06/05/2012 07 2013 thru 2018 Six-Year Transportation Improvement Program Adoption - Public Hearing X ,
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of: June 5, 2012
•
ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -year
Transportation Improvement Program (TIP) for the years
2013 to 2018, and to amend the Metropolitan
Transportation Plan; and B)Amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element
SUBMITTED BY: Joan Davenport, Acting Director of Community and
Economic Development
CONTACT Doug Mayo, City Engineer, 576 -6678
PERSON /TELEPHONE:
SUMMARY EXPLANATION:
Attached is the 2013 - 2018 Six -year TIP, along with an explanation sheet that describes the
information contained on the various columns of the Six -year TIP. Two projects have been
added to the six -year TIP. The projects are:
• #18 S. 75 Avenue - Mead Ave. to Nob Hill Blvd.
• #46 S. 80 Avenue Bridge (over Wide Hollow Creek)
Projects that that have been removed from the 2012 - 2017 TIP as they were completed or
the funds were obligated include:
• Powerhouse/William O. Douglas Trail Connector
• Nob Hill Blvd. - 49 Avenue to 64 Avenue
Many Yakima Transit projects have also been removed from the City's TIP as they have
elected to create their own six -year TIP. Their six -year TIP is no due until December.
Council and the public are welcome to add other arterial system projects to the list. The six -
year TIP project listing will be finalized at the June 19 hearing and sent to the Yakima
Valley Conference of Governments (YVCOG) after approval.
City and County staff, together with the Council Intergovernmental Committee, are working
toward common standards and coordinated planning for public projects that impact both the
city and surrounding county areas. Agreement on these issues will be the first step toward
the goal of a seamless transportation planning process between the City and County.
A)Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -
year Transportation Improvement Program (TIP) for submittal to the Washington State
Department of Transportation. This plan must include all transportation projects for which
state gas tax revenue of federal revenue will be used.
The current plan for 2013 - 2018 includes two projects that are funded. Funding for the
remainder of the projects will continue to be sought. We have grant applications in for six
more projects.
Six -year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible,
Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the
next authorization after the prior Transportation Equity Act of 1998 for the 21 Century
(TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991.
The current act again specifies the systems on which certain funds can be used and
activities for which funds can be used and promotes the role of the Metropolitan Planning
Organizations (MPO) in the planning and programming of projects. SAFETEA -LU requires
each designated MPO to develop a Transportation Improvement Program (TIP), and the
state to develop a Statewide Transportation Improvement Program (STIP) as a condition to
securing federal funds for the transportation projects.
Projects listed in the STIP are the only projects that can be approved by the Federal
Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize
federal fund of by the State of Washington for approved. State funding agencies. The STIP is
a prioritized program of transportation projects, complied from local and regional plans,
along with the Washington Transportation System Plan (WTP), which provides a backbone
for developing projects for the intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional
planning processes. Long range transportation planning is a part of the comprehensive land
use planning carried out by local governments. Citizen participation is an integral part of the
planning process at all levels. Local Agencies are required to develop and adopt a six -year
transportation program. All local agencies are required to hold at least one public hearing
during the development of the six -year transportation program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division.
The ranking will be integrated with other project needs and the total list will be reviewed and
adjusted to the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted six -year TIP for 2013 to 2018. This will ensure that we
are in compliance with the Growth Management Act and that we are consistent with. the
Comprehensive Plan as required. The amendment is limited to incorporate only those
projects that adopted in the STIP and is not subject to the "once a year" change required
under the laws of the Growth Management Act.
Resolution Ordinance Other Six -Year TIP
(specify)
Contract: Mail to:
Contract Term: Amount: Expiration Date:
Insurance Required? No
Funding
Source: Phone:
APPROVED FOR
SUBMITTAL: City Manager
STAFF RECOMMENDATION:
1. Hold the Public Hearing to consider adoption of Resolution approving the Six -Year
TIP amending the regional Metropolitan Transportation Plan and the Comprenhensive
Plan Capital Facilities Element.
2. Continue Public Hearing to the June 19, 2012 Council Meeting for second Public
Hearing and possible adoption of plan.
BOARD /COMMISSION RECOMMENDATION:
ATTACHMENTS:
Click to download
❑ TIP Explanation Sheet
❑ 2013 - 2018 Transportation Improvement Program
9. Appendices
A. Six Year Form Instructions
Heading
Agency Enter name of the sponsoring agency.
County Number Enter the OFM assigned number (see LAG Appendix 21 44).
City Number Enter the OFM assigned number (see LAG Appendix 21 45).
MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Hearing Date Enter the date of the public hearing
Adoption Date Enter the date this program was adopted by council or commission
Resolution Number Enter Legislative Authority resolution number (if applicable )
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
approved by FHWA.)
Description
00- No Classification
Rural (Under 5000 pop.) Urban (Over 5000 pop.)
