Loading...
HomeMy WebLinkAboutR-2008-111 2009-2014 Six-Year Transportation Improvement Program [FUNDING RESOLUTION]RESOLUTION NO. R-2008-111 A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of 2009 through 2014 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at regular meetings of the Yakima City Council on July 1, 2008, and on July 15, 2008, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2009 through 2014 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2009 through 2014, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 15(h day of July, 2008. ATTEST: City Cle Davi • ''dler, Mayo • • 9. Appendices A. Six Year Form Instructions Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification' must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access Urban (Over 5000 pop.) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial • 17- Collector 19- Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c).Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. Description 07 - Resurfacing 08 - New Bridge Construction 09- Bridge Replacement 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety/Traffic Operation/TSM 13 - Environmentally Related 01- New construction on new alignment 02- Relocation Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06- Other Enhancements 25 14 - Bridge Program -Special . 21 - Transit Capital Project 22- Transit Operational 23 -.Transit Planning 24 - Transit Training/Admin. 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV O - Other S - Sewer (other than agency -owned) W - Water G - Gas P Power T - Telephone 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly/Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis'Program SCP - Small City Program AIP - Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15: Total Funds. • Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP Too" program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS . - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. RJW Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required" for Federally funded projects only.) 27 Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-1-2008 Adoption Date: Resolution No.: To 4 m c U LL w a, :o E i Z Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required (MMDate/VY) Federal Fund Code Federal Cost by Phase 1st 2nd _ 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 - Yakima Railroad Grade Separations - Phase 2 Lincoln Ave. 8 Martin Luther King J. Blvd. from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstructon, including realignment of Front Street. 01 06 07 08 S 0.2 T G O W S CN CN CN 1/1/2009 1/1/2009 4/1/2009 STP(U) 20600 FMSIB OTHER AIP 4500 2250 4650 1000 5500 2250 25250 15000' 18000 EA Yes 3/01/07 Totals 20,600 11400 1000 33000 15000 18000 14 2 16TH AVENUE REALIGNMENT 16TH AVENUE REALIGNMENT from AHTANUM ROAD to WASHINGTON AVENUE Realign 16th Avenue out of the runway safety area of the Yakima Air Terminal Includes FAA funds. 01 08 S 1.0 P O T W $ CN 4/1/2009 3840 38401 3840 EA Yes 11/2007 Totals 3840 3840 3840 00 3 YVT Railway Rehabilitation & Museum 3rd Ave from: 3rd Ave to: Pine St Car Barn, Museum Restoration and Pathway 03 P N/A G C S T W P PE CN 1/1/2009 6/1/2009 STP(E) STP(E) 18 1900 _ 32 285 50 21851 50 2185 EA No Totals 1,918 317 2235 2235 00 4 ' Transit Operating Expenditures Various Funding Areas from: N/A to' N/A Supplemental Funding for Transit Service Operating Expenses 12 22 23 24 31 S N/A CN 1/1/2009 5307 1655 1655 33101 3310 CE No Totals 1,655 1655 3310 3310 Report Date: July 10, 2008 • Page 1 v. 5.7 - Supersedes previous editions • Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 7-1-2008 Hearing Date: Amend Date: Adoption Date: Resolution No.: Functional Class Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. ' Project Title D. Street/Road Name or Number• E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement I Type(s) �— vi in ITotal Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase 1 Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 YVTTrolley Barn/Powerhouse Rehabilitation S 3rd Ave0 from: to: Minor car barn