Loading...
HomeMy WebLinkAboutWashington State Department of Transportation - Reimbursable Agreement JE5465 - I-82 Monitoring Well4 Reimbursable Agreement Agreement No.: JE 5465 SR and MP: I -82, MP 32.68 -32.84 CITY: City of Yakima Fed. Tax ID: 91- 6001293 Address & Phone 129 N 2"d S1.reet Number: Yakima, WA 98901 509- 575 -6111 (City of Yakima) 425- 402 -8800 (SLR International Corp.) Estimate of Cost: Actual cost of labor, plus administrative overhead to create and provide environmental documentation required by FHWA for tenant use of interstate highway right of way (with costs not to exceed $;'500.00). Description of work: MOT agrees to provide written environmental documentation associated with City of Yakima monitoring well PROJECT, for only the location shown in the attached Exhibit "A ". This AGREEMENT, made and entered into this Z3�day of February, 2010, between the State of Washington, Department of Transportation, acting by and through the Secretary of the Department of Transportation, hereinafter called the "STATE" and the City of Yakima, 129 N 2 "d Street, Yakima, Washington, 98901, hereinafter called the "CITY ". WHEREAS, the CITY (working through SLR International Corporation, Bothell, WA) is constructing a network of groundwater monitoring wells, hereinafter called the "PROJECT ", WHEREAS, the STATE and the CITY have agreed to the construction and operation of part of the PROJECT within the interchange "Limited Access Right-of-Way" under the STATE's control (L /A), and WHEREAS, the CITY has funding resources including, but not limited to local and STATE funds, but excluding Federal funds, and WHEREAS, the parties hereto desire to enter into an AGREEMENT providing for the STATE to perform the PROJECT environmental documentation and to ensure all PROJECT work is completed in accordance with the specifications of Federal environmental regulations and specifications, and WHEREAS, the STATE and the CITY now wish to define the responsibility for the completion-of the proposed work. NOW THEREFORE, it is mutually agreed between the parties hereto as follows: The STATE agrees to perform the work described above for the location shown on Exhibit "A ", at 100 percent CITY expense and responsibility. Any change of work from that provided for in this agreement and at the location shown on Exhibit "A" must be approved by the CITY prior to beginning such work. JE 5465 IC# 5 -39 -08826 2/15/2010 I Upon execution of this AGREEMENT by the STATE and the CITY, the STATE agrees to the timely completion of the PROJECT work required under this AGREEMENT. All material and workmanship shall conform to the Washington State Department of Transportation Standard Specifications for Environmental Documentation under Federal NEPA and SEPA guidelines. A cost estimate for work to be performed by the STATE at the CITY'S expense has been done and the amount is noted in Exhibit `B ", attached hereto and by this reference made part of the agreement. The CITY, in consideration of the faithful performance of the work to be done by the STATE, agrees to reimburse the STATE for the actual direct and related indirect cost of the work. The CITY agrees that if payment for the work is not made within ninety (90) days after receipt of billing, the STATE may withhold any tax monies which the CITY is entitled to receive from the Motor Vehicle Fund until payment for the work is received by the STATE. In the event unforeseen conditions require an increase in the cost from that agreed to on Exhibit `B ", this AGREEMENT will be modified by a supplemental agreement covering said cost increases. No liability shall attach to the STATE or the CITY by reason of entering into this AGREEMENT except as expressly provided herein. IN WITNESS WHEREOF, the parties hereto agree to these conditions as of the day and year first above written. CITY OF YAIUMA By: - —V v. N J Title: v Date: JE 5465 2/15/2010 STATE OF WASHINGTON DEPT. OF TRANSPORTATION By: /_- / Title � � l�l�`lfSN'Ct,f pv Date: °Zf 3 1Z d IC# 5 -39 -08826 LEGEND MW PROPOSED MONITORING WELL LOCATION -- - - -- PROPERTY LINE —n— F ° -- FENCE JELD -WEN PROPERTY i LEDGESTONE HOTEL EXHIBlowl' "A" 0 80 160 SCALE IN FEET / DATE 09/09 FIGURE / "?I22 zo!n Avs SE DWN• >3D -1. 1VSDOT PROPERTY SL'R 13LDG.11, SUITE I:0 API ll. M°S YAi {f(vIA, bVASHi�fGTON BOTHELL, WA 98021 REVIS. T' a_ >s- 4oz -M�wl IROJECTNO. PROPOSED GROUNDWATER SLR International Coip F: -Qi-41))-'4MQ 001.0221.00000 - MONITORING WELL LOCATION N Exhibit B t • P rq • s -• -• ection 106 No Effect Letter 5 "$500$200 Endagered Species Act No Effect Letter 5 NEPA /SEPA Documentation Environmental Classification Summary 10 • 0 000 00 J E 5465 2/15/2010