HomeMy WebLinkAboutR-2021-034 Cowiche Canyon Trail Project; Addendum to Agreement with Perteet Inc.RESOLUTION NO. R-2021-034
A RESOLUTION authorizing an Addendum to an Agreement with Perteet, Inc. for the
Cowiche Canyon Trail Project
WHEREAS, the Yakima City Council has accepted a 2015 grant from the State
Legislature's Tier 2 Pedestrian and Bicycle Safety Projects as part of the Connecting
Washington funding program in the amount of $2,000,000; and
WHEREAS, the City of Yakima followed the procedure established by the State of
Washington to select and recommend an engineering consulting firm using the Municipal
Research and Service Center (MRSC) Professional Services Roster process to select a firm to
perform the design work; and
WHEREAS, Perteet, Inc. was determined to be the most qualified firm to prepare the
plans and oversee the work, and has shown that they are qualified to perform the work required;
and
WHEREAS, Perteet, Inc. already has the plans, specifications, and project details
needed to complete the required Joint Aquatic Resources Permit Application (JARPA)
accurately and timely; and
WHEREAS, the amended Scope of Work and Budget included in this addendum meet
the needs and requirements of the City of Yakima for this project in the amount not to exceed
$34,680; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute an Addendum to an Agreement
between the City of Yakima, Washington and Perteet, Inc. attached hereto and incorporated
herein by this reference not to exceed Thirty -Four Thousand, Six Hundred and Eighty Dollars
($34,680) to provide the professional services to complete the JARPA as described in the
Addendum to the Agreement.
ADOPTED BY THE CITY COUNCIL this 16th day of March, 2021.
ASEST:
t/7\71/
Soriya Claar Tee, City C er
4
./1-1 .714 174'
Patricia Byers, Mayor
1
ITEM TITLE:
SUBMITTED BY:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEM ENT
Item No. 4.E.
For Meeting of: March 16, 2021
Resolution authorizing an addendum to an Agreement with Perteet,
Inc. for the Cowiche Canyon Trail Project
Scott Schafer, Director of Public Works
Bill Preston, City Engineer - (509) 575-6754
SUMMARY EXPLANATION:
In June of 2015, the Cowiche Canyon Trail project was selected as one of the Tier 2 Pedestrian
and Bicycle Safety Projects of the Connecting Washington funding program; awarding the City of
Yakima (City) with a $2,000,000 Connect Washington grant. The project is to further extend the
Cowiche Canyon Trail by constructing approximately two miles of new pathway with
bike/pedestrian bridges. In 2017, the City used the MRSC Roster process to select Perteet,
Inc. to develop the project and design the plans.
Design is well underway and final plans are due June 30, 2021. In order to go to ad, a Joint
Aquatic Resources Permit Application (JARPA) must be submitted, and approved, to complete
the environmental documentation. The JARPA was not part of the original scope of work for the
Perteet contract. Since Perteet has the project knowledge, and the expertise to complete the
JARPA, an addendum is required to add this work to the Perteet Agreement.
The terms of the Addendum to the Agreement (Amendment No. 4) with Perteet shall be in an amount
not to exceed $34,680 and has been attached for City Council review. The expenditure of $34,680 for
the JARPAwill be funded out of the $2,000,000 Connect Washington grant.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Neighborhood and Community Building
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
2
Description Upload Date Type
D Ftcsolotton - Addendum JARPA Covuchc Canyon Pal S3/2021 Ftcsolotton
D Amendment ti4 211912E121 Contract
PERTEET
2302 W Dolorway Rood, Suite 1, Ellensburg, WA 98926 I P 425.252.7700
City of Yakima
Cowiche Canyon Trail
AMENDMENT NO. 4
City of Yakima, "CLIENT" desires to amendment the agreement entered into with Perteet, Inc.,
"CONSULTANT" executed on April 19, 2017, amended on March 2, 2020, October 7, 2020 and January 25,
2021 All provisions in the basic agreement remain in effect except as expressly modified by this amendment
The changes to the agreement are described as follows:
SECTION 2: SCOPE OF SERVICES
The original scope of services will be amended to include additional services to complete the project as described
in Exhibit "A", attached hereto and made a port of this agreement
SECTION 5: COMPENSATION
This section shall be amended as follows.
