HomeMy WebLinkAboutPacific Power - Watt Smart - Street Lights Phase 2PACIFIC POWER
A DIVISION OF PACIFICORP
14845 SW Murray Scholls Dr.
Suite 110, PMB #513
Beaverton, OR 97007
wattsmart Business — Incentive Offer Letter
(Washington)
Participant
Customer Name: Joseph Rosenlund
Business Name: City of Yakima
Business Address: City wide
Pacific Power
watt smart Business Program
Program Representative:
Becky Berg - Program Coordinator
503-515-7292 fax: 503-482-7447
wa.lighting@pacificpower.net
City, State Zip: Yakima , WA
After reviewing your application we are pleased to provide you an incentive offer for the successful implementation of the
approved energy efficiency measures described in the attached exhibit(s).
Cash Incentive Estimate
Typical Upgrade Incentive: Issue Date: 12/29/2017
See Exhibit A Completion Date: 6/27/2018
For this offer to remain valid and to receive an incentive. it is the responsibility of the participant to:
I. Sign and return this offer to the contact above no later than:
2. Implement the project by the Completion Date.
3.
2/27/2018
Notify Pacific Power of any changes that materially affect the implementation schedule, measure costs or savings.
4. Upon project completion notify Pacific Power.
5. Provide all required documentation and participate in any required inspections.
Acknowledaement
I understand: (1) my responsibilities listed above; (2) the incentive offer is an estimate; (3) the incentive paid will be based on
verified electric energy savings and approved costs; (4) If I terminate a material portion of my electric service requirements
from Pacific Power for my facility within 60 months of the date of the final incentive payment under this Incentive Offer, and
my facility remains in operation, I am obligated to repay the final incentive to Pacific Power with 30 days of written request.
The repayment ("Repayment") will be determined as follows: Repayment - final incentive x (60 - Savings Delivery Term)/60,
where Savings Delivery Temn = number of months between the month the Final Incentive payment was made and the month
the Facility terminated a material portion of its electric service. For determining the repayment, the dates will be the first day
of the month in which they occur.
4—ittA
Name (please print)
Signature
,1'sl-�F- Q,
Title
tl) nototth)
�-• ate, z��
Date
Publicity Release
Please check the box below if you agree to give Pacific Power and its affiliated companies permission to include your
company name and certain specific details about this project and any future projects in its print ads, press releases, articles,
customer communications. website, etc. The project details would be limited to company name, annual energy and cost
savings. project cost. incentive amount, paybacks before and after incentives, and the type of project (e.g. lighting, HVAC,
compressed air, irrigation. etc.).
0 Yes, I give Pacific Power permission to include my company name and project information as described in the paragraph
above.
Company name as you would like it to appear:
Signature Date
WSBWA_71354 City of Yakima Street Lights PH2
V 071116.3CBecky Berg 12/29/2017
ITY CONTRACT NO: 'O
29
�>/Z
RESOLUTION NO
PACIFIC POWER
Let's turn the answers on.
V 071116.3
Project Site Information
Project Name
Business Name
Installation Address
City, State, Zip
Contact, Title
Phone, Email
Account, Meter, Rate
Participant is:
Business Type
City of Yakima Street Lights PH2
City of Yakima
City wide
Yakima
WA
Joseph Rosenlund
SL rate
24
E Acct Holder 0 Elect. User ❑Building Owner
Other
Coordinating Contractor Information
Contact
Business Name
Address
City, State, Zip
Phone, Email
Kurt Lundgren
❑ EEA Participant
Ameresco
509-343-5308
klundorenaameresco.com
Payee Information
Incentive Should
Business Name
Attention
Check Reference
Address
City, State, Zip
Be Addressed To:
Other Address (Listed Below)
City of Yakima
Johnny Martinez
2301 Fruitvale Blvd
Yakima
WA 98902
Customer Information (As Shown on Tax Forms)
