HomeMy WebLinkAboutR-2007-095 2008 to 2013 Six-Year Transportation Improvement Plan Adoption (TIP)RESOLUTION NO. R — 2007 - 95 A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of 2008 through 2013 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at regular meetings of the Yakima City Council on June 19, 2007, and on July 3, 2007, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2008 through 2013 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2008 through 2013, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 3rd day of July, 2007. ATTEST: Deborah Moore, City Clerk 40/ Davi. • ler, Mayor Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007- Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mmfdd/yyYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M y) 21 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 14 1 Yakima Railroad Grade Separations - Phase 2 Lincoln Ave. & Martin Luther King J. Blvd. from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstructon, including realignment of Front Street. 01 06 07 08 S 0 2 T p G W S PE RW CN 6/1/2008 8/1/2008 4/1/2009 STP(U) STP(U) STP(U) 5500 3000 7000 AIP OTHER AIP 1285 7500 1000 7785 3000 14500 3000 3000 3000 4785 11500 EA Yes 3/01/07 Totals 15,500 8785 1000 25285 9000 16285 14 2 16TH AVENUE REALIGNMENT 16TH AVENUE REALIGNMENT from: AHTANUM ROAD to: WASHINGTON AVENUE Realign 16th Avenue out of the runway safety area of the Yakima Air Terminal. Includes FAA funds. 01 08 S 1.0 P 0 T W S CN 1 4/1/2009 I 1 3840 38401 3840 1 CE Yes 11/2007 Totals 3840 3840 3840 00 3 YVT Railway Rehabilitation & Museum 3rd Ave from: 3rd Ave to: Pine St Car Bam, Museum Restoration and Pathway 03 P N/A G C S T F PE CN 1/1/2008 6/1/2008 STP(E) STP(E) 18 1816 32 272 50 2088 I 50 2088 EA Na Totals 1,834 304 2138 2138 00 4 Transit Operating Expenditures Various Funding Areas from: N/A to: N/A Supplemental Funding for Transit Service Operating Expenses 12 22 23 24 31 S N/A1 CN 1/1/2008 5307 1650 1650 3300 I 3300 I CE No Totals 1,650 1650 3300 3300 Report Date: June 27, 2007 Page 1 v. 5.7 - Supersedes previous editions � Washington State Department of Transportation W Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/VV Required Date M Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 YVT Trolley Barn/Powerhouse Rehabilitation S 3rd Ave from: to: Minor car barn andpowerhouserestorationS including property purchase 03 S C G 0 P T W PE RW CN 6/1/2008 6/1/2008 6/1/2008 STP(E) STP(E) STP(E) 36 205 255 36 205 255 36 205 255 CE Yes 06/01/07 Totals 496 496 496 00 6 Street Asset Amenities (Transit) Route Maintenance, Repair and Improvements from: to: Maintenance of Shelters, Benches and Signage throughout our Transit Route System 22 31 S N/A ALL 1/1/2008 50 501 50 CE No Totals 50 50 50 00 7 Wiliam 0. Douglas Trail 6th Ave Pathway & Bridge Decking from: to: Build pathway and install pathway decking on Naches River bridge with partner Wiliam 0. Douglas Trail Fundation 32 08 06 S 1.0 0 S W T PE CN 1/1/2008 4/1/2009 STP(E) STP(E) 57 271 57 271 57 1 271 CE No Totals 328 328 328 00 8 Wiliam 0. Douglas Heritage Trails Bridge Restoration & Trailhead from: to: Trailhead restoration, right of way acquisition partner with the William 0. Douglas Foundation, including restoration of bridge , cleaning, rust removal and painting 32 13 10 S G P S T W PE RW CN 1/1/2008 1/1/2008 1/1/2008 STP(E) STP(E) STP(E) 65 150 285 65 150 285 65 150 285 CE Yes 01/01/07 Totals 500 500 500 Report Date: June 27, 2007 Page 2 v. 5.7 - Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederalAid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) m 