These additional services will cause an increase in the amount of Thirty -Four Thousand Six Hundred and
Eighty Dollars ($34,680) These additional services will be invoiced in accordance with Exhibit "B", fee
determination and 2021 Hourly Rates for Perteet and subconsultants, attached hereto and made a part
of this agreement
If you concur in this amendment and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
Dated this t day of @ Y Llii� , 2021
CITY OF YAKIMA
TITLE�� 1'
CITY CONTRACT NO' t�g
RESOLUTION NO' 7p "2
PERTEET, INC.
ystal L. Donner
President
City of Yakima Cowiche Canyon Trail
Prepared by Perteet, Inc.
Y-\Controcr Admemstration\Contracts\ Yakimo\20160316_Cowiche Canyon Trml\Amendment 41-3-2021\20160316_Cowiche Amend 4_DRAFT.doc
Pagel
Amendment No. 4
PERTEET
2302 W Dolarway Road, Suite 1, Ellensburg, WA 98926 I P 425.252.7700
Exhibit "A"
Amendment No. 4
City of Yakima Cowiche Canyon Trail
INTRODUCTION
The purpose of this Amendment is to add stream crossing and environmental documentation services as described
below
The Consultant will bill hours according to their published 2021 billing rotes, attached hereto
WORK ELEMENTS
Work Element 22 — Stream Crossing Permitting and Environmental Documentation
• Evaluate readily available and provided existing natural resources maps and database information and
state/federal permitting requirements for a prosed stream crossing of Cowiche Creek that may also
impact wetland critical areas.
• Conduct field work and data collection work to determine, delineate, and map wetland and stream
OHWM conditions along and adjacent to the trail alignment of the stream crossing.
• Provide design assistance and consultation relating to wetland and stream critical areas associated with
the stream crossing.
• Prepare Wetland and Stream Critical Areas/Mitigation Report and On -Site Mitigation Drawings for
inclusion at 90% or Final PS&E associated with the stream crossing and wetland/stream critical areas.
• Prepare JARPA form and up to four reduced format drawings (DARPA figures) to depict potential impacts
and mitigation.
• Prepare Biological Evaluation (BE) for 404 permit assuming a No -Effect or Not Likely to Adversely Affect
determination
• Provide related correspondence via email and phone.
• Facilitate permit issuance with follow-up as described
Assumptions.
• Fieldwork will consist of fieldwork preparation, wetland delineation, and identification of the stream
ordinary high water mark (OHWM) per agency standards and typically acceptable standards of care
Fieldwork will be completed in one working day inclusive of travel time.
• The Consultant will prepare a JARPA permit application and submittal documents (as described in this
scope and budget) The JARPA will be used for Corps 404 Permit and for HPA.
• Corps 404 and WDFW HPA are the only assumed federal and state permits under this scope It is
assumed the Corps will certify for 401
• One round of Client review will be conducted to review draft submittal information prepared by the
Consultant prior to permit submittal
City of Yakima Cowiche Canyon Trail
Prepared by- Perteet, Inc.
Y \Contract Administratwn\Contracts\Yakima\20160316_Cowiche Canyon TradWmendment 4 2-3-2021\20160316_Cowiche Amend 4_DRAFT.doc
Page 2
Amendment No. 4
PERTEET
2302 W Dolorwoy Road, Suite 1, Ellensburg, WA 98926 I P 425.252.7700
• One online pre -submittal consultation meeting is assumed under this scope with WDFW and Corps
permit staff invited to attend.
• Permit coordination provided by the Consultant under this scope assumes one round of review comments
for each submittal and one limited resubmittal to address necessary follow-up items.
• All permit fees and public notice fees/mailings will be paid by the Client.
• Up to three months of bi-weekly emails or phone calls are assumed to be provided by the Client to
facilitate concurrent permit review with the Corps and WDFW
• All permit documents will be prepared with information provided or previously provided under this overall
scope, is readily available, or can be otherwise made available to the Consultant
• Any supplemental efforts may necessitate a change in scope and fee.
