HomeMy WebLinkAbout08/06/2018 10 2019-2024 Six-Year TIP and YUACP Capital Facilities Element Public HearingBUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
1
Item No. 10.
For Meeting of: August 6, 2018
ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -Year
Transportation Improvement Program for the years 2019 to 2024,
and to amend the Metropolitan Transportation Plan; and B)Amend
the Yakima Urban Area Comprehensive Plan Capital Facilities
Element and continue Public Hearing to the August 21, 2018, City
Council Meeting for the second Public Hearing
SUBMITTED BY: Scott Schafer, Director of Public Works
Brett Sheffield, Chief Engineer - 576-6797
SUMMARY EXPLANATION:
A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to
update its Six -Year Transportation Improvement Program (T I P) for submittal to the Washington
State Department of Transportation. This Plan must include all transportation projects for which
state gas tax revenue and federal revenue will be used.
The proposed 2019-2024 TIP includes fifteen projects that have funding. The funded projects
are listed below by Priority Number:
#3 — Garfield Elementary Safety Improvements
#4 — Yakima Valley Transportation Company Preservation
#5 — Spring Creek Road Reconstruction
#6 — South 36th Avenue Reconstruction
#7 — Sorenson Road Reconstruction
#8 — Bravo Company Boulevard
#11 — Cowiche Canyon Trail
#12 — N.34th Avenue/Fruitvale Boulevard & N. 34th Avenue/River Road Roundabouts
#13 — Complete Street Projects
#14 — East Nob Hill Boulevard and Fair Avenue Intersection Improvements
#15 — S. 80th Avenue Wide Hollow Creek Bridge
#16 — Wide Hollow Road Bridge in the Vicinity of 89th Avenue
#17 — West River Road Improvements
#22 — 64th Avenue and Ahtanum Road Intersection Improvements
#24 — McClure Elementary School Vicinity Safety 1 mprovements
2
Attached is the complete 2019 — 2024 Six -Year TI P, which describes each project. The City will
continue to seek funding for the remainder of the projects included in the 2019-2024 TIP.
City Council and the public are welcome to add other arterial system projects to the list. The Six -
Year TI P project listing will be finalized at the August 21st hearing and sent to the Yakima Valley
Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as
those administered by the Federal Highway Administration (FHWA) and the Federal Transit
Authority (FTA), projects must be included in the Statewide Transportation Improvement
Program (STI P). The STI P is a prioritized program of transportation projects, complied from
local and regional plans, along with the Washington Transportation System Plan (WTP), which
provides a backbone for developing projects for the intermodal transportation network in the State
of Washington.
The STI P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Citizen participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six-year Transportation Program; holding at least
one public hearing during its development.
B) The City is in need of amending the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the adopted Six -Year TI P for 2019 to 2024. This will ensure
that we are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporating only those projects
that are adopted in the STIP and is not subject to the "once a year" change required under the
laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima -area media, including to Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED:
STRATEGIC PRIORITY:
APPROVED FOR
SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
Continue Public Hearing on August 21, 2018.
BOARD/COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description Upload Date
2019 - 2024 Six -Year TIP 7/23/2018
Type
Coyer Memo
3
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road -Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
North 1st Street Revitalization, Phase 2
N. 1st Street
from: 'H' Street to: 'N'Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
06
12
P
0.50
P
T
G
C
W
S
0
CN
1/1/2020
BUILD
4,320
TIB
1,080
0
5,400
5,400
CE
Yes
12/31/2018
Totals 4,320
5,400 0 5,400
14
2
North 1st Street Revitalization, Phase 3
N. 1st Street
from: MLK Blvd. to: 'H'Street
Improve North 1st Street by rehabilitating the pavement
and lane markings, removing on -street parking,
enhancing street and pedestrian lighting, constructing
median islands and installing various pedestrian and
decorative elements.
