Loading...
HomeMy WebLinkAboutR-2012-082 2013-2018 Six-Year Transportation Improvement Program Adoption FUNDING RESOLUTIONRESOLUTION NO. R- 2012 -82 A RESOLUTION adopting the Six -Year Transportation Improvement Program for the period of 2013 through 2018 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at the regular meeting of the Yakima City Council on June 5, 2012 and June 19, 2012, with proper public notice as required by RCW 35 77 010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2013 through 2018 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2013 through 2018, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved ADOPTED BY THE CITY COUNCIL this 191h day of June, 2012. Micah Cawley, Payor ATTEST: f WA :7�*' Sonya\,`Iaar Tee, City Cl k *' 4 J A � 4 p BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of: June 19, 2012 ITEM TITLE: Public Hearing and consideration of Resolution for: A) Adoption of the Six -year Transportation Improvement Program (TIP) for the years 2013 to 2018, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element. SUBMITTED BY: Joan Davenport, Acting Director of Community and Economic Development CONTACT Doug Mayo, City Engineer, 576 -6678 PERSON /TELEPHONE: SUMMARY EXPLANATION: Attached is the 2013 - 2018 Six -year TIP, along with an explanation sheet that describes the information contained on the various columns of the Six -year TIP. Five projects have been added to the six -year TIP. The projects are: #18 S. 75th Avenue - Mead Ave. to Nob Hill Blvd. #46 S. 80th Avenue Bridge (over Wide Hollow Creek) #47 Nob Hill Boulevard /1st Street Corridor Safety Improvements #48 Lincoln Avenue Corridor Safety - N. 32nd Avenue to N. 5th Avneue #49 Citywide Safety Improvements Projects that that have been removed from the 2012 - 2017 TIP as they were completed or the funds were obligated include: Powerhouse/William O. Douglas Trail Connector Nob Hill Blvd. - 49th Avenue to 64th Avenue Many Yakima Transit projects have also been removed from the City's TIP as they have elected to create their own six -year TIP. Their six -year TIP is not due until December. Council and the public are welcome to add other arterial system projects to the list. The six - year TIP project listing will be finalized at the June 19th hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six - year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. The current plan for 2013 - 2018 includes five projects that are funded. Funding for the remainder of the projects will continue to be sought. We have grant applications in for three more projects. Six -year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU) This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA -LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments Citizen participation is an integral part of the planning process at all levels Local Agencies are required to develop and adopt a six -year transportation program. All local agencies are required to hold at least one public hearing during the development of the six -year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six -year TIP for 2013 to 2018. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. Resolution X Contract: Contract Term: Insurance Required? No Funding Source: APPROVED FOR SUBMITTAL: STAFF RECOMMENDATION: Ordinance Other (specify) Mail to: Amount: Expiration Date: Phone: City Manager Hold Public Hearing to consider adoption of Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element.Adopt the Six -Year TIP and amend the Metropolitan Transportation Plan and Yakima Urban Area Comprehensive Plan Capital Facilities Element. BOARD /COMMISSION RECOMMENDATION: ATTACHMENTS: Click to download ❑ Resolutions ❑ STIP Explanation Sheets E] 2013 - 2018 Six -year TIP 9. Appendices A. Six Year Form Instructions Heading Agency, Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21 44) City Number Enter the OFM assigned number (see LAG Appendix 21 45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or - Major Collector RTPO (if located in a rural area) Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable ) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access Urban (Over 5000 pop.) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial 17- Collector 19- Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2 Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. 01- New construction on new alignment 02- Relocation Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06= Other Enhancements Description 07 - Resurfacing 14 - Bridge Program - Special 08 - New Bridge Construction 21 - Transit Capital Project 09- Bridge Replacement 22- Transit Operational 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety /Traffic Operation /TSM 13 - Environmentally Related 25 23 - Transit Planning 24 - Transit Training /Admin. 