Business Name
Address
City, State, Zip
Office Use Only
City of Yakima Street Lights PH2 10
You Can Now Use The Project
Information Tab
Processing Information
Washington
wattsmart' Business
Project ID
Lighting Coordinator
Tool Prepared by
Project Manager
Account Manager
07/11/16 Effective Date
WSBWA_71354
Becky Berg
Jason Dietel
Construction Type
Retrofit
Stage
Incentive Offer Needed
Project Cost
Material
Labor
Other
Total Project Cost
$169, 224.00
$223, 250.00
$150, 451.00
$542,925.00
Space Type & Size
Calculation Method Extenor Only
Allowed Wattage
0
FT2
FT2
FT2
FT2
FT2
W/FT2
W/FT 2
W/FT 2
W/FT2
W/FT2
W/FT2
FT2
0
0.00
Lighting Operation Schedule
# of Holidays Closed?
Day A B C D E
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Op Weeks Per Year
Add/Edit Seasonal
Schedule
S is for 0 hrs/year
X is for 8760 hrs/year
Y is for 4380 hrs/year
Total
Additional Information
Import
Existing
Project
EEA
Participant
Info
Email
Coordinator
Lighting
Catalog
LED
Policy
Report A
Problem
1/23/2018
Page 1
Category
LED
,a1W • c, ,4 5,11w
Incentive
PACIFIC POWER
Let's turn the answers on.
to
O1
tO
\
1°°
Sri'
S3
Fixture
Add Fixture ,ai w C, ,ta°s,....,
- ; tisw us1 swm W
$35,437.08
Lamp
Remove Fixture u a /. c) eo uW
Lamp il40
115
i2< ,ll1 .eo to m+w
Clear Filter ii eCJi-,two sow
Savings Information
L.ep Qty
39 w C 1 fn'wr os
Build Fixture _, n.w ,w ,o1W
$38,845 Saved Per Year
„Project Tracking,,
Proposed. -
K Lundgren 12,6/2017
Ballast
,
Insw c r rasa ,.. s•,v _ _a
'..,
13.1 Year Simple Payback
Factor
Reset -�
590,618 kWh Saved Per Year
115W-CUST:LEDPM-115W
Lighting Power Density
Fre-Inspection Completed.
Jason D0ete/ 1/82018
Custom Fixture
0.00
°.o°
Code
Exletam
O.O%
Better Than Code
Incentive Offer Needed
Stipulated Wattage
Full Incentive (69% of Cost Paid By Incentive)
°.o°
Proposed
LPD (w/fN)
Incentive Offer Needed WSBWA_7/354 City of Yakima Street Lights PH2
Contracted
Post -inspection
15 out Of 15 Lines used
s
Interior
0
Interior
c
Existing
902
0
Exterior
/90.539
Proposed
902
0
Exterior
55.695
Final Review Needed
a
LT Incentive Type
30.06/kWh Saved PM
8
Fixtue
Fixture
Wattage
Space
Wattage
Ftxture
OP,
Canei,t.4
Fixture
Wattage
Space
Wattage
;;Project Notes,,
40W: AEL ATBS E MVOLT R3 MP
NL P7 AO = 39.8W DLC PM
71%
58%
LT $$$
$1,792.32
1
P Y
70HPSCobra
HPS-70W
124
95
11,780
CUST: LEDPM-40W
124
40
4,960
2
P Y
100HPSCobra
HPS-100W
193
130
25,090
CUST: LEDPM-40W
193
40
7.720
ATBS E MVOLT R3 MP NL P7 AO
69%
$4,564.86
30,06/kWh Saved PM
$0.06/kWh Saved PM
3
P Y
100HPSCobra
HPS-100W
7
130
910
LEDPM-80W
7
80
560
80W: ATBM C MVOLT R3 46 MP
NL P7 = 80.33W DLC PM
38 %
$91.98
4
P Y
120LEDCobra
LEDPM-120W
1
120
120
LEDPM-80W
1
80
80
ATBM C MVOLT R3 48 MP NL P7
33%
79%
39%
$10,50
$5,989,74
$19.20
30,06/kWh Saved PM
$0.06/kWh Saved PM
$0.06/kWh Saved PM
5
P Y
150HPSCobra
HPS-150W
154
188
28,952
CUST: LEDPM-40W
154
40
6,160
