Loading...
HomeMy WebLinkAboutR-2011-094 Six-Year TIP for 2012 to 2017; Amendments to Metropolitan Transportation Plan RESOLUTION NO. R- 2011 -94 ' A RESOLUTION adopting the Six -Year Transportation Improvement Program for the period of 2012 through 2017 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at the regular meeting of the Yakima City Council on June 7, 2011 and June 21, 2011, with proper public notice as required by RCW 35.77.010, 'the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2012 through 2017 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2012 through 2017, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 21 day of June, 2011. Micah C wley, Mayor ATTEST: City CIe • . 0 • .. S: . . • • • • • • WashingtonState Department of Transportation . . Six Year Transportation Improvement Program • Agency: Yakima From 2012 to 2017 • Co. No.: 39 • . Co. Name: Yakima Co. • Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded rti A. PIN /Federal Aid No. ® B. Bridge No. v Expenditure Schedule y ,o a) � a , m a� Fund Source Informati P Projects Only C. Project Title • > - o $ Federal Funding (Lo Agency) ' 't al o U a 2 • D. Street/Road Name or Number n o D a RIW u al- w o = 6 Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E 2 o Start Fund Cost by Fund State Local Total Thru Envrr' Date' F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Mry . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 . 18 19 20 21 CN 4/1/2012 STP(U) 798 FMSIB 3500 2200 6498 3000 3498 14 1 01 P 0 T CN 4/1/2012 DEMO 2582 AIP 6000 8582 3000 5582 EA Yakima Railroad Grade Separations- Phase 3 06 P • G • Yes Martin Luther King, Jr. Blvd . • 07 0 from: N. 1st Sreet to: N. 1st Ave • • Construct Grade Separation and adjacent roadway reconstruction including 08 9/1/2009 Front Street ' Totals 3,380 9500 2200 15080 6000 9080 ALL 1/1/2012 5307 1900 . 1 1900 38001 • 3800 00 2 12 S N/A CE • . Transit Operating Expenditures 22 • No • Various fixed rates and locations 23 , from: N/A to: N/A 24 . - Annual operating assistance from the ETA in support of our transit system; 31 • - - . fixed conte, paratransit Dial -A -Ride and vanpool program • . • Totals 1,900 1900 3800 3800 RW 1/1/2012 STP(U) 86 14 100 100 . 16 3 04 S 0.5 W CN 3/1/2013 STP(U) 749 176 925 925 EA - . 64th Ave. Roadway Widening. 06 G - YES • 03 P . from: Nob Hill Blvd to: Tieton Drive. - T Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 4/1/2011 • Totals • • 835 190 1025 100 925 00 4 32 S 1.5 G CN 1/1/2012 250 2501 250 ' Powerhouse/William 0 Douglas Trail Connector P CE T. . No . from: Powerhouse/Williow St. to: 6th Ave /I Street C Paved pathway • O ' Totals 250 250 250 • • Report Date: May 26, 2011 Page 1 v. 5.7 - Supersedes previous editions • • • • Washington State Department of Transportation . . Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 . Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG • . Amend Date: Resolution No.: Project Identification • Project Costs in Thousands of Dollars • Federally Funded A. PIN/Federal Aid No. B. Bridge No. e ; Ex enditure Schedule Projects Only d 03 . a a Fund Source Information P j o o E • C. Project Title d " w d e (Local A _ > a Federal Funding t o Q Z D. StreetlRoad Name or Number a� co o t RNV a Phase Federal Federal State • 4th Required E. Beginning MP or Road - Ending MP or Road E r m ° Start Fund Cost by Fund State Local . Total. Envir. Date F. Describe Work to be Done a` Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (lyhyyy) 1 2 . 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 22 S ALL 1/1/2012 5309(Bus) 1 309 I I 771 386 3861 I CE N/A Street Asset Amenities (Transit) 31 No Route Maintenance, Repair and Improvements - e , from: N/A ' to: N/A ' On going improvements to bus benches, shelters and signage infrastructure Totals 309 77 386 386 • RW 1/1/2013 STP(U) 173 27 200 200 14 6 31 P N/A O CN 4/1/2014 STP(U) 865 135 10001 1000 CE . E Nob Hill Blvd & Fair Ave 03 C E Nob Hill Blvd 04 P Yes from: E Nob Hill Blvd to: Fair Ave T W 4/1/2001 Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting, - stormwater • Totals 1,038 162 1200 1200 00 7 22 S N/A ALL 1/1/20121 5316 1901 . 1 190 3801 380 1 Terrace Heights Service • New University & Retail Links No • . from: N/A to: N/A • Extension of fixed route bus service only into the Terrace Heights area of • Yakima County Totals 190 190 380 380 CN 1 4/1/2012 AIP 2700 421 31211 3121 8 Nob Hill Blvd 05 P 0.97 P CE No 07 T G • from: 49th Avenue to: 64th Avenue Widen, curb, gutter, sidewalk, lighting, drainage, gnnd and overlay full width 12 3 O - • Totals 2700 421 3121 3121 • • Report Date: NI 011 •Page 2 v. 5.7 - Supersedes pre editions . 0 - ' . • . .' , . 0 0 . ,. . . • • • Washington State Department of Transportation Six Year Transportation Improvement Program . Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. • ' Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG • . • Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • a `m A. PIN /Federal Aid No. B. Bridge No. c m Fund Source Information Expenditure Schedule Projects Only o N' - C. Project Title 0 E l'-' e • ° ' o u (Local A enc R/W '� , m o E l Project L Federal Funding 9 yj - c� p` Z D. Street/Road Name or Number 0 n a 1- co :: = - Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E 2 d Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a Code • Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M � 1 2 . . 3 4 5 6 7 8 9 10 11 12 13 14 15 ' 16 17 18 19 20 `21 00 9 . 21 S ALL 1/15/2013 I OTHER 144 36 180 1 1 NIA CE • Acquisition of new Dial -A -Ride paratransit vehicles No from: N/A to: N/A - 0 • Purchase new vehicles to replace older, less reliable units . Totals . 