ITEM TITLE: Update of the Multi -year Irrigation System Rebuild Project
SUBMITTED BY: Dave Brown - Water /Irrigation Division Manager
Mike Shane, Water /Irrigation Engineer
CONTACT PERSON /TELEPHONE: Dave Brown — 509 - 576 -6480
SUMMARY EXPLANATION:
Attached is an updated report to City Council on the multi -year Irrigation System Rebuild
project. This project has its origins more than a decade ago and it is easy to lose track of its
importance, progress, and status as time marches on.
You will find a memo that contains the background, chronology of activities, the current
activities, and the plan for the next few years and a detailed list of accomplishments. Included
are the projects completed by the city Irrigation Crew. Our Crews have replaced some 33,115
feet of mains (6.3 miles) and 1,378 services of the 181,364 feet of pipe that has been replaced
to date. You will also find a table with the projects listed by system, a spreadsheet showing the
finances and a map of the system showing the pipes that have been replaced.
There are about three or four more years to complete the initial high priority projects. After the
high priority projects are complete we will begin updating and refurbishing the medium priority
parts of the irrigation system that were indentified in the December 1999 Master Irrigation Plan.
The project is under budget and ahead of schedule.
Once the report is accepted it will be posted to the City's web site.
Resolution Ordinance Other (Specify) Report
Contract _ Mail to (name and address):
Funding Source
APPROVED FOR SUBMITTAL:C "" 4 City Manager
STAFF RECOMMENDATION: Accept the report.
BOARD /COMMISSION /COMMITTEE RECOMMENDATION:
COUNCIL ACTION:
110
• Water / Irrigation Division
Working Together Toward Excellence in Service and Quality
Otis
2301 Fruitvale Blvd.
Niewor ' Yakima, WA 98902
"Water is life and Infrastructure Makes it Happen"
DATE: July 5, 2011
TO: Honorable Mayor Cawley and City Council Members
Dick Zais, City Manager
FROM: Dave Brown, Water /Irrigation Manager
Mike Shane, Water /Irrigation Engineer
RE: Irrigation System Rebuild Update
Periodically, staff has provided the City Council an update of the multi -year Irrigation System
Rebuild project. In that this project has its origins more than a decade ago, it is easy to lose
track of its importance, progress, and status as time marches on.
Background:
During the many Council Study Sessions, Meetings, Public Hearings, and Public Information
Meetings over the past decade, plans for the future of the City's Irrigation System were
discussed in detail. Based on those discussions, the City Council authorized the following plan
of action:
1) Fund rehabilitation /replacement of the General Irrigation System replacement through
a combination of revenue bonds ($10M) and funds generated through a CIP rate
component. Total cost estimated to be $13- $14million;
2) Revenue bonds to be issued in two increments of $5M each. The first bond of $5
million was obtained in 2004, with the second bond of $3.5 million expected by the end
of 2011. The $3 -$4 million difference between the bond proceeds and the estimated
total project cost is planned to be funded from monies collected as part of the CIP rate;
3) Completion of the General Irrigation System replacement project scheduled for 2012;
4) The General Irrigation System project is considered the highest priority;
5) Bond repayment is from the funds collected through revenues generated by the CIP
rate. (Rates are to , be set at a level sufficient to pay the costs of the
rehabilitation /replacement project.)
Note: The Irrigation Utility is an "Enterprise Fund ", which essentially means that the Utility
should be self - sufficient. By law, the Utility may not support any other fund through its rate
structure; however, rates must be set at a level that will cover all operating and capital costs of
the Utility, including debt service (Le:: payments on bonds and other debt). While it is unlawful
• David E. Brown Water /Irrigation Manager
(509) 575 -6204 Fax (509) 575 -6187
dbrown a ci.vakima.wa.us
for revenue generated by the Utility to be used to support other funds, pp , it is also unlawful to set
rates at a level that is insufficient to cover the. Utilities bond payments, as this would be an
unconstitutional impairment of a contract. Therefore, a cost of service study is performed
periodically to review the rate structure and ensure that rates are set at a prudent operating and
legally authorized level.
Chronology:
•. 1997 Irrigation System Formed including a Capital Improvement Fund
• 1998 completed first General System upgrade project
• December 1999 Master Irrigation Plan completed. The Plan included evaluation of all of
the City owned irrigation systems, developed a Capital Improvement Plan (CIP) and
identified eight systems rating a "high" priority for repair /replacement:
1) Capital Hill (Replacement Complete)
2) Nob Hill (Replacement Complete)
3) Hillcrest (Replacement Complete)
4) Brackett Park (Replacement Complete)
5) West Yakima (Replaced 2/3 of the system)
6) North Hillcrest A (Replacement Complete)
7) DeAtley Park (Replacement Complete)
8) Fruitvale Canal Improvements (ongoing project started in 2003) a,
9) General (ongoing project started in 1998)
• The General System Phase 2 began in 2004 and is completed.