11 rn Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RAN Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 Transit Service to Union Gap. Demonstration Transit Project Expansion from: to: Demonstration project that provide service to, and around Union Gap. 22 31 S ALL 1/1/2008 CMAQ 63 63 7 70 70 No Totals 63 7 70 70 00 10 West Side Transit Center Placement Acquire Property to Expand Operations from: to: Recent Annexations Mandate Transit Expansion to These Areas 12 28 21 P NNPE 1/15/2008 OTHER 50 50I 50 Totals 50 50 50 16 11 W. Nob Hill Blvd -S 68th Ave to S. 72nd Ave. W Nob Hill Blvd from: S. 68th Ave. to: 74th Reconstruct to minor arterial standards 04 03 P 73 C W 0 P T s CN 6/1/2009 4321 68 5001 500 Totals 432 68 500 500 14 12 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to: S 68th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 P .77 p C G 0 S T W PE CN CN 1/1/2008 6/1/2008 10/1/2008 STP(U) STP(U) 248 360 TPP 2011 20 48 232 268 408 2243 268 408 500 1743 EA Yes 01/01/07 Totals 608 2011 300 2919 1176 1743 Report Date: June 27, 2007 Page 3 v. 5.7 - Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 ' 9 10 11 12 13 14 15 16 17 18 19 20 21 00 13 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN CN 8/1/2008 8/1/2008 8/1/2008 STIP (S) STP(S) STIP (S) 60 180 360 AIP 240 60 120 420 360 120 420 360 CE No Totals 600 240 60 900 120 780 00 14 Various Overlay Projects/Selected on Local Pnority N/A from: N/A to: N/A 07 P N/A WCN S 7/1/2008 STP(U) 228 1 32 2601 260 EA No Totals 228 32 260 260 00 15 Storm Drains/Vegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2008 1/1/2008 96 864 96 864 96 1 864 EA No Totals 960 960 960 17 16 Reconstruction Rudkin Rd Rudkin Rd from: E Vola Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P 76 WPE T P S CN 1/1/2010 1/1/2011 STP(C) STP(C) 104 900 TPP 900 26 101 130 1901 130 1901 CE No Totals 1,004 900 127 2031 130 1901 Report Date: June 27, 2007 Page 4 v. 5.7 - Supersedes previous editions 4111 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done II, Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. ' Type(MM�� R/W Required Date Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 17 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P .76 C G P T PE CN 9/1/2009 4/1/2009 STP(S) STP 116 1648 TPP TPP 22 196 7 66 145 1910 145 1910 CE No Totals 1,764 218 73 2055 145 1910 19 18 Long(berRd- Phase 2(3 -Phases) Longfiber Rd from: Valley Mat Blvd to: W Washington Ave New roadway construction and reconstruction, 3 -lane w/tum, curb, gutter, sidewalks - Partner with City of Union Gap, waterloop with development 01 03 P .50 P S T PE CN 1/1/2009 1/1/2010 127 1411 127 1411 127 1411 CE No Totals 1538 1538 127 1411 14 19 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P .1 C S T PE RW CN 1/1/2008 3/1/2008 1/1/2009 STP(U) STP(U) STP(U) 16 22 240 2 2 42 18 24 282 18 24 282 CE Yes 01/01/07 Totals 278 46 324 42 282 16 20 Roadway City Wide Shoulder Improvements City Wide from: to: City Wide shoulder improvements, PM10 abatement. 01 P N/A S PE 7/1/2008 CMAQ 480 65 5451 545_ CE No Totals 480 65 545 545 Report Date: June 27, 2007 Page 5 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Enver. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 21 E Nob Hill Blvd 8 Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 S N/A O C P T W PE 8/1/2008 STP(U) 72 11 83 83 CE Yes 10/01/07 Totals 72 11 83 83 17 22 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 0 C P T W S PE RW CN 1/1/2008 1/1/2009 6/1/2009 AIP AIP AIP 125 364 1588 19 56 248 144 420 1836 144 420 1836 EA Yes 01/01/08 Totals 2077 323 2400 144 2256 17 23 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S .15 C S T P PE CN 1/1/2008 6/1/2008 STP(E) STP(E) 22 75 7 20 29 95 1 29 95 CE Yes 03/01/07 Totals 97 27 124 124 17 24 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 1.0 W T P 0 C PE RW CN 1/1/2011 6/1/2011 1/1/2012 STP(C) STP(C) STP(C) 259 332 2240 41 52 324 300 384 2564 300 384 2564 EA Yes 04/01/10 Totals 2,831 417 3248 3248 Report Date: June 27, 2007 Page 6 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done a ^ 8 m t r a1— E Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/YYYY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/VV Required 9 Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 25 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 05 06 P 2 0 S PE RW CN 1/1/2009 1/1/2010 6/1/2011 STP(U) STP(U) STP(U) 208 311 2838 32 49 232 240 360 3070 240 360 3070 EA Yes 01/01/09 Totals 3,357 313 3670 240 360 3070 00 26 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights 14 32 P .25 T 0 PE CN 1/1/2010 3/1/2011 STP(E) STP(E) 240 3000 32 392 272 3392 272 3392 CE No Totals 3,240 424 3664 272 3392 00 27 Gravel Road B.S.T. Various Areas from: City Wide to: 07 P N/A S PE CN 4/1/2008 6/1/2008 CMAQ 186 240 36 240 222 1 100 70 70 222 CE No Totals 186 276 462 100 70 292 16 28 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, possible roundabout 12 P N/A T P Q S C W CN 10/1/2009 STP(S) 480 70 5501 550 CE Yes 09/01/2007 Totals 480 70 550 550 Report Date: June 27, 2007 Page 7 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length I Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start mm/dd/ ( yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date MM/Y11 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 12 P N/A p PE RW 1/1/2011 6/1/2011 STP(S) STP(S) 24 24 4 4 28 28 28 28 CE S 48th Ave & Summitview Ave Signa/ization T CN 8/1/2012 STP(S) 528 77 605 605 Yes S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 06/01/11 Totals 576 85 661 661 16 30 12 P N/A P PE CN 4/1/2008 6/1/2008 12 204 12 204 12 204 CE S 3rd Ave & W Washington Ave Signal T No S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades Totals 216 216 216 14 31 12 ID N/A p PE CN 1/1/2008 6/1/2008 STP(S) STP(S) 12 72 12 72 24 144 24 144 CE S 16th Ave & WWashington Ave Signal & Intersection. 05 T CN 6/1/2008 650 650 650 No S 16th Ave from: S 16th Ave to: W Washington Ave 03 Included in Union Gaps Valley Mall Blvd. project Totals 84 650 84 818 818 14 32 12 P 2 5 P PE RW 1/1/2009 6/1/2009 STP(S) STP(S) 52 102 8 18 60 120 60 120 CE W Nob Hill Blvd Sidewalks T CN 3/1/2010 STP(S) 306 54 360 360 Yes W Nob Hill Blvd from: S 16th Ave to: S. 6th St. W S Install missing sidewalks on southside of Nob Hill. 09/01/08 Totals 460 80 540 180 360 Report Date: June 27, 2007 Page 8 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederal Aid No. B. Bridge No. C. Project Title 1 D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Date (MM/rY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4thRequired bin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 33 Beech St Pedestrian Connection Beech St from: Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under SR82 to Greenway 06 32 P 1.0 p T PE RW CN 1/1/2010 6/1/2010 1/1/2011 STP(S) STP(S) STP(S) 54 180 480 7 24 65 61 204 545 61 204 545 CE Yes 09/01/09 Totals 714 96 810 61 749 16 34 W Lincoln Ave Sidewalks W Lincoln Ave from: N 56th Ave to: N 29th Ave Sidewalks, meters and fire hydrants replacement or relocation 12 P 2.0 P T S W PE RW CN 1/1/2010 6/1/2010 1/1/2011 STP(S) STP(S) STP(S) 41 