01 - Interstate 11- Interstate
02 - Principal Arterials 12- Freeways & Expressways
06 - Minor Arterials 14- Other Principal Arterials
07 - Major Collector 16- Minor Arterial
08 - Minor Collector 17- Collector
09 - Local Access 19- Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number /Federal Route
Number; (e) Beginning and Ending Termini (mile post or street and (f)
Describe the Work to be Completed.
3. Improvement Type Codes. Enter the appropriate federal code number.
Description
01- New construction on 07 - Resurfacing 14 - Bridge Program - Special
new alignment 08 - New Bridge Construction 21 - Transit Capital Project
02- Relocation 09- Bridge Replacement 22- Transit Operational
Project
03- Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning
04- Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin.
05- Minor Widening 12 - Safety /Traffic Operation /TSM 31- Non Capital Improvement
06- Other Enhancements 13 - Environmentally Related 32 - Non Motor Vehicle Project
25
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C - Cable TV G - Gas
0 - Other P - Power
S - Sewer (other than agency- owned) T - Telephone
W - Water
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month /day /year in MM /DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
FTA Discretionary for Capital Expenditures
BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas
BR - Bridge Replacement or Rehab 5309(Bus)- Bus
CDBG - Community Development 5309(FG) - Fixed Guideways
Block Grant (HUD) 5309(NS) - New Starts
CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled
DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas
Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program
Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program
DOD - Dept. of Defense STP(E) - STP Transportation Enhancements
IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR
IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected
NHS - National Highway System STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
CAPP - County Arterial Preservation Program PWTF - Public Works Trust
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnershis Program SCP - Small City Program
AIP - Arterial Improvement Program WSDOT - WSDOT funding
PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding
PTST - Public Transportation Systems Progra
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP
Too" program.)
16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be _
required for this project. (This is "required" for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. RNV Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required" for Federally funded projects only.)
27
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
Expenditure Schedule
m w Project Identification 'Fund Source Information . Only
a m (Local Agency)
u E /
A. PIN /Federal Aid No. B. Bridge No. c t Federal Funding R W
G Project Title m 't, v t - Phase
4 Z D. stre /Rood Name or Number N °3 ` ° Federal State State Local Total Envir Required
Start Federal Fund
c`o E. Beginning MP or Road - Ending MP or Road o. a ' 1p "g. o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
,: a F Describe work to Be Done _ E Ft ∎if la 5 a Phase (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 1 Yakima Railroad Grade Separations - Phase 3 01 P 0.2 T CN 1/1/2013 STP(U) 798 FMSIB 3,500 2,200 6,498 3,000 3,498 EA Yes
Martin Luther King, Jr. Boulevard 06 P CN 1/1/2013 DEMO 2,582 AIP 6,000 8,582 3,000 5,582
from: N. 1st Street to: N. 1st Avenue 07 G 9/1/2009
Grade separate the rail and vehicle traffic at the 08 O
Martin Luther King, Jr Boulevard rail crossing.
Construct a Front Street Bridge over Martin Luther
King, Jr. Boulevard.
Totals 3,380 9,500 2,200 15,080 6,000 ,9,080
16 2 64th Avenue Roadway Widening 04 5 0.5 W CN I1 /1/20131 STP(U) 1 7491 I l 1761 925 9251 I I CE Yes
64th Avenue 06 G
from: Nob Hill Boulevard to: Tieton Drive 03 P 10/31/2011
T
Widen roadway, install curb, gutter, sidewalk, lighting C
and drainage. 0
Totals 749 176 925 925
14 3 North 1st Street Revitalization P 0.42 P CN 1 1/1/20141 STP(U) I 2,6631 1 1 4161 3,0791 I 3,0791 I CE No
North 1st Street T
from: 'N' Street to: SR 12 0
C -
Improve North 1st Street by rehabilitating the
pavement and lane markings, removing on- street
parking, enhancing street and pedestrian lighting,
constructing median islands and installing various
pedestrian and decorative elements.
Totals 2,663 416 3,079 3,079
14 4 E. Nob Hill Blvd. & Fair Ave. l/5 Improvements 03 P N/A P RW 1/1/2015 STP(U) 173 27 200 200 CE Yes
Nob Hill Boulevard 04 T CN 6/1/2016 STP(U) 865 135 1,000 1,000
from: E. Nob Hill Blvd. to: Fair Ave. 31 W 1 1 1 t 4/1/2015
•
C
Widen Nob Hill Boulevard through the intersection, 0
construct left-turn lane, curb, gutter, sidewalk, street
•
lighting and drainage. Upgrade signal by installing
i mast arm structures.
