HomeMy WebLinkAbout06/21/2011 10 Six-Year TIP for 2012 to 2017; MTP Ammendment; Yakima UAC Plan BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT /0 Item No. For Meeting of June 21, 2011 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -year Transportation Improvement Program for the years 2012 to 2017, and to amend the Metropolitan Transportation Plan; and, B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to Incorporate the Adopted Six -Year Transportation Improvement Program SUBMITTED BY: Joan Davenport, Acting Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer, 576 -6678. SUMMARY EXPLANATION: Attached is the 2012 — 2017 Six -year TIP, along with an explanation sheet that describes the information contained . on the various columns of the Six -year TIP. One transit and two • transportation projects have been added to the six -year TIP. The projects are: • #80 Selah- Military Training Center Commuter Bus • #81 North First Street Revitalization • #82 Tieton Dr. and 64 Ave. Intersection Improvements Continued on Page Two Resolution X Ordinance Contract Other (Specify) Six -Year TIP Funding Source APPROVED FOR SUBMITTAL: City Manager .. STAFF RECOMMENDATION: 1. Hold the Public Hearing to consider adoption of Resolution approving the Six -year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2. Adopt the Six -Year TIP and amend the Metropolitan Transportation Plan and Yakima Urban Area Comprehensive Plan Capital Facilities Element. BOARD /COMMISSION /COMMITTEE RECOMMENDATION: • COUNCIL ACTION: Page Two Projects that that have been removed from the 2011 — 2016 TIP as they were completed or the funds were obligated include: • #3 William O. Douglas Heritage Trails • #7 S. 16 Avenue and W. Washington Avenue Signal and Intersection • #8 66 Avenue and Summitview Avenue Intersection • #9 Coolidge Road Widening and Paving Council and the public are welcome to add other arterial system projects to the list. The six -year TIP project listing will be finalized at the June 21 hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas.. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. The current plan for 2012 — 2017 includes nine projects that are funded. Funding for the remainder of the projects will continue to be sought. Six -year Transportation Improvement Program (TIP) Background On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA -LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21S Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA -LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by the State of Washington for approved State funding agencies. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning • process at all levels. Local Agencies are required to develop and adopt a six -year transportation program. All local agencies are required to hold at least one public hearing during the development of the six -year transportation program. Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated with other project needs and the total list will be reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted six -year TIP for 2012 to 2017. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as. required. The amendment is limited to incorporate only those projects that adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. • . H • • • 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority - resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. • Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 pop.) Urban (Over 5000 pop.) • 01 - Interstate 11- Interstate 02 - Principal Arterials • 12- Freeways & Expressways 06 - Minor Arterials 14- Other Principal Arterials 07 - Major Collector 16- Minor Arterial 08 - Minor Collector 17- Collector 09 - Local Access 19- Local Access 1. Priority Numbers.. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street /Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. Description 01- New construction on 07 - Resurfacing 14 - Bridge Program - Special new alignment 08 - New Bridge Construction 21 - Transit Capital Project 02- Relocation 09- Bridge Replacement 22- Transit Operational Project 03- Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning 04- Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin. • 05- Minor Widening 12 = Safety /Traffic Operation /TSM 31= Non Capital Improvement 06- Other Enhancements 13 Environmentally Related 32 - Non Motor Vehicle Project • 25 • • • 5. Funding Status. Enter the funding status for the entire project which describes the current status. • S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV G - Gas O - Other P - Power S - Sewer (other than agency- owned) T - Telephone W _ Water • • 8. Project Phase. Select the appropriate phase code of the project. PE . Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month /day /year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ- - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 • 410 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program SCP - Small City Program AIP - Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP Too" program.) 16 -19: Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be • required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required "for Federally funded projects only.) • 27 RESOLUTION NO. R — 2011 S . A RESOLUTION adopting the Six -Year Transportation Improvement Program for the period of 2012 through 2017 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the . Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at the regular meeting of the Yakima City Council on June 7, 2011 and June 21, 2011, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2012 through 2017 for the construction of streets and arterial streets in the. City of Yakima, now, • therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2012 through 2017, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 21 day of June, 2011. Micah D. Cawley, Mayor ATTEST: . City Clerk . • . • RESOLUTION NO. R — 2011 - A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six -year Transportation Improvement Program (TIP) for the period of 2012 through 2017. