Loading...
HomeMy WebLinkAboutColumbia Reach Pack - Stormwater Maintenance Agreement City of Yakima Codes Division 129 N. 2nd St. —2nd Floor Yakima, WA 98901 STORMWATER MAINTENANCE AGREEMENT THIS AGREEMENT TO MAINTAIN STORMWATER FACILITIES IS ENTERED INTO THIS VI DAY OF Seek-A.4r 20]. BY AND BETWEEN THE CITY OF YAKIMA(HEREINAFTER "CITY")AND 6.A4..�..+4- R_c...S►AND ITS HEIRS, SUCCESSORS, OR ASSIGNS(HEREINAFTER"LANDOWNER"). SWPPP Permit No.: )13lx35-- Parcel No.: I iiirb ESN oZ1 Parcel Full Legal Description: Scc Lsu�71�1 BSI TV101ShiP /3, Ramie /g NE) Project Name:Cot Sorg ¢ot1` C.4 WITNESSETH WHEREAS,the Landowner has submitted for approval by the City a permit application and Site Plan,which require the construction and installation of stormwater management facilities pursuant to the City of Yakima Post-Construction Stormwater Runoff Ordinance;and WHEREAS,the Post-Construction Stormwater Runoff Ordinance requires,as a condition of permit approval,a maintenance agreement between the City and the Landowner to ensure the Landowner will construct and maintain the stormwater facilities identified in the Site Plan;and WHEREAS,the City and the undersigned, its successors and assigns,including any homeowners association, agree that the health,safety, and welfare of the residents of the City of Yakima,Washington requires that on- site stormwater management facilities be constructed and maintained on the Property; and WHEREAS, under said Ordinance it is provided that private stormwater management facilities must be maintained by the property owner, and a maintenance agreement must be executed before the development plan is approved. Stormwater Maintenance Agreement(April 2018) Page 1 NOW,THEREFORE, in consideration of the foregoing premises,the mutual covenants contained herein, and the following terms and conditions,the parties hereto agree as follows: 1. The Landowner shall construct and install stormwater management facilities as depicted and shown on the Site Plan, in accordance with the plans and specifications(attach Site Plan that shows type and location of stormwater facilities to be maintained). 2. The Landowner shall maintain the stormwater management facilities as shown on the Site Plan in good working order acceptable to the City as outlined in maintenance schedule attached hereto. 3. The Landowner hereby grants permission to the City, its authorized agents,and employees to enter the property and to inspect any stormwater management facilities pursuant to Chapter 7.83 of the Yakima Municipal Code, Post-Construction Stormwater Runoff Ordinance and this Maintenance Agreement. 4. In the event the Landowner fails to maintain stormwater management facilities as shown on the Site Plan in good working order acceptable to the City,the City may enter the property and take whatever steps it may deem necessary to maintain said stormwater facilities. It is expressly understood and agreed that the City is under no obligation to maintain or repair said facilities, and in no event shall the Agreement be construed to impose any such obligation on the City. 5. In the event the City, pursuant to this Agreement, performs work of any nature,or expends any funds in performance of said work for labor, use of equipment,supplies, or materials,the Landowner shall reimburse the City on demand,within a time frame specified by the City for all costs incurred, including reasonable attorney's fees in the event that an action to collect such costs must be instituted.Costs, if not paid,shall become a lien on the property. 6. It is the intent of this Agreement to insure the proper maintenance of stormwater management facilities by the Landowner; provided, however,that this Agreement shall not be deemed to create or affect any additional liability of any party for damage alleged to result from or be caused by stormwater management. 