• The General System Phase 3 began in 2007 and is completed.
• The General System Phase 4 began in 2010 and will be completed in the 2011/12
construction season.
Current Activities:
In addition to beginning the General Irrigation System Replacement Phase 4 /Stage 2 in the
winter of 2011/2012, the Fruitvale Canal will be piped from N. 5 Ave. to N. 7 St. (excluding
BNSF right -of -way).
With the replacement of the high priority systems nearly complete, remaining replacement
projects will be based on funds available in the CIP budget and system repair history.
Below is a list of the projects completed since 1997. Also attached is an accounting of the funds
collected and spent in the Capital Improvements Program, a table summarizing the completed
projects and three maps.
David E. Brown Water /Irrigation Manager
(509) 575 -6204 Fax (509) 575 -6187
dbrown@ci.yakima.wa.us
2
•
1998/1999
General System by contractor:
• 2,800 feet of 30" PVC Fruitvale Canal System by contractor:
• 450 feet of concrete canal lining
1999/2001
Consultant/Staff - Irrigation Master . General System by Irrigation Division:
Plan /Study Completed • 875 feet of 8" PVC
• 200 feet of 6" PVC
2001/2002 • 2,400 feet of 4" PVC
General System by contractor: • 800 feet of 3" PVC
• 1,800 feet of 21" PVC • 141 services
• 1,800 feet of 12" PVC
2005/2006
Fruitvale Canal System — 1,600 feet of 48" General System by contractor:
Hancor Pipe, 12 access manholes • 2,385 feet of 16" HDPE
• 875 feet of 14" HDPE
2002/2003 1,025 feet of 12" HDPE
General System by contractor: • 3,390 feet of 10" HDPE
• 5,600 feet of 30" PVC ▪ 1,210 feet of 8" HDPE
2003/2004
• 85 feet of 3" HDPE
Consultant/Staff- Preliminary Design of the • 103 Services
General Irrigation System
General System by Irrigation Division:
•
DeAtley Park & Nob Hill Systems and a 1,250 feet of 6" PVC
small portion of the General by contractor: • 1,800 feet of 4" PVC
• 600 feet of 6" HDPE (high density • 650 feet of 3" PVC
polyethylene) • 137 services
• 1,250 feet of 4" HDPE
• 700 feet of 3" HDPE West Yakima System by contractor:
•
• 4,500 feet of 2" HDPE 135 feet of 10" HDPE
• 1 Pumps • 2,000 feet of 8" HDPE
• 152 Services • 2,800 feet of 6" HDPE
• 1,275 feet of 4" HDPE
General System by Irrigation Division: • 3,800 feet of 3" HDPE
• 1,600 feet of 4" PVC • 1,800 feet of 2" HDPE
• 900 feet of 3" PVC • 270 services
• 115 services
2006/2007
2004/2005 General System by Irrigation Division:
General System by contractor: • 800 feet of 6" PVC
• 5,300 feet of 30" HDPE • 1.320 feet of 4" PVC
• 1,670 feet of 18" HDPE • 2,600 feet of 3" PVC
• 970 feet of 16" HDPE • 202 services
• 430 feet of 3" HDPE
• 23 services
- David E. Brown Water /Irrigation Manager
(509) 575 -6204 Fax (509) 575 -6187
dbrown @ci.yakima.wa.us
3
•
General System by contractor: 41111 .
y y t actor: Belgold, West Chestnut and West
• 575 feet of 24" steel casing Yakima irrigation systems.