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5 Funding Status. Enter the funding status for the entire project which describes the current status S - Protect is selected by the appropriate selection body and funding has been secured by the lead agency P - Project is subject to selection by an agency other than the lead and is listed for planning purposes (Funding has not been determined ) 6 Total Length. Enter project length to the nearest hundredth (or code °00" if not applicable) 7 utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are Impacted by the construction project. C -Cable TV G -Gas O - Other P -Power S - Sewer (other than agency - owned) T -Telephone W - Water 8 Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW -light of Way or land acquisltlon only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases from Preliminary Engineering through Construction 9 Phase Start Date. Enter the month/c0avlvear in MM/DDNY format that the selected phase of the protect Is actually expected to start. 10 Federal Fund Code. Enter the Federal Fund code from the table BIA : Bureau of Indian Affairs BR - Bridge Replacemeni or Rehab CDBG Community Development 5309(FG) Bloc; Grant (HUD) CMAQ Congestion Mitigation Air Quality DEMO ISTEA Demo Project (Selected) Discretionary Ferry Boat Discretionary, Public. REV Lands Highways, or Scenic Byways DOD Dept of Defense Ic Interstate Construction 110 - Interstate Maintenance NHS - National Highway System 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12 State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 FTA Discretionary for Capital Expenditures 5307 - FTA Urban Areas 5309(Bus)- Bus 5309(FG) - Fixed Guideways 5309(NS) - New Starts 5310 - FTA Elderly /Disabled 5311 - FTA Rural Areas REV - Rural Economic Vitality Program STP(C) - STP Statewide Competitive Program STP(E) - STP Transportation Enhancements STP(S) - STP Safety Including Hazard and RR STP(R) - STP Rural Regionally Selected STP(U) - STP Urban Regionally Selected STP - wSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12 State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 CAPP - County Arterial'Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program AIP - Arterial Improvement Program PSMP - Pedestrian Safety & Mobility Program PTST - Public Transportation Systems Progra SCP - Small City Program WSDOT - WSDOT funding OTHER - All other unidentified state funding 13. State Funds. Enter all funds from the State Agencies in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP Too" program.) 16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification: Click Y if Right of Way acquisition is required. If yes, Enter RM Certification Date, if known. (This is "required" for Federally funded projects only.) 27 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No.: U 7i u c �i E Z `o_ L Project Identification A. PIN /Federal Aid No. B. Bridge No, C. Project Title D. Street/Road Name or Number E. Be inning MP or Road - Endin MP or Road B g F Describe work to Be Done c u i ° 'm o. n n r c — '° 0 o _ j Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only N ° " m 'ii n` Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R /yy Required 4 Date (MM /YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 1 2 1 3 4 5 1 6 7 8 9 10 11 12 13 14 15 16 17 18_- _1.9 20 21 -- —14- -1- Yakima Railroad Grade Separations - Phase 3 - 01 P 0.2 T CN 1/1/2013 STP(U) 798 FMSIB 3,500 2,200 6,498 3,000 3,498 EA Yes Martin Luther King, Jr. Boulevard 06 P CN 1/1/2013 DEMO 2,582 AIP 6,000 8,582 3,000 5,582 from: N. 1st Street to: N. 1st Avenue 07 G 9/1/2009 Grade separate the rail and vehicle traffic at the 08 O Martin Luther King, Jr Boulevard rail crossing. Construct a Front Street Bridge over Martin Luther King, Jr Boulevard. Totals 3,380 9,500 2,200 15,080 6,000 9,080 16 2 64th Avenue Roadway Widening 04 S 0.5 W CN 1/1/2013 STP(U) 749 176 925 925 CE Yes 64th Avenue 06 G 1 1 1 1 from: Nob Hill Boulevard to: Tieton Drive 03 P 10/31/2011 T Widen roadway, install curb, gutter, sidewalk, lighting C and drainage. 0 Totals 749 176 925 925 14 3 North 1st Street Revitalization P 0.42 P CN 1/1/2014 STP(U) 2,663 416 3,079 3,079 CE No North 1st Street T 1 1 1 1 1 from: 'N' Street to: SR 12 0 C Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. Totals 2,663 416 3,079 3,079 14 4 E. Nob Hill Blvd. & Fair Ave. 115 Improvements 03 P N/A P RW 1/1 /2015 STP(U) 173 27 200 200 CE Yes Nob Hill Boulevard 04 T CN 6/1/2016 STP(U) 1 865 135 1,000 1,000 from: E. Nob Hill Blvd. to: Fair Ave. 31 W 4/1/2015 C Widen Nob Hill Boulevard through the intersection, 0 construct left -turn lane, curb, gutter, sidewalk, street lighting and drainage. Upgrade signal by installing mast arm structures. Totals 1,038 162 1,200 200 1,000 Agency- Yakima Co. No. 39 Co. Name: Yakima Co. City No.: 1485 tViPCI /RTPO- YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No. Project