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year Transportation Improvement Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City . of . Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of. the Six -year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six -year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six -year Transportation Improvement Plan for the period of 2012 to 2017 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, public hearings were held by the Yakima City Council on the Six -year TIP on June 7, 2011 and June 21, 2011, with proper public notice as required by RCW 35.77.010; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six -Year Transportation Improvement Program for the period of 2012 through 2017 for the City of Yakima shall be incorporated as an amendment to the Capital facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 21s day of June, 2011. Micah D. Cawley, Mayor . ATTEST: City Clerk . • 0 0 • , :. • • • Washington State Department of Transportation . Six Year Transportation Improvement Program • • Agency: Yakima • From 2012 to 2017 . Co. No.: 39 • Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPOIRTPO: YVCOG • Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. E Expenditure Schedule ` s m - • C. Project Title a ` _ cI c Fund Sou Information (Local Agency) Projects Only '7 m - . o E , a r 7 L Federal Funding v n`. Z D. Street/Road Name or Number ° n . a R/W LL a► - co is = t Phase Federal Federal State 4th • Required E. Beginning MP or Road - Ending MP or Road E r °' Start Fund Cost by Fund State Local • Total Envir. Date F. Describe Work to be Done a Code Phas Code Funds Funds Funds 1st 2nd 3 rd bin Type (Mtn y) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 . 18 19 20 21 • 14 1 CN 4/1/2012 STP(U) 798 FMSIB • 3500 2200 6498 3000 3498 • 0 P p ,2 T CN 4/1/2012 DEMO . AIP 6000 • 8582 3000 5582 • EA • Yakima Railroad Grade Separations- Phase 3 06 • P Yes • Martin Luther King, Jr. Blvd 07 O - from: N. 1st Sreet to: N. 1st Ave Construct Grade Separation and adjacent roadway reconstruction including 08 • 9/1/2009 Front Street Totals • 3,380 9500 2200 '15080 6000 • 9080 00 2 12 S ALL 1/1/2012 5307 19001 . 1900 38001 3800 I CE N/A Transit Operating Expenditures 22 No Various fixed Tales and locations . 23 , from: N/A - to: N/A 24 Annual operating assistance from the FTA in support of our transit system; 31 - • - . fixed conte, paratransit Dial -A -Ride and vanpool program • • Totals 1,900 1900 3800 3800 - RW 1/1/2012. STP(U) 86 14 • 100 100 . 16 3 • • 04 S 0.5 W CN 3/1/2013 • STP(U) 749 - 176 925 925 EA - . 64th Ave. Roadway Widening. 06 G YES • . 03 . T • from: Nob Hill Blvd to: Tieton Drive. T . Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 4/1/2011 Totals ' • 835 190 1025 100 925 00 4' 32 S 1.5 G CN 1/1/2012 250 . 1 2501 250 1 Powerhouse/William 0 Douglas Trail Connector • P CE T No • • from: Powerhouse/Williow St. to: 6th Ave /I Street C Paved pathway - - o • • Totals. • 250 250 • ' 250 • • • • Report Date: May 26, 201-1 Page 1 v. 5.7 - Supersedes previous editions • • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 . Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded m c A. PIN /Federal Aid No. B. Bridge No. c « m .. Expenditure Schedule Pro N xu_, 03 a e, • Fund Source Information p jects Only 4 CD . o C. Project Title a m ci Federal Funding (Local Agency) ) g o > D. Street/Road Name or Number 8 .=° . d . a RlV11 ri 8.1-- co o = g Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E • h d Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done • o_ Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/VY 1 2 3 4 5 6 7 8 9 10 11 12 13 • 14 15 16 17 18 19 20 21 • 00 5 22 S ALL 1/1/2012 5309(Bus) I 309 77 386 386 CE N/A Street Asset Amenities (Transit) 31 No • Route Maintenance, Repair and Improvements r , from: N/A ' to: N/A - On going improvements to bus benches, shelters and signage infrastructure - Totals ' 309 77 386 386 • RW 1/1/2013 STP(U) 173 27 200 200 14 6 31 P N/A O CN 4/1/2014 STP(U) 865 135 1000 1000 CE E Nob Hill Blvd &Fair Ave 03 C • E Nob Hill Blvd 04 P Yes from: E Nob Hill Blvd to: Fair Ave • T Intersection widening & new signal, curb, gutter and sidewalk, street lighting, W - - 4/1/2001 stormwater • Totals 1,038 162 1200 1200 ALL 1/1/2012 5316 190 1901 3801 380 I 00 7 22 S N/A Terrace Heights Service - No New University & Retail Links . from: N/A to: N/A Extension of fixed route bus service only into the Terrace Heights area of . Yakima County , • Totals 190 • 190 380 380 8 05 P C CN 4/1/20121 1 • AIP 2700 4211 312P1 3121 I CE 0.97 • • Nob Hill Blvd • 06 P No 07 T from: 49th Avenue to: 64th Avenue 12 G • Widen, curb, gutter, sidewalk, lighting, drainage, gnnd and overlay full width 13 O • • Totals 2700 421 3121 3121 Re ort Date: M 011 • Pa9e 2 V. 5 - Supersedes pre editions P r P P • . . . • • . • .- - - • . . , . . 0 • • • • . • . • . • . . • • . . • . • . . . . . . . . . • • . . . . • . . • • . • . • • . . . . . . • . • • • . . . . • • Washington State Department of Transportation -" Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co, Name: Yakima Co. ' • . Hearing Date: Adoption Date: • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: ' Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c d Expenditure Schedule � a. d e, , Fund Source Information P Projects Only • B N A' ; C. Project Title m = ,° •o m (Local'Agency) . .0 m , E'. ti a O Federal Funding R/W v 6:2 ' D. Street/Road Name or Number nl- N c i - Phase Federal Federal State 4th Required ' tL E. Beginning MP or Road - Ending MP or Road E 12 d Start Fund Cost by Fund State Locai Total Envir. • Date • F. Describe Work to be Done a Cod Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 '21 00 9 21 S ALL 1/15/2013 I OTHER 144 36 180 1801 N/A • CE Acquisition of new Dial -A -Ride paratransit vehicles No from: N/A to: N/A . Purchase new vehicles to replace older, less reliable units Totals 144 36 180 180 ' PE 1/1/2012 STP(U) 173 27 200 200 14 10 • 03 P • N/A RW 1/1/2012 . STP(U) 433 67 500 500 CE E. Lincoln & 10th Street Roundabout 05 CN 6/1/2012 STP(U) 1125 175 1300 1300 Yes 06 . from: E. Lincoln to: E. MLK Jr. Blvd. • . • Roundabout construction at intersection curb, gutter, sidewalk, 8 street 6/1/2011 lighting ' Totals 1,731- 27 242 2000 200 1800 • ALL 1/1/2012 STP(U) 865. 