HomeMy WebLinkAbout03/17/2020 06L Wastewater Maintenance Facility Renovation; Contract with POW Contracting, Inc. to\'4\lyy tbxk ik 1 + PPP d g. P A P p P 1 PPi ittYlltYlt.\ta. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.L. For Meeting of: March 17, 2020 ITEM TITLE: Resolution authorizing a contract with POW Contracting, Inc. for Project Nos. 2509/2510 Wastewater Maintenance Facility Renovation SUBMITTED BY: Scott Schafer, Director of Public Works David Brown,Assistant Director of Public Works Mike Price, Wastewater/Stormwater Division Manager, 249-6815 SUMMARY EXPLANATION: The City of Yakima (City)Wastewater Collections Maintenance Facility located at 202 West Pine Street(see attached Project Location Map)serves as the operations center for the wastewater and stormwater collections system maintenance staff and equipment. The workgroup first occupied the facility in 1992 with a staff of ten employees. Since that time, staff has grown to over twenty employees to meet the maintenance requirements of the expanding wastewater and stormwater collection systems. The restrooms, offices, and conference/lunch room in the existing facility require reconfiguration and renovation to accommodate the increase in workgroup staff experienced over the past twenty-eight years. City of Yakima Projects 2509/2510 provide the required renovations and updates within the building's existing footprint and extend the useful life of the facility. The City previously entered into an agreement with KDA Architecture, Inc. under resolution 2019- 047 to provide architectural, bidding, and construction services for the Maintenance Facility Renovation project. The City utilized the procedures established by the State of Washington for competitively bidding projects. Three contractors submitted bids, with POW Contracting, Inc. submitting the lowest bid of$650,834. The contract is attached for City Council review. The projects are funded by Wastewater Capital Fund 476 and Stormwater Capital Fund 442 ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt resolution 2 ATTACHMENTS: Description Upload Date Type D Rtrrolution 3412020 Rost-Affirm) D Contract 3141202C Contract D ProjW Location Map 02FL2020 Backup Material 3 RESOLUTION NO. R-2020- A RESOLUTION authorizing a contract with POW Contracting, Inc. for Project Nos. 2509/2510 Wastewater Maintenance Facility Renovation WHEREAS, the City of Yakima owns, operates, and maintains the 19,349 square foot Wastewater Collections Maintenance Facility located at 202 West Pine Street as the base of operations for the Wastewater and Stormwater Division collections systems maintenance staff and equipment; and WHEREAS, the 7,161 square feet of office, restroom, and conference room space in the Facility requires reconfiguration and renovation to accommodate the increase in workgroup staff from ten (10) employees to twenty (20) employees experienced since initial occupancy in 1992, and to extend the Facility's useful life; and WHEREAS, the City previously entered into contract No. 2019-047 with KDA Architecture, Inc. to provide design, bidding, and construction services for the Facility Renovation Project, and WHEREAS, the City of Yakima used the procedure established by Washington State law for the bidding and awarding of public capital improvement projects; and WHEREAS, POW Contracting, Inc. submitted the low bid and has the ability to perform the contract specified work; and WHEREAS, the Acting City Chief Engineer has recommended awarding the contract to POW Contracting, Inc. for constructing the Facility renovations; and WHEREAS, the City Council finds that it is in the best interest of the City of Yakima to enter into a contract with POW Contracting, Inc. to perform the work detailed in the contract documents for the reconfiguration and renovation of 7,161 square feet of office, restroom, and conference room space in the Wastewater Collections Maintenance Facility; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached contract with POW Contracting, Inc., in the amount of Six Hundred Fifty Thousand Eight Hundred and Thirty-Four dollars ($650,834) for City Project Nos. 2509/2510, which extend the useful life of the Wastewater Maintenance Facility through reconfiguration and renovation of existing facility space. ADOPTED BY THE CITY COUNCIL this 17th day of March, 