• 650 feet of 18" HDPE
• 2,670 feet of 16" HDPE 2008/2009
• 1,830 feet of 14" HDPE General System by Irrigation Division
• 60 feet of 12" HDPE • 1,000 feet of 4" PVC
• 400 feet of 10" HDPE • 3,700 feet of 3" PVC
• 2,380 feet of 8" HDPE • 1,400 feet of 2" PVC
• 1,090 feet of 6" HDPE • 280 services
• 185 feet of 3" HDPE
• 25 services General System by contractor:
• 2,410 feet of 6 PVC
Maclaren Reservoir by contractor: • 6,592 feet of 4" PVC
• Repaired cracks in the existing • 890 feet of 4" HDPE
concrete reservoir, rehabilitated the • 510 feet of 3" PVC
existing weir box, installed a new • 95 feet of 2" PVC
aluminum ladder and slide gate, and • 366 services
installed a new outlet screen Hillcrest, N. Hillcrest and Buena Vista
structure Systems by contractor:
• 945 feetof6 "HDPE
2007/2008 • 330 fee of 6" PVC
General System by Irrigation Division: • 1,916 feet of 4" HDPE
• 1,000 feet of 6" PVC • 2,320. feet of 4" PVC
• . 1.320 feet of 4" PVC • 1,604 feet of 3" HDPE
• 1,420 feet of 3" PVC • 2,132 feet of 3" PVC
• 300 feet of 2" PVC • 597 feet of 2" HDPE
• 100 Feet of 1" PVC • 271 services
• 182 services
2009/2010
General System by contractor: General System by Irrigation Division
• 123 feet of 24" DI • 1,480 feet of 6" PVC
• 5,026 feet of 6" HDPE • 1,400 feet of 4" PVC
• 3,781 feet of 4" HDPE • 1,120 feet of 3" PVC
• 1,599 feet of 3" HDPE • 92 services
• 2,298 of 2" HDPE
• 322 services General System by contractor:
• 8,755 feet of 4" PVC
Brackett Park System by contractor:. • 1,729 feet of 4" HDPE
• 3,060 feet of 2" HDPE • 725 feet of 3" PVC
• 45 services • 854 feet of 3" HDPE ..
• 325 services
Glenn Drive Reservoir by contractor:
• Replaced existing pump station, Capitol Hill System by contractor:
including pumps, building, valves • 1,966 feet of 12" PVC
and piping which provides service to • 1,644 feet of 6" HDPE
the Glenn Drive, West Walnut, • 1,543 fee of 6" PVC
• 5,411 feet of 4" PVC
David E. Brown Water /Irrigation Manager
(509) 575 -6204 Fax (509) 575 -6187 •
dbrown @ci.yakima.wa.us
4
• • 355 feet of 3" HDPE s
Capitol Hill System b
P Y by contractor:
• 3,180 feet of 3" PVC • 1,036 feet of 12" PVC
• 180 feet of 2" HDPE • • 1,257 feet of 8" PVC
• 314 services - • 589 feet of 6" PVC
• 6,324 feet of 4" PVC
2010/2011 • 120 feet of 4" HDPE
• 1,946 feet of 3" PVC
General System by Irrigation Division • 258 services
• 1,100 feet of 6" PVC
• 1,450 feet of 4" PVC General. System by contractor:
• 2,450 feet of 3" PVC • 3,306 feet of 32" HDPE
• 600 feet of 2" PVC • 922 feet of 30" HDPE
• 145 services • 3,442 feet of 6" HDPE
• 3,487 feet of 4" HDPE
• 241 services
Future Activities
• Move the Fruitvale Canal Diversion
• Refurbish the Medium Priority Irrigation Systems
o Complete the last 1/3 of the West Yakima system — Replace approx. 12,000 feet
• of pipe
• Refurbish the Low Priority Irrigation Systems
The accomplishments to date are significant, as is the work remaining to complete the adopted
plan and provide for the integrity of the City owned irrigation systems. City staff is working to
complete this work in as cost effective a manner as possible. Irrigation construction projects to
date have been completed on schedule and within construction estimates. You will note that a
number of projects were completed with in -house forces, depending on maintenance workload
and project complexity these efforts on the part of City crews can result in significant savings, a
change of pace and cross - training opportunities for the crews. .
•
0 .
. David E. Brown Water /Irrigation Manager
(509) 575 -6204 Fax (509) 575 -6187
dbrown @ci.yakima.wa. us
5
•
•
•
•
•
•
•
Irrigation System Improvement Fund - 479
Actual Revenues and Expenditures
For the years ended 1998 to 2010
•
Description 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Total
Beginning Fund Balance $ - $ 334,164 $ 596,314 $ 998,281 $ 960,034 $ 1,363,438 $ 1,395,637 $ 6,842,855 $ 6,494,996 $ 5,894,145 $ 4,511272 $ 3,754,937 $ 2,539,036
Revenues: •.