Costs in Thousands of Dollars Federally Funded ` Project Identification 1- Expenditure Schedule Projects Only I u :i ,, Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. c E i Phase (Local Agency) Federal Funding R/W 9 Z > C. Project Title D. Street /Road Name or Number 1' v � Start Federal Fund Federal State State Local I Total Envir Required .o E. Beginning MP or Road - Ending MP or ROad i e V o Cade Cost by Fund Codel Funds Funds Funds 1St I 2nd 3rd $ttl Type Date ,i- F Describe Work to Be Done L- I G r- d i Phase I (N•1 M /YY) 1 2 3 a 5 1 6 7 8 9 10 11 12 1 13 14 15 1 16 17 18 19 20 21 14 5 E. Lincoln Avenue& 10th Street Roundabout 03 P I N/A P L _ET- 1/1/20J4 STP(U) 173 27 200 200 CE Yes Martin Luther King, Jr Boulevard 05 RW 1_/1/2015 STP(U) 433 67 500 500 rom: E. Lincoln Ave. to: N 10th Street 06 CN 1/1/2016 S1P(w 1,125 175 1,3001 1,300 10/31/2015 Construct a roundabout at the intersection of Lincoln Avenue, 10th Street and MLK, Jr Boulevard. install curb, gutter, sidewalk, street lighting and dr.- rinage. _ _ Totals 1,731 269 2,000 200 500 1,300 12 6 SH 12 & 16th Avenuelnterchanae 03 P N/A 0 PE 1/1/2015 STPtU) 86 14 100 100 CE No Westbound ramps of SR 12 06 CN 1/1/20161 STP(U) I 7791 121 900 900 from: 16th Avneue to: SR 12 Construct a roundabout where the westbound ramps intersect with N. 16th Avenue. totals 865 135 1000 700 900 11 7 1 -82 & Lincoln Avenue Interchange 01 P N/A 0 PE 1/1/2013 STP(U) 260 40 300 300 CE No Lincoln Avenue P RW 1/1/2014 STP(U) 173 27 200 200 from: E. V 'Street to: 1 -82 G CN 6/1/2014 STP(U) 1,730 270 2,000 500 1,500 Reconstruct /extend off -ramp from existing 1 -82 off - ramp for Lincoln Avenue to E. 'G' Street. Totals 2,163 337 2,500 300 700 1,500 14 8 E. Yakima Ave. & Fair Ave. Signalization 12 P N/A P PE 1/1/2015 STP(U) 86 14 100 100 CE No Yakima Avenue T CN 6/1/2016 STP(U) 519 81 600 600 from: E. Yakima Ave. to: Fair Ave. W S Install traffic signal. O Totals 605 95 700 100 600 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No Project Costs in Thousands of Dollars Expenditure Schedule Federally Funded Fund Source Information Project Identification Projects Only U E A. PIN /Federal AId No. B. Bridge No. c m s m (Local Agency) Federal Funding R/W oZ c.Pro)ectTitle D. Street/Road Name or Number m e ` v Tw State State Local Total Envir Required Federal Fund Federal .o E. Beginning MP or Road - Ending MP or Road ` n IN 1 Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date F. Describe Work to Be Done E F �° Phase (MM /YY) 1 1 2 1 3 4 5 1 6 1 7 8 9 10 11 12 13 14 15 16 1 17 18 19 20 21 - °16 ' - 9— S.3rd Avenue & W Washington Ave. Signal 12 P N/A P PE 4/1/2013 20 20 20 CE No S. 3rd Avenue T CN 9/1/2013 210 210 210 from: S. 3rd Ave. to: W Washington Ave. Upgrade the traffic signalization system Totals 230 230 230 14 10 S. 1st St. & E. Washington Ave. I/SImprovements 03 P N/A P PE 014 STP(U) 260 40 300 300 CE Yes South 1st Street 06 W 11/1/2 RW 9/1/20 STP(U) 260 1 40 300 100 200 from: S. 1st Street to: E. Washington Ave. S CN 014 9/1/215 STP(U) 1,211 189 1,400 200 1,200 8/1/2015 Realign intersection, widen E. Washington Avenue to T accommodate an additional lane, replace curb, gutter 0 and sidewalk, and install a new traffic signalization system. Totals 1,731 269 2,000 400 400 1,200 17 11 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2014 STP(U) 223 35 258 200 58 CE Yes South 48th Avenue 05 T RW 1 1/1/2015 STP(U) 519 81 600 600 from: SummitviewAve. to: Nob Hill Blvd. W CN 1/1/2016 STP(U) 1,485 232 1,717 1,485 12/1/2015 S Reconstruct and widen 48th Avenue, install curb, 0 gutter, sidewalk, street lighting and drainage system. Totals 2,227 348 2,575 200 658 1,485 14 12 S. 72nd Ave. & Mead Ave. I/S Signalization 12 P N/A P PE 1/1/2013 5RTS 25 5 30 30 CE No S. 72nd Avenue T CN 6/1/2013 SRTS 258 25 283 283 from: 5.72nd Ave. to: Mead Ave. W S Install traffic signal system. 0 Totals 283 30 313 313 Agency Yakima Co. No. 39 Co. Name: Yakima Co City No.: 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No. t U 75 °_ c ,i Z o Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Title D. Street /Road Name or Number E. BeginningrvlPorRoad - Ending MP or Road F Describe Work to Be Done j _ 1Z > „ �y o- [ � „ i m o -o " �� Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only a I Phase ' t: Start �i i � II — Fund Source Informztion i Federa Funding State (Fund Code State Funds Local Funds Total Funds Envir i TVpe R /N/ Required Date (MM /YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 1 3 4 5 6 7 �I j j S lti 11 1 12 13 i4 i5 16 17 18 19 20 21 17 13 Zier Food Improvements 06 P 0.15 F, PE I v-'/2013i SLATS 25 5 30 30 CE No Zier Road T CfJ 1 6/1/2013 SRTS 236 ZS 261 261 from: 75th Ave. to. 72nd Ave. C i I Install curb, gutter and sidewalk on the south side of S Zier Road. I Totals 261 30 291 291 16 14 Tieton Dr & S. 5th Ave. I/S Improvements 12 P N/A P PE 1/1/2015 STP(U) 69 11 80 80 CE Yes Tieton Drive , W RW 1/1/2016 STP(U) 104 16 120 120 from: Tieton Dr [o: S. 5th Ave. S CN 6/1/2016 STP(U) 865 1351 1,000 I 1,000 5/1/2016 Remove existing traffic signal and construe', a I T roundabout, remove and replace curb, gutter, I 0 sidewalk, street lighting and drainage Totals 1,038 162 1,200 80 1,120 16 15 E. 