HomeMy WebLinkAboutR-2011-079 Railroad Grade Separations, Phase 2 - Lincoln Ave, Agreement Supplement with BERGER/ABAM Engineers, Inc.RESOLUTION NO. R- 2011 -79 A RESOLUTION authorizing the . City Manager to execute an additional (eighth) supplemental agreement with BERGER /ABAM Engineers, Inc., for project administration, inspection and engineering support for the Lincoln Avenue Grade Separation Project. WHEREAS, in July 2000 the City of Yakima issued and advertised a request for qualifications from firms interested in providing consulting services for the design and development of a grade separation railroad project; and WHEREAS, the request for qualifications advertisement described the matter as a multi- phase project that would later include preparation of plans, specifications and estimates and construction project management for the Railroad Grade Separation Project ( "Project "); and WHEREAS, as a result of that request for qualifications process, the City selected and contracted with BERGER /ABAM Engineers, Inc., to provide the said services for the Project; and WHEREAS, additional engineering and consulting services are required for project administration and inspection to construct the Project, as described in the Scope of Work Description included in the Supplemental Agreement; and WHEREAS, it is requested that the City Manager have the authority to execute an additional (eighth) supplemental agreement for additional engineering and consulting services to administer and inspect the Project and to extend the completion date and term of the second contract with BERGER /ABAM Engineers, Inc., through July 31, 2012; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to authorize the City Manager to execute an additional (eighth) supplemental agreement with BERGER /ABAM Engineers, Inc., for additional engineering and consulting services to administer and inspect the Lincoln Avenue Railroad Grade Separation Project and to extend the completion date and term of the contract with BERGER /ABAM Engineers, Inc., through July 31, 2012, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute an additional (eighth) supplemental agreement with BERGER /ABAM Engineers, Inc., for additional engineering and consulting services to administer and inspect the Lincoln Avenue Railroad Grade Separation Project and to extend the completion date and term of the contract with BERGER/ABAM Engineers, Inc., (City Contract No. 2003 -53) through July 31, 2012. The total additional compensation authorized by said supplemental agreement shall not exceed $601,482. The form of said supplemental agreement shall be reviewed and approved by the City Attorney or his designee. ADOPTED BY THE CITY COUNCIL this 7'h day of June, 2011. Micah CawleyoAAayor ATTEST: City Clerk s� OWNER: PROJECT NAME. FEDERALAID NO CITY PROJECT NO HLA PROJECT NO.: CONTRACTOR: o 1_iC,/,JA L CHANGE ORDER NO. '19 City of Yakima DEC L 3 M1 Railroad Grade Separation; Phase 2 - Lincoln Avenue STPX - NCPD- 000S(062) , _ y - CR1818 06106E Apollo, Inc. THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS: ISr $ December 19, 2011 Original Contract Price. $11,169,856.03 Current Contract Price Adjusted by Previous Change Order(s): $15,285,795 69 Change in Contract Price Due to This Change Order: $33,480.00 Adjusted Contract Price Due to This Change Order $15,319,275.69 Original Contract Completion Date: June 3, 2011 Current Contract Completion Date Adjusted by Previous Change Order September 29, 2011 Change in Contract Completion Date Due to This Change Order -0- Additional Days Revised Contract Completion Date: September 29, 2011 CONTRACTOR: Date. L3 UI Apollo, Inc. ENGINEER: Date: BergerAbam OWNER: L' / t Date: Z LZ 1 City Engineer Date: v�C z L/—Z/ ity Manage i 00- 04BMacintosh HD :Users:dmayol:Documents:MicrosoR User Data:Saved Attachments: 121911 CHANGE ORDER 19(1).x1sx December 19, 2011 City of Yakima Railroad Grade Separation - Phase 2 - Lincoln Avenue STPX - NCPD- OOOS(062) HLA Project No.: 06106E CHANGE ORDER NO. 19 ITEM NO. I DESCRIPTION UNIT QTY UNIT PRICE AMOUNT New Item 19 -1 Remobilize Equipment LS 1 $15,810.00 $15,810.00 19 -2 Site Work FA Est. $8,000.00 $8,000.00 19 -3 Trailer Cost LS 1 $3,38000 $3,380.00 19-4 Traffic Control Supervisor LS 1 $6,29000 $6,29000 CHANGE ORDER NO. 19 TOTAL $33,480.00 Reason for Chan-ge Order: Winter Susoension Due to the revised bottom seal work by change order the project duration was extended. This pushed critical path weather sensitive work such as shotcrete fascia, HMA Paving and Striping into winter months. HMA paving materials will not be available until March or April of 2012. The project will be suspended during January and February of,2012. This change compensates the Contractor for remobilizing of necessary equipment to complete the work after suspension, any cost for needed site work by the Contractor as directed by the Engineer, cost forjob trailers during the suspension and costs for necessary inspections of traffic control devices and signage. Remobilize Equipment— Lumo Sum The Contractor will remove all equipment currently on site during the suspension period. The agreed lump sum price of $15,810.00 includes the cost to remobilize all necessary equipment to complete the work after a resume work order is issued in March or April of 2012. The lump sum price includes all labor, equipment and materials to transport all equipment to and from the location where the equipment is stored. No further compensation will be allowed. Site Work — Force Account This item will compensate the Contractor for any site visits and or work that may be required to maintain the project site and or repairs as requested by the Engineer. The Contractor will be compensated in accordance with Section 1 -09.6 of the WSDOT Standard Specifications, Force Account. Trailer Cost The agreed Lump Sum price of $3,380.00 includes all labor, equipment and material costs including any and all utilities that will remain in service during the suspension period. Costs to remove the trailers after work is complete in spring of 2012 will be a part of the existing bid Item "Field Office Building". Traffic Control Supervisor The agreed lump sum price of $6,290.00 for Traffic Control Supervisor includes all labor, equipment and materials to perform the work described