HomeMy WebLinkAbout01/05/2021 04F Cured-In-Place Pipe Rehabilitation of Sanitary Sewer Mains Agreement with Insituform Technologies, LLCB US INE S S O F T HE C I T Y C O UNC I L
YAK I M A, WAS HING T O N
AG E ND A S TAT E M E NT
I tem No. 4.F.
For Meeting of: J anuary 5, 2021
I T E M T IT L E :Resolution authorizing a contract with I nsituform Technologies,
L L C. for Cured-I n-Place Pipe Rehabilitation of Sanitary S ewer
Mains
S UB M IT T E D B Y:S cott S chafer, Director of Public Works
David B rown, Assistant Director of Public Works
Mike Price, Wastewater/Stormwater Manager, 249-6815
S UM M ARY E X P L ANAT I O N:
City of Yakima (City) Project 2495 rehabilitates approximately 15,550 linear feet of aging and
deficient concrete and clay sewer pipe in the ten locations identified on the attached Project
L ocation Map.
Rehabilitating deficient sewer lines reduces groundwater infiltration, improves collection system
reliability, and decreases treatment costs at the Wastewater Treatment P lant. T he P roject will
utilize cured-in-place pipe technology to minimize surface disturbances.
The City previously entered into an A greement with HL A Engineering and L and S urveying, I nc.
under City Contract 2020-047 to provide engineering design, bidding, and construction services
for the pipe rehabilitation. T he City utilized the procedure established by the S tate of Washington
for competitively bidding projects. Three contractors submitted bids, with I nsituform
Technologies, L L C. submitting the lowest bid of $676,077.
The contract is attached for City Council review in an amount not to exceed $676,077. T he
project is funded by Wastewater Capital Fund 476.
I T E M B UD G E T E D:Yes
S T RAT E G I C P RI O RI T Y:P ublic S afety
AP P RO V E D F O R S UB M IT TAL B Y T HE C IT Y M ANAG E R
RE C O M M E ND AT I O N:
A dopt Resolution
1
AT TAC HM E NT S :
Description Upload Date Type
Resolution 12/1/2020 Resolution
Contract 12/4/2020 Contract
Project Location Map 11/19/2020 Backup Material
2
RESOLUTION NO. R-2021-______
A RESOLUTION authorizing a contract with Insituform Technologies, LLC. for Project 2495
Cured-In-Place Pipe Rehabilitation of Sanitary Sewer Mains
WHEREAS, the City of Yakima maintains the Wastewater Collections System in
accordance with applicable Federal, State and Local regulations; and
WHEREAS, the City of Yakima Wastewater Division has identified pipeline segments that
require rehabilitation or replacement; and
WHEREAS, this and future projects will stabilize current conditions of the city’s
wastewater pipe system and reduce infiltration of groundwater which will save treatment costs,
improve collection system reliability, and limit the need for upgrades to the Wastewater Treatment
Plant; and
WHEREAS, by resolution R-2020-034, the City entered into an agreement with HLA
Engineering and Surveying (HLA) to prepare the plans and contract documents for the
rehabilitation of City of Yakima sanitary sewer main lines in various locations in city, and
WHEREAS, the City of Yakima Wastewater Division requires construction services for the
rehabilitation of the deficient collections system pipes; and
WHEREAS, The City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Insituform Technologies, LLC. submitted the low bid and has the ability to
perform the contact specified work; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with Insituform Technologies, LLC. to perform the work
detailed in the contract documents for the rehabilitation of approximately 15,550 LF of aging City
of Yakima sanitary sewer main lines by means of cured-in-place pipe; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Insituform
Technologies, LLC., in the amount of SIX HUNDRED SEVENTY-SIX THOUSAND AND
SEVENTY-SEVEN DOLLARS ($676,077)., for rehabilitation of approximately 15,550 LF of aging
City of Yakima sanitary sewer main lines by means of cured in place pipe in various locations in
city
ADOPTED BY THE CITY COUNCIL this 5th day of January, 2021.
________________________
ATTEST: Patricia Byers, Mayor
____________________________________
Sonya Claar Tee, City Clerk
3
G:\PROJECTS\2020\20079E\Spec\20079 Spec.docx 4-2
CONTRACT
THIS AGREEMENT, made and entered in triplicate, this _____ day of __________, 20___, by and between
the City of Yakima , hereinafter called the Owner, and ________________________________________ a
Washington Corporation, hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE
BID AMOUNT OF: $ ______________, for CIPP Rehabilitation - Priority 1, City of Yakima Project No.
2495, all in accordance with, and as described in the attached plans and specifications and the 2020
Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference
incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work
provided under this contract and every part thereof.
Work shall start within ten (10) days after the Notice to Proceed and shall be completed in Sixty-five (65)
working days. If work has not commenced within the ten (10) days after the notice to proceed, the first
chargeable working day shall be the eleventh (11th) working day after the date on which the City issues the
Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each day said work remains uncompleted after expiration of the
specified time, as liquidated damages.
The Contractors shall provide and bear the expense of all equipment; work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
in this contract and every part thereof, except such as are mentioned in the specifications to be furnished
by the City of Yakima .
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided for in this contract.
III. INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its
officers, elected officials, employees and agents from and against all claims, causes of action, damages,
losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and
-performance
of the services, duties and obligations required of it under this Agreement.
IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into
this contract, except as expressly provided herein.
IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this ______ day of ___________ 20___. ________________________________,a _______Corporation Contractor
___________________________________ By: _______________________________________________
City Manager
Attest: __________________________________________________
(Print Name)
_______________________________________
City Clerk
Its: _______________________________________________
(President, Owner, etc.)
Address: __________________________________________
________________________________________________________
4
Project Location Map
Wastewater Collection System Improvements
CIPP Rehabilitation Project Task 2020-01
Page 1 of 2
5
Project Location Map
Wastewater Collection System Improvements
CIPP Rehabilitation Project Task 2020-01
Page 2 of 2
6