'H 'Street Extension E.'H'Street Ol 08 P 1.10 P T PE RW 1/1/2013 STP(U) STP(U) 303 303 47 47 350 350 250 100 150 200 CE Yes from: 1st Street to: Yakima River W CN !6/1/2014 1 1/1/2015 STP(Uj 1,730 270 2,000 2,000 12/1/2015 Construct new roadway including water, sewer, curb, S gutter, sidewalk, street lighting and storm drainage O system. Totals 2,336 3G4 2,700 250 _ 250 2,200 17 16 N. 10th Street Extension 01 P I 13 P PE 1/1/2013 STP(U) 700 108 808 700 103 CE Yes North 10th Street 06 T I R.4'J 6/1/2014 STP(U) 5,500 850 6,350 300 6,050 from: R' Street to: Lincoln Ave. W IS CiJ 1/1/2616 STP(U) 7,900 972 8,872 8,872 12/1/2015 Construct new roadway including water, sewer, Curb, 5 gutter, sidewalk, street lighting and storm drainage O system. Totals 14,100 1,930 16,030 700 408 6,050 8,872 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No.: Project Costs in Thousands of Dollars Expenditure Schedule Federally Funded Fund Source Information Project Identification Projects Projects Only U E A. PIN /Federal Aid No. 8. Bridge No. c t m (Local Agency) Federal Funding R/W c o z C. Project Title E w 1;o J v L o_ Phase State State Local Total Envir Required Federal t; D. Street /Road Name or Number a — Start Federal Fund Z o E. Beginning MP or Road - Ending MP or Road n o Code Cost by Fund Code Funds Funds Funds 15[ 2nd 3rd 4th Type Date i F. Describe Work to Be Done E F i°– j o. Phase (MM /YY) 1 2 3 4 1 5 1 6 7 8 9 30 11 12 13 14 15 16 17 18 19 20 21 -17 17 Yakima Downtown future Initiatives, Phase 5 06 P 0.15 P PE 1/1/2014 OTHER 500 500 500 CE No 12 T CN 4/1/2015 OTHER 5,500 5,500 5,500 from: 1st Street to: 9th Street C Install historic lighting, sidewalk modifications and 5 other improvements. Exact improvement area(s) to be determined Totals 6,000 500 5,500 17 18 75th Avenue improvements 01 P 0.50 P PE 11112016 STP(U) 87 13 100 100 CE No 75th Avenue 08 W RW 1/1/2017 STP(U) 173 27 200 200 from: Mead Ave. to: Nob Hill Blvd. S CN 1/1/2018 STP(U) 1,038 162 1,200 1,200 Construct portions of and widen roadway, install T curb, gutter, sidewalk, street lighting and storm O drainage system. Totals 1,500 1,500 14 19 Washington Ave. & LongFber Rd. Intersection 03 P N/A C PE 1/1/2014 STP(U) 100 14 114 114 CE Yes Washington Avenue 05 T RW 6/1/2014 STP(U) 100 14 114 114 from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2015 STP(U) 700 95 795 795 12/1/2015 Widen Washington Avenue to 5 lanes and widen S Longfiber Road to 3 lanes, install or replace curb, O gutter, sidewalk, street lighting and Safety Flashing Signal. Totals 900 123 1,023 228 795 14 20 E. Nab Hill Blvd. & S. 18th Street 1/S Improvements 01 P 0.10 C PE 1/1/2014 STP(U) 50 8 58 SS CE No E. Nob Hill Boulevard 04 T CN 6/1/2014 1 STP(U) 346 54 400 400 from: E. Nob Hill Blvd. to: S. 18th Street W Widen south leg for double left turn from westbound S Nob Hill, install curb, gutter, sidewalk, upgrade traffic signal system Totals 396 62 458 458 Agency: Yakima Co. No.: 39 Co. Name: Yak,ma Cu. City No. 1485 NIPO /RTPU: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date:_ Amend Date: Resolution No. ,c U m E Z Y o a Pr °lect ;dentificat,on A. PIN /Federal Aid No. B. Bridge Nu. C. Project Title D. Stine[ /Road Name or Number IE.Be Beginning MP or [toad MP or Road g g g F Describe Work to Be Done c m VI i c' a F r I 1 r. I ,� 1 t m .rte' r °_ I I j > I 1_ Proiect Costs in Thousands of Dollars _ Fund Source Information Expenditure Schedule _ -" (Local Agency) Federal Funding i c 1 Phase �- Federal State State !_ocal Total i ;tart Federal Fund Cost Fund Code Funds Funds Funds 1st 2nd 3rd 4th I I I „ L— �ndP Phase + Federally Projects Funded Only Envir type R/W Required 4 Date (MM /1'Y) 1 2 3 4 5 6 7 3= 9 10 11 12 13 14 15 16 t7 18 19 20 21 16 21 Powerhouse Rd. & Englewood Ave. I/S Powerhouse Rd. from: Powerhouse Rd. to: Englewood Ave I 12 P N/A i F' T PE 1/1/2014 STP(Sj 43 I 7 50 50 RW 1!1/2015 STP(Si 87 13 100 100 I r_N 6/1/2015 STP(S) I 504 , 1 74 5781 5%81 CE Yes 5/1/2015 5 Intersection realignment, install curb, gutter, I 0 I , sidewalk, Safety Flashing Signal. W I Totais 634 94 728 50 678 14 22 S. 48th Ave. & Summitview Ave. Signalizotion 12 P I N/A P 1 PE 1/_/2015 STP(S) 25 4 29 29 CE Yes S w Avenue I T 6/1 /20151 STP(S) 25 �41 29 29 1 from. 5u from. Surnmitview P.ve. [o: S. 48th Ave. I CIN � GV 1 1;1/2016+1 STP(5) 554 81 635 635 12 /1 /2015 I traffic signalization system I 1 (Install I i Totals 604 89 693 58 635 14 23 W Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2014 STP(E) 424 