ATBS E MVOLT R3 MP NL P7 AO
6
P Y
150HPSCobra
HPS-150W
1
188
188
CUST: LEDPM-115W
1
115
115
115W: AEL ATBM E MVOLT R3
4B MP NL P7 = 114.92W DLC PM
7
P Y
200HPSCobra
HPS-200W
45
250
11.250
CUST: LEDPM-40W
45
40
1,800
ATBS E MVOLT R3 MP NL P7 AO
84%
68%
$2.483.46
$8,086,38
$0.06/kWh Saved PM
30.06/kWh Saved PM
8
P Y
200HPSCobra
HPS-200W
181
250
45,250
LEDPM-80W
181
80
14,480
ATBM C MVOLT R3 48 MP NL P7
9
P Y
250HPSCobra
HPS-250W
6
295
1,770
CUST. LEDPM-40W
6
40
240
ATBS E MVOLT R3 MP NL P7 AO
86%
73%
3402,06
$3,220.62
$0.06/kWh Saved PM
30.06/kWh Saved PM
10
P Y
250HPSCobra
HPS-250W
57
295
16,815
LEDPM-80W
57
80
4,560
ATBM C MVOLT R3 48 MP NL P7
11
P Y
310HPSCobra
HPS-310W
1
365
365
CUST LEDPM-40W
1
40
40
ATBS E MVOLT R3 MP NL P7 AO
89%
$85.44
$0.06/kWh Saved PM
30.06/kWh Saved PM
12
P Y
310HPSCobra
HPS-310W
125
365
45.625
CUST: LEDPM-115W
125
115
14.375
ATBM E MVOLT R3 48 MP NL P7
68%
$8,212.50
13
P Y
400HPSCobra
HPS-400W
1
465
465
LEDPM-80W
1
80
80
ATBM C MVOLT R3 48 MP NL P7
83%
$101.16
$0.06/kWh Saved PM
$0.06/kWh Saved PM
14
P Y
400HPSCobra
HPS-400W
3
465
1,395
CUST: LEDPM-115W
3
115
345
ATBM E MVOLT R3 48 MP NL P7
75%
$275.94
15
P Y
150HPSPT2
HPS-150W
3
188
564
CUST: LEDPM-60W
3
60
180
60W Granville - GVD2 P30 40K
AS M BK 3 N C U P7 NL1X1 =
60W DLC PM
68%
$100.92
$0.06lkWh Saved PM
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
;4
46
47
48
49
�q
50
51
52
53
City of Yakima Street Lights PH210
1/23/2018203 PM
Page 2 of 4
PACIFIC POWER
Let's turn the answers on.
V 071116.3
Custon,a, t„rn,rti.,
Viewing The Incentive Offer
Needed Stage
Project
Company
Customer Contact
City of Yakima Street Lights PH2
City of Yakima
Joseph Rosenlund
•, Stipulated Wattage
Actual Wattage
Stipulated
Wattage
Lighting
Control
Total
kWh/Year
590,618
0
590,618
Avg kW/Month
0.00
0.00
0.00
$ Savings/Year
$38,844.95
$0.00
$38,844.95
Total Cost
Total Incentive
7% Of Cost Paid By Incentive
$542,925.00
$35,437.08
Net Project Cost $507,488
Lighting
Controls
Incentive
$35,437.08
$35,437.08
Full Incentive
0% Better Than Code LPD (w/ft')
Existing Code Proposed
71% Better Than Code Operation Cost/Yr
Existing Code Proposed
0.00
0.00
0.00
$54,889
$54,889
$16,044
Simple Payback
(Without Incentive)
14.0 Yrs
Simple Rate Of Return
_ (Without Incentive)
7%
Simple Payback
(With Incentive)
13.1 Yrs
Simple Rate Of Return
(With Incentive)
Project
Washington
wattsmart Business
07/11/16 Effective Date
Project ID
Lighting Coordinator
Lighting Tool Prepared by
nhtinn Energy Usage Over Time
WSBWA_71354
Becky Berg
Jason Dietel
E $700,000
a $600,000
J
g500, 000
Sv 400, 000
aLLI$300,000
0
o $200,000
O $100,000
$0
00
2.0 4.0
6.0 8.0 10.0 12.0
— — Existing or Code
Proposed • SPB
14.0
Years
I(ect Cost
The incentive and energy savings above are estimates only. This tool is designed to calculate savings and incentives for wattsmart Buisness lighting projects.