144 36 180 180 ' • 14 10 03 p PE 1/1/2012 STP(U) 173 27 200 200 N/A RW 1/1/2012 . STP(U) 433 67 500 500 . CE E. Lincoln & 10th Street Roundabout • 05 CN 6/1/2012 STP(U) 1125 .175 1300 1300 Yes 06 • • from: E. Lincoln to: E. MLK Jr. Blvd. . Roundabout construction at intersection curb, gutter, sidewalk, & street 6/1!2011, . lighting - 0 ' . Totals 1,731 27 242 2000 200 1800 • • 12 11 03 P N/A O ALL 1/1/2012 STP(U) 865. 1 135 10001 1000 1 CE • S.R.12 & 16th'Avenue Interchange 06 No • Interchange . from: 16th Avenue to: S.R. 12 . - Upgrade Interchange by constructing a Roundabout • . • . Totals 865 135 1000 1000 • 11 12 01 P N/A ° ALL 1/1/2012 STP(U) 1 8651 1351 10001 1 10001 I EA 1 -82 & Lincoln Avenue Interchange P . I I I Yes 1 -82 Interchange G , from: E, "G" Street to: 1 -82 • Reconstruct I extend off from existing 1 -82 off -ramp for Lincoln Avenue - 6/2011 . to E. 'G" Street • . - Totals • 865 135 1000 1000 Report Date: May 26, zo1 t Page 3 -v. 5.7 - Supersedes previous editions . • Washington State Department of Transportation Six Year Transportation Improvem m nt Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification . Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. . d E Schedule Projects Only H Fund Source Information J Y o m o . C. Project Titl E " H c o m - (Local Agency) _ / > d «' , Feder Funding • LL v ti Z D. Street/Road Name or Number a - co o = t Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r . Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done' a` Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM( 1 2 3 4 5 6 7 8 9 ' 10 11 12 13 14 15 16 17 18 19 20 21 14 13 12 P N/A P ALL 1 1/1/2013 STP(U) 865 1351 1000 1000 . CE E. Yakima Avenue & Fair Avenue Signalization W - No •. T from: E. Yakima Avenue to: Fair Avenue S Construct Traffic Signal Totals 865 135 1000 1000 00 14 22 S ALL 1/2/2012 5316 130 130 ' 2601 260 CE Fixed route Bus Services to Moxee along SR 24 Corridor No SR 24 Hwy Corridor/Park & Ride Lots from: - to: . JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at two Park & Ride lots along SR 24. . Totals 130 130 260 260 PE 4/1/2012 13 13 13 16 15 12 P N/A P CN 6/1/2012 214 214 214 CE S 3rd Ave & W Washington Ave Signal T No • S3rdAve ' from: S 3rd Ave to: W Washington Ave Signal Upgrades . Totals 227 227 227 14 16 4579 • 12 P N/A P PE 6/1/2012 STP(U) 252 381 2901 290 EA S 1st St. - E. Washington Ave. Intersection Improvement W • ' ' • Yes S1stSt. • S ' from: S 1st St. to: E Washington Ave. • T Realign intersection, upgrade traffic signal • 01/01/11 • Totals 252 38 290 290 Report Date: M11 v. 5.7 - Supersedes pre editions - Page 4 • .. . . • 40 . 0 • • ., • • . . • • . . . . , . . . . .. . • ... • . :•. . . • . • • • . . • . Washington State Department of Transportation, Six Year Transportation Improvement Program Agency: m Yakima • Fro 2012 to 2017 Co. No.: 39 'Co. Name: Yakima Co. Hearing Date: Adoption Date: . City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification • Project Costs in Thousands of Dollars • Federally Funded A. PIN /Federal Aid No. B.. Bridge No. d Fund Source Information Expenditure Schedule Projects Only • ` .n C. Project Title o " • = d • m (Local Agency) • . 0 m o E > o y r Federal Funding RAN • v li Z D. Street/Road Name or Number a1 y 3 a Phase Federal Federal State 4th Required U- ' E. Beginning MP or Road - Ending MP or Road . E f 5 a) Start Fund Cost by Fund State Local Total ' Envir. Date • . F. Describe Work to be Done ' a Code Phase Code Funds Funds Funds 1st 2nd • 3rd • 6th Type (MMnY) 1 2 3 • 4 5 6 7 8 9 10 11 • 12 13 14 15 16 17 18 19 20 21 17 17 . 4587 03 P P ALL 4/1/2013 SW 2268 307 2575 525 2050 ' S 48th Ave. Reconstruction 1 00 T EA Yes S 48th Avenue W ' • from: Summitview Ave. to: Nob Hill Blvd. S W curb, gutter, sidewalk, lighting, drainage . O _ • � 4/1/2014 ' Totals 2,268 307 2575 525 2050 PE ' 1/1/2013 STP(U) • 51 8 59 59 14 18 03 P N/A O CN 6/1/2013 STP(U) 383 61 444 444 CE South 72nd Ave 8 Mead Ave Intersection 12 . P Yes South 72nd Ave S from: South 72nd Ave to: Mead Ave T . New intersection, signals, curb, gutter and sidewalk W 6/10/2010 • . Totals 434 69 • 503 503 4562 • , ALL 4/4/2013 STP(U) 378 WSDOT 378 7561 756 16 19 • 12 P N/A ' CE Tieton Dr- S 5th Ave. Intersection Project W • Yes Tieton.Drive T ' from: 5th Ave. Intersection to: • O ' S • Replace traffic signal with roundabout 4/1/2014 • Totals 378 - 378 756 756 • • PE 1/1/2012 STP(U) 303 47 350 350 16 20 01 P 1.1 0 RW 1/1/2014 STP(U) 303 • 47 350 350 CE E.1 St. Extension , • • 08 S CN 6/1/2014 STP(U) 1730 270 2000 2000 Yes E. "H" St.. ' . . • from: 1st St. to: Yakima River T ' . Construct road including water, sewer, curb, gutter and sidewalk for future W - 1/1/2014 development. . • . - Totals 2,336 364 2700 350 350 2000 • • Report Date: May 26, 2011 Page v. 5.7 - Supersedes previous editions • • I) • • • Washington State Department of Transportation Six Year Transportation Improvement ent Progr Agency: ' Yakima From 2012 to 2017 Co. No.: 39 ' Co. Name: Yakima Co. Hearing Date: Adoption Date: • .City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded 7 - .._ A. PIN /Federal Aid No. B. Bridge No. c in Expenditure Schedule c y -a C. Pro "ect Title E' .5 va g ency) c a] 43 Fund Source Information (Local A Projects Only 'v . 1 8 e . Federal Funding R/W 0 L.L v — E LP to D. Street/Road Name or Number L to o a o. Phase Federal Federal State . 4th Required E. Beginning MP or Road - Ending MP or Road E 5 ° U Start Fund Cost by Fund State Local Total Envir. Date Thru F. Describe Work to be Done o_ Code Phase . Code Funds Funds Funds 1st • 2nd 3rd, • 6th Type (MM/Yl� . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18: 19 20 21 17 21 PE 1/1/2013 . STP(U) 700 108 808 808 ' 01 P 1.3 0 RW 1/1/2014 STP(U) 5500 850 6350 6350 CE N. 10th St. Extension 06 P CN 6/1/2014 STP(U) 7900 972 8872 8872 Yes N. 10th St. S • • from: R St. to: 10th Street - Lincoln Ave. T Construct road including water,sewer, curb, gutter, sidewalk for future W 1/1/2013 development. _ Totals 14,100 1930 16030 808 15222 • 00 22 23 P N PE 1/1/2012 5309(NS) 1600 400 20001 2000 I CE • N/A • West Valley Transit Center No Acquire'Property to Expand Operations . • • from: N/A to: N/A Locate and acquire property for the placement of a West Side Transit Center Operation Totals 1,600 400 2000 2000 PE 1/1/2013 OTHER 500 500 500 • 17 23 06 P .60 P CN 4/1/2014 OTHER 5500 5500 5500 CE Yakima Downtown Future Initiatives, Phase 5 12 W No S from: 1st Street to: 9th Street T Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. ' Totals • 6000 .6000 500 5500 • PE 1/1/2012 STIP (S) 60 60 120 120 ' 00 24 01 P N/A CN 4/1/2013 STP(S) 180 AIP 240 420 420 CE Annual Signal Upgrades CN 4/1/2013 STIP (S) 360 360 360 No Local Selection from: N/A . ' to: N/A . Upgrade signals • Totals 600 240 60 900 120 780 • • Report Date: Ma 011 p - 0 v 5.7 - Supersedes reSeditions - Page 6 • 0 . • 0 ' • . • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2012 to 2017 Co. No.: 39 Co. Name: • Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded o _ A. PIN /Federal Aid No. B. Bridge No. • m rn 2 13 F Source Information (Local Agency) Expenditure Schedule Projects Only • 4 n ' o sa C. Project Title E N N c o ( •., m E• o a 0 0 t Federal Funding R/VV • 3 0 d Z D. Street/Road Name or Number a� rn D Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r n °' Start Fund Cost by Fund State Local. Total Envir. Date y Funds Funds Funds 1st 2nd 3rd 6th Type (M)Wyy) d F. Describe Work to be Done Code • Phase Code 1 2 3 4 5 6 n 7 8 9 10 11 12 13 14 • 15 16 17 18 19 20 21 • PE 1/1/2012 STP(U) 100 . ' 14 114 114 . 19 25 • • 03 P N/A P CN 3/1/2013 STP(U) • 700 95 795 795 CE LongfiberRd & Washington Ave • 05 S Yes • Intersection 06 W • from: • to: T New intersection construction and reconstruction, 3 -lane and 5 -lane w /tum, 0 • - 3/1/2012 curb, gutter, sidewalks. • • Totals 800 109 909 114 795 14. 26 04 P 1 C CN' 4/1/2013 STP(U) 240 42 282 282 CE • E Nob Hill Blvd & S 18th St 01 S • Yes E Nob Hill Blvd W • , . from: -S 18th St ' to: E Nob Hill Blvd T Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT . 01/01/07 Project) possible curb, gutter and sidewalk . S ' Totals - 240 42 282 _ 282 PE 1/1/2012 STP(E) 22 7 ,29 29 ' 17 27 • • 05 P .15 ' C CN 6/1/2012 STP(E) . 75 20 95 95 CE Zier Rd - 5 75th Ave to 5 72nd Ave 06 S Yes Zier Rd . T • from: S 75th Ave to: -S 72nd Ave P • • Minor widening, curb, gutter and sidewalk - 6/1/2011 ' Totals 97 27 124 124 • 16 28 12 P N/A T : CN 10/1/2013 STP(S) 504 74 5781 578 CE • • Powerhouse Rd & Englewood Ave P • Yes Powerhouse Rd 0 from: Powerhouse Rd. to: Englewood Ave . Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, W 10/1 /2013 • possible roundabout . Totals 504 74 578 578 - Report Date: May 26, 2011 . Page 7 v. 5.7 - Supersedes previous editions • • • • . • • • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima ' From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c $ m Expenditure Schedule ,� w a,,., 0 v a Fund Source Information P Projects Only o N E C. Project Title m M 5 o m (Local Agency) RIVU m .o E , m n • Federal Funding . a o fi Z D. Street/Road Name or Numbe o a ; ? A^ a LA- al- w c = ;, Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E o a Start Fund Cost by Fund State Local Total Envir. Date Thru F. Describe Work to be Done o_ • Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M » 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 PE 1/1/2013 STP(S) 25 4 29 29 12 P N/ A P RW 6/1/2013 STP(S) 25 4 29 29 CE S 48th Ave & Summitview Ave Signalization • T CN 8/1/2014 STP(S) 554 81 635 635 Yes S 48th Ave ' S 48th Ave to: Summitview Ave . ignalization 8/1/2013 Totals 604 89 693 58 635 . PE 1/1/2013 STP(E) 424 67 . 491 491 14 30 01 P .5 W RW 1/1/2014 STP(E) 1047 163 1210 1210 CE w Lincoln Ave & 'B' St Realignment • 12 T CN 1/1/2015 . STP(E) 1801 281 2082 2082 Yes W Lincoln Ave S from: W 5th Ave to: Custer St P . • ' Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G 1/1/2014 • C Totals' 3,272 511 3783 491 1210 2082 16 31 12 P N/A W I I 1 I I I I I I I 1 CE • School Safety Projects No Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features • • ' ' Totals PE 1/1/2013. STP(C) 546 84 630 630 14 32 0 P .85 C RW 1/1/2014 STP(C) 1090 170 1260 1260 EA E Nob Hill Blvd. Reconstruction 04 G CN 1/1/2015 STP(C) 6539 .1013 7552 7552 Yes E Nob Hill Blvd. • 06 0 from:. S 6th Street to: S 18th Street • • P ' Major roadway widening and reconstruction to 5 lanes with intersection T 1/1/2014 • improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants W Totals 8,175 1267 9442 630 1260 7552 • • • • Report Date: Ma • 011 v. 5.7 - Supersedes pre editions P age 8 • • . fa . • Washington State Department of Transportation ' Six Year T ransportation Improvement Program Agency: Yakima From 2012 to .2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded c A. PIN /Federal Aid No. B. Bridge No. ar Fund Source Information Expenditure Schedule Projects Only s m o f C. Project Title d= ; d c m (Local Agency) • o r Fe deral Funding RM/ c U D. Street/Road Name or Number 8 r z. 0 - a a .. - 1-. — t Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road m Start Fund Cost b Fund State Local Total Envir. Date F. Describe Work to be Done a ; Code Phase Code Funds Funds Fund 1st 2nd 3rd .6th Type (M y) 1 - ' 2 3 4 5 6 7 8 9 10 . 