Loading...
HomeMy WebLinkAbout04/21/2020 04F Wastewater Collections System Improvements; Contract with DW Excavating, Inc.B US INE S S O F T HE C I T Y C O UNC I L YAK I M A, WAS HING T O N AG E ND A S TAT E M E NT I tem No. 4.F. F or Meeting of: April 21, 2020 I T E M T IT L E :Resolution authorizing a contract with D W Excavating, I nc. for City P roject No. 2501 Wastewater Collections System I mprovements - P riority 5 S UB M IT T E D B Y:S cott S chafer, Director of Public Works David B rown, Assistant Director of Public Works Mike Price, Wastewater/Stormwater Division Manager 249-6815 S UM M ARY E X P L ANAT I O N: A s part of the ongoing sewer collections system aging infrastructure rehabilitation program, City P roject No. 2501 - Wastewater Collections S ystem I mprovements - Priority 5 provides for the replacement of 820 linear feet of failing 8-inch diameter concrete sewer main, the re-alignment of 160 linear feet of 8-inch concrete main, and the addition of 18 new sanitary sewer manholes for improved system reliability and maintainability. The specific project locations are shown on the attached Project L ocation Map The City previously entered into an agreement with HL A E ngineering and L and Surveying, I nc. under resolution R-2017-069 to provide engineering design, bidding, and construction services for the rehabilitation of City of Yakima sanitary sewer main lines in various locations in City. The City utilized the procedure established by the S tate of Washington for competitively bidding projects. F our contractors submitted bids, with D W E xcavating, I nc. submitting the lowest bid of $601,561. for the project. The contract is attached for City Council review. T he project is funded by Wastewater Capital Fund 476. I T E M B UD G E T E D:Yes S T RAT E G I C P RI O RI T Y:P ublic S afety AP P RO V E D F O R S UB M IT TAL B Y T HE C IT Y M ANAG E R RE C O M M E ND AT I O N: A dopt resolution AT TAC HM E NT S : 1 Description Upload Date Type Resolution 3/31/2020 Resolution Contract 4/1/2020 Contract Project Location Map 3/30/2020 Backup Material 2 RESOLUTION NO. R-2020-______ A RESOLUTION authorizing a contract with DW Excavating, Inc. for City of Yakima Project No. 2501 Wastewater Collections System Improvements – Priority 5. WHEREAS, the City of Yakima maintains the Wastewater Collections System in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City of Yakima Wastewater Division has identified pipeline segments that require rehabilitation or replacement, and WHEREAS, this and future projects will stabilize current conditions of the city’s wastewater pipe system and reduce infiltration of groundwater which will save treatment costs, improve collection system reliability, improve collection system maintainability and limit the need for upgrades to the Wastewater Treatment Plant, and WHEREAS, by resolution R-2017-069, the City entered into an agreement with HLA Engineering and Surveying (HLA) to prepare the plans and contract documents for the rehabilitation of City of Yakima sanitary sewer main lines in various locations in city, and WHEREAS, the City of Yakima Wastewater Division requires construction services for the rehabilitation of the deficient collections system pipes and manholes; and WHEREAS, The City of Yakima used the procedure established by the State of Washington for competitively bidding projects, and WHEREAS, DW Excavating, Inc. submitted the low bid and has the ability to perform the contact specified work, and WHEREAS, the City Council finds that it is in the best interest of the City of Yakima to enter into a contract with DW Excavating, Inc. to perform the work detailed in the contract documents for the replacement of 820 linear feet of failing 8-inch diameter sewer main, the re- alignment of 160 linear feet of 8-inch sewer main, and the installation of 18 new sanitary sewer manholes to allow improved sewer main maintenance; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached contract with DW Excavating, Inc., in the amount of Six Hundred One Thousand Five Hundred and Sixty-One Dollars ($601,561.) for the replacement of 820 linear feet of failing 8-inch diameter concrete sewer main, the re-alignment of 160 linear feet of 8-inch sewer main, and the installation of 18 new sanitary sewer manholes to allow improved sewer main maintenance. ADOPTED BY THE CITY COUNCIL this 21st day of April, 2020. ________________________ ATTEST: Patricia Byers, Mayor ____________________________________ Sonya Claar Tee, City Clerk 3 4 Project Location Map Wastewater Collection System Improvements City Project No. 2501 Page 1 of 2 5 Project Location Map Wastewater Collection System Improvements City Project No. 2501 Page 2 of 2 6