Loading...
HomeMy WebLinkAbout08/21/2018 06H Wastewater Treatment Plant Sharpies Centrifuge Repair; Emergency Contract AuthorizationBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT 1 Item No. 6.H. For Meeting of: August 21, 2018 ITEM TITLE: Resolution ratifying the declaration of an emergency and authorizing execution of contracts for the labor and materials for repairing the Wastewater Treatment Plant Sharples Centrifuge SUBMITTED BY: Scott Schafer, Director of Public Works Mike Price, Wastewater/Stormwater Manager 249-6815 SUMMARY EXPLANATION: Mechanical issues prevented one of the Wastewater Treatment Plant's two centrifuges from providing the required sludge processing capacity. It was required that the Sharples centrifuge be shipped off-site for evaluation and repair in order to restore capacity, leaving the facility at risk of not meeting Department of Ecology (DOE) sludge processing requirements should a failure occur with the City's second centrifuge. The Wastewater Division followed the City's Emergency Purchasing Policy in immediately contracting for the emergency repair of the centrifuge repair to expedite the return of the centrifuge to provide the redundancy required of the City's National Pollutant Discharge Elimination System (NPDES) permit with DOE. The centrifuge was shipped to Sentrimax Centrifuges Inc., a firm qualified to perform all evaluation and repairs at the same location to expedite the return of the centrifuge to the Wastewater Treatment Plant. It is in the best interest of the City to declare an emergency dispensing with the necessity for bidding for services, material, and equipment and supplies costing more than $25,000 and to authorize the execution of all applicable documents to repair the Wastewater Treatment Plant's centrifuge. Repairs on the Sharples centrifuge shall not exceed $72,900 from the Wastewater capital account. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: Yes Public Safety 2 STAFF RECOMMENDATION: Adopt Resolution BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type O resolution 8/9/2018 Cover Memo O COY Emergency PO Form 7/16/2018 Backup Material O Emergency PO Memo Attachment 7/16/2018 Backup Material O Repair Quote 7/16/2018 Backup Material 3 A RESOLUTION RESOLUTION NO. R -2018 - ratifying the declaration of an emergency and authorizing execution of all applicable contracts for the labor and materials for repairing the Wastewater Treatment Plant Sharples Centrifuge. WHEREAS, Article VI, section 6 of the City of Yakima Charter and the Yakima Municipal Code Chapter 1.80 provide that the City Council may declare an emergency dispensing with the necessity for bidding for services, material, and equipment and supplies costing more than $25,000; and WHEREAS, unexpected and unforeseen mechanical issues that were not a result of failure to maintain the centrifuges prevented one of the Plant's centrifuges from providing the required sludge processing capacity; and WHEREAS, the Wastewater Division Sharples centrifuge required repair to restore required sludge processing capacity; and WHEREAS, the Wastewater Division did not have the expertise and tools to repair the centrifuge and the repairs were required immediately; and WHEREAS, an emergency was declared by the City Manager on June 18, 2018 in order to expeditiously restore the centrifuge to service and begin work on the repairs; and WHEREAS, the City Council deems it to be in the best interest of the City and its residents to ratify the City Manager's declaration of an emergency, and authorize the execution of all necessary documents for contracts for the labor and materials for the repair of the Treatment Plant Sharples centrifuge, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The emergency, as declared on June 18, 2018 by the City Manager is hereby ratified, the City Council resolves that there is an emergency and adopts the foregoing recitals as