Totals 1,038 162 1,200 200 1,000
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
Project Identification Fund Source Information — Expenditure Schedule Projects Only
n (Local Agency)
1
10 j A. PIN /Federal Aid No. B. Bridge No. w L b m Federal Funding R/W
Z C. Project Title E ti v t Phase
° D. Street/Road or u ° « Federal State State Local Total Envir Required
L c Start Federal Fund
.o E. Beginning MP or Road - Ending MP or Road o. > m c L o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
E.- F Describe Work to Be Done E r vi 2 j o Phase (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19, 20 21
14 5 E. Lincoln Avenue & 10th Street Roundabout 03 P N/A P PE 1/1/2014 STP(U) 173 27 200 200 CE ' Yes
Martin Luther King, Jr Boulevard 05 RW 1/1/2015 STP(U) 433 67 500 500
from: E. Lincoln Ave. to: N. 10th Street 06 CN 1/1/2016 STP(U) 1,125 , 175 1,300 1,300 10/31/2015
Construct a roundabout at the intersection of Lincoln
Avenue, 10th Street and MLK, Jr Boulevard. Install
curb, gutter, sidewalk, street lighting and drainage.
Totals 1,731 269 2,000 200 500 1,300
12 6 SR 12 & 16th Avenue Interchange 03 P N/A 0 PE 1 1/1/20151 STP(U) 1 861 1 1 141 1001 1 1 1001 CE No
Westbound ramps of SR 12 06 CN 1/1/2016 STP(U) 779 121 900 900
from: 16th Avneue to: SR 12
Construct a roundabout where the westbound ramps
intersect with N. 16th Avenue.
Totals 865 135 1000 100 900
1.1 7 1 -82 & Lincoln Avenue Interchange 01 P N/A 0 PE 1/1/2013 STP(U) 260 40 300 300 CE No
Lincoln Avenue P RW 1/1/2014 STP(U) 173 27 200 200
from: E. 'G' Street to: 1 -82 G CN 6/1/2014 STP(U) 1,730 270 2,000 500 1,500
Reconstruct /extend off -ramp from existing 1 -82 off-
ramp for Lincoln Avenue to E. '0' Street.
Totals 2,163 337 2,500 300 ' 700 1,500
14 8 E. Yakima Ave. & Fair Ave. Signalization 12 P N/A P PE 1 1/1/20151 STP(U) 1 861 1 1 141 1001 1 1 1001 CE No
Yakima Avenue T CN 6/1/2016 STP(U) 519 81 600 600
from: E. Yakima Ave. to: Fair Ave. W
5
Install traffic signal, 0
Totals 605 95 700 100 600
Agency: Yakima
Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
m `w Project Identification Fund Source Information Expenditure Schedule
a Projects Only
V E A. PIN /Federal Aid No. B. Bridge No. c Federal Funding Local Agency) /
2 z' C• Project Title E E'o - 5 t Phase g R W
o D.street/RoadNameorNumher N J d a Federal State State Local Total Envir Required
Start Federal Fund
c o E. Beginning MP or Road - Ending MP or Road a a 3 m 'o Cast by Fund Co Funds Funds Funds 1st 2nd 3rd 4th Type Date
2 a F Describe Work to Be Done E F N = a Code Phase
(MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 9 S. 3rd Avenue & W Washington Ave. Signal 12 P N/A P PE 4/1/2013 20 20 20 CE No
S. 3rd Avenue - T CN 9/1/2013 210 210 210
from: S. 3rd Ave. to: W Washington Ave.
Upgrade the traffic signalization system
Totals 230 230 230
14 10 S. 1st St. & E. Washington Ave. l/S Improvements 03 P N/A P PE 1/1/2014 STP(U) 260 40 300 300 . CE Yes
South 1st Street 06 W RW 9/1/2014 STP(U) 260 40 300 100 200
from: S. lstStreet to: E. Washington Ave. 5 CN 9/1/2015 STP(U) 1,211 189 1,400 200 1,200 8/1/2015
Realign intersection, widen E. Washington Avenue to T
accommodate an additional lane, replace curb, gutter 0
and sidewalk, and install a new traffic signalization
system.
Totals 1,731 269 2,000 400 400 1,200
' 17 11 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2014 STP(U) 223 35 258 200 - 58 CE Yes
South 48th Avenue 05 T RW 1/1/2015 STP(U) 519 81 600 600
from: Sumrnitview Ave. to: Nob Hill Blvd. W CN 1/1/2016 STP(U) 1,485 232 1,717 1,485 12/1/2015
5
Reconstruct and widen 48th Avenue, install curb, O
gutter, sidewalk, street lighting and drainage system.
Totals 2,227 348 2,575 200 658 1,485
14 12 S. 72nd Ave. & Mead Ave. 1/S Signalization 12 P N/A P PE 1 1/1/20131 SRTS 1 251 I 1 5 301 301 1 1 CE No
S. 72nd Avenue T CN 6/1/2013 SRTS 258 25 283 283
from S. 72nd Ave. to: Mead Ave. W
S
Install traffic signal system. 0
Totals 283 30 313 313
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs In Thousands of Dollars Federally Funded
•
m to Project Identification ,
r Fund Source Information Expenditure Schedule
Projects Only
U E A. PIN /Federal AId No. B. Bridge No. c (Local Agency)
a F e d era l Funding R/W
o Z C. Project Title u a Phase Federal State State Local Total Envir Required
D Street /Road Name or Number > Start Federal Fund
c . E. Beginning MPar Road - Ending MP or Road a — o. ,,, ^ L o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
,
d F Describe Work toBeDone E F .n r 5 a Phase (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 13 Zier RoadImprovements 06 P 0.15 P PE 1/1/2013 SRTS 25 5 30 30 CE No
Zier Road T CN 6/1/2013 SRTS 236 25 261 261
from: 75th Ave. to: 72nd Ave. C
Install curb, gutter and sidewalk on the south side of S
Zier Road.
