Loading...
HomeMy WebLinkAboutUSDA Forest Service Okanogan-Wenatchee NF-Gray Water Disposal Agreement for Pipeline FireGENERAL CLAUSES TO EMERGENCY EQUIPMENT RENTAL AGREEMENT FORM OF -294 (2/2018) EMERGENCY EQUIPMENT RENTAL AGREEMENT PAGE_1 OF 1 1. Procurement agency: a. name & address USDA Forest Service Dkanogan-Wenatchee NF 215 Melody Lane Wenatchee, WA 98802 b. Phone # 509-664-9200 c. Fax # I. Contractor: a. name & address Yakima City Public Works 2301 Fruitvale Blvd Yakima, WA 98902 Mike Price - Wastewater Manager 509-728-8104 b. DUNS #: 078212651 (Active in SAM) c. email address: mike.price@yakimawa.gov rt. Phone # (day: 509-575-6077 Phone # (night): Cell phone #: 509-249-6815 2. Agreement #: 1205GG19K5505 3. Effective dates of agreement a. beginning : 7/24/2019 b. ending: c. x END OF INCIDENT 5. Incident name: Pipeline PNMG86 (1502), 5-26 Incident #: WA -SES -000324 6. Point of hire (location when hired if different than block 4): Yakima, WA 7. Ordering dispatch center: CWICC 8. The work rate is based on all operating supplies being furnished by: Contractor (wet) Government (dry) NA 9. Operator furnished by: N/A Contractor Government 10. Item/resource description (include VIN, make, model, year, 11. # of 12. Hourly/daily/mileage/ serial #, accessories or other identifying features): , operators shift basis (single/double) per shift Rate Unit Gray water disposal See attached 13. Special Rate Unit 15. Special provisions: tz) General clauses to the EERA OF -294 are attached hereto and incorporated herein by reference. b.) The attached General Provisions and Pacific Northwest Supplemental to the OF -294 apply to this agreement. c.) Wage Determination applicable and attached. 16. Contractor's or authorized agent's signature: 17. Date: 19. Contractin CITY CONTRACT NO: aMel sr? fficees signaturte.tESOLUTION NO. N4 _26 -Date: 7/27/2019 Original to payment center; copy in documentation box. 14. Guarantee 18. Print name and title: 21. Print name and title: Mariah Morris -Titus, Contracting Officer Phone #: 509-881-7293 Optional Form -294 (REV 1/18) USDA/USDI Yakima Public Works Gray Water Rates: Yakima Public Works will provide one invoice for the Pipeline (hauler is W/W Pumping) and a separate invoice for the Left Hand (hauler is Tryways) Receiving Charge (Yakima Municipal Code 7.600.035 B. (21.. The receiving charge for the water is $25.00 per delivery. Each tanker load is a delivery. reatment Charges (Yakima Munidpal Code 7.60.035 . (1) The volume charge is $0.4279 per one hundred cubic feet of water. In more practical terms, this translates to $0.5720 per one thousand (1,000) gallons of water. Biochemical Oxygen Demand (BOD) charge is $0.5465 per pound of BOD. Total Suspended Solids (TSS) charge is $0.5430 per pound of TSS. The pounds of BOD and TSS are determined by a calculation that uses the delivered volume of the water and the concentration of BOD and TSS as determined by laboratory testing (below). Testing Charges (Yakima Municipal Code 7.6OM 5 . (3)/7.60.105(21 BOD testing charge of $54.29 per test TSS testing charge of $54.29 per test pH testing charge of $27.14 per test The testing frequency - whether or not the City tests each tanker load for a particular parameter - is at my discretion. At a minimum, the first delivery from each fire camp will be tested for BOD, TSS and pH. CLAUSE 1: GENERAL REQUIREMENTS Upon request of the Government, the Contractor shall furnish the equipment listed herein to the extent the Contractor is willing and able at the time of order. Resources furnished under this agreement may be operated and subjected to extreme environmental and/or strenuous operating conditions which could include but is not limited to unimproved roads, steep, rocky, hilly terrain, dust, heat, and smoky conditions. As a result, by entering into this agreement, the contractor agrees that what is considered wear and tear under this agreement is in excess of what the resource is subjected to under normal operations and is reflected in the rates paid for the resource. The Contractor shall provide dependable equipment that meets all applicable state and federal laws relating to motor vehicles and equipment. CLAUSE 2: SCOPE The intent of this Agreement is to obtain resources for use during a specific local host agency incident. The Contractor is responsible for all equipment, materials, supplies, transportation, personnel necessary to meet or exceed the Agreement specifications. The resources may be used in the protection of lands, to include but not be limited to, fire suppression and all -hazard incidents. The Incident Commander or responsible Government Representative is authorized to administer the technical aspects of this agreement. Unless otherwise designated, the operator(s) shall