Loading...
HomeMy WebLinkAbout01/08/2013 08 Yakima Rail Road Grade Separations Project; Berger/Abam Endingeers, Inc - Supplement No. 104 yy Uby F`i�1 iµY BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of: January 8, 2013 ITEM TITLE: Resolution authorizing the City Manager to execute Supplement No. 10 of the Professional Services Agreement with Berger /ABAM Engineers, Inc. for construction support on the MLK Underpass since they are the Engineer of Record. SUBMITTED BY: Doug Mayo, City Engineer, 576 -6678 CONTACT Brett Sheffield, Chief Engineer, 576 -6797 PERSON /TELEPHONE: SUMMARY EXPLANATION: The City has a professional services agreement with Berger /ABAM Engineers, Inc. under which they have provided the City with design engineering, project management, inspection services and engineering support during design and construction of the Yakima Railroad Grade Separations Project. Although a different consulting firm will be used to provide the Construction Engineering services for the MLK Underpass, Berger /ABAM, as the Engineer of Record of the Plans and Specifications, must be retained to approve various submittals and any changes to the Plans. The estimated cost of this construction support is $234,808. Therefore, this supplement will increase the maximum amount payable of the Berger /ABAM Consultant Agreement No. 2 to $5,165,534. Resolution X Ordinance Other (specify) Contract: X Mail to: Contract Term: Amount: $234,808 Expiration Date: 9/30/14 Insurance Required? No Funding Cumulative Reserve for Capital Phone: Source: Improvements, Fund 392 APPROVED FOR SUBMITTAL: City Manager E,fir1;rZ ZX9I9]u1� Staff respectfully requests that Council approve this resolution authorizing Supplement No. 10 with Berger /ABAM Engineers, Inc. BOAR D /CONIMISSION RECOMMENDATION: ATTACHMENTS: Click to download ❑ Resolution bergerabam ❑ supplemental Agreement No. 10 RESOLUTION NO. R -2013- A RESOLUTION authorizing the City Manager to execute Supplement No. 10 of the Professional Services Agreement with Berger /ABAM Engineers, Inc., for construction support on the MLK Underpass since they are the Engineer of Record. WHEREAS, in July 2000 the City of Yakima issued and advertised a request for qualifications from firms interested in providing consulting services for the design and development of a grade separation railroad project; and WHEREAS, the request for qualifications advertisement described the matter as a multi -phase project that would later include preparation of plans, specifications and estimates and construction project management for the Railroad Grade Separation Project ( "Project'), and WHEREAS, as a result of that request for qualifications process, the City selected and contracted with BERGER /ABAM Engineers, Inc., to provide the said services for the Project; and WHEREAS, additional engineering and consulting services are required for project administration to construct the Project, as described in the Scope of Work Description included in the Supplemental Agreement; and WHEREAS, it is requested that the City Manager have the authority to execute an additional (tenth) supplemental agreement for additional engineering and consulting services to provide construction support on the MLK Underpass since they are the Engineer of Record, and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to authorize the City Manager to execute an additional (tenth) supplemental agreement with BERGER /ABAM Engineers, Inc., to provide construction support of the MLK Underpass since they are the Engineer of Record, now therefore, 1 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute Supplement No. 