HomeMy WebLinkAboutR-1996-046 Yakima Ave / I-82 Interchange Area / Fair Ave Project• 0 t A RESOLUTION RESOLUTION NO. R-96 4 6 authorizing the execution of Supplement #3 to the Agreement for Joint Construction of Improvement of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project with the State Department of Transportation and Yakima County WHEREAS, the City of Yakima, Yakima County, and the Department of Transportation for the State of Washington desire to collectively construct improvement for the Yakima Avenue/I-82 Interchange Area and Fair Avenue Project valued at $18 95 million dollars, which are mutually beneficial to all entities, and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to Supplement the aforementioned agreement removing the State Department of Transportation from involvement in Stage 1C and revising Attachment 1 reflecting the increased project funding from TIB with no increase to the City of Yakima, Yakima County or the Developer, for the purpose of joint cooperation for the construction of the aforementioned improvement, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA The City Manager and the City Clerk are hereby authorized and directed to execute Supplement #3 to Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project, a true copy of which is attached hereto and incorporated herein ADOPTED BY THE CITY COUNCIL this 411-12 day of April, 1996 ATTEST �Gttclt-,..� �4 � c.�v►.� CITY CLERK Lynn Buchanan, Mayor SUPPLEMENTAL AGREEMENT AGREEMENT GC 9263 SUPPLEMENT #3 This agreement, made and entered into this Cnt‘" day of-.17/ue , 19 9G , between the State of Washington, Department of Transportation, acting through the Secretary of the Department of Transportation, by virtue of Title 47 RCW, hereafter called the "STATE", the City of Yakima, hereafter called the "CITY", and Yakima County, hereafter called the "COUNTY". WHEREAS, the parties hereto entered into Agreement GC 9263 on February 7, 1992, which provided for the improvement to the SR 82/Yakima Avenue Interchange. WHEREAS, the parties hereto entered into Supplement #1 of Agreement GC 9263 on May 13, 1994 which provided for local funding increases to secure additional TIB funding. WHEREAS, the parties hereto entered into Supplement #2 of Agreement GC 9263 on March 17, 1995 which provided for local funding increases to secure additional TIB funding. WHEREAS, it is deemed desirable to further supplement the agreement to reflect the in kind contribution by the STATE to the local match fund to secure additional TIB funds. This in kind contribution is money previously expended by the STATE on the project, but not credited to the local match. WHEREAS, the project is in the construction phase for Stage 1A and Stage 1 B, it is desired that the construction administration and financial processes be clarified for Stage 1C. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1. The Local Share Cost Allocation, Attachment 1, in the original agreement and as supplemented is hereby superseded and replaced by Attachment 1, Supplement #3 2. The total cost of the project as revised by Supplement #2 is revised from $17,754,950 to $18,950,395.00 3. The STATE shall be credited for the in kind contribution of $ 330,000.00 of STATE funds expended on the project. With the in kind contribution the STATE share shall be a maximum amount of $2,559,154.00. 4. The CITY shall advertise and award the phased construction contract for Stage 1C if acceptable bids are received, and administer the construction contract. Agreement GC 9263 Supplement #3 Page 1 of 2 5. The STATE has approval authority over all work within the STATE rights of way and any work on the CITY street system which impacts the operation of the STATE highway system. 6. All other terms and conditions of the original agreement shall remain in full force and effect except as modified by this Supplemental Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. The City of Yakima, Yakima County, and Washington State Department of Transportation have executed the Agreement and subsequent supplements for joint construction and hereby execute Supplement #3 of said Agreement GC 9263. Richard A. Zais, Jr. City Manager ATTEST: City Clerk Yakinia City Attorney Approved as to Form: mss._ Assistant Attorney General ATTEST: n /A.I._ lb CITY CONTRACT NO: ! - 3 / SyIv . Hinojosa Cle . f the Board State Design Engineer Washington State Dept. of Transportation Lea eig6..* Yakima Coommission Yakima County Commission 41. 1 Yakima County Commission Agreement GC 9263 Supplement #3 Page 2 of 2 GC 9263 Supplement #3 ATTACHMENT 1: LOCAL SHARE COST ALLOCATION TOTAL PROJECT COST (revised 7/95) Agencies Local Match -A- Percent of Total Local Match Cost with Developer Participation -B- Cash Cost Participation Percent of Total Local Match Costs without Developer Participation -C- Percent of Total Project Cost with Developer Participation 1. City of Yakima a) Engineering Division $2,494,278.00 35.97% 42.21% 13 14% b) Transit Division $201,026.00 2.90% 3 40% 1 06% ,,R, -:, ,.::,; , ,,,ip :„ : ‘„ „,,,,,‘ 2. Yakima County $654,503.00 9.44% 11 08% 3.45% ,„' 3. District #5 of V1/ DOT** $2;559,154.00 36 91% 43.31% 13.50% 6 ,,e- :;.. -- -„;i,: ,,.