Loading...
HomeMy WebLinkAbout01/05/2021 04C Wastewater Collections Facility Renovation Project Completion; POW Contracting, Inc.B US INE S S O F T HE C I T Y C O UNC I L YAK I M A, WAS HING T O N AG E ND A S TAT E M E NT I tem No. 4.C. For Meeting of: J anuary 5, 2021 I T E M T IT L E :P roject completion and contract acceptance for P O W Contracting, I nc. for Wastewater/S tormwater Collections Facility Renovation S UB M IT T E D B Y:S cott S chafer, Director of Public Works David B rown, Assistant Director of Public Works Mike Price, Wastewater/Stormwater Division Manager, 249-6815 S UM M ARY E X P L ANAT I O N: City P roject S C2509/S W 2510 renovated the existing single story, 19,349 sq. ft. Wastewater/Stormwater Division Collections F acility. The City contracted with P O W Contracting, I nc. for the renovation. Final inspection for this project was made and the recommendation is that the project be accepted. P roject Manager: Dana K allevig Contractor: P O W Contracting Contract Award: 3/17/2020 Contract Cost: $745,062.74 Total Due: $0.00 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project. I T E M B UD G E T E D:Yes S T RAT E G I C P RI O RI T Y:P ublic S afety AP P RO V E D F O R S UB M IT TAL B Y T HE C IT Y M ANAG E R RE C O M M E ND AT I O N: A ccept P roject 1 AT TAC HM E NT S : Description Upload Date Type Final 12/7/2020 Backup Material 2 3 4 5 6