findings, and the City Manager's execution of all appropriate documents for the labor and materials for the repair of the Treatment Plant Sharples centrifuge without calling for bids, is hereby ratified and approved. ADOPTED BY THE CITY COUNCIL this 21s1 day of August 2018. ATTEST: Kathy Coffey, Mayor Sonya Claar Tee, City Clerk City of Yakima Emergency Purchase Order Justification # 1806E 4 Requestor Name: Mike Price Your Depa ern/Division: Public Works7Wastewater Requestor Phone: 6815 Requisition (PR) N umber: Requested Vendor: Cost Estimate (incl. TAX): Sentrimak Centrifuges incorporate $75,000. Vendor's Address: 108 Sentry Drive, Mansfield, TX 76063 Vendor Contact Name: Jeff forenruori Vendor E -Mail : Vendor Phone: jeffjohannson@sentrirnax.corn (817) 453-8112 1 What is the emergency situation? Describe damages or loss of property or essential services that are/they be a result of this emergency. (Attach extra sheet if necessary.) One of the Treatment Plant's two centrifuges has failed and requires emergency repair. Loss of second centrifuge would require centrifuge rental at $38,000. per month to comply with Riosolids Perm t. 2. What labor and/or materials are required? Attach a copy of your quote or estimate. $75,000 estimated in labor and materials. 3. Did vendor quote prevailing wages, if applicable (e.g. repairs, construction, maintenance)? Yes E No 4. Was vendor informed of the Intent and Affidavit filing requirements with L&I? Yes x No 5. Does vendor have a current certificate of insurance on file with the City? Check IC http://cityice/purchasinq/contractornist/ Yes No 6. Are federal funds being used? If federal funds are being used, a cost price arialy Aluihiffi lffi must be done at earliest opportunity and a copy sent to Purchasing. Yes No X STATEMENT OF NEED: My division's recommendation for an emergency purchase order and waiver of the quote or bib requirements is based upon an objective review of the emergency situation and appears to be in the best interest of the City. 1 understand that if this purchase is over $50 000, or if any change orders to this purchase increase the amount to $50,000 or over that our division must initiate and prepare necessary information (Resolution) to advise City Cr:tuned that there has been an emergency situation requiring immediate action SItjt.1 Whir. NKR ce OM. Pmee 6,Zay YA.M.21 mr-Vostowmer 6/142015 wad A, to onoalyaki,..gov c.US Date 2grao6 .4 1441.53 Olt& 2 3 Mike Price Signature of Division Manager David Brown signature of Department Head Sue Ownby 01,914,:y paw ied Dowd 9,..an Ott M,own 4.), Vakin. cre.WaNritmgaten Ernail.dawd.b,own.vaidmawmj., c.us Date .20;845., 1154:07 -OW Mg:1.1v s,gned Soe Ownby, urtakm,..,Pughop,g. elmil,„(542#.2COMSA CO= e.115 Oat. 2018,060 11.55 OTCV Recommendation *f Approval by Purchasing Manager y m oval b Please complete entire form and forward to Purchasin Purchasing wiff fo ard to the City Mariager for final approvar Manager Date 6/15/2015 Date 6/15/2015 Date Date Memorandum 5 Wastewater / Stormwater Division 2220 E Viola Ave Yakima, WA 98901 TO: Scott Schafer, Director of Public Works FROM: Mike Price, Wastewater/Stormwater Division Manager DATE: June 15, 2018 Subject: Attachment to Emergency P.O. Form #1806E for Wastewater Treatment Plant Sharples Centrifuge Mechanical Repair The Wastewater Treatment Plant owns and operates two centrifuges for biosolids dewatering in order to meet Department of Ecology redundancy criteria. Presently, mechanical issues with one of the centrifuges have limited machine performance to the point where it cannot provide reliable process capacity. Restoration of reliable performance requires that the centrifuge be evaluated and repaired off-site at a qualified firm. The centrifuges are pollution control equipment that allow regulatory -compliant and cost effective biosolids handling by creating a compact biosolids cake that is one-tenth of the weight and volume of