation contained in the Contract and the Contractor Requirements set forth on Exhibit "C" attached to the Contract and this Agreement.. including, but not be limited to. payment of all costs incurred for any damages to Rail va'c roadbed, tracks. and/or appurtenances thereto. resulting from use. occupancy, or presence of its et tnlo•,.ee , rePrtscnialives. rlt agents or subconn-actors on or about the construction site. Section 5. TRAIN DELAY Contractor is responsible for and hereby indemnities and holds harmless Railway (including its affiliated railway companies, and its tenants) for, from and against all damages arising from any unscheduled delay to a freight or passenger train which affects Railway's' ability to fully utilize its equipment and to meet customer service and contract obligations. Contractor will be billed, as further provided below, for the economic losses arising from loss of use of equipment, contractual loss of incentive pay and bonuses and contractual penalties resulting front train delays, whether caused by Contractor, or subcontractors, or by the Railway performing wort: under this Agreement. Railway agrees that it will not perform any act to unnecessarily cause train delay. For loss of use of equipment, Contractor will be billed the current freight train hour rate per wain as determined from Railivae"s records. Any disruption to train traffic may cause delays to multiple trains at the same time for the same period. Additionally. the parties acknowledge that passenger. U.S. mail trains and certain other grain, intermodal, coal and freight trains operate under incentive/penalty lty contracts between Railway and its customer(s). Under these arrangements, if Railway_ does not meet its contract service commitments, Railway may suffer loss of performance or incentive. pay and/or he subject to penalty payments. Contractor is responsible for any train performance and incentive penalties or other contractual economic losses actually incurred by Railway which are attrtibutable to a train delay caused by Contractor or its subcontractors. The contractual relationship between Railway and its customers is proprietary and confidential. In the event of a train delay covered by this Agreement, Railway will share information relevant to any train delay to the extent consistent with Railway confidentiality obligations. Damages for train delay for certain trains may be as high as $50,000.00 per incident. Form 01106 Res' 06/01"05 Law Department Approved Contractor'and its subcontractors must give Railway's representative four 14) weeks advance notice of the times and dates for proposed work windows. Railway and Contractor will establish mutually agreeable work windows for the project. Railway has the right at any time to revise or change the work windows due to train operations or service obligations. Railway will not he responsible for any additional costs or expenses resulting from a change in work windows. Additional costs or expenses resulting from a change in work windows shall be accounted for in Contractor's expenses for the project. Contractor and subcontractors must plan, schedule, coordinate and conduct all Contractor's work so as to not cause any delays to any trains. Kindly acknowledge receipt of this letter by signing and returning to the Rails, ay two original conies of this letter, which, upon execution by Railway. \vill constitute an A rcetnent between us. (Contractor) [3NSF Railway Company By: By: Printed Name: Name: Title: Contact Person: Address: City: State: Zip: Fax: Phone: E-mail: Manager Public Projects Accepted and effective this day of 20 Form 0106 Rev. 06/01/05 1..)c3...mrnerit • EXHIBIT D Form 0106 Rev. 36/0.,V05 BNSF ENGINEERING SUMMARY REPORT ' • ' * ' NOTE NOTE' * * ' * " * *" FOR INTERNAL USE ONLY LOCATION PLANITEM NUMBER : PROPERTY OF OPERATED BY JOINT FACILITY % BILLABLE (+/-): YAKIMA 000155524 BNSF RAILWAY COMPANY BNSF RAILWAY COMPANY CITY OF YAKIMA 0100.0 LINE SEGMENT MILEPOST DIVISION SUBDIVISION TRACK TYPE TAX STATE SPONSOR : 48 00089.0 TO 30091.3 : NW YAKIMA VALLEY S : WA VP ENGINEERING ...... NOTE '." NOTE APE NUMBER RFA NUMBER CPAR NUMBER BUDGET YEAR. BUDGET CLASS REPORTING OFFICE CENTER/ROLLUP 7409109 5985209 C1.001601 2009 117 52555 PURPOSE, JUSTIFICATION AND DESCRIPTION PIP - BRIDGE INSPECTION - LS 45 - MS 59 - 91 - YAKIMA VALLEY SUB - NORTHWEST NORTH DIVISION - 100% BILLABLE TO CITY OF YAKIMA. ... NOTE LABOR COSTS MATERIAL COSTS OTHER COSTS TOTALS "....".*****.... . ' ... * FOR INTERNAL USE ONLY « * * * * NOTE CASH CAPITAL NONCASH CAPITAL OPERATING EXP REMOVAL COST I 0 0 0 0 0 0 0 SYSTEM MAINTENANCE AND PLANNING - KANSAS CITY ESTIMATE REF. NUMBER : 5985209 ESTIMATED BY : Si.trrmN BILLABLE TOTALS 0 0 0 75,000 0 75,000 0 75,000 75,000 PRINTED ON : 12/14/2009 COSTING DATE 12/14/2009 PRINTED BY : �N._. ENGINEERING ._J.:.A-.. REP -ORT 1 FOR INTERNAL . ;E ONLY LOCATION _AKIMA. LIN_ SEGMENT . _E NU<EER 74C.j9109 II _.. 9QC.....0 P A NUIIEER 1,990 enc PLP^-sdT"?'EDi :;JiiB=P, 00015.'3524 MILEPOST .G TO _ PROPERTY _F ENSF RAIL4:A'i COMPANY DIVI_ION . ... __. _EF_ BGG=E__ OPERATED __ ENS. COMPANYRAILWAY SUE."IVISION _AK_:tA VALLEY EUDGE': _E_lAR ii'y % RILL JOINTFACILITY OF _AKIFIA TRACKTYPEU D T CLASS _ II.L_ -%- G1O G.. T.'-".. STATE F ] C 1 SPONSOR ENGINEERING __NTE ... O_L'.__ c_ I ..-.EC . TOTALS ALS F'OR R .A ---. GANG TYPE _..S}: NAME STRAIGHT HOURS OVERTIME MATERIAL TOTALS .v.. REA NOTE, MA..TL WITH VAR CODE •• .BUST RE FIE:,- ORDERED .,.-.TERI-.L TYPE QTY UOQ; AR CODE CASH OTHER TOTALS FOR ETA --- ' GANG TYPE OTHER DES_ N)M SASE COST GANGNO =_ NEEDED CONTRACT - EP.IDG_ INSPECTION _ .G LS ?„ II I3NSF ENGINEERING SUYIMI: K REPORT LOCATION: YAKIMA PLANITEM NUMBER : 000159.50 PROPERTY OF : BNSF RAILWAY COMPANY OPERATED BY /INS!' RAILWAY COMPANY JOINT FACILITY : CITY OF YAKIMA 070 BILLABLE (-,-) : 110,0 LINE SEGMENT: 49 MILEPOST 09.0 TO 910 DIVISION : NW SUBDIVISION : YAKIAIA VALLEY TRACK TYPE S TAX STATE : WA. SPONSOR : VP ENGINEERING AFENUMBER: RFA NUMBER 5907010 CPAR NUMBER : C0000009 BUDGET YEAR : 2010 BUDGETCLASS :6 REPORTING OFFICE : 716 CENTER:ROLLUPS3555 PURPOSE, JUSTIFICATION .AND DESCRIPTION PLAN ITEM TRACK - BUILD SHOOFLY AROUND PROPSEi) UNDERPASS GRADE SEPARATION PROD USING TK PANELS FROM PREY UNDERPASS PRO) REBUILD TK ACROSS NEW RR BRIDGE - LS 40 - MP 09 - 91 - YAKIMA VALLEY SUB - N\ N. DIV - 1005 BILLABLE TO CITY OF YAKIMA LINE SEG BEG MP END MP BEGIN STATION END STATION PROJECT TYPE BUD 000153355 49 09.0 91.0 YAKIMA ':-AKIIA PUBLIC IMPROVEMENT PROJECT 2u10 LABOR COSTS MATERIAL COSTS OTHER COSTS TOTALS CASH CAPITAL NONCASH CAPITAL OPERATING EXP REMOVAL COSTS RILI.ARI.F TOTALS 0 0 0 0 32.724 522,724 0 0 0 0 644:.4 64,454 0 0 0 0 33.786 33.736 0 0 0 .0 130.964 130,964 SYSTEM MAINTENANCE AND PLANNING - KANSAS CITY ESTIMATE REF. NUMBER: 5907010 COSTING DATE: 01;01:2010 Page 1 of 2 PRINTED ON: 01/04,2010 ESTIMATED BY: STEFFEN PRINTED BY: STEFFEN ORAL ENGINEERING SU.NI REPORT LOCATION : YAKIMA PL.ANITEM NUMBER : 000 I SF3ss PROPERTY OF BLASE RAILWAY COMPANY OPERATED BY : RASP RA IL AS CCI PAN', JOINT FACILITY : CITY OF YAKIMA BILLABLE 100 0 I_INF. SEGNIENT . MILEPOST . S9.0 'IS') 91.0 DIVISION . NW CUB! /IVISION : YAKINIA VALLEY TRACK TYPE S TAN S1 A.115 : WA SPONSOR VP ENGINEERING APE NUNIBER REA NUMBER : 5907(,10 (TAR NI.IMBER : C0000002 BUDGET YEAR : 2010 BUDGET CLASS : 6 REPOR-FING OFFICE : 716 CENTER.:KOLLLIP : S-3555 LABOR TOTALS FOR REA GANG TYPE TASK NAN1E STR.AIGHT HOURS OVERTIME HOURS WELDING GANG, 2 NI -UN SECTION GANG (5 MAN) SECTION GANGS MAN) ' SECTION GANG (S MAN) MmSEAUNsi 1.iANU IN MAN) UNLOADING GANG. (3 MAN) UNLOADING GANG. (5 MAN) UNLOADING GANG. IS N1AN) WORKTRAIN CREW (N MAN) WORKTRAIN CREW (3 mAN) PLACE FIELD WELDS cAp REPLACE CROSS TIES - CAP REPLACE TRACK PANELS - CAP PLACE RAIL/01 SURFACE TRACK - REPLACEMENT CAP UNLOAD BALLAST - Ri)PI.AC'LNIEN F - CAP UNLOAD TRACK PANELS • ADD! TION UNLOAD RA IL/OTNI - ADDITION - CAP WORK TRAIN - BALLAST - REPLACEN1ENT - CAP WORK TRAIN • TRACK PANELS - ADDITION 16,0 0 40 0 2no 255 zi 36.0 100 0 64.0 36,0 4F 0 0.0 0.0 0 0 o II 0.0 0.0 IS 0 24 0 MATERIAL TOTALS FOR EPA NOTE: MATI. WITH VAR CODE " MUST BE FIELD ORDERED NLATERI Al TYPE QTY SION1 VA R CODE CASH BALLAST, SPRAGUE. WA (MTN. NO -N. EWE. JOINT, COMPROMISE. I IS LbILLB, LI!. 31_ JOINT. COMPROMISE. 115 1_1:4112 LB, RH. IR A 2R FLAIL. 136 LB NEST WELDED. PREMIUM : RAIL. TRANSNI.H.2S FT. 130-1(4 WORN 115 RAIL, TRANSN.RH.25 FT, 136-1;4 WORN 115 TIE. TRK.10FT.PRE-PLATED. PANDROL. ('IN. ROUND HOLE TIP, Tit I.: GE nF 'FEE ATFD,HARDWOC,D.S.5 FT TRACK PANEL. 136 STANDARD RAIL. 40 PT -GRADES TIES- WELDKIT, GENERIC FOR ALL RAIL WEIGHTS I 200.0 2.0 2.0 40o.o 2.0 CO 20,0 III 2.0 20.0 NT PR FR LE EA EA EA EA EA KT S S492.0 031 S 375.0 C F776.0 S 2S17.0 2S17.0 S 2400.0 S 5657.0 S SS64 Cl S 1390.0 OTHER TOTALS FOR REA GANG TYPE (MER DESC QTY UOM NI O BASE COST NO GANG NEEDED NC) GANG NEEDED CRANE RENTAL LOADER RFNTAI Page 2 of 2 1.0 In ES LS 0 0 S 4000 O 12000 CEPS PLAN ITEM DOCUMENT LOCATION . PLANITEM NUMBER : PROPERTY OF OPERATED BY: JOINT FACILITY : % BILLABLE REQUESTOR ID: PROJECT TYPE - DOT NUMBER : YAKIMA To FLAGGING PIR099 I 64S BNSF RAILWAY COMPANY BNSF RAILWAY COMPANY CITY OF YAKIMA 100.0 U225 PIP 099164S LINE SEGMENT : 4S MILEPOST : 90.14 DIVISION : NW SUBDIVISION : YAKIMA VALLEY ENGR. DIVISION : NORTHWEST NORTH TAX STATE : WA, CO: YAKIMA MATL DATE : LOCATION CODE : 513021 TRACK TYPE : S AFE NLMBER : RFA NUMBER : CPAR NUMBER : BUDGET YEAR : BUDGET CLASS : REPORTING OFFICE : SPONSOR : DEPT CODE : DERAILMENT CODE : 59159(19 C$090 ISO 2009 117 VP ENGINEERING MOWGH PURPOSE. JUSTIFICATION AND DESCRIPTION FLAGGING - NORTHWEST NORTH DIV - YAKIMA VALLEY SUB - LS - MP 90.14 - RDM VULGAS DESCRIPTION OF PROJECT AS PROVIDED BY PROJECT ENGINEER FLAGGING FOR MLK UNDERPASS BILLING FOR THIS PROJECT SHOULD BE DIRECTED TO: 1001'o BILLABLE TO CITY OF YAKIMA - REOLIESTOR RUSTY OLSON MAINTAIN PROPRIETARY CONFIDENTIALITY THE PHYSICAL LIMITS OF THIS PROJECT ARE DESCRIBED BY LINE SEGMENT, MILE POST RANGES, AND IN SOME CASES TRACK NUMBER. THIS IS THE PRIMARY AREA FOR THE PROJECT. THERE WILL BE CASES WHERE WORK MAY OCCUR BEYOND THE DEFINED LIMITS. PROJECTS THAT INCLUDE SIGNAL, ELECTRICAL, OR TELECOMMUNICATION EQUIPMENT MAY REQUIRE ACTIVITY BEYOND THESE DEFINED TRACK LIMITS. ALL OR PORTIONS OF SOME PROJECTS MAY OCCUR IN AREAS WHERE NO MILEPOST SIGNS EXIST SUCII AS YARDS. THIS ESTIMATE IS 0001) FOR 90 DAYS. THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR. MATERIAI.. AND OVERHEAD. CASH CAPITAL NONCASH CAPITAL OPERATING EXP REMOVAL COSTS BILLABLE TOTALS LABOR COSTS MATERIAL COSTS OTHER COSTS TOTALS0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 63.632 63,632 0 7.063 70.695 0 7.063 70,695 SYSTEM MAINTENANCE AND PLANNING - KANSAS CITY ESTIMATE REF. NUMBER : PTR099 I 64S - I -59-2L COSTING DATE : 02/11/2009 PRINTED ON : 01/04/2010 ESTIMATED BY : STEFFEN PRINTED BY STEFFEN .ACCT (11511 SN PPE DESCI1J IP -HON QTY 'ST 07 'CM \Sft NONCASH (PIE RE:IMOVAL 12:1 FLAGGING - OTHER R.o r.AP LABOR SI RIO • ADDITIVES PAYROLL ASSOCIATED COSTS EQUIPMENT EXPENSES DA LABOR OVERHEADS INSURANCE EXPENSES 16,1.1 1111,1:1 12.521 10.532 19.537 2.861 • GANG SUBTOTAL FLAGMAN -1M - FLAGMAN. I MAN 63,632 0 0 0 PROJECT SUBTOTAL 63.632 0 0 0 CONTINGENCIES 6.363 0 o 0 BILL PREPARATION FEE 700 0 0 0 PROJECT GROSS COST LESS COST PAID BY OTHERS 70.695 711.695 0 0 PROJECT NET COST 0 0 MAINTAIN PROPRIETARY CONE![)EN TIALiTY " IiNSF RAILWAY COMPANY FHPM ESTIMATE FOR CITY OF YAKIMA LOCATION YAKIMA TO FLAGGING DETAILS OF ESTIMATE PLAN ITEM : PTR09916 S VERSION : I PURPOSE. JUSTIFICATION AND DESCRIPTION FLAGGING - NORTHWEST NORTH DIV - YAKIMA VALLEY SUB - LS 48 - MP 90.14 - RDM VULGAS DESCRIPTION OF PROJECT AS PROVIDED BY PROJECT ENGINEER FLAGGING FOR SILK UNDERPASS BILLING FOR THIS PROJECT SHOULD BE DIRECTED TO, 100% BILLABLE TO CITY OF YAKISIA - REQUESTOR RUSTY OLSON MAINTAIN PROPRIETARY CONFIDENTIALITY THE PHYSICAL LIMITS OF THIS PROJECT ARE DESCRIBED BY LINE SEGMENT. MILE POST RANGES. AND IN SOME CASES TRACK NUMBER. THIS IS THE PRIMARY AREA FOR THE PROJECT. THERE WILL BE CASES WHERE WORK MAY OCCUR BEYOND THE DEFINED LIMITS. PROJECTS THAT INCLUDE SIGNAL, ELECTRICAL, OR TELECOMMUNICATION EQUIPMENT MAY REQUIRE ACTIVITY BEYOND THESE DEFINED TRACK LIMITS. ALL OR PORTIONS OF SOME PROJECTS MAY OCCUR IN AREAS WHERE NO MILEPOST SIGNS EXIST SUCH AS YARDS. THIS ESTIMATE IS GOOD FOR 90 DAYS. THEREAFTER THE ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR. MATERIAL, AND OVERHEAD. . DESCRIPTION QUANTITY U/SI COST TOTAL S LABOR FLAGGING - OTHER R.O. W.- CAP PAYROLL ASSOCIATED COSTS EQUIPMENT EXPENSES DA LARCIR OVERHEADS INSURANCE EXPENSES MATERIAL OTHER 800.0 MH 18,151 12.521 10,532 19.537 2,561 TOTAL LABOR COST 63.632 63.62•2 TOTAL MATERIAL COST 0 0 TOTAL OTHER ITEMS COST 0 0 PROJECT SUBTOTAL 63.632 CONTINGENCIES 6.363 BILL PREPARATION FEE 700 GROSS PROJECT COST LESS COST PAID BY BNSF 70,695 0 TOTAL BILLABLE COST 70.695 RA /L 14/A `74 S Date: 10.08.2012 Douglas Mayo, PE City Engineer 129 N 2nd Street City of Yakima Richard (Rick) W Wagner Manager Public Projects BNSF Railway Company 2454 Occidental Avenue South Suite 20 Seattle, WA 96134 Tel (206) 625-6152 rax (206) 625.6115 Richard Wagn.er(ubnst corn Mobile (206) 604-8290 Re: Final Approval of Plans and Specifications dated September 26th, 2012, drafted by BERGER/ABAM Engineers (hereinafter called, the "Plans and Specifications") Dear Mr. Mayo; This letter serves as BNSF RAILWAY COMPANY's ("BNSF") final written approval of the Plans and Specifications covering the construction of the Martin Luther King, Jr. Boulevard Underpass. This final written approval is given to City of Yakima ("Agency") pursuant to Article III, Section 1 of that certain Underpass Agreement between BNSF and Agency, dated December 4th, 2009. If the Plans and Specifications are revised by Agency subsequent to the date set forth above, this letter shall no longer serve as final written approval of the Plans and Specifications and Agency must resubmit said Plans and Specifications to BNSF for final written approval. Regards, Richard VVagner Manager Public Projects, BNSF Law Department Approved Exhibit F Brid2-e Requirements BRIDGE DESIGN. PLANS cC SPECiFiCA.DQNS: Bridge design calculations will be submitted to BNSF for review and approval. Design calculations will be summarized on a cover sheet to state the design dead load, design live load and amount of impact and any secondary loads considered. Bridge design by other than a BNSF pre -approved consultant will be subject to a third parte design check at the Agency's expense. For railroad bridges and culverts over waterways, BNSF will be provided with the Hydrology and Hydraulic design criteria, calculations and site specific data, including electronic data utilized in computer simulation modeling. Design considerations should include future land use changes that would increase the volume, velocity or sediment transport characteristics of the srreambed flows. Design shall include sediment transport calculations and erosion control mitigation measures if necessary. Bridge plans will be submitted to BNSF for review and approval at the 30%, 60% and 90% stage of design. The final set of plans must be approved by BNSF prior to letting of bids for the Project. Prior to issuing any invitation to bid on construction of the Structure, the Agency should conduct a pre -hid meeting where prospective Contractors have the opportunity to communicate with BNSF personnel as to the site specific train speeds, train density, and general safety requirements for men and equipment working near live tracks. Any invitation to bid and specifications for the Structure and the Project must be submitted to BNSF for review and approval prior to letting of bids for the Project. BRIDGE CONSTRUCTION: After awarding die bid, but prior to the Contractor entering BNSF right of way. the Agency should conduct a pre - construction meeting with BNSF personnel ht attendance to reiterate the safety requirements of construction activity adjacent to live tacks. During construction. BNSF will require an expe.rienc.ed Quality Control Inspector to he present during certain critical tunes of the Project, including but not limited to: driving foundation piles, erecting falsework, construction of shoring and retaining walls, placing concrete; placing soil backfill and compaction processes. Certain components; normally produced off site, will require a QC inspector to be present, including the production of precast concrete components and steel fabrication. The QC inspector will provide reports to BNSF including pile driving records, concrete compressive test records, and other such reports requested by BNSF. QC Inspection services can be provided by the Agency subject to acceptance by BNSF. If the QC services provided are not acceptable. BNSF will provide an independent. QC Inspection service to supplement the deficiencies. The Agency shall reimburse BNSF for all costs of supplemental QC Inspection services. Within 90 days of the conclusion of the Project and final acceptance by BNSF, the Agency will provide BNSF with a complete electronic set of the bridge plans labeled "As Built". Those plans will reflect any and all deviations from the original plans that occurred during construction. The "As Built" plans will he submitted in Micro Station *.dgn electronic format (preferred) or AutoCAD *.dwg format. Electronic plans are to be submitted in the original format used for CAD plan preparation and not converted to another format prior to submission. The. plans must show dimensioned locations of existing and relocated utilities. BRIDGE MAINTENANCE: Form 0106 Rev. 08/01/05 L-!' 'Departmont Approved BNSF will be restronsible for maintenance of the treeD sUUCtUre. and ballast over the brid_^e and the earth embankment approaches. The Agency still be responsible tot tnaintenance of the non-structural and rc,n-safer, components of the bridge such as slope protection and pier encasements. For bridges over roadways, the Agency will maintain the roadwaysunder the bridge including signs, pedestrian walkways. fences. drains, landscaping, earth retention components, embankment slopes, erosion control. surface drainage, paint. walkways, handrails. lighting and other improvements associated with the Project. The Agency will be responsible to post highway vertical clearance signs and maintain such signs to reflect potential inure pavement profile elevation changes. Clearance st ns. traffic control signals J:' other 'signs should not be attached to a load - carrying member of the railroad bridge. For railroad bridges over waterways, the Agency will be responsible for all aspects of channl maintenance across BNSF..N right-of-way, including toe of slope erosion control where the railroad embankment meets the streambed. The Agency will he responsible for debris removal that may accumulate at bridge piers as well as silt, removal. local and general scour and remediation and streambed lateral migration and streambed degradation remediation. Fencing and other trespass controls within BNSF's right-of-way and incorporated into the Project shat be designed and maintained by the Agency. Graffiti removal will be the responsibility of the Agency. BRIDGE INSPECTION. BNSF will conduct annual routine structural inspections of railroad bridges over public roadways and waterways at no cost to the Agency. The Agency shall provide traffic control under those bridges spanning roachvays to enable BNSF personnel or representatives to safely conduct the annual inspections. For routine annual inspections, BNSF will give the public agency 7 days advance notice of traffic control requirements. In the event of an earthquake, fire. flood, damage from vehicular impacts or other emergent situations, the Agency will provide traffic control in roadways to allow immediate inspection by BNSF personnel or representatives. Traffic control will include lane closures or other such measures to allow BNSF personnel. contractors and equipment to be safely positioned under the superstructure. Upon the conclusion of the BNSF inspection, the Asenc.y'.will be notified of items in need of repair that hills within the Agency's jurisdiction as described under BRIDGEMAINTENANCE section. If the Agency does not complete the repairs requested by BNSF within a reasonable time period, BNSF personnel and/or contractors will perform the repairs and invoice the Agency for the entire cost of such repairs. Regardless of the nature or cause of such maintenance and repairs, irafiir: control will be provided by the Agency at no cost to BNSF to allow cafe access to the bridge. Form 0106 Rev. 06701/05 I I I I I I I I I I I I I I I I I I I APPENDIX C Geotechnical Engineering Report of August 17, 2012 TABLE OF CONTENTS SHANNON &WILSON, INC. Page 1.0 INTRODUCTION 1 2.0 SITE AND PROJECT DESCRIPTION 1 3.0 PREVIOUS EFFORTS 2 3 1 Draft Geotechnical Engineering Report 3 3.2 Test Pit Excavation Report 3 3.3 Becker Hammer Soil Borings Report 4 3.4 Conclusions from Sonic Borings Letter 4 3.5 Modified Phase 1 Environmental Site Assessment Report 4 3.6 Infiltration Study Report 5 4.0 FIELD EXPLORATIONS 5 5.0 LABORATORY TESTING 6 6.0 GEOLOGY AND SUBSURFACE CONDITIONS 6 6.1 Regional Geologic Setting 6 6.2 Mapped Area Geology 7 6.3 Subsurface Soil Conditions 7 6.4 Groundwater Conditions 8 7.0 ENGINEERING RECOMMENDATIONS AND CONCLUSIONS 8 7.1 Earthquake Engineering 9 7.1.1 Ground Motions 9 7.1.2 Earthquake -Induced Geologic Hazards 9 7.2 Bottom Seal 10 7.2.1 Excavate in the Wet 10 7.2.1.1 Description 10 7.2.1.2 Advantages 11 7.2.1.3 Disadvantages 11 7.2.1.4 Risks 12 7.2.2 Excavate in the Dry using Jet Grouting 12 7.2.2.1 Advantages 14 7.2.2.2 Disadvantages 14 7.2.2.3 Risks 14 7.2.3 Excavate in the Dry using Overlapping Drilled Shafts 15 7.2.3.1 Advantages 15 7.2.3.2 Disadvantages 15 7.2.3.3 Risks 16 7.2.4 Excavate in the Dry with Dewatering 16 21-1-09306-0I0-RI.docx/wp/Ikn 21-1-09306-010 TABLE OF CONTENTS (cont.) SHANNON iWILSON, INC. Page 7.2.4.1 Advantages 17 7.2.4.2 Disadvantages 17 7.2.4.3 Risks 17 7.3 Hydrostatic Uplift 18 7.4 Earth Retention Walls 18 7.4.1 Soldier Pile and Lagging Walls 19 7.4.2 In Situ Reinforced Concrete Walls 19 7.4.2.1 Secant Pile Walls 20 7.4.2.2 Diaphragm (Slurry) Walls 20 7.4.2.3 Advantages 21 7.4.2.4 Disadvantages 21 7.4.2.5 Risks 22 7.5 Fill Walls 22 7.6 Lateral Earth Pressures for Walls 22 7.7 Lateral Resistance 23 7.8 Sliding Resistance 23 7.9 Deep Foundation Design 24 7.9.1 Axial Resistance of Secant Pile and Diaphragm Walls 24 7.9.2 Horizontal Resistance of Secant Pile and Diaphragm Walls 25 7.10 Shallow Foundation Design 25 7.10.1 Bearing Capacity 25 7.10.2 Estimated Settlements 25 7.11 Temporary Cut Slopes 26 7.12 Pavement Design 26 7.13 Fill Placement and Compaction 27 8.0 CONSTRUCTION CONSIDERATIONS 8.1 General 8.2 Secant Pile Wall Construction 8.2.1 Methods of Construction 8.2.1.1 8.2.1.2 8.2.1.3 8.2.1.4 8.2.1.5 8.2.1.6 Dry Method Casing Method Wet Method Drilled Shaft Considerations Observing Drilled Shaft Installation Integrity Testing 8.3 Diaphragm (Slurry) Walls 8.3.1 Method of Construction 8.3.2 Observing Slurry Wall Construction 8.4 Obstructions 8.5 Instrumentation 8.6 Wet Weather Considerations 28 28 28 28 29 29 30 31 32 32 32 33 34 34 35 35 21-1-09306-010-R I .docx/wp/Ikn 21-1-09306-010 TABLE OF CONTENTS (cont.) 9.0 CONSTRUCTION OBSERVATION 36 10.0 LIMITATIONS 36 11.0 REFERENCES 39 TABLE 1 Recommended Parameters for Lateral Resistance Analyses Using LPILEPLus FIGURES 1 Vicinity Map 2 Crossing Location Map 3 Site and Exploration Plan 4 Generalized Subsurface Profile A -A' Lincoln Avenue (2 sheets) 5 Generalized Subsurface Profile B -B' Martin Luther King Jr. Blvd 6 Recommend Lateral Earth Pressures for Earth Retention Walls 7 Recommended Lateral Earth Pressures for CIPC Walls 8 Recommended Surcharge. Loading for Temporary and Permanent Walls 9 Uplift Resistance 10 Estimated Axial Capacity of Secant Pile / Diaphragm Wall APPENDICES A Subsurface Explorations B Geotechnical Laboratory Test Procedures and Results C Important Information About Your Geotechnical/Environmental Report 2I-I-09306-010-RI.docx/wp/Ikn 11 21-1-09306-010 SHANNON iWILSON, INC. ' 1 GEOTECHNICAL ENGINEERING REPORT YAKIMA GRADE SEPARATION PROJECT YAKIMA, WASHINGTON 1.0 INTRODUCTION The Yakima Grade Separation Project was authorized in 2001 and consisted of evaluating t underpass and overpass grade separation alternatives at seven street and railroad crossings in Yakima, Washington. The near-term plan from the City of Yakima was to complete grade separations at two of the locations; Lincoln Avenue and Martin Luther King Jr. (MLKJ) Boulevard (formerly B Street). The remaining five locations, I Street, D Street, Yakima Avenue, Mead Avenue, and Washington Avenue, were considered part of the City's long-term plan with ' no scheduled date for completion. The location of the project is shown in the Vicinity Map, Figure 1, and the locations of the seven crossings are indicated on the Crossing Location Map, Figure 2. At the time of this report's preparation, design and construction of the Lincoln Avenue crossing I was complete. The MLKJ Boulevard crossing is currently under design and scheduled to begin construction later this year. The grade separations at both crossings lower the vehicular traffic below the railroad tracks. Shannon & Wilson has performed geotechnical, environmental, and hydrogeologic subsurface explorations and engineering evaluations, and provided design and construction conclusions and recommendations, for the Lincoln Avenue and MLKJ Boulevard crossings since 2001. This report finalizes our geologic interpretations at the two crossings and provides updated ' geotechnical engineering conclusions and recommendations for the MLKJ Boulevard design and construction. ' Notice to proceed to update the geotechnical report was provided on August 6, 2012, by Berger/ABAM Engineers, Inc. (Berger/ABAM). Our engineering services are performed in ' general accordance with our proposal for this effort, dated August 2, 2012. 2.0 SITE AND PROJECT DESCRIPTION 1 Railroad tracks bisect the City of Yakima. The tracks are owned and operated by BNSF Railway and are an important corridor for shipping freight through Yakima County. Within the City, there are nine roadway/railroad crossings; three crossings are grade separated and the remaining 21-1-09306-010-R 1 .docx/wp/Ikn 21-1-09306-010 1 SHANNON &WILSON, INC. six crossings are at -grade. Up to 16 trains, hauling 97,000 tons of freight, are projected to pass through the City per day in the future. Vehicular traffic at the six at -grade crossings are anticipated to be delayed up to 176 minutes per day per crossing. These delays will have adverse impacts on the movement of freight, citizens reaching their places of employment, and on the response times of emergency vehicles within the City. Trains with an approximate length of 6,500 or more can block numerous at -grade crossings at the same time. Accidents, noise, and air -pollution from idling vehicles are also byproducts of the at -grade crossings. Lincoln Avenue and MLKJ Boulevard are two one-way streets that operate as a "couplet." Their locations within the City make them critical to the movement of truck freight traffic and emergency vehicles. Construction of the Lincoln Avenue grade separation was completed in May 2012. Construction of the MLKJ Boulevard grade separation is scheduled to begin in December 2012. Excavation for the vehicular underpass at MLKJ Boulevard will extend approximately 26 feet below existing grade at its lowest point. The length of excavation along the roadway will be about 875 feet. Open cut excavations, soldier pile and lagging walls, and secant pile and/or diaphragm walls will be used to construct the underpass. Precast struts will be used along approximately 215 feet of the wall for stability. A bottom seal will be constructed below the proposed roadway to mitigate the presence of groundwater during construction and counteract hydraulic uplift pressure (heave) along the constructed roadway. A shoofly will be constructed to temporarily move the railroad track east of the existing line. Excavation and fill earthwork will be required to meet the proposed temporary top of rail elevation. The proposed permanent railroad bridge will be 30 feet wide and supported on the secant pile and/or diaphragm walls used for the excavation. The top of rail on the bridge will match existing top of rail elevation. 3.0 PREVIOUS EFFORTS Shannon & Wilson has performed geotechnical, environmental, and hydrogeologic services for this project since 2001. Several reports documenting our observations and conclusions have been produced during this time. The following sections summarize these reports. The titles of each report are listed in the Reference section of this report. 21-I-09306-010-R1.docx/wp/Ikn 2 21-1-09306-010 SHANNON &WILSON, INC. 3.1 Draft Geotechnical Engineering Report Shannon & Wilson, Inc. completed a preliminary geotechnical studies report in 2001 for the development of the 30 Percent Design Documents at the Lincoln Avenue and MLKJ Boulevard crossings and the conceptual design at the other five crossings. Published soil information and six historical geotechnical reports were reviewed. Eight subsurface boring explorations were completed at the Lincoln Avenue and MLKJ Boulevard crossings with depths ranging from about 16.5 to 52 feet. Mud rotary drilling techniques were used to advance the borings. In situ testing and soil samples were retrieved from the borings using the Standard Penetration Test. Index testing consisting of visual classification, water content determinations, and grain size analyses were conducted on select samples from the borings. Engineering recommendations and conclusions were evaluated based on the information collected. Three grade separation alternatives were assessed for the seven crossings: (a) a vehicular underpass with the railroad tracks remaining at existing elevation, (b) a vehicular underpass with the railroad tracks raised about 5 feet, and (c) a vehicular overpass with the railroad tracks remaining at existing elevation. Engineering calculations were performed for site ground motions, earthquake -induced geologic hazards, excavation support, shallow and deep foundation capacities, bottom seal and hydrostatic uplift, pavement design, fill walls, and fill embankments. The geologic and geotechnical interpretations, conclusions, and recommendations found in this report supersede those from the Draft Geotechnical Engineering Report. 3.2 Test Pit Excavation Report Shannon & Wilson, Inc. completed a geotechnical studies report in 2004 providing revised geotechnical recommendations for the design and construction of the Lincoln Avenue and MLKJ Boulevard crossings. Two subsurface test pit explorations were conducted at the crossings using an excavator equipped with a 4 -foot -wide bucket. Depths of the test pits ranged from about 21 to 23 feet. Soil samples were retrieved from the test pits, and index testing consisting of visual classification, water content determination, and grain size analysis was conducted on one of the samples. Based on the collected information, geotechnical recommendations related to site excavation and wall design were revised from the 2001 Draft Geotechnical Engineering Report. The geologic and geotechnical interpretations, conclusions, and recommendations found in this report supersede those from the Test Pit Excavation Report. 21-1-09306-010-R 1 .docx/wp/Ikn 3 21-1-09306-010 SHANNON flWILSON, INC. 3.3 Becker Hammer Soil Borings Report Shannon & Wilson, Inc. completed a comparative subsurface materials report in 2008 for the design and construction of the Lincoln Avenue and MLKJ Boulevard crossings. Four subsurface boring explorations were completed at the crossings with depths ranging from about 50 to 51.5 feet. Impact hammer drilling techniques were used to advance the borings. In situ testing was conducted below 20 feet using a 3 -inch outside diameter split -spoon sampler. Soil samples were collected from the continuous core recovered from the boring advancement and the split - spoon sampler. Index testing consisting of visual classification, water content determinations, and grain size analyses were conducted on select samples from the borings. The soil samples retrieved during the subsurface explorations were compared to the soils observed in the borings and test pits completed in 2001 and 2004, respectively. The relative density and gradation of the collected soil at both crossing locations was also compared. The geologic interpretations and conclusions found in this report supersede those from the Becker Hammer Soil Borings Report. 3.4 Conclusions from Sonic Borings Letter BergerABAM completed a letter in 2011 recommending permeation grouting no longer be considered for construction of the bottom seal at the Lincoln Avenue crossing. Shannon & Wilson, Inc. completed ten subsurface boring explorations in support of this letter. Sonic core drilling techniques were used to advance the borings to depths ranging from about 30 to 55 feet. Index testing at select intervals from the continuous core consisted of visual classification, water content determinations, and grain size analyses. 3.5 Modified Phase 1 Environmental Site Assessment Report Shannon & Wilson Inc. completed a revised, modified Phase 1 environmental site assessment report in 2005 to evaluate the likelihood of recognized environmental conditions and the presence of certain contaminants in the soil and groundwater at the site. Historical records research and a site reconnaissance were conducted in 2004. Soil and groundwater sampling were also completed in 2004. Groundwater samples were collected from the two monitoring wells installed during boring explorations in 2001, from one of the test pits completed in 2004, and from a monitoring well installed by others and located between Lincoln Avenue and MLKJ Boulevard. Soil samples were collected from the two test pits completed in 2004. Select samples were tested for volatile organic compounds, total petroleum hydrocarbons, and metals. 21-1-09306-010-R I .docx/wp/Ikn 4 21-1-09306-010 SHANNON &WILSON, INC. , Based on the laboratory test results and our research, a summary of our findings was prepared. Recommendations were provided for the acquisition of property in the project area. Preliminary ' cost estimates were provided for cost estimating purposes regarding underground storage tank removal, asbestos abatement, and contaminated soil disposal. 3.6 Infiltration Study Report Shannon & Wilson, Inc. completed an infiltration study report in 2012 for the design of the Lincoln Avenue and MLKJ Boulevard infiltration pond. Four subsurface test pit explorations were conducted at the crossing to depths ranging from about 3 to 10 feet. In situ pilot infiltration tests were performed using water from a City hydrant. Soil samples were retrieved from the test pits and laboratory index testing consisting of visual classification, water content determinations, and grain size analyses completed on select samples. Hydrogeologic recommendations and conclusions were evaluated based on the information ' collected. Analyses were performed to estimate the hydraulic conductivity and the impact of groundwater mounding at the pond location. 4.0 FIELD EXPLORATIONS Shannon & Wilson, Inc. evaluated the subsurface conditions at the Lincoln Avenue and MLKJ Boulevard crossings by completing 22 borings and 6 test pits between 2001 and 2012. The borings are designated L-1 through L-14, L-16, and L-17 at the Lincoln Avenue crossing and B-1 through B-6 at the MLKJ Boulevard crossing. Boring depths ranged from about 16.5 to 55 feet below ground surface (bgs) at the Lincoln Avenue crossing, and 16.5 to 51.5 feet bgs at the MLKJ Boulevard crossing. Groundwater observation wells were installed in borings L-2, L-8, L-9, L-11, L-13, L-16, and B-3, with 10- to 20 -foot screens located approximately 20 to 55 feet bgs. ' Test pits completed in 2004 are designated TP -1 and TP -2. Test pits completed in 2012 are designed TP -1 through TP -4. Test pit depths ranged from about 3 to 23 feet bgs. ' The approximate locations of the borings and test pits completed for this project are shown in Figure 3. Descriptions of the drilling programs, test pit programs, and the boring and test pit logs are presented in Appendix A. 21-1-09306-010-RI.docx/wp/Ikn 21-1-09306-010 5 SHANNON &WILSON, INC. 5.0 LABORATORY TESTING Geotechnical laboratory tests were performed on select samples retrieved from the explorations to characterize the index and engineering properties of the subsurface soils at the project site. Laboratory testing included visual soil classification, moisture content determinations, and grain size analyses. The geotechnical laboratory testing was performed in the Shannon & Wilson, Inc. laboratory in Seattle, Washington, and in general accordance with the American Society of Testing and Materials/ASTM International (ASTM) standard procedures (ASTM, 2000-2011). A brief description of the laboratory test procedures and the laboratory test results are presented in Appendix B. 6.0 GEOLOGY AND SUBSURFACE CONDITIONS 6.1 Regional Geologic Setting The project site is located in the western part of the Columbia Plateau physiographic province, which encompasses most of eastern Washington, and is bordered on the west by the Cascade Mountains. The Columbia Plateau is characterized by incised rivers, extensive plateaus, and anticlinal ridges rising to 4,000 feet above sea level. The region is underlain by Tertiary (Miocene age), Columbia River Basalt Group (CRBG) bedrock, and interbedded terrestrial sediments (Lasmanis, 1991). The basalt that comprises most of the CRBG was extruded between about 17 and 6 million years ago. The basalt accumulated as successive eruptions filled the area creating the Columbia Plateau and covering more than 77,000 square miles. The CRBG is divided into five formations — the Saddle Mountains, Wanapum, Grande Ronde, Picture Gorge, and Imnaha Basalts (Reidel and others, 2003) and includes tuffs, sandstones, conglomerates, and other sediments deposited between eruptions (Lasmanis, 1991). Along the western edge of the basin, the CRBG interfingers with Tertiary alluvium and colluvium (mostly coarse-grained, but locally fine- grained) that were deposited around the edges of the plateau from the continued uplift and erosion of the Cascade Mountains to the west. In the western portion of the Columbia Basin, faulting and folding of the CRBG and interfingered Tertiary alluvium/colluviums have resulted in a series of west -northwest -trending anticlinal ridges and intervening valleys. This region is called the Yakima Fold Belt subprovince. Faulting and folding were initiated during middle to late Miocene time and has continued to this day. 21-1-09306-010-RI.docx/wp/lkn 6 21-1-09306-010 SHANNON &WILSON, INC. More recent Quaternary (Holocene and Pleistocene) sediments have been deposited on the older Tertiary sedimentary and CRBG rock. Numerous glacial outburst floods originating in northeastern Washington and northern Idaho/western Montana deposited gravel, sand and silt during the Pleistocene Epoch throughout much of the plateau area. Extensive areas of Late Pleistocene and Holocene wind-blown loess also accumulated. Locally, the present topography and Quaternary surface geology of the Yakima Valley have been affected by episodic erosion and deposition by the Yakima River. The valley has been flooded repeatedly by blockage of the river channel and by glacial runoff. Ash deposits from the Cascades have also contributed sediment to the area; therefore, in some locations there are occasional deposits of finer grained sediment interbedded with more coarse-grained alluvial deposits. 6.2 Mapped Area Geology A review of geologic maps prepared by Bentley and Campbell (1983) and Schuster (1994) indicate that the surficial geologic units within the project area consist of Quaternary -Tertiary age terrace deposits. These units are generally described as follows: • Terrace Deposits (Qt) — Pleistocene age fluvial terrace deposits of poorly indurated silt, sand, and gravel are found along the margins of the Yakima River Valley. These deposits contain clasts with a diverse composition and locally include lacustrine, paludal, and eolian deposits. The terrace deposits may extend to between 5 and 10 meters above the modern Yakima River floodplain. The terrace deposits are inferred to have been the result of continued uplift and/or downcutting of the Yakima River. 6.3 Subsurface Soil Conditions The subsurface conditions encountered in our explorations generally consisted of up to 5 feet of recent fill overlying native terrace deposits. These units are further described as: • Holocene Fill (Hf) — Holocene age fill consists of various rock and soil materials placed or re -worked in an engineered or non -engineered method to modify the existing topography. At the project site, fill was encountered in borings L-1 to L-7, B-1 to B-6, and test pits TP -1 (2004) and TP -2 (2004). The fill materials include medium dense to dense, sand and gravel; loose to medium dense, fine sandy silt; and hard, slightly clayey to clayey silt. The fill locally contains cinders, bricks, and concrete blocks. • Terrace Deposits (Qt) - Underlying the fill or existing ground surface are terrace deposits generally consisting of loose to very dense, trace of silt to silty, sandy gravel with scattered to numerous cobbles and scattered boulders. The gravel becomes 21- I -09306-010-R I .docx/wp/lkn 7 21-1-09306-010 SHANNON &WILSON. INC. locally slightly clayey. Scattered layers of gravelly sand were also encountered in the borings. Our interpretation of the Lincoln Avenue and MLKJ Boulevard site subsurface conditions is shown in our generalized subsurface profiles presented in Figure 4 and 5, respectively. 6.4 Groundwater Conditions Groundwater levels vary with the time of year in the City of Yakima and are dependent upon the amount of irrigation. Water levels tend to be highest in the summer and early fall months when irrigation is at its peak. Groundwater was estimated during our subsurface explorations in 2001 at approximate depths ranging between 15 and 20 feet bgs in borings L-2 through L-4, and at approximate depths ranging between 14 and 16.5 feet bgs in borings B-1 through B-4. This corresponds with groundwater elevations of about 1,051 to 1,057 feet at the time of drilling. Groundwater was also observed during test pit explorations in TP -1 and TP -2 performed in 2004, and in TP -2 performed in 2012, at depths ranging between about 9.5 and 15 feet bgs. On April 1, 2001, groundwater levels were measured at approximate depths of 16.8 and 14.6 feet bgs in the observation wells installed in borings L-2 and B-3, respectively. The City of Yakima continued to monitor these wells between May 2002 and May 2004, and observed the groundwater fluctuate between depths of about 13 feet bgs in the summer months and 19 feet bgs during the winter months. This corresponds with groundwater elevations of about 1,051 to 1,057 feet during monitoring. On January 20, 2011, during construction of the Lincoln Avenue grade separation bottom seal, groundwater was measured in the wells installed in borings L-8, L-9, L-11, L-13, and L-16. Depths ranged from about 3.3 to 12.9 feet bgs, corresponding with groundwater elevations of about 1,053 to 1,056 feet. 7.0 ENGINEERING RECOMMENDATIONS AND CONCLUSIONS The geotechnical engineering recommendations and conclusions presented in the following sections are for the design and construction of the MLKJ Boulevard grade separation project. We understand that the grade separation will be designed in accordance with the 2008 Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction, and the 2004 American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design 21-1-09306-010-RI.docx/wp/Ikn 8 21-1-09306-010 SHANNON &WILSON, INC. Specifications, 3rd Edition. The recommendations and conclusions herein are based on information from field explorations, in situ testing, and laboratory testing previously performed for this project, and the 95 Percent Plan Submittal and construction understanding provided by Berger/ABAM. 7.1 Earthquake Engineering 7.1.1 Ground Motions Seismic design for the project is based on a ground motion level corresponding to a 10 percent probability of exceedence in 50 years (475 -year return period). The modal magnitude and soft rock peak ground acceleration (PGA) for the design ground motion level were determined based on results of the 2003 U.S. Geologic Survey (USGS) probabilistic seismic hazard analyses. Based on the USGS interactive deaggregation and project location, we estimate a design magnitude and soft rock PGA of 5.2 and 0.10g, respectively. For design purposes, the soft rock PGA is modified for subsurface conditions within 100 feet of the ground surface. Based on the subsurface conditions encountered in the explorations, we recommend that the site be classified as AASHTO Soil Profile Type II with a corresponding site coefficient, S, of 1.2. AASHTO describes a Soil Profile Type II as a stiff cohesive or deep cohesionless soils profile over 200 feet thick. Based on the provided classification, we recommend the site design PGA be 0.12g. 7.1.2 Earthquake -Induced Geologic Hazards Earthquake -induced geologic hazards that may affect a given site include landsliding, fault rupture, settlement, and liquefaction and associated effects (loss of shear strength, bearing capacity failures, loss of lateral support, ground oscillation, lateral spreading, etc.). Because of the relatively flat topography at the site, the risk of landsliding is considered low. Based on the relatively dense nature of the granular soils at the site, the risk of liquefaction is also considered low. The potential for fault -related ground surface rupture is low as well. There are no faults mapped within the project area. The nearest mapped potentially active faults identified by the USGS (2008) are the east -west -trending Ahtanum Ridge and Rattlesnake Hills structures located about 4 miles south of the site (Lidke, 2003a and 2003b; Personius and Lidke, 2003). Other faults near the site but not identified as potentially active by the USGS are a series 21-1-09306-010-RI.docx/wp/Ikn 9 21-1-09306-010 SHANNON &WILSON, INC, of generally east -west -trending thrust faults along the Yakima Ridge anticline, about 2 miles north of the site (Schuster, 1994). 7.2 Bottom Seal Construction of the vehicular underpass will require excavations below the anticipated groundwater table. The proposed finished grade low point for the underpass will be at elevation 1,044.8 feet. We estimate the groundwater elevation at the site could be as high as elevation 1,062 feet, and likely will fluctuate due to season and infiltration from the adjacent pond. A bottom seal will be used to mitigate groundwater seepage and uplift of the roadway. We understand construction of the bottom seal will be contractor designed. The excavation for the bottom seal could be performed in the wet or in the dry. Based on the anticipated subsurface materials and the construction efforts at the Lincoln Avenue site, our review of various excavation methods resulted in the following three alternatives that were reviewed for feasibility and relative cost: 1. Excavate in the wet and install a concrete tremie seal to resist the water pressures. 2. Perform jet grouting to form a base seal to resist the water pressures and excavate in the dry. 3. Construct overlapping drilled shafts to form a base seal to resist the water pressures and excavate in the dry. 4. Dewater the excavation and excavate in the dry. These excavation alternatives were reviewed independently of the earth retention wall system alternatives discussed in Section 7.4. 7.2.1 Excavate in the Wet 7.2.1.1 Description One method of excavation below the groundwater table is to perform the excavation in the wet. After the earth retention walls are installed (see Section 7.4), excavation could be performed using excavators above the groundwater table. After the excavation reaches the groundwater table, excavators may not be able to work within the excavation. Further excavation below the groundwater table could be performed with clamshell buckets or draglines suspended from cranes. The wet soil would be removed until the excavation reached the required depth. The means and method of excavation would be determined by the Contractor. 21-1-09306-010-RI.docx/wp/Ikn 10 21-1-09306-010 SHANNON &WILSON, INC. I In some instances the walls may have to extend deeper or additional supports may be required to support the excavation during construction. ' Before the permanent structure can be constructed inside the excavation, the water would need to be removed. A base seal is required to cutoff the water and reduce heave of the ' excavation subgrade. The base seal needs to provide resistance to resist the water pressure acting upwards (uplift) when water is removed from the excavation. For excavation in the wet, a typical method to seal the base of the excavation is to place mass concrete at the base of the excavation by tremie underwater. If friction along the ' sides of the tremie seal (between the seal and the wall) is considered, the required thickness of the tremie seal may be reduced by about 5 to 10 percent, depending on the type of shoring wall that is used. This assumes that the seal is not structurally connected to the wall. If an excavation support wall, such as a slurry wall or secant pile wall, is selected, the thickness of the tremie seal could be reduced if the tremie seal is structurally connected to the secant/slurry wall. However, ' it should be noted that the structural connection would have to be made by divers working underwater within the excavation prior to placement of the tremie seal. After the concrete tremie seal is placed and has cured, water is removed from the excavation and the construction of the permanent structure can commence. 7.2.1.2 Advantages If excavation is performed in the wet, the following advantages were identified: ' • Obstructions could easily be removed from the excavation. • Dewatering in the soil would not be required. The only water that would need to be considered for disposal is the volume contained within the excavation. • The concrete tremie seal would provide passive resistance at the base of the ' excavation. • The permanent structure could be connected to the tremie seal to engage the weight of the seal to resist uplift pressures. 7.2.1.3 Disadvantages , If the excavation is performed in the wet, the following disadvantages were identified: , 21-I-09306-010-RI_docx/wp/Ikn 21-1-09306-010 11 SHANNON &WILSON, INC. • If a tremie seal is not structurally connected to a secant/slurry wall, the tremie seal would need to be thicker, and require more excavation. The additional excavation volume would also result in increased soil disposal. ■ Because a tremie seal would require a full excavation adjacent to the retaining walls (as opposed to a grouted bottom seal), the installation of a tremie seal would require a deeper and stiffer shoring system or increased bracing prior to placement of the tremie seal. • If excavation shoring bracing is required, some of the bracing may have to be installed underwater. ■ The water removed from the excavation after the tremie seal is poured would likely have a high pH, requiring treatment prior to disposal. • Excavation below the groundwater table would be difficult below any internal braces that will be spanning over the undercrossing. The equipment used for this type of construction typically requires significant overhead room to operate. 7.2.1.4 Risks Our evaluation also included evaluating potential risks that could increase the cost and/or schedule of the project. These risks are difficult to quantify and cannot accurately be predicted for the cost and schedule estimate. For excavation in the wet with a tremie seal, the following risks were identified: • The installation of bracing underwater could be problematic and expensive. Improper installation could result in excessive wall movements, which could damage utilities and adjacent structures. • Since quality control of the tremie concrete slab is difficult to perform underwater, the tremie seal could be uneven and may have imperfections and voids that could affect the seal integrity. Post -grouting could be required to repair affected areas of the tremie seal. 7.2.2 Excavate in the Dry using Jet Grouting Jet grouting may be used to create a bottom seal prior to excavation of the undercrossing. The bottom seal would resist the inflow of water such that the excavation could be performed in the dry. Jet grouting methods have been used for structural cut-off walls, base seal applications (in combination with jet grouting), low -strength piles, and base seal applications. The jet grouting can be installed so that a continuous block is formed (100 percent improvement) or such that a smaller percentage of ground is replaced (for situations where water cutoff is not required). 21-1-09306-010-RI.docx/wp/Ikn 12 21-1-09306-010 SHANNON &WILSON, INC. Jet grouting involves the partial replacement of soils with a cementitious material to form a mass of nearly concrete -like material termed soilcrete. The jet grouting technique is used to erode in situ soil and simultaneously mix it with cement grout to form soilcrete. Jet grouting is a bottom-up procedure. Although there are variations, the basic jet grout operation consists of horizontally jetting cement grout under high pressure through nozzles near the end of a drill rod to erode a column of soil while mixing the soil constituents with the grout fluid. Secondary fluids, such as water and/or air, can be used to help with the erosion of material. The energy of the grout injection breaks down the soil matrix and mixes it with the grout. As soil erosion and replacement with grout continues, the rods are rotated and slowly lifted to create a soilcrete column. Designed integration of adjacent columns creates a soilcrete mass. Jet grouting is effective across a wide range of soil types. Because it is an erosion -based system, soil erodibility plays a major role in predicting the geometry and quality of the soilcrete column. Geometries (full or partial columns or panels) and physical properties of the soilcrete can be engineered to provide the desired degree of improvement. The diameter of the jet -grouted soil will depend on the erodibility of the soil, jet nozzle configuration, jet pressure, and rate of withdrawal of the drill string. Jet -grouted soilcrete columns on the order of 3 to 6 feet in diameter are typically achievable. The larger diameters are achieved in looser soils and/or fine grained, erodible soils. If obstructions are encountered, in most cases the grout can encapsulate the obstruction as long as the density of obstructions is not significant. The compressive strength of jet -grouted soilcrete varies depending on the soil type and installation methods and could range from about 500 to 2,000 pounds per square inch. The jet grouting process would generate significant spoils volume, on the order of about 100 percent of the treatment volume. The jet -grouted bottom seal could be constructed either before or after the walls are constructed. The following options were considered in our evaluation: 1. Install a wider zone of jet -grouted soilcrete prior to wall installation. This would limit the types of walls that could be considered because some wall types would be difficult to install through the soilcrete. 2. Install the jet -grouted soilcrete after wall installation. When the walls have been constructed and the soilcrete has cured, the excavation would proceed in the dry and the saturated soil would be removed from the excavation area. The excavation 21-I-09306-010-RI.docx/wp/Ikn 13 21-1-09306-010 SHANNON &WILSON, INC. would proceed in the dry to the required depth at the top of the soilcrete zone. The top of the soilcrete is likely to be irregular, so some excavation through cement -treated soil would likely be required. The permanent structure would then be constructed in the dry excavation. 7.2.2.1 Advantages If the bottom seal is constructed using jet grouting, the following advantages were identified: • Dewatering outside or below the excavation would not be required. If no dewatering is performed, there would not be a risk of lowering the groundwater table outside of the excavation, which could lead to settlement and movement of adjacent facilities. • Overexcavation beyond the required depth for the permanent structure would not be required. • The thick cement -treated soil zone would provide passive resistance at the base of the excavation. This could allow for shortening of the walls or reduced bracing. 7.2.2.2 Disadvantages If the bottom seal is constructed using jet grouting, the following disadvantages were identified: • Since the jet -grouted soilcrete has a lower unit weight than structural concrete, a larger thickness would be required to resist uplift. • Spoils would be generated from the jet grouting process. Storage areas for the spoils would be required on the site to allow the wet cement -soil mixture to harden prior to transportation to a disposal facility. If storage areas are not available on site then disposal costs would increase due to the need to dispose of the wet cement -soil mixture. • Mobilization of jet grouting equipment is expensive. Maintenance of rail traffic may require multiple mobilizations of the jet grouting equipment if the jet grouting could not be performed beneath the tracks or shoofly area. 7.2.2.3 Risks Our evaluation also included evaluating potential risks that could increase the cost and/or schedule of. the project. These risks are difficult to quantify and cannot accurately be predicted for the cost and schedule estimate. For construction of the bottom seal using jet grouting, the following risks were identified: 21-1-09306-010-RI.docx/wp/Ikn 14 21-1-09306-010 SHANNON &WILSON, INC. • Obstructions may limit the penetration and could reduce the effectiveness of the jet grouting process and/or result in voids or soft areas within the seal that are not adequately mixed. These deficient areas may result in leakage of groundwater during construction. Post -grouting may be required to seal areas where leakage is occurring through the soilcrete seal due to inadequate mixing. This would affect the cost and schedule of the project. 7.2.3 Excavate in the Dry using Overlapping Drilled Shafts Overlapping drilled shafts may be used to create a bottom seal prior to excavation of the undercrossing. The bottom seal shafts would be constructed similar to secant piles (discussed in Section 8.1.2) in that the primary shafts would be installed with a center -to -center spacing slightly less than twice the shaft diameter and then backfilled with lean concrete. Additional (secondary) shafts would then be drilled midway between the primary shafts and overlap the outer portions of the primary shafts. The minimum overlap is typically about 6 inches. Unlike secant pile walls, reinforcement of the overlapping shafts would not be necessary for the bottom seal shafts. The bottom seal shafts could be constructed either before or after the retaining walls. If constructed after the retaining walls, a gap will be present between the bottom seal and walls, which will require other suitable methods, such as grouting or excavation and tremie concrete, to fill and provide a full seal. 7.2.3.1 Advantages If the excavation is performed in the dry using overlapping drilled shafts, the following advantages were identified: • Dewatering outside or below the excavation would not be required. If no dewatering is performed, there would not be a risk of lowering the groundwater table outside of the excavation, which could lead to settlement and movement of adjacent facilities. • The thick concrete base seal would provide passive resistance at the base of the excavation. This could allow for shortening of the walls or reduced bracing. 7.2.3.2 Disadvantages If the excavation is performed in the dry with overlapping drilled shafts, the following disadvantages were identified: 21-1-09306-010-Rl.docx/wp/Ikn 15 21-1-09306-010 SHANNON &WILSON, INC. • Constructing overlapped drilled shafts over the bottom seal area would generally be a slower process than other, more conventional techniques, such as jet grouting or tremie concrete. • Obstructions, such as boulders, may be encountered, which could slow advance rates. and require special tools to remove. 7.2.3.3 Risks Our evaluation also included evaluating potential risks that could increase the cost and/or schedule of the project. These risks are difficult to quantify and cannot accurately be predicted for the cost and schedule estimate. For excavation in the dry with overlapping drilled shafts, the following risks were identified: • If the alignment of the drilled shafts is not carefully controlled, there could be water leakage at joints between the shafts. Post -grouting would be performed to seal against water flow. • Due to the gravelly/cobbly nature of the site subsoil (with possible presence of boulders), installing the drilled shafts could be slow and expensive. • If the bottom seal drilled shafts are installed after the walls, there will be a gap between the bottom seal and the walls. This gap, even when filled, is a likely location of water leakage after excavation. Post -grouting would be performed to seal against water flow. 7.2.4 Excavate in the Dry with Dewatering One common method of excavating in the dry is to use dewatering to lower the groundwater table below the bottom of the excavation. Watertight shoring is used to retain water behind the shoring walls and the shoring wall penetration is extended to a sufficient depth to reduce the flow of water around the base of the shoring walls. Dewatering wells are installed inside the excavation. Water is pumped out of the dewatering wells and either appropriately disposed of in existing drainage facilities (sanitary or storm sewers), or recharged back into the ground outside the excavation. Excavation then proceeds in the dry while the groundwater table is incrementally lowered and typically maintained at least 2 feet below the base of the excavation. Once excavation is extended to the required level for the permanent structure, a working pad is placed on the subgrade soil and the permanent structure constructed inside the dewatered excavation. 21-1-09306-010-R1.docx/wp/ikn 16 21-1-09306-010 SHANNON &WILSON, INC. For this construction alternative, we have not performed groundwater modeling analyses to determine the feasibility of drawdown in the project area. A feasibility analyses can be performed if this alternative is selected for design. 7.2.4.1 Advantages If the excavation is performed in the dry with dewatering, the following advantages were identified: • Overexcavation beyond the required depth for the permanent structure would not be required. Uplift pressure would be temporarily reduced through the use of the dewatering wells. • Obstructions could be more easily removed in the open excavation. 7.2.4.2 Disadvantages If the excavation is performed in the dry with dewatering, the following disadvantages were identified: • The dewatering process can result in drawdown of the groundwater table outside the excavation; depending on the soil types, rate of pumping, and depth of the watertight shoring. To control drawdown outside the excavation, either the depth of the watertight shoring would be increased, or a recharge system would be required to restore the groundwater table to acceptable levels outside the excavation. • The permanent structure would be constructed around the dewatering wells. Typically, the wells would be installed adjacent to the inside of the shoring walls. • Water will be generated from the dewatering process that will require treatment and proper disposal. Depending on the rate of pumping, soil conditions and other factors, the volume of water may require special permitting to allow for disposal into the sewer system. 7.2.4.3 Risks Our evaluation also included evaluating potential risks that could increase the cost and/or schedule of the project. These risks are difficult to quantify and cannot accurately be predicted for the cost and schedule estimate. For excavation in the dry with dewatering, the following risks were identified: • Unanticipated soil conditions could alter the effectiveness of the dewatering and recharge system. Monitoring of groundwater levels will be required during 21-1-09306-010-RI.docx/wp/lkn 17 21-1-09306-010 SHANNON &WILSON, INC. construction. If the dewatering and/or recharge system is not achieving the desired results, additional wells may be installed. This could impact the cost and schedule of the project. • Dewatering has the potential to affect groundwater flow in the vicinity of the dewatering operations. Currently, the groundwater flows southeast during the summer months and more easterly during the winter months. Dewatering could induce movements of contaminants and spread contamination plumes, if present, into areas not previously impacted and/or into the construction zone. Treatment and/or special handling of the groundwater withdrawn may be necessary. • Dewatering and/or recharge wells may plug up or fail during construction. Periodic maintenance and or replacement of wells may be required. • If the groundwater levels outside the excavation are not properly maintained, damage to adjacent utilities or facilities could occur due to ground settlement. 7.3 Hydrostatic Uplift Hydrostatic uplift resistance should be accounted for when designing the bottom seal. The uplift pressure due to the buoyancy acting against the base of the bottom seal can be resisted by the dead weight of the seal, through the use of structural tiedowns, or by the combined weight of the seal and walls, if structural shear connections are designed and provided between them. We understand that the design option selected is to resist the uplift pressure solely through the dead weight of the bottom seal. Based on groundwater observations between May 2002 and May 2004 at the site, and the potential groundwater mounding related to the proximity of the infiltration pond to the site, we recommend a water level elevation of 1,062 feet be used for design. Further recommendations for the design of hydrostatic uplift resistance are provided in Figure 9. 7.4 Earth Retention Walls In areas where the excavation will extend less than 2 feet below the groundwater table, soldier pile and lagging walls will be used for earth retention. In situ reinforced concrete walls consisting of secant pile and/or diaphragm walls will be used where the excavation extends below the groundwater table. The in situ reinforced concrete walls, in combination with the bottom seal, will be used to help control the groundwater without dewatering. A groundwater elevation of 1,062 feet is recommended for design. If the in situ reinforced concrete walls are to be installed through the previously installed bottom seal, they should not be installed until at least seven days after the bottom seal is installed. 21-1-09306-010-RI.docx/wp/Ikn 18 21-1-09306-010 SHANNON FiWILSON, INC. General recommendations for soldier pile and lagging walls and in situ reinforced concrete walls are given in the following sections. 7.4.1 Soldier Pile and Lagging Walls Construction of the soldier pile wall involves vertical steel members placed into predrilled holes. Spacing of the soldier piles is typically 6 to 10 feet on -center. The holes are backfilled with concrete up to the final excavation level. The remaining portion of the hole is backfilled with a lean mix concrete. As the excavation proceeds, horizontal lagging is installed between the soldier piles. We recommend no more than 4 feet (measured vertically) of unsupported excavation be exposed at any one time. Due to the relatively clean gravelly nature of the site soils, the actual height of the vertical, unsupported excavation may be less than 4 feet. Voids behind the lagging should be filled with concrete sand, drainage sand and gravel, or locally with a weak controlled density fill (CDF). Sumps may be necessary where the excavation extends below the groundwater table. A permanent, concrete wall face will be constructed adjacent to the soldier pile and lagging wall inside the excavation. The Contractor should provide means, such as weep holes, to mitigate the buildup of hydrostatic pressure behind the walls. Due to soil arching between soldier piles, a reduced lateral earth pressure is recommended for design of the lagging. Recommended pressures for temporary lagging design are presented in Figure 6. The penetration depth of the soldier piles below the final excavation grade should be adequate for kick -out resistance. We recommend that soldier piles penetrate at least 5 feet below the bottom of the excavation. 7.4.2 In Situ Reinforced Concrete Walls In situ concrete walls are continuous concrete walls that are used in congested urban areas as excavation shoring systems and permanent foundation walls. They can be installed in close proximity to existing structures with minimal ground movements. In situ concrete walls are considered generally watertight and relatively rigid. These walls can consist of secant pile walls, tangent pile walls, slurry walls, and other reinforced concrete walls. For this project, we reviewed secant pile walls and diaphragm (slurry) walls. We understand that these wall types will be used as the walls for the permanent structure. 21-I-09306-010-R1.docx/wp/Ikn 19 21-1-09306-010 SHANNON iWILSON, INC. 7.4.2.1 Secant Pile Walls A secant pile wall can be constructed by local drilled shaft contractors. Construction is performed by installing shafts with a center -to -center spacing slightly less than twice the shaft diameter and backfilling them with lean concrete. Additional shafts (structural shafts) are then drilled midway between the lean concrete shafts and overlap the outer portions of these lean shafts. The minimum overlap is typically about 6 inches. The structural shafts are then backfilled with reinforced concrete. The reinforcing steel can be conventional steel reinforcing cages or steel wide -flange or H sections. Secant pile wall widths can be variable (2 to 10 feet), depending on the diameter and/or size of the drilled shaft equipment used. 7.4.2.2 Diaphragm (Slurry) Walls A diaphragm (slurry) wall is an option being considered in place of the secant pile wall. Slurry walls are typically constructed by specialty contractors. The slurry wall method involves the excavation of alternating trenches (panels) along the proposed wall alignment using slurry to prevent the sides of the excavation from caving prior to placement of reinforced concrete. The walls are constructed by first installing two slurry guide walls on either side of the proposed wall alignment. The guide walls are typically about 5 feet deep and are spaced slightly wider than the proposed wall width. A linear slot trench between the guide walls is excavated using one or more equipment passes to construct the slurry panel. The excavation is typically performed using a clamshell bucket or hydromill. As the trench is excavated, a mineral or polymer slurry is introduced into the excavation. The slurry used to maintain the stability of the excavations would have to be designed to consider the presence of cobbles and boulders in the subsurface. After the trench is excavated to the desired depth, a reinforcing cage, or a steel W or H section, is inserted into the excavation. Finally, the concrete is tremied into the excavation, displacing the slurry. The slurry is typically reconditioned and reused for the next panel. The panel sections would be overlapped, similar to secant pile walls. Slurry wall widths typically range from about 2 to 5 feet. The panel length is determined based on a number of factors, including soil face stability, size of reinforcing cage, location of bracing, wall alignment, and type of excavating equipment. A panel cannot be shorter, or narrower, than one equipment pass. Panel lengths typically range from about 8 to 20 feet, depending on the Contractor's equipment. Mobilization costs for slurry walls can be high because a slurry plant must be constructed at the site to produce, process, and condition slurry for the construction operation. 21-1-09306-010-RI.docx/wp/lkn 20 21-1-09306-010 SHANNON EMILSON, INC. The slurry diaphragm wall would serve as both temporary and permanent excavation support and to support the railroad track bridge. The diaphragm wall in conjunction with a jet -grouted base seal could also provide the required barrier to groundwater. An advantage of a slurry diaphragm wall over a secant pile wall is that the potential for gaps in the wall is much less with a slurry wall. 7.4.2.3 Advantages If an in situ reinforced concrete wall (secant pile or diaphragm wall) is used to support the excavation, the following advantages were identified: • The walls can be used to support the vertical loads of the proposed bridges crossing over the undercrossing. • In addition to acting as temporary excavation support and water cutoff, the walls can be used as the permanent walls for the undercrossing structure. An architectural concrete facing could be connected to the inside edge of the walls for the final structure. ■ In situ reinforced concrete walls are considered semi-rigid wall systems. Depending on the excavation depth, wall width, wall stiffness, and soil and groundwater conditions, the walls could be cantilevered or require less bracing than more flexible systems. • If the permanent structure is structurally connected into the wall system, the wall weight and friction could be used to resist uplift due to groundwater forces for the permanent structure. 