• Wetland boundaries and Ordinary High Water Mark (OHWM) determinations will be mapped for one
crossing location by the Consultant utilizing GPS and GIS The wetland and OHWMs may not be
flagged by the Consultant in the field since they will be mapped concurrent with determination by the
Consultant
• Impacts to any wetland or the stream are assumed to be minor (within a few hundred square feet) and
avoided to the extent possible.
• Mitigation areas for any impacts (assumed to be wetland or stream buffer mitigation) will occur in or
adjacent to the delineated wetland or stream areas under this scope Enhancement and restoration
planting will be the assumed kind of mitigation
• Mitigation or permit costs/fees will be paid by others and not paid by the Consultant
• Local permitting will be done by others and not the Consultant
• There will be no appeals to any permits or determinations.
Deliverables:
• Pre -submittal depiction of wetlands and stream for evaluation of impacts and to facilitate pre -submittal
permit coordination (draft and final conceptual design drawings with permitting information via email
• Wetland and Stream Critical Areas Report (inclusive of data forms, ratings and maps) and addressing
on -site mitigation approach (as applicable and feasible)
• Completed DARPA application, BE, and supporting documentation for 404 and HPA to include other
documents prepared under thus scope.
• One assumed minor revision to the documents to allow for 404 and HPA issuance
• Correspondence via email
The budget for new Work Element 22 is $34,680 00
City of Yakima Cowiche Canyon Trail
Prepared by Perteet, Inc.
Y \Contract Administration \Contracts\Yokima\20160316_Cowiche Canyon Trail mendment 4_2-3-2021\20160316_Cowiche Amend 4_DRAFT.doc
Page 3
Amendment No. 4
PERTEET
Project Yakima Cowiche Canyon Trail
Client City of Yakima
AMENDMENT NO. 4
Exhibit B
Task Billing Rate
Sr.
Assodate
Lead
Engineer/
Mgr
Planner I1
Lead
Ecologist/M
1r
Total
Hours
Labor Dollars
$215.00
$170,00
$120.00
$150.00
Stream Crossing Permit and EmAro Doc
44.00
10.00
76.00
96.00
226.00
$34,680.00
Total Stream Crossing Pernik and Emiro
Doc .
44:00
. ' 10.00
' .36.00
' .96,00
. -, 4; A
,..226.00
' 6. ,
r l,'1E34,680.00
Fn"° Y' ,
ExOenses
Total Expenses
; 0.00
• 0.00
0.00
• ..0.00
.; ,,.'O00
Y k3. >. $0.00
Total Hours
44.00
10.00
76.00
96.00
226.00
Total Dollars
$9,460.00
$1,700.00
$9,120.00
$14,400.00
$34,680.00
SUMMARY
Labor
$34,680.00
Expenses
$0.00
Subconsuhants
$0,00
CONTRACT TOTAL
$34,680.00
PERTEET
Schedule of2021 Billing Rates
Engineering. Planning and Environmental Classifications
Principal
Senior Associate
2021 Hourly Rate
250 00
215.00
Senior Engineer/Manager
Lead Engineer/Manager
Engineer III
Engineer II
Engineer I
200.00
170 00
140 00
130.00
110.00
Senior Planner/Manager/Cultural Resources Manager
Lead Planner/Manager
Cultural Resources Specialist III
Cultural Resources Specialist II
Cultural Resources Specialist I
Planner III
Planner II
Planner I
170 00
140.00
120 00
115.00
85.00
130 00
120 00
80 00
Senior Environmental Scientist/Manager
Lead Environmental Scientist/Manager
Environmental Scientist III
Environmental Scientist II
Environmental Scientist I
165.00
150 00
125.00
105.00
85.00
Lead Technician/Designer
Technician III
Technician II
Technician I
130 00
110.00
85.00
75 00
Contract Administrator
Accountant
Graphics Specialist
Clerical
105.00
100.00
95.00
90 00
Emergency Response Rate (immediate response following event)
Expert Witness Rates:
Consulting & Preparation Time
Court Proceedings & Depositions (4 hour minimum)
@ 1.5 times hourly rates
@ standard hourly rates
@ 1.5 times hourly rates
Perteet s Hourly Rates are subject to change each year on January f'
PERTEET
Schedule of2021 Billing Rates
Page 2
Direct Expenses Ra e
Living & travel expenses outside of service area Cost plus 10 percent