be considered the Contractor's Representative. CLAUSE 3: AGREEMENT PERIOD Effective Date as annotated on OF -294 until demobilized by the Incident Command Team (IMT). Agreement is for duration of assigned incident only and is non-transferrable. Per IIBMH, an administrative change (FAR 43.101) is defined as a contract change that does not affect the substantive rights of the parties (e.g. a change in the payment office, incident #, financial code, etc.). For the purpose of administration, an incident may include a resource utilized for complexes, mergers, splits, or lend lease for one unit or IMT managing multiple incidents. In these circumstances, the resource may continue performance under the original EERA. If the resource is needed on an incident outside the responsible area of the incident management team, a new EERA shall be written. CLAUSE 4: PRICING Rates shall include, but are not limited to, labor (as required), equipment, operating supplies, materials, State and Federal taxes (including workers compensation costs), insurance coverage, transportation costs, overhead, and profit, and any costs/fees necessary to ensure equipment/ operators/crews meet(s) the specified standards. As required by the agreement, any costs associated with a contractor provided support truck for fuel, maintenance, and operator transportation; delivery/setup/takedown, mobilization/demobilization, power generation, and a Contractors representative attendance at the operational period briefings should also be included. Rate negotiations will follow the prevailing incident agency practices. CLAUSE 5: TIME UNDER HIRE The time under hire shall start at the time the equipment begins traveling to the incident after being ordered by the Government, and end at the estimated time of arrival back to the point of hire after being released, as annotated on the OF -294. CLAUSE 6: TIMEKEEPING Time will be verified and approved by the Government Agent responsible for ordering and/or directing use of each piece of equipment. Time will be recorded to the nearest quarter hour worked for daily/hourly rate, or whole mile for mileage. CLAUSE 7: CHANGES Changes to Emergency Equipment Rental Agreements (EERAs), OF294 may only be made by the original signing procurement official or his/her authorized representative. If the original signing procurement official is not available and adjustments are deemed appropriate, a new EERA shall be executed at the incident and shall be applicable only for the duration of that incident. The agreement will include name and the point of hire. CLAUSE 8: ORDERING PROCEDURES Information provided to the Contractor at time of order: (1) Resource Order Number. (2) Incident Order Number and Name of Incident. Dispatch offices may use a FAX or email to provide a hard copy of the resource order to the Contractor. (3) Date and time to report to incident. (4) Descriptive location of the designated site where the Contractor shall meet a Government representative. A map, if available. (5) Incident contact phone number for further information. (6) Fire Code/Funding Code Prior to departing for the incident, the Contractor shall provide to dispatch the complete name of each person dispatched with the contractor equipment, and the Estimated Time of Departure (ETD) and Estimated Time of Arrival (ETA) from point of dispatch, 8,1 DEMOBILIZATION: The Incident Commander will determine the priority of demobilization. 8,2 ORDER CANCELLATION. Order cancellation/enroute. If the order is cancelled after the resource order has been confirmed, and the resource is enroute, the resource is considered mobilized. Payment will be made by the host agency in accordance with Payment Provisions. CLAUSE 9: ADMINISTRATIVE REQUIREMENTS .1 INCIDENT BEHAVIOR It is extremely important that inappropriate behavior be recognized and dealt with promptly. Inappropriate behavior is all forms of harassment including sexual and racial harassment. HARASSMENT IN ANY FORM WILL NOT BE TOLERATED. Non-prescription and Federally unlawful drugs and alcohol are not permitted at the incident. Possession or use of these substances will result in the Contractor being released from the incident. During off -incident periods, personnel are responsible for proper conduct and maintenance of fitness for duty. Drug or alcoho abuse resulting in unfitness for duty will normally result in the Contracto being released from the incident. Sexual harassment is defined as unwelcome sexual advances, request for sexual favors, and other verbal or physical conduct of a sexual nature constitute sexual harassment when (1) submission to such conduct is made either explicitly or implicitly a term or condition of an individual's employment, (2) submission to or rejection of such conduct by an individual is used as the basis for employment decisions affecting such individual, or (3) such conduct has the purpose or effect of unreasonably interlering with an individual's work performance or creating an intimidating, hostile, or offensive working environment. 