HomeMy WebLinkAboutR-2008-165 Berger Abam Agreement - Railroad Grade Separation ProjectRESOLUTION NO. R-2008-165 A RESOLUTION authorizing the City Manager of the City of Yakima to execute an additional (fifth) supplemental agreement with BERGER/ABAM Engineers, Inc., for engineering and consulting services for the Railroad Grade Separation Project. WHEREAS, in July 2000 the City of Yakima issued and advertised a request for qualifications from firms interested in providing consulting services for the design and development of a grade separation railroad project; and WHEREAS, the request for qualifications advertisement described the matter as a multi- phase project that would later include preparation of plans, specifications and estimates related to the construction of the Railroad Grade Separation Project ("Project"); and WHEREAS, as a result of that request for qualifications process, the City selected and contracted with .BERGER/ABAM Engineers, Inc., to provide the said services for the Project; and WHEREAS, additional engineering and consulting services are required to proceed with the Project, including as more fully set forth on the proposed Scope of Work Modifications associated herewith; and WHEREAS, it is requested that the City Manager have the authority to' execute an additional (fourth) supplemental agreement for additional engineering and consulting services to proceed with the Project and to extend the completion date and term of the second contract with BERGER/ABAM Engineers, Inc., through June 30, 2010; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to authorize the City Manager to execute an additional (fifth) supplemental agreement with BERGER/ABAM Engineers, Inc., for additional engineering and consulting services to proceed with the Railroad Grade Separation Project and to extend the completion date and term of the contract with BERGER/ABAM Engineers, Inc., through June 30, 2010, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute an additional (fifth) supplemental agreement with BERGER/ABAM Engineers, Inc., for additionalengineering and consulting services to proceed with the Railroad Grade Separation Project and to extend the completion date and term of the contract with BERGER/ABAM Engineers, Inc., (City Contract No. 2003-53) through June 30, 2010. The total additional compensation authorized by said supplemental agreement shall not exceed $217,912.00. The form of said supplemental agreement shall be reviewed and approved by the City Attorney or his designee. ADOPTED BY THE CITY COUNCIL this 2nd day of 4 cember, ATTEST: /6) -(L -A6_4_) City Clerk (70-1 - avid Edler, Mayor Yakima Rail ade SeparationsIIIII Engineer's Est of Probable Construction Costs 90% Estimate File: C:\Documents and Settings\bdesgros.YAKIMA_CITY\My Documents\Engineer\Rail Road\Grade Sep - FMSIB - 2000-11\Estimates\[Estimate_09-26-08 90% Cost Est_ Subtotal - Estimated Bid Price in 4th Quarter of 2007 Inflation (1 Year at 1.7%, 0.5 Years at 1.2%) Inflation (1 Year at 1.7%, 1.5 Years at 1.2%) Lincoln Avenue MLK, Jr. Blvd. Total $14,715,1161 $14,427,7341 $29,142,850 Estimated Bid Price in 4th Quarter of 20081 Estimated Bid Price in 4th Quarter of 2009 Construction Contingency (10% on Lincoln, 5% on MLK) Estimated Total