HomeMy WebLinkAbout10/05/2010 12 Fire Station #94 Improvements Final Contract Payment; City Project No. FC2265 BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No f
For Meeting Of 10/5/10
ITEM TITLE Final Contract Payment for Fire Station #94 Improvements
City Project No FC2265 (Standard Motion V -B — Accept the project
and approve the final payment)
SUBMITTED BY Dave Willson — Deputy Fire Chief
CONTACT PERSON /TELEPHONE Dave Willson — Deputy Fire Chief 509 - 575 -6165
SUMMARY EXPLANATION --
This project consisted of construction of a 1,284 square foot building addition and alterations to
an existing 1,338 square feet. The Demolition work included selective saw cutting, removal of
asphalt and concrete paving The site work included site clearing, earthwork, asphalt and
concrete paving, irrigation system and landscaping The building construction included
reinforced concrete foundations and floor slabs, wood stud exterior walls, glue laminated
beams, prefabricated wood roof joists, wood stud interior walls and partitions, plywood decking
and sheathing, modified bitumen roofing, and gypsum wallboard The interior included gypsum
® wallboard, painting of gypsum board walls and ceilings, miscellaneous painting, ceramic tile
walls and floors, fiberglass reinforced panels, resilient flooring and base, carpet flooring, rubber
sports flooring and acoustical ceiling panels
Final contract amount shows 4 charge order increases as approved by City Manager Final
inspection for this project was made and the recommendation is that the project be accepted
This Council action is to accept the project and approve the final construction costs
Contractor Stephens & Sons Construction, Inc
Contract Award 1/14/10
Contract Cost: $415,750 00
Final Contract Cost. $442,904 74
Amt. This Payment: -0-
The above total contract cost is for construction only and does not include engineering and
other costs
Resolution Ordinance X Other (Specify) Final Contract Payment
Contract Mail to (name and address)
Funding Source F-C taI
APPROVED FOR SUBMITTAL '�� � City Manager
STAFF RECOMMENDATION Accept the project and approve final estimate
• COUNCIL ACTION
--- -- AUG 3 0 2010 v ' - ( -
41 y .1,u�` p ,:, : ,
+ /�
r B ROCKWAY ® OP FE R R AAB
r 1 III.:.
Ill
:F ARCHITECTURE, P L.L C
Jii A it
PROJECT Station 94 Improvements CHANGE ORDER NO 4
City of Yakima Fire Department
TO Stephens & Sons Construction INITIATION DATE. August 27 2010
417 South 51st Avenue
Yakima. Washington 96909 ARCHI 11cCTS PROJECT NO 081
CONTRACT FOR General Construction
CONTRACT DATE. January 1 2010
You ere directed to make the following changes in this Contract
COP 12 Misc. Electrical Revisions
$311.20
TOTAL NET CHANGE
$311.20
ID
Notvalid until signed by both the Owner and Architect
Signature of the Contractor indicates his agreement herewith. including any adjustment in the Contract Sum or Contract Time
The original Contract Sum was. $ $415,750.00
Net change by previously authorized Change Orders. $ $26,843.54
The Contract Sum will be increased by this Change Order 1 $ $311.20
The new Contract Sum including this Change Order will be. $ 5442,904.74
The Contract Time will be increased by ( -0 -) Days
The Date of Substantial Completion as of the date of this Change Order therefore is August 14, 2010
Authorized:
Erockwey Opfer Raab Architecture Stephens & Sons Construction City of Yakima Fire Department
1320 North 1 6th Avenue, Suite C 417 South 51st Avenue 410 North Front Street
Yakima. Washing * -- q 90' Yakima Was ington 96909 Yakima. Washin ton 99901
By
L _.V BY ...4._ CA- Date Oat 2'711 t1 Date e'0- / Date g - -
1320 N 16TH AVENUE- SurrE C YAKIMA, WAS$ UNGTON 98902 (509) 451-3299 FAX (509) 454 -3254