Loading...
HomeMy WebLinkAboutR-1998-135 Yakima Avenue / I-82 Phase 1C Consultant Agreement with Huibregtse Louman Associates• • RESOLUTION NO. R-98-135 A RESOLUTION authorizing and directing the City Manager and City Clerk of the City of Yakima to execute Contract Amendment No. 8, amending Supplemental Agreement to the Local Agency Agreement 94-57 with Huibregtse, Louman Associates, Inc., Consulting Engineers for Professional Engineering Services on the I-82/Yakima Ave. project in the City of Yakima, City Project 1847. WHEREAS, the City of Yakima desires to proceed to the completion of the I-82/Yakima Ave. project, and WHEREAS, the Yakima City Council deems it to be in the best interest of the city that the attached document, Contract Amendment No. 8, be executed by the City of Yakima, accordingly, now therefore. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and City Clerk of the City of Yakima are hereby authorized and directed to execute Contract Amendment No. 8 to the Local Agency Agreement 94-57 with Huibregtse, Louman Associates, Inc., Consulting Engineers in Yakima for Professional Engineering Services for the purpose mentioned above, a copy of which Contract Amendment is attached hereto and by reference made a part hereof. ADOPTED BY THE CITY COUNCIL this 15 th day of September, 1998. ATTEST: 2 - 4:19 PM City Clerk vvi) Mayor Project No. Agency Name of Project Agreement No. Gentlemen: The Local Agency of entered into with July 20, 1994, SUPPLEMENTAL AGREEMENT AMENDMENT NO. 8 Task 8 -Additional Services Completion of State 1A, 1B, and 1C of 1-82/ Yakima Avenue Project STPUS - 4611 (001) City of Yakima Fair Avenue Improvement Project 94-57 (R-94-98) the City of Yakima desires to supplement the agreement Huibregtse, Louman Associates, Inc. and executed on and identified as Agreement No. 94-57 (R-94-98) All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1 Section 1, SCOPE OF WORK, is hereby changed to read See attached Exhibit B-1, Supplemental. 11 Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read June 30, 1999. 111 Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. The maximum amount payable under this agreement as supplemented inclusive of all fees and other costs is now $ 419,045.90 . If you concur in this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. August 21, 1998 Date Z Consultant's Signature William L. Huibregtse, President Huibregtse, Louman Associates, Inc. PROJ9-90.wpd Sincerely, September 18, 1998 Date Approving Aut orityor ty� R. A. Zais, Jr., City Manager City of Yakima City Contract No. 98-101 Resolution No. R-98-135 ilnibreotse. Lohman Associates. Inc. EXHIBIT "A" Summary of Payments (Amendment No. 8) (Task 8, Additional Services for Completion of State 1A, 1B, and 1C of I-82/Yakima Avenue Project.) Basic Agreement Supplement Total +Amendment No. 1 +Amendment No. 2 +Amendment No. 3 +Amendment No. 4 +Amendment No. 5 +Amendment No. 6 +Amendment No. 7 Direct Salary Cost 97,923.60 +Amendment No. 8 29,565.60 127,489.20 Overhead 147,639.42 44.576.06 192,215.48 (including Payroll Activities) Direct Non -Salary Costs 4,820.00 2,200.00 7,020.00 Fixed Fee 34,273.26 10,347.96 44.621.22 Sub -Consultant 32,700.00 15,000.00 47,700.00 Total 317,356.28 101,689.62 419,045.90 PROJ9-90.wpd Huibregtse, Louman Associates, Inc. City of Yakima Yakima Avenue -1/82 Phase 1C CONTRACT AMENDMENT NO. 8 CITY PROJECT NO. 1847 EXHIBIT B-1 Scope of Services General Project Description: The work covered by this Supplemental Agreement consists of the completion of design and construction of project elements of Stage 1C and certain work items not completed under Stage 1B of the