135 10001 1000 • 12 11 • 03 P N/A O CE . 1 S.R.12 & 16th - Avenue Interchange 06 'No Interchange . - from: 16th Avenue to: S.R. 12 . Upgrade Interchange by constructing a Roundabout Totals 865 135 1000 1000 ' 11 12 01 P N/A O ALL 1/1/2012 STP(U) 865 135 10001 1000 I EA. 1 -82 & Lincoln Avenue Interchange P • , ' Yes 1 - 82 Interchange G . from: E. "G" Street to: 1 -82 . . Reconstruct / extend off-ramp from existing 1 -82 off -ramp for Lincoln Avenue 6/2011 • . to E. 'G' Street Totals • - 865 135 1000 1000 • • Report Date: May 26, 2011 Page 3 -v. 5.7 - Supersedes previous editions • • • .1111111■ v T Washington State Department of Transportation Six fear Transportation Improvement Program Agency: Yakima From 2012. to 2017 • Co. No.: 39 Co. Name: Yakima Co. • • Hearing Date: Adoption Date: City No.: i1485. MPO /RTPO: YVCOG Amend Date: " Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded c A. PIN /Federal Afd No. B. Bridge No. Fund Source Informati Expenditure Schedule Projects Only • o m ' E C. Project Title E ,n a c o in (Local Agency) - C. ; ar U L Federal Funding 9 Yj U a` 2 D. Street/Road Name or Number a� y :° Phase Federal Federal State Require d t ` E. Beginning MP or Road - Ending MP or Road E r ° Start Fund Cost b Fund State Local Total 4th Envir. Date y Funds Funds Funds 1st 2nd 3rd Thru T F. Describe Work to be Done a. Code Phase Code 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 13 12 P N/A ' ALL 1/1/2013 STP(U) I 865 135 1000 I 10001 I CE E. Yakima Avenue "& Fair Avenue Signalization " W No T from: E. Yakima Avenue - to: Fair Avenue S Construct Traffic Signal Totals • 865 135 1000 1000 ' 00 14 22 $ ALL 1/2/2012 5316 • 130 1301- 2601 260 I - • Fixed route Bus Services to Moxee along SR 24 Corridor CE SR 24 Hwy Corridor /Park & Ride Lots No from: to: - - JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at two Park 8 Rlde lots along SR 24. • • Totals 130 130 260 260 PE 4/1/2012 13 13 13 16 15 12 P N/A P CN 6/1/2012 214 214 214 CE S 3rd Ave & W Washington Ave Signal T No • S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades Totals 227 227 227 . 14 16 4579 12 P N/A P PE 6/1/20121 STP(U) 252 38 2901 290 EA S 1st St. - E. Washington Ave. Intersection Improvement W Yes S 1st St. S from: S 1st St. to: E Washington Ave. " T Realign intersection, upgrade traffic signal 01/01/11 • Totals 252 38 290 290 • Re port Date: M 11 v. 5.7 - Supersedes pre editions P •ae4 " . ' ' . . • . • • Wash Stat Department of Transportation. Six Year Transportation Improvement Program • Agency: Yakima From 2012 to 2017 . Co. No.: 39 •Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: .1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A . PIN /Federal Aid No. B.. Bridge a No. d Fund Source Information P Projects Only Expenditure Schedule • p, �. m , • : o ti C. Project Title . e = . 3 a `m e d (Local Agency) `o E i > :° t • Federal Funding RNV c� a z D. Street/Road Name or Number 8.1- N :: Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E t 5 ° Start Fund Cost by Fund State Local Total Thru Envir. Date P Code Pha Code F F F 1st 2nd 3rd T ype (M F. Descr Work to be Done ' a 6th 1 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 • 20 21 17 17 4587 03 ' P P ALL 4/1/2013 STP 2268 307 • 2575 525 2050 1.o0 EA S 48th Ave. Reconstruction T Yes S 48th Avenue W • from: Surnmitview Ave. - to: Nob Hill Blvd. S ' Widen, curb, gutter, sidewalk, lighting, drainage . . O 4/1/2014 Totals 2,268 307 2575 525 2050 • PE • 1/1/2013 STP(U) • 51 8 59 59 14 18 03 P N/A O CN 6/1/2013 STP(U) 383 61 444 444 CE South 72nd Ave & Mead Ave Intersection . , 12 P • . • Yes South 72nd Ave ' S . . from: South 72nd Ave to: Mead Ave . T . New intersection, signals, curb, gutter and sidewalk . W 6/10/2010 • • Totals 434 69 • 503 503 - 4562 ALL 4/4/2013 STP(U) 378 WSDOT 378 7561 756 16 19 12 P N/A w ' CE Tieton Dr- S 5th Ave. Intersection Project Yes . Tieton Drive T . from: 5th Ave. Intersection to: O Replace traffic signal with roundabout S 4/1/2014 Totals 378 378 756 756 ' PE 1/1/2012 STP(U) 303 47 350 350 • 16 20 01 P 1.1 0 RW 1/1/2014 STP(U) 303 47 350 350 CE • E. 'H" St. Extension ., • 08 P CN 6/1/2014 STP(U) 1730 270 • 2000 2000 Yes E. "H" St.. . from: 1st St. to: Yakima River . T ' Construct road including water, sewer, curb, gutter and sidewalk for future W 1/1/2014 • development. ' • • . . Totals 2,336 • 364 2700 350 350 2000 • • Report Dater May 26, 2011 Page 5 • v. 5.7 - Supersedes previous editions • it • • • • Washington State Department of Transportation Six Year Transportation Improvement Progr Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: .City No.: 1485 MPO /RTPO: YVCOG Amend Date:. Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded T A. PIN /Federal Aid No. B. Bridge No. ' c a Expenditure Schedule N .. ` m o , v a Fund Source Information P Projects Only o N C . Project Title E .' , � c (Local Agency) m o E d 3 U Federal Funding R/VV tc c.> a Z D. Street/Road Name or Number o a is a 6.1- u) o — Federal Federal State . 4th Required E. Beginning MP or Road - Ending MP or Road E 1 — S o Phase Start Fund Cost by Fund State Local Total- Th Envir. Date F Funds Funds 1st 2nd 3rd,' Type F. Describe Work to be Done a Code Phase , Code 6th ' Yp (Mh • . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ' 21 17 21 PE 1/1/2013 STP(U) 700 108 808 808 01 P 1.3 O RW 1/1/2014 STP(U) 5500 850 6350 6350 CE N. 10th St. Extension 06 P CN 6/1/2014 STP(U) 7900 972 8872 8872 Yes • N. 10th St. S , from: R St. • to: 10th Street - Lincoln Ave. T Construct road including water, sewer, curb, gutter, sidewalk for future W 1/1/2013 • • development. • Totals 14,100 1930 16030 • 808 15222 . 00 22 PE 1/1/2012 5309(NS) 1 1600 400 20001 I 20001 I 23 P N/A CE • West Valley Transit Center No Acquire Property to Expand Operations • • from: N/A to: N/A Locate and acquire property for the placement of a West Side Transit Center Operation - - - Totals • 1,600 400 2000 2000 • PE 1/1/2013 OTHER 500 500 500 17 23 06 P .60 P CN 4/1/2014 Yakima Downtown Future Initiatives, Phase 5 • 12 W OTHER 5500 5500 5500 CE S • No • from: 1st Street to: 9th Street • T Install Historic Lighting, Sidewalk Modification & Other Improvements. - • Exact improvement area(s) to be determined. Totals 6000 6000 500 5500 • PE 1/1/2012 STIP (S) 60 60 120 120 • 00 • 24 01 P N/A CN 4/1/2013 STP(S) 180 AIP 240 420 420 CE Annual Signal Upgrades CN 4/1/2013 STIP (S) 360 360 360 NO Local Selection from: N/A . ' to: N/A • Upgrade signals _ Totals 600 240 60 900 120 780 • Report Date: Mill) 1 v. 5.7 - Su ersedes re editions •aOe6 p p • 0 . . 0 • . ' • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date:' • • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification . Project Costs in Thousands of Dollars Federally Funded m • A. PIN /Federal Aid No B Brid No c m Expenditure Schedule N c a � m _, rn � � Fun Source Information p Projects Only 4 : o C. Project Title m " 3 ; o m (Local Agency) '� _ , a t Federal Funding R/V/ v a Z , D . Street/Road Name or Number ° ° r - .4 . a LL • - E. Beginning NIP or Road - Ending MP or Road E ~ rn ° 0 Start F Fund I Cost by Federal Funtd 4th Required Date State Local. Total Envir. F. Describe Work to be Done a te ` Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type whyyy) 1 . 2 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2012 STP(U) 100 14 114 114 . 19 25 . 03 P N/A P CN 3/1/2013 STP(U) 700 95 795 ' 795 CE Longfiber Rd & Washington Ave 05 S - . • Intersection 06 W Yes ' from to: T New intersection construction and reconstruction, 3 -lane and 5 -lane w /tum, • . , 3/1/2012 curb, gutter, sidewalks. . • Totals . • 800 109 909 114 795 . . 14. 26 04 P 1 C CN 1 4/1/2013 STP(U) I 2401 I 421 ' 2821 II 282 I I CE E Nob Hill Blvd & S 18th St 01 S J E Nob Hill Blvd W Yes from: •S 18th St to: E Nob Hill Blvd T . • Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT 01/01/07 ' Project) possible curb, gutter and sidewalk - , • ' Totals 240 42 282 282 • PE 1/1/2012 STP(E) 22 7 29 29 • 17 27 05 P ,15 • C CN 6/1/2012 . STP(E) 75 20 95 95 CE • Zier Rd - S 75th Ave to S 72nd Ave 06 S Yes Zier Rd T from: S 75th Ave to: S 72nd Ave P Minor widening, curb, gutter and sidewalk . 6/1!2011 • ' Totals 97 27 124 124 • T CN 10/1/2013 STP(S) 504 74 5781 578 CE • 16 28 12 P N/A . Powerhouse Rd & Englewood Ave P Yes Powerhouse Rd • 0 from: Powerhouse Rd to: Englewood Ave S • Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, W 1 • possible roundabout . Totals 504 74 578 • 578 • • • Report Date: May 26, 2011 Page 7 v. 5.7 - Supersedes previous editions • • • • Washington State Department of Transportation Six Year Transportation Improvement Program • Agency: Yakima From 2012 to • 2017 . Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG • - Amend.Date: Resolution No.: • Project Identification • Project Costs in Thousands of Dollars Federally Funded tai c A. PIN /Federal Aid No, B. Bridge No. m rn a m Fund Source Information Expenditure Schedule ' Projects Only g m ' o E C. Project Title E m m (Local Agency) •-, _ . I ; r u t Federal Funding RAN c v ti Z D. Street/Road Name or Number c 1- rn 5 .Z• , Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r ° - 5 • ° Start Fund Cost by Fund State Local Total Envir. Date y Funds Funds Funds 1st 2nd 3rd, 6th T ype (ngnvyy) a F. Describe Work to be Done Code Phase Code' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 .16 17 18 19 20 21 PE 1/1/2013 STP(S) 25 4 29 29 14 29 12 P N/A P RW 6/1/2013 STP(S) 25 . 4 29 29 CE S 48th Ave & SummitviewAve Signalization T CN 8/1/2014 STP(S) 554 81 • 635 635 • Yes S 48th Ave ' • irom: S 48th Ave . to: Summitview Ave ( Signalization • 8/1/2013 • Totals 604 89 693 58 635 . • • PE 1/1/2013 STP(E) 424 67 491 491 14 30 01 P .5 W RW 1/1/2014 STP(E) 1047 163 1210 1210 CE W Lincoln Ave & 'B' St Realignment 12 T CN 1/1/2015 . , STP(E) 1801 281 2082 2082 Yes W Lincoln Ave . from: W 5th Ave to: Custer St P Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 1/1/2014 G . • C Totals' 3,272 • 511' 3783 491 1210 2082 16 31 12 P N/A W I I I I I I I I I I CE - . School Safety Projects No Various Locations - Citywide ' • from: to: Crossing flashers, sidewalks, signing, other features . - Totals • PE 1/1/2013. STP(C) 546 • 84' 630 630 • 14 32 03 P .85 C RW 1/1/2014 STP(C) 1090 170 1260 1260 EA • E Nob Hill Blvd. Reconstruction 04 C CN 1/1/2015 STP(C) 6539 1013 7552. 