82 545 7 14 84 48 96 629 48 96 629 CE Yes 09/01/10 Totals 668 105 773 773 14 35 WLmcoln Ave 8 'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P .5 W T S P 0 G G C PE RW CN 1/1/2009 1/1/2010 1/1/2011 STP(E) STP(E) STP(E) 404 997 1715 64 155 268 468 1152 1983 468 1152 1983 CE Yes 09/01/10 Totals 3,116 487 3603 468 3135 16 36 School Safety Projects Various Locations- Citywide from: to: Crossing flashers, sidewalks, signing, other features 12 P N/A WPE CN 1/1/2008 1/1/2008 PSMP PSMP 12 228 2 46 14 274 14 1 274 CE No Totals 240 48 288 288 Report Date: June 27, 2007 Page 9 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: Co. Name: Yakima Co. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 TO o y c v t` Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditureal Schedule cy) Federally Funded Projects Only , co o Q7 oo. Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date MM/Y Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 37 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadwayvnden in and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants 03 04 06 p .85 C G P S T W PE RW CN 1/1/2009 1/1/2010 1/1/2011 STP(C) STP(C) STP(C) 520 1038 6228 80 162 965 600 1200 7193 600 1200 7193 EA Yes 1/1/09 Totals 7,786 1207 8993 8993 17 38 S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 01 12 06 PRW N/A W T P 0 PE CN 1/1/2009 1/1/2010 1/1/2011 STP(C) STP(C) STP(C) 87 87 518 13 13 82 100 100 600 100 100 600 CE Yes 1/1/2008 Totals 692 108 800 800 14 39 4579 S 1st Sf. - E. Washington Ave. Intersection Improvement S 1st St. from: S 1st St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 P N/A P W S T 0 PE 6/1/2008 STP 240 36 2761 276 EA Yes 06/01/07 Totals 240 36 276 276 16 40 4562 Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 p N/A p W T 0 S ALL 4/4/2009 STP(U) 360 WSDOT 360 1 7201 720 CE No Totals 360 360 720 720 Report Date: June 27, 2007 Page 10 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Start (mm/dd/yyyY) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 41 Tieton Dr. Pedestrian Safety Improvements from: 16th Avenue to: 24th Avenue Pedestrian Safety, Sidewalks and ADA Ramps. 12 S 0.50 W T O 0 PE CN 1/1/2008 1/1/2008 WSDOT WSDOT 20 172 10 20 182 20 182 Totals 192 10 202 202 17 42 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 P T W S 0 ALL 4/1/2008 STP 2160 292 24521 500 1952 EA No Totals 2,160 292 2452 500 1952 14 43 South 72nd Ave & Mead Ave Intersection South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 P N/A O P S T W PE CN 1/1/2008 6/1/2008 STP(U) STP(U) 49 365 8 58 57 423 57 423 CE No Totals 414 66 480 480 00 44 William 0. Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trail. 14 32 P N/A O S P w PE CN 1/1/2008 7/1/2008 STP(E) STP(E) 10 104 2 16 12 120 1 12 120 CE No Totals 114 18 132 132 Report Date: June 27, 2007 Page 11 v. 5.7 - Supersedes previous editions Ink Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road 9 9 F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R!W Required Date (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 45 Arterial Street Crosswalk Safety Upgrade. Bonnie Doone & 16th Avenue. from: Bonnie Doone to: 16th Avenue. Install crosswalk safety facilities. 