Loading...
HomeMy WebLinkAboutR-1998-069 Industrial Waste InterceptorRESOLUTION NO. R-98- 69 A RESOLUTION authorizing the City Manager and City Clerk of the City of Yakima to execute a contract amendment with Huibregtse, Louman Associates, Inc. for Emergency Design and Construction related to Replacement of the Industrial Waste Interceptor at the Wastewater Treatment Plant. WHEREAS, the City of Yakima has a responsibility to transport, collect, and treat industrial wastewater from Del Monte Inc. in a manner prescribed by the Department of Ecology; and WHEREAS, approximately 300 lineal feet of the 36 inch sewer line used to convey and collect industrial wastewater from Del Monte has deteriorated to the point of potentially polluting groundwater at the Wastewater Facility; and WHEREAS, the City of Yakima has identified the need for specific engineering services to correct this deteriorated line and appurtenances; and WHEREAS, the City of Yakima has selected an engineering firm from the City of Yakima's rooster of qualified engineering professionals in compliance with applicable State requirements for acquisition of professional services; and WHEREAS, a contract; agreement already exists with Huibregtse, Louman Associates, Inc. to provide these services to the City of Yakima and an amendment to that existing agreement is in the best interest of the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and City Clerk are hereby duly authorized to execute a contract in substantially the same form as the attached and incorporated Agreement for professional Wastewater services with Huibregtse, Louman Associates, Inc. and other documents relating to the design and construction of this project for the City of Yakima. ADOPTED BY THE CITY COUNCIL this 19th day of May, 1998 ATTEST: C.c City Clerk ayor John Puccinelli Project No. Agency Name of Project Agreement No. Gentlemen: The Local Agency of entered into with July 20, 1994, SUPPLEMENTAL AGREEMENT - AMENDMENT NO. 7 Task 7 -Additional Services For Improvements to Collection System at WWTP STPUS - 461.1 (001) City of Yakima Fair Avenue Improvement Project 94-57 (R-94-98) the City of Yakima desires to supplement the agreement Huibregtse, Louman Associates, Inc. and executed on ' and identified as Agreement No. 94-57 (R-94-98). All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read See attached Exhibit B-1, Supplemental. 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read July 31, 1998. 111 Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. The maximum amount payable under this agreement as supplemented inclusive of all fees and other costs is now $ 317,356.28 . If you concur in this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. May 11, 1998 Date a)le Consultant's Signature William L. Huibregtse, President Huibregtse, Louman Associates, Inc. ATTEST: PROJ9-85.wpd Sincerely, May 19, 1998 Date Approving Authority ais, Jr., City Manager kima City Clerk Huibregtse, Louma'iti Associates, Inc. CITY CONTRACT No: 98 1 RESOLUTION No: R—QR _. EXHIBIT "A" Summary of Payments (Amendment No. 7) (Task 7, Additional Services for Improvements to Collection System at WWTP) Basic Agreement Supplement Total +Amendment No. 1 +Amendment No. 2 +Amendment No. 3 +Amendment No. 4 +Amendment No. 5 +Amendment No. 6 +Amendment No. 7 Direct Salary Cost 95.561.20 2,362.40 Overhead 144,077.63 3.561.79 97,923.60 147.639.42 (including Payroll Activities) Direct Non -Salary Costs 4.620.00 200.00 4,820.00 Fixed Fee 33.446.42 826.84 34.273.26 Sub -Consultant 32,700.00 0.00 32.700.00 Total 310,405.25 6.951.03 317,356.28 PROJ9-85.wpd Huibreutse, Louman Associates, Inc. City of Yakima Fair.Avenue Improvement Project Spruce Street to Pacific Avenue CONTRACT AMENDMENT NO. 7 TASK 7, ADDITIONAL SERVICES FOR IMPROVEMENTS TO COLLECTION SYSTEM AT VWVTP EXHIBIT B-1 Plans. Specifications, and Estimate (PS&E) - City Sewer Main Additions and Improvements at Wastewater Treatment Plant Task 6 of Exhibit B-1, Scope of Work, of the Original Agreement dated July 20, 1994, provided for additional services for improvements and/or additions to the sanitary sewer collection system in the project area. Scope of Work and fees to be determined 'upon authorization to proceed with the Task. 1 Meet with the City Wastewater Division to determine the extent of the improvements to approximately 300 LF of Industrial Waste Influent Line at the Wastewater Treatment Plant. 2. Research various options and approximate costs for constructing the desired improvements to the Industrial Waste Influent Line, including slip -lining and cut and cover operations. 