7.4.2.4 Disadvantages If an in situ reinforced concrete wall is used to support the excavation, the following disadvantages were identified: ■ If slurry walls are used, a slurry plant will need to be constructed in the vicinity of the wall. Due to the congested nature of the site, finding suitable locations for the slurry plant may be difficult. • Slurry walls are typically installed by specialty contractors. If multiple mobilizations are required to install the walls due to maintenance of railroad traffic, the cost of the walls would increase. • Spoils will be generated from the slurry wall or secant pile wall construction. The volume of spoils will be equal to or slightly greater than the volume of the wall. 21-I-09306-010-RI.docx/wp/Ikn 21 21-1-09306-010 SHANNON &WILSON, INC. The spoils will consist of saturated soil, possibly mixed with slurry. If mixed with slurry, the spoils will likely have a high pH. 7.4.2.5 Risks Our evaluation also included evaluating potential risks that could increase the cost and/or schedule of the project. These risks are difficult to quantify and cannot accurately be predicted for the cost and schedule estimate. For an in situ reinforced concrete wall system, the following risks were identified: • If the alignment of the secant piles or slurry wall panels is not carefully controlled, there could be water leakage at joints between the shafts or panels. With slurry walls, there would be fewer potential locations where these leaking joints could exist. Post - grouting would be performed to seal the excavation walls against water flow. • Due to the gravelly/cobbly nature of the site subsoil (with possible presence of boulders), installing secant piles could be slow and expensive. • For slurry walls, obstructions would be difficult to remove with the clamshell or hydromill excavation equipment. Obstructions would also hinder secant pile operations, although drilled shafts can penetrate more readily through obstructions using equipment options. • For slurry walls, there is a potential for cave-in of the sides of the trench if the slurry is not carefully controlled and conditioned. If cave-ins occur, they could damage adjacent utilities and structures and impact the integrity of the wall. 7.5 Fill Walls At each end of the grade separation, cast -in-place, cantilever concrete walls will be installed. The walls will consist of a steel reinforced concrete stem and base slab in the shape of an "L". Wall heights are anticipated to be 10 feet or less. Overturning and sliding due to lateral earth pressures are resisted by the wall's self -weight and the weight of the soil above the base slab. However, these walls are not very flexible and need to be constructed on competent foundation soils. Counterforts (triangle braces that connect the base and wall stem) can be installed at regular intervals to reduce bending moments and shear in the wall. 7.6 Lateral Earth Pressures for Walls The earth retention and fill walls should be designed to withstand external soil pressures. Lateral earth pressures against buried walls are dependent upon many factors, including method of backfill placement and degree of compaction, backfill slope, surcharges, the type of backfill soil and/or adjacent native soil, drainage provisions, and whether or not the wall can yield or deflect 21 -1 -09306 -010 -RI .docx/wp/lkn 22 21-1-09306-010 SHANNON %WILSON, INC. I laterally or rotate at the top after or during placement of backfill or during and after excavation. For walls that are allowed to move at least 0.001 times the wall height, we recommend that a static, active, lateral earth pressure be used. For walls that are not allowed to move 0.001 times the wall height, static, at -rest, lateral earth pressures should be used. The recommended active and at -rest earth pressures for the earth retention and fill walls are presented in Figures 6 and 7. Lateral pressures as a result of surcharge loads may be evaluated based on the diagrams shown in Figure 8. The total earth pressures should be analyzed for seismic loading conditions using a dynamic load increment equal to a percentage of the static earth forces. The seismic load increment for the earth retention and fill walls are presented in Figures 6 and 7. A percentage load increase for seismic conditions is consistent with a pseudo -static analysis using the Mononobe-Okabe equation for lateral earth pressures and a horizontal seismic coefficient of 0.06g. The seismic coefficient is not equivalent to the site PGA of 0.12g. The PGA is experienced only a few times within the record of earthquake shaking, and the actual earthquake ground motion is cyclic in nature, not static. Values of the seismic coefficient are thus typically one-third to one-half the value of the PGA that may be experienced at the site. 7.7 Lateral Resistance Resistance to lateral forces caused by unbalanced earth pressures, hydrostatic pressures, seismic, and/or other forces can be provided by passive earth pressures acting against the embedded portion of the walls. We recommend a nominal passive pressure of 435 pounds per cubic foot (pcf) for dense, native granular soil below the water table. For compacted, structural fill above the water table, we recommend a nominal passive pressure of 450 pcf. Refer to Figures 6 and 7 for pressure distributions. Resistance factors should be applied to the passive resistances. For static conditions, we 1 recommend a resistance factor of 1.00 be applied to the nominal passive earth pressures for earth retention walls (soldier pile walls, secant pile walls, and diaphragm walls) and a resistance factor of 0.50 be applied to the nominal passive earth pressures for fill walls (cast -in-place cantilever walls). For seismic conditions, we recommend a resistance factor of 1.00 be applied to the nominal passive earth pressures for both the earth retention and fill walls. 7.8 Sliding Resistance Lateral loads on the cast -in-place fill walls may also be resisted through base friction of the wall base slab. We recommend the base sliding resistance be determined using a nominal base ' 21-1-09306-010-RI.docx/wp/lkn 21-1-09306-010 ' 23 SHANNON FiWILSON, INC. friction resistance of 0.80. This value assumes concrete for the base slab will be cast against dense, native granular soil. Resistance factors should be applied to the sliding resistance. For static and seismic conditions, we recommend resistance factors of 0.80 and 1.00 be used, respectively. The static resistance factor is for cast -in-place concrete on sand; the factor may be increased if different construction techniques are used or different subsurface conditions are encountered. 7.9 Deep Foundation Design 7.9.1 Axial Resistance of Secant Pile and Diaphragm Walls The vertical loads from the proposed railroad bridge structures can be supported by side resistance on the sides of the secant pile or diaphragm wall and end resistance on the bottom of the wall. For the abutment walls, side resistance is assumed to act along the entire outside surface of the walls and along the portion of the inside surface of the walls extending from the finished street grade to the bottom of the walls. Axial resistance analyses were performed based on the assumed wall width of 3 feet, which is based on either a 3 -foot -thick diaphragm wall, or an effective width of the secant pile wall of 3 feet, using overlapping 4 -foot -diameter drilled shafts. The axial resistance analyses were performed using an in-house computer program in accordance with AASHTO LRFD Bridge Design Specifications (AASHTO, 2004). Strength parameters for the soil deposits encountered at the project site were developed based on the results of the field and laboratory testing, and our experience with similar subsurface conditions. Axial resistance analyses were performed under static loading conditions, because we understand that static loadings govern the axial capacity design (that is, deeper penetration was required under static conditions). The results of our axial resistance analyses under static loading conditions are presented graphically in Figure 10 as continuous resistance values from the existing (i.e., at the time of the subsurface explorations) ground surface to the depth of the field explorations accomplished for the project. The axial resistance provided in Figure 10 is dependent upon, among other things, good construction practices. Considerations for drilled shaft construction are provided in Section 8.1.2. 21-1-09306-010-RI.docx/wp/Ikn 24 21-1-09306-010 SHANNON &WILSON, INC. 7.9.2 Horizontal Resistance of Secant Pile and Diaphragm Walls The computer program LPILEPLus (Reese and others, 2008) may be used to generate P -Y curves (load -deflection curves) for the horizontal resistance analysis of the drilled shafts and to calculate the magnitude of deflection, shear force, and bending moment along the shaft/pile. , Based on the subsurface conditions described above, the recommended parameters for input into the LPILEPLus program under static loading conditions are summarized in Table 1. These parameters can be used to evaluate the horizontal resistance of the foundations supporting the proposed railroad bridge structures. 7.10 Shallow Foundation Design 7.10.1 Bearing Capacity , Shallow foundations will be used for the design of the cast -in-place, cantilever fill walls. Wall footings bearing in the native, dense to very dense sand and gravel deposits may be , designed for a nominal bearing resistance of 22,000 pounds per square foot (psf). Footings bearing on compacted structural fill may be designed for a nominal bearing resistance of 8,500 psf. We recommend resistance factors of 0.45 and 1.00 be applied to the bearing resistance values for static and seismic conditions, respectively. The bearing resistance requires that the footings be at least 6 feet wide and bear a minimum of 24 inches below final street grade. The elevation difference of adjacent footings should not be greater than one-half the clear distance between them. Where adjoining continuous wall footings are at different elevations, the upper footing should be stepped down to the lower footing. Loose soils encountered at the foundation subgrades should be removed. If overexcavation is required, the excavations should extend to dense to very dense native soils and the footings lowered. Alternatively, the overexcavated areas may be backfilled with structural fill. If structural fill is to be placed in the overexcavation then the width of the overexcavation in unsuitable soil should extend laterally from the edge of the proposed foundation a distance equal ' to the depth of the overexcavation. 7.10.2 Estimated Settlements ' Because of the mostly granular nature of the subsurface soils at the project site, settlements are generally expected to take place as the load is applied. Assuming compliance with the above recommendations, it is our opinion that settlements along the cast -in-place, 21-1-09306-010-RI.docx/wp/Ikn 21-1-09306-010 ' 25 SHANNON &WILSON, INC. cantilever fill walls will be 1 inch or less. Differential settlements along an approximate 20 -foot span of continuous wall footing may approach one-half of the estimated total settlements. 7.11 Temporary Cut Slopes Construction slope values required for stability and safety depend on a careful evaluation of the following factors: (a) the amount of groundwater seepage, (b) the soil and materials exposed in the excavation slope, (c) the depth of the excavation, (d) surcharge loads on the top of the excavation, (e) the geometry of the excavation, and (f) the time of construction. Because of the many variable factors involved, required slope values can only be estimated prior to construction. For safe working conditions and prevention of ground loss, excavation slopes should be the responsibility of the Contractor as he/she will be at the job site full time to observe and control the work. All current and applicable safety regulations regarding excavation slopes should be followed. In our opinion, excavations can be accomplished with conventional excavating equipment, such as a dozer, front-end loader, or backhoe. For planning purposes, we recommend that temporary, unsupported, open -cut slopes in the fill and native material be no steeper than 1 Horizontal to 1 Vertical. Flatter cut slopes may be required where loose soils are encountered. The above recommendation is for temporary cut slopes in dry conditions. If wet conditions or uncontrolled groundwater flow is encountered, flatter slopes may be required. Exposed cut slopes may also need to be protected with a waterproof covering during periods of wet weather to reduce sloughing and erosion. All traffic and/or construction equipment loads should be set back from the edge of the cut slopes a minimum of 4 feet. Excavated material, stockpiles, and equipment should not be placed closer to the edge of any excavation than the depth of the excavation, unless the excavation is shored and such materials are accounted for as a surcharge load on the shoring system. 7.12 Pavement Design In order to provide a firm subgrade for pavements, we recommend that the paved areas be stripped to remove all loose, soft, or disturbed soil, old fill, and organic materials/soils and debris to expose medium dense to very dense, native soils. We recommend that a total of at least 12 inches of base course and/or ballast be provided beneath the pavement and that the total pavement section be at least 18 inches. The base course and ballast should be non -frost -susceptible. Where the bottom seal is present below the 21-1-09306-010-R .docx/wp/lkn 26 21-1-09306-010 SHANNON iWILSON, INC. pavement, we recommend 4 inches of crushed surfacing base course (CSBC) overlie 8 inches of shoulder ballast. A geotextile fabric should be designed and placed between the CSBC and the shoulder ballast to prevent the migration of the fines, but still allow the free flow of water. Where native subgrade is present below the pavement, we recommend 12 inches of CSBC. The CSBC should meet 2008 WSDOT Specification 9-03.9(3) with the added requirement that the material contains not more than 5 percent fines (based on the dry weight passing the No. 200 sieve from the fraction passing the minus 3/4 -inch sieve). The shoulder ballast should meet 2008 WSDOT Specification 9-03.9(2). Any fines should be non -plastic. Pavement subbase, base course, and ballast should be compacted to at least 95 percent of the Modified Proctor maximum dry density (ASTM D 1557, Method C or D). We recommend that asphalt pavements over dense, proof -rolled native subgrade soils be designed using a CBR value of 20. We also recommend that asphalt pavements over densely compacted structural fill be designed using a CBR value of 15. In areas where the subgrade is a dense mixture of soil and concrete (i.e., bottom seal) we recommend a CBR of 30 be used. Drainage should be provided below the base course to mitigate saturation of the base course and subgrade soils. 7.13 Fill Placement and Compaction All fill placed beneath structures such as pavements and sidewalks, or backfill against buried walls and foundations, should be structural fill. The on-site soils could be used as structural fill provided cobbles and boulders larger than 6 inches be removed prior to or during backfill placement. Numerous cobbles and boulders were observed in the subsurface explorations and may prove time consuming to sort through. Imported, structural backfill should meet the gradation requirements of Section 9-03.14(2), Select Borrow, of the 2008 WSDOT Standard Specifications. If fill is to be placed during periods of wet weather or under wet conditions, it should have the added requirement that the percentage of fines (materials passing the No. 200 sieve based on wet -sieving the minus 3/4 inch fraction) be limited to 5 percent. The fines should be non -plastic. Structural fill should be placed in horizontal uniform lifts, compacted to a dense and unyielding condition, and to at least 95 percent of the Modified Proctor maximum dry density (ASTM D 1557). All subgrades to receive structural fill should be dense and unyielding and should be evaluated by the geotechnical engineer. In general, the thickness of soil layers before compaction should not exceed 10 inches for heavy equipment compactors or 6 inches for hand- 2I-1-09306-010-RI.docx/wp/lkn 27 21-1-09306-010 SHANNON &WILSON, INC. operated compactors. The most appropriate lift thickness should be determined in the field using the Contractor's selected equipment and fill, and verified with in situ soil density testing (nuclear gauge methods). All compacted surfaces should be sloped to drain to prevent ponding. Structural fill operations should be observed and evaluated by an experienced geotechnical engineer or technician. 8.0 CONSTRUCTION CONSIDERATIONS 8.1 General The applicability of the design recommendations provided in this report is contingent on good construction practice. Poor construction techniques may alter conditions from those on which our recommendations are based, possibly resulting in unfavorable conditions, such as reduced foundation resistance, higher earth pressures, and increased settlement. The following sections present additional construction and material considerations for this project. 8.2 Secant Pile Wall Construction Construction of a secant pile wall requires installation of overlapping drilled shafts along a specified alignment and spacing. Construction of a drilled shaft requires boring a hole of a specified diameter and depth and then backfilling the hole with reinforced concrete, or, for the nonstructural members, with lean concrete. The selection of equipment and procedures for constructing drilled shafts are a function of the shaft dimensions, the foundation soil conditions, and the groundwater characteristics. Consequently, the design and performance of secant pile walls can be significantly influenced by the equipment and construction procedures used to install the shafts. In particular, wall friction would be impacted by the procedures used for construction and by the method of placement and properties of the concrete. Construction procedures and methods are of paramount importance to the success of the drilled shaft installations at this project site. Drilled shaft contractors who participate in this project should be required to demonstrate that they have suitable equipment and at least five years of experience in the construction of large - diameter drilled shafts. 8.2.1 Methods of Construction In general, there are three typical methods of installing drilled shafts for secant pile walls: the dry method, the casing method, and the wet method, as described in the following sections. 21-1-09306-010-RI.docx/wp/lkn 28 21-1-09306-010 SHANNON &WILSON, INC. 8.2.1.1 Dry Method In the dry method of construction, the excavation is normally carried to its full depth without casing or slurry through dry, hard clay or dry, dense sand where groundwater is not encountered. Following cleanout and inspection, concrete is placed through a drop chute to minimize segregation. The dry method of construction would generally not be applicable for this project. 8.2.1.2 Casing Method The casing method is applicable where seepage or caving soil conditions are encountered and a casing can be pushed, driven, twisted, or oscillated into an impermeable, firm stratum below the caving soil. The hole is generally drilled as in the dry method until caving, squeezing soil, or excessive seepage is encountered. Bags of bentonite clay are placed in the hole and mixed with wet soil to develop slurry, and/or bentonite slurry is added to the hole. The latter procedure is normally preferred for quality control purposes. Drilling would then continue until an impermeable layer is encountered. The top of the slurry must be maintained above the groundwater level. Casing may then be placed into the shaft and pushed, driven, twisted, or oscillated into an impermeable layer to form a seal. The slurry may then be bailed out with a cleanout or mud bucket and drilling may proceed in the dry as long as no other caving zones or permeable soil layers are encountered within the proposed shaft excavation, and/or if a bottom heave situation might occur. The impermeable firm stratum must have sufficient thickness to resist hydrostatic pressures below this zone when the shaft is dewatered. For this method to be effective, the casing must be clean and smooth. Bottom heave could occur if caving zones or permeable soil layers are located within a sufficient distance below the shaft bottom such that hydrostatic pressures could cause the base of the shaft to heave. For this case, drilling in the dry could not be performed. Bottom heave is evaluated by determining the pressure head in the underlying permeable unit and comparing it against the weight of the soil between the bottom of the shaft and the permeable unit. Typically, a factor of safety of at least 1.1 against bottom heave is desired. If the soil profile is such that only a thin zone of caving soil exists within the shaft excavation, it may be possible to eliminate the use of the slurry. For this situation, the casing should be placed into the hole as soon as the caving material is encountered. The casing is then pushed, twisted, or oscillated through the caving zone into an impermeable soil layer below. Excavation may be continued in the dry. 21-I-09306-010-RI.docx/wp/Ikn 29 21-1-09306-010 SHANNON 6WILSON, INC. Upon completion of the shaft excavation, the hole is cleaned and the reinforcing steel is installed. For the casing method of construction, the reinforcing steel is usually placed to the bottom of the hole, because it is difficult to keep a partial -length cage in position by a hoist line as the casing is withdrawn. The reinforcing steel should therefore be designed to accommodate both the structural requirements of the completed shaft and the stability requirements for its placement, concrete placement, and casing withdrawal. For example, as the concrete column is placed in the hole with sufficient head to resist hydrostatic forces from the groundwater and/or slurry, downward forces could be exerted on the steel cage. The magnitude of this force will depend on the slump of the concrete, the flow velocity, and the volume of reinforcing steel. These forces should be considered in the design of the rebar cage. The reinforcing steel should be equipped with suitable centralizers or spacers to maintain proper alignment during installation and concrete placement. After the reinforcing steel is placed, the hole should be filled with concrete. Under no circumstances should the casing be withdrawn until the concrete produces a hydrostatic pressure greater than the groundwater and/or slurry that is sealed by the casing. The casing should be pulled slowly and smoothly so that the concrete flows out of the base of the casing to displace the trapped slurry. Voids or annular spaces that may exist between the casing and the subsurface materials should be filled with concrete during this process. Improper casing extraction could result in an unacceptable drilled shaft. Casing may tend to adhere to the subsurface soils. Attempts to knock the casing loose take time and may allow the concrete placed in the shaft to set. The concrete may then separate when the casing is pulled, resulting in voids in the shaft. Therefore, the casing should be left in place if the concrete appears to be setting up and extraction becomes difficult. When this situation occurs, frictional resistance would be altered and the load -carrying capacity of the shaft should be reevaluated. The presence of "running" or "caving" formations will require close monitoring of the concrete level during casing extraction. Failure to maintain a positive head of concrete during casing extraction could result in a contaminated mix or presence of voids in the shaft. 8.2.1.3 Wet Method The wet method of construction generally involves the use of slurry. The subsurface conditions where the wet method of construction is applicable include any of the conditions described above for the casing method. In instances where heavy seepage or caving 21-1-09306-010-R1.docx/wp/lkn 30 21-1-09306-010 SHANNON &WILSON, INC. conditions are encountered and the hole cannot be sealed to allow installation of a casing, the wet method of construction may be the only feasible way to stabilize the shaft walls while drilling is continued. if an impermeable soil zone is not encountered in which to form a seal, or there is a potential for bottom heave or blowout, it would be required to complete the excavation in the wet with slurry. After the hole is completed to its full depth, the slurry must be processed to meet specifications before concrete placement. If there is too much sediment in suspension, material can settle to the bottom of the excavation before concrete is placed, resulting in a soft base. The allowable volume of sediment remaining at the base of the excavation before concrete placement would generally depend on the actual shaft design and the amount of settlement that can be tolerated. For designs where end bearing is high, a clean, firm bottom is required. The American Concrete Institute (ACI 336,3R-93) recommends that in no case should the volume of loose material and spoil at the base of the shaft exceed that which would be required to cover 5 percent of the base area to a depth of 2 inches (ACI, 1997). In addition to spoil at the base of the shaft, the sediment in suspension could also settle to the top of the concrete column as the pour is progressing. This material could coat the rebar and sidewalls of the shaft, reducing the bond strength. Such issues need to be addressed in the contract specifications and will require careful inspection and quality control during shaft construction. 8.2.1.4 Drilled Shaft Considerations In our opinion, the dry method is not recommended for the installation of the drilled shafts for this project. Installation of the drilled shafts could generally proceed using a combination of the casing and wet methods of construction described in the previous section. Based on experience by others, some conditions may exist where casing is required to stabilize a shaft excavation that proceeds using the wet method. This may occur at depths where water - bearing, clean, granular zones are anticipated and in the surficial fill and natural soils where obstructions may be encountered. However, contractors should be allowed to select the construction method as long as the required drilled shafts are properly installed. To reduce the potential for ground loss, we recommend that the specifications state that where obstructions, caving conditions, or excessive water seepage is encountered in the drilled hole, or where there is a potential for heaving conditions or loss of ground, which, in the opinion of the .Engineer, impacts the construction of the drilled shafts or adjacent existing 21-1-09306-010-RI_docx/wp/Ikn 31 21-1-09306-010 SHANNON &WILSON, INC. facilities, no further drilling shall be allowed until the contractor implements measures to prevent caving, water inflow, ground loss, and/or bottom heave. The current WSDOT Special Provision (WSDOT, 2011) for drilled shafts should be used for installing the secant pile walls for this project. 8.2.1.5 Observing Drilled Shaft Installation An experienced and qualified geotechnical engineer familiar with the subsurface conditions of the project site should observe installation of drilled shafts. Construction of the shafts by the wet method will prevent downhole visual observation. The geotechnical engineer/geologist would perform observation and identification of soil mucked from the hole or retrieved from auger flights to estimate whether the subsurface conditions assumed for design are actually present. In addition to a description of the subsurface conditions encountered, the excavation methods, volume of soil removed, steel reinforcing and concrete placement operations, and casing extraction procedures should be observed and documented. As a minimum, a report should be prepared for each shaft that includes the criteria recommended in the Drilled Shaft Inspector's manual (Joint Caisson — Drilled Shaft Committee, 2004). 8.2.1.6 Integrity Testing After completing the installation of drilled shafts, we recommend that non- destructive testing, such as crosshole sonic logging (CSL), be used to evaluate the integrity of selected installed drilled shafts. We recommend that non-destructive testing be performed on at least 20 to 50 percent of the total number of secant wall shafts. If voids or other abnormalities/defects are detected in the testing, the test findings should be analyzed to determine if the installed drilled pile shafts satisfy the design requirements. For CSL testing, tubes should be installed in the drilled shafts to provide access for the ultrasonic equipment. The integrity tests should be performed and analyzed by experienced and qualified personnel. 8.3 Diaphragm (Slurry) Walls The success of slurry wall performance is, at least partially, dependent on properly constructed wall panels. The following discussion presents general considerations for construction of slurry walls. 21-1-09306-010-RI.docx/wp/Ikn 32 21-1-09306-010 SHANNON &WILSON, INC. 8.3.1 Method of Construction Before excavation, a shallow trench is excavated to locate utilities and other shallow obstructions. Existing utility pipes, including abandoned pipes, should be sealed to reduce loss of slurry or contamination of the slurry. Shallow obstructions could also be removed by pre - trenching. The excavated trench should be backfilled with suitable compacted fill or CDF. The wall panels should be installed vertically, in the proper alignment, and should avoid irregularities and protrusions from the average wall face. The occurrence and extent of these deviations depends mainly on the excavating equipment and its operator; the method of supporting and guiding the rig, including the guide -wall construction; and, the type of soil encountered. Excess deviation could result in construction joints where the adjoining panels are separated at some depth with a potential for soil intrusion and/or groundwater infiltration. The recommended vertical alignment accuracy should be less than 1/80. Overbreaks, or protrusions of the wall face, should be limited to about 6 inches. Although there was occasional drill mud loss during drilling in some of the project borings, significant loss of slurry is not expected during slurry wall construction because the suspended soils are likely to plug small voids. However, the Contractor should be required to carefully monitor for loss of slurry and to take appropriate action if slurry loss occurs. The Contractor should be required to use appropriate slurry wall construction techniques for the project. As a minimum, this should include proper slurry treatment and control, as well as appropriate withdrawal rates of the grab buckets (if used) to minimize suction and collapse of the surrounding soils. Upon completion of panel excavation, the slurry in the trench should be thoroughly de - sanded to remove soil particles that could settle out and accumulate in a loose state later on the bottom. If there is too much sediment in suspension, material can settle to the bottom of the excavation before concrete is placed, resulting in a soft base. The presence of loose material on the bottom of the trench could reduce the estimated axial capacities and lead to wall settlements greater than anticipated. The bottoms of the trenches should be thoroughly cleaned of all loose material immediately prior to the start of tremie concrete placement. An airlift is normally used for final cleaning. Sounding and probing should be used to estimate that the bottom is thoroughly cleaned of loose material. Cleaning requirements at the base of the slurry wall should be similar to those required for drilled shafts developed by the ACI (ACI 336, 3R-93), which recommends that in no case should the volume of loose material and spoil at the base of the shaft exceed that which would be required to cover 5 percent of the base area to a depth of 2 inches 21-I-09306-010-RI.docx/wp/1kn 33 21-1-09306-010 SHANNON &WILSON, INC. (ACI, 1997). In addition to spoil at the base of the wall panel, the sediment in suspension could also settle to the top of the concrete column as the pour is progressing. This material could coat the rebar and sidewalls of the wall panel, reducing the bond strength. Such issues need to be addressed in the contract specifications and will require careful inspection and quality control during wall construction. Following excavation of the panel, reinforcing steel is installed in the slurry trench. The reinforcing steel should be designed to accommodate both the structural requirements of the completed wall and the stability requirements for its placement. The reinforcing steel should be equipped with suitable centralizers or spacers to maintain proper alignment during installation and concrete placement. Reinforcing steel installed in slurry trenches should be equipped with suitable centralizers or spacers to maintain proper alignment during installation and concrete placement. The level of tremie concrete should be raised uniformly on both sides of the wall panel. Slurry wall contractors working on this project should be required to demonstrate that they have suitable equipment and at five years of experience in the construction of slurry walls in urban locations. 8.3.2 Observing Slurry Wall Construction An experienced and qualified geotechnical engineer/geologist familiar with the subsurface conditions of the project site should observe the installation of slurry walls. This engineer/geologist would identify soil excavated from the trench. These observations should allow an estimation that the subsurface conditions assumed for design are actually present. In addition to a description of the subsurface conditions encountered, the excavation methods, volume of soil removed, steel reinforcing, and concrete placement operations should be observed and documented. 8.4 Obstructions Based on borings at the site and our interpretation of the local geologic deposits, the Contractor should expect to encounter cobbles and boulders in excavations at the project site. The cobbles and boulders would likely be composed of high to very high strength igneous and/or metamorphic rock types and may range in diameter from 3 inches to greater than 24 inches. The Contractor should be prepared to advance excavations and penetrations, including the secant pile and/or drilled shaft casings, secant pile, drilled shaft or slurry wall excavations, and jet grout drill strings past such obstructions using suitable means, methods, and equipment. 21-I-09306-010-RI.docx/wp/Ikn 34 21-1-09306-010 SHANNON &WILSON, INC. 8.5 Instrumentation We recommend that an instrumentation program be implemented to monitor movements during excavation and shoring installation, and after the permanent wall is constructed. A preconstruction crack survey of adjacent streets and facilities should be completed prior to the r start of construction, and monitoring baseline readings established before excavation begins. Any visible signs of distress, including cracks in walls, floor slabs, or sidewalks should be noted, I photographed, and documented in a report. We recommend that optical survey points be established on existing structures located within a distance equal to the depth of excavation from the top of excavation. The performance of the walls should be monitored during construction and at least three months after completion of the project. During construction, optical survey points should be established at the top of every other soldier pile, every fifth secant pile, and no more than 20 feet along the diaphragm wall. After construction of the permanent walls, optical survey points should be 1 established no more than 50 feet along the wall. During construction the walls should be monitored weekly, and after construction monitored monthly, for vertical and horizontal movements. Performance of the wall could dictate more frequent monitoring. For any open cut slopes, we recommend that optical survey points be established no more than , 2 feet behind the top of the slope and at a maximum spacing of 50 feet along the slope. 8.6 Wet Weather Considerations 1 In the project area, wet weather generally begins about mid-October and continues through about May. It would be advisable to schedule earthwork during the drier weather months. However, should wet weather or wet condition earthwork be unavoidable, the following recommendations are provided: I ■ The ground surface in and surrounding the construction area should be sloped to promote rapid runoff of precipitation away from work areas and to prevent the111 ponding of water. • Work areas, slopes, and stock piles should be covered with plastic and appropriate erosion and sediment control measures applied. The use of sloping, ditching, sumps, dewatering, and other measures should be employed as necessary to permit proper completion of the work. • Earthwork should be accomplished in small sections to minimize exposure to wet conditions. That is, each section should be small enough so that the removal of 21-1-09306-010-R I .docx/wp/Ikn 21-1-09306-010 35 SHANNON &WILSON, INC. unsuitable soils and placement and compaction of clean structural fill could be accomplished on the same day. • To mitigate soil disturbance, the size or type of construction equipment may have to be limited. • Fill material to be place should consist of clean, well -graded granular soils of which not more than 5 percent by dry weight pass the No. 200 mesh sieve, based on the wet sieving fraction passing the 3/4 -inch mesh sieve. The fines should be non -plastic. • No fill soil should be left uncompacted and exposed to moisture. A smooth -drum vibratory roller, or equivalent, should roll the surface to promote rapid runoff of the surface water. • In-place soil or fill soil that becomes wet and unstable and/or too wet for compaction should be removed and replaced with clean, structural fill material. • Excavation and placement of structural fill material should be observed on a full-time basis by a geotechnical engineer, experienced in wet weather/wet condition earthwork to determine that the work is being accomplished in accordance with the project specifications and our recommendations. • Grading and earthwork should not be performed during periods of heavy, continuous rainfall. 9.0 CONSTRUCTION OBSERVATION Geotechnical recommendations that are used as a basis for design are developed from a limited number of explorations and tests. Consequently, there may be a need for adjustment in the field, and we therefore recommend that Shannon & Wilson, Inc. be retained to observe the geotechnical, environmental, and hydrogeological aspects of the construction. Construction observation should include site excavation, shoring installation, bottom seal installation foundation installation, backfill placement and compaction, erosion control, and groundwater control. Construction observation would allow us to evaluate the subsurface conditions as they are exposed during construction, to make recommendations as needed, and to determine that the work is accomplished in accordance with our recommendations. 10.0 LIMITATIONS This report was prepared for the exclusive use of Berger/ABAM, the City of Yakima, and other members of the design team for specific application to the subsurface interpretation of the Lincoln Avenue and MLKJ Boulevard sites and the design of the MLKJ Boulevard grade separation as it relates to the geotechnical aspects discussed in this report. It should be made available to prospective contractors and/or the contractor for information on factual data only, 21-I-09306-010-RI.docx/wp/Ikn 36 21-1-09306-010 SHANNON &WILSON, INC. and not as a warranty of subsurface conditions such as those interpreted from the exploration logs and presented in the discussion of subsurface conditions included in this report. Construction observation by our firm is necessary to confirm recommendations and interpretations made in this report. The analyses, conclusions, and recommendations contained in this report are based on site conditions as they existed at the time the previous reports were prepared, and further assume that the explorations presented herein are representative of the subsurface conditions beneath the sites; that is, the subsurface conditions everywhere are not significantly different from those disclosed by the field explorations. If conditions different from those described in this report are observed or appear to be present during construction, we should be advised at once so that we can review these conditions and reconsider our recommendations, where necessary. If conditions have changed because of natural forces or construction operations at or near the site, we recommend that this report be reviewed to determine the applicability of the conclusions and recommendations considering the changed conditions and time lapse. Within the limitations of the scope, schedule, and budget, the analyses, conclusions, and recommendations presented in this report were prepared in accordance with generally accepted professional geotechnical engineering principles and practices in this area at the time the report was prepared. We make no other warranty, either expressed or implied. These conclusions and recommendations were based on our understanding of the project as described in this report and the site conditions as interpreted from the explorations. Unanticipated soil conditions are commonly encountered and cannot fully be determined by merely taking soil samples from borings and test pits. Such unexpected conditions frequently require that additional expenditures be made to attain a properly constructed project. Therefore, some contingency fund is recommended to accommodate such potential extra costs. The scope of our geotechnical services did not include any environmental assessment or evaluations regarding the presence or absence of wetlands, hazardous or toxic materials in the soil, surface water, groundwater, or air on or below or around Lincoln Avenue and MLKJ Boulevard, or the evaluation for disposal of contaminated soils or groundwater, should any be encountered. A Phase I environmental site assessment was conducted by our firm under a separate agreement and is identified in this report. 21-1-09306-010-RI.docx/wp/lkn 37 21-1-09306-010 SHANNON &WILSON, INC-. We have prepared the document, "Important Information About Your Geotechnical/ Environmental Report," as Appendix C to assist you and others in understanding the use and limitations of our report. SHANNON & WILSON, INC. William A. Hultman, P.E., L.E.G. Vice President BSR:MDH: WAH/bsr 21-1-09306-010-R1.docx/wp/lkn 38 21-1-09306-010 SHANNON &WILSON, INC. 11.0 REFERENCES American Association of State Highway and Transportation Officials (AASHTO), 2004, Standard specification for highway bridges: Washington, D.C. American Society of Testing and Materials/ASTM International (ASTM), 2000-2011, 2000-2011 annual book of standards, construction, volume 04.08, soil and rock (I): West Conshohocken, Penn., ASTM, 1026 p. American Concrete Institute (ACI), 1997, Design and construction of drilled piers, in ACI Manual of concrete practice: Farmington Hills, Mich., ACI, pt. 4, ACI 336.3R-93. Bentley, R.D., and Campbell, Newell P., 1983, Geologic map of the Yakima Quadrangle, Washington: Washington State Department of Natural Resources, Division of Geology and Earth Resources, Geologic Map GM -29, 1:62,500. Joint Caisson — Drilled Shaft Committee of the ADSC and DFI, 2004, Drilled shaft inspector's manual (2"d Edition): Dallas, Tex., ADSC, 64 p. Lasmanis, Raymond, 1991, The geology of Washington: Rocks and Minerals, v. 66, no. 4, p. 262-277. Lidke, D.J., compiler, 2003a, Fault number 564a, Ahtanum Ridge structures, Ahtanum Creek fault, in Quaternary fault and fold database of the United States: U.S. Geological Survey website, http://earthquakes.usgs.gov/regional/gfaults, accessed 07/09/2010 02:08 PM. Lidke, D.J., compiler, 2003b, Fault number 564b, Ahtanum Ridge structures, folds and other faults of the Ahtanum Ridge uplift, in Quaternary fault and fold database of the United States: U.S. Geological Survey website, http://earthquakes.usgs.gov/regional/qfaults, accessed 07/09/2010 02:08 PM. Personius, S.F., and Lidke, D.J., compilers, 2003, Fault number 565, Rattlesnake Hills structures, in Quaternary fault and fold database of the United States: U.S. Geological Survey website, http://earthquakes.usgs.gov/regional/gfaults, accessed 07/09/2010 02:12 PM. Reese, L.C.; Wang, S.T.; Isenhower, W.M.; and Arrellaga, J.A., 2008, LPILE Plus v. 5.0: Austin, Texas, Ensoft, Inc. Reidel, S.P., Martin, B.S., and Petcovic, H.L., 2003, The Columbia River flood basalts and the Yakima fold belt, in Swanson, T.W., ed., Western Cordillera and adjacent areas: Boulder, Colorado, Geological Society of America Field Guide 4, p.87-105. 21-1-09306-010-RI.docx/wp/Ikn 39 21-1-09306-010 SHANNON &WILSON, INC. Schuster, J. Eric, compiler, 1994, Geologic map of the east half of the Yakima 1:100,000 Quadrangle, Washington: Washington Division of Geology and Earth Resources, Open File Report 94-12. Shannon & Wilson, Inc., 2001, Geotechnical engineering report, City of Yakima Grade Separation Project, Yakima, Washington: Report prepared by Shannon & Wilson, Inc., Seattle, Wash., 21-1-09306-001, for Berger/ABAM Engineers, Inc., 1 v., July. Shannon & Wilson, Inc., 2004, Test pit excavation results and revised recommendations, Yakima Grade Separation Project, Yakima, Washington: Report prepared by Shannon & Wilson, Inc., Seattle, Wash., 21-1-09306-002, for Berger/ABAM Engineers, Inc., 1 v., July 27. Shannon & Wilson, Inc., 2005, Revised report of modified Phase I environmental site assessment (REV. 02), Yakima Railroad Grade Separation Project, Yakima, Washington: Report prepared by Shannon & Wilson, Inc., Seattle, Wash., 21-1-09306-002, for Berger/ABAM Engineers, Inc., 1 v., September 27. Shannon & Wilson, Inc., 2008, Results of Becker hammer soil borings, Yakima Railroad Grade Separation Project, Yakima, Washington: Report prepared by Shannon & Wilson, Inc., Seattle, Wash., 21-1-09306-002, for Berger/ABAM Engineers, Inc., 1 v., February 5. Shannon & Wilson, Inc., 2012, Summary report for test pit excavation and pilot infiltration testing at the Lincoln Avenue Grade Separation, Yakima, Washington: Report prepared by Shannon & Wilson, Inc., Seattle, Wash., 21-1-09306-100, for Berger/ABAM Engineers, Inc., 1 v., June 20. U.S. Geological Survey (USGS), 2008, National Seismic Hazard Maps, from USGS website: http://earthquake.usgs.gov/research/hazmaps/products data/2008/. Washington State Department of Transportation (WSDOT), 2008, Standard specifications for road, bridge, and municipal construction: English Units, M 41-10: Olympia, Wash. Washington State Department of Transportation (WSDOT), 2011, Shafts, bridge special provision: Olympia, Wash., WSDOT, July 19, 29 p. 21-1-09306-010-RI.docx/wp/Ikn 40 21-1-09306-010 APPENDIX A SUBSURFACE EXPLORATIONS SHANNON iWILSON. INC. 21-1-09306-010 SHANNON iWILSON. INC. APPENDIX A SUBSURFACE EXPLORATIONS TABLE OF CONTENTS Page A.1 INTRODUCTION A-1 A.2 EXPLORATIONS A-2 A.2.1 Mud -rotary Drilling A-2 A.2.2 Becker Hammer Drilling A-2 A.2.3 Sonic Core Drilling A-2 A.2.4 Test Pit Exavations A-3 A.3 SAMPLING A-3 A.4 PENETRATION TEST A-4 A.5 EXPLORATION LOGS A-4 A.6 REFERENCE A-5 FIGURES A-1 Soil Classification and Log Key (2 sheets) A-2 Log of Boring L-1 (2 sheets) A-3 Log of Boring L-2 (MW -2) A-4 Log of Boring L-3 A-5 Log of Boring L-4 A-6 Log of Boring L-5 A-7 Log of Boring L-6 A-8 Log of Boring L-7 (2 sheets) A-9 Log of Boring L-8 (3 sheets) A-10 Log of Boring L-9 (4 sheets) A -1l Log of Boring L-10 (3 sheets) A-12 Log of Boring L-11 (4 sheets) A-13 Log of Boring L-12 (3 sheets) A-14 Log of Boring L-13 (4 sheets) A-15 Log of Boring L-14 (3 sheets) A-16 Log of Boring L-16 (2 sheets) A-17 Log of Boring L-17 (3 sheets) 21 -1 -09306 -010 -RI -AA.docx/wp/Ikn A -i 21-1-09306-010 SHANNON 6WoLSON. INC. TABLE OF CONTENTS (cont.) FIGURES (cont.) A-18 Log of Boring B-1 A-19 Log of Boring B-2 A-20 Log of Boring B-3 (MW -3) A-21 Log of Boring B-4 A-22 Log of Boring B-5 A-23 Log of Boring B-6 A-24 Log of Test Pit TP -1 (2004) A-25 Log of Test Pit TP -2 (2004) A-26 Log of Test Pit TP -1 (2012) A-27 Log of Test Pit TP -2 (2012) A-28 Log of Test Pit TP -3 (2012) A-29 Log of Test Pit TP -4 (2012) 21-1-09306-010-RI-AA.docx/wp/Ikn A -ii 21-1-09306-010 APPENDIX A SUBSURFACE EXPLORATIONS A.1 INTRODUCTION SHANNON 6WILSON, INC. To date, the field explorations performed by Shannon & Wilson, Inc. for the proposed City of Yakima Grade Separation project have consisted of drilling and sampling 22 borings and excavating 6 test pits at select locations in the project area between 2001 and 2012. Sixteen borings, designated L-1 through L-14, L-16, and L-17, were drilled along Lincoln Avenue, and six borings, designated B-1 through B-6 were drilled along Martin Luther King Jr. Boulevard (formerly known as B Street). Borings L-1 to L-4 and B-1 to B-4 were drilled in March 2001 using mud -rotary drilling techniques. Borings L-5, L-6, B-5, and B-6 were drilled in December 2007 using a Becker hammer drill. Borings L-7 through L-14, L-16, and L-17 were drilled in January 2011 during the Lincoln Avenue grade separation construction using roto -sonic drilling methods. Two test pits were excavated in May 2004, and four test pits were excavated in April 2012. The borings ranged in depth from 16.5 to 55 feet below ground surface (bgs), and the test pits were excavated to depths of between about 3 and 23 feet bgs. Driven soil samples were obtained generally at 2.5- to 5.0 -foot intervals in borings L-1 to L-6 and B-1 to B-6. Monitoring wells were installed in borings B-3, L-2, L-8, L-9, L-11, L-13, and L-16. The results of those explorations (except borings L-7 through L-17) have been summarized in the following reports: • Draft Geotechnical Engineering Report, City of Yakima Grade Separation Project Yakima, Washington, July 2001. • Test Pit Excavation Results and Revised Recommendations, Yakima Grade Separation Project, Yakima, Washington, July 27, 2004. • Results of Becker Hammer Soil Borings, Yakima Railroad Grade Separation Project, Yakima, Washington, February 5, 2008. • Summary Report for Test Pit Excavation and Pilot Infiltration Testing at the Lincoln Avenue Grade Separation, Yakima, Washington, June 20, 2012. Approximate locations of the explorations performed at the project site are shown in Figure 3, Site and Exploration Plan. The exploration locations were estimated by hand taping from existing site features. A soil classification and log key is presented in Figure A-1 as a reference for symbols and information presented on the boring logs. The logs of the explorations are presented as Figures A-2 through A-29. 21-1-09306-0I 0-R I-AA.docx/wp/lkn A-1 21-1-09306-010 SHANNON WILSON, INC. A.2 EXPLORATIONS A.2.1 Mud -rotary Drilling Borings L-1 to L-4 and B-1 to B-4 were drilled between March 13 and 21, 2001, by Geo -Tech Explorations, Inc., of Kent, Washington, under subcontract to Shannon & Wilson, Inc. They were drilled using a CME -75 truck -mounted drill rig with traditional mud rotary techniques and 4 7/8- and 6 -inch drill bits. During mud -rotary drilling, drilling mud, consisting of bentonite slurry, is pumped out of a mud tank at the ground surface, down the drill rods, out through the bit, up the annulus of hole between the drill rods and borehole, and back into the mud tank. The circulation of drilling mud removes the cuttings generated during the drilling process from the hole and carries them to the surface where they are allowed to settle out in the mud tank. The cuttings were periodically removed from the tank, placed in drums, and removed from the site for disposal. Drilling mud also keeps the hole from caving or collapsing during sampling. Samples are obtained by removing the drill rods and drill bit from the borehole, removing the drill bit from the end of the rods, attaching a sampler to the drill rods, and lowering the sampler to the bottom of the hole. Upon their completion, observation wells were installed in borings B-3 and L-2. Details of the monitoring well installation for these two borings are shown on the respective boring logs. A.2.2 Becker Hammer Drilling Borings L-5, L-6, B-5, and B-6 were drilled between December 10 and 13, 2007, by Great West Drilling, Inc. (GWD) of Fontana, California, under subcontract to. Shannon & Wilson, Inc. GWD advanced the borings using a Becker AP 1000 drill rig, which uses an impact hammer, similar to a pile driver, to advance two steel casings into the ground: a 9 -inch -diameter outer casing and a 6 -inch -diameter inner casing. The casings are driven into the ground as compressed air is forced through the annular space between the casings. The air forces the soil and groundwater up the inner casing and delivers it to the ground surface through a hopper. The hopper deposits the soil into a waiting bin. A continuous log of the soil deposited into the bin was recorded. A.2.3 Sonic Core Drilling Borings L-7 through L-14, L-16, and L-17 were accomplished on January 11 to 19, 2011, by Boart Longyear, Inc. using a Boart Longyear track -mounted Spider sonic core (roto -sonic) drill. The sonic core drilling method uses high -frequency vibratory motion applied to the top of the drill column, along with down -pressure and rotation, to obtain nearly continuous core 21-1-09306-010-RI-AA.docx/wp/Ikn A-2 21-1-09306-010 SHANNON iWILSON. INC. samples in soil and rock. Soil samples were obtained using a 4 -inch or 6 -inch outside -diameter (O.D.) core barrel. As the drill column was advanced into the ground, soil entered the core barrel. After advancing the core barrel a specific distance (termed a core "run"), the drill column and core barrel were then removed from the borehole, and the soil core was extracted from the core barrel. After retrieval of the soil core for a specific interval, a temporary casing was vibrated to the bottom of the sampled interval. The casing was then cleared of slough and the next core sample was collected, starting at the bottom of the temporary casing. Upon their completion, observation wells were installed in borings L-8, L-9, L-11, L-13, and L-16. Details of the monitoring well installation for these two borings are shown in the respective boring logs. A.2.4 Test Pit Exavations Test pits TP -1 and TP -2 were excavated on May 11 and 12, 2004, by Ken Leingang Excavators of Yakima, Washington, using a John Deere 829ELC excavator to depths of about 21 and 23 feet bgs. Test pits TP -1 through TP -4 were excavated on May 10 and 11, 2012, by Apollo Construction, during construction of the Lincoln Avenue grade separation to depths of between about 3 and 10 feet bgs. A.3 SAMPLING In the mud -rotary borings, soil sampling was generally conducted at 2.5 -foot intervals to a depth of 20 feet and at 5 -foot intervals thereafter using a drive sampler. Driven and grab samples were collected from the Becker hammer borings at about 5 -foot intervals. Disturbed soil samples were obtained by a split -spoon sampler (sometimes known as a split -barrel sampler) used in conjunction with a penetration test. Core samples from the sonic borings were collected in Lexan liners, or in flexible plastic bags. The Lexan liners consist of hard plastic tubes inserted into the core barrel prior to advancing the core barrel. As the core barrel is advanced, the core is retained in the liner. Lexan liners were used to collect the core in borings L-7, L-10, L-12, L-16, and L-17. Flexible bags were used for the remaining sonic core borings. Representative grab samples were collected from the test pits for review and testing. A Shannon & Wilson, Inc. representative was present throughout the drilling and test pit procedures to collect soil samples, visually classify the samples, and to prepare an exploration log for each boring and test pit. After classification, representative soil samples were sealed to 21-1-09306-010-RI-AA.docx/wp/Ikn A-3 21-1-09306-010 SHANNON 6WILSON, INC. help preserve the natural moisture content of the soil and returned to our laboratory in Seattle, Washington, for analyses. A.4 PENETRATION TEST To obtain a disturbed soil sample in the mud -rotary and Becker hammer borings, penetration tests were performed in general accordance with the American Society for Testing and Materials/ASTM International (ASTM) D 1586, Test Method for Penetration Test and Split - Barrel Sampling of Soils. However, Dames & Moore sampling equipment was used because the samples are larger and generally of higher quality for sampling gravelly soils than those obtained with Standard Penetration Test equipment. The Dames & Moore sampler is a 2.5 -inch inside diameter, 3 -inch O.D., split -spoon sampler, larger than the standard sampler. The sampler was driven with a 300 -pound hammer falling freely a height of 30 inches. The number of blows required to achieve each of three 6 -inch increments of sampler penetration was recorded. The number of blows required to cause the last 12 inches of penetration is termed the Penetration Resistance. When penetration resistances exceeded 50 to 100 blows for 6 inches or less of penetration, the test was terminated, and the number of blows recorded along with the penetration distance. The penetration resistances were recorded by our field representative and are plotted on the boring logs. These values are empirical parameters that provide a means of evaluating the relative density or compactness of cohesionless (granular) soils and the relative consistency (stiffness) of cohesive soils. The terminology used to describe the relative density or consistency of the soils is presented in Figure A-1. The split -spoon sampler used during the penetration testing recovers a disturbed sample of the soil, which is useful for identification and classification purposes. The samples were classified and recorded on field logs by our engineer or geologist. The samples were sealed in jars and returned to our laboratory for testing. A.5 EXPLORATION LOGS Field exploration logs were prepared by our field representative for each exploration to record the encountered subsurface conditions at that time. Pertinent information, including depths, stratigraphy, engineering characteristics, and groundwater occurrence, were recorded. The summary boring logs presented in this report represent our interpretation of the field exploration logs, and are a written record of the subsurface conditions encountered in the boring at the time of exploration. It graphically shows the geologic units (layers) encountered in the boring and the 21-1-09306-010-RI-AA.docx/wp/Ikn A-4 21-1-09306-010 SHANNON &WILSON. INC. Unified Soil Classification System symbol of each geologic layer. The stratigraphic contacts indicated on the summary logs represent the approximate boundaries between soil or rock types at those locations. Other information shown on the boring logs include details of installed observation wells, the water level measured during drilling or in the observations wells, approximate surface elevation, and types and depth of sampling. The subsurface conditions were those recorded at the time of drilling, and may not necessarily represent those at other times and locations. A.6 REFERENCE American Society for Testing and Materials/ASTM International (ASTM), 2000 - 2007, 2000 - 2007 annual book of standards, construction, volume 04.08, soil and rock (I): West Conshohocken, Penn. 21-1-09306-010-RI-AA.docx/wp/lkn A-5 21-1-09306-010 BORING CLASS1 21-09306.GPJ SWNEW.GDT 8/17/12 Shannon & Wilson, Inc. (S&W), uses a soil classification system modified from the Unified Soil Classification System (USCS). Elements of the USCS and other definitions are provided on this and the following page. Soil descriptions are based on visual -manual procedures (ASTM D 2488-93) unless otherwise noted. S&W CLASSIFICATION OF SOIL CONSTITUENTS • MAJOR constituents compose more than 50 percent, by weight, of the soil. Major consituents are capitalized (i.e., SAND). • Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by "slightly" compose 5 to 12 percent of the soil (i.e., slightly silty SAND). • Trace constituents compose 0 to 5 percent of the soil (i.e., slightly silty SAND, trace of gravel). MOISTURE CONTENT DEFINITIONS Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table ABBREVIATIONS ATD Elev. ft FeO MgO HSA ID in lbs Mon. N NA NP OD OVA PID ppm PVC SS SPT USC WOH WOR WLI At Time of Drilling Elevation feet Iron Oxide Magnesium Oxide Hollow Stem Auger Inside Diameter inches pounds Monument cover Blows for last two 6 -inch increments Not applicable or not available Non plastic Outside diameter Organic vapor analyzer Photo -ionization detector parts per million Polyvinyl Chloride Split spoon sampler Standard penetration test Unified soil classification Weight of hammer Weight of drill rods Water level indicator GRAIN SIZE DEFINITION DESCRIPTION SIEVE NUMBER AND/OR SIZE FINES <#200 (0.08 mm) SAND* - Fine - Medium - Coarse #200 to #40 (0.08 to 0.4 mm) #40 to #10 (0.4 to 2 mm) #10 to #4 (2 to 5 mm) GRAVEL* - Fine - Coarse #4 to 3/4 inch (5 to 19 mm) 3/4 to 3 inches (19 to 76 mm) COBBLES 3 to 12 inches (76 to 305 mm) BOULDERS > 12 inches (305 mm) * Unless otherwise noted, sand and gravel, when present, range from fine to coarse in grain size. RELATIVE DENSITY / CONSISTENCY COARSE-GRAINED SOILS FINE-GRAINED SOILS N, SPT, BLOWS/FT. RELATIVE DENSITY N, SPT, RELATIVE BLOWS/FT. CONSISTENCY 0 - 4 4 - 10 10 - 30 30 - 50 Over 50 Very loose Loose Medium dense Dense Very dense Under 2 2 - 4 4 - 8 8 - 15 15 - 30 Over 30 Very soft Soft Medium stiff Stiff Very stiff Hard WELL AND OTHER SYMBOLS Bent. Cement Grout Bentonite Grout Bentonite Chips Silica Sand PVC Screen Vibrating Wire '• Surface Cement Seal Asphalt or Cap Slough Bedrock Yakima Grade Separation Project Yakima, Washington SOIL CLASSIFICATION AND LOG KEY August 2012 21-1-09306-010 SHANNON & WILSON, INC. FIG. A-1 Geotechnical and Environmental Consultants Sheet 1 of 2 BORING CLASS2 21-09306.GPJ SWNEW.GDT 8/17/12 UNIFIED SOIL=CLASSIFICATION SYSTEM:(USCS) (From' USACE Tech)Memo 3 357)' MAJOR DIVISIONS GROUP/GRAPHIC SYMBOL TYPICAL DESCRIPTION COARSE- GRAINED (more than 50% retained on No. 200 sieve) Gravels (more than 50% of coarse fraction retained on No. 4 sieve)GM Clean Gravels (less than 5% fines) GW . w In • 1' 1• '� Well -graded gravels, ravels, gravel/sand mixtures,iittle or no fines. GP V 0 o la,',„"C Poorly graded gravels, gravel -sand mixtures, little or no fines Gravels with Fines (more than fines) 12/ . w 1. '' I. 6 Silty gravels, gravel -sand -silt mixtures GC dli / Clayey gravels, gravel -sand -clay y mixtures Sands (50% or more of coarse fraction passes the No. 4 sieve) Clean Sands (less than 5% fines) SW Well -graded sands, gravelly sands, or no fines SP Poorly graded sand, gravelly sands, little or no fines Sands with Fines (more than 12% fines) SM Silty sands, sand -silt mixtures SC Clayey sands, sand -clay mixtures FINE-GRAINED SOILS (50% or more passes the No. 200 sieve) Silts and Clays (liquid limit less than 50) Inorganic ML Inorganic silts of low to medium plasticity, rock flour, sandy silts, gravelly silts, or clayey silts with slight plasticity CL ��i j Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays Organic anic OL —_ —_ Organic silts and organic silty clays of low plasticity Silts and Clays (liquid limit 50 or more) Inorganic MH 0 Inorganic silts, micaceous or diatomaceous fine sands or silty soils, elastic silt CH Inorganic clays of medium to high pias plasticity, sandy fat clay, or gravelly fat cy Organic OH //, // plasticityclorganic medium to high ORGANIC SOILS Primarily organ c matter, dark in color, and organic odor PTS A. A,n n./ Peat, humus, swamp soils with high organic content (see ASTM D 4427) NOTE: No. 4 size = 5 mm; No. 200 size = 0.075 mm NOTES 1. Dual symbols (symbols separated by a hyphen, i.e., SP -SM, slightly silty fine SAND) are used for soils with between 5% and 12% fines or when the liquid limit and plasticity index values plot in the CL -ML area of the plasticity chart. 2. Borderline symbols (symbols separated by a slash, i.e., CL/ML, silty CLAY/clayey SILT,* GW/SW, sandy GRAVEL/gravelly SAND) indicate that the soil may fall into one of two possible basic groups. Yakima Grade Separation Project Yakima, Washington SOIL CLASSIFICATION AND LOG KEY August 2012 21-1-09306-010 SHANNON & WILSON, INC. FIG. A-1 Geotechnical and Environmental Consultants Sheet 2 of 2 t MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 52 ft. Northing: Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: — 1070 ft. Easting: — Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: — 80+67 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: — 17 Ft. L Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. a a) 0 0 0 E V) a) 0 E co U) a c � (tf o Q a> O PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 3001bs/30 inches 0 20 40 60 -\Asphalt Paving Dense GRAVEL; (Hf) GP. Loose, brown, slightly fine sandy SILT; moist; (Hf) ML. J Medium dense to very dense, gray -brown, trace to slightly silty, sandy GRAVEL, dry to moist; abundant cobbles and possibly boulders inferred from drill action, scattered weathered zones with a trace of clay; (Qt) GP-GM/GP. - Becomes wet at about 17 feet. Very dense, gray, gravelly, fine to medium SAND; moist to wet; hydrocarbon odor; (Qt) \SP. Very dense, brown and gray, slightly silty, sandy GRAVEL, trace of clay; wet; abundant cobbles and possibly boulders inferred from drill action; (Qt) GP -GM. - sand seam from 33 to 34 feet - weathered with increasing silt and clay at 45.0 feet BOTTOM OF BORING COMPLETED 3/21/2001 CONTINUED NEXT SHEET 0.7 2.0 4.0 19.5 23.0 52.0 owl 0U 21 �o J o C s� 0 o 41 00 ( sCI 00( 6� 1i 0 9 o =* 00 00(10 o = )o C 11 m * o C 12 0 o o = 13s* o 00 C Q c O 14 00 C 0 )O o C 15 5 10 15 20 25 30 35 40 45 50 55 041 • • 86/b 100/3"A 50/6° 1.00/4'.'A 1.00/3"A 105/6",* Ac LEGEND * Sample Not Recovered I 3.25" O.D. Split Spoon Sample NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING L- 1 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-2 Sheet 1 of 2 REV 3 MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 52 ft. Northing: — Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: — 1070 ft. Easting: — Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: -- 80+67 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: — 17 Ft. L Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. a a) 0 0 0 E a) a E co U) -a C o m o 0 _c - ca. n. a) 0 PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 300Ibs / 30 inches 0 20 40 60 Notes: - Lost about 40 gallons of drilling mud around depth of 12.5 feet. - Lost drilling mud around approximate depth of 17 feet. LEGEND * Sample Not Recovered I 3.25" O.D. Split Spoon Sample NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 65 70 75 80 85 90 95 100 105 110 115 0 20 40 O % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING L- 1 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-2 Sheet 2 of 2 REV 3 1 1 x 0 CO N. 0 q a to rn 9 N w 0 0 rnto w 2 Total Depth: 30.4 ft. Northing: - Drilling Method: Mud Rotary Hole Diam.: 6 in. Top Elevation: - 1070 ft. Easting: - Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: -- 78+85 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: - 17 Ft. L. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. p_ N Symbol Samples Ground Water Depth, ft. PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 300 lbs / 30 inches 0 20 40 60 -\Asphalt Paving 0.7 3.0 12.0 14.5 30.4 ti 21 31 44- sT 6 0 7T. 6 9=* 10= = `_ \ \ \\ ._ _ \ 5 \ 10 \ 15 \ 20 25 • • Medium dense, brown, slightly fine sandy SILT; moist; (Hf) ML. F. • 1 / • 1 • 1 Medium dense to very dense, brown, silty, sandy GRAVEL to sandy GRAVEL, trace of silt; moist; scattered cobbles and possibly boulders inferred from drill action; (Qt) GM/GP. • •_ 624 �. —• 794 Dense, brown, slightly silty, sandy GRAVEL;° moist; scattered cobbles and possibly boulders inferred from drill action; (Qt) GP -GM. / J • • I • 1 1 • 1 r 1 1 . • 50/5.5% Dense to very dense, brown and gray, silty,• sandy GRAVEL; wet; locally trace of clay, scattered cobbles and possibly boulders inferred from drill action; (Qt) GM. 50/4.5"I • 76/1" 4 100/4. 30 35 40 45 BOTTOM OF BORING COMPLETED 3/14/2001 Notes: - Lost little drilling mud around depth of 9 feet. -Lost drilling bit in hole. Abandoned hole. Moved about 4 feet to west, redrilled to 12.5' and continued sampling. - Lost about 30 gallons of drilling mud in upper 6 feet. ......... ......... 0 20 40 60 LEGEND * Sample Not Recovered I H I Piezometer Screen and Sand Filter O % Fines (<0.075mm) I 3.25" O.D. Split Spoon Sample H H Bentonite -Cement Grout • % Water Content I Split Spoon 1•• Bentonite Chips/Pellets H H Bentonite Grout M Ground Water Level in Wet NOTES Yakima Grade Separation Project Yakima, Washington ' 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF BORING L- (MVV -2) 2 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants I FIG. A-3 REV 3 z x a 0 mCD cip w 0 Ui W a Total Depth: 31.5 ft. Northing: — Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: — 1071 ft. Easting: — Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: — 77+28 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: — 22 Ft. R. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. to a) 0. E to -c c a.) 7 ai o O c 0 PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 0 20 300 lbs / 30 inches 40 60 Asphalt Paving Dense GRAVEL; (Hf) GP. Hard, brown, slightly clayey, fine, sandy SILT; moist; massive; (Hf) ML. Dense to very dense, brown and gray, slightly silty to silty, sandy GRAVEL; moist to wet; scattered to abundant cobbles and possibly boulders inferred from drill action, locally trace of clay; (Qt) GW-GM/GM. BOTTOM OF BORING COMPLETED 3/16/2001 0.8 1.0 3.0 31.5 • • • I. a m lie $ V m 10 15 20 25 30 35 40 45 50 55 • • ..: • • •; • 86/11.5'* 95/11 5".• 66* 92a 74/10.5"AL 69 AL 100/5'* 101/b• 85/6" • LEGEND Sample Not Recovered a Ground Water Level ATD 3.25" O.D. Split Spoon Sample NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 20 40 60 O % Fines (<0.075mm) • % Water Content Yakima Grade Separation Project Yakima, Washington LOG OF BORING L- 3 August2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-4 REV 3 z Log: KJB Rev: HJS MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 16.5 ft. Northing: - Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: - 1072 ft. Easting: Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: - 75+81 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: - 17 Ft. L. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Asphalt Paving Dense GRAVEL; (Hf) GP. Hard, slightly clayey, gravelly, sandy SILT; moist; numerous cinder fragments; (Hf) ML. Dense to very dense, brown, slightly silty, sandy GRAVEL, moist to wet; scattered cobbles and possibly boulders inferred from drill action; (Qt) GW -GM. - Becomes wet at about 10 feet. BOTTOM OF BORING COMPLETED 3/15/2001 s 0 a) 0 0.8 1.0 3.0 16.5 0 .0E a rn LEGEND * Sample Not Recovered SZ Ground Water Level ATD I 3.25" O.D. Split Spoon Sample a� 0 E f0 U) 11 21 3/ 4II 61 NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. During Drilling ,1 C O (6 o L n a) 0 5 10 15 20 25 30 35 40 45 50 55 PENETRATION RESISTANCE (blows/foot) A Hammer Wt. & Drop: 300 lbs / 30 inches 0 • 20 40 60 83/11.5" • 93 0 20 40 O % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING L- 4 August 2012 21-1-09306-010 SHANNON & WILSON, INC. FIG. A-5 Geotechnical and Environmental Consultants REV 3 Log: KPC Rev: BMR MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 50 ft. Northing: - Drilling Method: Advanced Casing Hole Diam.: 9 in. Top Elevation: - 1071 ft. Easting: - Drilling Company: Great Western Rod Diam.: Vert. Datum: Station: - 77+00 ft. Drill Rig Equipment: Becker Hammer Hammer Type: Cathead Horiz. Datum: Offset: - 20 Ft. R. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. a a) C 0 0 E rn a) 0) 0 E co rn L N o 0 0 PENETRATION RESISTANCE (blows/foot) A Hammer Wt. & Drop: 300lbs /30 inches 0 20 40 60 Asphalt Paving Medium dense to dense, dark brown, fine to medium GRAVEL; moist; (Base Course - Hf) GP. Medium dense to dense, brown, sandy GRAVEL; moist; numerous cobbles, scattered boulders inferred by drill action; (Qt) GW. Dense to very dense, brown and gray, trace to slightly silty, sandy GRAVEL, trace of clay; moist; scattered to numerous cobbles, scattered boulders inferred by drill action; (Qt) GP-GM/GP. BOTTOM OF BORING COMPLETED 12/12/2007 1.0 2.0 19.0 50.0 d Ti .'. .• .• .' .• ou O C 00 00 c 00 o \c )0 o0 ( O c oO o ac 'O U 00( o c )o J .0( o(,c lJ -III- 2[ j 3 -111- 4 Tr f11 4-nr 5IE During Drilling 1F1 5 10 15 20 25 30 35 40 45 50 55 LEGEND * Sample Not Recovered ]j[ 3" O.D. Split Spoon Sample GI Grab Sample V Ground Water Level ATD NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 O % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING L- 5 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-6 REV3 Log: KPC Rev: BMR Typ: LKD MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 50 ft. Northing: — Drilling Method: Advanced Casing Hole Diam.: 9 in. Top Elevation: — 1070 ft. Easting: — Drilling Company: Great Western Rod Diam.: Vert. Datum: Station: — 78+70 ft. Drill Rig Equipment: Becker Hammer Hammer Type: Cathead Horiz. Datum: Offset: -- 15 Ft. R. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. n a) 0 0 E fn yr a E co U) c a) o t a a) 0 PENETRATION RESISTANCE (blows/foot) Hammer Wt. & Drop: 300lbs /30 inches 0 20 40 60 Asphalt Paving Medium dense to dense, dark brown, sandy, fine to medium GRAVEL; moist; (Base Course Hf) GP. Medium dense to very dense, brown, slightly silty, sandy GRAVEL; moist to wet; scattered to numerous cobbles, scattered boulders inferred by drill action; (Qt) GP -GM. -Becomes wet at about 17 feet. -Sampler bouncing on a rock at 35 feet. BOTTOM OF BORING COMPLETED 12/13/2007 1.0 5.0 50.0 J o 0 J o C c Do J o C O c J 00 O c �o J 00 0 = �o J o ( O c )O 0 O c J O C O c J 0 0 = J o 0 = �O J o OC O c )O 0 2 3 4 5 6 IGI During Drilling ��J 5 10 15 20 25 30 35 40 45 50 55 LEGEND * Sample Not Recovered I[[ 3" O.D. Split Spoon Sample Grab Sample 2 Ground Water Level ATD NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 O % Fines (<0.o75mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING L- 6 August 2012 21-1-09306-010 SHeANNONandEonmental &IrWILSON ConsWILSON, FIG. A-7 Geot REV3 U 0 0 Total Depth: 30 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1064 ft. Easting: — 0 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: — 68+50 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Gray to brown and dark gray, mix of grout and silty, gravelly SAND; moist; (Hf - Disturbed Soils) SM. 0.7 1.0 4.8 5.7 9.8 10.8 12.10 19.8 10 15 I '. ;.0 o Il j O b O Brown, fine to medium sandy GRAVEL, trace of silt; moist; (Qt) GP. Gray to brown -gray, silty, sandy GRAVEL; moist; (Qt) GM. Brown, slightly silty, sandy GRAVEL; moist; (Qt) GP -GM. _........ ......... _.... .......... .......... _. Gray -brown to brown, slightly silty to silty, sandy GRAVEL; moist becoming wet at approximately 7.3 feet; scattered zones with trace of silt; (Qt) GP-GM/GM. Gray -brown, silty, gravelly SAND; moist; (Qt) SM. t� Q Gray -brown, trace to slightly silty, sandy GRAVEL; moist; (Qt) GP-GM/GP. Brown to gray -brown, trace to slightly clayey, silty, sandy GRAVEL; moist to wet; scattered cobbles; (Qt) GM. -Scattered cobbles about about 16.5 feet. II ' 1 1� • • • 1� • SHEET 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) •% Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 7 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-8 Sheet 1 of 2 REV 3 1 1 a- U WDN Rev:DPO Total Depth: 30 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1064 ft. Easting: — 0 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: — 68+50 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, silty, sandy GRAVEL; wet; (Qt) GM. 20.5 21.5 22.4 22.9 24.2 30.0 • 0 of o I 7 ` 25 30 35 Brown, sandy GRAVEL, trace of silt; wet; (Qt) SGP. /-- BrownA, slightly silty, sandy GRAVEL; wet; (Qt) \GP -GM. /- ov vK • 1• b ; �1 • 1 • . 1 • /•b • • R-6 Brown, sandy GRAVEL, trace of silt; wet; (Qt) GP. 1ccobbles;Brown, (Qyt)sGlndy GRAVEL; wet; scattered M. Gray -brown, trace to slightly clayey, silty, sandy GRAVEL; wet; (Qt) GM. - Trace of silt from 26.3 to 26.5 feet. BOTTOM OF BORING COMPLETED 1/12/2011 ......................................................................................... 0 20 40 60 LEGEND * Sample Not Recovered 0 % Fines (<0.075mm) Soil Core (as in Sonic Core Borings) • % Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 7 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-8 Sheet 2 of 2 REV 3 4 0 0 0 a. 0 -J0 m �- 0 a a t0 0 r" m 0 w 0 a. w N Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1062 ft. Easting: - 10 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 69+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, silty, sandy GRAVEL to silty, gravelly SAND; moist; scattered cobbles; (Qt) GM/SM. 2.5 5.0 10.0 10.7 13.2 13.8 17.0 18.0 'J • 0 ' b 0 0 I o 3 - 1115 j1 o41' oil 0 /1 01 0 k 0 0 (, j. °2 2 .� 1 s .,‘,. -i,, \ \\ \ \ '% \ \\ \ 10 \ 15 \ N Brown, trace to slightly silty, sandy GRAVEL; moist; (Qt) GP/GP-GM. Brown, slightly silty to silty, sandy GRAVEL; moist to wet at approximately 3 feet; numerous cobbles, (Qt) GP-GM/GM. Brown, trace to slightly silty, sandy GRAVEL; -\wet; scattered cobbles; (Qt) GP-GM/GP. Brown, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. Brown, trace to slightly silty, sandy GRAVEL; \wet; (Qt) GP/GP-GM. [ a - o a 111 lit o I o Brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles, scattered silty zones; (Qt) GP-GM/GM. Brown, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. .- Brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles, scattered silty zones; (Qt) GP GM/GM. CONTINUED NEXT SHEET 0 C •20 40 60 LEGEND * Sample Not Recovered i H 1 Piezometer Screen and Sand Filter O % Fines (<0.075mm) • 0 Soil Core (as in Sonic Core Borings) H N Bentonite -Cement Grout %Water Content I Sample Test Interval ••• Bentonite Chips/Pellets 0 0 Bentonite Grout T. Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. O LOG OF SONIC CORE L- 8 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-9 Sheet 1 of 3 REV 3 1 CO0.1 0 0 0 COa 0 0 a, m 9 w 0 0 ccw w 0, Total Depth: 50 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: — 1062 ft. Easting: — 10 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: — 69+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Dark gray -brown, slightly silty, slightly gravelly SAND; moist to wet; fines upward; (Qt) SW -SM. 20.0 21 22'6 24.9 26.0 28.0 29.9 31.0 32.0 33.0 35.0 37.4 °° • e° e e - : o e --5 -7 $ 1 4 .► . • ,; ;2 _ - _ _ _. - _ __ — 25 30 35 • Brown, silty, gravelly SAND; wet; (Qt) SM. :.:... . •: I: • 1 Brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GM/GP-GM. Brown, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM.t .............. Brown, slightly silty to silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GP-GM/GM. c '•• • U (R_6 ;:: Brown, trace to slightly clayey, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. Brown, slightly silty, fine to medium SAND; wet; (Qt) SP -SM. Dark gray -brown, trace of fine gravel to gravelly SAND, trace of silt; wet; (Qt) SP. ..— o 3 Z c LC o J ( Brown -gray, trace to slightly silty, sandy —\GRAVEL; wet; (Qt) GP/GP-GM. 7- Brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Yellow-brown, silty, sandy GRAVEL, trace of clay; wet; iron -oxide staining; (Qt) GM.- ' • 1 Brown -gray and red -brown, trace to slightly clayey, silty, sandy GRAVEL; wet; (Qt) GM. - At 39 feet becomes dark gray with trace of clay. CONTINUED NEXT SHEET • I • • �i 0 20 40 60 LEGEND * Sample Not Recovered I . H 1 Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) [ l N Bentonite -Cement Grout • % Water Content I Sample Test Interval MI Bentonite Chips/Pellets VIM Bentonite Grout .M Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 8 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-9 Sheet 2 of 3 REV 3 0 -J Log: WDN Rev: DPO 0.1 0 0 0 x 0 0 Co 0 M w 0 w Total Depth: 50 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: — 1062 ft. Easting: — 10 ft. Drilling Company: Boart Lon ear Rod Diam.: Vert. Datum: Station: — 69+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. s a co Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, trace to slightly silty, sandy GRAVEL; wet; (Qt) GP-GM/GP. 40.0 41.3 42.2 43.1 44.0 45.7 48.0 50.0 a11. 0` ti = _ 45 Gray -brown, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM. .�- . mom. o Ii I: Gray -brown, slightly silty, sandy GRAVEL; wet; —\(Qt) GP -GM. f Brown, silty, sandy GRAVEL, trace of clay; \wet; (Qt) GM. „.� o ,0� �. Brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. � 1 11 10 Brown -gray, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM. Brown to gray -brown, slightly clayey, silty, sandy GRAVEL; wet; scattered cobbles, locally clayey; (Qt) GM. BOTTOM OF BORING COMPLETED 1/11/2011 50 55 0 20 40 60 LEGEND * Sample Not Recovered I H 1 Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) 0 Soil Core (as in Sonic Core Borings) F l it Bentonite -Cement Grout • %Water Content I Sample Test Interval fin Bentonite Chips/Pellets lA M Bentonite Grout 1 Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. p LOG OF SONIC CORE L- 8 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-9 Sheet 3 of 3 REV 3 - O a a a, 9 N w (2 0 Ui w a Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1059 ft. Easting: - 20 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 69+77 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, trace to slightly silty, sandy GRAVEL; wet; (Qt) GP/GP-SM. 1.2 2.2 4'2 5.0 6 2 8'9 11.1 13.6 14.3 °`J j �• o II 0 1 •� j °„�j ° (l • 3 cv \ \ \ \ \ \ \ 5 \ \ 10 \ \ .................... Brown, silty, sandy GRAVEL; moist to wet; scattered cobbles; (Qt) GM. Brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. Dark gray, sandy GRAVEL, trace of silt; wet; (Qt) GP. ° 4 •\ Gray -brown, trace to slightly silty, sandy SGP-GM/GP. GRAVEL; et; scattered cobbles; (Qt) �- ° n 111 .................................... 0 • 1 ° r.--2 o Dark gray to brown -gray, sandy GRAVEL, trace of silt; wet; scattered cobbles; (Qt) GP.oO Brown to dark gray, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. ° j 1 �' 1 °II • �p 1 011 • • 11- j 1M o.,, ( I,;1• , • O Yellow-brown, sandy GRAVEL, trace of silt; moist; scattered iron -oxide staining; (Qt) GP. /---11.5 Gray -brown and yellow-brown, silty, sandy/� GRAVEL, trace of clay; moist; numerous cobbles, iron -oxide stained; (Qt) GM. Dark gray, slightly silty, sandy GRAVEL; moist; ,(Qt) GP -GM. - CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered I H1 Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) ENE' Bentonite -Cement Grout • %Water Content I Sample Test Interval !•• Bentonite Chips/Pellets 11 Bentonite Grout Y Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 9 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-10 Sheet 1 of 4 REV 3 CL 0 n o C3 0 c7 S a a t7 m 0 N w 0 0 w 5) Q Total Depth: 50 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: — 1059 ft. Easting: — 20 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: — 69+77 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown -gray, silty, sandy GRAVEL, trace of clay; moist; scattered iron -oxide staining; (Qt) GM. J � J o 041,0,--' o 0 V o 0 _ 0 • ir. �irr <> \ 2• $ 2 \ 25 • 0 $, Gray -brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Brown, silty, sandy GRAVEL, trace of clay;wet; scattered cobbles; (Qt) GM.- Becomes yellow-brown to dark gray at approximately 19.5 feet.Brown-gray, 177 21.8 �`• 22.3 Wig 11 N�C L slightly silty, sandy GRAVEL; wet;.............................. (Qt) GP -GM. Brown, silty, sandy GRAVEL; wet; cobbles; (Qt) GM.22.8 Brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. 23.7\ Brown -gray, silty, sandy GRAVEL; wet; (Qt)� GM. 24.3 25.0"--s 25.8 26.3 ,,` M1e 27.2ail( :4, ' r'4ENE MIR Brown -gray to yellow-brown, slightly silty, sandy GRAVEL; wet; iron -oxide stained; (Qt) GP -GM. 90 _............ Gray brown, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. Yellow-brown to gray -brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GM/GP-GM. Brown -gray, slightly silty, sandy GRAVEL; wet; numerous cobbles; (Qt) GP -GM. Brown -gray, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM. CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered I H I Piezometer Screen and Sand Filter % Fines (<0.075mm) • [2] Soil Core (as in Sonic Core Borings) I N Bentonite -Cement Grout %Water Content I Sample Test Interval IA!IF0 Bentonite Chips/Pellets H H Bentonite Grout M Ground Water Level in Wet NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 9 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A -1D Sheet 2 of 4 REV 3 0 0 a 0 csi co F- 0 z x a- 0 rn 9 N w cnO' 0 w I- i Total Depth: 50 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: — 1059 ft. Easting: — 20 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: -- 69+77 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. n N Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown -gray to gray, trace to slightly clayey,-\ silty, sandy GRAVEL; wet; numerous cobbles, scattered yellow-brown zones; (Qt) GM. 30.0 34.2 • 35.4 40.0 41.0 43.2 0 �- 1_ j ° �� 0 ................................................................... 0,l j i- ���� 1 • l_. /1 • / • •1 . �r • �� /� o..r 011 , �� j 41 li b --s P — _: _ _ — _ _ —_ _ - _ - `_ __ _ _ _• _ _ — - 35 40 Brown to yellow-brown, trace to slightly clayey, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. Gray -brown and yellow-brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. Brown, silty, sandy GRAVEL; wet; (Qt) GM. - Contains trace of clay and with scattered slightly silty zones below approximately 36.5 feet. Dark gray,slightly clayey, silt sandy39.6 9 Y Y Y Y GRAVEL; moist; (Qt) GM. ` Brown, silty, sandy GRAVEL; wet; (Qt) GM. Brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. Brown to brown -gray, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered MOM Piezometer Screen and Sand Filter % Fines (<0.075mm) 0 Soil Core (as in Sonic Core Borings) ••\ Bentonite -Cement Grout • % Water Content I Sample Test Interval l.':1•0! Bentonite Chips/Pellets •■• Bentonite Grout T Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 9 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-10 Sheet 3 of 4 REV 3 o - U Log.' WDN Rev: DPO m 0 0 0 3 cn a 00 m 9 N w 0 0 W Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1059 ft. Easting: - 20 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 69+77 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: -- Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 r ,: P _. ....... ....... Dark gray, slightly silty, sandy GRAVEL; wet; --\(Qt) GP -GM. F 46.3 46.8 ° + . +0 to it • 1 Brown to yellow-brown, silty, sandy GRAVEL; wet; scattered cobbles, scattered slightly silty zones; (Qt) GM. BOTTOM OF BORING COMPLETED 1/13/2011 50.0 50 55 0 20 40 60 LEGEND * Sample Not Recovered I H I Piezometer Screen and Sand Filter % Fines (<0.075mm) • 0 Soil Core (as in Sonic Core Borings) N H Bentonite -Cement Grout %Water Content I Sample Test Interval ••• Bentonite Chips/Pellets rl H Bentonite Grout M Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L- 9 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG, A -1O Sheet 4 of 4 REV 3 a U 0 0 Cat) 0 Total Depth: 45 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1060 ft. Easting: — 30 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: — 70+14 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Gray -brown, slightly silty to silty, sandy GRAVEL; moist; (Qt) GP-GM/GM. 1.5 4.3 5.6 8.5 9'9 11.6 13.2 16.0 18.3 1.0 ° l ) ��� _ 3 5 10 15 Gray -brown to brown, silty, sandy GRAVEL moist to locally wet; locally trace of clay; (Qt)• GM. •lbr 1 / • Brown, slightly silty, gravelly, fine to medium SAND; wet; (Qt) SP -SM. ! :.•..• 01. 1• o lIoR-2 0 ''e 0 o C)` )o 0 ° ( ..................... Brown, slightly silty, sandy GRAVEL; wet; (Qt)° GP -GM. Brown, sandy GRAVEL, trace of silt; wet; (Qt) GP. Brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. Gray -brown, silty, sandy GRAVEL moist; locally trace of silt; (Qt) GM. • • ►R_ / li• S. 1 • 1 01 j c D. o (R-4 ? Gray -brown to gray, trace to slightly clayey, silty, sandy GRAVEL; moist; (Qt) GM. Yellow-brown, slightly silty to silty, sandy GRAVEL; wet; scattered slightly clayey zones, iron -oxide stained; (Qt) GP-GM/GM. Yellow-brown, slightly silty, gravelly SAND; wet; scattered silt zones, iron -oxide stained; r \(Qt) SP -SM. CONTINUED NFXT SHEET � •�� b •- 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) 0 Soil Core (as in Sonic Core Borings) • °/,:i Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-10 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-11 Sheet 1 of 3 REV3 a 0 0 0 J Total Depth: 45 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1060 ft. Easting: -- 30 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: — 70+14 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: -- Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Yellow-brown, silty, sandy GRAVEL, trace of clay; wet; iron -oxide stained; (Qt) GM. 20.3 22.0 26.7 28.6 35.0 36.2 37.3 39.8 -s ; ► ►� 4, ► • 25 30 35 • 0 Yelllow-brown, slightly silty, fine to medium SAND; wet; scattered gravelly zones, iron -oxide stained; (Qt) SP -SM. [ 4 � • Il 1. 1 Yellow-brown to brown -gray, trace to slightly clayey, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. -Iron-oxide stained above about 23 feet. Yellow-brown to brown -gray, trace to slightly silty, sandy GRAVEL; wet; scattered iron -oxide -stained zones; (Qt) GP-GM/GP. Brown -gray, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM.10 - Becomes trace to slightly clayey below approximately 30 feet. - Layer of sandy gravel with trace of silt from 34.1 to 34.3 feet. r Gray -brown, slightly silty to silty, sandy _GRAVEL; wet; (Qt) GP-GM/GM. 1 Brown -gray, sandy GRAVEL, trace of silt; wet; Qt �( ) GP. ,— Brown -gray, silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GM. canis-rta-Eo-tdExf sffEET 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) • % Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-1 0 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-11 Sheet 2 of 3 REV 3 Log: WDN Rev: DPO Typ: CLP MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 45 ft. Northing: - 10 ft. Top Elevation: - 1060 ft. Easting: - 30 ft. Vert. Datum: Station: - 70+14 ft. Horiz. Datum: Offset: Drilling Method: Drilling Company: Drill Rig Equipment: Other Comments: Sonic Core Boart Long year Spider Sonic Lexan Liner Hole Diam.: 4 in. Rod Diam.: Hammer Type: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. a a) 0 0 E T fn U) a) a E ns 0) a) 7 N o n. a) 0 0 20 40 60 Brown -gray, slightly silty, fine gravelly SAND; wet; (Qt) SP -SM. Gray -brown, silty, gravelly SAND; wet; (Qt) SM. Gray -brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. BOTTOM OF BORING COMPLETED 1/12/2011 41.2 42.7 45.0 • • ':"R9 ou 0 o o 45 50 55 LEGEND * Sample Not Recovered 12 Soil Core (as in Sonic Core Borings) I Sample Test Interval NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF SONIC CORE L-10 August 2012 21-1-09306-010 SHANNON & WILSON, INC. FIG. A-11 Geotechnical and Environmental Consultants Sheet 3 of 3 REV3 Total Depth: 55 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1066.5 ft. Easting: - 40 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 70+81 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, slightly silty to silty, sandy GRAVEL; moist; (Qt) GP-GM/GM. °" ) 0 0 o \ o "o o 0 �l (ly\ 0 c c ., co '-1 ( o \ \ \ \ \ \ 5 k. \ \ \ 3.6 Dark brown, sandy GRAVEL, trace of silt; -\moist; (Qt) GP. /- 4.2 ° Lc o� a o J oCD \ 00 o-2 )0 ov l o on o Gl 10 )0 c ( , .Gray -brown, slightly silty, sandy GRAVEL; moist; (Qt) GP -GM. - Becomes dark brown with cobbles at approximately 6.7 feet. Brown, silty, fine sand seam at 8.4 approximately 8.2 feet. ........... ............... . Dark brown, slightly silty, sandy GRAVEL; moist; numerous cobbles; (Qt) GP -GM.\ Dark brown, trace to slightly silty, sandy 10.0 GRAVEL; moist; (Qt) GP-GM/GP. Dark gray -brown, sandy GRAVEL, trace of silt; 11.0 moist; scattered cobbles; (Qt) GP. o ) o D o0 ( ° 3cR 3 Gray -brown, slightly silty, sandy GRAVEL; wet; 13.0 numerous cobbles; (Qt) GP -GM. CONTINUED NEXT SHEET ,v j o 0 0 o^ ( 0 20 40 60 LEGEND 0 * Sample Not Recovered I H I Piezometer Screen and Sand Filter %Fines (<0.075mm) Soil Core (as in Sonic Core Borings) l) iii Bentonite -Cement Grout % Water Content I Sample Test Interval eng Bentonite Chips/Pellets H H Bentonite Grout S Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-11 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-12 Sheet 1 of 4 REV 3 1 0 Total Depth: 55 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1066.5 ft. Easting: - 40 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 70+81 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Z Q N Symbol Samples Ground Water Depth, ft. 0 20 40 60 15 . 8 17.5 19.2 20.0 24.6 26.3 27.0 28.2 29.2 C \ N. \ \ N \ N' \ \ \ 20 N \ 25 ........... . ................. ` 1 •- Brown, sandy GRAVEL, trace of silt; wet; (Qt) GP.16.8 GRAVEL; wet; silty, sandy Gray-brown, _,numerous cobbles;slightly (Qt) GP -GM. --s Brown, silty, sandy GRAVEL, trace of clay; wet; numerous cobbles; (Qt) GM. /'•\ .r j o I� °11.5 O 11 1 ° II' Gray -brown, sandy GRAVEL, trace of silt; wet; (Qt) GP. �J •Gray Brown -gray, slighlty silty, sandy GRAVEL; wet; scattered to numerous cobbles; (Qt) GP -GM. li ��i �, • -brown, slightly silty, sandy GRAVEL; wet; scattered to numerous cobbles; (Qt) GW -GM. Brown, slightly silty, sandy GRAVEL; numerous cobbles; (Qt) GP GM. o II" 10 1 11 Brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP-GM/GM. 011 111 Brown, GP -GM. slightly silty, sandy GRAVEL; wet; (Qt) Brown-gray, silty, sandy GRAVEL; wet; with cobbles; (Qt) GM;,ONTINUED NEXT SHEET 0 20 LEGEND 40 60 * Sample Not Recovered I H 1 Piezometer Screen and Sand Filter O % Fines (<0.075mm) • 1 Soil Core (as in Sonic Core Borings) ENE Bentonite -Cement Grout %Water Content I Sample Test Interval tip!•.:! Bentonite Chips/Pellets MN Bentonite Grout Y. Ground Water Level in Well NOTES Yakima Grade Separation Yakima, Washington Project i 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. i LOG OF SONIC CORE August 2012 21-1-09306-010 L-11 [ SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-12 Sheet 2 of 4 REV 3 0 0 a C 0 0 a a- 0 Co 0 a, m 9 w 0 a Total Depth: 55 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1066.5 ft. Easting: . - 40 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 70+81 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, trace to slightly silty, sandy GRAVEL; wet; scattered cobbles, scattered seams with trace of silt; (Qt) GP-GM/GP. 30.0 31.2 O' oH. �.. • 1lt • l CI. . .► '► ' 4 i , ', �► ► ► ► ► 4► 4: '► to N V4 00 .. • • • • IN . . .. = •ElMI• • • • IN MI• No wit • MI • = 1. NI • IN I • C4 V.4 35 40 ivGray-brown, silty, sandy GRAVEL, trace of clay; wet; numerous cobbles; (Qt) GM. Brown, slightly silty, sandy GRAVEL; wet;• \scattered iron -oxide staining; (Qt) GP -GM. F 32.5 �� 1. 7 33.0 ;.r• j 41 o V o �'� 11• o 1I 11 /� 1 oI 110 Iii Dark gray to gray -brown and brown, trace to slightly clayey, slighlty silty, slighlty sandy to sandy, GRAVEL; wet; scattered to numerous cobbles; (Qt) GP -GM. Gray brown, slighty silty, sandy GRAVEL; wet; (Qt) GP GM. 39.7 1. 4 11 b 11 •GRAVEL; Dark gray brown, slightly silty, sandy wet; scattered cobbles; (Qt) \GW -GM. 40.8 111•• 41.7 43.0 i`G •r e, Gray brown, slightly silty, sandy GRAVEL; wet;II FGP -GM. `42.5 A(Qt) Light brown and gray -brown, trace to slightly / clayey, silty, sandy GRAVEL; wet; (Qt) GM. / Gray -brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM/GP-GM. CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered I H I Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) • 2] Soil Core (as in Sonic Core Borings) H 0 Bentonite -Cement Grout %Water Content I Sample Test Interval ti•1 Bentonite Chips/Pellets ••• Bentonite Grout -T- Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-11 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-12 Sheet 3 of 4 REV 3 1 Log: WON Rev: DPO r` o 0 -Ja 0 0 CO rn 9 w 0 0 Ui w C/) Total Depth: 55 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: — 1066.5 ft. Easting: — 40 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: — 70+81 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown to gray -brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP-GM/GM. - Slightly silty, slightly sandy gravel zone at approximately 46.5 to 47.3 feet. 45.0 47.8 48.3 49.5 50.3 52.1 54.0 55.0 0 j II 4] � o 4� II '• I 1 ._9 = _. _ _. _ _ — __ 50 Gray -brown, sandy GRAVEL, trace of silt; wet; \numerous cobbles; (Qt) GP. /— 0� 0 lk• j il • °U I 1 I Brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Gray -brown, silty, sandy GRAVEL; wet;• numerous cobbles; (Qt) GM. , o 00 0 j ��'• �o 1 �• �• � Dark gray -brown, sandy GRAVEL, trace of silt; wet; scattered cobbles; (Qt) GP. Gray -brown, slightly silty, sandy GRAVEL; wet; numerous cobbles, scattered yellow-brown seams; (Qt) GP -GM. Dark gray and brown, trace to slightly clayey, silty, sandy GRAVEL; wet; scattered cobbles; -\(Qt) GM. 55 BOTTOM OF BORING COMPLETED 1/18/2011 0 20 40 60 LEGEND * Sample Not Recovered I . H I Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) 12 Soil Core (as in Sonic Core Borings) F N Bentonite -Cement Grout • % Water Content I Sample Test Interval to•':! Bentonite Chips/Pellets •••• Bentonite Grout Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-11 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-12 Sheet 4 of 4 REV 3 0 0 O 0) H 0 a 0) 0 0 0 0 M N w C 0 w Q Total Depth: 55 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: - 1066.5 ft. Easting: - 50 ft. Drilling Company: Boart Lonqyear Rod Diem.: Vert. Datum: Station: -- 71+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown GRAVEL; moist; (Qt) GP. ° 3• - ' 3 -4 5 15 Yellow-brown to gray -brown, sandy GRAVEL, trace of silt; moist; iron -oxide stained; (Qt) GP. - Silty zone at 2.3 to 2.5 feet. 0.8 3.1 3.1 0 j 3' o 6 o0 I ..- • j • • 1 Gray -brown, silty, sandy GRAVEL; moist; numerous cobbles, scattered slightly silty seams with iron -oxide staining; (Qt) GM. Yellow-brown, sandy GRAVEL, trace of silt; moist; iron -oxide stained; (Qt) GP. 5.5 6.5 ° ' 03 Gray -brown, silty, sandy GRAVEL; moist; numerous cobbles, scattered slightly silty seams; (Qt) GM. ` 7.8 10.010 o v o� 00 i 0 3' .I j: et Yellow-brown, sandy GRAVEL, trace of silt; moist; scattered cobbles, iron -oxide stained; (Qt) GP. Gray -brown, silt, sandy GRAVEL; moist; scattered cobbles; (Qt) GM. Yellow-brown, fine to medium sandy GRAVEL, trace of silt; moist to wet; (Qt) GP. --13.3 12.3 ° j �� 0 0 >o 01 n, 1 Brown to gray -brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. Gray -brown, trace to slightly silty, sandy GRAVEL; wet; (Qt) GP/GP-GM. 16.5 0 03- 18.1 iO O b_ Gray -brown to dark gray, silty, sandy GRAVEL; wet; locally trace to slightly clayey, scattered cobbles; (Qt) GM. CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) El Soil Core (as in Sonic Core Borings) •% Water Content 1 Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-12 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-13 Sheet 1 of 3 REV 3 0 0 0 n o 0 0 J ZI x m OI 0 0 m 9 w O 0 cc w F-. Total Depth: 55 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: - 1066.5 ft. Easting: - 50 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 71+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: -- Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol cu n E (n Ground Water Depth, ft. 0 20 40 60 21.6 22.8 23.3o 24.1 26.0 27.5 29.5 33.0 35.0 '� I�, 1It- ��l li� ill P u C 6 25 30 35 _. _.... _ Brown and gray -brown, slightly silty, sandy GRAVEL; wet; scattered cobbles, scattered iron-oxide staining; (Qt) GP -GM. Gray -brown, silty, sandy GRAVEL; wet; (Qt) GM. Yellow-brown and gray -brown, slightly silty, sandy GRAVEL; wet; scattered cobbles, iron -oxide staining; (Qt) GP -GM. •O �.� 1. ;1- •SII 1 11.* i� Gray -brown, silty, sandy GRAVEL; wet; (Qt) GM. - Scattered brown, slightly silty zones below approximately25 feet. Gray -brown to brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles, locally trace of clay; (Qt) GP-GM/GM. 1 1] 1 II. 11 = 11. IR 1 ' 1 1 Gray -brown to brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Brown, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM. Gray -brown to brown, slighlty silty to silty, sandy GRAVEL; wet; scattered cobbles, locally trace of clay; (Qt) GP-GM/GM. CONTINUED NEXT SHEET . j I� 4111 III 1 i1• 11 ; 4.8 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) • % Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-12 12 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-13 Sheet 2 of 3 REV 3 WDN Rev: DPO ° co 0 0 9m N w 0 0 Ui w U) Total Depth: 55 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1066.5 ft. Easting: -- 50 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: — 71+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 -Become iron -oxide stained at about 42 feet. 43.2 46.0 o u l o )p o C a > o_g .46 j ��►410� •1 .' 1 b 04� o(' o 40-10 a I►` 1( 0 IV 041 o O C 11 45 50 55 .... .... .. • __.... --__ _. ........ .:...... ... ....... .......... Gray -brown and brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GM/GP-GM. Gray -brown to brown -gray and dark gray, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles, locally trace of clay; (Qt) GP-GM/GM. Gray -brown and brown, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. 52.0 54.3 R ' r.,' 0 0 n` Gray -brown, slightly sandy GRAVEL, trace of \silt; wet; (Qt) GP. /— 55.0 ......... ...................................................... BOTTOM OF BORING COMPLETED 1/18/2011 0 20 40 60 LEGEND * Sample Not Recovered % Fines (<0.075mm) [2] Soil Core (as in Sonic Core Borings) •% Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-12 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-13 Sheet 3 of 3 REV 3 1 Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1061.5 ft. Easting: -- 60 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 71+63.5 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. wa o -f2E T (n ai a -o c 2 as II. o 0 20 40 60 Brown, slightly silty, sandy GRAVEL; scattered -\cobbles; (Qt) GP -GM. /-- 0.6 Dark brown, trace to slightly clayey, silty, -\sandy GRAVEL; moist; (Qt) GM. /-- 1.5 � b Brown to gray -brown, sandy GRAVEL, trace of silt; moist; scattered cobbles; (Qt) GP. 2.9 ° Cy o o O(R-1 (\ _ ............... Gray -brown and brown, trace to slightly silty, sandy GRAVEL; moist; numerous cobbles, scattered layers with trace of silt; (Qt) GP-GM/GP. °" oG ° 0 Jp ` J ........................................................................ 7.0 00 0 )o o ) (5 ` D ( D ` \ 5 \ R.N._ Gray -brown, silty, sandy GRAVEL; moist to ,wet; (Qt) GM. 7.7 •-Q' 0 ) Brown, slightly sandy GRAVEL, trace of silt; wet; (Qt) GP. o c_ )o T Gray -brown, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. 8.6 °v o )o ` Dark to brown, GRAVEL, 9.7 •416 ` \ gray -brown sandy trace of silt; wet; scattered cobbles; (Qt) GW -GM. j • �6 0 10 CO Brown, slightly silty, fine to medium sandy 11. o GRAVEL; wet; numerous cobbles; (Qt) r12.2 \GP -GM. 0 cR-3 L Dark brown to yellow-brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. � — e , Yellow-brown, slightly sandy GRAVEL, trace of silt; wet; iron-oxided stained; (Qt) GP. ` 13.6 14.2 ° o v F Q= \ ,\\\ ° CONTINUED NEXT SHEET ,i� N 0 20 40 60 LEGEND * Sample Not Recovered I . H I Piezometer Screen and Sand Filter % Fines (<0.075mm) • % Water Content Soil Core (as in Sonic Core Borings) \■\ Bentonite -Cement Grout F I Sample Test Interval ••• Bentonite Chips/Pellets o ••• Bentonite Grout o T Ground Water Level in Well a `n NOTES Yakima Grade Separation Project Yakima, Washington o 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. m 2. Groundwater level, if indicated above, is for the date specified and may vary. 9 3. USCS designation is based on visual -manual classification and selected lab testing. w4. The hole location was measured from existing site features and should be considered approximate. 02 LOG OF SONIC CORE L-13 1 3 August 2012 21-1-09306-010 W QGeotechnical SHANNON & WILSON, INC. and Environmental Consultants FIG. A-14 Sheet 1 of 4 0 0 C, Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1061.5 ft. Easting: - 60 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 71+63.5 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. 15.0 0 l j 0 0 0 4� ,► 4 ' ,.\• ; 4• 4 ,' '► ,' 0 I, 4 \trace \ \\ \ $ . : B ?. • i \ \ \ 20 . .. : 25 . 2 • • • • Brown gray, sandy GRAVEL, trace of silt; wet; \(Qt) GP. / 16.0 0 ° )U o °I,`ka ° 19.0 ail °1` ) 20.0 ° o1C 0 23.5 ,� j �� • ' li 25.9 0.! j I° ( lb 4� ( 1.` ( 41,, I,` II` ill ( • 1• .1R-5 ► /1 o 41 ( Brown, trace to slightly silty, sandy GRAVEL, of clay; wet; scattered cobbles; (Qt) GP-GM/GP.�o� - Gravel zone from approximately 16.6 to 17.2 feet. Brown -gray, slightly silty, sandy GRAVEL, trace of clay; wet; numerous cobbles; (Qt) -\GP-GM. /- ................ .......... . . Gray -brown to brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. Gray -brown, silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GM. .:...: _. _. _..... Brown, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. Gray -brown, slightly silty to silty, sandy GRAVEL; wet; numerous cobbles; (Qt) GP-GM/GM. CONTINUED NEXT SHEET 28.3 ° F j Iv o �O ( ° 1I= 0 20 40 60 LEGEND * Sample Not Recovered I H I Piezometer Screen and Sand Filter O % Fines (<0.075mm) 21 Soil Core (as in Sonic Core Borings) (\1 N Bentonite -Cement Grout • %Water Content I Sample Test Interval NEN Bentonite Chips/Pellets K.1I 1 Bentonite Grout 1 Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-1 3 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-14 Sheet 2 of 4 REV 3 t n o O 0 0a 0 0 0 r° m w 0 0 Ui w U) 2 Total Depth: 50 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: — 1061.5 ft. Easting: — 60 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: — 71+63.5 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: -• Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown -gray, trace to slightly silty, sandy \GRAVEL; wet; cobbles; (Qt) GP-GM/GP. /— 30.0 30.5 37.9 40.0 41.2 42.1 43.2 43.7 o nl 0" �o 0 ( o = o ( o c o C 0 c 00C °`--6 o ( 0 C o ( o C . J °( — _ _ _ _• —. — _ L. - = = — _ __. _ _ — —• = __ — _. — __ _ —_• — • • • 35 • 40 • • Brown-gray,sli hlt silt sandyGRAVEL, slighlty Y, trace of clay; wet; scattered cobbles; (Qt) GP -GM. Gray -brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP-GM/GM. 0 ( jo o ( o = Dark gray -brown, trace to slightly silty, sandy�� GRAVEL; wet; (Qt) GP/GP-GM. 0 ( )0 0 OC ; 1 ' 0 ° ( j �' �o v ( ; c II et. I Brown -gray, silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GM. Yellow-brown to gray, trace to slightly silty, sandy GRAVEL; wet; numerous cobbles, Giron oxide stained; (Qt) GP-GM/GP. ,,— Brown, slightly silty, slightly sandy GRAVEL: wet; (Qt) GP GM. ` CONTINUED NEXT SHEET 0 20 LEGEND 40 60 * Sample Not Recovered I H I Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) ME Bentonite -Cement Grout • % Water Content I Sample Test Interval WV Bentonite Chips/Pellets %//.■'//. Bentonite Grout 1 Ground Water Level in Well NOTES Yakima Grade Separation Yakima, Washington Project 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE August 2012 21-1-09306-010 L-13 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-14 Sheet 3 of 4 REV 3 Log: WDN Rev: DPO r -- cc I- cnz x a. c m 9 N w 0 0 w i Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1061.5 ft. Easting: - 60 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 71+63.5 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: -- Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown to brown -gray, trace to slightly clayey, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. 45.0 46.2 50.0 c)--' j = Ov ova °C 00 1, 00 ° 00 ll -(-f _ C ^ _ - --\ Brown -gray, slightly silty, sandy GRAVEL; wet; (Qt) GP GM. Interbedded, brown to gray -brown, slightly silty, sandy GRAVEL and silty, sandy GRAVEL; wet; scattered cobbles, scattered seams with trace of silt; (Qt) GP-GM/GM. BOTTOM OF BORING COMPLETED 1/19/2011 50 55 0 20 40 60 LEGEND * Sample Not Recovered I H • I Piezometer Screen and Sand Filter %Fines (<0.075mm) • 21 Soil Core (as in Sonic Core Borings) H N Bentonite -Cement Grout %Water Content I Sample Test Interval P$• i' Bentonite Chips/Pellets 0 A Bentonite Grout 1 Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-13 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-14 Sheet 4 of 4 REV 3 1 Y 1 1 Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. i4. Top Elevation: - 1061.5 ft. Easting: - 70 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 72+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Dark brown, silty, sandy GRAVEL; wet; (Qt) \GM. /- 0.8 2.3 4.1 7.4 8.3 9.5 10.4 12.3 14.1 15.0 7.3 19.5 • ts 011 • tl i • j 1� • •.1 _2 . " 4 ► : ; ► ; '► • ► ► 5 10 15 Dark brown, slightly silty, sandy GRAVEL; moist; iron -oxide staining; (Qt) GP -GM. Gray, silty, sandy GRAVEL: moist; scattered cobbles; (Qt) GM./11 Brown to gray -black, slightly silty, sandy1GRAVEL; moist to wet; scattered cobbles; (Qt) GW -GM. �• o Ii' o ti jo • Brown -gray, sandy GRAVEL, trace of silt; wet; _N(Qt) GP. ,- Brown, slightly silty, sandy GRAVEL; wet; ,locally trace of silt; (Qt) GP -GM. Brown, silty, sandy GRAVEL; wet; (Qt) GM. Brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Brown -gray, silty, sandy GRAVEL; wet; (Qt) GM. 0 .11 1 • Brown -gray to dark gray, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. a o )p b o0l .3• Brown -gray, sandy GRAVEL, trace of silt; wet; scattered cobbles; (Qt) GP. ° j 0 I a Brown -gray, trace of silt to slightly silty, sandy GRAVEL; wet; numerous cobbles; (Qt) GP/GP-GM. °� A, CONTINUED NEXT SHEET 0 20 LEGEND 40 60 Q % Fines (<0.075mm) * Sample Not Recovered El Soil Core (as in Sonic Core Borings) • % Water I Sample Test Interval i Content NOTES Yakima Grade Separation Yakima, Washington Project i 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE August 2012 21-1-09306-010 L-14 [Geotechnical _ SHANNON & WILSON, INC. and Environmental Consultants FIG. A-15 Sheet 1 of 3 REV 3 0 0 m 0 O a a Co 0 ch0 CD rn 9 N w c0 0 w N Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1061.5 ft. Easting: - 70 ft. Drilling Company: Boort Lonqyear Rod Diam.: Vert. Datum: Station: - 72+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown -gray to brown, slightly silty to silty, sandy GRAVEL; wet; locally numerous cobbles; (Qt) GP-GM/GM. 22.2 23.2 25.0 26.8 28.1 36.0 37'7 • _ j 11' .4111 ` � ' 11 �'-5 jjj ' ._s 25 30 35 11 f> Brown, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GW -GM. — Brown -gray to gray -brown, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GW -GM. Gray -brown, trace to slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GW-GM/GW. Gray, slightly silty to silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GW-GM/GM. ..in 1Yellow-brown, • I0 11 r e • slightly silty, sandy GRAVEL; r wet; iron -oxide -stained; (Qt) GP -GM. Gray -brown, silty, sandy GRAVEL, trace of clay; wet; (Qt) GM. - Seam of sandy gravel, trace of silt at 32.2 feet. Gray -brown, slightly silty to silty, sandy GRAVEL; wet; (Qt) GP-GM/GM. . W 011' .O1 Brown to dark gray, sandy GRAVEL, trace of silt; wet; (Qt) GP. CONTINUED NEXT SHEET .v j C' b OI o 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) 2 Soil Core (as in Sonic Core Borings) •°/o Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-14 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-15 Sheet 2 of 3 REV 3 1 1 1 1 1 i 1 1 WDN Rev: DPO Typ: LKN r - co a a O 0 m 9 N w 0 0 - Jw i Total Depth: 50 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 6 in. Top Elevation: - 1061.5 ft. Easting: - 70 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 72+20 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown -gray, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. 40.0 42.0°�j� 42.8 • 45.4 48.4 50.0 0' )0 ot�C o U 1 • 45 55 Brown -gray, silty, sandy GRAVEL; wet; (Qt) -\GM. / -- Brown -gray, slightly silty, sandy GRAVEL; wet; `43.6 \(Qt) GP -GM. / .. it. e• 0 o )0 o o b R-7 c C Brown -gray to brown, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. Brown to brown -gray, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. Gray, silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GM. � 'I �� 'II50 , BOTTOM OF BORING COMPLETED 1/17/2011 .......................................................................................... 0 20 LEGEND 40 60 * Sample Not Recovered O % Fines (<0.075mm) • 0 Soil Core (as in Sonic Core Borings) % Water I Sample Test Interval Content NOTES Yakima Grade Separation Yakima, Washington Project 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE August 2012 21-1-09306-010 L-14 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-15 Sheet 3 of 3 REV 3 m F- 0 zl N a p 0 r" rn 0 Lu 0' 0 a.' w Q 2 Total Depth: 30 ft. Northing: — 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1062.5 ft. Easting: — 80 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: — 73+10 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 .\Brown, silty, sandy GRAVEL; moist; (Qt) GM. - 0.3 l o N - • •• • • • • • • • • • : • a 2 •• •• • e O 2. g 5 2. O B o '•p• 2. $ 10 o • •• • •• • • •• • ••• 15 .0 s 0� ° 3- )o °O"' )o' 0, j �'• o O , ° O 0 1 'IP i ► 1 Gray -brown, GRAVEL; moist; (Qt) GP.- 1.0 Brown to yellow-brown, sandy GRAVEL, trace of silt; moist; scattered silty seams, iron -oxide staining; (Qt) GP. Gray -brown, slightly silty, sandy GRAVEL; 3.8 moist; (Qt) GP -GM. - Scattered yellow-brown, trace to slightly silty seams at approximately 6.5 to 7.4 feet. • 9.3 Gray -brown, slightly silty, gravelly SAND; wet; (Qt) SP -SM. n Gray -brown, trace to slightly silty, gravelly 11.0 SAND; wet; (Qt) SP-SM/SP. `: Brown, slightly silty, sandy GRAVEL; wet; (Qt) 12.2 GP -GM. ° j u'• 11 - 3 l• Gray -brown, slighlty silty to silty, sandy 13.9 GRAVEL; wet; numerous cobbles; (Qt) -AGM/GP GM. y- 15.3 �l e, _.... . _. ... _. ...... ........... 1r ° ( Ro 0111( 0 O, • 1GM. ,' b R4 1 Gray -brown to brown, slightly silty to silty, sandy GRAVEL; wet; scattered cobbles, locally trace of silt; (Qt) GP-GM/GM. Gray -brown, silty, sandy GRAVEL; wet; (Qt) 18.5 CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered I . H I Piezometer Screen and Sand Filter 0 % Fines (<0.075mm) • 0 Soil Core (as in Sonic Core Borings) ( 1 Bentonite -Cement Grout %Water Content 1 Sample Test Interval ••• Bentonite Chips/Pellets i1 Bentonite Grout J_ Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-16 1 6 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-16 Sheet 1 of 2 REV 3 1 1 s 1 1 Y WDN Rev: DPO T 1 Total Depth: 30 ft. Northing: -- 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: — 1062.5 ft. Easting: — 80 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 73+10 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: — Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Yellow-brown, trace to slightly silty, trace of gravel to gravelly, fine to medium SAND; wet; scattered cobbles, iron -oxide stained; (Qt) SP/SP-SM. 20.0 23.8 25.6 30.0 ...:� j• ' • 1 :.� . II • 1 • •IR • 1 •� ( -s — _ _. _. _. 25 Brown to gray -brown, silty, sandy GRAVEL,• trace of clay; wet; (Qt) GM. Gray -brown, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. BOTTOM OF BORING COMPLETED 1/19/2011 30 35 0 20 40 60 LEGEND * Sample Not Recovered I H I Piezometer Screen and Sand Filter % Fines (<0.075mm) Soil Core (as in Sonic Core Borings) \■• Bentonite -Cement Grout • % Water Content I Sample Test Interval MO Bentonite Chips/Pellets MY Bentonite Grout I. Ground Water Level in Well NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-16 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-16 Sheet 2 of 2 REV 3 a. 0 Total Depth: 40 ft. Northing: -- 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: - 1058.5 ft. Easting: - 90 ft. Drilling Company: Boart Longyear Rod Diam.: Vert. Datum: Station: - 69+ 79 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. - 0 20 40 60 Brown, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. 2.40 4.4 5.0 70 10.8 11.8 12.4 13.3 14.1 15.0 15.8 °" o Cy O( ) ac l 10 15 .............. Brown, silty, sandy GRAVEL, trace of clay;r wet; (Qt) GM. - Black from 3.9 to 4.1 feet. iv .I1 fp ° n= Brown, sandy GRAVEL, trace of silt; wet; (Qt) \GP. 0‘..,) ),o 00 o o C = O • Gray-brown, slightly silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GP -GM. Gray -brown, sandy GRAVEL, trace of silt; wet; scattered siltier zones; (Qt) GP. ° o IR o 00( Cy )p o 00 o(3( �c' Brown, fine to medium SAND, trace of silt; wet; (Qt) SP. Becomes gravelly at 11.3 feet. . ..slip Brown -gray, silty, sandy GRAVEL; wet; (Qt) GM. 0e 0C3 0 Brown, sandy GRAVEL, trace of silt; wet; (Qt) GP. Brown to gray, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. 0 �00 ►• Gray, silty, sandy GRAVEL; wet; (Qt) GM. Gray, slightly silty, sandy GRAVEL; wet; (Qt) GP -GM. Gray to brown, silty, sandy GRAVEL, trace of clay; wet; scattered cobbles, locally slightly clayey; (Qt) GM. 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) 121 Soil Core (as in Sonic Core Borings) • % Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-17 1 7 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-17 Sheet 1 of 3 REV 3 1 f 1 1 1 1 1 1 1 1 t 1 1 1 00 0 CC 0 Total Depth: 40 ft. Northing: -- 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: - 1058.5 ft. Easting: - 90 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 69+ 79 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 Brown to brown -gray, silty, sandy GRAVEL; wet; scattered cobbles; (Qt) GM. 19.9 26.5 27.0 27.6 28.4 30.0 • 1 1 II�1i 1C •-5 1 • • 0 6 25 30 35 _.... Gray -brown, sandy GRAVEL, trace of silt; wet; (Qt) GP. � • '. Brown -gray, silty, sandy GRAVEL; wet; (Qt) GM. 0.r o +, • I 1 : 1 • / li. •1 11 1 / i--8• II Yellow-brown, slightly silty to silty, sandy GRAVEL; wet; iron -oxide -stained; (Qt) GP-GM/GM. Brown -gray, silty, sandy GRAVEL, trace of clay; moist; numerous cobbles; (Qt) GM. Brown -gray and brown, silty, sandy GRAVEL, trace of clay; wet; scattered cobbles; (Qt) GM. - Finer gravel below approximately 36 feet. CONTINUED NEXT SHEET 0 20 40 60 LEGEND * Sample Not Recovered O % Fines (<0.075mm) Soil Core (as in Sonic Core Borings) • % Water Content I Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-17 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-17 Sheet 2 of 3 REV 3 a U Log: WDN Rev: DPO Total Depth: 40 ft. Northing: - 10 ft. Drilling Method: Sonic Core Hole Diam.: 4 in. Top Elevation: - 1058.5 ft. Easting: - 90 ft. Drilling Company: Boart Lonqyear Rod Diam.: Vert. Datum: Station: - 69+ 79 ft. Drill Rig Equipment: Spider Sonic Hammer Type: Horiz. Datum: Offset: - Other Comments: Lexan Liner SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. Depth, ft. Symbol Samples Ground Water Depth, ft. 0 20 40 60 BOTTOM OF BORING COMPLETED 1/13/2011 40.0 45 50 55 .................................. ..................................... 0 20 40 60 LEGEND * Sample Not Recovered % Fines (<0.075mm) Soil Core (as in Sonic Core Borings) % Water Content 1 Sample Test Interval NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF SONIC CORE L-17 1 7 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-17 Sheet 3 of 3 REV 3 t i t 1 1 to z Log: KJB Rev: HJS MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 16.5 ft. Northing: Top Elevation: — 1068 ft. Easting: Vert. Datum: Station: -- 49+90 ft. Horiz. Datum: Offset: -- 20 Ft. R. Drilling Method: Mud Rotary Drilling Company: Geotech Drill Rig Equipment: CME 75 Other Comments: Hole Diam.: 5 in. Rod Diam.: Hammer Type: Cathead SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. a a) 0 0 E to U, a� o_ E ro U) c (D o a a) 0 PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 300 lbs /30 inches 0 20 40 60 Asphalt Paving \SAND; (Hf) SP. Dense to very dense, brown, trace to slightly silty, sandy GRAVEL; moist to wet; scattered cobbles and possibly boulders inferred from drill action (Qt) GP-GM/GP. BOTTOM OF BORING COMPLETED 3/13/2001 0.5 1.0 16.5 oil o c t �o J °° ( 21 o c �o J o° o �o J o o61 3 5 4l1 51 During Drilling iII 5 10 15 20 25 30 35 40 45 50 55 LEGEND * Sample Not Recovered a Ground Water Level ATD I 3.25" O.D. Split Spoon Sample NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 O % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING B-1 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-18 REV 3 m O 0 q a a. c5 0 0 0) m w 0 w Q Total Depth: 50.6 ft. Northing: - Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: - 1070 ft. Easting: - Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: - 48+50 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: - 17 Ft. L. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. a= w p. a1 Symbol Samples Ground Water Depth, ft. PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 300 lbs / 30 inches 0 20 40 60 -\Asphalt Paving �-- 0.7 1.0 4.0 28.0 50.6 5 10 E m 15 0 g, o 20 25 30 35 40 45 50 55 • �e • • • 74/11.5"A Dense GRAVEL; (Hf) GP. 7- Very dense, brown and black, slightly gravelly, \sandy SILT; moist; (Hf) ML. • • ' • /• • • 2� s� 4 1 5i 6 1 ' 7* b 1 8-F s 103/9''/ • 701 Very dense, brown and gray, slightly silty, sandy GRAVEL, dry to wet; scattered to numerous cobbles and possibly boulders inferred from drill action; (Qt) GW-GM/GP-GM. • • 964 100/9 i •. 60/6'i 70/674 • 89/11':' • 50/5.5",1 Very dense, brown, sandy GRAVEL, trace of silt and clay; moist to wet; scattered cobbles and possibly boulders inferred from drill action, scattered weathered zones; (Qt) GP. - Sand layer with no gravel or cobbles between 47 and 49 feet based on drill action. 0 o�� 10 00 ° Cy )o p 11--* 00( ° )o p 00 ( 12=r oc 0 3( 13—* ) 0 o 00 ° C( t 14=* 75f6''A "A • 100/1 100/5 A 79/1-"-a 150/1"a BOTTOM OF BORING COMPLETED 3/20/2001 Note: - Lost drilling mud while driving sample S-3 at 7.5 feet. 0 20 40 60 LEGEND * Sample Not Recovered SL Ground Water Level ATD %Fines (<0.075mm) I 3.25" O.D. Split Spoon Sample • °/o Water Content NOTES Yakima Grade Separation Project Yakima, Washington 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. LOG OF BORING B-2 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-19 REV 3 1 t 1 1 a Log: KJB Rev: HJS MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 31.5 ft. Northing: — Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: — 1070 ft. Easting: Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: — 47+35 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: — 17 Ft. R. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. -\Asphalt Paving \Dense. GRAVEL; (Hf) GP. Dense to very dense, gray -brown, sandy GRAVEL, trace of silt; moist to wet; scattered to numerous cobbles and possibly boulders inferred from drill action; (Qt) GP/GW. BOTTOM OF BORING COMPLETED 3/15/2001 Note: - Lost about 100 gallons of drilling mud between approximate depths of 15 and 17 feet. L a d 0 0.7 1.5 31.5 0 E to o v 0 o , 03` -0 o cc o 3c ,0 o0 C p 3c -0 oO ,a3` 3c -0 0 0 C o = -b oc C -0 0 oc C o 3c �O 00( ,03` 3c -0 a E co 11 21 31 41 61 81 sT 101 0 N o 0 N N N N N N 4 a O a) PENETRATION RESISTANCE (blows/foot) ♦ Hammer Wt. & Drop: 300 lbs / 30 inches 0 20 40 60 20 25 30 35 40 45 •. 91• 80• 75/5'!AL 64• LEGEND * Sample Not Recovered I 3.25" O.D. Split Spoon Sample ..H.1 Piezometer Screen and Sand Filter Bentonite -Cement Grout Bentonite Chips/Pellets ® Bentonite Grout 1 Ground Water Level in Well NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 O % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING B-3 (MW -3) August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-20 REV 3 KJB Rev:HJS MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 16.5 ft. Northing: - Drilling Method: Mud Rotary Hole Diam.: 5 in. Top Elevation: - 1070 ft. Easting: - Drilling Company: Geotech Rod Diam.: Vert. Datum: Station: - 45+61 ft. Drill Rig Equipment: CME 75 Hammer Type: Cathead Horiz. Datum: Offset: - 14 Ft. L. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. n 0 0 E to CI) a) n E m to -a c a) o O r a a 0 PENETRATION RESISTANCE (blows/foot) Hammer Wt. & Drop: 300 lbs / 30 inches 0 20 40 60 m Asphalt Paving \Dense GRAVEL; (Hf) GP. Dense to very dense, brown and gray, trace to slightly silty, sandy GRAVEL; dry to wet; scattered to numerous cobbles and possibly boulders inferred from drill action; (Qt) GP/GP-GM. r BOTTOM OF BORING COMPLETED 3/19/2001 0.7 1.0 16.5 o C o3o )0 O 0 .3' �0 0 00 o 3' I0 O 0 o 3c 21 31 4m 51 61 During Drilling ill 5 10 15 20 25 30 35 40 45 50 55 • '. 71* 88* 5013"* 91* 91* LEGEND * Sample Not Recovered 3.25" O.D. Split Spoon Sample SZ Ground Water Level ATD NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 0 20 40 60 % Fines (<0.075mm) • % Water Content Yakima Grade Separation Project Yakima, Washington LOG OF BORING B-4 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-21 REV 3 Log: KPC Rev: BMR Typ: LKD MASTER LOG E 21-09306.GPJ SHAN WIL.GDT 8/17/12 Total Depth: 51.3 ft. Northing: Drilling Method: Advanced Casing Hole Diam.: 9 in. Top Elevation: - 1070 ft. Easting: Drilling Company: Great Western Rod Diam.: Vert. Datum: Station: -- 47+10 ft. Drill Rig Equipment: Becker Hammer Hammer Type: Cathead Horiz. Datum: Offset: - 18 Ft. L Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. -\Asphalt Paving Medium dense to dense, brown, sandy GRAVEL; moist; (Base Course - Hf) GP. Medium dense to very dense, gray -brown, trace to slightly silty, sandy GRAVEL, trace of clay; moist; scattered to numerous cobbles, scattered boulders inferred by drill action; (Qt) GW-GM/GW. - becomes wet at approximately 18 feet Dense to very dense, gray -brown, fine to medium sandy GRAVEL, trace of clay; wet; scattered to numerous cobbles, scattered boulders inferred by drill action; (Qt) GP. - Sampler bouncing at approximately 42 feet. Very dense, brown, silty, sandy GRAVEL, trace of clay; wet; scattered to numerous cobbles, scattered boulders inferred by drill action; (Qt) GM. Very dense, brown, medium to coarse sandy GRAVEL; wet; (Qt) GP. BOTTOM OF BORING COMPLETED 12/10/2007 LEGEND * Sample Not Recovered 3" O.D. Split Spoon Sample Grab Sample r a a) 0 0.9 3.0 30.0 45.0 49.0 51.5 0 E T U) 1• • • 1 • - 1 • 1� co a) a E (9 11E •♦ 2 • • 4I G 3 n t * • 4 III .? 1 1• o 8� SZ Ground Water Level ATD NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. During Drilling i1 C N o 0 s a a) 0 5 10 15 20 25 30 35 40 45 50 55 PENETRATION RESISTANCE (blows/foot) Hammer Wt. & Drop: 300 lbs /30 inches 0 20 40 60 0 20 40 O % Fines (<0.075mm) • % Water Content 60 Yakima Grade Separation Project Yakima, Washington LOG OF BORING B-5 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-22 REV 3 0 CO CC U d a m t- 0 0 >_J z a 0 (0 MASTER LOG E 21-0 Total Depth: 50 ft. Northing: - Drilling Method: Advanced Casing Hole Diam.: 9 in. Top Elevation: -- 1070 ft. Easting: - Drilling Company: Great Western Rod Diam.: Vert. Datum: Station: - 48+75 ft. Drill Rig Equipment: Becker Hammer Hammer Type: Cathead Horiz. Datum: Offset: - 15 Ft. R. Other Comments: SOIL DESCRIPTION Refer to the report text for a proper understanding of the subsurface materials and drilling methods. The stratification lines indicated below represent the approximate boundaries between material types, and the transition may be gradual. r 0 a 0 .0 E T U) a) a E t_ o m L a cn a) 0 PENETRATION RESISTANCE (blows/foot) A Hammer Wt. & Drop: 300lbs /30 inches 0 20 40 60 Asphalt Paving Medium dense to dense, dark brown, sandy, fine to medium GRAVEL; moist; (Base Course - Hf) GP. Medium dense to dense, dark brownish -black, sandy, GRAVEL; moist; numerous cobbles; (Qt) GW. Dense, dark brown and black, silty, sandy GRAVEL; moist; numerous cobbles, scattered boulders inferred by drill action; (Qt) GM. Very dense, dark brown, fine SAND; moist; (Qt) SP. Very dense, brown, trace to slightly silty, sandy GRAVEL; wet; numerous cobbles, scattered boulders inferred by drill action; (Qt) GP-GM/GW-GM/GP. - Sampler bouncing on rock at 21.2 feet. BOTTOM OF BORING COMPLETED 12/11/2007 0.9 3.0 15.0 20.0 21.0 50.0 0U 0 0 0 0 0 O 0 0 0 G G During Drilling �Kj 10 15 35 40 45 50 55 88/8 78* 50/3"A 99/8"* LEGEND * Sample Not Recovered �[ 3" O.D. Split Spoon Sample 0 Grab Sample 7. Ground Water Level ATD NOTES 1. Refer to KEY for explanation of symbols, codes, abbreviations and definitions. 2. Groundwater level, if indicated above, is for the date specified and may vary. 3. USCS designation is based on visual -manual classification and selected lab testing. 4. The hole location was measured from existing site features and should be considered approximate. 20 40 60 % Fines (<0.075mm) • % Water Content Yakima Grade Separation Project Yakima, Washington LOG OF BORING B-6 August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. A-23 REV 3 1= s II MO 1 s M M M I M— — 1 MI N In File: C:\Users\cnt\appdata\loca8temp\AcPublish_6128\21-1-09306-010 TPs (2004).dwg Date: 08-16-2012 Author: cnt SHANNON & WILSON, INC. Geotechnical and Environmental Consultants LOG OF TEST PIT TP -1 (2004) JOB NO: 21-1-09306-002 DATE: 5-11-2004 LOCATION: See Site and Exploration Plan PROJECT: Yakima Grade Separation SOIL DESCRIPTION 1O Asphalt surfacing with 9 -inch base course. O Medium stiff, brown, slightly clayey to clayey, sandy SILT; moist; scattered root fragments; (Qt) ML. OMedium dense to dense, grayish brown, sandy GRAVEL; moist to wet; numerous rounded to subrounded cobbles, scattered boulders up to 14 inches; (Qt) GP. - Iron -oxide staining at 8 feet. - Seepage zones at 14 feet. p N 41, C (13 o � 0 a a> Q E S-1 S-2 S-3 a) 0 0 5 10 15 20 25 30 0 Sketch of North Pit Side 4 Surface Elevation: Approx.1070 Ft. Horizontal Distance in Feet 8 12 16 20 24 File: C:1Users\cnt\appdata\locahtemp\AcPublish_6128\21-1-09306-010 TPs (2004).dwg Date: 08-16-2012 Author: cot SHANNON & WILSON, INC. Geotechnical and Environmental Consultants LOG OF TEST PIT TP -2 (2004) JOB NO: 21-1-09306-002 DATE: 5-11-2004 LOCATION: See Site and Exploration Plan PROJECT: Yakima Grade Separation SOIL DESCRIPTION o @ (0� li a- a> 0 Sketch of North Pit Side Surface Elevation: Approx.1068 Ft. Horizontal Distance in Feet 0 4 8 12 16 20 24 1O Asphalt surfacing with 6 -inch base course. 0 Brick layer with scattered debris including a concrete block; about 20 inches long; (Hf). O3 Loose to medium dense, brown, silty, sandy GRAVEL; moist to wet; numerous rounded to subrounded cobbles, scattered boulders to 14 inches, scattered roots fragments; (Qt) GM. O 5 N Medium dense to dense, grayish brown, trace to slightly silty, sandy GRAVEL; moist to wet; numerous rounded to subrounded cobbles, scattered boulders up to 14 inches; (Qt) GP/GP-GM. V 9.3 S-1 S-2 0 5 10 15 20 25 30 Sides of Pit Caving Below 10 Feet INN — UN UN 1— S H UN —— N r— r H MI E NM M MI —— M ME M M MO MN MI MI M-- — i 1 Filename: J:\211\09306-010\21-1-09306-010 TPs (2012).dwg Date: 08-16-2012 Login: cnt SHANNON & WILSON, INC. Geotechnical and Environmental Consultants LOG OF TEST PIT TP -1 (2012) JOB NO: 21-1-09306-100 DATE: 5-10-2012 LOCATION: See Site and Exploration Plan PROJECT: Lincoln Avenue Grade Separation Infiltration Pond, Yakima, Washington SOIL DESCRIPTION o CO O� U) Q% a E co cn a 0 0 2 4 6 Sketch of East Pit Side Surface Elevation: Approx. 1062 Ft. Horizontal Distance in Feet 10 12 0 Loose to medium dense, brown, slightly silty, sandy GRAVEL; moist; numerous cobbles, iron -oxide staining; (Qt) GP -GM. OLoose, brown, silty fine SAND; moist; localized deposit in southwest quarter of test pit; (Qt) SM. None Observed 0 2 Filename: J:1211\09306-010\21-1-09306-010 TPs (2012).dwg Date: 08-16-2012 Login: cnt SHANNON & WILSON, INC. Geotechnical and Environmental Consultants LOG OF TEST PIT TP -2 (2012) 0 SOIL DESCRIPTION Loose to medium dense, brown, sandy GRAVEL, trace of silt; moist; numerous cobbles, increased sand at 5 -ft to 6 -ft; (Qt) GP. OLoose to medium dense, gray, sandy GRAVEL, trace of silt; wet; (Qt) GP. c 0 JOB NO: 21-1-09306-100 DATE: 5-10-2012 LOCATION: See Site and Exploration Plan PROJECT: Lincoln Avenue Grade Separation Infiltration Pond, Yakima, Washington Sketch of West Pit Side Surface Elevation: Approx. 1062 Ft. Horizontal Distance in Feet 4 6 8 10 12 r r• M S all ,, MS MI— r—= N II OM 111M1 1111111 IIIIII OM— I M M S! E I M M N NM M— I M N IIIIIII Filename: J:\211\09306-010\21-1-09306-010 TPs (2012).dwg Date: 08-16-2012 Login: cnt SHANNON & WILSON, INC. Geotechnical and Environmental Consultants LOG OF TEST PIT TP -3 (2012) JOB NO: 21-1-09306-100 DATE: 5-10-2012 LOCATION: See Site and Exploration Plan PROJECT: Lincoln Avenue Grade Separation Infiltration Pond, Yakima, Washington SOIL DESCRIPTION -o o(0 o c5 li a a) a Sketch of West Pit Side 0 Loose to medium dense, brown, sandy GRAVEL; moist; numerous cobbles, scattered iron -oxide staining; (Qt) GP. p 03 None Observed S-1 S-2 0 2 4 6 8 10 12 Surface Elevation: Approx. 1062 Ft. Horizontal Distance in Feet 2 4 6 8 10 I. -1 L. Filename: J:\211\09306-010\21-1-09306-010 TPs (2012).dwg Date: 08-16-2012 Login: cn SHANNON & WILSON, INC. Geotechnical and Environmental Consultants LOG OF TEST PIT TP -4 (2012) JOB NO: 21-1-09306-100 DATE: 5-11-2012 LOCATION: See Site and Exploration Plan PROJECT: Lincoln Avenue Grade Separation Infiltration Pond, Yakima, Washington SOIL DESCRIPTION -a a) omits o � n a> 0 Sketch of West Pit Side Surface Elevation: Approx. 1062 Ft. Horizontal Distance in Feet 0 2 4 6 8 10 12 OLoose to medium dense, sandy GRAVEL, trace of silt; moist; numerous cobbles; (Qt) GP. c0 None Observed S-1 0 2 6 10 12 M M M M 1 i M-- MI N N r M- M- MO 0. . . .. . . . . . . . / . SHANNON MMLSON, INC. APPENDIX B GEOTECHNICAL LABORATORY TEST PROCEDURES AND RESULTS 21-1-09306-001 SHANNON MNOLSON, INC. APPENDIX B GEOTECHNICAL LABORATORY TEST PROCEDURES AND RESULTS TABLE OF CONTENTS Page B.1 INTRODUCTION B-1 B.2 VISUAL CLASSIFICATION B-1 B.3 WATER CONTENT DETERMINATION B-1 B.4 GRAIN SIZE ANALYSES B-1 B.5 REFERENCES B-2 B-1 Grain Size Distribution, B-2 Grain Size Distribution, Boulevard B-3 Grain Size Distribution, Boulevard B-4 Grain Size Distribution, Boulevard B-5 Grain Size Distribution, Boulevard B-6 Grain Size Distribution, Boulevard B-7 Grain Size Distribution, Boulevard B-8 Grain Size Distribution, B-9 Grain Size Distribution, FIGURES Borings B-1 through B-6, Lincoln Avenue Borings L-1 through L-5, Martin Luther King Jr. Borings L-6 through L-8, Martin Luther King Jr. Borings L-9 through L-10, Martin Luther King Jr. Borings L-11 through L-12, Martin Luther King Jr. Borings L-13 through L-14, Martin Luther King Jr. Borings L-16 through L-17, Martin Luther King Jr. Test Pits TP -2 (2004), TP -1 (2012), and TP -2 (2012) Test Pits TP -3 (2012) and TP -4 (2012) 21-1-09306-010-RI-A13.docx/wp/Ikn B -i 21-1-09306-010 SHANNON &WILSON, INC. APPENDIX B GEOTECHNICAL LABORATORY TEST PROCEDURES AND RESULTS B.l INTRODUCTION This appendix contains descriptions of the procedures and the results of the geotechnical laboratory tests performed on select soil samples obtained from the subsurface explorations completed for the City of Yakima Grade Separation project. The samples were tested to evaluate the basic index and physical properties of the native soil. The laboratory test program included visual classifications, water content determinations, and grain size analyses. The laboratory testing was performed by an experienced technician at the Shannon & Wilson, Inc. laboratory in Seattle, Washington. B.2 VISUAL CLASSIFICATION ' The soil samples recovered from the exploratory borings and test pits were visually reclassified in our laboratory using a system based on American Society for Testing and Materials/ASTM International (ASTM) Designation: D 2487, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System), and ASTM Designation: D 2488, Standard Practice for Description and Identification of Soils (Visual -Manual Procedure). This ' visual classification method allows for convenient and consistent comparison of soils from widespread geographic areas. The terminology used and the definition of modifying terms are presented on Figure A -i in Appendix A. The sample classifications are presented on the ' individual boring and test pit logs in Appendix A. B.3 WATER CONTENT DETERMINATION The natural water content of select samples recovered was determined in general accordance with ASTM Designation: D 2216, Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. Comparison of the natural water content of a soil with its index properties can be useful in characterizing soil unit weight, consistency, ' compressibility, and strength. The water contents are shown graphically on the boring logs in Appendix A. ' B.4 GRAIN SIZE ANALYSES ' Grain size analyses were performed on selected samples of granular soils in general accordance with ASTM Designation: D 422, Standard Test Method for Particle -Size Analysis of Soils. 21 -1 -09306 -0I0 -RI -AB .docx/wp/Ikn 21-1-09306-010 I3-1 SHANNON 6WILSON, INC. Results of these analyses are presented as grain size distribution curves in Figures B-1 through B-8 in this appendix. Along with each grain size distribution is a tabulated summary containing the sample description, Unified Soil Classification System symbol for the soil group, percentage of fines passing the No. 200 sieve, and the natural water content. Grain size distribution is used to assist in classifying soils and to provide correlation with soil properties, including hydraulic conductivity, capillary action, liquefaction potential, and sensitivity to moisture. B.5 REFERENCES American Society for Testing and Materials/ASTM International (ASTM), 2000 - 2011, 2000 — 2011 annual book of standards, construction, volume 04.08, soil and rock (I): West Conshohocken, Penn. U.S. Army Corps of Engineers, 1986, Engineering and design: laboratory soils testing: Washington, D.C., U.S. Army Corps of Engineers Engineer Manual EM 1110-2-1906. 21-1-09306-010-R I -A B. doc x/wp/lkn B-2 21-1-09306-010 NM M N N NM N M all r M N MI - - - -- NM PERCENT FINER BY WEIGHT 10 SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS O V co O 90 80 70 60 50 40 30 20 10 0 4 co O O O O O O 0 O n. en O O O O O O 0 0 O O 0 0 Cr en O N 0 co m W ("J N - W 0 • O 0 O O GRAIN SIZE IN MILLIMETERS N OO O O O O O O O O 10 20 30 40 50 60 70 80 90 100 O O COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM %: Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U.S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM SG NAT WC % Cu Cc TEST BY REVIEW BY ASTM DES • B-1, S-5 ■ B-2, S-2 ♦ B-3 (MW -3), S-6 • B-5, S-2 o B-5, S-6 0 B-6, S-2 p B-6, S-6 12.5 5.0 15.0 25.0 45.0 25.0 45.0 GP GP -GM GW GW -GM GM GW -GM GP -GM Brown, sandy GRAVEL, trace of silt Brown, slightly silty, sandy GRAVEL Gray -brown, sandy GRAVEL, trace of silt Gray -brown, slightly silty, sandy GRAVEL, trace of clay; scattered cobbles cobb Gray-brown,les silty, sandy GRAVEL, trace of clay; scattered Gray -brown, slightly silty, sandy GRAVEL; scattered cobbles Gray -brown, slightly silty, sandy GRAVEL; numerous cobbles 74 66 79 64 63 63 70 22 27 18 28 25 29 22 4.0 7.0 2.7 7.8 12.1 8.4 8.1 4 5 8 13 7.3 4.7 9.7 9.9 9.0 7.2 8.7 61.1 99.7 21.5 154.4 379.5 163.9 132.4 5.1 3.2 2.5 1.5 6.3 2.2 7.3 SAM SAM SAM AKV AKV AKV AKV KJB KJB KJB AJC AJC AJC AJC D422 D422 D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings B-1 through B-6 Lincoln Avenue August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-1 Sheet 1 of 1 AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 -11 p N PERCENT FINER BY WEIGHT 10 90 80 70 6 50 40 30 20 10 0 100 SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS M O O O O N Q tD O (D N O Q CO O O CO CO Q c- 0 0 00 O O O 11111111111 -.1..wriq min m min Mill ii11111 11:1111m• '111•1111 O 0 10 20 30 40 I- 2 >- cc w 0 0 U o I - z w U w 70 d 80 90 N 0 0 0 0 0 CO tD Q CO N .- CO [D Q CO "CO CO Q CO N 1- CO CO Q CO N CO CO Q CO N .- ' O 0 0 0 0 0 0 0 0 0 0 0 O 0 O O O 0 GRAIN SIZE IN MILLIMETERS COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY LEGEND USCS: Unified Soil Classification System COBBLE REM % : Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC% . Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U.S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM SG NAT WC Cu Cc TEST BY REVIEW BY ASTM DES • L- 1, S-2 •L -1,S-5 A L- 2 (MW -2), S-5 • L- 3, S-7 O L- 4, S-2 ❑ L- 5, S-2 A L- 5, S-6 5.0 12.5 12.5 17.5 5.0 25.0 45.0 GP GP -GM GP -GM GW -GM GW -GM GP -GM GP -GM Gray -brown, sandy GRAVEL, trace of silt Brown, slightly silty, sandy GRAVEL Brown, slightly silty, sandy GRAVEL Dark brown, slightly silty, sandy GRAVEL Dark brown, slightly silty, sandy GRAVEL Gray -brown, slightly silty, sandy GRAVEL, trace of clay; numerous cobbles Gray -brown, slightly silty, sandy GRAVEL; scattered cobbles 66 73 49 61 63 66 75 30 21 46 32 31 27 20 4.1 6.0 5.6 7.1 5.7 7.3 5.5 10 8 3.7 8.4 7.2 8.1 6.1 5.8 8.4 48.3 71.4 51.8 70.0 70.9 97.8 113.8 0.7 9.3 0.2 2.4 1.1 4.0 4.8 SAM SAM SAM SAM SAM AKV AKV KJB KJB KJB KJB KJB AJC AJC D422 D422 D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings L-1 through L-5 Martin Luther King Jr. Boulevard August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-2 Sheet 1 of 1 - NM MN I 111111 MN NM N - NIII I= N I I N I M UR M AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 MN IIID MEI IIID r - NM MS all - 111111 EMI I Illi 111111 11111 IIID NM IIIA C) w PERCENT FINER BY WEIGHT 10 SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS M N CO v O 0 90 80 70 60 50 40 30 20 10 0 N 0 0 O CO O O o O O O0 oi N- 0 O CO O Q M N O 0. R N N CO • 0 0 0 0 GRAIN SIZE IN MILLIMETERS N NO O O O O O O 10 20 30 40 50 60 70 80 90 100 0 COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM % Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U.S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM % SG NAT WC Cu Cc TEST BY REVIEW BY ASTM DES • L- 6, S-2 L- 6, S-6 ♦ L- 7, S -R-3 • L- 7, S -R-4 L- 8, S -R-3 ❑ L- 8, S -R-5 A L- 8, S -R-7 25.0 45.0 12.1 17.8 10.7 20.0 33.0 GP -GM GP -GM GM GM GP -GM SW -SM GP -GM Gray -brown, slightly silty, sandy GRAVEL; scattered cobbles Gray -brown, slightly silty, sandy GRAVEL Mottled gray and brown, silty, sandy GRAVEL, trace of clay; scattered cobbles Gray -brown, slightly clayey, silty, sandy GRAVEL Gray -brown, slightly silty, sandy GRAVEL; scattered cobbles Gray, slightly silty, slightly gravelly SAND Gray -brown, slightly silty, sandy GRAVEL 70 73 61 53 66 11 73 24 21 25 27 27 80 21 6.4 6.3 14.0 19.3 6.8 8.1 6.1 8 6 8 11.7 6.4 6.0 6.6 7.3 14.8 5.8 49.9 97.6 129.3 6.9 80.7 4.0 7.2 2.1 1.1 4.4 AKV AKV JSL JSL EJK EJK JSL AJC AJC JFL JFL JFL JFL JFL D422 D422 D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings L-6 through L-8 Martin Luther King Jr. Boulevard August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-3 Sheet 1 of 1 AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 -11 p 0o PERCENT FINER BY WEIGHT SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS N N r C") N CO r M N Q M O 0 0 co !o Q O O O O 0 0 O O N O 10 90 80 70 6 50 40 30 20 10 0 11.1 Ippwormpiiiimp 111111 N O 6 co 0 0 Q M O 0 CO 0 Q M N CO (0 Q M N - O O O GRAIN SIZE IN MILLIMETERS M N O O co CV COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY 0 10 20 30 1— I C9 W > m W to 0 U t_ Z W U W 70 a 0 0 0 80 90 100 LEGEND USCS: Unified Soil Classification System COBBLE REM % Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U.S.C.s. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM 'Yo SG NAT WC % Cu Cc TEST BY REVIEW BY AS 'M DES • L- 9, S -R-3 ■ L- 9, S -R-5 ♦ L-10, S -R-5 • L-10, S -R-6 11.5 27.2 23.0 29.0 GM GM GM GM Brown, silty, sandy GRAVEL, trace of clay; numerous cobbles Gray, silty, sandy GRAVEL, trace of clay; numerous cobbles Brown, silty, sandy GRAVEL, trace of clay Dark brown, silty, sandy GRAVEL, trace of clay 60 63 66 59 27 22 21 25 12.7 14.6 12.3 15.8 17 18 6.7 9.2 7.9 10.8 628.7 6.2 JJM JJM CRM CRM JFL JFL JFL JFL D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings L-9 through L-10 Martin Luther King Jr. Boulevard August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-4 Sheet 1 of 1 N IIIIIII — IIIIIII MI N IIIIII M NM M N M NM M N MO IIIIII M IMO AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 11111 E 111111 I I I NS NM 1 I NM M111 NM 1 NM 11111 -11 p co PERCENT FINER BY WEIGHT 10 SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS N Q N CO O O 0 0 0 N Q (0 O N CO 0 O Q N N O O 0 o O o 0 0 0 Q N N O 0 0 0 0 0 0 90 80 70 0 60 4a 50 40 30 20 116. 10 0 V� O O N 0 N 0 CO 0 Q N N W (0 Q N N � O GRAIN SIZE IN MILLIMETERS O Q O O O 0 0 0 O O O O CV O O COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY 10 20 30 40 50 60 70 80 90 100 PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM %: Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials! ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U.S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM % SG NAT WC % Cu Cc TEST BY REVIEW BY ASTM DES • L-11, S -R-2 ■ L-11, S -R-5 A L-11, S -R-5 • L-11, S -R-7 o L-11, S -R-8 ❑ L-12, S -R-6 A L-12, S -R-9* 8.4 20.0 24.6 31.2 40.8 29.5 42.3 GP -GM GP -GM GW -GM GM GW -GM GP -GM GP -GM Gray -brown, slightly silty, sandy GRAVEL Gray -brown, slightly silty, slightly cobbley, sandy GRAVEL; numerous cobbles Gray -brown, slightly silty, sandy GRAVEL; numerous cobbles Mottled dark brown, silty, sandy GRAVEL, trace of clay; numerous cobbles Brown -gray, slightly silty, sandy GRAVEL; scattered cobbles Brown, slightly silty, sandy GRAVEL Gray -brown, slightly silty, sandy GRAVEL 73 67 69 65 56 72 49 22 25 25 23 35 18 41 5.6 8.0 5.1 12.4 9.5 9.9 10.0 24 10 10 11 6 2.8 5.8 5.8 8.8 7.4 7.1 10.5 76.4 154.7 65.4 513.9 123.5 326.2 153.5 5.6 3.2 1.9 5.0 1.1 14.6 0.2 JSL AKV AKV AKV AKV CRM CRM JFL JFL JFL JFL JFL JFL JFL D422 D422 D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings L-11 through L-12 Martin Luther King Jr. Boulevard August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-5 Sheet 1 of 1 • Sample specimen weight did not meet required minimum mass for ASTM test method. AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 p w rn PERCENT FINER BY WEIGHT 10 SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS N N M P O O to O N 90 80 70 60 50 N 40 30 20 10 -t 01 I N 0 N O r O O N N 0 CO tD V N N CO Q C7 co O CO tD w CO N 0 0 0 0 O O O O O O CO0. CO O O O GRAIN SIZE IN MILLIMETERS O O co O O O O O O O O 0 10 20 30 40 50 60 70 80 90 100 O O COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM %: Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC e/: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U. S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM SG NAT WC Cu Cc TEST BY REVIEW BY ASTM DES • L-13, S -R-3 III L-13, S -R-4 A L-13, S -R-5 • L-14, S -R-1 O L-14, S -R-4 ❑ L-14, S -R-5 A L-14, S -R-5 10.0 17.4 27.3 4.1 15.0 20.0 22.2 GW -GM GP -GM GP -GM GW -GM GP GP -GM GW -GM Dark brown -gray, slightly silty, sandy GRAVEL; scattered cobbles Dark brown -gray, slightly silty, sandy GRAVEL, trace of clay; scattered cobbles Dark gray, slightly silty, sandy GRAVEL; scattered cobbles Gray, slightly silty, sandy GRAVEL; scattered cobbles Brown -gray, sandy GRAVEL, trace of sill; scattered cobbles Brown, slightly silty, sandy GRAVEL; numerous cobbles Dark gray, slightly silty, sandy GRAVEL; scattered cobbles 66 72 70 65 71 80 64 27 21 21 27 24 13 27 6.8 7.1 9.7 7.4 4.9 7.0 8.8 5 4 9 6 6 15 9 6.3 6.0 6.9 3.9 6.1 6.4 7.2 129.3 81.0 237.2 100.2 101.0 150.6 129.2 2.1 4.8 11.2 2.6 3.7 12.7 2.4 AKV CRM AKV JSL CRM AKV AKV JFL JFL JFL AKV JFL JFL JFL D422 D422 D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings L-13 through L-14 Martin Luther King Jr. Boulevard August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-6 Sheet 1 of 1 I_Ol1111 ME ME MI 11111 IIIIIII IIIIII INN MIMI IIIIII MINI EMI =I 11E1 AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 NEI EN M EN E 11111 11111 — —— — i — 1 EN 1 I PERCENT FINER BY WEIGHT SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS C N O O O O O 0 0 O Cr CO c- O O O O O O N .- i+) '- M V N Q O N O O O O O O O O O O O 10 ,I 11 I I I I I I I 0 90 10 80 20 70 t` 30 60 40 50 „ 50 40 60 30 70 20 10 0 csi r 0 o v �n O 0 CO (D Cr M N 1- CO CO V <7 N CO 0 O 0 GRAIN SIZE IN MILLIMETERS 0 0 0 CO O 0 0 0 O O 0 80 90 100 0 O COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM %: Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) SYMBOL SOIL CLASSIFICATION GRAVEL ao SAND FINES COBBLE REM % SG NAT WC % Cu Cc TEST BY REVIEW BY ASTM DES • L-16, S -R-1 • L-16, S -R-1 ♦ L-16, S -R-3 • L-17, S -R-2 0 L-17, S -R-4 1.0 3.8 10.0 7.2 17.0 GP GP -GM SP -SM GP GM Brown, sandy GRAVEL, trace of silt Gray, slightly silty, sandy GRAVEL Gray -brown, slightly silty, gravelly SAND Brown, sandy GRAVEL, trace of silt Gray -brown, silty, sandy GRAVEL, trace of clay; scattered cobbles 77 73 45 57 64 20 21 46 39 23 3.2 6.6 9.3 3.4 12.9 3 2.6 4.1 9.8 9.9 9.3 53.7 182.9 71.4 56.4 7.6 7.4 0.5 0.2 CRM CRM AKV JJM AFW JFL JFL JFL JFL JFL D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Borings L-16 through L-17 Martin Luther King Jr. Boulevard August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-7 Sheet 1 of 1 AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 ii co Co PERCENT FINER BY WEIGHT 10 SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS N N � N N CO r N O O 0 0 0 0 ro 0 O 0 • 90 80 70 60 50 40 30 20 10 0 ui o o 0 0 0 CO 0 (O Q N N Q M N (0 0 M � O GRAIN SIZE IN MILLIMETERS co O 0 0 0 I CO 0 0 0 0 O 0 10 20 30 40 50 60 70 80 90 100 O COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM Ya Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) u. S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM SG NAT WC Cu Cc TEST BY REVIEW BY ASTM DES • TP -1 (2012), S-1 TP -1 (2012), S-2 A TP -2 (2004), S-2 • TP -2 (2012), S-1 O TP -2 (2012), S-4 3.0 3.0 14.0 3.0 9.5 SM GP GP -GM GP GP Brown, slightly gravelly, silty SAND; sample taken from SW corner of TP -1 (2012) Brown, sandy GRAVEL, trace of silt; sample taken from NE corner of TP -1 (2012) Dark brown, slightly silty, sandy GRAVEL; scattered organics, scattered cobbles Brown, sandy GRAVEL, trace of silt Gray -brown, sandy GRAVEL, trace of silt 7 54 71 68 75 52 43 22 30 23 40.1 2.6 7.6 1.8 2.5 39 29.0 5.7 9.3 4.2 8.8 67.7 197.5 88.9 73.5 0.1 4.3 0.6 5.7 AKV AKV CKN AKV AKV JFL JFL WLM JFL JFL D422 D422 D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Test Pits TP -1 (2012), TP -2 (2004), and TP -2 (2012) August 2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-8 Sheet 1 of 1 11111 — — — ! M NM i — — — NM — I EN M S N I AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 -n w IIIIII— MI N MN I N i — I I• i M I E ! E E PERCENT FINER BY WEIGHT SIEVE ANALYSIS HYDROMETER ANALYSIS SIZE OF MESH OPENING IN INCHES NO. OF MESH OPENINGS PER INCH, U.S. STANDARD GRAIN SIZE IN MILLIMETERS N Crl CV ? CV CO O O O O O O O Q m N O OCO CO O O O (;5 '- Ih Q N Q O N O O o O O O O O O 0 10 I I 1 1 1 1 1 1111 f 1 1 I I I ( 0 90 \ 10 80 20 70 30 60 40 50 50 40 60 30 70 20 80 10 1. 90 0 N CO n 0 M N 0 CO 0 Q CO N a) O Q CJ N O CO GRAIN SIZE IN MILLIMETERS O O O O O O O O COARSE FINE COARSE MEDIUM FINE GRAVEL SAND FINES: SILT OR CLAY 100 PERCENT COARSER BY WEIGHT LEGEND USCS: Unified Soil Classification System COBBLE REM %: Percentage of cobbles removed from specimen; based on pre -removal total dry mass SG: Specific gravity of soil solids < No. 4 sieve per ASTM D854 NAT WC %: Natural water content Cu: Coefficient of uniformity Cc: Coefficient of curvature ASTM DES: American Society for Testing and Materials/ ASTM International test standard designation BORING AND SAMPLE NO. DEPTH (feet) U.S.C.S. SYMBOL SOIL CLASSIFICATION GRAVEL SAND FINES COBBLE REM SG NAT WC % Cu Cc TEST BY REVIEW BY ASTM DES • TP -3 (2012), S-1 ■ TP -3 (2012), S-2 ♦ TP -4 (2012), S-1 1.0 3.0 2.5 GP GP GP Brown, sandy GRAVEL, trace of silt Brown, sandy GRAVEL, trace of silt Brown, sandy GRAVEL, trace of silt 52 76 60 46 22 38 1.5 1.6 2.8 3.7 3.2 3.7 36.5 44.2 51.5 0.1 7.8 0.2 AKV AKV AKV JFL JFL JFL D422 D422 D422 Yakima Grade Separation Project Yakima, Washington GRAIN SIZE DISTRIBUTION Test Pits TP -3 (2012) and TP -4 (2012) August2012 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants FIG. B-9 Sheet 1 of 1 AASHTO GSA MAIN 3INCHMINUS 21-09306.GPJ SHAN WIL.GDT 8/17/12 SHANNON bWILSON, INC. APPENDIX C IMPORTANT INFORMATION ABOUT YOUR GEOTECHNICAL/ENVIRONMENTAL REPORT 21-1-09306-010 SHANNON & WILSON, INC. Geotechnical and Environmental Consultants Attachment to and part of Report 21-1-09306-010 Date: August 17, 2012 To: Mr. Bob Lee, P.E. Berger/ABAM Engineers, Inc. IMPORTANT INFORMATION ABOUT YOUR GEOTECHNICAL/ENVIRONMENTAL REPORT CONSULTING SERVICES ARE PERFORMED FOR SPECIFIC PURPOSES AND FOR SPECIFIC CLIENTS. Consultants prepare reports to meet the specific needs of specific individuals. A report prepared for a civil engineer may not be adequate for a construction contractor or even another civil engineer. Unless indicated otherwise, your consultant prepared your report expressly for you and expressly for the purposes you indicated. No one other than you should apply this report for its intended purpose without first conferring with the consultant. No party should apply this report for any purpose other than that originally contemplated without first conferring with the consultant. THE CONSULTANT'S REPORT IS BASED ON PROJECT -SPECIFIC FACTORS. A geotechnical/environmental report is based on a subsurface exploration plan designed to consider a unique set of project -specific factors. Depending on the project, these may include: the general nature of the structure and property involved; its size and configuration; its historical use and practice; the location of the structure on the site and its orientation; other improvements such as access roads, parking lots, and underground utilities; and the additional risk created by scope -of -service limitations imposed by the client. To help avoid costly problems, ask the consultant to evaluate how any factors that change subsequent to the date of the report may affect the recommendations. Unless your consultant indicates otherwise, your report should not be used: (1) when the nature of the proposed project is changed (for example, if an office building will be erected instead of a parking garage, or if a refrigerated warehouse will be built instead of an unrefrigerated one, or chemicals are discovered on or near the site); (2) when the size, elevation, or configuration of the proposed project is altered; (3) when the location or orientation of the proposed project is modified; (4) when there is a change of ownership; or (5) for application to an adjacent site. Consultants cannot accept responsibility for problems that may occur if they are not consulted after factors which were considered in the development of the report have changed. SUBSURFACE CONDITIONS CAN CHANGE. Subsurface conditions may be affected as a result of natural processes or human activity. Because a geotechnical/environmental report is based on conditions that existed at the time of subsurface exploration, construction decisions should not be based on a report whose adequacy may have been affected by time. Ask the consultant to advise if additional tests are desirable before construction starts; for example, groundwater conditions commonly vary seasonally. Construction operations at or adjacent to the site and natural events such as floods, earthquakes, or groundwater fluctuations may also affect subsurface conditions and, thus, the continuing adequacy of a geotechnical/environmental report. The consultant should be kept apprised of any such events, and should be consulted to determine if additional tests are necessary. MOST RECOMMENDATIONS ARE PROFESSIONAL JUDGMENTS. Site exploration and testing identifies actual surface and subsurface conditions only at those points where samples are taken. The data were extrapolated by your consultant, who then applied judgment to render an opinion about overall subsurface conditions. The actual interface between materials may be far more gradual or abrupt than your report indicates. Actual conditions in areas not sampled may differ from those predicted in your report. While nothing can be done to prevent such situations, you and your consultant can work together to help reduce their impacts. Retaining your consultant to observe subsurface construction operations can be particularly beneficial in this respect. Page 1 of 2 1/2012 A REPORTS CONCLUSIONS ARE PRELIMINARY. The conclusions contained in your consultant's report are preliminary because they must be based on the assumption that conditions revealed through selective exploratory sampling are indicative of actual conditions throughout a site. Actual subsurface conditions can be discerned only during earthwork; therefore, you should retain your consultant to observe actual conditions and to provide conclusions. Only the consultant who prepared the report is fully familiar with the background information needed to determine whether or not the report's recommendations based on those conclusions are valid and whether or not the contractor is abiding by applicable recommendations. The consultant who developed your report cannot assume responsibility or liability for the adequacy of the report's recommendations if another party is retained to observe construction. THE CONSULTANTS REPORT IS SUBJECT TO MISINTERPRETATION. Costly problems can occur when other design professionals develop their plans based on misinterpretation of a geotechnical/environmental report. To help avoid these problems, the consultant should be retained to work with other project design professionals to explain relevant geotechnical, geological, hydrogeological, and environmental findings, and to review the adequacy of their plans and specifications relative to these issues. BORING LOGS AND/OR MONITORING WELL DATA SHOULD NOT BE SEPARATED FROM THE REPORT. Final boring logs developed by the consultant are based upon interpretation of field logs (assembled by site personnel), field test results, and laboratory and/or office evaluation of field samples and data. Only final boring logs and data are customarily included in geotechnical/environmental reports. These final logs should not, under any circumstances, be redrawn for inclusion in architectural or other design drawings, because drafters may commit errors or omissions in the transfer process. To reduce the likelihood of boring log or monitoring well misinterpretation, contractors should be given ready access to the complete geotechnical engineering/environmental report prepared or authorized for their use. If access is provided only to the report prepared for you, you should advise contractors of the report's limitations, assuming that a contractor was not one of the specific persons for whom the report was prepared, and that developing construction cost estimates was not one of the specific purposes for which it was prepared. While a contractor may gain important knowledge from a report prepared for another party, the contractor should discuss the report with your consultant and perform the additional or alternative work believed necessary to obtain the data specifically appropriate for construction cost estimating purposes. Some clients hold the mistaken impression that simply disclaiming responsibility for the accuracy of subsurface information always insulates them from attendant liability. Providing the best available information to contractors helps prevent costly construction problems and the adversarial attitudes that aggravate them to a disproportionate scale. READ RESPONSIBILITY CLAUSES CLOSELY. Because geotechnical/environmental engineering is based extensively on judgment and opinion, it is far less exact than other design disciplines. This situation has resulted in wholly unwarranted claims being lodged against consultants. To help prevent this problem, consultants have developed a number of clauses for use in their contracts, reports and other documents. These responsibility clauses are not exculpatory clauses designed to transfer the consultant's liabilities to other parties; rather, they are definitive clauses that identify where the consultant's responsibilities begin and end. Their use helps all parties involved recognize their individual responsibilities and take appropriate action. Some of these definitive clauses are likely to appear in your report, and you are encouraged to read them closely. Your consultant will be pleased to give full and frank answers to your questions. The preceding paragraphs are based on information provided by the ASFE/Association of Engineering Firms Practicing in the Geosciences, Silver Spring, Maryland Page 2 of 2 1/2012 APPENDIX D Wetwell Pump Test Form Pump Performance Test Pump Name Specification Reference Pump Manufacturer Model Size Serial Number Pump Curve Rating: Flow TDH Speed gpm cfs mgd ft rpm Run 5 1 Suction Pressure psi Motor Manufacturer Max Speed rpm Min. Speed rpm Sheet Date 1 of 3 Project K/J Job No. Field Data Witnessed By: ❑ 1 0 ❑ 30 Field Performance Data Item Description Units Run 1 Run 2 Run 3 Run 4 Run 5 1 Suction Pressure psi 2 Discharge Pressure psi 3 Pump Speed rpm 4 Motor Power Use watts 5 Assumed Power Factor - 6 Flow Meter Reading 7 Receiving Tank WSE at Start ft. 8 Receiving Tank WSE at Finish ft. 9 Start Time 10 Finish Time 11 Atmospheric Pressure psia 12 Fluid Temperature 'F 13 Suction Sump WSE Above Datum ft 14 Elevation Datum 15 Elevation of impeller eye above datum 16 Elev. Of suction pressure gauge above datum 17 Elev. Of discharge pressure gauge above datum ft. ft. 18 Surface area of volumetric vessel sq. ft. 19 Fluid being pumped 20 Suction pipe diameter ff. 21 Discharge pipe diameter ft. ft. Pump Performance Test See attached table Add If Sump WSE is below "datum" Add if Suction Pressure is subatmospheric Add If Sump WSL is below Impeller Eye Sheet 2 of 3 Date KJJ Job No. Item Description Units Calculated from Circled Item No. Run 1 Run 2 Run 3 Run 4 Run 5 22 Discharge Pressure ft. (2) x 2.3067 23 Suction Pressure ft. (1) x 2.3067 24 Pressure Differential ft. (23) - (22) 25 Vertical Distance Between Gauges ft. (17) - (16) 26 Estimated Total Dynamic Head ft. (24) + (25) Actual flow (6) or actual flow (45) or 27 Actual or Approximate Flow gpm from pump curve 28 Suction Pipe Area s.f. 0.785 x (20)2 29 Suction Pipe Velocity fps 2.228 x 10"' x (27) + (28) 30 Discharge Pipe Area s.f. 0.785 x (21)2 31 Discharge Pipe Velocity fps (27) + (30) 32 Suction Velocity Head ft. (29)2 + 64.4 33 Discharge Velocity Head ft. (31)2+ 64.4 34 Total Dynamic Head ft. (26) - (32) + (33) 35 Pump Curve RPM rpm from pump curve 36 Ratio of Curve/Actual Speed (35) + (3) 37 Motor Power (3 Phase) hp (4) x (5) x 1.732 + 746 38 Vapor Pressure of Fluid psia * from (12) and Steam Tables 39 Specific Weight of Fluid pcf from (12) and (19) Vertical Distance from Sump WSL to 40 Impeller Eye ft. (15) - (13) Net Positive Suction Head Available [(11) - (38)1 x 144 + (39) + (32) 41 (NPSHA) ft. - (23) """- (40) "•"" 42 Volume of Fluid Pumped gal. ((7) - (8)(x (18) x 7.48 43 Elapsed Time of Pumping min. (10) - (9) 44 Corrected Flow Rate gpm (6) x (36) 45 Actual Flow Rate gpm (42) + (43) 46 Curve Flow Rate gpm from pump curve 47 Flow Rate Comparison - (44) or (45) + (46) 48 Corrected TOM ft. (34) x (36)2 49 Curve TDH ft. from pump curve ' Pump Performance Test ISheet 3 of 3 Date IKM Job No. IItem Description Units Calculated from Circled Item No, Run 1 Run 2 Run 3 Run 4 Run 5 50 TDH Comparison (48) + (49) 0 I51 Corrected Motor Power hp (37) x (36)' 0 52 Curve Motor Power hp from pump curve I 53 Motor Power Comparison (51) - (52) 54 Corrected Pump Efficiency (44) x (48) +1(51) x 3960] 55 Curve Pump Efficiency from pump curve I 56 Pump Efficiency Comparison - (54) + (55) 57 Corrected NPSHA ft. (41) x (36)2 0 I58 Curve NPSHA ft. from pump curve 59 NPSHA Comparison (57) + (58) I Comments: 1 ' Evaluation: ❑ Passes ❑ Fails 1 t By: APPENDIX E NOT USED APPENDIX F BNSF Railway Application For Private Crossing RA/.[ brAY APPLICATION FOR PRIVATE CROSSING Jones Lang LaSalle Permit Services 3017 Lou Menk Drive, Suite 100 Fort Worth, TX 76131-2800 To be completed for Residential use: Date: Licensee: Daytime Phone: (Legal Name as shown for Permit) Fax Number: Address: To be completed for Commercial/Industrial Use: Licensee: Daytime Phone: (Legal name as shown on permit) Fax Number: Address: Corporation: State in which incorporated: Is applicant a Railroad Shipper? Yes No _ If yes, BNSF Marketing Rep name and number: The Following is to be completed by all applicants: Type of Crossing (plank, concrete, etc.): New: Existing: Width: If Existing: Need Rehab? Yes No Crossing Location: City: County: State: Section: Township: Range: Highway Name/Number: Temporary: Permanent: Crossing, located at RR Milepost: DOT# If Temporary, specify time period crossing will be required: What use will be made of the crossing: (Residential, Farm, Commercial) User Vehicle Type: Total number of vehicle crossing per day: (auto, pickup, van, if industrial, list type): Other private crossings in vicinity: Yes No _ If yes, give distance/direction from the crossing: What is the distance to the closestup bac crossing in either direction: Do you own or lease the land on either side of your crossing: Lease Own If leased, provide owners name and telephone number: If leased, please provide written authorization for legal owner with application. If this is an existing crossing, bow many families are using it now? If known, list names and addresses on reverse. If Cooperative use, please provide names and permit numbers held by others (attach) and provide proof of land ownership, What are the future plans for this property? Applicant understands he or she will be requested to sign a regular crossing permit, which will provide that Applicant will I) assume the cost to construct the crossing, 2) furnish insurance as requested by BNSF Railway, 3) assume the cost to remove the crossing if crossing is temporary, and 4) reimburse BNSF Railway for the expense incurred to maintain this crossing. Date: If yon would like confirmation of your application, Please print your email address: Signature: Print Name: Phone Number: Fax: APPENDIX G Modified Phase 1 Environmental Site Assessment of September 2005 This page left intentionally blank. i r Ft No am um am am me am am __. i _. _ _. _ _ o No TABLE 3 SUMMARY OF REGULATORY RECORDS REVIEW Site Name EDR Map ID Address/ Approx. Distance and Direction from Site Regulatory List(s) Ecology File Review? and Notes Elliott Tire Center Al, A2 1 E. Lincoln Avenue/ Adjacent north of Lincoln Avenue CSCSL-NFA, RCRIS- SQG, FINDS Lincoln Avenue Car I B3, B4 Wash 302 N. 15t Street/ Adjacent north of Lincoln Avenue CSCSL, WA 1CR, LUST, UST, VCP, RCRIS-SQG, FINDS Yes - Remedial action (RA) conducted, residual contamination left, on-going institutional controls required. No further action status granted by Ecology. Yes - 4 USTs removed, 3 operational. Petroleum products impacted soil and groundwater. Independent RA, status: monitoring. Smitty's Conoco 15 301 N. l5t Street/ 150 feet NE of Lincoln Avenue UST No —Not on other databases that would indicate that contamination is present. Four operational USTs. Myrlin H. Ackerman C6 132 N. 1" Street/ Adjacent south of `B" St. UST No — Not on other databases that would indicate that contamination is present. Three USTs closed in place, 3 removed. Crest Linen C7 200 N. 1st Street/ Adjacent north of "B" • Street CSCSL-NFA Yes - HOC impacted soil and groundwater; RA completed. No further action status granted by Ecology. Yakima County Public Works/Court- house Printing Dept. 8, F 16 Orphan Il 128 N. 2nd Street (Room 408 Courthouse)/350 feet east UST, RCRIS-SQG, FINDS No—Not on other databases that would indicate that contamination is present. Two USTs removed; site is down gradient. Department of Corrections 9 210 N. 2nd Street/ 350 feet east LUST, UST, WA 1CR No — Site is downgradient. One exempt UST; 1995 release reported cleaned up. City of Yakima Fire Department D10, Dl l 410 N. Front Street/ 450 feet north CSCSL, LUST, UST, WA 1CR Yes - 2 USTs removed; petroleum products in soil and suspected in groundwater; site is ranked 5 (lowest assessed risk). Prentice Packing & Storage Company 12 202 N. 15' Avenue/ Adjacent north side of "B" Street UST No —Not on other databases that would indicate that contamination is present. One UST removed, 1 UST exempt. Yakima County Public Works Soils. Lab/Health District E13,E14 104 N. 1" Street/ 300 feet south RCRIS-SQG, FINDS No —Not on other databases that would indicate that contamination is present. 21-1-09306-002 �!!nAlhlll'n! A 1Atti Oro,' �:ir' Site Name K. Denny Colvin City of Yakima Yakima County Shiloh Building Washington Fruit & Produce Co. 1 -tops Extract of America Michelsen Packaging Co. General Supply Inc. Yakima CA Snokist Growers Adeline City of Yakima Bowles, Shell Station Dale B. Engelhart John 1 Haas Inc. Main Laboratory L.L. Buchanan Jade Tree Site L TABLE 3 (CONTINUED) FDR Map ID Address/ Approx. Distance and Regulatory List(s) Direction from Site Ecology File Review? and Notes 15 408 N. Is' Street/ 500 feet north WA ICR No — Soil only, reported cleaned up. F17 F18 129 N. 2' Street/ 550 feet SE 112 N. 2nd Street/ 450 feet SE UST RCRIS-SQG, FINDS No —Not on other databases that would indicate that contamination is present. Two USTs closed in place. No — Not on other databases that would indicate that contamination is present. 19 401 N. I' Avenue/ 450 feet NNW UST G20, 305 N. 2"d Avenue/ LUST, UST, WA ICR, G21, G24 400 feet west 1-1.22 1123 202 N. 2"Avenue/ 400 feet west 201 N. 2nd Avenue/ RCRIS-SQG, UST, RCRIS-SQG, FINDS No —Not on other databases that would indicate that contamination is present. Two exempt USTs. No — Soil only, reported cleaned up. Three USTs closure in process. Petroleum products and conven- tional inorganic contaminants. RCRIS-SQG, FINDS 200 feet west FINDS No —Not on other databases that would indicate that contamination is present. 25 504 N. Is' Avenue/ 750 feet NW UST No —Not on other databases that would indicate that contamination is present. Two USTs closed in place. No —Not on other databases that would indicate that contamination is present. One UST closed in place. 26 16 N. ls` Street/ 900 feet SSE CSCSL No— proje Cross ocated at least 900 feet from the proposed t excavation, and either downgradient or radient. 127,128, 501 N. 1j1 Street/ 129 1,000 feet north WA ICR, RCRIS- SQG, UST, FINDS No — Located at least 1,000 feet from the proposed project excavation. Three USTs removed. 30 10 W. Yakima Avenue/ 950 feet south UST No —Not on other databases that would indicate that contamination is present. Three USTs removed. 31 31 N. ls' Avenue/ 950 feet south RCRIS-LQG, FINDS No — Not on other databases that would indicate that contamination is present. 32 115 West "D" Street! 650 feet NW UST No —Not on other databases that would indicate that contamination is present. Four USTs removed. 33 204 E. Yakima Avenue/ 1,050 feet SE LUST, UST, WA ICR No — Located at least 1,050 feet from the proposed project excavation, and downgradient. Two USTs removed. I 1 11111 MN M 21-1-09306-002 S X,.-m.�! ' \NI J. 1r,1 MEI um - — N !• I — ! — — N . i• = — — ' — NIB a ,, !• TABLE 3 (CONTINUED) Site Name EDR Map ID Address/ Approx. Distance and Direction from Site Regulatory List(s) Ecology File Review? and Notes Union Gospel Mission J34, .135 110 W. Yakima Avenue/950 feet south CSCSL, VCP, UST, LUST, WA ICR No — Located at least 950 feet from the proposed project excavation. Four USTs removed. 201 W. Yakima Avenue Site K.36, K37, K38 201 W. Yakima Avenue/1,050 feet south CSCSL, LUST, UST, WA ICR No — Located at least 1,050 feet from the proposed project excavation. AT&T Ahtanum Ridge K39, K40, K41 208 W. Yakima Avenue/1,050 feet south INDIAN LUST No — Located at least 1,050 feet from the proposed project excavation. Site reported cleaned up. Roche Fruit Co. Warehouse 4 42 610 N. 151 Avenue/ 1,300 feet NW William Douglas Federal Building 43 25 S. 34 -Street/ 1,300 feet SE Educational Service District #105 L44, L46 LUST, UST 33 S. 2"d Avenue/ 1,200 feet SW WA ICR, UST No — Located at least 1,300 feet from the proposed project excavation. One UST closure in process; petroleum release in 1992, awaiting cleanup. No — Located at least 1,300 feet from the proposed project excavation, and downgradient. WA 1CR, LUST No — Located at least I ,200 feet from the proposed project excavation. Valley Iron Works 45 102 S_ Front Street/ 1,400 feet south LUST, UST, WA ICR Yakima Federal Savings & Loan M47, Orphans 7,8,9 S. 2"d Street & E. Chestnut/I,500 feet SSE WA ICR, UST, LUST, FINDS No — Located at least 1,400 feet from the proposed project excavation. No — Located at least 1,500 feet from the proposed project excavation, and downgradient. Snyder's Bakery, Inc. 48 10 N. 3'd Avenue/ 1,200 feet SW Advanced Carpet Warehouse M49 124 S. 2"d Street/ 1,500 feet SSE WA ICR, UST, LUST No — Located at least 1,200 feet from the proposed project excavation. CSCSL, RCR1S-SQG, FINDS No — Located at least 1,500 feet from the proposed project excavation, and downgradient. Firestone Master Care 50,54 14-102 N. Naches Avenue/1,700 feet east CSCSL, LUST, WA ICR No — Located at least 1,700 feet from the proposed project excavation, and downgradient. Woods Industries Tiger Oil Corp. 51 709 N. 1st Avenue/ 1,700 feet NNW CSCSL NFA, RCRIS- SQG, FINDS No — Located at least 1,700 feet from the proposed project excavation. N52, N53 15 E. Walnut Avenue/ 1,900 feet south CSCSL NFA, VCP, WA ICR, UST No — Located at least 1,900 feet from the proposed project excavation. Firestone Master Cgre 55 202 S. I5' Street/ 2,000 feet south CSCSL NFA, VCP, IST, WA ICR No — Located at least 2,000 feet from the proposed project excavation. 21-I -09306-002 SHANNON WILSON, INC. TABLE 3 (CONTINUED) Site Name EDR Map ID Ad cl ress/ Approx. Distance and Direction from Site Regulatory List(s) Ecology File Review? and Notes Yakima Transit 056, 059, 060, Orphan 4 100 S. 4th Street/ 1,900 feet SE WA ICR, UST, LUST, FINDS No — Located at least 1,900 feet from the proposed project excavation, and downgradient. US Bank P57, P58 404 W. Yakima Avenue/1,600 feet SW LUST, UST, WA ICR No — Located at least 1,600 feet from the proposed project excavation. Shell Station Q61, Q62 216 N. 5`h Avenue/ 1,600 feet west LUST, UST, WA TCR No — Located at least 1,600 feet from the proposed project excavation. Frank Wear Cleaners R63 106 S. 3'd Avenue/ 1,700 feet SSW CSCSL, FINDS, C ERC-NFRAP, RCRIS-SQG No — Located at least 1,700 feet from the proposed project excavation. Chevron S64, S65 501 W. Lincoln/ 1,600 feet west Medic I Facility R66, R67 1 1 l S. 3rd Avenue/ 1,700 feet SSW LUST, UST, WA ICR No — Located at least 1,600 Feet from the proposed _project excavation. CSCSL, LUST, WA ICR, UST No — Located at least 1,700 feet from the proposed project excavation. Prestige Buick 68 217 S. 211d Street/ 2,000 feet SSE CSCSL NFA, FINDS, CERC-NFRAP, RCRIS-SQG No — Located at least 2,000 feet from the proposed project excavation, and downgradient. Darigold, Inc. T69, T70 102 N. 5'I' Avenue/ 1,700 feet SW LUST, UST, WA ICR No — Located at least 1,700 feet from the proposed project -excavation. Goodwill U71, U72, Orphan 3 222 S. 3rd Street/ 2,200 feet SSE CSCSL, LUST, WA ICR, UST No — Located at least 2,200 feet from the proposed project excavation, and downgradient. ARCO V73, V74 601 E. Yakima Avenue/ 2,200 feet east LUST, UST, WA ICR, VCP, CSCSL, FINDS, RCRIS-SQG No — Located at least 2,200 feet from the proposed project excavation, and downgradient. American Red Cross 75 302 S. 2" Street/ 2,500 feet SSE CSCSL, LUST, WA ICR, UST, FINDS, RCRIS-SQG No — Located at least 2,500 feet from the proposed project excavation, and downgraclient. I Yakima Gull #1614 76 214 S. 5111 Avenue/ 2,500 feet SW CSCSL, LUST, UST No — Located at least 2,500 feet from the proposed project excavation. 21-1-09306-002 t,iJ rt Alit �! ti.i J lhite x`11..1 •. �+'• Mill ISM 1111111 MIN 1111111 NIB EMI NMI MEI MIS MIN MIS 1111111 _ I— MI ti MI ME— I M i N MN i— MI I MINI.. I TABLE 3 (CONTINUED) Site Name EDR Map ID Address/ Approx. Distance and Direction from Site Regulatory List(s) Ecology File Review? and Notes 7 Eleven Store 77 810 E. Yakima Avenue/ 3,000 feet east CSCSL, VCP Boise Cascade Plywood Log Yard 78 N 7`'' and H Street/ 3,400 feet NE L CSCSL No — Located at least 3,000 feet from the proposed project excavation, and downgradient. No — Located at least 3,400 feet from the proposed project excavation. Nakano Foods 79 115 W. I Street/ 3,400 feet NNW CSCSL, VCP, WA ICR, RCRIS-SQG, FINDS No — Located at least 3,400 feet from the proposed project excavation. Bissell Distributing 80 311 W.1 Street/ 3,500 feet NNW CSCSL No — Located at least 3,500 feet from the proposed project excavation. Former Unocal 76 81 920 N. 6th Avenue/ 3,600 feet NW CSCSL, RCRIS-SQG, FINDS No — Located at least 3,600 feet from the proposed project excavation. CERC-NFRAP CSCSL FINDS HOC INDIAN LUST LQG LUST NFA RCRIS UST SQG VCP WA ICR Comprehensive Environmental Response, Compensation, and Liability Act —No Further Remedial Action Planned (EPA) Confirmed and Suspected Contaminated Sites List (Ecology) Facility Index System/Facility Identification Initiative Program Summary Halogenated Organic Compounds Leaking Underground Storage Tanks on Indian Lands (EPA) Resource Conservation and Recovery Act (RCRA) Large Quantity Generator Leaking Underground Storage Tank (Ecology) No further action Resource Conservation and Recovery Information System (EPA) Underground Storage Tank (Ecology) RCRA Small Quantity Generator Voluntary Cleanup Program (Ecology) Washington Independent Cleanup Reports (Ecology) Note: EDR listings not included in this table were considered to be far enough away (based on their locations as mapped by EDR) that it is unlikely they would impact the project area. 21-1-09306-002 S-IAnunnr SHANNON &WILSON, INC_ TABLE 4 SOIL SAMPLE IDENTIFICATION AND FIELD SCREENING RESULTS TP -1 SI TP -1 S2 TP -1 S3 TP -2 S1 Gravelly sand with cobbles and occasional boulders, slightly moist Sandy gravel and cobbles with boulders, moist to wet Sandy gravel and cobbles with boulders, wet (saturated) Gravelly sand with cobbles and occasional boulders, wet TP -2 S2 PID Photoionization detection meter ppm parts per million 14.5 12 Analytical tests were performed on samples denoted with bold type. 21-1-09306-002 IIIIII IMO NM M NM NM E 111 - N E -.. - i NIB M I NM TABLE 5 SUMMARY OF ANALYTICAL RESULTS, SOIL AND GROUNDWATER SAMPLES r Parameter' Sam le Date VOCs Chloroform Tetrachloroethene (PCE) Acetone Methylene Chloride TPFI-G TPH-D TPI -1-O Metals- Arsenic etals- Arsenic Cadmium Chromium3 Copper Lead Mercury Nickel Selenium Silver Zinc VOCs Volatile organic compounds TPH-G Gasoline range total petroleum hydrocarbons TPII-D Diesel range total petroleum hydrocarbons TPH-O Oil range total petroleum hydrocarbons ND Not detected; all analytes were less than the test detection limits; refer to laboratory report for full list of analytes. 5/11/04 ND <22 <54 <110 <1.1 <0.54 9.5 20 2I <0.27 10 <11 <0.54 40 awl"Sam` e`sdm/. rp:2';515 TP 2::S2. 5/12/04 <0.0011 <0.0011 0.0090 H 0.028 H <23 <29 <57 <11 <0.57 8.2 19 8.9 <0.29 8.5 <Il <0.57 31 5/12/04 <0.0011 <0.0011 0.0074 H 0.031 H <23 <57 <110 <11 <0.57 11 21 <5.7 <0.28 10 <11 <0.57 36 v.cr 0.05 0.02 2,000 2,000 20 2 2,000 250 2 5/11/04 0.88 <0.20 <5.0 <1.0 <0.027 <0.066 <0.11 <3.0 <4.0 <10 <10 <1.0 <0.50 <20 <5.0 <10 <50 5/11/04 1.2 0.41 <5.0 <1.0 <0.10 <0.26 0.52 <3.3 <4.4 <11 <11 96 <0.50 <22 <5.6 <11 11,000 rountiwuter'S•. 9/23/04 NT NT NT NT <3.3 <4.4 <11 <11 140 <0.50 <22 <5.6 <11 21,000 iinple§?. Figs • 9/23/04 NT NT NT NT <3.3 <4.4 <11 <11 4.3 <0.50 <22 <5.6 <11 41 M W-3 9/23/04 NT MICA -A. Grbund=.. • water 5 NT Ni' 500 N'I500 <3.3 <4.4 <11 IS 8.8 <0.50 <22 <5.6 <11 78 -- 5 5 50 15 21-1-09306-002 SHANNON R Wlt gnt,i u ir� TABLE 5 (CONTINUED) • SUMMARY OF ANALYTICAL RESULTS, SOIL AND GROUNDWATER SAMPLES mg/kg milligrams per kilogram tg/L micrograms per liter 2 Only the analytes that were detected at greater than the test detection limits are listed; refer to laboratory report for full list of analytes. Total metals for all except sample TP -1 GW 1, which is dissolved metals. Chromium VI (hexavalent) MTCA-A Soil Cleanup Level =19 mg/kg Chromium III (trivalent) MTCA-A Soil Cleanup Level = 2,000 mg/kg MTCA-A Model Toxics Control Act Method A Groundwater Cleanup Levels or Soil Cleanup Levels for unrestricted land uses. NT Not tested H The analyte indicated is a common laboratory solvent and may have been introduced during sample preparation, impacting the sample result. 21-1-09306-002 MN NM ' 111M1 IIMI NM I 111111 am us am am EN me m NN W v t! --- �--- ---- — — - L 9-M Li tO01 w1.1.13 rrA :a n i 0 120 E i---1 1 I 240 Scale in Feet MAP ID CURRENT (OR FORMER) LAND USE 1 Helliesen Lumber Co. 2 (railroad freight depot) 3 Yakima County Jail (creamery (3a); Myrlin Ackerman - gasoline station and auto repair [3b)) 4 Inland Fruit & Produce Co. 5 Hollingbery & Sons - Hops 6 Yakima County Printing Department (Safeway; lodging) 7 (Crest Linen; Automotive Engineering Co.) 8 (gasoline station and auto repair shop) 9 (Peerless Laundry & Dry Cleaning) 10 (auto repair) 11 County Coroner (Pizza Hut; gasoline station and auto repair shop) 12 Firman Pollen Company 13 Sunquist Fruit & Cold Storage 14 Elliott Tire Center (gasoline station; Economy Fuel Co.) 15 Lincoln Avenue Car Wash and Arco gasoline station 16 Smitty's Conoco LEGEND Existing Monitoring Well Designation and Approximate Location Boring Designation and Approximate Location Test Pit Designation and Approximate Location NOTE Base map taken from client FTP site. Autocad file "00704 HLA Survey.dwg" dated 6-1-04. Yakima Grade Separation Environmental Site Assessment Yakima, Washington SITE PLAN AND SAMPLE LOCATIONS September 2005 21-1-09306-002 SHANNON & WILSON, INC. Geolechnical and Environmenlat Consultants FIG. 2 SHANNON WILSON. INC. APPENDIX D ON-SITE ENVIRONMENTAL LABORATORY REPORTS 21-1-09306-002 This page left intentionally blank. i i 1 i TI 1 41 1' i j.J k OnSite Environmental Inc. 14648 NE 95`h Street, Redmond, WA 98052 • (425) 883-3881 May 20, 2004 Donna Parkes Shannon & Wilson, Inc. 303 Wellsian Way Richland, WA 99352 Re: Analytical Data for Project 21-1-09306-002 Laboratory Reference No. 0405-061 Dear Donna: Enclosed are the analytical results and associated quality control data for samples submitted on May 12, 2004. The standard policy of OnSite Environmental Inc. is to store your samples for 30 days from the date of receipt. If you require longer storage, please contact the laboratory. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the data, or need additional information, please feel free to call me. Sincerely, David Baumeister Project Manager Enclosures OnSite Environmental, Inc. 14648 NE 95'}' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 2 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Case Narrative Samples were collected on May 11, 2004 and received by the laboratory on May 12, 2004. They were maintained at the laboratory at a temperature of 2°C to 6°C. General QA/QC issues associated with the analytical data enclosed in this laboratory report will be indicated with a reference to a comment or explanation on the Data Qualifier page. More complex and involved QA/QC issues will be discussed in detail below, Volatiles EPA 8260B (Soil) Analysis The MS/MSD associated with this sample had out of control recoveries and out of control RPD's for all analytes. The sample was immediately re -extracted and re -analyzed with similar results. The out of control events are therefore attributed to matrix interference. A spike blank extracted with this sample batch had all parameters within limits. Any other QA/QC issues associated with this extraction and analysis will be indicated with a footnote reference and discussed in detail on the Data Qualifier page. OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. ri I ci LJ 1,j, S lt.e 3 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 NWTPH-HCID Date Extracted: Date Analyzed: 5-13-04 5-13-04 Matrix: Soil Units: mg/kg (ppm) Client ID: Lab ID: TP -1 S2 05-061-01 Gasoline: ND PQL: 22 Diesel Fuel: ND PQL: 54 Lube Oil: ND PQL: 110 Surrogate Recovery: o-Terphenyl 110% Flags: y OnSite Environmental, Inc. 14648 NE 95''' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody; and is intended only for the use of the individual or company to whom it is addressed. 4 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-13-04 5-13-04 NWTPH-HCID METHOD BLANK QUALITY CONTROL Matrix: Soil Units: mg/kg (ppm) Lab ID: Gasoline: PQL: MB0513S1 ND . 10 Diesel Fuel: ND PQL: 25 Lube Oil: ND PQL: 50 Surrogate Recovery: o-Terphenyl 120% Flags Y OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 5 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-13-04 5-14-04 Matrix: Water Units: mg/L (ppm) Client ID: Lab ID: TP -1 GW1 05-061-03 NWTPH-HCID MW -1 05-061-04 Gasoline: ND ND PQL: 0.027 0.10 Diesel Fuel: ND ND PQL: 0.066 0.26 Lube Oil: ND Lube Oil PQL: 0.11 0.41 Surrogate Recovery: o-Terphenyl 86% 83% Flags: Y Y OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and Is intended only for the use of the individual or company to whom It is addressed. 6 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-13-04 5-14-04 NWTPH-HCI D METHOD BLANK QUALITY CONTROL Matrix: Water Units: mg/L (ppm) Lab ID: MB0513W1 Gasoline: ND PQL: 0.10 Diesel Fuel: ND PQL: 0.25 Lube Oil: ND PQL: 0.40 Surrogate Recovery: o-Terphenyl 86% Flags Y OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 7 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: Matrix: Units: Lab ID: Client ID: Analyte Arsenic Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc 5-14-04 5-14&17-04 Soil mg/kg (ppm) 05-061-01 TP -1 S2 Method 6010B 60103 60108 60108 60108 7471A 601013 60108 60108 6010B TOTAL METALS EPA 60106/7471A Result ND ND 9.5 20 21 ND 10 ND ND 40 PQL 11 0.54 0.54 1.4 5.4 0.27 2.7 11 0.54 2.7 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 8 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21 -1-09306-002 Date Extracted: Date Analyzed: TOTAL METALS EPA 6010B METHOD BLANK QUALITY CONTROL 5-14-04 5-17-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: MB0514S1 Analyte Arsenic Cadmium Chromium Copper Lead Nickel Selenium Silver Zinc Method Result PQL 6010E ND 10 6010B ND 0.50 60108 ND 0.50 6010B ND 1.3 6010B ND 5.0 60108 ND 2.5 6010E ND 10 6010E ND 0.50 60108 ND 2.5 OnSite Environmental, Inc. 14648 NE 95Ih Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody. and is intended only for the use of the individual or company to whom it is addressed. 9 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: TOTAL METALS EPA 7471A METHOD BLANK QUALITY CONTROL 5-14-04 5-14-04 Matrix: Soil Units: mg/kg (ppm) Lab 1D: M90514S2 Analyte Method Result PQL Mercury 7471A ND 0.25 OnSite Environmental, Inc. 14648 NE 951" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-14-04 5-17-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-063-02 Analyte Arsenic Cadmium Chromium Copper Lead Nickel Selenium Silver Zinc TOTAL METALS EPA 6010B DUPLICATE QUALITY CONTROL Sample Duplicate Result Result RPD POL Flags ND ND NA 10 ND ND NA 0.50 14.7 15.1 3 0.50 11.3 9.74 15 1.3 ND ND NA 5.0 23.0 22.0 4 2.5 ND ND NA 10 ND ND NA 0.50 21.8 20.8 5 2.5 10 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 683-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is Intended only for the use of the individual or company to whom it is addressed. 11 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: 5-14-04 Date Analyzed: 5-14-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-034-08 Analyte Mercury TOTAL METALS EPA 7471A DUPLICATE QUALITY CONTROL Sample Duplicate Result Result RPD PQL Flags ND ND NA 0.25 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3381 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 12 Date•of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 TOTAL METALS EPA 6010B MS/MSD QUALITY CONTROL Date Extracted: Date Analyzed: 5-14-04 5-17-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-063-02 Spike Percent Percent Analyte Level MS Recovery MSD Recovery RPD Flags Arsenic 100 93.2 93 92-5 93 1 Cadmium 50 42.7 85 43.8 88 3 Chromium 100 106 92 108 93 2 Copper 50 57.4 92 59.3 96 3 Lead 250 215 86 222 89 3 Nickel 100 111 88 114 91 3 Selenium 100 85.6 86 94.7 95 10 Silver 50 46.0 92 47.0 94 2 Zinc 100 110 88 112 90 2 OnSite Environmental, Inc. 14648 NE 95`" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 13 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: 5-14-04 Date Analyzed: 5-14-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-034-08 Analyte Mercury TOTAL METALS EPA 7471A MS/MSD QUALITY CONTROL Spike Percent Percent Level MS Recovery MSD Recovery RPD Flags 1.0 0.994 99 1.05 105 6 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom It is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 TOTAL METALS EPA 200.8/7470A Date Extracted: 5-17&19-04 Date Analyzed: 5-18&19-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-061-04 Client ID: MW -1 Analyte Method Arsenic 200.8 Cadmium 200.8 Chromium 200.8 Copper 200.8 Lead 200.8 Mercury 7470A Nickel 200.8 Selenium 200.8 Silver 200.8 Zinc 200.8 Result PCNL ND 3.3 ND 4.4 ND 11 ND 11 96 1.1 ND 0.50 ND 22 ND 5.6 ND 11 11000 560 14 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and Is intended only ior.the use of the Individual or company to whom it is addressed. 15 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 TOTAL METALS EPA 200.8 METHOD BLANK QUALITY CONTROL Date Extracted: 5-17&19-04 Date Analyzed: 5-18&19-04 Matrix: Water Units: ug/L (ppb) Lab ID: MB0517W1 Analyte Method Result PQL Arsenic 200.8 ND 3.3 Cadmium 200.8 ND 4.4 Chromium 200.8 ND 11 Copper 200.8 ND 11 Lead 200.8 ND 1.1 Nickel 200.8 ND 22 Selenium 200.8 ND 5.6 Silver 200.8 ND 11 Zinc 200.8 ND 560 OnSite Environmental, Inc. 14648 NE 95`" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: Matrix: Units: Lab ID: Analyte Mercury TOTAL METALS EPA 7470A METHOD BLANK QUALITY CONTROL 5-19-04 5-19-04 Water ug/L (ppb) MB0519W 1 Method 7470 A Result POL ND 0.50 16 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and Is intended only for the use of the individual or company to whom it is addressed. 17 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 TOTAL METALS EPA 200.8 DUPLICATE QUALITY CONTROL Date Extracted: 5-17&19-04 Date Analyzed: 5-18&19-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-067-01 Sample Duplicate Analyte Result Result RPD PQL Flags Arsenic ND ND NA 3.3 Cadmium ND ND NA 4.4 Chromium ND ND NA 11 Copper 16.0 14.1 13 11 Lead ND ND ' NA 1.1 Nickel ND ND NA 22 Selenium ND ND NA 5.6 Silver ND ND NA 11 Zinc 38.1 37.0 3 28 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom It is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: 5-19-04 Date Analyzed: 5-19-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-077-10 Analyte Mercury TOTAL METALS EPA 7470A DUPLICATE QUALITY CONTROL Sample Duplicate Result Result RPD PQL Flags ND ND NA 0.50 18 OnSlte Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is Intended only for the use of the individual or company to whom It Is addressed. 1p� i_. I 19 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 TOTAL METALS EPA 200.8 MS/MSD QUALITY CONTROL Date Extracted: 5-17&19-04 Date Analyzed: 5-18&19-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-067-01 Spike Percent Percent Analyte Level MS Recovery MSD Recovery RPD Flags Arsenic 110 112 102 118 107 5 Cadmium 110 107 97 112 102 4 Chromium 110 103 93 107 97 4 Copper 110 113 88 118 93 4 Lead 110 105 96 111 101 5 Nickel 110 99.8 91 105 95 5 Selenium 110 112 102 119 108 6 Silver 110 96.9 88 107 97 10 Zinc 110 147 99 155 106 5 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: 5-19-04 Date Analyzed: 5-19-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-077-10 Analyte Mercury TOTAL METALS EPA 7470A MS/MSD QUALITY CONTROL Spike Percent Percent Level MS Recovery MSD Recovery RPD Flags 10.0 9.58 96 10.4 104 8 20 OnSite Environmental, Inc. 14648 NE 95Ih Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is Intended only for the use of the individual or company to wham it is addressed. 21 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Filtered: Date Analyzed: Matrix: Units: Lab ID: Client ID: Analyte Arsenic Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc 5-12-04 5-14&19-04 Water ug/L (ppb) 05-061-03 TP -1 GW1 Method 200.8 200.8 200.8 200.8 200.8 7470A 200.8 200.8 200.8 200.8 DISSOLVED METALS EPA 200.8/7470A Result ND ND ND ND ND ND ND ND ND ND PQL 3.0 4.0 10 10 1.0 0.50 20 5.0 10 50 OnSite Environmental, Inc. 14648 NE 95`h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 DISSOLVED METALS EPA 200.8/7470A METHOD BLANK QUALITY CONTROL Date Filtered: 5-12-04 Date Analyzed: 5-14&19-04 Matrix: Water Units: ug/L (ppb) Lab ID: MB0512D1 Analyte Arsenic Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc Method Result POL 200.8 ND 3.0 200.8 ND 4.0 200.8 ND 10 200.8 ND 10 200.8 ND 1.0 7470A ND 0.50 200.8 ND 20 200.8 ND 5.0 200.8 ND 10 200.8 ND 50 22 OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 23 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 DISSOLVED METALS EPA 200.8/7470A DUPLICATE QUALITY CONTROL Date Filtered: 5-12-04 Date Analyzed: 5-14&19-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-077-10 Sample Duplicate Analyte Result Result RPD PQL Flags Arsenic 18.8 18.9 0 3.0 Cadmium ND ND NA 4.0 Chromium ND ND NA 10 Copper ND ND NA 10 Lead ND ND NA 1.0 Mercury ND ND NA 0.50 Nickel ND ND NA 20 Selenium ND ND NA 5.0 Silver ND ND NA 10 Zinc ND ND NA 50 OnSite Environmental, Inc. 14648 NE 95'" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 24 Date of Report; May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 DISSOLVED METALS EPA 200.8/7470A MS/MSD QUALITY CONTROL Date Filtered: 5-12-04 Date Analyzed: 5-14&19-04 Matrix: Water Units: ug/L (ppb) Lab I D : 05-077-10 Spike Percent Percent Analyte Level MS Recovery MSD Recovery RPD Flags Arsenic 200 233 107 232 107 0 Cadmium 200 194 97 193 97 D Chromium 200 190 95 191 95 0 Copper 200 181 90 181 91 0 Lead 200 191 96 193 96 1 Mercury 10 9.58 96 10.4 104 8 Nickel 200 178 89 180 90 1 Selenium 200 221 110 220 110 0 Silver 200 190 95 190 95 0 Zinc 200 202 101 205 102 1 OnSite Environmental, Inc. 14648 NE 95`h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. r f`I r -i f :] ri 1:„1 I 1 1.:1 r.i 1, I 25 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B Page 1 of 2 Date Extracted: 5-12-04 Date Analyzed: 5-12-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-061-01 Client ID: TP -1 S2 Compound Results Flags PQL Dichlorodifluoromethane ND 0.0011 Chloromethane- ND 0.0011 Vinyl Chloride ND 0.0011 Bromomethane ND 0.0011 Chloroethane ND 0.0011 Trichlorofluoromethane ND 0.0011 1,1-Dichioroethene ND 0.0011 Acetone ND . 0.0054 lodomethane ND 0.0054 Carbon Disulfide ND 0.0011 Methylene Chloride ND 0.0054 (trans) 1,2-Dichioroethene ND 0.001.1 Methyl t -Butyl Ether ND 0.0011 1,1-Dichioroethane ND 0.0011 Vinyl Acetate ND 0.0054 2,2-Dichloropropane ND 0.0011 (cis) 1,2-Dichloroethene ND 0.0011 2-Butanone ND 0.0054 Bromochforomethane ND 0.0011 Chloroform ND 0.0011 1,1,1 -Trichloroethane ND 0.0011 Carbon Tetrachloride ND 0.0011 1,1-Dichloropropene ND 0.0011 Benzene ND 0.0011 1,2-Dichloroethane ND 0.0011 Trichloroethene ND 0.0011 1,2-Dichloropropane ND 0.0011 Dibromomethane ND 0.0011 Bromodichloromethane ND 0.0011 2-Chioroethyl Vinyl Ether ND 0.0054 (cis) 1,3-Dichloropropene ND 0.0011 Methyl Isobutyl Ketone ND 0.0054 Toluene ND 0.0011 (trans) 1,3-Dichloropropene ND 0.0011 OnSite Environmental, Inc. 14648 NE 95' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 26 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Lab ID: Client ID: VOLATILES by EPA 8260B Page 2 of 2 05-061-01 TP -1 S2 Compound Results Flags PQL 1,1,2 -Trichloroethane ND 0.0011 Tetrachloroethene ND 0.0011 1,3-Dichloropropane ND 0.0011 2-Hexanone ND 0.0054 Dibromochloromethane ND 0.0011 1,2-Dibromoethane ND 0.0011 Chlorobenzene ND 0.0011 1,1,1,2 -Tetrachloroethane ND 0.0011 Ethylbenzene ND 0.0011 m,p-Xylene ND 0.0022 o -Xylene ND 0.0011 Styrene ND 0.0011 Brornoform ND 0.0011 Isopropylbenzene ND 0.0011 Bromobenzene ND 0.0011 1,1,2,2 -Tetrachloroethane ND 0.0011 1,2,3-Trichloropropane ND 0.0011 n-Propylbenzene ND 0.0011 2-Chiorotoluene ND 0.0011 4-Chiorotoluene ND 0.0011 1,3,5-Trimethylbenzene ND 0.0011 tert-Butylbenzene ND 0.0011 1,2,4-Trimethylbenzene ND 0.0011 sec-Butylbenzene ND 0.0011 1,3 -Dichlorobenzene ND 0.0011 p-isopropyltoluene ND 0.0011 1,4 -Dichlorobenzene ND 0.0011 1,2 -Dichlorobenzene ND 0.0011 n-Butylbenzene ND 0.0011 1,2-Dibromo-3-chloropropane ND 0.0054 1,2,4-Trichlorobenzene ND 0.0011 Hexachlorobutadiene ND . 0.0054 Naphthalene ND 0.0011 1,2,3-Trichlorobenzene ND 0.0011 Percent Control Surrogate Recovery Limits Dibromofluoromethane 90 71-126 Toluene, d8 84 73-130 4-Bromofluorobenzene 88 70-130 OnSite Environmental, Inc. 14648 NE 95`h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it Is addressed. r i i tr a A d _7 If. Cil 27 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B METHOD BLANK QUALITY CONTROL Page 1 of 2 Date Extracted: 5-12-04 Date Analyzed: 5-12-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: MB0512S1 Compound Results Flags PQL Dichlorodifluoromethane ND 0.0010 Chloromethane ND 0.0010 Vinyl Chloride ND 0.0010 Bromomethane ND 0.0010 Chloroethane ND 0.0010 Trichlorofluoromethane ND 0.0010 1,1-Dichloroethene ND 0.0010 Acetone ND 0.0050 fodomethane ND 0.0050 Carbon Disulfide ND 0.0010 Methylene Chloride ND 0.0050 (trans) 1,2-Dichloroethene ND 0.0010 Methyl t -Butyl Ether ND 0.0010 1.1-Dichioroethane ND 0.0010 Vinyl Acetate ND 0.0050 2,2-Dichloropropane ND 0.0010 (cis) 1,2-Dichloroethene ND 0.0010 2-Butanone ND 0.0050 Bromochloromethane ND 0.0010 Chloroform ND 0.0010 1,1,1 -Trichloroethane ND 0.0010 Carbon Tetrachloride ND 0.0010 1,1-Dichloropropene ND 0.0010 Benzene ND 0.0010 1,2-Dichioroethane ND 0.0010 Trichloroethene ND 0.0010 1 ,2-Dichloropropane ND 0.0010 Dibromomethane ND 0.0010 Bromodichioromethane ND 0.0010 2-Chloroethyl Vinyl Ether ND 0.0050 (cis) 1,3-Dichloropropene ND 0.0010 Methyl Isobutyl Ketone ND 0.0050 Toluene ND 0.0010 (trans) 1,3-Dichloropropene ND 0.0010 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B METHOD BLANK QUALITY CONTROL Page 2 of 2 Lab ID: MB0512S1 Compound 1,1,2 -Trichloroethane Tetrachloroethene 1,3-Dichioropropane 2-Hexanone Dibrom ochiorom ethane 1,2-Dibromoethane Chlorobenzene 1,1,1,2 -Tetrachloroethane Ethylbenzene m,p-Xylene o -Xylene Styrene Bromoform Isopropyibenzene Bromobenzene 1,1,2,2 -Tetrachloroethane 1,2,3-Trichloropropane n-Propylbenzene 2-Chiorotoluene 4-Chiorotoluene 1 ,3 ,5-Trimethylbenzene tert-Butylbenzene 1 ,2,4-Trimethyibenzene sec-Butylbenzene 1 ,3 -Dichlorobenzene p-Isopropyltoiuene 1,4 -Dichlorobenzene 1 ,2 -Dichlorobenzene n-Butylbenzene 1 ,2-Dibromo-3-chloropropane 1 ,2,4-Trichlorobenzene Hexachiorobutadiene Naphthalene 1,2,3-Trichlorobenzene Su rrog ate Dibromofluoromethane Toluene, d8 4-Bromofluorobenzene Results Flags PQL ND 0.0010 ND 0.0010_ ND 0.0010 ND 0.0050 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0020 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0050 ND 0.0010 ND 0.0050 ND 0.0010 NO 0.0010 Percent Control Recovery Limits 79 71-126 78 73-130 92 70-130 28 OnSite Environmental, Inc. 14648 NE 95t' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and Is Intended only for the use of the individual or company to whom It is addressed. ::1 i 6 ea i.J Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B MS/MSD QUALITY CONTROL Date Extracted: 5-12-04 Date Analyzed: 5-12-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-061-01 Compound 29 Sample Spike Percent Percent Recovery Amount Amount MS Recovery MSD Recovery Limits Flags 1,1-Dichloroethene ND 0.0500 0.0256 51 0.0412 82 53-141 Benzene ND 0.0500 0.0215 43 0.0359 72 66-135 Trichloroethene ND 0.0500 0.0188 38 0.0301 60 69-130 Toluene ND 0.0500 0.0188 38 0.0329 66 72-127 Chlorobenzene ND 0.0500 0.0184 37 0.0357 71 68-134 RPD RPD Limit Flags 1,1-Dichloroethene 47 11 L Benzene 50 11 L Trichloroethene 46 13 L Toluene 54 11 L Chlorobenzene 64 12 L OnSile Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed, Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: Matrix: Units: Lab ID: Client ID: Compound Dichlorodifluoromethane Chloromethane Vinyl Chloride Bromomethane Chloroethane Trichlorofluoromethane 1,1-Dichloroethene Acetone lodornethane Carbon Disulfide Methylene Chloride (trans) 1,2-Dichloroethene Methyl t -Butyl Ether 1,1 -Dichloroethane Vinyl Acetate 2,2-Dichloro propane (cis) 1,2-Dichloroethene 2-Butanone Bromochioromethane Chloroform 1,1 ,1 -Trichloroethane Carbon. Tetrachloride 1,1 -Dichloropropene Benzene 1,2-Dichloroethane Trichloroethene 1 ,2 -Dich loropropane Dibromomethane Bromodichloromethane 2-Chloroethyl Vinyl Ether (cis) 1,3-Dichloropropene Methyl Isobutyl Ketone Toluene (trans) 1,3-Dichloropropene VOLATILES by EPA 82608 Page 1 of 2 5-13-04 5-13-04 Water ug/L (ppb) 05-061-03 . TP -1 GW1 Results Flags POL ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 5.0 ND 1.0 ND 0.20 ND 1.0 ND 0.20 ND 0.20 • ND 0.20 ND 1.0 ND 0.20 ND 0.20 ND 5.0 ND 0.20 0.88 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 1.0 ND 0.20 ND 2.0 ND 0.20 ND 0.20 30 OnSite Environmental, Inc. 14648 NE 95`h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed, 31 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Lab ID: Client ID: VOLATILES by EPA 8260B Page 2 of 2 05-061-03 TP -1 GW1 Compound Results Flags PQL 1,1,2 -Trichloroethane ND 0.20 Tetrachloroethene ND 0.20 1,3-Dichloropropane ND 0.20 2-Hexanone ND 2.0 Dibromochloromethane ND 0.20 1,2-Dibromoethane ND 0.20 Chlorobenzene ND 0.20 1,1,1,2 -Tetrachloroethane ND 0.20 Ethylbenzene ND 0.20 m,p-Xylene ND 0,40 o -Xylene ND 0.20 Styrene ND 0.20 Bromoform ND 1.0 Isopropylbenzene ND 0.20 Bromobenzene ND 0.20 1,1,2,2 -Tetrachloroethane ND 0.20 1,2,3-Trichloropropane ND 0.20 n-Propyibenzene ND 0.20 2-Chlorotoluene ND 0.20 4-Chlorotoluene ND 0.20 1,3,5-Trimethylbenzene ND 0.20 tert-Butylbenzene ND 0.20 1 ,2 ,4-Trimethylbenzene ND 0.20 sec-Butylbenzene ND 0.20 1,3 -Dichlorobenzene ND 0.20 p-Isopropyltoluene ND Q_20 1,4 -Dichlorobenzene ND 0.20 1,2 -Dichlorobenzene ND 0.20 n-Butylbenzene ND 0.20 1,2-Dibromo-3-chloropropane ND 1.0 1,2,4-Trichlorobenzene ND 0.20 Hexachlorobutadiene ND 0.20 Naphthalene ND 1.0 1,2,3-Trichlorobenzene ND 0.20 Percent Control Surrogate Recovery Limits Dibromofluoromethane 110 70-123 Toluene, d8 104 70-119 4-Bromofluorobenzene 91 70-1 19 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B Page 1 of 2 Date Extracted: 5-13-04 Date Analyzed: 5-13-04 Matrix: Water Units: ug/L (ppb) Lab ID: 05-061-04 Client ID: MW -1 Compound Dichlorodifluoromethane Chloromethane Vinyl Chloride Bromomethane Chloroethane Trichlorofluoromethane 1,1-Dichloroethene • Acetone lodomethane Carbon Disulfide Methylene Chloride (trans) 1,2-Dichloroethene Methyl t -Butyl Ether 1,1-Dichloroethane Vinyl Acetate 2,2-Dichloro propane (cis) 1,2-Dichloroethene 2-Butanone Bromochloromethane Chloroform 1,1,1 -Trichloroethane Carbon Tetrachloride 1,1-Dichloropropene Benzene 1,2-Diichloroethane Trichloroethene 1 ,2- Dichloropropane Dibromomethane Brornodichloromethane 2-Chloroethyl Vinyl Ether (cis) 1,3-Dichloropropene Methyl Isobutyl Ketone Toluene (trans) 1,3-Dichloropropene Results Flags PQL ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 5.0 ND 1.0 ND 0.20 ND 1.0 ND 0.20 ND 0.20 ND 0.20 ND 1.0 ND 0.20 ND 0.20 ND 5.0 ND 0.20 1.2 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 1.0 ND 0.20 ND 2.0 ND 0.20 ND 0.20 32 OnSite Environmental, Inc. 14648 NE 95u' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and Is intended only for the use of the Individual or company to whom it Is addressed. 33 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Lab ID: Client ID: VOLATILES by EPA 8250E Page 2 of 2 05.061-04 MW -1 Compound Results Flags POL. 1,1,2 -Trichloroethane ND 0.20 Tetrachloroethene 0.41 0.20 1,3-Dichforopropane ND 0.20 2-Hexanone ND 2.0 Dibromochloromethane ND 0.20 1,2-Dibromoethane ND 0.20 Chforobenzene ND 0.20 1,1,1,2 -Tetrachloroethane ND 0.20 Ethylbenzene ND 0.20 m,p-Xytene ND 0.40 o -Xylene ND 0.20 Styrene ND 0.20 Bromoform ND 1.0 Isopropylbenzene ND 0.20 Bromobenzene ND 0.20 1,1,2,2 -Tetrachloroethane ND 0.20 1,2,3-Trichloropropane ND 0.20 n-Propylbenzene ND 0.20 2-Chlorotoluene ND 0.20 4-Chlorotoluene ND 0.20 1,3,5-Trimethylbenzene ND 0.20 tert-Butylbenzene ND 0.20 1,2,4-Trimethyfbenzene ND 0.20 sec-Butylbenzene ND 0.20 1,3 -Dichlorobenzene ND 0.20 p-lsopropyltoluene ND 0.20 1,4 -Dichlorobenzene ND 0.20 1,2 -Dichlorobenzene ND 0.20 n-Butylbenzene ND 0.20 1,2-Dibromo-3-chloropropane ND 1.0 1,2,4-Trichlorobenzene ND 0.20 Hexachlorobutadiene ND 0.20 Naphthalene ND 1.0 1, 2,3-Trichlorobenzene ND 0.20 Percent Control Surrogate Recovery Limits Dibromofluoromethane 112 70-123 Toluene, d8 104 70-119 4-Bromofluorobenzene 91 70-119 OnSite Environmental, Inc. 14648 NE 95'x' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B METHOD BLANK QUALITY CONTROL Page 1 of 2 Date Extracted: 5-13-04 Date Analyzed: 5-13-04 Matrix: Water Units: ug/L (ppb) Lab ID: MB0513W1 Compound Dichlorodifluoromethane Chloromethane Vinyl Chloride Bromomethane Chloroethane Trichlorofluoromethane 1,1-Dichloroethene Acetone lodomethane Carbon Disulfide Methylene Chloride (trans) 1,2-Dichloroethene Methyl t -Butyl Ether 1,1-Dichloroethane Vinyl Acetate 2,2-Dichioropropane (cis) 1,2-Dichloroethene 2-Butanone Bromochioromethane Chloroform 1,1,1 -Trichloroethane Carbon Tetrachloride 1,1-Dichloropropene Benzene 1 ,2-Dichloroethane Trichloroethene 1,2-Dichloropropane Dibromomethane Bromodichioromethane 2-Chloroethyl Vinyl Ether (cis) 1,3-Dichloropropene Methyl Isobutyl Ketone Toluene (trans) 1,3-Dichloropropene Results Flags PQL ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 5.0 ND 1.0 ND 0.20 -ND 1.0 ND 0.20 ND 0.20 ND 0.20 ND 1.0 ND 0.20 ND 0.20 ND 5.0 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 0.20 ND 1.0 ND 0.20 ND. 2.0 ND 0.20 ND 0.20 34 OnSite Environmental, Inc. 14648 NE 95° Street, Redmond, WA 98052 (425) 883-3861 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. r 1 I i i i 35 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 VOLATILES by EPA 8260B METHOD BLANK DUALITY CONTROL Page 2 of 2 Lab ID: MB0513W1 Compound Results Flags PQL 1,1,2 -Trichloroethane ND 0.20 Tetrachloroethene ND 0.20 1,3-Dichloropropane ND 0.20 2-Hexanone ND 2.0 Dibromochloromethane ND 0.20 1,2-Dibromoethane ND 0.20 Chlorobenzene ND 0.20 1,1,1,2 -Tetrachloroethane ND 0.20 Ethylbenzene ND 0.20 m,p-Xylene ND 0.40 o -Xylene ND 0.20 Styrene ND 0.20 Bromoform ND 1.0 Isopropylbenzene ND 0.20 Bromobenzene ND 0.20 1,1 ,2,2 -Tetrachloroethane ND 0.20 1,2,3-Trichloropropane ND 0.20 n-Propylbenzene ND 0.20 2-Chlorotoluene ND 0.20 4-Chlorotoluene ND 0.20 1,3,5-Trimethylbenzene ND 0.20 tert-Butylbenzene ND 0.20 1,2,4-Trimethyibenzene ND 0.20 sec-Butylbenzene ND 0.20 1,3 -Dichlorobenzene ND 020 p-lsopropyltoluene ND 0.20 1,4 -Dichlorobenzene ND 0.20 1,2 -Dichlorobenzene ND 0.20 n-Butylbenzene ND 0.20 1,2-Dibromo-3-chloropropane ND 1.0 1,2,4-Trichlorobenzene ND 0.20 Hexachlorobutadiene ND 0.20 Naphthalene ND 1.0 1,2,3-Trichlorobenzene ND 0.20 Percent Control Surrogate Recovery Limits Dibromofluoromethane 111 70-123 Toluene, d8 104 70-119 4-Bromofluorobenzene 91 70-119 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 {425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: 5-13-04 Date Analyzed: 5-13-04 Matrix: Water Units: ug/L (ppb) Lab ID: Compound 1,1-Dichloroethene Benzene Trichloroethene Toluene Chlorobenzene SB0513W 1 36 VOLATILES by EPA 82608 SB/SBD QUALITY CONTROL Spike Percent Percent Recovery Amount SE Recovery SBD Recovery Limits Flags 10.0 9.24 92 9.04 90 70-130 10.0 8.74 87 8.78 88 70-130 10.0 8.75 87 8.59 86 70-130 10.0 8.56 86 8.36 84 70-130 10.0 9.06 91 8.83 88 70J130 RPD RPD Limit Flags 1,1-Dichloroethene 2 17 Benzene 0 13 Trichloroethene 2 1 2 Toluene 2 14 Chlorobenzene 3 9 OnSite Environmental, Inc. 14648 NE 95"` Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use o1 the individual or company to whom it is addressed, 37 Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-13-04 5-14-04 Matrix: Water Units: mg/L (ppm) Client ID: Lab ID: Diesel Range: PQL: Identification: MW -1 05-061-04 ND 0.27 Lube Oil Range: 0,52 PQL: 0.43 Identification: Lube Oil Surrogate Recovery o-Terphenyl: Flags: 83% Y NWTPH-Dx OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is Intended only for the use of the individual or company to whom it is addressed. Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: NWTPH-Dx METHOD BLANK QUALITY CONTROL 5-13-04 5-13-04 Matrix: Water Units: mg/L (ppm) Lab ID: MB0513W1 Diesel Range: PQL: Identification: Lube Oil Range: PQL: Identification: Surrogate Recovery o-Terphenyl: Flags: ND 0.25 ND 0.40 86% Y 38 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. 39 Date of Report; May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-13-04 5-14-04 NWTPH-Dx DUPLICATE QUALITY CONTROL Matrix: Water Units: mg/L (ppm) Lab ID: 05-060-01 05-060-01 DUP Diesel Range: ND PQL: 0.27 RPD: N/A ND 0.26 Surrogate Recovery o-Terphenyl: 61% 60% Flags: Y Y OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed, Date of Report: May 20, 2004 Samples Submitted: May 12, 2004 Laboratory Reference: 0405-061 Project: 21-1-09306-002 Date Analyzed: 5-12-04 Client ID TP -1 S2 % MOISTURE Lab ID % Moisture 05-061-01 8 40 OnSite Environmental, Inc. 14648 NE 95`h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company Io whom it is addressed. OnSite Environmental Inc. Data Qualifiers and Abbreviations A - Due to a high sample concentration, the amount spiked is insufficient for meaningful MS/MSD recovery data. B - The analyte indicated was also found in the blank sample. C - The duplicate RPD is outside control limits due to high result variability when analyte concentrations are within five times the quantitation limit. E - The value reported exceeds the quantitation range and is an estimate. F - Surrogate recovery data is not available due to the high concentration of coeluting target compounds. G - Insufficient sample quantity for duplicate analysis. H - The analyte indicated is a common laboratory solvent and may have been introduced during sample preparation, and be impacting the sample result. I Compound recovery is outside of the control limits. J - The value reported was below the practical quantitation limit. The value is an estimate. K - Sample duplicate RPD is outside control limits due to sample inhomogeneity. The sample was re -extracted and re -analyzed with similar results. L - The RPD is outside of the control limits. M - Hydrocarbons in the gasoline range (toluene-napthalene) are present in the sample. O - Hydrocarbons indicative of diesel fuel are present in the sample and are impacting the gasoline result. P - The RPD of the detected concentrations between the two columns is greater than 40. Q - Surrogate recovery is outside of the control limits. S - Surrogate recovery data is not available due to the necessary dilution of the sample. T - The sample chromatogram is not similar to a typical U - The analyte was analyzed for, but was not detected above the reported sample quantitation limit. V - Matrix Spike/Matrix Spike Duplicate recoveries are outside control limits due to matrix effects. W - Matrix Spike/Matrix Spike Duplicate RPD are outside control limits due to matrix effects. X - Sample extract treated with a silica gel cleanup procedure. Y - Sample extract treated with an acid cleanup procedure. z ND - Not Detected at POL POL - Practical Quantitation Limit RPD - Relative Percent Difference OnSite Environmental, Inc. 14648 NE 95'h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. 41 ii 11111 I N— — M I— ■s s M• M M -. MO M N r 05-061 =III SHANNON &WILSON, INC. A Geotechnical and Environmental Consultants 400 N. 34th Street, Suite 100 Seattle, WA 98103 (206) 632-8020 2055 Hill Road Fairbanks, AK 99709 (907)479.0800 2255 S.W. Canyon Road Portland, OR 97201-2498 (503) 223-8147 Sample Identity 2043 Westport Center Drive SL Louis, MO 63146-3564 (314) 392-0050 5430 Fairbanks Street, Suite 3 Anchorage, AK 99518 (907) 561-2120 1200 17th Street, Suite 1024 Denver, Co 80202 (303) 825-3800 Lab No. 303 Welisien Way . Richland, WA 99352 (509) 946-6309 - Time -OF-CUSTODY RECORD Date Sampled Laboratory Attn: Analysis Parameters/Sample Container Description Q (Include preservative it used) Page f of t 'n,5,• Cf' t ,De 00� ` Remarks/Mair TP— ',l Q, r f l.so cS-ti- , ` �( fx L { f µ Oa f ►'h .5 1� ah, e. j a r �r P�'btc a 3 3 F:DO 5- t 4- Sod 4.01 TP- l GLc) I jiajf Liv ►a11 S"1/-01 -»-o1 x )( X x is 9 b sso VC. rn,z 4 .s - r, . -5 , , tdff 1 d s 10014 .. Project. information Sample Receipt Relinquished By: 1. . Relinquished By: 2. Relinquished By: 3_ � ���� j u"Total Number Si tura: Time: j 13 0 Signature: Time: Signature: Tune: Project Numbe�j -1-��� of Containers _ Project Name: 1.�At� (�('� COC Seals/Intact? Y/NINA e p Pri Namt Dale:�j `� r*;1� Punted Name: Date: Printed Name: Dale: Contact: i . a r Ke 5 Received Good Cond./Cold /��, Delivery Method:�i nil G `7 r��`S Ongoing Project? Yes • No [ q 9u9,5 Company: Company: Company: Sampler: D. Par K 2 ` (attach shipping bill, 11'3 yT rs1 cSh(,t rth 0-ri Y /4)/1 0/1 Instructions Receivedi.By. .• 1. Received By: 2. Received By: 3. Requested Turnaround Time:,S`- i Sign T : rSignalure: lime: Signature: Time: arck Special instructions: PIeCZ_5e nofr1y cf 4-1(....);) re5ul rinle e: Date' i � Printed Name: Dale: Printed Name: Dale: c 0.'525:141‹.-- - 1 LO W LL1-"� an 4-s /fi/ez,/ aidi- Distribution. While - w/shipment - returned to Shannon & Wilton w/ laboratory report Yellow - w/shipment • for consignee files Pink - Shannon 8 Wilson - Job File Co�mpan+y, J //1J, •/ p Fr// ► [ ![�i/ Company: Company: F-19-91/UR No,026107 OnSite Environmental Inc. 14648 NE 95'" Street, Redmond, WA 98052 • (425) 883-3881 May 26, 2004 Donna Parkes Shannon & Wilson, Inc. 303 Wellsian Way Richland, WA 99352 Re: Analytical Data for Project 21-1-09306-002 Laboratory Reference No. 0405-070 Dear Donna: Enclosed are the analytical results and associated quality control data for samples submitted on May 13, 2004. The standard policy of OnSite Environmental Inc. is to store your samples for 30 days from the date of receipt. If you require longer storage, please contact the laboratory.. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the data, or need additional information, please feel free to call me. Sincerely, David Baumeister Project Manager Enclosures OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 2 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Case Narrative Samples were collected on May '12, 2004 and received by the laboratory on May 13, 2004. They were maintained at the laboratory at a temperature of 2°C to 6°C. General QA/QC issues associated with the analytical data enclosed in this laboratory report will be indicated with a reference to a comment or explanation on the Data Qualifier page. More complex and involved QA/QC issues will be discussed in detail below. OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is Intended only for the use of the individual or company to whom it is addressed. 3 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-14-04 5-14-04 Matrix: Soil Units: mg/kg (ppm) Client ID: Lab ID: TP -2 S1 05-070-01 NWTPH-HCID TP -2 S2 05-070-02 Gasoline: ND ND PQL: 23 23 Diesel Fuel: ND ND PQL: 57 57 Lube Oil: Lube Oil ND PQL: 110 110 Surrogate Recovery: o-Terphenyl 100% 104% Rags: Y Y OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 4 Date of Report: May 28, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-14-04 5-14-04 NWTPH-HCID METHOD BLANK QUALITY CONTROL Matrix: Soil Units: mg/kg (ppm) Lab ID: MB0514S1 Gasoline: ND PQL: 20 Diesel Fuel: ND PQL: 50 Lube Oil: ND PQL: 100 Surrogate Recovery: o-Terphenyl 109% Flags Y 1.jJ OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and Is intended only for the use of the Individual or company to whom it is addressed. 5 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: Matrix: Units: Lab ID: Client ID: Analyte Arsenic Cadmium Chromium Copper Lead Mercury Nickel Selenium Silver Zinc 5-14-04 5-14&17-04 Soil mg/kg (ppm) 05-070-01 TP -2 SI Method 6010B 60108 6010B 60105 6010B 7471A 6010B 6010B 60105 60108 TOTAL METALS EPA 6010B/7471A Result ND ND 8.2 19 8.9 ND 8.5 ND ND 31 PQL 11 0.57 0.57 1.4 5.7 0.29 2.9 11 0.57 2.9 OnSite Environmental, Inc. 14648 NE 95'" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom It is addressed. 6 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 TOTAL METALS EPA 6010B/7471A Date Extracted: Date Analyzed: 5-14-04 5-14&17-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-070-02 Client ID: TP -2 S2 Analyte Method Arsenic 60106 Cadmium 60108 Chromium 6010B Copper 6010B Lead 6010B Mercury 7471A Nickel 6010E Selenium 6010E Silver 6010B Zinc 6010E Result PQL ND 11 ND 0.57 11 0.57 21 1.4 ND 5.7 ND 0.28 10 2.8 ND 11 ND 0.57 36 2.8 OnSite Environmental, Inc. 14648 NE 95`" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom It is addressed. 7 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: TOTAL METALS EPA 6010B METHOD BLANK QUALITY CONTROL 5-14-04 5-17-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: M80514S1 Analyte Method Result PQL Arsenic 60108 ND 10 Cadmium 6010B ND 0,50 Chromium 6010B ND 0.50 Copper 6010B NO 1.3 Lead 6010E ND 5.0 Nickel 6010E ND 2,5 Selenium 6010B ND 10 Silver 6010E ND 0.50 Zinc 6010B ND 2.5 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 TOTAL METALS EPA 7471A METHOD BLANK QUALITY CONTROL Date Extracted: 5-14-04 Date Analyzed: 5-14-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: MB0514S2 Analyte Mercury Method 7471A Result PQL ND 0.25 8. OnSite Environmental, Inc. 14648 NE 95° Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. r i . l 9 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 TOTAL METALS EPA 6010B DUPLICATE QUALITY CONTROL Date Extracted: 5-14-04 Date Analyzed: 5-17-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-063-02 Sample Duplicate Analyte Result Result RPD POL Flags Arsenic ND ND NA 10 Cadmium ND ND NA 0.50 Chromium 14.7 15.1 3 0.50 Copper 11.3 9.74 15 1.3 Lead ND ND NA 5.0 Nickel 23.0 22.0 4 2.5 Selenium ND ND NA 10 Silver ND ND NA 0.50 Zinc 21.8 20.8 5 2.5 OnSite Environmental, Inc. 14648 NE 95'h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-14-04 5-14-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-034-08 Analyte Mercury TOTAL METALS EPA 7471A DUPLICATE QUALITY CONTROL Sample Duplicate Result Result RPD POL Flags ND ND NA 025 10 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. 