HomeMy WebLinkAbout07/16/2019 09 2020-2025 Six Year TIP; Transportation Improvement Plan/YUACP Capital Facilities Element Amendments ti i..asxntntj kd
(..‘*:c*orri
aY ae..
x°'naa.x,,4n
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 9.
For Meeting of: July 16, 2019
ITEM TITLE: Second of two Public Hearings to consider: Resolution adopting
the 2020-2025 Six-year Transportation Improvement Plan and
amend the Transportation Systems Plan 2040; and
Resolution amending the Yakima Urban Area Comprehensive Plan
Capital Facilities Element
SUBMITTED BY: Scott Schafer, Director of Public Works
Bob Desgrosellier,Acting Chief Engineer, 575-6228
SUMMARY EXPLANATION:
Each year the City is required by state statute to update its Six-year Transportation Improvement
Program (TIP)for submittal to the Washington State Department of Transportation. This plan
must include all transportation projects for which state gas tax revenue or federal revenue will be
used. The current plan for 2020 -2025 contains eleven funded projects that have yet to be
constructed. The eleven projects include:
1. North 1st Street Revitalization, Phase 2
2. North 1st Street Revitalization, Phase 3
3. Yakima Valley Transportation Company Preservation
4. Cowiche Canyon Trail
5. N. 34th Avenue/Fruitvale Boulevard & N. 34th Avenue/River Road Roundabouts
6. S. 80th Avenue Box Culvert
7. Wide Hollow Road Box Culvert in the Vicinity of 89th Avenue
8. West River Road Improvements
9. 64th Avenue and Ahtanum Road Intersection Improvements
10. 34th Avenue/Fruitvale Boulevard and 34th Avenue/River Road Roundabouts
11. McClure Elementary School Vicinity Safety I mprovements
Funding for the remainder of the projects will continue to be sought. A Public Hearing will be
held to consider adoption of a Resolution approving the six-year TIP and amending the
Transportation Systems Plan 2040 and Comprehensive Plan Capital Facilities Element.
Projects must be listed in the Statewide Transportation Improvement Program (STI P) in order to
be approved by the Federal Highway Administration (FHWA) and the Federal Transit
Administration (FTA)to utilize federal funds by the State of Washington for approved State
2
funding agencies. The STI P is a prioritized program of transportation projects, compiled from
local and regional plans, along with the Washington Transportation System Plan (WTP), which
provides a backbone for developing projects for the intermodal transportation network in
the State of Washington.
The STI P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program. Project ranking has been
performed utilizing data supplied by the Street and Traffic Division. The ranking will be integrated
with other project needs and the total list will be reviewed and adjusted to the particular need of
the City of Yakima.
The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element
to incorporate the adopted six-year TIP for 2020 to 2025. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive
Plan as required. The amendment is limited to incorporate only those projects that are adopted in
the STI P and is not subject to the "once a year" change required under the laws of the
Growth Management Act.
ITEM BUDGETED: NA
STRATEGIC PRIORITY:
APPROVED FOR City Manager
SUBMITTAL:
STAFF RECOMMENDATION:
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description Upload Date Type
D Resolution-T1P adopt 6/20/2019 Backup Material
D Resolution-amend Urban Area 6/2012019 Backup Material
6 6-year11P 6/20/2019 Backup Material
3
RESOLUTION NO. R-2019-
A RESOLUTION adopting the Six-Year Transportation Improvement Program for the
period of 2020 through 2025 for the construction of the streets and arterial
streets in the City of Yakima and amending the Transportation Systems
Plan 2040.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
program for the construction of streets and arterial streets in the City of Yakima for the ensuing
six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable
federal law; and
WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of streets and arterial streets in the City Of Yakima, all as contemplated and
required by State and Federal Law; and,
WHEREAS, after public hearings on the matter, held at the regular meeting of the
Yakima City Council on July 2, 2019 and July 16, 2019, with proper public notice as required by
RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the
Six-Year Transportation Improvement Program for the period of 2020 through 2025 for the
construction of streets and arterial streets in the City of Yakima; and,
WHEREAS, adopting the Six-year Transportation Improvement Program and amending
the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six-Year Construction Program for the period of 2020 through 2025, a copy of which
is attached hereto and by this reference made a part thereof, is hereby adopted as the official
Six-Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the Transportation Systems Plan 2040 along with Street Improvements, which
are also approved.