7552 Yes E Nob Hill Blvd. 06 from:.S 6th Street to: S 18th Street • P Major roadway widening and reconstruction to 5 lanes with intersection S • 1 /1/2014 • improvements, curb, gutter, sidewalks, replacement or relocation of meters T an hydrants W Totals 8,175 1267 9442 630 1260 7552 Report Date: Ma , 011 Page 8 v. 5.7 - Supersedes pre editions • • . • • • • • • . v 7f1 Washington State Department of Transportation • Six Year Transportation Improvement Program Agency: Yakima From 2012 to .2017 Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: - Adoption Date: City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: . Project Identification • Project Costs In Thousands of Dollars Federally Funded • A: PIN /Federal Aid No. B. Bridge No. Expenditure Schedule Projects Only ' • � 9 „^ rn d �, Fund Source Information o N � C. Project Title m lz ; d 3 m (Local Agency) m o E C Pro j > d 2 Federal Funding RAN g v 6: Z D. Street/Road Name or Number o `a 1- N 3 u Phase Federal • Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E t ° - 5 °' Start Fund Cost by Fund State Local Total Thru Envir. Date Code Phas Code F F F 1st 2nd 3rd T (Ainvyy) F. Describe Work to be Done a 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2013 • STP(C) 91 14 105 • 105 • 17 33 • 01 P N/A W RW 1/1/2014 STP(C) 91 14 105 105 CE S 72nd Avenue & W Washington Avenue 12 • S CN 1/1/2015 STP(C) 544 86 630 630 Yes S 72nd Ave . • 06 from: S 72nd Ave to: W Washington Ave P • Intersection Improvement, possible roundabout 1!1/2015 Totals 726 114 840 • 105 105 630 PE 1/1/2013 STP(E) 23 5 28 28 17 34 • . 04 P .76 W CN 7/1/2014 STP(E) . 1096 164 1260 1260 • S 66th Avenue - 03 T Yes S 66th Ave S . from: Scenic Drive to:. Summitview :- Widen roadway, curb, gutter, sidewalk and utilities 7/1/2013 • • • T otals 1,119 169 1288 28 1260 . • • PE 1/1/2014 STP(U) 126 17 143 143 14 35 12 P N/A W RW 1/1/2014 ' STP 63 . 8 71 71 CE 40th Avenue and Summilview Signal Upgrade S CN 6/6/2014 STP(U) 544 86 630 630 Yes' ' 40th Avenue - T from: 40th Avenue to: Summitview . P • • Signal upgrade, radius improvements, turn lane extension 6/1/2014 . Totals 733 111 844 844 PE 1/1/2014 STP • 95 . 13 ' 108 108 14 36 - ' • 12 P N/A W RW 1/1/2015 STP 63 8 71 71 CE 40th Avenue and Englewood . T CN 1/1/2015 STP . 145 20 165 165 Yes • 40th Avenue . • from: 40th Avenue' to: Englewood P . Replace traffic signal poles, upgrade controller - 1/1/2015 . • Totals • 303 41 344 179 165 I . • • Report Date: May 26, 2011 Page.9 v. 5.7 - Supersedes previous editions • • Washington State Department of Transportation Wi it Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 • Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO /RTPO: YVCOG Hearing Date: Adoption Date: • Amend Date: • Resolution No.: Project Identification w Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c a E X enditure Schedule c v, .Z a� m 0, • v F und Source Information Expenditure Projects Only `; 6 m . C. Project Title E i B 3 o r Federal Funding (Coca/ Age v ei: Z D. Street/Road Name or Number o `w B a R/W , E. Beginning MP or Road - Ending MP or Road ' E ~ 1- 0 • o Start Federal I Cost by Funtd 4th Required' State Local Total Thru Envir. F. Describe Work to be Done o. Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type tM� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21- 00 37 PE 1/1/2013 STP - 126 18 144 144 16th Avenue and Fruitvale Blvd 1 P N/A W RW 6/1/2013 STP 63 8 71 71 CE• 16th Avenue S CN 1/1/2014 • STP 315 43 358 358 Yes from: 16th Avenue to: Fruitvale Blvd P )Replace traffic signal poles, radius improvements, ADA ramps 1/1/2013 Totals 504 69 573 215 358 14 38 PE 1/1/2012 STP 32 , 5 37 37 12 P N/A W CN 1/1/2013 STP 126 17 1431 143 CE 1st Street and ! Street T 1st Street S No from: 1st Street to: I Street P ' Replace and upgrade traffic signal equipment • Totals 158 22 180 37 143 16 • PE 6/1/2015 STP(U) 820 189 1009 1009 01 P .25 O RW 1/1/2016 STP(U) •3150 630 3780 3780 CE Washington Ave. Railroad Grade Separation P CN 1/1/2017 STP(U) 6552 1008 7560 Washington Ave. S 7560 Yes from: Longfibre Road to: T Railroad grade overpass including at utilities W 1/1/2017 Totals • 10,522 1827 12349 12349 16 . PE 1/1/2012 STP(U) • 272 43 :315 315 • 01 P 1 .3 C RW 6/1/2013 STP(U) 349 55 • 404 404 CE • Frontage Road & "H" St. Loop G CN 1/1/2015 STP(U) 2352 340 2692 2692 Yes N. 8th St. O from: "Fr St. • to: I -82 P • Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for T 1/1/2015 future development and Terrace Heights connection. - W Totals 2,973 438 3411 315 404 2692 • Report Date: M11 v . 5.7 - S • upersedes' re editions S a9elO p • • III i .i • . . . . . . . . . . . . . . . . . , . . . . . . • . . . . , • . . . . .. . . ,Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 t Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG • . ' Amend Date: Resolution No.: Project-Identification . Project Costs in Thousands of Dollars Federally Funded c A. PIN /Federal Aid No. • B. Bridge No. c Fund Source Information Expenditure Schedule ` Projects Only '. . o m : o E C. Project Titl m . , 8 2 . . Federal Funding (Local Agenc RIVV v . e U D. Street/Road Name or Number 8g., a a Z • a — co 3 _ u Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending "MP or Road E }-- ° Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done n_ Code Phase Code Funds Funds Fund 1st 2nd 3rd 6th Type (MM/� y) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 41 04 P 3 5 C PEI 1/1/2014 STP(U) 120 17 137 137 CE 16th Ave. Corridor • G • 16th Ave. 0 • from: SR -12 ' to: )Nap Ave.Nalley Mall P Widen roadway, curb, gutter, sidewalk, lighting. - S. T W Totals • 120 17 137 137 . 14 42 04 P 3.2 C PE 1/1/2014 STP(U) 120 17 " 1371 ' 137 CE 40th Ave. Corridor 0 40th Ave. G from: SR -12 to: Washington Ave. P S Widen roadway, curb, gutter, sidewalks, lighting. W T Totals • 120 • 17 137 137 PE 1/1/2013 STP(U) 120 . 17 1371 137 14 43 03 P 2.7 C CE Nob Hill Corridor 04 G • Nob Hill O . from: 1 -82 to: S. 16th Ave. P Widen roadway, sidewalk, curb, gutter, lighting S • T . W Totals`. 120 17 137 • • 137 PE 1/1/2014 . STP(U) 120 I • 17 137 1 137 14 44 04 P 2.o C CE S. 1st St/Main St. Comdor G ' S. 1st St./Main St. 0 . . from: Nob Hill Blvd. to: Barker Mill Bridge P • Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, S • • . T lighting. W Totals ' 120 17 137 137 • • Report Date: May 26, 2011 Page 11 v. 5.7 - Supersedes previous editions Washing • • • • • • ton Six Year Tra Improvement Program Agency: Y akima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: Adoption Date: City No.: 1485 MPOlRTPO: YVCOG Amend Date: Resolution No.: . Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN/Federal Ald No. B. Bridge No. c E X enditure Schedule c Z• a� m p, Fund Source Information . P Projects Only 4 N C . Project Title • E e '« c o m (Local Agency) 0 m . o E , c :°. 0 t Federal Funding U ti Z D. Street/Road Name or Number ° a R/W to- rn • B = .6 Phase Federal Federal State 4th Required • LL E. Beginning MP or Road - Ending MP or Road E 2 n . o Start Fund • Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Mrywr 1 2 3 4' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 45 PE 1/1/2013 STP(C) 109 27 136 136 03 P .76 W CN 1/1/2014 STP(C) 945 TPP 945 106 1996. 1996 • CE Reconstruction Rudkin Rd 06 T Rudkin Rd P No • from: E Viola Ave to: Rainier Place S Reconstruct, excavate ballast, top course, curb, gutter, sidewalk . • Partner with City of Union Gap, additional sewer force main • • Totals 1,054 945 133 ' 2132 136 1996 16 46 ' 03 P .76 C CN PE 9/1/2013 4/1/2014 S STP ) 1730 TPP 206 70. 2006 152 2006 CE E Mead Ave Reconstruction 06 G • E Mead Ave 0 No from: Rudkin Rd to: Fair Ave P Partner with City of Union Gap, reconstruct, excavate ballast, top course, S _ Ipurb, gutter, storm, acp T Totals 1,852 229 . 77 2158 .152 2006 • PE 1/1/2013 AIP 131 20 . 151 151 17 • 47 - 04 P 1.3 O RW 1/1/2014 AIP 382 59 441 441 EA S 80th Ave - Tieton Dr to Zier Rd C CN 4/1/2015 AIP 1667 260 1927 1927 Yes S 80th Ave . P ' from: Tieton Dr to: Zier Rd T • Major widening, curb, gutter, sidewalk S 4/1/2015 • Totals 2180 339 2519 151 441 1927 - PE 1/1/2015 STP(C) 272 43 315 315 17 48 05 P 1.0 W RW 6/1/2015 STP(C) 349 55 404 404 EA Englewood Ave - N 40th Ave to N 56th Ave 06 S CN 1/1/2016 STP(C) 2352 340 2692 2692 Yes • Englewood Ave T from: N 40th Ave to: N 56th Ave P Widen roadway, curb, gutter, sidewalk - C 1/1/2013 C • Totals 2,973 438 3411 3411 • • Report Date Ma 011 v. 5.7 - Su ersedes rev s P age 12 p p editions • 0 • • • • • • • • • • • • . Washington State Department of Transportation Six Year T Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 • • Co. Name: Yakima Co. Hearing Date: Adoption Date: • . City No.: 1485 MPOIRTPO: YVCOG . . Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No: c iu e , • Fund Source Information Expenditure Schedule Projects Only s N ° C. Project Title E " rn 0 m (Local Agency) • m ,0 E o r s Fe deral Funding RAN • U a Z D. Street/Road Name or Number • a1- N ° Y a Phase • Federal Federal State 4th Required • E. Beginning MP or Road - Ending MP or Road E 2 m Start Fund Cost by Fund State Local Total Envir, Date . F. Describe Work to be Done a ` Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th T (M 1 2 3 4 5 6 7 8 9 10 11 12 ' 13 14 15 16 17 18 19 20 21 PE 1/1/2014 STP(U) . 219 34 253 253 17 49 05 P 2 O RW 6/1/2014 STP(U) 327 51 378 378 • EA • Englewood Aye.- N 24th Ave to N 16th Ave .. 06 S CN 6/1/2015 STP(U) 2980 244 3224 3224 ' Yes Englewood Ave • • ' from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 6/1/2015 Totals 3,526 , . • 329 3855 631 3224 . • PE .1/1/2014 STP(S) 55 8 63 63 • 14 .50 12 P 2.5 P RW 6 STP(S) 107 19 126 126 CE W Nob Hill Blvd Sidewalks T CN 3/1/2015 STP(S) 321 57 378 378 Yes W Nob Hill Blvd W . • from: S 16th Ave to: S. 6th St. S • Install missing sidewalks on southside of Nob Hill. 3/1/2015 • Totals 483 84 567 189 378 • PE 1/1/2014 STP(S) 57 ' 7 64 64 00 51 06 P 1.0 P RW 6/1/2014 STP(S) 189 25 214 . 214 CE . Beech St Pedestrian Connection 32 T CN 1/1/2015 STP(S) 504 68 572 572 Yes . . Beech St from: Fair Ave to: Chalmers /Riverside • Construct pedestrian pathway under SRe2 to Greenway - 1/1/2015 pl Totals . 100 . 850 278 . 572 • PE 1/1/2014 STP(S) 43 7 50 50 16 52 12 P 2.0 P RW 6/1/2014 STP(S) ' 86 15 • 101 . 101 CE . W Lincoln Ave Sidewalks T CN 1/1/2015 . STP(S) 572 88 660 660 Yes W Lincoln Ave from: N 56th Ave to: N 29th Ave W • Sidewalks, meters and fire hydrants replacement or relocation 1/1/2015 . Totals • io1 . 110 811 151 660 Report Date: May 26, 2011 Page 13 v. 5.7 - Supersedes previous editions • Washington State Department of Transportation • • • • • • • ®„ Si Year Transportation Improvement Program Agency: Yakima From 2012 . to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded w A. PIN /Federal Aid No. ' B. Bridge No. Cr E X enditure Schedule Z^ m s d Ca 13 m Fund Source Information • P Projects Only o N° C. Project Title m" d 2 m T : E m 0 t Federal Funding 0 a Z D. Street/Road Name or Number a 4 . a RNV rn o Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E l— o Start Fund Cost by Fund Stat L T Thru Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/yy) 1 2. 3 4 5 6 7 8 9 10 11 12 13 14 . 15 16 17 18 19 20' 21 14 53 PE 6/1/2014 STP(U) 820 189 1009 1009 Mead Ave. Railroad Grade Separation 01 P .25 W RW 1/1/2015 STP(U) 3150 630 3780 3780 CE ' Mead Ave. S T • CN 1/1/2016 STP(U) 6552 1008 7560 7560 Yes P • from: Presson Place to: Maryland • • Construct railroad overpass including all utilities ° 1/1/2016 . Totals . 10,522 • '1827 12349: 1009 11340 • PE 6/1/2013 STP(U), 252 38 290 290 16 54 • - 01 P 4.0 ' ° RW 1/1/2014 STP(U) . 756 88 ' 844 • 844 CE City wide Pathway Connections P CN 1/1/2015 STP(U) 1890 315 2205 . 2205 Yes Yakima S T from: to: Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, W 1/1/2015 • WOD Trail, Greenway including Naches Rail Spur, signage and amenities Totals 2,898 441 • 3339 290 844 2205 PE 1/1/2014 STP(U) 63 5 68 68 17 55 .' 01 P N/A ° CN 6/1/2014 STP(U) 567 76 643 643 • CE 34th Ave & River Rd Improvements 12 P • Fruitvale Blvd. S No • from: 34th Ave. to: River Rd. T Intersection improvements including lamination, sewer,.water, curb, water W and sidewalks - • Totals 630 • 81 711 711 PE 1/1/2014 STP(U) 218 34 252 252 • 17 56 • 01 P . 1.0 ° RW 6/1/2015 • STP(U) 327 51 378 378 CE Englewood Ave 05 P CN 1/1/2016 ' STP(U) 2980 244 3224 3224 Yes Englewood Ave 12 S from: 24th Ave to: 40th Ave T Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines W . - 1/1/2016 and street lights. _ Totals . 