- ..,„,-, 7, 'N ,. . - , , ; ; 4 Local Developer* $1,024,708.00 14 78% 0.00% 5.41% $6,933,669.00 100.00% 100.00% 36.59% Transportation Improvement Account (TIA) $12,016,726 00 63.41% %;, TOTAL COST ESTIMATE $18,950,395.00 100.00% ** *** Right -of -Way Dedication Value $330,000 is an in kind contribution of STATE expenditures. TIB No. 9E-180(001)-1,-2 and -3 Revenues City of Yakima Department of Finance and Budget 142 GATEWAY PROJECT MAJOR STREET CONSTRUCTION Estimated vs. Actual Revenues As of February 29, 1996 Amended Revenue Estimate Total Estimated Adjustments Revenue Revenue Received To Date Projected Revenue to Complete Total Projected Revenue City of Yakima Contributions County STP - Billed by City District 5 of WDOT - Billed by City Half Cent Funds Transit Division Bond Proceeds 418,302 328,017 179,437 201,026 1,200,000 418,302 328,017 179,437 201,026 1,200,000 395,561 328,017 179,437 201,026 1,200,000 22,741 418,302 0 328,017 O 179,437 O 201,026 O 1,200,000 Total City Contributions - 12% 2,326,782 0 2,326,782 2,304,041 22,741 2,326,782 Transportation Improvement Board 10,466,153 (TIB) 887,447 663,126 12,016,726 6,883,456 5,133,270 12,016,726" Total Revenue Accounted for Through City System 12,792,935 1,550,573 14,343,508 9,187,497 5,156,011 14,343,508 State of Washington Contributions City STP County STP District 5 of WDOT District 5 of WDOT 473,746 473,746 236,201 236,201 675,555 1.225,582 330,000 2,231,137 0 473,746 473,746 0 236,201 236,201 1,920,244 310,893 2,231,137 Total Revenue Heid by State 1,385,502 1,555,582 2,941,084 1,920,244 1,020,840 2,941,084 Public Works Trust Fund Loan Public Works Trust Fund Match Sewer Utility Water Utility 448,695 448,695 76,960 76,960 115,440 115,440 448,695 76,960 115,440 0 448,695 O 76,960 0 115,440 Total Public Works Trust Fund Proceeds 641,095 0 641,095 641,095 O 641,095 TOTAL PROJECT REVENUES 14,819.532 3,106,155 17,925,687 11,748,836 6,176,851 17,925,687 Right -Of -Way Value E. G. Lukehart - Right -of -Way 1,190,363 -165,655 1.024,708 1,024,708 1.024,708 "Total Right -of -Way Value 1,190,363 -165,655 1,024,708 0 1,024,708 1,024,708 TOTAL ESTIMATED PROJECT RESOURCES THROUGH SUPPLEMENT NO.3 16,009,895 2,940,500 18,950,395 11,748,836 7,201,559 18,950,395 STP -Surface Transportation Program TIB -Transportation Improvement Board WDOT-Washington State Department of Transportation To access 5% Contingency ($323,555) ---City must need this resource to complete the project. City must have the local match($182,000) on hand to match the contingency if it is utilize. Interest Income is not applicable on this project since this is a reimbursable grant. Right -of -Way soft money - Shown only for match CS 3/1/96 8:57 AM BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. / For Meeting of 4/2/9F ITEM TITLE: Supplement #3 - Local Share Agreement for Gatewa SUBMITTED BY: Department of Community & Economic Develop Engineering Division roject CONTACT PERSONITELEPHONE: Glenn Valenzuela, Director/576-6613 Dennis E. Covell, Gateway Coordinator/576-6313 SUMMARY EXPLANATION: In July of 1995 the Transportation Improvement Board authorized an increase in TIA FUNDS for the Gateway Project. The increase of $663,126 was approved July 7, 1995 and was supplemented with local increase funding by the Washington Department of Transportation as an in kind contribution of $330,000. Allocated Public Work Trust Funds and City Water and Sewer previously allocated local funds were also used as increased local match as they had not been previously utilized to leverage TIB dollars. The local match money agreement needs to be amended to reflect the new TIB money and local match money for Phase 1 of the Gateway Project. Supplemental #3 to the agreement provides for Stage 1C be advertised and awarded by the City of Yakima and further that the City of Yakima shall administer the construction contract. For Council information attached is the February financial analysis for the Gateway Project revenues as previously presented to the City Council and County Commissioners on February 20, 1996 The financial analysis includes supplement #3 revenue increases. Resolution X Ordinance Contract X APPROVAL FOR SUBMITTAL: "-opeN1.91. Other (Specify) (1) 02/20/96 Finance Statement of Revenues 2) Supplement #3 City Manager 4c/'i STAFF RECOMMENDATION: Approve the resolution authorizing execution of Supplement #3 to the local match money Agreement #GC -9263 by the City Manager. SR 82 / YAKIMA AVENUE INTERCHANGE - GATEWAY PROJECT AGREEMENT GC 9263 - SUPPLEMENT #2 This a reement, made and entered into this day of - la ""'�-" 19 £, between the State of Washington, Department of Transportation, acting b through the Secretary of the Department of Transportation, by virtue of Title 47 RCW, hereafter called the "STATE," the City of Yakima, hereafter called the "CITY," and Yakima County, hereafter called the "COUNTY." WHEREAS, the parties hereto entered into Agreement GC 9263 on February 7, 1992, which provided for the improvement to the SR 82/Yakima Avenue Interchange and subsequently executed Supplement #1 on May 13, 1994, and WHEREAS, it is deemed desirable to further supplement the agreement to reflect local match fund increases to secure additional TIB funds, and WHEREAS, the project is approaching the construction phase, it is desired that the construction administration and financial processes be clarified. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1. The Agreement is hereby supplemented and the Local Share Cost Allocation, Attachment 1, is hereby superseded and replaced by Attachment 1 Supplement #2. Agreement GC 9263 Supplement #2 Page 1 of 3 2. The total cost of the project is increased from $15,368,800.00 to $17,754,950 as shown on Attachment #1 attached hereto and by this reference made a part of this agreement. 