7. The Landowner,its executors, administrators,assigns, and any other successors in interest,shall indemnify and hold the City and its agents and its employees harmless for any and all damages, accidents, casualties, occurrences,or claims which might arise or be asserted against the City from the construction, presence, existence, or maintenance of the stormwater management facilities by the Landowner or the City. 8. In the event a claim is asserted against the City, its agents, or employees,the City shall notify the Landowner and the Landowner shall defend at his own expense any suit based on such claim. If any judgment or claims against the City, its agents, or its employees shall be allowed,the Landowner shall pay all costs and expenses in connection therewith. 9. This Agreement shall be recorded among the land records of Yakima County,Washington,and shall constitute a covenant running with the land,and shall be binding on the Landowner, its administrators,executors, assigns, heirs, and any other successors in interest. Stormwater Maintenance Agreement(April 2018) Page 2 IN WITNESS THEREOF,the parties hereto acting through their duly authorized agents have caused the Agreement to be signed,sealed and delivered: k qtA /)/ I .„lri— Name/Title Name/Title 3 )07 goal /4k1,'4-1 i'4& 1fYDz Address Address State of Washington ) )ss. County of Yakima I certify that I know or have satisfactory evidence that /is/are the person(s)who appeared before me,and said person(s)acknowledged that he/she/they signed this instrument and acknowledged it to be his/ er/their free and voluntary act for the uses and purposes mentioned in the instrument. Witness my hand and official seal hereto affixed the day and year first above written. 4:4( 14/1 - 614 Notary Public in and for the State of Washington, residing in L/a -"-4-- . 0111110111/11. Dated at Yakima, Washington,this 2S day of �.�o - — , 2018_. %�� , 1E B1 , Approved By: r.V• NOTARY � PUBLIC •2 City Engineer 1' •#',o• ••NO: •:&N.7 1H•u `,��� Accepted By: CI Mana7 - CITY CONTRACT NO:____________ RESOLUTION NO: A/12 Stormwater Maintenance Agreement(April 2018) Page 3 Exhibit A Legal Description of Parcel 181315-11021 That part of the Northeast '/4 of the Northeast '/4 of Section 15, Township 13 North, Range 18, E.W.M., bounded as follows: COMMENCING at the intersection of the centerline of the right of way of North Yakima and Valley Railway Company and the West line of said subdivision;thence South 58°30' East along said railroad centerline 858.60 feet; thence North 4°37' East 313.80 feet; thence North 2°37' East 522.60 feet to the point of beginning; thence North 57°33' East to the centerline of the Union Ditch; thence Southeasterly along said centerline to the East line of said subdivision;thence Northerly along said East line to the Northeast corner of said Section 15;thence North 89°18' West along the North line thereof 370.00 feet;thence South 12°34' West 147.50 feet to the top of the South bank of a branch of the Naches River;thence along the top of said bank South 66°11' West to a line bearing North 2°37' East from the point of beginning; thence South 2°37' West to the point of beginning; Assessor's Parcel No. 181315-11021. CRP—River Road Storage Lease—Page 5 1 �L I I °""''L O D. \C T(3N.n °EA.. �--/ i—— l CAP .D ' ` °'` 1 s ::1$�"`mx:.. c:z:,-t 1 I /1 ��\ — -- _ \ O AN sad Ty , f /" / ® _w.ID. J I I o / / U Nn F I!�)i ail 4o� ////�/ F. wozl ] IIII/ �i , �rD�o / // / a s y�a II '� - ���///� \� ��pd Jt O� //�/// / CONSTRUCTION NOTES 3 6 0 S We Il1..a,. l 1 �F// // // O CONSTRUCT IHFlLTRAnOU STALES•C•0•B•PER DETAILS a.SHEET 2 3 Q C '�I II '`'°mob j/ yaD RQ� j/// j/ OO CONSTRUCT ASPHALT PAVEMENT SECTION PER DETAIL ON SHEET 2 I'7j}". 