in Standard Specification 1- 10.2(1)B. It is agreed that inspections will occur every Monday, Wednesday and Friday of each week during the suspension. This is anticipated to be the months of January and February 2012. Inspection forms as required by the Standard Specifications will be completed for each of each inspection day No payment will be made unless the required forms are transmitted to the Engineer 00- 04BMacintosh HD: Users:dmayol:Documents:Microsoft User Data:Saved Attachments: 121911 CHANGE ORDER 19(1).x1sx � Washington State WI/ Department of Transportation `C ,UN 2 ®2011 Supplemental Agreement p p g Organization and Address rat>�p�� Berger ABAM Engineers, Inc. Number 8 33301 Ninth Avenue South, Suite 300 Federal Way, WA 98003 Original Agreement Number LA - 4453 Phone: 206 - 431 -2300 Project Number Execution Date Completion Date 1 STPX- NCPD -000S (062) 6/7/2011 7/31/2012 Project Title New Maximum Amount Payable MLK Blvd. and Lincoln Ave. Grade Separation $ 4,780,726.00 Description of Work The Consultant shall continue to provide project administration, inspection and engineering support for the Lincoln Avenue Grade Separation project. The Local Agency of City of Yakima desires to supplement the agreement entered into with Berger ABAM Engineers, Inc. and executed on 6/20/2003 and identified as Agreement No. LA - 4453 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: Work will he completed holy 31, 2017 III Section V, PAYMENT, shall be amended as follows: Payment shall he in_ greased 4 %601,49? ac shown in Fxhibit D as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By. Berger ABAM FrIgineers, Inc By: 04 of Yakima Consultant Signature R. A. Zais—,--�' Jr. , City Manager CITY CONTRAC C NO: -� - Date DOT Form 140 -063 EF RESOLUTION NO: - Revised 9/2005 EXHIBIT D CONSULTANT FEE DETERMINATION SUMMARY (All Tasks) DIRECT SALARY COSTS (DSC) for BERGER/ABAM Engineers, Inc. TOTAL BERGER/ABAM FEE (DSC + SE + OH + FF + DNSC) = $ 345,533 Budget Revision May 2011 R2.xlsx Page 1 of 2 - Personnel Hours Rate Cost 1 Project Manager 600 X $56.62 = $ ' 33,973 2 Resident Engineer 0 X $50.96 = $ - 3 Field Engineer 0 X $45.91 = $ - 4 Office Engineer 452 X $50.07 = $ 22,630 5 Inspector 1,264 X $41.52 = $ 52,490 6 Public Involvement 0 X $32.39 = $ - 7 CADD Operator /Graphics 180 X $30.82 = $ 5,548 8 Proj. Coord. /Clerical 88 X $27.57 = $ 2,426 BERGER/ABAM Hours, TOTAL 2,584 Subtotal Direct Salary Costs (DSC) = $ 117,067 Escalation of DSC @ 5% per year (assume 2/3 of work done in FY 2009 ) = 0.00% $ - Subtotal (DSC + SE) = $ 117,067 Overhead (OH) 158.23% of (DSC + SE) = $ 185,235 Fixed Fee (FF) 32.00% of (DSC + SE) = $ 37,461 _ TOTAL SALARY COSTS (DSC + SE + OH + FF) = $ 339,764 DIRECT NONSALARY COSTS (DNSC) Courier 10 packages @ $ 25.00 $ 250 Field Office Computer @ $ 1,200.00 $ - Portable Laptop 0 @ $ 1,500.00 $ - Printer @ $ 4,000.00 $ - Copier (by contractor) @ $ - Fax @ $ 900.00 $ - Office Phones 6 months @ $ 150 $ 900 Cell Phones 0 months @ $ 100 $ - Vehicle Lease 0 months @ $ 1,000 $ - Fuel and Maintenance 0 months @ $ 500 $ - Mileage (Engineering Support) 6,300 miles @ $ 0.550 $ 3,465 Mileage (Public Involvement) miles @ $ 0.550 $ - Daily Per Diem (field visits) 6 days @ $ 109 $ 654 Daily Per Diem (temporary inspector) days @ $ 109 $ - Daily Per Diem (public involvement) days @ $ 109 $ - Info. meeting / event booth reservation estimate @ $ 2,500 $ - Press conference estimate @ $ 1,500 $ - Paid media, advertorials, etc. each @ $ 150 $ - Grand Reopening Event - estimate @ $ 1,500 $ - Workshop (room, refreshments, etc) each @ $ 750 $ - Refreshments for PAG Meetings days @ $ 100 $ - Misc. Printing & Expendables (film, etc) 1 estimate @ $ 500 $ 500 TOTAL REIMBURSABLE EXPENSES (DNSC) = $ 5,769 TOTAL BERGER/ABAM FEE (DSC + SE + OH + FF + DNSC) = $ 345,533 Budget Revision May 2011 R2.xlsx Page 1 of 2 EXHIBIT D CONSULTANT FEE DETERMINATION SUMMARY (All Tasks) SUBCONSULTANTS HLA @ $15,000 / Month Average Plus 2.5 Months for Temp Inspection $ 144,626 Transpo $ 18,462 Shannon & Wilson $ 34,725 Widener Associates $ 3,528 Kennedy -Jenks $ 21,279 Hanson Professional Services $ 4,756 Baer Testing $ 28,573 TOTAL SUBCONSULTANT FEES = $ 255,950 TOTAL AUTHORIZED AMOUNT= $ 601,482 MANAGEMENT RESERVE = $ - TOTAL CONTRACT AMOUNT = $ 601,482 Budget Revision May 2011 R2.xlsx Page 2 of 2 EXHIBIT B - CITY OF YAKIMA LINCOLN AVENUE GRADE SEPARATION PROJECT SUPPLEMENTAL SCOPE OF WORK FOR CONSTRUCTION ADMINISTRATION AND SUPPORT SERVICES PROJECT DESCRIPTION The Consultant shall provide project administration, inspection, and engineering support for the Lincoln Avenue Grade Separation project. Should construction funding become available, project administration, inspection, and engineering support will be provided as supplemental services for the MLK, Jr. Blvd. Grade Separation. The project will be constructed by the successful low bidder for the project, hereafter referred to as the Contractor. Services to be provided by the Consultant during construction include shop drawing review, .submittal review, responses to Contractor requests for information (RFIs) during construction, inspection, and construction administration of the construction contract on behalf of the City of Yakima, hereafter referred to as the City. :Prior to the start of construction, the Consultant will meet with City staff to clarify and agree on :roles, responsibilities, and communication procedures to be followed by both the Consultant and City during the administration of the construction contract. The following tasks are to be performed by the Consultant on a time- and - materials basis. These tasks have been developed to estimate the level of effort required and shall be performed only as required to complete construction of the project, in consultation with City staff. ASSUMPTIONS It is assumed that the Contractor will achieve substantial completion within 12 months after award of the Construction Contract. 2. The Consultant shall provide a resident project engineer, a lead inspector, a part -time inspector as needed, and a part -time administrative assistant for record keeping, filing and other document management tasks as required. 3. The Consultant shall provide review of RFIs and submittals for project elements designed by the Consultant. Responses to RFIs and submittal review will be prepared within a mutually agreed time frame. 