9.2 HARRASSMENT FREE WORKPLACE: Contractors shall abide by "U.S. Code,Title Vil, CivilRights Act of 1964 Executive Order EO -93 05, Secretary's Memorandum 4430-2 Workplace Violence Policy, and Harassment Free Workplace (29 CFR Part 1614)". Regulations can be found at www.gpoaccess.gov/. VnFInsxnm—vvs*POmpROmannom: The possesion of firearms or other dangerous weapons (18 USC 930 (g) (2)) are prohibited at all times while on Government Property and during performance of services, under this agreement. The term dangerous weapon does not include a pocket knife with a blade less than 2 1/2 inches in length or a multi-purpose tool such as a Leatherman 9.4 PERSONNEL REQUIREMENTS: All Contractor personnel shall comply with Safety Standards, Contractors shall comply with the Fair Labor Standards Act when employing persons under 18 years of age (Ref. 29 CFR 570). Minimum Age for Firefighting Resources. Persons under 18 years of age shall not perform hazardous or arduous duties during wildland fire management operations, including execution of prescribed burns. ENGLISH SPEAKING REQUIREMENT. Communications between Contractor crew personnel and Governmenincident personnel is maridatory for safe and effective performance. Contractors representative shall be able to proficiently communicate in English, in the language of the crew, and read and communicate the Incident Action Plan, Safety Alerts, etc. All radio communication on Government -assigned frequencies shall be in English. 9.5 CONDITION OF EQUIPMENT All equipment furnished under this agreemenshall be in acceptable condition. The Government reserves the right to conduct inspections at any time and reject equipment that is not in safe and operable condition. No payment will be made for time that the equipment was not available prior to incident use or anytime the resource is under hire. If the resource does not pass inspection at the incidenor designated inspection station, it is considered noncompliant. The Contractor may be given 24 hours or time frame designated by Government representatives to bring the resource into compliance. If the resource does not pass inspection, no payment will be made for travel to the incident or point of inspection or return to the point of hire, or for the time that the resource was not available. 9.6 All work under this Agreemenshall be performed in a safe manner to a professional standard. The goal of performance undethis Agreemenis the suppression of wildland fire and other emergency incident responses. The lncident Commander may release from an incident assignment any Contractor employee deemed incompetent, careless, or otherwise objectionable including violation of Harassment Free Workplace Policy. It will be Ieft to the discretion of the lncident Commander to demobilize an entire resource or to allow replacement of the noncompliant personnel. Documentation of the rationale for release will be provided to the CO subsequent to the action. Accordingly, the Contracting Officer may require, in writing, the Contractor remove from use under this Agreement, any employee found incompetent, careless, or otherwise objectionable including violation of Harassment Free Workplace Policy. The Contracting Officer may require other proof of mitigation. Misconduct may result in cancellation of this Agreement. If an employee or crew is terminated, quits, or otherwise is released from the incident for any reason, the Contractor is responsible for returning the employee(s) to the point of hire with a departure time from the lncident Command Post (ICP) no later than 12 hours or time specified by a government official following such decision. The Contractor may, at their discretion, provide such transportation, or request the lncident Management Team (IMT) to arrange for the transportation with all transportation costs deducted from Contractor's payment. If the Contractor does not act in a timely manner (i.e., Contractor's employee(s) not departing from the ICP for return to point of hire within the specified time period), the IMT has authority to transport said employee or arrange for employee's transportation and to deduct all such transportation costs from Contractor's payment. 