2020. ATTEST: Patricia Byers, Mayor Sonya Clear Tee, City Clerk 4 �..,., TM Standard Form of ree en Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 17 day of March in the year 2020 (Zn words, indicate day,month and year) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner added information needed for its Warne, legalstixtus, address rntd other infornaataon) completion.The author may also have revised the text of the original City of Yakima City of Yakima Project Nos. SC509& SW2510 AIA standard form.An Additions and 129 North 2m4 Street Deletions Report that notes added r 98901 information as well as revisions to the Wa shington ashington standard form text is available from the author and should be reviewed.A and the Contractor: vertical line in the left margin of this (Wane, legal stratus, address and outer information) document indicates where the author has added necessary information and where the author has added to or Pot ('ontracmmg,tuc. deleted from the original AIA text. 1105 F. (Columbia St. Pasco tT.�993 1 This document has important legal {$09)542 R5,97 consequences.Consultation with an attorney is encouraged with respect for he Lollowing Project, to its completion or modification. (A'anae, lac anota and detailed descfiption) The parties should complete A101 TV-2017, Exhibit A, Insurance 'Wastewater Collections Facility Upgrade and Bonds,contemporaneously with Yakima,W/1 this Agreement.AIA Document This protect is for the renovation of the existing, single story, 19,349 square foot A201 T"1-2017,General Conditions of Wastewater Colleenoivs Department Mavitenarnce Facility in Yakima,Washington. The the Contract for Construction,is renovation area is approximately 7,161 isquare feet.The project will be constructed to meet adopted in this document by the requirements of Type V-B construction, Occupancy Group B and S-2 per the reference. Do not use with other Interinational Buildma Codes, ^_01 S edition. The building is not sprinklered and is not general conditions unless this equipped with a file alarm system No additional square footage is added in this project. document is modified. The project houses the office and admi istrative functions,locker room,restrooms(Group B areas)and the itoikout(gym),maintenance area, and vehicle storage functions(Group S 2 areas)of the Wastewater Collections Department The project includes no site work except for the restripnig and signing of the existing handicapped stalls to comply with current codes, and other Work indicated in the Contract Documents. The Architect (Warne, tegat status, address and other infbrnuatian) KDA Architecture, Inc. KDA Project No. 201920 1310 North 16th Avenue Yalci na 'Washington 98902 The Otvner and Contractor agree as follows. init. AIA Document A101TM'-2017.Copyright O. 1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIAC Document is protected by U.S.Copyright Law and Intemational Treaties. Unauthorized reproduction or distribution of this AIA"" Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03/04/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 5 TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT I s 3 DATE OF COMMENCEMENT, SUBSTANTIAL,AND FINAL COMPLETION 4 CONTRACT SUM 5 s PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OFs CONTRACT DOCUMENTS EXHIBIT A INSURANCE AND BONDS ARTICLE i THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract(General, Supplementary, and other Co editions,as revised),Drawings, Specifications,Addenda issued prior to execution of this Agreement other documents listed in this Agreement,and Modifications issued after execution of this Agreement,all of which form the Contract and are as fully apart of the Contract as if attached to this Agreement or repeated herein The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations,or agreements,either written or oral An entnneration of the Contract Documents, other than a lodihcation, appears m Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the entire Work described in the Contract Documents.except as specifically Incbcatvd in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §3,1'The date of commencement of the Work shall be: (Check one of the folioTeataglbcxes,) [ • ] The date of this Agreement [X] A date set forth in a notice to proceed issued by the Owner. [ ] Established as follows: (Inert¢date or a means to determarre the date of commencement of the Work) If a date of commencement of the Work is not selected,then the date of commencement shall be the date of this Agreement §3.2sThe Contract Time shall be measured from the date of commencement of the Work. §3.3 Substantial and Final Completion §3.