Loading...
HomeMy WebLinkAboutR-2010-098 2011-2016 Six-Year Transportation Improvement Program AmendmentRESOLUTION NO. R-2010-98 A RESOLUTION to amend the Six-year Transportation Improvement Program (TIP) for the period of 2011 through 2016 to include projects affecting the City's Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year TIP for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the adopted 6 -Year TIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year TIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -Year Transportation Improvement Plan for the period of 2010 to 2015 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, a public hearing has been held by the Yakima City Council on amending the 6 -Year Transportation Improvement Plan on Tuesday, August 3, 2010, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2011 through 2016 for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation Improvement Plan attached. ADOPTED BY THE CITY COUNCIL this 3rd day of August, 2010. ATTEST: 4)9--ka Clerk Micah Cawley, Mayor Washington lipepartmentof Transportation Agency: Yakima Co. No.: 39 City No.: 1485 • Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemengram From 2011 to 016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 To* o fj m U ✓ `m :o E a Z ' Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title . • D. Street/Road Name or Number E. Beginning MP or Road - Ending MP,or Road F. Describe Work to be Done Improvement I Type(s) !I y ° N Total Length. I Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RAN Required Date (NywyY) Federal Fund Code Federal Cost by Phase 1st • 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20. 21 14 1 Yakima Railroad Grade Separations- Phase 3 Martin Luther King, Jr. Blvd from: N. 1st Sreet to: N. 1st Ave . Construct Grade Separation and adjacent roadway reconstruction including Front Street 01 06 07 08 P 0.2 T G 0 CN CN 4/1/2011 4/1/2011 STP(U) DEMO 1700 3281 FMSIB AIP- 2000 1500 4530 8230 4781 3000 3000. 5230 1781 EA Yes 9/1/2009 Totals 4,981 3500. 4530. 13011 6000 7011 00 2 Transit Operating Expenditures Various fixed rates and locations from: N/A to: N/A Annual operating assistance from the FTA in support of our transit system; fixed conte, paratransit Dial -A -Ride and vanpool program . 12 22 - 23 24 31 S N/A ALL 1/1/2011 5307 1601 1601 32021 3202 CE No Totals 1,601 1601 3202. 3202 00 3 William 0. Douglas Heritage Trails Bridge Restoration & Trailhead • from: to: Trailhead restoration, right of way acquisition partner with the William 0. Douglas Foundation, including restoration of bridge , cleaning, rust removal and painting 32 13 10 S N/A G O P T S W RW CN 1/1/2011 1/1/2011 STP(E) STP(E) 150 285 150 285 150 285 CE Yes 6/01/09 Totals • 435 435 435 .00 4 . . Street Asset Amenities (Transit) . Route Maintenance, Repair and Improvements from: N/A 'to: N/A On going improvements to bus benches, shelters and signage infrastructure 22 31 S N/A ALL 1/1/2011 5309(Bus) 280 1 50 3301 50 100 100 80 - CE No Totals 280 50 330 50 100 100 80 Report Date: July 27, 2010 Page 1 v. 5.7 - Supersedes previous editions ig Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title • D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) 3 Federal rn Total Length Utility Codes Project Costs In Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mmfddiyyyy) Fund Source Information • Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV Required Date (mmfyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th . Thru 6th 1 2 3 4 5 6 7 8 9 ' 10 11 12 13 14 15 16 17 18 19 20 21 00 •Continue 5 Transit Service to Terrace Heights New University & Retail Links from: N/A to: N/A Extension of fixed route bus service only into the Terrace Heights area of Yakima County 22 S N/A ALL 1/1/2011 CMAQ 71 11 82 82 No Totals 71 11 82 82 14 6 Nob Hill Blvd and 64th Ave Improvements Nob Hill Blvd from:, 53rd Ave to: 64th Ave Widen and re -construct 64th Ave. to 33 -foot width with curb, gutter and sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter sidewalk and stormwater runoff treatment on the north side of Nob Hill. 03 05 07 12 13 P .71 C P T CN 1/1/2011 JOBS 925 9251 925 CE No Totals 925 925 925 • 14 7 S 16th Ave & W Washington Ave Signal & Intersection. S 16th Ave from: S 16th Ave . to: W Washington Ave Included in Union Gap's Valley Mall Blvd. project 12 05 03 S N/A P T CN CN 1/1/2011 7/1/2011 AIP AIP 880 1000 383 214 12614 1263 1214 CE Yes 4/1/2010 • Totals• 1880 597 2477 2477 16 8 66th Ave. & Summitview Intersection N. 66th Avenue & Summitview from: N. 66th Ave. to: Summitview Ave. Widen for left turn lanes, intersection Improvements, curb, gutter, handicap ramps and lighting 05 12 S zo O P S T W C CN 1/1/2011 600 6001 600 CE Yes, 4/1/2010 Totals 600 600 600 Report Date: July 27, 2010 Page 2 v. 5.7 - Supersedes previous editions ��"= Washington • Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemeneogram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A.