Payments to Contractor Estimated Reimbursement of BNSF for Construction by BNSF Forces (Includes 25% Contingency) Estimated Total Construction Costs Estimated Future Design Engineering Costs Estimated Future City Administration Costs Estimated Future Construction Engineering Costs Estimated Future ROW Costs SUBTOTAL - FUTURE COSTS Design Engineering Costs Spent to Date City Administration Costs Spent to Date Phase 1 Costs Spent to Date ROW Costs Spent to Date SUBTOTAL - COSTS SPENT TO DATE TOTAL ESTIMATED COSTS AT COMPLETION $339,949 $15,055,065. $1,505,507 $16,560,5721 $15,685,0661 $431,724 $16,992,2961 $16,116,7901 $420,000 $100,000 $1,042,400 $2,187,000 $20,741,6961 $17,279,1901 $510,424 $850,373 $14,938,158 $29,993,223 $746,908 $2,252,414 $32,245,637 $431,724 $863,448 $33,109,085 $50,000 $50,000 $1,042,400 $20,000 $470,000 $150,000 $2,084;800 $2,207,000 $38,020,885 $2,182,271 $300,000 $2,200,486 $70,000 $0 $0 $0 $0 $2,182,271 $300,000 $2,200,486 $70,000 $4,752,7571 $01 $4,752,757 $25,494,4531 $17,279,1901 $42,773,642 i GRAND TOTAL PROJECT COSTS $42,773,6421 Estimate 09-26-08 90% Cost Est 42.773-million.xls 1 of 1 11/25/2008 • LINCOLN AVENUE AND MLK, JR. BLVD. GRADE SEPARATION PROJECT BEST CASE SCHEDULE ID Task Name Duration Start Finish 2009 2010 2011 N!D JIF MIA!M J JIAISIO N D JIF M AIMIJ J AISO N D J FIM A M JIJ 1 Prepare Lincoln Ave. Grade Separation Bid Documents (Design Team) Revise 95% PS&E for Access Bridge and Moving Pond (Design Team) _.__...._._._........__..._........__..._._..-_.._..._. ' Review 90% PS&E (BNSF) _.. Incorporate BNSF 90% Review Comments (Design Team) Review 95% PS&E (City, BNSF, and WSDOT/FHWA) Prepare Bid Documents (Design Team) Acquire ROW from BNSF Revise Grade Separation ROW Plans and True Cost Estimate (Design Team) Approval of ROW Plans and True Cost Estimate (WSDOT/FHWA) Approve Funding for ROW Acqusition (WSDOT/FHWA) Prepare Appraisals (Design Team) Review Appraisals (Design Team) Make Offers (Design Team and City) Review Offers/Negotiations (BNSF and City) Close on Property Acqusitions (All) Certify ROW (WSDOT) Bid and Award Lincoln Ave. Construction Contract Advertise for Bid (City) Bid on Lincoln Ave. Construction Project (Contractors) Award Lincoln Ave. Construction Contract (City Manager, Council, and WSDOT/FHWA) Issue NTP (City) Lincoln Ave. Ground Breaking Ceremony Construct Lincoln Ave. Construct Lincoln Ave. (Contractor) . 67 days! 32 d12/19/08'0 ays 28 days 10 days 1 15 days 1 10 days 81 days 6 days 1 day 0 days 7 days 13 days 5 days 25 days 15 days 15 days; 65 days 0 days 1 25 days 1 20 days 20 days 0 days 260 days 260 days Thu 11!6/08: ..__.._..Thu 11/6/08: Wed 11/12/08 Mon 12/22/08 Mon 1/5/09 Mon 1/26/09 Fri 11/7/08 Fri 11/7/08 Mon 11/17/08 Mon 11/17/08 Mon 11/10/08 Wed 11/19/08, Mon 12/8/08 Mon 12/15/08 Mon 1/19/09 Mon 2/9/09 Fri 2/27/09 Fri 2/27/09 Mon 3/2/09 Mon 4/6/09; Mon 5/4/09 Fri 5/29/09 Mon 6/1/09 Mon 6/1/09 Fri 2/6/09 Fri Fri 12/19/08 Fri 1/2/09 Fri 1/23/09 Fri 2/6/09 Fri 2/27/09 Fri 11/14/08 Mon 11/17/08 Mon 11/17/08 Tue 11/18/08 Fri 12/5/08 Fri 12/12/08 Fri 1/16/09 Fri 2/6/09 Fri 2/27/09 Fri 5/29/09 Fri 2/27/09 Fri 4/3/09 Fri 5/1/09 Fri 5/29/09 Fri 5/29/09 Fri 5/28/10 Fri 5/28/10 Flisswir ' Fillinglagi 4, 4 11/17 ' ; r :a a. 2/27 4,5/29 