Loading...
HomeMy WebLinkAbout05/16/2017 06G Professional Services Agreement with Golder Associates, Addendum 3; Modeling Naches RiverBUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 6.G. For Meeting of: May 16, 2017 ITEM TITLE: Resolution authorizing addendum no. 3 to the existing agreement with Golder Associates, Inc. for $16,670 to complete Modeling efforts for the Naches River that meet WS DOT requests as well as other agency requests during the permit process SUBMITTED BY: David Brown, Water/Irrigation Manager, 509-575-6204 Scott Schafer, Director of Public Works SUMMARY EXPLANATION: During a review of the City of Yakima's Water Treatment Plant I ntake Modification project with stakeholders, Washington Department of Transportation (WS DOT), and several other state and federal agencies, a request for a river hydraulic model was made to indicate flow elevation changes predicted from structures placed within the Naches River as part of this project. Permitting of the project also requires that a hydraulic model be conducted. The City already has an existing Professional Services Agreement with Golder Associates, I nc. pertaining to work with the City's Water Treatment Plant and is qualified to conduct the required hydraulic modeling. Addendum No. 3 authorizes the development of the required hydraulic model of the Naches River, including data review and model development, for a new intake structure and floodplain stabilization structures. The terms of Addendum No. 3 would be in an amount not to exceed $16,670. (See attached Addendum No. 3 with Exhibit "A" and "B") Exhibit "A" of the Agreement describes the Scope of Work in more detail. Exhibit "B" of the Agreement describes the Schedule of Rates in more detail. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FORcl*� F SUBMITTAL: + City Manager STAFF RECOMMENDATION: Adopt Resolution BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type resoultion 5/10/2017 Cowr Memo Addendum 3 5/312017 Contract RESOLUTION NO. R -2017- A RESOLUTION authorizing execution of addendum 3 to the engineering and consulting services agreement with Golder Associates, Inc. for $16,670 to complete Modeling efforts for the Naches River that meet WSDOT requests as well as other agency requests during the permit process. WHEREAS, the City is in the process of making improvements to the Water Treatment Plant Intake, which requires the development of a hydraulic model of the river for permitting of the project; and WHEREAS, the City desires to enter into Addendum 3 to the existing Professional Services Agreement with Golder Associates, Inc. to develop the river hydraulic model necessary for the permits required for the Water Treatment Plant Intake Improvements; and, WHEREAS, the City of Yakima used the procedure established by the State of Washington and used the Municipal Research and Service Center Professional Services Roster process to select a firm to perform the design work; and WHEREAS, Golder Associates, Inc. was determined to be qualified to perform the needed hydraulic model work; and WHEREAS, the Scope of Work and Budget included in this supplement meet the needs and requirements of the City of Yakima for this project, and WHEREAS, the City Council of the City of Yakima finds that it is in the best interest of the City and its residents to enter into Addendum 3 to the Professional Services Agreement with Golder Associates, Inc., to continue work necessary to improve the Water Treatment Plant, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized to execute the attached Addendum 3 to the Professional Services Agreement with Golder Associates, Inc., attached hereto and incorporated herein by this reference, not to exceed Sixteen Thousand Six Hundred and Seventy Dollars ($16,670) to provide the Professional Services as described in the Addendum. ADOPTED BY THE CITY COUNCIL this 16th day of <ay, 2017. Kathy Coffey, Mayor ATTEST: Sonya Claar Tee, City Clerk AGREEMENT FOR PROFESSIONAL SERVICES ADDENDUM NO. 3 This Addendum, hereinafter identified as Addendum No. 3, is hereby entered into and made a part of the Agreement between City of Yakima, Washington, and Golder Associates, Inc., for Professional Services first entered into on the 9th day of April, 2010, by the CITY OF YAKIMA, hereinafter called the "CITY," and GOLDER ASSOCIATES, INC., hereinafter called the "ENGINEER." WITNESSETH: That in consideration of the mutual covenants and agreements herein contained, the parties hereto do mutually agree to amend, revise, and/or add the following to the referenced Agreement: SECTION 2 - SCOPE OF SERVICES 2.1 Basic Services: In addition to the duties set forth in the underlying agreement, ENGINEER agrees to perform additional work tasks described in the attached Addendum No. 3 Exhibit A: Modeling efforts for the Naches River that meet WSDOT requests as well as other agency requests during the permit process. SECTION 5 - COMPENSATION 5.1 COMPENSATION ON A TIME SPENT BASIS AT SPECIFIC HOURLY RATES: For the services described in the attached Addendum No. 3 Exhibit A, compensation shall be on a time spent plus expenses basis at the ENGINEER's normal hourly billing rates shown on Exhibit B, attached to this agreement. IN WITNESS WHEREOF the parties hereto duly enter into and execute this Addendum No. 3, as of this day of 12017. Other than specific amendments stated herein, all other terms, conditions and requirements of the underlying contract shall remain in full force and effect throughout the term of the underlying contract. CITY OF YAKIMA Signature Printed Name: Cliff Moore Title: City Manager Date: Attest Sonya Claar Tee, City Clerk City Contract No. 2011-85 Resolution No. R-2011-154 Page 1 GOLDER ASSOCIATES, INC. Signature Printed Name: Title: Date: ADDENDUM NO. 3 EXHIBIT A CITY OF YAKIMA — NACHES RIVER HYDROTECHNICAL ENGINEERING SUPPORT FOR THE WATER TREATMENT PLANT INTAKE SCOPE OF WORK During the term of