- PIN/Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name -or Number: E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds. . Local Funds Total Funds Envir. Type • 'R/VV Required Date (MM/yY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd . 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 Coolidge Road Widening and Paving. from: 80th AVE. to: 88TH AVE. Widen roadway and pave with curb and gutter. 03 05 06 S .50 S P T CN 1/1/2011 CMAQ, 540 214 754 754 CE Yes 9/1/2009 Totals .540 214 754 754 00 10 Acquisition of new Dial -A -Ride paratransit vehicles from: N/A to: N/A Purchase new vehicles to replace older, less reliable units 21 $ N/A ALL 1/15/2013 • 5309(NS) 96 84 1801 180 CE No Totals 96 84 180 180 14 11 E. Lincoln & 10th Street Roundabout from: E. Lincoln to: E. MLK Jr. Blvd. Roundabout construction at intersection curb, gutter, sidewalk, & street lighting 03 05 06 P N/A- PE RW CN 1/1/2011 1/1/2012 6/1/2012 STP(U) STP(U) STP(U) 173 433 1125 27 67 175 .200 500 1300. 200• 500 1300 • CE Yes 6/1/2011 Totals 1,731 27 242 2000 200 1800 • 12 12 • S.R.12 & 16th Avenue Interchange Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout 03 06 P N/A 0 ALL 1/1/2011 STP(U) 865 135 10001 1000 CE No Totals 865 135 1000 1000 • Report Date: July.27, 2010 Page 3 v. 5.7 - Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 m 0 m co u Priority I Number Project Identification A. PIN/Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done • Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule • (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mmiddiyyyy) Fund Source Information Federal Funding State Code •State Funds Local Funds Total Funds Envir. Type RNVC. R Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 , 18 . 19 20 21 11 13 1-82 & Lincoln Avenue Interchange 1-82 Interchange from: E. "G' Street ' to: 1-82 Reconstruct / extend off -ramp from existing 1.82 off -ramp for Lincoln Avenue to E. "G' Street. 01 P N/A 0 13 0 ALL 1/1/2012 STP(U) 865 135 1000 1000 EA Yes 6/2011 Totals 865 135 1000 1000 14 14 E. Yakima Avenue & Fair Avenue Signalization from: E. Yakima Avenue to: Fair Avenue Construct Traffic Signal 12 P N/A P W T S 0 ALL 1/1/2012 STP(U) 865 135 10001 1000 CE No Totals 865 135 1000 1000 00 15 Fixed route Bus Services to Moxee along SR 24 Corridor SR 24 Hwy Corridor/Park & Ride Lots from: • to: JARC funded demonstration project to determine ridership potential to and from the Moxee area including stops at two Park 8 Ride lots along SR 24. 22 S • ALL 1/2/2011 5316 131 131 2621 131 131 CE No Totals 131 • 131 262 131 131 • 14 16 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening 8 new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 P N/A O C P T W RW CN 1/1/2012 4/1/2012 STP(U) STP(U) 173 865 I 27 135 200 1000 200. 1000. CE Yes 4/1/2001 Totals 1,038 162 1200 1200 Report Date: July 27, 2010 Page 4 v. 5.7 - Supersedes previous editions Washington ®Department of Transportation WAIF Agency: Yakima Co. No.: 39 Co. Name: City No.: 1485 MPOIRTPO: Yakima Co. YVCOG Six Year Transportation Improvemenpogram From 2011 to 2016 Hearing Date: Amend Date: 6-15-2010 Adoption Date: 6-15-2010 Resolution No.: 2010-66 Functional' Class Priority Number Project Identification' A. PIN/Federal Aid No. - B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road -, Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars ,. • Expenditure Schedule (Local Agency) Federally Funded.• • .Projects Only Project Phase Phase Start (mm/ddyyyy) Fund Source Information Federal Funding State Fund Code State Funds • Local Funds Total Funds Envir. Type RNV Required Date (MI41/Yy) Federal Fund Code - Federal Cost by • Phase 1st 2nrd d 3 4th Thru 6th 1 2 3 4 5 ` 6 7 8 9 10 ' 11 ,12 13 14 15 16 17 , 18 • 19 20 21 16 17 • S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 P N/A P T PE CN 4/1/2011 6/1/2011 13 214 13 214 13 214 CE No `Totals 227 - 227 227 14 18 4579 S 1st St. - E. Washington Ave. Intersection Improvement S1stSt. from: S 1st St.. • to: E Washington Ave. - Realign intersection, upgrade traffic signal 12 P N/A P W S T O PE 6/1/2011 STP(U) 252 38 2901 290 EA 'Yes 01/01/11• Totals 252 38 290 . 