For wattsmart Buisness Lighting projects, lighting incentives are capped at 70% of eligible energy efficiency project costs, and the minimum simple payback (with incentive) for the project is one
year. If needed, incentives will be decreased to reflect a one-year payback. The simple payback with incentive is the net project cost divided by the annual electric cost savings (dollar savings).
For wattsmart Small Business Lighting projects, lighting retrofit incentives are capped at 80%.
Stipulated vs. Actual wattage — This tool has two calculation methods to distinguish between actual and stipulated wattages. There will only be a difference between actual and stipulated if the
existing fixtures are impacted by efficacy standards (e.g. general service fluorescent and incandescent). Results from either calculation can be viewed by selecting "Stipulated wattage" or "Actual
wattage." Incentive calculations and 1-year simple payback cap are always based on stipulated wattage.
To receive an incentive you MUST sign an Incentive Offer before purchasing equipment.
City of Yakima Street Lights PH2 10
1/23/2018 Page 4
RESOLUTION
PA,CIFICOFopPOWER
14845 SW Murray Scholls Dr.
Suite 110, PMB 4513
Beaverton, OR 97007
watt smart' Business — Incentive Offer Letter
(Washington)
Participant Pacific Power
Customer Name: Joseph Rosenlund watt smart Business Program
Business Name: City of Yakima Program Representative:
Becky Berg - Program Coordinator
Business Address: City wide 503-515-7292 fax: 503-482-7447
wa.lighting@pacificpower.net
City, State Zip: Yakima , WA
After reviewing your application we are pleased to provide you an incentive offer for the successful implementation of the
approved energy efficiency measures described in the attached exhibit(s).
Cash Incentive Estimate
Typical Upgrade Incentive:
See Exhibit A
Issue Date: 12/29/2017
Completion Date: 12/29/2018
For this offer to remain valid and to receive an incentive. it is the responsibility of the participant to:
1. Sign and return this offer to the contact above no later than:
2. Implement the project by the Completion Date.
3.
7/27/2018
Notify Pacific Power of any changes that materially affect the implementation schedule, measure costs or savings.
4. Upon project completion notify Pacific Power.
5. Provide all required documentation and participate in any required inspections.
Acknowledaement
I understand: (1) my responsibilities listed above; (2) the incentive offer is an estimate; (3) the incentive paid will be based on
verified electric energy savings and approved costs; (4) If I tenninate a material portion of my electric service requirements
from Pacific Power for my facility within 60 months of the date of the final incentive payment under this Incentive Offer, and
my facility remains in operation, I am obligated to repay the final incentive to Pacific Power with 30 days of written request.
The repayment ("Repayment") will be determined as follows: Repayment - final incentive x (60 - Savings Delivery Tenn)/60,
where Savings Delivery Term = number of months between the month the Final Incentive payment was made and the month
the Facility terminated a material portion of its electric service. For determining the repayment, the dates will be the first day
of the month in which they occur.
a t a rncb
Name (please print)
Signs
Title
k, 5, aCil<
Date
Publicity Release
Please check the box below if you agree to give Pacific Power and its affiliated companies permission to include your
company naive and certain specific details about this project and any future projects in its print ads, press releases, articles,
customer communications. website. etc. The project details would be limited to company name, annual energy and cost
savings. project cost. incentive amount, paybacks before and after incentives, and the type of project (e.g. lighting, HVAC,
compressed air, irrigation. etc.).
❑ Yes, I give Pacific Power permission to include my company name and project information as described in the paragraph
above.
Company name as you would like it to appear:
Signature Date
WSBWA_71354 City of Yakima Street Lights PH2 V 071116.3
Supercedes and extends
completion date of Becky Thompson 6/27/2018
previous Incentive Offer
PACIFIC POWER
Let's turn the answers on.
