Loading...
HomeMy WebLinkAbout02/20/2018 06E Addendum 4 to the Engineering Agreement with Golder Associates, Inc.; Naches River Water Treatment Plant Intake ProjectITEM TITLE: SUBMITTED BY: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT 1 Item No. 6.E. For Meeting of: February 20, 2018 Resolution authorizing execution of Addendum 4 to the Engineering and Consulting Services Agreement with Golder Associates, Inc. 2011-085 for $103,550 to complete permitting efforts for the Naches River Water Treatment Plant Intake Project David Brown, Water/I rrigation Manger, 509-575-6204 Scott Schafer, Director of Public Works SUMMARY EXPLANATION: Improvements to the Water Treatment Plant intake are necessary to ensure proper flow of Naches River to the Water Treatment Plant. Over the last few years, several high water events have caused the Naches River to migrate away from the intake. Design of these improvements are completed and the project is ready for the permitting process. This addendum is necessary to receive permits and to make changes required by the permitting agencies. Permits are required from Corps of Engineers, Yakima County (both Shoreline and SEPA), Washington Fish and Wildlife and Washington Department of Ecology. Consultation with National Marine Fisheries and US Fish and Wildlife regarding Endangered Species is also necessary. Using the Municipal Research and Services Center (MRSC) of Washington Roster, a statewide small works and consultants roster system, followed by a competitive selection process, the City selected Golder Associates, Inc. The City desires to enter into Addendum 4 to the existing Professional Services Agreement with Golder Associates, Inc. to apply for and obtain permits required for the Water Treatment Plant Intake I mprovements. The terms of Addendum 4 would be in an amount not to exceed $103,550. (See attached Agreement with Exhibit A and B) Exhibit A of the Agreement describes the Scope of Work. Exhibit B of the Agreement describes the Schedule of Rates. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR City Manager SUBMITTAL: STAFF RECOMMENDATION: Adopt Resolution BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date O Resolution 1/17/2018 O Addendum 1/17/2018 Type Resc ution act 2 A RESOLUTION RESOLUTION NO. R-2018- 3 authorizing execution of addendum 4 to the engineering and consulting services agreement with Golder Associates, Inc. 2011-085 for $103,550 to complete Permitting efforts for the Naches River Water Treatment Plant Intake Project. WHEREAS, the City is in the process of making improvements to the Water Treatment Plant Intake, which requires applying and obtaining permitting for the project; and WHEREAS, the City desires to enter into Addendum 4 to the existing Professional Services Agreement with Golder Associates, Inc. 2011-085 to apply and obtain permits required for the Water Treatment Plant Intake Improvements; and, WHEREAS, the City of Yakima used the procedure established by the State of Washington and used the Municipal Research and Service Center Professional Services Roster process to select a firm to perform the design work; and WHEREAS, Golder Associates, Inc. was determined to be qualified to perform the needed hydraulic model work; and WHEREAS, the Scope of Work and Budget included in this supplement meet the needs and requirements of the City of Yakima for this project, and WHEREAS, the City Council of the City of Yakima finds that it is in the best interest of the City and its residents to enter into Addendum 4 to the Professional Services Agreement with Golder Associates, Inc. 2011-085, to apply and obtain permits for the Water Treatment Plant Intake Improvement Project, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached Addendum 4 to the Professional Services Agreement with Golder Associates, Inc., attached hereto and incorporated herein by this reference, not to exceed One Hundred and Three Thousand Five Hundred and Fifty Dollars ($103,550) to provide the Professional Services as described in the Addendum. ADOPTED BY THE CITY COUNCIL this _ day of , 2018. Kathy Coffey, Mayor ATTEST: Sonya Claar Tee, City Clerk For City of Yakima Use Only: Contract No.2011-085 Project No. AC2335 Resolution No.R-2011-154_ SOQ No. AGREEMENT FOR PROFESSIONAL SERVICES ADDENDUM NO. 4 4 This Addendum, hereinafter identified as Addendum No. 4, is hereby entered into and made a part of the Agreement between City of Yakima, Washington, and Golder Associates, Inc., for Professional Services first entered into on the 9th day of April, 2010, by the CITY OF YAKIMA, hereinafter called