11 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: 5-14-04 Date Analyzed: 5-17-04 Matrix: Units: Lab ID: Soil mg/kg (ppm) 05-063-02 TOTAL METALS EPA 6010E MS/MSD QUALITY CONTROL Spike Percent Percent Analyte Level MS Recovery MSD Recovery RPD Flags Arsenic 100 93.2 93 92.5 93 1 Cadmium 50 42.7 85 43.8 88 3 Chromium 100 106 92 108 93 2 Copper 50 57.4 92 59.3 96 3 Lead 250 215 86 222 89 3 Nickel 100 111 88 114 91 3 Selenium 100 85.6 86 94.7 95 10 Silver 50 46.0 92 47.0 94 2 Zinc 100 110 88 112 90 2 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-14-04 5-14-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-034-08 Analyte Mercury TOTAL METALS EPA 7471A MS/MSD QUALITY CONTROL Spike Percent Percent Level MS Recovery MSD Recovery RPD Flags 1.0 0.994 99 1.05 105 6 12 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the Individual or company to whom It Is addressed. is Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-13-04 5-13-04 VOLATILES by EPA 8260B Page 1 of 2 Matrix: Soil Units: mg/kg (ppm) Lab ID: Client ID: 05-070-01 TP -2 Si Compound Results Flags PQL Dichlorodifluoromethane ND 0.0011 Chloromethane ND 0.0011 Vinyl Chloride ND 0.0011 Bromomethane ND 0.0011 Chloroethane ND 0.0011 Trichlorofluoromethane ND 0.0011 1,1-Dichloroethene ND 0.0011 Acetone 0.0090 H 0.0057 lodomethane ND 0.0057 Carbon Disulfide ND 0.0011 Methylene Chloride 0.028 H 0.0057 (trans) 1,2-Dichloroethene ND 0.0011 Methyl t -Butyl Ether ND 0.0011 1,1-Dichloroethane ND 0.0011 Vinyl Acetate ND 0.0057 2,2-Dichloropropane ND 0.0011 (cis) 1,2-Dichloroethene ND 0.0011 2-Butanone ND 0.0057 Bromochloromethane ND 0.0011 Chloroform ND 0.0011 1,1,1 -Trichloroethane ND 0.0011 Carbon Tetrachloride ND 0.0011 1,1-Dichloropropene ND 0.0011 Benzene ND 0.0011 1,2-Dichloroethane ND 0.0011 Trichloroethene ND 0.0011 1 ,2-Dichloropropane -ND 0.0011 Dibromomethane ND 0.0011 Bromodichloromethane ND 0.0011 2-Chloroethyl Vinyl Ether ND 0.0057 (cis) 1,3-Dichloropropene ND 0.0011 Methyl Isobutyl Ketone ND 0.0057 Toluene ND 0.0011 (trans) 1,3-Dichloropropene ND 0.0011 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. f !f y j Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21.1-09306-002 VOLATILES by EPA 8260B Page 2 of 2 Lab ID: 05-070-01 Client ID: TP -2 S1 Compound 1,1,2 -Trichloroethane Tetrachloroethene 1,3-Dichloropropane 2-Hexanone Dibromochloromethane 1,2-Dibromoethane Chlorobenzene 1,1,1,2 -Tetrachloroethane Ethylbenzene m,p-Xylene o -Xylene Styrene Bromoform Isopropylbenzene Bromobenzene 1,1,2,2 -Tetrachloroethane 1,2,3-Trichloropropane n-Propylbenzene 2-Chlorotoluene 4-Chlorotoluene 1,3,5-Trimethylbenzene tert-Butylbenzene 1,2,4-Trimethylbenzene sec-Butylbenzene 1,3 -Dichlorobenzene p-Isopropyltoluene 1,4 -Dichlorobenzene 1,2 -Dichlorobenzene n-Butylbenzene 1,2-Dlbromo-3-chloropropane 1 ,2,4-Trichloroben zene Hexachlorobutadiene Naphthalene 1,2,3-Trichlorobenzene Surrogate Dibrornofluorom ethane Toluene, d8 4-Brornofluorobenzene Results Flags PQL ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0057 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0023 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 -ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0011 ND 0.0057 ND 0.0011 ND 0.0057 ND 0.0011 ND 0.0011 Percent Control Recovery Limits 85 71-126 79 73-130 90 70-130 14 OnSite Environmental, Inc. 14648 NE 95'h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom It Is addressed. 15 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 VOLATILES by EPA 8260B Page 1 of 2 Date Extracted: 5-13-04 Date Analyzed: 5-13-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: 05-070-02 Client ID: TP -2 S2 Compound Results Flags PQL Dichlorodifluoromethane ND 0.0011 Chloromethane ND 0.0011 Vinyl Chloride ND 0.0011 Bromomethane ND 0.0011 Chloroethane ND 0.0011 Trichlorofluoromethane ND 0.0011 1,1-Dichloroethene ND 0.0011 Acetone 0.0074 H 0.0057 lodomethane ND 0.0057 Carbon Disulfide ND 0.0011 Methylene Chloride 0.031 H 0.0057 (trans) 1,2-Dichloroethene ND 0.0011 Methyl t -Butyl Ether ND 0.0011 1,1-Dichloroethane ND 0.0011 Vinyl Acetate ND 0.0057 2,2-Dichloropropane ND 0.0011 (cis) 1,2-Dichloroethene ND 0.0011 2-Butanone ND 0.0057 Bromochloromethane ND 0.0011 Chloroform ND 0.0011 1,1,1 -Trichloroethane ND 0.0011 Carbon Tetrachloride ND 0.0011 1,1-Dichloropropene ND 0.0011 Benzene ND 0.0011 1,2-Dichloroethane ND 0.0011 Trichloroethene ND 0.0011 1,2-Dichloropropane ND 0.0011 Dibromomethane ND 0.0011 Bromodichloromethane ND 0.0011 2-Chloroethyl Vinyl Ether ND 0.0057 (cis) 1,3-Dichloropropene ND 0.0011 Methyl lsobutyl Ketone ND 0.0057 Toluene ND 0.0011 (trans) 1,3-Dichloropropene ND 0.0011 OnSite Environmental, Inc. 14648 NE 95m Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Lab ID: Client ID: VOLATILES by EPA 8260B Page 2 of 2 05-070-02 TP -2 S2 Compound Results Flags POL 1,1,2 -Trichloroethane ND 0.0011 Tetrachloroethene ND 0.0011 1,3-Dichloropropane ND 0.0011 2-Hexanone ND 0.0057 Dibromochloromethane ND 0.0011 1,2-Dibromoethane ND 0.0011 Chlorobenzene ND 0.0011 1,1,1,2 -Tetrachloroethane ND 0.0011 Ethylbenzene ND 0.0011 m ,p -Xylene ND 0.0023 o -Xylene ND 0.0011 Styrene ND 0.0011 Bromoform ND 0.0011 Isopropylbenzene ND 0.0011 Bromobenzene ND 0.0011 1,1 ,2,2 -Tetrachloroethane ND 0.0011 1,2,3-Trichloropropane ND 0.0011 n-Propylbenzene ND 0.0011 2-Chlorotoluene ND 0.0011 4-Chlorotoluene ND 0.0011 1,3,5-Trimethylbenzene ND 0.0011 tert-Butylbenzene ND 0.0011 1,2,4-Trimethylbenzene ND 0.0011 sec-Butylbenzene ND 0.0011 1,3 -Dichlorobenzene ND 0.0011 p-Isopropyltoluene ND 0.0011 1,4 -Dichlorobenzene ND 0.0011 1,2 -Dichlorobenzene ND 0.0011 n-Butylbenzene ND 0.0011 1,2-Dibromo-3-chloropropane ND 0.0057 1,2,4-Trichlorobenzene ND 0.0011 Hexachlorobutadiene ND 0.0057 Naphthalene ND 0.0011 1,2,3-Trichlorobenzene ND 0.0011 Surrogate Dibromofluoromethane Toluene, d8 4-Bromofluorobenzene Percent Control Recovery Limits 90 71-126 86 73-130 82 70-130 16 OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 17 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: VOLATILES by EPA 82508 METHOD BLANK QUALITY CONTROL Page 1 of 2 5-13-04 5-13-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: MB0513S2 Compound Results Flags PQL Dichlorodifluoromethane ND 0.0010 Chloromethane ND 0.0010 Vinyl Chloride ND 0.0010 Bromomethane ND 0.0010 Chloroethane ND 0.0010 Trichlorofluoromethane ND 0.0010 1,1-Dichloroethene ND 0.0010 Acetone ND 0.0050 ladomethane ND 0.0050 Carbon Disulfide ND 0.0010 Methylene Chloride ND • 0.0050 (trans) 1,2-Dichloroethene ND 0.0010 Methyl t -Butyl Ether ND 0.0010 1,1-Dichloroethane ND 0.0010 Vinyl Acetate ND 0.0050 2,2-Dichloropropane ND 0.0010 (cis) 1,2-Dichioroethene ND 0.0010 2-Butanone ND 0.0050 Bromochloromethane ND 0.0010 Chloroform ND 0.0010 1,1,1 -Trichloroethane ND 0.0010 Carbon Tetrachloride ND 0.0010 1,1-Dichloropropene ND 0.0010 Benzene ND 0.0010 1,2-Dichloroethane ND 0.0010 Trichloroethene ND 0.0010 1,2-Dichloropropane ND 0.0010 Dibromomethane ND 0.0010 Bromodichloromethane ND 0.0010 2-Chloroethyl Vinyl Ether ND 0.0050 (cis) 1,3-Dichioropropene ND 0.0010 Methyl Isobutyl Ketone ND 0.0050 Toluene ND 0.0010 (trans) 1,3-Dichloropropene ND 0.0010 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 18 Date,of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 VOLATILES by EPA 82609 METHOD BLANK QUALITY CONTROL Page 2 of 2 Lab ID: MB0513S2 Compound 1,1,2 -Trichloroethane Tetrachloroethene 1,3-Dichloropropane 2-Hexanone Dibromochforomethane 1,2-Dibromoethane - Chlorobenzene 1,1,1,2 -Tetrachloroethane Ethylbenzene m,p-Xylene o -Xylene Styrene Bromoform Isopropylbenzene Brom obenzene 1,1,2,2 -Tetrachloroethane 1,2,3-Trichloropropane n-Propylbenzene 2-Chlorotoluene 4-Chlorotoluene 1,3,5-Trimethylbenzene tert-Butylbenzene 1 ,2 ,4-Trimethylbenzene sec-Butylbenzene. 1 ,3 -Dichlorobenzene p-lsopropyltoiuene 1,4 -Dichlorobenzene 1,2 -Dichlorobenzene n-Butylbenzene 1,2-Dibromo-3-chloropropane 1 ,2,4-Trlchlorobenzene Hexachlorobutadiene Naphthalene 1,2,3-Trichlorobenzene Results Flags PQL ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0050 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0020 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0.0010 ND 0,0010 ND 0.0010 ND 0.0010 ND 0.0050 ND 0.0010 ND 0.0050 ND 0.0010 ND 0.0010 Percent Control Surrogate Recovery Limits Dibromofluoromethane 82 71-126 Toluene, d8 80 73-130 4-Bromofluorobenzene 90 70-130 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. L,I is Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 VOLATILES by EPA 82606 MS/MSD QUALITY CONTROL Date Extracted: 5-13-04 Date Analyzed: 5-13-04 Matrix: Soil Units: mg/kg (ppm) Lab 10: 05-063-01 Compound 19 Sample Spike Percent Percent Recovery Amount Amount MS Recovery MSD Recovery Limits Flags 1,1-Dichloroethene ND 0.0500 0.0536 107 0.0555 111 53-141 Benzene ND 0.0500 0.0442 88 0.0429 86 66-135 Trichloroethene ND 0.0500 0.0440 88 0.0439 88 69-130 Toluene ND 0.0500 0.0427 85 0.0427 85 72-127 Chlorobenzene ND 0.0500 0.0452 90 0.0476 95 68-134 RPD RPD Limit Flags 1,1 -Dichloroethene 3 11 Benzene 3 11 Trichloroethene 0 13 Toluene 0 11 Ch lorobenzene 5 12 OnSite Environmental, Inc. 14648 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-21-04 5-21-04 Matrix: Soil Units: mg/kg (ppm) Client ID: Lab ID: Diesel Range: PQL: identification: Lube Oil Range: PQL: Identification: Surrogate Recovery o-Terphenyl: Flags: TP -2 Si 05-070-01 ND 29 ND 57 110% Y NWTPH-Dx 20 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it is addressed. 1: 4 L.„J 21 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: NWTPH-Dx METHOD BLANK QUALITY CONTROL 5-21-04 5-21-04 Matrix: Soil Units: mg/kg (ppm) Lab ID: MB0521S1 Diesel Range: POL: Identification: Lube Oil Range: POL: Identification: Surrogate Recovery o-Terphenyl: ND 25 ND , 50 117% Flags: Y OnSite Environmental, Inc. 14648 NE 95°i Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Extracted: Date Analyzed: 5-21-04 5-21-04 NWTPH-Dx DUPLICATE QUALITY CONTROL Matrix: Soil Units: mg/kg (ppm) Lab ID: Diesel Range: PQL: RPD: 05-105-06 05-105-06 DUP ND 25 N/A ND 25 Surrogate Recovery o-Terphenyl: 95% 87% . Flags: Y 22 OnSite Environmental, Inc. 14646 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 23 Date of Report: May 26, 2004 Samples Submitted: May 13, 2004 Laboratory Reference: 0405-070 Project: 21-1-09306-002 Date Analyzed: 5-13-04 Client ID TP -2 SI TP -2 S2 % MOISTURE Lab ID % Moisture 05-070-01 13 05-070-02 12 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company 10 whom it is addressed. 24 6 OnSite 141' Environmental Inc. Data Qualifiers and Abbreviations A - Due to a high sample concentration, the amount spiked is insufficient for meaningful MS/MSD recovery data. B - The analyte indicated was also found in the blank sample. C - The duplicate RPD is outside control limits due to high result variability when analyte concentrations are within five times the quantitation limit. E - The value reported exceeds the quantitation range and is an estimate. F - Surrogate recovery data is not available due to the high concentration of coeluting target compounds. G - Insufficient sample quantity for duplicate analysis. H - The analyte indicated is a common laboratory solvent and may have been introduced during sample preparation, and be impacting the sample result. I - Compound recovery is outside of the control limits. J - The value reported was below the practical quantitation limit. The value is an estimate. K - Sample duplicate RPD is outside control limits due to sample inhomogenelty. The sample was re -extracted and re -analyzed with similar results. L - The RPD is outside of the control limits. M - Hydrocarbons in the gasoline range (toluene-napthalene) are present in the sample. 0- Hydrocarbons indicative of diesel fuel are present in the sample and are impacting the gasoline result. P - The RPD of the detected concentrations between the two columns is greater than 40. Q - Surrogate recovery is outside of the control limits. S - Surrogate recovery data is not available due to the necessary dilution of the sample. T - The sample chromatogram is not similar to a typical U - The analyte was analyzed for, but was not detected above the reported sample quantitation limit. V - Matrix Spike/Matrix Spike Duplicate recoveries are outside control limits due to matrix effects. W - Matrix Spike/Matrix Spike Duplicate RPD are outside control limits due to matrix effects. X - Sample extract treated with a silica gel cleanup procedure. Y - Sample extract treated with an acid cleanup procedure. z ND - Not Detected at PQL PQL - Practical Quantitation Limit RPD - Relative Percent Difference OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom It Is addressed. 05-070 _II• SHANNON F�WiLSON, INC. •M� Geotechnical and Environmental Consultants 400 N. 34th Street, Suite 100 Seattle. WA 98103 (206) 632-8020 2055 Hirt Road Fairbanks, AK 99709 (907) 479-0800 2255 S.W. Canyon Road Portland, OR 97201-2498 (503) 223-6147 Sample Identity 2043 Westport Center Drive St. Louis. MO 63146-3564 (314) 392-0050 5430 Fairbanks Street, Suite 3 Anchorage, AK 99518 (907) 561-2120 1200 17th Street, Suite 1024 Denver, Co 80202 (303) 825-3800 Lab No. N -OF -CUSTODY RECORD 303 Welislan Way , ichland, WA 99352 - r 9) 946-6399 Time Date Sampled Laboratory Attn: -ge_L _ ot_ I Analysts Parameters/Sample Container Description (Include1reservative it used) G ce •i` Remarks/Matrix TP- 5 1 1 ` ; io 512.0 '. otal Number of Containers Si lure: Time: /I', 00 X Signature: Time: Y 64 Project Name: & i':Irvt 6,R R it Sod I __Wit trite Name: Dale:3t)1 JoII Tp -.5 Printed Name: Date: Contact: 1), Parkias 2"' ;.a p 5'!a Oji X X4- Company: S 6r ,� np)r� t t l h o' w "�' Company: t� - tads, Company: ref ell 3�: Sampler j� Oaf `> ( attach shipping bill, it any) ` (I pn��+ 5b1�. toll Oa 0-L. L. Signature: Time: Signature: Time: �- y Special Instructions: Date;,1(1(44/4 printed Name: Date: Printed Name: Date: �� 1- ( , —c& Company: `� . Company: Company: Distribution: Whiteo- w tt - returned ns g fi Shannon 8 Wilson w( laboratory report Yellow - w/shipment -for consignee files Pink - Shannon & Wilson - Job File fr/5S -4 I I ' P t to oirttel3tlo n' .:.1.::-:.• :.:.. ,....:.: :.Sain`Ie��Rcel"�t,'..:.1.::10116401.0 '• .. p.., ..... , P_.....�t3d �.: - `'�ieltn4tis�ii,l3cl BY: 2.:-Rellri ulsh"8d8'. Project Number -(t93(U( /-/ '. otal Number of Containers Si lure: Time: /I', 00 Signature: Time: Signature: Time: u Project Name: & i':Irvt 6,R R COC Seals/Intact? YIN/NA trite Name: Dale:3t)1 JoII Printed Name: Dale: Printed Name: Date: Contact: 1), Parkias Received Good Cond./Cold i D T1bQ �A r k�S Ongoing Project? Yes 0 No Q' Delivery Method: Company: S 6r ,� np)r� t t l h o' w "�' Company: t� - tads, Company: ref ell 3�: Sampler j� Oaf `> ( attach shipping bill, it any) 1n`s tu` 30 ;4 .• ..... • t � hs« i" Requested Turnaround Time: it fICAR ,� Time: an, Signature: Time: Signature: Time: �- y Special Instructions: Date;,1(1(44/4 printed Name: Date: Printed Name: Date: �� 1- ( , —c& Company: `� . Company: Company: Distribution: Whiteo- w tt - returned ns g fi Shannon 8 Wilson w( laboratory report Yellow - w/shipment -for consignee files Pink - Shannon & Wilson - Job File F-19-91/UR No026108 111111 ON SIM _ r 111111 M_ 111111— MR N— r MN NM RN OnSite Environmental Inc. 14648 NE 95"' Street, Redmond, WA 98052 • (425) 883-3881 October 5, 2004 Donna Parkes Shannon & Wilson, Inc. 303 Wellsian Way Richland, WA 99352 Re: Analytical Data for Project 21-1-09306-002 Laboratory Reference No. 0409-147 Dear Donna: Enclosed are the analytical results and associated quality control data for samples submitted on September 24, 2004. The standard policy of OnSite Environmental Inc. is to store your samples for 30 days from the date of receipt. If you require longer storage, please contact the laboratory. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the data, or need additional information, please feel free to calf me. Sincerely, David Baumeister Project Manager Enclosures OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 2 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 Case Narrative Samples were collected on September 23, 2004 and received by the laboratory on September 24, 2004. They were maintained at the laboratory at a temperature of 2°C to 6°C. General QA/QC issues associated with the analytical data enclosed in this laboratory report will be indicated with a reference to a comment or explanation on the Data Qualifier page. More complex and involved QA/QC issues will be discussed in detail below. Total Metals EPA 200,8/7470A Analysis The Matrix Spike! Matrix Spike Duplicate recoveries for Silver are outside control limits due to matrix interferences. The Spike Blank recovery was 98%. Any other QA/QC issues associated with this extraction and analysis will be indicated with a footnote reference and discussed in detail on the Data Qualifier page. OnSite Environmental, Inc, 14648 NE 95`x' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 3 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 200.8/7470A Date Extracted: 9-24&27-04 Date Analyzed: 9-27&30-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-147-01 Client ID: MW 1-02 Analyte Method Result PQL Arsenic 200,8 ND 3.3 Cadmium 200.8 ND 4.4 Chromium 200.8 ND 11 Copper 200.8 ND 11 Lead 200.8 140 1.1 Mercury 7470A ND 0.50 Nickel 200.8 ND 22 Selenium 200.8 ND 5.6 Silver 200.8 ND 11 Zinc 200.8 21000 560 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 4 Date 'of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 200.8/7470A Date Extracted: 9-24&27-04 Date Analyzed: 9-27&30-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-147-02 Client ID: MW2-01 Analyte Method Result PQL Arsenic 200.8 ND 3.3 Cadmium 200.8 ND 4.4 Chromium 200.8 ND 11 Copper 200.8 ND 11 Lead 200.8 4.3 1.1 Mercury 7470A ND 0.50 Nickel 200.8 ND 22 Selenium 200.8 ' ND 5.6 Silver 200.8 ND 11 Zinc 200.8 41 28 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and Is intended only for the use of the Individual or company to whom It is addressed. 5 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 200.8/7470A Date Extracted: 9-24&27-04 Date Analyzed: 9-27&30-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-147-03 Client ID: MW3-01 Analyte Method Result POL Arsenic 200.8 ND 3.3 Cadmium 200.8 ND 4.4 Chromium 200.8 ND 11 Copper 200.8 15 11 Lead 200.8 8.8 1.1 Mercury 7470A ND 0.50 Nickel 200.8 ND 22 Selenium 200.8 ND 5.6 Silver 200.8 ND 11 Zinc 200.8 78 28 OnSite Environmental, Inc. 14648 NE 950' Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the usa of the individual or company to whom it is addressed. 6 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 200.8 METHOD BLANK QUALITY CONTROL Date Extracted: 9-24-04 Date Analyzed: 9-27&30-04 Matrix: Water Units: ug/L (ppb) Lab ID: M130924W1 Analyte Method Result POL Arsenic 200.8 ND 3.3 Cadmium 200.8 ND 4.4 Chromium 200.8 ND 11 Copper 200.8 ND 11 Lead 200.8 ND 1.1 Nickel 200.8 ND 22 Selenium 200.8 ND 5.6 Silver 200.8 ND 11 Zinc 200.8 ND 28 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is Intended only for the use of the individual or company to whom it Is addressed. 7 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 7470A METHOD BLANK QUALITY CONTROL Date Extracted: 9-27-04 Date Analyzed: 9-27-04 Matrix: Water Units: ug/L (ppb) Lab ID: MB0927W1 Analyte Mercury Method Result POL 7470A ND 0.50 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is Intended only for the use of the individual or company to whom it is addressed. 8 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 200.8 DUPLICATE QUALITY CONTROL Date Extracted: 9-24-04 Date Analyzed: 9-27&30-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-143-01 Sample Duplicate Analyte Result Result RPD POL Flags Arsenic ND ND NA 3.3 Cadmium ND ND NA 4.4 Chromium ND ND NA 11 Copper ND ND NA 11 Lead 3.14 3.53 12 1.1 Nickel ND ND NA 22 Selenium ND ND NA 5.6 Silver ND ND NA 11 Zinc 462 462 0 28 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed In accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 Date Extracted: 9-27-04 Date Analyzed: 9-27-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-143-09 Analyte Mercury TOTAL METALS EPA 7470A DUPLICATE QUALITY CONTROL Sample Duplicate Result Result RPD PQL Flags ND ND NA 0.50 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and Is Intended only for the use of the individual or company to whom it is addressed. Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 TOTAL METALS EPA 200.8 MS/MSD QUALITY CONTROL Date Extracted: 9-24-04 Date Analyzed: 9-27&30-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-143-01 Spike Percent Percent Analyte Level MS Recovery MSD Recovery RPD Flags Arsenic 110 116 106 115 104 2 Cadmium 110 106 96 110 100 4 Chromium 110 111 101 113 102 2 Copper 110 100 91 101 92 0 Lead 110 116 103 113 100 2 Nickel 110 116 106 118 108 2 Selenium 110 117 106 115 105 1 Silver 110 45.6 41 47.1 43 3 Zinc 110 580 107 569 97 2 V 10 OnSite Environmental, Inc: 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 Thls report pertains to the samples analyzed in accordance with the chain of custody. and is intended only for the use of the individual or company to whom it is addressed. 11 Date of Report: October 5, 2004 Samples Submitted: September 24, 2004 Laboratory Reference: 0409-147 Project: 21-1-09306-002 Date Extracted: 9-27-04 Date Analyzed: 9-27-04 Matrix: Water Units: ug/L (ppb) Lab ID: 09-143-09 Analyte Mercury TOTAL METALS EPA 7470A MS/MSD QUALITY CONTROL Spike Percent Percent Level MS Recovery MSD Recovery RPD Flags 10 9.82 98 9.76 98 1 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 12 OnSite Environmental Inc, Data Qualifiers and Abbreviations A - Due to a high sample concentration, the amount spiked is insufficient for meaningful MS/MSD recovery data. B - The analyte indicated was also found in the blank sample. C - The duplicate RPD is outside control limits due to high result variability when analyte concentrations are within five times the quantitation limit. E - The value reported exceeds the quantitation range and is an estimate. F - Surrogate recovery data is not available due to the high concentration of coeluting target compounds. G - Insufficient sample quantity for duplicate analysis. H - The analyte Indicated is a common laboratory solvent and may have been introduced during sample preparation, and be impacting the sample result. 1 - Compound recovery is outside of the control limits. J --The value reported was -below the practical quantitation limit: The value- is an estimate_ K - Sample duplicate RPD is outside control limits due to sample inhomogeneity. The sample was re -extracted and re -analyzed with similar results. L - The RPD is outside of the control limits. M - Hydrocarbons in the gasoline range (toluene-napthalene) are present in the sample. O - Hydrocarbons indicative of diesel fuel are present in the sample and are impacting the gasoline result. P - The RPD of the detected concentrations between the two columns is greater than 40. Q - Surrogate recovery is outside of the control limits. S - Surrogate recovery data is not available due to the necessary dilution of the sample. T - The sample chromatogram is not similar to a typical U - The analyte was analyzed for, but was not detected above the reported sample quantitation limit. V - Matrix Spike/Matrix Spike Duplicate recoveries are outside control limits due to matrix effects. W - Matrix Spike/Matrix Spike Duplicate RPD are outside control limits due to matrix effects. X - Sample extract treated with a silica gel cleanup procedure. Y - Sample extract treated with an acid/silica gel cleanup procedure. z - ND - Not Detected at PQL PQL - Practical Quantitation Limit RPD - Relative Percent Difference OnSite Environmental, Inc. 14548 NE 951h Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 11111 MN In MI 11011 MIR MI ON NB 111111 INS MIR VIII 11111 MI 11111 11111 NMI 09-147 -19-9 N0026140 1 os .4 Page- ' giftSHANNONF�WILSON,INC. 0 -CUSTODY RECORD tabor ort' OA .c f� Geotechnical and Environmental Consultants r Atte r �� I 400 N. 341h Street. Suite 100 2043 Westport Center DrNe 303 Weilsian Way Seattle, WA 98103 St. Louis, MO 63146-3564 • •fend, WA 99352 Analysis ParameterelSample Container Description (206) 632-8020 (314) 392-0050 509) 946.6309 (include preservative if used) 2055 Hill Road 5430 Fairbanks Street, Suite : Fairbanks, AK 99709 Anchorage, AK 99518 //;.i (907) 479-0600 (907) 561-2120 v Cr‘ 2255 S.W. Canyon Road 1200 17th Street, Suite 1024 { ti e1s �y t!• •o e Portland, OR 97201-2498 Denver, Co 80202 S C� (503) 223.6147 (303) 825-3800 Date 2� ,�� 4 , `�� Go Sample Identity Lab No. Time Sampled �� ' • �o &Remarks/Matrix M 1,01 tr,a 1 ia;3a 9/23jii- 1 4)Ale r —ai It X45- 2( i xi :,p• rt ci:•1'"f iIT1 . I ..!?. ar atl4n � � •Satrt� i>i3ll;�R: �'�i'�•• .. t;� -���i.-ul�Me � •Rein''ii! hed�'B •2• -Reln� s 3 - Project Numla�rI-'I-' �D+p -Q' Total Number of Containers S lure: _,.;- tme: i ©•r+ Signature: Time: Signature: Time: �_ Project Name: (�i K 1�'1[� COC Seals/intact? YJN/NA ,)n - j�(ii , D,.1' ed Name: Oat AMPF Printed Name: Dale: Printed Name: Dale: Contact: 'kEtS Received Good Cond./Cold �Q Ongoing 0 ( Delivery Method: i �S """'y: Project? Yes No LIPS Q�, j Co pent': Company: Company: Sampler: D, Pa rtes (attach shipping bill, if any) /� -- 1 ), 5112.p !fi's't �' ,e,:. n11. ':ris s- r ru •'�� t'i' v� L s �, .fir .i` 1 •.,.,,,::::;=,;,,e1,1:. r. : �ti�p e � , 4.1.. .p K.t A '. Requested Turnaround Time: J�•, y�dar� Sirv,, ` / Time: J, 3Q Signature: Time: Signature: Time: Special Instructions: �' f / , (1' wiled ams: Date: 7. 7-v./Printed Name: Date: Printed Name: Date: PM' Kat.so,j - Distribution; White - w/shipment - returned to Shannon & Wilson WI laboratory report Yellow - wlshipment - for consignee files Pink - Shannon & Wilson - Job File Company: Company: Company: • -19-9 N0026140 • APPENDIX H Former Lincoln Avenue Car Wash Asbestos Survey, April 2008 Figure 2, Table — Material Sampled and Analytical Results, and Appendix C 1 J N O z t ON O to rn rL U a •0 09306-002\ Lin FT -1-01 RF -1-01 RF -1 -02 RF -2-01 WP -2-01 0 MOR -1-01 CONC-1-01 WP -1-01 Former Car Wash Building WP -2-01 MOR -2-01 FAC -1-01 Fueling Canopy 0 10 20 Approximate Scale in Feet LEGEND RF -1-01 PACM (Potential Asbestos -Containing Material) Sample Designation and Approximate Location NOTE This figure is based on observations and measurements taken in the field and is approximate. Variations may exist between figure and actual conditions. Former Lincoln Avenue Car Wash Asbestos Survey Yakima, Washington BUILDING LAYOUT AND SAMPLE LOCATIONS April 2008 21-1-09306-002 SHANNON & WILSON, INC. GeotechnIcal and Environmental Consultants FIG. 2 MATERIALS SAMPLED AND ANALYTICAL RESULTS Sample 1D Sample Description and Location Friable? Result / Asbestos Percent Initial Bulk PLM Follow-up Point Count WP -1-01 Off- white window putty (older material) No Negative NA WP -2-01 Gray window putty (newer material) No Negative NA MOR -1-01 Mortar from between concrete blocks (inside building): Thin coating of grout -like material and paint Mortar No Chrysotile 2% Negative Asbestos 0.8% NA MOR -2-01 Dark gray mortar with paint from between decorative facing blocks (outside building) No Negative NA PNT-1-01 Thick layered paint on metal at car wash train Yes Negative NA CONC-1- 01 Grout -like patch on interior concrete block wall: Compacted powdery material with paint Concrete block Yes Chrysotile 2% Negative Asbestos 0.8% NA FAC -l-01 Painted decorative facing blocks (outside building) No RF -1-01 RF -1-02 Black asphaltic roofing felt Roofing materials: Black asphaltic felt with light-colored granules Black asphaltic tar (sealer) No No Negative NA Negative Negative Chrysotile 4% NA NA Asbestos 1.8% RF -2-01 Black asphaltic tar (roof sealer) No FT -1-01 Flooring (bathroom): Brown ceramic tile Dark gray mastic Concrete No Chrysotile 5% Negative Negative Negative Asbestos 2.3% NA NA Not analyzed 21-1-09306-001 me um an MR MB 1111111 ' _ >S 611111 s NM MN all ION 11111111m411. WI HAM SHANNON \MLsO'-:1. iNC. APPENDIX C ANALYTICAL LABORATORY REPORTS 21-1-09306-002 .ah Code:102063 0 AIH '"''AL1'°... ;CCREDITED ABORATORY LARORATORIES,INC 3 AURORA AVE N ITL E. WA 98103.6518 208.547.0100 206.634.1436 abs@nvii b5. coin March 27, 2008 Donna Parkes Shannon & Wilson, Inc. 303 Wellsian Way, PO Box 967 Richland, WA 99352 RE; Bulk Asbestos Fiber Concentration by Point Count NVL Batch # 2803855.00 Dear Ms. Parkes, HAZARDOUS MATER I Al MANAGEMENT • TRAINING • LAB SERVICES INVIL 'M LABS HAZARDOUS MATERIALS SERVICES At your request, NVL Laboratories conducted analysis of your sample to determine the asbestos concentration using point count procedures. The sample was analyzed for the presence of asbestos fibers using polarized light microscopy (PLM) with dispersion staining in accordance with U.S. EPA method 600/R -93/116. Eight slides of thoroughly homogenized material are prepared for any given sample that requires point counting. In order to be counted as a point, the crosshairs of the microscope must center on either a fiber or a particle. The analyst counts at least 50 points per slide preparation. A minimum of 400 non -empty points are counted, then the number of counted asbestos fibers are divided by the total number of points counted to arrive at the percentage of asbestos in the sample. Please see the conclusion section of the lab reports for point count results. It has been a pleasure to be of service to you. Please feel free to call if there is anything further we can assist you with. Sincerely, Enc.: Sample Results RECEIVJii APR 1 if 2008 www.n vllabs.corn 1.888.NVL.LASS (685.5227( ,?' 1 1 1 1 1 1 1 1 1 1 1 NVL Laboratories, Inc. 4708 Aurora Ave. N., Seattle, WA 98103 PLM Point Coufftr the scope of accreditation under NVLAP Lab Code 102063-0 Tel: 206.54Fax: 206.634.1936 www.nvllabs.com Bulk Asbestos Fibers Analysis www.n Client: Shannon & Wilson, Inc. Address: 303 Wellsian Way, PO Box 967 Richland. WA 99352 Attention: Ms. Donna Parkes Project Location: Yakima RR Batch #: 2803855.00 Client Project #: 21-1-09306-002 Date Received: 03/26/2008 Samples Received: 4 Samples Analyzed: 4 Method: EPA/600R-93/116 Lab ID : 280223/6 Client Sample #: MOR -1-01 Sample Description: Off-white compacted powdery material with paint, layer 1 of 2 This sample was initially analyzed for Asbestos content using Polarized Light Microscopy (PLM). Introduction: Asbestos fibers were observed and quantity was determined using calibrated visual area estimation. 2 % in Layer 1. Corresponding Lab ID was 28020499 Asbestos content was originally found to be Non Total Prep Asbestos Asbestos Points Slide # Point Point Counted 1 1 49 50 2 0 50 50 3 0 50 50 4 0 50 50 5 1 49 50 6 1 49 50 7 0 50 8 0 50 50 Total 3 400 Conclusion: This Sample Contains 0.8 % ASBESTOS Sampled by: Client nalyzed by: Nadezhda Prysyazhnyuk Reviewed by: Nick Ly Date: 03/27/2008 Date: 03/27/2008 Nick If samples are not homogeneous, then subsamples of the components were analyzed separately. All bulk samples are analyzed using EPA 6001R 3 6 Method with the following measurement uncertainties for the reported % Asbestos (1%=0-3%, 5%=1-9%, 10%=5-15%, 20%=10-30%, 50%=40 1%). This report relates only to the items tested. If sample was not collected by NVL personnel, then the accuracy of the results is limited by the Idology and acuity of the sample collector. This report shall not be reproduced except in full, without written approval of NVL Laboratories, Inc. It shall used to claim product endorsement by NVLAP or any other agency of the US Government. Paae 1 of 4 NVL Laboratories, Inc. tAp 4708 Aurora Ave. N., Seattle, WA 98103 PLM Point Cout'r the scope of accreditation Tel: 206.547.0100, Fax: 206.634.1936 www.nvllabs.com Bulk Asbestos Fibers Analysis under NVLAP Lab Code 10206-0 Client: Shannon & Wilson, Inc. Address: 303 Wellsian Way, PO Box 967 Richland. WA 99352 Attention: Ms. Donna Parkes 'Project Location: Yakima RR Batch #: 2803855.0 Client Project ##: 21-1-09306-00 Date Received: 03/26/2008 Samples Received: Samples Analyzed: Method: EPA/600R-93/116. Lab ID : 28022317 Client Sample #: CONC-1-01 Sample Description: Off-white compacted powdery material with paint, layer 1 of 2 This sample was initially analyzed for Asbestos content using Polarized Light Microscopy (PLM). Introduction: Asbestos fibers were observed and quantity was determined using calibrated visual area estimation. Asbestos content was originally found to be 2 % in Layer 1. Corresponding Lab ID was 28020502 Prep Asbestos Slide # Point 1 0 2 1 3 0 4 0 5 0 6 0 7 1 8 1 Total Non Asbestos Point 50 49 50 50 50 50 49 49 1 397 Total Points Counted 50 50 50 50 50 50 50 50 400 Conclusion: This Sample Contains 0.8 % ASBESTOS Sampled by: Client Analyzed by: Nadezhda Prysyazhnyuk Reviewed by: Nick Ly Date: 03/27/2008 Date: 03/27/2008 Nick L e: If samples are not homogeneous, then subsamples of the components were analyzed separately. All bulk samples are analyzed using EPA 600/R /116 Method with the following measurement uncertainties for the reported % Asbestos (1%=0-3%, 5%=1-9%, 10%=5-15%, 20%=10-30%, 50%=40 %) This report relates only to the items tested. If sample was not collected by NVL personnel, then the accuracy of the results is limited by the hodology and acuity of the sample collector. This report shall not be reproduced except in full, without written approval of NVL Laboratories, Inc. It shall be used to claim product endorsement by NVLAP or any other agency of the US Government. Paoe 2 of 4 I NVL Laboratories, Inc. awlp 4708 Aurora Ave. N., Seattle, WA 98103 PLM Point Coulttr the scope of accreditation under NVLAP Lab Code 102063-0 Te1:206.5401 Fax: 206.634.1936 www.nvllabs.com Bulk Asbestos Fibers Analysis www.nvIlabs.com Client: Shannon & Wilson, Inc. Address: 303 Wellsian Way, PO Box 967 Richland. WA 99352 Attention: Ms. Donna Parkes Project Location: Yakima RR Batch #: 2803855.00 Client Project #: 21-1-09306-002 Date Received: 03/26/2008 Samples Received: 4 Samples Analyzed: 4 Method: EPA/600R-93/116 Lab ID : 28022318 Client Sample #: RF -1-02 Sample Description: Black asphaltic mastic,layer 2 of 2 This sample was initially analyzed for Asbestos content using Polarized Light Microscopy (PLM). Introduction: Asbestos fibers were observed' and quantity was determined using calibrated visual area estimation. Asbestos content was originally found to be 4 % in Layer 2 . Corresponding Lab ID was 28020505 Prep Asbestos Slide # Point 1 1 2 1 3 2 4 1 5 1 6 0 7 1 8 0 Total 1 7 Non Asbestos Point 49 49 48 49 49 50 49 50 1 393 Total Points Counted 50 50 50 50 50 50 50 50 400 Conclusion: This Sample Contains 1.8% ASBESTOS "Sampled by: Client nalyzed by: Nadezhda Prysyazhnyuk Reviewed by: Nick Ly I If samples are not homogeneous, then subsamples of the components were analyzed separately. All bulk samples are analyzed using EPA 600/R 6 Method with the following measurement uncertainties for the reported % Asbestos (1%=0-3%, 5%=1-9%, 10%=5-15%, 20%=10-30%, 50%=40 %). This report relates only to the items tested. If sample was not collected by NVL personnel, then the accuracy of the results is limited by the iidology and acuity of the sample collector. This report shall not be reproduced except in full, without written approval of NVL Laboratories, inc. It shall used to claim product endorsement by NVLAP or any other agency of the US Government. Date: 03/27/2008 Date: 03/27/2008 Nick Pann , of d 1 I (NVL Laboratories, Inc. a?L.ap 4708 Aurora Ave. N., Seattle, WA 98103 +` PLM Point CoUil r the scope of accreditation under NVLAP Lab Code 10206 Tel: 206.547.0100, Fax: 206.634.1936 Bulk Asbestos Fibers Analysis www.nvilabs.com D Client: Shannon & Wilson, Inc. Address: 303 Wellsian Way, PO Box 967 Richland. WA 99352 Attention: Ms. Donna Parkes Project Location: Yakima RR Batch #: 2803855.0; Client Project #: 21-1-09306-00 Date Received: 03/26/200 Samples Received: Samples Analyzed: 4 Method: EPA/600R-93/116 Lab ID : 28022319 Client Sample #: RF -02-01 Sample Description: Black asphaltic material This sample was initially analyzed for Asbestos content using Polarized Light Microscopy (PLM). Introduction: Asbestos fibers were observed and quantity was determined using calibrated visual area estimation. Asbestos content was originally found to be 5 % in Layer 1. Corresponding Lab ID was 28020506 Prep Slide # 1 2 3 4 5 6 7 8 Total 1 Asbestos Point 2 Non Asbestos Point Total Points Counted 1 1 0 2 1 1 1 9 48 49 49 50 48 49 49 49 391 50 50 50 50 50 50 50 50 L 400 Conclusion: This Sample Contains 2.3 % ASBESTOS Sampled by: Analyzed by: Reviewed by: Client Nadezhda Prysyazhnyuk Nick Ly Date: 03/27/2008 Date: 03/27/2008 Nick L If samples are not homogeneous, then subsamples of the components were analyzed separately. All bulk samples are analyzed using EPA 600/R (116 Method with the following measurement uncertainties for the reported % Asbestos (1%=0-3%, 5%=1-9%, 10%=5-15%, 20%=10-30%, 50%=40 '4). This report relates only to the items tested, if sample was not collected by NVL personnel, then the accuracy of the results is limited by the odology and acuity of the sample collector. This report shall not be reproduced except in full, without written approval of NVL Laboratories, Inc. It shall e used to claim product endorsement by NVLAP or any other agency of the US Government. Pana d of IMO INN :mmHg 814ANNIONzWiLbbikrNt 9: kld.oti3 hillta I an cl:EiiMitinin e cal Ofirtstillaht5 • WEI "MI IIISATtillb 1.111 111111- 1.11 op, 2803855.00 RDEg.bgratory AnatP4P4r:ajr.1.0tir**,604' 170?critatiO.n. 1461tida rifts,ir.v0.00Jf lied} 400:No340 SIret. SUl(e.'160 •,S.dat14. WA, 9ti I 113 (idp) 32-80240 997.Q9. • 0'074 .179-0Soti Ca9yori•Rod :P.git.1; 9k.97401 -249p. 4563) 22-4147 .Sri1pIeIderijy. • 20'0. gOktritti@tbr.13 civ,o P14)1-04;660' 'Sl4$1.:i'NIV38,111isiii(RR1;,.§iire . :NiOibr*,•AR:99t.lgi (§P) 12001714 St*I. Suiie 1024 Der...1.yervpwgo2o 6031-ii5.4sOci Lab No. • FAIN -OFC no3MellslAq Way., IS* • Tftne .9:qmarkikiatth< S 02I Nr oi4 ,:ooe " iliog6iyed iqood CondVd6ra voliv6ry WOthodiLt iran9) .10;115;17 -It - br Requeste0 TUfriirpuraTirm .[iqdj'gt .1n§truelibri§:, ,..;to.p.C1.)Shar.)14.:0; Coryk.. Oi;tribution: Vteniio - wAhipmerii.,%returnpa :o Shannor4"WIlson velabda ton, r_epcirt Yqiiow-wistliprneril -..fditonsignfiles e SharirionAmilsbn*- Jot?. Fire Rnn Tirrig;. Dale; ComriEk: "t/ • ••42, SigrAtult E'nntedNinie: go.ft113aqY: ''• 1. rimitt Dere:. 0°4?;1:0 y: /4 No. 29 g i� ar V 2803559.00 Ill SHANNON &WILSGeotechnical andaON, INC. Consultants�-CHAIN-OF-CUSTODY RECORD emir 400 N, 34th Street, Suite 100 Seattle, WA 98103 (206) 632-8020 2355 Hill Road Fairbanks, AK 99709 (907) 479.0600 2255 S.W. Canyon Road Portland, OR 97201-2498 (503) 223.6147 Sample Identity 2043 Westport Center DrivV 303 Weilsian Way St. Louis, MO 63146-3564f Richland, WA 99352 (314) 699-9660 (509) 946-6309 5430 Fairbanks Street, Suite Anchorage, AK 99518 (907) 561-2120 1200 17th Street, Suite 1024 Denver, Co 80202 (303) 825-3800 Date Lab No. Time Sampled 3)44 Laboratory Page J- of -I- 1)J 'v' Mtn' Analysis Parameters/Sample Container Description (include preservative if used) Remarks/Matrix Project Information Project Niititper: J—U y R Ll 1., -.00 Project Name: 5/,C 1.:'/'. i'Yo_ P- r� Contact: D, r Ongoing Project? Yes ❑ No ❑ Sampler: D, r . Sample Receipt Total Number of Containers COO Seals!lntact? Y/N/NA Received Good Cond./Cold Delivery Method: Leci-: (attach shipping bill, if any) Instructions Relinquished By: 1. Relinquished By: .2. gn2ture: -Time:,) .3 L Signature: Time: : 1 Printed Name: Date.�f/g�r; �y D Company: Received By: 1. Printed Name: Company, Date: Received By: Relinquished By: 3. Pr' led Narn i Company /1/i/Z- LL Date'.1.0 . (2) Received By: Requested Turnaround Time: Special Instructions:4 lyv : �•S �V(tYuL. Distribution: White - wlshipment - returned 10 Shannon & Wilson w/ laboratory report Yellow - wishipment - tar consignee files Pink - Shannon & Wilson - Joo Fite Signature: Time: Signature: Time, 3. Signature: Time: /0; lh.3 Printed Name: Printed Name: Dale: Company: Printed Name: Company: Dale: • Company: l 1/L/L— F-19.91/uR y ib'C.Clr`t. (V '(. ,s'�L(.��,i /�C:::; '1,7tij_ APPENDIX I Groundwater Monitoring Results, Former ARCO Station, May 2008, Tables 1 and 2, Figure 1, and Lab Results 1 1 1 SHANNON &WILSON. INC. TABLE 1 SUMMARY OF WATER LEVEL MEASUREMENTS (IN FEET) Date MW -1 MW -2 MW -5. MW -6 DTW Elev. DTW Elev. DTW Elev. DTW Elev. 11/5/2007 16.09 1053.54 16.65 105 3.3 5 16.63 1053.86 16.96 1053.57 2/12/2008 17.64 1051.99 18.22 1051.78 18.33 1052.16 18.67 1051.86 3/18/2008* 18.12 1051.51 18.70 1051.30 18.85 1051.64 19.155 1051.375 5/20/2008 16.59 1053.04 17.17 1052.83 -- -- 17.54 1052.99 DTW Depth to water below top of casing * Water sample not collected. 1 ' 21-1-09306-002 TABLE 2 MW -I GROUNDWATER ANALYTICAL RESULTS SUMMARY :; tAlii ameter . ' 7/22/01 •::>3/10/02 '. :4/4/03.. p 7/31/03 =40/15/03 ;,9/30/04 ;;4/3/05:,, 10/9/05 . .:.:3/5/06-'_. <.11/5/075',2/12/08r..:;.5/20/08 s i111TCA-X.'' TPH Gas, pg/L 580 10,000 1,600 1,300 960 590 ND 3,500 220 1,300 1,600 1,500 800* TPH-Diesel, L NA NA 660 1 700 690 150 ND ND ND <270 <250 NA 500 TPH-Oil, a L NA NA NR NR NR NA NR NR NR <430 <410 NA 500 VOCs**, pe/L. MTBE <3 34 <I <I <1 <3 <2 NA NA <1 NA NA 20 Benzene 8 65 5 3 <1 2 <2 <5 <1 2.2 6.9 11 5 Ethylbenzene 14 220 49 41 23 6 8 56 5 35 48 40 700 Xylenes 50 930 80 81 35 <3 <2 95 <3 57 68 55 1,000 Isopropylbenzene NR NR NR NR NR NR NR NR NR 6.9 NA NA -- n-Propylbenzene NR NR NA NR NR NA NR NR NR 18 NA NA -- 1,3,5-Trimethylbenzene NR NR NA NR NR NR NR NR NR 2.6 NA NA — 1,2,4-Trimethylbenzene NA NA 240 200 140 27 24 NA NA 170 NA NA. -- sec-Butylbenzene NR NR NR NR NR NA NR NA NR 2.1 NA NA — p-lsopropyltoluene NR NR NR NR NR NR NA NR Nit 1.1 NA NA -- Na.hthalcne NA NA 22 62 12 5 8 NA NA 23 NA NA 160 Total Lead, pg/L NA NA 92.6 8.93 <1 9*** 21. I <3.«* <3*** <1.1 _ 3.3 1.7 15 IvITCA-A Model Tuxics Control Act Method A cleanup levels for groundwater. Results in BOLD exceed MICA Method A cleanup levels for groundwater. NA Not analyzed ND Not detected at greater than the test detection limits NR Not reported (in Clayton's summary table) * TPH-Gas cleanup level is 800 pg/L when benzene is present at any detected concentration. ** Only those compounds detected at greater than the test detection limits (10/31/07 sample) are shown; refer to laboratory report for ItsII list of compounds. * ** Units corrected from mg/L to ug/L =111 SHANNON L WILSON. INC. 21- 1-09306-002 NMI MIN NM IMO INN 11111 MEI NE NM NS IMO 11E1 all MINI OM 11111 En INN 1=1 H Not to Scale NOTES N., ......„ ,_,... . 1----- , overhead N.: -----power and NN. telephone �\ N. Mel's Diner N —_ `ow —'am Lincoln Avenue Car Wash 302 N. 1st Street Yakima, Washington not. gas 81 82 • aletr eond (us vent pipes MW -5 kiosk iii conopy__ sidewalk Lincoln Avenue (1052.99) Groundwater surface elevation in feet, measured on 5/20/2008 -- Groundwater. surface elevation contours —�-► Groundwater flow direction 111111 CIL 83 S UST -1 15,000—gallon Regullar Unleaded U —2 10,000—gallon Premium( & Super Unldoded Monitoring Well Soil Boring P'rudt:ct Dispenser Storm ()ruin Crate Base map from Clayton Group Services, Inc. Figure 3, Soil Boring and Monitoring Well Locations 3) CD CD uogDIS 000uo0 Former Lincoln Avenue Car Wash Yakima, Washington WELL LOCATIONS AND GROUNDWATER ELEVATIONS May 2008 SHANNON & WILSON, INC. Geotechnical and Environmental Consutlanls 21-1-09306-002 FIG. 1 OnSite Environmental Inc. 14648 NE 951h Street, Redmond, WA 98052 • (425) 883-3881 May 29, 2008 Donna Parkes Shannon & Wilson, Inc. 303 Wellsian Way Richland, WA 99352 Re: Analytical Data for Project 21-1-09306-002 Laboratory Reference No. 0805-167 Dear Donna: Enclosed are the analytical results and associated quality control data for samples submitted on May 21, 2008. The standard policy of OnSite Environmental inc. is to store your samples for 30 days from the date of receipt. If you require longer storage, please contact the laboratory. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning the data, or need additional information, please feel free to call me. Sincerely, David Baumeister Project Manager Enclosures OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 Thls report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 2 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 Case Narrative Samples were collected on May 20, 2008 and received by the laboratory on May 21, 2008. They were maintained at the laboratory at a temperature of 2°C to 6°C except as noted below. General QA/QC issues associated with the analytical data enclosed in this laboratory report will be indicated with a reference to a comment or explanation on the Data Qualifier page. More complex and involved QA/QC issues will be discussed in detail below. OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 3 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 Date Extracted: Date Analyzed: Matrix: Water Units: ug/L (ppb) Client ID: Lab ID: 5-21-08 5-21-08 MW1-03 05-167-01 NWTPH-Gx/BTEX Result Flags PQL Benzene 11 1.0 Toluene ND 1.0 Ethyl Benzene 40 1.0 m,p-Xylene 55 1.0. o -Xylene ND 1.0 TPH-Gas 1500 100 Surrogate Recovery: Fluorobenzene 107% OnSite Environmental, Inc. 14648 NE 95'" Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 4 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 Date Extracted: Date Analyzed: Matrix: Water Units: ug/L (ppb) Lab ID: NWTPH-Gx/BTEX METHOD BLANK QUALITY CONTROL 5-21-08 5-21-08 MB0521 W1 Result Flags PQL Benzene ND 1.0 Toluene ND 1.0 Ethyl Benzene _ ND 1.0 m,p-Xylene ND 1.0 o -Xylene ND 1.0 TPH-Gas ND 100 Surrogate Recovery: Fluorobenzene 106% OnSite Environmental, inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 NWTPH-Gx/BTEX MS/MSD QUALITY CONTROL Date Extracted: 5-21-08 Date Analyzed: 5-21-08 Matrix: Water Units: ug/L (ppb) Spike Level: 50.0 ppb 6 Lab ID: 05-169-01 Percent 05-169-01 Percent MS Recovery MSD Recovery • RPD Flags Benzene 49.5 99 50.6 101 2 Toluene 50.3 101 51.4 103 2 Ethyl Benzene 50.5 101 51.5 103 2 m,p-Xylene 50.8 102 51.6 103 1 o -Xylene 50.8 102 51.7 103 2 Surrogate Recovery: Fluorobenzene 94% 96% OnSite Environmental, Inc. 14648 NE 95Th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 7 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 TOTAL LEAD EPA 200.8 Date Extracted: 5-22-08 Date Analyzed: 5-22-08 Matrix: Water Units: ug/L (ppb) Client ID Lab ID MW1-03 05-167-01 Result PQL OnSite Environmental, Inc. 14648 NE 95Th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. 8 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 TOTAL LEAD EPA 200.8 METHOD BLANK QUALITY CONTROL Date Extracted: 5-22-08 Date Analyzed: 5-22-08 Matrix: Water Units: ug/L (ppb) Lab ID: MB0522Wt Analyte Method Result PQL Lead • 200.8 ND 1.1 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it Is addressed. 9 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 Date Extracted: 5-22-08 Date Analyzed: 5-22-08 Matrix: Water Units: ug/L (ppb) Lab ID: 05-166-07 Analyte Lead TOTAL LEAD EPA 200.8 DUPLICATE QUALITY CONTROL Sample Duplicate Result Result RPD PQL Flags ND ND NA 1.1 OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the Individual or company to whom it Is addressed. 111 10 Date of Report: May 29, 2008 Samples Submitted: May 21, 2008 Laboratory Reference: 0805-167 Project: 21-1-09306-002 TOTAL LEAD EPA 200.8 MS/MSD QUALITY CONTROL Date Extracted: 5-22-08 Date Analyzed: 5-22-08 Matrix: Water Units: ug/L (ppb) Lab ID: 05-166-07 1 Spike Percent Percent Analyte Level MS Recovery MSD Recovery RPD Flags Lead 110 104 94 110 100 6 111 111 OnSite Environmental, Inc. 14648 NE 95a Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. U 11 OnSite Environmental km. Data Qualifiers and Abbreviations A - Due to a high sample concentration, the amount spiked is insufficient for meaningful MS/MSD recovery data. B - The analyte indicated was also found in the blank sample. C - The duplicate RPD is outside control limits due to high result variability when analyte concentrations are within five times the quantitation limit. E - The value reported exceeds the quantitation range and is an estimate. F - Surrogate recovery data is not available due to the high concentration of coeluting target compounds. H - The analyte indicated is a common laboratory solvent and may have been introduced during sample preparation, and be impacting the sample result. I - Compound recovery is outside of the control limits. J - The value reported was below the practical quantitation limit. The value is an estimate. K - Sample duplicate RPD is outside control limits due to sample inhomogeneity. The sample was re -extracted and re -analyzed with similar results. L - The RPD is outside of the control limits. M - Hydrocarbons in the gasoline range are impacting the diesel range result. M1 - Hydrocarbons in the gasoline range (toluene-napthalene) are present in the sample. N - Hydrocarbons in the lube oil range are impacting the diesel range result. O - Hydrocarbons indicative of heavier fuels are present in the sample and are impacting the gasoline result. P - The RPD of the detected concentrations between the two columns is greater than 40. Q -Surrogate recovery is outside of the control limits. S - Surrogate recovery data is not available due to the necessary dilution of the sample. T - The sample chromatogram is not similar to a typical U - The analyte was analyzed for, but was not detected above the reported sample quantitation limit. U1 - The practical quantitation limit is elevated due to interferences present in the sample. V - Matrix Spike/Matrix Spike Duplicate recoveries are outside control limits due to matrix effects. W - Matrix Spike/Matrix Spike Duplicate RPD are outside control limits due to matrix effects. X - Sample extract treated with a mercury cleanup procedure. Y - Sample extract treated with an acid/silica gel cleanup procedure. z ND - Not Detected at PQL PQL - Practical Quantitation Limit RPD - Relative Percent Difference OnSite Environmental, Inc. 14648 NE 95th Street, Redmond, WA 98052 (425) 883-3881 This report pertains to the samples analyzed in accordance with the chain of custody, and is intended only for the use of the individual or company to whom it is addressed. OnSite Chain o1 Custody Page i of !llvironmental Inc. Turnaround Request (in working days) Laboratory Number: 05 - 1 6 ? Phone: (425) 8933881 • Fax: (425) 885-4603 Company: l ;� �? Ska'(lY10-1/14 W ) 6rY1 PjciiJJI .! (Check One) ❑ Same Day ■ 1 Day Requested Analysis ) Project Number:CO c-1—)-08306-0oa_ ■2Day ■3Day o Project Name: ‘ij;-E L-Y1ALL.- R k_ Ql andard (7 working days) m H °o Project Mana r: D.Par zi$ (TPH analysis 5 working days) x m co m CO N< g s „ Sampled by: •o a , v m � ti w T p ,. °0.1 r Sample Identification Sampled (other) Date Time Sampled Matrix a of Cont, z z co z x o z n m o i •o E in m = a m 2 . m � a8- 271 2 T 4 O k m o YAW i — rO 3 Sao D o }a.11 fir► walfr -3 is >° ori f16 X o t Relinquished by Signature � - P it r,/I�.frl�' ,.. Company I W 1 + +1A Date 0 Time • Conments1SpecialInstructions. Received by ,La". `L ♦ ,e, t r a- •�t1 "30 Relinquished by Received by Relinquished by Received by Reviewed try/Date Reviewed by/Date Chromatograms with Final report 0 whda - OnSite Copy Yellow - Report Copy Pink - Client Copy pro•'^ .. ...._,•,�:--• ,,,,...,r...r.... .. „r.� .. •-'^+r• 111101 11E1 MO IMO Ell MO ill M MN NMI NM IMIN a—. APPENDIX H Prevailing Wage Rates Page I1 General Decision Number: WA120001 10/05/2012 WA1 Superseded General Decision Number: WA20100001 State: Washington Construction Type: Highway Counties: Washington Statewide. HIGHWAY (Excludes D.O.E. Hanford Site in Benton and Franklin Counties) Modification Number Publication Date Modification Number Publication Date 0 01/06/2012 13 07/20/2012 1 01/13/2012 14 08/03/2012 2 02/10/2012 15 08/10/2012 3 02/17/2012 16 09/07/2012 4 03/23/2012 17 09/21/2012 5 04/06/2012 18 10/05/2012 6 04/13/2012 7 04/27/2012 8 05/04/2012 9 06/08/2012 10 06/15/2012 11 06/29/2012 12 07/06/2012 CARP0001-008 09/01/2009 Rates Fringes Carpenters: COLUMBIA RIVER AREA - ADAMS, BENTON, COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GRANT, OKANOGAN (EAST OF THE 120TH MERIDIAN) AND WALLA WALLA COUNTIES GROUP 1• $ 27.73 10.56 GROUP 2• $ 29.73 10.56 GROUP 3• $ 28.00 10.56 GROUP 4 $ 27.73 10.56 GROUP 5 $ 63.50 10.56 GROUP 6 $ 30.75 10.56 GROUP 7 $ 31.75 10.56 GROUP 8 $ 28.00 10.56 GROUP 9 $ 33.75 10.56 WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 12 SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS AND WHITMAN COUNTIES GROUP 1• $ 26.06 10.56 GROUP 2 $ 28.06 10.56 GROUP 3 $ 26.32 10.56 GROUP 4 $ 26.06 10.56 GROUP 5 $ 60.14 10.56 GROUP 6 $ 29.07 10.56 GROUP 7 $ 30.07 10.56 GROUP 8 $ 27.32 10.56 GROUP 9 $ 33.07 10.56 CARPENTER & DIVER CLASSIFICATIONS: GROUP 1: Carpenter GROUP 2: Millwright, machine erector GROUP 3: Piledriver - includes driving, pulling, cutting, placing collars, setting, welding, or creosote treated material, on all piling GROUP 4: Bridge carpenters GROUP 5: Diver Wet GROUP 6: Diver Tender, Manifold Operator, ROV Operator GROUP 7: Diver Standby, Bell/Vehicle or Submersible operator Not Under Pressure GROUP 8: Assistant Tender, ROV Tender/Technician GROUP 9: Manifold Operator -Mixed Gas ZONE PAY: ZONE 1 0-40 MILES FREE ZONE 2 41-65 MILES $2.25/PER HOUR ZONE 3 66-100 MILES $3.25/PER HOUR ZONE 4 OVER 100 MILES $4.75/PER HOUR DISPATCH POINTS: CARPENTERS/MILLWRIGHTS: PASCO (515 N Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS/PILEDRIVER: SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite). CARPENTERS: MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite). WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 13 DEPTH PAY FOR DIVERS BELOW WATER SURFACE: 50-100 feet $2.00 per foot 101-150 feet $3.00 per foot 151-220 feet $4.00 per foot 221 feet and deeper $5.00 per foot PREMIUM PAY FOR DIVING IN ENCLOSURES WITH NO VERTICAL ASCENT: 0-25 feet Free 26-300 feet $1.00 per Foot SATURATION DIVING: The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete the diver rate shall be paid for all saturation hours. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. HAZMAT PROJECTS: Anyone working on a HAZMAT job (task), where HAZMAT certification is required, shall be compensated at a premium, in addition to the classification working in as follows: LEVEL D + $.25 per hour - This is the lowest level of protection. No respirator is used and skin protection is minimal. LEVEL C + $.50 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B + $.75 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit". LEVEL A +$1.00 per hour - This level utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line. WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page (4 CARP0003-006 10/01/2011 SOUTHWEST WASHINGTON: CLARK, COWLITZ, KLICKITAT, LEWIS(Piledriver only), PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to Willapa Bay to the Pacific Ocean), SKAMANIA AND WAHKIAKUM COUNTIES and INCLUDES THE ENTIRE PENINSULA WEST OF WILLAPA BAY SEE ZONE DESCRIPTION FOR CITIES BASE POINTS ZONE 1: Rates Fringes Carpenters: CARPENTERS $ 32.04 14.18 DIVERS TENDERS $ 36.34 14.18 DIVERS $ 77.08 14.18 DRYWALL $ 27.56 14.18 MILLWRIGHTS $ 32.19 14.18 PILEDRIVERS $ 33.04 14.18 DEPTH PAY: 50 TO 100 FEET $1.00 PER FOOT OVER 50 FEET 101 TO 150 FEET $1.50 PER FOOT OVER 101 FEET 151 TO 200 FEET $2.00 PER FOOT OVER 151 FEET Zone Zone Zone Zone Zone Zone Differential (Add up 2 - $0.85 3 - 4 - 5 - 6 - 1.25 1.70 2.00 3.00 Zone 1 rates): BASEPOINTS: ASTORIA, LONGVIEW, PORTLAND, THE DALLES, AND VANCOUVER, (NOTE: All dispatches for Washington State Counties: Cowlitz, Wahkiakum and Pacific shall be from Longview Local #1707 and mileage shall be computed from that point.) ZONE city ZONE 2: miles of ZONE 3: miles of ZONE 4: miles of ZONE 5: miles of ZONE city 1: Projects located within 30 miles hall of the above mentioned cities Projects located more than the respective city of the Projects located more than the respective city of the Projects located more than the respective city of the Projects located more than the respective city of the 6: Projects located more than of the above mentioned cities of the respective 30 miles above mentioned cities 40 miles and less than above mentioned cities 50 miles and less than above mentioned cities 60 miles and less than above mentioned cities 70 miles of the respected and less than 40 50 60 70 WA120001 Modification 18 Federal Wage Determinations for Highway Construction CARP0770-003 06/01/2010 Rates Fringes Carpenters: CENTRAL WASHINGTON: CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN),KITTITAS, OF THE 120TH MERIDIAN) AND YAKIMA COUNTIES CARPENTERS ON CREOSOTE MATERIAL $ 35.49 12.60 CARPENTERS $ 35.39 12.60 DIVERS TENDER $ 39.15 12.60 DIVERS $ 87.20 12.60 MILLWRIGHT AND MACHINE ERECTORS $ 36.39 12.60 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING $ 35.59 12.60 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Pa e gI5 b OKANOGAN (WEST Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Seattle Auburn Renton Aberdeen-Hoquiam Ellensburg Centralia Chelan Zone Pay: 0 -25 radius 26-35 radius 36-45 radius 46-55 radius miles miles miles miles Olympia Bremerton Shelton Tacoma Everett Mount Vernon Pt. Townsend Over 55 radius miles Free $1.00/hour $1.15/hour $1.35/hour $1.55/hour Bellingham Anacortes Yakima Wenatchee Port Angeles Sunnyside (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles 26-45 radius miles Over 45 radius miles Free $ .70/hour $1.50/hour WA120001 Modification 18 Federal Wage Determinations for Highway Construction CARP0770-006 06/01/2010 Rates Fringes Page 16 Carpenters: WESTERN WASHINGTON: CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS (excludes piledrivers only), MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES BRIDGE CARPENTERS $ 35.39 CARPENTERS ON CREOSOTE MATERIAL $ 35.49 CARPENTERS $ 35.39 DIVERS TENDER $ 39.15 DIVERS $ 87.20 MILLWRIGHT AND MACHINE ERECTORS $ 36.39 PILEDRIVER, DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING OR CRESOTE TREATED MATERIAL, ALL PILING $ 35.59 13.08 13.08 13.08 13.08 13.08 13.08 13.08 (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS Hourly Zone Pay shall be paid on free zone computed from the city listed cities: Seattle Auburn Renton Aberdeen-Hoquiam Ellensburg Centralia Chelan Olympia Bremerton Shelton Tacoma Everett Mount Vernon Pt. Townsend Zone Pay: 0 -25 radius miles 26-35 radius miles 36-45 radius miles 46-55 radius miles Over 55 radius miles Free $1.00/hour $1.15/hour $1.35/hour $1.55/hour jobs located outside of center of the following Bellingham Anacortes Yakima Wenatchee Port Angeles Sunnyside the (HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT AND PILEDRIVER ONLY) Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center Zone Pay: 0 -25 radius miles 26-45 radius miles Over 45 radius miles Free $ .70/hour $1.50/hour WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 17 ELEC0046-001 06/01/2011 CLALLAM, JEFFERSON, KING AND KITSAP COUNTIES Rates Fringes CABLE SPLICER $ 44.87 3%+15.71 ELECTRICIAN $ 40.79 3%+15.71 ELEC0048-003 07/02/2012 CLARK, KLICKITAT AND SKAMANIA COUNTIES Rates Fringes CABLE SPLICER $ 40.75 18.41 ELECTRICIAN $ 37.05 18.41 HOURLY ZONE PAY: Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities: Portland, The Dalles, Hood River, Tillamook, Seaside and Astoria Zone Pay: Zone 1: 31-50 miles $1.50/hour Zone 2: 51-70 miles $3.50/hour Zone 3: 71-90 miles $5.50/hour Zone 4: Beyond 90 miles $9.00/hour *These are not miles driven. Zones are based on Delorrne Street Atlas USA 2006 plus. ELEC0048-029 07/02/2012 COWLITZ AND WAHKIAKUM COUNTY Rates Fringes CABLE SPLICER $ 40.75 15.36 ELECTRICIAN $ 37.05 15.36 * ELEC0073-001 07/01/2012 ADAMS, FERRY, LINCOLN, PEND OREILLE, SPOKANE, STEVENS, WHITMAN COUNTIES Rates Fringes CABLE SPLICER $ 31.70 15.39 ELECTRICIAN $ 28.82 15.39 WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 18 ELEC0076-002 09/01/2011 GRAYS HARBOR, LEWIS, MASON, PACIFIC, PIERCE, AND THURSTON COUNTIES Rates Fringes CABLE SPLICER $ 37.54 ELECTRICIAN $ 34.13 21.62 21.62 ELEC0112-005 06/01/2011 ASOTIN, BENTON, COLUMBIA, FRANKLIN, GARFIELD, KITTITAS, WALLA WALLA, YAKIMA COUNTIES Rates Fringes CABLE SPLICER $ 37.70 35+14.63 ELECTRICIAN $ 35.90 3%+14.63 ELEC0191-003 07/01/2011 ISLAND, SAN JUAN, SNOHOMISH, SKAGIT AND WHATCOM COUNTIES Rates Fringes CABLE SPLICER $ 42.91 15.39 ELECTRICIAN $ 39.01 15.39 ELEC0191-004 07/01/2011 CHELAN, DOUGLAS, GRANT AND OKANOGAN COUNTIES Rates Fringes CABLE SPLICER $ 39.28 15.24 ELECTRICIAN $ 35.71 15.24 WA120001 Modification 18 Federal Wage Determinations for Highway Construction Pa ENG10302-003 06/01/2011 CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN), SAN JUNA, SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE 120TH MERIDIAN) COUNTIES PROJECTS: CATEGORY A PROJECTS (EXCLUDES CATEGORY B PROJECTS, AS SHOWN BELOW) Zone 1 (0-25 radius miles): Rates Power equipment operators: Group 1A $ 35.79 Group IAA $ 36.36 Group lAAA $ 36.92 Group 1 $ 35.24 Group 2 $ 34.75 Group 3 $ 34.33 Group 4 $ 31.97 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30 Fringes 15.15 15.15 15.15 15.15 15.15 15.15 15.15 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1AAA - Cranes -over 300 tons, or 300 ft of boom (including jib with attachments) GROUP IAA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders -overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments WA120001 Modification 18 Federal Wage Determinations for Highway Construction ge 19 Page 110 GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers -self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane -overhead, bridge type -20 tons through 44 tons; Chipper; Concrete Pump -truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power); Drilling machine; Excavator, shovel, backhoe-3yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders -overhead under 6 yards; Loaders -plant feed; Locomotives -all; Mechanics -all; Mixers -asphalt plant; Motor patrol graders -finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper -self propelled, hard tail end dump, articulating off-road equipment -under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine -shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; A -frame crane over 10 tons; Drill oilers -auger type, truck or crane mount; Dozers -D-9 and under; Forklift -3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists -(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader -elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps -concrete; Roller, plant mix or multi -lift materials; Saws -concrete; Scrpers-concrete and carry -all; Service engineer -equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes -A frame -l0 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; Pumps, water; Rigger and Bellman; Roller -other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator Category B Projects: 95% of the basic hourly reate for each group plus full fringe benefits applicable to category A projects shall apply to the following projects. A Reduced rates may be paid on the following: 1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded. 3. Marine projects (docks, wharfs, etc.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing H-2 Class "C" Suit - Base wage rate plus $ .25 per hour. H-3 Class "B" Suit - Base wage rate plus $ .50 per hour. H-4 Class "A" Suit - Base wage rate plus $ .75 per hour. Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) - $ .70 Zone 3 (Over 45 radius miles) - $1.00 BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima WA120001 Modification 18 Federal Wage Determinations for Highway Construction 11 Page 112 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1AAA - Cranes -over 300 tons, or 300 ft of boom (including jib with attachments) GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower •crane over 175 ft in height, base to boom GROUP lA - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders -overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1 - Cableway; Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump articulating off-road equipment 45 yards and over; Loader- overhead 6 yards to, but not including 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9, HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers -self propelled 45 yards and over; Slipform pavers; Transporters, all truck or track type GROUP 2 - Barrier machine (zipper); Batch Plant Operaor- Concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane -overhead, bridge type -20 tons through 44 tons; Chipper; Concrete Pump -truck mount with boom attachment; Crusher; Deck Engineer/Deck Winches (power); Drilling machine; Excavator, shovel, backhoe -3 yards and under; Finishing Machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Horizontal/directional drill operator; Loaders -overhead under 6 yards; Loaders -plant feed; Locomotives -all; Mechanics -all; Mixers -asphalt plant; Motor patrol graders -finishing; Piledriver (other than crane mount); Roto-mill,roto-grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper -self propelled, hard tail end dump, articulating off-road equipment -under 45 yards; Subgrade trimmer; Tractors, backhoes-over 75 hp; Transfer material service machine -shuttle buggy, blaw knox-roadtec; Truck crane oiler/driver-100 tons and over; Truck Mount portable conveyor; Yo Yo Pay dozer WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 3 - Conveyors; Cranes-thru 19 tons with attachments; A -frame crane over 10 tons; Drill oilers -auger type, truck or crane mount; Dozers -D-9 and under; Forklift -3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside hoists -(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loader -elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pumps -concrete; Roller, plant mix or multi -lift materials; Saws -concrete; Scrpers-concrete and carry -all; Service engineer -equipment; Trenching machines; Truck Crane Oiler/Driver under 100 tons; Tractors, backhoe 75 hp and under GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete finish mahine-laser screed; Cranes -A frame -10 tons and under; Elevator and Manlift-permanent or shaft type; Gradechecker, Stakehop; Forklifts under 3000 lbs. with attachments; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger, mechanical; Power plant; Pumps, water; Rigger and Bellman; Roller -other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator CATEGORY B PROJECTS: 95% OF THE BASIC HOURLY RATE FOR EACH GROUP PLUS FULL FRINGE BENEFITS APPLICABLE TO CATEGORY A PROJECTS SHALL APPLY TO THE FOLLOWING PROJECTS. REDUCED RATES MAY BE PAID ON THE FOLLOWING: 1. Projects involving work on and bridges whose total value million excluding mechanical, of the contract. 2. Projects of less involved. Surfacing utilities excluded. 3. Marine projects structures is less such as buildings than $1.5 electrical, and utility portions than $1 million where no building is and paving including, but (docks, wharfs, ect.