Loading...
HomeMy WebLinkAboutWashington State Department of Transportation - McClure Elementary School - Safe Routes to SchoolWas install State W. Department of Transportation AGENCY Local Programs State Funding Agreement Work by Public Agencies Agency and Address City of Yakima 129 N. 2nd Street Yakima, WA 98901 Agreement Number LA 94 0 2 Maximum Amount Authorized 270,000.00 Location and Description of Work (See also Exhibit "A") This project will install sidewalk, cross walks and ADA ramps at various locations in the vicinity of McClure Elementary School Participating Percentage 100.00% ,Project Number ._A NLP-SR17 (on This AGREEMENT is made and entered into this 3 day of Tk Iy Z e between the STATE OF WASHINGTON, Department of Transportation, actin y and through the Secretary of Transportation, hereinafter called the "STATE," and the above named organization, hereinafter call the "AGENCY." WHEREAS, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested financial assistance for the project or program, and WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the STATE for funding assistance. NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached and incorporated and made a part hereof, IT IS MUTUALLY AGREE AS FOLLOWS: Type of Work Estimate of Funding (1) Estimated Total Project Funds (2) Estimated Agency Funds (3) Estimated State Funds PE a. Agency 11,500.00 11,500.00 b. Other Yakima County 10,000.00 10,000.00 c. Other d. State 500.00 500.00 e. Total PE Cost Estimate (a+b+c+d) $ 22,000.00 $ 0.00 $ 22,000.00 Right of Way f. Agency g. Other h. Other i. State J. Total R/W Cost Estimate (f+g+h+i) $ 0.00 $ 0.00 $ 0.00 Construction k. Contract I. Other m. Other n. Other o. Agency p. State q. Total CN Cost Estimate (k+I+m+n+o+p) $ 0.00 $ 0.00 $ 0.00 r. Total Project Cost Estimate (e+j+q) $ 22,000.00 $ 0.00 $ 22,000.00 DOT Form 140-087 Revised 03/2015 Page 1 Washington State ®® Department of Transportation July 5, 2018 Mr. Brett Sheffield Chief Engineer City of Yakima 129 North Second Street Yakima, Washington 98901 Transportation Building 310 Maple Park Avenue S.E. P.O. Box 47300 Olympia, WA 98504-7300 360-705-7000 TTY: 1-800-833-6388 www.wsdot.wa.gov RECEIVED JUL 10 2018 ENGINEERING City of Yakima McClure Elementary School Vic. Safety Improvements HLP-SR17(011) 2017 Safe Routes to School Program Dear Mr. Sheffield: The above project has received fund authorization, effective July 3, 2018, as follows: PHASE Preliminary Engineering TOTAL $22,000 STATE SHARE $22,000 Enclosed for your information and file is a fully executed copy of Local Programs State Funding Agreement LA -9402 between WSDOT and your agency. All costs exceeding those shown on this agreement are the sole responsibility of your agency. All future correspondence relating to the project is to be submitted to your Region Local Programs Engineer, Bill Preston. Sincerely, roe , Stephanie Tax Manager, Program Management Local Programs ST:tm:ml Enclosures cc: Bill Preston, South Central Region Local Programs Engineer 1FtgfLeTt— L General The AGENCY agrees to perform the above described work in accordance with the Project Application attached hereto as "Exhibit A" and made a part of this AGREEMENT. Plans, specifications, and cost estimates shall be prepared by the AGENCY in accordance with the current State of Washington Standard Specifications for Road, Bridge, and Municipal Construction and adopted design standards, unless otherwise noted. The AGENCY will incorporate the plans and specifications into the AGENCY's project and thereafter advertise the resulting project for bid and, assuming bids are received and a contract is awarded, administer the contract, or if the project is of a size which the AGENCY is authorized to perform with its own forces under the laws of the State of Washington, the AGENCY may proceed with its own forces. All work performed under this AGREEMENT shall comply with the applicable provisions of state law. 11 Payment The STATE, in consideration of the faithful performance of the work to be performed by the AGENCY, agrees to reimburse the AGENCY for the percentage of the actual direct and related indirect cost of the work shown above, up to the "MAXIMUM AMOUNT AUTHORIZED". The agency will comply with Governmental Accounting Auditing and Financial Reporting Standards and applicable state law and local regulations, policies and procedures. No payment will be made for work done prior to execution of this AGREEMENT. Partial payments shall be made by the STATE, upon request of the AGENCY, to cover costs incurred. These payments are not to be more frequent than one (1) per month. It is agreed that any such partial payment will not constitute agreement as to the appropriateness of any item and that, at the time of the final audit, all required adjustments will be made and reflected in a final payment. The AGENCY agrees to submit a final bill to the STATE within forty-five (45) days after the AGENCY has completed work. The AGENCY agrees that all costs in excess of the amount authorized and the AGENCY's matching funds shall be the responsibility of the AGENCY. III Audit The AGENCY agrees that an audit may be conducted by the STATE. During the progress of the work and for a period not less than three (3) years from the date of final payment to the AGENCY, the records and accounts pertaining to the work and accounting thereof are to be kept available for inspection and audit by the STATE and copies of all records, accounts, documents, or other data pertaining to the project will be furnished upon request. If any litigation, claim, or audit is commenced, the records and accounts along with supporting documentation shall be retained until all litigation, claim, or audit finding has been resolved even though such litigation, claim, or audit continues past the three-year retention period. IN WITNESS WHEREOF, the parties hereto have executed this AGREEM AGENCY By: Title: City Manager Date: DOT Form 140-087 Revised 03/2015 IV Legal Relations No liability shall attach to the AGENCY or the STATE by reason of entering into this AGREEMENT except as expressly provided herein. V Nondiscrimination The AGENCY agrees to comply with all applicable state and federal laws, rules, and regulations pertaining to nondiscrimination and agrees to require the same of all subcontractors providing services or performing any work using funds provided under this AGREEMENT. VI Venue For the convenience of the parties to this AGREEMENT, it is agreed that any claims and/or causes of action which the AGENCY has against the STATE, growing out of this AGREEMENT or the project or program with which it is concerned, shall be brought only in the Superior Court for Thurston County. VII Termination The Secretary of the Department of Transportation may terminate this AGREEMENT if the funding becomes unavailable or if the Secretary determines that it is in the best interest of the STATE. VIII Final Report and Final Inspection Within ninety (90) days following the completion of the project and submission of the final billing for the project, a final report and/or final inspection shall be submitted to the Director, Highways & Local Programs containing the following information: Non -Capital Projects 1. A description of the project or program. 2. A summary of actual costs of the project or program. 3. An evaluation of the project or program. This should address aspects such as transportation and/or other benefits to the public. Capital Projects 1. A final inspection is required. IX Supplement This agreement may be modified or supplemented only in writing by parties. ENT on theday a year last written belo . STATE By: Dir r, Local Programs Date: JUL 0 3 2018 CITY CONTRACT NO* ,v )0 RESOLUTION NO: 1 l ( 4 Page 2