HomeMy WebLinkAbout06/16/2020 06 Six-Year TIP 2021-2026 Adoption and Comprehensive Plan Amendments 't..an,gtntj ka d E$A BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6. For Meeting of: June 16, 2020 ITEM TITLE: Public Hearing to consider: A) Resolution adopting the Six-Year Transportation Improvement Program for the period of 2021 through 2026, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Scott Schafer, Director of Public Works Bob Desgrosellier, Chief Engineer- 575-6228 SUMMARY EXPLANATION: This item contains two elements: A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-Year Transportation Improvement Program (TIP)for submittal to the Washington State Department of Transportation. This Plan must include all transportation projects for which state gas tax revenue and federal revenue will be used. The proposed 2021-2026 TIP includes seven (7) funded projects that have full or partial funding. These projects are: Spring Creek Road Reconstruction; Phase 2 South 36th Avenue Reconstruction Bravo Company Boulevard Extension Cowiche Canyon Trail; Phases 1 and 2 34th Avenue / Fruitvale Blvd. & 34th Avenue / River Road Roundabouts East Nob Hill Boulevard and Fair Avenue Intersection Improvements McClure Elementary School Vicinity Safety I mprovements Two more projects have just recently been funded and will be added to the 2021-2026 STIP: 48th Avenue & Washington Avenue Intersection Improvements (Spring Creek) 72nd Avenue & Washington Avenue Roundabout Attached is the complete 2021 —2026 Six-Year TIP, which describes each project. The City will continue to seek funding for the remainder of the projects included in the 2021-2026 TIP. City Council and the public are welcome to add other arterial system projects to the list. The Six- 2 Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG)after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA)and the Federal Transit Authority(FTA), projects must be included in the Statewide Transportation Improvement Program (STI P). The STI P is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter-modal transportation network in the State of Washington. The ST I P contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element by incorporating the adopted Six-Year TI P for 2021 to 2026. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six-Year TIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima-area media, including to Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: NA STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt resolutions ATTACHMENTS: Description Upload Date Type d ResoluhonA G4/2020 Resolution O Resolution B 6/42020 Resolution 6 6-Year STIP 2021-2026 &412020 Backup Matei ial 3 RESOLUTION NO. R-2020- A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the period of 2021 through 2026 for transportation improvements to arterial streets in the City of Yakima and amending the Transportation Systems Plan 2040. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040 to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City Of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on June 16, 2020, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six- Year Transportation Improvement Program for the period of 2021 through 2026 for transportation improvements to arterial streets in the City of Yakima; and, WHEREAS, adopting the Six-year Transportation Improvement Program and amending the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six-Year Construction Program for the period of 2021 through 2026, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six-Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Transportation Systems Plan 2040 along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 16'h day of June, 2020. ATTEST: Patricia Byers, Mayor Sonya Clear Tee, City Clerk 4 RESOLUTION NO. R-2020- A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2021 through 2026. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year Transportation Improvement Program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and, WHEREAS, this amendment is limited to incorporation of the projects listed in the Six- Year Transportation Improvement Plan for the period of 2021 to 2026 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW36.70A.130(2B) and RCW 35.77.010; and, WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP on June 16, 2019 with the proper public notice as required by RCW 35.77.010; and WHEREAS, amending the Yakima Area Comprehensive Plan Capital Facilities Element is in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted Six-year Transportation Improvement Program for the period of 2021 through 2026 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 16'h day of June, 2020. ATTEST: Patricia Byers, Mayor Sonya Clear Tee, City Clerk ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniPio > _ aK 3 e S 00n<�e 0 ,a:440edeae 0edeae e1 OPSTW 0200 CE ,es Fundng Status Phase Phase StartYear[`IVY VI Pev.l Fv de Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Pagel st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniFio _ 3 e S Fred ee:° a'�o'," �. — a a Bravo Company Boulevard Bravo Company Blvd Constnot four lane roadwaysection wah median bike lanes arid rouridaboNs install arb gNter sidewalk Meet lighting arid storm drainage ssterri along w(Eh water arid awersy9erris Status Phase Phase Start Year[`IVY VI FederalFund Code Federal Funds State Funds Local Funds Total Expenditure Schedule Phase IS End 3rd 4th an 86th Report Date:June 03,2020 Page 2 ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agemy Yakima [curly Yakima eniPio > _ 3 e S Project 10 ) e103 0ede/20 0ede/20 03 COPiw CE -es E Nob Hill Blvd.4 Fair Are VS Mprovernents Ibb Hill Blvd E Nob Hill Blvdto Fair AR prtter sidewalk street lighting arid drainage Upgrade signal including mastarm stnotires Furidng Status Phase Phase Start Year(WY VI Federal Fund Co v n n c Fed State Ad Code State Ads Local Total Funds St n S CN ate P(u) Report Date:June 03,2020 Page 3 t.t Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniFio > _ 3 e S voge11Fe -,u706n620 0dnd.,0 38 COPT CE Yes McClure Berrieran School Safety Irrpro‘erriellts Vairous Streets .ous location anouslocations safery ran provements in the minrly of McClure Berrieran School such as conn-uoting sidewalk ADArarrips arid irrpromrivrosstualks Fundng Status Phase Phase Start Year raver VI Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Teel Funds Expenditure Schedule Report Date:June 03,2020 Page 4 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima .i A PIN/Project No eniFio _ 3 e S Project eta:° a'�o'," �. - a i TW • avenue• and W mare .� �a3 Avenue Improvements OS m4.8st• tnh` .(Sp ft k the adi f"e neon Bata"and realile`ed tin€ones&. abstandard corner at Spring Creek Road Fundng Status Phase Phase StartYear nvv VI Federal Fund Code Federal Funds e Fund Code vale Funs Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 5 t.t Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniFio _ 3 e S Fred eta:° a'�o'," �. — a Fundng Status Phase Phase Start Year nvvv] Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 6 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniFio > _ aK 3 egn . nermn e S Project e 00 -,I80 0000/20 0000/20 28 1.000 CE -es Optuiche Canyon Trail Optuiche Canyon Rd Powerhoua Road to"Railhead Omstnot a pathway including pedenlan bndgez over Comohe Creek Fundng Status Phase Phase Start Year[`IVY VI Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Total Funds Expenditure Schedule Federal Funds State Funds Local Funds Total Funds Report Date June 03,2020 Page 7A st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniPio _ 3 e S Free e.:° a'�o'," �. — a a TW tbrth 1st Street PeNalization Phase] tbrth 1st Street Mprove North 1st Street byre habilnating the pa‘errient arid lane markings rerrovng or!Meet primp instilling bike lanes replacing and widening sidewalk enhancing street lightng installing pedestnari lightng corinlicting median islands arid instilling‘anouspedenlari arid decorative elements ,,,, to Phase Start Yearnwn Federal Fund Code Federal State Fund Code State Funds Local ad Total Expenditure Schedule Phase IS End 3rd 4th an 86th Report Date:June 03,2020 Page 1e ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima .i A PIN/Project No eniPio _ 3 e S v. D ErFred eta:° a'�o'," �. — a i Omstilictriew roadway inlcuding water sewer curb prtter sidewalk sreetlighting arid storm drainage walerri Fundng Status Phase Phase StartYear nvvv] Federal Funde Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date June 03,2020 Page 8 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima [curly Yakima .i A PIN/Project No eniPio _ 3 e S v. D ErFred ee:° a'�o'," �. — a i TW Omstilict new roadway including water sewer curb gNter sidewalk street lighting arid storm drainage walerri Fundng Status Phase Phase StartYear nvv VI Federal Fund Code Federal Funds e Fund Code vale Funds Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 9 ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniPio _ 3 e S Fred eta:° a'�o'," �. — a a Lincoln Afenue Sreet Fundng Status Phase Phase StartYear[`IVY VI Federal Funde Federal Funds State And Code vale Ands Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 10 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima .i A PIN/Project No eniPio _ 3 e S Fred eta:° a'�o'," �. — a a Pobertmn Elementary Soho&Safety Improvements ‘arious streets rious locations to))a.ous Imams n«Nimo rovements in the minnyof Pobertmn Elementary School ach as new sidewalk arid coristncting ADArarrips Fundng Status Phase Phase StartYear[`IVY VI rev.l Fv e Federal Funds State And Code State Ands Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 11 rtaittan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniPio s. _ 3 e S Fred eta:° a'�o'," �. — a a ‘arious streets rious locations to))a.ous Imams safery improvements in the minnyof Nob Fill Berrientiry School ach as rretu sidewalk arid coristncting ADArarrps Fundng Status Phase Phase StartYear[`IVY VI rev.l Fv e Federal Funds State And Code State Ands Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 12 ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniPio > _ aK 3 egn . nermn e S Project 00 ) -,uK72 0000/20 0000/20 05 CO P T 3500 CE No VanousAleys Pave the easthest gra‘el alles between Folsom Aerwe arid fmrhale Boule)mrd Fundng Status Phase Phase StartYear[`IVY VI Federal Funde Federal Funds State And Code vale Ands Local Funds Teel Funds Expenditure Schedule Phase IS End 3rd 4th an 86th CN 0 520200 0 0 0 Report Date:June 03,2020 Page 13 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima [curly Yakima eniPio s. _ 3 e S Fred eta:° a'�o'," �. — a a Box Culvert Installations hstall box. 00. Road Odij&at the BOthMenue Bhdge andNAde Hollow Bhda.e reduce looding issues Joint project wrth Yalorra County Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code vale Funds Local Funds Total Funds Expenditure Schedule Phase IS End 3rd 4th an 86th CN 160000 0 0 0 0 Report Date:June 03,2020 Page 14 ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yak no [curly Yak no enivio _ 3 e S Fred eta:° a'�o'," �. — a NIst Street to R Street Fundng Status Phase Phase Start Year nvvv] Federal Furd Code Federal Furds State And Code vale Ands Local w Total Funds Phase IS End 3rd 4th an 86th Report Date:June 03,2020 Page 15 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniP ID s. _ 3 e S Fred eta:° a'�o'," a. — a a S• 1st Street S 1st Street to E Washingen Are lane replace arb gNter and sidewalk and install a rretu trafic signaliz aeon sy3err. Status Phase Phase StartYear[`IVY VI v.l Fv e Fed v n n s State Ad Code State Ads Local s Total nds P PE 2026 ST PO Co Federal PM P CN 2026 siPM Expenditure Schedule Report Date:June 03,2020 Page 16 �n e.t Six Year Transportation Improvement Program From 2021 to 2026 A ge my Yakima Gouty Yakima eniP ID _ 3 e y Fred eta:° a'�o'," �. — a a thprove the Wa shin gto n Alen we and Long the r Road intersen on b y constw ding an curb gutter ede.,iw.street I ig ai6.