290 17 19 ' 4587 S 48th Ave. Reconstruction S 48th Avenue • from: Summitview Ave. • to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage • 03 - P 1.00 P T W S O .ALL 4/1/2012 I STP 22681 3071 - 2575 , 525 . 2050 EA Yes 4/1/2014 Totals 2,268 . 307 2575 • 525 2050 14 . 20 South 72nd Ave & Mead Ave Intersection South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 p N/A 0 P S T W PE . CN 1/1/2012 6/1/2012 STP(U) STP(U) 51 383 8 61 59 444 • 59 444 CE Yes 6/10/2010 Totals - 434 69 503 503 Report Date: July 27, 2010 Page 5 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 3g Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. .Project Title D. Street/Road Name or Number E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddiyyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir. Type R/W Required Date M ( MNy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 21 4562 Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A P W T 0 S ALL 4/4/2012 STP(U) 378 WSDOT 378 • 756 756 CE Yes 4/1/2014 Totals 378 378 756 756 16 22 E. 'H"St.Extension E. "H" St. from: 1st St. to: Yakima River Construct road including water, sewer, curb, gutter and sidewalk for future development. 01 08 P 1.1 0 P S T W PE RW CN 1/1/2012 1/1/2014 6/1/2014 STP(U) STP(U) STP(U) 2180 2180 1199 340 340 1871 2520 2520 3070 2520 2520 3070 CE Yes 1/1/2014 'Totals 5,559 2551 8110 2520 5590 17 23 • N. 10th St. Extension N. 10th St. . from: R St. to: 10th Street - Lincoln Ave. Construct road including water, sewer, curb, gutter, sidewalk for future development. • 01 06 PPE 1.3 0 0 S W RW CN 1/1/2012 1/1/2013 6/1/2013 STP(C) STP(U) STP(U) 700 5500 7900 108 850 972 808 6350 8872 808 6350 8872 CE Yes 1/1/2013 Totals 14,100 1930 16030 808 15222 00 24 West Side Transit Center Acquire Property to Expand Operations from: N/A to: N/A Locate and acquire property for the placement of a West Side Transit Center Operation 23 P N/A PE 1/1/2011 5309(NS) - 400 . OTHERI 100 500 500 CE No Totals 400 100 500 500 Report Date:July 27, 2010 Page 6 v. 5.7 - Supersedes previous editions Washington. Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemeneogram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.:.2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Atd.No. B. Bridge No. C. Title Project Pro 1 D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) us Total Length iu v . 0 jr B =. Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase • Phase Start . (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (IjfryVyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th I 1 2 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 • 17 18 19 20 ,21 17 25 ' • Yakima Downtown Future Initiatives, Phase 5 . from: .1st Street to: 9th Street Install Historic Lighting, Sidewalk Modification & Other Improvements. Exact improvement area(s) to be determined. 06 12 P • .60 P W S T 0 PE 4/1/2011 OTHER 6000 • 6000 6000 - CE No . Totals '.6000 6000 6000 00 26 Annual Signal Upgrades Local -Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN CN 1/1/2011 4/1/2012 4/1/2012 STIP (S) STP(S) STIP (S) 60 180 360 AIP 240 60 120 420 . 360 120 420 360 CE No Totals 600 • 240 60 900 120 780 00 27 Various Overlay Projects/Selected on Local Pnority N/A from:- N/A • to: N/A • 07 1 P N/A W S CN 6/1/2011 STP(U) • 228 32 260 260 EA No .Totals 228 • 32 260 260 • 19 28 •. Longfiber Rd &Washington Ave Intersection from: to: New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn, curb, gutter, sidewalks. 03 05 06 P N/A 8 W T O PE CN 1/1/2011 3/1/2012 STP(U) STP(U) 100 700 - 14 95 114 ` 795 114 795 CE Yes 3/1/2012 Totals 800 109 .909 114 795 Report Date: July 27, 2010 Page 7 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 •A. TiFund I-3 m c U Priority I Number Project Identification PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done • Improvement Type(s) Status • Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase . Phase Start (mm/dd/yyyy) Source Information Federal Funding State Fund1st Code State Funds Local Funds Total Funds Envir. Type RNV Required 4 Date (Mwyy) Federal Fund Code Federal Cost by Phase 2nd 3rd 4th Thru 6th 1 2 " 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT_ Project) possible curb, gutter and sidewalk 04 01 P .1 C S W T CN 4/1/2011 STP(U) 240 42 282 282 CE Yes • 01/01/07 Totals 240 42 282 282 17 30 Zier Rd - S 75th Ave to S 72nd 'Ave Zier Rd from: S 75th Ave , to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 P .15 C S T P PE CN 1/1/2011 6/1/2011 STP(E) STP(E) 22 75 7 20 29 95 29 95 CE Yes 6/1/2011 Totals 97 27 124 124 00 31 Gravel Road B.S.T. Various Areas from: City Wide to: • 07 P N/A • S PE CN 1/1/2011 6/1/2011 50 240 50 240 E50 240 CE No Totals • 290 290 290 16 32 Powerhouse Rd & Englewood Ave Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, possible roundabout 12 P N/A T P 0 C W CN 10/1/2013 STP(S) 504 74 5781 I 578 CE Yes 10/1/2013 Totals - 504 74 578 578 Report Date: July 27, 2010 Page 8 v. 5.7 - Supersedes previous editions Washington Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvemererogram From 2011 to 2016. Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid 140. B. Bridge No. ' C. Project TitleFederal D. Street/Road Name or'Number E. Beginning MP or Road - .Ending MP or Road • F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule • (Local Agency) Federally Funded Projects Only Project Phase 3 �� Fund Source Information Funding State Code • State Funds Local Funds Total Funds' Envir. Type (Mnvyy) UN Required Date Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th 6th Thru 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 • 18 . 19 20 21 14 33 48th Ave & SummitviewAve Signalization S 48th Ave • from: S 48th Ave to: Summitview Ave Signalizetion 12 P N/A P -T PE RWS CN CN 1/1/2013 6/1/2013 8/1/2014 STP(S) STP(S) STP(S) 25 25 554 4 4 81 . 29 29 635 29 29 635 CE Yes 8/1/2013 Totals 604 89 693 58 635 14 • 34 W Lincoln Ave & '8' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W. Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P 5 W T S P 0 G C PE RW CN 1(112012 1/1/2013 1/1/2014 . STP(E) STP(E) STP(E) 424 1047 1801 67 163 281 491 1210 2082 491 1210 2082 CE Yes - 1/1/2014 Totals • 3,272 511 3.783 491 1210 2082 16 3512 School Safety Projects Various Locations - Citywide from: . to: Crossing flashers, sidewalks, signing, other features p N/A W 1 I 1 I I 1 1 1 I CE . No Totals .• 14 36 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening end 'reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters an hydrants '. 03 04 06 • P .85 C G O P S T W PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(C) STP(C) STP(C) - 546 1090 6539 - 84 170 1013 630 1260 7552 - 630 1260 7552 EA Yes 1/1/2014 Totals 8,175 1267 9442 630 1260 7552 Report Date: July 27, 2010 Page 9 v. 5.7 - Supersedes previous editions WIWashington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: Amend Date: 6-15-2010 Adoption Date: 6-15-2010 Resolution No.: 2010-66 Functional Class 1 Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) v w Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally -Funded Projects Only Project Phase 3 m w Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds Enver. Type R/W Required Date (Mr Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 • 10 11 12 13 14 15 16 17 18 . 19 20 21 17 37 S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 01 12 06 P N/A W S P 0 . PE RW CN 1/1/2012 1/1/2013 1/1/2014 STP(C) STP(C) STP(C) 91 91 544 14 14 86 105 105 630 105 105 630 CE Yes 1/1/2013 Totals - 726 114 840 105 105 630 17 38 S 66th Avenue S66thAve from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 03 • P .76 W T S P PE CN 1/1/2012 7/1/2013 STP(E) STP(E) 23 1096 5 164 28 1260 28 1260 Yes 7!1!2012 Totals 1,119 169 1288 28 1260 14 39 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: Summitview Signal upgrade, radius improvements, tum lane extension • 12 P N/A W S T P PE RW CN 1/1/2013 1/1/2013 6/6/2013 STP(U) STP STP(U) 126 63 544 17 8 86 143 71 630 143 71 630 CE Yes 6/1/2012 Totals 733 111 844 • 844 14 40 40th Avenue and Englewood 40th Avenue from: 40th Avenue • to: Englewood traffic signal poles, upgrade controller 12 P NIA W T S P 0Replace PE RW CN 1/1/2013 1/1/2014 1/1/2014 STP STP STP - 95 63 145 13 8 20 108 71 165 108 71 165 CE Yes 1/1/2013 Totals 303 41 344 1-79 165 Report Date: July 27, 2010 Page 10 v. 5.7 - Supersedes previous editions Washington department of Transportation Agency: Yakima Co. No.:. 39 City No.: 1485 Co. Name:. Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemenegram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Resolution No.: 2010-66 Amend Date: Functional Class Priority Number Project Identification A. PIN/Federal Ald No. B. Bridge No. C. Project Title D. StreetlRoad Name or NumberRequired E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RM( Date (MM/yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 .16 17 . 18 19 201 21 00 41 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps 12 P N/A W S P PE RW CN 1/1/2013 6/1/2013 1/1/2014 - STP STP STP 126 63 315 18 8 43 144 71 358 144 71 358 CE Yes 1/1/2013 Totals - 504 69 573 215 358 14 . 