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ® ..,.4 ,- 24 3/5 6/4 25 Prepare MLK, Jr. Blvd. Grade Separation Bid Documents (Design Team) Complete 95% PS&E (Design Team) Incorporate Lessons Leamed from Lincoln Construction (Design Team) Review 95% PS&E (City, BNSF, and WSDOT/FHWA) Prepare Bid Documents (Design Team) Bid and Award MLK, Jr. Blvd. Construction Contract I Advertise for Bid (City) Bid on MLK, Jr. Blvd. Construction Project (Contractors) Award MLK, Jr. Blvd. Construction Contract (City Manager, Council, and WSDOT/FHWA) Issue NTP (City) - »-•--_..._O MLK, Jr. Blvd. Ground Breaking Ceremony Construct MLK, Jr. Blvd Construct MLK, Jr. Blvd. (Contractor) ' 265 days; 30 days 15 days 1 20 days I 10 days' 65 days: 0 days' 25 days 20 days 20 days da_ "._.:__......._Fri Ys 260 days' 260 days Mon 3/2/09: Mon 3/2/09 Mon 1/4/10 Mon 1/25/10. Mon 2/22/10, Fri 3/5/10 Fri 3/5/10; Mon 318/10, Mon 4/12/10: Mon 5/10/10; 6/4/10 Mon 6/7/10 Mon 6/7/10 Fri 3/5/10 Fri 4/10/09 Fri 1/22/10 Fri 2/19/10 Fri 3/5/10 Fri 6/4/10 Fri 3/5/10 Fri 4/9/10 Fri 5/7/10 Fri 6/4/10 _.._.._..Fri 6!4!10 Fri 6/3/11' Fri 6/3/11 26 27 28 29 30 31 32 33 34 35 36 37 Page 1 Washington State O71Department of Transportation Supplemental Agreement Number 5 Organization and Address BERGER/ABAM Engineers Inc. 33301 Ninth Avenue South, Suite 300 Federal Way, WA 98003 Phone: (206) 431-2300 Original Agreement Number LA -4453 Project Number STPX-NCPD-000S (062) Execution Date 31 December 2008 Completion Date 30 June 2010 Project Title MLK Blvd. and Lincoln Avenue Grade Separation New Maximum Amount Payable $ 2,476,185.00 Description of Work Intermediate and final design, right-of-way plans,. and environmental documentation for rebuilding MLK Blvd. and Lincoln Avenue under the BNSF railroad in downtown Yakima. The Local Agency of City of Yakima desires to supplement the agreement entered into with BERGER/ABAM Engineers Inc . and executed on 20 June 2003 and identified as Agreement No. LA -4453 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. Ole changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby changed to read: See attached. II Section IV, TIME FOR BEGINNING AND COMPLETION is amended to change the number of calendar days for completion of the work to read: Work will fie completed by 30 June 2010. III Section V, PAYMENT, shall be amended as follows: See attached. as set forth in the attached Exhibit D, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: BERGERABAM Engineers Inc. DOT Form 140-063 EF Revised 9/2005 By: City of Yakima Consultant Signature Approving Authority Signature Date SECTION II, SCOPE OF WORK These Scope of Work Modifications add to and revise Exhibit B, Scope of Work, Phase 2 and/or the Supplement No. 2, No.3, and No.4 Scope of Work Modifications. Where conflicts occur between these Scope of Work modifications and the original Scope of Work and/or the Supplement No. 2, No. 3, and No. 4 Scope of Work Modifications, these modifications will take precedence. Item A - Out of Scope Work Already Done to Try to Reach Agreement with BNSF • Five months of added coordination, management, and administration related to acquiring the BNSF property west of the tracks and relocating their facilities • Added design work to determine the feasibility