ADOPTED BY THE CITY COUNCIL this 16'h day of July, 2019.
Kathy Coffey, Mayor
ATTEST:
Sonya Clear Tee, City Clerk
4
RESOLUTION NO. R-2019-
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the Six-year Transportation Improvement Program
(TIP) for the period of 2020 through 2025.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for the construction of streets and arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2020 to 205 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided
under RCW 36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, public hearings were held by the Yakima City Council on the Six-year TIP
on July 2, 2019 and July 16, 2019, the proper public notice as required by RCW 35.77.010; and
WHEREAS, amending the Yakima Area Comprehensive Plan Capital Facilities Element
is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2020
through 2025 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 16'h day of July, 2019.
Kathy Coffey, Mayor
ATTEST:
Sonya Clear Tee, City Clerk
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPio
s.
caiw oeescnaimnd "•• e. a a a o i EL i
StatusMprove North 1st Street byre habilrtating the pa‘errientard lane markings
rerrovng or!Meet parlong installing bike lanes replacing and widening sidewalk
enhancing street lighen g installing pedestnan lightng corinlicting median islands
Fundng
Phase Phan Start Year(YYYY) Federal Fund Code Federal Funds State ca o e State Funds Local Funds Total Funds
Expenditure Schedule
Report Date:June 19,2019 Pages
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
s.
nd Terrnin
caiwoe naicn e. a a P i
StatusTW
rbrth 1st Street PeNalization Phase]
rbrth 1st Street
MLKBoule)mrd to H Street
thp11))/P North 1st Street byre habilnating the pa‘errientard lane markings
rerrovng or!Meetparlong instilling bike lanes replacing and widening sidewalk
enhancing streetligheng installing pedestnan lightng corinlicting median islands
Fundng
Phase Phan Start Year(YYYY) Federal Fund Code Federal Funds State ca o e State Funds Local Funds Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Paget
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
enivioF a
Project oeendaimTermi"•• e. a a o i
Yakima ValleyTransporlation Company Preservation
Fundng
Status Phase Phase Year reYYY) r e Federals s w m State Fund Code ate Funds Local Funds Total Funds
s CN 2020sTP� Lo
Report Date:June 19,2019 Page 3
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPio
nd Terrnin
Project nwicn 0 Structure ID a a p i i
StatusBravo Oprrparly Boulevard
Bravo Oprrparly Blvd
Omstnct four lane roadwaysection wah median bike lanes arid rouridaboNs install
arb prtter sidewalk Meet lighting arid storm drainage ssterri along w(Eh water
arid awersy3erris
Fundng
Phase Phan Start YearreYYY) rural Fund me. rural Funds .Fund Code State Funds Local Funds Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 4
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
enivioF a
Terrnin
caiwoeendwicn e. a a o i
OmsEnctriew roadway inlcuding water sewer curb prtter sidewalk sreetlighting
ard storm drainage zyzterri
Fundng
Status Phase Phase Year reYYY] Federal Fund ODde Federal Funds sate Fund Code sate Funds Local wee, Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
PE 500000 0 0 0 0
Report Date:June 19,2019 Pages
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
Gouty Yakima
39-' A PIN/Project No
eniPID
s.
Project oenaim"•• e. a a p i i
StatusTW
Omstnct new roadway including water sewer curb prtter sidewalk street lighting
arid storm drainage rya-terri
Fundng
a Phan Start YearreYYY) Federal Fund me. Federal Funds .Fund Code vae Funds Local Funds Total Funds
Expenditure Schedule
Report Date:June 19,2019 Page 6
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivioF a -
Eemnaim"w e. a a n
1s i
000n<rn Yax«meme mnene n 0 PSTW 0030 CE Yes
30th A enue.4 Fn.!Wale Boule a rd arid 30th Aferwe arid R ver Road RouridaboNs
Status Phase Phase Year reYYY) Federal Fund Code Federal Furds sate Fund Code sate Funds Local Fu Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 7
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
enivio
s.
5
Project oeescnaimnd "•• e. a a a o i g i
Oprrplete Streets Projects
%/mous Streets
OmsEnctsidewalk on the soiAh side of Swan foenue tom Wanness Parkto
mut side of Prash Avenue from 20th foremen 16th A‘enue on the mut!side of
Mob from 10th foremen Oth Avenue and on Powerhouse Poad torn Roberta'!"
