HomeMy WebLinkAbout10/17/2017 06G 1818 Lincoln Avenue Grade Separation Artwork & Elevated Sidewalk Project; Project CompletionBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.G. For Meeting of: October 17, 2017 ITEM TITLE: Project Completion and Contract Acceptance for Belsaas and Smith Construction, Inc. Project 1818 Lincoln Avenue Grade Separation Artwork & Elevated Sidewalk Project (Standard Motion V -B -Accept the project and approve) SUBMITTED BY: Brett Sheffield - Chief Engineer -509-576-6797 Scott Schafer, Public Works Director SUMMARY EXPLANATION: A final payment of $33,781.99 is recommended for Belsaas and Smith Construction, Inc. for the construction of an elevated sidewalk on the south side of Lincoln Avenue from 1st Avenue to 1st Street, re -striping Lincoln Avenue, constructing ADA compliant curb ramps, and construction of the' Bins of Light" artwork, and other miscellaneous work needed to complete the project. Final inspection for this project was made and the recommendation that the project be accepted. A final payment of $33,781.99 (5% retainage) is due from the City to Belsaas and Smith Construction, Inc. for the completion of the project associated with the Lincoln Grade Separation Artwork 8 Elevated Sidewalk Project. Project Manager: Brett Sheffield Contractor: Belsaas and Smith Construction, Inc. Contract Awarded: 3/23/2016 Contract Cost: $675,639.81 Retainage Due: $33,781.99 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR City Manager SUBMITTAL: STAFF RECOMMENDATION: Accept Project BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date D FINAL 1Q'9/'2017 Type Greer Memo 2 City of Yakima City Engineering Division 129 N 2nd Street Yakima, WA 98901 TO: Belsaas & Smith Construction, Inc. PROJECT TITLE Lincoln Avenue Grade Separation Artwork & Elevated Sidewalk Project City Project No.: Progress Estimate No.: FINAL Date October 17, 2017 1818 Tr Item Na. De$GRPtiUR Et TY UNIT URIC P Se 6ltl Cemmct '.... A To Date UtllattIty % ef,,,. CUmtact Amount Previous Quantity PfeVIauS Payments Quantity this peRUR '.... Amotstt Due AGCt Det 1 SPCC Plan 1 LS $800.00 $ 800.00 1 100% $ 800.00 1 $ 800.00 0 $ - 30 2 Mobilization 1 LS $65,000.00 $ 65,000.00 1 100% $ 65,000.00 1 $ 65,000.00 0 $ - 30 3 Project Temporary Traffic Control 1 LS $16,000.00 $ 16,000.00 1 100% $ 16,000.00 1.00 $ 16,000.00 0.00 $ - 30 4 Removal of Cement Conc. Sidewalk 10 SY $150.00 $ 1,500.00 10 100% $ 1,500.00 10 $ 1,500.00 0 $ - 30 5 Removal of Cement Conc. Curb 20 LF $38.00 $ 760.00 20 100% $ 760.00 20 $ 760.00 0 $ - 30 6 Removing Median Barrier 750 LF $5.00 $ 3,750.00 750 100% $ 3,750.00 750 $ 3,750.00 0 $ - 30 7 Crushed Surfacing Base Course 650 TON $45.00 $ 29,250.00 650.5 100% $ 29,272.50 650.5 $ 29,272.50 0.0 $ - 61 8 Single Slope Concrete Barrier 614 LF $109.00 $ 66,926.00 614 100% $ 66,926.00 614 $ 66,926.00 0 $ - 61 9 Single Slope Concrete Barrier Transistion 2 EA $13,000.00 $ 26,000.00 2 100% $ 26,000.00 2 $ 26,000.00 0 $ - 61 10 Standard Hand Rail Pedestrain Railing 714 LF $100.00 $ 71,400.00 714 100% $ 71,400.00 714 $ 71,400.00 0 $ - 61 11 Cement Conc. Traffic Curb and Cutter 182 LF $47.00 $ 8,554.00 268 147% $ 12,596.00 268 $ 12,596.00 0 $ - 61 12 Cement Concrete Sidewalk - 4 inch thick 515 SY $50.00 $ 25,750.00 512 99% $ 25,600.00 512 $ 25,600.00 0 $ - 61 13 Cement Conc. Curb Ramp Type Parallel A 3 EA $1,000.00 $ 3,000.00 4 133% $ 4,000.00 4 $ 4,000.00 0 $ - 61 14 Paint Line 1720 LF $1.00 $ 1,720.00 1720 100% $ 1,720.00 1720 $ 1,720.00 0 $ - 30 15 Painted Wide Lane Line 860 LF $1.50 $ 1,290.00 860 100% $ 1,290.00 860 $ 1,290.00 0 $ - 30 16 Plastic Bicycle Lane Symbol 3 EA $500.00 $ 1,500.00 3 100% $ 1,500.00 3 $ 1,500.00 0 $ - 30 17 Removing Paint Line 2580 LF $0.50 $ 1,290.00 2580 100% $ 1,290.00 2580 $ 1,290.00 0 $ - 30 18 Art Structures 1 LS $165,000.00 $ 165,000.00 1.00 100% $ 165,000.00 1.00 $ 165,000.00 0.00 $ - 70 19 Art Graphics Panels 1 LS $5,000.00 $ 5,000.00 1 100% $ 5,000.00 1 $ 5,000.00 0 $ - 70 20 Art Glass Panels 1 LS $62,000.00 $ 62,000.00 1 100% $ 62,000.00 1.00 $ 62,000.00 0.00 $ - 70 21 Art Lighting and Controls 1 LS $86,000.00 $ 86,000.00 1 100% $ 86,000.00 1 $ 86,000.00 0 $ - 70 22 Base Cover Panel 1 LS $4,000.00 $ 4,000.00 1 100% $ 4,000.00 1 $ 4,000.00 0 $ - 70 23 Top Cap 1 LS $4,000.00 $ 4,000.00 1 100% $ 4,000.00 1 $ 4,000.00 0 $ - 70 24 Bird Deterrent 1 LS $4,000.00 $ 4,000.00 1 100% $ 4,000.00 1 $ 4,000.00 0 $ - 70 25 Repair or Replacement 1 FA $15,000.00 $ 15,000.00 0.55 55% $ 8,212.93 0.55 $ 8,212.93 0.00 $ - 30 TOTALS $ 669,490.00 99.72% $ 667,617.43 $ 667,617.43 CHANGE ORDER NO.1 1-1 Install Electrical Outlets 1 LS $8,022.38 $ 8,022.38 1.00 100% $ 8,022.38 0.00 $ 8,022.38 1.00 $ - 70 item Nn. est on QTY UNIT Ur1I[ Price 6Id CUTAmCC '.... '.. Amoum To Dat quantity % Uf',. Contract AmGdr1C Previous Quandry PrevlGus I ayments Quantity This period '.... Amots1C [Sue AG CC Dat Project Total with Change Orders $ 677,512.38 99.72% $ 675,639.81 $ 675,639.81 5% RETAINAGE DUE $33,781.99 I hereby certify that the foregoing is a true and correct statement of the work performed under this Contract. CITY ENGINEER /s/ Brett Sheffield