Loading...
HomeMy WebLinkAbout08/06/2018 10 2019-2024 Six-Year TIP and YUACP Capital Facilities Element Public HearingBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT 1 Item No. 10. For Meeting of: August 6, 2018 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -Year Transportation Improvement Program for the years 2019 to 2024, and to amend the Metropolitan Transportation Plan; and B)Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element and continue Public Hearing to the August 21, 2018, City Council Meeting for the second Public Hearing SUBMITTED BY: Scott Schafer, Director of Public Works Brett Sheffield, Chief Engineer - 576-6797 SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year Transportation Improvement Program (T I P) for submittal to the Washington State Department of Transportation. This Plan must include all transportation projects for which state gas tax revenue and federal revenue will be used. The proposed 2019-2024 TIP includes fifteen projects that have funding. The funded projects are listed below by Priority Number: #3 — Garfield Elementary Safety Improvements #4 — Yakima Valley Transportation Company Preservation #5 — Spring Creek Road Reconstruction #6 — South 36th Avenue Reconstruction #7 — Sorenson Road Reconstruction #8 — Bravo Company Boulevard #11 — Cowiche Canyon Trail #12 — N.34th Avenue/Fruitvale Boulevard & N. 34th Avenue/River Road Roundabouts #13 — Complete Street Projects #14 — East Nob Hill Boulevard and Fair Avenue Intersection Improvements #15 — S. 80th Avenue Wide Hollow Creek Bridge #16 — Wide Hollow Road Bridge in the Vicinity of 89th Avenue #17 — West River Road Improvements #22 — 64th Avenue and Ahtanum Road Intersection Improvements #24 — McClure Elementary School Vicinity Safety 1 mprovements 2 Attached is the complete 2019 — 2024 Six -Year TI P, which describes each project. The City will continue to seek funding for the remainder of the projects included in the 2019-2024 TIP. City Council and the public are welcome to add other arterial system projects to the list. The Six - Year TI P project listing will be finalized at the August 21st hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STI P). The STI P is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STI P contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is in need of amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six -Year TI P for 2019 to 2024. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima -area media, including to Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Continue Public Hearing on August 21, 2018. BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date 2019 - 2024 Six -Year TIP 7/23/2018 Type Coyer Memo 3 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road -Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 North 1st Street Revitalization, Phase 2 N. 1st Street from: 'H' Street to: 'N'Street Improve North 1st Street by rehabilitating the pavement and lane markings, removing on -street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 06 12 P 0.50 P T G C W S 0 CN 1/1/2020 BUILD 4,320 TIB 1,080 0 5,400 5,400 CE Yes 12/31/2018 Totals 4,320 5,400 0 5,400 14 2 North 1st Street Revitalization, Phase 3 N. 1st Street from: MLK Blvd. to: 'H'Street Improve North 1st Street by rehabilitating the pavement and lane markings, removing on -street parking, enhancing street and pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 06 12 P 0.48 P T G C W S 0 CN 1/1/2020 BUILD 4,320 TIB 1,080 0 5,400 5,400 CE Yes 12/31/2018 Totals 4,320 5,400 0 5,400 19 3 Garfield Elementary Safety Improvements Various Streets from: to: This project will make various pedestrian safety improvements in the vicinity of Garfield Elementary School, such as, constructing sidewalk, improving roadway crossings, installing flashers. 