this AGREEMENT, the ENGINEER shall perform professional services in connection with the following project: A scope of work is presented here to complete Modeling efforts for the Naches River that meet WSDOT requests as well as other agency requests during the permit process: The initial project tasks addressing Data Review (Task 1), Site Reconnaissance (Task 2), and Reporting (Task 3) for the first phase of work have been completed, as indicated below. This scope of work covers the development of a hydraulic model, which includes data review and model development for a new intake structure and floodplain stabilization structures as discussed in more detail below: Task 1 — Data Review (COMPLETE) Task 2 — Site Reconnaissance (COMPLETE) Task 3 — Reporting (COMPLETE) Task 4 — Meetings (IN PROGRESS) Task 5 — Final Design (IN PROGRESS) Detailed descriptions of the services are provided as follows: Task 6 — Develop 1D HEC -RAS Model (Update Existing and Develop Proposed Model) Description: Update existing model and develop a proposed model. Assumptions: • Review the one-dimensional (1D) HEC -RAS model provided by the Yakima County. • Update Existing Conditions 1 D Model with the current conditions geometry as reflected by the current channel geometry. This update will incorporate the most recent available LiDAR data (2013) and survey data collected in (11/19/2014) and (6/30 and 7/27/2016). Deliverables: Create a Proposed Conditions 1 D Model from the Existing Conditions 1 D Model incorporating the proposed Project conditions and geometry Schedule: Final schedule to be coordinated with the City. Anticipated completion Summer/Fall 2017. Cost: $6,240. Task 7 — Develop 2D TUFLOW Model (Update Existing and Develop Proposed Model) Description: Includes investigations, data review and model development work for: 1) a new City intake structure, and 2) for proposed floodplain grade controls and stabilization structures. Page 2 Assumptions: Utilize the surface created in the 1D HEC -RAS Model to create an Existing Conditions 2D Model using TUFLOW (compare and calibrate against the 1 D HEC -RAS model). Deliverables: Update the 2D Existing Conditions Model to create a Proposed Conditions 2D Model which introduces the proposed Project conditions and geometry. Schedule: Final schedule to be coordinated with the City. Anticipated completion Summer/Fall 2017. Cost: $5,070. Task 8 — Water Intake Project Hydraulics Technical Memorandum Description: Put together a brief technical memorandum summarizing the hydraulic modeling and results. 1) Assumptions: Design basis and modeling assumptions 2) Hydraulic model design input data sources 3) 1D HECRAS Model Results for Existing and Proposed Conditions (i.e. tabular comparison of WSE, Velocity, Shear Stress) 4) 2D TUFLOW Model Results for Existing and Proposed Conditions Deliverables: Technical memorandum summarizing the hydraulic modeling and results. Results shown within Afflux Maps for WSE, Velocity, and Shear Stress (figures showing differential change in hydraulic parameters for existing versus proposed conditions) Schedule: Final schedule to be coordinated with the City. Anticipated completion Summer/Fall 2017. Cost: $5,360. BUDGET SUMMARY A detailed itemization of costs is presented in an attached table, and is summarized below. Table 1: Budget Summary Task Budget Task 6 — Develop 1 D HEC -RAS Model $6,240 Task 7 — Develop 2D TUFLOW Model $5,070 Task 8 — Technical Memorandum $5,360 Total $16,670 Page 3 EXHIBIT B SCHEDULE OF RATES See attached 2017 Golder rate sheet, titled "Golder Associates, Schedule of Fees Redmond, Washington Effective January 1, 2017". Page 4 of 4 older ociates 0610191 Wall- 1 0 :9 Me! p IMP big!WWI k _"me Effective January 1, 2017 Labor charges are based upon standard hourly billing rates for each category of staff. The billing rates include costs for salary, payroll taxes, insurance associated with employment, benefits (including holiday, sick leave, and vacation), administrative overheads, and profit. In some cases statutory overtime rates may apply. Rates by labor category are as follows: ENGINEERS, SCIENTISTS, PROJECT MANAGERS AND REVIEWERS* Admin Support Staff Admin Support Intermediate Senior Admin Support I Intermediate I Senior Admin Support 11 Intermediate 11 Associate/Senior I Associate/Senior 11 Principal/Associate/Senior III ISI II ISI III r Principal/Specialist ADMINISTRATIVE SUPPORT Admin Support Staff Admin Support Intermediate Senior Admin Support I Senior Admin Support 11 TECH NICIANSITECH NOLOGISTS Intermediate CAD AND CIVIL ENGINEERING DESIGN TECHNOLOGISTS/ GIS Draftsperson Staff Draftsperson Senior Draftsperson • The above rates are subject to revision. A 7% charge will be added to the total fees to cover normal incidental office disbursements, including but not limited to associated communication charges, travel and document production. A 15% carrying charge will be added to disbursements including materials, subcontractor costs, drilling or excavation services and use of external laboratory services. * Rates for specialist services, including but not limited to litigation support, expert witness, including time spent in depositions and the preparation and presentations of testimony, and/or senior level consultation, and priority emergency level services are available upon request. Rates for laboratory services and use of equipment owned by Golder Associates will be provided upon request. Special Note: 1. The rates and charges listed above exclude applicable local and federal taxes The taxes will appear as a separate line item on each invoice, Golder Associates Inc. 18300 NE Union Hill Road, Suite 200 Redmond, WA 98052 USA Tel: (425) 883-0777 Fax: (425) 882-5498 v\&wv.golder.com Golder, Golder Associates and the CA globe design are trademarks of Golder Associates Corporation Golder Associates: Operations in Africa, Asia, Australasia, Europe, North America and South America