11 .12 13 14 15 16 17 18 19 20 21 • PE 1/1/2013 • STP(C) 91 14 105 105 17 33 01 P N/A W RW 1/1/2014 STP(C) 91 14 105 105 CE S 72nd Avenue & W Washington Avenue 12 S • CN 1/1/2015 STP(C) 544 86 630 630 Yes S 72nd Ave 06 T from: S 72nd Ave to: W Washington Ave P ' Intersection Improvement, possible roundabout 1/1/2015 . Totals • 726 114 840 ' 105 105 630 PE 1/1/2013 STP(E) 23 5 28 28 • 17 34 . • 04 P .76 W CN 7/1/2014 STP(E) 1096 . 164 12601 • 1260 :; S 66th Avenue 03 T • Yes % S 66th Ave S from: Scenic Drive to: Summitview P • Widen roadway, curb, gutter, sidewalk and utilities , 7/1/2013 • Totals 1,119 169 1288 28 1260 • . . PE 1/1/2014 STP(U) 126 17 143 143 14 .35 12 P N/A W RW 1/1/2014 ' STP 63 . 8 71 71 CE 40th Avenue and Summitview Signal Upgrade S CN 6/6/2014 STP(U) 544 86 630 630 Yes' 40th Avenue T from: 40th Avenue to: Summitview P Signal upgrade, radius improvements, turn lane extension 6/1/2014 Totals 733 111 844 844 • PE 1/1/2014 STP • 95 13 ' 108 108 14 36 12 P N/A W RW 1/1/2015 STP 63 8 71 71 CE 40th Avenue and Englewood . T CN 1/1/2015 STP 145 20 165 165 Yes: ' 40th Avenue S . from: 40th Avenue to: Englewood • P Replace traffic signal poles, upgrade controller 1/1/2015 Totals 303 41 344 . 179 165 Report Date: May 26, 2011 Page 9 v. 5.7 - Supersedes previous editions • • Al l b. WI Washington State Department of Transportation Six Year Transportation Improvement Program t. • . Agency: Yakima From r 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption .Date: City No.: 1485 MPOIRTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in.Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c Expenditure Schedule Pro' c , a� m i v a� Fund Source Information P Projects Only o C. Project Title E co d rn o m (Local Agency) u o f , m ' v a Federal Funding R/1M g U a 2 D. Street/Road Name or Number o T a at- W - _ I u Phase . Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road e 2 D •o Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (mmiyy) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • PE 1/1/2013 STP - 126 18 144 144 00 37 - 12 P N/A W RW 6/1/2013 SW 63 8 71 71 CE 16th Avenue'and Fruitvale Blvd T CN 1/1/2014 STP 315 43 358 358 Yes 16th Avenue S from: 16th Avenue to: Fruitvale Blvd P )eplace traffic signal poles, radius improvements, ADA ramps - 1/1/2013 Totals 504 69 573 • 215 358 PE 1/1/2012 STP 32 5 37 ' 37 14 38 12 P N/A W CN 1/1/2013 STP 126 17 143 143 CE 1st Street and I Street T 1st Street S No from: 1st Street to: I Street P Replace and upgrade traffic signal equipment Totals 158 22. 180 37 143 PE 6/1/2015 STP(U) 820 189 1009 1009 16 ' 39 01 P .25 O RW 1/1/2016 STP(U) 3150 630 3780 • 3780 CE Washington Ave. Railroad Grade Separation P CN 1/1/2017 STP(U) 6552 1008 7560 7560 Yes Washington Ave. S from: Longfibre Road to: . T Railroad grade overpass including all utilities - VV 1/1/2017 • Totals • 10,522 1827 12349 12349 PE 1/1/2012 STP(U) • 272 43 .315 315 16 40 01 P 1.3 G RW •6/1/2013' STP(U) 349 55 404 404 CE Frontage Road & "H" St. Loop CN 1/1/2015 STP(U) 2352 340 2692 2692 Yes N. 8th St. 0 - from: "H St. to: 1 -82 P Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for S 1/1/2015 • future development and Terrace Heights connection. - W Totals 2,973 438 • 3411 315 404 2692 • • Report Date: M 11 - S ae v. 5.7 - Supersedes pre editions 10 • 0 . • • . . • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima- From 2012 to 2017 • Co. No.: 39 - Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification . Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. , B. Bridge No. c in Expenditure Schedule c 0 ; d m ' v y F und Source Information P Projects Only'.'. - B n C. Proje Titl m ` w o m . (Local Agency) R/VV ', m .o E m r Federal Funding c o p Z D. Street/Road Name or Number o r a • at- to .1 = • Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E t ° - 5 o S tart Fund Co by Fund State Local Total Thru Envir. Date F. Describe Work to be Done n. Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/y >7 1 ' 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • PE 1/1/2014 . STP(U) 1201 I I 17 I 137 137 14 41 04 P 3.5 I I O I I I CE 16th Ave. Corridor G 16th Ave. 0 from: SR -12 , to: ja Ave.Nalley Mall P Widen roadway, curb, gutter, sidewalk, lighting. S .. T W Totals 120 17 137 137 • . PEI 1/1/2014 STP(U) 1 1201 1 ' 1 171 1371 I 137 14 42 04 P 3.2 C CE 40th Ave. Corridor . O • 40th Ave. . • G from: SR -12 to: Washington Ave. . P • Widen roadway, curb, gutter, sidewalks, lighting. S . W T Totals 120 1 37 17 137 PEI 1/1/2013 STP(U) 1 1201 1 . 1. 171 1371 I 137 1 I CE .03 14 43 Nob Hill Corridor 04 P 2 ' 7 G • Nob Hill O • from: 1 -82 . to: S. 16th Ave. P Widen roadway, sidewalk, curb, gutter, lighting S T . ' W Totals . 120 17 137 137 C PE 1/1/2014 STP(U) 1 120 1 1 17 1371 1 1. 1371 CE 14 44 04 P 2.0 S. 1st St/Main St. Corridor G S. 1st St. /Main St. 0 • from: Nob Hill Blvd. to: Barker Mill Bridge P Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, S lighting. T W Totals 120 17 137 137 • Report Date: May 26, 2011 Page 11 v. 5 . 7 - Supersedes previous editions • IOW Washington State Department of Transportation Six Year Transportation Improvement Program r Agency:. Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPOIRTPO: YVCOG Amend Date: Resolution No.: • . Project Identification Project Costs in Thousands of Dollars Federally Funded c A. PIN /Federal Aid No. B. Bridge'No. m a m . Fund Source Information . Expenditure Schedule Projects Only o N C. Pro Title E H a o (Local A '� m . E I a « ' � v . Federal Funding RIW U ri Z D. Street/Road Name or Number • n . t- CO Z Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r°- m Start Fund • Cost by Fund State Local Total Envir. Date F. Describe Work to be Done o_ Code Phase Code Funds Funds Funds 1st 2nd 3rd Stn Type (MIWYY) 1 2 3 4 5 6 7 8 9 10 11 12 13 • 14 15 16 17 18 _ 19 20 21 • PE 1/1/2013 STP(C) 109 27 136 136 17 45 03 P .76 W CN 1/1/2014 STP(C) 945 TPP 945 106 1996 • 1996 CE Reconstruction Rudkin Rd 06 T Rudkin Rd P No from: E Viola Ave to: Rainier Place S - Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main • • ' Totals 1,054 945 133 2132 136 1996 PE 9/1/2013 STP(S) 122 TPP' 23 7 152 152 16 46 03 P .76 C CN 4/1/2014 STP 1730 TPP 206 70 2006 2006 CE E Mead Ave Reconstruction • 08 G No E Mead Ave' o • from: Rudkin Rd to: Fair Ave P Partner with City of Union Gap, reconstruct, excavate ballast, top course, S - I curb, gutter, storm, acp T ' Totals 1,852 229 77 2158 .152 2006 PE 1/1/2013 AIP 131 20 . 151 ' 151 17 47 - 04 P 1.3 0 RW 1/1/2014 AIP 382 59 441 441 EA S 80th Ave - Tieton Dr to Zier Rd C CN 4/1/2015 AIP 1667 260 1927 1927 Yes S 80th Ave . P ' from: Tieton Dr to: Zier Rd T • Major widening, curb, gutter, sidewalk W S 4/1/2015 Totals 2180 339 2519 151 441 1927 • • PE 1/1/2015 STP(C) 272 43 315 315 17 48 05 P 1.0 W RW 6/1/2015 STP(C) 349 55 404 404 EA • Englewood Ave - N 40th Ave to N 56th Ave 06 T CN 1/1/2016 STP(C) 2352 340 2692 2692 Yes . Englewood Ave . from: N 40th Ave to: N 56th Ave P Widen roadway, curb, gutter, sidewalk 1/1/2013 • Totals 2,973 438 3411 3411 ' • • • Report Date: Ma , 0 11 Page 12 - p v 5.7 - Supersedes rev s editions • • • , . • . -• _ • •40 • Washington State Department of Transportation irhy • • • . • . . . • . . . • • . . • , . . • . .. . . . .. . . . . , . . . . . , . . . . . . . . . . ..• . .. . . • . . Six Year Tr Improvement Program • Agency: Yakima From 2012 to 2017 Co. No.: • 39 ' Co. Name: Yakima Co. . • • Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: • YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded m A.. PIN /Federal Aid No. B. Bridge No: c w m EX enditure Schedule y . � m • o, v Fund Source Information P Projects Only s �, C P Title m ` . ; d a m (Local Agency) T3 CO . o E m v c Federal Funding c (..> ti Z D . Street/Road Name or Number a� N �; z. o RAN Phase • Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or,Road E o Start Fund Cost by Fund State Local Total Envir. Date . F. Describe Work to be Done o- Code Phase Code Funds Funds .Funds 1st 2nd 3rd 6th Type (MM/1 1 2 ' 3 4 5 . 6 7 8 9 • 10 11 12 • 13 14 15 16 17' 18 19 20 21 17 49 PE 1/1/2014, STP(U) - 219 34 253 253 05 P 2 O RW 6/1/2014 STP(U) 327 51 378 378 EA Englewood Ave - N 24th Ave to N 16th Ave . 06 • • W CN 6/1/2015 STP(U) 2980 244 3224 3224 Yes Englewood Ave S • from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 6/1/2015 ' Totals 3,526 • 329 3855 631 3224 . • PE 1/1/2014 STP(S) 55 8 63 63 ' 14 50 12 P 2.5 P , RW 6/1/2014 STP(S) 107 19 '126 126 CE W Nob Hill Blvd Sidewalks T CN 3/1/2015 STP(S) 321 57 378 378 Yes W Nob Hill Blvd • W from: S 16th Ave ' to: S. 6th St. S Install missing sidewalks on southside of Nob Hill. 3/1/2015 Totals 483 84 567 • 189 378 • PE 1/1/2014 STP(S)' 57 7 64 64 00 51 06 P 1.0 P RW 6/1/2014 STP(S) 189 25 214 214 CE Beech St Pedestrian Connection 32 T CN 1/1/2015 STP(S) 504 68 572 572 Yes Beech St ' from: Fair Ave to: Chalmers /Riverside il iC onstruct pedestrian pathway under SR82 to Greenway 1/1/2015 Totals 750 . 100 . 850 278 '572 PE 1/1/2014 STP(S) 43 7 50 50 16 52 12 P 2.0 P RW 6/1/2014 STP(S) • • .86 ' 15 • 101 101 CE . WLincoln Ave Sidewalks T CN 1/1/2015 STP(S) 572 88 660 660 Yes W Lincoln Ave . S • from: N 56th Ave to: N 29th Ave W • • Sidewalks, meters and fire hydrants replacement or relocation 1/1/2015 • • Totals 701 . 110 811 ' . 151 660 • • • Report Date: May 26, 2011 Page 13 v. 5.7 - Supersedes previous editions • • • . , • • • Aft. Washington State Department of Transportation • Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 • Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: Adoption Date: • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. .c d m Fund Source Information - ' Expenditure Schedule Projects Only g w 'o E ' C Project Title E d = c o t Federal Funding (Local Agency) RIVV c v � . o , a n a Z z D. Street/Road Name or Number a to • 3 - g Phase Federal Federal State • 4th Required a E. Beginning MP or Road - Ending MP or Road E 1 ° - m °' Start Fund Cost b Fund State Local Total Thru Envir. Date P Code Phas Code F Funds Funds 1st 2nd 3rd T (Mw ,� F. Describe Work to be Done a 6th 1 2. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • PE 6/1/2014 STP(U) 820 189 1009 1009 14 53 01 P .25 W RW 1/1/2015 STP(U) 3150 630 3780 3780 CE Mead Ave. Railroad Grade Separation S CN 1/1/2016 STP(U) 6552 1008 7560 7560 Yes Mead Ave. . from: Presson Place to: Maryland P . Construct railroad overpass including all utilities 0 1/1/2016 Totals . 10,522 1827 12349, 1009 11340 PE 6/1/2013 STP(U) 252 38 290 290 ' 16 54 . . 01 P 4.0 ° RW 1/1/2014 STP(U) -' 756 88 844 , 844 CE City wide Pathway Connections P CN 1/1/2015 STP(U) 1890 315 2205 2205 Yes Yakima S from: to: T • ' Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, W - 1/1/2015 WOO Trail, Greenway including Naches Rail Spur, signage and amenities • Totals 2,898 441 3339 290 844 2205 PE 1/1/2014 STP(U) 63 • 5 . 