BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6.
For Meeting of: June 16, 2020
ITEM TITLE: Public Hearing to consider: A) Resolution adopting the Six-Year
Transportation Improvement Program for the period of 2021
through 2026, and to amend the Transportation Systems Plan
2040; and B) Resolution amending the Yakima Urban Area
Comprehensive Plan Capital Facilities Element
SUBMITTED BY: Scott Schafer, Director of Public Works
Bob Desgrosellier, Chief Engineer- 575-6228
SUMMARY EXPLANATION:
This item contains two elements:
A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to
update its Six-Year Transportation Improvement Program (TIP)for submittal to the Washington
State Department of Transportation. This Plan must include all transportation projects for which
state gas tax revenue and federal revenue will be used.
The proposed 2021-2026 TIP includes seven (7) funded projects that have full or partial
funding. These projects are:
Spring Creek Road Reconstruction; Phase 2
South 36th Avenue Reconstruction
Bravo Company Boulevard Extension
Cowiche Canyon Trail; Phases 1 and 2
34th Avenue / Fruitvale Blvd. & 34th Avenue / River Road Roundabouts
East Nob Hill Boulevard and Fair Avenue Intersection Improvements
McClure Elementary School Vicinity Safety I mprovements
Two more projects have just recently been funded and will be added to the 2021-2026 STIP:
48th Avenue & Washington Avenue Intersection Improvements (Spring Creek)
72nd Avenue & Washington Avenue Roundabout
Attached is the complete 2021 —2026 Six-Year TIP, which describes each project. The City will
continue to seek funding for the remainder of the projects included in the 2021-2026 TIP.
City Council and the public are welcome to add other arterial system projects to the list. The Six-
2
Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley Conference
of Governments (YVCOG)after approval.
In order to utilize federal funds, such as those administered by the Federal Highway
Administration (FHWA)and the Federal Transit Authority(FTA), projects must be included in the
Statewide Transportation Improvement Program (STI P). The STI P is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
inter-modal transportation network in the State of Washington.
The ST I P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Public participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six-year Transportation Program; holding at least
one public hearing during its development.
B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element by incorporating the adopted Six-Year TI P for 2021 to 2026. This will ensure that we
are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporating only those projects
that are adopted in the Six-Year TIP and is not subject to the "once a year" change required
under the laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima-area media, including to Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED: NA
STRATEGIC PRIORITY: Public Trust and Accountability
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt resolutions
ATTACHMENTS:
Description Upload Date Type
d ResoluhonA G4/2020 Resolution
O Resolution B 6/42020 Resolution
6 6-Year STIP 2021-2026 &412020 Backup Matei ial
3
RESOLUTION NO. R-2020-
A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the
period of 2021 through 2026 for transportation improvements to arterial
streets in the City of Yakima and amending the Transportation Systems
Plan 2040.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
program for transportation improvements to arterial streets in the City of Yakima for the ensuing
six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable
federal law; and
WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of streets and arterial streets in the City Of Yakima, all as contemplated and
required by State and Federal Law; and,
WHEREAS, after a public hearing on the matter, held at the regular meeting of the
Yakima City Council on June 16, 2020, with proper public notice as required by RCW
35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six-
Year Transportation Improvement Program for the period of 2021 through 2026 for
transportation improvements to arterial streets in the City of Yakima; and,
WHEREAS, adopting the Six-year Transportation Improvement Program and amending
the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six-Year Construction Program for the period of 2021 through 2026, a copy of which
is attached hereto and by this reference made a part thereof, is hereby adopted as the official
Six-Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the Transportation Systems Plan 2040 along with Street Improvements, which
are also approved.
ADOPTED BY THE CITY COUNCIL this 16'h day of June, 2020.
ATTEST: Patricia Byers, Mayor
Sonya Clear Tee, City Clerk
4
RESOLUTION NO. R-2020-
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the Six-year Transportation Improvement Program
(TIP) for the period of 2021 through 2026.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2021 to 2026 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided
under RCW36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP
on June 16, 2019 with the proper public notice as required by RCW 35.77.010; and
WHEREAS, amending the Yakima Area Comprehensive Plan Capital Facilities Element
is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2021
through 2026 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 16'h day of June, 2020.