Bernentaryto Englewood
Fundng
Status Phase Phase Year pYYY) Federal Fund me. Federal Funds State Fund Code Stan Funds Local Fund, Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an &Rh
Report Date:June 19,2019 Page 8
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
EemnaicaTerrni"w e.s. a a n
1s
eee(0o7) ham m.me mnene 03 COCOPTW CE Yes
StatusE Nob Hill Blvd.4 Fair Are VS Mprovernents
rbb Hill Blvd
E Nob Hill Blvdto Fair AR
Wden rbb Hill Boulevard through the interaction constnctleftturn lane arb
prtter sidewalk street lighting and drainage Upgrade signal including rnastarrn
stnctires
Fundng
Phase Phan StartYear(YYYY) Federal
Code or s s Fed a ate Fund Code ate Funds Local „ m Funds
2020e T
S CN na STP(u)
Report Date:June 19,2019 Page 9
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
[curly Yakima
39-' A PIN/Project No
eniPio
Terrnin
Aj t oeennaicn e. a a o i
80thhstall box culvertadjaceinto the to.. " °ac: asr n`oyww, a o"x p flooding issues
i..
Ecoioeyean conj..hae..m the m. =nood plain.a..e m.M pAjae
StatusFundng
Phase Phan Start YearreYYY) rural Fund me. rural Funds .Fund Code sate Funds Local Funds Total Funds
Expenditure Schedule
Report Date:June 19, 2019 Page 10
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Gouty Yak rn.
_ $
39-' A PIN/Project No
eniPio - -
, 3 cNum •• i ' e e$ i End-rem"
Aiwonwim es a a o
Wde Hollow Road Box WI ert
Wde Hollow Road
ad
g
oyslm oloereantn oorvunaonwu,
theme: oe pmn management pAjea
Status Phase Phan Start YearreYYY) rural r„m me. rural Furtls State Fund Code sate Funds Local Furor Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 11
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
enivioF a
EemnaimTerrni"w e. a a n
00
Project
vaxrzmeme mnene 05 C000 PT 3500 CE No
Fundng
Status Phase Phase Year reYYY] Federal Fund ODde Federal Funds sate Fund Code sate Funds Local Funds Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 12
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeennaimTerrni"•• e. a a o i
StatusPowerhoua Road Bike Imes arid Sidewalk
Powerhoua Road
Constnct5 foot bike lanes or!both sides corisna a 5 foot sidewalk or!the east
side of Powerhoua Road arid install a crosswalk across Powerhouse Poad at
Cowiche Canyon Road
Fundng
n Phan Start Year(YYYY) rural Fund me. rural Funds .Fund Code sate Funds Local Funds Total Funds
Expenditure Schedule
PE 70000 0 0 0 0
Report Date:June 19,2019 Page 13
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivioF a -
Project oeennaimTerm"Number
e. a a o i
Pe stnpe th s four lane road to be a three lane road tub bke lanes on each s de of
Status Phase Phase Year reYYY) Federal Fund mee Federal Furds State Fund Code State Funds Local wee, Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 14
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
B.niPID
,a 3 ;.ham" i $ 5 ' e e_
Aiwoeendwicn e. a a o i
StatusTW
Reconstnotand widen 16th Aferwe and Tieton Lime by adding lettim lanes for all
Fundng
a Phan Start YearreYYY] Federala Federal „ s s Locale ate Fund Code ate Funds Ti unds
PO ha
PM
P CN Con STPM
Expenditure Schedule
PE 300000 0 0 0 0
Report Date:June 19,2019 Page 15
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2a 3 cr Number i $ o ' e e_
Project oeendaim"•• e. a a o i
StatusIan 31377Underpass
Yak ma A enue
Yak ma A enue to 18th Street
a Phan Start YearreYYY) Federal Furtl ODde Federal Furtls sate Fund Code sate Funds Local Furtls Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 16
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
enivioF a
Project oeendaimTerrni"•• e. a a o i
6011-1A‘erwe to Annum Road
westbound nght Vim lane arid installing atraficsignal
Fundng
Status Phase Phase Year reYYY] Federal Fund ODde Federal Furtls sate Fund Code sate Funds Local Fu Total Funds
Expenditure Schedule
Report Date June 19,2019 Pagel]
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
,a 3 ;.N i $ ' e e_
Project oeennaim"•• e. a a o i
Statuswash ngtori Aerwe to Nob HD Boule)mrd
