Loading...
HomeMy WebLinkAbout02/28/2017 02 Transportation Benefit District Project List BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 2. For Meeting of: February 28, 2017 ITEM TITLE: Transportation Benefit District Project List SUBMITTED BY: Brett Sheffield -509.576.6797 SUMMARY EXPLANATION: At the January 31, 2017 City Council special meeting, a list of projects that could be constructed over 20 years with a Transportation Benefit District (TBD) establishing a$15 car tab fee was presented. Attached to this item are 1)the $15 car tab project list; 2)a potential $20 car tab project list; 3) projects contained in the current local 6-year Transportation Improvement Program; 4)a spreadsheet offering lists of projects that could be constructed for varying amounts of car tab fees; 5) a spreadsheet describing the TIP projects and why they are needed; 6) list of other Washington cities that have established TBD's and the amount; and, 7) list of projects to be included in a TBD that was presented in 2012. Should Council wish to proceed with changes to the project list, a public hearing must be held and public notice provided no less than 10 days before the hearing. The revised list must be included in the hearing notification.An ordinance is required to implement a fee, which does not include a public hearing. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type D $15 Car Tab 2/16/2017 Coker Memo D $20 Car Tabs 2/16/2017 Coker Memo D Projects List all TIP 2/16/2017 Coker Memo D TBD Project Lists 2/16/2017 Coker Memo D TIP Project Descriptions and Needs 2/16/2017 Coker Memo D List of WA cities 2/16/2017 Coker Memo D List of Projects to be Considered 2/16/2017 Coker Memo Transportation Benefit District ($15 Car Tabs) A $20 car tab would generate approximately $975,000 annually. It had been previously proposed that the funds be divided as follows: • $500,000 to pay debt service on a bond for one large project; • $300,000 to construct projects in the million dollar range; and • $175,000 for sidewalk repair and/or installation. The previously created twenty-year project list is shown in the table below: Estimated Construction Project District Cost N. 1st Street Revitalization, Ph. 2(20 yr. bond) 1,4, 5 10,800,000 Washington & Longfiber I/S 3 1,023,000 Aquatic Center Road (SIED Loan Payment) 5 750,000 16th& Fruitvale I/S 1, 5 816,000 1st Street&Washington I/S 3 2,000,000 Nob Hill & Fair Avenue I/S 2 256,000 Powerhouse Rd& Englewood I/S 5 800,000 Total: 16,445,000 Sidewalk Projects 3rd Avenue: Nob Hill to Walnut 4 480,000 Naches Ave.Walnut to Pacific 2 330,000 4th Street: Walnut to Pacific 2 315,000 Chestnut: 56th Ave.to 70th Ave. 6 448,200 Mead Ave: 27th Ave.to 28th Ave. 3 17,000 Brown Ave.:7th Ave.to 16th Ave. 5 336,000 2nd Street: 'G'Street to MLK 1,4 312,000 3rd Street: 'G'Street to MLK 1,4 312,000 4th Street: 'G'Street to MLK 1,4 312,000 6th Street: 'G'Street to MLK 1 312,000 7th Street: 'G'Street to MLK 1 312,000 Total: 3,486,200 Transportation Benefit District ($20 Car Tabs) A $20 car tab would generate approximately $1,300,000 annually. It had been previously proposed that the funds be divided as follows: • $500,000 to pay debt service on a bond for one large project; • $500,000 to construct projects in the million dollar range; and • $300,000 for sidewalk repair and/or installation. The previously created twenty-year project list is shown in the table below: Estimated Construction Project District Cost N. 1st Street Revitalization, Ph. 2(20 yr. bond) 1,4, 5 10,800,000 Washington & Longfiber I/s 3 1,023,000 Aquatic Center Road (SIED Loan Payment) 5 750,000 16th& Fruitvale I/S 1, 5 816,000 1st Street&Washington I/S 3 2,000,000 Nob Hill & Fair Avenue I/S 2 256,000 40th Avenue and Summitview I/S 6, 7 1,200,000 Powerhouse Rd& Englewood I/S 5 800,000 18th Street Underpass 2 750,000 Tieton and 5th Avenue Roundabout 4 2,105,000 Total: 20,500,000 Sidewalk Projects 3rd Avenue: Nob Hill to Walnut 4 480,000 Naches Ave.Walnut to Pacific 2 330,000 4th Street: Walnut to Pacific 2 315,000 Chestnut: 56th Ave.to 70th Ave. 6 448,200 Mead Ave: 27th Ave.to 28th Ave. 3 17,000 Brown Ave.:7th Ave.to 16th Ave. 5 336,000 2nd Street: 'G'Street to MLK 1,4 312,000 3rd Street: 'G'Street to MLK 1,4 312,000 4th Street: 'G'Street to MLK 1,4 312,000 6th Street: 'G'Street to MLK 1 312,000 7th Street: 'G'Street to MLK 1 312,000 8th Street: 'G'Street to MLK 1 312,000 Nob Hill Blvd.: 13th Ave.to 3rd Ave 4 625,000 4th Avenue: Nob Hill to Logan 4 208,000 6th Avenue: Nob Hill to Logan 4 208,000 Prasch Avenue: 10th Ave.to Ledwich Ave. 2,4 682,080 88th Avenue: Summitview to Tieton 6 520,000 Total: 6,041,280 Projects Included in the 6-Year TIP Large Projects (more than $4,000,000) Estimated 20-Year Construction Funding City Funds Bond Project Description District(s) Cost Source Required Payment North 1st Street Revitalization, Phase 2 1, 4, 5 $10,000,000 TIB $8,500,000 $540,000 East Nob Hill Boulevard Reconstruction, 6th St. to 18th St. 2 9,442,000 600,000 9,442,000 600,000 16th Avenue and Tieton Drive Intersection Improvements 3,4 5,800,000 370,000 5,800,000 370,000 6th Avenue Roadway Improvements 1, 5 4,400,000 280,000 4,400,000 280,000 Other Projects Listed in the City's Transportation Improvement Program Estimated Funding Construction Funding Source City Funds Project Description District(s) Cost Source Amount Required North 1st Street Revitalization, Phase 1 1, 5 $3,142,000 STP $2,780,000 $362,000 Garfield Elementary Safety Improvements 1 141,000 SRTS 141,000 0 Bravo Company Boulevard 1 6,600,000 LIFT 6,600,000 0 E. 'H' Street Extension, Ph. 1 1 5,100,000 LIFT 5,100,000 0 Northside Alley Paver 1 448,185 CMAQ 387,685 60,500 E. 'H' Street Extension, Ph. 2 1 3,000,000 LIFT 3,000,000 0 W. Lincoln Ave. & MLK Blvd. Realignment 1 3,783,000 1-82 & Lincoln Avenue Interchange 1 2,500,000 Con WA 2,500,000 0 18th Street Underpass 1, 2 3,160,000 N. 16th Avenue & Fruitvale Blvd. I/S 1, 5 806,000 E. Yakima Ave. & Fair Ave. Signalization 1, 2 700,000 Adams Elem./Washington M.S. Sidewalk Improvements 2 282,000 SRTS 282,000 0 E. Nob Hill Blvd. & Fair Ave. I/S Improvements 2 1,900,000 STP 1,644,000 256,000 E. Mead Avenue Reconstruction, Rudkin to Fair 2 2,158,000 E. Nob Hill Blvd. & S. 18th Street I/S Improvements 2 516,000 Rudkin Road Reconstruction, Viola to Ranier 2 2,132,000 Spring Creek Road Reconstruction 3 1,920,000 SIED 550,000 1,370,000 S. 36th Avenue Reconstruction 3 905,000 SIED 260,000 645,000 Sorenson Road Reconstruction 3 320,000 SIED 90,000 230,000 McClure Elementary School Safety Improvements 3 270,000 SRTS 