3. Submit information obtained from Item 2 to the Wastewater Division personnel and review the • options. Perform field topographic surveying of the project area to show physical features and underground utilities of record along the proposed pipeline replacement alignment as well as the location of the Industrial Waste Influent pipeline. Prepare a project plan drawing showing the topographic information obtained in Item 4 and the work to be constructed. Prepare contract documents, including specifications, for construction of the improvements, based upon the option selected by the City Wastewater Division. Review the plans and specifications with the Wastewater Division, with follow-up as required. Print up to thirty (30) sets of plans and specifications for distribution"for bidding. 9. Prepare the advertisement forbids and distribute the plans and specifications for bidding. 10. Prepare and issue Addenda as required. 11. Schedule and attend a pre-bid conference. 12. Attend and assist at the bid opening. 13. Prepare bid summaries. 14. Evaluate the bids and make recommendation for Construction Contract award. 15. Assist the City in preparing copies of the Construction Contracts for signing by the City and the Contractor. • PROJ9-85 wpd Huibregtse, Louman Associates, Inc. Note: City personnel to obtain signatures by the Contractor and appropriate City Officials. Review of Bond and Insurance, Affirmative Action requirements, and issuance of Notice to Proceed to be done by the City of Yakima. City of Yakima to perform construction observation, monitor labor documents, prepare progress payments, and conduct project close-out. DOCUMENTS TO BE FURNISHED BY THE CONSULTANT (30) sets of Pians and Specifications for Bidding and Construction Addenda, as required Bid Summary Recommendation of Construction Contract Award PROJ9-85 wpd Hoihreatse. Lowman Associates. Inc. EXHIBIT D-1 - AMENDMENT NO. 7 CONSULTANT FEE DETERMINATION -_SUMMARY SHEET (LUMP SUM, COST PLUS FIXED FEE, COST PER UNIT OF WORK) PROJECT: CITY OF YAKIMA FAIR AVENUE IMPROVEMENT PROJECT Spruce Street to Pacific Avenue DIRECT SALARY COST (DSC): TASK: '! Amendment No. 7 Task 7, Additional Services for Improvements to Collection System at WWTP Classification Man Hours Rate Cost Principal Engineer 4 x 37.00 $148.00 Licensed Engineer 40 x 25.00 1!= 1,000.00 Licensed Land Surveyor '2 x 20.00 ''= 40.00 Two Man Survey Crew 4 x 33.40 = 133.60 CAD Technician 40 x 16.00 = 640.00 Word Processing Technician 24 x 16.70 400.80 TOTAL DSC = $ 2,362.40 OVERHEAD (OH COST - including. Salary Additives): OH Rate x DSC or 150.77 % x $ 2.362.40 = $ 3.561.79 FIXED FEE (FF): FF Rate x DSC or 35 °A)x$2.362.40 $ 826.84 REIMBURSABLE Itemized = $ 200.00 SUBCONSULTANT COSTS (See Exhibit G): _ $ 0.00 GRAND TOTAL = . $ 6,951.03 PREPARED BY: William L. Huibregtse DATE: May 11, 1998 PROJ9-55 wpd Huibregtse; Louman Associates, Inc. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. /1' For Meeting Of 5/19/98 ITEM TITLE: Consideration of a Resolution Authorizing the City Manager to Execute an amendment to a Professional Engineering Services Agreement with Huibregtse, Louman Associates, Inc. for Emergency Design Replacement of Industrial Waste Interceptor at the Wastewater Treatment Plant. SUBMITTED BY: Doug Mayo, Wastewater Project Manager CONTACT PERSON/TELEPHONE: Doug Mayo/575-6077 SUMMARY EXPLANATION: Staff respectfully requests City Council approval of the attached resolution authorizing the City Manager to execute the attached amendment with Huibregtse, Louman Associates, Inc. for Emergency Design Replacement of Industrial Waste Interceptor at the Wastewater Treatment Plant. The main 36 inch line, which transports industrial wastewater to the: facility for treatment is deteriorated, leaking, and potentially causing groundwater problems at the Wastewater Plant. It is necessary to repair or replace this line before pear processing begins in Mid -August. Funding for this project is available in the 476 wastewater collection system project fund. Resolution X Ordinance _Contract X Other (Specify) Funding Source 476 wastewater collection system project fund Approved 1998 Appropriation -Project 1461 APPROVED FOR SUBMITTAL: —City Manager STAFF RECOMMENDATION: Approve resolution authorizing City Manager to execute professional engineering amendment with Huibregtse, Louman Associates, Inc. for Emergency Design Replacement of Industrial Waste Interceptor at Wastewater Treatment Plant. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-98-69