and powerhouse restoration including property purchase 03 S N/A C G P S T W PE RW CN 1/1/2009 1/1/2009 1/1/2009 STP(E) STP(E) STP(E) 36 205 255 36 205 255 36 205 255 - CE Yes 06/01/07 Totals 496 496 496 00 6 Street Asset Amenities (Transit) Route Maintenance, Repair and Improvements from: to: Maintenance of Shelters, Benches and Signage throughout our Transit Route System 22 31 - S N/A ALL 1/1/2009 WSDOT . - 50 50 - 50 - CE No Totals 50 50 50 00 7 William 0 Douglas Trail 6th Ave Pathway & Bridge Decking from: to: Build pathway and install pathway decking on Naches River bridge with partner William 0 Douglas Trail Fundation 32 08 06 S 1.0 ' 0 P w T CN 4/1/2009 STP(E) 525 5251 525 CE No Totals 525 525 525 00 8 William 0. Douglas Hentage Trails Bridge Restoration & Trailhead from: - to: Trailhead restoration, right of way acquisition partner with the Wiliam 0. Douglas Foundation, including restoration of bndge , cleaning, rust removal and painting 32 13 10 S N/A G P S T W PE RW CN 1/1/2009 1/1/2009 1/1/2009 STP(E) STP(E) STP(E) 65 150 285 65 150 285 65 150 285 CE Yes 01/01/07 Totals 500 500 500 Report Date: July 10, 2008 Page 2 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7-1-2008 Adoption Date: Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or NumberRequired E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase 1 Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Date (MMyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 Transit Service to Terrace Heights New University & Retail Links from: to: Provide Transit service to this growing area of Yakima County to include the new University & Retail Shops 22 S N/A ALL 1/1/2009 WSDOT 51 9 60 60 No Totals 51 9 60 60 14 10 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to: S 68th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 P -77 P G O T T W PE RW CN 1/1/2009 1/1/2009 1/1/2009 STP(U) 1000 TPP TPP 200 1300 300 200 2000 500 200 4300 500 200 4300 EA Yes 01/01/07 Totals 1,000 1500 2500 5000 5000 00 11 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN CN 1/1/2009 4/1/2009 4/1/2009 STIP (S) STP(S) STIP (S) 60 180 360 AIP 240 60 120 420 360 120 420 360 CE No Totals 600 240 60 900 120 780 00 12 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 PEA N/A W S CN 6/1/2009 I STP(U) 228 32 2601 260 No Totals 228 32 260 260 Report Date' July 10, 2008 Page 3 • v. 5.7 - Supersedes previous editions Am Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG S Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7/1/2008 Adoption Date: Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars - Expenditure Schedule Local Agency Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM/y1� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 : 12 13 14 15 16 17 18 19 20 21 00 13 Storm Drains Vegetation Local Selection from: City Wde to: City Wde 32 P N/A PE CN 1/1/2009 1/1/2009 100 900 100 900 100 900 EA No Totals 1000 1000 1000 17 14 Reconstruction Rudkin Rd Rudkin Rd from: E Viola Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P .76 W T S PE CN 1/1/2010 1/1/2011 STP(C) STP(C) 109 945 TPP 945 27 106 136 1996 136 1996 CE No Totals 1,054 945 133 2132 136 1996 16 15 E Mead Ave Reconstruction E Mead Ave ' from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P .76 C G 0 P T PE CN 9/1/2010 4/1/2010 STP(S) STP 122 1730 TPP TPP 23 206 7 70 152 2006 152 2006 CE No _ Totals 1,852 229 77 2158 , 152 ' 2006 19 16 LongfiberRd &WashingtonAve Intersection - from: - - to: New intersection construction and reconstruction, 3 -lane and 5 -lane Mum,7/1/2009 curb, gutter, sidewalks. 03 05 06 P N/A p S W T PE CN 1/1/2010 1/1/2011 STP(U) STP(U) 100 - 700 14 95 114 795 114 795 CE Yes Totals 800 ' 109 909 114 795 Report Date: July 10, 2008 Page 4 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7/1/2008 Adoption Date: Amend Date: Resolution No.: m g;Local B a U LLE. Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) a u) Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase 1 Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required DateV) (MM/y Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 17 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill, (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 C S W T CN 1/1/2009 STP(U) 240 42 282 282 CE Yes 01/01/07 Totals 240 42 282 282 16 18 Roadway City Wide Shoulder Improvements City Wide from. ' to: City Wde shoulder improvements, PM10 abatement. 01 P N/A S PE CN 4/1/2009 7/1/2009 CMAQ CMAQ 24 480 3 65 27 545 27 545 CE No Totals 504 68 572 572 14 19 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from' E Nob Hill Blvd to: Fair Ave Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting, stormwaler 31 03 04 S N/A O C P T W PE 1/1/2009 STP(U) 72 11 831 83 CE Yes 10/01/2009 Totals 72 11 83 83 17 20 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tielon Dr to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 O P T W S PE RW CN 1/1/2009 1/1/2010 6/1/2010 AIP AIP AIP 131 382 1667 20 59 260 151 441 1927 151 441 1927 EA Yes 01/01/09 Totals 2180 339 2519 151 2368 Report Date: July 10, 2008 410 Page 5 v. 5.7 - Supersedes previous editions Washington State Department of Transportation WAF Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG ' • • Six Year Transportation Improvement Program From 2009 to 2014 7/1/2008 Adoption Date: Resolution No.: - Hearing Date: Amend Date: c :F., m c LL Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E.' Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M >7 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2009 STP(E) 22 7 29 29 17 21 05 S .15 C CN 6/1/2009 STP(E) 75 20 95 95 CE Zier Rd - S 75111 Ave to S 72nd Ave 06 S Zier Rd from: S 75th Ave - to: S 72nd Ave T P Yes Minor vndening, curb, gutter and sidewalk 03/01/09 Totals 97 27 124 124 17 22 05 P 1.0 W PE RW 1/1/2012 6/1/2012 STP(C) STP(C) 272 349 43 55 315 404 315 404 EA Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to- N 56th Ave 06 S T P CN 1/1/2013 STP(C) 2352- - 340 - 2692 - 2692 Yes Widen roadway, curb, gutter, sidewalk 0 04/01/11 • Totals 2,973 438 3411 3411 17 23 05 P 2 PE RW 1/1/2010 1/1/2011 STP(U) STP(U) 219 327 34 51 253 378 253 378 EA Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave 06 W S CN 6/1/2012 STP(U) 2980 244 3224 3224 Yes from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 01/01/10 Totals 3,526 '329' 3855 - 253 378 3224 00 24 14 P .25 T T PE 1/1/2011 . 3/1/2012 STP(E) STP(E) 252 34 286 286 Pedestrian Bridge 34 CN 3150 412 . 3562 3562 CE Pedestrian Bridge 0 No from: N 10th St to: Yakima Greenway Construct pedestrian bndge from Gateway area to Yakima Greenway, power, handicap accessible, lights Totals 3,402 446 3848 286 3562 Report Date' July 10, 2008 Page 6 v. 5.7 - Supersedes previous editions V// Agency: Yakima Washington State Department of Transportation Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7/1/2008 Adoption Date: Amend Date: Resolution No.: o m c U. Li_ ' E Cl-nZ Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title Street/Road-Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done d E a E E m rn rn J ;o i2 m v rT - Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (Mpl/yy) Federal Fund Code Federal Cost b y Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00. 25 Gravel Road 8 S.T. Vanous Areas from: City Wide to: 07 P N/A S PE CN 4/1/2009 6/1/2009 CMAQ 195 252 38 252 233 100 70 82 233 CE No Totals 195 290 485 100 70 315 16 26 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, possible roundabout 12 P N/A T P 0 S S W CN 10/1/2010 STP(S) 504 74 5781 578 CE Yes 09/01/2009 Totals 504 74 578 578 14 27 S 48th Ave & Summdwew Ave Signalization S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 12 P N/A P T PE RW CN 1/1/2012 6/1/2012 8/1/2013 STP(S) STP(S) STP(S) 25 25 554 4 4 81 29 29 635 - 29CE 29 635 Yes 06/01/12 Totals 604 89 693 693 16 28 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to. W Washington Ave Signal Upgrades 12 p - N/A T PE CN 4/1/2009 6/1/2009 13 214 13 214 13 1 214 CE No Totals 227 227 227 Report Date: July 10, 2008 • Page 7 • v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG • Six Year Transportation Improvement Program From 2009 to 2014. Hearing Date: 7/1/2008 Adoption Date: Amend Date: Resolution No.: To UC. S o LL Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Types) in Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (M yl Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 12 S N/A P PE RW 1/1/2009 6/1/2009 AIP AIP 120 84 52 36 172 120 100 40 72 80 CE S 16th Ave & W Washington Ave Signal & Intersection. 