Yakima Avenue - 1/82 Project 1. Wetlands mitigation 2. Completion of the Lincoln/B street couplet 3. Landscaping These items are project elements which were included in a previous consultant contract between the City of Yakima and CH2M HILL. Each of the project elements was completed to a different stage depending upon the project funding limitations at that time. It is our understanding that the City of Yakima has received funding for completion of these project elements. Huibregtse, Lournan Associates, Inc. (HLA), is preparing this Scope of Services as requested by the City of Yakima and, therefore, assumes the previous contractual relationship between the City and CI -12M HILL has been terminated and'all previous studies, reports, designs, and information related to these items are available to HLA. The City of Yakima will advertise the construction phases of the project elements for bid, and print and distribute the plans and specifications to prospective bidders, conduct the bid opening(s), and prepare the contracts for signature and award. The City will also perform construction administration and observation, project close out, progress payments, and funding requests and reports. PROJ9-90.wpd A.......,:..t.ILC. lose Task la - Wetlands Mitigation - Current Status Research The current status of the previous wetlands mitigation work of Boise Cascade property is uncertain and should be verified. Task 1a - Current Status Research is intended to discover the status of the previous work and to obtain a more clear need and direction of additional tasks necessary to complete the wetlands mitigation. A scope of potential additional tasks has been separately outlined under Task 1 b - Mitigation Work. 1 a.1 Contact CH2M HILL and the City of Yakima to obtain copies of all documents relating to the Boise Cascade wetlands mitigation issue. 1a.2 Review all documents received to determine if there is any outstanding mitigation work to. be completed. 1a.3 Review the status of project funding allocations for wetlands mitigation. 1a.4 Prepare a technical memorandum summarizing the status of the wetlands mitigation issue, as determined from information obtained in Tasks 1.1 through 1.3. 1a.5 Prepare estimate of costs of remaining mitigation work. PROJ9-90.wpd Huibregtse, Louman Associates, Inc. • • • Task 1b - Wetlands Mitigation - Mitigation Work Depending upon the information obtained in Task la, additional tasks may be necessary to complete the wetlands mitigation project element. Subtask 1 b will be authorized by the City of Yakima, if necessary, after completion of Task la - Current Status Research. Some of the following tasks may not be necessary, while other tasks not identified below may be required: 1 b.1 Contact Boise Cascade, the Corps of Engineers, the Department of Ecology, WSDOT, and the Yakima Greenway, as required, to proceed with additional wetlands mitigation work. 1 b.2 Determine wetlands mitigation site(s). lb.3 Perform field surveying and area calculations of mitigation site(s). lb.4 Prepare legal descriptions and maps. lb.5 Provide the City Legal Department with the legal descriptions and maps for their preparation of necessary agreements. lb.6 File surveys and legal descriptions with the Yakima County Auditor's Office, as required. 1 b.7 Perform field surveying to permit final design of required mitigation work. 1 b.8 Prepare final PS&E for wetlands mitigation construction. lb.9 Submit final PS&E to the City of Yakima Engineering Division for review and approval with follow-up as required. 1 b.10 Deliver original plans and specifications to the City of Yakima Engineering Division for printing, advertising and bidding. 