Interest from Investments $ - $ 5,217 $ 20,890 $ 26,862 $ 23,248 $ 2,541 $ 34,471 $ 155,912 $ 167,654 $' 104,632 $ 28,124 $ 42,500 $ 3,528 $ 615,580
Fruitvale Canal Div - 2010 - Bonneville grant $ 18,299 $ 46,973 $ 65,272
Bond Proceed (line of credit) $ 325,000 $ 325,000
Bond Proceed (revenue bond) $ 5,031,294 $ 5,031,294
Operating transfer from CIP Rate $ 400,355 $ 509,799 $ 517,892 $ 514,686 $ 516,083 $ 596,487 $ 1,244,657 $ 867,504 $ 901,811 $ 896,930 $ 896,926 $ 896,197 $ 1,153,212 $ 9,912,538
•
Total Revenues $ 725,355 $ 515,016 $ 538,782 $ 541,548 $ 539,330 $ 617,328 $ 6,357,394 $ 1,023,416 $ 1,069,465 $ 1,001,562 $ 925,051 $ 938,697 $ 1,156,740 $ 15,949,684
Expenditures:
29th and Castlevale to Jerome and 25th $ 351,191 $ 15,809 $ 367,000
Irrigation Master Plan $ 172,867 $ 56,444 $ 4,967 $ 234,278
Operating Transfer (debt payment) $ 40,000 $ 80,000 $ 80,000 $ 80,000 $ 80,000 $ 5,014 $ 242,013 $ 607,027
25th & Jerome to 6th & Jerome $ 371 $ 312,223 $ 962 $ 5,067 $ 318,623
48 " in Chesterly Park $ 182,604 $ 4,107
•
$ 186,711
F St lrrigation Reconstruction -1950 $ 35,048 $ 469,817 $ 12 $ 504,877
6th Ave & Walnut Reline $ 35,594 $ 35,594
DeAtley Park Replacement $ 14,426 $ 92,585 $ 176 • $ 107,186
Nob Hill System Replace $ 20,836 $ 210,562 $ 257 $ 231,655
Fruitvale Canal Diversion & Canal Lining $ 34,376 $ 72,254 $ 87,779 $ 3,150 $ 24,554 $ 88,395 $ 37,452 $ 116,103 $ 464,062
General Irrigation System Rebuild Phase 2 $ 534,763 $ 767,466 $ 1,358,084 $ 1,062,969 $ 3,723,282
W Yakima Irrigation System Replacement $ 500,599 $ 305,768 $ 806,367
' Utility Billing System $ 15,000 $ 15,000
MaClaren Reservoir Reline $ 2,481 $ 50,922 $ 5,034 $ 58,437
General Irrigation System Rebuild Phase 3 $ 771,121 $ 1,570,915 $ 816,889 $ 517,217 $ 3,676,141
• Bracket Park Refurbishment $ 245,221 $ 31,118 $ 276,338
Glen Drive Pump Platform $ 834 $ 229,649 $ 188,049 $ 418,532
Public Works Paving
$ - $,: 31,777 $ 18,500 $ 50,277
Hillcrest and Buna Vista Refirbishment $ 467,499 $ 310,818 $ 778,316
Capital Hill System •
General Irrigation System Rebuild Phase 4 $ $ 650,882 $ 977,117 $ 1,627,999
3
$ 617,734 $ 617,734
Total Expenditures $ 391,191 $252,867 $ 136,815 $ 579,794 $ 135,926 $ 585,130 $ 910,176 •$ 1,371,276 $ 1,670,316 $ 2,384,436 $ 2,382,786 $ 1,834,540 $ 2,470,183 $ 15,105,435 '
Ending Fund Balance $ 334,164 $ 596,314 $ 998,281 $ 960,034 $ 1,363,438 $ 1,395,637 $ 6,842,855 $ 6,494,996 $ 5,894,145 $ 4,511,272 $ 3,053,536 $ 2,859,094 $ 1,225,592
•
•
•
• •
•
Pipe Replacements and Improvements Completed After the Irrigation Utility was Formed in 1997
Feet of Pipe Replaced in the General Irrigation System
1998/1999 2001/2002 2002/2003 2003/2004 2004/2005
2,800 3,600 5,600. 2,500 12,645
Feet of Pi a Replaced in the General Irrigation System
2005/2006 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011
12,670 13,985 16,967 16,597 16,063 16,757
Fruitvale Canal
2001/2002 2004/2005
1,600 feet of Pipe and 12 Access Manholes 450' of Canal Lining
•
DeAtley Park System and Nob Hill System West Yakima System
2003/2004 2005/2006
7,050' of Pipe and 1 Pumps 11,800'
Maclaren Reservoir Bracket Park
2006/2007 2007/2008
• Filled cracks and replaced outlet and inlet structure 4,720
Glenn Drive Reservoir Hillcrest, N. Hillcrest / Capital Hill System
Buena Vista
2007/2008 2008/2009 2009/2010 2010/2011
Replaced pump station 9,844 14,273 11,313
Total Pipe Replaced
181,364 feet 34 miles
• • •
.\_ ~ "' •w...,�„ • nr \ Irrigation District ■661 Fru4vale
\ 1611.. 'IV ---_____.-_ , ` -� ! . -- Larson • 864 Lenox IIII � — • 5 La .