42' 1st Street and I Street 1st Street from: 1st Street to: 1 Street Replace andupgrade traffic signal equipment 12 P N/A W T S P 0 PE CN 1/1/2011 1/1/2012 STP STP 32 126 - 5 17 37 143 37 • - 143 CE . No Totals 158 22 180, 37 143 16 • 43 Washingtdn Ave. Railroad Grade Separation Washington Ave. from: Longfibre Road to: Railroad grade overpass including all utilities • 01 P • .25 o O P S T W PE RW CN 6/1/2014 1/1/2015 1/1/2016 STP(U) STP(U) STP(U) 820 _ 3150 6552 189 630 1008 1009 3780 7560 1009 3780 7560 CE _ Yes 1/1/2016 Totals 10,522 1827 1234912349 16 44 Frontage Road & "H" St. Loop N. 8th St. from: "H" St. to: 1-82 Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for future development and Terrace Heights connection. 01 P 1.3 C GG P S T W PE RW CN 1/1/2013 6/1/2014 1/1/2016 STP(U) STP(U) STP(U) 272 349 2352 43 •55 340 315 404 2692 - 315 404 2692 CE Yes 1/1/2015 Totals 2,973 438 . 3411 315 3096 Report Date: July 27, 2010 Page 11 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name oret/Road• E. Beginning MP or Road - EndingMP or Road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule • (Local Agency) Federally Funded Projects Only Project Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code • State Funds Local Funds Total Funds Envir. Type RMI Required Date (MM/yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 45 ' 16th Ave. Corridor 16th Ave. from: SR -12 to: Ktahington Ave.Nalley Mall Widen roadway, curb, gutter, sidewalk, lighting. 04 P 3.5. C G 0 P T T W PE 1/1/2014 STP(U) 120 17 137. , 137 CE Totals 120 17 137 137 14 46 40th Ave. Corridor 40th Ave. from: SR -12 . to: Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting. 04 P 3.2 C 0 G P S W T PE 1/1/2013 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 14 47 • Nob Hill Corridor Nob Hill from: 1-82 to: S. 16th Ave. Widen roadway, sidewalk, curb, gutter, lighting • 03 04 P 2.7 C G 0 P T T PE 1/1/2012 STP(U) 120 17 1371 137 CE • W Totals • 120 17 137 137 ' 14 48 S. 1st St/Main St. Corridor S. 1st St./Main St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap to widen roadway, curb, gutter, sidewalk, lighting. 04 P 2.0 C G -0 P S T W PE 1/1/2014 STP(U) 120 • 17 1371 137 CE Totals 120 17- 137 137 Report Date: July 27, 2010 Page 12 v. 5.7 - Supersedes previous editions WashingtoDepartment of Transportation Agency: Yakima Co. No.: 39 City No.: .1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvemel ogram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number . • Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. StreeURoad Name or Number • E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement I Type(s) ; CO Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code • State Funds Local Funds Total Funds Envir. Type R/W Required Date (My) Federal Fund Code Federal Cost by Phase 1st6th 2ndwy 3rd 4th Thru 1 2 .3 4 5 6 7 8 9 10 11 12 . 13 14 15 16 '17 - 18 . 19 . ' 20 21 00 49 Storm Drains/Vegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2011 1/1/2011 100 900 .100 900 100. 900 ` EA No Totals 1000 1000 1000 17 50 Reconstruction Rudkin Rd Rudkin RdP from: E Viola Ave . '• to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P .76 W T S PE CN - 1/1/2012 1/1/2013 STP(C) STP(C) 109 945 TPP 945 . 27 106 136 1996 136 1996 CE / No Totals 1,054 945 133 2132 136 1996 16 51• • E Mead Ave Reconstruolion E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 p .76 C G 0 P T T PE CN 9/1/2012 4/1/2013 STP(S) STP 122 1730 TPP TPP 23 206 7 70 152 2006 152 2006 CE No Totals 1,852 229 77 2158 152. 2006 17 52 - S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr • • . to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 0 C ID T W .S PE RW CN 1/1/2012 • 1/1/2013 4/1/2013 AIP AIP AIP 131 382 1667 20 59 260 151 441 1927 . 151 441 • 1927 EA Yes 4/1/2012 Totals 2180 339 2519 151 2368 Report Date: July 27, 2010 Page 13 v. 5.7 - Supersedes previous editions "Ti Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs In Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase -� m Fund Source Information Expenditure Federal Funding State Funds Local Funds Total Funds Envir. Type R/W Required Date (Mavyy) Federal Fund Code . Federal Cost by Phase State Fund Code 1st 2nd 3rd 4th 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 53 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 10 W S T P PE RW CN 1/1/2014 6/1/2014 1/1/2015 STP(C) STP(C) STP(C) 272 349 2352 43 55 340 315 404 2692 315 . 404 2692 EA Yes 1/1/2013 Totals 2,973 438 3411 3411 17 54 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 05 06 P 2 W S PE RW CN 1/1/2013 6/1/2013 6/1/2014 STP(U) STP(U) STP(U) 219 327 2980 - 34 51' 244 • 253 378 3224 253 378 3224 EA Yes 6/1/2013 Totals 3,526 329 3855 631 3224 • 14 ' 55 W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: S. 6th St. Install missing sidewalks on southside of Nob Hill. 12 P 2 8 P T W S PE RW CN 1/1/2013 6/1/2013 3/1/2014 STP(S) STP(S) STP(S) 55 107 321 8 19 57 63 126 378 63 126 378 CE Yes' .' 