n Phan Start Year(YYYY) rural Fund me. rural Furds State Fund Code sate Funds Local Furds Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 18
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
Gouty Yakima
39-' A PIN/Project No
eniPio
Eemnaim" e
Number
. a a n
Terrni
1e Rlji i Begin
@lp YAKS] muvm mnene 38 co PT CE Yes
McClure Berrierdary School Safety Irrpro‘errie=
Vairous Streets
Vanous location‘anous locations
.M improvements
McClure Berrierdary School such as co rizeucting sidewalk ADArarripsard
irrpromrig crosswalks
Fundng
Status Phase Phase Start YearreYYY) Federal Fund mee Federal Furtls State Fund Code sae Funds Local roan Total Funds
Expenditure Schedule
CN 228000 0 0 0 0
Report Date:June 19,2019 Page 19
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Agerty Yakima
Gouty Yakima
39-' A PIN/Project No
eniPio
Project oeendaimTerrni"•• e. a a oji
i
McHriley Berrientiry School Safety Improvements
‘arious streets
‘arious locations to))anous Imams
.M improvements
StatusMo Hn ley Bernentiry School ach as replacing dilapidated sidewalk consruaing
Fundng
Phase Phan Start YearreYYY) Federal a Federal Funds sate Fund Code sate Funds Local wee, Total Funds
Expenditure Schedule
Report Date:June 19,2019 Page 20
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivio -
2a 3 cr Number i $ - ' e e_
Aiwo` naim"•• e. a a o i
Walnut Steen:. Rver Road
Status Phase vn.e Start YearreYYY) real wm mee Federal Furtls State Fund Code State Funds Local Furtls Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 21
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivio -
2a 3 ;.nm" i $ o ' e e_
Aiwoeendwim"•• e. a a o i
SR 12 westbound ramps
Aferwe
Status Phase Phase ear(YYYY) Federal Furtl ODde Federal Furtls sate Fund Code sate Funds Local r Total Funds
P
P CN Con STPM
Expend ture Schedule
Report Date:June 19,2019 Page 22
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• e. a a o i
S• 1st Street
Realign intersenon wider! E Washington Aferwe to accomodate ari addreorol lane
replace curb gutter ard sidewalk arid install a rienrafic signaliz Zion rysterri
Fundng
Status Phase Phase Year reYYY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
P(
P RW 2023 TPM
P CN vna nPM
Expenditure Schedule
Report Date:June 19,2019 Page 23
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yakima
eniPio
2y 3 ;.harem" i $ 5 ' e e_
Project daicr. ere a a o i
IN
thprove the Iftea shin glo n Aar.ue and Long the r Road intersen on b y conna ding an
eastound left turn lane on Washington and a no ritth ound left turn lane on Lo
instill or replace m.ewetadewax.Street I ig aig.EEO III da1..e+=1 „fiber
lashing signal
Status a Phan Start Y ear(YYYY) et, Federal „ s s LocalSt ate Fund Code ate Funds Local Ti St
P ha
PM
P CN 2023 STPM
Report Date:June 19,2019 Page 24
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2y 5 ;.ham" i $ o ' e e_
Project oeendaim"•• e. a a o i
StatusTW
E Nob HD Boule)mrd
remove and replace arb gNter sdetualk Meet!ghtrig arid storm dra nage swterri
a Phan Start Year(YYYY) Federala Federal „ s s e ate Fund Code ate Funds Local Totalca e Tids
PO Lo
PM
P CN 2023 STPM
Expend ture Schedule
Report Date:June 19,2019 Page 25
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• e. a a o i
Mprove the flaw!bycoristnnng larger corner radii lerigtherlingthe turn
Fundng
Status Phase Phase Year reYYY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
P PE 2021 P
P RW 2022 TPM
P CN 2023 STPM
Expenditure Schedule
Phase 1st End 3rd 4th an 86th
RW 0 150000 0 0 0
Report Date:June 19,2019 Page 26
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• e. a a o i
Mprove the flaw!bycoristnnng larger corner radii installing ADArarrips ard
upgrading thetrafic signal rysterri
Fundng
Status Phase Phase ear(YYYY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
P PE 2021 P
P RW 2022 TPM
P CN 2023 STPM
Expenditure Schedule
Report Date:June 19,2019 Page 27
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yak ma
Gouty Yak ma
39-' A PIN/Project No
eniPio -
2a 3 cr Numberrm i $ - ' e e_
Project oeennaim"•• e. a a p i
StatusI
E Mead Aferwe Rem-Grua or!