Totals 261 30 291 291
16 14 Tieton Dr & 5. 5th Ave. 1/5 Improvements 12 P N/A P PE 1/1/2015 STP(U) 69 11 80 80 CE Yes
Tieton Drive W RW 1/1/2016 STP(U) 104 16 120 120
from: Tieton Dr. to: 5. 5th Ave. S CN 6/1/2016 STP(U) 865 135 1,000 1,000 5/1/2016
Remove existing traffic signal and construct a T
roundabout, remove and replace curb, gutter, 0
sidewalk, street lighting and drainage
Totals 1,038 162 1,200 80 1,120
16 15 E. 'H' Street Extension 01 P 1.10 P PE 1/1/2013 STP(U) 303 47' 350 250 100' CE Yes
E. 'H' Street 08 T RW 6/1/2014 STP(U) 303 47 350 150 200
from: lst Street to: Yakima River W CN 1/1/2016 STP(U) 1,730 270 2,000 2,000 12/1/2015
Construct new roadway including water, sewer, curb, S
gutter, sidewalk, street lighting and storm drainage 0
system.
Totals 2,336 364 2,700 250 250 2,200
17 16 N. 10th Street Extension 01 P 1.3 P PE 1/1/2013 STP(U) 700 108 808 700 108 CE Yes
North 10th Street 06 T RW 6/1/2014 STP(U) 5,500 850 6,350 300 6,050
from: 'R' Street to: Lincoln Ave. W CN 1/1/2016 STP(U) 7,900 972 8,872 8,872 12/1/2015
Construct new roadway including water, sewer, curb, S
gutter, sidewalk, street lighting and storm drainage 0
system.
Totals 14,100 1,930 16,030 700 408 6,050 8,872
Agency: Yakima
Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
• Project Costs in Thousands of Dollars Federally Funded
Expenditure Schedule
`v projects Only Project Identification Fund Source Information (Local Agency)
E A. PIN /Federal Aid No. B. Bridge No. w .c ' w '^ Federal Funding R/W
c z
C. Project Title E s v -c Phase
D. Street /Road Name or Number N u a- Federal State State Local Total Envir Required
c _ Start Federal Fund
c E. Beginning MP or Road - Ending MP or Road o, n ' m o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
Li.. F. Describe Work to Be Done E F N 2 5 a Phase .
(MM /YY)
1 2 3 4 5 6 7 8 9 10 11 . 12 13 14 15 16 17 18 19 20 21
' 17 17 Yakima Downtown Future Initiatives, Phase 5 06 P 0.15 P PE 1/1/2014 OTHER 500 500 500 CE No
12 T CN 4/1/2015 OTHER 5,500 5,500 5,500
from: 1st Street to: 9th Street C
Install historic lighting, sidewalk modifications and 5
other improvements. Exact improvement area(s) to
be determined
Totals 6,000 500 5,500
17 18 75th Avenue Improvements 01 P 0.50 P PE 1/1/2016 STP(U) 87 13 100 100 CE No
75th Avenue 08 W RW 1/1/2017 STP(U) 173 27 200 200
from: Mead Ave. to: Nob Hill Blvd. 5 CN 1/1/2018 STP(U) 1,038 162 1,200 1,200
Construct portions of and widen roadway, install T -
curb, gutter, sidewalk, street lighting and storm 0
drainage system.
t
Totals 1,500 1,500
14 19 Washington Ave. & Longfiber Rd. Intersection 03 P N/A C PE 1/1/2014 STP(U) 100 14 114 114 CE Yes
Washington Avenue 05 T RW 6/1/2014 STP(U) 100 .14 114 114
from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2015 STP(U) 700 95 795 795 12/1/2015
Widen Washington Avenue to 5 lanes and widen 5
Longfiber Road to 3 lanes, install or replace curb, 0
gutter, sidewalk, street lighting and Safety Flashing
Signal.