12 S N/A P T 0 CN 1/1/2019 SRTS 141 141 141 CE Yes 1/1/2019 Totals 141 141 141 14 4 Yakima Valley Transportation Company Preservation Yakima Avenue from: Yakima Avenue to: 6th Avenue This project will remove and replace a portion of the existing trolley rail in the vicinity of the intersection of 6th Avenue and Yakima Avenue. 03 S 0.02 O CN 1/1/2019 STP(E) 52 52 52 CE No Totals 52 52 52 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 5 Spring Creek Road Reconstruction Spring Creek Road from: Washington Ave. to: 36th Avenue Widen roadway to three lanes, install curb, gutter, sidewalk and street lights. 03 S 0.85 S W CN 1/1/2019 1,920 1,920 1,920 SEPA Yes 3/1/2017 0 1,920 1,920 1,920 17 6 S. 36th Avenue Reconstruction 36th Avenue from: Spring Creek Rd. to: Sorenson Rd. Widen roadway to three lanes, install curb, gutter, sidewalk and street lights. 03 S 0.40 S W CN 1/1/2019 905 905 905 SEPA Yes 1/1/2019 0 905 905 905 17 7 Sorenson Road Reconstruction Sorenson Road from: 36th Avenue to: 38th Avenue Widen roadway, install curb, gutter, sidewalk and street lights. 03 S 0.14 S W CN 1/1/2019 320 320 320 Yes 1/1/2019 Totals 0 320 320 320 16 8 Bravo Company Boulevard North 10th Street from: 'H' Street to: Lincoln Ave. Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 01 06 S 0.65 P T W S 0 CN 11/1/2019 I I I LIFT I 15,OOOI I 15,OOOI 15,OOOI I I CE Yes 1/1/2019 Totals 15,000 0 15,000 15,000 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 9 E. 'H' Street Extension, Ph. 1 E. 'H' Street from: 1st Street to: 7th Street Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 01 08 P 1.10 P T W S 0 CN 1/1/2020 BUILD 4,800 TIB 1,200 6,000 6,000 CE No 12/1/2018 Totals 0 6,000 0 0 16 10 E. 'H' Street Extension, Ph. 2 E. 'H' Street from: 7th Street to: 1-82 Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 01 08 S 0.55 P T W S CN 1 1/1/20211 1 I LIFT 1 2,0001 5001 2,5001 1 1 2,5001 CE Yes 1/1/2019 Totals 0 500 2,500 2,500 0 00 11 Cowiche Canyon Trail Cowiche Canyon from: Powerhouse Road to: Trailhead Construct a 10 -foot wide pathway, including two bridges over Cowiche Creek. 28 S 2.00 RW CN 7/1/2019 1/1/20201 1 CWA 1 CWA 105 1,695 105 1 1,695 105 1,695 1 1 CE Yes 1/1/2020 Totals 1,800 105 1,695 14 12 N. 34th Ave./Fruitvale Blvd. & N. 34th Ave./River Road Roundabouts 34th Avenue from: Fruitvale Blvd. to: River Road Improve the intersections of N. 34th Avenue & Fruitvale Boulevard and N. 34th Avenue & River Road by installing roundabouts 03 12 S N/A P T 0 S W CN 1/1/2019 HSIP 788 88 876 876 CE Yes 1/1/2019 Totals 788 88 876 876 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 13 Complete Streets Projects Various Streets from: N/A to: N/A Construct sidewalk on the south side of Swan Avenue from McGuiness Park to Campbell Lane, on Race St. between 8th St. and Naches Ave., south side of Prasch Ave. from 20th to 16th, south side of Viola from 10th Ave. to 4th Ave. and on Powerhouse road from Robertson Elementary to Englewood. 32 S N/A P T C CN 1/1/2019 TIB 365 365 365 Yes 1/1/2019 365 365 14 14 E. Nob Hill Blvd. & Fair Ave. 1/S Improvements Nob Hill Boulevard from: E. Nob Hill Blvd. to: Fair Ave. Widen Nob Hill Boulevard through the intersection, construct left -turn lane, curb, gutter, sidewalk, street lighting and drainage. Upgrade signal by installing mast arm structures. 