the "CITY," and GOLDER ASSOCIATES, INC., hereinafter called the "ENGINEER." WITNESSETH: That in consideration of the mutual covenants and agreements herein contained, the parties hereto do mutually agree to amend, revise, and/or add the following to the referenced Agreement: SECTION 2 - SCOPE OF SERVICES 2.1 Basic Services: In addition to the duties set forth in the underlying agreement, ENGINEER agrees to perform additional work tasks described in the attached Addendum No. 4 Exhibit A: Permitting Support for the City of Yakima Water Intake Project (Project). SECTION 5 - COMPENSATION 5.1 COMPENSATION ON A TIME SPENT BASIS AT SPECIFIC HOURLY RATES: For the services described in the attached Addendum No. 4 Exhibit A, compensation shall be on a time spent plus expenses basis at the ENGINEER's normal hourly billing rates shown on Exhibit B, attached to this agreement. IN WITNESS WHEREOF the parties hereto duly enter into and execute this Addendum No. 4, as of this day of , 2018. Other than specific amendments stated herein, all other terms, conditions and requirements of the underlying contract shall remain in full force and effect throughout the term of the underlying contract. CITY OF YAKIMA GOLDER ASSOCIATES, INC. Signature Signature Printed Name: Cliff Moore Printed Name: Title: City Manager Title: Date: Date: Attest Sonya Claar Tee, City Clerk City Contract No. 2011-85 Resolution No. R-2011-154 Page 1 5 ADDENDUM NO. 4 EXHIBIT A CITY OF YAKIMA - NACHES RIVER HYDROTECHNICAL ENGINEERING SUPPORT FOR THE WATER TREATMENT PLANT INTAKE SCOPE OF WORK During the term of this AGREEMENT, the ENGINEER shall perform professional services in connection with the following project: A scope of work is presented here to complete Permitting for the City of Yakima Water Intake Project (Project): The initial project tasks addressing Data Review (Task 1), Site Reconnaissance (Task 2), and Reporting (Task 3) for the first phase of work have been completed, as indicated below. Meetings and Final Design tasks (4 and 5, respectively) are on-going. Development of hydraulic models, which includes data review and model development for a new intake structure and floodplain stabilization structures and reporting (Tasks 6 through 8) have been similarly been completed. The new Permitting Support work (Task 9) is addressed in this addendum: Task 1 — Data Review (COMPLETE) Task 2 — Site Reconnaissance (COMPLETE) Task 3 — Reporting (COMPLETE) Task 4 — Meetings (IN PROGRESS) Task 5 — Final Design (IN PROGRESS) Task 6 — Develop 1D HEC -RAS Model (COMPLETE) Task 7 — Develop 2D TUFLOW Model (COMPLETE) Task 8 — Hydraulics Technical Memorandum (COMPLETE) Task 9 — Permitting Support (NEW) Detailed descriptions of the services are provided as follows: Task 9 — Permitting Support for the City of Yakima Water Intake Project Description: Prepare and submit City of Yakima Water Intake Project permits as described within the following subtasks 9a through 9f below. Assumptions: • Golder Associates, Inc. (Golder) will serve as the prime through permitting process and provide integrated engineering, coordination and project management. • 48 North Solutions, Inc. (48 North), as a sub -contractor to Golder, to provide permit expertise, support, development, and coordination. • This scope/budget is focused on developing and submitting permit level documents for Agency/regulatory permit review, generally using the currently developed Project design drawings and information; this scope/budget does not include detailed engineering effort or development of construction bid packages and drawings. • No Habitat Management Plan or Mitigation Plan for the Project will be required as part of this scope. Page 2 6 • Permitting support provided by 48 North is as described herein and in more detail in their proposal dated December 14, 2017; and all information contained in that proposal are applicable to the work as described in this Addendum. • Permitting effort and corresponding engineering effort assumes the current status of design is generally accepted by the Agencies and corresponding regulatory review of permit submittals, and that no significant changes to the design are required; any significant changes or modifications to the design or corresponding permit documents (after permit submittals as described herein) would require updating the scope/budget to reflect the required Agency changes. Deliverables: As described in subsequent tasks. Schedule: Final schedule to be coordinated with the City. Anticipated completion summer 2018. A working schedule will be initiated immediately upon start of the