liquid biosolids. Biosolids must be regularly removed from the facility because City of Yakima coverage under the Department of Ecology Permit for Biosolids Management does not extend to biosolids storage. Without the centrifuge process, the monthly biosolids handling costs would inflate from the present $15,000 for dewatered cake hauling to $150,000 for liquid biosolids hauling until a rental centrifuge ($35,000 per month) could be procured. Staff identified a qualified firm in Texas to disassemble and perform an evaluation of the needed repairs, which has been accomplished. The estimate came back at $75,000. We attempted to obtain 2 additional quotes, however, it is problematic for vendors to reassemble the unit and take it to their shop to provide an estimate, or have the competitors go to the location of where the unit has been disassembled to provide their own quote. In the end, we decided to process this repair on an emergency PO because the additional time needed to orchestrate obtaining 2 more quotes was putting our biosolids permit in jeopardy. Sentrimax has provided a fixed scope of work with costs and it is imperative we proceed with repairs immediately at the same location. SENTRIMAl'C CENTRIFUGESI C 1 Date: June 20, 2018 To: City of Yakima Attention: Mike Price - Mike.Price@yakimawa.gov Steve Brown - Steve.Brown@yakimawa.gov Phone: 509-249-6015 Job #: 01943 RE: Inspection Report & Proposal- Sharples Model# DS -705 SER# R8818 6 Inspection Findings Upon disassembling the rotating assembly, the following is a list of our findings: Gearbox Assembly 1. Oil sample was sent out for analysis and results came back normal (please see attached report). There was considerable grease contamination originating from conveyor and spline shaft area suggesting compromised output seal (Photo 1). All bearings and seals require replacement. 2nd stage pinion has damaged bearing seat requiring replacement (Photo 2). No other external leaks found and run -outs to be within OEM specifications. All remaining components found to be in satisfactory condition. The following parts will be replaced: a. 0-ring/seal & gasket kit b. Complete bearing kit c. 1st stage cover W/2nd stage pinion assembly d. Spiral lock retainer e. Disk springs f. Lubricant meeting OEM specification Bowl Assembly 2. Small End (SE) Hub - All bearing fits and machined surfaces found to be within OEM specifications. 3. Large End (LE) Hub - All bearing fits and machined surfaces found to be within OEM specifications. 4. Bowl shell - All interference fits and machine surfaces within OEM specifications. 5. Bowl Shell Extension - Minor erosion repair required on 8x wear insert posts (Photo 3). Multiple grooves and washout around entire I.D. of machined caulk strips. Recommend machining I.D. of extension and installing raised caulk strips. (Photo 4) US 1 108 Sentry Dive! Mansfield, TX 1 76063 1 TF: 844-327-3632 Canada 1 9440 60"' Ave1 Edmonton, AB 1 T6E 0C1 1 TF: 866-247-5141 SENTRIMAl'C E r\1 i Ft f..f t# G E 6. Wear Inserts - All eight inserts are in satisfactory condition. 7. Wear Ring - Wear ring carbide inserts are starting to erode causing damage to stainless portion of ring. (Photo 5) 8. Solid End (SE) Pillow Block - Bearing fit and machined surfaces found to be within OEM Specifications. Lubricant nozzle lock nut damaged. 9. Liquid End (LE) Pillow Block - Bearing fit and machined surfaces found to be within OEM specifications. 10. Pillow Block Covers - All critical areas are found to be within OEM specifications. 11. Bowl Hub Flinger - All critical areas are found to be within OEM specifications. 12. Pully - Normal wear in grooves but still within specifications. Seal cap in good condition. 13. Gearbox Adaptor - All critical dimensions are within OEM specifications. 14. Tension Bar Nut - All critical dimensions are within OEM specifications. Conveyor Assembly 15. Tension Bar - All bearing fits and machined surfaces found to be within OEM specifications. 