Totals 900 123 1,023 228 795
14 20 E. Nob Hill Blvd. & S. 18th Street 1/5 lmprovements ,01 P 0.10 C PE 1/1/2014 STP(U) 50 8 58 58 CE No
E. Nob Hill Boulevard 04 T CN 6/1/2014 STP(U) 346 54 400 400
from: E. Nob Hill Blvd. to: S. 18th Street W
Widen south leg for double left turn from westbound 5
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
Totals 396 62 458 458
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
m Zr, Project Identification N Fund Source Information Expenditure Schedule Projects Only
V E g A. PIN /Federal Aid No. 8. Brid a No. c Federal Funding R/W
(Local Agency) -
r ;,
o z' . StreectTitie a ` i u 11 Phase Federal State State Local Total Envir Required
D. Street /Road Name or Number : •,-,-; _ r Start Federal Fund
c . ."8 D E. Beginning MP or Road - Ending MP or Road a E ' T. o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
Li n F Describe Work to Be Done E m
� �, 12 a Phase (MM /YY)
1 2 3 4 . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 21 Powerhouse Rd. & Englewood Ave. I/5 12 P N/A ' P PE 1/1/2014 STP(S) 43 7 50 50 CE Yes
Powerhouse Rd. T RW 1/1/2015 STP(S) 87 13 100 100
from: Powerhouse Rd. to: Englewood Ave. C CN 6/1/2015 STP(S) 504 74 578 578 5/1/2015
5
Intersection realignment, install curb, gutter, 0
sidewalk, Safety Flashing Signal. W
Totals ' 634 94 728 50 678
14 22 S. 48th Ave. & Summitview Ave. Signolization 12 P N/A P PE 1/1/2015 STP(S) 25 4 29 29 CE Yes
Summitview Avenue T RW 6/1/2015 STP(S) 25 4 29 29
from: Summitview Ave. to: S. 48th Ave. CN 1/1/2016 STP(S) 554 81 635 635 12/1/2015
Install traffic signalization system
Totals 604 89 693 58 635
14 23 W Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2014 STP(E) 424 67 491 491 CE Yes
W Lincoln Avenue 12 T RW 1/1/2015 STP(E) 1,047 163 1,210 1,210
from. W 5th Ave. to: Custer St. W CN 1/1/2016 STP(E) 1,801 281 2,082 2,082 12/1/2015
S ,
0
Realign W Lincoln Avenue. Install curb, gutter, P
sidewalks, street lighting, drainage. G
Totals 3,272 511 3,783 491 1,210 2,082
14 24 E. Nob Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2014 STP(C) 546 84 630 630 CE Yes
E. Nob Hill Boulevard 04 T RW 1/1/2015 STP(C) 1,090 170 1,260 1,260
from: S. 6th Street to: 5. 18th Street 06 W CN 1/1/2016 STP(C) 6,539 1,013 7,552 7,552 12/1/2015
5
Reconstruct and widen roadway to 5 lanes with 0
intersection improvements, curb, gutter, sidewalk, P
street lighting and drainage system G
Totals 8,175 1,267 9,442 630 1,260 7,552
Agency: Yakima Six Year Transportation Improvement Progra
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
iv Project Identification Fund Source Information Expenditure Schedule Projects Only
0 E A. PIN /Federal Aid No. B. Bridge No. c a^ (Local Agency)
y
z' .Prolectera E c a Phase F ederal Funding
t R/W
72 o m _ J Federal State State Local Total Envir Required
D. Street /Road Name or Number c N Y Start Federal Fund
o E. Beginning MP or Road - ending MP or Road a r„.' m a o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
, 1 F Describe Work to Be Done E
o Phase (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 25 5. 72nd Ave. & W Washington Ave. I/S 12 P N/A P PE 1/1/2014 STP(C) 91 14 105 105 CE Yes
S. 72nd Avenue 06 T RW 1/1/2015 STP(C) 91 14 105 105
' from: s. 72nd Ave. to: W Washington Ave. 0 CN 1/1/2016 STP(C) 544 86 630 630 12/1/2015
Improve intersection by installing a traffic signal 5
system or roundabout. W _
Totals 726 114 840 105 105 630
17 26 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2014 STP(E) 86 '14 100 100 CE Yes
66th Avenue 04 T RW 1/1/2015 STP(E) 173 27 200 200
from: Summitview Ave. to: Scenic Dr W CN 1/1/2016 STP(E) 1,096 164 1,260 1,260 12/1/2014
5
Reconstruct and widen roadway, install curb, gutter, 0
sidewalk, storm drainage system and utilities.
Totals 1,355 205 1,560 100 200 1,260
14 27 N. 40th Ave. & Summitview Dr VS 12 P N/A P PE 1/1/2014 STP(U) 126 17 143 143 CE Yes
N.40th Avenue T RW 1/1/2015 STP(U) 63 8 71 71
from: N. 40th Ave. to: Summitview Dr W CN 1/1/2016 STP(U) 544 86 630 630 12/1/2015
Improve the intersection by constructing larger curb 5
radii, lenghtening the turn lanes, and upgrading the 0
traffic signal system.
Totals 733 111 844 143 71 630
14 28 N. 40th Ave. & Englewood VS 12 P N/A P PE 1/1/2015 STP(U) 43 7 50 50 CE No
N. 40th Avenue T 09 6/1/2015 STP(U) 260 40 300 300
from: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller .
Totals 303 47 350 350
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
m a Project Identification a Fund Source Information Expenditure Schedule Projects Only
V E A. PIN /Federal Aid No. B. Bridge No.
t (Local Agency) R/W
,� '^ m Federal Funding C. Project Title E v d Phase g
0 « D. Street /Road Name or Number ; a u ° Federal State State Local Total Envir Required
c o E. Beginning MP or Road - Ending MP or Road a L o Start Federal Fund Cost by Fund Code Funds Funds Funds 1st 2nd 3rd 4th Type Date
ii & F. Describe Work to Be Done E ,2 n r 5 o . Code Phase
(MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 29 N. 16th Avenue & Fruitvale Blvd. 1/5 12 P N/A P PE 1/1/2013 STP(U) 126 18 144 144 CE Yes
N. 16th Avenue T RW 6/1/2013 STP(U) 173 27 200 200 •
from: N. 16th Ave. to: Fruitvale Blvd. 0 CN 3/1/2014 STP(U) 315 43 358 358 2/1/2014
Improve the intersection by constructing larger curb S
radii, installing ADA ramps, and.upgrading the traffic W
signal system.
Totals 614 88 702 344 358
14 30 N. 1st Street &'I' Street l /SImprovement 12 P N/A P PE 1/1/2015 STP(E) 32 5 37 37 CE No
N. 1st Street T CN 6/1/2015 STP(E) 126 17 143 143
from: N. 1st Street to: 'I'Street W
S
Replace and upgrade traffic signal system 0
Totals 158 22 180 180
17 31 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2014 STP(C) 109 27 136. 136 CE No
•
Rudkin Road 06 T CN 1/1/2015 STP(C) 945 TPP 945 106 1,996 1,996
from: E. Viola Ave. to: Rainier PI. W
S
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
Totals 1,054 133 2,132 136 1,996 0
16 32 E. Mead Avenue Reconstruction 03 P 0.76 P PE 1/1/2015 STP(S) 122 TPP 23 7 152 152 CE No
E. Mead Avenue 06 T CN 1/1/2016 STP(S) 1,730 TPP 206 70 2,006 2,006
from: Rudkin Rd. to: Fair Ave. 5
Partner with Union Gap to reconstruct E. Mead C
Avenue, install curb, gutter, sidewalk and storm G
drainage system. 0
Totals 1,852 229 77 2,158 152 2,006
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollari Federally Funded
Expenditure Schedule
v Project Identification N Fund Source Information (Local Agency)
Only
0 E A. PIN /Federal Aid No. B. Bridge No. c -c m C L Federal Funding R/W
c z C. Project Title E 'moo c -_ Phase
4 a D. Street /Road Name or Number i — " St art F Fund Federal State State Local Total 4th Envir Required
° u 3 m 8 ' a Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thar Type Date
c `o E. Beginning MP or Road - Ending MP or Road o. n ,� _ o Code Y Yp
u ci , F. Describe Work to Be Done ' E 5 ig F j it Phase
6th (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 i 20 21
17 33 S. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2015 AIP 131 20 151 151 CE Yes
S. 80th Avenue T RW 1/1/2016 AIP 382 59 441 441
from Tieton Drive to: Zier Road 0 CN 1/1/2017 AIP 1,667 260 1,927 1,927 12/1/2016
S
Widen roadway, install curb, gutter, sidewalk, street W
lighting and storm drainage system. C
Totals 2,180 339 2,519 151 2,368
17 34 Englewood Avenue Improvements 05 P 1.00 P PE 1/1/2015 STP(C) 272 43 315 315 CE Yes
Englewood Avenue 06 T RW 1/1/2016 STP(C) 349 55 404 404
from: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2017 STP(C) 2,352 340 2,692 2,692 12/1/2016
S
Widen roadway, install curb, gutter, sidewalk, street O
lighting and storm drainage system. C
Totals 2,973 438 3,411 315 3,096
17 35 Englewood Avenue lmprovements 05 P 0.50 P PE 1/1/2015 STP(U) 136 21 157 157 CE Yes
Englewood Avenue 06 T RW 1/1/2016 STP(U) 173 27 200 200
from. N. 16th Ave. to: N. 24th Ave. W CN 1/1/2017 STP(U) 1,164 182 1,346 1,346 12/1/2016
Widen roadway, install curb, gutter, sidewalk, street 5
lighting and storm drainage system.
Totals 1,473 230 1,703 157 1,546
• 14 36 Nob Hill Boulevard Sidewalk Improvements 12 P 2.50 P PE 1/1/2015 STP(S) 55 8 63 63 CE Yes
Nob Hill Boulevard T RW 1/1/2016 STP(S) 107 19 126 126
from: 5. 16th Ave. to: 5. 6th Street S CN 1/1/2017 STP(S) 321 57 378 378 12/1/2017
Construct sidewalk in locations where it doesn't exist W
on the south side of Nob Hill •
Totals 483 84 567 63 504
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
Project Identification Fund Source Information
Expenditure Schedule Projects Only
U E A. PIN /Federal Aid No. B. Bridge No.