10 of the Professional Services Agreement with Berger /ABAB Engineers, Inc. for construction support on the MLK Underpass since they are the Engineer of Record. The total additional compensation authorized by said supplemental agreement shall not exceed $234,808. The form of said supplemental agreement shall be reviewed and approved by the City Attorney or his designee. ADOPTED BY THE CITY COUNCIL this 8th day of January, 2013. ATTEST: City Clerk FA Micah D. Cawley, Mayor MAM ro Ste" AP of --F A I:dfn Supplemental Agreement �p g Organization and Address BergerABAM Inc. Number 10 33301 Ninth Avenue S., Suite 300 Federal Way, WA 98003 Original Agreement Number LA -4453 Phone: 206 -431 -2300 Project Number Execution Date Completion Date STPX - NCPD- OOOS(062) 10/29/2012 9/30/2014 Project Title New Maximum Amount Payable Yakima Railroad Grade Separations $ 5,165,534.00 Description of Work The CONSULTANT will provide design construction support services through the advertisement and construction process. The Local Agency of the. City of Yakima desires to supplement the agreement entered into with BergerABAM Inc. and executed on 6/20/2003 and identified as Agreement No LA -4453 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows. Section 1, SCOPE OF WORK, is hereby changed to read: See attached Fxhihit A- 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read. Nn chance III Section V, PAYMENT, shall be amended as follows: See attached Fxhihits F -1 and G -1 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By Z/Rt-raerAFLAM Inc Consultant Signature DOT Form 140 -063 EF Revised 9/2005 Approving Authority Signature Date EXHIBIT A -1- CITY OF YAKIMA MARTIN LUTHER KING JR BOULEVARD GRADE SEPARATION PROJECT SUPPLEMENTAL SCOPE OF WORK FOR DESIGN CONSTRUCTION SUPPORT SERVICES PROJECT DESCRIPTION The CONSULTANT will provide design construction support services through the advertisement and construction process. Services to be provided by the CONSULTANT are as described below for TASKS 1 thru 8. ESTIMATED LEVEL OF EFFORT AND BUDGET TRACKING The anticipated level of effort associated with providing these construction support services is shown in Exhibit E. The estimated level of effort is based upon the assumptions and task descriptions provided below. Work shall be performed only as required to complete construction of the project, in consultation with CITY staff. The effort to complete these tasks can vary from the effort assumed for the preparation of the level effort shown in Exhibit E. Some budget items may cost more and others may cost less. Budgets for some SUBCONSULTANTS may not be expended and may be used by the CONSULTANT or other SUBCONSULTANTS. The CONSULTANT shall monitor total costs expended under this agreement and shall notify the CITY when total costs have exceeded 75 percent of the maximum amount payable under this agreement and will subsequently provide the CITY an estimated cost to complete the work. The CONSULTANT will not perform any work in excess of the maximum amount payable without prior written authorization from the CITY. Assumptions It is assumed that the CITY will provide inspection personnel experienced with inspection of drilled shafts and ground improvement as general roadway construction. It is also assumed that the CITY will provide contract administration. Contract administration to be provided by the CITY will include: 1. Monitoring of the CONTRACTOR'S work plans, methods and schedule. 2. Preparation of monthly pay estimates and processing of pay estimates in a timely manner. 3. The CITY will plan and conduct all weekly meetnlgs, involving the CONSULTANT as required. 