68 68 17 - 55 ' 01 P - N/A ° CN 6/1/2014 STP(U) 567 76 643 643 • CE 34th Ave & River Rd Improvements 12 P • No Fruitvale Blvd. S - • from: 34th Ave. to: River R T • Intersection improvements including lumination, sewer, water, curb, water W and sidewalks - Totals 630 81 711 _ 711 PE 1/1/2014 STP(U) 218 34 252 252 17 56 0 P - 1.0 ° RW 6/1/2015 • STP(U) 327 51 378 378 CE ' Englewood Ave 05 3 CN 1/1/2016 • STP(U) 2980 244 3224 3224 Yes Englewood Ave 12 • from: 24th Ave ' to: 40th Ave T . Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. Totals 3,525 329 3854 252 3602 • . • . Report Date: Ma , 011 • • Page 14 v . 5.7 - Supersedes pre editions - • . ' 414 ' . • 0 - . • 0 , • V741 . Washington State Department of Transportation • Six Year Transportation Improvement .Pr Agency: Yakima • • From 2012 to 2017 • Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: ' YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded . c A. PIN /Federal Aid No. B. Bridge No. c ' • Fund Source Information - Expenditure Schedule Projects Only s w C. Proje Title. 3 d o m (Local Agency) :t-3 m . `o E a w 8 t Federal Funding R/W m v ti z D . Street/Road Name or Number a h 3 a Phase Federal Federal State Required E. Beginning MP or Road - Ending MP or Road E i 5 d Start Fund Cost b Fund State Local' Total 4th Envir. Date F. Describe Work to be Done o_ Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MA 1 2 :, 3 4 5 6 7 8 9 10 11 12 13 14 ' 15 16 17 18 19 20 21 • .Iq PE 1/1/2015 STP(U) . 120 17 137 137 14 57 01 P 6.o C • CE - . W.,Yakima North/South to West Valley 04 G . Unknown road O6 O . • . from: North - South to: in West Valley • P S City & County joint project to build/extend roadways. - - T W Totals 120 17 137 137 • PE 1/1/2014 I I 100 • 1001 100 16 58 01 P ,38 s • • Occidental Road Construction. W • P from: 58th Ave. to: 64th Ave. T • ' Construct roadway - . ' Totals 100 100 100 ' 00 59. 01 P PE 1/1/2015 I 100 1001 100 • 27 • 86th Ave. Road Construction • • ' from: Occidental , Coolidge Construct roadway ' Totals • 100 100 • 100 PE 1/1/2015 STP(E) 18 32 50 50 00 60 03 P N/A G CN 6/1/2015 STP(E) 1900 285 2185 2185 EA ' YVT Railway Rehabilitation & Museum C • No ' • - 3rd Ave S • from: 3rd Ave to: Pine St T W Car Barn, Museum Restoration and Pathway - . P • . Totals 1,918 317 2235 2235 ' . • • • Report Date:- May 26, 2011 Page 15 v. 5.7 - Supersedes previous editions • • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co: Name: Yakima Co. • Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • A. PIN /Federal Aid No. B. Bridge No. c fo y Expenditure Schedule a rn (I) Fund Source Information P Projects Only m . o C. Project Title > a ° L Federal Funding (Local Agency) R/W a p: Z j D. Street/Road Name or Number • I? a B - p °- 8.1- Re uired 8 u o = Phase Federal Federal State - 4th 9 E. Beginning MP or Road - Ending MP or Road E o Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd Type (M >7 6th • 1 2 3 4 5 6 7 8 9 10 11 12 13 14 '15 16 . 17 18 19 20 21 16 61 01 P N/A S CN 7/1/2013 CMAQ 480 65 545 545 CE Roadway City Wide Shoulder Improvements . No City Wide • from: to: City Wide shoulder improvements, PM10 abatement. Totals 504 '68 572 572 PE 1/1/2014 STP(E) . 252 34 286 286 00 62 14 P .25 T CN 3/1/2015 STP(E) 3150 412 3562 3562 CE- Pedestrian Bridge . - 32 P Pedestrian Bridge 0 No • from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights Totals. • 3,402 446 3848 286 3562 PE 1/1/2013 STP(E) 10 - 2 12 12 • 00 63 14 P N/A O CN 7/1/2013 STP(E) 109 17 126 126 CE William O. Douglas Pathway • . 32 S No . P . . ' from: Pine St to: Cowiche Canyon W Pathway improvements, connections, and signage to Cowiche Canyon Trail. - Totals 119 19' 138 138 PE 1/1/2015 STP(U) 315 38 353 353 00 64 . YVr Pathway 03 P N/A P CN 6/1/2015 STP(U) 945 126 1071 1071 CE 32 No YVT Railway Corridor. S from: to: T Development pathway in West Valley area including 53rd Ave, Wide Hollow, W 64th Ave, Ahtanum including all utilities and signage - Totals 1,260 164 1424 1424 • Report Date: M „ •P a9e16 v. 5.7 - Supersedes pre editions - . . . .. . . • • 40 • ill . . • . . • . . . . . . . . . • . . .. . • . . . . :,. . .. . . . • • . . • . „ . ,r, • . ,, . .... . . . • • • Washington State Department of Transportation Six Year Transportation Improvement Program . Agency: Yakima From 2012 to 2017 ' Co.•No.: 39 Co. Name: Yakima Co. .. Hearing Date: Adoption Date:. City No.: 1485 MPO /RTPO: YVCOG - Amend Date: • Resolution No.:. . Project Identification Project Costs in Thousands of Dollars • , Federally Funded A. P IN /Federal Aid No. B. Bridge No. c r Expenditure Schedule . Projects Only Tic , 9 m m Fund S ource Information m o E C. Project Title > m CO • 0 u r Federal Funding (Local Agency) RIVV • • 3 v fi Z D. Street/Road Name.or Number • o . � CO .B = a Phase Federal Federal State 4th Required • E. Be ginning MP or Road - Ending MP o Road E I .- - m ° Start Fund Cost b Fund State Local Total Envir. Date g g g ° y Funds Funds Funds 1st 2nd 3rd Thru Type - (MM/yy) F. Describe Work to be Done n. C ode Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 - 14 15 16 17 -18 19 20 21 PE 1/1/2013 ARRA - FHWA 50 50 50 14 65 06 P 2.64 CN 6/1/2013 ARRA - FHWA 1950 1950 1950 CE Summilview Ave. Grind & Overlay 07 No from: 14th Ave to: 56th Ave . . Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA ramps - - . Totals 2,000 2000 2000 - , PE 1/1/2012 STP(U) 50 50 50 17 66 - 03 P 0.50 W RW 6/1/2012 STP(U) 86 14 100 50 50 CE • River Road Improvements 05 F CN 1 STP(U) 1168 182 1350 1350 Yes from: 6th Ave to: 16th Ave 06 O . Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage 07 T - 6/1/2015 Totals 1,254 246 1500 100 1400 • ' 14 67 03 P .71 ` C CN 1/1/2012 JOBS 925 ( I . 