Loading...
HomeMy WebLinkAboutR-2018-129 Pipe Rehabilitation Agreement with Insituform Technologies, LLC RESOLUTION NO. R-2018-129 A RESOLUTION authorizing a contract with Insituform Technologies, LLC , in the amount of $464,021., for rehabilitation of aging City of Yakima sanitary sewer main lines WHEREAS, the City of Yakima maintains the Wastewater Collections System in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City of Yakima Wastewater Division has identified pipeline segments that require rehabilitation or replacement, and WHEREAS, this and future projects will stabilize current conditions of the city's wastewater pipe system and reduce infiltration of groundwater which will save treatment costs, improve collection system reliability, and limit the need for upgrades to the Wastewater Treatment Plant, and WHEREAS, by resolution R-2017-069, the City entered into an agreement with HLA Engineering and Surveying (HLA) to prepare the plans and contract documents for the rehabilitation of City of Yakima sanitary sewer main lines in various locations in city, and WHEREAS, the City of Yakima Wastewater Division requires construction services for the rehabilitation of the deficient collections system pipes and manholes, and WHEREAS, The City of Yakima used the procedure established by the State of Washington for competitively bidding projects, and WHEREAS, lnsituform Technologies, LLC submitted the low bid and has the ability to perform the contact specified work, and WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and its residents to enter into a contract with Insituform Technologies, LLC to perform the work detailed in the contract documents for the rehabilitation of approximately 7,600 LF of aging City of Yakima sanitary sewer main lines by means of cured in place pipe, now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached contract with lnsituform Technologies, LLC , in the amount of$464,021 11, for rehabilitation of approximately 7,600 LF of aging City of Yakima sanitary sewer main lines by means of cured in place pipe in various locations in city ADOPTED BY THE CITY COUNCIL this 4th day of December, 2018 ATTEST. . athy C ffey, r @PC& N • Sonya Claar TEA, City Clerk v CONTRACT THIS AGREEMENT, made and,entered in triplicate, this' day of , 2018, by and between the City of Yakima, hereinafter called the Owner, and Insituform Technologies, LLC a Washington Corporation,,hereinafter called the Contractor. WITNESSETH: That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties hereto covenant and agree as follows: I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF: $464,021.11, for Wastewater Collection System Improvements Priority 2 - CIPP, City of Yakima Project No. .2470, all in accordance with, and as described in the attached plans and specifications and the 2018 Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations.in or additions to the:work provided under this contract and every part thereof Work shall start within ten (10) days after the Notice to Proceed and shall be completed in Thirty-five(35) working,days, If work has not commenced within the ten (10) days after the notice to proceed, the first chargeable working day shall be the eleventh (.11th)working day after the date on which the City issues the Notice to Proceed. If said work.is not completed within the time specified, the Contractor agrees to pay to the Owner the sum ,specified in the Standard Specifications.for each day said work remains uncompleted after expiration of the specified time, as liquidated damages. The Contractors shall provide and bear the expense of all equipment;work and labor of any sort whatsoever that may'.be required for the-transfer of-materials and for constructing and completing the work provided for in this contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima. II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be.done the above described work and to complete and finish the same according to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same according to the attached specifications,and'the schedule of unit or itemized prices hereto attached, at the time and in the manner and upon the conditions provided for in this contract. III. INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its officers, elected officials, employees and agents from and against all claims, causes of action, damages, losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and court costs, arising out.of, relating to, or resulting from The Contractor's performance or non-performance of the services, duties and obligations required of it under this Agreement. IV The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of the Contractor. V It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract, except as expressly provided herein. IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day-and year first herein above written. Countersigned. CITY OF YAKIMA CONTRACTOR this S �1 � Delaware LLC day of ITV 20 re. Insituform Technologies,LLC ,a , .�; Contract or B 07/(04-1- (ht1i ManagerAtt Whittney V '0616 Name) City file)' ts: Contracting&AttestingOfficer CITY CONTRACT NO• Lt i�' - �..-•�' � -2lilO'"I7 `�^ r (President,Owner,etc.) RESOLUTION NO' • "; •.- ,, y Address: 17988 Edison Avenue '=t Chesterfield,MO 63005 7r.) BUSINESS OF THE CITY COUNCIL YAKIMA,WASHINGTON AGENDA STATEMENT Item No 6 D For Meeting of December 4,2018 ITEM TITLE: Resolution authorizing a contract with Insituform Technologies, LLC, in the amount of $464,021 for cured-in-place pipe rehabilitation of 7,600 linear feet(LF)of aging City of Yakima sanitary sewer main lines. SUBMITTED BY: Scott Schafer, Director of Public Works Mike Price,Wastewater/Stormwater Division Manager,249-6815 SUMMARY EXPLANATION: The Wastewater Division allocated$750,000 in 2018 for the rehabilitation of aging and deficient clay and concrete sewer mains to reduce infiltration of groundwater which will save treatment costs, improve collection system reliability,and limit the need for upgrades to the Wastewater Treatment Plant. City Project#2470 was established for the rehabilitation of approximately 7,600 linear feet of sewer pipe in various locations throughout the City by means of cured-in-place pipe(CIPP)technology The City utilized the procedure established by the State of Washington for competitively bidding projects. Four contractors submitted bids,with Insituform Technologies, LLC submitting the lowest bid of$464,021 See attached contract. The project is funded by Wastewater Collections Capital Fund 476 ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL: ity Manager STAFF RECOMMENDATION: Adopt Resolution BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type O Insituform Contract Resolution 11/8/2018 Resolution fl Insituform Contract 11/8/2018 Contract