06
12
P
0.48
P
T
G
C
W
S
0
CN
1/1/2020
BUILD
4,320
TIB
1,080
0
5,400
5,400
CE
Yes
12/31/2018
Totals 4,320
5,400 0 5,400
19
3
Garfield Elementary Safety Improvements
Various Streets
from: to:
This project will make various pedestrian safety
improvements in the vicinity of Garfield Elementary
School, such as, constructing sidewalk, improving
roadway crossings, installing flashers.
12
S
N/A
P
T
0
CN
1/1/2019
SRTS
141
141
141
CE
Yes
1/1/2019
Totals 141
141 141
14
4
Yakima Valley Transportation Company Preservation
Yakima Avenue
from: Yakima Avenue to: 6th Avenue
This project will remove and replace a portion of the
existing trolley rail in the vicinity of the intersection
of 6th Avenue and Yakima Avenue.
03
S
0.02
O
CN
1/1/2019
STP(E)
52
52
52
CE
No
Totals 52
52 52
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
5
Spring Creek Road Reconstruction
Spring Creek Road
from: Washington Ave. to: 36th Avenue
Widen roadway to three lanes, install curb, gutter,
sidewalk and street lights.
03
S
0.85
S
W
CN
1/1/2019
1,920
1,920
1,920
SEPA
Yes
3/1/2017
0 1,920 1,920 1,920
17
6
S. 36th Avenue Reconstruction
36th Avenue
from: Spring Creek Rd. to: Sorenson Rd.
Widen roadway to three lanes, install curb, gutter,
sidewalk and street lights.
03
S
0.40
S
W
CN
1/1/2019
905
905
905
SEPA
Yes
1/1/2019
0 905 905 905
17
7
Sorenson Road Reconstruction
Sorenson Road
from: 36th Avenue to: 38th Avenue
Widen roadway, install curb, gutter, sidewalk and
street lights.
03
S
0.14
S
W
CN
1/1/2019
320
320
320
Yes
1/1/2019
Totals 0 320 320 320
16
8
Bravo Company Boulevard
North 10th Street
from: 'H' Street to: Lincoln Ave.
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
06
S
0.65
P
T
W
S
0
CN 11/1/2019
I
I
I LIFT
I 15,OOOI
I 15,OOOI 15,OOOI
I
I
CE
Yes
1/1/2019
Totals
15,000 0 15,000 15,000
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
9
E. 'H' Street Extension, Ph. 1
E. 'H' Street
from: 1st Street to: 7th Street
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
08
P
1.10
P
T
W
S
0
CN
1/1/2020
BUILD
4,800
TIB
1,200
6,000
6,000
CE
No
12/1/2018
Totals 0 6,000 0
0
16
10
E. 'H' Street Extension, Ph. 2
E. 'H' Street
from: 7th Street to: 1-82
Construct new roadway including water, sewer, curb,
gutter, sidewalk, street lighting and storm drainage
system.
01
08
S
0.55
P
T
W
S
CN
1 1/1/20211
1
I LIFT
1 2,0001 5001 2,5001
1
1
2,5001
CE
Yes
1/1/2019
Totals 0 500 2,500
2,500
0
00
11
Cowiche Canyon Trail
Cowiche Canyon
from: Powerhouse Road to: Trailhead
Construct a 10 -foot wide pathway, including two
bridges over Cowiche Creek.
28
S
2.00
RW
CN
7/1/2019
1/1/20201
1
CWA
1 CWA
105
1,695
105
1 1,695
105
1,695
1
1
CE
Yes
1/1/2020
Totals 1,800 105 1,695
14
12
N. 34th Ave./Fruitvale Blvd. & N. 34th Ave./River
Road Roundabouts
34th Avenue
from: Fruitvale Blvd. to: River Road
Improve the intersections of N. 34th Avenue &
Fruitvale Boulevard and N. 34th Avenue & River Road
by installing roundabouts
03
12
S
N/A
P
T
0
S
W
CN
1/1/2019
HSIP
788
88
876
876
CE
Yes
1/1/2019
Totals 788 88 876 876
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
13
Complete Streets Projects
Various Streets
from: N/A to: N/A
Construct sidewalk on the south side of Swan Avenue from McGuiness
Park to Campbell Lane, on Race St. between 8th St. and Naches Ave.,
south side of Prasch Ave. from 20th to 16th, south side of Viola from 10th
Ave. to 4th Ave. and on Powerhouse road from Robertson Elementary to
Englewood.