05 T CN 6/1/2009 AIP 880 383 1263 1263 Yes S 16th Ave from: S 16th Ave to: W Washington Ave 03 Included in Union Gaps Valley Mall Blvd. protea 3/1/2009 Totals 1084 471 1555 1403 152 14 30 12 P 2 5 P PE RW 1/1/2010 6/1/2010 STP(S) STP(S) 55 107 8 19 63 126 63 126 CE W Nob Hill Blvd Sidewalks - . T CN 3/1/2011 STP(S) 321 57 378 - 378 Yes W Nob Hill Blvd from: S 16th Ave to: S. 6th St. W S Install missing sidewalks on southside of Nob Hill. 09/01/08 Totals 483 84 567 189 378 00 31 • 06 P 1.0 P PE RW 1/1/2011 6/1/2011 STP(S) STP(S) 57 189 7 25 64 214 64 214 CE Beech St Pedestnan Connection 32 T CN 1/1/2012 STP(S) 504 68 572 572 Yes Beech St from: Fair Ave to: Chalmers/Riverside Construct pedeslnan pathway under SR82 to Greenway 09/01/10 Totals 750 100 850 .64 786 16 32 12 P 2.0 P PE RW 1/1/2011 6/1/2011 STP(S) STP(S) 43. 86 7 15 50 101 50 101 CE WLnncolnAve Sidewalks T CN 1/1/2012 STP(S) 572 _ 88 .660 660 Yes W Lincoln Ave S from: N 56th Ave to: N 29th Ave W Sidewalks, meters and fire hydrants replacement or relocation 09/01/11 Totals 701 110 811 -811 Report Date: July 10, 2008 Page 8 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7/1/2008 Adoption Date: Amend Date: Resolution No.: m ,, U,2 c 5n. u.E. w ':o E Z Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) 2 u) Total Length I Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (min/cid/MA Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2010 STP(E) 424 67 491 491 14 33 01 P .5 W RW 1/1/2011 STP(E) 1047 163 1210 1210 CE WLincoln Ave & 'B' St Realignment 12 S CN 1/1/2012 STP(E) 1801 281 2082 2082 Yes W Lincoln Ave from: W 5th Ave to: Custer St P 0 09/01/11 Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G C Totals 3,272 511 3783 491 3292 PE 1/1/2009 PSMP 13 2 15 15 16 34 12 p N/A W CN 1/1/2009 PSMP 239 48 287 1 287 CE School Safety Projects No Various Locations - Citywide from: to Crossing flashers, sidewalks, signing, other features Totals 252 50 302 302 PE 1/1/2010 STP(C) . 546 84 630 630 14 35 03 p .85 C RW 1/1/2011 STP(C) 1090 170 1260 1260 EA E Nob Hill Blvd Reconstruction 04 G CN 1/1/2012 STP(C) 6539 1013 7552 7552 Yes E Nob Hill Blvd. from: S 6th Street to: S 18th Street 06 P S 1/1/2010 Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters T Totals 8,175 ' 1267 9442 9442 an hydrants W PE 1/1/2010 STP(C) 91 14 105 105 17 36 01 PRW N/A W 1/1/2011 STP(C) 91 14 105 105 CE S 72nd Avenue & WWashington Avenue 12 T CN 1/1/2012 STP(C) 544 86 630 630 Yes S 72nd Ave from: S 72nd Ave to: W Washington Ave 06 P O 1/1/2011 Intersection improvement, possible roundabout _ Totals 726 114 840 840 Report Date July 10, 2008 • Page 9 • v. 5.7 - Supersedes previous editions Washington State Department of Transportation 11,71 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG • • Six Year Transportation Improvement Program From 2009 to 2014 7/1/2008 Adoption Date: Resolution No.: Hearing Date: Amend Date: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/Y11 Federal Fund Code ' Federal Cost by. Phase, 1st 2nd 3rd 4th Thru 6th 2 3 , 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 37 4579 S 1st St. - E Washington Ave. Intersection Improvement S 1st St. from: S 1st St. ' to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P N/A _ P W S T O PE 6/1/2009 STP 252 38 290 290 EA Yes 01/01/11 Totals 252 38 290 290 16 38 4562 Tieton Dr - S 5th Ave. Intersection Protect Tieton Drive from' 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A P W T 0 S ALL 4/4/2010 STP(U) 378 WSDOT 378 7561 756 CE No 'Totals 378 378 756 756 17 39 4587 S 48th Ave. Reconstruction S 48th Avenue from: Sumrnitview Ave. to: Nob Hill Blvd. Wden, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 _ P T W S .O ALL 4/1/2009 STP 2268 307 25751 525 2050 EA No Totals 2,268 307 2575 525 2050 14 40 South 72nd Ave & Mead Ave Intersection South 72nd Ave • from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 p N/A O P S T W PE CN 1/1/2009 6/1/2009 STP(U) STP(U) 51 383 _ 8 61 59 444 59 444 CE ' No Totals 434 69 503 503 Report Date: July 10, 2008 Page 10 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: 7/1/2008 Adoption Date: Amend Date: Resolution No.: T.) o U LL w .o a D Z Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - MP or Road g 9 Ending F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNVc Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 . 