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designed hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing. H-2 Class "C" Suit - Base wage rate plus $.25 per hour. H-3 Class "B" Suit - Base wage rate plus $.50 per hour. H-4 Class "A" Suit - Base wage rate plus $.75 per hour. WA120001 Modification 18 Federal Wage Determinations for Highway Construction 13 Page 14 ENGI0370-002 06/01/2011 ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN), COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES ZONE 1: Rates Fringes Power equipment operators: GROUP 1A $ 24.41 12.05 GROUP 1 $ 24.76 12.05 GROUP 2 $ 25.08 12.05 GROUP 3 $ 25.69 12.05 GROUP 4 $ 25.85 12.05 GROUP 5 $ 26.01 12.05 GROUP 6 $ 26.29 12.05 GROUP 7 $ 26.56 12.05 GROUP 8 $ 27.66 12.05 ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00 Zone 1: Within 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1A: Boat Operator; Crush Feeder; Oiler; Steam Cleaner GROUP 1: Bit Grinders; Bolt Threading Machine; Compressors (under 2000 CFM, gas, diesel, or electric power); Deck Hand; Drillers Helper (Assist driller in making drill rod connections, service drill engine and air compressor, repair drill rig and drill tools, drive drill support truck to and on the job site, remove drill cuttings from around bore hole and inspect drill rig while in operation); Fireman & Heater Tender; Hydro -seeder, Mulcher, Nozzleman; Oiler Driver, & Cable Tender, Mucking Machine; Pumpman; Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler -Driver (CLD required) & Cable Tender, Mucking Machine WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 2: A -frame Truck (single drum); Assistant Refrigeration Plant (under 1000 ton); Assistant Plant Operator, Fireman or Pugmixer (asphalt); Bagley or Stationary Scraper; Belt Finishing Machine; Blower Operator (cement); Cement Hog; Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); Distributor Leverman; Ditch Witch or similar; Elevator Hoisting Materials; Dope Pots (power agitated); Fork Lift or Lumber Stacker, hydra -lift & similar; Gin Trucks (pipeline); Hoist, single drum; Loaders (bucket elevators and conveyors); Longitudinal Float; Mixer (portable -concrete); Pavement Breaker, Hydra -Hammer & similar; Power Broom; Railroad Ballast Regulation Operator (self-propelled); Railroad Power Tamper Operator (self-propelled); Railroad Tamper Jack Operator (self-propelled; Spray Curing Machine (concrete); Spreader Box (self-propelled); Straddle Buggy (Ross & similar on construction job only); Tractor (Farm type R/T with attachment, except Backhoe); Tugger Operator GROUP 3: A -frame Truck (2 or more drums); Assistant Refrigeration Plant & Chiller Operator (over 1000 ton); Backfillers (Cleveland & similar); Batch Plant & Wet Mix Operator, single unit (concrete); Belt -Crete Conveyors with power pack or similar; Belt Loader (Kocal or similar); Bending Machine; Bob Cat (Skid Steer); Boring Machine (earth); Boring Machine (rock under 8 inch bit) (Quarry Master, Joy or similar); Bump Cutter (Wayne, Saginau or similar); Canal Lining Machine (concrete); Chipper (without crane); Cleaning & Doping Machine (pipeline); Deck Engineer; Elevating Belt -type Loader (Euclid, Barber Green & similar); Elevating Grader -type Loader (Dumor, Adams or similar); Generator Plant Engineers (diesel or electric); Gunnite Combination Mixer & Compressor; Locomotive Engineer; Mixermobile; Mucking Machine; Posthole Auger or Punch; Pump (grout or jet); Soil Stabilizer (P & H or similar); Spreader Machine; Dozer/Tractor (up to 0-6 or equivalent) and Traxcavator; Traverse Finish Machine; Turnhead Operator GROUP 4: Concrete Pumps (squeeze-crete, flow -Crete, pump- crete, Whitman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond); Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist); Loaders (overhead & front-end, under 4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton); Rubber -tired Skidders (R/T with or without attachments); Surface Heater & Plant Machine; Trenching Machines (under 7 ft. depth capacity); Turnhead (with re -screening); Vacuum Drill (reverse circulation drill under 8 inch bit) WA120001 Modification 18 Federal Wage Determinations for Highway Construction 15 Page 116 GROUP 5: Backhoe (under 45,000 gw); Backhoe & Hoe Ram (under 3/4 yd.); Carrydeck & Boom Truck (under 25 tons); Cranes (25 tons & under), all attachments including clamshell, dragline; Derricks & Stifflegs (under 65 tons); Drilling Equipment(8 inch bit & over) (Robbins, reverse circulation & similar); Hoe Ram; Piledriving Engineers; Paving (dual drum); Railroad Track Liner Operaotr (self-propelled); Refrigeration Plant Engineer (1000 tons & over); Signalman (Whirleys, Highline Hammerheads or similar); Grade Checker GROUP 6: Asphalt Plant Operator; Automatic Subgrader (Ditches & Trimmers)(Autograde, ABC, R.A. Hansen & similar on grade wire); Backhoe (45,000 gw and over to 110,000 gw); Backhoes & Hoe Ram (3/4 yd. to 3 yd.); Batch Plant (over 4 units); Batch & Wet Mix Operator (multiple units, 2 & incl. 4); Blade Operator (motor patrol & attachments); Cable Controller (dispatcher); Compactor (self-propelled with blade); Concrete Pump Boom Truck; Concrete Slip Form Paver; Cranes (over 25 tons, to and including 45 tons), all attachments including clamshell, dragline; Crusher, Grizzle & Screening Plant Operator; Dozer, 834 R/T & similar; Drill Doctor; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Multiple Dozer Units with single blade; Paving Machine (asphalt and concrete); Quad -Track or similar equipment; Rollerman (finishing asphalt pavement); Roto Mill (pavement grinder); Scrapers, all, rubber -tired; Screed Operator; Shovel(under 3 yds.); Trenching Machines (7 ft. depth & over); Tug Boat Operator Vactor guzzler, super sucker; Lime Batch Tank Operator (REcycle Train); Lime Brain Operator (Recycle Train); Mobile Crusher Operator (Recycle Train) GROUP 7: Backhoe (over 110,000 gw); Backhoes & Hoe Ram (3 yds & over); Blade (finish & bluetop) Automatic, CMI, ABC, Finish Athey & Huber & similar when used as automatic; Cableway Operators; Concrete Cleaning/Decontamination machine operator; Cranes (over 45 tons to but not including 85 tons), all attachments including clamshell and dragine; Derricks & Stiffleys (65 tons & over); Elevating Belt (Holland type); Heavy equipment robotics operator; Loader (360 degrees revolving Koehring Scooper or similar); Loaders (overhead & front-end, over 8 yds. to 10 yds.); Rubber -tired Scrapers (multiple engine with three or more scrapers); Shovels (3 yds. & over); Whirleys & Hammerheads, ALL; H.D. Mechanic; H.D. Welder; Hydraulic Platform Trailers (Goldhofer, Shaurerly andSimilar); Ultra High Pressure Wateriet Cutting Tool System Operator (30,000 psi); Vacuum Blasting Machine Operator WA120001 Modification 18 Federal Wage Determinations for Highway Construction Pa GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower), all attachments including clamshell, dragline; Loaders (overhead and front-end, 10 yards and over); Helicopter Pilot BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom. HAZMAT: Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification. ENGI0612-006 06/01/2011 LEWIS,PIERCE, PACIFIC (portion lying north of a parallel line extending west from the northern boundary of Wahkaikum County to the sea) AND THURSTON COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS FULL FRINGE BENEFITS. ON ALL OTHER WORK, THE FOLLOWING RATES APPLY. Zone 1 (0-25 radius miles): Rates Fringes Power equipment operators: GROUP lA $ 35.79 15.15 GROUP IAA $ 36.36 15.15 GROUP 1AAA $ 36.92 15.15 GROUP 1 $ 35.24 15.15 GROUP 2 $ 34.75 15.15 GROUP 3 $ 34.33 15.15 GROUP 4 $ 31.97 15.15 Zone Differential (Add to Zone 1 rates): Zone 2 (26-45 radius miles) = $ .70 Zone 3 (Over 45 radius miles) - $1.00 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1 AAA - Cranes -over 300 tons or 300 ft of boom (including jib with attachments) GROUP IAA - Cranes- 200 tonsto 300 tons, or 250 ft of boom (including jib with attachments; Tower crane over 175 ft in height, bas to boom WA120001 Modification 18 Federal Wage Determinations for Highway Construction ge 117 Page 118 GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Loaders -overhead, 8 yards and over; Shovels, excavator, backhoes-6 yards and over with attachments GROUP 1 - Cableway; Cranes 45 tons thru 99 tons under 150 ft of boom (including jib with attachments); Crane -overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator, shovel, backhoes over 3 yards and under 6 yards; Hard tail end dump•articulating off-road equipment 45 yards and over; Loader- overhead, 6 yards to, but not including, 8 yards; Mucking machine, mole, tunnel, drill and/or shield; Quad 9 HD 41, D-10; Remote control operator on rubber tired earth moving equipment; Rollagon; Scrapers - self -propelled 45 yards and over; Slipform pavers; Transporters, all track or truck type GROUP 2 - Barrier machine (zipper); Batch Plant Operator - concrete; Bump Cutter; Cranes, 20 tons thru 44 tons with attachments; Crane -Overhead, bridge type, 20 tons through 44 tons; Chipper; Concrete pump -truck mount with boom attachment; Crusher; Deck engineer/deck winches (power); Drilling machine; Excavator, shovel, backhoe -3 yards and under; Finishing machine, Bidwell, Gamaco and similar equipment; Guardrail punch; Loaders, overhead under 6 yards; Loaders -plant feed; Locomotives -all; Mechanics- all; Mixers, asphalt plant; Motor patrol graders, finishing; Piledriver (other than crane mount); Roto -mill, roto - grinder; Screedman, spreader, topside operator-Blaw Knox, Cedar Rapids, Jaeger, Caterpillar, Barbar Green; Scraper -self- propelled, hard tail end dump, articulating off-road equipment- under 45 yards; Subgrader trimmer; Tractors, backhoe over 75 hp; Transfer material service machine -shuttle buggy, Blaw Knox- Roadtec; Truck Crane oiler/driver-100 tons and over; Truck Mount Portable Conveyor; Yo Yo pay GROUP 3 - Conveyors; Cranes through 19 tons with attachments; Crane -A -frame over 10 tons; Drill oilers -auger type, truck or crane mount; Dozer -D-9 and under; Forklift -3000 lbs. and over with attachments; Horizontal/directional drill locator; Outside Hoists -(elevators and manlifts), air tuggers, strato tower bucket elevators; Hydralifts/boom trucks over 10 tons; Loaders -elevating type, belt; Motor patrol grader-nonfinishing; Plant oiler- asphalt, crusher; Pump -Concrete; Roller, plant mix or multi-lfit materials; Saws -concrete; Scrapers, concrete and carry all; Service engineers -equipment; Trenching machines; Truck crane oiler/driver under 100 tons; Tractors, backhoe under 75 hp WA120001 Modification 18 Federal Wage Determinations for Highway Construction GROUP 4 - Assistant Engineer; Bobcat; Brooms; Compressor; Concrete Finish Machine -laser screed; Cranes A -frame 10 tons and under; Elevator and manlift (permanent and shaft type); Forklifts -under 3000 lbs. with attachments; Gradechecker, stakehop; Hydralifts/boom trucks, 10 tons and under; Oil distributors, blower distribution and mulch seeding operator; Pavement breaker; Posthole digger -mechanical; Power plant; Pumps -water; Rigger and Bellman; Roller -other than plant mix; Wheel Tractors, farmall type; Shotcrete/gunite equipment operator FOOTNOTE A- Reduced rates may be paid on the following: 1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract. 2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded. 3. Marine projects (docks, wharfs, etc.) less than $150,000. HANDLING OF HAZARDOUS WASTE MATERIALS: Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan. H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing H-2 Class "C" Suit - Base wage rate plus $ .25 per hour. H-3 Class "B" Suit - Base wage rate plus $ .50 per hour. H-4 Class "A" Suit - Base wage rate plus $ .75 per hour. ENGI0701-002 01/01/2012 CLARK, COWLITZ, KLICKKITAT, PACIFIC (SOUTH), SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1 Rates Power equipment operators: (See Footnote A) GROUP 1 $ 37.27 GROUP 1A $ 39.13 GROUP 1B $ 41.00 GROUP 2 $ 35.64 GROUP 3 $ 34.64 GROUP 4 $ 33.71 GROUP 5 $ 32.60 GROUP 6 $ 29.61 Zone Differential (add to Zone 1 rates): Zone 2 - $3.00 Zone 3 - $6.00 WA120001 Modification 18 Federal Wage Determinations for Highway Construction Fringes 12.08 12.08 12.08 12.08 12.08 12.08 12.08 12.08 Page 19 Page 20 For the following metropolitan counties: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt. St. Helens "Blast Zone" shall receive Zone I pay for all classifications. All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications. For the following cities: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications. All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications. All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications. WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 21 POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: CONCRETE: Batch Plant and/or Wet Mix Operator, three units or more; CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments; FLOATING EQUIPMENT: Floating Crane, 150 ton but less than 250 ton GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom; FLOATING EQUIPMENT: Floating Crane 250 ton and over GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over; FLOATING EQUIPMENT: Floating Crane 350 ton and over GROUP 2: ASPHALT: Asphalt Plant Operator (any type); Roto Mill, pavement profiler, operator, 6 foot lateral cut and over; BLADE: Auto Grader or "Trimmer" (Grade Checker required); Blade Operator, Robotic; BULLDOZERS: Bulldozer operator over 120,000 lbs and above; Bulldozer operator, twin engine; Bulldozer Operator,tandem, quadnine, D10, Dll, and similar type; Bulldozere Robotic Equipment (any type; CONCRETE: Batch Plant and/or Wet Mix Operator, one and two drum; Automatic Concrete Slip Form Paver Operator; Concrete Canal Line Operator; Concrete Profiler, Diamond Head; CRANE: Cableway Operator, 25 tons and over; HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment); TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; CRUSHER: Crusher Plant Operator; FLOATING EQUIPMENT: Floating Clamshell, etc.operator, 3 cu. yds. and over; Floating Crane (derrick barge) Operator, 30 tons but less than 150 tons; LOADERS: Loader operator, 120,000 lbs. and above; REMOTE CONTROL: Remote controlled earth -moving equipment; RUBBER -TIRED SCRAPERS: Rubber - tired scraper operator, with tandem scrapers, multi -engine; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Shovel, Dragline, Clamshell, operator 5 cu. yds and over; TRENCHING MACHINE: Wheel Excavator, under 750 cu. yds. per hour (Grade Oiler required); Canal Trimmer (Grade Oiler required); Wheel Excavator, over 750 cu. yds. per hour; Band Wagon (in conjunction with wheel excavator); UNDERWATER EQUIPMENT: Underwater Equipment Operator, remote or otherwise; HYDRAULIC HOES -EXCAVATOR: Excavator over 130,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 122 GROUP 3: BULLDOZERS: Bulldozer operator, over 70,000 lbs. up to and including 120,000 lbs.; HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment); LATTICE BOOM CRANES: Lattice Boom Crane -50 through 89 tons (and less than 150 feet boom); FORKLIFT: Rock Hound Operator; HYDRAULIC HOES -EXCAVATOR: excavator over 80,000 lbs. through 130,000 lbs.; LOADERS: Loader operator 60,000 and less than 120,000; RUBBER -TIRED SCRAPERS: Scraper Operator, with tandem scrapers; Self -loading, paddle wheel, auger type, finish and/or 2 or more units; SHOVEL, DRAGLINE, CLAMSHELL,SKOOPER OPERATOR: Shovel, Dragline, Clamshell operators 3 cu. yds. but less than 5 cu yds. GROUP 4: ASPHALT: Screed Operator; Asphalt Paver operator (screeman required); BLADE: Blade operator; Blade operator, finish; Blade operator, externally controlled by electronic, mechanical hydraulic means; Blade operator, multi -engine; BULLDOZERS: Bulldozer Operator over 20,000 lbs and more than 100 horse up to 70,000 lbs; Drill Cat Operator; Side -boom Operator; Cable -Plow Operator (any type); CLEARING: Log Skidders; Chippers; Incinerator; Stump Splitter (loader mounted or similar type); Stump Grinder (loader mounted or similar type; Tub Grinder; Land Clearing Machine (Track mounted forestry mowing & grinding machine); Hydro Axe (loader mounted or similar type); COMPACTORS SELF-PROPELLED: Compactor Operator, with blade; Compactor Operator, multi -engine; Compactor Operator, robotic; CONCRETE: Mixer Mobile Operator; Screed Operator; Concrete Cooling Machine Operator; Concrete Paving Road Mixer; Concrete Breaker; Reinforced Tank Banding Machine (K-17 or similar types); Laser Screed; CRANE: Chicago boom and similar types; Lift Slab Machine Operator; Boom type lifting device, 5 ton capacity or less; Hoist Operator, two (2) drum; Hoist Operator, three (3) or more drums; Derrick Operator, under 100 ton; Hoist Operator, stiff leg, guy derrick or similar type, 50 ton and over; Cableway Operator up to twenty (25) ton; Bridge Crane Operator, Locomotive, Gantry, Overhead; Cherry Picker or similar type crane; Carry Deck Operator; Hydraulic Crane Operator, under 50 tons; LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; CRUSHER: Generator Operator; Diesel -Electric Engineer; Grizzley Operator; Drill Doctor; Boring Machine Operator; Driller -Percussion, Diamond, Core, Cable, Rotary and similar type; Cat Drill (John Henry); Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Diesel-electric Engineer; Jack Operator, elevating barges, Barge Operator, self - unloading; Piledriver Operator (not crane type) (Deckhand required); Floating Clamshelll, etc. Operator, under 3 cu. yds. (Fireman or Diesel -Electric Engineer required); Floating Crane (derrick barge) Operator, less than 30 tons; GENERATORS: Generator Operator; Diesel-electric Engineer; GUARDRAIL EQUIPMENT: Guardrail Punch Operator (all types); Guardrail Auger Operator (all types); Combination Guardrail machines, i.e., punch auger, etc.; HEATING PLANT: Surface Heater and Planer Operator; HYDRAULIC HOES EXCAVATOR: WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments; Excavator Operator over 20,000 lbs through 80,000 lbs.; LOADERS: Belt Loaders, Kalman and Ko Cal types; Loaders Operator, front end and overhead, 25,000 lbs and less than 60,000 lbs; Elevating Grader Operator by Tractor operator, Sierra, Euclid or similar types; PILEDRIVERS: Hammer Operator; Piledriver Operator (not crane type); PIPELINE, SEWER WATER: Pipe Cleaning Machine Operator; Pipe Doping Machine Operator; Pipe Bending Machine Operator; Pipe Wrapping Machine Operator; Boring Machine Operator; Back Filling Machine Operator; REMOTE CONTROL: Concrete Cleaning Decontamination Machine Operator; Ultra High Pressure Water Jet Cutting Tool System Operator/Mechanic; Vacuum Blasting Machine Operator/mechanic; REPAIRMEN, HEAVY DUTY: Diesel Electric Engineer (Plant or Floating; Bolt Threading Machine operator; Drill Doctor (Bit Grinder); H.D. Mechanic; Machine Tool Operator; RUBBER -TIRED SCRAPERS: Rubber -tired Scraper Operator, single engine, single scraper; Self -loading, paddle wheel, auger type under 15 cu. yds.; Rubber -tired Scraper Operator, twin engine; Rubber -tired Scraper Operator, with push- ull attachments; Self Loading, paddle wheel, auger type 15 cu. yds. and over, single engine; Water pulls, water wagons; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER OPERATOR: Diesel Electric Engineer; Stationay Drag Scraper Operator; Shovel, Dragline, Clamshell, Operator under 3 cy yds.; Grade -all Operator; SURFACE (BASE) MATERIAL: Blade mounted spreaders, Ulrich and similar types; TRACTOR-RUBBERED TIRED: Tractor operator, rubber -tired, over 50 hp flywheel; Tractor operator, with boom attachment; Rubber -tired dozers and pushers (Michigan, Cat, Hough type); Skip Loader, Drag Box; TRENCHING MACHINE: Trenching Machine operator, digging capacity over 3 ft depth; Back filling machine operator; TUNNEL: Mucking machine operator WA120001 Modification 18 Federal Wage Determinations for Highway Construction 23 Page I 24 GROUP 5: ASPHALT: Extrusion Machine Operator; Roller Operator (any asphalt mix); Asphalt Burner and Reconditioner Operator (any type); Roto -Mill, pavement profiler, ground man; BULLDOZERS: Bulldozer operator, 20,000 lbs. or less or 100 horse or less; COMPRESSORS: Compressor Operator (any power), over 1,250 cu. ft. total capacity; COMPACTORS: Compactor Operator, including vibratory; Wagner Pactor Operator or similar type (without blade); CONCRETE: Combination mixer and Compressor Operator, gunite work; Concrete Batch Plant Quality Control Operator; Beltcrete Operator; Pumperete Operator (any type); Pavement Grinder and/or Grooving Machine Operator (riding type); Cement Pump Operator, Fuller -Kenyon and similar; Concrete Pump Operator; Grouting Machine Operator; Concrete mixer operator, single drum, under (5) bag capacity; Cast in place pipe laying machine; maginnis Internal Full slab vibrator operator; Concrete finishing mahine operator, Clary, Johnson, Bidwell, Burgess Bridge deck or similar type; Curb Machine Operator, mechanical Berm, Curb and/or Curb and Gutter; Concrete Joint Machine Operator; Concrete Planer Operator; Tower Mobile Operator; Power Jumbo Operator setting slip forms in tunnels; Slip Form Pumps, power driven hydraulic lifting device for concrete forms; Concrete Paving Machine Operator; Concrete Finishing Machine Operator; Concrete Spreader Operator; CRANE: Helicopter Hoist Operator; Hoist Operator, single drum; Elevator Operator; A -frame Truck Operator, Double drum; Boom Truck Operator; HYDRAULIC CRANE OPERATOR: Hydraulic Boom Truck, Pittman; DRILLING: Churm Drill and Earth Boring Machine Operator; Vacuum Truck; Directional Drill Operator over 20,000 lbs pullback; FLOATING EQUIPMENT: Fireman; FORKLIFT: Fork Lift, over 10 ton and/or robotic; HYDRAULIC HOES EXCAVATORS: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type); Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; LOADERS: Loaders, rubber- tired type, less than 25,000 lbs; Elevating Grader Operator, Tractor Towed requiring Operator or Grader; Elevating loader operator, Athey and similar types; OILERS: Service oiler (Greaser); PIPELINE -SEWER WATER: Hydra hammer or simialr types; Pavement Breaker Operator; PUMPS: Pump Operator, more than 5 (any size); Pot Rammer Operator; RAILROAD EQUIPMENT: Locomotive Operator, under 40 tons; Ballast Regulator Operator; Ballast Tamper Multi -Purpose Operator; Track Liner Operator; Tie Spacer Operator; Shuttle Car Operator; Locomotive Operator, 40 tons and over; MATERIAL HAULRS: Cat wagon DJBs Volvo similar types; Conveyored material hauler; SURFACING (BASE) MATERIAL: Rock Spreaders, self-propelled; Pulva-mixer or similar types; Chiip Spreading machine operator; Lime spreading operator, construction job siter; SWEEPERS: Sweeper operator (Wayne type) self-propelled construction job site; TRACTOR -RUBBER TIRED: Tractor operator, rubber -tired, 50 hp flywheel and under; Trenching machine operator, maximum digging capacity 3 ft depth; TUNNEL: Dinkey WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 6: ASPHALT: Plant Oiler; Plant Fireman; Pugmill Operator (any type); Truck mounted asphalt spreader, with screed; COMPRESSORS: Compressor Operator (any power), under 1,250 cu. ft. total capacity; CONCRETE: Plant Oiler, Assistant Conveyor Operator; Conveyor Operator; Mixer Box Operator (C.T.B., dry batch, etc.); Cement Hog Operator; Concrete Saw Operator; Concrete Curing Machine Operator (riding type); Wire Mat or Brooming Machine Operator; CRANE: Oiler; Fireman, all equipment; Truck Crane Oiler Driver; A -frame Truck Operator, single drum; Tugger or Coffin Type Hoist Operator; CRUSHER: Crusher Oiler; Crusher Feederman; CRUSHER: Crusher oiler; Crusher feederman; DRILLING: Drill Tender; Auger Oiler; FLOATING EQUIPMENT: Deckhand; Boatman; FORKLIFT: Self-propelled Scaffolding Operator, construction job site (exclduing working platform); Fork Lift or Lumber Stacker Operator, construction job site; Ross Carrier Operator, construction job site; Lull Hi -Lift Operator or Similar Type; GUARDRAIL EQUIPMENT: Oiler; Auger Oiler; Oiler, combination guardrail machines; Guardrail Punch Oiler; HEATING PLANT: Temporary Heating Plant Operator; LOADERS: Bobcat, skid steer (less than 1 cu yd.); Bucket Elevator Loader Operator, BarberGreene and similar types; OILERS: Oiler; Guardrail Punch Oiler; Truck Crane Oiler -Driver; Auger Oiler; Grade Oiler, required to check grade; Grade Checker; Rigger; PIPELINE -SEWER WATER: Tar Pot Fireman; Tar Pot Fireman (power agitated); PUMPS: Pump Operator (any power); Hydrostatic Pump Operator; RAILROAD EQUIPMENT: Brakeman; Oiler; Switchman; Motorman; Ballast Jack Tamper Operator; SHOVEL, DRAGLINE, CLAMSHELL, SKOOPER, ETC. OPERATOR: Oiler, Grade Oiler (required to check grade); Grade Checker; Fireman; SWEEPER: Broom operator, self propelled, construction job site; SURFACING (BASE) MATERIAL: Roller Operator, grading of base rock (not asphalt); Tamping Machine operartor, mechanical, self-propelled; Hydrographic Seeder Machine Operator; TRENCHING MACHINE: Oiler; Grade Oiler; TUNNEL: Conveyor operator; Air filtration equipment operator WA120001 Modification 18 Federal Wage Determinations for Highway Construction 25 Page X26 IRON0014-005 01/01/2012 ADAMS, ASOTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND ORIELLE, SPOKANE, STEVENS, WALLA WALLA AND WHITMAN COUNTIES Rates Fringes IRONWORKER $ 31.35 20.10 IRON0029-002 01/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKAIKUM COUNTIES Rates Fringes IRONWORKER $ 33.87 20.10 IRON0086-002 07/01/2012 YAKIMA, KITTITAS AND CHELAN COUNTIES Rates IRONWORKER $ 31.35 Fringes 20.10 IRON0086-004 01/01/2012 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PIERCE, SKAGIT, SNOHOMISH, THURSTON, AND WHATCOM COUNTIES Rates Fringes IRONWORKER $ 37.89 20.10 WA120001 Modification 18 Federal Wage Determinations for Highway Construction LAB00001-002 06/01/2009 ZONE 1: Rates Fringes Page Laborers: CALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (NORTH OF STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN), PIERCE, SAN JUAN,SKAGIT, SNOHOMISH,THURSTON AND WHATCOM COUNTIES GROUP 1 $ 21.77 9.07 GROUP 2 $ 24.86 9.07 GROUP 3 $ 30.96 9.07 GROUP 4 $ 31.70 9.07 GROUP 5 $ 32.21 9.07 CHELAN, DOUGLAS (WEST OF THE 120TH MERIDIAN), KITTITAS AND YAKIMA COUNTIES GROUP 1 $ 17.95 9.07 GROUP 2 $ 20.58 9.07 GROUP 3 $ 22.54 9.07 GROUP 4 $ 23.09 9.07 GROUP 5 $ 23.48 9.07 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: CHELAN, SUNNYSIDE, WENATCHEE, AND YAKIMA ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 radius miles from the respective city hall ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.25 WA120001 Modification 18 Federal Wage Determinations for Highway Construction 27 Page 128 LABORERS CLASSIFICATIONS GROUP 1: Landscaping and Planting; Watchman; Window Washer/Cleaner (detail clean-up, such as but not limited to cleaning floors, ceilings, walls, windows, etc., prior to final acceptance by the owner) GROUP 2: Batch Weighman; Crusher Feeder; Fence Laborer; Flagman; Pilot Car GROUP 3: General Laborer; Air, Gas, or Electric Vibrating Screed; Asbestos Abatement Laborer; Ballast Regulator Machine; Brush Cutter; Brush Hog Feeder; Burner; Carpenter Tender; Cement Finisher Tender; Change House or Dry Shack; Chipping Gun (under 30 lbs.); Choker Setter; Chuck Tender; Clean-up Laborer; Concrete Form Stripper; Curing Laborer; Demolition (wrecking and moving including charred material); Ditch Digger; Dump Person; Fine Graders; Firewatch; Form Setter; Gabian Basket Builders; Grout Machine Tender; Grinders; Guardrail Erector; Hazardous Waste Worker (Level C: uses a chemical "splash suit" and air purifying respirator); Maintenance Person; Material Yard Person; Pot Tender; Rip Rap Person; Riggers; Scale Person; Sloper Sprayer; Signal Person; Stock Piler; Stake Hopper; Toolroom Man (at job site); Topper-Tailer; Track Laborer; Truck Spotter; Vinyl Seamer GROUP 4: Cement Dumper -Paving; Chipping Gun (over 30 lbs.); Clary Power Spreader; Concrete Dumper/Chute Operator; Concrete Saw Operator; Drill Operator (hydraulic, diamond, aiartrac); Faller and Bucker Chain Saw; Grade Checker and Transit Person; Groutmen (pressure) including post tension beams; Hazardous Waste Worker (Level B: uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit"); High Scaler; Jackhammer; Laserbeam Operator; Manhole Builder-Mudman; Nozzleman (concrete pump, green cutter when using combination of high pressure air and water on concrete and rock, sandblast, gunite, shotcrete, water blaster, vacuum blaster); Pavement Breaker; Pipe Layer and Caulker; Pipe Pot Tender; Pipe Reliner (not insert type); Pipe Wrapper; Power Jacks; Railroad Spike Puller -Power; Raker -Asphalt; Rivet Buster; Rodder; Sloper (over 20 ft); Spreader (concrete); Tamper and Similar electric, air and glas operated tool; Timber Person -sewer (lagger shorer and cribber); Track Liner Power; Tugger Operator; Vibrator; Well Point Laborer GROUP 5: Caisson Worker; Miner; Mortarman and Hodcarrier; Powderman; Re-Timberman; Hazardous Waste Worker (Level A: utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line). WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 129 LAB00238-004 06/01/2012 PASCO AREA: ADAMS, BENTON, COLUMBIA,DOUGLAS (East of 120th Meridian), FERRY, FRANKLIN, GRANT, OKANOGAN, WALLA WALLA SPOKANE AREA: ASOTIN, GARFIELD, LINCOLN, PEND OREILLE, SPOKANE, STEVENS & WHITMAN COUNTIES Rates Fringes LABORER (PASCO) GROUP 1 $ 21.71 10.30 GROUP 2 $ 23.81 10.30 GROUP 3 $ 24.08 10.30 GROUP 4 $ 24.35 10.30 GROUP 5 $ 24.63 10.30 LABORER (SPOKANE) GROUP 1 $ 21.41 10.30 GROUP 2 $ 23.51 10.30 GROUP 3 $ 23.78 10.30 GROUP 4 $ 24.05 10.30 GROUP 5 $ 24.33 10.30 Zone Differential (Add to Zone 1 rate): $2.00 BASE POINTS: Spokane, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: 45 radius miles and over from the main post office. LABORERS CLASSIFICATIONS GROUP 1: Flagman; Landscape Laborer; Scaleman; Traffic Control Maintenance Laborer (to include erection and maintenance of barricades, signs and relief of flagperson); Window Washer/Cleaner (detail cleanup, such as, but not limited to cleaning floors, ceilings, walls, windows, etc. prior to final acceptance by the owner) WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 30 GROUP 2: Asbestos Abatement Worker; Brush Hog Feeder; Carpenter Tender; Cement Handler; Clean-up Laborer; Concrete Crewman (to include stripping of forms, hand operating jacks on slip form construction, application of concrete curing compounds, pumperete machine, signaling, handling the nozzle of squeezcrete or similar machine,6 inches and smaller); Confined Space Attendant; Concrete Signalman; Crusher Feeder; Demolition (to include clean-up, burning, loading, wrecking and salvage of all material); Dumpman; Fence Erector; Firewatch; Form Cleaning Machine Feeder, Stacker; General Laborer; Grout Machine Header Tender; Guard Rail (to include guard rails, guide and reference posts, sign posts, and right-of-way markers); Hazardous Waste Worker, Level D (no respirator is used and skin protection is minimal); Miner, Class "A" (to include all bull gang, concrete crewman, dumpman and pumperete crewman, including distributing pipe, assembly & dismantle, and nipper); Nipper; Riprap Man; Sandblast Tailhoseman; Scaffold Erector '(wood or steel); Stake Jumper; Structural Mover (to include separating foundation, preparation, cribbing, shoring, jacking and unloading of structures); Tailhoseman (water nozzle); Timber Bucker and Faller (by hand); Track Laborer (RR); Truck Loader; Well -Point Man; All Other Work Classifications Not Specially Listed Shall Be Classified As General Laborer GROUP 3: Aspahit Raker; Asphalt Roller, walking; Cement Finisher Tender; Concrete -Saw, walking; Demolition Torch; Dope Pot Firemen, non-mechanical; Driller Tender (when required to move and position machine); Form Setter, Paving; Grade Checker using level; Hazardous Waste Worker, Level C (uses a chemical "splash suit" and air purifying respirator); Jackhammer Operator; Miner, Class "B" (to include brakeman, finisher, vibrator, form setter); Nozzleman (to include squeeze and flo-crete nozzle); Nozzleman, water, air or steam; Pavement Breaker (under 90 lbs.); Pipelayer, corrugated metal culvert; Pipelayer, multi- plate; Pot Tender; Power Buggy Operator; Power Tool Operator, gas, electric, pneumatic; Railroad Equipment, power driven, except dual mobile power spiker or puller; Railroad Power Spiker or Puller, dual mobile; Rodder and Spreader; Tamper (to include operation of Barco, Essex and similar tampers); Trencher, Shawnee; Tugger Operator; Wagon Drills; Water Pipe Liner; Wheelbarrow (power driven) WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page I 31 GROUP 4: Air and Hydraulic Track Drill; Brush Machine (to include horizontal construction joint cleanup brush machine, power propelled); Caisson Worker, free air; Chain Saw Operator and Faller; Concrete Stack (to include laborers when laborers working on free standing concrete stacks for smoke or fume control above 40 feet high); Gunite (to include operation of machine and nozzle); Hazardous Waste Worker, Level B (uses same respirator protection as Level A. A supplied air line is provided in conjunction with a chemical "splash suit"); High Scaler; Laser Beam Operator (to include grade checker and elevation control); Miner, Class C (to include miner, nozzleman for concrete, laser beam operator and rigger on tunnels); Monitor Operator (air track or similar mounting); Mortar Mixer; Nozzleman (to include jet blasting nozzleman, over 1,200 lbs., jet blast machine power propelled, sandblast nozzle); Pavement Breaker (90 lbs. and over); Pipelayer (to include working topman, caulker, collarman, jointer, mortarman, rigger, jacker, shorer, valve or meter installer); Pipewrapper; Plasterer Tender; Vibrators (all) GROUP 5 - Drills with Dual Masts; Hazardous Waste Worker, Level A (utilizes a fully encapsulated suit with a self-contained breathing apparatus or a supplied air line); Miner Class "D", (to include raise and shaft miner, laser beam operator on riases and shafts) GROUP 6 - Powderman LAB00238-006 06/01/2012 COUNTIES EAST OF THE 120TH MERIDIAN: ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND OREILLE, STEVENS, SPOKANE, WALLA WALLA, WHITMAN Rates Fringes Hod Carrier $ 23.78 10.30 LAB00335-001 06/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WEST TO THE PACIFIC OCEAN), SKAMANIA AND WAHKIAKUM COUNTIES Rates Fringes Laborers: ZONE 1: GROUP 1 $ 28.24 9.70 GROUP 2 $ 28.84 9.70 GROUP 3 $ 29.28 9.70 GROUP 4 $ 29.66 9.70 GROUP 5 $ 25.74 9.70 GROUP 6 $ 23.32 9.70 GROUP 7 $ 20.12 9.70 WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page 132 Zone Differential (Add to Zone 1 rates): Zone 2 $ 0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 BASE POINTS: GOLDENDALE, LONGVIEW, AND VANCOUVER ZONE 1: Projects within 30 miles of the respective city all. ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall. LABORERS CLASSIFICATIONS GROUP 1: Asphalt Plant Laborers; Asphalt Spreaders; Batch Weighman; Broomers; Brush Burners and Cutters; Car and Truck Loaders; Carpenter Tender; Change -House Man or Dry Shack Man; Choker Setter; Clean-up Laborers; Curing, Concrete; Demolition, Wrecking and Moving Laborers; Dumpers, road oiling crew; Dumpmen (for grading crew); Elevator Feeders; Median Rail Reference Post, Guide Post, Right of Way Marker; Fine Graders; Fire Watch; Form Strippers (not swinging stages); General Laborers; Hazardous Waste Worker; Leverman or Aggregate Spreader (Flaherty and similar types); Loading Spotters; Material Yard Man (including electrical); Pittsburgh Chipper Operator or Similar Types; Railroad Track Laborers; Ribbon Setters (including steel forms); Rip Rap Man (hand placed); Road Pump Tender; Sewer Labor; Signalman; Skipman; Slopers; Spraymen; Stake Chaser; Stockpiler; Tie Back Shoring; Timber Faller and Bucker (hand labor); Toolroom Man (at job site); Tunnel Bullgang (above ground); Weight -Man- Crusher (aggregate when used) GROUP 2: Applicator (including pot power tender for same) applying protective material by hand or nozzle on utility lines or storage tanks on project; Brush Cutters (power saw); Burners; Choker Splicer; Clary Power Spreader and similar types; Clean- up Nozzleman-Green Cutter (concrete, rock, etc.); Concrete Power Buggyman; Concrete Laborer; Crusher Feeder; Demolition and Wrecking Charred Materials; Gunite Nozzleman Tender; Gunite or Sand Blasting Pot Tender; Handlers or Mixers of all Materials of an irritating nature (including cement and lime); Tool Operators (includes but not limited to: Dry Pack Machine; Jackhammer; Chipping Guns; Paving Breakers); Pipe Doping and Wrapping; Post Hole Digger, air, gas or electric; Vibrating Screed; Tampers; Sand Blasting (Wet); Stake -Setter; Tunnel-Muckers, Brakemen, Concrete Crew, Bullgang (underground) WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 3: Asbestos Removal; Bit Grinder; Drill Doctor; Drill Operators, air tracks, cat drills, wagon drills, rubber -mounted drills, and other similar types including at crusher plants; Gunite Nozzleman; High Scalers, Strippers and Drillers (covers work in swinging stages, chairs or belts, under extreme conditions unusual to normal drilling, blasting, barring -down, or sloping and stripping); Manhole Builder; Powdermen; Concrete Saw Operator; Pwdermen; Power Saw Operators (Bucking and Falling); Pumperete Nozzlemen; Sand Blasting (Dry); Sewer Timberman; Track Liners, Anchor Machines, Ballast Regulators, Multiple Tampers, Power Jacks, Tugger Operator; Tunnel -Chuck Tenders, Nippers and Timbermen; Vibrator; Water Blaster GROUP 4: Asphalt Raker; Concrete Saw Operator (walls); Concrete Nozzelman; Grade Checker; Pipelayer; Laser Beam (pipelaying) -applicable when employee assigned to move, set up, align; Laser Beam; Tunnel Miners; Motorman -Dinky Locomotive -Tunnel; Powderman-Tunnel; Shield Operator -Tunnel GROUP 5: Traffic Flaggers GROUP 6: Fence Builders GROUP 7: Landscaping or Planting Laborers LAB00335-019 06/01/2012 Rates Fringes Hod Carrier $ 30.30 9.70 PAIN0005-002 01/01/2012 STATEWIDE EXCEPT CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH), SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Painters: STRIPERS $ 27.96 12.77 PAIN0005-004 03/01/2009 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WHATCOM COUNTIES Rates Fringes PAINTER $ 20.82 7.44 WA120001 Modification 18 Federal Wage Determinations for Highway Construction 33 Page 34 PAIN0005-006 07/01/2012 ADAMS, ASOTIN; BENTON AND FRANKLIN (EXCEPT HANFORD SITE); CHELAN, COLUMBIA, DOUGLAS, FERRY, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA COUNTIES Rates Fringes Painters: Application of Cold Tar Products, Epoxies, Polyure thanes, Acids, Radiation Resistant Material, Water and Sandblasting $ 25.99 9.99 Over 30'/Swing Stage Work$ 22.20 7.98 Brush, Roller, Striping, Steam -cleaning and Spray$ 20.99 ' 9.99 Lead Abatement, Asbestos Abatement $ 21.50 7.98 *$.70 shall be paid over and above the basic wage rates listed for work on swing stages and high work of over 30 feet. PAIN0055-002 07/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Painters: Brush & Roller $ 20.61 8.42 High work - All work 60 ft. or higher $ 21.36 8.42 Spray and Sandblasting $ 21.21 8.42 PAIN0055-007 07/01/2011 CLARK, COWLITZ, KLICKITAT, SKAMANIA and WAHKIAKUM COUNTIES Rates Fringes Painters: HIGHWAY & PARKING LOT STRIPER $ 33.19 9.05 WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page PLAS0072-004 06/01/2012 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT, KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN, AND YAKIMA COUNTIES Rates Fringes CEMENT MASON/CONCRETE FINISHER ZONE 1 $ 25.43 11.97 Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00 BASE POINTS: Spokane, Pasco, Lewiston; Wenatchee Zone 1: 0 - 45 radius miles from the main post office Zone 2: Over 45 radius miles from the main post office PLAS0528-001 06/01/2012 CLALLAM, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC, PIERCE, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON, WAHKIAKUM AND WHATCOM COUNTIES Rates Fringes Cement Masons: CEMENT MASON $ 35.88 14.25 COMPOSITION, TROWEL MACHINE, GRINDER, POWER TOOLS, GUNNITE NOZZLE $ 36.38 14.25 TROWLING MACHINE OPERATOR ON COMPOSITION $ 36.38 14.25 PLAS0555-002 06/01/2012 CLARK, KLICKITAT AND SKAMANIA COUNTIES ZONE 1: Rates Fringes Cement Masons: CEMENT MASONS DOING BOTH COMPOSITION/POWER MACHINERY AND SUSPENDED/HANGING SCAFFOLD$ 30.58 17.76 CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD $ 30.58 17.76 CEMENT MASONS $ 29.98 17.76 COMPOSITION WORKERS AND POWER MACHINERY OPERATORS$ 31.18 17.76 WA120001 Modification 18 Federal Wage Determinations for Highway Construction 35 Page I 36 Zone Differential (Add To Zone 1 Rates): Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 3.00 BASE POINTS: BEND, CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER ZONE 1: Projects within 30 miles of the respective city hall ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall TEAM0037-002 06/01/2012 CLARK, COWLITZ, KLICKITAT, PACIFIC (South of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), SKAMANIA, AND WAHKIAKUM COUNTIES Rates Fringes Truck drivers: ZONE 1 GROUP 1 $ 26.90 13.25 GROUP 2 $ 27.02 13.25 GROUP 3 $ 27.15 13.25 GROUP 4 $ 27.41 13.25 GROUP 5 $ 27.63 13.25 GROUP 6 $ 27.79 13.25 GROUP 7 $ 27.99 13.25 Zone Differential (Add to Zone 1 Rates): Zone 2 - $0.65 Zone 3 - 1.15 Zone 4 - 1.70 Zone 5 - 2.75 BASE POINTS: ASTORIA, THE DALLES, LONGVIEW AND VANCOUVER ZONE 1: Projects within 30 miles of the respective city hall. ZONE 2: More than 30 miles but less than 40 miles from the respective city hall. ZONE 3: More than 40 miles but less than 50 miles from the respective city hall. ZONE 4: More than 50 miles but less than 80 miles from the respective city hall. ZONE 5: More than 80 miles from the respective city hall. WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page TRUCK DRIVERS CLASSIFICATIONS GROUP 1: A Frame or Hydra lifrt truck w/load bearing surface; Articulated Dump Truck; Battery Rebuilders; Bus or Manhaul Driver; Concrete Buggies (power operated); Concrete Pump Truck; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations there of: up to and including 10 cu. yds.; Lift Jitneys, Fork Lifts (all sizes in loading, unloading and transporting material on job site); Loader and/or Leverman on Concrete Dry Batch Plant (manually operated); Pilot Car; Pickup Truck; Solo Flat Bed and misc. Body Trucks, 0-10 tons; Truck Tender; Truck Mechanic Tender; Water Wagons (rated capacity) up to 3,000 gallons; Transit Mix and Wet or Dry Mix - 5 cu. yds. and under; Lubrication Man, Fuel Truck Driver, Tireman, Wash Rack, Steam Cleaner or combinations; Team Driver; Slurry Truck Driver or Leverman; Tireman GROUP 2: Boom Truck/Hydra-lift or Retracting Crane; Challenger; Dumpsters or similar equipment all sizes; Dump Trucks/Articulated Dumps 6 cu to 10 cu.; Flaherty Spreader Driver or Leverman; Lowbed Equipment, Flat Bed Semi -trailer or doubles transporting equipment or wet or dry materials; Lumber Carrier, Driver -Straddle Carrier (used in loading, unloading and transporting of materials on job site); Oil Distributor Driver or Leverman; Transit mix and wet or dry mix trcuks: over 5 cu. yds. and including 7 cu. yds.; Vacuum Trucks; Water truck/Wagons (rated capacity) over 3,000 to 5,000 gallons GROUP 3: Ammonia Nitrate Distributor Driver; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 10 cu yds. and including 30 cu. yds. includes Articulated Dump Trucks; Self -Propelled Street Sweeper; Transit mix and wet or dry mix truck: over 7 cu yds. and including 11 cu yds.; Truck Mechanic -Welder -Body Repairman; Utility and Clean-up Truck; Water Wagons (rated capacity) over 5,000 to 10,000 gallons GROUP 4: Asphalt Burner; Dump Trucks, side, end and bottom cumps, including Semi -Trucks and Trains or combinations thereof: over 30 cu. yds. and including 50 cu. yds. includes Articulated Dump Trucks; Fire Guard; Transit Mix and Wet or Dry Mix Trucks, over 11 cu. yds. and including 15 cu. yds.; Water Wagon (rated capacity) over 10,000 gallons to 15,000 gallons GROUP 5: Composite Crewman; Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 50 cu. yds. and including 60 cu. yds. includes Articulated Dump Trucks GROUP 6: Bulk Cement Spreader w/o Auger; Dry Pre -Batch concrete Mix Trucks; Dump trucks, side, end and bottom dumps, including Semi Trucks and Trains of combinations thereof: over 60 cu. yds. and including 80 cu. yds., and includes Articulated Dump Trucks; Skid Truck WA120001 Modification 18 Federal Wage Determinations for Highway Construction 37 Page X38 GROUP 7: Dump Trucks, side, end and bottom dumps, including Semi Trucks and Trains or combinations thereof: over 80 cu. yds. and including 100 cu. yds., includes Articulated Dump Trucks; Industrial Lift Truck (mechanical tailgate) TEAM0174-001 06/29/2012 CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, KING, KITSAP, LEWIS, MASON, PACIFIC (North of a straight line made by extending the north boundary line of Wahkiakum County west to the Pacific Ocean), PIERCE, SAN JUAN, WHATCOM COUNTIES SKAGIT, SNOHOMISH, THURSTON AND Rates Fringes Truck drivers: ZONE A: GROUP 1• $ 31.68 16.23 GROUP 2• $ 30.84 16.23 GROUP 3• $ 28.03 16.23 GROUP 4• $ 23.06 16.23 GROUP 5• $ 31.23 16.23 ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates. ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates. *Zone pay will be calculated from the city center of the following listed cities: BELLINGHAM CENTRALIA RAYMOND OLYMPIA EVERETT SHELTON ANACORTES BELLEVUE SEATTLE PORT ANGELES MT. VERNON KENT TACOMA PORT TOWNSEND ABERDEEN BREMERTON TRUCK DRIVERS CLASSIFICATIONS GROUP 1 - "A -frame or Hydralift" trucks and Boom trucks or similar equipment when "A" frame or "Hydralift" and Boom truck or similar equipment is used; Buggymobile; Bulk Cement Tanker; Dumpsters and similar equipment, Tournorockers, Tournowagon, Tournotrailer, Cat DW series, Terra Cobra, Le Tourneau, Westinghouse, Athye Wagon, Euclid Two and Four -Wheeled power tractor with trailer and similar top -loaded equipment transporting material: Dump Trucks, side, end and bottom dump, including semi -trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment; Explosive Truck (field mix) and similar equipment; Hyster Operators (handling bulk loose aggregates); Lowbed and Heavy Duty Trailer; Road Oil Distributor Driver; Spreader, Flaherty Transit mix used exclusively in heavy construction; Water Wagon and Tank Truck -3,000 gallons and over capacity WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 2 - Bulllifts, or similar equipment used in loading or unloading trucks, transporting materials on job site; Dumpsters, and similar equipment, Tournorockers, Tournowagon, Turnotrailer, Cat. D.W. Series, Terra Cobra, Le Tourneau, Westinghouse, Athye wagon, Euclid two and four -wheeled power tractor with trailer and similar top -loaded equipment transporting material: Dump trucks, side, end and bottom dump, including semi -trucks and trains or combinations thereof with less than 16 yards capacity; Flatbed (Dual Rear Axle); Grease Truck, Fuel Truck, Greaser, Battery Service Man and/or Tire Service Man; Leverman and loader at bunkers and batch plants; Oil tank transport; Scissor truck; Slurry Truck; Sno-Go and similar equipment; Swampers; Straddler Carrier (Ross, Hyster) and similar equipment; Team Driver; Tractor (small, rubber-tired)(when used within Teamster jurisdiction); Vacuum truck; Water Wagon and Tank trucks -less than 3,000 gallons capacity; Winch Truck; Wrecker, Tow truck and similar equipment GROUP 3 - Flatbed (single rear axle); Pickup Sweeper; Pickup Truck. (Adjust Group 3 upward by $2.00 per hour for onsite work only) GROUP 4 - Escort or Pilot Car GROUP 5 - Mechanic HAZMAT PROJECTS Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows: LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing. LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit." LEVEL A: +$.75 per hour - This level utilizes a fully - encapsulated suit with a self-contained breathing apparatus or a supplied air line. WA120001 Modification 18 Federal Wage Determinations for Highway Construction 39 Page 140 TEAM0760-002 06/01/2009 ADAMS, ASOTIN, BENTON, CHELAN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, GRANT KITTITAS, LINCOLN, OKANOGAN, PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN AND YAKIMA COUNTIES Rates Fringes Truck drivers: (ANYONE WORKING ON HAZMAT JOBS SEE FOOTNOTE A BELOW) ZONE 1: GROUP 1 $ 20.02 10.86 GROUP 2 $ 22.29 10.86 GROUP 3 $ 22.79 10.86 GROUP 4 $ 23.12 10.86 GROUP 5 $ 23.23 10.86 GROUP 6 $ 23.40 10.86 GROUP 7 $ 23.93 10.86 GROUP 8 $ 24.26 10.86 Zone Differential (Add to Zone 1 rate: Zone 2 - $2.00) BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston Zone 1: 0-45 radius miles from the main post office. Zone 2: Outside 45 radius miles from the main post office TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Escort Driver or Pilot Car; Employee Haul; Power Boat Hauling Employees or Material GROUP 2: Fish Truck; Flat Bed Truck; Fork Lift (3000 lbs. and under); Leverperson (loading trucks at bunkers); Trailer Mounted Hydro Seeder and Mulcher; Seeder & Mulcher; Stationary Fuel Operator; Tractor (small, rubber -tired, pulling trailer or similar equipment) GROUP 3: Auto Crane (2000 lbs. capacity); Buggy Mobile & Similar; Bulk Cement Tanks & Spreader; Dumptor (6 yds. & under); Flat Bed Truck with Hydraullic System; Fork Lift (3001-16,000 lbs.); Fuel Truck Driver, Steamcleaner & Washer; Power Operated Sweeper; Rubber -tired Tunnel Jumbo; Scissors Truck; Slurry Truck Driver; Straddle Carrier (Ross, Hyster, & similar); Tireperson; Transit Mixers & Truck Hauling Concrete (3 yd. to & including 6 yds.); Trucks, side, end, bottom & articulated end dump (3 yards to and including 6 yds.); Warehouseperson (to include shipping & receiving); Wrecker & Tow Truck GROUP 4: A -Frame; Burner, Cutter, & Welder; Service Greaser; Trucks, side, end, bottom & articulated end dump (over 6 yards to and including 12 yds.); Truck Mounted Hydro Seeder; Warehouseperson; Water Tank truck (0-8,000 gallons) WA120001 Modification 18 Federal Wage Determinations for Highway Construction Page GROUP 5: Dumptor (over 6 yds.); Lowboy (50 tons & under); Self- loading Roll Off; Semi -Truck & Trailer; Tractor with Steer Trailer; Transit Mixers and Trucks Hauling Concrete (over 6 yds. to and including 10 yds.); Trucks, side, end, bottom and end dump (over 12 yds. to & including 20 yds.); Truck -Mounted Crane (with load bearing surface either mounted or pulled, up to 14 ton); Vacuum Truck (super sucker, guzzler, etc.) GROUP 6: Flaherty Spreader Box Driver; Flowboys; Fork Lift (over 16,000 lbs.); Dumps (Semi -end); Mechanic (Field); Semi- end Dumps; Transfer Truck & Trailer; Transit Mixers & Trucks Hauling Concrete (over 10 yds. to & including 20 yds.); Trucks, side, end, bottom and articulated end dump (over 20 yds. to & including 40 yds.); Truck and Pup; Tournarocker, DWs & similar with 2 or more 4 wheel -power tractor with trailer, gallonage or yardage scale, whichever is greater Water Tank Truck (8,001- 14,000 gallons); Lowboy(over 50 tons) GROUP 7: Oil Distributor Driver; Stringer Truck (cable oeprated trailer); Transit Mixers & Trucks Hauling Concrete (over 20 yds.); Truck, side, end, bottom end dump (over 40 yds. to & including 100 yds.); Truck Mounted Crane (with load bearing surface either mounted or pulled (16 through 25 tons); GROUP 8: Prime Movers and Stinger Truck; Trucks, side, end, bottom and articulated end dump (over 100 yds.); Helicopter Pilot Hauling Employees or Materials Footnote A - Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in additon to the classification working in as follows: LEVEL C -D: - $.50 PER HOUR (This is the lowest level of protection. This level may use an air purifying respirator or additional protective clothing. LEVEL A -B: - $1.00 PER HOUR (Uses supplied air is conjunction with a chemical spash suit or fully encapsulated suit with a self-contained breathing apparatus. Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours. WA120001 Modification 18 Federal Wage Determinations for Highway Construction 41 Page 42 NOTE: Trucks Pulling Equipment Trailers: shall receive $.15/hour over applicable truck rate WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union. Union Identifiers An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four -digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example. Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate. 0000/9999: weighted union wage rates will be published annually each January. WA120001 Modification 18 Federal Wage Determinations for Highway Construction Pa Non -Union Identifiers Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date. Survey wage rates will remain in effect and will not change until a new survey is conducted. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 WA120001 Modification 18 Federal Wage Determinations for Highway Construction CYe 43 Page 144 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION WA120001 Modification 18 Federal Wage Determinations for Highway Construction State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 10/17/2012 County Trade Job Classification Wage Holiday Overtime Note Yakima Asbestos Abatement Workers Journey Level $17.83 1 Yakima Boilermakers Journey Level $60.24 5N 1C Yakima Brick Mason Journey Level $41.03 5A 1M Yakima Building Service Employees Janitor $9.04 1 Yakima Building Service Employees Shampooer $11.14 1 Yakima Building Service Employees Waxer $9.04 1 Yakima Building Service Employees Window Cleaner $9.14 1 Yakima Cabinet Makers (In Shop) Journey Level $16.35 1 Yakima Carpenters Journey Level $29.72 1 Yakima Cement Masons Journey Level $37.40 7B 1N Yakima Divers & Tenders Diver $100.28 5D 1M 8A Yakima Divers Et Tenders Diver On Standby $56.68 5D 1M Yakima Divers & Tenders Diver Tender $52.23 5D 1M Yakima Divers & Tenders Surface Rcv & Rov Operator $52.23 5D 1M Yakima Divers & Tenders Surface Rcv & Rov Operator Tender $48.67 5A 1B Yakima Dredge Workers Assistant Engineer $49.57 5D 1T 8L Yakima Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L Yakima Dredge Workers Engineer Welder $49.62 5D 1T 8L Yakima Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L Yakima Dredge Workers Maintenance $49.06 5D 1.1- 8L Yakima Dredge Workers Mates And Boatmen $49.57 5D 1T 8L Yakima Dredge Workers Oiler $49.19 5D 1T 8L Yakima Drywall Applicator Journey Level $38.43 5D 1M Yakima Drywall Tapers Journey Level $32.51 7E 1P Yakima Electrical Fixture Maintenance Journey Level $43.32 1 Workers Yakima Electricians - Inside Cable Splicer $54.82 5A 1 E 1,14,,c•//fnt•t,-000 .iro (m r/1nihzunrtAlnnlr.l.,/r.•-ar%X1-., ��L.... o. 111/1 '7/')!11') 1 1 1 Yakima Electricians - Inside Journey Level $52.94 5A 1 E Yakima Electricians - Inside Welder $56.71 5A 1E Yakima Electricians - Motor Shop Craftsman $15.37 1 'Yakima Electricians - Motor Shop Journey Level $14.69 1 Yakima Electricians - Powerline Cable Splicer $64.95 5A 4A Construction 'Yakima Electricians - Powerline Certified Line Welder $59.37 5A 4A Construction Yakima Electricians - Powerline Groundperson $42.16 5A 4A Construction Yakima Electricians - Powerline Head Groundperson $44.50 5A 4A Construction ;Yakima Electricians - Powerline Heavy Line Equipment Operator $59.37 5A 4A Construction Yakima Electricians - Powerline Jackhammer Operator $44.50 5A 4A Construction Yakima Electricians - Powerline Journey Level Lineperson $59.37 5A 4A Construction Yakima Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction ;Yakima Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction Yakima Electricians - Powerline Powderperson $44.50 5A 4A Construction Yakima Electronic Technicians Journey Level $23.40 1 Yakima Elevator Constructors Mechanic $75.24 7D 4A ;Yakima Elevator Constructors Mechanic In Charge $82.00 7D 4A ;Yakima Fabricated Precast Concrete Craftsman - In -Factory Work Only $9.04 1 Products ;Yakima Fabricated Precast Concrete Journey Level - In -Factory Work Only $9.04 1 Products Yakima Fence Erectors Fence Erector $13.79 1 ;Yakima Flaggers Journey Level $24.62 1 Yakima Glaziers Journey Level $22.43 61 1B Yakima Heat a Frost Insulators And Journey Level $25.32 1 Asbestos Workers Yakima Heating Equipment Mechanics Journey Level $34.85 1 Yakima Hod Carriers & Mason Tenders Journey Level $33.71 7A 2Y ;Yakima Industrial Engine And Machine Journey Level $15.65 1 Mechanics .Yakima Industrial Power Vacuum Journey Level $9.24 1 Cleaner ;Yakima Inland Boatmen Journey Level $9.04 1 :Yakima Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer Operator $9.73 1 Sewer a Water Systems By Remote Control ;Yakima Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Intt..c•//fnrtrocc. I:» r'n� /lr��t yal��lrllnIn- «T...ol lrnn nm. -.-v 1 n/1'7/')n1'1 1 Ct/i nig 1 Remote Control Yakima Inspection/Cleaning/Sealing Of Head Operator $12.78 1 Sewer Et Water Systems By Remote Control Yakima Inspection/Cleaning/Sealing Of Technician $9.04 1 Sewer Et Water Systems By Remote Control Yakima Inspection/Cleaning/Sealing Of Tv Truck Operator $10.53 1 Sewer a Water Systems By Remote Control Yakima Insulation Applicators Journey Level $38.43 5D 1M Yakima Ironworkers Journeyman $52.44 7N 10 Yakima Laborers Air, Gas Or Electric Vibrating Screed $32.75 7A 2Y Yakima Laborers Airtrac Drill Operator $33.71 7A 2Y Yakima Laborers Ballast Regular Machine $32.75 7A 2Y Yakima Laborers Batch Weighman $30.75 7A 2Y Yakima Laborers Brick Pavers $32.75 7A 2Y Yakima Laborers Brush Cutter $32.75 7A 2Y Yakima Laborers Brush Hog Feeder $32.75 7A 2Y Yakima Laborers Burner $32.75 7A 2Y Yakima Laborers Caisson Worker $33.71 7A 2Y Yakima Laborers Carpenter Tender $32.75 7A 2Y Yakima Laborers Cement Dumper -paving $33.31 7A 2Y Yakima Laborers Cement Finisher Tender $32.75 7A 2Y Yakima Laborers Change House Or Dry Shack $32.75 7A 2Y Yakima Laborers Chipping Gun (under 30 Lbs.) $32.75 7A 2Y Yakima Laborers Chipping Gun(30 Lbs. And Over) $33.31 7A 2Y Yakima Laborers Choker Setter $32.75 7A 2Y Yakima Laborers Chuck Tender $32.75 7A 2Y Yakima Laborers Clary Power Spreader $33.31 7A 2Y Yakima Laborers Clean-up Laborer $32.75 7A 2Y Yakima Laborers Concrete Dumper/chute Operator $33.31 7A 2Y Yakima Laborers Concrete Form Stripper $32.75 7A 2Y Yakima Laborers Concrete Placement Crew $33.31 7A 2Y Yakima Laborers Concrete Saw Operator/core Driller $33.31 7A 2Y Yakima Laborers Crusher Feeder $30.75 7A 2Y Yakima Laborers Curing Laborer $32.75 7A 2Y Yakima Laborers Demolition: Wrecking Et Moving (incl. Charred Material) $32.75 7A 2Y Yakima Laborers Ditch Digger $32.75 7A 2Y Yakima Laborers Diver $33.71 7A 2Y Yakima Laborers Drill Operator (hydraulic,diamond) $33.31 7A 2Y 1 Ct/i nig 1 1 1 1 t 1 1 1 1 1 1 i i Yakima Laborers Dry Stack Walls $32.75 7A 2Y Yakima Laborers Dump Person $32.75 7A 2Y Yakima Laborers Epoxy Technician $32.75 7A 2Y Yakima Laborers Erosion Control Worker $32.75 7A 2Y Yakima Laborers Faller a Bucker Chain Saw $33.31 7A 2Y Yakima Laborers Fine Graders $32.75 7A 2Y Yakima Laborers Firewatch $30.75 7A 2Y ;Yakima Laborers Form Setter $32.75 7A 2Y Yakima Laborers Gabian Basket Builders $32.75 7A 2Y Yakima Laborers General Laborer $32.75 7A 2Y Yakima Laborers Grade Checker a Transit Person $33.71 7A 2Y Yakima Laborers Grinders $32.75 7A 2Y 'Yakima Laborers Grout Machine Tender $32.75 7A 2Y Yakima Laborers Groutmen (pressure)including Post Tension Beams $33.31 7A 2Y ;Yakima Laborers Guage and Lock Tender $33.81 7A 2Y ;Yakima Laborers Guardrail Erector $32.75 7A 2Y Yakima Laborers Hazardous Waste Worker (level A) $33.71 7A 2Y Yakima Laborers Hazardous Waste Worker (level B) $33.31 7A 2Y ,Yakima Laborers Hazardous Waste Worker (level C) $32.75 7A 2Y Yakima Laborers High Scaler $33.71 7A 2Y Yakima Laborers Jackhammer $33.31 7A 2Y Yakima Laborers Laserbeam Operator $33.31 7A 2Y Yakima Laborers Maintenance Person $32.75 7A 2Y Yakima Laborers Manhole Builder-mudman $33.31 7A 2Y Yakima Laborers Material Yard Person $32.75 7A 2Y ;Yakima Laborers Motorman -dinky Locomotive $33.31 7A 2Y :Yakima Laborers Nozzleman (concrete Pump, Green Cutter When Using Combination Of High Pressure Air a Water On Concrete a Rock, Sandblast, Gunite, Shotcrete, Water Bla $33.31 7A 2Y 'Yakima Laborers Pavement Breaker $33.31 7A 2Y Yakima Laborers Pilot Car $30.75 7A 2Y .Yakima Laborers Pipe Layer(lead) $33.71 7A 2Y ,Yakima Laborers Pipe Layer/tailor $33.31 7A 2Y Yakima Laborers Pipe Pot Tender $33.31 7A 2Y Yakima Laborers Pipe Reliner $33.31 7A 2Y ;Yakima Laborers Pipe Wrapper $33.31 7A 2Y Yakima Laborers Pot Tender $32.75 7A 2Y Yakima Laborers Powderman $33.71 7A 2Y httno•//frvrtr.e n,0 rtnvr/1in1/.n0na1nnlr,it,Inr rn70Rolnnlrnr� norw 1n/1'7/')nl') Yakima Laborers Powderman's Helper $32.75 7A 2Y Yakima Laborers Power Jacks $33.31 7A 2Y Yakima Laborers Railroad Spike Puller - Power $33.31 7A 2Y Yakima Laborers Raker - Asphalt $33.71 7A 2Y Yakima Laborers Re-timberman $33.71 7A 2Y Yakima Laborers Remote Equipment Operator $33.31 7A 2Y Yakima Laborers Rigger/signal Person $33.31 7A 2Y Yakima Laborers Rip Rap Person $32.75 7A 2Y Yakima Laborers Rivet Buster $33.31 7A 2Y Yakima Laborers Rodder $33.31 7A 2Y Yakima Laborers Scaffold Erector $32.75 7A 2Y Yakima Laborers Scale Person $32.75 7A 2Y Yakima Laborers Sloper (over 20") $33.31 7A 2Y Yakima Laborers Sloper Sprayer $32.75 7A 2Y Yakima Laborers Spreader (concrete) $33.31 7A 2Y Yakima Laborers Stake Hopper $32.75 7A 2Y Yakima Laborers Stock Piler $32.75 7A 2Y Yakima Laborers Tamper Et Similar Electric, Air Et Gas Operated Tools $33.31 7A 2Y Yakima Laborers Tamper (multiple Et Self- propelled) $33.31 7A 2Y Yakima Laborers Timber Person - Sewer (tagger, Shorer Et Cribber) $33.31 7A 2Y Yakima Laborers Toolroom Person (at Jobsite) $32.75 7A 2Y Yakima Laborers Topper $32.75 7A 2Y Yakima Laborers Track Laborer $32.75 7A 2Y Yakima Laborers Track Liner (power) $33.31 7A 2Y Yakima Laborers Traffic Control Laborer $32.61 7A 1H 8R Yakima Laborers Traffic Control Supervisor $32.61 7A 1H 8R Yakima Laborers Truck Spotter $32.75 7A 2Y Yakima Laborers Tugger Operator $33.31 7A 2Y Yakima Laborers Tunnel Work-Miner $33.81 7A 2Y 84, Yakima Laborers Vibrator $33.31 7A 2Y Yakima Laborers Vinyl Seamer $32.75 7A 2Y Yakima Laborers Watchman $28.07 7A 2Y Yakima Laborers Welder $33.31 7A 2Y Yakima Laborers Well Point Laborer $33.31 7A 2Y Yakima Laborers Window Washer/cleaner $28.07 7A 2Y Yakima Laborers - Underground Sewer General Laborer Et Topman $32.75 7A 2Y Et Water Yakima Laborers - Underground Sewer Pipe Layer $33.31 7A 2Y Et Water Yakima Landscape Construction Irrigation Or Lawn Sprinkler Installers $9.04 1 Yakima Landscape Construction Landscape Equipment Operators Or Truck Drivers $15.45 1 httno•//fnrtrocc Nunn rtnA,/1ni/«m.mAlnnlrii+ar-vr, XXTacrolnnL»r non,. 1 n/1'7/onl I 1 1 1 r 1 1 1 1 1 1 Yakima Landscape Construction Landscaping Or Planting Laborers $9.04 1. Yakima Lathers Journey Level $38.43 5D 1M Yakima Marble Setters Journey Level $41.03 5A 1M Yakima Metal Fabrication (In Shop) Fitter $12.00 1 Yakima Metal Fabrication (In Shop) Laborer $10.31 1 Yakima Metal Fabrication (In Shop) Machine Operator $11.32 1 ;Yakima Metal Fabrication (In Shop) Painter $12.00 1 Yakima Metal Fabrication (In Shop) Welder $11.32 1 Yakima Millwright Journey Levet $26.05 1 ;Yakima Modular Buildings Journey Level $14.11 1 Yakima Painters Journey Level $28.12 6Z 1W ;Yakima Pile Driver Journey Level $48.82 5D 1M Yakima Plasterers Journey Level $48.23 7C, 1R Yakima Playground Et Park Equipment Journey Level $9.04 1 Installers Yakima Plumbers Et Pipefitters Journey Level $72.04 6Z 1_4 'Yakima Power Equipment Operators Asphalt Plant Operators $51.89 7A 3C 8P Yakima Power Equipment Operators Assistant Engineer $48.62 7A 3C 8P ,Yakima Power Equipment Operators Barrier Machine (zipper) $51.40 7A 3C 8P Yakima Power Equipment Operators Batch Plant Operator, Concrete $51.40 7A 3C 8P Yakima Power Equipment Operators Bobcat $48.62 7A 3C 8P Yakima Power Equipment Operators Brokk - Remote Demolition Equipment $48.62 7A 3C 8P :Yakima Power Equipment Operators Brooms $48.62 7A 3C 8P ,Yakima Power Equipment Operators Bump Cutter $51.40 7A 3C 8P ,Yakima Power Equipment Operators Cableways $51.89 7A 3C 8P Yakima Power Equipment Operators Chipper $51.40 7A 3C 8P Yakima Power Equipment Operators Compressor $48.62 7A 3C 8P Yakima Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Over 42 M $51.89 7A 3C 8P :Yakima Power Equipment Operators Concrete Finish Machine -laser Screed $48.62 7A 3C 8P Yakima Power Equipment Operators Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $50.98 7A 3C 8P Yakima Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment. Up To 42m $51.40 7A 3C 8P Yakima Power Equipment Operators Conveyors $50.98 7A 3C 8P 'Yakima Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments $51.40 7A 3C 8P Yakima Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $51.40 7A 3C 8P inftno•//fnrtrcc.c' «,o nn<r/lr.i/<:7onalnnLl<nInnrtxlnrtclnnIriin cionv 1 (1/i '7/')(11') Yakima Power Equipment Operators Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (including Jib With $52.44 7A 3C 8P Yakima Power Equipment Operators Cranes: 100 Tons Through 199 Tons, or 150' of boom (including jib with attachments); Overhead, bridge type, 100 tons and over; Tower crane up to 175' in height, base to boom. $52.44 7A 3C 8P Yakima Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $53.01 7A 3C 8P Yakima Power Equipment Operators Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $51.89 7.4 3C 8P Yakima Power Equipment Operators Cranes: A -frame - 10 Tons And Under $48.62 7A 3C 8P Yakima Power Equipment Operators Cranes: Friction 100 Tons Through 199 Tons $53.01 7A 3C 8P Yakima Power Equipment Operators Cranes: Friction Over 200 Tons $53.57 7A 3C 8P Yakima Power Equipment Operators Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $53.57 7A 3C 8P Yakima Power Equipment Operators Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $50.98 7A 3C 8P Yakima Power Equipment Operators Crusher $51.40 7A 3C 8P Yakima Power Equipment Operators Deck Engineer/deck Winches (power) $51.40 7A 3C 8P Yakima Power Equipment Operators Derricks, On Building Work $51.89 7A 3C 8P Yakima Power Equipment Operators Dozer Quad 9, HD 41, D10 and Over $51.89 7A 3C 8P Yakima Power Equipment Operators Dozers D-9 Et Under $50.98 7A 3C 8P Yakima Power Equipment Operators Drill Oilers: Auger Type, Truck Or Crane Mount $50.98 7A 3C 8P Yakima Power Equipment Operators Drilling Machine $51.40 7A 3C 8P Yakima Power Equipment Operators Elevator And Man -lift: Permanent And Shaft Type $48.62 7A 3C 8P Yakima Power Equipment Operators Finishing Machine, Bidwell And Gamaco Et Similar Equipment $51.40 7A 3C 8P Yakima Power Equipment Operators Forklift: 3000 Lbs And Over With Attachments $50.98 7A 3C 8P Yakima Power Equipment Operators Forklifts: Under 3000 Lbs. With Attachments $48.62 7A 3C 8P Yakima Power Equipment Operators Grade Engineer: Using Blue Prints, Cut Sheets, Etc $51.40 7A 3C 8P Yakima Power Equipment Operators Gradechecker/stakeman $48.62 7A 3C 8P Yakima Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P inttr,c•//fnrtr.oc ,Tror<n.i/ln;/..ionolnnlr„r,/nr-rrVVoRolnnL,lr, oors, 1 n/l'7/')n1') 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Yakima Power Equipment Operators Guardrail Punch/Auger $51.40 7A 3C 8P Yakima Power Equipment Operators Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. a Over $51.89 7A 3C 8P Yakima Power Equipment Operators Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards $51.40 7A 3C 8P Yakima Power Equipment Operators Horizontal/directional Drill Locator $50.98 7A 3C 8P Yakima Power Equipment Operators Horizontal/directional Drill Operator $51.40 7A 3C 8P Yakima Power Equipment Operators Hydralifts/boom Trucks Over 10 Tons $50.98 7A 3C 8P Yakima Power Equipment Operators Hydralifts/boom Trucks, 10 Tons And Under $48.62 7A 3C 8P Yakima Power Equipment Operators Loader, Overhead 8 Yards. Ft Over $52.44 7A • 3C 8P Yakima Power Equipment Operators Loader, Overhead, 6 Yards. But Not Including 8 Yards $51.89 7A 3C 8P Yakima Power Equipment Operators Loaders, Overhead Under 6 Yards $51.40 7A 3C 8P ;Yakima Power Equipment Operators Loaders, Plant Feed $51.40 7A 3C 8P Yakima Power Equipment Operators Loaders: Elevating Type Belt $50.98 7A 3C 8P Yakima Power Equipment Operators Locomotives, All $51.40 7A 3C 8P Yakima Power Equipment Operators Material Transfer Device $51.40 7A 3C 8P .Yakima Power Equipment Operators Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $52.44 7A 3C 8P Yakima Power Equipment Operators Mixers: Asphalt Plant $51.40 7A 3C 8P Yakima Power Equipment Operators Motor Patrol Grader - Non- finishing $50.98 7A 3C 8P ,Yakima Power Equipment Operators Motor Patrol Graders, Finishing $51.89 7A 3C 8P :Yakima Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield $51.89 7A 3C 8P ;Yakima Power Equipment Operators Oil Distributors, Blower Distribution it Mulch Seeding Operator $48.62 7A 3C 8P Yakima Power Equipment Operators Outside Hoists (elevators And Manlifts), Air Tuggers,strato $50.98 7A 3C 8P Yakima Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $51.40 7A 3C 8P Yakima Power Equipment Operators Overhead, Bridge Type: 100 Tons And Over $52.44 7A 3C 8P ;Yakima Power Equipment Operators Overhead, Bridge Type: 45 Tons Through 99 Tons $51.89 7A 3C 8P Yakima Power Equipment Operators Pavement Breaker $48.62 7A 3C 8P Yakima ' Power Equipment Operators Pile Driver (other Than Crane Mount) $51.40 7A 3C 8P Yakima Power Equipment Operators Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P 1 r1/1 71,1n1 ^ Yakima Power Equipment Operators Posthole Digger, Mechanical $48.62 7A 3C 8P Yakima Power Equipment Operators Power Plant $48.62 7A 3C 8P Yakima Power Equipment Operators Pumps - Water $48.62 7A 3C 8P Yakima Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P Yakima Power Equipment Operators Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $48.62 7A 3C 8P Yakima Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving Equipment $51.89 7A 3C 8P Yakima Power Equipment Operators Rigger And Bellman $48.62 7A 3C 8P Yakima Power Equipment Operators Rollagon $51.89 7A 3C 8P Yakima Power Equipment Operators Roller, Other Than Plant Mix $48.62 7A 3C 8P Yakima Power Equipment Operators Roller, Plant Mix Or Multi -lift Materials $50.98 7A 3C 8P Yakima Power Equipment Operators Roto -mill, Roto -grinder $51.40 7A 3C 8P Yakima Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P Yakima Power Equipment Operators Scraper, Self Propelled Under 45 Yards $51.40 7A 3C 8P Yakima Power Equipment Operators Scrapers - Concrete Et Carry All $50.98 7A 3C 8P Yakima Power Equipment Operators Scrapers, Self-propelled: 45 Yards And Over $51.89 7A 3C 8P Yakima Power Equipment Operators Service Engineers - Equipment $50.98 7061/4 3C 8P Yakima Power Equipment Operators Shotcrete/gunite Equipment $48.62 7A 3C 8P Yakima Power Equipment Operators Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $50.98 7A 3C 8P Yakima Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $51.89 7A 3C 8P Yakima Power Equipment Operators Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $51.40 7A 3C 8P Yakima Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $52.44 7A 3C 8P Yakima Power Equipment Operators Shovel, Excavator, Backhoes: Over 90 Metric Tons $53.01 7A 3C 8P Yakima Power Equipment Operators Slipform Pavers $51.89 7A 3C 8P Yakima Power Equipment Operators Spreader, Topsider Et Screedman $51.89 7A 3C 8P Yakima Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 8P Yakima Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P Yakima Power Equipment Operators Tower Crane Over 175'in Height, Base To Boom $53.01 7A 3C 8P Yakima Power Equipment Operators Tower Crane Up To 175' In Height Base To Boom $52.44 7A 3C 8P Yakima Power Equipment Operators Transporters, All Track Or Truck Type $51.89 7A 3C 8P Yakima Power Equipment Operators Trenching Machines $50.98 7A 3C 8P 1I-' 1•r inn 1n 1 t 1 1 1 1 1 1 1 Yakima Power Equipment Operators Truck Crane Oiler/driver - 100 Tons And Over $51.40 7A 3C 8P Yakima Power Equipment Operators Truck Crane Oiler/driver Under 100 Tons $50.98 7A 3C 8P Yakima Power Equipment Operators Truck Mount Portable Conveyor $51.40 7A 3C 8P Yakima Power Equipment Operators Welder $51.89 7A 3C 8P Yakima Power Equipment Operators Wheel Tractors, Farmall Type $48.62 7A 3C 8P Yakima Power Equipment Operators Yo Yo Pay Dozer $51.40 7A 3C 8P Yakima Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Assistant Engineer $48.62 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Barrier Machine (zipper) $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Batch Plant Operator, Concrete $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Bobcat $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Brokk - Remote Demolition Equipment $48.62 7A 3C 8P Underground Sewer a Water ;Yakima Power Equipment Operators- Brooms $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Bump Cutter $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Cableways $51.89 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Chipper $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Compressor $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Over 42 M $51.89 7A 3C 8P Underground Sewer a Water :Yakima Power Equipment Operators- Concrete Finish Machine -laser Screed $48.62 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Up To 42m $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Conveyors $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Cranes: 20 Tons Through 44 Tons With Attachments $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Cranes: 20 Tons Through 44 Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Cranes: 100 Tons Through 199 $52.44 7A 3C 8P hrr,- //F...-r,-oon ..,rt .,o, 111/ 1'7/'1l11') t 1 1 1 Underground Sewer Et Water Tons, Or 150' Of Boom (including Jib With Yakima Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $53.01 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $51.89 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Cranes: A -frame - 10 Tons And Under $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Cranes: Friction 100 Tons Through 199 Tons $53.01 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Cranes: Friction Over 200 Tons $53.57 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $53.57 7A 3C 8P Underground Sewer &t Water Yakima Power Equipment Operators- Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $50.98 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Crusher $51.40 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Deck Engineer/deck Winches (power) $51.40 7A 3C 8P Underground Sewer &t Water Yakima Power Equipment Operators- Derricks, On Building Work $51.89 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Dozer Quad 9, HD 41, D10 and Over $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Dozers D-9 a Under $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Drill Oilers: Auger Type, Truck Or Crane Mount $50.98 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Drilling Machine $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Elevator And Man -lift: Permanent And Shaft Type $48.62 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Finishing Machine, Bidwell And Gamaco & Similar Equipment $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Forklift: 3000 Lbs And Over With Attachments $50.98 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Forklifts: Under 3000 Lbs. With Attachments $48.62 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Grade Engineer: Using Blue Prints, Cut Sheets, Etc $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Gradechecker/stakeman $48.62 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Guardrail Punch $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Guardrail Punch/Auger $51.40 7A 3C 8P Underground Sewer & Water t 1 1 1 1 1 1 1 1 Yakima Power Equipment Operators- Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. a Over $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Hard Tail End Dump Articulating Off-road Equipment Under 45 Yards $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Horizontal/directional Drill Locator $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Horizontal/directional Drill Operator $51.40 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Hydralifts/boom Trucks Over 10 Tons $50.98 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Hydralifts/boom Trucks, 10 Tons And Under $48.62 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Loader, Overhead 8 Yards. & Over $52.44 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Loader, Overhead, 6 Yards. But Not Including 8 Yards $51.89 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Loaders, Overhead Under 6 Yards $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Loaders, Plant Feed $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Loaders: Elevating Type Belt $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Locomotives, All $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Material Transfer Device $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $52.44 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Mixers: Asphalt Plant $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Motor Patrol Grader - Non- finishing $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Motor Patrol Graders, Finishing $51.89 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And/or Shield $51.89 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Oil Distributors, Blower Distribution & Mulch Seeding Operator $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Outside Hoists (elevators And Manlifts), Air Tuggers,strato $50.98 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $51.40 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Overhead, Bridge Type: 100 Tons And Over $52.44 7A 3C 8P Underground Sewer & Water Yakima Power Equipment Operators- Overhead, Bridge Type: 45 Tons Through 99 Tons $51.89 7A 3C 8P Underground Sewer & Water 1ni1"7I111' Yakima Power Equipment Operators- Pavement Breaker $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Pile Driver (other Than Crane Mount) $51.40 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Posthole Digger, Mechanical $48.62 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Power Plant $48.62 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Pumps - Water $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $48.62 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Remote Control Operator On Rubber Tired Earth Moving Equipment $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Rigger And Bellman $48.62 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Rollagon $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Roller, Other Than Plant Mix $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Roller, Plant Mix Or Multi -lift Materials $50.98 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Roto -mill, Roto -grinder $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Saws - Concrete $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Scraper, Self Propelled Under 45 Yards $51.40 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Scrapers - Concrete Et Carry All $50.98 7A 3C 8P Underground Sewer Et Water Yakima Power Equipment Operators- Scrapers, Self-propelled: 45 Yards And Over $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Service Engineers - Equipment $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Shotcrete/gunite Equipment $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Shovel, Excavator, Backhoes: $52.44 7A 3C 8P 1A/1 ' f\1 1 1 1 1 1 1 1 1 1 1 1 1 111-1'nc•//fnrtracc rrrn rrn-,r/lni/,.Ira nalnnli>>ninr AXT,Ian]nnLnr, 0crw 1 (1/1'7/')n1 ) Underground Sewer a Water Over 50 Metric Tons To 90 Metric Tons Yakima Power Equipment Operators- Shovel, Excavator, Backhoes: Over 90 Metric Tons $53.01 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Slipform Pavers $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Spreader, Topsider a Screedman $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Subgrader Trimmer $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Tower Crane Over 175'in Height, Base To Boom $53.01 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Tower Crane Up To 175' In Height Base To Boom $52.44 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Transporters, All Track Or Truck Type $51.89 7A 3C 8P Underground Sewer a Water ;Yakima Power Equipment Operators- Trenching Machines $50.98 7A 3C 8P Underground Sewer a Water 'Yakima Power Equipment Operators- Truck Crane Oiler/driver - 100 Tons And Over $51.40 7A 3C 8P Underground Sewer a Water 'Yakima Power Equipment Operators- Truck Crane Oiler/driver Under 100 Tons $50.98 7A 3C 8P Underground Sewer a Water ;Yakima Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Welder $51.89 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Wheel Tractors, Farmall Type $48.62 7A 3C 8P Underground Sewer a Water Yakima Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A 3C 8P Underground Sewer a Water ;Yakima Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers 'Yakima Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers Yakima Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A Trimmers "Yakima Power Line Clearance Tree Tree Trimmer $38.38 5A 4A Trimmers Yakima Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers Yakima Refrigeration a Air Journey Level $28.11 1 Conditioning Mechanics ;Yakima Residential Brick Mason Journey Level $29.00 1 ;Yakima Residential Carpenters Journey Level $17.14 1 ;Yakima Residential Cement Masons Journey Level $11.86 1 Yakima Residential Drywall Applicators Journey Level $18.00 1 Yakima Residential Drywall Tapers Journey Level $17.00 1 111-1'nc•//fnrtracc rrrn rrn-,r/lni/,.Ira nalnnli>>ninr AXT,Ian]nnLnr, 0crw 1 (1/1'7/')n1 ) Yakima Residential Electricians Journey Level $21.98 1 Yakima Residential Glaziers Journey Level $22.43 61 1B Yakima Residential Insulation Journey Level $14.38 1 Applicators Yakima Residential Laborers Journey Level $11.02 1 Yakima Residential Marble Setters Journey Level $29.00 1 Yakima Residential Painters Journey Level $16.32 1 Yakima Residential Plumbers & Journey Level $20.55 1 Pipefitters Yakima Residential Refrigeration & Air Journey Level $28.11 1 Conditioning Mechanics Yakima Residential Sheet Metal Journey Level (Field or Shop) $37.10 5A 1X Workers Yakima Residential Soft Floor Layers Journey Level $17.55 1 Yakima Residential Sprinkler Fitters Journey Level $9.04 1 (Fire Protection) Yakima Residential Stone Masons Journey Level $16.00 1 Yakima Residential Terrazzo Workers Journey Level $9.04 1 Yakima Residential Terrazzo/Tile Journey Level $17.00 1 Finishers Yakima Residential Tile Setters Journey Level $16.78 1 Yakima Roofers Journey Level $12.00 1 Yakima Sheet Metal Workers Journey Level (Field or Shop) $50.61 5A 1X Yakima Sign Makers & Installers Journey Level $14.65 1 (Electrical) Yakima Sign Makers & Installers (Non- Journey Level $14.65 1 Electrical) Yakima Soft Floor Layers Journey Level $23.11 5A 1N Yakima Solar Controls For Windows Journey Level $9.04 1 Yakima Sprinkler Fitters (Fire Journey Level $26.36 1 Protection) Yakima Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) Yakima Stone Masons Journey Level $41.03 5A 1M Yakima Street And Parking Lot Journey Level $9.04 1 Sweeper Workers Yakima Surveyors Assistant Construction Site Surveyor $50.98 7A 3C 8P Yakima Surveyors Chainman $50.46 7A 3C 8P Yakima Surveyors Construction Site Surveyor $51.89 7A 3C 8P Yakima Telecommunication Journey Level $20.00 1 Technicians Yakima Telephone Line Construction - Cable Splicer $35.09 5A 2B Outside Yakima Telephone Line Construction - Hole Digger/Ground Person $19.22 5A 2B Outside Yakima Telephone Line Construction - Installer (Repairer) $33.63 5A 2B Outside . httnc•//fnrtrocc 117.1 nni r/1n;/wo r.ol nnlriinl,rVYTiTn RP1 nnlriin °onv 1 11/1 '7/1111 1 1 1 1 1 1 1 Yakima Telephone Line Construction - Special Aparatus Installer I $35.09 5A 2B Outside Yakima Telephone Line Construction - Special Apparatus Installer II $34.37 5A 2B Outside Yakima Telephone Line Construction - Telephone Equipment Operator (Heavy) $35.09 5A 2B Outside Yakima Telephone Line Construction - Telephone Equipment Operator (Light) $32.62 5A 2B Outside ;Yakima Telephone Line Construction - Telephone Lineperson $32.62 5A 2B Outside Yakima Telephone Line Construction - Television Groundperson $18.65 5A 2B Outside Yakima Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B Outside Yakima Telephone Line Construction - Television System Technician $29.42 5A 2B Outside Yakima Telephone Line Construction - Television Technician $26.43 •5A 2B Outside ,Yakima Telephone Line Construction - Tree Trimmer $32.95 5A 2B Outside ,Yakima Terrazzo Workers Journey Level $32.15 5A 1M ;Yakima Tile Setters Journey Level $32.15 5A 1M Yakima Tile, Marble & Terrazzo Journey Level $28.07 5A 1M Finishers :Yakima Traffic Control Stripers Journey Level $41.27 7A 1K Yakima Truck Drivers Asphalt Mix $14.19 1 Yakima Truck Drivers Dump Truck Et Trailer(c.wa- 760) $36.36 61 2G Yakima Truck Drivers Dump Truck(c.wa-760) $36.36 61 2G Yakima Truck Drivers Other Trucks(c.wa-760) $36.36 61 2G Yakima Truck Drivers Transit Mixer $36.36 61 2G Yakima Well Drillers Et Irrigation Pump Irrigation Pump Installer $25.44 1 Installers Yakima Well Drillers Et Irrigation Pump Oiler $9.20 1 Installers Yakima Well Drillers & Irrigation Pump Well Driller $18.00 1 Installers httnc•//fnrtr000 nrnrtnv/1I'll /.vnrra1nnlrnn/nr.r%XTnr'olnnirnn nonv 1 n/1'7/)/111 Washington State Department of Labor and Industries Policy Statement (Regarding the Production of "Standard" or "Non-standard" Items) The offsite fabrication of nonstandard items specifically produced for a public works project is considered public work for which prevailing wages are required. Below is the department's (State L&I's) list of criteria to be used in determining whether a prefabricated item is "standard" or "non-standard". For items not appearing on WSDOT's predetermined list, these criteria shall be used by the Contractor (and the Contractor's subcontractors, agents to subcontractors, suppliers, manufacturers, and fabricators) to determine coverage under RCW 39.12. The production, in the State of Washington, of non-standard items is covered by RCW 39.12, and the production of standard items is not. The production of any item outside the State of Washington is not covered by RCW 39.12. 