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Contractor shall achieve Substantial Completion of the entire Work: (Check one of the foilowang boxes and con aplete the necessary infornaation.) I nit. AR Document A101 TM'—2017.Copyright 11915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIAr Document is protected by U.S.Copyright Law and International Treaties. 2 Unauthorized reproduction or distribution of this AIA"" Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03/04/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 6 [ _l Not later than ( ) calendar days from the date of commencement of the Work. [X] By the following date: September 27,2020 §3,3>2 Subject to adjustments of the Contract Time as provided in the Contract I c um cnts,if portions of the li%ork are t i be completed prior to Substantial Completion of the entire Work,the Contractor shall achieve Substantial Completion of such portions by the following hates: ' (Table deleted) (Table Deleted), §3 3.3 If the Contractor fails to achieve Substantial Completion as provided in this Section 3 3,liquidated damages,if any;shall be assessed as set forth in Section 4.5. §3.3.4 After Substantial Completion the Coritraetor shall carry the work forward expeditiously with adequate forces and shall achieve Final Completion, satisfyirig all requirements necessary for the Owrier's acceptance of the project, within thirty(30)calendar days after Substantial Completion.If the Contractor fails to achieve Final Completion as provided in this Section 4.4.4, liquidated damages,if any,shall be assessed as set forth in Section 4.5. ARTICLE 4 CONTRACT SUM 54.1 The Owner shall pas the Contractor the Coritraet Sum iri current funds for the Contractor's performance of the Contract.The Contract Sum shall riot exceed Six Hundred Fifty Thousand Eight Hundred Thirty Four Dollars($ 6501,834),without written approval of the Owner,plus W S.S.T and subject to written additions and deductions approved in writing by die parties,as provided in the Contract Documents. §4.23Alternates 's §4.2.1 alternates,if any;included in the Contract Sum: Item Price Alternate No 1' Replace All Interior Lighting with New Fixtures $8,476. ,lltemate no 2' Provide New Door Panels&Hardware(ttil Doors 104.1 & 105.1 S725. Alternate no 3' Tachboards'Markerboards to be 111 Contract $7,713. Altemate No 4: Pro de hick n $14,681. i'llternate no 5' Replace Ceiling'files in All Rooms $15,183. Alternate no o Parking Lot Restriping $3,619. Altemate No 8 Countertop at Flat File Cabinets in Office 107 $1,512. §4.22 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Agreement Upon acceptance,the Owner shall issue a Modification to this Agreement (Insert below each altetwate and the conditions that must be met for the 0-wrier to accept the alienate.) Item Price Conditions for Acceptance 1 10fle3 §4.3 Allowances, if any.,included in the Contract Sum: (Ident?t1'each atlaw'ance.) Item Price 1 s None §4.4 L nit prices;it any: (Idenhfi the item and state the unitp-race and quantity limitations, if any, to which the unit price will he applicable.) Item Units and Limitations Price per Unit($0.00) 1 None. I nit. AR Document A101TM'-2017.copyright'1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIA, Document is protected by U.S.Copyright Law and Intemational Treaties. 3 Unauthorized reproduction or distribution of this AIA Document,or any portion of it,may result in severe civil and criminal penalties,and will be t prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03104/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 7 §4.5 Liquidated damages, if any: (Insert terms and conditions for liquidated damages, if any.) The Owner will incur serious and substantial special, incidental, and consequential damages if the work is not completed by the date stipulated in the agreement. Therefore,liquidated damages shall be assessed as compensation to the(wrier for damages incurred by the loss of the project not being completed on time,but not as a penalty to the Contractor Liquidated