n Phan Start YearreYYY) Federal ee Federal Furtls State Fund Code sate Funds Local Furtls Total Funds
ExpertIture Schedule
Report Date:June 19,2019 Page 28
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2a 3 ;. i $ o ' e e_
Project oeenrptcr.Number e. a a i
Peonstnctand tu der.roadwaytothree lanes nstall curb gNter sidetuall¢ Meet
Status Phase Phase ear(YYYY) Federal Fund ade Federal Furds sate Fund Code sate Funds Local P Total Funds
P PE 2021 P
P RW 2022 TPM
P CN 2023 STPM
Expend ture Schedule
Report Date:June 19,2019 Page 29
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
[curly Yakima
39-' A PIN/Project No
eniPio
Project oeenngimTerrni"•• e. a a P i
TW
Powerhuoa Road
..e ..a Road .Englewood ..sdewax e.e araP lashing signalPossiblycoristnurdaboN
StatusFundng
Phase Phan Start YearreYYY) Federal F. de Federal Funds sate Fund Code sate Funds Local Funds Total Funds
Expenditure Schedule
Report Date:June 19,2019 Page 30
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2y 3 ;.ham" i $ o ' e e_
Project oeendaim"•• e. a a P i
StatusTW
Peal gn West bncoln Afenue nstall curb gutter sidewalk Meet!ghtng and storm
Phase Phan Start YearreYYY] Federala Federal „ s s Locale ate Fund Code ate Funds Ti unds
PO ha
PM
P CN Con STPM
Expend ture Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 31
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• e. a a o i
Perr“exinng trafic signal arid coristncta rouridaboutrerr“arid replace curb
Fundng
Status Phase Phase ear(YYYY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
P PE 2021 P
P RW 2022 TPM
P CN 2023 STPM
Expenditure Schedule
Report Date:June 19,2019 Page 32
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
39-' A PIN/Project No
enivio
Project oeescnaimnd "Number
e. a a oji
i
Yakima Downtown finire Inniabves Project No 5
19 Streetto EC Street
�m �.°a(s)to be determinedn g sidewalk mod ...e other improvements rnb
Fundng
Status Phase Phase Year reYYY) Federal Fund mee Federal Funds State Fund Code State Funds Local Funds Total Funds
Expenditure Schedule
Phase IS End 3rd 4th an 86th
PE 0 500000 0 0 0
Report Date:June 19,2019 Page 33
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2a 3 cr Number i $ o ' e e_
Project oeendaim"•• e. a a o i
E Nob HD BI‘d
Boule ard nstall curb gNter sidewalk arid up grade trafics pal sy9erri
Status Phase Phase Year(YYYY) Federal Fund ODde Federal Furds sate Fund Code sate Funds Local P Total Funds
P PE 2022 P
TPM
P CN vna STPM
Expend ture Schedule
Report Date:June 19,2019 Page 34
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a -
Project oeendaimTerrni"•• e. a a o i
StatusFundng
a Phan Start YearreYYY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
Expenditure Schedule
PE 0 0 80000 0 0
CN 0 0 0 0 800000
Report Date:June 19,2019 Page 35
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
,a 3 ;.N i $ ' e e_
Project oeendaim"•• e. a a o i
Status a Phan Start Year(YYYY) Federal Fund Code Federal Furds sate Fund Code sate Funds Local Furds Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 36
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
.< C Project Hie eniPio -
2y 3 ;.ham" i $ - ' e e_
Project oeendaim"•• e. a a o i
Funcing
Statuz Phaze Phan Start YearreYYY] Federala Federal s d w a ate Fund Code ate Fund Total
TiFundz
PO ha
P CN Con STPM
Expenditure Schedule
PE 0 50000 0 0 0
CN 0 0 360000 0 0
Report Date:June 19,2019 Page 37
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivio -
,a 3 ;.N i $ ' e e_
Project oeendaim"•• e. a a o i
Status Phase Phase Year reYYY) Federal Fund Code Federal Furds sate Fund Code sate Funds Local Fu Total Funds
Expend ture Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 38
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2y 3 ;.ham" i $ o ' e e_
Project oeendaim"•• e. a a o i
StatusE Yak ma Aferwe
E Yak ma Aferwe to Far Aferwe
a Phan Start YearreYYY] Federala Federal „ s s Locale ate Fund Code ate Funds Ti unds
PO ha
P CN Con STPM
Expend ture Schedule