V 071116.3
Project Site Information
Project Name
Business Name
Installation Address
City, State, Zip
Contact, Title
Phone, Email
Account, Meter, Rate
Participant is:
Business Type
City of Yakima Street Lights PH2
City of Yakima
City wide
Yakima
WA
Joseph Rosenlund
SL rate
24
E Acct Holder El Elect. User ❑ Building Owner
Other
Coordinating Contractor Information
Contact
Business Name
Address
City, State, Zip
Phone, Email
Kurt Lundgren
❑ EEA Participant
Ameresco
509-343-5308
klundgrenc ameresco.com
Payee Information
Incentive Should
Business Name
Attention
Check Reference
Address
City, State, Zip
Be Addressed To:
Other Address (Listed Below)
City of Yakima
Johnny Martinez
2301 Fruitvale Blvd
Yakima
WA 98902
Customer information (As Shown On Tax Forms)
Business Name
Address
City, State, Zip
Office Use Only
City of Yakima Street Lights PH2 10
You Can Now Use The Project
Information Tab
Processing Information
Washington
wattsmare Business
Project ID
Lighting Coordinator
Tool Prepared by
Project Manager
Account Manager
07/11/16 Effective Date
WSBWA_71354
Becky Berg
Jason Dietel
Construction Type
Retrofit
Stage
Incentive Offer Needed
Project Cost
Material
Labor
Other
Total Project Cost
$169, 224.00
$223, 250.00
$150, 451.00
$542,925.00
Space Type & Size
Calculation Method Exterior Only
Allowed Wattage
0
FT 2
FT 2
FT2
FT2
FT2
W/FT2
W/FT2
W/FT2
W/FT2
W/FT2
W/FT2
FT
0
0.00
Lighting Operation Schedule
# of Holidays Closed?
Day A B C D E
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Op Weeks Per Year
Add/Edit Seasonal
Schedule
S is for 0 hrs/year
X is for 8760 hrs/year
Y is for 4380 hrs/year
Total
Additional information
Import
Existing
Project
EEA
Participant
Info
Email
Coordinator
Lighting
Catalog
LED
Policy
Report A
Problem
1/23/2018
Page 1
Category
LED
L "•'
Incentive
PACIFIC POWER
I c` s tum the onswers on.
]II.
Falore
Add Fixture =
$35,437.08
Lamp
Remove Frxbne
L.np (W9
i 15
Char Filter . _ .
Savings information
:Amp ory
Build Fixture
$3a,aPer45 Saved rYear
„Project Tracking..
Proposed:
K Lundgren 121 2017
Ballast
f r + _.— _ _ . 1
13.1 Year Simple Payback
FeGOt
Reset
590,511 kWh Saved Per Year
115W - CUST LEDPA1-115W
Lighting Power Density
Pre -Inspection Completed:
Jason Deed1/d2016
Custom Fixture
O. oo
o 00
Code
amino
0.0%
Better Than Code
Incentive Offer Needed
Stipulated Wattage
Full Incentive (6 5% of Cost Paid By Incentive)
0 00
Proposed
LPD (w/R')
incentive Offer Needed WSBWA_71354 City of Yakima Street Lights PH2
Contracted
Post -Inspection
Is Out or 75 DIMS used
S
toted/sr
0
Existing
902
0
EKterbr
190 539
Proposed
902
0
&tarlw
55.695
Final Review Needed
LT alo.800. Type
ii
_
-...<o.
_..
�.
Fixture
Wattage
Space
Wattage
F'.r
ur,
o r„o.