1 b.11 Provide services during bidding to answer questions from bidders and prepare addenda for distribution by the City. 1 b.12 Attend the bid opening and assist the City in evaluation of the bids. PR0J9-90.wpd Task 2 - Completion of the Lincoln/B Street Couplet Previous contract work completed construction of the Lincoln Avenue portion of the Lincoln/B Street couplet. The B Street portion of the couplet was not constructed. 2.1 Contact CH2M HILL and the City of Yakima to ascertain the 'status of the right of way acquisition and PS&E for the completion of the Lincoln/B Street couplet. 2.2 Prepare legal descriptions for any outstanding parcels to be acquired on Stage 1C. 2.3 Transmit legal descriptions to the City Legal Department,for acquisition and recording of any outstanding parcels on Stage 1C. 2.4 Contact CH2M HILL and the City of Yakima to obtain alignment and design information. 2.5 Perform additional field surveying to permit final detailed design of the couplet. 2.6 Prepare PS&E for construction of the B Street portion of the couplet. 2.7 Perform field surveying to permit final design of the sidewalks. 2.8 Prepare final PS&E for new sidewalk construction as a separate Schedule. 2.9 Submit final PS&E to the City of Yakima Engineering Division for review and approval, with follow-up as required. 2.10 Deliver original plans and specifications to the.City of Yakima Engineering Division for printing, advertising, and bidding. 2.11 Provide services during bidding to answer questions from bidders and prepare addenda for distribution by the City. 2.12 Attend the bid opening and assist the City in evaluation of the bids. PROJ9-90.wpd Huibregtse, Lounian Associates, Inc. • • • Task 3 - Landscaping Previous consultant work by CH2M HILL provided for the conceptual design of landscaping improvements to the Fair Avenue area from the Lincoln/B Street couplet to the Terrace Heights undercrossing. Due to funding limitations, landscaping was not constructed as part of Stage 1A or Stage 1B construction phases. This outline of tasks covers landscaping design from the Fair Avenue undercrossing ramp to Yakima Avenue to the TAR Ramp, east of Fair Avenue to the existing right of way fence, and the triangular area between the Lincoln Street and B Street couplet to Fair Avenue. No irrigation is to be designed for any landscaping. 3.1 Obtain available design information from CH2M HILL, including a copy of Landscaping and Erosion Control Report, I-82/Yakima Avenue Interchange and Fair Avenue Project (CH2M HILL), the City of Yakima, and the WSDOT. 3.2 Prepare PS&E for landscaping withing current City funding limitations. 3.3. Review plans with the Yakima Arboretum, the City of Yakima. 3.4 Revise plans as required per comments from reviewing organizations. 3.5 Submit final PS&E to the Yakima Arboretum and the City of Yakima Engineering Division for review and approval, with follow-up as required. 3.6 Deliver original plans and specifications to the City of Yakima Engineering Division for printing, advertising, and bidding. 3.7 Provide services during bidding to answer questions from bidders and prepare addenda for distribution by the City. 3.8 Attend the bid opening and assist the City in evaluation of the bids. PROJ9-90.wpd EXHIBIT D-1 - AMENDMENT NO. 8 CONSULTANT FEE DETERMINATION - SUMMARY SHEET (LUMP SUM, COST PLUS FIXED FEE, COST PER UNIT OF WORK) PROJECT: CITY OF YAKIMA TASK: Amendment No. 8 FAIR AVENUE IMPROVEMENT PROJECT Subtask la, Wetlands Mitigation - Spruce Street to Pacific Avenue Current Status Research DIRECT SALARY COST (DSC): Classification Man Hours Rate Cost Principal