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 41 . William 0 Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trail. 14 32 P N/A 0 S P W PE CN 1/1/2009 7/1/2009 STP(E) STP(E) 10 109 2 17 12 126 12 126 CE No Totals 119 19 136 138 17 42 S 66th Avenue S 66th Ave from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 03 P .76 W T S P -0 0 PE CN 1/1/2009 7/1/2009 STP(E) STP(E) 23 1096 5 164 28 1260 28 1260 Yes 1/1 /2009 Totals 1,119 169 1288 1288 16 43 . 66th Ave. & Summitview Intersection N. 66th Avenue & Summitview from: N. 66th Ave. to: Summitview Ave. Widen for left turn lanes, intersection improvements, curb, gutter, handicap ramps and lighting 05 12 p .20 G 0 S T W C PE RW CN 1/1/2010 6/1/2010 7/1/2011 STP(S) STP(S) STP(S) 164 382 1090 25 60 170 189 442 1260 189 442 1260 CE Yes 1/1/2010 Totals 1,636 255 1891 189 442 1260 14 44 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: Summitview Signal upgrade, radius improvements, turn lane extension 12 P N/A W S P 0 PE RW CN 1/1/2010 1/1/2010 6/6/2010 STP(U) STP STP(U) 126 63 544 17 8 86 143 71 630 143 71 630 CE Yes 1/1/2010 Totals 733 111 844 844 Report Date July 10, 2008 • Page 11 v. 5.7 - Supersedes previous editions Washington State Department of Transportation _ Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG 1 Six Year Transportation Improvement Program From 2009 to 2014 7-1-2008 Hearing Date: Amend Date: Adoption Date: Resolution No.: To N A c o m Priority I Number Project Identification ' A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Types) Status Total Length Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Utility Codes Project Phase Phase Start (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds • Envir. Type R/V1! Required Date (M y) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6[h 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ' 17 18 19 20 21 14 45 40th Avenue and Englewood 40th Avenue from: 40th Avenue to: Englewood Replace traffic signal poles, upgrade controller 12 P N/A W PE RW T CN S P 1/1/2010 1/1/2010 1/1/2011 STP. • STP STP 95 63 145 13 8 20 108 71 165 108, 71 165 CE Yes 1/1/2010 Totals 303 41 344 344 00 46 16th Avenue and Fruilvale Blvd 16th Avenue from 16th Avenue to: Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps' 12 P N/A WPE RW T CN S P 1/1/2010 6/1/2010 1/1/2011 STP STP STP 126 63 315 _ _ 18 8 43 144 71 358 144 71 358 CE Yes 6/1/2010 Totals 504 69 573 573 14 47 1st Street and / Street 1st Street from: 1st Street to: I Street Replace and upgrade traffic signal equipment 12 P N/A WPE T CN S P 0 1/1/2010 1/1/2011 STP STP 32 126 5 17 37 143 37 143 CE No Totals 158 22 180 180 14 48 Mead Ave Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities 01 P •25 W PE RW T CN S P 6/1/2011 .1/1/2012 1/1/2013 STP(U) STP(U) STP(U) 820 3150 6552 189 630 1008 1009 3780 7560 1009 3780 7560 CE • Yes 1!1/2012 Totals 10,522 1827 12349 4789 7560 Report Date: July 10, 2008 Page 12 v. 5.7 - Supersedes previous editions ' Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-1-2008 Adoption Date: Resolution No.: Report Date: July 10, 2008 • Page 13 • v. 5.7 - Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Expenditure Schedule Federally Funded Projects Only Project Phase Fund Source Information To v A. PIN/Federal Aid No. B. Bridge No. d _ rn 2 (Local Agency) Federal Funding R/W o N '— n C. Project Title d s B m U. u m g U ° E n D. Street/Road Name or Number > n. rn _ Phase Federal Federal State Total 4th nvir. Required Date E. Beginning MP or Road - MP or Road 9 