03 04 31 S N/A P T W C 0 CN 1/1/2025 STP(U) 1,457 227 1,684 1,684 CE Yes 1/1/2025 Totals 1,457 227 1,684 1,684 17 15 S. 80th Avenue Bridge S. 80th Avenue from: Wide Hollow Rd. to: Plath Ave. Replace existing two-lane bridge over Wide Hollow Creek with three -lane bridge. The City's involvement is only to pass through of an Ecology grant in conjunction with the County's flood plain management project. 09 S 0.05 P T 0 CN 1/1/2019 DOE 90 0 90 90 CE No Totals 90 17 16 Wide Hollow Road Bridge Wide Hollow Road from: 89th Avenue to: 88th Avenue Replace existing two-lane bridge over Wide Hollow Creek with three -lane bridge. The City's involvement is only to pass through of an Ecology grant in conjunction with the County's flood plain management project. 09 S 0.05 P T 0 CN 1/1/2019 DOE 90 0 90 90 CE No Totals 90 90 90 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 17 West River Road Improvements 03 S 0.36 P RW 1/1/2019 364 364 364 CE Yes River Road from: 40th Avenue to: 34th Avenue 04 T G CN 4/1/2019 TIB 650 522 1,172 1,172 4/1/2019 S C Reconstruct and widen roadway to three lanes, install curb, gutter, sidewalk, street lights and drainage. 0 650 886 1,536 1,536 0 0 17 18 Powerhouse Bike Lanes and Sidewalk 05 P 0.60 C PE 9/1/2019 Ped/Bike 62 8 70 70 CE Yes Powerhouse Road 12 T RW 1/1/2020 Ped/Bike 53 7 60 60 from: Mobil Home Park to: Cowiche Canyon Rd 0 CN 1/1/2021 Ped/Bike 657 85 742 742 1/1/2021 Construct 5 -foot wide bike lanes on both sides, construct a 5 -foot wide sidewalk on the east side of Powehouse Road and install a crosswalk across Powerhouse Road at Cowiche Canyon Road. Totals 872 70 60 742 17 19 24th Avenue Road Diet 12 P 0.96 PE 9/1/2019 Ped/Bike 20 20 20 CE No 24th Avenue from: Nob Hill Blvd. to: Tieton Drive CN 1/1/2020 Ped/Bike 223 223 223 Re -stripe this four -lane section to be a three -lane section with bike lanes on each side of 24th Avenue. Totals 243 243 20 223 14 20 16th Ave. & Tieton Dr. Intersection Improvements 5 P 0.40 P PE 1/1/2020 STP(U) 260 40 300 300 CE Yes 16th Avenue 7 T RW 1/1/2021 STP(U) 3,460 540 4,000 3,460 from: 16th Ave. to: Tieton Dr. G CN 4/1/2022 STP(U) 1,300 200 1,500 1,500 4/1/2022 0 Reconstruct and widen 16th Avenue and Tieton Drive by adding left -turn lanes for all movements at the intersection. Upgrade the traffic signal. C S W Totals 5,020 780 5,800 300 3,460 1,500 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 21 18th Street Underpass Yakima Avenue from: Yakima Ave. to: 18th Street Replace the bridge on E. Yakima Avenue that crosses over 18th Street. 12 P 0.02 P T 0 S W PE CN 1/1/2020 1/1/2021 BRAC BRAC 240 2,288 60 572 300 2,860 300 2,860 CE No Totals 2,528 632 3,160 300 2,860 17 22 64th Ave. & Ahtanum Intersection Improvements 64th Avenue from: 64th Ave. to: Ahtanum Rd. Improve the 64th Avenue and Ahtanum Road intersection by constructing a westbound right -turn lane on Ahtanum and installing a traffic signal. 12 S N/A P T C 0 RW CN 1/1/2019 1/1/2020 CMAQ CMAQ 43 404 7 63 50 467 50 209 258 CE Yes 1/1/2020 Totals 447 70 517 50 209 258 14 23 South 16th Avenue Sidewalks 16th Avenue from: Washington Ave. to: Nob Hill Blvd. Install 7 -foot sidewalk on the west side of 16th Avenue. 12 P 0.88 P T C 0 PE RW CN 1/1/2020 6/1/2020 6/1/2021 PBP PBP PBP 54 234 369 6 26 41 60 260 410 60 260 410 CE Yes 6/1/2021 Totals 657 73 730 320 410 19 24 McClure Elementary School Safety Improvements Various locations from: to: improvements in the vicinity of McClure Elementary School, such as, constructing sidewalk, ADA ramps and improving crosswalks. 