4. The CITY will maintain all project records as required to fulfill audit requirements associated with FHWA funding. Task i - Project Administration and Meetings The CONSULTANT will attend project site meetings as necessary. The estimated number of meetings for each is shown in the accompanying fee estimate. Design Construction Support Services BergerABA4f, A04.0016.00 ?ELK Grade Separations December 2012 Citp of Yakima page The CONSULTANT shall also prepare monthly invoices for the CONSULTANT's services that include a brief description of services provided during the month. Invoices will be based on the task descriptions contained in this scope of work. Deliverable(s) e Monthly CONSULTANT invoices and progress reports Task 2 - Requests for Information (RFIs) and Submittal Review The CONSULTANT will respond to questions and RFIs by the contractor and shall review ' contractor submittals as assigned by the CITY. Assumed submittal items are as indicated in the accompanying fee estimate. Deliverable(s) Responses to CITY Staff to support RFIs, as required Responses to CITY Staff to support Submittals, as required Responses to CITY Staff to support Materials reviews, as required Task 3- Change Orders The CONSULTANT shall provide revised plans and specifications as required to execute change orders. Deliverable(s) o Revised plans and specifications will be provided, as required Task 4 - Inspections BergerABAM design staff, railroad, geotechnical, pump station electrical and mechanical, traffic signal and illumination subconsultant design staff will provide part -time inspections on an as- needed or as- desired basis. Possible specialized inspection services may include the following. ® Specialized Structures inspections for BNSF Bridge, Front Street Bridge, Drilled Shafts and Bottom Seal Installation as needed. e Geotechnical observation for the installation of drilled shafts for the BNSF Bridge and startup of the drilled bottom seal installation. • Special inspections of pump station electrical • Special inspections of pump station mechanical • Special inspections of Traffic Signal and Illumination • Special inspections of BNSF work. Deliverable(s) CONSULTANT staff will provide daily inspection reports whenever on site to conduct these inspections. Design Construction Support Services BergerABA \1, A04.0016.00 NILK Grade Separations December 2012 City of Yakima Page 2 Task 5 - Record Drawings The CONSULTANT shall prepare a record set of drawings for the CITY that reflect field changes (additions, modifications, or deletions) to the bid drawing set during construction. The record drawing set shall include any drawungs revised or reissued during construction as a result of change orders and shall include changes resulting from RFI responses. The basis for the record drawings shall be a set of bid drawings redlined with changes by the CITY and supplied to the CONSULTANT. These drawings shall be noted as "record drawings" in the drawing revision block, but shall not require seals or signatures of registered professionals. The intent of the record drawing set is to provide the best information available to capture significant field changes, but not necessarily every minor change that may occur. Deliverable(s) • One set of 11 x 17 final record drawings • One electronic set in AutoCAD format Task 6 - Pre Construction Services The CONSULTANT will respond to Contractor questions as needed during the bid process. Addendums to the plans and Special Provisions will be prepared as needed. Tlne CONSULTANT will attend the prebid conference and will assist the City in reviewing the apparent low