Engineer 16 x 37.00 = $592.00 Licensed Engineer 40 x 25.00 = 1,000.00 Word Processing Technician 8 x 16.70 = 133.60 TOTAL DSC = $ 1,725.60 OVERHEAD (OH COST - including Salary Additives): OH Rate x DSC or 150.77 % x $ 1,725.60 = $ 2,601.69 FIXED FEE (FF):, FF Rate x DSC or 35 % x $ 1,725.60. _ $ 603.96 REIMBURSABLE: Itemized = $ 200.00 SUBCONSULTANT COSTS (See Exhibit G): _ $ 0.00 GRAND TOTAL = $ 5,131.25 PREPARED BY: William L. Huibregtse DATE: August 21, 1998 PROJ9-90.wpd Huibregtse, Louman Associates, Inc. EXHIBIT D-1 - AMENDMENT NO. 8 CONSULTANT FEE DETERMINATION - SUMMARY SHEET (LUMP SUM, COST PLUS FIXED FEE, COST PER UNIT OF WORK) PROJECT: CITY OF YAKIMA TASK: Amendment No. 8 FAIR AVENUE IMPROVEMENT PROJECT Subtask lb, Wetlands Mitigation - Spruce Street to Pacific Avenue Mitigation Work DIRECT SALARY COST (DSC): Classification Man Hours Rate Cost Principal Engineer 16 x 37.00 = $592.00 Licensed Engineer 100 x 25.00 = 2,500.00 Project Engineer 20 x 19.00 = 380.00 Licensed Land Surveyor . 40 x 20.00 = 800.00 Two Man Survey Crew 40 x 33.40 = 1,336.00 CAD Technician • 100 x 16.00 = 1,600.00 Word Processing Technician 40 x 16.70 = • 668.00 TOTAL DSC = $ 7,876.00 OVERHEAD (OH COST - including Salary Additives): OH Rate x DSC or 150.77 % x $ 7,876.00 FIXED FEE (FF): FF Rate x DSC or 35 % x $ 7,876.00 $ 11,874.65 $ 2,756.60 REIMBURSABLE: Itemized = $ 600.00 SUBCONSULTANT COSTS (See Exhibit G): _ $ 0.00 GRAND TOTAL = $ 23,107.25 PREPARED BY: William L. Huibreatse DATE: August 21, 1998 PROJ9-90.wpd EXHIBIT D-1 - AMENDMENT NO. 8 CONSULTANT FEE DETERMINATION - SUMMARY SHEET (LUMP SUM, COST PLUS FIXED FEE, COST PER UNIT OF WORK) PROJECT: CITY OF YAKIMA TASK Amendment No. 8 FAIR AVENUE IMPROVEMENT PROJECT Subtask 2, Lincoln/B Street Spruce Street to Pacific Avenue Couplet DIRECT SALARY COST (DSC): Classification Man Hours Rate Cost Principal Engineer 60 x 37.00 = $2,220.00 Licensed Engineer 200 x 25.00 = 5,000.00 Project Engineer 60 x 19.00 = 1,140.00 Licensed Land Surveyor 40 x 20.00 = 800.00 Two Man Survey Crew 60 x 33.40 2,004.00 CAD Technician 260 x 16.00 = 4,160.00 Word Processing Technician 80 x 16.70 1,336.00 TOTAL DSC = $ 16,660.00 OVERHEAD (OH COST - including Salary Additives): OH Rate x DSC or 150.77 % x $ 16,660.00 = $ 25,118.28 FIXED FEE (FF): FF Rate x DSC or 35 % x $ 16,660.00 $ 5,831.00 REIMBURSABLE: Itemized = $ 1,000.00 SUBCONSULTANT COSTS (See Exhibit G): _ $ 5,000.00 GRAND TOTAL = $ 53,609.28 PREPARED BY: William L. Huibregtse DATE: August 21, 1998 PROJ9-90.wpd Huibreutse, Louman Associates, Inc. • EXHIBIT D-1 - AMENDMENT NO. 8 CONSULTANT FEE DETERMINATION - SUMMARY SHEET (LUMP SUM, COST PLUS FIXED FEE, COST PER UNIT OF WORK) PROJECT: CITY OF YAKIMA TASK: Amendment No. 8 FAIR AVENUE IMPROVEMENT PROJECT Subtask 3, Landscaping Spruce Street to Pacific Avenue DIRECT SALARY COST (DSC): Classification Man Hours Rate Cost Principal Engineer 8 x . 37.00 = $296.00 Licensed Engineer 40 x 25.00 = 1,000.00 Project Engineer 20 x 19.00 = 380.00 CAD Technician 60 x 16.00 = 960.00 Word Processing Technician 40 x 16.70 = 668.00 TOTAL DSC = $ 3,304.00 OVERHEAD (OH COST - including Salary Additives): OH Rate x DSC or 150.77 % x $ 3,304.00 = $ 4,981.44 41) FIXED FEE (FF): FF Rate x DSC • or 35 %x$3,304.00 $ 1,156.40 REIMBURSABLE: Itemized = $ 400.00 SUBCONSULTANT COSTS (See Exhibit G): GRAND TOTAL PREPARED BY: William L. Huibreqtse PROJ9-90.wpd = $ 10,000.00 $ 19,841.84 DATE: August 21, 1998 • • ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of September 15, 1998 Yakima Avenue/l82 Phase 1C Consultant Agreement Department of Community and Economic Development Engineering Division CONTACT PERSON/TELEPHONE: Fred French, City Engineer / 575-6096 SUMMARY EXPLANATION: Work on four items of the Yakima Avenue/I82 project are remaining to be completed. These are Wetland mitigation, HUD access mitigation (tentatively settled with previous Council action), Final design and construction of the B Street couplet connection and landscaping. These items have been collected into Phase 1C for completion. This consultant agreement is an amendment to the existing agreement with Huibregtse, Louman and Associates for previous phases of the 182 project originally entered into by Resolution R-94-98 and subsequently amended. This amendment number 8 to the original agreement is within the budget for this project. The costs for the specific services included in the scope of work will not exceed $101,689.62. Resolution X Ordinance _Contract X Other (Specify) Project Budget Funding Source Arterial Street Fund (143) APPROVED FOR SUBMITTAL: ity Manager er STAFF RECOMMENDATION: Adopt the attached resolution authorizing the City Manager and City Clerk to execute the contract amendment for Professional Engineering Services. BOARD/COMMISSION RECOMMENDATION: • COUNCIL ACTION: September 8, 1998 • City of Yakima Yakima Avenue / I82 Interchange Area Phase IC Project 9E-180)001)-1 Letter to TIB of 1-12-98 from Denny Covell Original Phase 1C Budget Engineering Construction Total Wetland Mitigation $28,750 $115,000 $143,750 HUD Access Mitigation $41,250 $165,000 $206,250 B Street Couplet Connection $44,000 $176,000 $220,000 Landscaping $19,550 $58,650 $78,200 Total $133,550 $514,650 $648,200 Revised Project Budget as of 9-8-98 Engineering Construction Total Wetland Mitigation $28,239 $150,000 $178,239 HUD Access Mitigation $2,000 $85,000 $87,000 B Street Couplet Connection $53,609 $225,000 $278,609 Landscaping $19,842 $84,510 $104,352 Total $103,690 $544,510 $648,200 Huibregtse, Louman Associates, Inc. August 21, 1998 CIVIL ENGINEERING • LAND SURVEYING • PLANNING City of Yakima Engineering Division 129 North Second Street Yakima, WA 98901 Attn: Fred French, PE City Engineer Re: City of Yakima - I-82/Yakima Avenue Project Completion of Stage 1A, 1B, and 10 City Contract No. 94-57 (R-94-98) Proposed Contract Amendment No. 8 City of Yakima Project No. 1847 Dear Fred: William L Huibregtse, PE Jeffrey T. Louman, PF Theodore W. Pooler, Dennis J.Whitcher, Pk Francis J. Jaeger, PE Eric T. Herzog, PLS Heidi C. Herzog, PE Michael T. Battle, PE HUIBREGTSE, LOUMAN ASSOCIATES, INC. (HLA), is pleased to submit the following proposed Contract Amendment per your request for the above referenced project. We have based our proposal on. the scope of work as we understand it today. Due to our limited understanding of this project's status and various stages of completion, we ask for your consideration of future adjustment in scope and fees, if changes are necessary. This Contract Amendment addresses Completion of Stade 1A, 1B, and 1C for the I-82/Yakima Avenue Project. Please refer to the attached Exhibit B-1 for the proposed Scope of Services for this Amendment. We have also enclosed completed Supplemental Agreement forms from the LAG Manual inforder to expedite this process. We will be glad to meet with you after you have had a chance to review this information. Please call if you have any questions or if we may provide additional information. We are prepared to begin immediately upon authorization to proceed. Thank you for the opportunity to provide these services to the City of Yakima. Very ruly yours, gic0 William L. Huibregtse, PE WLH/jc PROJ9-90.wpd Enclosure 3800 Summitview, Suite 100 a Yakima,WA 98902 a (509) 966-7000 + FAX (509) 965-3800 e