4. Revisions to environmental documents and /or project permits will not be required. 5. Contract administration and inspection duties, as described above and in Task 1 below, will be provided for an additional two months beyond the substantial completion milestone, if required, to facilitate close out of the project. During this two -month period, the project will be closed out and inspection services will be reduced or be discontinued as the project is completed. City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 P.— l of 14 6. The Construction Contract shall include the provision of an office facility for the construction administration team with power, heat, air conditioning, suitable furniture (file cabinets, desks, and chairs) for four staff, an alarm, security, and communications, including high -speed internet. 7. The Consultant shall provide computers, copiers, fax, and other miscellaneous office equipment as required. TASK 1- PROJECT ADMINISTRATION AND MEETINGS The Consultant will organize and facilitate a preconstruction conference that will include representatives from the City, the Contractor, and all utility agencies affected by the project. The Consultant's field staff will attend weekly site meetings and other meetings with City staff as required for monitoring the Contractor's workplans, methods, and schedule. The Consultant shall also prepare monthly estimates of payments to be made to the Contractor in accordance with the terms of the Construction Contract. This task includes the setting up of project documentation files for correspondence, pay estimate, and other construction inspection records, and the subsequent submittal of these records to the City at the conclusion of the project. The Consultant shall review the Contractor's baseline schedule for construction of the project and shall monitor the Contractor's progress relative to that schedule and request updates as necessary. All documentation and project administration activities shall be sufficient to comply with current state and federal aid requirements as established by the Federal Highway Administration (FHWA) and the Washington State Department of Transportation (WSDOT). The Consultant shall be available to meet with local and state auditors when required. The Consultant shall also prepare monthly invoices for the Consultant's services that include a brief description of services provided during the month. Invoices will be based on the task descriptions contained in this scope of work. The Consultant shall set up and maintain a file transfer protocol (FTP) site to allow City, Contractor, and other consultants to upload and download electronic documents during construction. The Consultant shall add and delete files on the FTP site as necessary to enable expedient sharing of information. Deliverables ■ Monthly pay estimates ■ . Meeting minutes for preconstruction meeting ■ Meeting minutes for weekly site meetings City of Yakima Lincoln Avenue Grade Separation Project F,1,;h; t R BERGER /ABAM, FAPWT -04 -016 March 2009 Page 2 of 14 n Meeting minutes for coordination meetings with City staff if requested by the City (assume two per month) • Meeting minutes for meetings with auditors if required (assume three during the life of the project) • Monthly Consultant invoices and progress reports • Substantial completion notice and list of deficiencies (punchlist) n One set of all project - related inspection and correspondence at the end of the project (project close out) TASK 2 - REQUESTS FOR INFORMATION (RFIs) AND SUBMITTAL REVIEW The Consultant shall respond to questions and RFIs by the Contractor, and shall review all submittals. The Consultant shall create and maintain a log of RFIs and submittals. It is assumed that up to 100 RFIs will be submitted. Deliverables a Responses to RFIs in format to be agreed to with the Contractor n Submittals will be returned with comments written directly on the submittal material and /or accompanied by a memo if required n A record of telephone conversation will be prepared where required to coordinate the submittal review with the Contractor. TASK 3 - CHANGE ORDERS the Consultant shall evaluate change order requests and provide revised plans and specifications, as required, to execute agreed changes. The Consultant shall provide legal review of the change orders when requested by the City. An allowance for assistance with change orders has been provided with the fee estimate. It is assumed that all change order requests will be successfully negotiated. Deliverables n Independent estimate of proposed change orders n Revised plans and specifications will be provided if required n Change orders will be issued in a format as approved by the City TASK 4 - INSPECTIONS The Consultant shall provide a full -time inspector and other'specialized inspection services on an as- needed basis. The Consultant shall also provide a field engineer to maintain project documentation and assist with inspection. Inspectors shall observe the construction work in progress, the placement of materials, and monitor the overall adherence to the Contract Documents. The Consultant shall provide coordination for all material testing in accordance with WSDOT and FHWA requirements. City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 Deliverables ■ Inspector's Daily Report including Inspector's Summary of Quantities o Preconstruction photographs and /or videos, periodic photo records during construction, and postconstruction project photos (digital photos, minimum resolution of 2 mega pixels) ■ Inspection records TASK 5 - RECORD DRAWINGS The Consultant shall prepare a set of record drawings for the City that reflects field changes (additions, modifications, or deletions) made from the bid drawing set during construction. The record drawing set shall include any drawings revised or reissued during construction as a result of change orders and shall include changes resulting from RFI responses. These drawings shall be noted as "Record Drawings" in the drawing revision block, but shall not require seals or signatures of registered professionals. The intent of the record drawing set is to provide the best information available to capture significant field