ATTEST: Patricia Byers, Mayor
Sonya Clear Tee, City Clerk
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniPio >
_ aK
3 e S
00n<�e 0 ,a:440edeae 0edeae e1 OPSTW 0200 CE ,es
Fundng
Status Phase Phase StartYear[`IVY VI Pev.l Fv de Federal Funds State And Code vale Ands Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Pagel
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniFio _
3 e S
Fred ee:° a'�o'," �. — a a
Bravo Company Boulevard
Bravo Company Blvd
Constnot four lane roadwaysection wah median bike lanes arid rouridaboNs install
arb gNter sidewalk Meet lighting arid storm drainage ssterri along w(Eh water
arid awersy9erris
Status Phase Phase Start Year[`IVY VI FederalFund Code Federal Funds State Funds Local Funds Total
Expenditure Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 03,2020 Page 2
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agemy Yakima
[curly Yakima
eniPio >
_
3 e S
Project
10 ) e103 0ede/20 0ede/20 03 COPiw CE -es
E Nob Hill Blvd.4 Fair Are VS Mprovernents
Ibb Hill Blvd
E Nob Hill Blvdto Fair AR
prtter sidewalk street lighting arid drainage Upgrade signal including mastarm
stnotires
Furidng
Status Phase Phase Start Year(WY VI Federal Fund
Co v n n c Fed State Ad Code State Ads Local Total Funds
St n S CN ate P(u)
Report Date:June 03,2020 Page 3
t.t Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniFio >
_
3 e S
voge11Fe -,u706n620 0dnd.,0 38 COPT CE Yes
McClure Berrieran School Safety Irrpro‘erriellts
Vairous Streets
.ous location anouslocations safery ran
provements in the minrly of
McClure Berrieran School such as conn-uoting sidewalk ADArarrips arid
irrpromrivrosstualks
Fundng
Status Phase Phase Start Year raver VI Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Teel Funds
Expenditure Schedule
Report Date:June 03,2020 Page 4
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
.i A PIN/Project No
eniFio _
3 e S
Project eta:° a'�o'," �. - a i
TW
• avenue• and W mare .� �a3 Avenue Improvements
OS m4.8st• tnh` .(Sp ft k the adi f"e neon Bata"and realile`ed tin€ones&.
abstandard corner at Spring Creek Road
Fundng
Status Phase Phase StartYear nvv VI Federal Fund Code Federal Funds e Fund Code vale Funs Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 5
t.t Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniFio _
3 e S
Fred eta:° a'�o'," �. — a
Fundng
Status Phase Phase Start Year nvvv] Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 6
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniFio >
_ aK
3 egn . nermn e S
Project
e 00 -,I80 0000/20 0000/20 28 1.000 CE -es
Optuiche Canyon Trail
Optuiche Canyon Rd
Powerhoua Road to"Railhead
Omstnot a pathway including pedenlan bndgez over Comohe Creek
Fundng
Status Phase Phase Start Year[`IVY VI Federal Fund Code Federal Funds State Fund Code vale Funds Local Funds Total Funds
Expenditure Schedule
Federal Funds State Funds Local Funds Total Funds
Report Date June 03,2020 Page 7A
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniPio _
3 e S
Free e.:° a'�o'," �. — a a
TW
tbrth 1st Street PeNalization Phase]
tbrth 1st Street
Mprove North 1st Street byre habilnating the pa‘errient arid lane markings
rerrovng or!Meet primp instilling bike lanes replacing and widening sidewalk
enhancing street lightng installing pedestnari lightng corinlicting median islands
arid instilling‘anouspedenlari arid decorative elements
,,,, to Phase Start Yearnwn Federal Fund Code Federal State Fund Code State Funds Local ad Total
Expenditure Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 03,2020 Page 1e
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
.i A PIN/Project No
eniPio _
3 e S
v. D ErFred eta:° a'�o'," �. — a i
Omstilictriew roadway inlcuding water sewer curb prtter sidewalk sreetlighting
arid storm drainage walerri
Fundng
Status Phase Phase StartYear nvvv] Federal Funde Federal Funds State And Code vale Ands Local Funds Total Funds
Expenditure Schedule
Report Date June 03,2020 Page 8
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
[curly Yakima
.i A PIN/Project No
eniPio _
3 e S
v. D ErFred ee:° a'�o'," �. — a i
TW
Omstilict new roadway including water sewer curb gNter sidewalk street lighting
arid storm drainage walerri
Fundng
Status Phase Phase StartYear nvv VI Federal Fund Code Federal Funds e Fund Code vale Funds Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 9
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniPio _
3 e S
Fred eta:° a'�o'," �. — a a
Lincoln Afenue
Sreet
Fundng
Status Phase Phase StartYear[`IVY VI Federal Funde Federal Funds State And Code vale Ands Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 10
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
.i A PIN/Project No
eniPio _
3 e S
Fred eta:° a'�o'," �. — a a
Pobertmn Elementary Soho&Safety Improvements
‘arious streets
rious locations to))a.ous Imams n«Nimo
rovements in the minnyof
Pobertmn Elementary School ach as new sidewalk arid coristncting ADArarrips
Fundng
Status Phase Phase StartYear[`IVY VI rev.l Fv e Federal Funds State And Code State Ands Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 11
rtaittan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniPio s.