12 S N/A W T G `' PE CN 1/1/2009 6/1/2009 STP(S) STP(S) 121 140 261 10 261 Totals 129 142 271 271 17 46 S 66th Avenue S 66th Ave from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 03 P .76 T S P PE CN 1/1/2008 7/1/2008 STP(E) STP(E) 22 1044 5 156 27 1200 1 27 1200 Yes 1/1/2008 Totals 1,066 161 1227 1227 16 47 66th Ave. &SumrnitviewIntersection N. 66th Avenue & Summitview from: N. 66th Ave. to: SummitoiewAve. Widen for left tum lanes, intersection improvements, curb, gutter, handicap ramps and lighting 05 12 P .20 G P S T W C PE RW CN 1/1/2009 6/1/2009 7/1/2010 STP(S) STP(S) STP(S) 156 364 1038 24 57 162 180 421 1200 180 421 1200 • CE Yes 1/1/2009 Totals 1,558 243 1801 180 421 1200 14 48 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: SummitviewP Signal upgrade, radius improvements, tum lane extension 12 PRW N/A W T 0 PE CN 1/1/2009 1/1/2009 6/6/2009 STP(U) STP STP(U) 120 60 518 16 8 82 136 68 600 136 68 600 CE Yes 1/1/2006 Totals 698 106 804 804 Report Date: June 27, 2007 Page 12 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or NumberPhase E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM�� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 49 40th Avenue and Englewood 40th Avenue from: 40th Avenue to: Englewood Replace traffic signal poles, upgrade controller 12 PRW N/A WPE T S P 0 CN 1/1/2009 1/1/2009 1/1/2010 STP STP STP 90 60 138 12 8 19 102 68 157 102 68 157 CE Yes 1/1/2008 Totals 288 39 327 327 00 50 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps 12 PRW N/A W T S P O PE CN 1/1/2010 6/1/2009 1/1/2009 STP STP STP 120 60 300 17 8 41 137 68 341 137 68 341 CE Yes 1/1/2008 Totals 480 66 546 546 14 51 1st Street and / Street 1st Street from: 1st Street to: I Street Replace and upgrade traffic signal equipment 12 P N/A W T S P 0 PE CN 1/1/2009 1/1/2010 STP STP 30 120 5 16 35 136 35 136 CE No Totals 150 21 171 171 14 52 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities 01 P .25 W T S P 0 PE RW CN 6/1/2010 1/1/2010 1/1/2011 STP(U) STP(U) STP(U) 780 3000 6240 180 600 960 960 3600 7200 960 3600 7200 CE Yes 1/1/2010 Totals 10,020 1740 11760 4560 7200 Report Date: June 27, 2007 Page 13 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 c 4 N c U Priority Number Project Identification A. PINIFederal Aid No. B. Bridge No. C. Project Title D. StreetiRoad Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (MM/VY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 53 01 p .25 0 PE RW 6/1/2010 1/1/2010 STP(U) STP(U) 780 3000 180 600 960 3600 960 3600 CE Washington Ave. Railroad Grade Separation P CN 1/1/2011 STP(U) 6240 960 7200 7200 Yes Washington Ave. from: Longfibre Road to: S T Railroad grade overpass including all utilities W 1/1/2009 Totals 10,020 1740 11760 11760 16 54 01 P 4.0 0 PE RW 6/1/2010 1/1/2010 STP(U) STP(U) 240 720 36 84 276 804 276 804 CE Citywide Pathway Connections P CN 1/1/2011 STP(U) 1800 300 2100 2100 Yes Yakima from: to: S T Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Naches Rail Spur, signage and amenities W 1/1 /2009 Totals 2,760 420 3180 276 2904 16 55 01 P 1.1 0 PE 1/1/2010 STP(U) 2076 324 2400 2400 E. 'H" St. Extension 08 P RW CN 1/1/2012 6/1/2013 STP(U) 2076 324 2400 2400 CE E. "H" St. from: 1st St. to: Yakima River S T STP(U) 1142 1782 2924 2924 Yes Construct road including water, sewer, curb, gutter and sidewalk for future development. W 1/1/2011 Totals 5,294 2430 7724 7724 17 56 p 1.3 0 PE RW 1/1/2011 1/1/2012 STP(C) STP(U) 665 5190 103 810 768 6000 768 6000 CE N. 9th St Extension P CN 6/1/2012 STP(U) 7474 926 8400 8400 Yes N. 9th St. S from: R St. to: Yakima Ave. T Construct road including water,sewer, curb, gutter, sidewalk for future development. W 1/1/2010 Totals 13,329 1839 15168 15168 Report Date: June 27, 2007 Page 14 v. 5.7 - Supersedes previous editions Ank Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (mwyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 57 YVT Pathway YVT Railway Corridor. from: to: Development pathway in