changes, but not necessarily every minor change that may occur. It is assumed that the Contractor shall keep independent records of field changes and shall provide any requested information from their records to validate and /or clarify changes during construction in order to provide the most complete information available for preparation of the record drawings. Deliverables ■ One full-size Mylar plan set of final record drawings TASK 6 - PUBLIC INVOLVEMENT PROGRAM The following is a list of public involvement services that are to be provided by the Consultant on this project. The outlirte/list of recommended activities and corresponding deliverables provides the basis for establishing a public involvement budget. It is anticipated that public involvement services may be revised in consultation with the City during the course of the project in response to task and activity additions or unforeseen necessities, and that reasonable changes to the budget for public involvement services may be required. A key assumption of the Public Involvement Plan (PIP) and associated fee estimate surrounds the formation of a Project Advisory Group (PAG). By virtue of this group's vested interest in the successful outcome of this project, they will be charged with carrying out specific outreach and communications activities, which are discussed below. The proposed public involvement services are intended to address the following key issues. Anticipated public dissatisfaction with work zone congestion, delays, and safety issues associated with a road closure anticipated to last about one year. Detours will create additional travel time for emergency vehicles, school, and public transit buses, and may inconvenience residents, both those traveling within the area and those whose streets become part of construction detours. City of Yakima BERGER /ABAM, FAPWT- 04-016 Lincoln Avenue Grade Separation Project March 2009 :Z. Business owners are concerned about loss of business due to yearlong construction, most of them adjacent to the closure and the detour. Businesses in the limited access area will need safe access alternatives. 3. Eastbound traffic on WK. Blvd. will be affected as it is reduced from three lanes to two and has opposing traffic where it normally doesn't. Stakeholder Outreach /Public Involvement Plan Development 'The blueprint for these activities is the PIP. The PIP will identify the project goals, public :involvement schedule, stakeholder groups, communication tools and what they will communicate, and address the concerns of the community while adequately evaluating and :mitigating potential levels of controversy. The PIP will be developed with input obtained from stakeholder interviews. Stakeholder interviews or "knowledge mapping" involve one -on -one discussions with select individuals representing communities of interest and are designed to :identify knowledge needs, gain a deeper understanding of the issues and concerns, and -uncover potential risks to project success. BERGER /ABAM recommends the following to gather stakeholder intelligence and prepare the :PIP. Prepare for and participate in a 60- minute teleconference with the City to develop a list of potential stakeholders or stakeholder groups for interviews, including identification of potential proponents (champions) and opponents of the project. This first meeting will also be used to establish /confirm communication protocols, both internal and external, to ensure consistent messaging and point(s) of contact. :?. Conduct background research via review of available information and City- provided historical documentation, reports, surveys, and the City's existing downtown merchant and property owner stakeholder database(s), along with other relevant materials to inform development of stakeholder questions and PIP. 3. Develop questions and process schedule (two review cycles), and conduct by phone up to six, 30- minute stakeholder interviews. 4. Prepare an aggregate stakeholder interview summary report. 5. Prepare for and participate in one, 60- minute teleconference with the City to review key findings and outline messaging and next steps. 6. Draft and provide one electronic copy of the preliminary PIP for review. 7. Prepare for and participate in teleconference (review cycle) to review the draft PIP. 3. Revise the preliminary plan for final approval. City of Yakima Lincoln Avenue Grade Separation Project Fxhihit R BERGER /ABAM, FAPWT -04 -016 March 2009 Paee 5 of 14 BERGER /ABAM Deliverables ■ Questions and process for stakeholder interviews Up to six, 30- minute stakeholder interviews (by phone) e Aggregate summary report of stakeholder interviews e Preliminary draft of the PIP ■ Final PIP To Be Provided by City ■ City will provide contact information for identified stakeholders to facilitate BERGER/ABAM scheduling of stakeholder interviews. ® City will provide relevant background information and data for research task item. Messaging Creating consistent key messages and messaging format, responsibilities, and protocols early in the process will help "brand" the project and ensure that everyone working on the project is on the same page. BERGER /ABAM recommends the following. . 1. Draft main and audience - specific messages (e.g., residents, businesses, commuters, etc.) outlined through PIP process (one review cycle). Identify benefits and opportunities of project. 2. Create a FAQ for distribution. Up to two review cycles. Up to three update revisions as needed throughout the course of the project (based on new or changed information). 3. Maintain and update messaging on project website (up to six updates), including progress and closures. 