3/1/2013 Totals • 483 84 567 189 378 00 56 from: • Beech St Pedestrian Connection Beech St Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under SR82 to Greenway 06 32 P 1'0 P T PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 57 189 504 7 25 68 64 214 572 64 214 572 CE• Yes 1/1/2013 Totals 750 100 850 278 572 Report Date: July 27, 2010 Page 14 v. 5.7 - Supersedes previous editions All 11. T Washingtore Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvemerogram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification 'A. PIN/Federal Aid No.- B. Bridge No. C. Protect Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement. Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars. Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase 0.-m ca. d . Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type' R/W Required Date (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 ' 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ' 21 16 57 WLincolnAveSidewalks W Lincoln Ave from: N 56th Ave to: N 29th Ave Sidewalks; meters and fire hydrants replacement or relocation 12 P 2 0 • P T T W PE RW CN 1/1/2013 6/1/2013 1/1/2014 STP(S) STP(S) STP(S) 43 86 572 7 15 88 50 101 660 50 101 660 CE Yes 1/1/2014 Totals 701 110 . 811 151 660 14 58 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities' 01 P .25 W T S P O PE RW CN 6/1/2013 1/1/2014 1/1/2015 STP(U) STP(U) STP(U) 820 3150 6552 189 630. 1008 1009 3780 7560 1009 • 3780 7560 CE Yes 1/1/2014 Totals •10,522 1827 12349 1009 11340 16 59 City wide Pathway Connections Yakima from: to: Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Naches Rail Spur, signage and amenities 01 P 4.0 O P S T W PE RW CN 6/1/2012 1/1/2013 1/1/2014 STP(U) STP(U) STP(U) 252 756 1890 c 38 88 315 290 844 2205 290 844 2205 CE Yes 1/1/2013 Totals • 2,898 • 441 3339 . 290 .844 2205 17 60 34th Ave & River Rd Improvements Fruitvale Blvd. from: 34th Ave. to:, River Rd. • Intersection improvements including lumination, sewer, water, curb, water and sidewalks 01 .12 P N/A O P S T W PE CN 1/1/2013 6/1/2013 STP(U) STP(U) 63 567 5 76 68 643 . - 68 643 CE No Totals 630 ' 81 711 711 Report Date: July 27, 2010 Page 15 v. 5.7 - Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Ald No. , B. Bridge No. C. Project Title D. ,Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State . Funds Local Funds Total Funds „ Envir. Type R/W Required Date (Mhvyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21' 17 61 Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. 01 05 12 P 1.0 O P S T w PE RW CN 1/1/2013 6/1/2014 1/1/2015 STP(U) STP(U) STP(U) 218 327 2980 34 51 244 252` 378; 3224 . •. 252 378 3224 CE , Yes 1/1/2015 Totals 3,525 329 3854 ' 252 3602 14 62 W Yakima North/South Connector to West Valley Unknown road from: North - South • to: in West Valley City & County joint project to build/extend roadways. 01 04 06 P 6.0 C G 0 P S T W PE 1/1/2014 STP(U) 120 17 1371 137 CE Totals 120 17 137 137 16 63 • Occidental Road Construction. from: 58th Ave. to: 64th Ave. Construct roadway 01 P 38 S W P T PE 1/1/2014 100 1001 100 • Totals 100 • 100 • 100 00 64 86th Ave. Road Construction from: Occidental to Coolidge Construct roadway 01 P 27 e PE 1/1/2014 100 1001 , 100 Totals 100 ' 100 100 Report Date: July 27, 2010 Page 16 v. 5.7 - Supersedes previous editions Washington Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvemerlogram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. .B: Bridge No. C. Project Title D. Street/Road Name or Number •E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done • Improvement I Type(s) m ai Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2• •3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 . 18 19 . 20 21 16 65 64th Ave. Roadway Widening. , from: Nob Hill Blvd to: Tieton Drive. Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. 04 .06 03 S 0.5 w G P T C O ALL_ – .12014— Ci – ZO 1 STP(U) 900 • 200 1100 200 900 EA` .YES 4/1/2011 Totals 900 200 1100 . 200 900 00 66 YVT Railway Rehabilitation 6 Museum 3rd Ave from: '.3rd Ave to: Pine St Car Barn, Museum Restoration and Pathway 03 P N/A •PE C S T W P CN 1/1/2014 6/1/2014 STP(E) STP(E) 18 1900 :32 285 50 2185 • 50 2185 • EA• No • Totals 1,918 317 2235 2235 16 - 67 Roadway City Wide Shoulder Improvements City Wide from: - to: • City Wide shoulder improvements, PM10 abatement.• • 01 - P . N/A S PE CN 4/1/2012. 