12 S N/A P T C 0 RW CN 1/1/2019 5/1/2019 SRTS SRTS 20 228 20 228 20 228 CE Yes 5/1/2019 Totals 248 248 248 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 10 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 19 25 McKinley Elementary School Safety Improvements Various locations from: to: This project will make various padestrian safety improvements in the vicinity of McKinley Elementary School, such as, replacing delapitated sidewalk, constructing ADA ramps, and installing a HAWK pedestrian crossing system. 12 P N/A P T C 0 PE CN 1/1/2020 1/1/2021 SRTS SRTS 40 460 10 50 460 50 460 CE No Totals 500 10 510 0 510 19 26 6th Avenue Raodway Improvements 6th Avenue from: Walnut Street to: River Road Reconstruct the existing trolley rail and impacted roadway, grind and overlay the remaining width of 6th Avenue. 03 07 P 1.51 0 P T PE CN 1/1/2022 1/1/2023 11 OTHER OTHER 200 1,650 400 3,350 600 5,000 600 5,000 CE No Totals 0 3,750 5,600 0 0 5,600 12 27 SR 12 & 16th Avenue Interchange Westbound rampsof SR 12 from: 16th Avneue to: SR 12 Construct a roundabout where the westbound ramps intersect with N. 16th Avenue. 03 06 P N/A 0 PE 11/1/20191 STP(U) CN 1/1/2020 STP(U) 1 861 779 I 1 141 1001 121 900 1 1001 900 I CE No Totals 865 135 1,000 100 900 14 28 S. 1st St. & E. Washington Ave. 1/5 Improvements South 1st Street from: S. 1st Street to: E. Washington Ave. Realign intersection, widen E. Washington Avenue to accommodate an additional lane, replace curb, gutter and sidewalk, and install a new traffic signalization system. 03 06 P N/A P W S T 0 PE RW CN 1/1/2021 1/1/2022 1/1/2023 300 300 1,400 300 300 1,400 300 300 CE Yes 1/1/2023 Totals 0 2,000 2,000 300 300 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 11 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 29 Washington Ave. & Longfiber Rd. Intersection 03 P N/A C PE 1/1/2020 STP(U) 100 14 114 114 CE Yes Washington Avenue 05 T RW 1/1/2021 STP(U) 100 14 114 114 from: Washington Ave. to: Longfiber Rd. 06 W CN 1/1/2022 STP(U) 688 107 795 795 1/1/2022 Improve the Washington Avenue and Longfiber Road intersection by constructing an eastboung left -turn lane on Washington and a northbound left -turn lane on Longfiber, install or replace curb, gutter, sidewalk, street lighting, storm drainage and safety flashing signal S 0 Totals 888 135 1,023 114 114 795 14 30 E. Nob Hill Boulevard Reconstruction 03 P 0.85 C PE 1/1/2020 STP(U) 545 85 630 630 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2021 STP(U) 1,090 170 1,260 1,260 from: S. 6th Street to: S. 18th Street 06 W CN 1/1/2022 STP(U) 6,532 1,020 7,552 7,552 1/1/2022 S Reconstruct and widen roadway to 5 lanes with intersection improvements, curb, gutter, sidewalk, street lighting and drainage system 0 P G Totals 8,167 1,275 9,442 630 1,260 7,552 14 31 N. 40th Ave. & Summitview Ave. Intersection 12 P N/A P PE 1/1/2020 STP(U) 126 17 143 143 CE Yes N. 40th Avenue T RW 1/1/2021 STP(U) 130 20 150 150 from: N. 40th Ave. to: Summitview Dr. W CN 1/1/2022 STP(U) 692 108 800 800 1/1/2022 Improve the intersection by constructing larger corner radii, lengthening the turn lanes, and upgrading the traffic signal system. S 0 Totals 948 145 1,093 143 150 800 14 32 N. 16th Avenue & Fruitvale Blvd. 1/5 12 P N/A P PE 1/1/2020 STP(U) 126 18 144 144 CE Yes N. 16th Avenue T RW 1/1/2021 STP(U) 173 27 200 200 from: N. 16th Ave. to: Fruitvale Blvd. 0 CN 1/1/2022 STP(U) 800 125 925 925 1/1/2022 Improve the intersection by constructing larger curb radii, installing ADA ramps, and upgrading the traffic signal system. S