c , r, r
FanMe
Wattage
Space
Wattage
;;Project Notesll
1
P Y
70HPSCobra
HPS-70W
124
95
11.780
CUST LEDPM-40W
124
40
q,g60
40W: AEL ATBS E MVOLT R3 MP NL P7 AO = 39.BW DLC PM
58% $1,792.32
50.06/kWh Saved PM
2
P Y
100HPSCobra
HPS-100W
193
130
25,090
CUST LEDPM-40W
193
40
7,720
ATBS E MVOLT R3 MP NL P7 AO
69% $4,564.86
38 % $91.98
$0.06/kWh Saved PM
$0.06ikWh Saved PM
3
P Y
100HPSCobra
HPS-100W
7
130
910
LEDPM-80W
7
80
560
80W ATBM C MVOLT R3 4B MP
NL P7 = 80.33W DLC PM
4
P Y
120LEDCobra
LEDPM-120W
1
120
120
LEDPM-80W
1
80
80
ATBM C MVOLT R3 4B MP NL P7
33% $10.50
$0.06AlWh Saved PM
50.06/kWh Saved PM
5
P Y
150HPSCcbra
HPS-150W
154
168
28.952
CUST. LEDPM-40W
154
40
6,160
ATBS E MVOLT R3 MP NL P7 AO
79% $5.989.74
6
P Y
150HPSCobra
HPS-150W
1
188
188
CUST: LEDPM-115W
1
115
115
115W: AEL ATBM E MVOLT R3
4B MP NL P7= 114.92W DLC PM
39% $19.20
$0.06MWh Saved PM
7
P Y
200HPSCobra
HPS-200W
45
250
11.250
CUST. LEDPM-40W
45
40
1,800
ATBS E MVOLT R3 MP NL P7 AO
84% $2.483.46
68% $8.086.38
86% $402.06
50.06/kWh Saved PM
50. 06,kWh Saved PM
$0.06kWh Saved PM
8
P Y
200HPSCobra
HPS-200W
181
250
45.250
LEDPM-80W
181
80
14.480
ATBM C MVOLT R348 MP NL P7
9
P Y
250HPSCobra
HPS-250W
6
295
1,770
CUST LEDPM-40W
6
40
240
ATBS E MVOLT R3 MP NL P7 AO
10
P Y
250HPSCobra
HPS-250W
57
295
16,815
LEDPM-80W
57
80
4,560
ATBM C MVOLT R3 4B MP NL P7
73% 63,220.62
89% $85.44
68% $8,212.50
83% $101.16
75% $275.94
68% $100.92
$0.06A(Wh Saved PM
$0.06A(Wh Saved PM
$0. 06AcWh Saved PM
$0. 068 Wh Saved PM
$0.0611 Wh Saved PM
$0. 06AcWh Saved PM
11
P Y
310HPSCobra
HPS-310W
1
365
365
CUST. LEDPM-40W
1
40
40
ATBS E MVOLT R3 MP NL P7 AO
12
P Y
310HPSCobra
HPS-310W
125
365
45.625
CUST. LEDPM-115W
125
115
14.375
ATBM E MVOLT R3 48 MP NL P7
13
P Y
400HPSCobra
HPS-400W
1
465
465
LEDPM-80W
1
80
80
ATBM C MVOLT R3 48 MP NL P7
14
P Y
400HPSCabra
HPS-400W
3
465
1,395
CUST. LEDPM-115W
3
115
345
ATBM E MVOLT R3 4B MP NL P7
15
P Y
150HPSPT2
HPS-150W
3
188
564
CUST. LEDPM-60W
3
60
180
60W. Granville - GVD2 P30 40K
AS M BK 3 N C U P7 NL1X1 =
60W DLC PM
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
City of Yakdna Street Lights PH2 10
1/23/20182:03 PM
Page 2 of 4
PACIFIC POWER
Let's turn the answers on.
V071116.3
-al, tramp, infrarmntir
Viewing The Incentive Offer
Needed Stage
Project
Company
Customer Contact
City of Yakima Street Lights PH2
City of Yakima
Joseph Rosenlund
to, Stipulated Wattage
Actual Wattage
kWh/Year Avg kW/Month $ Savings/Year
Stipulated Lighting 590,618 0.00 $38,844.95
Wattage Control 0 0.00 $0.00
Total 590,618 0.00 $38,844.95
Total Cost
$542,925.00
Total Incentive
7% Of Cost Paid By Incentive
Net Project Cost
$35,437.08
$507,488
Lighting $35,437.08
Controls $0.00
Incentive $35,437.08
Full Incentive
0% Better Than Code LPD (w/ft')
Existing Code Proposed
71% Better Than Code Operation Cost/Yr
Existing Code Proposed
0.00
0.00
0.00
$54,889
$54,889
$16,044
Simple Payback
14.0 Yrs
Simple Rate Of Return
7/
(Without Incentive)
(Without Incentive)
Simple Payback
Simple Rate Of Return
13.1 Yrs
8%
(With Incentive)
(With Incentive)
Washington
wattsmart Business
07/11/16 Effective Date
Project ID
Lighting Coordinator
Lighting Tool Prepared by
,I 1 iohting Fnergv tisane Over Tirrn
WSBWA_71354
Becky Berg
Jason Dietel
$700,000
13) $600,000
J
tj 4500, 000
o ,400, 000
O $300,000
�,0 $200,000
O $100,000
$0
00 2.0 4.0 6.0 8.0 10.0 12.0
— — Existing or Code Proposed • SPB
14.0
Years
.>nt of Initial :jest Cost
The incentive and energy savings above are estimates only. This tool is designed to calculate savings and incentives for wattsmart Buisness lighting projects.