1-1 I p I/ W /�/ / / CONTRACT.TO HEW i ROAD AND MAINTAIN MINIMUM DARES O s/`/ gd /l a5 ///// sHDWN. a a I l 4p VA/ � �/ �.o //j//%/ ®CONSTRUCT 0FANOUT PER DETAIL SHOW.ON SHEET 2. V O �" W 'I// `N��// / N O ✓ // / LWTRACTOR ro FlE p FIT ASPHALT ROAD O HATCH EXISTING // ///l ��y� J/// // ©cawETE APRON. PARCEL NO. 18 1313-110 2 1 I //`A. dr 'H / // COOSTNUCT L"cuRB AND GUTTER TO ROUTE sToe.ECTFR TO SWNE '///4/.n.T_ s /�ei' 9c� 4. ////// 0 A ANo SWO E O. m' IA :4' // �� f� //i/i/ L -FaIN_ /// �j/ AA // // GENERAL NOTES/F J� T,C // F / /// s. { . /�_ i// �4`� '' /// SIES—— — // KRIFY ME LOCATION AND DEPM CC ALL UNDERGROUND FACNTES. — —''c=_——'� // /// STATE EDLAW ED BTENonHES MATATION A ALL EXCAVATOR WORK a UNDERGROUND T BE O • F.y rs 9 O /// // FACWTIES MROUW A ONE NUMBER LOCATOR SERVICE: ,Z,i h;"i`"SI ;'=i-s.1, `/,:'tv:'/`.':%: � •:.. , A R /// // 800.42{-5555. z YV 0.L..,-"". �n; L O // // 3 INSTALL ALL NORM IN ACCORDANCE NM TIE CURRENT WI N OF Z _''i Til,P_:,i. ti' '' ,� 4>."3' 'Df. ME SPEGFlCAnONS FOR ROAD.BRIDGE.AND MUNICIPAL "'?`yr�Ilih I,.`.:.¢�..'. �`„yam"./xTTt4,z'�'/ '�y�P=}i lJ�� ///// CONSTRUCTOR PREPARED BY ME WASHINGTON STATE DEPARTMENT a I ,k.�;'.,�.••^v;.> >.a'00 //// /// of TRANSPORTATION I N�g.� A CONTRACTOR TO PREVENT ANY SILT CONTAMINATOR OF STORM E,� 1„�. Sp rt!� e1Z*rp / z/.// WATER INFILTRATION PADUTIES BEFGTE.DURING,AND AFTER C IUD• rr N R.`:.•.:—t a,A ///%// CONSTRUCTION. I/2"R®AR k CM ,��,�p»,••;2, S STOMMATER DESIGN IS IN ACCORDANCE NM STATE UN: LS IC909 FOUND IgL /// ,�/ REQUIREMENTS. 0 w t—Pt� /§.,;,,ma-s,..\\\\ //%//P/ a CONTRACTOR TO VERIFY ALL EIEVAnarls. t LS 18929/..333 SET {`.=: .'?y yA\\ \ // // A a XI 1 PY;. ;,'w\\\ )///// // A;,$� } \\\\�//% /�/ / LAND USE INFORMATION SY2111541021 2 ti ^a€'..,,x >. ,'// // // bit WORM N —gip , 0flV1l RTE ire �'''iV,"• su a/ INFORMATION LEGEND. MY IMMO�E/I9IIEWE *ryO�YR TEl _ w '-:'/� ', A `- f IV l01 EIfOdIQ/AQN9MRE MG N.dt SOLE IEI , i �Ifj)fyI[Rb Ol.fOl/LI IO d.A DfR1019H:LM ARSU M9A9UMY 80 Y i 1 a''',,,'''..',.: M-0NI NItlW CITY OP YA[INA LAND UCH INFORMATION m Y g `/ - ,,,.1::.. :;>„ r�. p uoisAaaDumWNPaRD¢r €w e;...'gelA'•' ,A. W e LHOAL DBHCEIPS'ION ine:4:/f„�;: :r' .�.e , ,,,,, :.'IRO k R/01 CA Nam Drc IIMB o S A r_, ., ,H{M;1.'i PAIECt IRE awBI R/OU NII EI/1w/N IYI OID0IDDI TITRE TINNIER 42L F@-ILWIaI-II.WFD-II ks a vo.oe .'"'=' §u^sEA,:k'.-,,.., Ira© 2 U b g �64.�.� .1 %. ""' 1/ ��L ��.�......- SWALE "C" — STAGE STORAGE TABLE � , rI � DEPT AVG END AVG END CONIC CONIC W r......om..' ' lit *L iS 1 ' �1< 'i00 AREA H INC. VOL TOTAL VOL INC. VOL TOTAL VOL. H ELEV (sq. ft) (ft) (cu. ft.) (cu. ft.) (cu. ft) (cu. ft) .ri Q' OZ ,'[', wr..s r .r n e ssD w.ws 1,117 00 766 N/A N/A 0 00 N/A N/A U L. E. 0 '4 La 1,118.00 1.057 100 911.91 91191 N/A N/A QFa 1,119 00 1,395 1 00 1226 27 2138 18 N/A N/A P4 W; In 1,119 50 1,582 0 50 744.16 2882 35 N/A N/A -{n d i Q 11111111 "B" — STAGE STORAGE TABLE 0 w x 0 DEPT AVG END AVG END CONIC CONIC U 0 r AREA H INC VOL TOTAL VOL. INC VOL. TOTAL VOL E. y 0ELEV (sq. ft.) (ft) (cu. ft.) (cu. ft.) (CA (L) (Cu. ft.) NO SCALE . 1.11647 255 N/A N/A 000 N/A N/A 1,118 34 673 1.87 867.39 867 39 N/A N/A 0_ 7 'Ol► STORM WATER MANAGEMENT SUMMARY 25 YEAR-24 HOUR EVENT 3,1 s 3,• INFILTRATION PEAK REQUIRED VOLUME SYSTEM VOLUME PROVIDED GRADE A I v z€ SWALE R 531 ft, 867 f� r,iie3. curs.LIMED D., / STORM WATER MANAGEMENT SUMMARY 4 .2 T 28 YEAR-3 HOUR EVENT h D pOSILAILl V< INFILTRATION PEAK REQUIRED VOLUME ? cm SuRGRADE .nro•�.1K'.,'00 -,3..a� n.m'1rvrm. ' SYSTEM VOLUME PROVIDED " (I) E Y 1' - - .l 'L SWALE I 758 0 M7 10 .DO NOT[N.V. K1„ � -11 � � � � � ,o esa n.n.oiss7 @ROCK INFILTRATION-SWALE•S- a orHEAVY ASPHALT PAVEMENT SECTION ,.B s..o n .7 LL NO SOME s µ Wy STORM WATER MANAGEMENT SUMMARY Z^a 25 YEAR-24 HOUR EVENT S INFILTRATION PEAK REQUIRED VOLUME 1D ou r n6'LLr GRADE BEREA v m Z SYSTEM VOLUME PROVIDED w SWALE C 2,075 ft3 2,882.35 ft, KE ,sw O ' gun. STORM WATER MANAGEMENT SUMMARY ',',‘\q\j\pE'4,/,,,' 25 YEAR•3 HOUR EVENT INFILTRATION PEAK REQUIRED VOLUME a SYSTEM VOLUME PROVIDED > u f. SWALE C 2.532 1t 2.66z.35 1t' .OO NO,Mane, t i t5 E i 1 @[OCC INPILTRA7ION-SWALS'[- O. 0 Pie SCALE ( O . 2