9.7 VVORK REST & LENGTH OF ASSIGNMENT: Contractors shall comply with the 2:1 work/rest ratio (for every 2 hours of work or travel, provide 1 hour of sleep and/or reswithin a 24 hour period) as outlined in the lnteragency lncident Business Management Handbook (Work/Rest Guidelines). When working an average of more than 16 hours, forthe duration ofthe incident, a Contractormay request to negotiate an equitable adjustment through the Procurement Unit Leader or Contracting Officer. Shifts exceeding 16 hours shall be approved by the Incident Commander. Hours worked that exceed 16 hours in a 24-hour period must be approved by the IC or Agency Administrator. Documentation shall include mitigation measures used to reduce fatigue. To mitigate exceeding length of assignment guidelines and manage the days of rest, the Government has the option to: (1) Request the Contractor to provide replacem Replacement personnel are subject to the work/rest and length of assignment guidelines and must arrive at the incident fully rested. The Government will not pay transportation cosfor replacement personnel. (2) Release resources aftea 14 -day assignmenor follow Iength of assignment extension guidelines as stated in lnteragency lncident Business Management Handbook. (3) With the Governments agreement, the contractor may choose to have their personnel remain at the incident base camp and not be placed on shift to allow proper rest. The time is not compensable when the Contractor is off shift in compliance with the length of assignment provisions. 98 EMERGENCY INCIDENT DRIVING: The Contractor shall follow the driving regulations and work/rest guidelines listed in the Interagency Incident Business Management Handbook (IIBMH). The Contractor is responsible for complying with all other current Federal, State and Local driving regulations. No driver will drive more than 10 hours (behind the wheel/actual driving time) within any duty- day (operational period). Multiple drivers in a single vehicle may drive up to the duty -day limitation provided no driver exceeds the individual driving time (behind the wheel/actual driving time) limitation of 10 hours. A driver shall drive only if they have had at least 8 consecutive hours off duty before beginning a shift. An exception to the minimum off-duty hour requirement is allowed when essential to: (1) Accomplish immediate and critical suppression objectives, or (2) Address immediate and critical firefighter/responder or public safety issues. As stated in the current agency work/rest policy, documentation of mitigation measures used to reduce fatigue is required for personnel who exceed 16 hour work shifts. This is required regardless of whether the driver was still compliant with the 10 hour individual (behind the wheel) driving time limitations. CLAUSE 10: GOVERNMENT FURNISHED SUPPLIES & SERVICES 10.1 LAUNDRY SERVICE: If the Government provides a laundry service at the incident base camp, the Contractor may utilize the service at no cost. 10.2 CAMPSITE: A campsite may be provided. The Contractor shall provide sleeping equipment such as tents or shelters, sleeping bags, etc. If the Government cannot provide a campsite, an overnight allowance may be authorized. (See Remain Overnight Allowance (RON)). 10.3 COMMISSARY: When authorized in writing by the Contractor, the Contractor's employees shall be permitted to use the commissary when one is available. 10.4 FIRST AID RESPONSIBILITY: The contractor is financially responsible for employee medical expenses and coverage. The Government may provide first aid at the incident at no charge to the contractor. Any other medical expenses incurred will be the responsibility of the contractor. If contractor personnel become ill or are injured and incident transportation is not available, the Government may evacuate or transport the injured/ill person(s) to a medical facility/hospital utilizing a commercial source (e.g. ambulance or air transport such as Life flight). Commercial transport costs will be the responsibility of the Contractor 10.6 REMAIN OVERNIGHT ALLOWANCE (RON), Contractors under this agreement are not paid per diem or lodging expenses to and from incidents. When the Government cannot provide a campsite after the first shift worked, the Government will pay actual lodging expenses or the per diem locality rate published by the U.S. General Services Administration (GSA) web site (www.gsa.gov), whichever is less. Double occupancy of hotel rooms is required. Any associated lodging taxes are reimbursable as documented. Lodging receipts, as well as documentation by incident personnel that a campsite was not provided, shall be submitted as supporting documentation with payment documents. - Reimbursement for meals and incidental expenses (M&IE) is based on per diem locality rates minus any Government - provided meals, -The maximum allowable rates are referenced at www.gsa.gov. - If the resource is allowed to return to its home unit location during off -shift time, RON allowance is not authorized. - The maximum RON that shall be allowed is based on the number of operators or crewmembers shown on the shift ticket. Payment shall be included as an addition on the invoice. 