_
3 e S
Fred eta:° a'�o'," �. — a a
‘arious streets
rious locations to))a.ous Imams safery improvements in the minnyof Nob
Fill Berrientiry School ach as rretu sidewalk arid coristncting ADArarrps
Fundng
Status Phase Phase StartYear[`IVY VI rev.l Fv e Federal Funds State And Code State Ands Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 12
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniPio >
_ aK
3 egn . nermn e S
Project
00 ) -,uK72 0000/20 0000/20 05 CO P T 3500 CE No
VanousAleys
Pave the easthest gra‘el alles between Folsom Aerwe arid fmrhale Boule)mrd
Fundng
Status Phase Phase StartYear[`IVY VI Federal Funde Federal Funds State And Code vale Ands Local Funds Teel Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
CN 0 520200 0 0 0
Report Date:June 03,2020 Page 13
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
[curly Yakima
eniPio s.
_
3 e S
Fred eta:° a'�o'," �. — a a
Box Culvert Installations
hstall box. 00. Road
Odij&at the BOthMenue Bhdge andNAde Hollow Bhda.e
reduce looding issues Joint project wrth Yalorra County
Fundng
Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code vale Funds Local Funds Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
CN 160000 0 0 0 0
Report Date:June 03,2020 Page 14
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yak no
[curly Yak no
enivio _
3 e S
Fred eta:° a'�o'," �. — a
NIst Street to R Street
Fundng
Status Phase Phase Start Year nvvv] Federal Furd Code Federal Furds State And Code vale Ands Local w Total Funds
Phase IS End 3rd 4th an 86th
Report Date:June 03,2020 Page 15
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniP ID s.
_
3 e S
Fred eta:° a'�o'," a. — a a
S• 1st Street
S 1st Street to E Washingen Are
lane replace arb gNter and sidewalk and install a rretu trafic signaliz aeon sy3err.
Status Phase Phase StartYear[`IVY VI v.l Fv e Fed v n n s State Ad Code State Ads Local s Total nds
P PE 2026 ST PO Co Federal
PM
P CN 2026 siPM
Expenditure Schedule
Report Date:June 03,2020 Page 16
�n e.t Six Year Transportation Improvement Program
From 2021 to 2026
A ge my Yakima
Gouty Yakima
eniP ID _
3 e y
Fred eta:° a'�o'," �. — a a
thprove the Wa shin gto n Alen we and Long the r Road intersen on b y constw ding an
curb gutter ede.,iw.street I ig ai6.>m�dnise an fie.