67 491 4911 CE Yes W Lincoln Avenue 12 1 RW 1/1i2015 STP(E) 1,047 163 1,210 I 1,210 from: W 5th Ave. to: Custer5t. W CN 1/1/2016 STP(E) 1,801 281 2,082 2,082 12/1/2015 S I O Realign W Lincoln Avenue. install curb, gutter, P sidewalks, street lighting, drainage. G 1 Totals 3,272 511 3,783 491 1,210 2,082 14 24 E. Nob Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2014 SIP(C) 546 84 630 630 CE Yes E. Nob Hill Boulevard 04 T 1 RW 1/1/2015 STP(C) 1,090 170 1,260 1,260 rom: S. 6th Street to: S. 18th Street 06 W CN 1/1/2016 STP(C) 1 6,539 I 1,013 7,552 7,552 12/1/2015 S Reconstruct and widen roadway to 5 lanes with O intersection improvements, curb, gutter, sidewalk, P street lighting and drainage system G Totals 8,175 1,267 9,442 630 1,260 7,552 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No.: U ° E Z g i Project Identification A. PIN /Federal Aid No. B. Bridge No. r- Project Title D. Street /Road Name or Number E. Beginning MP or Raad - Ending MP or Road F. Describe Work to Be Done m E — ° ; n o. > E r r m o t- v 0 uFederal � Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Tt- Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir T e yP R/W Required Date (MM /YY) Federal Fund Code Costb Y Phase 1st 2nd 3rd 4th 1 1 2 1 3 4 5 1 6 1 7 8 9 10 it 12 13 14 15 16 17 18 19 20 21 16- 25 - S. 72nd Ave. &-W Wdshington Ave. 1/S 12 P N/A P PE 1/1/2014 STP(C) 91 14 105 105 CE Yes S. 72nd Avenue 06 T RW 1/1 /2015 STP(C) 91 14 105 105 from: s. 72nd Ave. to: W Washington Ave. O CN 1/1/2016 STP(C) 544 86 630 1 630 12/1/2015 Improve intersection by installing a traffic signal S system or roundabout. W Totals 726 114 840 105 105 630 17 26 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2014 STP(E) S6 14 100 100 CE Yes 66th Avenue 04 T RW 1/1/2015 STP(E) 1 173 27 200 200 from: Summitview Ave. to: Scenic Dr W CN 1/1/2016 STP(E) 1,096 164 1,260 1,260 12/1/2014 S Reconstruct and widen roadway, install curb, gutter, O sidewalk, storm drainage system and utilities. Totals 1,355 205 1,560 100 200 1,260 14 27 N. 40th Ave. & Summitview Dr I/S 12 P N/A P PE 1/1/2014 STP(U) 126 17 143 143 - CE Yes N. 40th Avenue T RW 1/1/2015 STP(U) 63 8 71 71 from: N. 40th Ave. to: Summitview Dr W CN 1/1/2016 STP(U) 544 86 630 630 12/1/2015 Improve the intersection by constructing larger curb S radii, lenghtening the turn lanes, and upgrading the 0 traffic signal system. Totals 733 111 844 143 71 630 14 28 N. 40th Ave. & Englewood I/S 12 P N/A P PE STP(U) 43 7 50 50 CE No N. 40th Avenue T CN 11/1/2015 6/1/2015 STP(U) 260 1 40 300 300 from: N. 40th Ave. to: Englewood Replace traffic signal poles and upgrade controller Totals 303 47 350 350 Agency: Yakima Co. No. 39 City No. 1485 Co. Name: Yakima Co. MPO /RTPO- YVCOG Six Year Transportation Improvement Program Hearing Date: Amend Date: From 2013 to 2018 Adoption Date: Resolution No. V c LL z o a Project identification Iq, PIN /Federal Aid NO. B. BridgeNe. G Project Title D. street /Road Name or Number E. Beginning MP or Road - Ending MP or Road F describe Work to Be Gone c E a I F i -' ;, ; N i I r_ oa m F I �� I i -' ,' 1 j Project Cests in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only r a ° 2 Phase Star, -- _Fued Source Information Federal Funding State Fund Code State Funds I Local Funds Total Funds Envir Type R/W Required Date (M(,l/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 14 2 29 3 Al. 16th Avenue & Fruitvale Blvd. I/S N, 16th Avenue 4 12 5 P 6 N/A 7 P T _ P 9 j 10 11 12 i3 14 15 16 17 18 19 20 21 I PE 1/11/2013 STP(U) 126 18 144 144 CE Yes R4V 6/];2013 ST ?(ll) 173 I 27 200 200 I from: N. 16th Ave. to: Fruitvale Blvd I 0 CN 3/1/'2014 STP(U) 315 I 43 358 I 3581 I 2;1/2014 Improve the intersection by constructing larger curb S radii, installing ADA ramps, and upgrading the traffic signal system. W _ als 614 88 702 344 358 14 30 N. istStreet &'I'Street115Improvemenr 12 P N/A tPPE ]/2015 STP(E1 32 5 37 37 CE No N. 1st Street /1/2015 STP(E) 17 143 143 fom: N. 1st Street to: ' /'Street s Replace and upgrade traffic signal system 1 0 Totals 158 22 180 180 17 31 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2014 STP(Cj 109 27 136 136 CE No Rudkin Road 06 I T I CN 1/1/2015 STP(C) 945 TPP 945 106 1,996 1,996 from: E. Viola Ave. to: Rainier Pl. W I I S Reconstruct roadway, install curb, gutter, sidewalk and storm drainage. Partner with Union Gap to install additional sewer force main. Totals 1,054 133 2,132 136 1,996 0 16 32 E. Mead Avenue Reconstruction ' 03 P 0.76 P I PE 1/1/2015 STF(S) 122 TPP 23 7 152 152 CE No E. Mead Avenue 06 T I CN 1/1/2016 STP(S) 1,730 TPP 206 70 2,006 2,006 from: Rocklin Rd. to: Fair Ave. S Partner with Union Gap to reconstruct E. Mead I C Avenue, install curb, gutter, sidewalk and storm G drainage system. 