Report Date:June 19,2019 Page 39
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Gouty Yak rra
39-' A PIN/Project No
eniPio -
2y 3 cr Number i $ o ' e e_
Project oeendaim"•• e. a a o i
weed u.t,m atoriswtem
Status Phase Phan StartYearreYYY) Federal Fund me. Federal w sate Fund Code sate Funds Local Furds Total Funds
Expend ture Schedule
Report Date:June 19,2019 Page 40
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPio
2y 3 ;.ham" i $ - ' e e_
Project oeendaicn e. a a o i
StatusMead AeroJe to Nob Hill Boule)mrd
Omstncta riewtuo lane roadwayand wider!portions of existing roadway coristnct
bndge over NAde Hollow Creek install curb gutter sidewalk streetlightng and
storm drainage sy9erri
Fundng
a Phan Start YearreYYY] Federala Federals s
Funds
ate Fund Code ate Funds Local Totalca e Ti
P Code
PM
P CN vna STPM
Expenditure Schedule
PE 0 150000 0 0 0
Report Date:June 19,2019 Page 41
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPio -
2a 3 ;.nm" i $ o ' e e_
Project oeendaim"•• e. a a o i
Status Phase Phase Year reYYY) Federal Fund ODde Federal Furds sate Fund Code sate Funds Local P Total Funds
P
P RW 2022 TPM
P CN 2023 STPM
Expend ture Schedule
Report Date:June 19,2019 Page 42
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivioF a -
Project oeescnaimnd Term"Number
e. a a o i
%dim Road Rem-Grua or!
%dim Road
Recoristnctroadway ristall curb gutter sdetualk arid storm dra nage Partner tub
IA on Gap to ristall adda mai sewer fo„e man
Status Phase vn.e Start Year(YYYY) Federal Fund ODde real Furds State Fund Code State Funds Local r Total Funds
Expend ture Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 43
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• e. a a o i
StatusEnglewood Merwe
°mid arid ovedayexisting roadway coristnctbike lanes install arb prtter
sidewalk streetlighting storm drainage ssterri waterand sewer lines
Fundng
a Phan Start YearreYYY) Federal Fund ODde Federal Funds sate Fund Code sate Funds Local Funds Total Funds
Expenditure Schedule
PE 0 0 315000 0 0
Report Date:June 19,2019 Page 44
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• eat a a o i
Englewood A‘eroJe
sidetuall“treetlightng storm drainage rystem water ard sewer lines
Status Phase Phase Start YearaWY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
P
TPM
P CN vu STPM
Expenditure Schedule
PE 0 0 157000 0 0
Report Date:June 19,2019 Page 45
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yak no
Gouty Yak no
39-' A PIN/Project No
eniP ID
-
2a 3 cr Numberrm i $ - ' e e_
Aiw oenaim"•• e. a a p i i
StatusTeen [Owe to Zer Poad
Nide!"roadwayto three lanes nstall arb gNter sdetualk Meet!ghtrig arid storm
a Phan Start Y ear(YYYY) Federal Fund mee Federal Fu State un o e vae Funds Local Furds Total Funds
Expend ture Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 46
Tyga Six Year Transportation Improvement Program
70 From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPioF a
Project oeendaimTerrni"•• eat a a o i
Englewood Merwe
sidetuall“treetlightng a storm drainage rysterri ard water arid sewer lines
Status Phase Phase Start YearaWY) Federal Fund Code Federal Funds sate Fund Code sate Funds Local Funds Total Funds
P(
TPM
P CN 2025 STPM
Expenditure Schedule
Report Date:June 19,2019 Page 47
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivio -
2a 3 cr Number i $ - ' e e_
caiwoeennwim"•• e. a a o i
Teen [Owe to Surrimnew Aferwe
Omstnctcurb giMer sidewalk arid Etorrrovater dra nage rysterri orithe east side of
Status Phase Phase Year reYYY) real wm mee Federal Furtls State Fund Code State Funds Local Furtls Total Funds
Expend ture Schedule
Phase IS End 3rd 4th an 86th
Report Date:June 19,2019 Page 48
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
Gouty Yakima
_ $
39-' A PIN/Project No
eniPio
,a3 ha " i - ' e e$ i _End
Project odaicr. e. a a o StatusWashington Perwe to Nob Hill BM
Wder.roadwayto three lanes install arb prtter sidewalks streetlighting and
storm drainage sy.3err.