lashin g sign al
Status P ha se Phase Start Year[WY VI F Federal n Local c Fed State Ad Code State AdsF Total Funds
P
PM
P CN 2026 nPM
Report Date:June 03,2020 Pagel]
t.t Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniP ID _
3 e y
Fred eta:° a'�o'," �. — a i
Powerhoua Road Multi Ua Path
Powerhoua Road
Constnct 10 foot paved pathwayari d install a crosswalk across Powerhouse Road
at Cowiche Caripri Road
Fundng
Status Phase Phase StartYear[`IVY VI Federal Fund Code Federal Funds e Fund Code vale Funs Local Funds Total Funds
Expenditure Schedule
Report Date:June 03,2020 Page 18
st Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yakima
Gouty Yakima
eniPio _
3 e S
Fred eta:° a'�o'," �. — a a
TW
°mid arid oveday and ADAcurb ramp replacement
Fundng
Status se Phase StartYear[`IVY VI Federal Fund Code Federal Funds State m o e vale Funds Local Funds Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
PE 30000 0 0 0 0
Report Date:June 03,2020 Page 19
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yak no
Gouty Yak no
eniPio _
3 e S
Fred eta:° a'�o'," �. — a a
TW
Teen [Me Pesurfacrig
Teen Einve
Onnd arid oveday and ADAcurb ramp replacement
Fundng
Status se Phase StartYear nvvv] Federal Furd Code Federal Furds State m o e vale Funds Local Furds Total Funds
Report Date:June 03,2020 Page 20
w ast Six Year Transportation Improvement Program
sersartaittan
From 2021 to 2026
Agerty Yakima
Gouty Yakima
.i A PIN/Project No
.< C Project Hie eniPio _
3 e S
Fred eta:° a'�o'," �. — a a
TIN
Feonstnot and widen 16th Afenue and"helm Lime by adding le t Vim lanes for all
Fundng
Status Phase Phase StartYear[`IVY VI v.l Fv e Fed v n n s State Ad Code State Ads Local s TotalFunds
S PE 2026 P Co Federal
PM
S CN 2026 sTPM
Expenditure Schedule
Report Date:June 03,2020 Page 21
��tan Six Year Transportation Improvement Program
From 2021 to 2026
Agerty Yak ma
Gouty Yak ma
enirio _
3 e S
Fred eta:° a'�o'," �. — a
Ian seeet underpass
Yak ma Aenue
Yak ma Aenue to 18th Street
Funeng
Status Phase Phase Start Year nvvv] Federal Furd Code Federal Furds State And Code State Ands Local F Total Funds
Federal Furds State Funds Local Furds Total Funds
Report Date June 03,2020 Page 22
Distributed at the
Meeting 12 JO- O
ga@ � -fi w4 Yakima Bikes and Walks!
's �� 4 g Yakima WA
4,,.?1,..4,07ip,,, ,4:4,..,4.7 .:1,,,.,,.;r.
i,,,.-,,,,47-'',0044:_000:43-.y_tl,:izvzo;„..,vt,trgi
0 l� V yakima.bikes@gmail.com
�t , : x :
r .; .. , : , ,,. www.facebook.com/YakimaBikes
June 16, 2020
Yakima City Council
City Hall
129 North Second Street
Yakima, WA 98901
Re: Public Hearing Comments - Six-Year Transportation Improvement Program for 2021-2026
Dear City Councilmembers:
Yakima Bikes and Walks! is a network of people who came together in 2014 to help make
Yakima more friendly for bicycles and pedestrians. We offer the following comments on the
city's proposed Six-Year Transportation Improvement Program for 2021-2026.
1
We hope that the City Council and staff will view and use this TIP as we do—as the primary
means for implementing the City's Bicycle Master Plan, which the City Council adopted in
2017. All of the funded projects on this TIP should incorporate the bicycle-friendly
improvements that are identified by the Bicycle Master Plan. As these projects are designed, the
1 following elements should be incorporated into the projects as listed below:
TIP
Priority Project Name and design elements identified by the Bicycle Master Plan
No.
1 34th Avenue/ Fruitvale Blvd. & 34th Avenue/ River Road Roundabouts—Bike
lanes on River Road,Bicycle Boulevard on 34th Avenue.
2 Bravo Company Boulevard Extension—Bike Lanes (connecting to the Yakima
Greenway).
3 E. Nob Hill Blvd & Fair Ave Intersection Improvements—Bike lanes on Fair
Avenue, north and south of the intersection.
4 McClure Elementary School Safety Improvements—Bike lanes on 24th Avenue.
S. 48th Avenue and W. Washington Avenue/ Spring Creek Road Improvements—
5 Buffered bike lanes on Washington Avenue connecting to the new bike lanes
adjacent to SOZO.
Yakima City Council
June 16,2020
Page 2
6 S. 72nd Ave and W. Washington Ave Improvements—Bike lanes on 72"d Ave, and
add protection to existing bike lanes on Washington Ave.
Cowiche Canyon Trail— This is a portion of the trail systems that will eventually
7 connect the Yakima Greenway and Cowiche Canyon Trail systems. Thanks to
Senator Curtis King.
Thank you,
Phil Hoge, for
Yakima Bikes and Walks!