32
S
N/A
P
T
C
CN
1/1/2019
TIB
365
365
365
Yes
1/1/2019
365 365
14
14
E. Nob Hill Blvd. & Fair Ave. 1/S Improvements
Nob Hill Boulevard
from: E. Nob Hill Blvd. to: Fair Ave.
Widen Nob Hill Boulevard through the intersection,
construct left -turn lane, curb, gutter, sidewalk, street
lighting and drainage. Upgrade signal by installing mast
arm structures.
03
04
31
S
N/A
P
T
W
C
0
CN
1/1/2025
STP(U)
1,457
227
1,684
1,684
CE
Yes
1/1/2025
Totals 1,457 227 1,684 1,684
17
15
S. 80th Avenue Bridge
S. 80th Avenue
from: Wide Hollow Rd. to: Plath Ave.
Replace existing two-lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
09
S
0.05
P
T
0
CN
1/1/2019
DOE
90
0
90
90
CE
No
Totals 90
17
16
Wide Hollow Road Bridge
Wide Hollow Road
from: 89th Avenue to: 88th Avenue
Replace existing two-lane bridge over Wide Hollow
Creek with three -lane bridge. The City's involvement
is only to pass through of an Ecology grant in
conjunction with the County's flood plain
management project.
09
S
0.05
P
T
0
CN
1/1/2019
DOE
90
0
90
90
CE
No
Totals 90 90 90
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
17
West River Road Improvements
03
S
0.36
P
RW
1/1/2019
364
364
364
CE
Yes
River Road
from: 40th Avenue to: 34th Avenue
04
T
G
CN
4/1/2019
TIB
650
522
1,172
1,172
4/1/2019
S
C
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, street lights and drainage.
0
650 886 1,536 1,536 0 0
17
18
Powerhouse Bike Lanes and Sidewalk
05
P
0.60
C
PE
9/1/2019
Ped/Bike
62
8
70
70
CE
Yes
Powerhouse Road
12
T
RW
1/1/2020
Ped/Bike
53
7
60
60
from: Mobil Home Park to: Cowiche Canyon Rd
0
CN
1/1/2021
Ped/Bike
657
85
742
742
1/1/2021
Construct 5 -foot wide bike lanes on both sides,
construct a 5 -foot wide sidewalk on the east side of
Powehouse Road and install a crosswalk across
Powerhouse Road at Cowiche Canyon Road.
Totals 872 70 60 742
17
19
24th Avenue Road Diet
12
P
0.96
PE
9/1/2019
Ped/Bike
20
20
20
CE
No
24th Avenue
from: Nob Hill Blvd. to: Tieton Drive
CN
1/1/2020
Ped/Bike
223
223
223
Re -stripe this four -lane section to be a three -lane
section with bike lanes on each side of 24th Avenue.
Totals 243 243 20 223
14
20
16th Ave. & Tieton Dr. Intersection Improvements
5
P
0.40
P
PE
1/1/2020
STP(U)
260
40
300
300
CE
Yes
16th Avenue
7
T
RW
1/1/2021
STP(U)
3,460
540
4,000
3,460
from: 16th Ave. to: Tieton Dr.
G
CN
4/1/2022
STP(U)
1,300
200
1,500
1,500
4/1/2022
0
Reconstruct and widen 16th Avenue and Tieton Drive
by adding left -turn lanes for all movements at the
intersection. Upgrade the traffic signal.
C S
W
Totals 5,020 780 5,800 300 3,460 1,500
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
21
18th Street Underpass
Yakima Avenue
from: Yakima Ave. to: 18th Street
Replace the bridge on E. Yakima Avenue that crosses
over 18th Street.