of alternate access to BNSF's facilities and of moving the pond to the east side of the tracks Item B - Out of Scope Work Still Needed to be Done to Construct Lincoln Ave. • Provide a memo to WSDOT/FHWA describing changes made to the project definition since the Environmental Assessment was completed • Design and detail the connection of the glass art wall to the strut and walls • Prepare Supplement No. 5 Item C - Proposed Changes to the Scope of Work to Accommodate BNSF Leaving Their Facilities As Is • Purchase most of the BNSF property east of the tracks and leave BNSF's facilities where they are west of the tracks • Revise the ROW plans and true cost estimate • Prepare appraisals, appraisal reviews, and offers for the property east of the tracks • Design and detail a new storm water pond on the property east of the tracks • Design and detail a new access bridge across Lincoln Ave. west of the tracks • Design and detail a new ramp on the west side of Hollingbery's Lincoln Ave. loading dock so it can be accessed from 1t Ave. and eliminate the need to cross what would now still be BNSF's property Item D - Possible Future Work that would need a Management Reserve • Modifying the demolition contract for the ARCO site to keep some of the tanks and pumps operational (this will require a specialized engineering subconsultant) • Completion of the MLK, Jr. Blvd. contract documents from 95% to 100% (this is anticipated to mostly be including any lessons learned from construction of Lincoln Ave.) • • • • Exhibit D Supplement No. 5 Summary Analysis of Costs Item A - Out of Scope Work Already Done to Try to Reach Agreement with BNSF BERGER/ABAM $ Item A Subtotal $ Item B - Out of Scope Work Still Needed to be Done to Construct Lincoln Ave. BERGER/ABAM Widener and Associates 32,466 32,466 $ 14,282 $ 15,159 Item B Subtotal $ 29,442 Item C - Proposed Changes to the Scope of Work to Accommodate BNSF Leaving Their Facilities As Is Totals Item D - Management Reserve BERGER/ABAM $ 95,292 PHAROS $ 12,270 Kennedy Jenks $ 13,443 Item C Subtotal $ 121,005 BERGER/ABAM $ 142,040 Widener and Associates $ 15,159 PHAROS $ 12,270 Shannon and Wilson 5 13,443 Subtotal $ 182,912 Unassigned $ 35,000 Item D Subtotal $ 35,000 SUPPLEMENT NO. 5 GRAND TOTAL $ 217,912 Supplment No. 5 Analysis of Costs - BERGER/ABAM Item A - Out of Scope Work Already Done to Try to Reach Agreement with BNSF Direct Salary Cost (DSC) PERSONNEL Hours Pay Rate Cost Project Executive 0 $ 81.25 $ - Project Manager 162 56.01 9,074 Project Engineer 0 56.01 Senior Engineer 40 38.46 1,538 Planner 0 39.13 Engineer/Technician 0 28.56 Graphics/CADD 0 32.93 Project Coordinator 10 27.16 272 Clerical 0 27.88 Direct Salary Cost Total 212 $ 10,884 Overhead Cost Net Fee 158.23% 32.00% of DSC $ 17,221 of DSC $ 3,483 SUBTOTAL $ 31,588 Reimbursables 5 Roundtrips at 300 miles each at $0.585/mile $ 878 REIMBURSABLES SUBTOTAL $ 878 Subconsultants: SUBCONSULTANTS SUBTOTAL $ SUPPLEMENT NO. 5 - ITEM A TOTAL $ 32,466 • Project Name: City of Yakima, MLK Blvd. and Lincoln Avenue Grade Separations Project No: FA PWT 04 016 Prepared By: CCW Date: 25 -Nov -08 • Item A - Out of Scope Work Already Done to Try to Reach Agreement with BNSF CLERICAL TOTAL 102 0 102 52 0 52 40 18 0 58 0 212 DESCRIPTION