7/1/2012 CMAQ CMAQ 24 480 3 65 27 545 27 545 CE - • No Totals • 504 • 68 ' 572 572 00 68 • Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights 14 32 P - .25 - - T O PE CN 1/1/2013 3/1/2014 STP(E) STP(E) 252 3150 34 412 286 3562 286 3562 ' CE No Totals 3,402 446 3848 • 286 - 3562 Report Date: July 27, 2010 Page 17 v. 5.7.- Supersedes previous editions Washington State Department of Transportation AMP -en Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number - Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title Street/Road Name.or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done , Improvement Type(s) N Total Length Utility Codes • Project Costs in Thousands of Dollars Federally Funded m Fund Source Information Expenditure Schedule Projects Only a Federal Funding (Local Agency) RNVD. o a Phase Start (mm/dd/yyyy) Federal Fund Code Federal Cost by • Phase State Fund Code • State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th Envir. Type Required Date (M� 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 69 William O. Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements, connections, and signage to Cowiche Canyon Trail. 14 32 P N/A 0 S P W PE CN 1/1/2011 7/1/2011 STP(E) . STP(E) 10 109 2 17 12 126 12 126 . CE No Totals 119 19 138 138 00 . 70 YVT Pathway YVT Railway Corridor. from: to: Development pathway in West Valley area including 53rd Ave, Wide Hollow, 64th Ave, Ahtanum including all utilities and signage 03 32 P N/A O P S T W CN 6/1/2014 STP(U) 945 126 1071 1071 CE No Totals 1,260 164 1424 1424 00 71 City wide Alleys from: to: Pave alleys throughout the city. • 07 P 5 G P S w T CN 6/1/2011 75 75 25 25 25 CE No Totals• 75 75 25 25 . • 25 • 14 72 from: Summitview Ave. Grind & Overlay 14th Ave to: 56th Ave Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA ramps ' 06 07 . P 2.64 PE CN 1/1/2011 6/1/2011 ARRA- ARRA- 50 1950 50 1950 50 1950 1 CE No Totals 2,000 2000 2000 i Report Date: July 27, 2010 Page 18 v. 5.7 - Supersedes previous editions 71 Washingto Agency: Yakima Co. No.: 39 City No.: 1485. Department of Transportation Co. Name: :Yakima Co. MPO/RTPO: YVCOG Six Year Transportation .Improvemei rogram From 2011 to . 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title ' . . D. Street/Road Name or Number • E. Beginning MP or Road - Ending MP or Road- F. Describe Work to be Done Improvement Type(s) • rn .Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded - Projects Only m a ` n. Phase • Start (mm/dd/yyYY) Fund Source Information • Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required q ed _ Date (MM y) Federal Fund Code Federal Cost b Phase 1st 2nd 3rd 4th 6th 1 2' 3 • 4 5 6 7 8 9 10 11 12 13 14 15 16- 17 18 - 19 •20 21 17 73 River Road Improvements from: 6th Ave to: 16th Ave Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage 03 05 06 07T P 0.50 wALL G P 1/1/2014, • STP(U) 1298 202 1500 1500 CE Yes 6/1/2015 Totals 1,298 • 202 1500 1500 74 Nob Hill Blvd from: 49th Avenue to: 64th Avenue Widen, curb,gutter, sidewatk, lighting, drainage, grind and overlay full width 05 06 07 12 13 P 0.97 C P T G O CN 7/1/2012 STP(U) 2700 421 31211 3121 CE No Totals 2,700 421 3121 3121 75 18th Street Underpass from: Yakima Ave to: 18th Street Repair or replace 18th Street Underpass • 10 11 P .01 P T C PE 4/1/2011 BRAC 501 I 50 50 N/A No Totals • 50 50 • 50 76-06 88th AvenueC from: Tieton Drive to: Summitview Ave Construct curb, gutter, sidewalk and stormwater runoff treatment on the east side of 88th. 1-2 13 P 0.48 C T G PE RW CN 1/1/2012 2/1/2012 6/1/2012 - WSDOT WSDOT WSDOT 50 25 320 10 50 25 330 50 25 330 CE Yes Totals 395 10 405 405 Report Date: July 27, 2010 Page 19 v. 5.7 - Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010. Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PINIFederal Ald No. B. Bridge No. C. Pro ect Title 7 D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done Improvement Type(s) Status Total Length d v o m Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Fu ed Projects O' Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type RNV. Required Date. (M,Y Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru; 6th 1 2 3 4 5 6 7 8 9 10 11 12 . 13 14 15 16, 17 18 19 20 • 21,. 77 Westside Transit Center (Transit) from: N/A • to: N/A Construct a West Side Transit Center (Park & Ride Facility) 23 P - N/A S PE 4/1/2013 5309(Bus) 15000 1000 16000 2000 14000 Yes Totals 15,000 1000 16000 2000 14000 78 Transit Operating Hours Expansion from: to: Expand Transit Operating Hours an hour later into the evening except for one route that will be expanded an hour earlier 23 P .. ALL 3/1/2011 . 