4. Prepare and participate in a 60- minute teleconference with the City once a month for one year, to coordinate messaging, updates, and identify needed strategies, tactics, or course corrections. BERGER /ABAM Deliverables ■ Main and audience - specific messaging for internal and external use ■ FAQ updated up to three times over the course.of the project ■ Maintain and provide up to six updates on the project website ■ Twelve, 60- minute teleconference update and coordination meetings with the City To Be Provided by City ■ City will provide updated information as needed for FAQ and website updates. City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 v.,1,'_ , Tn+.,, "r '_.. __ FYh;h;+ R Paoa (, of 14 [Project Advisory Group The creation of a PAG of impacted stakeholders to provide oversight and advice on, as well as carry out some important project outreach and communications activities, is an integral component of the public involvement strategy. The PAG, selected based on their constituent networks.and stakeholder . representation, would provide advice through the.duration of the project, preconstruction through completion, in addition to providing a key component of the outreach effort itself. The main focus of this group will be to help develop strategies (business retention, marketing) for keeping local businesses viable during construction, and provide ongoing liaison or information dissemination to constituencies and organizational affiliations about project status. BERGER /ABAM recommends the following for development of a PAG. L BERGER /ABAM will prepare for and conference call with the City to identify potential membership and a recruitment approach for the PAG (target 10 to 15 members). Constituency pools for consideration include — City technical /project management staff — Representatives or business owners in the immediately affected area — Representatives of the greater area business association — Larger property owners — Local business district property management representatives — Emergency services (fire and police) — School district — Neighborhood association representation 2. Develop a PAG charter (two review cycles) to establish parameters and manage expectations. The PAG charter could include protocols related to — Roles /responsibilities /decision - making limits — Operating protocols and structure — Facilitator expectations — Constituency relations /volunteer recruitment — Duration of committee — Media protocols 3. Schedule and send notifications for ten, 1- to 2 -hour monthly meetings 4. Prepare for, facilitate, and prepare meeting notes for ten, 1- to 2 -hour monthly meetings 5. Develop with (as part of the working charge of) the PAG, a business /neighborhood outreach plan, and schedule, including construction mitigation, business retention, and marketing strategies. Prepare final plan document. BERGER /ABAM Deliverables n Assist with PAG development and recruitment strategy (conference call) n PAG charter City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 V�LUi— XAT- 1,;- - +-- Fvhihi +R P-7nf ld ■ Meeting notification for 10 PAG meetings ■ Facilitation and meeting notes for ten, 1- to 2 -hour PAG meetings ■ PAG- driveri business /neighborhood outreach plan To Be Provided by City s City will assist identifying potential members and recruit PAG members. ■ City will provide staff person (or persons) to be seated on the PAG. Informational Meetings /Events Existing events and organizational meetings are excellent opportunities for disseminating and reinforcing messages and project updates. Initial outreach could include recruiting and developing a list of neighborhood volunteers and /or PAG members to assist with the various events. 1. Identify opportunities, locations (shopping malls, library, community centers, etc.), and well- attended business, community, school, safety, sports, City, and other events to piggyback communications efforts. Deliverables ■ A list and calendar of potential activities with which to piggyback and disseminate communications about the project. To Be Provided by City ■ City will determine which recommended activities to engage in. ■ Some events /activities may require City staffing /attendance or displays. Create/ Disseminate Collateral information The use of carefully chosen communication tools and collateral pieces will educate and reinforce messaging throughout the duration of the project. BERGER /ABAM recommends the following. 1. Up to three project updates to be submitted to local neighborhood newsletters; school district newsletters (via backpack marketing), and /or business association publications. One review cycle per submission. 2. Develop and orchestrate PAG distribution of door hangers and /or door - hanging packages that may include items like earplugs, detour map, magnet with website or hotline number, etc., for businesses and residents in the immediately impacted area. 3. Create stand - alone /point -of- purchase information display(s) to be rotated among businesses in the area (e.g., grocery stores, banks, restaurant lobbies). (Assumption is one display, two review cycles.) 4. Develop one -page PAG - informed, locally- driven business retention /marketing tip sheet for impacted businesses (two review cycles). City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 [Deliverables in Up to three project updates submitted through locally identified communications channels in PAG door hanger or door - hanger package and orchestration of PAG dissemination in One stand -alone display for use at rotating locations To Be Provided by City in City will provide contact information for identified communications channels. a City will determine locations and be responsible for placement of rotating display. IPreconstruction Press Conference .A press conference held on site will give the media an early opportunity to learn the facts about the project, critical safety issues, detour and road alternatives, business impacts, website information, construction schedule, meet the project spokespersons and citizen champions. and reinforce that impacted businesses are open during construction. BERGER/ABAM tasks include Develop event agenda and timeline :?. Identify and draft press release and media background materials and graphics (two review cycles); disseminate media release and assemble media kit 3. Draft talking points for speakers (City, PAG, fire, police) (two review cycles) 4. Secure logistics (with City assistance), including seating, refreshments, chairs, sound, and shelter, if needed 5. On -site orchestration, media management, and tear down [Deliverables in Press conference agenda and timeline in Press release, background materials and graphics, media kit in Talking points for speakers in On -site orchestration and media management To Be Provided by City in City will determine best location for press conference. m City will assist with printing media kit pieces, securing