10.6 FOOD & DRINK: Contractors are required to provide sufficient food & drink to support their employee(s) while in travel status and the first shift of the incident. This is not reimbursed by the Government. - After that time, when Government subsistence at incident camps are available, meals for Contractor's operator(s) will be furnished without charge. Government will furnish meals without cost if restaurant subsistence is the approved camp for incident personnel. - The Government, during demobilization and/or reassignment, may provide sack lunches to the Contractor personnel without charging the Contractor. 10.7 FUEL: If procuring fuel at the incident site, the contractor shall do so with a major credit card (Visa or MasterCard). 10.8 REPAIRS: Repairs shall be made and paid for by the Contractor. The Government may, at its option, elect to make such repairs when necessary to keep the resource operating. The cost of such repairs will be determined by the Government and will be deducted from payment to the contractor. CLAUSE 11: CONTRACTOR FURNISHED EQUIPMENT, SUPPLIES, AND PERSONNEL Equipment specific requirements, if applicable, will be attached and are considered incorporated in this agreement. 11.1 OPERATING SUPPLIES: Operating supplies include fuel, oil, filters, lube/oil changes. Even though Block 7 may specify that all operating supplies are to be furnished by the Contractor (wet), the Government may, at its option, elect to furnish such supplies when necessary to keep the equipment operating. The cost of such supplies will be determined by the Government and deducted from payment to the Contractor. 11.2 VEHICLE LICENSING REQUIREMENTS: - Licensed Units. All Units offered and used under this Agreement shall be licensed and legally operable on all roads. All Units with a Gross Vehicle Weight Rating (GVWR) of 10,001 pounds and greater shall have: a) annual USDOT certified vehicle inspection; or b) Commercial Vehicle Safety Alliance Inspection. (49 CFR 396.23) - Federal regulations prohibit the use of official agency shields or markings on private vehicles or property. 11.3 TRANSPORTATION VEHICLES: All transportation vehicles shall be in sound mechanical condition with sufficient horsepower and mainframe configurations to ensure successful performance on roads and highways, or in terrain described in these specifications. All vehicles under this Agreement shall be able to be legally driven on highways under their own power and be able to travel at a minimum of 50 miles an hour. 11.4 MEDICAL INSURANCE: Contractor shall provide the operator(s) with an adequate supply of appropriate insurance forms, insurance ID card(s), and other necessary documents. Such documents shall accompany the injured/ill person(s) when the medical need arises. Per FAR 52.247-21 Contractor Liability for Personal Injury And/Or Property Damage (APR 1984). 11r_VEHICLE CLEANING FOR NOXIOUS WEEDCONTROL: The resource shall arrive at the incident or designated inspection point washed and free of noxious weed seeds. Equipment with frames and cross -members will be inspected and all debris collecting areas including belly pans, guards and coverings must be washed to alleviate the spread of noxious weed seeds and to protect against grease and oil soaked residues catching on fire in belly pans and skid plates. Heavy equipment operators shall manually clean tracks and belly pans before leaving project site on all heavy equipment. CLAUSE 12: PAYMENTS The host agency for each incident is responsible for payments. 12.1 TIME UNDER HIRE: The time under hire shall start at the time the resource begins traveling to the incident after being ordered by the Government, and end at the estimated time of arrival back to the point of hire after being released, except as provided in exceptions. 12.2 RATES OF PAYMENTS: Payment will be at rates specified and shall be in accordance with the following: - On -Shift includes time worked, time that resource is held or directed to be in a state of readiness, and compensable travel (resource traveling under its own power) that has a specific start and ending time. - The vendor will be paid for travel to and from the incident from the Equipment City and State they designated on the OF -294. Vendor must meet date and time needed. - Rates for equipment hired with Contractor Furnished operator(s) shall include all operator(s) expenses. Payment will be at rates specified and, except as provided in the EXCEPTIONS portion of this document, shall be in accordance with the following: - Work Rates (column 13) (hourly/daily/mileage/shift