12
P
0.02
P
T
0
S
W
PE
CN
1/1/2020
1/1/2021
BRAC
BRAC
240
2,288
60
572
300
2,860
300
2,860
CE
No
Totals 2,528 632 3,160 300 2,860
17
22
64th Ave. & Ahtanum Intersection Improvements
64th Avenue
from: 64th Ave. to: Ahtanum Rd.
Improve the 64th Avenue and Ahtanum Road
intersection by constructing a westbound right -turn
lane on Ahtanum and installing a traffic signal.
12
S
N/A
P
T
C
0
RW
CN
1/1/2019
1/1/2020
CMAQ
CMAQ
43
404
7
63
50
467
50
209
258
CE
Yes
1/1/2020
Totals 447 70 517 50 209 258
14
23
South 16th Avenue Sidewalks
16th Avenue
from: Washington Ave. to: Nob Hill Blvd.
Install 7 -foot sidewalk on the west side of 16th
Avenue.
12
P
0.88
P
T
C
0
PE
RW
CN
1/1/2020
6/1/2020
6/1/2021
PBP
PBP
PBP
54
234
369
6
26
41
60
260
410
60
260
410
CE
Yes
6/1/2021
Totals 657 73 730 320 410
19
24
McClure Elementary School Safety Improvements
Various locations
from: to:
improvements in the vicinity of McClure Elementary
School, such as, constructing sidewalk, ADA ramps
and improving crosswalks.
12
S
N/A
P
T
C
0
RW
CN
1/1/2019
5/1/2019
SRTS
SRTS
20
228
20
228
20
228
CE
Yes
5/1/2019
Totals 248 248 248
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
10
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
25
McKinley Elementary School Safety Improvements
Various locations
from: to:
This project will make various padestrian safety
improvements in the vicinity of McKinley Elementary
School, such as, replacing delapitated sidewalk,
constructing ADA ramps, and installing a HAWK
pedestrian crossing system.
12
P
N/A
P
T
C
0
PE
CN
1/1/2020
1/1/2021
SRTS
SRTS
40
460
10
50
460
50
460
CE
No
Totals 500 10 510
0 510
19
26
6th Avenue Raodway Improvements
6th Avenue
from: Walnut Street to: River Road
Reconstruct the existing trolley rail and impacted
roadway, grind and overlay the remaining width of
6th Avenue.
03
07
P
1.51
0
P
T
PE
CN
1/1/2022
1/1/2023
11
OTHER
OTHER
200
1,650
400
3,350
600
5,000
600
5,000
CE
No
Totals 0 3,750 5,600
0 0 5,600
12
27
SR 12 & 16th Avenue Interchange
Westbound rampsof SR 12
from: 16th Avneue to: SR 12
Construct a roundabout where the westbound ramps
intersect with N. 16th Avenue.
03
06
P
N/A
0
PE 11/1/20191 STP(U)
CN 1/1/2020 STP(U)
1 861
779
I
1 141 1001
121 900
1 1001
900
I
CE
No
Totals 865 135 1,000
100 900
14
28
S. 1st St. & E. Washington Ave. 1/5 Improvements
South 1st Street
from: S. 1st Street to: E. Washington Ave.
Realign intersection, widen E. Washington Avenue to
accommodate an additional lane, replace curb, gutter
and sidewalk, and install a new traffic signalization
system.
03
06
P
N/A
P
W
S
T
0
PE
RW
CN
1/1/2021
1/1/2022
1/1/2023
300
300
1,400
300
300
1,400
300
300
CE
Yes
1/1/2023
Totals 0 2,000 2,000
300 300
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
11
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
Washington Ave. & Longfiber Rd. Intersection
03
P
N/A
C
PE
1/1/2020
STP(U)
100
14
114
114
CE
Yes
Washington Avenue
05
T
RW
1/1/2021
STP(U)
100
14
114
114
from: Washington Ave. to: Longfiber Rd.