seating, refreshments, chairs, sound, and shelter. [Media Coordination The media is .a powerful conduit to the general public and will play a key role in educating and informing stakeholder audiences and commuters about every aspect of the project. BERGER /ABAM recommends the following media strategy. Prepare for and meet with the Yakima Herald Editorial Board to inform and generate support for the project. City of Yakima Lincoln Avenue Grade Separation Project BERGER /ABAM, FAPWT -04 -016 March 2009 P­ a„c1a 2. Meet With and conduct follow up with the business editor of the Yakima Herald to broker business promotion /marketing opportunities that could include (more ideas may be forthcoming from the PAG) — Writing business.,profiles for.local impacted businesses, ( "advertorials:').._ — Creating a project "column" with frequently asked questions or project updates — Providing weekly construction schedule updates for a construction column — Develop "open for business" ads — Develop inserts for local distribution, if affordable 3. Up to four press release updates when key milestones are reached (e.g., 50 percent complete, etc.) (one review cycle per release) 4. Draft and provide up to eight traffic /detour updates and alerts (one review cycle each). (Assumes communications /coordination with construction field team.) Deliverables • Prepare for and attend Yakima Herald Editorial Board, including preparation of media kitibackground materials • Prepare for and attend meeting with Yakima Herald business editor to'broker business and marketing opportunities m Up to four project update press releases ■ Up to eight traffic /detour updates /alerts To Be Provided by City ■ City representative will attend Editorial Board meeting Grand Reopening Event A grand reopening event can serve to engage the community in the revitalization of the area, provide businesses the opportunity to remind customers their services are again fully accessible, and allow the City to celebrate a project well done and on time and budget. The PAG will also be integrally involved planning this event, which can also involve area businesses. BERGER /ABAM tasks include 1. Develop event agenda and timeline, one review 2. Identify and draft press release, media background materials, and graphics (two review cycles); disseminate media release and assemble media kit 3. Draft talking points for speakers (two review cycles) 4. Secure logistics (with City assistance), including seating, refreshments, chairs, sound, and shelter if needed City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 V�L,; — R P— In nrld 5. Coordinate with PAG on event participation, business involvement, and miscellaneous outreach needs 15. On -site orchestration, media management, and tear down IDeliverabies in Press conference agenda and timeline a Press release, background materials and graphics, media kit in Talking points for speakers is PAG coordination in On -site orchestration and media management 'Po Be Provided by City in City will determine best location for press conference and will assist with securing seating, refreshments, chairs, sound, and shelter. [Business Coordination Prior to construction, if possible, but certainly after construction commences, BERGER/ABAM recommends that businesses and business groups develop contingency plans and marketing strategies to prepare for the closure and, thereby, minimize the amount of potential economic loss. The PAG will be helpful in this effort. Once construction begins, ongoing marketing and public relations efforts will be necessary to further mitigate impacts to those most directly affected due to access issues, utility relocation, and the like. BERGER /ABAM recommends the following strategies, but additional ideas could emerge from meetings with businesses and the ]PAG, and these possibilities will be assessed for efficacy and cost - effectiveness. Budget assumes a collaborative effort (one -third each) between BERGER/ABAM, the City, and PAG. L Assistance with initial (prior to project kick -off) door -to -door business contacts to key impacted entities with general information, including schedule and contact information, ways to stay informed, and perhaps tips to prepare for construction impacts, as well as gathering specific or preferable business contact information. 7_. Create an e -mail blast list for businesses and interested others, and prepare informational updates up to twice a month, or as needed before and during construction. In addition to construction updates, business tips'and information about upcoming meetings, etc., can be included via e -mail. I Conduct PAG- driven (City sponsored) workshops on "managing your business to minimize disruption" based on the premise that problems faced by business owners during construction projects can be anticipated, tapping low -to -no cost expertise such as S.C.O.R.E., and educational business expertise. Planning for such disruptions can significantly reduce potential economic loss and overall impact on the business. (Details of workshop to be determined which may impact budget estimate.) City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 Yakima Wachinofnn Fxhihit B Page 11 of 14 4. Conduct a planning workshop for businesses to discuss and share creative marketing techniques. (Details of workshop to be determined which may impact budget estimate.) 5. Design a locally focused one -page support piece for business -to- customer marketing Deliverables ■ Assistance with initial (prior to project kick -off) door -to -door business contacts ■ Up to two e -mail update blasts per month ■ Orchestrate and conduct "managing your business to minimize disruption' workshop (details TBD) ■ Orchestrate and conduct a planning workshop for businesses to discuss and share creative marketing techniques (details TBD) ■ Business -to- customer marketing support piece To Be Provided by City ■ City staff contact person will participate in initial door -to -door business contacts Commuter Coordination Thousands of commuters, local residents, shoppers, and emergency and municipal services use this thoroughfare every day. BERGER /ABAM recommends partnering with public transit for information dissemination. 