1. Is the item fabricated for a public works project? If not, it is not subject to RCW 39.12. If it is, go to question 2. 2. Is the item fabricated on the public works jobsite? If it is, the work is covered under RCW 39.12. If not, go to question 3. 3. Is the item fabricated in an assembly/fabrication plant set up for, and dedicated primarily to, the public works project? If it is, the work is covered by RCW 39.12. If not, go to question 4. 4. Does the item require any assembly, cutting, modification or other fabrication by the supplier? If not, the work is not covered by RCW 39.12. If yes, go to question 5. 5. Is the prefabricated item intended for the public works project typically an inventory item which could reasonably be sold on the general market? If not, the work is covered by RCW 39.12. If yes, go to question 6. 6. Does the specific prefabricated item, generally defined as standard, have any unusual characteristics such as shape, type of material, strength requirements, finish, etc? If yes, the work is covered under RCW 39.12. It is the manufacturer's responsibility to verify that the correct county wage rates are applied to work they perform. Any firm with questions regarding the policy, WSDOT's Predetermined List, or for determinations of covered and non -covered workers shall be directed to State L&I at (360) 902-5330. Supplemental to Wage Rates 1 08/31/2012 Edition, Published August 3rd, 2012 1 1 1 1 1 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator Below is a list of potentially prefabricated items, originally furnished by WSDOT to Washington State Department of Labor and Industries, that may be considered non- standard and therefore covered by the prevailing wage law, RCW 39.12. Items marked with an X in the "YES" column should be considered to be non-standard and therefore covered by RCW 39.12. Items marked with an X in the "NO" column should be considered to be standard and therefore not covered. Of course, exceptions to this general list may occur, and in that case shall be evaluated according to the criteria described in State and L&I's policy statement. ITEM DESCRIPTION YES NO 1. Metal rectangular frames, solid metal covers, herringbone grates, and bi-directional vaned grates for Catch Basin Types 1, 1 L, 1 P, and 2 and Concrete Inlets. See Std. Plans 2. Metal circular frames (rings) and covers, circular grates, and prefabricated ladders for Manhole Types 1, 2, and 3, Drywell Types 1, 2, and 3 and Catch Basin Type 2. See Std. Plans X 3. Prefabricated steel grate supports and welded grates, metal frames and dual vaned grates, and Type 1, 2, and 3 structural tubing grates for Drop Inlets. See Std. Plans. X 4. Concrete Pipe - Plain Concrete pipe and reinforced concrete pipe Class 2 to 5 sizes smaller than 60 inch diameter. X 5. Concrete Pipe - Plain Concrete pipe and reinforced concrete pipe Class 2 to 5 sizes larger than 60 inch diameter. X 6. Corrugated Steel Pipe - Steel lock seam corrugated pipe for culverts and storm sewers, sizes 30 inch to 120 inches in diameter. May also be treated, 1 thru 5. X 7. Corrugated Aluminum Pipe - Aluminum lock seam corrugated pipe for culverts and storm sewers, sizes 30 inch to 120 inches in diameter. May also be treated, #5. X Supplemental to Wage Rates 08/31/2012 Edition, Published August 3rd, 2012 2 ITEM DESCRIPTION YES NO 8. Anchor Bolts & Nuts - Anchor Bolts and Nuts, for mounting sign structures, luminaries and other items, shall be made from commercial bolt stock. See Contract Plans and Std. Plans for size and material type. X 9. Aluminum Pedestrian Handrail - Pedestrian handrail conforming to the type and material specifications set forth in the contract plans. Welding of aluminum shall be in accordance with Section 9-28.14(3). X 10. Major Structural Steel Fabrication - Fabrication of major steel items such as trusses, beams, girders, etc., for bridges. X 11. Minor Structural Steel Fabrication - Fabrication of minor steel Items such as special hangers, brackets, access doors for structures, access ladders for irrigation boxes, bridge expansion joint systems, etc., involving welding, cutting, punching and/or boring of holes. See Contact Plans for item description and shop drawings. X 12. Aluminum Bridge Railing Type BP - Metal bridge railing conforming to the type and material specifications set forth in the Contract Plans. Welding of aluminum shall be in accordance with Section 9-28.14(3). X 13. Concrete Piling--Precast-Prestressed concrete piling for use as 55 and 70 ton concrete piling. Concrete to conform to Section 9-19.1 of Std. Spec.. X 14. Precast Manhole Types 1, 2, and 3 with cones, adjustment sections and flat top slabs. See Std. Plans. X 15. Precast Drywell Types 1, 2, and with cones and adjustment Sections. See Std. Plans. X 16. Precast Catch Basin - Catch Basin type 1, 1 L, 1 P, and 2 With adjustment sections. See Std. Plans. X Supplemental to Wage Rates 08/31/2012 Edition, Published August 3rd, 2012 3 1 i 1 t 1 1 1 1 ITEM DESCRIPTION YES NO 17. Precast Concrete Inlet - with adjustment sections, See Std. Plans X 18. Precast Drop Inlet Type 1 and 2 with metal grate supports. See Std. Plans. X 19. Precast Grate Inlet Type 2 with extension and top units. See Std. Plans X 20. Metal frames, vaned grates, and hoods for Combination Inlets. See Std. Plans X 21. Precast Concrete Utility Vaults - Precast Concrete utility vaults of various sizes. Used for in ground storage of utility facilities and controls. See Contract Plans for size and construction requirements. Shop drawings are to be provided for approval prior to casting X 22. Vault Risers - For use with Valve Vaults and Utilities Vaults. X 23. Valve Vault - For use with underground utilities. See Contract Plans for details. X 24. Precast Concrete Barrier - Precast Concrete Barrier for use as new barrier or may also be used as Temporary Concrete Barrier. Only new state approved barrier may be used as permanent barrier. X 25. Reinforced Earth Wall Panels — Reinforced Earth Wall Panels in size and shape as shown in the Plans. Fabrication plant has annual approval for methods and materials to be used. See Shop Drawing. Fabrication at other locations may be approved, after facilities inspection, contact HQ. Lab. X 26. Precast Concrete Walls - Precast Concrete Walls - tilt -up wall panel in size and shape as shown in Plans. Fabrication plant has annual approval for methods and materials to be used X Supplemental to Wage Rates 08/31/2012 Edition, Published August 3rd, 2012 4 ITEM DESCRIPTION YES NO 27. Precast Railroad Crossings - Concrete Crossing Structure Slabs. X 28. 12, 18 and 26 inch Standard Precast Prestressed Girder — Standard Precast Prestressed Girder for use in structures. Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders. See Std. Spec. Section 6-02.3(25)A X 29. Prestressed Concrete Girder Series 4-14 - Prestressed Concrete Girders for use in structures. Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders. See Std. Spec. Section 6-02.3(25)A X 30. Prestressed Tri -Beam Girder - Prestressed Tri -Beam Girders for use in structures. Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders. See Std. Spec. Section 6-02.3(25)A X 31. Prestressed Precast Hollow -Core Slab — Precast Prestressed Hollow -core slab for use in structures. Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders. See Std. Spec. Section 6-02.3(25)A. X 32. Prestressed -Bulb Tee Girder - Bulb Tee Prestressed Girder for use in structures. Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders. See Std. Spec. Section 6-02.3(25)A X 33. Monument Case and Cover See Std. Plan. X Supplemental to Wage Rates 08/31/2012 Edition, Published August 3rd, 2012 5 1 1 1 1 ITEM DESCRIPTION YES NO 34. Cantilever Sign Structure - Cantilever Sign Structure fabricated from steel tubing meeting AASHTO-M-183. See Std. Plans, and Contract Plans for details. The steel structure shall be galvanized after fabrication in accordance with AASHTO-M-111. X 35. Mono -tube Sign Structures - Mono -tube Sign Bridge fabricated to details shown in the Plans. Shop drawings for approval are required prior to fabrication. X 36. Steel Sign Bridges - Steel Sign Bridges fabricated from steel tubing meeting AASHTO-M-138 for Aluminum Alloys. See Std. Plans, and Contract Plans for details. The steel structure shall be galvanized after fabrication in accordance with AASHTO-M-111. X 37. Steel Sign Post - Fabricated Steel Sign Posts as detailed in Std Plans. Shop drawings for approval are to be provided prior to fabrication X 38. Light Standard -Prestressed - Spun, prestressed, hollow concrete poles. X 39. Light Standards - Lighting Standards for use on highway illumination systems, poles to be fabricated to conform with methods and materials as specified on Std. Plans. See Specia Provisions for pre -approved drawings. X 40. Traffic Signal Standards - Traffic Signal Standards for use on highway and/or street signal systems. Standards to be fabricated to conform with methods and material as specified on Std. Plans. See Special Provisions for pre -approved drawings X X 41. Precast Concrete Sloped Mountable Curb (Single and DualFaced) See Std. Plans. Supplemental to Wage Rates 08/31/2012 Edition, Published August 3rd, 2012 6 ITEM DESCRIPTION YES NO 42. Traffic Signs - Prior to approval of a Fabricator of Traffic Signs, the sources of the following materials must be submitted and approved for reflective sheeting, legend material, and aluminum sheeting. NOTE: *** Fabrication inspection required. Only signs tagged "Fabrication Approved" by WSDOT Sign Fabrication Inspector to be installed X X Custom Message Std Signing Message 43. Cutting & bending reinforcing steel X 44. Guardrail components X X Custom End Sec Standard Sec 45. Aggregates/Concrete mixes Covered by WAC 296-127-018 46. Asphalt Covered by WAC 296-127-018 47. Fiber fabrics X 48. Electrical wiring/components X 49. treated or untreated timber pile X 50. Girder pads (elastomeric bearing) X 51. Standard Dimension lumber X 52. Irrigation components X Supplemental to Wage Rates 08/31/2012 Edition, Published August 3rd, 2012 7 i i i 1 1 1 i 1 1 1 1 ITEM DESCRIPTION YES NO 53. Fencing materials X 54. Guide Posts X 55. Traffic Buttons x 56. Epoxy X 57. Cribbing X 58. Water distribution materials X 59. Steel "H" piles X 60. Steel pipe for concrete pile casings X 61. Steel pile tips, standard X 62. Steel pile tips, custom X Supplemental to Wage Rates 8 08/31/2012 Edition, Published August 3rd, 2012 WSDOT's List of State Occupations not applicable to Heavy and Highway Construction Projects This project is subject to the state hourly minimum rates for wages and fringe benefits in the contract provisions, as provided by the state Department of Labor and Industries. The following list of occupations, is comprised of those occupations that are not normally used in the construction of heavy and highway projects. When considering job classifications for use and / or payment when bidding on, or building heavy and highway construction projects for, or administered by WSDOT, these Occupations will be excepted from the included "Washington State Prevailing Wage Rates For Public Work Contracts" documents. • Electrical Fixture Maintenance Workers • Electricians - Motor Shop • Heating Equipment Mechanics • Industrial Engine and Machine Mechanics • Industrial Power Vacuum Cleaners • Inspection, Cleaning, Sealing of Water Systems by Remote Control • Laborers - Underground Sewer & Water • Machinists (Hydroelectric Site Work) • Modular Buildings • Playground & Park Equipment Installers • Power Equipment Operators - Underground Sewer & Water • Residential *** ALL ASSOCIATED RATES *** • Sign Makers and Installers (Non -Electrical) • Sign Makers and Installers (Electrical) • Stage Rigging Mechanics (Non Structural) The following occupations may be used only as outlined in the preceding text concerning "WSDOT's list for Suppliers - Manufacturers - Fabricators" • Fabricated Precast Concrete Products • Metal Fabrication (In Shop) Definitions for the Scope of Work for prevailing wages may be found at the Washington State Department of Labor and Industries web site and in WAC Chapter 296-127. Supplemental to Wage Rates 9 08/31/2012 Edition, Published August 3rd, 2012 Washington State Department of Labor and Industries Policy Statements (Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.) WAC 296-127-018 Agency filings affecting this section Coverage and exemptions of workers involved in the production and delivery of gravel, concrete, asphalt, or similar materials. (1) The materials covered under this section include but are not limited to: Sand, gravel, crushed rock, concrete, asphalt, or other similar materials. (2) All workers, regardless of by whom employed, are subject to the provisions of chapter 39.12 RCW when they perform any or all of the following functions: (a) They deliver or discharge any of the above -listed materials to a public works project site: (i) At one or more point(s) directly upon the location where the material will be incorporated into the project; or (ii) At multiple points at the project; or (iii) Adjacent to the location and coordinated with the incorporation of those materials. (b) They wait at or near a public works project site to perform any tasks subject to this section of the rule. (c) They remove any materials from a public works construction site pursuant to contract requirements or specifications (e.g., excavated materials, materials from demolished structures, clean-up materials, etc.). (d) They work in a materials production facility (e.g., batch plant, borrow pit, rock quarry, etc.,) which is established for a public works project for the specific, but not necessarily exclusive, purpose of supplying materials for the project. (e) They deliver concrete to a public works site regardless of the method of incorporation. (f) They assist or participate in the incorporation of any materials into the public works project. Supplemental to Wage Rates 10 08/31/2012 Edition, Published August 3rd, 2012 (3) All travel time that relates to the work covered under subsection (2) of this section requires the payment of prevailing wages. Travel time includes time spent waiting to load, loading, transporting, waiting to unload, and delivering materials. Travel time would include all time spent in travel in support of a public works project whether the vehicle is empty or full. For example, travel time spent returning to a supply source to obtain another load of material for use on a public works site or returning to the public works site to obtain another load of excavated material is time spent in travel that is subject to prevailing wage. Travel to a supply source, including travel from a public works site, to obtain materials for use on a private project would not be travel subject to the prevailing wage. (4) Workers are not subject to the provisions of chapter 39.12 RCW when they deliver materials to a stockpile. (a) A "stockpile" is defined as materials delivered to a pile located away from the site of incorporation such that the stockpiled materials must be physically moved from the stockpile and transported to another location on the project site in order to be incorporated into the project. (b) A stockpile does not include any of the functions described in subsection (2)(a) through (f) of this section; nor does a stockpile include materials delivered or distributed to multiple locations upon the project site; nor does a stockpile include materials dumped at the place of incorporation, or adjacent to the location and coordinated with the incorporation. (5) The applicable prevailing wage rate shall be determined by the locality in which the work is performed. Workers subject to subsection (2)(d) of this section, who produce such materials at an off-site facility shall be paid the applicable prevailing wage rates for the county in which the off-site facility is located. Workers subject to subsection (2) of this section, who deliver such materials to a public works project site shall be paid the applicable prevailing wage rates for the county in which the public works project is located. [Statutory Authority: Chapter 39.12 RCW, RCW 43.22.051 and 43.22.270. 08-24-101, § 296-127-018, filed 12/2/08, effective 1/2/09. Statutory Authority: Chapters 39.04 and 39.12 RCW and RCW 43.22.270. 92-01-104 and 92-08-101, § 296-127-018, filed 12/18/91 and 4/1/92, effective 8/31/92.] Supplemental to Wage Rates 11 08/31/2012 Edition, Published August 3rd, 2012 Benefit Code Key - Effective 08-31-2012 thru 03-02-2013 ************************************************************************************************************ Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects, the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker. 1. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. D. The first two (2) hours before or after a five - eight (8) hour workweek day or a four - ten (10) hour workweek day and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage. All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. F. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. G. The first ten (10) hours worked on Saturdays and the first ten (10) hours worked on a fifth calendar weekday in a four - ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. H. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. [. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two (2) hours after eight (8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over ten (10) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. N. All hours worked on Saturdays (except makeup days) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 1. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays, holidays and after twelve (12) hours, Monday through Friday and after ten (10) hours on Saturday shall be paid at double the hourly rate of wage. Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 P. All hours worked on Saturdays (except makeup days if circumstances warrant) and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays (except Christmas day) shall be paid at double the hourly rate of wage. All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. T. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage. All hours worked on Labor Day shall be paid at three times the hourly rate of wage. V. All hours worked on Sundays and holidays (except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage. All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage. W. All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at double the hourly rate of wage. X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage. When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage. Y. All hours worked outside the hours of 5:00 am and 5:00 pm (or such other hours as may be agreed upon by any employer and the employee) and all hours worked in excess of eight (8) hours per day (10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate of wage. (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight -time rate until they have worked 8 hours in a day (10 in a 4 x 10 workweek) or 40 hours during that workweek.) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. 1. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay. 2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. — 2 — Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 2. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage. F. The first eight (8) hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay. All hours worked in excess of eight (8) hours on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay. H. All hours worked on Sunday shall be paid at two times the hourly rate of wage. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. K. All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double the hourly rate of wage. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage. W. The first two (2) hours after eight (8) regular hours Monday through Friday and the first eight (8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. On a four-day, ten- hour weekly schedule, either Monday thru Thursday or Tuesday thru Friday schedule, all hours worked after ten shall be paid at double the hourly rate of wage. The first eight (8) hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage. All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage. Y. All hours worked on Saturdays (except for make-up days) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate. Hours worked over twelve hours (12) in a single shift and all work performed after 6:00 pm Saturday to 6:00 am Monday and holidays shall be paid at double the straight time rate of pay. Any shift starting between the hours of 6:00 pm and midnight shall receive an additional one dollar ($1.00) per hour for all hours worked that shift. The employer shall have the sole discretion to assign overtime work to employees. Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. B. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked over twelve (12) hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. C. Work performed in excess of eight (8) hours of straight time per day, or ten (10) hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage. All work performed after 6:00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage. After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight (8) hours or more. Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 3. D. All hours worked between 6:00 pm Monday through 6:00 am Saturday, shall be paid at an overtime rate of 15% over the hourly rate of wage. All other hours worked after 6:00 am on Saturdays, shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hours worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week, once 40 hours of straight time work is achieved, then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate. 4. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. All hours worked in excess of eight (8) hours per day or forty (40) hours per week shall be paid at double the hourly rate of wage. All hours worked on Saturdays, Sundays and holidays shall be paid at double the hourly rate of wage. B. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage. All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. Holiday Codes 5. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, and Christmas Day (7). B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, the day before Christmas, and Christmas Day (8). C. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). D. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Day after Thanksgiving Day, And Christmas (6). I. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). J. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day, Christmas Eve Day, And Christmas Day (7). K. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). L. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, And Christmas Day (8). N. Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (9). P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9). If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. R. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, One -Half Day Before Christmas Day, And Christmas Day. (7 1/2). Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 5. S. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, And Christmas Day (7). T. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Holiday Codes Continued 6. A. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). E. Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, Christmas Day, And A Half -Day On Christmas Eve Day. (9 1 /2). G. Paid Holidays: New Year's Day, Martin Luther King Jr. Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And Christmas Eve Day (11). H. Paid Holidays: New Year's Day, New Year's Eve Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, Christmas Day, The Day After Christmas, And A Floating Holiday (10). Q. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, And Christmas Day (7). Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, The Day After Thanksgiving Day And Christmas Day (8). Unpaid Holiday: Presidents' Day. T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day, And Christmas Day (9). Z. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday. Holiday Codes Continued 7. A. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8). Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays: New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 7. D. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays: President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. E. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. F. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Holidays: New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. I. Holidays: New Year's Day, President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. J. Holidays: New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. K. Holidays: New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day, And Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. Holidays: New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. M. Paid Holidays: New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, And the Day after or before Christmas Day. 10). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. N. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. When Christmas falls on a Saturday, the preceding Friday shall be observed as a holiday. O. Paid Holidays: New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And The Employees Birthday. 11). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. P. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day (7). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. — 6 — Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 7. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day (8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day. R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day (10). If any of the listed holidays fall on Saturday, the preceding Friday shall be observed as the holiday. If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. Note Codes 8. A. In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or more: Over 50' To 100' - $2.00 per Foot for Each Foot Over 50 Feet Over 100' To 150' - $3.00 per Foot for Each Foot Over 100 Feet Over 150' To 220' - $4.00 per Foot for Each Foot Over 150 Feet Over 220' - $5.00 per Foot for Each Foot Over 220 Feet C. In addition to the hourly wage and fringe benefits, the following depth premiums apply to depths of fifty feet or more: Over 50' To 100' - $1.00 per Foot for Each Foot Over 50 Feet Over 100' To 150' - $1.50 per Foot for Each Foot Over 100 Feet Over 150' To 200' - $2.00 per Foot for Each Foot Over 150 Feet Over 200' - Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. L. Workers on haaiiat projects receive additional hourly premiums as follows - Level A: $0.75, Level B: $0.50, And Level C: $0.25. M. Workers on hazmat projects receive additional hourly premiums as follows: Levels A & B: $1.00, Levels C & D: $0.50. N. Workers on hazmat projects receive additional hourly premiums as follows - Level A: $1.00, Level B: $0.75, Level C: $0.50, And Level D: $0.25 P. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit: $1.50, Class C Suit: $1.00, And Class D Suit $0.50. Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid. R. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012. S. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. Benefit Code Key — Effective 08-31-2012 thru 03-03-2013 8. T. Effective August 31, 2012 — A Traffic Control Laborer performs the setup, maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer. All naggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. This classification is only effective on or after August 31, 2012. APPENDIX I City of Yakima Standard Plans and Details ADJUSTABLE FOR 1 1/4" THROUGH 2" PIPE b ( I RESIDENTIAL LUMINAIRE TANKO LIGHTING - COBRA HEAD EW -3870-2501 M -50 -1 -T3 -F L 1-2-5 BG J -BOX 1 3' MAX. ADJUSTABLE FOR 1 1/4" THROUGH 2" PIPE ARTERIAL LUMINAIRE BETA LED #STR-LWY-3M-HT-12-D-UL-SV HANDHOLE BOND QUICK DISCONNECTS (STD. SPEC. 9-29.7) 1" MAX 1" CHAMFER #4 HOOPS AT 1'-0" .11=11-117 .II=I =11! '11-11-11. • CENTERS 2" SCHD. 40 PVC CONDUIT EIGHT #7 BARS EVENLY SPACED PORTLAND CEMENT CONCRETE CL. 3000 (SEE POLE FOUNDATION DETAIL) 5/8" x 10'-0" COPPER -CLAD GROUND WIRE 3' SQUARE OR ROUND ELIMINATE ALL SLACK 2" NPS,SCH. 40, 2 3/8" O.D. TENON 8' (TYP.) OR AS SPECIFIED DAVIT ARM 6063-T6 ALUM. TAPERED 6" X 3 1/2" X .188" WALL, SATIN GROUND FINISH, 80 GRIT. RADIUS = 5'-9" SLIPOVER JOINT, -SHAFT INSERTED 12" INTO DAVIT ARM, (2) 5/8" X 7" LG. S/S HEX HEAD BOLTS, -NUTS, FLATS & LOCK WASHERS LOCK THE ASSEMBLY. INSULATED GROUNDING BUSHING INSTALL COMPLETE WITH BOLT COVERS in 2" NOM. GROUT PAD WITH 1/2" DRAIN HOLE 6063-T6 ALUM SHAFT TAPERED FLUSH w/ SIDEWALK 8" X 6" X .250 WALL SATIN GROUND FINISH, 80 GRIT N 4" X 6" FLUSH HANDHOLE C/W S/S HARDWARE & GROUND WIRING CAST ALUM. SHOEBASE (COMPLETE) STREET LIGHT BASE SHALL BE FLUSH WITH SIDEWALK AND/OR CURB SIDEWALK CURB _2% POLE PLACEMENT ADJACENT TO SIDEWALK OR —+ OR AS APPROVED BY CITY ENGINEER NOTE: 1. All WORK AND MATERIALS SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE (NEC). 2. JUNCTION BOX, CONDUIT AND CONSTRUCTION METHODS SHALL BE PER WSDOT - TYPE 1 UNLESS OTHERWISE SPECIFIED AND APPROVED BY THE CITY ENGINEER. 3. ALL ELECTRICAL CONDUIT SHAL BE A MINIMUM OF 2" DIA. AND MAINTAIN 24" MINIMUM COVER. SWEEPS AND PLAN LOCATION SHALL BE PER POWER COMPANY AND SHALL BE DETAILED ON THE PLANS PRIOR TO APPROVAL. 4. ALL SERVICE CONNECTIONS WETHER INDIVIDUAL OR MULTIPLE POLES SHALL BE PEDESTAL MOUNT ONLY. SERVICE CONNECTIONS SHALL NOT BE ALLOWED TO BE ATTACHED TO THE POLE. 5. SERVICE PEDESTALS SHALL BE METERED. 6. LUMINAIRE SHALL BE LEVELED IN BOTH DIRECTIONS AFTER POLE IS PLUMBED. City Of Yakima Engineering Division 129 North Second Street Yakima, Washington City of Yakima - Standard Detail STREET LIGHT El NOT TO SCALE 4 BOLT GALVANIZED STEEL BASE PLATE REMOVABLE BASE COVER (2 PIECE) —�O 5" x 7" OVAL HANDHOLE WITH REMOVABLE COVER FINISHED GRADE Ila 2" SCHEDULE 40 PVC CONDUIT(S) EXTEND 5" ABOVE BASE AND ANGLE END TOWARD HANDHOLE IN POLE. CO i 5/8" x 10' COPPER WELD GROUND ROD (SERVICE POLE ONLY) CEMENT CONCRETE ANCHOR 36" DIA. x 8' DEPTH. FORM 24" SQUARE x 4" DEPTH AT TOP OF BASE (CHAMFER EDGES). GROUT BETWEEN ANCHOR BASE AND BASEPLATE AFTER POLE IS PLUMB AND SECURED. POLE FOUNDATION City Of Yakima Engineering Division 129 North Second Street Yakima, Washington 4 GALVANIZED STEEL ANCHOR BOLTS WITH DOUBLE NUTS AND DOUBLE WASHERS. ANCHOR BOLTS SHALL EXTEND 4 1/2" ABOVE CONCRETE BASE. BOLT CIRCLE DIMENSIONS AND ANCHOR BOLT SIZE SHALL BE SUBMITTED BY POLE MANUFACTURER. REINFORCING STEEL BARS REQUIRED. 8 NO. 7 BARS VERTICAL. EVENLY SPACED AROUND PERIMETER. 8 -NO. 4 HOOPS AT 12" ON CENTERS. 3" MINIMUM CONCRETE COVER. REBAR SHALL NOT BE WELDED. City of Yakima - Standard Detail SIGNAL POLE FOUNDATION E3 NOT TO SCALE Revision 7-2011 • STREET LIGHT 2" SCHD. 40 PVC CONDUIT _ = = Z METERED SERVICE PEDESTAL = _ _ = _ = = = WSDOT•TYPE 1. 'JUNCTION•BOX CONDUIT PER POWER COMPANY } PLAN VIEW 3' MAX STREET LIGHT J -BOX 100 AMP METERED SERVICE PEDESTAL AS MANUFACTURED BY TESCO CONTROLS OR MILBANK MANUFACTURING OR APPROVED BY THE CITY ENGINEER. `— 2" SCHD. 40 PVC CONDUIT 5/8" x 10'-0" COPPER -CLAD GROUND WIRE SECTION A NOTE: 1. All WORK AND MATERIALS SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE (NEC). 2. JUNCTION BOX, CONDUIT AND CONSTRUCTION METHODS SHALL BE PER WSDOT - TYPE 1 UNLESS OTHERWISE SPECIFIED AND APPROVED BY THE CITY ENGINEER. 3. ALL ELECTRICAL CONDUIT SHALL BE A MINIMUM OF 2" DIA. AND MAINTAIN 24" MINIMUM COVER. SWEEPS AND PLAN LOCATION SHALL BE PER POWER COMPANY AND SHALL BE DETAILED ON THE PLANS PRIOR TO APPROVAL. 4. ALL SERVICE CONNECTIONS WETHER INDIVIDUAL OR MULTIPLE POLES SHALL BE PEDESTAL MOUNT ONLY. SERVICE CONNECTIONS SHALL NOT BE ALLOWED TO BE ATTACHED TO THE POLE. 5. SERVICE PEDESTALS SHALL BE METERED. City Of Yakima Engineering Division 129 North Second Street Yakima, Washington City of Yakima - Standard Detail SERVICE LAYOUT E4 NOT TO SCALE Revision 7-2011 • FINISHED GRADE BACKFILL AND CONDUIT BEDDING MATERIAL SHALL BE COMPACTED CRUSHED SURFACING TOP COURSE. 2" SCHEDULE 40 CONDUIT SHOWN ON THE PLANS CONDUIT TRENCH SECTION NOTE: 1. All WORK AND MATERIALS SHALL CONFORM TO THE NATIONAL ELECTRICAL CODE (NEC). 2. JUNCTION BOX, CONDUIT AND CONSTRUCTION METHODS SHALL BE PER WSDOT - TYPE 1 UNLESS OTHERWISE SPECIFIED AND APPROVED BY THE CITY ENGINEER. 3. ALL ELECTRICAL CONDUIT SHAL BE A MINIMUM OF 2" DIA. AND MAINTAIN 24" MINIMUM COVER. SWEEPS AND PLAN LOCATION SHALL BE PER POWER COMPANY AND SHALL BE DETAILED ON THE PLANS PRIOR TO APPROVAL. 4. ALL SERVICE CONNECTIONS WETHER INDIVIDUAL OR MULTIPLE POLES SHALL BE PEDESTAL MOUNT ONLY. 5. SERVICE CONNECTIONS SHALL NOT BE ALLOWED TO BE ATTACHED TO THE POLE. City Of Yakima Engineering Division 129 North Second Street Yakima, Washington City of Yakima - Standard Detail ■ CONDUIT TRENCH SECTION E51 NOT TO SCALE Revision 7-2011 RP tcFp// II `94, II it 11 WIDTH PER YMC 8.64.070 SEE PLANS CONCRETE APRON 7' MIN. OR TO RAN LINE (WHICHEVER IS GREATER) 15' ON) SEE P1AN PREFERRED RAMP CONFIGURATION RP COLD JOINT (TYP) s p� /i2, 4V4, ALTERNATE RAMP CONFIGURATION NO. 1 CONCRETE A VALLEY GUTTER COMMERCIAL APPROACH - TYPE 1 RAISED CURBING MAY VALLEY GUTTER CONTINUE INTO SITE. FLOW LINE 0.5 CEMENT CONCRETE 1•1116.- 1' 3' VALLEY GUTTER NOTES RAMP RUNNING SLOPES SHALL BE 8.3% MAX. MIN. 0.25' CSTC (COMPACTED DEPTH) SECTION A 15 1Q� ALTERNATE RAMP CONFIGURATION NO. 2 RP COLD JOINT (TYP) PSE 4.°0' MIN. 0.25' CSTC (COMPACTED DEPTH) (INCLUDING APRON) 0.5' CEMENT CONCRETE (INCLUDING APRON) COMMERCIAL APPROACH - TYPE 2 VALLEY GUTTER 1. COMMERCIAL APPROACH - TYPE 1 IS STANDARD FOR ALL COMMERCIAL APPROACH SITUATIONS WITH ANY COMBINATION OF THE FOLLOWING; ROADWAY SPEEDS OVER 30 MPH, HEAVY VEHICLE VOLUMES, HEAVY TRUCK TRAFFIC. 2. USE OF COMMERCIAL APPROACH - TYPE 2 BY APPROVAL OF CITY ENGINEER ONLY. 3. CURB & GUTTER, VALLEY GUTTER, & CONCRETE APPROACH SHALL BE SEPARATED BY 3/8" THICK EXPANSION JOINT MATERIAL. 4. THIS DETAIL INDICATES GENERAL CONFIGURATION REQUIREMENTS FOR COMMERCIAL DRIVEWAY APPROACHES. STYLE AND LOCATION OF HANDICAP RAMPS WILL DEPEND UPON SITE CONDITIONS AND SHALL BE CONSTRUCTED ACCORDING TO THE SPECIFIC PROJECT SITE PLAN APPROVED BY THE CITY ENGINEER. 5. WSDOT CLASS 3000 CONCRETE WITH COARSE AGGREGATE GRADING NO. 5. 6. DUE TO THE MINIMUM SIZE RADIUS OF 15', SPECIAL CONSIDERATIONS NEED TO BE MADE TO ALLOW FOR ADA REQUIREMENTS ON THE RAMPS. 15' RADIUS DESIGNS MUST BE SUBMITTED AND APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. 7. ALL SIDEWALK WITHIN COMMERCIAL APPROACH LIMITS, FROM RADIUS POINT TO RADIUS POINT, SHALL BE 0.5' CEMENT CONCRETE ON 0.25' CSTC. 12 COLD JOINT (TYP) i0'S'iL �'C y S l' -'45/4>A/ Bsg COLD JOINT (TYP) MIN. 0.17' CSTC (COMPACTED DEPTH) 0.5' CEMENT CONCRETE RESIDENTIAL APPROACH INN ME City Of Yakima Engineering Division 129 North Second Street akimalMington 10111 ' Ov cinnn . 7012_ _ City of Yakima - Standard Detail DRIVEWAY APPROACHES R4 THROUGH JOINTS ON EACH SIDE OF AND AROUND EACH UTILITY APPURTENANCE. FOR HANDICAP RAMP SIZE AND POSITION, SEE BLE STANDARD DETAILS. SIDEWALK JOINTING SEE PLANS COLD JOINT 0.5' CEMENT CONCRETE COMPACTED SUBGRADE 0.17' MIN. CSTC (COMPACTED DEPTH) 6" SIDEWALK SECTION SEE PLANS S= 0.02 ft/ft COLD JOINT 0.33' CEMENT CONCRETE COMPACTED SUBGRADE 0.17' MIN. CSTC (COMPACTED DEPTH) 4" STANDARD SECTION NOTES 1. THROUGH JOINTS WITH 3/8" JOINT MATERIAL SHALL BE PLACED AT 20' INTERVALS OR MATCH EXISTING CURB JOINTS. 2. 1 1/2" DEEP DUMMY JOINTS SHALL BE SCORED INTO THE CONCRETE AT ALTERNATING 10' INTERVALS. 3. "V" GROOVES SHALL BE PLACED AT 5' INTERVALS. 4. ALL JOINTS, "V" GROOVES, AND EDGES SHALL BE FINISHED WITH AN EDGER HAVING A 1/4" RADIUS. 5. SEE PLANS FOR WIDTH AND POSITION OF SIDEWALK. 6. WSDOT CLASS 3000 CONCRETE WITH COARSE AGGREGATE GRADING NO. 5. City Of Yakima City of Yakima - Standard Detail Engineering Division CEMENT CONCRETE SIDEWALK R5 129 North Second Street ' Yakima, Washington NOT TO SCALE Revision 03-2011 9-1/2" GD 8" 7-1/8" --1 I--1/2" MONUMENT CASE TO BE SATHER MFG. CO. #2022 OR APPROVED EQUIVALENT 3/16" WIDE BEAD, 1/8" HIGH MONUMENT CASE MONUMENT CASE 1 1/2" CLASS "G" ASPHALT (COMPACTED DEPTH) 6" CLASS 3000 CONCRETE MOW r i Q i CRUSHED SURFACING TO BE PLACED AFTER PLACEMENT OF MONUMENT CASE SUFFICIENT TO SECURE MONUMENT 2" ALUMINUM, BRONZE OR BRASS SURVEY CAP 5/8" REBAR - 24" LENGTH MIN. SECTION NOTES 1. MONUMENT TO BE PLACED AFTER FIRST LIFT. 2. TOP OF MONUMENT CASE SHALL BE 1" BELOW TOP OF FIRST LIFT. 3. MONUMENT CASE TO BE PLACED AFTER FINAL LIFT OF ASPHALT. 4. IN UNIMPROVED ROADS, THE MONUMENT CASE SHALL BE SET WITH THE TOP OF THE CASE 6" BELOW EXISTING GRADE. 5. WSDOT CLASS 3000 CONCRETE WITH AGGREGATE GRADING NO. 5. City Of Yakima Engineering Division 129 North Second Street Yakima, Washington City of Yakima - Standard Detail SURVEY MONUMENT NOT TO SCALE Revision 11-2008 R8 VALVE BOX 2.5' PAVEMENT ---4:1-SEE NOTE 3 SEE NOTE 1 5" STORZ COUPLING 3' MIN. CLEARANCE FROM OBSTRUCTIONS �I II\ GROUND LINE 6" RESILENT SEAT GATE VALVE SEE NOTE 1 SEE NOTE 1 POP 6" CLASS 52 D.I.P. UNDISTURBED EARTH 0.25 C.Y. GRAVEL DRAIN 1 1/2" ROUND WASHED ROCK 77. SPECIFIED HYDRANT _L_ : •0 DRAIN HOLE in SHALL NOT BE COVERED ( CONCRETE THRUST BLOCK N 0 z w w b•'G 12"x12"x6" CONC. BLOCK UNDISTURBED EARTH NOTES 1. ROMAC "GRIP RING" MECHANICAL JOINT ACCESSORY KITS SHALL BE USED ON ALL MECHANICAL JOINT CONNECTIONS FROM TEE TO HYDRANT. 2. MINIMUM HYDRANT DEPTH IS 5 FEET. THIS DISTANCE MAY INCREASE WHEN HYDRANTS ARE INSTALLED ON DISTRIBUTION MAIN SIZES LARGER THAN 6 INCHES IN DIAMETER. 3. CONNECTION TO WATER MAIN CAN ALSO BE MADE WITH TAPPING VALVE AND SLEEVE. (NOT SHOWN) HYDRANT ASSEMBLY City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL HYDRANT ASSEMBLY W1 CAST IRON LID FINISHED GRADE GATE OR BUTTERFLY VALVE (GATE VALVE SHOWN) NOTES UPPER SECTION SLIDING TYPE C.I. VALVE BOX (RICH MODEL 940—B, 18 INCHES HIGH) LOWER SECTION (RICH MODEL R-36, 36 INCHES HIGH) 1. PROVIDE EXTENSION PIECE WHERE REQUIRED FOR VALVE BOX. (RICH MODEL 044, 12 INCHES HIGH) 2. VALVE SIZE AND ENDS AS SPECIFIED OR INDICATED ON THE PLANS. W2 WATER VALVE BOX NTS City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL WATER VALVE BOX W2 SEE DETAIL R24 FOR TRENCH PATCHING 1 CO 1 I MIN PIPE COVER EXCAVATION LIMIT »i, \ 18" OVER 18" —ma 12" _ 24" I.D. 24" UP TO _ 12" is. - 24" I.D. • >% % 8o �o 0 0 O VI 0 O0�o �o O O 0 N • 0d0 o o >- UNDISTURBED EARTH NOTES COMPACTED BACK FILL BEDDING MATERIAL SHALL MEET THE REQUIREMENTS OF CLASS 'C' PER SECTION 9-03.18 UNLESS THE ENGINEER DETERMINES THAT CONDITIONS REQUIRE ANOTHER CLASS. 1. ACTUAL SLOPE OF TRENCH SIDES TO BE DETERMINED BY THE CONTRACTOR TO FIT THE METHOD OF CONSTRUCTION AND ALL SAFETY REQUIREMENTS. 2. MECHANICAL COMPACTION SHALL BE REQUIRED FOR ALL TRENCHES. TYPICAL TRENCH SECTION City of Yakima — Engineering Division APPROVED: 4-18-02 CITY OF YAKIMA - STANDARD DETAIL TYPICAL TRENCH SECTION W3 11' VALVE & VALVE BOX VALVE & VALVE BOX ..61 TEE or CROSS lNIVALVE & VALVE BOX 2.5' HYDRANT VALVE & VALVE BOX VARIES NOTE CONCRETE CURB & GUTTER R/W ft ce /CLOCATE HYDRANT PER PLANS. 1. INFORMATION AS TO TYPE OF FITTINGS, PIPE ETC... HAVE BEEN PURPOSELY REMOVED TO CLARIFY THE LOCATION OF WATER RELATED STRUCTURES. SEE INDIVIDUAL DETAILS FOR ADDITIONAL INFORMATION. TYPICAL INTERSECTION LAYOUT City of Yakima — Engineering Division U, w > APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL TYPICAL INTERSECTION LAYOUT W4 2" DOUBLE STRAP SERVICE SADDLE z co 2" SCH. 80 PVC & FITTINGS CONCRETE BLOCKING (SEE PLUG DETAIL) COMPLETE VALVE BOX TO BE SUPPLIED AND INSTALLED BY CONTRACTOR. PLAN VIEW UPPER SECTION OF VALVE BOX (RICH MODEL 940—B) 2' w O U 2" DOUBLE STRAP SERVICE SADDLE 2" x 6" BRASS MIP NIPPLE 1 ob VENTED PVC PLUG 2" SCH. 80 PVC (PE x MIP) LENGTH AS REQ'D 2" CURB VALVE WITH STOP/WASTE (FIP x PJ) 0.25 CY DRAIN ROCK 1 /j,\\ s 4" min. — 12" max. LENGTH VARIES ELEVATION VIEW r 2" FIP ADAPTER `— 45' BEND 2" SCH. 80 PVC 45' BEND APPROVED: 6-28-07 CITY OF YAKIMA - STANDARD DETAIL TYPICAL BLOW OFF ASSEMBLY W5 1 1 1 TEES SIDE VIEW (TYPICAL ALL BLOCKING) Zft PLUG (USE MECH. CAP FOR SLIP JOINT PIPE. (L) PLUGS & CAPS SQUARE STEEL PLATE 1/4" THICK NOTES BENDS 1. FORM CONCRETE TO ALLOW REMOVAL OF BOLTS. 2. ALL FITTINGS AND/OR PIPE MAKING DIRECT CONTACT WITH CONCRETE SHALL BE WRAPPED WITH 4 MIL. POLYETHYLENE SHEETING PRIOR TO PLACEMENT OF CONCRETE. 3. (D) IS NOMINAL PIPE DIAMETER. THE TABLE OF END AREAS IS BASED ON AN ALLOWABLE SOIL BEARING PRESSURE OF 1500 psf. THE ENGINEER SHALL DETERMINE THE REQUIRED END AREAS. 4. ALL CONCRETE IS TO BE CLASS "B" CONCRETE AND IS TO BE POURED IN PLACE. MINIMUM END AREAS PIPE SIZE (D) TEES & PLUGS 45' BENDS 22 1/2' BENDS 6" 5.1 sq. ft. 3.9 sq. ft. 2.0 sq. ft. 8" 8.8 sq. ft. 6.7 sq. ft. 3.4 sq. ft. 10" 14.3 sq. ft. 11.0 sq. ft. 5.6 sq. ft. 12" 20.4 sq. ft. 15.7 sq. ft. 7.9 sq. ft. 14" 27.7 sq. ft. 21.2 sq. ft. 10.7 sq. ft. 16" 35.8 sq. ft. 27.5 sq. ft. 13.9 sq. ft. TYPICAL CONCRETE BLOCKING City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL TYPICAL CONCRETE BLOCKING W6 TYPE "A" BLOCKING FOR 11 1/4', 22 1/2', 30' VERTICAL BENDS DIA. (VB) (S) (d) (L) 4" 11 1/4 0.2' 1.5' 4" 221/2 2.2' 5/8" 2.0' 30 2.6' 5.0' 11 1/4 2.2' 12" 45 6" 22 1/2 2.9' 5/8" 2.0' 7.8' 30 3.5' 20" 8.2' 8" 111/4 2.5' S/8" 2.0' 22 1/2 3.6' 30 4.1' 3/4" 2.5' 111/4 3.2' 5/8" 2.0' 12" 22 1/2 4.5' 7/8" 3.0' 30 5.1' 111/4 4.1' 7/8" 3.0' 16" 22 1/2 5.7' 1 1/8" 4.0' 30 6.5' 1 1/4" 11 1/4 4.5' 7/8" 3.0' 20" 22 1/2 6.1' 1 1/4" 4.0' 30 6.9' 1 3/8" 4.5' 11 1/4 5.0' 1" 3.5' 24" 22 1/2 6.8' 1 3/8" 4.5' 30 7.9' 1 5/8" 5.5' TYPE "B" BLOCKING FOR 45' VERTICAL BENDS DIA. (VB) (S) (d) (L) 4" 3.1' 6" 4.1' 5/8" 2.0' 8" 5.0' 12" 45 6.1' 3/4" 2.5' 16" 7.8' 1 1/8" 4.0' 20" 8.2' 1 1/4, 24" 9.4' 1 3/8" 4.5' DIAMETER OF HOLE EQUAL TO THE DIAMETER OF RESTRAINT ROD PLUS 1/8". POLLARD UNDERGROUND CLAMP OR APPROVED EQUAL TYPE "A" BLOCK NG (FOR VERTICAL BENDS OF 30' OR LESS) POLLARD UNDERGROUND CLAMP OR APPROVED EQUAL TYPE "B" BLOCKING (FOR 45' BENDS) NOMINAL PIPE DIAMETER AS PER TABLES ABOVE POLLARD UNDERGROUND CLAMP CONCRETE VERTICAL BEND BLOCKING City of Yakima - Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL VERTICAL BEND BLOCKING W7 1 STANDARD METER COVER RING 8c LIDS OUTLET OF VENT MUST BE SCREENED 90' BEND MIP x CTS 1" DIA. x 6" BRASS NIPPLE 1" RIGHT ANGLE METER BALL VALVE 1" METER ADAPTER IP x THREADS CLEAN GRANULAR MATERIAL TO DISPERSE WATER 1" TYPE K COPPER LINE OR CROSS LINKED POLYETHYLENE O • • G - • -o 2 i -O . a -o NOTE VAL MATIC MODEL 201C OR EQUAL. COMBINATION AIR—VACUUM VALVE. 1" DIA. x 3" BRASS NIPPLE 18" DIA. 80 PIP PVC PIPE APPROXIMATELY 32" LONG- 1"x1"x1- BRASS TEE 2" DIA. PIPE OF A LENGTH TO SUPPORT A/V ASSEMBLY BRICK FOR SUPPORT BASE. 1. BLOW OFF ASSEMBLY AND T1LE TO BE SET BEHIND CURB LINE OR BACK OF SIDEWALK 1" CORPORATION BALL VALVE AIR -VACUUM RELIEF VALVE City of Yakima — Engineering Division APPROVED: 8.29.01 CITY OF YAKIMA - STANDARD DETAIL AIR -VACUUM RELIEF VALVE W8 CITY OF YAKIMA STANDARD rPREFABRICATED COVER SECTION 3" R.S. GATE VALVE 4" D.I. SERVICE LINE 7 i 1' x 5' DIA. CONCRETE WELL CURBS 2" THICK EXTRUDED 3" COMPOUND METER POLYSTYRENE BOARD SEE NOTE 3" FLxFL 3" FLxFL 90' BEND 90' BEND 4" MJ x 3" FL REDUCER, ROMAC GRIP RING ACCESSORY KIT REQUIRED ROMAC GRIP RING — ACCESSORY KIT REQUIRED AT MAIN VALVE //// /////i 0111 '&IIN ImII* Is' 3" FL x FL TEE 1 1/2" x 10 1/2" BRASS NIPPLE NOTE 1. 1 1/2" BALL VALVE 1 1/2" x 7" BRASS NIPPLE 3" R.S. GATE VALVE z 'n i. 5' LENGTH OF 4" D.I. PIPE BOTTOM WELL CURB SECTION TO BE SET ON CONCRETE BLOCKS AND NOTCHED TO MAINTAIN TWO (2) INCHES CLEARANCE OVER THE SERVICE LINE 4" MJ x 3" FL REDUCER, ROMAC GRIP RING ACCESSORY KIT REQUIRED 3" FL x FL x MJ TEE 3" COMPOUND METER SHOWN. IF LARGER THAN 3" COMPOUND METER IS USED, RESIZE THE SERVICE LINE, 90' BENDS, GATE VALVES AND TEES TO TO APPROPRIATE SIZE AND DELETE THE REDUCERS. COMPOUND METER INSTALLATION City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL COMPOUND METER INSTALL W9 CITY OF YAKIMA STANDARD PREFABRICATED COVER SECTION COPPER METER SETTERS SHALL BE EQUIVALENT TO EITHER FORD #VB1366-27B-44 OR # V13B77-278-44, 1 1/2' OR 2' RESPECTIVELY 1' x 4' DIA. CONCRETE WELL CURBS TYPE K COPPER OR CROSS LINKED POLYETHELENE TUBING FLOW 2" THICK EXTRUDED POLYSTYRENE BOARD W/ 7 HOLE TO READ METER //////////A f'// /////// 5' MIN. z BOTTOM WELL CURB SECTION TO BE SET ON CONCRETE BLOCKS AND NOTCHED TO MAINTAIN TWO (2) INCHES CLEARANCE OVER WATERLINES 1 1/2" & 2" METER INSTALLATION City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL 1 1/2" & 2" METER INSTALLATION W10 30" OPENING • DCA'S MAY BE SINGLE OR PARALLEL w INSTALLATIONS RANGING IN SIZE FROM 0 2 1/2" THROUGH 10". THE SIZE >- OF THE VAULT IS DETERMINED BY D THE DCA CONFIGURATION USED. m In 4 v CO z Un OPEN BOTTOM 12'-0" x 6'-9" OR 8'-0" x 5'-2" INSTALL REQUIREMENTS FOR DCA'S City of Yakima — Engineering Division "co APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL INSTALL REQ. FOR DCA'S W11 30" OPENING 4. v. 4 DDCA'S MAY BE SINGLE OR PARALLEL INSTALLATIONS RANGING IN SIZE FROM 2 1/2" THROUGH 10". THE SIZE OF THE VAULT IS DETERMINED BY THE DDCA CONFIGURATION USED. ' BURY DEPTH d a 4 4 r BRASS PIPING BALL VALVE ' —BRASS PIPING BALL VALVE co z N 4. 3/4 DOUBLE CHECK VALVE 12'-0" x 6'-9" \--OPEN BOTTOM 5/8 x 3/4 METER READ—OUT IN ft3 OR 8'-0" x 5'-2" INSTALL REQUIREMENTS FOR DDCA'S City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL INSTALL REQ. FOR DDCA'S W12 5' STEEL LINE POST SET AT END OF CURB STOP. TOP TO BE 4 TO 6 INCHES BELOW THE SURFACE EXISTING STREET ////////////////ilii/////, SELECT BACK FILL WATER MAIN R/W SET CURB STOP TO PERMIT INSTALL OF RISER IN PUBLIC RIGHT OF WAY SERVICE LINE — TYPE K COPPER OR CROSS LINKED POLYETHYLENE 1 BALL VALVE CURB STOP CTS INLET x IP THREAD OUTLET CURB STOP IP THREAD INLET x CTS OUTLET 90' ELBOW O FLOW 3/4" & 1" SERVICE LINE w/o METER City of Yakima — Engineering Division Z m In APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL 3/4" & 1" SERVICE LINE W13 CITY OF YAKIMA STANDARD METER COVER & RING FURNISHED BY THE CITY AT CONTRACTORS EXPENSE 36" x 18" DIA. WHITE 80 PIP RISER ANGLE BALL VALVE ALL BACKFILL MATERIALS SHALL BE COMPACTED PRIOR TO SETTING THE METER TILE 2"x8"x16" PATIO BLOCK (TYP) r 16 GAUGE INSULATED SOLID COPPER TRACING WIRE STRAPPED TO CROSS LINKED POLYETHYLENE & CONNECT TO CORP. COCK i i ANGLE METER ADAPTER FINISHED GROUND 1 1/2" THICK EXTRUDED POLYSTYRENE INSULATION I � j / METER W/ HOLE TO READDOI WHEN USING CROSS LINKED POLYETHYLENE, ATTACH PIPE TO 5' METAL POST W/ NYLON ZIP—TIES. NOTES 1. USE CROSS LINKED POLYETHYLENE OR TYPE K COPPER DIELECTRIC COUPLING REQUIRED WHEN USING METALLIC PIPE I!III!I! 5' OUT LEG REQUIRED W/ FITTING z in 2. WHEN USING CROSS LINKED POLYETHYLENE A BENDING SUPPORT MUST BE USED AT ALL 90' BENDS 3. WHEN USING CROSS LINKED POLYETHYLENE AN INTERNAL TUBING STIFFENER MUST BE USED ON ALL FITTINGS 4. ALL BENDS TO BE MADE WITH COPPER TUBING BENDER wi4 5/8", 3/4" & 1" METER INSTALLATION City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL 5/8", 3/4" & 1" METER INSTALL W14 TAPS FOR 1 1/2" AND 2" DIA. SERVICES SHALL BE MADE UTILIZING A TWO STRAP TAPPING SADDLE, HAVING IP THREADS. TAPPING SHALL BE DONE WITH A MULLER MODEL D-5 TAPPING MACHINE ALL IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED WITH SAID TAPPING MACHINE. APPROX. PARALLEL TO FINISHED SURFACE NOTES 1. ALL CORPORATION STOPS SHALL BE BALL VALVES TAPS FOR 3/4" AND 1" DIA. SERVICES SHALL BE MADE UTILIZING A MULLER MODEL B-101 TAPPING MACHINE. THREADS SHALL BE CC. TAPS SHALL BE IN ACCORDANCE WITH THE INSTRUCTIONS INCLUDED WITH SAID TAPPING MACHINE. TAPPING PROCEDURE DETAIL City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL TAPPING PROCEDURE DETAIL W15 SYMMETRICAL ABOUT // OF WATER MAIN NTERLINE.♦♦.♦♦♦.♦♦.♦�.�.�♦�.�.�♦�.�♦�♦�♦�♦�♦�.�♦�♦ 0������������������41 PARALLEL WATER/SEWER SEPARATION City of Yakima — Engineering Division CITY OF YAKIMA - STANDARD DETAIL APPROVED: 7.9.99 WATER/SEWER SEPARATION W16 6" AMETEK LID 6" PVC PIPE STRAIGHT CURB STOP STOP/WASTE PJxFIP FLOW STRAIGHT METER ADAPTER PLASTIC IRRIGATION BOX 3/4" — 2" METER r NOTE r FIPxSLIP PVC COUPLING ANGLE BALL VALVE CURB STOP METER x PJ 90' MIPxPJ ELBOW COPPER OR CROSS LINKED POLYETHYLENE 1. ALL FITTINGS ARE TO BE BRASS. 3/4" & 2" IRRIGATION METER SET City of Yakima — Engineering Division APPROVED: 7.9.99 CITY OF YAKIMA - STANDARD DETAIL 3/4" & 2" IRRIG. METER SET W17 APPENDIX J Pacificorp — Power Specs 2011 Electric Service Requirements, 2nd Edition Section 5 5.5 Clearances From Padmounted Equipment and Pedestals The customer shall comply with the distances listed in the figures below, in addition to state and local requirements. See Section 2.1, Codes and Ordinances, for more information. Figure 5.5.1 — Free -Standing Meter Base Clearances from Permanent Power Company Equipment The meter base shall be a minimum of 6 feet from a transformer or other metallic equipment. The meter base shall be a minimum of 3 feet from non-metallic equipment (such as secondary boxes). Greater separation may be needed for conduit and minimum sweep requirements. The meter base shall be a minimum of 6 feet from a pole. (Customer - owned poles taller than ten (10) feet shall not be placed beneath overhead lines.) MUMMY MI g metallic equipment •— 3' min, ': non-metallic equipment 4— 6' min. — - Power Company pole Figure 5.5.2 — Clearances Between Equipment Pads and Buildings window wal (or eave) doorway 120e1ffiriPa aaraoraamS11721 .lCIESMmaWwemMIaw$50101511391 SHIM egress window mc.cmi® LORA ..... f9 WHIM Si Og frorti:;edge <i of•wlndoW from'edge'::+;rs of:egressi.. window;.or{ -doorway `. (if clearances from edges are met ) single-phase non -access side 3' In all directions access side Distances are from the pad. Centerline represents the hinges on the access door. three-phase non -access side 3' in all directions access side Distances are from the pad. Centerline represents the front (access side) of the transformer. MS workspace clearances fire code clearances 1PACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation. i 27 28 Section 5 2011 Electric Service Requirements, 2nd Edition Requirements: 1. Distances noted in Section 5.5 and Table 5.5 are from the pad. 2. If the building has an overhang, the distance is measured from the outside edge of the overhang. 3. Outside walkways or stairs attached to the building are considered part of the building. Minimum clearances must also be maintained from walkways used for exiting to a place of safety. 4. Distances less than those specified in Table 5.5 (but not less than the required working space) may be allowed if approved by the appropriate code enforcement authority. This may require alternate means of fire protection per NEC Section 450.27 and NESC Section 152(A)(2), including fire barriers, fire -rated walls, sprinkler systems, oil -containment means, or other measures. Use of alternate means of fire protection must be approved by the local code enforcement authority. 5. The final grade at the location of the transformer shall provide oil drainage away from the building. Otherwise, an oil containment means is required. 6. The customer shall conform to all local building codes, insurance regulations, and/or ordinances affecting the transformer location. 7. Combustible/non-combustible construction types are defined by respective state building codes. 8. No vegetation other than grass or sod shall be present in the clear workspace. 9. Trip hazards such as gutters, spigots, etc., shall not exist within the clear workspace. Curbs may be acceptable in the clear workspace; contact the Power Company during site scoping. 10. A minimum 6 -foot (6') clearance between fire hydrants and metallic padmounted equipment shall be maintained. This clearance may be reduced to 4 feet (4') for non-metallic equipment. Greater separation may be required by local ordinances. 11. Where equipment is exposed to vehicle traffic, barrier posts are required; see Section 9.9 and consult the Power Company for installation -specific requirements. 12. Additional clearances may be required for other padmounted equipment. Table 5.5—Clearances Between Oil -Filled Padmounted Equipment and Structures, and Structure Openings Type of Framing Clearance In Front of Framing (ft) Clearance to Side of Framing (ft) Vertical Clearance from Framing (ft) Fire escape 20 10 Doorway 20 10 Window that can be opened 20 10 Solid window 10 5 10 Air vent intake 20 10 25 Air vent exhaust 10 10 25 Combustible surface (single-phase) 8 See Figure 5.5.2 Combustible surface (three-phase) 8 See Figure 5.5.2 Non-combustible surface (single-phase) 3 See Figure 5.5.2 Non-combustible surface (three-phase) 3 See Figure 5.5.2 NPACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and Interpreted in its entirety. Individual pages will not represent all the requirements necessary to an Installation. t i 2011 Electric Service Requirements, 2Rd Edition Section 6 6 Underground Requirements 6.1 General The customer is responsible for providing all trenches, backfill, compaction, conduit, and equipment foundations. The customer shall meet the requirements described in this section to complete construction for underground installation of services. Consult the Power Company for conduit layout, and for equipment foundation requirements for secondary and primary extensions. The customer shall give consideration to local ground and frost conditions such that the installation remains structurally sound. The customer is responsible for ensuring that all conduit complies with Power Company requirements at the time of the cable installation. Conduit systems installed prior to written approval from the Power Company shall be subject to Power Company acceptance and the requirements of this manual. 6.2 Conduit Requirements The Power Company owns and maintains the customer -installed conduit and the service lateral to the service point. The Power Company will install the underground cable from the Power Company's source to the service point. All services shall be installed in conduit. Requirements: The following list of requirements applies to all conduit installations: 1. The customer shall ensure that Power Company conduit is located away from (and never underneath) buildings, building foundations, or other structures (including retaining walls). 2. The customer is responsible for recognizing potential surface and subgrade water flows and coordinating with the Power Company to minimize potential runoff problems. 3. All raceways and conduit shall be sealed to prevent the infiltration of water into the electrical equipment. 4. The customer shall install fiberglass, electrical -grade PVC, or RMC conduit. Above -ground conduit shall be Schedule 40 PVC or better. Some jurisdictions may require conduit grades better than Schedule 40; consult the local governing code. (Fiberglass conduit shall meet the requirements of PacifiCorp Material Specification ZG 033, Fiberglass Conduit, posted beneath this manual at www.pacificpower.net\ESR and www.rockymountainpower.net\ESR.) 5. All joints shall be compressed to the depth of the coupling system, and glued. Where straight ends and bell ends are joined, the straight end shall be beveled so as not to become an obstacle to mandrels or pulled cable. 6. The customer shall supply smooth-walled conduit reducers (swedges) when required. 7. The customer shall provide and install conduit, including long -radius elbows (or "sweeps). See Table 6.2.1, Sweep Specifications. All elbows shall be fiberglass or PVC. (Steel elbows may be allowed with prior approval from the Power Company.) 8. When conduit terminates at Power Company equipment, the customer shall consult the Power Company for the exact conduit location. The customer shall not install conduit within two feet of Power Company facilities, unless requested by the Power Company. 9. When conduit extends vertically through a paved or concrete surface, a sleeve shall be placed around the conduit to prevent direct contact with the pavement. This helps prevent damage to conductors and service equipment caused by soil settling. 10. The customer shall keep conduit free of dirt and debris during installation. 1PACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and Interpreted in its entirely. Individual pages will not represent all the requirements necessary for an Installation. i i i 31 i i 32 Section 6 2D11 Electric Service Requirements, 2nd Edition 11. The customer shall provide backfill, compaction, and surface restoration that conforms to city, county, and state requirements. 12. The customer is responsible for repairing crushed conduit, including any costs for crews to return to the job site. 13. The customer shall provide a flat pull line (preferred) or poly rope (alternative) capable of withstanding 500 lbs. of tension, installed with six feet of extra line able to extend from each end of the conduit. The pull line shall be secured inside the ends of the conduit and both conduit ends shall be capped. 14. All underground raceways shall be proofed with a mandrel to remove obstructions, and to confirm at least 80 percent of the nominal conduit diameter. When requested by the Power Company, the customer shall perform a "witnessed proofing"of conduit systems. See Table 6.2.2, Required Mandrel Sizes for Conduit Proofing, and Figure 6.2, Mandrel Proofing. 15. The customer shall not install customer -owned conductors in the same conduit/vault system with Power Company conductors. Table 6.2.1 – Sweep Specifications Diameter (in.) Long Radius Sweep (in.) Minimum Fiberglass Wall Thickness (in.) 3 36 .070 4 36 .096 5 48 .110 6 48 or 60 .110 Additional Requirements for Fiberglass elbows: 1. Fiberglass elbows require special couplings; see PacifiCorp Material Specification ZG 033, Fiberglass Conduit, for details. ZG 033 is posted beneath this manual at www.pacificpower.net\ESR and www.rockymountainpower.net\ESR. 2. Elbows must be certified by a Nationally Recognized Testing Labratory (NRTL). Table 6.2.2—Required Mandrel Sizes for Conduit Proofing Conduit Nominal Diameter (in.) Mandrel Diameter (in.) Minimum Mandrel Length (in.) Maximum Mandrel Length (in.) Proof (percentage) 3 2.5 3.25 8 83 4 3.5 4.25 8 87 5 4.75 5.25 10 92 6 5.5 6.25 10 92 Figure 6.2—Mandrel Proofing NPACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and interpreted In its entirety. Individual pages will not represent at the requirements necessary to an Installation. 1 1 1 t 1 r 1 1 2011 Electric Service Requirements, 2nd Edition Section 6 6.2.1 Service Conduit Requirements The customer shall meet the following requirements when preparing a service conduit system: 1. A stronger conduit material, larger conduit size, or larger sweep radius may be required for long runs or more than three bends. The customer shall obtain written approval from the Power Company for exceptions. 2. The customer must meet minimum conduit size requirements. Table 6.2.1.1 below lists the minimum acceptable conduit sizes for Power Company service lateral conductors. 3. Provide trenching to code depth. Minimum cover of 24 inches over conduit is required for secondary services. 4. Trench requirements as shown in Figures 6.3.3 and 6.3.4 shall be met. 5. An aerial extension (primary or secondary) to connect a new underground service is not allowed, unless the following conditions exist: a. Physical obstacles such as large culverts or sewer lines prohibit boring or trenching. b. Boring is prohibited by the municipal, county, or state authority. c. Geological barriers such as deep canyons, water ways, solid rock, steep slopes, or unstable soil conditions prohibit trenching or boring. i Table 6.2.1.1 — Conduit Sizes, Run Lengths, and Bend Limits Phase Load Conduit Size Conduit Length (ft.) Max. Degree of Bends Single 200 amps or less one 3 -inch 150 270 Single 201 to 400 amps one 3 -inch 150 270 Single 401 amps or more two 4 -inch 100 270 Three 200 amps or less one 3 -inch 150 270 Three 201 to 400 amps one 4 -inch 150 270 Three 401 to 600 amps two 4 -inch 100 270 Three 601 to 800 amps three 4 -inch 100 270 Three 801 amps or more Consult Power Company 50 Consult Power Company Note: For sizes or quantities different than those listed in this table, contact the Power Company. NPACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and Interpreted in ds entirety. Individual pages will not represent all the requirements necessary for an Installation. 33 1 34 Section 6 2011 Electric Service Requirements, 2nd Edition 6.3 Trench and Backfill Requirements The customer shall provide all trenching. OSHA requires that the trench be shored when the combined height of the trench and the spoil exceeds five feet. To comply with OSHA rules when not shoring a trench, the customer shall keep the spoil at least two feet away from the open trench. To the extent possible, trench bottoms shall be level and made of well -tamped earth or selected backfill without sharp rises and drops in elevation. Rock spurs or ridges shall not project into the trench. If trenching is left open overnight, the customer is responsible for cleaning prior to conduit installation. If state or local regulations are more stringent than Power Company requirements, the more stringent requirements shall apply. 6.3.1 Backfill Requirements The following list of requirements applies to all installations requiring backfill: 1. The customer shall provide trench backfill and site restoration. 2. All backfill shall be free of materials that may damage the conduit system. Backfill within 4 inches (4") of the conduit shall be select (capable of passing through a 3/4" seive). 3. The Power Company will not energize conductors until the customer completes the backfill to Power Company satisfaction. Extra caution should be taken when refilling trenches. The cost to repair a conduit and the Power Company's crew costs are the responsibility of the customer/developer. 6.3.2 Call Before You Dig State laws require the customer or excavator to call for underground utility locations. Excavation may not be started until locations have been marked or the utilities have informed the excavator that there are no facilities in the area. Notify the local underground locating services (811) before you dig, or refer to Table 1.12 for other contact options. 6.3.3 Service Trench When installing only service cable in the trench, follow the dimensions and requirements in Figure 6.3.3 below. Figure 6.3.3 — Service Trench (Only) spoil (typical) final grade 12" min. I 24" min. 4 backfill service conduit/ cable Backfill within 4 inches (4, of the conduit shall be select (capable of passing through a 3/4"seive). LEGEND service • (conduit / cable) "0 backfill screened backfill undisturbed earth See Section 6.3.1 for backfill requirements. NPACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and Interpreted in its entirety. Individual pages wit not represent all the requirements necessary tar an Installation. 2011 Electric Service Requirements, 2nd Edition Section 6 6.3.4 Joint Use Service Trench Joint use trenching requirements may vary by area; consult the Power Company for requirements before installation. The customer may be allowed to place communication, signal, and other electrical supply conductors in the same trench as Power Company conductors, provided that the installation meets Power Company policy, and all concerned parties agree on the placement. final grade The Power Company will not install electrical conductors in a common trench with water lines, sewer lines, or other drainage lines. For a joint use trench with gas lines, contact the Power Company for requirements. When installing service cable in a joint use trench, follow the dimensions in Figure 6.3.4. Figure 6.3.4 - Joint Use Service Trench spoil (typical) 24" min. + / 24" min., 48" max. Q a a v a Q c ,/ a • Backfill within 4 inches (47 of the conduit shall be /�\ select (capable of passing •� through a 3/4"salve). • 12" min. a A LEGEND • other cable utilities (telephone, cable tv) secondary / service (conduit / cable) • V. I 0 backfill select backfill undisturbed earth See Section 6.3.1 for backfill requirements. PACIFICORP Pacific Power I Rocky Mountain Power This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary For an Installation. 1 i 35 i GV 001 Equipment Bases and Enclosures—General Information A. Scope This standard provides information for the selection and application of pads, box pads, padvaults, manholes, and vaults in the distribution underground system. Included in this section are standards for concrete and polymer concrete pads, nonconcrete box pads, and concrete padvaults, manholes, and vaults. Material specifications for individual pieces are located in distribution specifications section ZG, Underground. B. General 1. Applications Precast pads, box pads, padvaults, manholes, and vaults are preferred wherever field conditions allow proper site preparation. Field -poured pads, manholes, and vaults may be used where existing conditions require. All new pad, box pad, padvault, manhole, or vault insulations for padmounted transformers shall be installed by the customer. Nonetheless, the requirements listed in this section shall be adhered to whether the material is installed by the customer, contractor, vendor or PacifiCorp. Structures which do not meet the minimum requirements listed in this standard will not be accepted. 