/ ) ,S�U� - • .253 MacLaren ■668 Arlington
o w P
11r. ° q SF _ _ - _ � �� �L-n ` / � �� t :\ , - 259 Capitol Hill • 668 Englewood
e �'. - . 279 Nob Hill 111 689 4th Street
■••�••po •=; t ' -1:1* -- I ' i 0 308 General ■692 Lincoln Heights
A o = ' • y' -�:, - - `� • 342 Loma Vista • 712 Jefferson HAMM
� _ , ` � - a s . t a FT I i 1ai , h S treet - • 378 Buena Vista • 371 Hill Crest • 715 South Glenn Drive
r _ . 748 28th Avenue South
• 3 If 111tIt1 ;
t .395 West Yakima .758 Park Lane
, Ctsruv y - r7 ` >t �� ` ;,` _ IN
19th Avenue South El 793 23rd Avenue South III
V /0 • ' v tao __ - bhp RDI LE BL = _ , r I I ` `� •``` `` ;: , , .454 Bonnie Doone ill
.529 9th Avenue .817 Clinton 99 37th Avenue North
v ,r > .. m _ . 1 ;= -�' R •1Q„ 11 _ t , , l �O` 1
ltoffeq fl ` .j ♦ ,, `,` - Cli Way
'� � a \ !�• ILA e`` s s 534 West Chestnut 622 Glen View •
! .-.7 d - c �' 11 , � ,;; `� ` `, MI 567 Glenn Drive • 842 Chestnut Park
837 King
� `
. 585 Mayfair 9 ANOI.FwOO AVE t ��.... .. NN ∎ C:.1 I "41 \ , �� �, �.
. �_ -- . , , ` , ` >� . 601 25th Avenue • 851 Rolling Green
m. w• i
+•.• _ _ _ a+±+�%..+ , � , `, � , ,` F YAKIMA AVE III 618 Brackett Park • 852 36th Avenue South
...,. �•.t7t i7sa - '� € - -- ! � t ,,�` `` ``� ` E`_ . 621 North Hill Crest •857 Swan Tracts
t wwHcOOAVF .�..,.M1 Efll ►�r *( �'L __. t .,. +. ,. � � �• '� Ala - rt a 624 Deatley Park 858 29th Avenue North
II
jn° . .,,,�.., a ' ; _. 1 N " - i'! a . _. •1 =+ ,1R ` . '� '_- "'�' Q 650 Browne Avenue a 861 24th Avenue
• � n W i P r n . L 7 . , - \, ±1 - a 658 West Walnut 0 996 Richey Road
822 Glen View= ' : h '� , .W...
s : � �r..r =� ��� / `�`b ` � ,, 4
Existing Irrigator Mains
^
len" ' t ., . . ,: U+I � / ir%IIIIWIIA�m� L`st�t ► m \ CAST
F '' S _ U i 1 .31' ^: st N y� ' 342 1• '
.... - - r D R65 ' ) 4 „ -till 1 •, _ • . COPPER
. r 1 1 8! I i i t 1 ^
- I711
^"'" "" "Of"' "` _ -` I „ _ ..� 2 5 3 M a c La GALv
s.......• "-°""' .•„oft , .4 —al) n ° t t f .....•1 atl• - y •ark i' I — HDPE
w 1 666 Aril tr iton �' _ i —PVC
-- :'a • `f 1, ' ^ � w - .H lli Cyst I
— STEEL
x 1
Si I I -
r a k ° ! 6i.. -WOOD
4� -O nfe D ooneW NOB HILL BLVD
M I' ,,,� E NOB wLLI
o q ;
,� 9th Avenue
, wm•. Irrigation M
v, __,
_ ._ �- � New g on al
664 Leno ,11111 N ITI a' Mains
''" 884 L nt)x I I ... ..., � A .. ...�, .[ f 6 = W ..,., tl 1 jI f 4 E 11111 r', \ - ...�
0 1 1 v., N ' -! Irrigation Mains
"P"'" y :.., 4 !I tN MEADnv8" - v `_ ; GY i . IA4�
■ Z' Replaced
0 1,250 2,500 5000 ' Swan rrazts 837 Kina Ir `- 1998 - 2011
N ;
s 1 4 ,Feet:', ,.W,,. t 1 i, (_ h N. 5 ........