HomeMy WebLinkAbout01/05/2021 04C Wastewater Collections Facility Renovation Project Completion; POW Contracting, Inc.B US INE S S O F T HE C I T Y C O UNC I L
YAK I M A, WAS HING T O N
AG E ND A S TAT E M E NT
I tem No. 4.C.
For Meeting of: J anuary 5, 2021
I T E M T IT L E :P roject completion and contract acceptance for P O W Contracting,
I nc. for Wastewater/S tormwater Collections Facility Renovation
S UB M IT T E D B Y:S cott S chafer, Director of Public Works
David B rown, Assistant Director of Public Works
Mike Price, Wastewater/Stormwater Division Manager, 249-6815
S UM M ARY E X P L ANAT I O N:
City P roject S C2509/S W 2510 renovated the existing single story, 19,349 sq. ft.
Wastewater/Stormwater Division Collections F acility. The City contracted with P O W Contracting,
I nc. for the renovation.
Final inspection for this project was made and the recommendation is that the project be
accepted.
P roject Manager: Dana K allevig
Contractor: P O W Contracting
Contract Award: 3/17/2020
Contract Cost: $745,062.74
Total Due: $0.00
The total contract cost is for construction only and does not include engineering and other costs.
City Council action is required to accept the project.
I T E M B UD G E T E D:Yes
S T RAT E G I C P RI O RI T Y:P ublic S afety
AP P RO V E D F O R S UB M IT TAL B Y T HE C IT Y M ANAG E R
RE C O M M E ND AT I O N:
A ccept P roject