0 Totals 1,852 229 77 2,158 152 2,006 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No.: Project Costs in Thousands of Dollars Federally Funded j2 b Project Identification Expenditure Schedule projects Only Fund Source Information U E A. PIN /Federal Aid No. B. Bridge No. c L (Local Agency) Federal R/W Fu z C. Project Title D. street /Road Name or Number E i N c " T-2 State State Local Total Envir Required Federal Fund Federal 4th c o E. Beginning MP or Road - Ending MP or Road ° ' n o. 3 — m — n— Code Cos Y Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type YP Date ii L F Describe Work to Be Done E � N '? � Phase 6th (MM /YY) 1 2 1 3 4 5 1 6 1 7 8 9 10 11 12 13 14 15 1 16 17 18 19 20 17= 33= S. 80th Avenue Improvements 04 P 1.30 -P PE 1%1/2015 AIP 131 20 151 151 CE Yes S. 80th Avenue T RW 1/1/2016 AIP 382 59 441 441 from: Tieton Drive to: Zier Road O CN 11112017 AIP 1,667 260 1,927 1,927 12/1/2016 S Widen roadway, install curb, gutter, sidewalk, street W lighting and storm drainage system. C Totals 2,180 339 2,519 151 2,368 17 34 Englewood Avenue Improvements 05 P 1.00 P PE STP(C) 272 43 315 315 CE Yes Englewood Avenue 06 T 11/l/2015 RW 1/1/2016 STP(C) 349 55 404 404 ram: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2017 STP(C) 2,352 340 2,692 2,692 12/1/2016 5 Widen roadway, install curb, gutter, sidewalk, street 0 lighting and storm drainage system. C Totals 2,973 438 3,411 315 3,096 17 35 Englewood Avenue Improvements 05 P 0.50 P PE 1/1/201-5 STP[U) 136 21 157 157 CE Yes Englewood Avenue 06 T RW 1/1/2016 STP(U) 173 27 200 200 from: N. 16th Ave. to: N. 24th Ave. W CN 1/1/2017 STP(U) 1,164 182 1,346 1,346 12/1/2016 Widen roadway, install curb, gutter, sidewalk, street 5 lighting and storm drainage system. Totals 1,473 230 1,703 157 1,546 14 36 Nob Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2015 STP(S) 55 8 63 63 CE Yes Nob Hill Boulevard T RW 1/1/2016 STP(S) 107 19 126 126 from: S. 16th Ave. to: S. 6th Street 5 CN 1/1/2017 STP(S) 321 57 378 378 12/1/2017 Construct sidewalk in locations where it doesn't exist W on the south side of Nob Hill Totals 483 84 567 63 504 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No. 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013_ to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No. Project !dertiticatiar. I I _ Project Costs in Thousands of Dollars Expenditure Schedule Federally i Funded r �_ Fund Source Information �T - -� U L4. PIN /Federal Aid Na. B. Bndge No. (Local Agency) Projects Only Envir R/W Required c E Z C. Project Title D.itrcet /Road Name Number E ._ j ,., I a u � -dr- Pha;9 Federal Funding Federal State Ii State Local Total 4th LL g cc or E. Beginning MP or Road- Ending IAPorRoad F Describe Work to Be Done ( a I = F. �� o L - V rL Start I Federa. Fund Code Cost by Phase Fund Code Funds I Funds 1 Funds lsi 2nd 3rd I Ihru 6th Type I Date (MM /YY) 1 2 3 4 S. 6 7 9 10 11 1 12 33 15 15 16 17 18 19 20 21 17 37 N. 34th Ave. & Fruitvale Blvd I/S Improvements 12 P N/A P w FE 1/1/2015 STP(U) I 63 5 68 68 CE No Fruitvale Boulevard T C,% 1/1/2016 STP(U) 1 567 7r, 643 643 from- Fruitvale Blvd. to: N 34th Ave I 0 1 Improve intersection installing a traffic signal system, S curb, gutter and sidewalk. I _! `,V Totals 630 81 711 6€ 643 17 38 Englewood Avenue Improvements 03 F 1.00 P PE 11/1/2015 STo(U) 218 ( 34 252 112 CE Yes Englewood Avenue 05 I I T kW 6/1/2016 STP(U) 327 51 378 378 from: N. 24th Ave. to. N 40th Ave. 06 W CN 1 5/1/20171 STP(U) 2,9601 I 244 3,2241 I 3,224 5/1/2017 S Reconstruct and widen roadway, Install curb, gutter, sidewalk, street lighting and storm drainage system. i 0 _ Totals 3,525 329 3,854 252 3,602 14 i 39 North /South Connector to West Lclley 01 P 1 6.00 I P PE 1/1/2015 5TP(U) 432 68 500 500 CE Yes Unknown Road 04 I from. Ahtanum Rd. to: Summitview Ext. 06 `N I I Corridor study to determine the best location fora I 1 C I north /south limited access route in West Va!IeY City I C 1 and County joint project. 0 I Totals 432 68 500 500 14 40 River Road Improvements 03 S 0.50 P 1 PE 1/1 /2013 140 140 140 CE Yes River Road US T R 6/1/20!3 1FMS;B 150 150 150 from: S. 16th Ave. to, S. 6th Ave. 1 06 G CN 3/1/2014 639 491 1,130 1,130 2/ 1/2014 07 I W Reconstruct and widen roadway, install curb, gutter, I 0 sidewalk, street lighting and storm drainage system. Totals 781 1,420 290 1,130 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No.: Project Costs in Thousands of Dollars Expenditure Schedule Federally Funded Fund Source Information ;, Project Identification Projects Only V A. PIN /Federal Aid No. B. Bridge No. V c t d (Local Agency) Federal Funding R/W Z C. Project Title E �o c Phase State State Local Total Envir Required Federal 4th O. street /Road Name or Number i „ 0 U Start Federal Fund o E. Beginning MP or Road - Ending MP or Road 0, > �', c o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date LL o` F Describe Work to Be Done E a` Phase 6th (MM/YY) 1 1 2 1 3 4 5 1 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 