West Valley area including 53rd Ave, Wide Hollow, 64th Ave, Ahtanum including all utilities and signage 03 32 p N/A 0 P S T W PE CN 1/1/2011 6/1/2011 STP(U) STP(U) 300 900 36 120 336 1020 336 1020 CE No Totals 1,200 156 1356 1356 17 58 34th Ave Sr River Rd Improvements Fruitvale Blvd. from: 34th Ave. to: River Rd. Intersection improvements including lumination, sewer, water, curb, water and sidewalks 01 12 P N/A 0 S T W PE CN 1/1/2010 6/1/2010 STP(U) STP(U) 60 540 5 72 65 612 65 612 CE No Totals 600 77 677 677 17 59 Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and streetlights. 01 05 12 P 1.0 0 S T W PE RW CN 1/1/2009 6/1/2010 1/1/2011 STP(U) STP(U) STP(U) 208 311 2838 32 49 232 240 360 3070 240 360 3070 CE Yes 1/1/2009 Totals 3,357 313 3670 600 3070 16 60 Frontage Road & °H" St. Loop N. 8th St. from: "H" St. to: 1-82 Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for future development and Terrace Heights connection. 01 P 1.3 C G P S T W PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(U) STP(U) STP(U) 259 332 2240 41 52 324 300 384 2564 300 384 2564 CE Yes .1/112008 Totals 2,831 417 3248 684 2564 Report Date: June 27, 2007 Page 15 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded ! Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund1st Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 61 Crtyvvide Alleys from: to: Pave alleys throughout the city. 07 P .5 G P S W T CN 6/1/2008 72 72 24 24 24 CE No Totals 72 72 24 24 24 14 62 Nob Hill Corridor Nob Hill from: 1-82 to: S. 16th Ave. Widen roadway, sidewalk, curb, gutter, lighting 03 04 P 2.7 C G 0 P S T W PE 1/1/2009 STP(U) 1 1201 17 1371 137 CE Totals 120 17 137 137 14 63 16th Ave. Corridor 16th Ave. from: SR -12 to: Xaahington AveNalley Mall Widen roadway, curb, gutter, sidewalk, lighting. P 3.5 C G 0 P S T W PE 1/1/2011 1 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 14 64 40th Ave. Corridor 40th Ave. from: SR -12 to: Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting. 04 P 3.2 C 0 G P 8 W T PE 1 1/1/2010 1 STP(U) 120 1 17 1371 137 CE Totals 120 17 137 137 Report Date: June 27, 2007 Page 16 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PINIFederalAid No. B. Bridge No. C. Project Title D. StreetJRoad Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RIVV Required Date (M� Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 65 S. 1st St/Main St. Corridor S. 1st St./Main St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint protect with Union Gap to siden roadway, curb, gutter, sidewalk, lighting. 04 P 2.0 C G O P T W PE 1/1/2011 STP(U) 120 17 137 137 CE Totals 120 17 137 137 14 66 W Yakima North/South Connector to West Valley Unknown road from: North - South to: in West Valley City & County joint project to build/extend roadways. P1 6.0 C G 0 P S T W PE 1/1/2011 120 1201 120 CE Totals 120 120 120 17 67 Yakima Downtown Future Initiatives, Phase 3 from: 1st Street to: 3rd Street Install Historic Ligh ling, Sidewalk Modification & Other Improvements. 06 12 S .60 W S T PE CN 1/1/2008 4/1/2008 OTHER OTHER 50 950 50 950 50 1 950 Totals 1000 1000 1000 00 - 68 Coolidge Road Widening and Paving. from: 80th AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. 