06
W
CN
1/1/2022
STP(U)
688
107
795
795
1/1/2022
Improve the Washington Avenue and Longfiber Road
intersection by constructing an eastboung left -turn
lane on Washington and a northbound left -turn lane
on Longfiber, install or replace curb, gutter, sidewalk,
street lighting, storm drainage and safety flashing
signal
S
0
Totals 888 135 1,023 114 114 795
14
30
E. Nob Hill Boulevard Reconstruction
03
P
0.85
C
PE
1/1/2020
STP(U)
545
85
630
630
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2021
STP(U)
1,090
170
1,260
1,260
from: S. 6th Street to: S. 18th Street
06
W
CN
1/1/2022
STP(U)
6,532
1,020
7,552
7,552
1/1/2022
S
Reconstruct and widen roadway to 5 lanes with
intersection improvements, curb, gutter, sidewalk,
street lighting and drainage system
0
P
G
Totals 8,167 1,275 9,442 630 1,260 7,552
14
31
N. 40th Ave. & Summitview Ave. Intersection
12
P
N/A
P
PE
1/1/2020
STP(U)
126
17
143
143
CE
Yes
N. 40th Avenue
T
RW
1/1/2021
STP(U)
130
20
150
150
from: N. 40th Ave. to: Summitview Dr.
W
CN
1/1/2022
STP(U)
692
108
800
800
1/1/2022
Improve the intersection by constructing larger
corner radii, lengthening the turn lanes, and
upgrading the traffic signal system.
S
0
Totals 948 145 1,093 143 150 800
14
32
N. 16th Avenue & Fruitvale Blvd. 1/5
12
P
N/A
P
PE
1/1/2020
STP(U)
126
18
144
144
CE
Yes
N. 16th Avenue
T
RW
1/1/2021
STP(U)
173
27
200
200
from: N. 16th Ave. to: Fruitvale Blvd.
0
CN
1/1/2022
STP(U)
800
125
925
925
1/1/2022
Improve the intersection by constructing larger curb
radii, installing ADA ramps, and upgrading the traffic
signal system.
S
W
Totals 1,099 170 1,269 144 200 925
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
12
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
33
E. Mead Avenue Reconstruction
03
P
0.76
P
PE
1/1/2021
STP(S)
146
TPP
27
9
182
182
CE
No
E. Mead Avenue
from: Rudkin Rd. to: Fair Ave.
06
T
S
CN
1/1/2022
STP(S)
1,920
TPP
360
120
2,400
2,400
Partner with Union Gap to reconstruct E. Mead
C
Avenue, install curb, gutter, sidewalk and storm
drainage system.
G
0
Totals 2,066 129 2,582 182 2,400
17
34
S. 48th Avenue Reconstruction
03
P
1.00
P
PE
1/1/2020
STP(U)
268
42
310
310
CE
Yes
South 48th Avenue
05
T
RW
1/1/2021
STP(U)
623
97
720
720
from: Summitview Ave. to: Nob Hill Blvd.
W
CN
1/1/2022
STP(U)
1,782
278
2,060
2,060
1/1/2022
S
Reconstruct and widen 48th Avenue, install curb,
gutter, sidewalk, street lighting and drainage system.
0
Totals 2,673 417 3,090 310 720 2,060
17
35
Powerhouse Rd. & Englewood Ave. 1/5
12
P
N/A
P
PE
1/1/2020
STP(S)
25
25
50
50
CE
Yes
Powerhouse Rd.
T
RW
1/1/2021
STP(S)
50
50
100
100
from: Powerhouse Rd. to: Englewood Ave.
C
CN
1/1/2022
STP(S)
289
289
578
578
1/1/2022
Realign intersection, install curb, gutter, sidewalk and
safety flashing signal. Possibly construct a
roundabout.
S
0
W
Totals 364 364 728 100 578
14
36
W. Lincoln Ave. & MLK Blvd. Realignment
01
P
0.50
C
PE
1/1/2020
STP(E)
324
51
375
375
CE
Yes
W. Lincoln Avenue
12
T
RW
1/1/2021
STP(E)
1,047
163
1,210
1,210
from: N. 5th Ave. to: Custer St.