damages shall be assessed as follows: (a) for each calendar day after the date fixed for Substantial Completion,the Contractor shall pay the Owner the sum of Five Hundred Dollars($500)per day (b)For each calendar day after the date fixed for final completion,the ('ontractor shall pay the Owner the sum of Five Hundred Dollars($±00)per day. (e)Each sum of liquidated damages can be assessed cumulatively. §4,6 Othcr. (Insert provisions(or fi(nus or other incentives, if airy, Ilia'might result in Cl change to the Contract Sum.) ARTICLE 5 PAYMENTS §5.1iProgress Payments §5,1 1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect,the Owner shall make progress payments on account of the Contract Sum to the Contract()r as provided below and elsewhere in the('ontract Documents. §5,1:2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows §5.1.3 The Owner will make progress payments within thirty(30)days of its receipt and approval of the Architect's Certificate for Payment. (Fe ckral. state or local laws may require payn aent within a certain period of time.) §5.1.4 Each Application for Payment shall be based orn the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work The schedule of values shall be prepared in such form,and supported by such data to substantiate it accuracc,as the Architect may require. This schedule of values shah be used as a bas s for reviewing the Clontractor'slApplications for Payment. §5.1;5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered be the Application for Payment. §5.1.5 hi accordance with AL-T Document A201 TM 2017,General Conditions of the Contract for Construction,and subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: §5.1.6.1 The amount of each progress payment shall first include: .1 That portion of the Contract Sun properly allocable to completed Work, .2 That portion of the Contract Sum properly allocable to materials and equipment delivered arid suitably stored at the site for subsequent incorporation in the completed construction,or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing, and .3 That portion of Construction Change Directives that the Architect determines,in the Architect's professional judgment,to be reasonably Justified. {5.1.6.2 I he a haunt of each progress payment shall then be reduced by: .1 The aggregate of any amounts previously paid by the Owner, .2 The amount, if any,for Work that remains uncorrected arid for which the Architect has previously withheld a Certificate for Payment as provided in Article y of Al A Document A201 2017: I nit. AR Document A101TM'-2017.Copyright'D 1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.An rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and Intemationai Treaties. 4 Unauthorized reproduction or distribution of this AIA"" Document,or any portion of it,may result in severe civil and criminal penalties,and wig be f prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03104/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 8 .3 Any amount for which the Contractor does not intend to pay a Subcontractor or material supplier, unless the Work has been performed by others the Contractor intends to pay; A4 For Work performed or defects discovered since the last payment application, any amount for which the Architect may withhold payment,or nullify a Certificate of Payment in whole or in part,as provided in Article 9 of AIADocumentA201-2017_and .5 Retainage withheld pursuant to Section 5.1.7. §5.1.7 Retainage §5,1.7.1 For each progress payment meek prior to Substantial Completion of the Work, the Owner may withhold the foil raving amount, as retainage, from the payment otherwise chic: (Insert a percentage or amount to be Withheld as retamage from each Application for Payment: The amount of retninage mcay be limited by governing law.) Retainage shall be 590 The roam age,its management and payment shall be in accordance with R('\T 60.28. as it now exists or is hereafter amended_and in accordance with other applicable laws of the State of Washington. §5.1,7,1.1 (Paragraphs deleted) 'INTENTIONALLY I)FT,ETF D §5,1,7,2 (Paragraphs deleted) TNTF,'gTTf77-AIsLY DELETED §5.1:7.3 (Paragraphs deleted{ INTENTIONALLY DELETED §5,1;81f final completion of the Work is materially delayed through no fault of the Contractor,the Owner shall pay the Contractor any additional amounts ill