>m�dnise an fie. lashin g sign al Status P ha se Phase Start Year[WY VI F Federal n Local c Fed State Ad Code State AdsF Total Funds P PM P CN 2026 nPM Report Date:June 03,2020 Pagel] t.t Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniP ID _ 3 e y Fred eta:° a'�o'," �. — a i Powerhoua Road Multi Ua Path Powerhoua Road Constnct 10 foot paved pathwayari d install a crosswalk across Powerhouse Road at Cowiche Caripri Road Fundng Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code vale Funs Local Funds Total Funds Expenditure Schedule Report Date:June 03,2020 Page 18 st Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yakima Gouty Yakima eniPio _ 3 e S Fred eta:° a'�o'," �. — a a TW °mid arid oveday and ADAcurb ramp replacement Fundng Status se Phase StartYear[`IVY VI Federal Fund Code Federal Funds State m o e vale Funds Local Funds Total Funds Expenditure Schedule Phase IS End 3rd 4th an 86th PE 30000 0 0 0 0 Report Date:June 03,2020 Page 19 ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yak no Gouty Yak no eniPio _ 3 e S Fred eta:° a'�o'," �. — a a TW Teen [Me Pesurfacrig Teen Einve Onnd arid oveday and ADAcurb ramp replacement Fundng Status se Phase StartYear nvvv] Federal Furd Code Federal Furds State m o e vale Funds Local Furds Total Funds Report Date:June 03,2020 Page 20 w ast Six Year Transportation Improvement Program sersartaittan From 2021 to 2026 Agerty Yakima Gouty Yakima .i A PIN/Project No .< C Project Hie eniPio _ 3 e S Fred eta:° a'�o'," �. — a a TIN Feonstnot and widen 16th Afenue and"helm Lime by adding le t Vim lanes for all Fundng Status Phase Phase StartYear[`IVY VI v.l Fv e Fed v n n s State Ad Code State Ads Local s TotalFunds S PE 2026 P Co Federal PM S CN 2026 sTPM Expenditure Schedule Report Date:June 03,2020 Page 21 ��tan Six Year Transportation Improvement Program From 2021 to 2026 Agerty Yak ma Gouty Yak ma enirio _ 3 e S Fred eta:° a'�o'," �. — a Ian seeet underpass Yak ma Aenue Yak ma Aenue to 18th Street Funeng Status Phase Phase Start Year nvvv] Federal Furd Code Federal Furds State And Code State Ands Local F Total Funds Federal Furds State Funds Local Furds Total Funds Report Date June 03,2020 Page 22 Distributed at the Meeting 12 JO- O ga@ � -fi w4 Yakima Bikes and Walks! 's �� 4 g Yakima WA 4,,.?1,..4,07ip,,, ,4:4,..,4.7 .:1,,,.,,.;r. i,,,.-,,,,47-'',0044:_000:43-.y_tl,:izvzo;„..,vt,trgi 0 l� V yakima.bikes@gmail.com �t , : x : r .; .. , : , ,,. www.facebook.com/YakimaBikes June 16, 2020 Yakima City Council City Hall 129 North Second Street Yakima, WA 98901 Re: Public Hearing Comments - Six-Year Transportation Improvement Program for 2021-2026 Dear City Councilmembers: Yakima Bikes and Walks! is a network of people who came together in 2014 to help make Yakima more friendly for bicycles and pedestrians. We offer the following comments on the city's proposed Six-Year Transportation Improvement Program for 2021-2026. 1 We hope that the City Council and staff will view and use this TIP as we do—as the primary means for implementing the City's Bicycle Master Plan, which the City Council adopted in 2017. All of the funded projects on this TIP should incorporate the bicycle-friendly improvements that are identified by the Bicycle Master Plan. As these projects are designed, the 1 following elements should be incorporated into the projects as listed below: TIP Priority Project Name and design elements identified by the Bicycle Master Plan No. 1 34th Avenue/ Fruitvale Blvd. & 34th Avenue/ River Road Roundabouts—Bike lanes on River Road,Bicycle Boulevard on 34th Avenue. 2 Bravo Company Boulevard Extension—Bike Lanes (connecting to the Yakima Greenway). 3 E. Nob Hill Blvd & Fair Ave Intersection Improvements—Bike lanes on Fair Avenue, north and south of the intersection. 4 McClure Elementary School Safety Improvements—Bike lanes on 24th Avenue. S. 48th Avenue and W. Washington Avenue/ Spring Creek Road Improvements— 5 Buffered bike lanes on Washington Avenue connecting to the new bike lanes adjacent to SOZO. Yakima City Council June 16,2020 Page 2 6 S. 72nd Ave and W. Washington Ave Improvements—Bike lanes on 72"d Ave, and add protection to existing bike lanes on Washington Ave. Cowiche Canyon Trail— This is a portion of the trail systems that will eventually 7 connect the Yakima Greenway and Cowiche Canyon Trail systems. Thanks to Senator Curtis King. Thank you, Phil Hoge, for Yakima Bikes and Walks!