5307 428 4281 428 CE Totals 428 428 428 79 Terrace Heights Moxee Route Expansion from: to: . Expand route service to Terrace Heights and Moxee • 23 P ALL 1/1/2011 5307 288 2881 288 CE Totals 288 288 • 288 80 Kittitas-Yakima Commuter Bus from: to: Expand Route Service to Kittitas County 23 P . ALL 1/1/2011 5307 602 6021 602 CE' Totals 602 602 602 Report Date: July 27, 2010 Page 20 v. 5.7 - Supersedes previous editions Washington epartment of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvemereogram From 2011 to 2016 Hearing Date: 6-15-2010 Adoption Date: 6-15-2010 Amend Date: Resolution No.: 2010-66 Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Protect Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to be Done . Improvement Type(s) Status Total Length] Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase I Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (Myy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 . 11. 12 13 14 15 16 17 18 19 20 21 81 Sunday Bus Service from: to: Expand existing bus service to operate every two hours four times per route on Sunday • 23 S N/A ALL 1/1/2011 CMAQ • 200 200 200 CE No Totals 200 200 200 16 82 64th Ave. Roadway Widening from: Washington Ave to: Nob Hill Blvd Widenroadway, curb, gutter, sidewalks, lighting and drainage - 03 04 06 P 1.0 w G P T 0 C • ALL 1/1/2012 STP(U) 1800 281 20811 • 200 1881 CE Yes 1/1/2013 Totals 1,800 281 2081 200 1881 00 83 PowerhouseANilliam 0 Douglas Trail Connector from: Powerhouse/Williow St. • to: 6th Ave/I Street Paved pathway 32 S 1.5 G P T O 0 ALL .x/4/2611- '1 /t /2010 283 2831 33 250 CE - No • Totals 283 • 283 33 250 • Report Date: July 27, 2010 Grand Totals for Yakima 132,034 15,463 27,833 175,330 28,954 26955 38,160 81, Page 21 v. 5.7 - Supersedes previous editions ITEM TITLE: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. c For Meeting of: August 3, 2010 Hold Public Hearing and consider resolution to Amend the Six-year Transportation Improvement Program (TIP) by adding four projects to the six- year TIP. SUBMITTED BY: Michael Morales, Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576-6678 Brett Sheffield, Chief Engineer 576-6797 SUMMARY EXPLANATION: The Six-year Transportation Improvement Program (TIP) is a list developed by the City that includes all of its transportation related projects. The City's existing six-year TIP has a list of projects that amount to around $175 million. Only projects that are listed as having funding secured are guaranteed to be constructed. • Each year near the end of June, the City is required by RCW 35.77.010 and RCW 36.81.121 to update its six-year TIP for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue of federal revenue will be used. Once the TIP has been approved by the City Council, it is then added to the Statewide Transportation Improvement Program (STIP). Only projects that are listed on the STIP can be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. • The STIP can be amended during the year to add projects that become available for federal or state funding. The first step to amend the STIP is for the City to amend its six-year TIP. Resolution X Ordinances (continued on Page 2) Other (Specify) Amended STIP Contract Mail to (name and address): Phone: Funding Source: STP Grant and Transportation Enhancement Grant APPROVED FOR SUBMITTAL: .=� City Manager STAFF RECOMMENDATION: Adopt resolution amending the STIP BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Page 2 Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (TIP) for the 2010-2015 planning period. The proposed amendments consist of the following projects: 1. 64th Avenue Roadway Widening, Washington Avenue to Tieton Drive (existing TIP project #65).., This project is proposed to be divided into two projects. The first project (updated priority #65) consists of improving 64th Avenue from Nob Hill Boulevard to Tieton Drive by constructing a 39 - foot roadway with curb, gutter, sidewalk, illumination and stromwater treatment. The second project (TIP Project #82) consists of making the same improvements to 64th Avenue between Washington. Avenue and Nob Hill Boulevard. The project was divided into two projects because the maximum dollar amount available per project at the last call for projects to be funded by the Surface Transportation Program (STP) was $900,000. The City was successful in obtaining a $900,000 grant for this project. 2. Powerhouse/William 0. Douglas Trail Connector (TIP Project #83). The City was successful in obtaining a $283,278 Transportation Enhancement grant for this project, which will construct a pathway that will connect the Powerhouse Trail to the William 0. Douglas Trail.