BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. D•
For Meeting of: April 3, 2012
ITEM TITLE: Resolution setting a Public Hearing on April 17, 2012 at 7
p.m. in the City Hall Council Chambers to amend the six -
year Transportation Improvement Program (TIP).
SUBMITTED BY: Joan Davenport, Acting Director of Community and
Economic Development
CONTACT Doug Mayo, City Engineer 576 -6678
PERSON /TELEPHONE: Brett Sheffield, Chief Engineer 576 -6797
SUMMARY EXPLANATION:
• This action would set April 17, 2012 as the date for a public hearing to amend the six -year
TIP. An amendment to the 2012 -2017 six -year TIP is required to break the North 1st Street
Revitalization, Martin Luther King, Jr. Boulevard to SR 12 project that is currently listed as
TIP Priority #81 into two projects. The TIP Priority #81 project will be North 1st Street
Revitalization, 'N' Street to SR 12. A new project, TIP Priority #84, will be North 1st Street
Revitalization, MLK Boulevard to 'N' Street.
A recent call for projects for the Surface Transportation Program (STP) resulted in the City
receiving a $250,000 grant (preliminary engineering only) for improving N. 1st Street from 'N'
Street to SR 12. The local match requirement will be $76,800.
Resolution X Ordinance Other
(specify)
Contract: Mail to:
Contract Term: Amount: Expiration Date:
Insurance Required? No
Funding Fund 142, Arterial Street Phone:
Source:
APPROVED FOR
SUBMITTAL: City Manager
STAFF RECOMMENDATION:
Staff respectfully requests the City Council to set April 17, 2012 as the date of Public
Hearing to arnend the six -year TIP.
BOARD /COMIVIISSION RECOMMENDATION:
ATTACHMENTS:
Click to download
i D Resolution to set date of Public Hearing
El Amended TIP protects
•
RESOLUTION NO. R -2012-
A RESOLUTION fixing the time and place of a hearing for April 17, 2012 at 7:00 pm in
the Council Chambers at City Hall to amend the 2012 through 2017 Six -
Year Transportation Improvement Program.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six -Year
Transportation Improvement Program for the construction of streets and arterial streets in
the City of Yakima for the ensuing six year period, all as contemplated and required by State
and Federal law, and
WHEREAS, the City of Yakima has identified a need to amend the current Six Year
Transportation Improvement Program for the construction of streets and arterial streets in
the City of Yakima; and
WHEREAS, a public hearing must be held on said amended program before final
approval, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
That said amended program shall be presented for hearing and determination on Tuesday,
April 17, 2012 at the hour of 7.00 PM on said day, in the Council Chambers of the City of
Yakima, at Yakima City Hall, Yakima, Washington, or as soon thereafter as the same may
be heard, and that notice of such hearing be given as approved by law.
ADOPTED BY THE CITY COUNCIL this 3rd day of April, 2012.
Micah D. Cawley, Mayor
ATTEST:
City Clerk
0
Ails
Depart tat spostaeten Six Year Transportation Improvement Program
From 2012 to 2017
Agency: Yakima
County: Yakima
MPO /RTPO: YVCOG Y Inside N Outside
m
3
v v
O 7, a
c A. PIN /Project No. B. STIP ID 3 0 3 o W
Z C. Project Title = D ? E m B 7 A
ct 0 o D. Road Name or Number 0 a o. o - r — B m
m c E. Begin & End Termini -o o 3 ' - o 1 '
m °3 m F. Project Description G. Structure ID m o o m m S 0 0.
14 81 ' YAK64 06/21/11 06/21/11 04/17/12 2012- 31 C G P T 0.420 CE No
North 1st Street Revitalization
'N' Street to SR 12
This project will improve 1st Street between 'N' Street and its connection with SR 12
and 1 -82 by rehabilitating the pavement and lane markings, removing on- street
parking, enhancing street and pedestrian lighting, constructing median islands and
installing various pedestrian and decorative elements.
Funding _
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2012 STP(U) 250,000 0 76,800 326,800
P CN 2013 STP(U) 2,662,643 0 415,557 3,078,200
Totals 2,912,643 0 492,357 3,405,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 150,000 100,000 0 0 0
CN 0 1,000,000 2,078,200 0 0
Totals 150,000 1,100,000 2,078,200 0 0
Report Date: March 21, 2012 Page 2
AO lk
Washington State Six Year Transportation Improvement Program
*!/ Department Od T7ansportaticen
From 2012 to 2017
Agency: Yakima
County: Yakima
MPO /RTPO: YVCOG Y Inside N Outside
m
3 ,c
9 z c 'o
c A. PIN /Project No. B. STIP ID 3 c
< c o
c Z C. Project Title D w ® = A -
n q D. Road Name or Number o n 0 ''. n 1 E a
m - . E. Begin & End Termini ., v 3 Z . ° a co -0 c•
SL 4 F. Project Description G. Structure ID coo $. T o o • 0 s 0 o
y
14 84 YAK 66 06/21/11 06/21/11 04/17/12 2012- 31 C G P T 0.980 CE No
North 1st Street Revitalization
1st Street
MLK.Boulevard to 'N' Street
This project will improve 1st Street between Martin Luther King, Jr Boulevard and 'N'
Street, by rehabilitating the pavement and lane markings, removing on- street parking,
enhancing street and pedestrian lighting, constructing median islands and installing
various pedestrian and decorative elements.
Funding
Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2015 STP(U) 564,845 0 88,155 653,000
P CN 2016 STP(U) 5,083,605 0 793,395 5,877,000
Totals 5,648,450 0 881,550 6,530,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th & 6th
PE 0 0 0 653,000 0
CN 0 0 0 0 5,877,000
Totals 0 0 0 653,000 5,877,000
Report Date:.March 21, 2012 Page 3