work, and then updated and revised as additional and/or new information is developed. Task 9a — Project Management Description: On-going project management throughout all subtasks to track resources, schedule, budgets, and deliverables for Golder staff and sub -contracted effort by 48 North. Assumptions: • Golder will serve as the prime and lead project management with support by 48 North. Deliverables: Regularly scheduled meetings to update on status (anticipating every -other - week), email communications, monthly invoicing and billing statements, etc. Schedule: Concurrently throughout Task 9. Cost: $4,650. Task 9b — Design Drawings and Engineering Description: Review and develop technical input, drawings, engineering, and related information for the permit documents. Assumptions: • Information developed to support permit submittal is not intended to meet the detailed design or engineering level. • Includes permitting level estimates for material quantities, volumes, areas, specifications. • Review/development of preliminary construction methods/engineering and water diversion options • JARPA-formatted figures/drawings to support permit applications. • 2 -year peak flow estimates and inundation areas. Deliverables: Technical input in the form of MS Word documents, drawings, emails, input, meeting coordination, etc. throughout the subsequent subtasks. Page 3 7 Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review; anticipated completion Q1 -Q2/2018. Cost: $17,200. Task 9c — Ordinary High Water Mark Determination Description: Complete a field assessment and delineation of the Ordinary High Water Mark (OHWM). Assumptions: • The OHWM is needed to determine the project footprint to support permit submittals. OHWM will be determined for both sides of the Naches River channel and extend approximately 50 -feet upstream and downstream of the expected construction limits, and will include a review of flow conditions. • Location will be marked with flagging and tagged with hand-held GPS units so that a Washington -registered survey crew to be contracted by the City can come back and capture the locations. • This subtask assumes that wetland delineations will not be completed. • Site access will be coordinated by the City for field assessment and delineation. Deliverables: Report summarizing the methods and conclusions of the delineated OHWM. This stand-alone report will accompany permits (addressed in subsequent subtasks); will include a description of the aquatic and terrestrial resources at the site and a description of the delineated OHWM boundaries. Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review; anticipated completion Q1 -Q2/2018. Cost: $15,100. Task 9d — SEPA Checklist and Local Permitting Description: Develop a standard State Environmental Policy Act (SEPA) Environmental Checklist, a Critical Areas Checklist, and the Shoreline Substantial Development permit applications. Assumptions: • SEPA Checklist will be sufficient for permitting requirements, and the project will not require an SEPA Environmental Impact Statement (EIS). • Cultural Resources Report has been/will be completed by others (i.e. outside the scope of this effort). • Package will be formatted and provided to the City for official submittal. Deliverables: One (1) draft copy of the SEPA Checklist and each permit application in MS Word format for internal review, and then prepare the final permit documents for submittal. Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review; anticipated completion Q1 -Q2/2018. Page 4 8 Cost: $16,300. Task 9e — Joint Aquatic Resource Permit Application and Assessments Description: Develop a Joint Aquatic Resource Permit Application (JARPA), Biological Assessment, and Essential Fish Habitat Assessment Assumptions: • Development of the JARPA will include the review of past communications between the City and the Federal and State agencies. An on-site meeting with the City is anticipated to be coordinated during the effort to complete the OHWM delineation. • Biological Assessment (BA) is anticipated under the Endangered Species Act (ESA) for either an informal determination of "may affect, is not likely to adversely affect", or formal determination of "may affect, is likely to adversely affect". Consultation to the National Marine Fisheries Service (NMFS) and/or the US Fish and Wildlife Service (collectively called the "Services") is expected. This subtask will coordinate with the Services to discuss the Project, and prepare the requested documentation summarizing the potential impacts of the Project on ESA -listed species. • Essential Fish Habitat (EFH) Assessment will include preparation of an EFH assessment for NMFS review; the resulting determination will either be "may adversely affect" or "will not adversely affect" designated EFH. The EFH is expected to address Chinook and coho salmon. An effect of determination will be made for a group of species rather than for each species. Deliverables: One (1) draft copy of the JARPA, BA, and EFH, and each permit application in MS Word format for internal review. A final package for submittal will be developed based on input and edits from the team and then submitted to the required agencies. Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review; anticipated completion Q1 -Q2/2018. Cost: $46,300. Task 9f — Permit Submission Trackinq Description: Submittal tracking by 48 North of all applications. Assumptions: • This level of effort anticipates tracking to be completed through teleconference and email communications and does not anticipate in-person meetings with stakeholders or larger unexpected changes to the permit package. Deliverables: 48 North will communicate via telephone and/or email with the respective agencies (addressed herein) to track permitting reviews and address questions, in order to keep the permitting process moving as efficiently as possible. Schedule: Final schedule to be coordinated with the City and pending input from Agency/regulatory review. Cost: $4,000. Page 5 9 BUDGET SUMMARY A subtask breakdown of costs and a total task cost is presented table below. Table 1: Budget Summary Task Budget Task 9a — Project Management $4,650 Task 9b — Design Drawings and Engineering $17,200 Task 9c — OHWM Determination $15,100 Task 9d — SEPA Checklist and Local Permitting $16,300 Task 9e — JARPA and Assessments $46,300 Task 9f — Permit Submission Tracking $4,000 Total $103,550 Page 6 ADDENDUM NO. 4 EXHIBIT B Page 7 of 7 10 GolderAssociates 11 SCHEDULE OF FEES REDMOND,U������ '------'~~'---~~^~~,,,,~~~^`~^~ Effective January 1.2O17 Invoices from Golder Associates include labor charges, other direct costs, and costs associated with in-house services. Charges include only those services directly attributable to the execution of the work. Time spent when travelling in the interests of the work will be charged in accordance with the hourly rates. Labor charges are based upon standard hourly billing rates for each category of staff, The billing rates include costs for salary, payroll texoo, insurance associated with employment, benefits (including holiday, sick |eavo, and vuuaUon), administrative ovorhoado, and profit. In some cases statutory overtime rates may apply. Rates by labor category are as follows: ENGINEERS, SCIENTISTS, PROJECT MANAGERS AND REVIEWERS* Junior Level 01 $100/h Junior II Level C2 $11O/h Intermediate | Level C3 $135/h Intermediate || Level C4 $165/h A000uiato/Senior| Level C5 $185/h Asnnoiate/Geninr|| Level C6 $215/h Principal/Associate/Senior ||| Level C7 $230/h Principal/Specialist Level C8 $250/h ADMINISTRATIVE SUPPORT Admin Support Level B1 $75/h Staff Admin Support Level B2 $85/h Senior Admin Support 1 Level B3 $95/h SeniorAdmin Support 11 Level B4 $105/h TECHNICIANS/TECHNOLOGISTS Junior Level T1 $80/h Junior II Level T2 $100/h Intermediate Level T3 $115/h Senior Level T4 $125/h CAD AND CIVIL ENGINEERING DESIGN TECHNOLOGISTS/ GIS / Draftsperson Level D1 $85/h Staff Draftsperson Level D2 $85/h Senior Draftsperson Level D3 $115/h NOTES The above rates are subject to revision. A 7% charge will be added to the total fees to cover normal incidental off ce disbursements, including but not limited to associated communication charges, travel and document production. A 15% carrying charge will be added to disbursements including materials, subcontractor costs, drilling or excavation services and use of external laboratory services. * Rates for specialist services, including but not limited to litigation support, expert witness, including time spent in depositions and the preparation and presentations of testimony, and/or senior level consultation, and priority emergency level services are available upon request. Rates for laboratory services and use of equipment owned by Golder Associates will be provided upon request. Special Note: 1. The rates and charges llsted above exclude applicab/e /oca/ and federal taxes The taxes will appear as a separate line item on each invoice. Golder Associates Inc. 1830NE Union Hill Roa.s"xe20m Redmond, WA 9805USA Tel: (425) 883-0777 Fax(425) 882-5498 wmw.nvu°,.ovm Golder, Golder Associates and the GA globe design are trademarks of Golder Associates Corporation