270,000 0 S. 1st St. & E. Washington Ave. I/S Improvements 3 2,000,000 Washington Ave. & Longfiber Rd. Intersection 3 1,023,000 S. 3rd Avenue&W. Washington Ave. Signal 3 230,000 Yakima Valley Transportation Company Preservation 4 52,000 STE 52,000 0 McKinley Elementary School Safety Improvements 4 480,000 SRTS 480,000 0 Tieton Dr. & S. 5th Ave. I/S Improvements 4 1,200,000 Yakima Downtown Future Initiatives, Phase 5 4 6,000,000 Powerhouse Road Sidewalk 5 245,000 TAP 245,000 0 Cowiche Canyon Trail 5 2,000,000 Con WA 2,000,000 0 SR 12 & 16th Avenue Interchange 5 1,000,000 Powerhouse Rd. & Englewood Ave. I/S 5 728,000 N. 34th Ave. & Fruitvale Blvd. I/S Improvements 5 1,012,898 HSIP 911,608 101,290 Englewood Avenue Improvements, 16th to 24th 5 1,703,000 River Road Improvements, 40th Ave. to 36th Ave. 5 1,500,000 SIED 750,000 800,000 N. 40th Ave. & Englewood Ave. Intersection 5, 6 350,000 Englewood Avenue Improvements, 16th to 24th 5, 6 3,411,000 Englewood Avenue Improvements, 24th to 40th 5 3,854,000 Englewood Avenue Improvements, 40th to 56th 5, 6 1,703,000 S. 48th Ave. & Summitview Ave. Signalization 6, 7 693,000 N. 40th Ave. & Summitview Ave. Intersection 6, 7 1,093,000 S. 48th Avenue Reconstruction, Summitview to Nob Hill 6, 7 2,575,000 S. 66th Avenue Improvements, Summitview to Scenic 6 1,560,000 S. 80th Avenue Improvements,Tieton to Zier 6, 7 2,519,000 88th Avenue Improvements,Tieton to Summitview 6 500,000 S. 80th Avenue Bridge 7 100,000 DOE 100,000 0 Wide Hollow Road Bridge 7 100,000 DOE 100,000 0 64th Ave. &Ahtanum Intersection Improvements 7 575,000 CMAQ 497,375 77,625 S. 72nd Ave. &W. Washington Ave. I/S 7 840,000 75th Avenue Improvements, Viola to Nob Hill 7 1,500,000 64th Avenue Improvements, Washington to Nob Hill 7 2,081,000 Total: $68,275,083 $28,740,668 $3,902,415 Projects with existing funding Projects Included in the 6-Year TIP $20 TBD $15 TBD $12 TBD $10 TBD Large Projects (more than $4,000,000) $26,000,000 $19,500,000 $15,600,000 $13,000,000 Estimated 20-Year Construction Funding City Funds Bond Project Description District(s) Cost Source Required Payment North 1st Street Revitalization, Phase 2 1, 4, 5 $10,000,000 TIB $8,500,000 $540,000 $10,800,000 10,800,000 East Nob Hill Boulevard Reconstruction, 6th St. to 18th St. 2 9,442,000 600,000 9,442,000 600,000 16th Avenue and Tieton Drive Intersection Improvements 3,4 5,800,000 370,000 5,800,000 370,000 7,400,000 7,400,000 6th Avenue Roadway Improvements 1, 5 4,400,000 280,000 4,400,000 280,000 Other Projects Listed in the City's Transportation Improvement Program Estimated Funding Construction Funding Source City Funds Project Description District(s) Cost Source Amount Required North 1st Street Revitalization, Phase 1 1, 5 $3,142,000 STP $2,780,000 $362,000 362,000 362,000 362,000 362,000 Garfield Elementary Safety Improvements 1 141,000 SRTS 141,000 0 Bravo Company Boulevard 1 6,600,000 LIFT 6,600,000 0 E. 'H' Street Extension, Ph. 1 1 5,100,000 LIFT 5,100,000 0 Northside Alley Paver 1 448,185 CMAQ 387,685 60,500 E. 