Authorized Subconsultants Cost plus 10 percent
Outside Services (printing, traffic counts, etc.) Cost plus 10 percent
CADD Station $10 00 per hour
Project Controls / Primavera $10.00 per hour
GIS /Traffic Modeling $15.00 per hour
Color Copies $.80 each
Mileage @ current federal rate
Construction Classifications
Construction Supervisor
Construction Engineering Manager
Senior Construction Manager
Construction Manager
Assistant Construction Manager
2021 Hourly Rate
220.00
190 00
150.00
125.00
125.00
Construction Engineer III
Construction Engineer II
Construction Engineer I
140 00
120.00
110 00
Senior Electrical Construction Observer
Senior Construction Observer
Construction Observer III
Construction Observer II
Construction Observer I
175 00
150 00
130.00
90 00
80.00
Senior Office Engineer
Senior Construction Technician
Construction Technician III
Construction Technician II
Construction Technician I
140.00
125.00
115.00
95.00
85.00
Perteet's Hourly Rates are subject to change each year onJanuary F'
PERTEET
2302 W. Dolantray Road, Suite 1, Ellensburg, WA 98926 1 P 425,252,7700
City of Yakima
Cowiche Canyon Trail
AMENDMENT NO. 5
City of Yakima, "CLIENT" desires to amendment the agreement entered into with Perteet, Inc.,
"CONSULTANT" executed on April 19, 2017, amended on March 2, 2020, October 7, 2020,
January 25, 2021 and March 18, 2021. All provisions in the basic agreement remain in effect
except as expressly modified by this amendment.
The changes to the agreement are described as follows:
SECTION 4: AUTHORIZATION, PROGRESS, AND COMPLETION
This section shall be amended as follows:
The time for completion is through October 31, 2021,
If you concur in this amendment and agree to the changes as stated above, please sign in the
appropriate spaces below and return to this office for final action.
Dated this Clitk day of \.t 2021.
CITY OF YAKIMA
TITLE
V'YtVt(
CITY CONTRACT NO P/011--
RESOLUTION NO:. 41104
PERTEEF, INC.
e
Crystal L. Donner
President
OW of Yakima Cowiche Canyon Trail Page 1
Prepared by: Perfect, Inc,. Amendment No. 5
rters:/frerteershareerhteorrYsItesfArtAterrojects/2616031Praidrrarewithe,:,ranyon_TrailInternatYProlect MonsertnerarrentractrAtrendlnent
5/201603LE_CowIthe Amend S_PRAFTeac
PERTEET
•
2302 W. Dalarway Road, Suite 1, Eilensburg, WA 98926
City of Yakima
Cowiche Canyon Trail
AMENDMENT NO. 6
P 425252,7700
City of Yakima, "CLIENT" desires to amendment the agreement entered into with Perteet, Inc.,
"CONSULTANT" executed on April 19, 2017, amended on March 2, 2020, October 7, 2020, januant 25,
2021, March 18, 2021, and July 9, 2021. All provisions in the basic agreement remain in effect except as
expressly mod fed by this amendment,
The changes to the agreement are described os follows:
SECTION 4: AUTHORIZATION, PROGRESS, AND COMPLETION
This section shall be amended as follows:
The tirne for completion is through December 31, 2021,
If you concur in this amendment and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action,
Dated this
t do if y o
CITY OF YAKIMA
2021,
TITLE,C c+-9 rfleolCa3<..-/
011
CITY CONTRACT NO*
RESOLUTION NO:
PERTEET, INC,
Cr toil_ Donner
President
1'
City of Yakima Cowithe Conran Trail Page I
Prepared by. Perteet inc. Amendment No. 6
A'ACondoel AdmdAddiadACondoctdddolomod201,60316_CCHWPche Canyon Trod \Ardeddment 6J0,.6-2021,„Tme EdA20160316dComdche 6mend 6,71rnd Ext30,6-2021 doc
T
2302 W. Dolorway Rood, Suite I, Ellensburg, WA 98926 P 425 252,7700
City of Yakima
Cowiche Canyon Trail
AMENDMENT NO. 7
City of Yakima, "CLIENT" desires to amendment the agreement entered into with Perteet,
Inc., "CONSULTANT" executed on April 19, 2017, amended on March 2, 2020, October 7,
2020, January 25, 2021, March 18, 2021, July 9, 2021 and October 11, 2021. All provisions
in the basic agreement remain in effect except as expressly modified by this amendment.