03 05 06 S .50 S P T ' PE RW CN 1/1/2008 4/4/2008 1/1/2009 CMAQ CMAQ CMAQ 50 50 380 226 50 50 606 50 50 606 Totals 480 226 706 100 606 Report Date: June 27, 2007 Page 17 v. 5.7 - Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2008 to 2013 Hearing Date: 7-3-2007 Adoption Date: 7/3/2007 Amend Date: Resolution No.: 2007-95 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road 9 g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Start (mmldd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 06 69 Occidental Road Construction. from: 58th Ave. to: 64th Ave. Constrict roadway 01 P 38 S W P T PE 1/1/2011 100 100 100 Totals 100 100 100 00 70 86th Ave. Road Construction from: Occidental to: Coolidge Construct roadway 01 p 27 PE 1/1/2011 100 1001 100 Totals 100 100 100 71 16th Ave. Pedestrian Crossing. from: "J" st. to: Hathaway. Place new signalized pedestrian crossing. 06 12 P .05 PE CN 1/1/2010 7/1/2010 STP(S) STP(S) 30 120 5 16 35 136 1 35 136 CE NO Totals 150 21 171 171 72 64th Ave. Roadway Widening. from: Washington Avenue. to: Tieton Drive. Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 04 06 P 1.5 W F T C O PE 1/1/2010 STP(U) 120 17 1371 137 EA YES Totals 120 17 137 137 Report Date: June 27, 2007 Grand Totals for Yakima 108,422 16,673 25,603 150,698 25,382 28612 29,089 67,615 Page 18 v. 5.7 - Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. '7 For Meeting of July 3, 2007 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six-year Transportation Improvement Program (TIP) for years 2008 to 2013, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMITTED BY: Department of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: Bob Desgrosellier, Senior Engineer, 575-6228. SUMMARY EXPLANATION: See Attached. Resolutions X Ordinance_ Contract _Other (Specify) STIP: Bike/Ped Committee Project List Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1) Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2) Adopt the plan. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2007-95 Six-year Transportation Improvement Program (continued) SUMMARY EXPLANATION: Attached is the 2008-2013 Six -Year TIP. Four projects have been added to the six-year TIP following the June 19, 2007 meeting. These projects are: • #67. Yakima Downtown Futures Initiative, Phase 3, construct sidewalk and streetscape improvements on 1st Street, 2nd Street and 3rd Street. • #68. Coolidge Road, paving and reconstruction from 80th Avenue to 88th Avenue • #69. Occidental Road, road construction from 58th Avenue to 64th Avenue • #70. 86th Avenue, road construction from Occidental to Coolidge Project rankings are determined by reviewing data supplied by the City's Street and Traffic Division and integrating particular needs of the City. Projects that were deleted from the 2007-2012 TIP as they were completed or funds were obligated include: • Yakima Railroad Grade Separation, Phase 1, • River Road Realignment • N. 16th Avenue and River Road Signal • W. Lincoln Avenue Sidewalks • SR 12 — N. 40th Avenue Reconstruction • Yakima Avenue Historic District Pedestrian Improvement Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP listing will be finalized at today's hearing and sent to Yakima Valley Conference of Governments, (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2008 — 2013 includes sixteen (16) funded projects and locally identified activities. Funding for the remainder of the projects will continue to be sought. On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. 2 -- June 28, 2007 Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds or by the State of Washington for approved State -funding agencies. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. All Transaction Committee projects within the city limits are listed in the TIP with at least preliminary engineering needs identified. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Plan for 2007 to 2012. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act.