Fundng
a Phan Start YearreYYY] Federala Federals s
Funds
ate Fund Code ate Funds Local Totalca e Tids
PO Lo
P CN Con STPM
Expenditure Schedule
Report Date:June 19,2019 Page 49
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPioF a -
Project oeendaim"•• e. a a o i
Sreet
Status Phase Phase Year reYYY) Federal Furtl ODde Federal Furtls sate Fund Code sate Funds Local P Total Funds
P(
TPM
P cn Con STPM
Expend ture Schedule
Report Date:June 19,2019 Page 50
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerty Yakima
[curly Yakima
39-' A PIN/Project No
enivio
AiwoeeTerrnin
ndwicn e. a a o i
TW
16th Me Comdor Improvement
SR 12 to Washington Aferwe
Fundng
Status Phase Phase Year reYYY) Federal Fund ODe Federal Funds s s w State Fund Code ate Funds ®iFunds TotalTi Funds
P PE Con ST xp9
Expenditure Schedule
Report Date:June 19,2019 Page 51
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
[curly Yak rra
39-' A PIN/Project No
enivio -
2a 3 ;.nm" i $ o ' e e_
Aiwoeendwim"•• e. a a o i
TW
Status Phase Phase Year reYYY) Federal Furtl ODe Federal Furtls s s w State Fund Code ate Funds Furtls Funds
P PE Con mxp9
Expend ture Schedule
Report Date:June 19,2019 Page 52
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
[curly Yak rra
39-' A PIN/Project No
enivio -
, 3 ;n " •• i o ' e e$ i een . m"
Aiwodwim eat a a o
TW
Status Phase
Phase ®r aYYY) Federal Furtl ODe Federal Furtls s s State Fund Code ate Funds Local FTotalTi Funds
lo m P PE ll ep9
Expend ture Schedule
Report Date:June 19,2019 Page 53
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
eniPioF a -
Project oeendaim"•• e. a a o i
Statustbrth/South Comeau
a Phan Start YearreYYY] Federal
haa Federal Furtls s s Localate Fund Code ate FundsLocali Furtls TotalTi Funds
v P Pe 21 ST Pp9
Expend ture Schedule
Report Date:June 19,2019 Page 54
Tyga Six Year Transportation Improvement Program
7,9 From 2020 to 2025
Gouty Yak rra
_ $
39-' A PIN/Project No
enivioF a -
Project oeendaim"•• e. a a o i
Status Phase Phase Year reYYY) Federal Fund ODe Federal Furds s s State Fund Code ate Funds Local FTotalTi Funds
2021m P PE xp9
Expend ture Schedule
Report Date:June 19,2019 Page 55
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Gouty Yak rra
39-' A PIN/Project No
eniPio -
caj t oeendaimTerm"•• e. a a o i
Status a Phan Start Year(YYYY) Federala Federal „ s s wTotale ate Fund Code ate Funds Local wee, Total Funds
STP(UL)P PE 2020 d
P CN 2021 STP(UL)
Expend ture Schedule
Federal Furds State Funds Local Furds Total Funds
Report Date:June 19,2019 Page 56
Tyga Six Year Transportation Improvement Program
From 2020 to 2025
Agerpy Yakima
Could Yakima
39-' A PIN/Project No
.< C Project idle eniPio
mj t Dem-OimTem"•• o. a a o A i A
StatusCpwiche Canyon Trail
Cpwiche Canyon Rd
Powerhoua Road to-Railhead
Cpnstnct a 10 donde pathway including bpdges over Cpwiche Creek
Funding
n Phan Start YearreYYY) rural Fund me. rural Funds .Fund Code State Funds Local Funds Total Funds
Expenditure Schedule
Federal Funds State Funds Local Funds Total Funds
Report Date:June 19,2019 Page 57