The changes to the agreement are described as follows:
SECTION 4: AUTHORIZATION, PROG
SS, AND COMPLETION
This section shall be amended as follows:
c_ 3
The time for completion is through Fylpsch--3-r: 2022.
If you concur in this amendment and agree to the changes as stated above. please sign in the
appropriate spaces below and return to this office for final action.
Dated this 442...:2 day of
CITY OF YAKIMA
TITLE: C- (IA ('A ---
CITY CONTRACT NO'
RESOLUTION NO:
2022,
PERTEET, INC.
Pr:,,,,, al L. Dc)/Iriel.t.,
resident
City of Yakima Cowiche Canyon Trail
Pmze 1
Prepared by: Perteet, Inc.
Amendment No 7
Y:,Connact Adminisranon \ Contracts Yaknua,20160316Cowiche Canyon Trathltnendmeni 72-3-2022Time Ex620160316 Cowiche Amend 7Time Ext2-8-
2022 doe
PERTEET
2302 W Dolarway Road, Suite 1, Ellensburg, WA 98926 P 425 252 7700
City of Yakima
Cowiche Canyon Trail
AMENDMENT NO. 8
City of Yakima, "CLIENT" desires to amendment the agreement entered into with Perteet, Inc.,
"CONSULTANT" executed on April 19, 2017, amended on March 2, 2020, October 7, 2020, January 25,
2021, March 18, 2021, July 9, 2021, and March 6, 2022 All provisions in the basic agreement remain in effect
except as expressly modified by this amendment.
The changes to the agreement are described as follows.
SECTION 4: AUTHORIZATION, PROGRESS, AND COMPLETION
This section shall be amended as follows
The time for completion is through May 31, 2022.
If you concur in this amendment and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action
Dated this 27th day of April 2022.
CITY OF YAKIMA PERTEET, INC.
atesa L.,
TITLE City Manager
CITY CONTRACT NO: 2
RESOLUTION NO: K' . 017—O 53
;011-0LI9 om_avict8'
Peter De Boldt
Peter De Boldt
Vice President
City of Yakima Cowtche Canyon Trail
Prepared by Perteet, Inc
Y \Contract Administration\Contracts \ Yakima \ 20160316_Cow,che Canyon TroHWmendment 8_4-27-2022 Tme Ext\20160316_Cowiche Amend 8 doc
Pagel
Amendment No 8
2302 W. Dolarway Road, Suite 1, Ellensburg, WA 98926
City of Yakima
Cowiche Canyon Trail
AMENDMENT NO. 9
P 425,252,7700
City of Yakima, "CLIENT" desires to amend the agreement entered into with Perteet, Inc.,
"CONSULTANT" executed on April 19, 2017, and amended on March 2, 2020, October 7, 2020,
January 25, 2021, March 18, 2021, July 9, 2021, October 11, 2021, March 28, 2022 and April 27,
2022. All provisions in the basic agreement remain in effect except as expressly modified by this
amendment.
The changes to the agreement are described as follows:
SECTION 4: AUTHORIZATION, PROGRESS, AND COMPLETION
This section shall be amended as follows:
The time for completion is through September 30th, 2022.
If you concur in this amendment and agree to the changes as stated above, please sign in the appropriate
spaces below and return to this office for final action.
Dated this
CITY OF YAKIMA
TITLE: City Manager
CITY CONTRACT NO:
RESOLUTION NO:
day of s)
, 2022.
PERTEET, INC.
Cry&at L. Donner
President
City of Yakima Cowiche Canyon Trail Page 1
Prepared by: Perteet, Inc. Amendment No, 9
Y:\Contract Administration\ContractsWakima\20160316_Cowiche Canyon Trail \ Amendment 9_5-31-2022_Time Ex020160316_Cowiche Amend 9 Time Ext doc