bidders pricing information. Deliverable(s) o Addendums as needed Task 7 - Lincoln Avenue Closeout The CONSULTANT will prepare a prefinal and final estimate for the CITY's processing to the Contractor. Archive boxes of all project records will be delivered to the CITY. The CONSULTANT will draft a physical completion letter once the pump station startup documentation is received from the Contractor. Deliverable(s) Draft Physical Completion Letter All project records Task 8 Wetwell Direct Engineer Charges The CONSULTANT will inspect the final remedies to the pump station equipment that occur after 7 September 2012, when Contract days expired, to physical completion. These charges will be tracked separate as direct engineering and forwarded to the CITY for deduction from monies due the Contractor by change order. Deliverable(s) o Log of hours expended for wetwell inspections after 7 September2012 by CONSULTANT and its subconsultants. Design Construction Support Services BergerABAIM, A04.0016.00 AILK Grade Separations _ December 2012 City of Yakima Page 3 SUBCONSULTANTS These construction support services include services provided by the following subconsultants. • Shannon & Wilson - Geotechnical • Hanson Professional Services - Railroad • Kennedy Jenks - Pump Station • Transpo - Signal and Illumination • HLA - Lincohl Avenue only. Design Construction Support Sen ices BergerABA\4, A04.0016.00 D4LK Grade Separations December 2012 Citv of Yakima Page 4 EXHIBIT E -1 CA plus DCSS Costs CONSULTANT FEE DETERMINATION 9212912092 Design Construction Support Services Costs DIRECT SALARY COSTS (DSC) for BergerABAM Personnel Hours Shannon & Wilson Rate Cost 1 Project Manager - Lee / French 304 X $52.21 = S 15,846 2 Project Engineer 178 X $42.91 = S 7,638 3 Civil Engineer 51 X $4411 = S 2,250 4 Structural Engineer 268 X 536.30 = S 9,728 5 Structural Inspector 120 X S4063 = S 4,876 6 Designer /CADD 57 X $3462 = S 1,973 7 Document Control 221 X $2411 = S 5,316 8 Admin /Clerical 28 X $29.62 = S 829 BergerABAM Hours, SUBTOTAL 1,226 Subtotal Direct Salary Costs (DSC) = $ 48,456 Salary Escalation (SE) = 5% of DSC = S 2,422.81 Subtotal (DSC + SE) = $ 50,879 Overhead (OH) 158.23% of (DSC + SE) = $ 80,506 Fixed Fee (FF) 32.00% of (DSC + SE) = 16,281 9 Inspector - Steve Nugent 91 X $60.00 5,430 BergerABAM Hours, TOTAL 1,317 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 147,666 DIRECT NONSALARY COSTS (DNSC) Courier packages @ S 25.00 S - Field Office Computers @ $ 1,500.00 S - Portable Laptops 0 @ S 2,00000 S - Printer (by contractor) @ S _ Copier (by contractor) @ S - Fax (by contractor) @ g Office Phones (by contractor) @ S Cell Phones (4) 0 months @ S 400 S - Mileage (300 miles / Trip) 10 Trips S 165.00 S 1 650 Mileage (private vehicle use, 50 miles/day) miles @ S 0.55 S - Miscellaneous Expendables (film, etc) 1 estimate @ S 500 S 500 TOTAL REIMBURSABLE EXPENSES (DNSC) = $ 2,150 �- TOTAL BergerABAM FEE (DSC + SE + OH + FF + DNSC) = $ _149,816 BergerABAM will be paid on a DSC multiplier equal to 2.902 SUBCONSULTANTS Shannon & Wilson $ 23,626 Hanson Professional Services (Includes BNSF CO Work) S 26,983 Transpo S 8,837 Kennedy /Jenks S 10,917 HLA (Lincoln Closeout) S 4.628 TOTAL SUBCONSULTANT FEES = $ 74,992 MANAGEMENT RESERVES $ 10,000 F- TOTAL ESTIMATED DESIGN CONSTRUCTION SUPPORT FEES = $ 234,808 Page 1 of 13 Exhibit E -1 CONSULTANT FEE DETERMINATION BergerABAM DCSS Hours 1 212 112 01 2 BergerABAM DCSS Staff TASK DESCRIPTION Task No. Project Project Manager BL Engineer SL Civil Engineer Structural Engineer Structural Inspector Inspector Nugent Designer- CADD Document Control BergerABAh Admin Clerical , Totals DESIGN CONSTRUCTION SUPPORT SERVICES TASK 1 - Project Admin & Meetings 1 128 30 - 75 28 261 Project Preconstruction Meeting '16 16 Attendance at Weekly Site Meetings (6 Mtgs) 54 - 54 Site Visits (4 site visits) 36 36 Monthly Invoices and Progress Reports 15 15 10 40 Weekly Document Filing & Maintenance (Assume 60 Wks) 30 60 90 Subcontracts & Subconsultant Admin 7 - 18 25 Quantity assistance 40 18 18 40 12 TASK 2 - RFI's & Submittal Review 2 91 86 31 219 12 92 531 ROM Setup and Format (Download from WSDOT) - - Process and Review RAM's and Mix Designs (BNSF) 16 16 ROM Maintenance - Driiled Shaft Installation Methods 8 8 2 18 Bottom Seal Submittal Package 8 8 2 18 CSL Test Reviews - 162 40 80 20 140 Concrete Girder Shop Drawings 4 16 2 22 Bridge Bearings and Other hardware 2 4 2 8 Girder Erection Methods 2 2 2 2 Formwork and Falsework 2 16 2 Reinforcement Shop Drawings 32 2 Metal Bridge Railing 2 4 2 Waterline and Appurtenances 2 2 Shoring Plans 4 4 16 2 Wetwell Shoring Plan 2 2 8 2 Dewatering Plan 2 4 2 8 RFI's (Assume 50) 25 50 25 25 12 50 187 TASK 3 - Change Orders(Allowance) 3 12 20 12 12 - 12 12 - s0 TASK 4 - Inspections 4 - - 120 120 Structural Inspection As Needed (Assume 120 hrs) 120 120 TASK 5 - Record Drawings 5 4 12 8 8 - 20 52 Task 6 - Subconsuit Ad, Bid, and Award 6 41.5 30 29 2.5 13 11,6 TASK 7 - Lincoln Closeout 7 27 17 42 86 gineering TASK 6 - Wetweli Direct Enc 8 71 71 TOTAL ESTIMATED HOURS FOR DCSS J 304 178 51 268 120 91 57 221 28 1,317 Page 2 of 13 EXHIBIT E -1 CONSULTANT FEE DETERMINATION BergerABAM CA Rates 12/21!2012 Classification Name Rate (July 1, 2012 to June 30, 2013) Percent ( %) Participation Blended Hourly Wage Rate Estimated Salary Escalation Factor Project Manager Bob Lee $52.21 100% $52.21 1 050 Project Engineer Shawna Lawrence $4291 100% $42.91 1.050 Document Control Dana Salyer $2411 100% $24.11 1 050 Engineering Support Jessica Aguilar $44.11 50% Santiago Aguilar $36.30 50% $40.21 1 050 Structural Inspector Bill Sandbo $36.30 100% $36.30 1 050 Inspector Steve Nugent $6000 100% $60.00 Department Coordinator /Admin Kelly Robinson $29.62 100% $29.62 1 050 Page 3 of 13 Exhibit G -1 SUBCONSULTANT FEE DETERMINATION DIRECT SALARY COSTS (DSC) Shannon Wilson Costs 12/21/2012 Personnel Hours Rate Cost 1 Principal 11 X $61.20 = $ 673 2 Associate 27 X $5769 = $ 1,558 3 Senior Engineer 2 46 X $43.27 = $ 1,990 4 Project Eng /Env Sci 1 0 X $34.24 = $ - 5 Staff 3 Eng /Env Sci 67 X $30.93 = $ 2,072 6 Staff 1 -2 Eng /Env Sci 0 X $2650 = $ - 7 Technician, Admin, Clerical 4 X $22.14 = $ 89 Total Hours 155 Subtotal Direct Salary Costs (DSC) = $ 6,382 Salary Escalation (SE) = 5% of DSC = $ 319.11 Subtotal (DSC + SE) = $ 6,701 Overhead (OH) 197.20% of (DSC + SE) = $ 13,215 Fixed Fee (FF) 30.00% of (DSC + SE) = $ 2,010 TOTAL SALARY COSTS (DSC + SE + OH + FF) _ $ 21,926 DIRECT NONSALARY COSTS (DNSC) Mileage 3000 miles @ $ 0 550 $ 1,650 Inspection Equipment Copies $ 50 TOTAL REIMBURSABLE EXPENSES (DNSC) _ $ 1,700 TOTAL AUTHORIZED AMOUNT = $ 23,626 PAYMENT Services will be paid on a DSC multiplier equal to 3.272 4 of 13 Exhibit G -1 SUBCONSULTANT FEE DETERMINATION Shannon Wilson Hours 12121/2012 Shannon and Wilson Staff TASK DESCRIPTION Task No. Principal Associate Senior Engineer Project Staff 3 Staff 1 -2 Engineer EnglEnv Sci EnglEnv Sci Technician, Admin, Clerical I_ri ca! Geo Engrs Totals CONSTRUCTION CONTRACT TASK 1 - Project Admin & Meetings 1 - 4 4 - - - 4 12 Monthly Invoices and Progress Reports 4 4 - - - 4 12 TASK 2 - RFI's & Submittal Review 2 6 13 8 - 7 _ _ 34 Dewatering Plan _ _ _ _ 2 _ - 2 Geotech Reviews of Shaft and CFA Plan 4 8 8 _ _ _ _ 20 RFI's (Assume 5) 