9 Ending Start Fund Cost by Fund State Funds Local Funds Funds 1st 2nd 3rd Thru 6th Type(MM/YY) F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 6/1/2011 STP(U) 820 189 1009 1009 16 49 01 P .25 0 RW 1/1/2012 STP(U) 3150 630 3780 3780 CE Yes Washington Ave. Railroad Grade Separation S CN 1/1/2013 STP(U) 6552 1008 7560 7560 Washington Ave. T from: Longfibre Road to W 1/1/2012 Railroad grade overpass including all utilities Totals 10,522 1827 12349 12349 PE 6/1/2011 STP(U) 252 38 290 290 CE 16 50 01 P 4.0 0 RW 1/1/2012 STP(U) 756 88 844 844 Yes Citywide Pathway Connections S CN 1/1/2013 STP(U) 1890 315 2205 2205 Yakima from: to T W 1/1/2012 Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Naches Rail Spur, signage and amenities Totals 2,898 441 3339 290 3049 PE 1/1/2011 STP(U) 2180 340 2520 2520. 16 51 01 P 1.1 O RW 1/1/2013 STP(U) 2180 340 2520 2520 CE E 'H"St Extension 08 P CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes E."H"St. from: 1st St. to. Yakima River T W 1/1/2013 Construct road including water, sewer, curb, gutter and sidewalk for future development. Totals 5,559 2551 8110 8110 PE 1/1/2012 STP(C) 700 108 808 808 17 52 01 P 1.3 0 RW 1/1/2013 STP(U) 5500 850 6350 6350 CE Yes N 10th St Extension 06 P CN 6/1/2013 STP(U) 7900 972 8872 8872 N. 10th St. from. R St. to. 10th Street - Lincoln Ave. T W 1/1/2013 Construct road including water, sewer, curb, gutter, sidewalk for future development. Totals 14,100 1930 16030 16030 Report Date: July 10, 2008 • Page 13 • v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG • Six Year Transportation Improvement Program From 2009 to 2014 7-1-2008 Hearing Date: Amend Date: Adoption Date: Resolution No.: mA. t.,9' m S U Priority I . Number Project Identification PIN/Federal Aid No. B. Bridge g No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (Miwyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 53 YVT Pathway YVT Railway Corridor. _ frorn: to: Development pathway in West Valley area including 53rd Ave, Wde Hollow, 64th Ave, Ahlanum including all utilities and signage 03 32 P N/A 0 P S T w PE CN 1/1/2012 6/1/2012 STP(U) STP(U) 315 945 38 126 353 1071 353 1071 CE No Totals 1,260 164 1424 1424 17 54 34th Ave &River Rd Improvements Fruitvale Blvd. from: 34th Ave. to: River Rd. Intersection improvements including lumination, sewer, water, curb, water and sidewalks 01 12 P N/A 0 P S T W PE CN 1/1/2011 6/1/2011 STP(U) STP(U) 63 567 5 76 68 643 1 68 643 _ CE No Totals 630 81 711 711 17 55 Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. 01 05 12 P 1.0 - O P S T W PE RW CN 1/1/2010 6/1/2011 1/1/2012 STP(U) STP(U) STP(U) 218 327 2980 34 51 244 252 378 3224 252 378 3224 CE Yes 6!1/2011 Totals 3,525 329 3854 630 3224 16 56 Frontage Road & "H" St Loop N. 8th St. from: "H" St. to: 1-82 Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for future development and Terrace Heights connection. 01 P 1.3 C G 0 P S T ' W PE RW CN 1/1/2010 6/1/2010 1/1/2011 STP(U) STP(U) STP(U) 272 349 2352 - 43 55 340 315 404 2692 315 404 2692 CE Yes 6/1/2010 Totals 2,973 438 3411 719 2692 Report Date: July 10, 2008 Page 14 v. 5.7 - Supersedes previous editions T Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 7-1-2008 Hearing Date: Amend Date: Adoption Date: Resolution No.: 4 s 5 - o c' 8: Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - MP or Road 9 9 Ending F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RAN Required Date (MM/YV) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18. 19 20 21 00 57 Citywide Alleys from: to' Pave alleys throughout the city 07 P .5 G P S W T CN 6/1/2009 75 75 25 25 25 CE No Totals 75 75 25 25 25 14 58 Nob Hill Corridor Nob Hill from: 1-82 to' S. 16th Ave. Widen roadway, sidewalk, curb, gutter, fighting 03 04 P 2.7 C G 0 P S T W PE 1/1/2010 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 14 59 40th Ave. Corridor 40th Ave. from: SR -12 to: Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting. 04 P 3.2 C 0 G P S W T PE 1/1/2011 STP(U) 120 17 1371 137 CE Totals . 