BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6.H.
For Meeting of: February 18, 2020
ITEM TITLE: Resolution authorizing a contract with Hurst Construction, LLC. for
Project No. 2487A Fair Avenue Sanitary Sewer Improvements
Phase A
SUBMITTED BY: Scott Schafer, Director of Public Works
David Brown,Assistant Director of Public Works
Mike Price, Wastewater/Stormwater Division Manager, 249-6815
SUMMARY EXPLANATION:
City of Yakima (City) Project No. 2487A Fair Avenue Sanitary Sewer Main Improvements Phase
A provides for the construction of the first of two phases (A& B)of sewer main capacity
improvements required to serve a fully developed Mill Site. Phase A uses open trenching to
replace 1 ,540 linear feet of existing 8-inch diameter sewer main along Fair Avenue between East
Spruce Street and East Beech Street (see attached Project Location Map)with a new 15-inch
sewer main. The project also reconstructs the existing roadway, sidewalk, curb and gutter and
other related work.
The City previously entered into an agreement with HLA Engineering and Land Surveying, Inc.
under resolution R-2018-141 to provide engineering design, bidding, and construction services
for the Fair Avenue Sanitary Sewer Main Improvements. The City utilized the procedure
established by the State of Washington for competitively bidding projects. Eight contractors
submitted bids, with Hurst Construction, LLC. submitting the lowest bid of$1 ,159,555.06 for
Phase A of the project. The contract is attached for City Council review.
The project is funded by Wastewater Capital Fund 476. Phase B of the project will go out to bid
in spring of 2020 and will consist of utilizing trenchless technology to upsize approximately 2,000
linear feet of sewer main between the Interstate 82/Fair Avenue off-ramp and East Chestnut
Avenue.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Economic Development
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
2
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
Description Upload Date Type
D Ro9olution 1/342020 Resolution
D Protect Location Mao 11332020 Backup Material
D Contract 2512020 Contract
3
RESOLUTION NO. R-2020-
A RESOLUTION authorizing a contract with Hurst Construction, LLC. for City of Yakima
Project No. 2487A Fair Avenue Sanitary Sewer Main Improvements.
WHEREAS, the City of Yakima owns and maintains the Wastewater Collections System
in accordance with applicable Federal, State and Local regulations; and
WHEREAS, the City of Yakima is planning and preparing for the Mill Site Development;
and
WHEREAS, a sewer system capacity analysis found that the existing eight (8)-inch sewer
main between East Spruce Street and Beech Street does not have adequate capacity to
accommodate Mill Site development; and
WHEREAS, by resolution R-2018-141 the City entered into an agreement with HLA
Engineering and Land Surveying, Inc., to provide engineering design, bidding, and construction
services for Fair Avenue Sanitary Sewer Main Improvements to provide adequate sewer main
capacity to accommodate full Mill Site development; and
WHEREAS, the City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Hurst Construction, LLC. submitted the low bid and has the ability to perform
the contract specified work, and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima to
enter into a contract with Hurst Construction, LLC. to perform the work detailed in the contract
documents for the installation of 1,540 linear feet of new fifteen (15)-Inch diameter sanitary sewer
main, reconstruction of existing roadway, sidewalk, curb and gutter and other related work; now,
therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Hurst
Construction, LLC, in the amount of One Million One Hundred and Fifty-Nine Thousand Five
Hundred and Fifty-Five Dollars ($1,159,555.) for the installation of 1,540 linear feet of new fifteen
(15)-inch diameter sanitary sewer main, reconstruction of existing roadway, sidewalk, curb and
gutter and other related work on Fair Avenue between Beech Street and East Spruce Street
ADOPTED BY THE CITY COUNCIL this 18'h day of February, 2020.
ATTEST:
Patricia Byers, Mayor
Sonya Clear Tee, City Clerk
4
Project Location Map
Project No. 2487A
Fair Avenue Sanitary Sewer Main Improvements Phase A
4
2 z
Xoi
# 8�FlE�Txi�ST XYE
PROJECT tA
r:
LOCATION
•
VICINITY MAP
NOT TO SCALE
. .
CONTRACT
� n THIS AGREEMENT, made and entered in triplicate, this day of=~�~~~~ .20 . by and between
the City of Yakima , hereinafter called the Owner, and Hurst Construction, LLC a
Washington Corporation, hereinafter called the Contractor.
WyTNESSETH:
That in consideration of the terms and conditions contained herein and attached and made o pert of this
agreement, the parties hereto covenant and agree aofollows:
|. The Contractor shall do all work and furnish all tuo1o. materials, labor and equipment for THE
8|D AMOUNT OF: �$ ' 1^159,55l6 , for Fair Avenue Sanitary Sewer Main Improvements (FA-6),
City of Yakima Project No. 2487A, all in accordance with, and as described in the attached plans and
specifications and the 2018Stmndand Specifications for Road. Bridge. and Municipal Construction which
are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or
~ additions to the work provided under this contract and every part thereof.
Work shall start within ten(10)days afterthe Notice to Proceed and shall be completed in Fifty(50)working
days. If work has not commenced within the ten (101 days after the notice to proceed, the first chargeable
working day shall be the eleventh (1 1th) working day after the date on which the City issues the Notice to
Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each day said work remains uncompleted after expiration of the
specified time, ae liquidated damages.
The Contractors shall provide and bear the expense of all equipment;work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
in this contract and every part thereof, except such as are mentioned in the specifications to be furnished
bv the City ofYakima
||. The City of Yakima hereby promises and agrees with the Contractor to emp|oy, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the oonno according to the attached
specifications and the schedule of unit oritemized prices hereto ottauhad, at the time and in the manner
and upon the conditions provided for in this contract.
|||. INDEMNIFICATION. The Contractor shall defend, indemnifv, and hold harmless the Cihy, its
offioera, elected offioia|o, employees and agents from and against all n|ainns, causes of action, damages,
|osnoa, and expenses of any kind or nature vxhatmoever, including but not limited to. attornoy'a N»as and
court costs, arising out of, relating to, or resulting from The Contractor's performance or non-performance
of the services, duties and obligations required of it under this Agreement.
|V. The Contractor for himself, and for his heirn, exeoutoro, adnninistnatore, muocaoaors, and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into
this contract, except os expressly provided herein.
IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKU88A CONTRACTOR
� this day of 20— a Corporation
Oumramn,
, By�,
City Manager
' - - -
Attest:
(Print Name)
� -City Clerk��
Its:
(Pnsidant. Owner,etc.) -