2 5 - - 5 - 12 TASK 3 - Change Orders 3 - TASK 4 - Inspections 4 5 10 34 - 60 - - 109 Drilled Shafts at BNSF Bridge 5 5 20 30 Drilled Shafts Other 9 20 29 CFA Seal Installtion 5 5 20 30 CSL Consultation as Needed 20 20 TASK 5 - Record Drawings 5 Task 6 - Subconsult Ad, Bid, and Award 6 _ TOTAL HOURS C4 1 11 27 46 - 67 - 41 155 page 5 of 13 EXHIBIT G -1 Hanson Costs SUBCONSULTANT FEE DETERMINATION 12/21/2012 DIRECT SALARY COSTS (DSC Total Hours Personnel Hours 8,478 Rate Salary Escalation (SE) = 5 % of DSC = Cost 1 Principal 0 X $76.00 = $ - 2 Project Manager EAS Vl1 35 X $5400 = $ 1,890 3 Designer EAS III 80 X $48.00 = $ 3,840 4 Designer EAS Tech VII 66 X $38.00 = $ 2,508 5 CADD -Admin 8 X $3000 = $ 240 Total Hours 189 Subtotal Direct Salary Costs (DSC) = $ 8,478 Salary Escalation (SE) = 5 % of DSC = $ 423.90 Subtotal (DSC + SE) = $ 8,902 Overhead (OH) 173.12% of (DSC + SE) = $ 15,411 Fixed Fee (FF) 30.00% of (DSC + SE) = $ 2,671 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 26,983 DIRECT NONSALARY COSTS (DNSC) Mileage miles @ $ 0.550 $ - Miscellaneous Expendables (photographs, equip rental, etc) TOTAL REIMBURSABLE EXPENSES (DNSC) _ $ - TOTAL AUTHORIZED AMOUNT = $ 26,983 PAYMENT Services will be paid on a DSC multiplier equal to 3 031 Page 6 of 13 EXHIBIT G -1 SUBCONSULTANT FEE DETERMINATION Hanson Hours 1212112012 TASK DESCRIPTION Task No. Project Principal Manager EAS vu Designer EAS III Designer CADD Admin Tech VII Hanson Prof Svcs Totals CONSTRUCTION CONTRACT 4 TASK 1 - Project Admin & Meetings 1 12 12 Processing Monthly Construction Billings 12 12 TASK 2 - RFI's & Submittal Review 2 6 33 39 Shop Dravrings 13 13 RFIs (assume 20 each) 6 20 26 TASK 3 - Change Orders 3 13 47 66 126 BNSF Work as CO or Added BNSF Contract 13 47 66 126 TASK 4 - Inspections 4 TASK 5 - Record Drawings 5 4 8 12 Task 6 - Subconsult Ad, Bid, and Award Support 6 _ TOTAL ESTIMATED HOURS 35 80 66 8 189 Page 7 of 13 EXHIBIT G -1 SUBCONSULTANT FEE DETERMINATION Transpo TOTAL REIMBURSABLE EXPENSES (DNSC) = , $ 50 TOTAL SUBCONSULTANTS FEE (DSC + SE + OH + FF + DNSC) = $ 8,837 Page 8 of 13 Personnel Hours Rate Cost 1 Associate Principal 12 X $55.00 = $ 660 2 Senior Engineer 37 X $43.00 = $ 1,591 3 Engineer 3 4 X $35.00 = $ 140 4 Accountant 4 X $28.50 = $ 114 5 0 X $000 = $ - 6 0 X $000 = $ - 7 0 X $0.00 = $ - Total Hours 57 Subtotal Direct Salary Costs (DSC) = $ 2,505 Salary Escalation (SE) = $ 125 Transpo Subtotal (DSC + SE) = $ 2,630 Overhead (OH) 204.07% of (DSC + SE) = $ 5,368 Fixed Fee (FF) 30.00% of (DSC + SE) = $ 789 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 8,787 DIRECT NONSALARY COSTS (DNSC) Mileage miles @ $ 055 $ - Subsistance days @ $ 109.00 $ - Copies $ 50 Federal Express Postage TOTAL REIMBURSABLE EXPENSES (DNSC) = , $ 50 TOTAL SUBCONSULTANTS FEE (DSC + SE + OH + FF + DNSC) = $ 8,837 Page 8 of 13 EXHIBIT G -1 SUBCONSULTANT FEE DETERMINATION Transpo Hours TASK DESCRIPTION Task No. Associate Senior Engineer Principal Engineer 3 Acct Subconsultant Totals TASK 1 - Project Admin & Meetings 1 2 - - 4 - - - 6 Monthly Invoices 2 - - 4 - - - 6 TASK 2 - RFI's & Submittal Review 2 10 28 - - - - - 38 RFI's (up to 12) 6 12 - - - - - 18 Signal & Illumination Submittals - Cat cuts (up to 12) 2 8 - - - - - 10 Signal & Illumination Submittals - Shop Dwgs (up to 3) 2 8 - - - - - 10 Miscellaneous TASK 3 - Change Orders (Allowance) 3 - - - - - - - - TASK 4 - Inspections 4 - 5 - - - - - 5 TASK 5 - Project Record Drawings 5 - 4 4 - - - - 8 TOTAL 12 37 4 4 0 0 0 57 Page 9 of 13 EXHIBIT G -1 KENNEDY - JENKS SUBCONSULTANT FEE DETERMINATION BILLING RATES (Includes DSC, OH, and FF) TOTAL REIMBURSABLE EXPENSES (DNSC) = $ 380 TOTAL SUBCONSULTANTS FEE (DSC + SE + OH + FF + DNSC) = $ 10,917 Page 10 of 13 Personnel Hours Rate Cost Engr. 8 MLS /EAD 0 X $6000 = $ - Engr.7 PAR 0 X $51.00 = $ - Engr. 6 TPGNAB 65 X $47.00 = $ 3,055 Engr. 3 EWK 0 X $3000 = $ - Designer LMM 4 X $3800 = $ 152 Proj Admin SLC 6 X $23.00 = $ 138 Total Hours 75 Subtotal Direct Salary Costs (DSC) = $ 3,345 Salary Escalation (SE) = $ 167 Kennedy Jenks Subtotal (DSC + SE) = $ 3,512 Overhead (OH) 170.00% of (DSC + SE) = $ 5,971 Fixed Fee (FF) 30.00% of (DSC + SE) = $ 1,054 TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 10,537 DIRECT NONSALARY COSTS (DNSC) Mileage (2 Roundtrips) 600 miles @ $ 055 $ 330 Shipping (Overnight) pkgs @ $ 10.00 $ - Plotting and Reproduction $ 50 Travel Expenses $ - TOTAL REIMBURSABLE EXPENSES (DNSC) = $ 380 TOTAL SUBCONSULTANTS FEE (DSC + SE + OH + FF + DNSC) = $ 10,917 Page 10 of 13 EXHIBIT G -1 SUBCONSULTANT FEE DETERMINATION KENNEDY - JENKS HOURS TASK DESCRIPTION Task No. Engr. 8 Engr. 7 Engr. 6 Engr. 3 Designer Proj. Admin. MLS /EAD PAR TPGNAB EWK LMM SLC Subconsultant Totals TASK 1 - Project Admin & Meetings 1 - - 4 - - 6 10 Monthly Invoice and Progress Reports - 4 - - 6 10 TASK 2 - RFI's S Submittal Review 2 - - 48 - - - 48 Pump Station and Appurtenances Submittals - - 20 - - - 20 Elec./Inst., Controls and Telemetry Submittals - - 20 - - - 20 RR's (Assume 4) _ - g _ _ - 8 TASK 3 - Change Orders (Allowance) 3 - - TASK 4 - Inspections 4 - - g _ _ _ g TASK 5 - Project Record Drawings 5 - - 4 - 4 - 8 75 TOTALI 65 - 4 61 Page 11 of 13 EXHIBIT G -1 SUBCONSULTANT FEE DETERMINATION Personnel Hours 1 Resident Engineer 19 2 Office Assistant 33 3 2 Man Survey Crew 0 4 Part Time Inspector 0 Total Hours 52 Overhead (OH) Fixed Fee (FF) HLA 150.77% 30.00% ' X $3660 = $ X $26.50 = $ X $54.00 = $ X $32.00 = $ Subtotal Direct Salary Costs (DSC) = $ Salary Escalation (SE) = $ Subtotal (DSC + SE) = $ of (DSC + SE) = $ of (DSC + SE) = $ H LA Cost 695 875 1,570 78 1,648 2,485 495 TOTAL SALARY COSTS (DSC + SE + OH + FF) _ $ 4,628 DIRECT NONSALARY COSTS (DNSC) Mileage 0 miles @ $ - $ - EXHIBIT G -1 SUBCONSULTANT FEE DETERMINATION TASK DESCRIPTION N TASK 1 - Project Admin & Meetings Process Submittals Process RFI's Process Claims Process Change Orders Process Pay Estimates Track Progress Schedules Track Working Days Process and Review Labor Documents Process and Review RAM's Attend Weekly Constrn and City mtg's Set Up and Maintain Documentation Prepare and attend federal audits On -site project admin. TASK 2 - RFI's & Submittal Review 2 Drilled Shaft/Diaphragm Wail Installation Methods Cross Hole Sonic Log Test Review RR Girder Shop Drawings Roadway Bridge Shop Drawings Access Bridge Shop Drawings Strut Shop Drawings Bridge Bearings and Other Hardware Girder Erection Methods Formwork and Falsework Fiber Optic Channel Shop Drawings Reinforcement Shop Drawings Metal Bridge Railing Concrete Mix Design Asphalt Mix Design Aggregate Sources Soldier Pile Wall Water Line Pipe and Appurtenances Storm Drain Pipe and Structures Pump Station and Appurtenances Impact Attenuator and Other Traffic Items Traffic Control Plans RFI's (Assume ?) Signal & Illumination Submittals Miscellaneous TASK 3 - Change Orders (Allowance) 3 TASK 4 - Inspections 4 Survey or Part Time Inspection as Needed 2 Man Part Subconsul isk Resident Office Survey Time tant o. Engineer Assistant Crew Inspector Totals 1 19 33 0 0 52 3 1 4 8 8 16 8 24 32 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 - 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 - 0 0 0 0 - (TASK 5- Project Record Drawings 5 0 0 0 0 - 0 0 0 0 - 0 0 0 0 TOTAL 19 33 - - 52 HLA HOURS