41° 18th Street Underpass- -" - _ - 12 P N/A P PE 1/1/2015 BRAC 240 60 300 300 CE No Yakima Avenue T CN 1/1/2016 BRAC 2,288 572 2,860 2,860 rom: Yakima Ave. to: 18th Street O Replace the bridge on E. Yakima Avenue that crosses S over 18th Street. W Totals 2,528 632 3,160 300 2,860 17 42 88th Avenue Improvements 06 P 0.48 P PE WSDOT 50 0 50 50 CE Yes 88th Avenue 12 T RW 11/1/20151 1/1/2016 WSDOT 25 0 25 25 from: Tieton Dr to: Summitview Ave. C CN 1/1/2017 WSDOT 320 10 330 330 _ 12/1/2016 G Construct curb, gutter, sidewalk and storm drainage system on the east side of 88th Avenue. Totals 395 10 405 50 355 16 43 64th Avenue Improvements 03 P 1.00 P PE STP(U) 200 32 232 200 CE No 64th Avenue 04 T CN 11/1/2014 1/1/2015 STP(U) 1,600 249 1,849 1,849 from: Washington Ave. to: Nob Hill Blvd. 06 W C Widen roadway, install curb, gutter, sidewalk, street G lighting and storm drainage system. 0 Totals 1,800 281 2,081 200 1,849 14 44 North 1st Street Revitalization 06 P 0.50 P PE STP(U) 605 95 700 700 CE No N.lst Street 12 T CN 11/1/2016 1/1/2017 STP(U) 5,165 806 5,971 5,971 from: MLK Blvd. to: 'N'Street G C Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. Totals 5,770 901 6,571 6,671 Agency Yakima Co. No. 39 Co. Name: Yakima Cc City No.: 1485 MPO /RTPO: 'rVCGG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Amend Date: Adoption Date: Resolution No. i I Projcct Costs in Thousands of Dollars Federally Funded U G z Project ldentification 1 A. PIN /Federal Aid NO. B. Bridge No. I v C. Frailect Title 1 z an I W — Expendrttire Schedule (Local Agency) Projects Only i i Phase Fund FederalFunding Source Information R W / 4th o i D. Street /Road Name or Number I _, ° J .. u Start Federal Federal Fund State 1FundCcde State Local Total Envir Required 4 c o E. Beginning MP or Road - Ending MP or Road I n. _ m Cost by lode Funds Funds Funds lsl 2nd 3rd Thru Type Date ri e` F Describe Work to Be Done l E ° "i a Phase n'th (MM /YY) 1 2 3 1 4 5 6 7 8 S 10 11 i2 13 14 15 16 17 18 19 20 21 14 45 Tieton Dr & 64th Ave. I/Slmprovements I 13 h F N/A P PE 1/i /2014) STP(U) 87 13 100 100 CE Yes Tieton Drive CS T RW 1/1/20151 STP(U) 2150 40 300 300 from: Tieton Dr to: 64th Ave 12 I O 1 5 CN 1/1/20161 STP(U) 692 I 108 800 800 12/1/2015 Improve intersection by constructing cleft -turn lane I I W Tieton Drive, installing a traffic signal system, curb, C (on gutter, sidewalk and street Lighting. G i Totals 1,039 161 1,200 100 300 800 16 46 IS. 80rh Avenue Bridge 01 P i 0.25 P PE 111/1114 STP(U) 44 6 50 'S0 CE Yes S. 80th Avenue I f CN 1/1 /2015 STP(U) 433 67 500 S00 from: Wide Hollow Rd. to Plath O i I 12/1/2016 Construct new bridge over Wide Hollow Creek. Joint project with the County. I 14 47 Nob HillG(vd /IstSt Corodor Safety lmprovements 07 S N/A P Totals 477 73 550 50 5L` -0 i CN 1/1%[013 HSIP 350 0 350 350 T CE Nob Hill Boulevard /1st Street l' from: 64th Ave /51712 to. 1- 82 /C /L l O !I I Make various, relatively inexpensive fixes to improve safety Improvements inclulde items, such as: larger signal lenses, larger street signs, improved lighting, etc. Also included in this project are elements of education and enforcement. Totals 350 0 350 350 i 14 48 Lincoln A venue Corridor SofetyImprovements 07 5 N/A P RW 1/1/2013 HSIP I 105 OF 105 105 I CE Lincoln Avenue I T CN 6/1/2013 HSIP 300 0 300 300 from: N. 32nd Ave. to. N. 5th Ave. D Improve safety by installing larger signal lenses. I installing ADA compliant ramps, repairing damaged sidewalk, Installing new sidewalk, installing overhead L school flashers, etc. I I I Totals 0 405 405 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPG /RTPO: YVCOG Six Year Transportation Improvement Program From 2013 to 2018 Hearing Date: Adoption Date: Amend Date: Resolution No.: u c o c LL `, ? z `o Pro ect Identification 1 A. PIN /Federal Aid NO. B. Bridge NO. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F Describe Work to Be Done m E m c N o. c, E �' ur t J ° '°- � v j Project Costs in Thousands of Dollars Expenditure Schedule Local y ( Agency) Federally Funded Projects Only � o a Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RJW Required Date (MM /YY) Federal Fund Cade Federal Cost by 1 Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 1 6 1 7 8 9 30 11 12 13 14 15 16 17 18 19 20 21 14 49 Citywide Safety Improvements 07 5 N/A P CN 1/1/2013 HSIP 375 375 375 CE Various streets throughout city T from: to: O S Improve safety by installing larger signal lenses and W installing ADA compliant ramps at intersections along C 16th Avenue. G Totals 375 375 375 14 50 16th Avenue Corridor Improvement 04 P 3.50 P PE STP(U) 120 17 137 137 CE 16th Avenue T 11/1/20151 from: SR 12 to: Washington Ave. W C G Widen 'roadway, install curb, gutter, sidewalk, street O lighting and storm drainage system. S Totals 120 17 137 137 14 51 40th Avenue Corridor Improvements 04 P 3.20 