basis) shall apply when equipment is under hire as ordered by the Government and on shift, including relocation of equipment under its own power. - Special Rates (column 14) shall apply when specified. - Guarantee, For each calendar day that equipment is under hire for at least 8 hours, the Government will pay not less than the amount shown in column 15. - If equipment is under hire for less than 8 hours during a calendar day, the amount earned for that day will be not less than one-half the amount specified in column 15. - The guarantee is not applicable to equipment hired under the Daily rate. - If equipment is transported under its own power, it is compensated under the Daily rate. - Daily Rate (column 13) - Payment will be made on basis of calendar days (0001 — 2400). For fractional days at the beginning and ending of time under hire, payment will be based on 50 percent of the Daily Rate for periods less than 8 hours.: Under the daily rate equipment may be staffed with or without operator. - Shift Basis (Portion of calendar day) - Single Shift - (SS) is staffed with one operator or one crew Double Shift - (DS) is staffed with two operators or two crews (one per shift). The DS rate will apply any calendar day the DS was under hire, including travel. There will be no compensation for a double shift unless a separate operator(s) and or crew(s) is/are ordered in writing for the second shift. - Agency personnel at the Section Chief Level may, by resource order, authorize a second operator or crew (Double Shift), if needed during the assignment, 12.3 METHOD OF PAYMENT: Lump -sum payment will normally be processed at the end of the emergency assignment, However, partial payment may be authorized as approved by the incident agency. Payment for each calendar day will be made for (1) actual units ordered and performed under Work or Daily, shift basis and/or Special rates or (2) the guarantee (if applicable) earned, whichever is the greater amount. 12.4 EXCEPTIONS: - No further payment will accrue during any period that resource under hire is not in a safe or operable condition or it is not available for the assigned shift or portions of the assigned shift. Payment will be based on the hours the resource was operational during the assigned shift, as documented on the shift ticket versus the designated shift, as shown on the Incident Action Plan. If the equipment was not operational for the full shift, the deduction from the daily rate is calculated by converting the length of shift from the IAP to determine the hourly rate and pay the contractor for the total hours worked before equipment became nonoperational. - If the Contractor withdraws resources prior to being released by the Government, no further payment shall accrue and the Contractor shall bear all costs of returning resources to the point of hire. - After inspection and acceptance for use, resources that become inoperable and cannot be repaired at the site of work by the Contractor or by the Government within 24 hours, may be considered as being withdrawn by the Contractor in accordance with above guidance with the exception that the Government shall pay return travel The Government shall calculate travel based on a normal release of resource. The Contractor shall bear any additional cost returning resource and/or operator(s) to the point of hire. No payment will accrue when the contractor is off shift in compliance with the mandatory Work/Rest and Length of Assignment provisions. 12.5 DEDUCTIONS: Unless specifically stated elsewhere in this agreement the cost of any supplies, materials, or services, including commissary, provided for the Contractor by the Government will be deducted from the payment to the Contractor. CLAUSE 13: INVOICING PROCESS The Contractor shall have one copy of the complete Agreement for the assigned incident. After each operational period worked, time will be verified and approved by the Government Agent responsible for ordering and/or directing use the resource. Time will be recorded to the nearest quarter hour worked. The Government will verify the Contractors time on an Emergency Equipment Shift Ticket (OF -297). The Government and the Contractor representatives will sign the OF -297 verifying the hours worked daily. Each operators name shall be listed on the shift ticket. The incident will submit a payment package including original invoices, a copy of the OF -294, a copy of resource order (if required for payment), supporting documentation per the Interagency Incident Business Management Handbook (i.e., repair orders, commissary issues, findings and determinations for claims, and any other documents supporting additions or deductions to the payment), and transmittal sheet to the designated payment office. See Payment Office Information for invoice payment contact information. CLAUSE 14: ACCOUNTABLE, DURABLE, AND CONSUMABLE GOODS The Government considers operators as fire line personnel who will use and wear specified articles of personal protective equipment. The following mandatory items (fire line personnel only) may be issued by the Government, when not required to be furnished by the Contractor, to operators performing within the scope of this agreement: 1. Clothing: (a) Flame resistant pants and shirts; (b) Gloves (Either Nomex or chrome tanned leather; (c) Hard hat; (d) Goggles or safety glasses. 2. Equipment: (a) Fire shelter; (b) Headlamp; 3. Other items may be issued by the Government. 4. Operators shall wear the items of clothing issued and maintain the issued equipment in a usable and readily available condition. Upon completion of the contract assignment, all issued items of clothing or equipment shall be returned to the Government. Deductions will be made for all Government furnished protective clothing and equipment not returned by the Contractor. 5. Contractor will be charged for Consumable Goods supplied by the Government and used by the resource while Under Hire. The cost of all Consumable Goods, with the exception of those specifically listed below, shall be deducted from payment to the Contractor. At the Government's discretion, the Government may provide the following incidental consumable goods at no cost, if available: one -quart plastic canteens, plastic sheeting, replacement radio batteries and replacement headlamp batteries, as required while under hire. CLAUSE 15: LOSS, DAMAGE, OR DESTRUCTION For equipment furnished under this EERA without operator, the Government will assume liability for any loss, damage or destruction of such equipment, except that no reimbursement will be made for loss, damage or destruction due to (1) ordinary wear or tear, (2) mechanical failure, or (3) the fault or negligence of the Contractor or the Contractor's agents or employees or Government employee owned and operated equipment. For equipment furnished under this EERA with operator, the Government shall not be liable for any loss, damage or destruction of such equipment, except for loss, damage or destruction resulting from the negligence, or wrongful act(s) of Government employee(s) while acting within the scope of their employment. The operator is responsible for operating the equipment within its operating limits and responsible for safety of the equipment. CLAUSE 16: ASSIGNMENT OF CLAIMS Assignment of claims is not authorized. CLAUSE 17: CLAIM SETTLEMENT AUTHORITY For the purpose of settling claims, the successor contracting officer is any contracting officer acting within their delegated warrant authority, under the clauses of this agreement, and limits set by the incident agency. NOTE: THE APPLICABLE FEDERAL ACQUISITION REGULATION CLAUSES AND TERMS AND CONDITIONS WILL BE INCORPORTATED AS AN ATTACHMENT AND WILL BE A PART OF THIS AGREEMENT. PAYMENT OFFICE INFORMATION FOREST SERVICE Albuquerque Service Center — B&F Incident Finance 101 B Sun Avenue NE Albuquerque, NM 87109 1-877-372-7248 BUREAU OF LAND MANAGEMENT National Operations Center PO Box 25047, Bldg. 50 Denver Federal Center Denver, CO 80225-0047 Mail Stop OC -620 303-236-7117 NATIONAL PARK SERVICE National Park Service Accounting Operations Center (AOC) PO Box 100000 Herndon, VA 20171 703-487-9453 NPS FedEx Address: National Park Service 13461 Sunrise Valley Drive Herndon, VA 20171 BUREAU OF INDIAN AFFAIRS Bureau of Indian Affairs Reston Financial Services Attn: EERA Payments 12220 Sunrise Valley Drive Reston, VA 20191 703-390-6446 (primary), 703-390-6336 (secondary) FISH & WILDLIFE SERVICE NIFC — US Fish and Wildlife Service Branch of Fire Management 3833 S. Development Avenue Boise, ID 83705 208-387-5536 (End of Clauses) PACIFIC NORTHWEST SUPPLEMENTAL TERMS AND CONDITIONS TO EMERGENCY EQUIPMENT RENTAL AGREEMENT (EERA) In addition to the General Provisions to Emergency Equipment Rental Agreements (EERA) Form OF -294, the following supplemental provisions shall apply to the administration and enforcement of EERAs for Federal Agencies in Region 6. Penalty for making false statements to the Government is described in 18 U.S.C. 1001. By siingtheagreennentthecontractoracknow|edgestheedverseconditionsthatequipmentwiUbeoperatedinduhng fire support and suppression activities that are reflected in the awarded rates. Warranted procurement personnel in Oregon and Washington are authorized to place orders under this agreement. FUEL If procuring fuel at the incident sitethe contractor shall do 50 with a major credit card (Visa or MasterCard). HEAVY EQUIPMENT/TRANSPORTS Heavy Equipment that has one operator for the transport and the