W Totals 1,099 170 1,269 144 200 925 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 12 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 33 E. Mead Avenue Reconstruction 03 P 0.76 P PE 1/1/2021 STP(S) 146 TPP 27 9 182 182 CE No E. Mead Avenue from: Rudkin Rd. to: Fair Ave. 06 T S CN 1/1/2022 STP(S) 1,920 TPP 360 120 2,400 2,400 Partner with Union Gap to reconstruct E. Mead C Avenue, install curb, gutter, sidewalk and storm drainage system. G 0 Totals 2,066 129 2,582 182 2,400 17 34 S. 48th Avenue Reconstruction 03 P 1.00 P PE 1/1/2020 STP(U) 268 42 310 310 CE Yes South 48th Avenue 05 T RW 1/1/2021 STP(U) 623 97 720 720 from: Summitview Ave. to: Nob Hill Blvd. W CN 1/1/2022 STP(U) 1,782 278 2,060 2,060 1/1/2022 S Reconstruct and widen 48th Avenue, install curb, gutter, sidewalk, street lighting and drainage system. 0 Totals 2,673 417 3,090 310 720 2,060 17 35 Powerhouse Rd. & Englewood Ave. 1/5 12 P N/A P PE 1/1/2020 STP(S) 25 25 50 50 CE Yes Powerhouse Rd. T RW 1/1/2021 STP(S) 50 50 100 100 from: Powerhouse Rd. to: Englewood Ave. C CN 1/1/2022 STP(S) 289 289 578 578 1/1/2022 Realign intersection, install curb, gutter, sidewalk and safety flashing signal. Possibly construct a roundabout. S 0 W Totals 364 364 728 100 578 14 36 W. Lincoln Ave. & MLK Blvd. Realignment 01 P 0.50 C PE 1/1/2020 STP(E) 324 51 375 375 CE Yes W. Lincoln Avenue 12 T RW 1/1/2021 STP(E) 1,047 163 1,210 1,210 from: N. 5th Ave. to: Custer St. W CN 1/1/2022 STP(E) 2,162 338 2,500 2,500 1/1/2022 S 0 Realign W. Lincoln Avenue, install curb, gutter, sidewalks, street lighting, drainage. P G Totals 3,533 552 4,085 375 1,210 2,500 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 13 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 37 Tieton Dr. & S. 5th Ave. 1/5 Improvements 12 P N/A P PE 1/1/2020 STP(U) 130 20 150 150 CE Yes Tieton Drive W RW 1/1/2021 STP(U) 104 16 120 120 from: Tieton Dr. to: S. 5th Ave. S CN 1/1/2022 STP(U) 1,038 162 1,200 1,200 1/1/2022 Remove existing traffic signal and construct a roundabout, remove and replace curb, gutter, sidewalk, street lighting and drainage T 0 Totals 1,272 198 1,470 150 120 1,200 17 38 Yakima Downtown Future Initiatives, Phase 5 06 P N/A P PE 1/1/2021 OTHER 500 500 500 CE No from: 1st Street to: 9th Street 12 T C CN 4/1/2022 OTHER 5,500 5,500 5,500 Install historic lighting, sidewalk modifications and other improvements. Exact improvement area(s) to be determined S Totals 6,000 6,000 500 5,500 14 39 E. Nob Hill Blvd. & S. 18th Street 1/S Improvements 01 P 0.10 C PE 1/1/2021 STP(U) 75 12 87 87 CE Yes E. Nob Hill Boulevard 04 T RW 1/1/2022 STP(U) 75 12 87 87 from: E. Nob Hill Blvd. to: S. 18th Street W CN 1/1/2023 STP(U) 623 81 704 704 1/1/2023 Widen south leg for double left turn from westbound S Nob Hill, install curb, gutter, sidewalk, upgrade traffic signal system Totals 773 105 878 87 791 14 40 S. 48th Ave. & Summitview Ave. Signalization 12 P N/A P PE 1/1/2022 STP(S) 69 11 80 80 CE Yes Summitview Avenue T RW 6/1/2023 STP(S) 69 11 80 80 from: Summitview Ave. to: S. 48th Ave. CN 1/1/2024 STP(S) 692 108 800 800 1/1/2024 Install traffic signal at the intersection of Summitview Avenue and 48th Avenue. Totals 830 130 960 960 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 14 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 41 S. 72nd Ave. & W. Washington Ave. 1/5 S. 72nd Avenue from: s. 72nd Ave. to: W. Washington Ave. Improve intersection by installing a traffic signal system or roundabout. 