HomeMy WebLinkAboutR-2021-031 North 1st St. Revitalization Phase 2 Agreement with Total Site Services, LLCRESOLUTION NO. R-2021-031
A RESOLUTION authorizing a contract with Total Site Services, LLC for the N. 1st St.
Revitalization Phase 2 Project.
WHEREAS, in 2019, the City of Yakima received federal and state funding to
reconstruct North 1st Street from SR12 to 200 feet south of "N" Street; and
WHEREAS, the City is resuming its efforts to continue the reconstruction and
improvements of North 1st Street from "N" Street to "J" Street, and
WHEREAS, the City has budgeted local Transportation Benefit District Funds (TBD) to
improve the streets, along with budgeted utility funds to replace, repair and improve aging public
utilities in the project vicinity, and
WHEREAS, the City has prepared the plans and contract documents for the
construction of the improvements, which include curb, gutter and sidewalk, roadway
replacement, ADA compliant curb ramps, stormwater, water, sewer improvements, street
lighting, pedestrian lighting and other related amenities, and
WHEREAS, the City of Yakima used the procedure established by Washington State
law for the bidding and awarding of public capital improvement projects, and
WHEREAS, Total Site Services, LLC submitted the lowest responsive bid and has the
ability to correctly install the improvements at a cost of $2,585,734; and
WHEREAS, the City Engineer has recommended awarding the contract to Total Site
Services, LLC for installing the improvements, and
WHEREAS, the City Council finds that it is in the best interests of the City of Yakima and
its residents to improve the roadway and all related improvements on North 1st Street from "N"
Street to "J" Street and award the construction contract; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a contract between the City of Yakima
and Total Site Services, LLC., attached hereto and incorporated herein by this reference not to
exceed Two Million Five Hundred Eighty -Five Thousand Seven Hundred Thirty -Four Dollars
($2,585,734) for City Project No 2390 to improve the roadway and relative roadway
improvements on North 1st Street from "N" Street to "J" Street.
ADOPTED BY THE CITY COUNCIL this 2nd day of March 2021
ST:
Sonya CI r Tee, City Clerk
t7,24
ftvr-
fr
P tricia Byers, Ma r
CONTRACT
THIS AGREEMENT, made and entered in triplicate, this,£ day of f1'1G-f'GC1 , 20 21 , by and between
the City of Yakima , hereinafter called the Owner, and Total Site Services, LLC a
Washington Corporation, hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE
BID AMOUNT OF: $ 2,585,734.08 , for North lst Street Revitalization Phase 2, City of Yakima
Project No. 2390A, all in accordance with, and as described in the attached plans and specifications and
the 2021 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference
incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work
provided under this contract and every part thereof.
Work shall start within ten (10) days after the Notice to Proceed and shall be completed in One hundred
forty (140) working days. If work has not commenced within the ten (10) days after the notice to proceed,
the first chargeable working day shall be the eleventh (11th) working day after the date on which the City
issues the Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each day said work remains uncompleted after expiration of the
specified time, as liquidated damages.
The Contractors shall provide and bear the expense of all equipment; work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
in this contract and every part thereof, except such as are mentioned in the specifications to be furnished
by the City of Yakima .
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided for in this contract.
III. INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its
officers, elected officials, employees and agents from and against all claims, causes of action, damages,
losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and
court costs, arising out of, relating to, or resulting from The Contractor's performance or non-performance
of the services, duties and obligations required of it under this Agreement.
IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into
this contract, except as expressly provided herein.
IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKIMA
this day of 20aj
\\fs02\General\PROJECTS \2015\15038\SPEC\15038A\15038A Spec.docx
CONTRACTOR
Total Site Services, LLC
Shannon Toranzo
General Manager
(President, Owner, etc.)
Address: 2780 Salk Avenue
Richland, WA 99354
4-2
CITY CONTRACT NO:
RESOLUTION NO;. r"
a LLC Corporation
1
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 4.E.
For Meeting of: March 2, 2021
ITEM TITLE: Resolution authorizing a contract with Total Site Services, LLC for
the N. 1st St. Revitalization Phase 2 Project
SUBMITTED BY: Scott Schafer, Director, Public Works
Bill Preston, PE, City Engineer - (509) 576-6754
SUMMARY EXPLANATION:
City Project No. 2390 was established for the N. 1st St. Revitalization Phase 2 Project. Bids
were opened on February 10th; the low bidder of three competitive bids was Total Site Services,
LLC of Richland, WA, with the low bid of $2,585,734.08. Their bid was $661,208.13 under the
engineer's estimate.
The project will reconstruct N. 1st Street between "J" Street and "N" Street including a complete
rebuild of the roadway (replacing the old concrete highway through town), 2,400 SY sidewalk, 3,500
LF curb and gutter, storm drainage improvements, improved street lighting, addition of pedestrian
lighting, landscaping, irrigation, and related improvements, tying to the end of the Phase 1 project
which was completed in 2019.
Funding sources include Stormwater Capital, budgeted for $354,166 and Water Capital, for the
replacement of two water mains with one upsized watermain, budgeted for $347,500. The remaining
$1.884M will be funded with Transportation Benefit District (TBD) funds. The project will begin in late
March and will be completed in October 2021.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Neighborhood and Community Building
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
Description Upload Date Type
2
D Resolution - Total Sites Senrices N, 1st St, Phase 2 2/23/2021 Resolution
D Contract 2/16/2021 Contract