P PE STP(U) 120 17 137 137 CE 40th Avenue T 1111120E- 1 1 1 from: SR 12 to: Washington Ave. W C G Widen roadway, install curb, gutter, sidewalk, street O lighting and storm drainage system. S Totals 17 137 137 14 52 Nab Hill Boulevard Corridor Improvements 03 P 2.70 P PE STP(U) 120 17 137 137 CE Nob Hill Boulevard 04 T 11/1/20151 1 from: 1 -82 to: 16th Ave. O 5 W Widen roadway, install curb, gutter, sidewalk, street C lighting and storm drainage system. G Totals 120 17 137 137 Agency Yakima Co. No.. 39 Co. Name: Yakima Co City No. 1485 MPO /RTPO YVCOG Six Year Transportation improvement Program From 2013 to 2018 Hearing Date: Adootion Date: Amend Date: Resolution No.: U jo E i Project Identification A. PIN /Federal Aid No. B. Bridge No. C. Project Title D. Street /Road Name or Number E. BeginningMPor Road - Ending MP or Road F Describe Work to Be Done E n n E t} i �'� '; i a I w F .,, z = j Project Costs in Thousands of Dollars Expenditure Schedule P (Local Agency) Federally Funded Protects Only 11 I a .. o o, I Phase I Start ( ___ Fund Source Information F, Lderal rundin g State Fund Code I State Funds Local Funds Total Funds Envir Type R W / Required Date (MM /YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 1 4th IThru 6th 1 2 3 4 5 6 7 8 9 i0 11 17_ 13 14 15 _ 16 17 18 19 20 21 14 53 S. 1st StreetjMoin Street Corridor Improvements 01 P L00 P PE 1/1/2015 STP(U) 120 17 137 137 CE S. 1st Street /Main Street T from: Nob Hill Blvd. to: Barker M,II Bridge 0 S Joint project with Union Gap. Widen roadway, Install W curb, gutter, sidewalk, street lighting and storm C drainage system. G Totals 120 17 137 137 14 54 Washington Ave. Railroad Grade Separation 01 P 0.25 P PE 1/1/2015 STP(U) 1,730 270 2,000 2,000 CE Yes Washington Avenue T RW 6/1/2016 S1P(U) 1,730 270 2,000 2,000 from: Russel Ln. to- Longfiber Rd. W CN J 1/1/2018 STP(U) 8,650 1,350 10,000 10,000 12/1/2017 Construct railroad grade overcrossing, including all 0 utilities S Totals 12,110 1,890 14,000 2,000 12,000 16 55 Mead Avenue Railroad Grade Separation 1 P 0.25 P PE 1/1/2015 STP(U) 1,730 270 2,000 2,000 CE Yes Mead Avenue T RW 6/1/2016 STP(U) 1,730 270 2,000 2,000 from: Presson PI. to: Maryland W CN 1/1/2018 STP(U) 8,650 1,350 10,000 10,000 12/1/2017 Construct railroad grade overcrossing, including all 0 utilities S Totals 1,890 14,000 2,000 12,000 CONTRACT THIS AGREEMENT, made and entered into in triplicate, this –1 day of 2013, by and between the City of Yakima, hereinafter called the Owner, and Granite Construction Comp v, a California Corporation, hereinafter called the Contractor WITNESSETH:. That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows- I The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF $820,820.00, for River Road – 16th Avenue to 6th Avenue Improvements, City Project No. 2314, all in accordance with, and as described in the attached plans and specifications and the 2012 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work provided under this contract and every part thereof Work shall start within ten (10),days after the Notice to Proceed and shall be completed in Eighty (80) working days If work has not commenced within the ten (10) days after the Notice to Proceed, the first chargeable working day shall be the 11 th day after the date on which the City issues the Notice to Proceed If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sdm specified in the Standard Specifications for each and every day said work remains uncompleted after expiration of the specified time, as liquidated damages. ; The Contractors shall provide and bear the expense of all equipment, work and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima. II The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same'according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. III INDEMNIFICATION The Contractor shall defend, indemnify, and hold harmless the City, its officers, elected officials, employees and agents from and against any and all claims, causes of action, damages, losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and court costs, arising out of, relating to, or resulting from the Contractor's performance or non - performance of the services, duties and obligation's , required of it under this Agreement. IV The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor - V It is further provided that no liability shall attach to the City of Yakima by reason of entering into this _contract, except as expressly provided herein. IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year, first! herein above written Countersigned: CITY OF YAKIMA CONTRACTOR this II— day of Clerk CITY CONTRACr RESOLUTION NO 2013 • f 1x °a. ) / Granite Construction Company, a California Corporation Contractor By J' i=aDes ai ( Print Name) Its Vice President (President, Owner, etc.) Address. 585 West Beach Street Watsonville, CA 95076