3. The STATE shall advertise the phased construction contracts, and if acceptable bids are received, award and administer the construction contracts. 4. On a monthly basis, the STATE shall bill the CITY the amount due in excess of the STATE portion. Groups 1, 2 and 3 on the contract Summary of Quantities shall be the STATE's responsibility. Groups 4 through 14 shall be the CITY's and COUNTY's responsibilities. Each group shall have construction engineering and administration overhead expenses attached thereto. The entire amount expended on the PROJECT shall be forwarded to the CITY to facilitate the TIB reimbursement process. 5. The contract item "Mobilization" and the construction engineering costs will be determined by a proration of the mobilization and engineering costs of the entire project to the construction costs of the work covered by this agreement. 6. The CITY shall bill the TIB and COUNTY for their respective shares within fifteen (15) days of the receipt of the STATE's invoice. 7 The CITY shall collect all funds due and forward to the STATE in Olympia within forty-five(45) days of the STATE's invoice. 8. All other terms and conditions of the original agreement shall remain in full force and effect except as modified by this Supplemental Agreement. Agreement GC 9263 Supplement #2 Page 2 of 3 IN WITNESS WHEREOF, the City of Yakima, Yakima County, and the Washington State Department of Transportation hereby execute Supplement #2 of said Agreement GC 9263 as of the day and year first above written. Richard A. Zais, Jr. City Manager ATTEST: 00,t444'6City C� erF .:tob"ec/(1 Aj A F`'/" A Yakima City Attorney Approved as to Form: Assistant Attorney eneral CITY CONTRACT NO: (�-ac Agreement GC 9263 • Stat esign EngineerJ Washington State Dept. of Transportation Bettie Ingham, Chair n Yakima County Commission / /tet/ �I ,' M. Le /ames aki -Pk ounty Commission 7 ) ,AllielL__ Wi Ilam H. Flower Yakima County Commission ATTEST: Syl i E. Hinojosa tz Cler of the Board Supplement #2 Page 3 of 3 Supplement #2 ATTACHMENT I: LOCAL SHARE COST ALLOCATION TOTAL PROJECT COST (Revised 7/94) Agencies Local Match --A-- Percent of Total Local Match Cost with Developei Participation --B-- Cash Cost Participation Percent of Total Local Match Costs without Developer Participation —C -- Percent of Total Project cost with Developer Participation 1. City of Yakima a) Engineering Division $1,836,041 29.96% 37.18% 10.34% b) Transit Division $218,168 3.56%` 4.42% 1.23% 2. Yakima County $654,503 10.68% 13.26% 3.68% 3. District #5 of WDOT $2,229,154 36.38% 45.14% 12.55% 4. Local Developer ' $1,190,363 19.42% 0.00% 6.70% $6,128,229 100.00% 100.00% 34.50% Transportation Improvement Account (TIA) $11,626,721 65.50% _ Total Cost Estimate $17,754,950 100.00% * Estimated Right -of -Way Dedication Value up to $1,190,363 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 1 / For Meeting Of Feb 14. 1995 ITEM TITLE: Revised Supplement #2, Local Share Agreement for Gateway Project SUBMITTED BY: Department of Engineering & Utilities - Engine ring Division CONTACT PERSON/TELEPHONE: Dennis E. Covell, Director EG. 576-6313 In July of this year the Transportation Improvement Board authorized an increase in TIA funds for the Gateway Project. The increase of $1,160,568 was accomplished at no increase to City, County or developer local match money. The increase in local match money was by WDOT - South Central Region. Supplement #2 was initially approved by the City of Yakima and Yakima County in late 1994 utilizing requested WDOT agreement language. The Attorney Generals Office review of Supplement #2, when it was presented by WDOT for final approval, resulted in additional language changes. The changes are: • Reference the agreement cost increase from Supplement #1 not the original agreement amount. • Eliminate the requirement that part of the State local share money ($1,000,000) must be spent by June 30, 1995. Resolution _XOrdinance Contract Other (Specify) 1) Funding History 2) Supplement #2 Funding Source APPROVED FOR SUBMITTAL: V Cky Manager STAFF RECOMMENDATION: Approve the resolution authorizing execution of the revised Supplement #2 to the local match money agreement #GC -0263 by the City Manager. COUNCIL ACTION: • Revise reference of a contract to phased construction contracts. • The State will bill the City for local share funding due in excess of the State portion rather than the state billing the City the entire amount of State expenditures. • Eliminated reference to a specific engineering and administrative overhead factor charged in the monthly amount paid the State. • The City will pay the monthly State invoice within 45 days rather than 30 days of billing date. The changes reflect simplifying the money flow for construction. Payments as discussed with WDOT - Headquarters and the Transportation improvement Board (TIB) in December of 1994. PHASE 1- FUNDING HISTORY ' In addition to this amount the City has seperately budgeted an additional $500,000 to upgrade water and sewer utilities in the project area. ORIGINAL Jul -93 Jul -94 CITY OF YAKIMA $1,691,689 $1,836,041 $1,836,041 12.62% 11.95% 10.34% YAKIMA TRANSIT $201,026 $218,168 $218,168 1.50% 1.42% 1.23% YAKIMA COUNTY $603,076 $654,503 $654,503 4.50% 4.26% 3.68% WSDOT $924,717 $1,003,572 $2,229,154 6.90% 6.53% 12.55% TRAIL WAGONS $600,000 $1,190,363 $1,190,363 4.48% 7.74% 6.70% TOTAL LOCAL $4,020,508 $4,902,647 $6,128,229 30% 31.90% 34.50% TIA $9,381,185 $10,466,153 $11,626,721 70% 68.10% 65.50% GRAND TOTALS $13,401,693 $15,368,800 $17,754,950 ' In addition to this amount the City has seperately budgeted an additional $500,000 to upgrade water and sewer utilities in the project area. AMU. ,772; Washington State -Iv Department of Transportation Sid Morrison Secretary of Transportation Mr. Dennis E. Covell, P.E. Department of Engineering and Utilities 129 North Second Street Yakima, WA 98901 Dear Mr. Covell: District 5 2809 Rudkin Road, Union Gap P o Box 12560 Yakima, WA 98909-2560 (509) 575-2510 February 6,1995 SR 82, MP33, Agmt GC9263,Supp#2 Gateway Project Agreement Supplement Number 2 Request Approval The Department of Transportation has found it necessary to modify the proposed Supplement #2. The attached documents reflect the acceptable modifications and have been approved by the Assistant Attorney General. The main revision is in the billing process. Not having administered a similar project has caused our accountants to rethink their system and develop a trackable billing scheme. The agreement now stipulates that the STATE is responsible for Groups 1,2, and 3 of the contract plans SUMMARY OF QUANTITIES. The CITY, and COUNTY are responsible for the remainder of the project. This resulted in an increase to the STATE but simplified accounting as desired. Please review this proposed supplement and secure the necessary signatures. When the signatures are obtained, please return the three originals to this office for the final execution. Note that the date on the front of the agreement is to be filled in by the STATE when the final signature is affixed. Call me at 575-2526 if you need additional information. DJ:attach cc: Eilert Bjorge Richard L. Larson. P.E. Region Administ by:Darryl Region Uti ity E T'neer FEB �p'rl JEERI�.F RESOLUTION NO. R-95 - 24 A RESOLUTION authorizing the execution of revised Supplement #2 to the Agreement for Joint Construction of Improvement of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project with the State Department of Transportation and Yakima County. WHEREAS, the City of Yakima, Yakima County, and the Department of Transportation for the State of Washington desire to collectively construct improvement for the Yakima Avenue/I-82 Interchange Area and Fair Avenue Project, which are mutually beneficial to all entities; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to Supplement the aforementioned agreement with a revised Attachment 2 reflecting the increased project funding from TIB with no increase to the City of Yakima, Yakima County or the Developer, for the purpose of joint cooperation for the construction of the aforementioned improvement, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and the City Clerk are hereby authorized and directed to execute the revised Supplement #2 to Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project, a true copy of which is attached hereto and imcorporated herein. ADOPTED BY THE CITY COUNCIL thisl4thday of February, 1995, E`,/_,C,___,Zi_e.-7,J__/---- MAYOR ATTEST: SUPPLEMENTAL AGREEMENT AGREEMENT GC 9263 SUPPLEMENT #2 This agreement, made and entered into this day of , 19 , between the State of Washington, Department of Transportation, acting through the Secretary of the Department of Transportation, by virtue of Title 47 RCW, hereafter called the "STATE", the City of Yakima, hereafter called the "CITY" and Yakima County, hereafter called the "COUNTY". WHEREAS, the parties hereto entered into Agreement GC 9263 on February 7, 1992 which provided for the improvement to the SR 82/Yakima Avenue Interchange. WHEREAS, it is deemed desirable to supplement the original agreement to reflect local match fund increases to secure additional TIB funds. WHEREAS, the project is approaching the construction phase, and it is desired that the construction administration and financial processes be clarified. WHEREAS, the STATE is committed to the expenditure of one million dollars on the construction phase of this PROJECT by June 30, 1995. NOW THEREFORE, in consideration of the terms, conditions, covenants and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREED AS FOLLOWS: 1. The Local Share Cost Allocation, Attachment 1, in the original agreement is hereby superseded and replaced by Local Share Cost Allocation. 2. The total cost of the project as shown in paragraph 5, page 2, of the original agreement is revised from $13,401,693.00 to $15,368,800.00. 3. The Project cost shown in paragraph 7, page 3, of the original agreement is revised from $13,401,693.00 to $15,368,800.00. 4. The STATE shall advertise, award the contract if acceptable bids are received and administer the construction contract. 5. The STATE shall make contract progress payments as the work is done in accordance with the STATE "CAPS" contract payment system. 6. On a monthly basis, the STATE shall bill to the CITY the entire amount of STATE expenditures on the PROJECT including engineering and administration overhead, currently 9.22%. 7. The CITY shall bill the TIP, COUNTY, CITY and STATE for their respective shares within fifteen (15) days of the STATE's invoice. 8. The PARTIES shall pay the CITY within thirty (30) days of the CITY'S invoice. 9. The CITY shall collect all funds due and forward to the STATE referencing this AGREEMENT number GC -9263 with the payment. 10. The CITY shall adjust the initial billing shares to assure that the STATE is billed one million dollars for the construction phase of the project by June 1, 1995, provided that contract expenses are greater than one million dollars to that date. 11. All other terms and conditions of the original agreement shall remain in full force and effect except as modified by this Supplement Agreement. Signature Sheet - Supplement #Z The City of Yakima, Yakaima County, and Washington Department of Transportation have executed the Agreement for Joint Construction and hereby execute Supplement #2 of said Agreement. Richard A. Zais, Jr. City Manager ATTEST: Dennis Jackson State Design Engineer Washington State Dept. of Transportation City Clerk Charles Klarich, Chairman Yakima County Commission Yakima City Attorney Bettie Ingham Yakima County Commissioner Approved as to Form: Assistant Attorney General CITY CONTRACT W0. James M. Lewis Yakima County Commissioner ATTEST: Sylvia E. Hinojosa Clerk of the Board Supplement #2 ATTACHMENT I: LOCAL SHARE COST ALLOCATION TOTAL PROJECT COST (Revised 7/94) Agencies Local Match --A-- Percent of Total Local Match Cost with Developer Participation --B-- Cash Cost Participation Percent of Total Local Match Costs without Developer Participation --C-- Percent of Total Project cost with Developer Participation 1. City of Yakima a) Engineering Division $1,836,041 29.96% 37.18% 10.34% b) Transit Division $218,168 3.56% 4.42% 1.23% 2. Yakima County $654,503 10.68% 13.26% 3.68% 3. District #5 of WDOT $2,229,154 36.38% 45.14% 12.55% 4. Local Developer * $1,190,363 19.42% 0.00% 6.70% $6,128,229 100.00% 100.00% 34.50% Transportation Improvement Account (TIA) $11,626,721 65.50% Total Cost Estimate $17,754,950 100.00% * Estimated Right -of -Way Dedication Value up to $1,190,363 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 1 For Meeting Of 11/1/94 ITEM TITLE: Supplement #2 - Local Share Agreement for Gateway Project SUBMITTED BY: Department of Engineering & Utilities CONTACT PERSON/TELEPHONE: Dennis E Covell, Director / EC 576-6313 In July of this year the Transportation Improvement Board authorized an increase in TIA funds for the Gateway Project. The increase of $1,160,568 was accomplished at no increase to City, County or developer local match money. The increase in local match money was by WDOT-District #5. The local match money agreement needs to be amended to reflect the new moneys for Phase I of the Gateway Project. For Council information the Phase I funding history chart is attached. Resolution o OrdinanceContract X Other (Specify) 1) Funding History 2) Supplement #2 Funding Source 143 Fund - Transportation Improvement Fund APPROVAL FOR SUBMITTAL: C i� �y Manager STAFF RECOMMENDATION: Approve the resolution authorizing execution of Supplement #2 to the local match money Agreement #GC -9263 by the City Manager. BOARD RECOMMENDATION: COUNCIL ACTION: Resolution adopted, Res. No. R-94-142 RESOLUTION NO. R-94 - A RESOLUTION authorizing the execution of Supplement #2 to the Agreement for Joint Construction of Improvement of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project with the State Department of Transportation and Yakima County. WHEREAS, the City of Yakima, Yakima County, and the Department of Transportation for the State of Washington desire to collectively construct improvement for the Yakima Avenue/I-82 Interchange Area and Fair Avenue Project valued at $17.8 million dollars, which are mutually beneficial to all entities; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to Supplement the aforementioned agreement with a revised Attachment 2 reflecting the increased project funding from TIB with no increase to the City of Yakima, Yakima County or the Developer, for the purpose of joint cooperation for the construction of the aforementioned improvement, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and the City Clerk are hereby authorized and directed to execute Supplement #2 to Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project, a true copy of which is attached hereto and incorporated herein. ADOPTED BY THE CITY COUNCIL this day of November, 1994. ATTEST: /69---ete c CITY CLERK \/�C0 MAYOR Supplement #1 ATTACHMENT I: LOCAL SHARE COST ALLOCATION TOTAL PROJECT COST (Revised 7/93) Agencies Local Match -- A -- Percent of Total Local Match Cost with Developer Partici- pation — B-- Cash Cost Partici- pation Percent of Total Local Match Costs with out Developer Particip- ation -- C -- Percent of of Total Project Cost with Developer Particip- ation 1. City of Yakima a) Engineering Division b) Transit Division $1,836,041 218,168 37.45% 4.45% 49.46% 5.88% 11.95% 1.42% 2. Yakima County 654,503 13.35% 17.63% 4.26% 3. District #5 of WDOT 1,003,572 20.47% 27.03% 6.53% 4. Local Developer * 1,190,363 24.28% 0.00% 7.74% $4,902,647 100.0% 100.00% 31.90% Transportation Improvement Account (TIA) 10,466,153 68.1% Total Cost Estimate $15,368,800 100% Estimated Right -of -Way Dedication Value up to $1,190,363 TD -10 DC.2 1 -- 12/13/93 Vgr>< tura Sheet - Supplement #1 The City of Yakima, Yakima County, and Washington Department of Transportation have executed the Agreement for Joint Construction and hereby execute Supplement #1 of said Agreement. Richard A. Zais, Jr. City Manager ATTEST: City Clerk CITY CONTRACT NO. Approved as to Form: p Dennis Jackson State Design Engineer Washington State Dept. of Transportation Charles Klarich, Chairman Yakima County Commission Bettie Ingham Yakima County Commissioner Yakima City Attorney James M. Lewis Yakima County Commissioner Legal/BD DEC/Gateway ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. /V For Meeting Of Dec. 21. 1993 Gateway Project Local Match Money Agreement - Supplement #1 Department of Engineering and Utilities CONTACT PERSON/TELEPHONE: SUMMARY EXPLANATION: Dennis E. Covell, Director / 576-6313 ec In July of this year, the Transportation Improvement Board (TIB) approved an additional $1,084,967 for the Gateway Project. This increase raised the TIB funding from $9,381,186 to $10,466,153. The increased TIB funding required an increase in local match money participation of $882,139. This increased the local match money from $3,020,508 to $4,902,647. The change in project funding requires a modification to Attachment I of the Agreement for Joint Construction to reflect the increased funding. The agreement Supplement #1 requires endorsement by the City of Yakima, Yakima County, and the Department of Transportation. The increase funding comparison is reflected as follows: Agency Original Participation Original % of Total Project Cost Revised Participation Revised % of Total Project Cost 1. City of Yakima a. Engr. Div. b. Transit Div. $ 1,691,689 $ 201,026 12.62% 1.50% $ 1,836,041 218,168 11.95% 1.42% 2. Yakima County 603,076 4.50% 654,503 4.26% 3. District #5 of WDOT 924,717 6.90% 1,003,572 6.53% 4. Local Developer' 600,000 4.48% 1,190,363 7.74% SUB -TOTAL $ 4,020,508 30.00% $ 4,902,647 31.90% 5. TIB Account 9,381,185 70.00% 10,466,153 68.10% ::... :Cf ...::::.....::.:::..::.#t :::::';;.::::::::::n::::::;:::::::::.... ....„;;;::;::;p :.....,..t., , o:::::::::::::::::::;::;:i;._c;;:;:::..:,,,, *estimated Right -of -Way Dedication The Department of Transportation requires sign -off of the Supplement before they sign -off. The Yakima County Commission is scheduled for approval action in early January, 1994. It is scheduled that the Supplement will be turned over for final sign -off to the Department of Transportation in January, 1994. Resolution X Ordinance _ Contract X Other (Specify) Agreement Supplement #1 Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Approve the accompanying resolution authorizing Supplement #1 to the Agreement for Joint Construction of Improvements of the Yakima Gateway project. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution No. R-93-148 Legal/BD DEC/Gateway A RESOLUTION RESOLUTION NO. R-93- 148 authorizing the execution of Supplement #1 to the Agreement for Joint Construction of Improvement of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project with the State Department of Transportation and Yakima County. WHEREAS, the City of Yakima, Yakima County, and the Department of Transportation for the State of Washington desire to collectively construct improvement for the Yakima Avenue/I-82 Interchange Area and Fair Avenue Project valued at 13.4 million dollars, which are mutually beneficial to all entities; and WHEREAS, the City, as lead agency, has acquired an additional $1,084,976 in Transportation Improvement Board funds to increase the finance of said project; and WHEREAS, the City, Yakima County, and other sources agreed to contribute additional local match monies to increase the project value to 15.37 million dollars; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to Supplement the aforementioned agreement with a revised Attachment 1 reflecting the increased project funding to all entities for the purpose of joint cooperation for the construction of the aforementioned improvement, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and the City Clerk are hereby authorized and directed to execute Supplement #1 to Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue Project, a true copy of which is attached hereto and incorporated herein. ADOPTED BY THE CITY COUNCIL this21st day of December, 1993. MAYOR ATTEST: CITY CLERK Legai/bd Resolutions RES DD Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue City of Yakima Yakima County Washington State Department of Transportation This Agreement, made and executed this day of , 1991 by and between the City of Yakima, (hereafter City), Yakima County, (hereafter County),and Washington State Department of Transportation, (hereafter Department), collectively hereinafter referred to as the Parties and individually as Party. WHEREAS, the City of Yakima has submitted to the Washington State Transportation Improvement Board, (hereinafter referred to as TIB) a project for improvement of the Yakima Avenue/Interstate-82 Interchange area and Fair Avenue, by widening roadways and creating alignments which involve new structures, existing structure removal or modification, installation of curbs, gutters, drainage facili- ties, sidewalks, landscaping, relocation or installation of utili- ties, installation of traffic signals, new roadway sections, pathways, street lights, guard rail, all of which is hereinafter called the Project; and WHEREAS, TIB did select the Project for funding and it re- quires a preliminary proposal prospectus from the City of Yakima to obligate the State's Transportation Improvement Account, hereafter referred to as (TIA), for program funds for up to 70% of the Pro- ject costs; and WHEREAS, the Washington State Legislature has enacted and the Governor has signed a comprehensive transportation funding bill in March, 1990, which includes funds for this TIA project; and WHEREAS, securing of absolute commitment of TIA funds toward the Project depends on expeditious completion of a predesign report to the TIB; and WHEREAS, this improvement lies within the boundaries of the City of Yakima providing mutual benefit to the Parties, and re- quires joint participation by the Parties; and WHEREAS, the TIA Program requires local jurisdictions to fund at least 30% of the total Project costs through a number of funding options, including, but not limited to, state or federal funds available to the Parties, developer contributions, local funds; and WHEREAS, RCW 39.34, the Interlocal Cooperation Act, provides authority for the Parties to enter into this agreement; and Page 1 of 5 (agr\fair) WHEREAS, the Parties recognize the mutual benefits for improving I-82 as a transportation corridor, and Fair Avenue by enhancing access to the Fairgrounds and the Sundome; and WHEREAS, the guidelines for the Transportation Improvement Account Program, as revised, provide the rules and regulations for the conduct of TIA funded projects, now, therefore, In consideration for the mutual promises contained herein, the said Parties hereby enter into an agreement as follows: 1. The City shall be the lead agency for the total Project, including consultant selection, plan review, TIA funding application, State Environmental Policy Act (SEPA), and National Environmental Policy Act (NEPA) determination and administration. Contract award, inspection and contract administration shall be by the City or the Department, depending on jurisdiction. 2. Overall policy oversight to the Project shall be provided by a three member executive committee consisting of the Department's District Assistant Project Development Engineer, the City's Director of Engineering and Utili- ties and the County's Assistant County Public Works Director or their respective designees. 3. The City's staff shall coordinate the Project with staffs of the respective Parties in all phases of the Project as they relate to predesign, design, and construction of improvements. 4. The Parties shall, without cost, issue all necessary right-of-way and any other permits necessary within their respective right-of-way and any other permits necessary within their respective rights-of-way, for the approved Project, provided, however, that nothing herein shall be interpreted to relieve any of the Parties of its quasi- judicial obligation in the issuance of such permits or in the event that review is sought of the issuance of such permit. 5. The Parties shall share the total cost of the Project according to their relative allocations shown in the preliminary cost estimate of the Project --- $13,401,693.00 in Attachment 1, which is attached hereto and incorporated herein. The approval of the Parties shall be sought prior to the submittal to the TIB of the Certification of Local Funds. 6. The Parties recognize the need to complete, as soon as possible, a design report prior to a final obligation of funds by the TIB, and jointly commit toward this effort, according to the allocations shown in Attachment 1. The costs in Attachment 1 are part of the overall Project Page 2 of 5 (agr\fair) cost and shall be credited to each Party's share of the total Project cost. 7. The figure mentioned in Paragraph 5 herein is recognized to be a very preliminary planning cost estimate. Any Project costs above the $13,401,693.00 for the Project as defined in the scope of work shall be apportioned and paid by the City, County, and Department according to the allocation found in Column C of percentages in At- tachment 1. Any improvements or special conditions which are identified by any parties and which are outside the original scope of the Project, as defined by the approved Project design report, will need to be evaluated care- fully and the cost shall be paid by the benefitting Party or Parties. Any costs above the $13,401,693.00 -- wheth- er part of the original scope or not, must be approved by the Parties, and apportioned according to the above provisions. 8. Project costs are defined as all related Project costs, including but not limited to, predesign, design, con- struction, demolition, right of way acquisition, legal, administration, consultant engineering, environmental assessment, testing services and costs related to or incident to TIA Program or department services. 9. Each Party shall be responsible for identifying in a timely manner their respective needs, concerns, special conditions, and other considerations to the City. The City shall be responsible to ensure that the consultant incorporates these comments into the pre -design and the design of the Project. The City shall also be responsi- ble for contacting the other utility service providers early in the process so as to provide for advance plan- ning and coordination. 10. Each Party shall pay invoices for their respective shares within 30 days of receipt of invoices from the City. Invoices shall be sent to: DEPARTMENT: Washington Department of Transportation -District #5 P.O. Box 12560 Yakima, Washington 98907 Attn: Linda Raber CITY: Dennis Covell City of Yakima Director of Department of Engineering & Utilities City Hall 129 North 2nd Street Yakima, Washington 98901 Page 3 of 5 (agr\fair) COUNTY: Dan Hesse Yakima County Director of Public Works Yakima County Courthouse Yakima, Washington 98901 11. Design and construction contract documents and agreements shall indemnity and hold harmless Parties to this agree- ment. 12. Review and approval of the Consultant Agreement Design Report and subsequent documents such as plans, special provisions and estimates shall require review and approv- al by both the Department and the Federal Highway Admin- istration. 13. Assignment: None of the entities hereto shall have the right to assign this agreement or any of its rights and obligations hereunder, nor to terminate its obligations hereunder otherwise without first securing the written consent of all other entities. 14. Execution of Documents: Each Party agrees that it shall execute any and all instruments, documents and resolu- tions or ordinances necessary to give the effect of the terms of this agreement. 15. Effective Date: The provisions of this agreement shall become effective on the date written above and the charges provided for herein commence on the effective date unless other provisions have been made., 16. Waiver: No Waiver by any Party or any term or condition of this agreement shall be deemed or construed as a waiver of any other term or condition nor shall a waiver of any breach be deemed to constitute a waiver of any subsequent breach whether the same or a different provi- sions of this agreement. 17. Remedies: In addition to the remedies provided by law, this contract shall be specifically enforceable by each Party. 18. Termination: This agreement shall remain in effect until the Project is completed and accepted in writing by the Parties. 19. Indemnification: Until final acceptance and approval of the Project, any cause, claim or liability arising from or out of the Project and determined to be the joint and/or mutual fault of the Parties, shall be borne by the Parties on a percentage basis determined by a court of competent jurisdiction or by agreement of the Parties. Liability attributable to the sole fault of a Party shall Page 4 of 5 (agr\fair) be borne by that Party. After final acceptance of the Project by the Parties, each Party shall hold harmless and indemnify the other Parties from any cause of action, arising from or out of design or construction of the improvement located within the geographical jurisdiction of each Party. IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of this day and year first above written. Richard A. Zai , Jr. City Manager ATTEST: City Clerk APPRO TO FORM: Yak ma City Attorney E. R. Burch State Design Engineer Washington State Department of Transportation Alex Deccio, Chairman Yakima County Commissioner Graham Tollefson Yakima County Commissioner Charles Klarich Yakima County Prosecuting Yakima County Commissioner Attorney gi,,.p,iJ -bo2_3 thr CONTRACT tfP: Page 5 of 5 (agr\fair) ATTACHMENT I: LOCAL SHARE COST ALLOCATION TOTAL PROJECT COST —A— Agencies Local Match Percent of Total Local Match Costs —B— Percent of of Total Project Cost Ove run Costs Partici- pation Percent of Total Local Match Costs 1. City of Yakima a) Engineering Division b) Transit Division $1,691,689 201,025 42.08% 5.00% 12.62% 1.50% 49.46% 5.88% 2. Yakima County 603,076 15.00% 4.50% 17.63% 3. District #5 of WDOT 924,717 23.00% 6.90% 27.03% 4. Local Developer * _600,000 14.92% 4.48% 0.00% $4,020,507 100.0% 30.00% 100.00% Transportation Improvement Account (TIA) 9,381,185 70% Total Cost Estimate $13,401,693 100% * Right -of -Way Dedication Value up to $600,000 TD -10 DC2 1 - 10/8/91 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting Of 11/12/91 ITEM TITLE: Agreement for Local Match Money Participation for Yakima Avenue/I-82 Interchange Area & Fair Avenue SUBMITTED BY: Department of Engineering & Utilities nn CONTACT PERSON/TELEPHONE: Dennis E. Covell, P.E. .C..�;V. Director of Engineering & Utilities / 575-6161 SUMMARY EXPLANATION: The Transportation Improvement Board requires a written agreement between local match money participating agencies to confirm pledged local funding. The accompanying agreement provides the confirmation by Yakima County, the City of Yakima, and the Washington State Department of Transportation. The agreement has been reviewed for content by Yakima County and the Department of Transportation and reflects their input. An additional agreement confirming the private developer right-of-way contribution is forthcoming. X Resolution Plan/Map Notification List Ordinance Contract Minutes APPROVED FOR SUBMITTAL: Other ecify \.. City Manager STAFF RECOMMENDATION: Approve the attached resolution authorizing the City Manager to execute the agreement on behalf of the City of Yakima. COUNCIL ACTION: T -DAILY -I 1 RESOLUTION NO.n F 0 2 3 A RESOLUTION authorizing the execution of an Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue with the State Department of Transportation and Yakima County. WHEREAS, the City, Yakima County, and the Department of Transportation for the State of Washington desire to collec- tively construct improvements for the Yakima Avenue/I-82 Interchange Area and Fair Avenue valued at 13.4 million dol- lars, which are mutually beneficial to all entities; and WHEREAS, the City as lead agency has applied to the State Transportation Improvement Board for funds to partially fi- nance such project; and WHEREAS, the City, Yakima County, and other sources will also contribute funds to finance such project; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to enter into the aforemen- tioned agreement with Yakima County and the State Department of Transportation for the purpose of joint cooperation for the construction of the aforementioned improvement, now, there- fore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and the City Clerk are hereby authorized and directed to execute an Agreement for Joint Construction of Improvements of Yakima Avenue/I-82 Interchange Area and Fair Avenue, a true copy of which is attached hereto and incorpo- rated herein. ADOPTED BY THE CITY COUNCIL this /2 day of /14v.7=4.— , 1991. ATTEST: City Clerk fres/fair.jv) 2t Mayor