For wattsmart Buisness Lighting projects, lighting incentives are capped at 70% of eligible energy efficiency project costs, and the minimum simple payback (with incentive) for the project is one
year. If needed, incentives will be decreased to reflect a one-year payback. The simple payback with incentive is the net project cost divided by the annual electric cost savings (dollar savings).
For wattsmart Small Business Lighting projects, lighting retrofit incentives are capped at 80%.
Stipulated vs. Actual wattage - This tool has two calculation methods to distinguish between actual and stipulated wattages. There will only be a difference between actual and stipulated if the
existing fixtures are impacted by efficacy standards (e.g. general service fluorescent and incandescent). Results from either calculation can be viewed by selecting "Stipulated wattage" or "Actual
wattage." Incentive calculations and 1-year simple payback cap are always based on stipulated wattage.
To receive an incentive you MUST sign an Incentive Offer before purchasing equipment.
City of Yakima Street Lights PH2 10
1/23/2018 Page 4
PACIFIC PO ER
A DIVISION OF PACIFICORP
14845 SW Murray Scholls Dr.
Suite 110, PMB 4513
Beaverton, OR 97007
wattsmarr Business — Incentive Offer Letter
(Washington)
Participant
Customer Name: Joseph Rosenlund
Business Name: City of Yakima
Business Address: City wide
Pacific Power
wait smart Business Program
Program Representative:
Becky Berg - Program Coordinator
503-515-7292 fax:503-482-7447
wa.lighting@pacificpower.net
City, State Zip: Yakima , WA
After reviewing your application we are pleased to provide you an incentive offer for the successful implementation of the
approved energy efficiency measures described in the attached exhibit(s).
Cash Incentive Estimate
Typical Upgrade Incentive: Issue Date: 12/29/2017
See Exhibit A Completion Date: 6/29/2019
For this offer to remain valid and to receive an incentive. it is the responsibility of the participant to:
1. Sign and return this offer to the contact above no later than:
2. Implement the project by the Completion Date,
3.
2/28/2019
Notify Pacific Power of any changes that materially affect the implementation schedule, measure costs or savings.
4. Upon project completion notify Pacific Power.
5. Provide all required documentation and participate in any required inspections.
Acknowledgement
I understand: (1) iny responsibilities listed above; (2) the incentive offer is an estimate; (3) the incentive paid will be based on
verified electric energy savings and approved costs; (4) If 1 tenninate a material portion of my electric service requirements
from Pacific Power for my facility within 60 months of the date of the final incentive payment under this Incentive Offer, and
my facility remains in operation, I am obligated to repay the final incentive to Pacific Power with 30 days of written request.
The repayment ("Repayment") will he determined as follows: Repayment - final incentive x (60 - Savings Delivery Term)/60,
where Savings Delivery Term = number of months between the month the Final Incentive payment was made and the month
the Facility terminated a material portion of its electric service. For determining the repayment, the dates will be the first day
of the month in which they occur.
Name (please print)
.6 ty kit/ILA: 62,,t4-Z.„
Title
Date /
Please check the box below if you agree to give Pacific Power and its affiliated companies permission to include your
company name and certain specific details about this project and any future projects in its print ads, press releases, articles,
customer communications, website. etc. The project details would be [united to company name, annual energy and cost
savings. project cost, incentive amount, paybacks before and after incentives. and the type of project (e.g. lighting, HVAC,
compressed air, irrigation. etc.).