W
CN
1/1/2022
STP(E)
2,162
338
2,500
2,500
1/1/2022
S
0
Realign W. Lincoln Avenue, install curb, gutter,
sidewalks, street lighting, drainage.
P
G
Totals 3,533 552 4,085
375 1,210 2,500
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
13
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
37
Tieton Dr. & S. 5th Ave. 1/5 Improvements
12
P
N/A
P
PE
1/1/2020
STP(U)
130
20
150
150
CE
Yes
Tieton Drive
W
RW
1/1/2021
STP(U)
104
16
120
120
from: Tieton Dr. to: S. 5th Ave.
S
CN
1/1/2022
STP(U)
1,038
162
1,200
1,200
1/1/2022
Remove existing traffic signal and construct a
roundabout, remove and replace curb, gutter,
sidewalk, street lighting and drainage
T
0
Totals 1,272 198 1,470 150 120 1,200
17
38
Yakima Downtown Future Initiatives, Phase 5
06
P
N/A
P
PE
1/1/2021
OTHER
500
500
500
CE
No
from: 1st Street to: 9th Street
12
T
C
CN
4/1/2022
OTHER
5,500
5,500
5,500
Install historic lighting, sidewalk modifications and
other improvements. Exact improvement area(s) to
be determined
S
Totals 6,000 6,000 500 5,500
14
39
E. Nob Hill Blvd. & S. 18th Street 1/S Improvements
01
P
0.10
C
PE
1/1/2021
STP(U)
75
12
87
87
CE
Yes
E. Nob Hill Boulevard
04
T
RW
1/1/2022
STP(U)
75
12
87
87
from: E. Nob Hill Blvd. to: S. 18th Street
W
CN
1/1/2023
STP(U)
623
81
704
704
1/1/2023
Widen south leg for double left turn from westbound
S
Nob Hill, install curb, gutter, sidewalk, upgrade traffic
signal system
Totals 773 105 878 87 791
14
40
S. 48th Ave. & Summitview Ave. Signalization
12
P
N/A
P
PE
1/1/2022
STP(S)
69
11
80
80
CE
Yes
Summitview Avenue
T
RW
6/1/2023
STP(S)
69
11
80
80
from: Summitview Ave. to: S. 48th Ave.
CN
1/1/2024
STP(S)
692
108
800
800
1/1/2024
Install traffic signal at the intersection of Summitview
Avenue and 48th Avenue.
Totals 830 130 960 960
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
14
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
41
S. 72nd Ave. & W. Washington Ave. 1/5
S. 72nd Avenue
from: s. 72nd Ave. to: W. Washington Ave.
Improve intersection by installing a traffic signal
system or roundabout.
12
06
P
N/A
P
T
0
S
W
PE
RW
CN
1/1/2020
1/1/2021
1/1/2022
STP(C)
STP(C)
STP(C)
86
86
778
14
14
122
100
100
900
100
100
900
CE
Yes
1/1/2022
Totals 950 150 1,100
100
100 900
14
42
N. 40th Ave. & Englewood Ave. Intersection
N. 40th Avenue
from: N. 40th Ave. to: Englewood
Replace traffic signal poles and upgrade controller.
12
P
N/A
P
T
PE
CN
1/1/2021
6/1/2022
STP(U)
STP(U)
43
311
7
49
50
360
50
360
CE
No
Totals 354 56 410
50
14
43
Nob Hill Boulevard Sidewalk Improvements
Nob Hill Boulevard
from: S. 16th Ave. to: S. 6th Street
Construct sidewalk in locations where it doesn't exist
on the south side of Nob Hill
12
P
2.50
P
T
S
W
PE
RW
CN
1/1/2021
1/1/2022
1/1/2023
STP(S)
STP(S)
STP(S)
43
173
389
7
27
61
50
200
450
50
200
450
CE
Yes
1/1/2023
Totals 605 95 700
650
14
44
E. Yakima Ave. & Fair Ave. Signalization
Yakima Avenue
from: E. Yakima Ave. to: Fair Ave.
Install traffic signal at the intersection of Yakima
Avenue and Fair Avenue.
