Loading...
HomeMy WebLinkAbout03/17/2020 06R Maul, Foster and Alongi, Inc. Contract Supplement to\'4\lyy tbxk ik 1 PP1-:4P PPP g. A P p PPi ittYlltYlt.\ta. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.R. For Meeting of: March 17, 2020 ITEM TITLE: Resolution to authorize a contract supplement to the Maul, Foster and Alongi contract(2014-180)to add additional tasks for clean-up at 2312 West Nob Hill Boulevard SUBMITTED BY: Joan Davenport, Community Development Director SUMMARY EXPLANATION: The City of Yakima established a contract for professional engineering services in 2014 for the purpose of developing and implementing a clean-up plan for the former Tiger Oil site at 2312 West Nob Hill Boulevard. The engineering firm (Maul Foster Alongi, MFA) has managed the clean up of the site, as funded primarily from the Department of Ecology. This contract supplement represents two additional tasks for MFA to perform under the contract with the City of Yakima.Adequate grant funding still exists from Department of Ecology Remedial Action Grant to cover this Supplement. ITEM BUDGETED: Yes STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt the Resolution ATTACHMENTS: Description Upload Date Type D resolution 3/13/ 0 0 r Me o D contract 3/13/2020 r Me o I cape of Vic rk Task scriptions fir upplement 3/13/2020 backup Material D upple ent MF1 retract daft schedule 3/13/2020 backup Material 2 RESOLUTION NO. R-2020- A RESOLUTION authorizing a Supplement to the Professional Services Agreement with Maul Foster Alongi, Inc. (MFA) to prepare additional tasks in the remedial design and construction oversight for the environmental cleanup of the former Tiger Oil site at 2312 West Nob Hill Boulevard. WHEREAS, the Yakima City Council established that the environmental cleanup and redevelopment of the former Tiger Oil property at 2312 West Nob Hill Boulevard is both an "Economic Development" and "Improving the Build Environment" priority; and WHEREAS, the Washington State Department of Ecology has provided funding for the cleanup of this site exceeding $1.2 million with budget reserve still available for this supplement; and WHEREAS, the City of Yakima entered into a contract with Maul Foster Alongi, Inc. (M FA) in 2014(Contract 2014-180)to prepare the engineering plans and manage the clean- up of the site; and WHEREAS, the Scope of Work and Budget included in this Professional Services Agreement meet the needs and requirements of the City of Yakima for this project;therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute Contract Supplement 6 of the Professional Services Agreement with Maul Foster Alongi, Inc. (MFA) attached hereto and incorporated herein by this reference not to exceed One Hundred Fifty-Six Thousand, One Hundred Thirty-Six Dollars ($156,136) to provide the Professional Services as described in the tasks of the Agreement, now, therefore, ADOPTED BY THE CITY COUNCIL this 17'h day of March, 2020. ATTEST: Patricia Byers, Mayor Sonya Claar-Tee, City Clerk � Contract ~ f | Supplemental /1 f w��`���` n���������` �� Supplemental Agreement Or§ani and Address: 0dumKn��� K8au| Foster and A|ongi � — - 1329N. State Street, Suite 301 Bellingham, VVA9H2Z5 Original Contract Number: Execution Date nfSupplement: 2014-180 March 17, 7070 City Engineering Project Numnb*r: 7389 Completion Date ofSupplement: December ]l, 20II Project Title: Maximum Amount Payable this Supplement: Former Tiger Oil Site Interim Remedial Action <156'136 Maximum Total Amount Payable for the $935,588 Agreement: Section 1: Supplemental Agreement ThrCik' nfYukimo. VVunhingtnndroi/rn\nnupp|crncnt\hccnn8uo\uU/crmcn\ cntr/rdintnx/ithk1uul FnntrrA|nngi, nc. and executed nn October 8. 2014hy Resolution No. 2014'121 and identified un Contract 2014-180. All provisions in the basic contract remain in effect except as expressly modified by this supplement. The changes to the agreement are described a»[ol|ow'o� Task 211—Semi-Annual Groundwater Monitoring & Soil Vapor Probe Monitoring Events 2020- 2021 Continue to assess the groundwater quality and the effectiveness of interim remedial actions that have been conducted at the site. Evaluate key data parameters in support of Natural Source Zone Depletion through grounUw'ater and soil vapor data and data analysis. Provide data support for decision making regarding additional actions that may be needed to achieve a satisfaction of consent decree. Task Z2--Pr#jeot Management ZQ3Q` ZQ31 Facilitate ongoing and consistent communication between the Washington State Department of Ecology (Ecology), City of Yakima (City), and Maul Foster & Alongi, Inc. This task includes providing quarterly project progress reporting, budget management and invoicing, and responding to City and/or Ecology communications related to invoicing, budget tracking, and other requests. Task Z3--|nd#or & Ambient Air Quality Assessments (Zevents) Continue to assess the indoor and ambient air quality at adjoining businesses (Xochimilco Mexican Restaurant, Barber HQ, and 1 Up Games) after previous completion of interim actions to reduce the potential o[ petroleum vapor intrusion. Section 2: Compensation Payment for this supplemented work will. ao shown on Exhibit Aio not toexceed $15U.1JU. bringing the total amount of the Agreement to $9J5.5UU |f you concur with this supplement and agree to the changes ao stated above, please sign the appropriate spaces Ue|ow and return to this office for final action. rDK�8U By: Jim By: / | con5uxantuonam,c City Manager oate 4 EXHIBIT A SEMI-ANNUAL