PROJECT EXEC PROJECT MGR PROJECT ENGR SENIOR ENGR PLANNER ENGR/TECH GRAPHICS/ CADD PROJECT COORD ITEM A-1: RAILROAD COORDINATION A-1.1. Added Meetings and Coordination With BNSF 102 TOTAL ABAM RAILROAD COORDINATION HRS 0 102 0 ITEM A-2: PROJECT MANAGEMENT AND ADMINISTRATION A-2.1. Added Project 0 0 0 0 0 Management and Administration 42 10 TOTAL ABAM MANAGEMENT HOURS 0 42 ITEM A-3: DESIGN WORK FOR ACCESS FEASIBILITY A-3.1. Determine 0 0 0 0 0 10 Feasibility of Alternate Accesses 16 24 A-3.2. Determine Feasibility of Moving Pond 2 16 TOTAL ABAM DESIGN WORK FOR ACCESS FEASIBILITY HOURS 0 18 0 40 0 0 0 0 BERGER/ABAM Supplement No. 5 • Item A Total 0 182 0 40 0 0 0 10 CLERICAL TOTAL 102 0 102 52 0 52 40 18 0 58 0 212 Supplment No. 5 Analysis of Costs - BERGER/ABAM Item B - Out of Scope Work Still Needed to be Done to Construct Lincoln Ave. Direct Salary Cost (DSC) PERSONNEL Hours Pay Rate Cost Project Executive 0 $ 81.25 $ - Project Manager 40 56.01 2,240 Project Engineer 0 56.01 - Senior Engineer 56 38.46 2,154 Planner 0 39.13 Engineer/Technician 0 28.56 - Graphics/CADD 16 32.93 527 Project Coordinator 0 27.16 - Clerical 0 27.88 Direct Salary Cost Total 112 $ 4,921 Overhead Cost Net Fee Reimbursables Subconsultants: Widener and Associates 158.23% 32.00% of DSC $ 7,787 of DSC $ 1,575 SUBTOTAL $ 14,282 REIMBURSABLES SUBTOTAL $ $ 15,159 SUBCONSULTANTS SUBTOTAL $ 15,159 SUPPLEMENT NO.5 - ITEM B TOTAL $ 29,442 • Project Name: City of Yakima, MLK Blvd. and Lincoln Avenue Grade Separations Project No: FA PWT 04 016 Prepared By: CCW Date: 25 -Nov -08 • Item B - Out of Scope Work Still Needed to be Done to Construct Lincoln Ave. DESCRIPTION PROJECT EXEC PROJECT MGR PROJECT ENGR SENIOR ENGR PLANNER ENGRI TECH GRAPHIC/CA DD PROJECT COORD CLERICAL TOTAL SUB TASK B-1:,EA PROJECT DEFINITION CHANGE MEMO B-1.1 . Develop and Coordinate NEPA Reevaluation Memo B-1,2. Coordination with Widener 8 0 WID a TOTAL ABAM EA PROJECT DEFINITION CHANGE MEMO 0 8 0 0 0 0 0 0 TASK B-2: DESIGN ARTWORK STRUCTURAL SUPPORT B-2.1. 0 8 Coordinate with Artist and Glass Wail Engineer 8 a B-2.2. Design Structure to Support Artwork - 2 24 16 26 B-2.3. Modify Plans to Include Support for Artwork 4 24 16 44 TOTAL ABAM DESIGN ARTWORK STRUCTURAL SUPPORT HOURS 0 14 0 56 0 0 16 0 TASK 8-3: PREPARE SUPPLEMENT NO. 5 0 86 B-3.1. Prepare,Scope 8 B-3.2. Prepare Fee proposal 8 B-3.3. Negotiate 2 8 2 TOTAL ARAM PREPARE SUPPLEMENT NO.5 HOURS 0 18 0 0 0 0 0 0 0 18 BERGERIABAM Supplement No. 5 • Item B Total 0 40 0 56 0 0 16 0 0 112 Suppement No. 5 Analysis of Costs - BERGER/ABAM Item C - Proposed Changes to the Scope of Work to Accommodate BNSF Leaving Their Facilities As Is Direct Safari Cost (DSC) PERSONNEL Hours Pay Rate Cost Project Executive 12 $ 81.25 $ 975 Project Manager 76 56.01 4,257 Project Engineer 48 56.01 2,688 Senior Engineer 432 38.46 16,615 Planner 0 39.13 Engineer/Technician 0 28.56 - Graphics/CADD 252 32.93 8,298 Project Coordinator 0 27.16 - Clerical 0 27.88 Direct Salary Cost Total Overhead Cost Net Fee Reimbursables 820 $ 32,833 158.23% of DSC $ 51,952 32.00% of DSC $ 10,507 SUBTOTAL $ 95,292 REIMBURSABLES SUBTOTAL $ Subconsultants: PHAROS $ 12,270 Kennedy Jenks $ 13,443 SUBCONSULTANTS SUBTOTAL $ 25,713 SUPPLEMENT NO. 5 - ITEM C TOTAL $ 121,005 • • • Project