Heavy Equipment will be paid at 65% of the rate for the transport minimum daily guarantee. SERVICE VEHICLES The rate of pay shown for heavy equipment includes service vehicles. No additional payment will be made for a service vehicle (or operator) that accompanies the heavy equipment to the incident. P1LOT/FL&GVBRICLBW If apilot/flag vehicle(s) is/are required by Iaw during transportation of heavy equipment, no additional payment will be made for this vehicle or operator. POTABLE WATER Contractor shall meet the current National Interagency Fire Center potable water standards as described in the National Potable Water Truck Solicitation. FUEL AND FUEL TRUCKS methods of payment may be used at vendor's discretion. (b) Should circumstance preclude the vendor from using the credit card system the following shall apply: Fuel dispensed shall be documented on fuel and oil issue logs or fuel and oil issue tickets (form OF -304) and turned into the incident finance section for payment. Fuel shall be billed to the administrative office for payment as per the emergency equipment use invoice (block 9). (c) No payment will be made for refueling trucks (either bringing fuel to the dispensing truck or driving the truck to the bulk plant) or spill containment requirements. (d) Fuel trucks shall have multi -fueling capability with two separate nozzles, one for gas and one for diesel. (e) Fuel prices will be established at the current local commercial rate. (f) All federal and state requirements shall be met when dealing with hazardous materials. FIRST AID/EMERGENCY EVACUATION ACCIDENTS The Contractor is financially responsible for medical coverage of employee accidents and illness. The Government will provide first aid to employees when needs arise due to work on the incident. In life threatening situations, first aid will be given and further medical aid will be charged back to the Contractor. If contractor personnel are injured on the fire line, the Government, at Contractor expense, may evacuate the injured person(s). If Contractor personnel become ill or are injured and require transport to a medical facility/hospital, the costs may be at the Contractors expense. GREY WATER DISPOSAL Upon approval and documentation, in writing, of a disposal of grey water disposal process by the Contracting Officer, the Government may reimburse the Contractor or the disposal facility for the costs associated with the disposal of grey water in accordance with the documented grey water disposal agreement. If costs are associated with the disposal process the Contractor shall provide an invoice verifying the date, time, and amount of grey water disposed of. SEVERITY (a) Severity Activity pay will be 75% of the Daily Rate (b) Length of shifts under Severity Activity will normally be 10 hours or Tess, including travel and excluding lunch break. The intent of this assignment is to have the equipment and operator on location and prepared for suppression activities. Shifts exceeding 10 hours will be paid at the daily Rate. (c) Specific funding is provided for Severity Activities. This 15 a condition which the Government has concluded a severe threat of wildland fire exists and Government at the Regional Forester level (or equivalent level for other PNWCG agencies) has determined that it is necessary to preposition resources because of imminent danger of fire. EQUIPMENT RENTED BY THE DAY, WEEK, AND MONTH Payment will be made at the rate (daily, weekly, monthly) that is the most advantageous to the Government. For payment purposes, the payment computation will start over after each 7 day period and after the 30th day for any period oftime under hire. SHOP (SERVJCE) TRUCKIMECHANIC WITH TOOLS BILLING RATE Hourly rate for billing purposes for work completed on vendor related equipment is $90.00 per hour plus parts. INCIDENT DRIVING LIMITATIONS In conjunctionvvkbtbebnukjcotdrhingUuzdudoom specified in Chapter \Oofthe Interagency Incident Management Handbook: No driver will drive more than 10 hours (behind the wheel) within any duty -day. b. Multiple drivers in a single vehicle may drive up to the limitation no driver exceeds the individual driving (behind the wheel) time limitation of 10 hours. c. A driver shall drive only ifthey have had at least8 consecutive hours off duty before beginnia shift An exception to the minimum off-duty hour requirement is allowed when essential to: i accomplish immediate and critical suppression objectives, or ii. address immediate and critica! firefighter or public safety issues. d. As stated in the current agency work/restnoliun documentation of mitigation measures used to reduce fatigue is required for drivers who exceed 16 hour work shifts. This is required regardless of whether the driver was still