'H' Street Extension, Ph. 2 1 3,000,000 LIFT 3,000,000 0 W. Lincoln Ave. & MLK Blvd. Realignment 1 3,783,000 1-82 & Lincoln Avenue Interchange 1 2,500,000 Con WA 2,500,000 0 18th Street Underpass 1, 2 3,160,000 N. 16th Avenue& Fruitvale Blvd. I/S 1, 5 806,000 806,000 806,000 806,000 806,000 E. Yakima Ave. & Fair Ave. Signalization 1, 2 700,000 Adams Elem./Washington M.S. Sidewalk Improvements 2 282,000 SRTS 282,000 0 E. Nob Hill Blvd. & Fair Ave. I/S Improvements 2 1,900,000 STP 1,644,000 256,000 256,000 256,000 256,000 256,000 E. Mead Avenue Reconstruction, Rudkin to Fair 2 2,158,000 E. Nob Hill Blvd. & S. 18th Street I/S Improvements 2 516,000 516,000 516,000 Rudkin Road Reconstruction, Viola to Ranier 2 2,132,000 Spring Creek Road Reconstruction 3 1,920,000 SIED 550,000 1,370,000 Other Projects Listed in the City's Transportation Improvement Program Estimated Funding Construction Funding Source City Funds Project Description District(s) Cost Source Amount Required S. 36th Avenue Reconstruction 3 905,000 SIED 260,000 645,000 Sorenson Road Reconstruction 3 320,000 SIED 90,000 230,000 McClure Elementary School Safety Improvements 3 270,000 SRTS 270,000 0 S. 1st St. & E. Washington Ave. I/S Improvements 3 2,000,000 2,000,000 Washington Ave. & Longfiber Rd. Intersection 3 1,023,000 1,023,000 1,023,000 1,023,000 1,023,000 S. 3rd Avenue &W. Washington Ave. Signal 3 230,000 Yakima Valley Transportation Company Preservation 4 52,000 STE 52,000 0 McKinley Elementary School Safety Improvements 4 480,000 SRTS 480,000 0 Tieton Dr. & S. 5th Ave. I/S Improvements 4 1,200,000 1,200,000 1,200,000 1,200,000 Yakima Downtown Future Initiatives, Phase 5 4 6,000,000 Powerhouse Road Sidewalk 5 245,000 TAP 245,000 0 Cowiche Canyon Trail 5 2,000,000 Con WA 2,000,000 0 SR 12& 16th Avenue Interchange 5 1,000,000 Powerhouse Rd. & Englewood Ave. I/S 5 728,000 N. 34th Ave. & Fruitvale Blvd. I/S Improvements 5 1,012,898 HSIP 911,608 101,290 101,290 101,290 Englewood Avenue Improvements, 16th to 24th 5 1,703,000 River Road Improvements, 40th Ave. to 36th Ave. 5 1,500,000 SIED 750,000 800,000 800,000 800,000 800,000 800,000 N. 40th Ave. & Englewood Ave. Intersection 5, 6 350,000 Englewood Avenue Improvements, 16th to 24th 5, 6 3,411,000 Englewood Avenue Improvements, 24th to 40th 5 3,854,000 Englewood Avenue Improvements, 40th to 56th 5, 6 1,703,000 S. 48th Ave. & Summitview Ave. Signalization 6, 7 693,000 N. 40th Ave. & Summitview Ave. Intersection 6, 7 1,093,000 S. 48th Avenue Reconstruction, Summitview to Nob Hill 6, 7 2,575,000 S. 66th Avenue Improvements, Summitview to Scenic 6 1,560,000 S. 80th Avenue Improvements,Tieton to Zier 6, 7 2,519,000 88th Avenue Improvements,Tieton to Summitview 6 500,000 500,000 500,000 500,000 500,000 S. 80th Avenue Bridge 7 100,000 DOE 100,000 0 Wide Hollow Road Bridge 7 100,000 DOE 100,000 0 64th Ave. &Ahtanum Intersection Improvements 7 575,000 CMAQ 497,375 77,625 Other Projects Listed in the City's Transportation Improvement Program Estimated Funding Construction Funding Source City Funds Project Description District(s) Cost Source Amount Required S. 72nd Ave. &W. Washington Ave. I/S 7 840,000 75th Avenue Improvements, Viola to Nob Hill 7 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 64th Avenue Improvements, Washington to Nob Hill 7 2,081,000 Total: $68,275,083 $28,740,668 $3,902,415 $19,864,290 $16,664,290 $13,847,000 $13,847,000 Projects with existing funding Sidewalk Projects Estimated Construction Project Description District(s) Cost 3rd Avenue: Nob Hill to Walnut 4 $480,000 $480,000 $480,000 $480,000 Naches Ave.Walnut to Pacific 2 330,000 330,000 330,000 4th Street: Walnut to Pacific 2 315,000 315,000 Chestnut: 56th Ave.to 70th Ave. 6 448,200 448,200 Mead Ave: 27th Ave.to 28th Ave. 3 17,000 17,000 17,000 17,000 Brown Ave.: 7th Ave.to 16th Ave. 5 336,000 336,000 336,000 336,000 2nd Street: 'G'Street to MLK 1,4 312,000 312,000 312,000 312,000 3rd Street: 'G'Street to MLK 1,4 312,000 312,000 312,000 312,000 4th Street: 'G'Street to MLK 1,4 312,000 312,000 6th Street: 'G'Street to MLK 1 312,000 312,000 7th Street: 'G'Street to MLK 1 312,000 8th Street: 'G'Street to MLK 1 312,000 Nob Hill Blvd.: 13th Ave.to 3rd Ave 4 625,000 625,000 625,000 4th Avenue: Nob Hill to Logan 4 208,000 208,000 6th Avenue: Nob Hill to Logan 4 208,000 208,000 208,000 S. 16th Avenue Sidewalk 3 730,000 730,000 Chesnut Avenue:46th Avenue to 40th Avenue 7 285,000 285,000 285,000 285,000 Other Projects Listed in the City's Transportation Improvement Program Estimated Funding Construction Funding Source City Funds Project Description District(s) Cost Source Amount Required 44th Avenue: North of Viola to Randall Park(west side of road) 7 275,000 275,000 Prasch Avenue: 10th Ave.to Ledwich Ave. 2,4 682,080 682,080 Total: $6,811,280 $6,187,280 $2,905,000 $1,742,000 $26,051,570 $19,569,290 $15,589,000 $13,847,000 TIP Project Descriptions and Need District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- N. 1st Street Revitalization, Phase 1 'N'Street to street parking,enhancing street and pedestrian Established by the City Council as Economic 1 1,5 Development and Improving the Built STP $2,718,000 $362,000 SR 12 lighting,constructing median islands and installing various pedestrian and decorative Environment Strategic Priorities. elements. Improve North 1st Street by rehabilitating the pavement and lane markings, removing on- N. 1st Street Revitalization, Phase 2 MLK street parking,enhancing street and pedestrian Established by the City Council as Economic 2 1,4,5 Development and Improving the Built TIB $1,500,000 $8,500,000 Boulevard to 'N'Street lighting,constructing median islands and installing various pedestrian and decorative Environment Strategic Priorities. elements. Widen westbound lane to provide a 14-foot Powerhouse Road Sidewalks Mobil wide shared bike lane and construct curb, Provides a connection between the Yakima 3 5 TAP $275,000 $0 Home Park to Cowiche Canyon Road gutter and sidewalk on the north side of the Greenway and the future Cowiche Canyon Trail. rn.rl This project will make various pedestrian safety improvements in the vicinity of Adams Adams Elementary and Washington Middle Elementary School and Washington Middle Improves safety for students walking and biking 4 2 SRTS $357,000 $0 School Safety Improvements School,such as,constructing sidewalks, to and from the schools. improving roadway crossings, installing flashers and installing fencing. This project will make various pedestrian safety improvements in the vicinity of Garfield 5 1 Garfield ElelmentarySchool SafetyImprovements ElementarySchool,such as,constructingImproves safety for students walking and biking SRTS p $187,000 $0 to and from the school. sidewalk, improving roadway crossings, installing flashers. Remove and replace a portion of the existing Yakima Valley Transportation Company The existing trolley track is in poor condition 6 4 trolley rail in the vicinity of the intersection of TE $52,000 $0 Preservation and needs to be replaced. 