Name: City of Yakima, MLK Blvd. and Lincoln Avenue Grade Separations Project No: FA PWT 04 016 Prepared By: CCW Date: 25 -Nov -08 • Item C - Proposed Changes to the Scope of Work to Accommodate BNSF Leaving Their Facilities As Is DESCRIPTION PROJECT EXEC PROJECT MGR PROJECT ENGR SENIOR ENGR PLANNER ENGR/TECH GRAPHIC/C ADD PROJECT COORD CLERICAL TOTAL SUB TASK C-1: REVISE ROW DOCUMENTS - C-1.1 Revise ROW Plans a C-1.2 Revise True Cost Estimate C-1.3 8 Prepare Appraisal, Appraisal Review, and Offer C-1.4 0 PH Coordinate with PHAROS •12 0 PH 12 TOTAL ABAM REVISE ROW DOCUMENTS HOURS 0 20 0 0 0 0 0 0 TASK C-2: NEW STORM WATER POND C-2.1. a 20 Revise Drainage Report 2 16 C-2.2. Revise 14 Plan Sheets C-2.3. 6 2022 18 Prepare Two New Pond Drawings 4 60 80 40 48 C-2.4. Revise and Prepare New Pump Station Plan Sheets 104 0 KJ TOTAL ABAM NEW STORM WATER POND HOURS 0 12 8 96 0 0 62 0 TASK C-3: NEW ACCESS BRIDGE 0 170 C-3.1. Determine Geometry for New Bridge 4 8 a C-3.2. Rerun Global Model for Underpass Structure and Revise Calculations 6 80 20 C-3.3. Revise Geometry of Underpass Structure 4 4 4 24 88 C-3.4. Revise Reinforcing Design 4 4 40 38 C-3.5. Revise Twelve Plan Sheets 10 32 38 48 C-3.6. Prepare Six New Plan Sheets 10 72 OB 80 178 C-3.7. QA/QC Z 32 16 16 64 TOTAL ABAM NEW ACCESS BRIDGE HOURS 12 32 48 272 0 0 150 0 TASK C-4: RAMP FOR HOLLINGBERY 0 514 C-4.1 Design and Detail New Ramp for Hollingbery 4 24 40 68 TOTAL ABAM RAMP FOR HOLLINGBERY HOURS 0 4 0 24 0 0 40 0 0 TASK C-5: REVISE COST ESTIMATE 68 C-5.1. Revise for New Pond 2 8 C-5.2. Revise for New Bridge 4 24 10 C-5.3. Revise for New Ramp 2 a 28 10 TOTAL ABAM REVISE COST ESTIMATE HOURS 0 8 0 40 0 0 0 0 0 48 BERGER/ABAM Supplement No. 5 - Item C Total 12 76 48 432 0 0 252 a o 820 LINCOLN AVENUE AND MLK, JR BLVD. GRADE SEPARATION PROJECT BEST CASE SCHEDULE ID 1 Task Name Duration Start Finish 2009 2010 20 1 NJD JIFIMIAIMIJIJIAISIOINID J IFIMIAIMIJ IJIAISIOINID Prepare Lincoln Ave. Grade Separation Bid Documents (Design Team) 87 days Thu 11/8/08 Thu 11/8/08 7777--__.___-___.._____.-_ Wed 11/12/08 Mon 12/22/08 ---__.._..._._-__ Mon 1/5/09 Mon 1126/09 -----•-7777 ____--__ Fri 1117108 _.._..---__-.._._..__._-.--__--___ Fri 11/7/08 Fri 216109rNog. _.-7117__ Fri 12/19/08 Fri 12/19/08 - Fri 1/2/d9 ------i-1--1-/-20/0-0 Fri 2/6/09 ___..__..._. Fri 2127/09 Fri 11/14/08 gig ' JIFIMIAIMIJIJ — _ -------_..-----------------•-------..._._i_..---------.. Revise 95% PS&E for Access Bridge and Moving Pond (Design Team) 32 days 3 __.._.____---------7777-------._.---__. _.----._._ Review 90% PS&E (BNSF) ---•77_77- 2B days 4 - -__ __.-_.___-_7.7_._ 77__.:._.__.___._-____----7777-._._.. Incorporate BNSF 90% Review Comments (Design Team) 10 days 5 _. __ ...__..__-._.__....._.._.------•-------____._._--_7777-..___.______---._ .__.___..__.._ _...-.._ Review 95% PS&E (City, BNSF, and WSDOT/FHWA) ____.___.-.- 15 days 6 Prepare Bid DocumentsDesi n Team) _ --`-' 10 days 7 --77777777..__.____ __..._._..-7777 Acquire ROW from BNSF 81 days s _ 11/17 8 - ___.-_-__----____ ._ _..7777-..__..___-.__._..__ Revise Grade Separation ROW Plans and True Cost Estimate (Design Team) 6 days 9 Approval of RW P Olans and True Coat Es(WOT/F timate SDHWA) 1 day Mon 11/17/08 M on 11/17/08 Mon 11/17/08 Mon 11/17/08 Mon 11/10/08--Tue11!1-8/08 Wed 11/19/08 Fd 12/5/08 Mon 12/8/08 Fri 12/12/08 1/5- Fri Mon 12/15/08 Fri 1/16/09 ---7---•- -_.