3,525 329 3854 252 3602 • • Report Date: Ma • a 9 e v. 5.7 - S ersedes re editions • p11 P p 14 • • S 0 • • • • Washington State Department of Transportation Six Year Transportatio Improvement .Program • . v71 Agency: Yakima From 2012 to 2017 • Co. No.: • 39 Co. Name: Yakima Co. Hearing Date: . Adoption Date: City No.: 1485 MPOIRTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c Expenditure Schedule 4 y � C Project Title E w m c c Federal Funding Fund Source Information (Local Agency) Projects Only ' . m ' ° L g U li 2 D. Street/Road Name or Number ° ?", 3 ;L• a a at rn o = Phase Federal Federal State 4th Required • E. Beginning MP or Road - Ending MP or Road E . r- o Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done a Code , Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/YY) 1 2 i 3, 4 5 6 7 8 9 10' 11 12 13 14 ' 15 16 17 18 19 20 21 • t PEI 1/1/2015 •STP(U) 120 I 1 171 137 137 14 57 " 01 P 6.0 C • J CE • W. Yakima North/South-Connector to West Valley 04 G • . • Unknown road 06 O • • . from: North - South to: in West Valley P . . • City & County joint project to build /extend roadways. S T W Totals 120 17 137 137 S PE 1'1/1/2014 ( I 1 I 1001 1001 I I 1001 16 58 . 01 P 36 Occidental Road Construction. W P • • • from: 58th Ave. to: 64th Ave. T • Construct roadway . Totals 100 100 100 00 59 . 01 P .27 PE 1/1/2015 + 1 I 1 1 1001 1001 1 1 . too 86th Ave. Road Construction from: Occidental to: Coolidge . Construct roadway ' • i Totals 100 100 100 PE 1/1/2015 STP(E). 18 32 50 50 00 60 03 P N/A G CN 6/1/2015 STP(E) 1900 285 ., 2185 • 2185 EA YVT Railway Rehabilitation & Museum C No • 3rd Ave S • • from: 3rd Ave to: Pine St T . Car Barn, Museum Restoration and Pathway W . P • - Totals 1,918 . 317 2235 2235 . Report Date: May 26,2011 2011 Page 1s v. 5.7 - Supersedes previous editions • • w71 Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to . 2017 • Co. No.: 39 Co: Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO:, . YVCOG • Amend Date: • Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded c �, A. PIN /Federal Aid No. B. Bridge No. C' 2 • Fund Source Informatiori . Expenditure Schedule Projects Only o N C P Title W w c U 2 Local Agency) . 0 m o E I o n 0 o = Federal Funding R/W U ti Z j D. Street/Road Name or Number a F w B z. - Phase Federal Federal State 4th Required � , . E. Beginning MP or Road - Ending MP or Road E r 5 m •Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/YY) 1 2 3 4 5. 6 7 8 .9 10 11 12 13 14 '15 16 17 18 19 20 21 PE 4/1/2013 CMAQ 24 3 27 27 16 61 • 01 P N/A S CN 7/1/2013 CMAQ 480 65 545 545 CE Roadway City Wide Shoulder Improvements No City Wide from: to: ' • City Wide shoulder improvements, PM10 abatement • . Totals- 504 68 572 572 PE 1/1/2014 STP(E) 252 34 286 286 00 62 • 14 P .25 T CN 3/1/2015 STP(E) 3150 412 3562 3562 CE Pedestrian Bridge . 32 P • Pedestrian Bridge . - O , , No from: N 10th St to:' Yakima Greenway . • Construct pedestrian bridge from Gateway area to Yakima Greenway, - _ ` power, handicap accessible, lights . Totals 3,402 446. 3848 286 3562 • PE 1/1/2013 STP(E) 10 2 12 12 00 63 14 P N/A 0 CN 7/1/2013 STP(E) 109 17 126 126 CE William O. Douglas Pathway 32 S No P • from: Pine St to: Cowiche Canyon W • Pathway improvements, connections, and signage to Cowiche Canyon Trail. - • Totals 119 19 138 138 00 64 03 P N/A O CN 6/1/2015 STP(U) 945 126 1071 1071 CE ' YVT Pathway 32 P YVT Railway Corridor. S . No from: to: T . Development pathway in West Valley area including 53rd Ave, Wide Hollow, W • 64th Ave, Ahtanum including all utilities and signage • Totals 1,260 164 1424 1424 • • Report Date: M 11 •Pa9e 16 v. 5.7 - Supersedes pre editions • 0 . ' 0 ' . • • • 4111111. . Washington State Depart tmentofTransportation Six Year Trans Improvement Program Agency: Yakima . From . 2012 to 2017 • Co..No.: 39 Co. Name: Yakima Co. - Hearing Date: . Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded To A. PIN/Federal Aid No. . B. Bridge No. c Expenditure Schedule „� o, v d Fund Source Information P Projects Only • o n ° C. Project Title E 0 c c o m (Local A m o E > ,, t Federal Funding R/W ' g o li Z D. Street/Road Name or Number o ;; 0- u_ E. Beginning MP or Road - Ending MP or Road E ~ ° Z c-, Phase tart Federal I Cost b Federal Fund Phase • 4th Required Date State Local Total Envir. F. Describe Work to be Done n`- Code Phase Code Funds _Funds Funds 1st 2nd 3rd 6th Type (MM/t Y) 1 2• 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2013 ARRA -FHWA 50 50 50 14 65 'r 06 P 2.64 CN 6/1/2013 ARRA -FHWA . 1950 1950 1950 CE Summitview Ave. Grind & Overlay . • 07 No from: 14th Ave to: 56th Ave . Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA • ramps Totals 2,000 2000 2000 PE 1/1/2012 STP(U) 50 . 50 50 17 66 .03 P 0.50 W RW 6/1/2012 STP(U) 86 • 14 100 50 50 CE River Road Improvements 05 F CN 1/1/2013 STP(U) 1168 182 1350 1350 Yes from: 6th Ave to: 16th Ave 06 O Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage 07 T 6/1/2015 • Totals . 1,254 246 1500 100 1400 . CN 1/1/20121 JOBS • I 925+ I I + 925+ 925 CE 14 67 03 P .71 C Nob Hill Blvd and 64th Ave Improvements 05 P No Nob Hill Blvd 07 .T ' from: Nob Hill Blvd to: 64th Ave 12 Widen and re-construct 04th Ave. to 33 -foot width with curb, gutter and 13 • sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter - sidewalk and stormwater runoff treatment on the north side of Nob Hill. Totals • 925 925 925 PE 4/1/2012 BRAG. 50 50 N/A 50 68 P . 10 P .01 ' I I .1 I • . 