accordance with Article 9 of AIA Document A201-2017. §5,1;9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §5.2fmal Payment §5,2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Article 12 of ALA DocumentA201-2017,and to satisfy other requirements,if any, which extend beyond final payment and ,2 a final Certificate for Payment has been issued by the Architect §5,2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate`for Payment, or as follows: §5.3 Interest Payments due and unpaid under the Contract shah bear interest from the date payment is due at the rate stated below, or in tile absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate oftttteresI agreed upon, ifarzv) Payments due and unpaid under the Contract Documents shall bear interest as specified by R('W 39.76,not to exceed the Yank of America prune plus two percent per aimum. I nit. AR Document A101TM'-2017.Copyright 1)1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and Intemational Treaties. 5 Unauthorized reproduction or distribution of this AIA"" Document,or any portion of it,may result in severe civil and criminal penalties,and will be f prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03/04/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 9 ARTICLE 6 DISPUTE RESOLUTION §6.1 Initial Decision Maker The Architect will serve as the Inrtlal.Decision\Taker pursuant to Article IS of ATA 1.)ocumcnt A201 2017,unless the parties appoint below another individual,not a party to this Agreement,to serve as the Initial Decision Maker. (Tf ibe parhes nuitua/lv agree, insert the name, address and other contact informatzon of the In2110//)ec ision Al(2ket; if at et that?the A,Glut eet) 66,2 Binding Dispute Resolution F w ny Claim subject to,but not resolved by,mediation pursuant to Article 1 S of ATA Document A"O1-?017, the method of binding dispute resolution shalle a bs follows: (Cheek t17e appropriate box) [ ] Arbitnitionpursuantto Section 15.3 of AIADocumentA201 2017' [X] Litigation i cocmt of competent jurisdiction in Yakima Count,tt,Vashington.unless the Owner and Contractor mutually agree inwntin to another form of dispute resolution. [ ] Other(Sipco v) If the Chvner and Contractor-do not select a rnethod of binding dispute resolution, or do not subsequently agree in writing to a binding chspute resolution method other than litigation. Clauns will be resolved by litigation in a court of competent lurisdiction ARTICLE 7 TERMINATION OR SUSPENSION §7.13'Ihe Contract may be terminated by the Owner or the Contractor as provided in Article 14 of ATA Document 1\201 2i)17 67.1.1 If the Contract is terminated for the Owner's convenience in accordance with Article 14 of Aril.Document 1\201 2l)17,then the Owner shall pay the Contractor (Paragraphs deleted) as prescribed in Article 14 4 of AIADoeument A20144017. §7.251 he tfork may be suspended by the Owner as provided in Article 14 of ATA Document A201'2017. ARTICLE 8 MISCELLANEOUS PROVISIONS §8.134A here reference is made in this Agreement to a provision of AlA Docimient A2i)I 2017 or another Contract 1.)ocwnra3f.the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents §8.2 The Owners representative: (Name, address, email address. and other information) Dana Kallevig l.tilitg Project\-tanager Cityof Yakima 22240 East Viola sAvenue Yakima.WA 98901 (SO9)249-6813 §8.3 The Contractor's representative: I nit. AR Document A101TM'-2017.Copyright'D 1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and Intemational Treaties. 6 Unauthorized reproduction or distribution of this AIR"" Document,or any portion of it,may result in severe civil and criminal penalties,and will be t prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03/04/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 10 (Name, address email address. and other infomlation) Shelley Ainsworth(Corporate Secretary, VP) Scott Seguin(Project Chip Ainsworth (Superintendent) POIN Contracting Inc. 1105E Columbia St. Pasco,IL A 99301 ( 0°,)542-8507 §8,4 Neither the Owner nor the Contractor's representative shall be changed without ten days'prior written notice to the other part;' §8,5 Insurance and Bonds §8,5.1 The Owner and the C'.tintractor shall purchase and maintain insurance as set forth in AIA Document Al 1"'t-2017;Standard p()rut of Agreement Between Owner and('ontractor where the basis of payment