9251 9251 I CE Nob Hill Blvd and 64th Ave Improvements 05 P I No Nob Hill Blvd 07 from: Nob Hill Blvd to: 64th Ave 12 Widen and re-construct 64th Ave. to 33 -foot width with curb, gutter and 13 . - sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter sidewalk and stormwater runoff treatment on the north side of Nob Hill. Totals 925 925 925 , 68 10 P 01 P PE 4/1/2012 BRAC, 1 f 50 I 5 °I 50 N/A 18th Street Underpass • 11 C . , No • from: Yakima Ave to: 18th Street . Repair or replace 18th Street Underpass ' • Totals 50 '50 50 • Report Date: May 26, 2011 Page 17 v. 5.7 - Supersedes previous editions • • • • • i■ll■ . Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: . City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars • Federally Funded @ A. PIN /Federal Aid No. B. Bridge No, c d Expenditure Schedule c y .• d rn a Fund Source Information P Projects Only o.5 13 C. Project Title m in , . w o m (Local Agency) i m o E , m o r Federal Funding ti v 6: Z D. Street/Road Name or Number o r 2 a RN co- o Phase a te 4th Required Federal Federal St E. Beginning MP or Road - Ending MP or Road E o Start Fund Cost by Fund State 'Local Total Thru Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M� 1 2 3 4 5 6 7 8 9 10 11 12 13 . 14 15 16 17 18 19 20 21 69 PE 1/1/2013 WSDOT 50 50 50 06 P 0.48 C RW 2/1/2013 WSDOT 25 25 25 CE 88th Avenue 12 T CN 6/1/2013 WSDOT 320 10 330 330 Yes 13 G from: Tieton Drive to: Summitview Ave Construct curb, gutter, sidewalk and stormwater runoff treatment on the east • side of 88th. • Totals 395 10 405 405 • 70 ALL 3/10/20121 CMAQ 1961 f I I 251 2211 221 I I CE 23 S N/A ( f Sunday Bus Service No • from: to: Demonstration project to provide limned fixed -route transit services on • _ Sundays. • Totals 196 . 25 221 221 • PE 1/1/2012 STP(U) 200 • 32 232 232 16 71 03 P 1.0 W CN 1/1/2013 STP(U) 1600 249 1849 ' 1849 ' CE 64th Ave. Roadway Widening 04 G Yes 06 P T from: Washington Ave to: Nob Hill Blvd Widen roadway, curb, gutter, sidewalks, lighting and drainage ' 1/1/2013 C • Totals • • 1,800 • 281 2081 232 1849 00 72 07 P N/A W CN 1 6/1/2012 ( STP(U) I 2281 1 1 321 2601 2601 Various Overlay Projects/Selected on Local Priority S EA N/A No • from: N/A to: N/A Totals 228 32 260 260 ' i 40 Report Date: M011 v 5 - Supersedes re editions - . Page 18 es p . • . . • . • • . • . . . • • .. .. • .. . . . • . . • . • .. :. • . . . . • . . . . • . . 4i. .. , . . . . .. . . . • it • • Washington State Department of Transportation . Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.:. 1485 MPO /RTPO: YVCOG Amend Date:. Resolution No.: Project Identification . Project Costs in Thousands of Dollars Federally Funded m A. PIN /Federal Aid No. B. Bridge c „ Expenditure Schedule Pro • c '• a`� e No m E. � u, Fund Source Information p Projects Only to B m . o E C. Project Title m 3 . Federal Funding (Local Agency) . . • Z D. Street/Road Name or Number o , =° 2 2: a RAN o o • a aF y o = , Phase Federal Federal State 4th Required E . Beginning MP or Road - Ending MP or R I 5 °' Start Fund Cost by Fund State Local Total Envir. Date . F. Describe Work to be Done a ` Code Phase Code F F F 1 st 2nd 3rd 6th Type (MM/Yy) 1 2 3 . 4 5 6 7 8 9. 10 11 12 13 14 15 16 17 18 19 20 21 • PE 1/1/2013 50 50 50 00 73 07 P N/A S CN 6/1/2013 240 240 240 CE Gravel Road B.S.T. .. • No Various Areas . ' from: City Wide to: • . • ' • Totals 290 290 290 PE 1/1/2012 1001 100 1 EA . 1 00 74. 32 P N/A • . Storm Drains/Vegetation No Local Selection . from: City Wide to: . ' City Wide . - . Totals no 100 loo 5 CN 6/1/2012 1 75 751 25 25 251 CE 00 75 G • 07 P City wide Alleys . P • S • No. from: . to: W Pave alleys throughout the city. . T • Totals 75 75 25 . 25 25 PE 4/1/2013 5309(Bus) 800 200 10001 1000 76 • 23 P N/A - S Westside Transit Center (property acquisition) • Yes • from: N/A to: N/A . Construct a West Side Transit Center (Park 8 Ride Facility) ' . Totals 800 200 1000 1000 Report Date? May zs, 2011 • Page 19 • v. 5.7 - Supersedes previous editions • • • • • tee. Washington State Department of Transportation Six Year Transportation Improvement Program - Agge en ncy: Yakima From 2012 to ZO17 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification • Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. _ m a Fund Source Information Expenditure Schedule Projects Only c u m 0) v 1 Y 0 m :o E C Project Title > m � ' r (Local Agency) Federal Funding g y RAN i U ti Z D. St Name or Number n r T to a a Phase . Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E 1- . D ° Start Fund • Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd bin Type (MM/YY) 1 2 3 . 4 5 6 7 8 9 10 11 '12 13 14 15 16 17 18 • 19 20 21 77 23 P ALL 1/1/2012 5316 200 48 248 2481 I I CE Transit Operating Hours Expansion from: to: Expand Transit Operating Hours an hour later into the evening except for - one route that will be expanded an hour earlier Totals 200 48 ' 248' 248 78 6 : 23 P ALL 1/1/20121 5307 288 2881 288 CE • pTerrace Heights Moxee Route Expansion - • from: to: Expand route service to Terrace Heights and Moxee - • Totals 288 288 288 • • 79 23 P ALL 1/1/2012 5316 264 1 264 5281 5 Ellensburg- Yakima Commuter Bus CE from: to: - Expand Route Service to the city of Ellensburg . Totals 264 264 528 528 80 ALL 1/1/2012 5316 49 12 611 61 23 P . Selah - Military Training Center Commuter Bus • from: to: Expand route service to the military training center near Selah - - - Totals 49 • 12 61 61 • • Report Date: Ma o1 v. 5.7 - Su ersees ree p 1 •P 20 d editions P p . • . • . • Adak . Fiji Washington State De of Transportation • Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. • - Hearing Date: Adoption Date: City No.: 1:1485 MPO /RTPO: YVCG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B . Bridge No. c Expenditure X enditure Schedule ` Fir rn u, Fund Source Information P Projects Only o m 'o E C. Project Titl ° (Local Agency) ; , > ` L Federal Funding . . RAN c U n ` D D. Street/Road Name or Number 8 T p a aI ti o = t Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E f- . Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a ` Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM'yy) 1 2 3 - 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 81 06 P 14 C ALL 1/1/20121 STP(U) 8650 1 1350 10000 100 1001 4900 4900 CE North,lst Street Revitalization - 1 G No P . from: MLK BLVD to: SR 12 T Totals 8,650 1350 10000 100 100 4900' 4900 ALL 1/1/2012 STP(U) 1 1040 1 1601 12001 1001 4001 7001 CE 16 82 • 03 P 0.2 Tieton Drive & 64th Ave. l/S 05 G Yes • 12 • s W • from: Tieton Drive to: 64th Avenue O P 01/12 • T Totals 1,040 •160 1200 100 400 700 • • • • • • Report Dater May 26, 2011 Page 21 v. 5.7 - Supersedes previous editions • • BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT /0 Item No. For Meeting of June 21, 2011 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -year Transportation Improvement Program for the years 2012 to 2017, and to amend the Metropolitan Transportation Plan; and, B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to Incorporate the Adopted Six -Year Transportation Improvement Program SUBMITTED BY: Joan Davenport, Acting Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer, 576 -6678. SUMMARY EXPLANATION: Attached is the 2012 — 2017 Six -year TIP, along with an explanation sheet that describes the information contained . on the various columns of the Six -year TIP. One transit and two • transportation projects have been added to the six -year TIP. The projects are: • #80 Selah- Military Training Center Commuter Bus • #81 North First Street Revitalization • #82 Tieton Dr. and 64 Ave. Intersection Improvements Continued on Page Two Resolution X Ordinance Contract Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL: City Manager .. STAFF RECOMMENDATION: 1. Hold the Public Hearing to consider adoption of Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2. Adopt the Six -Year TIP and amend the Metropolitan Transportation Plan and Yakima Urban Area Comprehensive Plan Capital Facilities Element. BOARD /COMMISSION /COMMITTEE RECOMMENDATION: • COUNCIL ACTION: Page Two Projects that that have been removed from the 2011 — 2016 TIP as they were completed or the funds were obligated include: • #3 William O. Douglas Heritage Trails • #7 S. 16 Avenue and W. Washington Avenue Signal and Intersection • #8 66 Avenue and Summitview Avenue Intersection • #9 Coolidge Road Widening and Paving Council and the public are welcome to add other arterial system projects to the list. The six -year TIP project listing will be finalized at the June 21 hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas.. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. The current plan for 2012 — 2017 includes nine projects that are funded. Funding for the remainder of the projects will continue to be sought. Six -year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21S Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA -LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning • process at all levels. Local Agencies are required to develop and adopt a six -year transportation program. All local agencies are required to hold at least one public hearing during the development of the six -year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six -year TIP for 2012 to 2017. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as. required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. • . H • • • 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority - resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. • Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 pop.) Urban (Over 5000 pop.) • 01 - Interstate 11- Interstate 02 - Principal Arterials • 12- Freeways & Expressways 06 - Minor Arterials 14- Other Principal Arterials 07 - Major Collector 16- Minor Arterial 08 - Minor Collector 17- Collector 09 - Local Access 19- Local Access 1. Priority Numbers.. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. Description 01- New construction on 07 - Resurfacing 14 - Bridge Program - Special new alignment 08 - New Bridge Construction 21 - Transit Capital Project 02- Relocation 09- Bridge Replacement 22- Transit Operational Project 03- Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning 04- Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin. • 05- Minor Widening 12 = Safety /Traffic Operation /TSM 31= Non Capital Improvement 06- Other Enhancements 13 Environmentally Related 32 - Non Motor Vehicle Project • 25 • • • 5. Funding Status. Enter the funding status for the entire project which describes the current status. • S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV G - Gas O - Other P - Power S - Sewer (other than agency- owned) T - Telephone W _ Water • • 8. Project Phase. Select the appropriate phase code of the project. PE . Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month /day /year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ- - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 • 410 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program SCP - Small City Program AIP - Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP Too" program.) 16 -19: Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be • required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required "for Federally funded projects only.) • 27