GROUNDWATER MONITORING AND SOIL VAPOR PROBE MONITORING EVENTS— 2020—2021 AND SUPPLEMENTAL INDOOR/AMBIENT AIR QUALITY ASSESSMENTS SCOPE OF WORK TIGER OIL WEST NOB HILL BLVD SITE, YAKIMA,WASHINGTON Task 21—Semi-Annual Groundwater Monitoring & Soil Vapor Probe Monitoring Events—2020- 2021 Purpose: Continue to assess the groundwater quality and the effectiveness of interim remedial actions that have been conducted at the site. Evaluate key data parameters in support of Natural Source Zone Depletion through groundwater and soil vapor data and data analysis. Provide data support for decision making regarding additional actions that may be needed to achieve a satisfaction of consent decree. Scope: This task includes: • Perform fieldwork, laboratory analysis, and investigation-derived waste disposal in accordance with the Groundwater Monitoring Plan • Complete data validation, data analysis, and reporting following each semi-annual monitoring event Schedule: • Semi-annual monitoring events will continue to be conducted in May and November of 2020 and 2021 Assumptions: • Assumes two (2) monitoring events (semi-annual sampling) consistent with the Groundwater Monitoring Plan • Report will be issued in electronic and hard copy format. Deliverables: • Semi-annual groundwater monitoring summary reports (two [2] total provided in letter report format consistent with prior reports) Task 22—Project Management 2020-2021 Purpose: Facilitate ongoing and consistent communication between the Washington State Department of Ecology (Ecology), City of Yakima (City), and Maul Foster& Alongi, Inc. (MFA) team to ensure the entire team is apprised of findings regarding the site's ongoing groundwater quality assessments, data interpretation, potential long term site management options, and compliance with the amended consent decree. Scope: MFA will participate in meetings and/or conference calls with Ecology, City, and City-identified individuals, as appropriate; and will schedule and coordinate with MFA staff, Ecology, City, and other appropriate parties to complete this scope of work. This task includes providing quarterly project progress reporting; budget management and invoicing; and responding to City and/or Ecology communications related to invoicing, budget tracking, and other requests. Assumptions: • Project status conference calls will be held on an as needed basis • Attend project status meetings, to be held in the Yakima area, on an as needed basis. Note: the current scope of work does not include budget nor allotted time for status meetings 5 Deliverables: • Quarterly Progress Reports (in letter format) for the 2020 - 2021 biennium (four [4] total reports per year) Schedule: • Activities will be conducted throughout the life of the change order associated with this scope of work • Progress reports will be issued quarterly Task 23—Indoor&Ambient Air Quality Assessments (2 events) Purpose: Continue to assess the indoor and ambient air quality at adjoining businesses (Xochimilco Mexican Restaurant, Barber HQ, and 1 Up Games) after previous completion of interim actions to reduce the potential of petroleum vapor intrusion. Scope: This task includes: • Coordinate with adjoining businesses' owners/tenants to obtain site access for air quality assessments • Perform fieldwork and laboratory analysis • Complete data validation, data analysis, and reporting following each indoor& ambient air quality assessment event Schedule: • Air quality assessments are anticipated to be conducted after completion of groundwater monitoring events and evaluation of the data Assumptions: • Report will be issued in electronic and hard copy format. Deliverables: • Technical Memos (two [2]total provided consistent with prior memo) ESTIMATED BUDGET C006 FORMER TIGER OIL GROUNDWATER MONITORING EVENTS 2020 - 2021 and AIR QUALITY ASSESSMENTS 2312 WEST NOB HILL BLVD YAKIMA, WASHINGTON Maul Foster& Alongi, Inc. Task Subcontractors Total Hours Labor Direct 21 Semi-Annual Groundwater&Soil Vapor Probe Monitoring- 1 semi-annual event 159 $20,135 $4,200 $4,686 $29,021 22 Project Management, Quarterly Progress Reports, Agency Communications- 1 semi-annual event 10 $1,773 $500 $0 $2,273 Sub-Total Estimated Cost for 1 semi-annual event $31,294 21 Semi-Annual Groundwater& Soil Vapor Probe Monitoring 2020 - 2021 (4 semi- annual events) $116,084 22 Project Management, Quarterly Progress Reports, Agency Communications 2020 - 2021 (4 semi-annual events) $9,092 Sub-Total Estimated Cost for 2020 - 2021 (4 semi-annual events) $125,176 23ISupplemental Indoor& Ambient Air Quality Assessment(2 events) 139 I $23,860 I $1,350 I $5,750 $30,960 Total Estimated Cost $156,136 R:A0818.02 City of Yakima V Contract V01 2020.02.24 Change Order No.6\Tiger Oil C006 budget est 022420.xls\Summary Budget 2/24/2020 7 City of Yakima—West Nob Hill Former Tiger Oil Site Environmental Tasks Updated February 24, 2020 . ECOLOGY CITY j A :11/ATE ::E::::..H::.:B O..:�:.:: :.. .....:.::........:...... ::: :.:,:;....