['Yes, I give Pacific Power permission to include my company name and project information as described in the paragraph
above.
,Company name as you would like it to appear:
Signature Date
WSBWA_71354 City of Yakima Street Lights PH2 V 071116.3
Supercedes and extends
completion date of Becky Thompson 12/31/2018
previous Incentive Offer
Lighting Coordinator
Let's turn the answers on.
Jason Dietel
Tool Prepared by
Project Manager
Account Manager
14.
WINNOW
0
0
Q
Cr
w
m
1
65
0
U
Project Name
City of Yakima
Total Project Cost
0
m
J
Co
(Ni
N
N
64
N
Oi
69
U
Installation Address
E
03
City, State, Zip
N
ea
Contact, Title
a
ro
0
Calculation
1- 1- 1, 1- ti i-
3 3 3 3 3 3
0
4. ti O. w 4 U.
Phone, Email
k.
1 0
Account, Meter, Rate
Business Type
Contractor information
EEA Participant
z
1
d
C1
Ct
W
a
U
CO
Q
R
O
City, State, Zip
Phone, Email
w
4.
WOW NNW
S is for 0 hrs/year
X is for 8760 hrs/year
(0
Y is for 4380 hrs/year
0
00
rn
Additional Information
a
0
z
2
7
h
a
Q
City, State, Zip'',
•U
0
1-1
a
o
a
CO
0
City of Yakima Street Lights PH2 10
E
9 a:
0
e3
2.2,2 2 A111 2 2
4 4, 4 4 4 21A
City of Yakima Street Lights PH2 10
c ro;
.2 cu
(7)
=
CO
42t
CZ ZS'
E
Ct,
4nni
c)
r..."
03
Let's turn the answers on.
Est
6
0
Jason Diet&
.0
Lighting Tool Pr
Needed Stage
V071116.3
'a
0
0
0
§ § § § § § §
gg..-gg":ggg
4 40 RuriteU 4r,.
fluiqfi 1313/0/d 10 SO3
af Yakima Street Li
444
cc
2
0
2
0
Co.
0
0
7% Of Cost Paid By Incentive
a
a
73
o.
o,
01
1/3 a
0 k.)
t
I °3 •C
at a
,4
8
CO
CO
CO
03
ci
0
0
a. 0
Z
CC 0
0 4.
0 0
CC .0
0.
47)
L.
0
04:
2 O.
O. -5. 0
0) '5
E o
E
‘,1
CO -4
tu .8
g
0
E
1.7) -cs
tn E
E
E 13"
0 0
C
ra o
m_
0.
'tic;
0 a)
a.)
a 0
c
.
.c
c 2
>s
g
0..
E
77/
WC
CSI
-C (4 S.)
i-
CO
..o
... a z
8 2
0
00
00)
t c
a) 7-.-
C -C
.r3)
E, 2 Ui
2) a) a)
o *E-
V, crt
- .c
13 •.=
o.
_c
r,
aj
8
0)0
5 E
•C 43 't
w
E E
c co
7 3
LL
a) t
!•-•
Z;
.2 '0
0.
.2 co
0 0
0-
13
C
RI 1-4
irs -3
t/).
2 .0
2
c'4
2 2'
ED- 1:1
CD /13
0
RS >
o
.o
00 c".
0
_C
o
4).
cf)
E
1-1:
g g
.o.
a;
ct
c
R/ CD
TV g
1...=043 73
g
c o
a) o
a) RIC
-CI C
"E• 0
c9
.20 °
g
LA 2
0
0 8
tCI
E
c
.2 oi
'5 • >•
4:1
o 45 a
-0 .E
0 (7,
2
-a
0
o 8
E
.0 as
>.
c
.2
cr) .11
c)
oz
4 t.>
6 2 ca
> -E
+1 g
2,...11
."(55-
To receive an incentive you MUST sign an Incentive Offer before purchasing equipment.
a/
00
ro
a.
CO
0
r•J
Cr)
City of Yakima Street Lights PH2 10