L 6 R/W
c z'
C. Proles Title E E -o a Phase Federal Funding
Z . -
D. street /Road Name or Number ; N Federal State State Local Total 4th Envir Required
Start Federal Fund
c `o E. Beginning MP or Road - Ending MP or Road . a o Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
u.. ` F. Describe Work to Be Done .E r Si 2 5 o' Cod Phase 6th (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 37 N. 34th Ave. & Fruitvale Blvd. I/S Improvements 12 P N/A P PE 1/1/2015 STP(U) 63 S 68 68 CE No
' Fruitvale Boulevard T CN 1/1/2016 STP(U) 567 76 643 643
from: Fruitvale Blvd. to: N. 34th Ave. 0
Improve intersection installing a traffic signal system, 5
curb, gutter and sidewalk. W
Totals 630 81 711 68 643
17 38 Englewood Avenue Improvements 03 P 1.00 P PE 1/1/2015 STP(U) 218 34 252 252 CE Yes
Englewood Avenue 05 T RW 6/1/2016 STP(U) 327 51 378 378
from: N. 24th Ave. to: N. 40th Ave. 06 W CN 6/1/2017 STP(U) 2,980 244 3,224 3,224 5/1/2017
S
•
Reconstruct and widen roadway, install curb, gutter, 0
sidewalk, street lighting and storm drainage system.
Totals 3,525 329 3,854 252 3,602
14 39 North /South Connector to West Valley 01 P 6.00 P PE 1/1/2015 STP(U) 432 68 500 500 CE Yes
Unknown Road 04 T
from: Ahtanum Rd. to: Summitview Ext. 06 W
5
Corridor study to determine the best location for a C
north /south limited access route in West Valley City G
and County joint project. 0
Totals 432 68 500 500
14 40 River Road Improvements 03 5 0.50 P PE 1/1/2013 140 140 140 CE Yes
River Road 05 T RW 6/1/2013 150 150 150
from: S. 16th Ave. to: S. 6th Ave. 06 G CN 3/1/2014 FMSIB 639 491 1,130 1,130 2/1/2014
07 W
Reconstruct and widen roadway, install curb, gutter, 0
sidewalk, street lighting and storm drainage system.
Totals 781 1,420 290 1,130
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. • From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Project Costs in Thousands of Dollars ' Federally Funded
Project Identification Fund Source Information Expenditure Schedule Projects Only
U 6 A. PIN /Federal Aid No. B. Bridge No. c t c (Local Agency)
W m F e d era l Funding R/W
Z C.ProlectTitle E o a Phase
o _ D.street /Road Name or Number > . V Start Federal Fund Federal State State Local Total 4th Envir Required
B ` m 9 t .14 Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
o a E. Beginning MP or Road - Ending MP or Road
2 . a F Describe Work to Be Done E F Si 2 n.. Cod Phase
6th (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ' 18 19 20 21
14 41 18th Street Underpass 12 P N/A P PE 1/1/2015 BRAC 240 60. 300 300, CE No
Yakima Avenue T CN 1/1/2016 BRAC 2,288 572 2,860 2,860
from: Yakima Ave. to: 18th Street O
Replace the bridge on E. Yakima Avenue that crosses 5 '
over lath Street. W
Totals 2,528 632 3,160 300 2,860
17 42 88th Avenue Improvements 06 P 0.48 P PE 1/1/2015 WSDOT 50 0 50 50 CE Yes
88th Avenue 12 T RW 1/1/2016 WSDOT 25 0 25 25
from: Tieton Dr to: Summitview Ave. C CN 1/1/2017 WSDOT 320 10 330 330 12/1/2016
G
Construct curb, gutter, sidewalk and storm drainage ;
system on the east side of 88th Avenue.
Totals 395 10 405 50 355
16 43 64th Avenue Improvements 03 P 1.00 P PE 1/1/2014 STP(U) 200 32 232 200 CE No
64th Avenue 04 T CN 1/1/2015 STP(U) 1,600 249 1,849 1,849
from: Washington Ave. to: Nob Hill Blvd. 06 W
C
Widen roadway, install curb, gutter, sidewalk, street G '
lighting and storm drainage system. 0 . . _
Totals 1,800 281 2,081 200 1,849
14 44 ■. North 1st Street Revitalization 06 P 0.50 P PE 1/1/2016 STP(U) 605 95 700 700 CE No
N. 1st Street 12 T CN 1/1/2017 STP(U) 5,165 806 5,971 5,971
from: MLK Blvd. to: 'N'Street G
C
Improve North 1st Street by rehabilitating the
pavement and lane markings, removing on- street
parking, enhancing street and pedestrian lighting,
constructing median islands and installing various • .
pedestrian and decorative elements.
