Loading...
HomeMy WebLinkAbout01/05/2021 04D WWTP Digester Gas Improvements Project Completion; Pease & Sons, Inc.B US INE S S O F T HE C I T Y C O UNC I L YAK I M A, WAS HING T O N AG E ND A S TAT E M E NT I tem No. 4.D. For Meeting of: J anuary 5, 2021 I T E M T IT L E :P roject completion and contract acceptance for Pease & S ons, I nc. -- Wastewater Treatment P lant Digester Gas I mprovements S UB M IT T E D B Y:S cott S chafer, Director of Public Works David B rown, Assistant Director of Public Works Mike Price, Wastewater/Stormwater Division Manager, 249-6815 S UM M ARY E X P L ANAT I O N: City P roject W F2484 installed digester gas drying equipment and a separate digester gas chiller unit. T he City contracted with Pease & S ons, I nc. for the digester gas improvements. Final I nspection for this project was made and the recommendation is that the project be accepted. P roject Manager: Dana K allevig Contractor: Pease & S on's, I nc. Contract Award: 6/12/2019 Contract Cost: $377,655.47 Total Due: $0.00 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project. I T E M B UD G E T E D:Yes S T RAT E G I C P RI O RI T Y:P ublic S afety AP P RO V E D F O R S UB M IT TAL B Y T HE C IT Y M ANAG E R RE C O M M E ND AT I O N: A ccept P roject 1 AT TAC HM E NT S : Description Upload Date Type Final 12/8/2020 Cover Memo 2 3