12 06 P N/A P T 0 S W PE RW CN 1/1/2020 1/1/2021 1/1/2022 STP(C) STP(C) STP(C) 86 86 778 14 14 122 100 100 900 100 100 900 CE Yes 1/1/2022 Totals 950 150 1,100 100 100 900 14 42 N. 40th Ave. & Englewood Ave. Intersection N. 40th Avenue from: N. 40th Ave. to: Englewood Replace traffic signal poles and upgrade controller. 12 P N/A P T PE CN 1/1/2021 6/1/2022 STP(U) STP(U) 43 311 7 49 50 360 50 360 CE No Totals 354 56 410 50 14 43 Nob Hill Boulevard Sidewalk Improvements Nob Hill Boulevard from: S. 16th Ave. to: S. 6th Street Construct sidewalk in locations where it doesn't exist on the south side of Nob Hill 12 P 2.50 P T S W PE RW CN 1/1/2021 1/1/2022 1/1/2023 STP(S) STP(S) STP(S) 43 173 389 7 27 61 50 200 450 50 200 450 CE Yes 1/1/2023 Totals 605 95 700 650 14 44 E. Yakima Ave. & Fair Ave. Signalization Yakima Avenue from: E. Yakima Ave. to: Fair Ave. Install traffic signal at the intersection of Yakima Avenue and Fair Avenue. 12 P N/A P T W S 0 PE 11/1/20211 STP(U) CN 6/1/2022 STP(U) I 861 519 I I 141 1001 81 600 I I 1001 600 CE No Totals 605 95 700 100 600 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 15 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 45 S. 3rd Avenue & W. Washington Ave. Signal 12 P N/A P PE 4/1/2020 20 20 20 CE No S. 3rd Avenue from: S. 3rd Ave. to: W. Washington Ave. T CN 1/1/2021 210 210 210 Upgrade the traffic signalization system 230 230 Totals 230 230 20 210 19 46 75th Avenue Improvements 01 P 0.50 P PE 1/1/2021 STP(U) 130 20 150 150 CE Yes 75th Avenue 08 W RW 1/1/2022 STP(U) 173 27 200 200 from: Mead Ave. to: Nob Hill Blvd. S CN 1/1/2023 STP(U) 1,297 203 1,500 1,500 1/1/2023 T Construct a new two-lane roadway and widen portions of existing roadway, construct bridge over 0 Wide Hollow Creek, install curb, gutter, sidewalk, street lighting and storm drainage system. Totals 1,600 250 1,850 150 1,700 17 47 S. 66th Avenue Improvements 03 P 0.76 P PE 1/1/2020 STP(U) 86 14 100 100 CE Yes 66th Avenue 04 T RW 1/1/2021 STP(U) 173 27 200 200 from: Summitview Ave. to: Scenic Dr. W CN 1/1/2022 STP(U) 1,096 164 1,260 1,260 1/1/2022 S Reconstruct and widen roadway to three lanes, install curb, gutter, sidewalk, storm drainage system and utilities. O Totals 1,355 205 1,560 100 200 1,260 17 48 Rudkin Road Reconstruction 03 P 0.76 P PE 1/1/2022 STP(C) 109 TPP 100 27 236 236 CE No Rudkin Road from: E. Viola Ave. to: Rainier PI. 06 T W CN 1/9/2023 STP(C) 945 TPP 945 106 1,996 1,996 Reconstruct roadway, install curb, gutter, sidewalk and storm drainage. Partner with Union Gap to install additional sewer force main. S Totals 1,054 1,045 133 2,232 2,232 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 16 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 49 Englewood Avenue Improvements 05 P 1.00 P PE 1/1/2022 STP(C) 272 43 315 315 CE Yes Englewood Avenue 06 T RW 1/1/2023 STP(C) 349 55 404 404 from: N. 40th Ave. to: N. 56th Ave. W CN 1/1/2024 STP(C) 2,329 363 2,692 2,692 1/1/2024 Grind and overlay existing roadway, construct 5 -foot bike lanes, install curb, gutter, sidewalk, street lighting and storm drainage system, water and sewer lines. S 0 C Totals 2,950 461 3,411 3,411 17 50 Englewood Avenue Improvements 05 P 0.50 P PE 1/1/2022 STP(U) 136 21 157 157 CE Yes Englewood Avenue 06 T RW 1/1/2023 STP(U) 173 27 200 200 from: N. 16th Ave. to: N. 24th Ave. W CN 1/1/2024 STP(U) 1,164 182 1,346 1,346 1/1/2024 Grind and overlay existing roadway, construct 5 -foot bike lanes, install curb, gutter, sidewalk, street lighting and storm drainage system, water and sewer lines. S Totals 1,473 230 1,703 1,703 17 51 S. 80th Avenue Improvements 04 P 1.30 P PE 1/1/2022 TIB 