Totals 5,770 901 6,671 6,671
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013' to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: Resolution No.:
Protect Costs in Thousands of Dollars Federally Funded
Expenditure Schedule
m Project Identification N Fund Source Information Projects Only
iJ E A. PIN /Federal Ald No. B. Bridge No. c t (Local Agency)
a, t F e d er al Fu nding R/W
o Z C. Project Title u -, a Phase Federal State State Local Total 4th Envir Required
D. Street/Road Name or Number > Start Federal Fund
o E.BeglnningMParRoad- Ending MP or Road
P. _ n . o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
,i i F Describe Work to Be Done E r2 7 0 - Phase
6th (MM /YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 45 Tieton Dr & 64th Ave. l/S Improvements 13 P N/A P PE 1/1/2014 STP(U) 87 13 100 100 CE Yes
Tieton Drive 05 T RW 1/1/2015 STP(U) 260 40 300 300
from: Tieton Dr to: 64th Ave. 12 0 CN 1/1/2016 STP(U) 692 108 800 800 12/1/2015
S
Improve intersection by constructing a left -turn lane W
on Tieton Drive, installing a traffic signal system, curb, C '
gutter, sidewalk and street lighting. G
Totals 1,039 161 1,200 100 300 800
16 46 S. 80th Avenue Bridge 01 P 0.25 P PE 1/1/2014 STP(U) 44 6 50 50 CE Yes
S. 80th Avenue T CN 1/1/2015 STP(U) 433 67 500 500
from: Wide Hollow Rd. to: Plath 0 12/1/2016
Construct new bridge over Wide Hollow Creek. Joint
project with the County
Totals 477 73 550 50 500
14 47 16th Avenue Corridor Improvement 04 P 3.50 P PE 1/1/2015 STP(U) 120 17 137 137 CE
16th Avenue T
from: SR 12 to: Washington Ave. W
C
G
Widen roadway, install curb, gutter, sidewalk, street 0
lighting and storm drainage system. 5 •
•
Totals 120 17 137 137
14 48 40th Avenue Corridor Improvements 04 P 3.20 P PE . 1/1/2015 STP(U) 120 17 137 137 CE
40th Avenue T
from: SR 12 to: Washington Ave. W
C
G
Widen roadway, install curb, gutter, sidewalk, street 0
lighting and storm drainage system. S
Totals 17 137 137
Agency: Yakima Six Year Transportation Improvement Program
Co. No.: 39 Co. Name: Yakima Co. From 2013 to 2018
City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date:
Amend Date: . Resolution No.:
Project Costs in Thousands of Dollars Federally Funded
m r, Project Identification Fund Source Information Expenditure Schedule Pro Only • a A. PIN /Federal Aid No. B. Bridge No. c ^' (Local Agency) y
E g „ c is v a, a
Phase
Federal Funding R/W
• z ' C. Protect title E
w c o Federal State State Local Total 4th Envir
Required
D. Street/Road Name or Number > ^ Y Start Federal Fund Q
c o E. Beginning MP or Road - Ending MP or Road o n 8 1° . o Code Cost by Fund Code Funds Funds Funds 1st 2nd 3rd Thru Type Date
, A: F. Describe Work to Be Dane E _i a Phase 6th (MM /YY)
1 2 3 4 5 -6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 49 Nob Hill Boulevard Corridor lmprovements 03 P 2.70 P PE 1/1/2015 STP(U) 120 17 137 • 137 CE
Nob Hill Boulevard 04 T
from: 1 -82 to: 16th Ave. 0
5
W
Widen roadway, install curb, gutter, sidewalk, street C
lighting and storm drainage system. G
Totals 120 17 137 137
14 50 5. 1st Street /Main Street Corridor Improvements 01 P 2.00 P PE 1/1/2015 STP(U) 120 17 137 1371 CE
5. 1st Street /Main Street T
from: Nob Hill Blvd. to: Barker Mill Bridge 0
5
Joint project with Union Gap. Widen roadway, install W
curb, gutter, sidewalk, street lighting and storm C
drainage system. G
Totals 120 17 137 137
16 51 Washington Ave. Railroad Grade Separation 01 P 0.25 P PE 1/1/2015 STP(U) 1,730 270 2,000 2,000 CE Yes
Washington Avenue T RW 6/1/2016 STP(U) 1,730 270 2,000 2,000
from: Russel Ln. to: Longfiber Rd. W CN 1/1/2018 STP(U) 8,650 1,350 10,000 10,000 12/1/2017
Construct railroad grade overcrossing, including all 0
utilities 5 .
Totals 12,110 1,890 14,000 2,000 12,000 •
16 52 Mead Avenue Railroad Grade Separation 1 P 0.25 P PE 1/1/2015 STP(U) 1,730 270 2,000 2,000 CE Yes
Mead Avenue T RW 6/1/2016 STP(U) 1,730 270 2,000 2,000
from: Presson PI. to: Maryland W CN 1/1/2018 STP(U) 8,650 1,350 10,000 10,000 12/1/2017
Construct railroad grade overcrossing, including all 0
utilities S .
Totals 1,890 14,000 2,000 12;000
•