1. Coordination with public transit for their development of a flier with construction and detour /schedule change information for distribution on the transit system and posting on the website. Determine origin /designation information for affected lines. Post rider alerts at bus stops and at transit centers. Deliverables ■ Coordination assistance with public transit on informational flier To Be Provided by City ■ City will provide contact information for public transit liaison. Public Information Summary Report At the conclusion of the project, BERGER /ABAM will produce a public involvement summary report that identifies all actions, activities, methods, and outcomes conducting throughout the course of the project. One conference call to review the draft report and identify needed revisions. Deliverables ■ Draft public involvement summary report (two review cycles) ■ Final summary report City of Yakima Lincoln Avenue Grade Separation Project A.ri,i'if R BERGER /ABAM, FAPWT -04 -016 March 2009 Po RO V) f 1,1 SERVICES PROVIDED BY THE CITY It is assumed that the City will identify one contact person /City representative to coordinate public involvement (PI) activities throughout the duration of the project and will provide support for all PI activities as identified for the various activities in Task 6. The City shall provide final approval for all contract changes and payments. Unless specifically identified in Task 6, the City shall provide all public notice /involvement services required, including notices regarding the closure of streets and other facilities affected by the project. The City shall provide construction staking and other survey services, if required by the construction administration team to validate the Contractor's survey or to resolve project issues related to surveying. The City shall contract with WSDOT to provide at a minimum the following. 1. A record of materials (ROM) 2. Provide plant inspection of the prestressed concrete girders 3. Others as deemed necessary and agreed upon by the City and WSDOT EXPENSES Direct nonsalary costs (expenses) listed in Exhibits E and G are considered billable expenses. 'The following is a summary of the how the expenses will be treated for invoicing purposes. Field Office Equipment :Field office equipment includes computers, printer, faxes, copiers, and phones, including cell phones. Allowances have been established for the purpose of acquiring these items and /or covering monthly expenses associated with their use. The actual monthly expenses will be invoiced. The actual cost to purchase the equipment shall also be invoiced. All equipment purchased with project funds will become the property of the City at the conclusion of the project. Some field office equipment, such as a copier, may be provided by the Contractor. Contractor - :provided equipment will become the property of Contractor or the City, depending on the terms of the Construction Contract. `Vehicles and Mileage Travel expenses for part -time inspection services by BERGER /ABAM and its subconsultants shall be invoiced on the basis of mileage. [Living Expenses The full -time resident engineer, full -time inspector, and part -time office administrator will be locally based and will not require subsidies for living expenses. It is assumed that the part -time inspector, if needed, will be living in Yakima during the workweek and returning home to the Seattle area on the weekend. This individual, as well as any other part -time staff required to City of Yakima BERGER /ABAM, FAPWT -04 -016 Lincoln Avenue Grade Separation Project March 2009 travel and stay overnight at the project site, would be compensated for living expenses in accordance with the latest WSDOT per diem allowances for lodging and meals. Public Involvement Expenses No allowance has been made for renting space for PAG group workshops, providing refreshments, and other expenses associated with public involvement activities. It is assumed that the City will pay for all public involvement expenses directly. City of Yakima Lincoln Avenue Grade Separation Project Yakima Wachi—f- Fxhihit R BERGER /ABAM, FAPWT -04 -016 March 2009 P—ld of 14 CPM Consultant Agreement and Supplements Item Date Executed Amount Accumulative Amount Professional Services Agreement 6/16/2009 $411,964.25 $411,964.25 Supplemental Agreement No. 1 6/7/2011 $28,535.67 $440,499.92 • J BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON. AGENDA STATEMENT Item No. 17— For Meeting of: June 7, 2011 ITEM TITLE: Consideration of Resolutions authorizing the City Manager to execute the following supplements for continued construction oversight on the Yakima Railroad Grade Separations, Phase 2 — Lincoln Avenue project: A) Supplement No. 8 of the Professional Services Agreement with Berger /ABAM Engineers, Inc. B) Supplement No. 1 of the Professional Services Agreement with Cascade Project Management. SUBMITTED BY: Joan Davenport, Acting Director of Community & Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer — 576 -6678 SUMMARY EXPLANATION: A) The City has a professional services agreement with Berger ABAM under which they provide the City with project management, inspection services and engineering support during construction of the Lincoln Avenue Grade Separation Project. Due to the difficulties that have been encountered in constructing the bottom seal for the Lincoln Avenue Underpass, the time and cost to construct this project have increased. This consultant agreement is scheduled to expire in July, and, due to the increased engineering required to develop other construction options for the bottom seal, the funds will run out by the end of May. At this time, staff requests authorization to execute Supplement No. 8 of this agreement, which would compensate Berger ABAM for continuing to provide project management, construction inspection services and engineering support throughout construction of the Lincoln Avenue Underpass. This supplement would extend the agreement to July 31, 2012, and would carry an additional cost not to exceed of $601,482, bringing the total amount of the Berger ABAM Consultant Agreement Number 2 to $4,780,726. With the difficulties that have been encountered so far on this project, it is imperative that we continue to have consistency to ensure federal reimbursement. Continued on Paqe Iwo Resolution. (2) Ordinance Contract (2) Other (Specify) Funding Source: Cumulative Reserve for Capital Improvements; Fund 392 APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Approve resolutions authorizing Supplement No. 8 with Berger /ABAM Engineers, Inc. and Supplement No. 1 with Cascade Project Management, PLLC BOARD /COMMISSION /COMMITTEE RECOMMENDATION: COUNCIL ACTION: (Page Two) • B) The City also has a professional services agreement with Cascade Project Management under which they are the City's Representative for the Lincoln Avenue Grade Separation Project and provide services such as, reviewing the Contractor's schedule, provide independent project progress and process input and review any potential claims. This agreement is scheduled to expire in July, and due to the extended length of the project, the .consultant is warranted salary escalation. Due to some uncertainties that have arisen, staff deems it appropriate to increase the Management Reserve to the maximum amount allowable. At this time, staff requests authorization to execute Supplement No. 1 of its professional services agreement with Cascade Project Management for continuing services - throughout construction of the Lincoln Avenue Underpass. This supplement would extend the agreement to July 31, 2012, and would carry an additional cost not to exceed of $28,535.67, bringing the total amount of the Cascade Project Management professional services agreement to $440,499.92. • • K -areo-071 April 20, 2012 OWNER: PROJECT NAME. FEDERAL AID NO.: CITY PROJECT NO HLA PROJECT NO CONTRACTOR: CHANGE ORDER NO. 21 City of Yakima Railroad Grade Separation - Phase 2 - Lincoln Avenue STPX - NCPD- OOOS(062) CR1818 06106E Apollo, Inc. THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS. Original Contract Price: $11,169,856.03 Current Contract Price Adjusted by Previous Change Order(s): $16,019,275.69 Change in Contract Price Due to This Change Order $147,743.26 Adjusted Contract Price Due to This Change Order: $16,167,018 95 Original Contract Completion Date: June 3, 2011 Current Contract Completion Date Adjusted by Previous Change Order September 29, 2011 Change in Contract Completion Date Due to This Change Order 18 - Additional Work Days Revised Contract Completion Date: November 15, 2011 CONTRACTOR: Apollo, Inc. ENGINEER: BergerAbam OWNER: G City Engineer City Manager G:\PFZ0JECTSQCQ6N06106EyA RR GRADE SEPAR,"TION - A;-. dlc \CHANGE ORDERS'.CHANGE ORDER NO. 2110332e12 CHANG_ ORDER 2- Date % Z- Date: Date: 5 Z Z Date. a � '-k April 20, 2012 City of Yakima Railroad Grade Separation - Phase 2 - Lincoln Avenue STPX - NCPD- OOOS(062) HLA Project No - 06106E CHANGE ORDER NO. 21 ITEM NO. DESCRIPTION UNI T QTY UNIT PRICE AMOUNT New Items 21 -1 Mobilization LS 1 $8,50000 $8,500.00 21 -2 Removal of Structures and Obstructions LS 1 $15,320.00 $15,32000 21 -3 Roadway Excavation Incl. Haul CY 1,027 $9.21 $9,458.67 21-4 3" minus Ballast Including Haul TON 1,000 $14.50 $14,500.00 21 -5 Embankment Compaction CY 97 $1 00 $97.00 21 -6 CSBC TON 150 $2800 $4,20000 21 -7 ATB TON 200 $82.00 $16,40000 21 -8 HMA TON 110 $9300 $10,23000 21 -9 Curb and Gutter LF 820 $1450 $11,890.00 21 -10 Cement Concrete Sidewalk, 4" Thick SY 430 $30.50 $13,115.00 21 -11 Cement Concrete Sidewalk, 6" Thick SY 120 $3700 $4,440.00 21 -12 CSTC TON 70 $30.00 $2,10000 21 -13 8" DI Storm Drain Pipe LF 60 $32.00 $1,92000 21 -14 12" DI Storm Drain Pipe LF 20 $38.00 $76000 21 -15 Catch Basin Type 1 EACH 4 $98000 $3,92000 21 -16 Replace CB Grate w /Solid Lid EACH 3 $35000 $1,050.00 21 -17 Survey LS 1 $4,70400 $4,70400 21 -18 Illumination System LS 1 $24,90459 $24,90459 Existing Items 99 1 Paint Line LF 650 $0.36 $234.00 CHANGE ORDER NO. 21 TOTAL $147,743.26 Reason for Change Order: The City of Yakima has directed the Conractor to construct a complete reconstruction of front Street between MLK Blvd. and Lincoln Avenue in lieu of the contract requirement to repair just those areas disturbed during construction of the Lincoln underpass project. The new design by BergerAbam includes new roadway section with sidewalks both sides, curb and gutter, parallel parking on east side, street illumination, storm drainage, and striping. GAPR0JECTS12006Q6.06E YA RR GP. -DE S= PAq.ATION - Hpcllo\CHANGE ORDcRS?CHA� ^J GE �-;RDER NG. 21;032^12 CNHNGR ORDER N OWNER. PROJECT NAME. FEDERAL AID NO CITY PROJECT NO HLA PROJECT NO.. CONTRACTOR: CHANGE ORDER NO. 22 City of Yakima Railroad Grade Separation - Phase 2 - Lincoln Avenue STPX - NCPD- OOOS(062) CR1818 06106E Apollo, Inc. THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS. o -� May 9, 2012 Original Contract Price: $11,169,856.03 Current Contract Price Adjusted by Previous Change Order(s)- $16,167,018.95 Change in Contract Price Due to This Change Order: $60,87000 Adjusted Contract Price Due to This Change Order $16,227,888.95 Original Contract Completion Date: June 3, 2011 Current Contract Completion Date Adjusted by Previous Change Order: October 25, 2011 Change in Contract Completion Date Due to This Change Order 5 - Additional Work Days Revised Contract Completion Date: November 1, 2011 CONTRACTOR: Ap , Inc. ENGINEER: BergerAbam OWNER: G City Engineer City Manager �. ?O +E,:TSlM ��e:C EY;; K =::F. CEO= P= :RPT1vN -r=- ,,., -.� �F.C= RS�F�: -.`1 E"r;E =?h:C 22�1GSG'.2CHANG. n =DER Date -_2) Z v Z. Date. Date. Date y Z May 9, 2012 City of Yakima Railroad Grade Separation - Phase 2 - Lincoln Avenue STPX - NCPD- OOOS(062) HLA Project No 06106E CHANGE ORDER NO. 22 ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE AMOUNT New Items 23 -1 Install and Pin Barrier LS 1 $8,45000 $8,45000 23 -2 Purchase Barriers /Pins /Mastic LF 800 $4930 $39,440.00 23 -3 Tubular Markers White EA 160 $48.00 $7,68000 23 -4 Traffic Control LS 1 $5,600.00 $5,60000 23 -5 Add Wet Well Light and Outlet LS 1 $3,840.00 $3,84000 Existing Items 93 Extruded Curb LF -900 $460 -$4,14000 CHANGE ORDER NO. 22 TOTAL $60,870.00 Reason for Change Order: The City of Yakima has directed the Conractor to construct a precast median barrier with tubular delineator post on Lincoln Avenue in lieu of extruded curb. Shared lane markings shall be placed where directed in the northern lane of the new underpass. Additional items shall be installed at the wet wall location including an outlet,and area light. This revision adds 5 additional working days.