12
P
N/A
P
T
W
S
0
PE 11/1/20211 STP(U)
CN 6/1/2022 STP(U)
I 861
519
I
I 141 1001
81 600
I
I
1001
600
CE
No
Totals 605 95 700
100 600
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
15
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
45
S. 3rd Avenue & W. Washington Ave. Signal
12
P
N/A
P
PE
4/1/2020
20
20
20
CE
No
S. 3rd Avenue
from: S. 3rd Ave. to: W. Washington Ave.
T
CN
1/1/2021
210
210
210
Upgrade the traffic signalization system
230 230
Totals 230 230 20 210
19
46
75th Avenue Improvements
01
P
0.50
P
PE
1/1/2021
STP(U)
130
20
150
150
CE
Yes
75th Avenue
08
W
RW
1/1/2022
STP(U)
173
27
200
200
from: Mead Ave. to: Nob Hill Blvd.
S
CN
1/1/2023
STP(U)
1,297
203
1,500
1,500
1/1/2023
T
Construct a new two-lane roadway and widen
portions of existing roadway, construct bridge over
0
Wide Hollow Creek, install curb, gutter, sidewalk,
street lighting and storm drainage system.
Totals 1,600 250 1,850 150 1,700
17
47
S. 66th Avenue Improvements
03
P
0.76
P
PE
1/1/2020
STP(U)
86
14
100
100
CE
Yes
66th Avenue
04
T
RW
1/1/2021
STP(U)
173
27
200
200
from: Summitview Ave. to: Scenic Dr.
W
CN
1/1/2022
STP(U)
1,096
164
1,260
1,260
1/1/2022
S
Reconstruct and widen roadway to three lanes, install
curb, gutter, sidewalk, storm drainage system and
utilities.
O
Totals
1,355 205 1,560 100 200 1,260
17
48
Rudkin Road Reconstruction
03
P
0.76
P
PE
1/1/2022
STP(C)
109
TPP
100
27
236
236
CE
No
Rudkin Road
from: E. Viola Ave. to: Rainier PI.
06
T
W
CN
1/9/2023
STP(C)
945
TPP
945
106
1,996
1,996
Reconstruct roadway, install curb, gutter, sidewalk
and storm drainage. Partner with Union Gap to
install additional sewer force main.
S
Totals 1,054 1,045 133 2,232 2,232
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
16
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
49
Englewood Avenue Improvements
05
P
1.00
P
PE
1/1/2022
STP(C)
272
43
315
315
CE
Yes
Englewood Avenue
06
T
RW
1/1/2023
STP(C)
349
55
404
404
from: N. 40th Ave. to: N. 56th Ave.
W
CN
1/1/2024
STP(C)
2,329
363
2,692
2,692
1/1/2024
Grind and overlay existing roadway, construct 5 -foot
bike lanes, install curb, gutter, sidewalk, street
lighting and storm drainage system, water and sewer
lines.
S
0
C
Totals
2,950 461 3,411 3,411
17
50
Englewood Avenue Improvements
05
P
0.50
P
PE
1/1/2022
STP(U)
136
21
157
157
CE
Yes
Englewood Avenue
06
T
RW
1/1/2023
STP(U)
173
27
200
200
from: N. 16th Ave. to: N. 24th Ave.
W
CN
1/1/2024
STP(U)
1,164
182
1,346
1,346
1/1/2024
Grind and overlay existing roadway, construct 5 -foot
bike lanes, install curb, gutter, sidewalk, street
lighting and storm drainage system, water and sewer
lines.
S
Totals 1,473 230 1,703 1,703
17
51
S. 80th Avenue Improvements
04
P
1.30
P
PE
1/1/2022
TIB
280
70
350
350
CE
Yes
S. 80th Avenue
T
RW
1/1/2023
TIB
400
100
500
500
from: Tieton Drive to: Zier Road
0
CN
1/1/2024
TIB
2,520
630
3,150
3,150
1/1/2024
S
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
W
C
Totals 3,200 800 4,000 4,000
17
52
Englewood Avenue Improvements
03
P
1.00
P
PE
1/1/2022
STP(U)
218
34
252
252
CE
Yes
Englewood Avenue
05
T
RW
1/1/2023
STP(U)
327
51
378
378
from: N. 24th Ave. to: N. 40th Ave.