16. Spline Shaft - All critical areas are found to be within OEM specifications. 17. Feed Rotor - Minor erosion around discharge openings. Recommend fill weld repair and re- application of tungsten coating on wetted surfaces. (Photo 6) 18. Feed Liner - Major Washout. Replace with new liner and apply tungsten coating to wetted areas. (Photo 7) 7 19. Feed Nozzles - All eight carbide nozzles in satisfactory condition. Stainless holders have minor wash out and require repair. (Photo 8) 20. Re -Direction Shroud - All eight carbide inserts in satisfactory condition. All eight stainless inserts have major erosion. (Photo 9) US 1 108 Sentry Dive! Mansfield, TX 1 76063 1 TF: 844-327-3632 Canada 1 9440 60"' Ave1 Edmonton, AB 1 T6E 0C1 1 TF: 866-247-5141 SENTRIMAY CENTRIFUES INC 21. Tiles - Replace 200 eroded tiles. Remaining tiles are within working specifications. (Photo 10) 22. Spline Hub - All critical fits are found to be within OEM specification. 23. LE Seal Ring - All critical fits are found to be within OEM specification. 24. LE Flights - Hard surface on O.D. of flights in good condition and within working specifications. 25. Main Conveyor Bores - Re -align bores after all repair work has been completed. • 8 4 4 4 t Photo 1: Grease contamination found in gearbox Photo 2: 2nd stage pinion damaged bearing seat US 1 108 Sentry Dive ! Mansfield, TX 1 76063 1 TF: 844-327-3632 Canada 1 9440 60' Ave 1 Edmonton, AB 1 T6E 0C1 1 TF: 866-247-5141 SENTRIMAY CENTRIFUES INC 9 Photo 3: Bowl Extension Erosion Photo 4: Multiple Grooves & Washout in Between Machined Caulk Strips. Photo 5: Wear Ring Washout Photo 6: Feed Rotor Washout US 1 108 Sentry Dive ! Mansfield, TX 1 76063 1 TF: 844-327-3632 Canada 1 9440 60' AveEdmonton, AB 1 T6E 0C1 1 TF: 866-247-5141 SENTRIMAY CENTRIFUES INC 10 Photo 7: Feed Zone Liner Washout Photo 8: Nozzle holder washout Photo 9: 9: Feed insert Washout Photo 10: Washout on tile holders US 1 108 Sentry Dive ! Mansfield, TX 1 76063 1 TF: 844-327-3632 Canada 1 9440 60' AveEdmonton, AB 1 T6E 0C1 1 TF: 866-247-5141 �� ����NT����I C E N T R1,..F_ LJG� x� Qty 200 Large Tiles, Conveyor 8 Feed Inserts/Holders 1 Wear Ring 1 Lube Nozzle Lock Nut 1 Caulk Strip Material SUB Machine Cone 1 FeedZoneLiner 1 Bearing Kit 1 0 -Ring Kit 1 GB Seal Kit 1 Gear Box Bearing Kit 2 Disk Springs 1 Spiral Lock Retainer 1 2nd stage pinion assembly SUB Tungsten coat feed rotor 1 Fastener Kit 1 Lubricant 16 Grease Total Parts Price $53,698'63 os|umSentry Dive! wmosfielu rx|r0003|TF: o*«-3zr-3o z Canada 1 9440 60"' Ave1 Edmonton, AB 1 T6E 0C1 1 TF: 866-247-5141 11 SENTRIMAl'C C : Ek r\I T F=t 1.. F= U C3 Em I C 1 Scope of ork' - Replace all hardware, bearings, seals and lubricants & required new parts meeting OEM specifications - Preform repairs to damaged components - Assemble bowl assembly for balancing - Assemble conveyor for balancing - Dynamic Balance bowl and conveyor to OEM specifications - Assemble and fill gearbox - Assemble rotating assembly and purge conveyor bearings - Test run rotating assembly for eight hours recording temps and vibrations - Preform final inspection - Prepare for shipment Total Labor $10,600.00 Add: Return Freight $ 3,200.00 Total Cost of Repair $67,498.63 12 Please add an additional $5400.00 to have a Sentrimax technician on-site for the commissioning of the DS705, bringing total repair cost to $72,898.63. Thank you for the opportunity to provide you with this inspection report and proposal. If you have any questions or concerns, feel free to contact me at any time. Regards, Jeff Johannson - General Manager Sentrimax Centrifuges - ISO 9001:2008 Certified 108 Sentry Drive, Mansfield, TX 76063 Toll Free: 844-327-3632 1 Phone: 817-453-8112 1 Cell: 817-583-4892 jeffjohannson@sentrimax.com I www.sentrimax.com US 1 108 Sentry Dive! Mansfield, TX 1 76063 1 TF: 844-327-3632 Canada 1 9440 60"' Ave1 Edmonton, AB 1 T6E 0C1 1 TF: 866-247-5141