is a Stipulated Sum,Exhibit.A,Insurance and Ponds, and elsewhere in the Contract I)ocunicnts. §8,52 The('ontractor shrill provide bonds as set forth in AIA I)octmient A101114 2017 Exhibit A, and elsewhere in the Contract Documents. §8,6 otice in electronic format,pursuant to Article t of AIA Document A201 '2017,may be given as set forth below: (Paragraph deleted) Pursuant to Article 1 6 of ATA Document A201-2017. §8,7 Other provisions_ ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS §9.1 This Agreement is coriiprised of the following documents: .1 AIA Document Al01Tm-2017, Staiidard Form of Agreement Between Owner and Contractor ,2 AIA Document AlillTm-2017,Exhibit A,Iiisurarice and Bonds AIA Document A201T's-2017_General Conditions of the Contract for Construction 4 This Contract,the Request for Proposals No. SC509&SW2510, Scope of Work,conditions, addenda, and modifications and Coiitraetor's proposal(to the extent consistent with City of Yakima documents) constitute the Contract Documents and are complementary. Specific Federal and State laws and the terms of this Contract to that order respectively, supersede other inconsistentprovisioins. These Contract Documents are on file'lithe Office of the Purchasing Manager, 129 No. 2nd St.,Yakima,WA, 98901 and are hereby incorporated by reference into this Contract. ,5 Enumeration of Drawings-See Exhibit B ,6 Enumeration of Specifications-See Exhibit C .7 Addenda, if any: Number Date Pages No. 1 February 7, 2020 18 No. 2 February 17, 2020 3 No. 3 February 19, 2020 3 (Paragraphs deieted) Portions of Addenda relating to bidding or proposal regcurernents are not part of die Contract Documents unless the bidding or proposal requirements are also emanrerated in this Article 9. .8 Other Exhibits: I nit. AR Document A101" -2017.copyright'1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.All rights reserved.WARNING:This AIA, Document is protected by U.S.Copyright Law and International Treaties. 7 Unauthorized reproduction or distribution of this AIA" Document,or any portion of it.may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03/04/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 11 (Check all boxes that apply and include appropriate information identifying the exhibit where required) [X] Washington State Prevailing Wage Rates—See Exhibit D [ ] The Sustainability Plan: Title Date Pages [; ] Supplementary and other Conditions of the Contract: Document Title Date Pages .9 Other doctunents,if any, listed below: L7sthere z j additional documents that are intended to faith;part of the Contract Docunaents..4IA Document,LOJT —201?provides that the advertisement or invitation to bid,Instructions to Bidders, sample forms, the Contractor's bid or proposal,portions ofAddenda relating to bidding or proposal requirements, arrd other information furnished by the Owner in anticipation of receiving bids or pi-oposette are not part of the Contract Documents'unless enumerated irr this Agreement Airy such documents should be listed here onl}'?(intended lobe pail()fine Contract Doeumenh.) This Agreement entered into as of the day and year first written above. OWNER(Signature) CONTRACTOR(Signature) ' s Alex l4eyencoif Interim ('ity Manager Shelley Ainsworth Corporate Secretary,VP (Pr-infect name-at d title) (Printed name and title) I nit. AR Document A101TM'—2017.Copyright'D 1915,1918,1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997,2007 and 2017 by The American Institute of Architects.Ad rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and International Treaties. 8 Unauthorized reproduction or distribution of this AM"" Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:13:12 PT on 03104/2020 under Order No.3830736827 which expires on 04/18/2020,and is not for resale. User Notes: (1348948785) 12 Project Location Map Project No. SC2509/SW2510 Wastewater Collections Facility Renovation �Y1xi51215+, \ ....- \ \ \- \ '•5 $4.3,,{klkw' +x;>:+ri5{x{NAS.,,-,•'4 - �,,.rM" m Y* As [�Y." t y t .. Iiti'•A+j'.K'•Akx= ,,,,A, tt . �. _M„ !:+ir5r 5••tr "1: t. ,,.,-..'".• 'r•" itt i'S{xA%�{t Y= Y={s{4 +�x-:Y{i y S i k. J� .{�'"kdr;}.{hr. •- ;'10x{xA5{54.-+w"' , .f '^L. y .'. {.. r..vii j{;? f'=riw"� .. },. tt y 4 ---- '. V \ T+:ii{i3 mot:tot*mg5 gg £ t V.I. y $.' t y 1. y 3 AHs71. L r. . ....................... =ors{Hy+A 5,54Uidal.i.T. ‘, w+...