�::�IEP.,:. ::.....:.:..N: .,..:.:..:.:...::...,::::::: :::::::n..::::::::::::::::::::::::::::::..::::::::::::::::::::::::::::::::::::::::::x::::::::::c: .::::::::::::::::::::::: ss :s : f I: 1 E gI 1 t..1 E tuttea:s: ::s u mpvtau::uur r t r assssssssssssssssssss: rt # # trt t t #s # #s t t#tEassountettattstassiongstssgmtanwt':sss p rt#sf+ ter site Ettt # ' IgMt*ssssssssssssssssssssssssssss +v s's s: # # xssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss 2. Conduct HRSC Field Investigation Oversight as needed Support Conduct November 26- December 7 Completed 3. Draft Report Review Review Prepare April 26, 2019 Completed 4. Additional CO2 Monitoring Review Review Conduct July 9 -10, 2019 Completed 5, Draft Final HRSC Report Review Review Prepare Dec 11, 2019 Submitted .................................................................................................................................................................................................................................................................................................................................................................................. ::.:.... c. :::. E## '#'#: :#s:: :: .d#:d t s............'t :# ':'r# ':' �##. . ...:':'dtd €#:tt.;;.: .. ..�..........:.:s: td#: #sssssssssssssssss3 s .t #: :c # tsos ssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss 6. Draft Site Management Plan Review Review Prepare November 2019 Completed 7. Draft Fact Sheet Version of Site Management Review Review Prepare November 2019 Plan Completed 8. Finalize Site Management Plan and Fact Sheet Review Review Prepare January 2020 Version—Awaitin Ecolo Comments ## . :ss:xti#ss:i### . r# Q r sssssssr#s # r �1 hrnn r r # Q#r # xssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss .................................................................................................................................................................................................................................................................................................................................................................................. ................................................................................................................................................................................................................................................................................................................................................................................. .................................................................................................................................................................................................................................................................................................................................................................................. ................................................................................................................................................................................................................................................................................................................................................................................. .................................................................................................................................................................................................................................................................................................................................................................................. ................................................................................................................................................................................................................................................................................................................................................................................. gtBBBBBBBBBBBBBBBBBBBBE .................................................................................................................................................................................................................................................................................................................................................................................. 9, Indoor Air Samples Review Review Conduct July 9 - 10,2019 Completed 10, Conduct bio-slurping and seal cracks in Review Review Prepare September 24- foundations of existing buildings 25,2019 11, Conduct confirmation air samples Review Review Conduct November, 2019 Completed 12. Prepare report documenting interim cleanup Review Review Prepare March 2020 action and confirmation sample results 13. Conduct follow up confirmation air sample— Review Review Conduct June-July dependent on semi-annual groundwater event 2020* data* (Change Order pending) ................................................................................................................................................................................................................................................................................................................................................................................. ::#...s.:sp#E s:l ::::..s::;:::s;:::: s #:::#s ss tt #s':'p flt:1#Nsss sst ...:...::art....##art' #s 11Sk.... .::ice': :£t€...sd ems.......:#ss . # r11 ass#s ::l::l:101611 rt## '`#1 r#r t s rt#:::611 ` r ''xsssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss 13. Spring 2019 Review Review Conduct May,2019 Completed 14. Fall 2019 Review Review Conduct November, 2019 15. Spring 2020 (Change Orderpending) Review Review Conduct May 2020 16. Fall 2020 (Change Orderpending) Review Review Conduct November 2020 Note: All tasks listed above are eligible for reimbursement through the Remedial Action Grant and are included in the scopes of work in the Consent Decree for the site and the MFA task orders with the City of Yakima. Page 1