2. Descriptions a) Pads A flat pad is a concrete base for padmounted transformers. Flat pads support the mounted equipment's weight without deflection (see Figure 1). Flat pads are to be used for replacement of old flat pads under single- and three-phase transformers. Flat pads may also be used for new three-phase transformer installations in irrigated or chemically contaminated areas, where chemicals may seep into the padvault or box pad. Flat pads are acceptable for use in direct -buried systems, and in conduit systems in irrigated or chemically -contaminated areas. Flat pads shall be used only where the ground is both level and sufficiently firm to prevent future shifting or tipping of the transformer. If the installation site foundation is not sufficiently firm, a box pad may be used in place of the flat pad with field engineer approval. Figure 1 - Typical Equipment Flat Pad Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): Standards Manager (G. Lyons): 10 Equipment Bases and Enclosures—General Information PACIFICORP A MICAmEnICA>j F"! Gy gOuto.Gscommtir 4 Apr 07 GV 001 Page 1 of 12 i i GV 001 b) Box Pad A box pad is a fiberglass or polymer -concrete base for padmounted equipment, with sufficient space inside for training cables. Polymer -concrete box pads weigh more than fiberglass, but are generally less expensive, more UV -resistant, and less likely to suffer buckling in areas where there is a high probability of incidental traffic. Box pads do not have bottoms and have no pulling eyes for cable pulling (see Figure 2). Box pads can be used with conduit by terminating the conduit with an elbow, or by stubbing up the conduit; however, padvaults are the first choice in conduit systems. Figure 2 - Typical Equipment Box Pad c) Padvault A padvault is a two-part concrete base for padmounted equipment, consisting of a pad and an open vault. Padvaults are the preferred base for padmounted equipment in conduit systems. Padvaults are designed to be set such that the top of the pad is three inches above the final grade in non -pedestrian areas, and flush with the final grade in pedestrian areas. Access is provided on the larger vaults; however, padvaults are not designed for routine operations work to be conducted inside. Additional cables may be pulled after equipment has been set. Cable pulling provisions are included (see Figure 3). Ground inserts, sumps, pulling eyes, and cable support brackets are supplied as required. PACIFICC RP AU M11FR. 1LAMESRC tOWINO5OOMMW GV 001 Page 2 of 12 4 Apr 07 Equipment Bases and Enclosures—General Information Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): PAO Standards Manager (G. Lyons): ..tld GV 001 Figure 3 - Typical Equipment Padvault d) Manhole A manhole is a subsurface enclosure that contains submersible junctions and splices. The equipment is installed and maintained by personnel inside the enclosure. Any switching is operated from the surface of the manhole. Depending on site requirements, a manhole may have a round cast-iron cover, or a door made of steel, composite, or polymer -concrete (see Figure 4). Figure 4 - Typical Manholes Distribution Construction Standard © 2007 by PacifiCorp. AU rights reserved. Engineer (D. Wedam): /fyll^-) Standards Manager (G. Lyons): ,tiej Equipment. Bases and Enclosures—General Information nPACIFICORP MN/AMPREAPI ENERGY MOLDINGS COMPANY 4 Apr 07 GV 001 Page 3 of 12 GV 001 e) Vault A vault is an above- or below -grade enclosure into which personnel may enter for the purpose of installing, maintaining, or operating equipment. Vaults are usually custom designed for a particular application. Vaults have more than one opening from the top or sides (see Figure 6). Vaults shall be used whenever equipment is to be operated from within the enclosure. Vaults typically contain transformers, switching equipment, or both, and are equipped with forced air ventilation, lighting, and sump pumps. For more information on specialty vaults, refer to Construction Standards GV 061, GV 071, GV081, and Engineering Handbook volume 2L.1. Figure 5 - Typical Double Entry Manhole 10' X 10' Lift—Out Door Pad—Mount Transformer a' x a' 10' x 10' Lift—Out Door Pad—Mount Transformer a' x a' 0 10' X 10' Lift—Out Door Pad—Mount Traneforrner 8' X 9' 0 ID' if 10' Lin—Out Door Pod—Mount Capacitor Bank a' x 8' Man—Door Into Building iIDbra enbie • 21' 61' Figure 6 - Example of Underground 3 -Transformer Vault with Capacitor Bank and Switch PACIFICORP AMIOAMERCAN ENERGY NOLOINGO COMPANY GV 001 Page 4 of 12 4 Apr 07 Equipment Bases and Enclosures—General Information Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): kV) Standards Manager (G. Lyons): i 1 GV 001 C. Site Selection and Preparation 1. The site shall be inspected prior to selecting the equipment base or enclosure type or determining the installation details. The following items should be included in the inspection: a) Soil class. Excavation equipment and drainage requirements are determined by soil class. Soil stability, including the consequences of inclement weather, shall be determined, and recommendations made on shoring or sloping requirements. b) Water table. All openings and conduits shall be sealed where a possibility of flooding exists. Precautions should be taken to prevent any flooding from affecting customer -owned equipment in adjacent structures. Refer to Construc- tion Standards section GC for details. c) Final Grade. If final grade has not yet been established, measures must be made to allow for anticipated grade changes. Where radical changes in grade are anticipated, installation should be delayed until near -final grade has been achieved. d) Site accessibility. The site location for any piece of padmounted equipment shall be within 15 feet of a gravel or paved surface. Future access requirements for operation and maintenance of equipment shall be considered when determining equipment location. For example, if the site is in or near a traffic area, loading issues or barriers should be considered. e) Required clearances and oil spill procedures, if oil -filled equipment is to be installed at the site. 2. Excavations should be no deeper than is necessary to install conductors or conduit, and set the equipment base or enclosure. All soil beneath any type of equipment base or enclosure shall be compacted in six-inch lifts, and leveled to within 2% slope prior to setting or pouring at the site. Customer shall supply a six-inch base of 3/4 -inch -minus gravel compacted to 90% of dry density under the equipment base or enclosure, and under any portion of the pad not situated directly atop the equipment base or enclosure. Flat pads for three-phase transformers shall be placed on 18 inches of compacted 3/4 -inch -minus gravel compacted to 90% of dry density. In marshy areas, where an adequate foundation cannot be created through normal methods, pilings may be required. 3. In locations where equipment damage due to vehicular traffic may occur, protective barriers shall be installed by the customer (see section J. of this document for barrier post requirements). If standard steel or concrete posts are unacceptable, alternate design barriers may be installed by the customer upon approval of the area engineer. Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): 1) Standards Manager (G. Lyons): .114 Equipment Bases and Enclosures—General Information 17 PACIFICORP A 1•4OAMEPIGAN EN£OGY HOUNNGS COMPANY 4 Apr 07 GV 001 Page 5 of 12 i GV 001 D. Clearances 1. Working Space The equipment base front (any side which opens for maintenance and operation) shall face away from any adjacent structure and shall have a minimum of ten feet of clearance from obstructions. A minimum of three feet shall separate all other sides of an equipment base from any adjacent structure (see Figure 7). C r C7 r--- 3' 3' 10' Keethis areaclear Figure 7 - Clearances for Working Space 2. Buildings and Structures All sides of an equipment base for oil -filled equipment shall be at least ten feet from any combustible structure. In addition, the following rules shall apply: a) Eaves and Overhangs If an adjacent, noncombustible structure has any eave or overhang consisting of combustible material, the distance from the pad to the structure shall be a minimum of 8 feet. If the eave or overhang of the structure is noncombustible, the distance from the pad may be reduced to 3 feet. b) Air intakes The equipment base shall not be placed within thirty-two vertical feet of any air intake. c) Valves The equipment base shall not be placed within fifteen feet of any valve or within twenty feet of any pumping or storage facility containing flammable materials. PACIFICORP AMOAMUb '4 MFEGY N=MOSCOMPANY GV 001 Page 6 of 12 4 Apr 07 Equipment Bases and Enclosures—General Information Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): kid Standards Manager (G. Lyons): i i GV 001 d) Windows The equipment base shall not be placed within a ten -foot perimeter of any window in an adjacent structure, nor within twelve vertical feet of a window (see Figure 8). 10' 10' Window No Equipment 'Base In This Are4 I � 0 Figure 8 - Clearances for Windows e) Doorways An equipment base shall not be placed within an area spanning ten feet to either side of any door(s) in an adjacent structure, and twenty feet out from the structure (see Figure 9). 10' —•( h 10 ' 1 I� Door No E ui ment Base In This Area 0 N Figure 9 - Clearances for Doors E. Concrete Standard materials and methods of construction shall be used for all concrete pads, padvaults, manholes, and vaults, whether precast or poured on site. Where required to provide equipment bases or enclosures, customers shall be given a list of acceptable suppliers. If the structure is to be poured on site, a licensed contractor shall certify adherence to all requirements. Final inspection will be made by PacifiCorp personnel prior to acceptance. Concrete structures for use in the PacifiCorp distribution system must meet specified construction criteria. See Material Specifications ZG 301 and ZG 311 for more information. Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): Ai() Standards Manager (G. Lyons): lid Equipment Bases and Enclosures—General Information NPACIFICORP A IMIAMMIICAT,&\'ENGY HOLDLI,GS COMPANY 4 Apr 07 GV 001 Page 7 of 12 i GV 001 F. Access Lids Access covers made of steel, polymer -concrete, composite or cast iron may be used, depending on site requirements. See Material Specification section ZG for details. Access covers made of steel, polymer -concrete or composite may be used for inciden- tal -traffic or non -traffic applications such as lawns, sidewalks, or patios (see Figure 10). Figure 10 - Incidental -Traffic Access Cover Cast-iron access covers shall be applied in full -traffic areas, such as streets, driveways, alleys, or parking lots (see Figure 11). Full -traffic lids should not be used in conjunction with bases supporting padmounted equipment. —,g o aoo0o0 =1]=0=.0.=0,=0=1)=.0=0— o=0=0=0=0 0.=,0=0=0= o 0=a 00 _=0�0�� 000 00===== �=0=- 0 a=0�0�o=o=od o�°�o�- o °a=a=0=0=o —0=0 /o=0=0=0 0=0=°=0=.0=.0 op 0.,,,7-70=1 o� = •=11-0-0.=q1,==0.=11.=.0 o °=o=o=o�o=o°=o =po°opo°o°o°ao° ..0...11.=,0=0=,0=.0.=.0 ;id'-o=o=o=°=o=o=o=0=0=, V r- . s► I- Figure 11 - Full Traffic Access Cover PACIFICORP A UMAMERICAN 0NEpGY NOLOING6 COMPANY GV 001 Page 8 of 12 4 Apr 07 Equipment Bases and Enclosures—General Information Distribution Construction Standard ® 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): kik) Standards Manager (G. Lyons): 114 i GV 001 G. Conduit Entry Term -A -Duct conduit entrances are positioned in the walls of precast concrete pad - vaults for conduit entry. Existing Term -A -Ducts shall be used if possible. Where conduit diameter is smaller than that of the Term -A -Duct, reducer/adaptors found in Construction Standards section GC shall be used. The lowest possible Term -A -Ducts in the bank should always be used first, in order to accommodate future installations. To prevent pull-out, conduit ends shall be glued in place in the Term -A -Ducts using the glue found in section GC. The estimator may contact the vault manufacturer if an application requires a number or size of Term -A -Duct different from the standard. Holes may also be drilled in the side of the enclosure to accommodate unusual conduit entries. Conduits entering an equipment base or enclosure without Term -A -Ducts shall be terminated with bell ends. Conduits shall be sealed with spray foam to prevent water from running through the conduit into the enclosure or equipment base. See Construc- tion Standard GC 121, Conduit and Cable Pulling—Conduit Sealing, for conduit sealing procedures. H. Grounding Grid All new padvaults, manholes, and vaults shall have an internal grounding grid built into the enclosure walls. The grounding grid shall meet NESC 094.B.6. The electrodes shall be 3/8" steel rebar. One electrode shall run horizontally around the enclosure at a height at least 24 inches below final grade, and shall be continuous except for a one -foot gap. The grounding system of the enclosure shall attach to "connection" inserts, made of high -bronze alloy and threaded to 0.5"-13UNC. All inserts shall have caps or plugs installed to prevent debris entering the insert. All padvaults, manholes, and vaults shall have at least two connection inserts on the outside of the enclosure walls such that non -electric utilities can connect to a common ground. The inserts on the outside of the enclosure walls shall be located within 12 inches of the top of the enclosure. I. Cable Training Cables pulled into equipment bases or enclosures, and routed to padmounted equip- ment or primary junctions, shall be looped once around the inside of the base or enclosure before exiting to the equipment. This method produces a large bend -radius in the cable (preferred) and allows for thermal expansion in the cable. Cables being looped in an enclosure shall be supported on cable support brackets, which are described in section GV (see Figure 12). Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): pod Standards Manager (G. Lyons): Equipment Bases and Enclosures—General Information -Nr. PACIFICORP A RL DAME 1WAN EMEfGY Ha p,,e5 COMPANY 4 Apr 07 GV 001 Page 9 of 12 1 1 1 1 i GV 001 Cable Support Bracket (typ) 11 p a p'p• pa O� o b•.o • Pp �L . t • . p p p / To Padmounted a r Equipment ! Q � D A ' :r 4 • i • a .b • C v .p p>• p v a p P b.- p v a p P4. 4 p pb• Conduit Entry Figure 12 - Equipment Base Cable Training and Support Cables which only pass through an enclosure without terminating at a piece of equip- ment, including those having been spliced in the enclosure, shall be run along the wall in as simple a routing as possible to avoid congestion and tripping hazards. In large vaults, where several cables are to be run, cables shall be supported on cable support brackets (see Figure 13). P1 4 p <. p . p Cable Support Bracket (typ) Conduit Entry (typ) n n Correct Method `7 ,. . Conduit Entry (typ) Incorrect Method Figure 13 - Enclosure Cable Training and Support To maintain cable integrity and to prevent tripping hazards, cables inside a padvault with an access panel shall never rest on the floor, and are to be racked in accordance with NESC 341.B.1. For additional information on cable training, refer to Engineering Handbook Section 2L.1 PACIFICORP A MIDMSgR144V ENFJ GY NtlWINGSd)MPANY GV 001 Page 10 of 12 4 Apr 07 Equipment Bases and Enclosures—General Information Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): kW-) Standards Manager (G. Lyons): kid GV 001 J. Barrier Posts Six-inch steel or concrete barrier posts shall be provided by the customer wherever vehicular traffic may pose a threat to padmounted equipment. Steel posts shall be painted or galvanized, and may be filled with concrete. Concrete posts shall be painted. The posts shall have a domed top, and be free of burrs and sharp edges. Each barrier post shall be set in a concrete foundation at least 12 inches in diameter and 24 inches in depth below grade (see Figure 14). 7" STANDARD PIPE ■ PERMANENT POST REMOVABLE POST Figure 14 - Barrier Post Details Posts shall meet the following additional requirements: 1 In areas where construction equipment traffic poses a temporary threat to equipment, barrier posts shall be provided by the customer, and shall remain in place until the threat has been eliminated. 2. Enough barrier posts shall be installed to adequately protect the padmounted equipment from vehicular traffic. 3. If the distance between two posts, or between a post and a non -traffic area, is greater than six feet, an intermediate post shall be installed (see Figure 15). 4. Barrier posts shall be placed so as not to obstruct the opening of the equipment doors, nor to impede the operation of the equipment. If this is not possible, removable posts shall be used in the obstructive location(s) (see Figure 16). i Distribution Construction Standard © 2007 by PactliCorp. All rights reserved. Engineer (D. Wedam): PlO Standards Manager (G. Lyons): Equipment Bases and Enclosures—General Information PACIFICORP A W6tMFRICA4 ENERGY Rowi G6GOMFANY 4 Apr 07 GV 001 Page 11 of 12 GV 001 I 72" Max. J` ` .1 0 Typical Equipment Base cct 24" Min. 0 Barrier Post 0 0 ccv 24" Min. Typical Equipment Base Barrier Post Figure 15 - Typical Barrier Post Layouts Permanent (Outside of Door Swing) Door Swing 6'4 Removable (Inside of door Swing) Equipment Figure 16 - Equipment Door and Barrier Post Positioning Detail PACIFICORP MlONACEICAN ENERGY HOSQU:L$CQMJATiY GV 001 Page 12 of 12 4 Apr 07 Equipment Bases and Enclosures—General Information Distribution Construction Standard © 2007 by PacifiCorp. All rights reserved. Engineer (D. Wedam): kg.) Standards Manager (G. Lyons): lid ZG 033 Fiberglass Conduit 1 Scope This material specification provides minimum requirements for fiberglass conduit and fiberglass conduit fittings. Fiberglass conduit can be laid in the trench as conduit, used as bridge attachment or placed on a pole as a riser. Primary, secondary, or communication conductors can be pulled into this conduit. 2 Applicable Documents The latest revisions of the following documents in effect on the date of invitation to bid apply to the extent specified herein. UL 2515, Aboveground Reinforced Thermosetting Resin Conduit (RTRC) and Fittings 3 Material Requirements The fiberglass conduit shall be built to meet or exceed all requirements outlined in UL 2515 except as outlined in this specification. All manufacturers and subcontractors (if the conduit was modified from original manufacturer) must be able to provide appropriate documentation to verify that their product meets or exceeds UL 2515 and is UL -listed. For conduit that falls outside UL 2515 for aboveground standards, manufacturer shall certify that the conduit is manufactured using UL 2515 and shall have other conduits manufactured with a current UL 2515 aboveground listing. 3.1 Dimensions The conduit shall be manufactured to IPS dimensions Type AG for aboveground use as shown in Table 1. Table 1—Material Thickness and Variance (inches)* Nominal Size Minimum Inside Diameter Wall Thickness Outside Diameter Maximum Out -of -Roundness Min. Max. Min. Max. 2/ 2.215 0.090 0.105 2.365 2.460 0.040 3f 3.340 0.090 0.105 3.490 3.580 0.040 4 4.320 0.090 0.105 4.470 4.560 0.040 6 6.380 0.110 0.125 6.570 6.680 0.060 values shown in table shall be met at the stub end. 1* This size conduit is larger than IPS. I i MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (Stephan Williams): 51,{J Standards Manager (D. Asgharian): Fiberglass Conduit PACIF!CORP A MIWM@hfCAN ENVIGYHOLDING9 COMPANY 22 Dec 11 ZG 033 Page 1 of 4 1 1 1 i i i i ZG 033 3.2 Color Conduit and elbows shall be black with three red longitudinal stripes spaced 120° apart. The width of the painted red stripe shall be between a minimum of 0.75" and a maximum of 1". All factory joints shall have a distinctive and visible yellow alignment mark to aid in inspecting the proper joint installation. This yellow mark should be non–visible once joints are correctly joined. 3.3 Markings All conduits and elbows shall be durably and legibly marked in accordance with UL 2515, Section 6. The marking intervals shall not exceed five feet. Elbows shall have at least one of each marking. In addition, the following information shall be printed on the conduit, in lettering not less than 1" high: • Wall thickness (inches) • UL 2515 listing label • UL 2515 (required for electrical contractors) • Manufacturer's name • Date of manufacturing • Angle and radius marked on all elbows If any of the preceding information cannot be printed on the conduit, PacifiCorp's Standards department shall be consulted prior to approval. 3.4 Elbows All elbows shall meet nominal radius + or –3° as listed in Table 2. All elbows shall maintain a minimum of 85% of their original internal dismeter as specified in UL 2515, Section 4.5.3. Table 2—Elbow Radii Diameter (inches) Radii (inches) 2.0 3.0 4.0 6.0 24", 36" 36", 48" 36", 48" 48", 60" All elbows shall have one PVC deep -socket coupler and one PVC stub coupler for transitioning to PVC conduit or pole risers. All PVC couplings shall be installed by the manufacturer using fiberglass epoxy. The depth of the deep -socket coupler for conduit diameter is shown in Table 3. PACIFICORP AMIE/AMERICAN EREPOY ROTA NG& COMPANY ZG 033 Page 2 of 4 22 Dec 11 Fiberglass Conduit MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (Stephan Williams): '5;'ii1 Standards Manager (D. Asgharian): �� Table 3—Coupler Size and Socket Depth Nominal IPS Coupling Length Minimum Socket Size (inches) (inches) Depth (inches) 2.0 8.0 3.25 3.0 8.0 3.25 4.0 8.0 3.75 6.0 12.0 5.00 ZG 033 I 3.5 Coefficient of Friction (COF) The internal conduit walls shall be smooth with all fibers embedded in the epoxy. The supplier shall provide a friction test report to PacifiCorp at the time of approval showing that a dry fiberglass conduit tested with linear low-density polyethylene cable jacket has a dynamic COF of less than 0.25. The manufacturer shall also state how frequently a COF test is run to assure quality. Further, if the manufacturer changes process or raw material, PacifiCorp shall be notified of the changes and provided updated information on the COF. 3.6 Elbow Burn -Through Test The supplier shall provide information on bum -through tests performed on their elbows. 3.7 Quality Assurance Program for Elbows The manufacturer shall develop and maintain an effective quality control system under written procedures which shall include material controls, test, and inspections throughout the manufacturing process, sufficient to assure that the conduit or elbow shipped meets the requirements of this specification. An ISO 9001 certification is preferred. The manufacturer shall provide and maintain suitable and adequate facilities for inspection and testing. Inspection records and associated test data shall be made available for examination upon request. Quality assurance records shall be maintained by the supplier for a minimum of one year after shipment. 3.8 Conduit Joining PacifiCorp requires a gasketed joint on all fiberglass conduits. This gasketed joint shall provide the minimum pullout strength as specified in Table 4. Table 4—Joint Pullout Strength Connection Type Pullout Strength (pounds) Fiberglass to Fiberglass 500 Fiberglass to PVC 500 i MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (Stephan Williams): -€.:;.t.) Standards Manager (D. Asgharian):Dtk- Fiberglass Conduit Nviv PACIFICORP A MIDAMEnICAN ENSRGY1101.01N65 COMPANY 22Dec11 ZG 033 Page 3 of 4 ZG 033 4 Delivery The conduit shall be packaged and delivered in such a way that a forklift can remove the conduit from the side of the trailer. 5 Manufacturing Inspection Observation by a PacifiCorp representative of the manufacturer, including inspection and testing, shall be at the option of PacifiCorp. 6 Issuing Department The Engineering and Asset Management Documentation department of PacifiCorp published this material specification. Questions regarding editing, revision history and document output may be directed to the lead editor at (503) 813-5293. Technical questions and comments may be submitted to Stephan Williams, Standards Engineering, (503) 813-6986. This material specification shall be used and duplicated only in support of PacifiCorp projects. This document is considered a valid publication when the signature block in the footer has been initialed by the authoring engineer and standards manager. NPACIFICORP M DAMERKAN EN RovnDWRIcs COMPANY ZG 033 Page 4 of 4 22 Dec 11 Fiberglass Conduit MATERIAL SPECIFICATION Distribution © 2011 by PaclflCorp. All rights reserved. Engineer (Stephan Williams): fl t,! Standards Manager (D. Asgharian): ��� ZG 301 General Equipment Base and Enclosure Requirements 1 Scope This specification outlines the minimum requirements for concrete and non—concrete equipment bases and enclosures to be used in conjunction with PacifiCorp owned primary—rated equipment. The specification applies whether the equipment base or enclosure is to be installed by company personnel, contractors, customer, or the supplier. 2 Applicable Documents The latest revisions of the documents, codes standards, and requirements listed in 2.1, PacifiCorp, and 2.2, Codes and Standards, in effect on the date of invitation to bid are applicable to the extent specified herein. 2.1 PacifiCorp Documents ZG 311, Concrete Requirements ZG 321, Nonconcrete Requirements 2.2 Codes and Standards Western Underground Committee Guide 2.13, Security for Padmounted Equipment En- closures Western Underground Committee Guide 2.15, Flat Single Phase Transformer Pads 3 General 3.1 Application Information This specification states general requirements which are applicable to all equipment bases or enclosures. Requirements which are applicable to concrete bases or enclosures only or non—concrete bases only, or which are applicable to specific equipment bases or enclosures are stated in separate specifications. 3.2 Authorized Material Specification This material specification is not considered valid until each page contains the approval signature or initials of the persons named in the title blocks. 4 Design and Manufacturing Requirements The purpose of an equipment base is to support the weight of primary—rated padmount equipment. Enclosures (manholes and vaults) are used to contain primary rated equipment below grade or provide an area for cable pulling or splicing. U t MATERIAL SPECIFICATION Distribution 2010 by PacifiCorp. All rights reserved. Engineer (D. Wedam): 1Dy1G.% Standards Manager (G. Lyons): 1;0 General Equipment Base and Enclosure Requirements NN A MIRA .%nICAN elGRGY HOLDINGS COMPANY PACIFICORP 14 Mar 10 ZG 301 Page 1 of 6 i ZG 301 4.1 Environmental Effects Equipment bases and enclosures must not be affected by exposure to asphalt, road salts, fertilizers, transformer oil, other common chemicals, weather, sunlight, or other normal service conditions. 4.2 Reinforcement The supplier shall determine the proper placement of reinforcement to ensure compliance with strength and deflection requirements. 4.3 Cabinet Base Security Requirements An equipment base must provide a flat surface for placement of padmounted cabinets, and must transfer and disperse the weight to the soil. The pad must minimize stresses to cabinet seams, welds, hinges, and latching components due to uneven earth settlement. An equipment base must not provide any point for wire entry or circumvention of Western Underground Conference Guide 2.15, paragraph 3.6, concerning the security of padmounted equipment enclosures. Test frames shall reflect the size of the equipment to be mounted. 4.4 Below -Grade Box or Vault Strength Requirements Below -grade boxes and vaults shall meet ANSI/SCTE 77 2007, unless higher ratings are stated in the specification or work order. 4.5 Equipment Base Requirements An equipment base must provide a flat surface for placement of the transformer and must transfer and disperse the transformer's weight to the soil. The pad must minimize stresses to cabinet seams, welds, hinges, and latching components due to uneven earth settlement. An equipment base must not provide any point for wire entry or circumvention of the Western Underground Conference Guide 2.15, para, 3.6. concerning security of padmounted equipment enclosures. Test frames shall reflect the size of the equipment to be mounted. 4.6 Miscellaneous Requirements 4.6.1 Dimensions All dimensions must comply with those shown in the individual equipment base and enclosure specifications. 4.6.2 Bearing Surface The "foot print" or base of box pads and padvaults shall have adequate surface area to support the equipment PACIFICORP AMA *MEHIL'AH Emmy NC,l.DN S COMPANY ZG 301 Page 2 of 6 14Mar 10 General Equipment Base and Enclosure Requirements MATERIAL SPECIFICATION Distribution © 2010 by PacifiCorp. All rights reserved. Engineer (D. Wedam): Ii Standards Manager (G. Lyons): ZG 301 4.6.3 Metallic Surfaces All exposed metallic surfaces, including threaded inserts, shall be corrosion -resist- ant stainless steel. Plastic or nylon may be substituted if the material provides the strength required. 4.6.4 Lifting Attachments All parts of equipment bases and enclosures weighing over forty pounds shall be sup- plied with enough appropriately sized lifting attachments to safely install the piece. The vendor shall supply drawings, details, and certified test data on the attachments to be provided. 4.6.5 Mounting Hardware Equipment bases are to be supplied with enough threaded inserts for attaching the equipment to the base. Exact mounting insert locations are detailed in the specifica- tions for each equipment base. All threaded equipment mounting inserts shall come with pre -mounted stainless steel hex bolts, belleville washers and 1-1/4" x 2-1/2" hold-down cleats with 1/4" lift and 7/16" holes. All inserts and hardware shall meet the requirements set forth in WUC 2.15, paragraph 4, except that 3/8" bolts and inserts shall be used. Each vault shall have the hardware attached. 4.6.6 Freezing Equipment bases shall be designed and constructed so that it, and any mounting hard- ware used, will not trap or hold water, and it will be able to withstand repeated freez- ing and thawing. 4.6.7 Color The color used in manufacture of equipment bases may be non—fading black, dark green, gray, or natural concrete. Enclosures shall be natural concrete. 4.6.8 Temperature Limits Equipment bases shall be capable, with equipment installed, of withstanding temper- ature variations of —40 ° C to +65 ° C without cracking, splitting, or deforming. 4.6.9 Identification All equipment bases and enclosures shall be permanently marked with the manufac- turers name, catalog number, and month and year of manufacture. On equipment bases, this identification should be located so as to be obtainable with the equipment installed. i i MATERIAL SPECIFICATION Distribution m 2010 by PacifiCorp. All rights reserved. Engineer (D. Wedam): #10 Standards Manager (G. Lyons): General Equipment Base and Enclosure Requirements PAC IFICORP A MinAMERICAH CNERGY KOLOViCe&COMMNY 14Mar10 ZG 301 Page 3 of 6 ZG 301 5 Testing Requirements for Concrete and Non -Concrete Products 5.1 Impact Resistance Test 5.1.1 Impact Resistance Requirement Equipment bases and enclosures shall be able to withstand transportation, handling, and installation without chipping, warping, or puncturing. 5.1.2 Impact Resistance Test Requirements Equipment bases and enclosures shall be able to withstand a right angle impact of 50 foot—pounds, using a weight having a C—tup dimension as per ASTM Guide 24-44. The equipment base or enclosure shall be constructed to withstand an impact any- where on the top or sides. Cracking or puncturing shall result in failure of the test. Denting or deformation at the point of impact shall not be considered as failure as long as moisture cannot penetrate into the equipment base or enclosure. The test shall be run at —25 ° C, plus or minus 2 °C. 5.2 Loading Test Each type of equipment base and enclosure shall be tested to ensure that it meets the loading which is anticipated. Loading test requirements for specific pieces are explained in the individual equipment base and enclosure specifications. 5.3 Deflection and Security Test Each type of equipment base shall be tested to ensure that it meets complies with Western Underground Committee Guide 2.13, Security For Padmounted Equipment Enclosures, as it applies, and is not compromised by an uneven site. Deflection and and security test requirements for individual equipment bases and enclosures are explained in the individual equipment base specifications. Specific test requirements for each type of base are given in the individual equipment base specifications. 5.4 Threaded Insert Pullout Test Equipment bases shall contain a specified number of 3/8"-16UNC threaded inserts to be used as equipment hold—downs. The insert locations are described in the individual equipment base specifications. Inserts shall be tested and shown to withstand a 250 pound straight pullout force, a 500 pound shear force at the equipment base surface, and a 36 foot—pound torque. 6 Warranty The supplier shall provide a one—year warranty against failure due to manufacturing defects. The warranty shall cover full replacement costs of the equipment base or enclosure, including PAcIFICORP ZG 301 Page 4 of S 14 Mar 10 General Equipment Base and Enclosure Requirements MATERIAL SPECIFICATION Distribution © 2010 by PacifiCorp. All rights reserved. Engineer (D. Wedam): /Y1G.) q��� Standards Manager (G. Lyons): ..E;4 ZG 301 labor and any material costs incident to the failure. The warranty shall run from the date of shipment. Shipment dates shall be stamped or stenciled on the inside of the equipment base or enclosure. 7 Product Certification 7.1 Initial Certification The following information and certification shall be supplied to PacifiCorp as part of a supplier's request to be placed on PacifiCorp's Approved Manufacturer List. 7.1.1 Description The supplier shall provide a description of the equipment base or enclosure, includ- ing a detailed description of construction, materials used, number and type of threaded inserts, and reinforcement. 7.1.2 Drawings and Structural Design The supplier shall provide submittal drawings, with details and structural design cal- culations signed and stamped by a registered professional engineer, for all compo- nents of a given equipment base or enclosure. 7.1.3 Test Documentation For any equipment base or enclosure, the supplier shall provide certified test results for the tests described this specification and any other applicable PacifiCorp specifi- cation required. 7.1.4 Warranty The supplier shall provide a copy of the supplier's written warranty. 7.2 Recertification If any changes are made to the design, materials, or manufacturing procedure after a product has been approved, the supplier shall resubmit product certification documentation, as outlined in 7.1, Initial Certification. 7.3 Loss of Certification Failure of any equipment base or enclosure during the expected service life due to manufacturing defects, or lack of adherence with this or other applicable specifications, may result in the supplier being removed from PacifiCorp's Approved Manufacturer List. To be reinstated, the manufacturer must identify the cause of failure or noncompliance, provide proof to PacifiCorp that the defect has been corrected, and recertify compliance with this specification. MATERIAL SPECIFICATION Distribution © 2010 by PacifiCorp. All rights reserved. Engineer (D. Wedam): Standards Manager (G. Lyons): ,W General Equipment Base and Enclosure Requirements AMn. MERICAN ENERGY HOlOMR $coMPAN? 14 Mar 10 ZG 301 Page 5 of 6 ZG 301 8 Issuing Department The Standards Engineering Department of PacifiCorp is responsible for issuing this material specification. Comments and suggestions are welcome. Submit comments or requests for additional copies of this document to: PacifiCorp Standards Engineering Documentation 825 NE Multnomah St., Suite 1600, Portland, OR 97232 telephone: (503) 813-5293; fax: (503) 813-6804 Technical questions regarding this material specification may be directed to: PacifiCorp Standards Engineering 825 NE Multnomah St., Suite 1600, Portland, OR 97232 telephone: (503) 813-6883; fax: (503) 813-6804 These materials and standards were developed by PacifiCorp for use in its operations and are the property of PacifiCorp. No other use is intended. These materials may not be reproduced except in support of PacifiCorp projects. PAC IF'CORP A MIOAMERWANIENE3WYNOLDIN6A COMPAKY ZG 301 Page 6 of 6 14 Mar 10 General Equipment Base and Enclosure Requirements MATERIAL SPECIFICATION Distribution 2010 by PacifiCorp. All rights reserved. Engineer (D. Wedam): Standards Manager (G. Lyons): ZG 311 Concrete Requirements 1 Scope This specification outlines the minimum material requirements for concrete equipment bases and enclosures to be used in conjunction with PacifiCorp owned primary -rated equipment. The specification applies whether the equipment base or enclosure is to be installed by company personnel, contractors, customer, or the supplier. 2 Applicable Documents The latest revisions of the documents listed below, in effect on the date of invitation to bid, apply to the extent specified herein. 2.1 PacifiCorp Documents ZG 301, General Equipment Base and Enclosure Requirements ZG 501, Padvault — Single -Phase Residential 48" x 48" ZG 506, Padvault —Large Single -Phase Residential Lid ZG 521, Padvault — Three -Phase Transformer ZG 531, Padvault — Three -Phase Sectionalizing Cabinet ZG 532, Flat Pad — Three -Phase Transformer ZG 541, Padvault — Single -Phase Fusing Cabinet Lid ZG 551, Padvault — Three -Phase Fusing Cabinet ZG 562, Padvault — 15, 25 and 35 kV, 600 -Amp, Dead -Front Switchgear ZG 571, Padvault — Metering Cabinet Lid ZG 616, Padvault— 4 -Foot by 6 -Foot (48"x 72") ZG 621, Padvault — 5 -Foot by 7 -Foot (56" x 84"), for Three -Phase Transformers, Sectionalizing Cabinets and Metering ZG 622, Padvault— 7 -Foot by 9 -Foot (84" x 108"), for Three -Phase, 15 kV Padmounted Switchgear ZG 631, Manhole — 6 -Foot by 6 -Foot (72" x 72") ZG 641, Vault — Shallow, 7 -Foot by 7 -Foot (84" x 84") ZG 701, Manhole — 7 -Foot by 12 -Foot (94" x 155") ZG 711, Vault— Shallow, 7 -Foot by 12 -Foot (94" x 155") ZG 715, Sleeve -15, 25 and 35 kV, 600 -Amp, Dead front Switchgear, Padvault ZG 811, Full -Traffic Cover and Frame Assembly ZG 821, Incidental -Traffic Cover For Padvaults 2.2 Codes and Standards Western Underground Committee Guide 2.13, Security for Padmounted Equipment Enclosures I i 1 i MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (E. Maleki): ,0/4 Standards Manager (D. Asgharian): A Concrete Requirements NPACIFICORP A M!DAMEH,CAN ENERGY HOLD NO1 COMPANY 16 Dec 11 ZG 311 Page 1 of 6 Deviation from this standard requires advanced approval. Contact the standards engineering manager for approval process and forms. ZG 311 Western Underground Committee Guide 2.15, Flat Single Phase Transformer Pads ANSI/SCTE 77, 2007, (Greater side wall strength may be specified for some projects.) ASTM A 615, Grade 60 Carbon—Steel Bars for Concrete Reinforcement ACI 211, Standard Practice for Selecting Proportions for Normal Heavyweight and Mass Concrete ACI 212, Chemical Admixtures for Concrete ACI 237, Self-Consolidationg Concrete ACI 304, Guide for Measuring, Mixing and Placing Concrete ACI 305, Hot Weather Concreting ACI 306, Cold Weather Concreting ACI 347, Guide to Formwork for Concrete American Welding Society D12.1, Recommended Practices for Welding Reinforcing SteelMetal Inserts and Connections in Reinforced Concrete Construction 3 General 3.1 Application Information This specification states material and construction requirements which are applicable only to all concrete equipment bases or enclosures. 3.2 Authorized Material Specification This material specification shall not be considered valid until each page contains the approval signature or initials of the persons named in the title blocks. 4 Design and Manufacturing Requirements The purpose of a concrete equipment base is to support the weight of primary -rated padmount equipment. Enclosure are used to contain primary rated equipment below grade or provide an area for cable pulling or splicing. 4.1 Concrete Materials Cement used shall be a standard brand of Portland cement, Type II or III conforming to ASTM C-150, latest edition. Aggregates shall consist of natural sands and gravels, crushed rock, crushed slag, or other inert materials having clean, uncoated grains of strong durable material which conforms to ASTM C-33 and ACI 318-89. Concrete strength at twenty-eight days shall be at least 4000 lbs. per square inch. 4.2 Forms Forms may be of wood or metal selected to produce a smooth surface finish They shall be constructed sufficiently tight to prevent leakage of concrete, and securely braced and PACIFICORP AMPDAMERICAN ENEMY HOWos COMPANY ZG 311 Page 2 of 6 16 Dec 11 Concrete Requirements MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (E. Maleki): ,4E/4 Standards Manager (D. Asgharlan):� Deviation from this standard requires adva iced approval. Contact the standards engineering manager for approval process end forms. ZG 311 shored to prevent displacement and safely support construction loads. Forms shall be removed in a manner and at a time which will ensure the complete safety of the structure. 4.3 Cold Weather Requirements When the ambient air temperature is below forty degrees Fahrenheit, concrete shall be at least sixty (60) degrees Fahrenheit when poured, and shall be maintained at least a minimum of fifty (50) degrees Fahrenheit for seventy—two (72) hours. All forms shall be frost free. 4.4 Surfaces The finished surface shall be flat and free of aggregate pockets and honey -comb. Where minor defects occur, they shall be painted with cement grout, patched with a one-to-one cement / sand mixture, and finished to match adjacent surfaces while the concrete is still green. 4.5 Curing All concrete shall be cured for not less than seven (7) days by keeping the surface wet by sprinkling. Membrane compound may be used in lieu of water curing. The component parts must be poured at least seven (7) days prior to shipment to stores or installation at the site, as required in individual equipment base and enclosure specifications. 4.6 Air Entrainment Approved air entraining agents shall be used to provide an air content at 6 %, + or — 1.5%. 4.7 Reinforcement The supplier shall determine the proper placement of steel reinforcement to ensure compliance with strength requirements. Reinforcement shall consist of 4 4 — 6/6 steel reinforcing mesh and #4 through #6 steel rebar, placed as required to meet the load requirements of individual equipment base and enclosure specifications. Mesh shall meet the requirements of ASTM A-185. Rebar shall be Grade 60, and shall meet the requirements of ASTM A-615. The supplier shall ensure that the holding strength of pulling eyes and irons meets the requirements description in each of PacifiCorp's specifications. Some pads require a plastic board (or boards) for securing the cabinet onto the pad. Plastic boards shall have a holding strength of 1000 lbs. per linear foot. 4.8 Concrete Test Reports PacifiCorp has the right to request certified concrete compressed air test reports. MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (E. Maleki): APM Standards Manager (D. Asgharian): Concrete Requirements 'PACIFICORP A McDAMOeCAN EN ZRIIV HOUYNGS COMPANY 16 Dec 11 ZG 311 Page 3 of 6 Deviation from this standard requires advanced approval. Contact the standartis engineering manager for approval process and forms. ZG 311 4.9 Certifying Suppliers Quality Assurance Program The vendor shall be required to provide details of their Quality Compliance program before being added as a qualified supplier. Included in the audit will be documents showing that the vault designs are certified by a Licensed Professional Engineer. 4.10 Vault Manufacturing Inspection Observation by a PacifiCorp representative of the vault manufacturer, including inspection of the facility, testing and/or a vault tear -down, is the option of PacifiCorp. 4.11 Marking The manufacturer shall provide the following marking on an internal wall: 1. Manufacturer's name. 2. Date of construction (showing month and year). 4.12 Grounding Grid PacifiCorp may request the viewing of the ground grid prior to the vendor's acceptance as a supplier. The viewing may be a visit to the plant to see the different steps in the manufacturing process. Alternative to a plant visit are electronic pictures of the reinforcing cage, showing how the grounding grid is integrated into the structure, and a Licensed Professional Engineer's stamp on the design documents. 4.13 "C"—Channel Material C -channels shall be galvanized or fiberglass 1 5/8" x 13/16". See the vault specification for length and rotation. PACIFICORP A 1411W44111CAN ENERGY HOLDINGS COMPANY ZG 311 Page 4 of 6 16Dec11 Concrete Requirements MATERIAL SPECIFICATION Distribution 0 2011 by PacifiCorp. All rights reserved. Engineer (E. Maleki): /40/4 Standards Manager (D. Asgharian): Deviation from this standard requires advanced approval. Contact the standards engineering manager for approval process and forms. ZG 311 4.14 Composite Board Lumber The composite board lumber shall be 2" x 4" winchester gray color with high-quality and 200 psi or higher shear strength design value. The composite plate shall be attached to the concrete by using the 5/16" x 4" zinc bolts. The attachments shall be strong enough to have a solid bond with concrete and shouldn't be pulled off when installing enclosures to the composite board. L N 6" F 12" I 6„ Figure 1—Composite Board Lumber 5 Issuing Department The Engineering and Asset Management Documentation department of PacifiCorp published this document. Questions regarding editing, revision history and document output may be directed to the lead editor at (503) 813-5293. Technical questions and comments may be directed to Ehsan Maleki, Standards Engineering, (503) 813-7089. This document shall be used and duplicated only in support of PacifiCorp projects. This document is considered a valid publication when the signature blocks below have been signed by the authoring engineer and standards manager. MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (E. Maleki): A0/4 Standards Manager (D. Asgharian): Concrete Requirements NPACIFICORP AMIman MAN ENERGY tWLPNG8CQM'ANY 16Dec11 ZG 311 Page 5of6 Deviation from this standard requires advanced approval. Contact the standards engineering manager for approval process and forms. ZG 311 This page is left blank intentionally. PACIFICORP AM!PAMER*404 ENERGY -HOLDINGS COMPANY ZG 311 Page 6 of 6 16Dec11 Concrete Requirements MATERIAL SPECIFICATION Distribution © 2011 by PacifiCorp. All rights reserved. Engineer (E. Maleki): 4ErI Standards Manager (D. Asgharian):�¢ Deviation from this standard requires advanced approval Contact the standards engineering manager for approval process and forms_ ZG 621 Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering 1 Scope This specification outlines the minimum requirements for 5' x 7' (56" X 84") vaults to be used for padmounted equipment. This specification applies to all 5' x 7' (56" x 84") vaults installed by PacifiCorp or its contractors, customers or suppliers. 2 Applicable Documents The latest revisions of the documents, standards, codes and requirements listed in 2.1, PacifiCorp, and 2.2, Codes and Standards, in effect on the date of invitation to bid apply to the extent specified herein. 2.1 PacifiCorp ZG 301, General Equipment Base and Enclosure Requirements ZG 311, Concrete Requirements ZG 821, Incidental -Traffic Cover For Padvaults 2.2 Codes and Standards ASTM C857 A-16 AASHTO H-20 (for vaults beneath roadways) ASTM C857 A-8 (for vaults beneath incidental light truck traffic) 3 General 3.1 Applicability Material and construction requirements stated in this material specification are applicable only to 5' x 7' (56" x 84") vaults. 3.2 Authorization This material specification shall not be considered valid unless each page contains the approval signature or initials of the persons named in the title blocks. 4 Applicable Stock Item Numbers Materials being submitted for the following PacifiCorp stock item numbers are subject to evaluation according to the requirements in this specification. i MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. All rights reserved. Engineer (E. Maleki): A014 Standards Manager (D. Asgharian): Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering PACIFICORP 14 June 12 ZG 621 Page 1 of 8 ZG 621 4.1 Stock Item Numbers ZG 521 Padvault — Three -Phase Transformer 7992604, PADVAULT, FUSING CABINET, 3-PHASE, 15/25KV, 3-4 POSITION 7992605, PADVAULT, SECTIONALIZING CABINET, 3-PHASE, 15 KV 7992606, PADVAULT, SECTIONALIZING CABINET, 3-PHASE, 25 KV 7992607, PADVAULT, SECTIONALIZING CABINET, 3-PHASE, 35 KV 3090369, VAULT, METERING, 3–PHASE, 200A (Refer to Figures 1, 2, & 3) 5 Design and Manufacturing Requirements The purpose of a 5' x 7' (56" x 84") vault is to provide an enclosure for cable pulling for three-phase transformers, three-phase sectionalizing cabinets, and three-phase fusing cabinets. 5.1 Vault Layout Figure 1 and Figure 2 show the assembled 5` x 7' (56" x 84") vault layout with dimensions. Unless otherwise approved by PacifiCorp Engineering, all dimensions and placement of hardware shall conform to those shown in Figure 1 and Figure 2. Vault enclosures shall be constructed to ASTM C857 A-16, and to the holding strengths of the pulling eyes or irons. 5.2 Lifting Attachments Enough lifting attachments shall be provided to ensure safe installation of all pieces at the site. 5.3 Pulling Attachments Cable pulling attachments shall be installed in the corners of the vault. Pulling attachments shall have a minimum pullout strength of 6000 pounds. Attachments shall allow the attachment of a clevis with a one -inch diameter through -bolt. Pulling attachments may be designed by the manufacturer to meet these requirements. (Pulling irons shall not block the front of the terminal duct entrances.) PACIFICORP A M>OLMSOCAN ENEMY MOLDINGS COMPANY ZG 621 Page 2 of 8 14 June 12 Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. All rights reserved. Engineer (E. Maleki): ,j Fi% Standards Manager (D. Asgharian):� ZG 621 5.4 Conduit Entrances The padvault shall be constructed with I'bRM-A-DUCT or equivalent conduit entrances compatible with PVC, Polyethylene (PE), or fiberglass 90°C -rated electrical -grade conduit. The standard conduit entrance locations are as follows, and are also shown in Figure 2: Entrances at each end wall: Two 6.63" entrances, two 4.5" entrances, and two 2.38" entrances. Entrances at each side wall: Eight 4.5" entrances and one 6.63" entrance. GALVANIZED PULL/LIFT IRON (1 EACH CORNER) 4.5" DIA. TERM—A—DUCT (8 EACH SIDE) 2' LONG GALVANIZED C—CHANNEL (1 EACH END) 2' LONG GALVANIZED C—CHANNEL (2 EACH SIDE) 48" (6) - " DIA. GROUNDING INSERTS (4 INSIDE WALLS, 2 OUTSIDE WALLS) 3.51" TERM—A—DUCT (2 EACH END, 1 EACH SIDE) 6.63" TERM—A—DUCT (2 EACH END, 1 EACH SIDE) 2.38" TERM—A—DUCT (2 EACH END) Figure 1-5' x 7' (56" x 84") Vault, Cutaway View i MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. All rights reserved. Engineer (E. Maleki): A0/4 Standards Manager (D. Asgharian):�� Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering Ny4-- PACIFICORP A 1.110A!AEAICAN ENERGY HO AiMGS l'UMNAfYY 14 June 12 ZG 621 Page 3 of 8 1 ZG 621 84" I (4) GALVANIZED PULL/LIFT IRONS 78" TsysLMsraill11111111sEZ:yaig 5D" 56" 1 2 DIA. GROUNDING INSERTS 4 INSIDE END WALLS, 2 OUTSIDE END WALLS) 2' LONG GALVANIZED C -CHANNEL (2 EACH SIDE) 6.63" TERM -A -DUCT (1 EACH SIDE) F— 24" .5" TERM A DUCT (8 EACH SIDE) 12" 12" DIA. SUMP GALVANIZED PULL/LIFT IRON (1 EACH CORNER) 2' LONG GALVANIZED C -CHANNEL (1 END WALL) (6) 1/2" DIA. GROUNDING INSERTS (4 INSIDE END WALLS, 2 OUTSIDE END WALLS) 2.38" TERM -A -DUCT (2 EACH END) 3.51" TERM -A -DUCT (2 END WALL) 6.63" TERM -A -DUCT (2 EACH END) Figure 2-5' x 7' (56" x 84") Vault Enclosure Layout 5.5 Grounding Grid The vault shall be equipped with an internal, encased electrode in the vault enclosure meeting NESC 094.B.6. The electrode shall be 3/8" steel rebar. The electrode shall be encased horizontally and run continuously around vault. The vault electrode shall be a minimum of 24" from the top of the vault. The grounding system shall attach to "connection" inserts, made of high -bronze alloy and threaded to 0.5"-13UNC. All inserts shall have caps or plugs installed. All padvaults shall have seven grounding inserts: two on the inside of each end wall, one on the outside of each end wall, and one on the bottom of the cover (near the access door). Refer to Figure 3 for layout details. NPACIFICORP aMP M�ncaaJnrNoia! saaMvawr ZG 621 Page 4 of 8 14 June 12 Padvault -- 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. All rights reserved. Engineer (E. Maleki): AEfri Standards Manager (D. Asgharian): -�� ZG 621 (7)-V BROW GROUNDING INSERTS w/15"9 STEEL LEAD & INSERT CAP PROTECTOR (2 EA. INSIDE; I EA. OUTSIDE) - TYP. EACH END )4" GROUNDING INSERT 3" )5" GROUNDING INSERT OUTSIDE GROUNDING INSERT 48" T1 I 1 I I 1 I 14i II 1I I1 I I II U I ICNIpp6 I T' INSIDE GROUNDING INSERT (TYP.) Figure 3-5' x 7' (56" x 84") Vault Ground Grid Layout V'9 GROUNDING DA (#3x20' -O" LONG) 5.6 Installation This unit shall be set at the site by the supplier. The contractor shall be responsible to ensure that all earth under the vault is compacted and leveled to no more than 2% slope prior to setting the vault. A clean gravel base under the padvault may be necessary in areas where drainage is poor. The interface between the pad and the enclosure shall be sealed using a waterproof substance, such as tar or mastic. The top of the frame should be flush with the final grade in pedestrian areas. Setting depth shall be determined by the local regulatory authority for full -traffic areas. MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. All rights reserved. Engineer (E. Ma(eki): AO,/ Standards Manager (D. Asgharian): l{� Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering NPACIFICORP A W,TDAMEHICAN ENERGY HoUaNNS CQN.. ,,Y 14 June 12 ZG 621 Page 5 of 8 ZG 621 6 Padvault for Three -Phase Sectionalizing Cabinets 6.1 Padvault Layout The 5' x 7' (56" x 84") vault is common for the three voltage classes of sectionalizing cabinets. However, the pads are unique for each voltage (15 kV, 25 kV, and 35 kV). See Figure 4, Figure 5 and Figure 6 for dimensions. 6.2 Inserts and Mounting Hardware The supplier shall provide: — two 2" x 4" x 66" composite boards for a 15 kV three-phase sectionalizing cabinet (padvault SI# 7992605), or — two 2" x 4" x 84" composite boards for a 25 kV (padvault SI# 7992606), or a 35 kV three-phase sectionalizing cabinet (padvault SI# 7992607). Boards shall be case flush with the top of the padvault lid at the locations specified in Figure 4 through Figure 6. The following hardware to fasten the sectionalizing cabinet to the composite boards shall be provided: by PacifiCorp: — six 1/2" x 2" hot -dip galvanized lag screws (SI# 7992810) — six stainless steel Belleville washers by the supplier: — six 1 1/4" x 2 1/2" stainless steel hold-down cleats with 1/4"lift and 9/16" 1 1/2" holes. 6.3 Access Panel All three-phase sectionalizing padvaults shall be equipped with one access panel, as described in material specification ZG 821, Incidental -Traffic Cover For Padvaults. The access panel size shall not exceed 24" x 60". IN. A AMCAMERICAN ENEMY HOLAwGSCOMPANY PACIFICORP ZG 621 Page 6 of 8 14 June 12 Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. AU rights reserved. Engineer (E. Maleki): #40,1 Standards Manager (D. Asgharlan): .�� 1'-2" 5'-2" 1'-2" 2'x4'x66 COMPOSITE ETCATTh 16"x62" BLOCKOUT O 2"x4"x66" COMPOSITE BOARD c ZG 621 1/2" GROUNDING INSERT --3" \-6" PAD THICKNESS Figure 4-15 kV Three -Phase Sectionalizing Cabinet Pad (SI# 7992605) 7-10" 6'- 6" 2 -"x4" -x84" COMPOSITE BOARD 16"x78" BLOCKOUT 2"x4"x84" COMPOSITE BOARD 0 "')' I I \� L_ d1;. '::.';;; ICY.'.'.'.'..`.. `% �iiii i`i`riii`ii s :`;` r;;`i`;:`;Y;;y;'ILL.rYr::1,Y.'.'.'..'dr.'ly`;:'7�5`" ryy�`."`i`r`r`r`irZ "`r�`r`riiii`Tir`iiii `r`r`Ti S' r`r; . .Y i Ti ,�` ,`iir;� �,�T�r ,�rrr"�rrrr,�r�rrrrrrr, rrrr`r'ihiir`Trrr` rr`"� r`rrrr"r` irrir`r`ir`r` ` y� yY y` y.„�.... r`rWr�:T Y�rry y�`i Trr1%,'*4� :i i r.`r,`ir'i:r:r`�`i�`ry✓`% a Ir) 1/2” GROUNDING INSERT \-6" PAD THICKNESS Figure 5-25 kV Three -Phase Sectionalizing Cabinet Pad (SI# 7992606) MATERIAL SPECIFICATION Distribution © 2012 by PacifiCorp. All rights reserved. Engineer (E. Malek): 040/4 iL1 Standards Manager (D. Asgharian):� Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering APACIFICORP AMM AMEHIC4N ENEHQY HUM HU9 CLAWWNY 14 June 12 ZG 621 Page 7 of 8 ZG 621 iV 2'x4"x84- COMPOSITE BOARD - 18'x78' BLOCKOUT 2'x4"x84" COMPOSITE BOARD O l 0 in 1/2- GROUNDING INSERT 6" PAD THICKNESS Figure 6-5 kV Three -Phase Sectionalizing Cabinet Pad (SW 7992607) 7 Testing 7.1 Test Compliance Vaults submitted under this specification shall meet all tests and requirements contained in material specifications ZG 301, General Equipment Base and Enclosure Requirement., ZG 311, Concrete Requirements, and this specification. Vaults shall also comply with requirements in applicable national standards. 8 Issuing Department The Engineering and Asset Management Documentation department of PacifiCorp published this document. Questions regarding editing, revision history and document output may be directed to the lead editor at (503) 813-5293. Technical questions and comments may be directed to Ehsan Maleki, Standards Engineering, (503) 813-7089. This document shall be used and duplicated only in support of PacifiCorp projects. This document is considered a valid publication when the signature blocks below have been signed by the authoring engineer and standards manager. PACIFICORP A MIDAMm1CAN FAEROE )OLORIO$ COMPANY ZG 621 Page 8 of 8 14 June 12 Padvault — 5' x 7' (56" x 84"), for Three -Phase, Sectionalizing Cabinets and Metering MATERIAL SPECIFICATION Distribution © 2012 by PaciflCorp. AU rights reserved. Engineer (E. Maleki): AEi-1 Standards Manager (D. Asgharian): APPENDIX K WSDOT Standard Plans — K Plans I= Mil NE NM 111111 N EN M - ' 11M1 11111 1 OM 11N1 ;: ' M 0 LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 80 LENGTH B (FEET) 165 200 250 305 380 425 495 570 BUFFER DATA TYPICAL PROTECTIVE VEHICLE WITH TMA (SEE NOTE 1) VEHICLE TYPE LOADED WEIGHT 4 YARD DUMP TRUCK SERVICE TRUCK, Fi.AT BED, ETC. MINIMUM WEIGHT 16,000 LBS. (MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WRH MANU- FACTURER RECOMMENDATION) O ROLL AHEAD STOPPING DISTANCE =30FEET MIN. (DRY PAVEMENTASSUM£D) MINIMUM TAPER LENGTH = L (rtt') LANE WIDTH (FEET) 25 30 35 POSTED 40 SPEED 45 50 (MPH) 55 80 85 70 10 105 150 205 270 450 500 550 - - • 11 115 165 225 294 495 550 805 660 - 0 a 0 12 125 180 245 520 540 600 880 720 780 640 CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 50170 40 80 55145 30 80 25130 20 40 SIGN SPACING = X (1) DOWNSTREAM TAPER TO SHOW END OR • END OF WORK AREA - SEE NOTE RURAL HIGHWAYS 60 / 65 MPH 600 t RURAL ROADS 45 / 55 MPH 500 5 RURAL ROADS & URBAN ARTERIALS 35140 MPH 350 t RURAL ROADS, URBAN ARTERIALS, x5130 MPH RESIDENTIAL & BUSINESS DISTRICTS 200 8 (2) URBAN STREETS 25 MPH OR LESS 100 t (2) ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE AT -GRADE INTERSECTIONS, AND DRNEWAYS. (2) THIS SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. W4 -2L - COMPLIANCE DATE 12/23/13 W20 -6R RIGHT LAN CLOSED AHEAD W2O.1 { END ` ROM WORK DOWNSTREAM TAPER TO SHOW END OR • END OF WORK AREA - SEE NOTE i v WORK AHEAD �6 100' (A) > B L X X X DI YSEE NOTE 2 I q q SEE NOTE 5 0 a 0 /WORK O •/j AREA O ° /j�///� / gl��tl q 7 0 0 0 0 0 0 0 0 0 a 0 0 0oA0° L 0 m m IN 0 0 II II If 0 0 n IL Il IN TEMPORARY LANE - 12' MIN. EXISTING EXISTING LANE ei LATERAL BUFFER - 4' WORK AREA BUsTING•LANE SHOULDER A 2' EXISTING SHOULDER SECTION OA LEGEND non IPCMSI i V A SIGN LOCATION CHANNED2ING DEVICES PROTECTIVE VEHICLE - RECOMMENDED PORTABLE CHANGEABLE MESSAGE SIGN ARROW PANEL EXISTING EDGE STRIPE EXISTING LANE STRIPE TEMPORARY TRAFFIC CONTROL DEVICE NOTES 1. A Protective Vehicle is recommended regardless if a Truck Mounted Attenuator (TMA) is ava8abie; a work vehicle may be used. When no TMA Is used, the Protective Vehicle shall be strategically located to shield workers, with no specific Roll -Ahead Stopping Distance. 2. Extend device taper (U3) across shoulder - recommended. 3. Portable Changeable Message Sign (PCMS) - recommended. 4. Traffic Safety Drums for al tapers on high speed roadway - recommended. 5. Transverse Devices in dosed lane every 1000' ± - recommended. 6. Channefaing Device spacing for the downstream taper option shall be 20' O.C. 7. Use advanced notice for any overwidth loads prior to lane closure for alternative routes if applicable •- recommended. 8. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M56-05. FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES EXPIRES AUGUST 9, 20071 1:155 SINGLE LANE CLOSURE WITH ENCROACHMENT STANDARD PLAN K-24.20-00 SHEET I OF 1 SHEET APPROVED FOR PUBLICATION Ken L Smith 02-15-01 w. MIMI DEMI 1.1011331 an Slab Departmentaalkao LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 80 LENGTH B (FEET) 155 200 250 305 360 425 485 570 BUFFER DATA TYPICAL PROTECTIVE VEHICLE WITH TMA (SEE NOTE 1) VEHICLE TYPE LOADED WEIGHT 4 YARD DUMP TRUCK SERVICE TRUCK, FLAT BED, ETC. MINIMUM WEIGHT 15,000 LBS. (MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WITH MANU- FACTURER RECOMMENDATION) 1OROLL AHEAD STOPPING DISTANCE -30 FEET MIN. (DRY PAVEMENTASSUMED) MINIMUM TAPER LENGTH = L (FEET) LANE 'MOTH (FEET) 25 30 POSTED 35 SPEED 40 45 (MPH) 50 55 60 10 - - - 270 450 500 550 - 11 - - - 284 405 550 605 660 12 - - - 320 540 600 650 720 SIGN SPACING = X (1) RURAL HIGHWAYS 60 / 65 MPH SOU 5 RURAL ROADS 45 / 55 MPH 500' * RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' 8 RURAL ROADS, URBAN ARTERIALS, 25190 MPH 20U z (2) RESIDENTIAL. & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' ± (2) ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS, AND DRIVEWAYS. (2) THIS SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 60 / 70 40 00 40!45 30 60 LEGEND I I a D oe PCMS1 I SIGN LOCATION CHANNELIZING DEVICES PROTECTIVE VEHICLE - RECOMMENDED PORTABLE CHANGEABLE MESSAGE SIGN ARROW PANEL G20 -2A OR DOWNSTREAM TAPER TO SHOW END OF WORK AREA - SEE NOTE 7 RECOMMEND CLOSING ADJACENT LANE TO MAINTAIN BUFFER SPACE - SEE STANDARD PLAN K-24.20 FOR ALTERNATE ENCROACHMENT PCMS SAMPLE MESSAGE 1 2 2 LANES CLOSED ONE MILE AHEAD 1.5 SEC 1.5 SEC FIELD LOCATE IN ADVANCE OF LANE CLOSURE SIGNING NOTES 1. A Protective Vehicle is recommended regardless if a Truck Mounted Attenuator (TMA) is available; a work vehicle may be used. When no TMA is used, the Protective Vehicle shall be strategically located to shield workers, with no specific Roll -Ahead distance. 2. Devices shall not encroach Into adjacent lanes. 3. Extend device taper (U3) across shoulder - recommended. 4. Portable Changeable Message Sign (PCMS) - recommended. 5. Use Transverse Devices in closed lane every 1000' t - recommended. 6. Traffic Safety Drums for all tapers on high speed roadway - recommended. 7. Channelaing Device spacing for the downstream taper option shall be 20' O.C. 8. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05. W4 -2L - COMPLIANCE DATE 1223/13 W20501 W20.1 FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES EXPIRES AUGUST 9, 20091 DOUBLE LANE CLOSURE ON MULTILANE ROADWAY STANDARD PLAN K-24.40-01 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Pasco Bakofich ill 10-12-07 ru osLw aa�Eu wte W .M,w.- Sm. D.pmrment Mne,.p.H.4a, um mu r gm i um ma s ma me EN MI E I ME all MI M MI a INS Nil EN 1E11 11111 I= 11111 11111 NM 111111 MI MI NE LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 3D 35 40 45 50 65 60 LENGTH B (FEET) 155 200 250 305 350 425 455 570 BUFFER DATA TYPICAL PROTECTIVE VEHICLE WITH 711A (SEE NOTE 1) VEHICLE TYPE LOADED WEIGHT 4 YARD DUMP TRUCK SERVICE TRUCK, FLAT BED, ETC. MINIMUM WEIGHT 15,000 LBS. (MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WITH MANU- PACTURER RECOMMENDATION) OROLLAHEAD STOPPING DISTANCE = 50 FEET MIN. (OW PAVEMENTABSUMED) END ROAD WORK 0 MINIMUM TAPER LENGTH o L (FEET) LANE WIDTH (FEET) 25 POSTED 3D i 35 SPEED 40 45 (MPH) 50 65 80 10 105 150 205 270 450 500 550 11 115 165 225 284 495 550 605 660 12 125 180 245 320 540 600 660 720 CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 50 / 70 40 80 35 / 45 30 80 25 / 30 20 40 020-2A OR DOWNSTREAM TAPER TO SHOW END OF WORK AREA - SEE NOTE 7 100' e 0 B SIGN SPACING o X (1) RURAL HIGHWAYS 80165 MPH 800' 3 RURAL ROADS 45155 MPH 506 3 RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 356 t RURAL ROADS, URBAN ARTERIALS, 25130 MPH 200 t (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 106 3 (2) ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERvmSE (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS. AND DRIVEWAYS. (2) THIS SIGN SPACING MAY SE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. • W4 -2L - COMPLIANCE DATE 12/23/13 SEE STANDARD PLAN K-24.20 FOR J ALTERNATE ENCROACHMENT LEGEND LI a C 4 PCMS SIGN LOCATION CHANNELIZING DEVICES PROTECTIVE VEHICLE - RECOMMENDED PORTABLE CHANGEABLE MESSAGE SIGN ARROW PANEL PCMS SAMPLE MESSAGE 2 LANE CLOSED ONE MILE AHEAD 1.5 SEC 1.5 SEC FIELD LOCATE 1 MILE s, N ADVANCE OF LANE CLOSURE N N N NOTES 1. A Protective Vehicle is recommended regardless If a Truck Mounted Attenuator (TMA) Is available; a work vehicle may be used. When no TMA Is used, the Protective Vehicle shall be strategically located to shield workers, with no specific Roll -Ahead distance. • 2. Devices shall not encroach into adjacent lanes. 3. Extend device taper (L13) across shoulder - recommended. 4. Portable Changeable Message Sign (PCMS) - recommended. 5. Use Transverse Devices in closed lana every 1000' t - recommended. 6. Traffic Safety Drums for all tapers on high speed roadway - recommended. 7. Channefzing Device spacing for the downstream taper option shall be 20 O.C. 8. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05. FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES [EXPIRES AUGUST 9. 20071 SINGLE LANE CLOSURE ON MULTILANE ROADWAY STANDARD PLAN K-24.60-00 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Ken L. Smith 02-15-07 TwoaMnpbSen Se. DB1,00010a .IT.pawien AP 80440ESUN01O0ea1 OATO LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 95 40 45 50 LENGTH B (FEET) 155 200 250 305 380 425 BUFFER DATA TYPICAL PROTECTIVE VEHICLE WITH TMA (SEE NOTE 1) VEHICLE TYPE LOADED WEIGHT 4 YARD DUMP TRUCK SERVICE TRUCK FLAT BED, ETC. MINIMUM WEIGHT 15,000 LBS. (MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WITH MANU- FACTURER RECOMMENDATION) 1OROLL AHEAD STOPPING DISTANCE = 30 FEET MIN. (DRY PAVEMENTASSUMED) SIGN SPACING = X LANE WIDTH RURAL ROADS 45155 MPH 500' 4 RURAL ROADS 8 URBAN ARTERIALS 35 / 40 MPH 350 s RURAL ROADS, URBAN ARTERIALS, 25/ 30 MPH RESIDENTIAL 8 BUSINESS DISTRICTS 200's ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERIMSE ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS, AND DRIVEWAYS. LANE WIDTH 10' MIN. - SEE STANDARD PLAN K-24.20 FOR ALTERNATE ENCROACHMENT MINIMUM TAPER LENGTH = L (FEET) LANE WIDTH POSTED SPEED MPH) (FEET) 25 90 35 40 45 50 10 105 150 205 270 450 500 11 115 165 225 294 485 550 12 125 150 245 320 540 BOO CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 50 40 80 35 / 45 30 so 25/30 20 40 X X N N H 0 OMa o 0 X X X L B MOO W4 -2R - COMPLIANCE DATE 1282119 PCMS SAMPLE MESSAGE 1 2 LEFT LANE CLOSED NO LEFT TURN 1.5 SEC 1.5 SEC FIELD LOCATE IN ADVANCE OF LANE CLOSURE SIGNING LEGEND 0 0 00 0 C...I+ IPCMSJ DDD SIGN LOCATION CHANNELIZING DEVICES PROTECTIVE VEHICLE - RECOMMENDED PORTABLE CHANGEABLE MESSAGE SIGN ARROW PANEL wW% NOTES 0 0 0 6 O LANE IMDTH 12 MIN. - SEE STANDARD PLAN K-24.20 FOR ALTERNATE ENCROACHMENT 1. A Protective Vehicle Is recommended regardless if a Truck Mounted Attenuator (TMA) is available; a work vehicle may be used. When no TMA is used, the Protective Vehicle shall be strategically located to shield workers, with no specific Roll -Ahead distance. 2. Portable Changeable Message Sign (PCMS) - recommended. 3. Prohibit turns as necessary for traffic conditions. 4. For signs size refer to Manual on Uniform Traffic Control Device (MUTCD) and WSDOT Sign Fabrication Manual M55-05. FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES EXPIRES AUGUST 9, 2009 LEFT AND CENTER LANE CLOSURE — TWO-WAY LEFT TURN LANE STANDARD PLAN K-26.40.01 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Pasco Bakotich p! 10-12-07 STATE 55558 ENOWEER wmlenybn Stab Opven.N d Lmspvmbn MI MIMI IMO OM NIB =I MIMI MINI NMI 11111 EMI EMI INN 1111 MI INN MIMI =I NMI EXPIRES AUGUST 9. 2007 M I M IM1 1 = = N ' M 101111 I = M M I IIMI z m 0 SIGN SPACING = X RURAL ROADS 45 / 55 MPH 800' a RURAL ROADS E. URBAN ARTERIALS 35 / 40 MPH 350' t RURAL ROADS, URBAN ARTERIALS, RESIDENTIAL& BUSINESS DISTRICTS 25 / 30 MPH 200 is URBAN STREETS 25 MPH OR LESS 10D 1. ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE AU. SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE AT -GRADE INTERSECTIONS AND DRIVEWAYS. CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPF) (FEET) (FEET) 50 / 70 40 SD 35 / 45 30 60 25 / 30 20 4D MINIMUM TAPER LENGTH = L (I -Ft r) LANE WIDTH (FEET) 25 POSTED 30 35 SPEED 40 (MPF) 45 50 55 10 105 150 205 270 450 500 650 11 115 165 225 294 495 550 606 12 125 180 245 320 540 800 680 LEGEND N SIGN LOCATION ▪ a o CHANNELITJNG DEVICES ▪ .F4 BARRICADE - TYPE 3 L 440 ARROW PANEL G20 -2A R19HT LAKE MUST NMI RIGHT END ROAD WORK NOTES I. If the work space extends across a crosswalk, the crosswalk should be closed (see Standard Plan K-34.20). 2. The normal procedure is to close on the near side of the inter- sedicn any lane that is not carried through the Intersection. However, when this results in the closure of a right lane having significant right turning movements, then the right lane may be restricted to right turn only, as shown. This procedure Increases the through capacity by eliminating right turns from the open through lana 3. Prohibit turns as necessary for traffic conditions. 4. Flashing Warning Lights (Type A per MUTCD) should be used, as needed, to mark barricades at night S. Steady Burning Warning Lights (Type C per MUTCD) shall be used to mark channa&lng devices at night 6. For long term projects, confiding pavement markings that are no longer applicable shall be removed or obliterated. Temporary markings shall be used as necessary. 7. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05. G20.2A FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES I pi INTERSECTION RIGHT LANE CLOSURE FAR SIDE STANDARD PLAN K-32.20.00 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Ken L Smith 02-15-07 MTV ow=swetma LIME Viaahlmgion S. n.p t T. pormaen 5 SIGN SPACING a X LANE WIDTH (FEET) RURAL ROADS 45 r 55 MPH 500' t RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' s RURAL ROADS, URBAN ARTERIALS, RESIDENTIAL & BUSINESS DISTRICTS 2, / 30 MPH 200 t URBAN STREETS 25 MPH OR LESS 100 * ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE AU. SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE AT -GRADE INTERSECTIONS AND DRIVEWAYS. MINIMUM TAPER LENGTH = L (FEET) LANE WIDTH (FEET) 25 POSTED 30 SPEED 35 40 (MPH) 45 50 65 10 105 150 205 270 450 500 550 11 115 165 225 294 495 650 605 12 125 ( 160 245 320 540 900 660 CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 50/70 40 so 35 1 45 30 60 25 r 30 20 40 LEGEND a ® a a CDD C=29 ENO •ROAD WORK G20 -2A END ROAD WORK NOTES 1. If the work space extends across a crosswalk the crosswalk should be closed (see Standard Plan K-34.20). 2. The normal procedure is to close on the near side of the intersection any lane that Is not carried through the intersection. However, when this results in the closure of a left lane having significant left -turning movements, then the left lane may be reopened as a turn bay for left turns only, as Shown. 3. Prohibit turns as necessary for traffic conditions. 4. Flashing Warning Lights (Type A per MUTCD) should be used, as needed, to mark barricades at night 5. Steady Burning Warning Lights (Type C per MUTCD) shall be used to mark channeli2ing devices at night 6. For long term projects, conflicting pavement markings that are no longer applicable shall be removed or obliterated. Temporary markings shall be used as necessary. 7. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05, SIGN LOCATION CHANNELIZNG DEVICES TEMPORARY TRAFFIC ARROW- OPTIONAL ARROW PANEL BARRICADE - TYPE 3 R 2A END DAD WORK W4 -2R COMPLIANCE DATE 12423713 FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES [EXPIRES AUGUST 9, 20071 i5 INTERSECTION LEFT LANE CLOSURE FAR SIDE STANDARD PLAN K-32.40-00 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Ken L Smith 02-15-07 (WE UMW BOMA Wry wubInglen 51d- Depmtnera alT,snyalebn NM IMO MIN NM =I MN MINI MINI Ili MIMI MIN 1E11 MIN MI II= I= OM NMI (EKPIRES AUGUST 9. 20071 M MO = M I N I M INIE I = = N MU I MO SIGN SPACING = X LANE WIDTH (FEET) RURAL ROADS 45155 MPH 50d ± RURAL ROADS 8 URBAN ARTERIALS 35140 MPH 350 3 RURAL ROADS, URBAN ARTERIALS, 25130 MPH RESIDEJTIAL 8 BUSINESS DISTRICTS 200 t URBAN STREETS 25 MPH OR LESS 100' 3 AU. SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE AT -GRADE INTERSECTIONS AND DRIVEWAYS. MINIMUM TAPER LENGTH C L (FEET) LANE WIDTH (FEET) 25 POSTED 30 35 SPEED 40 (MPF) 45 60 55 10 105 150 205 270 450 500 550 11 115 185 225 284 485 550 805 12 125 180 245 920 540 600 660 CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 60170 4D 80 35145 3D 80 25/30 20 4o LEGEND N P o e 020.2A NOTES 1. Prohibit turns as necessary for traffic conditions. 2. Flashing Warning Lights (Type A per MUTCD) should be used, as needed, to mark barricades at night 3. Steady Burning Warning Lights (Type C per MUTCD) shall be used to mark dwnnefiztng devices at night. 4. For long term projects, conflicting pavement markings that are no longer appfcable shall be removed or obliterated. Temporary markings shall be used as necessary. 5. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05. END ROAD WORK END ROAD WORK SIGN LOCATION CHANNELIZING DEVICES TEMPORARY TRAFFIC ARROW - OPTIONAL BARRICADE-TYPE9R END ROAD WORK G2.0.2A FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES INTERSECTION MULTIPLE LANE CLOSURE STANDARD PLAN K-32.60-00 SHEET 1 OF 1 SHEEP APPROVED FOR PUBLICATION Ken L. Smith 02-15-07 (VATS rami 0105531 wa wpd�iabn SIM Pponara alTrmaportolion LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 95 40 45 LENGTH B (FEET) 55 e5 120 170 270 W4 -2L ^ COMPLIANCE DATE 12/23/13 SIGN SPACING = X RURAL ROADS 451 55 MPH 600' 3 RURAL ROADS & URBAN ARTERIALS 35 (4D MPH 350' 3 RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH 200 t RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100 * ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERIMSE ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE AT -GRADE INTERSECTIONS AND DRIVEWAYS. MINIMUM TAPER LENGTH = L (FEET) LANE WIDTH (FEET) 25 POSTED 30 36 SPEED 40 (MPH) 45 50 55 10 105 150 205 270 450 500 550 11 115 155 225 294 495 550 805 12 125 180 245 320 540 600 680 CHANNELIZING DEVICE SPACING POSTED SPEED IN TAPER IN TANGENT (MPH) (FEET) (FEET) 50/70 40 80 35/45 30 e0 25130 20 40 LEGEND b SIGN LOCATION 0 o m CHANNELIZING DEVICES DDD ARROW PANEL Innnl BARRICADE - TYPE 3 L OBLITERATED MARKING 626,24 NOTES 1. NO LEFT TURN signs are to be used if traffic volumes are too high or there Is an operating signal. Close the left turn pocket If there is one on the side street 2. When turn prohibitions are implemented, two turn prohibition signs should be used, one on the near side end, space permitting, one on on the far side of the Intersection. 3. If the work space extends a crosswalk, the crosswalk should be closed (see Standard Plan K-34.20). 4. Fleshing Warning Lights (Type A per MUTCD) should be used, as needed, to mark barricades at night. 5. Steady Burning Warning Lights (Type C per MUTCD) shall be used to mark channelizing devices at night 6. For long term projects conflicting pavement markings that are no longer applicable shall be removed or obliterated. Temporary markings shall be used. 7. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05. G20 -2A FOR LOCAL AGENCY USE ONLY NOT FOR USE ON STATE ROUTES (ESPEES AUGUST 9. ?OCT INTERSECTION — HALF ROAD CLOSURE WITH LANE SHIFT STANDARD PLAN K-32.80-00 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Ken L. Smith 02-15-07 mai aELOB Mug. oNE wodigR,n Una O.po,fl, .1 heuspa,Emw, 111111 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _