Loading...
HomeMy WebLinkAboutR-2019-008 Addendum 5 to Engineering and Consulting Services Agreement with Golder Associates, IncA RESOLUTION RESOLUTION NO. R-2019-008 authorizing execution of addendum 5 to the engineering and consulting services agreement with Golder Associates, Inc. to complete permitting efforts for the Naches River Water Treatment Plant Intake Project. WHEREAS, the City is in the process of making improvements to the Water Treatment Plant Intake, which requires applying and obtaining permits for the project; and WHEREAS, the US Corps of Engineers requires some additional Professional Services to develop additional materials for the 404 permit; and WHEREAS, the City desires to enter into Addendum 5 to the existing Professional Services Agreement with Golder Associates, Inc 2011-085 to provide the additional materials and apply and obtain permits required for the Water Treatment Plant Intake Improvements, and, WHEREAS, the City of Yakima used the procedure established by the State of Washington and used the Municipal Research and Service Center Professional Services Roster process to select a firm to perform the design work; and WHEREAS, Golder Associates, Inc. was determined to be qualified to perform the needed hydraulic model work, and WHEREAS, the Scope of Work and Budget included in this supplement meet the needs and requirements of the City of Yakima for this project, and WHEREAS, the City Council of the City of Yakima finds that it is in the best interest of the City and its residents to enter into Addendum 5 to the Professional Services Agreement with Golder Associates, Inc. 2011-085, to apply and obtain permits for the Water Treatment Plant Intake Improvement Project, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached Addendum 5 to the Professional Services Agreement with Golder Associates, Inc , attached hereto and incorporated herein by this reference, not to exceed $114,712 00 to provide the Professional Services as described in the Addendum. ADOPTED BY THE CITY COUNCIL this 15th day of January, 2019 ATTEST _ ,r'Y1 t a6704 Sonya Claar Tee, City Clerk • s 4 t For City of Yakima Use Only: Contract No.2011-085 Project No AC2335 Resolution No.R-2011-154 SOQ No. AGREEMENT FOR PROFESSIONAL SERVICES ADDENDUM NO. 5 This Addendum, hereinafter identified as Addendum No. 5, is hereby entered into and made a part of the Agreement between City of Yakima, Washington, and Golder Associates, Inc., for Professional Services first entered into on the 9th day of April, 2010, by the CITY OF YAKIMA, hereinafter called the "CITY," and GOLDER ASSOCIATES, INC., hereinafter called the "ENGINEER." WITNESSETH That in consideration of the mutual covenants and agreements herein contained, the parties hereto do mutually agree to amend, revise, and/or add the following to the referenced Agreement: SECTION 2 - SCOPE OF SERVICES 2.1 Basic Services. In addition to the duties set forth in the underlying agreement, ENGINEER agrees to perform additional work tasks described in the attached Addendum No. 5 Exhibit A: Design Modifications and Construction Support for the City of Yakima Water Intake Project (Project). SECTION 5 - COMPENSATION 5.1 COMPENSATION ON A TIME SPENT BASIS AT SPECIFIC HOURLY RATES. For the services described in the attached Addendum No. 5 Exhibit A, compensation shall be on a time spent plus expenses basis at the ENGINEER's normal hourly billing rates shown on Exhibit B, attached to this agreement. IN WITNESS WHEREOF the parties hereto duly enter into and execute this Addendum No. 5, as of this day of , 2019 Other than specific amendments stated herein, all other terms, conditions and requirements of the underlying contract shall remain in full force and effect throughout the term of the underlying contract. CITY OF YAKIMA Printed Name. Cliff Moore Title. Date Attest City Manager GOLDER ASSOCIATES, INC. Signature Printed Name. 4ktotfr e kac e Title. fk 0 . .:---.. 7i, -7 ova aar Tee, City Clerk '- , -\' ,i ` ti City Contract No. 2011-85 Q6ck 5 fc, Resolution No R-2011-154 Page 1 Nationwide Permit process instead of the going through the larger effort of the full Alternatives Analysis and Individual Permit process. To make these adjustments, Golder proposes to complete the following design change tasks to prepare an updated design for a new Joint Aquatic Resources Permit Application (JARPA) submission. • Additional scope includes permitting support for the Washington Department of Fish and Wildlife (WDFW) Hydraulic Project Approval (HPA), which Golder assisted early this year with development of a figure for the WDFW HPA. The Corps indicated that a Section 404 of the Clean Water Act (CWA) permit through the Corps may need to be obtained