-- Mon 1/19!09 Frl 216/09 Mon 2/9/09 Fri 2/27/09 FN 2/27/09 Fri 5/29/09 Fri 2/27/09 Fri 2/27/09 Mon 3/2/09 . Fri 4/3/09 ._. Mon 4/8/09 Frl 5/1/09 Mon 5/4109 Fri 5/29/09 -------7171. _. Frl 5/29/09 Frl 5129/09 Mon 6/1/09 Fri 5/28/10 Mon 6/1/09 Fri 5/28/10 -._.Mon /2/09 Mon 3/2109 FH 3/5/10 4/10_..9 Mon 3/2/09 Fri 4/10/09 Mon 1/4/10 Fri 1/22/10 Mon 1/25/10 Fri 2/19/10 Mon 2/22/10 Fri 3/5/10 i 3_5/0. Fri 3/5110 Fri 614110 Fri 3/5/10 Fri 3/5/10 3/8/10 "-' �'• Fri Mon 4/9/10 Mon 4/12/10 Fri 5/7/10 Mon 5/10/10 Fri 6/4/10 Fri 6/4/10 Fri 6/4/10 Mon 6l7/10 Frl 8!3!111 10 _.. ___-----..._-_._.._-•---__.__-----__..__----•-------------7777-........_--7777----7777-- Approve Funding for ROW Acqusition (WSDOT/FHWA) 0 dayss 11 Preare APPraisals (Desi n Team)7 days 12 _..----.._,__._ _.-1111-_,.._..... Review Appraisals (Design Team) - -� 13 days 13 -_._.._..___._1111-1111.---- Make Offers (Design Team and City) . 5 days 14 15 Review Offers/Negotiations(BNSF and City)"- days 9 - 25 days Close on Property Acqusitlons (All) _ - - - - -_ 1111-_- 15 days 16 111.---_.__._._. _--1117.__.___.7117. _ 1111.- Certify ROW (WSDOT) 15 days 17 - Bid and Award Lincoln Ave. Construction Contract 85 days 2/27 . 5/29 18 Advertise for Bid (City) _.-._,_.,_.____.-.____.._...._._,�_._._._....___._._._.____....._.__....._..._._..__._... 0 days 19 Bld on Lincoln Ave. Construction Project (Contractors) 25 days _. __._.-_.____._.__...-.-.._.__._...-____..-.----_-.-._.___..._.-_-.__._._____----F-ri_ Award Lincoln Ave. Construction Contract (City Manager, Council, and WSDOT/FHWA) 20 days 21 _-_7711-. _.-1111-__..._._.._7111__ . _.__._._.._.....__. Issue NTP (City) 20 days 22 -7.177. -----•- Lincoln Ave. Ground Breaking Ceremony 05/- days 23 —7777--7777-7777-----�--• -.--.--______..-1111._-..______._-..---1117---- Construct Lincoln Ave. 280 days 24 Construct Lincoln Ave. (Contractor) 260 days . 25 716 days Prepare MLK, Jr. Blvd. Grade Separation Bid Documents (Design Team) 285 days 3/5 6/4 26 Complete 95% PS&E (Design Team)0d...._...____......_-.__.2-__9...__...i 30 days 27 Incorporate Lessons Learned from Lincoln Construction (Design Team) 15 days 28 29 DOT/ -._.__.._.._.--1111_.-.. Review 95% PS&E (City, BNSF, and WSDOT/FHWA) 20 days Prepare Bid Documents (Design Team) _.___...._..__..._.__._..__._.•._..._----------.__._..__..------•-7777-.._..___.._......._.. 10 days 30Bid 31 32 on.-...-c.d--._.._-_-. and Award MLK, Jr. Blvd. Construction Contract 65 days Advertise for Bid (City) 0 days Bid on MLK, Jr. Blvd. Construction Project (Contractors)"" 25da 1 25 days 33 . Award MLK, Jr. Blvd. Construction Contract (City Manager, Council, and WSDOT/FHWA) 20 days 34 Issue NTP (City) 20 20 days 35 777__ _._.-.__._.-__._...___..___._-.----_-„---..