120 17 137 137 14 60 16th Ave Corridor 16th Ave. from: SR -12 to: a Kington Ave.Nalley Mall 6Y.. Widen roadway, curb, gutter, sidewalk, lighting 04 P 3.5 C G 0 P S T W PE 1/1/2012 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 Report Date: July 10, 2008 Page 15 • v. 5.7 - Supersedes previous editions • Washington State Department of Transportation Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG • Six Year Transportation Improvement Program From 2009 to 2014 7-1-2008 Hearing Date: Amend Date: Adoption Date: Resolution No.: a 4 m .0 _ c o LL Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only d m . a •o a Phase Start (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M yl Federal Fund Code Federal Cost by Phase 1st 2nd. 3rd 4th 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 61 S. 1st St/Main St Comdor S. 1st St./Main St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap to olden roadway, curb, gutter, sidewalk, lighting. 04 P 2.0 C G 0 P S T W PE 1/1/2012 STP(U) 120 17 137 137 CE Totals 120 17 137 137 14 62 W. Yakima North/South Connector to West Valley Unknown road from: North - South to: in West Valley City 8 County joint project to build/extend roadways. 01 04 06 P 6.0 C G 0 P S T W PEI 1/1/2012 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 00 63 West Side Transit Center Placement Study Acquire Property to Expand Operations from: to: Recent Annexations Mandate Transit Expansion to These Areas 23 S N/A PE 1/15/2009 OTHER 100 1001 100 Totals 100 100 1o0 16 64 W Nob Hill Blvd -S 68th Ave to S 72nd Ave. W Nob Hill Blvd from: S. 68th Ave. . to: 72th Reconstruct to minor artenal standards. • - 04 03 P 73 C W 0 P T S CN ' 6/1/2009 432 68 5001 500 Totals - 432 68 500 500 Report Date: July 10, 2008 Page 16 v. 5.7 - Supersedes previous editions v Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7/1/2008 Adoption Date: Resolution No.: m o m o• LL Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. 'Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase 1 Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. T e yP R/W Required Date (MM/YV) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 65 Yakima Downtown Future Initiatives, Phase 4 from: 1st Street to: 9th Street Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. 06 12 S .60 P W S T O PE CN 5/1/2009 4/1/2010 OTHER OTHER 400 2600 400 2600 400 2600 CE No Totals 3000 3000 3000 00 66 Coolidge Road Widening and Paving. from. 80th AVE to: 88TH AVE. Widen roadway and pave with curb and gutter. 03 05 06 S .50 S W T T CN 1/1/2009 CMAQ 440 214 • 6541 654 CE No Totals 440 214 654 654 16 67 Occidental Road Construction from:' 58th Ave. to: 64th Ave. Construct roadway 01 p .38 S W P T PE 1/1/2012 100 1001 100 Totals 1o0 100 100 00 68 86th Ave Road Construction from Occidental to: Coolidge Construct roadway 01 P 27 PE 1/1/2012 100 1001 100 Totals too 100 100 Report Date' July 10, 2008 • Page 17 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG • Six Year Transportation Improvement Program From 2009 to 2014 Hearing Date: Amend Date: 7-1-2008 Adoption Date: Resolution No.: o_` 6„ c U LLState Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. . Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) S' co Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only 1 Project Phase Phase Start' (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code Funds Local Funds Total Funds Envir. Type R/W Re uired 4 Date (MftNY Federal Fund Code Federal Cost by Phase - 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 69 64th Ave. Roadway kt4denmq. from: Washington Avenue. to. Tieton Drive. Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 04 06 P 1.5 wPE G P T C O 1/1/2012 STP(U) 120 17 137 • 137 EA YES 7/4/2012 Totals 120 17 137 137 00 70 Purchase four newtransitbuses(replacements) On-going vehicle replacement program from: to: - Seek RFP's to acquire four new transit buses that will replace units that are 15 years of age (six years past federal standards) 21 S _ N/A ALL 1/1/2009 5309(Bus) 1540 15401 1540 - CE No Totals 1540 1540 1540 00 71 Acquisition of new Dial -A -Ride paratransit vehicles Replace several older vehicles from: to: Upgrade Dial -A -Ride service by replacing several older vehicles wnh new models. 