18th Street Underpass 11 - T No . C . from: Yakima Ave to: 18th Street Repair or replace 18th Street Underpass S Totals 50 50 50 • Report Date: May 26, 2011 • ' Page 17 v. 5.7 - Supersedes previous editions • • Program �"� Washington State'Department of Transportation Six Year Transportation Improvement Pr ®gram • Agency: Yakima . From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded c A. PIN /Federal Aid No. B. Bridge No. m rn N Fund Source Information Expenditure Schedule Projects Only m . E C . Project Title m a = 0 L Federal Funding • (Local Agency) R � • U 6 D. Street/Road Name or Number al- y .2 = a Phase Federal Federal State 4th Required u E. Beginning MP or Road - Ending MP or Road E 1- m Start Fund Cost b Fund State 'Local Tot Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Mjwyy) 1 2 3 4 5 ' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2013 WSDOT 50 50 50 69 06 P ' 0.48 C RW 2/1/2013 WSDOT 25 25 25 CE • 88th Avenue - . 12 T CN 6/1/2013 WSDOT 320 10 330 330 Yes 13 G from: Tieton Drive to: Summitview Ave Construct curb, gutter, sidewalk and stormwater runoff treatment on the east side of 88th. • Totals 395 10 405 405 70 23 S NIA ALL 3/10/20121 CMAQ 196 25 2211 221 ' CE Sunday Bus Service No from: to: Demonstration project to provide limited fixed -route transit services on - . • Sundays. - - Totals 196 25 221 221 - PE 1/1/2012 STP(U) ' 200 - 32 232 232 16 71 03 P 1.0 W CN 1/1/2013 STP(U) 1600 - 249 1849 1849 - CE 64th Ave. Roadway Widening - 04 G Yes 06 • P . from: Washington Ave to: Nob Hill Blvd T O Widen roadway, curb, gutter, sidewalks, lighting and drainage - 1/1/2013 C • Totals - • 1,800. 281 2081 232 1849 - 00 72 07 P N/A W CN 6/1/2012 STP(U) 228 32 2601 2601 1 EA Various Overlay Projects/Selected on Local Priority S No N/A • • - from: N/A to: N/A Totals 228 - 32 260 260 • • Report Date: M�011 • Page 18 v. 5.7 - Supersedes pre editions • 0 • 0 . • 0 . • Washington State Department of Transportation . Six Year Transportation Improvement Program • Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: Adoption Date: City No.:. 1485 - MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification • • - Project Costs in Thousands of Dollars Federally Funded G A. PIN /Federal Aid No. B. Bridge No. m Fund Source Information Expenditure Schedule ,Projects Only s H a C. Project Title m "- in d s m ( Agency) . • • .a ra - E , > a ° - L Federal Funding RAN D. Street/Road Name or Number ' o a .. a c � tl - Q t- co S° _ � Phase Federal Federal State 4th Required u_ E. Beginning MP or Road - Ending MP or Road E 2 5 ° Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done o_ Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th T ype (MM y) 1 2 3 , '. 4 5 6 7 8 9. 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2013 00 73 07 P N/A S CN 6/1/2013 240 240 240 CE Gravel Road B.S.T. No Various Areas from: City Wide to: . . Totals 290 290 290 . PE 1/1/2012 00 74. - 32 P N/A 1 100 loot 1001 1 EA Storm Drains/Vegetation No Local Selection from: City Wide to: . City Wide . Totals 100 100 100 CN 6/1/2012 1 75 751 25 25 • 25 00 75 07 P .5 .G CE City wide Alleys . P No • S from: to: W ' Pave alleys throughout the city. T . ' Totals 75 75 25 . 25 25 • S PE 4/1/2013 5309(Bus) 800 200 . 10001 1000 76 23 P N/A Westside Transit Center (property acquisition) . • Yes • from: N/A to: N/A . ' Construct a West Side Transit Center (Park & Ride Facility) ' _ . Totals - 800 200 1000 1000 • Repoli May 26, zo1 Page 19 v..5.7 - Supersedes previous editions • • • • • Washington State Department of Transportation - Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 . Co. Name: Yakima Co. Hearing Date: . • Adoption Date: City No:: 1485 . MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars A. PIN /Federal Aid No. B. Bridge No. c m Schedule Expenditure Federally Funded • o `m E a H 0 v •i>,' Fun Source Information P Projects Only y • •° C. Project Title „ , W o m (Local Agency) m o E > d _ 0 .. Federal Funding tc U ti Z D. Street/Road Name or Number • o r ; a R/W • LIP- V c — Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r - o Start Fund • Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/Yl� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 _ 21 77 23 P ALL 1/1/2012 5316 2001 1 48 248 2481 I . Transit Operating Hours Expansion CE • from: to: • Expand Transit Operating Hours an hour later into the evening except for one route that will be expanded an hour earlier Totals 200 48 . 248 " 248 • • 78 „ 23 P ALL 1/1/2012 5307 2881 • 2881 288 1 Terrace Heights Moxee Route Expansion CE . from: to: ' • Expand route service to Terrace Heights and Moxee - Totals . 288 - 288 288 • 79 23 P ALL 1/1/2012 5316 264 1 264 5281 528 1 1 GE. E Ellensburg- Yakima Commuter Bus from: to: Expand Route Service to the city of Ellensburg ' Totals 264 264 528 528 . 8 ' 23 P ALL 1/1/2012 5316 49 12 611 61 1 Selah - Military Training Center Commuter Bus from: to: , Expand route service to the military training center near Selah - Totals 49 12 61 61 • Report Date: Ma 011 V. 5.7 - Supersedes reeditions P •P ae20 p p d • • • 0 ' ' • . . • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2012 to 2017 Co. No.: 39 Co. Name: Yakima Co. • Hearing Date: Adoption Date: • City No.: 1;1485 MPO /RTPO: YVCG • Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B . Bridge No. a Expenditure Schedule � ` A m g d o, � � Fund Source Information P Projects Only o h C . Project Title d" y d e m (Local Agency) u m . E 8 m v 2 Federal Funding RNV o U a Z D. St�eet/Road Name or Number aF w o = — Phase Federal . Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E r . 5 ?.. Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a Code Phase Code Funds Funds Funds 1st 2nd 3rd Thru Type (M y) 1 2 3 4 5 6 7 8 9 10 • 11 12 13 14 15 16 17 18 19 20 21 14 81 06 P 14 C ALL + 1 1/1/2012 I STP(U) I 8650 I ' 1350 10000 100 100 I 4900 4900 • North 1st Street Revitalization 12 G CE P No • ' from: MLK BLVD to: SR 12 T . . • Totals . 8,650 . 1350 10000 100 100 4900 4900 ALL 1/1/2012 STP(U) 1040 160 12001 1001 400 700 16 82 03 P 0.2 C. CE • Tieton Drive & 64th Ave. I/S . 05 G Yes 12 • S W from: Tieton Drive to: 64th Avenue O P 01/12 • • • T Totals 1,040 160 1200 100 400 700 • • • • Report Date:' May 26, 20� 1 Page 21 v. 5.7 - Supersedes previou editions • •