280 70 350 350 CE Yes S. 80th Avenue T RW 1/1/2023 TIB 400 100 500 500 from: Tieton Drive to: Zier Road 0 CN 1/1/2024 TIB 2,520 630 3,150 3,150 1/1/2024 S Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. W C Totals 3,200 800 4,000 4,000 17 52 Englewood Avenue Improvements 03 P 1.00 P PE 1/1/2022 STP(U) 218 34 252 252 CE Yes Englewood Avenue 05 T RW 1/1/2023 STP(U) 327 51 378 378 from: N. 24th Ave. to: N. 40th Ave. 06 W CN 1/1/2024 STP(U) 2,789 435 3,224 3,224 1/1/2024 Grind and overlay existing roadway, construct 5 -foot bike lanes, install curb, gutter, sidewalk, street lighting and storm drainage system, water and sewer lines. S 0 Totals 3,334 520 3,854 3,854 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 17 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 53 88th Avenue Improvements 88th Avenue from: Tieton Dr. to: Summitview Ave. Construct curb, gutter, sidewalk and storm drainage system on the east side of 88th Avenue. 06 12 P 0.48 P T C G PE RW CN 1/1/2020 1/1/2021 1/1/2022 SRTS SRTS SRTS 41 56 403 24 34 242 65 90 645 65 90 645 CE Yes 1/1/2022 Totals 300 800 65 735 17 54 64th Avenue Improvements 64th Avenue from: Washington Ave. to: Nob Hill Blvd. Widen roadway to three lanes, install curb, gutter, sidewalk, street lighting and storm drainage system. 03 04 06 P 1.00 P T W C G 0 O PE CN 1/1/2021 1/1/2022 STP(U) STP(U) 200 1,600 32 249 232 1,849 232 1,849 CE No 1,800 281 2,081 232 1,849 16 55 1-82 & Lincoln Avenue Interchange Lincoln Avenue from: E. 'G' Street to: 1-82 Reconstruct/extend off -ramp from existing 1-82 off - ramp for Lincoln Avenue to E. 'G' Street. 01 P N/A 0 P G PE RW CN 1/1/2020 1/1/2021 6/1/2022 STP(U) STP(U) STP(U) 260 173 1,730 40 27 270 300 200 2,000 300 200 2,000 CE Yes 6/1/2022 2,163 337 2,500 300 200 2,000 14 56 16th Avenue Corridor Improvement 16th Avenue from: SR 12 to: Washington Ave. Study to determine strategies for improving the 16th Avenue corridor 04 P 3.50 P T W C G 0 S PE 1/1/2021 STP(U) 173 27 200 200 173 27 200 200 Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG 18 Six Year Transportation Improvement Program From 2019 to 2024 Hearing Date: 8/6/18 & 8/21/18 Adoption Date: 8/21/2018 Amend Date: Resolution No.: Functional Class Priority Number Project Identification A. PIN/Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or Road - Ending MP or Road F. Describe Work to Be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (M M/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 57 40th Avenue Corridor Improvements 40th Avenue from: SR 12 to: Washington Ave. Study to determine strategies for improving the 40th Avenue corridor. 04 P 3.20 P T W C G 0 S PE 1/1/2021 STP(U) 173 27 200 200 Totals 173 27 200 200 14 58 Nob Hill Boulevard Corridor Improvements Nob Hill Boulevard from: 1-82 to: 16th Ave. Study to determine strategies for improving the Nob Hill Boulevard corridor. 03 04 P 2.70 P T 0 S W C G PE 1/1/2020 STP(U) 173 27 200 200 173 27 200 200 14 59 North/South Connector to West Valley Unknown Road from: Ahtanum Rd. to: Summitview Ext. Corridor study to determine the best location for a north/south limited access route in West Valley. City and County joint project. 01 04 06 P 6.00 P T W S C G 0 PE 1/1/2021 STP(U) 432 68 500 500 CE Yes 432 68 500 500 14 60 S. 1st Street/Main Street Corridor Improvements S. 1st Street/Main Street from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap. Stucy to determine strategies for improving the 1st Street/Main Street corridor. 01 P 2.00 P T 0 S W C G PE 1/1/2021 STP(U) 173 27 200 200 No 173 27 200 200