for continued dredging activities associated with annual work that has been completed in order to maintain flows to the water intake. Additional budget has been included for Golder to assist in these efforts for 2019 if the permitting need arises. Deliverables: As described in subsequent tasks. Schedule: Final schedule to be coordinated with the City. Anticipated completion late fall 2019. A working schedule will be initiated immediately upon start of the work, and then updated and revised as additional and/or new information is developed. Task 10a — Preliminary Alternatives Analysis Description: Prepare preliminary Alternative Analysis for the Corps in support of the JARPA. Assumptions: • Golder will serve as the prime and main author of the Alternatives Analysis to summarize, expand upon, and develop the Alternatives Analysis. 48 North, as a sub -contractor to Golder, will provide permit expertise, support, development, and review of the Alternatives Analysis. Deliverables: Coordinate, participated, prepared one draft preliminary Alternatives Analysis and reviewed the initial comments from the Corps. Schedule: Task Completed Cost: $9,020. Task 10b — Prepare and Coordinate Meetings with Corps Description: Prepare and Coordinate meetings with the Army Corps of Engineers to review Alternatives Analysis and address a project path forward. Assumptions: • Golder served as the prime and main coordinator for the Corps meeting. 48 North Solutions, Inc. (48 North), as a sub -contractor to Golder, provided presentation review, meeting facilitation and support. Matthew Wells, as separately contracted through the City, provided review and input regarding any discussions on water rights and point of diversion transfers. • Golder will prepare and coordinate a meeting with the Corps to present project background and respond to most recent alternatives analysis comments. The goal of the meeting is to educate the Corps about the project, establish clarification on the comments and develop an agreed upon working path (scope) forward. Page 3 Assumptions: • Golder will develop a final Issued for Construction (IFC) design drawings that will incorporate comments from the JARPA package submission and comments from the reviewing regulatory agencies. The ultimate comments and extent of which the City will implement design modifications is unknown at this time and a general estimate for the level of effort is made within this task. • Final IFC drawings will modify the ELJ elevations within the water intake RGC structure to confirm that the structure elevations are set at an elevation to allow for flows to enter and access the secondary channel. Golder will review water surface elevations within the 2D Tuflow model as they correspond to the RGC structure at the water intake. • Golder will develop project specifications to be incorporated into the final IFC drawing package. These will include general specifications, materials specifications, and general guidance on installation of the RGC and ELJ structures. • Golder will prepare a planning level construction cost estimate and develop a bid list and summary of quantities for contractor bid submittals. Golder will complete a bid walk with the prospective contractors to answer questions. Deliverables: Golder will develop a final IFC design drawings and specifications, a planning level construction cost estimate and attend a bid walk. Drawings will be provided electronically and two (2) full-sized signed hard copies will be provided to the City. Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review; anticipated completion Q2-Q3/2018. Cost: $19,390. Task 10e — Construction Support Description: Provide on -site engineering support during construction. Assumptions: • Golder will be prepared to provide construction support to respond to requests for information (RFIs) and provide on -site construction support during installation of the project. The extent and duration of this task and quantity of RFIs is currently unknown, and an initial level of effort is assumed for 1-week of in -office and 3-weeks of on -site construction support (assuming 12-hour days, 5 days a week). • Golder will work with an on -site construction manager or inspector to direct and implement the construction drawings and specifications. Deliverables: RFI responses and daily field report updates (provided in email format). Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review, river conditions, permit stipulations and contractor selection; anticipated completion Q3-Q4/2018. Cost: $39,380. Task 10f — Water Intake Dredging Permit Support Description: Provide interim water intake dredging permit support Page 5 ADDENDUM NO. 5 EXHIBIT B Golder Associates SCHEDULE OF FEES REDMOND, WASHINGTON Effective January 1, 2017 Invoices from Golder Associates include labor charges, other direct costs, and costs associated with in-house services Charges include only those services directly attributable to the execution of the work. Time spent when travelling in the interests of the work will be charged in accordance with the hourly rates Labor charges are based upon standard hourly billing rates for each category of staff The billing rates include costs for salary, payroll taxes, insurance associated with employment, benefits (including holiday, sick leave, and vacation), administrative overheads, and profit. In some cases statutory overtime rates may apply Rates by labor category are as follows ENGINEERS, SCIENTISTS, PROJECT MANAGERS AND REVIEWERS* Junior I Level C1 $100/h Junior II Level C2 $110/h Intermediate I Level C3 $135/h Intermediate 11 Level C4 $165/h Associate/Senior I Level C5 $185/h Associate/Senior II Level C6 $215/h Principal/Associate/Senior III Level C7 $230/h Principal/Specialist Level C8 $250/h ADMINISTRATIVE SUPPORT Admin Support Level B1 $75/h Staff Admin Support Level B2 $85/h Senior Admin Support I Level B3 $95/h Senior Admin Support II Level B4 $105/h TECHNICIANS/TECHNOLOGISTS Junior I Level T1 $80/h Junior II Level T2 $100/h Intermediate Level T3 $115/h Senior Level T4 $125/h CAD AND CIVIL ENGINEERING DESIGN TECHNOLOGISTS/ GIS / Draftsperson Level D1 $85/h Staff Draftsperson Level D2 $95/h Senior Draftsperson Level D3 $115/h NOTES The above rates are subject to revision A 7% charge will be added to the total fees to cover normal incidental office disbursements, including but not limited to associated communication charges, travel and document production A 15% carrying charge will be added to disbursements including materials, subcontractor costs, drilling or excavation services and use of external laboratory services * Rates for specialist services, including but not limited to litigation support, expert witness, including time spent in depositions and the preparation and presentations of testimony, and/or senior level consultation, and priority emergency level services are available upon request. Rates for laboratory services and use of equipment owned by Golder Associates will be provided upon request. Special Note 1 The rates and charges listed above exclude applicable local and federal taxes The taxes will appear as a separate line item on each invoice Golder Associates Inc. 18300 NE Union Hill Road, Suite 200 Redmond, WA 98052 USA Tel: (425) 883-0777 Fax: (425) 882-5498 www golder.com Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America ITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.H. For Meeting of: January 15, 2019 Resolution authorizing Addendum 5 to the Engineering and Consulting Services Agreement with Golder Associates, Inc. to complete permitting efforts for the Naches River Water Treatment Plant Intake Project Scott Schafer, Public Works Director David Brown, Assistant Public Works Director, 509-575-6204 SUMMARY EXPLANATION: This is Addendum 5 to our current contract with Golder Associates for the design and permitting of the City of Yakima's Water Treatment Plant Intake I mprovements project. During recent flooding and long duration high water events, the Naches River has migrated towards the southeast river bank. The City's Water Treatment Plant intake is located on the northwest river bank. This project redirects the river flow back towards the northwest bank and the Water Treatment Plant intake to ensure adequate water is readily available for treatment to meet the domestic, commercial, industrial, irrigation and fire suppression needs of the City of Yakima. During the permitting process, the US Army Corps of Engineers (USACE) requested some design changes and re -submission of permit documents. This requirement will result in additional work by Golder Associates. The City secured a Department of Ecology (Ecology) Watershed grant that was to cover some of the design cost, with most of the funding obligated for actual construction. Because of the USACE additional requirements, Ecology has agreed to modify the grant in order to shift more funds towards the design and permitting of the project. However, this will reduce the amount of funding available for construction. Funds not ultimately spent on design or permitting, may be redirected back to construction. Additional funds if needed for construction will be from the Water Improvement Fund. Addendum 5 is not to exceed $114,712.00 and has been attached for City Council review. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability 2 APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt Resolution BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Resdution 12/27(2018 contract 1/10/2019 Type Resofutbn Cover Memo Contract Supplemental Agreement Supplemental Agreement Number: 1 Original Contract Number: 2011-085 Addendum 6 City Engineering Project Number: AC2335 Project Title: Permitting Support for the City of Yakima Water Intake Project Maximum Total Amount Payable for the Agreement: Task 11 Additional Permitting Support Organization and Address: Golder Associates, Inc. 9 Monroe Parkway, Suite 270 Lake Oswego, OR 97035 Execution Date of Supplement: February 17, 2020 Completion Date of Supplement: Upon completion of City Project AC2335 Maximum Amount Payable this Supplement: $70,100.00 $289,00.00 Description: Support additional permitting requests by federal and local agencies for the City of Yakima Water Intake Project permits as described within the following subtasks 11a through 11d below. Assumptions: • Golder Associates, Inc. (Golder) will serve as the prime through permitting process and provide integrated engineering, coordination and project management. • 48 North Solutions, Inc. (48 North), as a sub -contractor to Golder, to provide permit expertise, support, development, and coordination. • This scope/budget is focused on efforts already completed and requested to be completed to continue the permitting process with the United States Army Corps of Engineers (USACE), National Marine Fisheries Service (NMFS), United States Fish and Wildlife Service (USFWS), Department of Natural Resources (DNR), City of Yakima, Yakima County and the Washington Department of Fish And Wildlife (WDFW). Deliverables: As described in subsequent tasks. Schedule: Final schedule to be coordinated with the City. Anticipated completion mid 2020. A working schedule will be initiated immediately upon start of the work, and then updated and revised as additional and/or new information is developed. Task l a — Permittin Meetings and Coo dination Description: Prepare and attend meetings with the USACE, NMFS and USFWS. Coordinate and prepare for meetings with nearby landowners. Assumptions: • Golder and 48 North has prepared, coordinated and attended meetings with various stakeholders to coordinate, educate and progress the permitting process. • Work included a trip to Yakima to meet with agencies on November 25, 2019. Deliverables: Coordinated, participated, developed meeting minutes, for in person and telephone meetings with various stakeholders. Schedule: Task Completed Cost: $14,800. Task llb -- Prepare Permitting Documents Description: Prepare additionally requested Biological Assessment (BA) addendum, Turbidity Plan, Fish Salvage, Site Mitigation and Monitoring Plan documents to support federal permitting requests. Assumptions: • Golder will serve as the prime and 48 North Solutions, Inc. (48 North), as a sub -contractor to Golder, who will primarily develop these documents for review by Golder and the City. Deliverables: Biological Assessment addendum with supporting documents Schedule: Final schedule to be coordinated with the City, where anticipated completion to occur in Q1-Q2/2020. Cost: $25,600_ Task ilc — Prepare Adaptive anagement Plan Description: Develop an Adaptive Management Plan to include a 5-year maintenance window. Assumptions: A draft framework for an Adaptive Management Plan prepared by Golder in June 2017 and will be updated to include requests made by the USACE. To be addressed within the plan includes project objectives, monitoring objectives, frequency of monitoring and what/when mitigative actions are to be taken. Deliverables: Prepare an Adaptive Management Plan to be included within the BA addendum. Schedule: Final schedule to be coordinated with the City, where anticipated completion to occur in Q1-Q2/2020. Cost: $8,000. Task lid — On -going Perrrdtting Support Description: Provide continued permitting support to coordinate additional meetings, address agency comments, and subsequent updates to design drawings, construction sequencing and phasing. Assumptions: • Golder will provide on -going project support to complete permitting and Issued for Construction (IFC) design drawings that will incorporate comments from the Washington Department of Fish and Wildlife (WDFW) HPA package submission and comments from the reviewing regulatory agencies. The ultimate comments and extent of which the City will implement design modifications is unknown at this time and a general estimate for the level of effort is made for this task. Deliverables: Permitting support and IFC design drawings and specifications Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review; anticipated completion Q2 /2020. Cost: $21,700. Consultant Signature CITY CONTRACT NO. ao zu RESOLUTION NO i-