21 S N/A ALL 6/1/2009 85 30 1151 115 CE No Totals 85 30 115 115 14 72 Nob Hill Overpass Repair from: 1st Street to: Ledwich Ave Make necessary repairs to Railroad Overpass (Bndge) 11 P 0.2 CN 4/1/2009 BR • • 700 360 i 1060 I 1060 - CE No Totals 700 360 1060 - 1060 Report Date: July 10, 2008 Page 18 v. 5.7 - Supersedes previous editions Ink Washington State Department of Transportation -ii Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2009 to 2014 7-1-2008 Hearing Date: Amend Date: Adoption Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir, Type R/Nt Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 73 E Lincoln 810th Street Roundabout from: E. Lincoln to E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk. & street lighting 03 05 06 P N/A PE RW CN 1/1/2009 1/1/2010 6/1/2010 STP(U) STP(U) STP(U) 173 433 1125 27 67 175 200 500 1300 200 500 1300 Yes 4/1/2010 Totals 1,731 269 2000 200 1800 12 74 S R.12 & 16th Avenue interchange Interchange from- 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout 03 06 P N/A O ALL 1/1/2009 STP(U) 865 135 10001 1000 CE No Totals 865 135 1000 1000 11 75 1-82 & Lincoln Avenue Interchange I-82 Interchange from: E. "G" Street to: I-82 Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue to E. "G" Street. 01 P N/A O P C i 1 I 1 1 1 1 I 1 1 1 EA Yes 6/2011 Totals 14 76 E. Yakima Avenue & Fair Avenue Signalizabon from E. Yakima Avenue to: Fair Avenue Construct Traffic Signal 12 P N/A P W T S O ALL 1/1/2010 STP(U) 865 135 1000 i 1000 CE No Totals 865 135 1000 1000 Report Date: July 10, 2008 • Grand Totals for Yakima 123,098 21,344 29,785 174,227 40,215 33404 30,005 70,603 Page 19 • v. 5.7 - Supersedes previous editions O BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON CORRECTED AGENDA STATEMENT Item No. 7 For Meeting of July 15, 2008 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six-year Transportation Improvement Program (TIP) for years 2009 to 2014, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMITTED BY: Department of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: Brett Sheffield, P.E., Chief Engineer, 576-6797 SUMMARY EXPLANATION: See Attached. Resolutions X Ordinance_ Contract Other (Specify) STIP and STIP Form Instructions STAFF RECOMMENDATION: 1) Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2) Adopt the plan. BOARD/COMMISSION RECOMMENDATION: ® COUNCIL ACTION: O Six-year Transportation Improvement Program (continued) SUMMARY EXPLANATION: Attached is the 2009-2014 Six -Year TIP. Three projects have been added to the six-year TIP following the July 1, 2008 meeting. These projects are: • #74. SR12 and 16th Avenue Interchange Improvements • #75. I-82 and 'G' Street Interchange • #76. Fair Avenue and Yakima Avenue Intersection Signal Project rankings are determined by reviewing data supplied by the City's Street and Traffic Division and integrating particular needs of the City. Projects that were deleted from the 2008-2013 TIP as they were completed or funds were obligated include: • Downtown Yakima Futures Initiative, Phase 3 • Tieton Pedestrian Safety Improvements Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP listing will be finalized at today's hearing and sent to Yakima Valley Conference of Governments, (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2009 — 2014 includes sixteen (16) funded projects and locally identified activities. Funding for the remainder of the projects will continue to be sought. On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for. the 21g Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utili7P federal funds or by the State of Washington for approved State -funding agencies. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the 2 - July 14, 2008 Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. All Transaction Committee projexts within the city limits are listed in the TIP with at least preliminary engineering needs identified. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Plan for 2009 to 2014. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. •