------•-- MLK, Jr. Blvd. Ground Breaking Ceremony 0 days 36 Construct MLK, Jr. Blvd 260 days 37 - ---------7777-- - Construct MLK, Jr. Blvd. (Contractor) days 260 days 41 ' Mon 6/7/10 - -F 6/3/ Fri 6/3/11 Page 1 • ITEM TITLE: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT 12_ Item No. For Meeting of December 2, 2008 Consideration of Resolution authorizing the City Manager to execute Supplement No. 5 for the Professional Services Contract with BERGER/ABAM Engineers, Inc. for Railroad Grade Separation Project SUBMITTED BY: William Cook, Director CED CONTACT PERSON/TELEPHONE: Michael Morales, Deputy Director — 575-3533 SUMMARY EXPLANATION: The city has engaged Berger/ABAM to provide design and administrative services for the development of the Lincoln Avenue/MLK Boulevard Grade Separation Project. In June 2008, the city council approved Supplement No. 4, which expires on December 31, 2008. Staff requests authorization to execute Supplement No. 5 of this agreement, which would extend the agreement to June 30, 2010, and cost $217,912. The need for Supplement No. 5 is directly related to the additional design changes, management/administrative costs related to delays by, and negotiations with, BNSF over right- of-way acquisition and relocation. After a year long stalemate, BNSF has agreed to consider an alternative design and property acquisition scenario that appears feasible. However, this solution will require design changes and updated appraisals. Supplement No. 5 will cover project design changes due to BNSF negotiations, administration up to the start of Lincoln Avenue construction in spring 2009 and Martin Luther King Jr. Blvd. up to the start of construction in the spring of 2010, or earlier if funds become available for MLK. Continuing active project design is recommended due to the potential for this project to receive additional funding via a federal or state stimulus package. Continued on page two Resolution X Ordinance _ Contract X Other (Specify) Project Schedule Funding Source: Cumulative Reserve for Capital Improvements: Fund 392 APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Approve resolution authorizing Supplement No 5. BOARD/COMMISSION/COMMITTEE RECOMMENDATION: COUNCIL ACTION: Page Two Work completed and ongoing includes: • NEPA and SEPA environmental review completed and approved. • Right of Way Plans completed and approved, acquisition in process • Phase 1 (Underground utility relocations), completed • Final Design (Contract Documents) for Lincoln Avenue underpass at 95% • Final Design (Contract Documents) for MILK Blvd. underpass at 60% • Intermediate contract to clear the ARCO site is 90% complete • Storm drainage ponds for BNSF property west of the tracks have been designed • Coordination, management and administration related to acquisition and relocation of BNSF property. Additional work for design completion includes: • Provide update to WSDOT/FHWA describing changes made to the project since the Environmental Assessment was completed • Revise the Right -of -Way plans and True Cost Estimate • Purchase most of BNSF property east of tracks leaving BNSF in place west of tracks • Prepare appraisals, appraisal reviews , and offers for the property east of the tracks • Design and detail a new storm drainage pond on property east of the tracks • Design and detail a new BNSF truck access bridge across Lincoln Ave. west of the tracks • Design and detail a new ramp on the west side of Hollingbery's Lincoln Ave. loading dock to allow for access from 1st Ave., eliminating the need to cross BNSF property • Design and detail the connection of the glass art wall to the strut and walls •