06
W
CN
1/1/2024
STP(U)
2,789
435
3,224
3,224
1/1/2024
Grind and overlay existing roadway, construct 5 -foot
bike lanes, install curb, gutter, sidewalk, street
lighting and storm drainage system, water and sewer
lines.
S
0
Totals
3,334 520 3,854 3,854
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
17
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
53
88th Avenue Improvements
88th Avenue
from: Tieton Dr. to: Summitview Ave.
Construct curb, gutter, sidewalk and storm drainage
system on the east side of 88th Avenue.
06
12
P
0.48
P
T
C
G
PE
RW
CN
1/1/2020
1/1/2021
1/1/2022
SRTS
SRTS
SRTS
41
56
403
24
34
242
65
90
645
65
90
645
CE
Yes
1/1/2022
Totals 300 800 65 735
17
54
64th Avenue Improvements
64th Avenue
from: Washington Ave. to: Nob Hill Blvd.
Widen roadway to three lanes, install curb, gutter,
sidewalk, street lighting and storm drainage system.
03
04
06
P
1.00
P
T
W
C
G
0
O
PE
CN
1/1/2021
1/1/2022
STP(U)
STP(U)
200
1,600
32
249
232
1,849
232
1,849
CE
No
1,800 281 2,081 232 1,849
16
55
1-82 & Lincoln Avenue Interchange
Lincoln Avenue
from: E. 'G' Street to: 1-82
Reconstruct/extend off -ramp from existing 1-82 off -
ramp for Lincoln Avenue to E. 'G' Street.
01
P
N/A
0
P
G
PE
RW
CN
1/1/2020
1/1/2021
6/1/2022
STP(U)
STP(U)
STP(U)
260
173
1,730
40
27
270
300
200
2,000
300
200
2,000
CE
Yes
6/1/2022
2,163 337 2,500 300 200 2,000
14
56
16th Avenue Corridor Improvement
16th Avenue
from: SR 12 to: Washington Ave.
Study to determine strategies for improving the 16th
Avenue corridor
04
P
3.50
P
T
W
C
G
0
S
PE
1/1/2021
STP(U)
173
27
200
200
173 27 200 200
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
18
Six Year Transportation Improvement Program
From 2019 to 2024
Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018
Amend Date:
Resolution No.:
Functional Class
Priority Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to Be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M M/YY)
Federal Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
57
40th Avenue Corridor Improvements
40th Avenue
from: SR 12 to: Washington Ave.
Study to determine strategies for improving the 40th
Avenue corridor.
04
P
3.20
P
T
W
C
G
0
S
PE
1/1/2021
STP(U)
173
27
200
200
Totals 173 27 200 200
14
58
Nob Hill Boulevard Corridor Improvements
Nob Hill Boulevard
from: 1-82 to: 16th Ave.
Study to determine strategies for improving the Nob
Hill Boulevard corridor.
03
04
P
2.70
P
T
0
S
W
C
G
PE
1/1/2020
STP(U)
173
27
200
200
173 27 200 200
14
59
North/South Connector to West Valley
Unknown Road
from: Ahtanum Rd. to: Summitview Ext.
Corridor study to determine the best location for a
north/south limited access route in West Valley. City
and County joint project.
01
04
06
P
6.00
P
T
W
S
C
G
0
PE
1/1/2021
STP(U)
432
68
500
500
CE
Yes
432 68 500 500
14
60
S. 1st Street/Main Street Corridor Improvements
S. 1st Street/Main Street
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap. Stucy to determine
strategies for improving the 1st Street/Main Street
corridor.
01
P
2.00
P
T
0
S
W
C
G
PE
1/1/2021
STP(U)
173
27
200
200
No
173 27 200 200