6th Avenue and Yakima Avenue. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required Previous management entered into an Spring Creek Road Widening&Reconstruction Widen roadway to three lanes, install curb, agreement with SOZO to improve this road to 7 3 meet the requirements necessaryto provide SIED $550,000 $1,370,000 Washington Ave.to 36th Ave. gutter,sidewalk and street lights. q access to the facility Previous management entered into an 36th Avenue Widening&Reconstruction Widen roadway to three lanes, install curb, agreement with SOZO to improve this road to 8 3 Spring Creek Rd.to Sorenson Rd. gutter,sidewalk and street lights. meet the requirements necessary to provide SIED $260,000 $645,000 access to the facility Previous management entered into an Sorenson Road Widening&Reconstruction 36th Widen roadway, install curb,gutter,sidewalk agreement with SOZO to improve this road to 9 3 Avenue to 38th Avenue and street lights. meet the requirements necessary to provide SIED $90,000 $230,000 access to the facility Construct new roadway including water,sewer, Bravo Company Blvd Extension Lincoln Willprovide the north south access to the 10 1 curb,gutter,sidewalk,street lighting and storm LIFT $6,600,000 $0 Ave.to'H'Street ment area sawmill development drainage system. p I nis is a portion or the proposed east-west Construct new roadway including water,sewer, connector within the Citylimits that will H'Street Reconstruction 1st 11 1 Street to 7th Street curb,gutter,sidewalk,street lighting and storm provide access to the sawmill deveopment TIB $2,250,000 $750,000 drainage system. area, I-82 and Terrace Heights. Pave the east/west gravel alleys between This project will improve the air quality in this 12 1 Northside Alley Paving Folsom Avenue and Fruitvale Boulevard from section of the City by eliminating the dust CMAQ $387,685 $60,500 16th Avenue to 6th Avenue. caused by the gravel alleys. I nis is a portion of the proposed east-west Construct new roadway including water,sewer, connector within the Citylimits that will East-West Corridor(aka'H'St. Extension) 7th 13 1 Street to Yakima River curb,gutter,sidewalk,street lighting and storm provide access to the sawmill deveopment LIFT $5,100,000 $0 drainage system. area, I-82 and Terrace Heights. This project will construct a trail that will provide an area for exercise and entertainment. Cowiche Canyon Trail Improvements Construct a 10-foot wide pathway, including CONNECTING 14 5 Once completed,the Cowiche Canyon Trail will $2,000,000 $0 Powerhouse Rd.to Cowiche Canyon Trailhead two bridges over Cowiche Creek. WASHINGTON stretch from Powerhouse Road to Weikel Road, a length of approximately 5 miles. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required Widen Nob Hill Boulevard through the This intersection functions poorly. Since there intersection,construct left-turn lane,curb, are no left turn lanes on Nob Hill at the Nob Hill Blvd/Fair Ave Intersection intersection,the signal must function in split- 15 2 gutter,sidewalk,street lighting and drainage. STP $1,644,000 $256,000 Improvements phase,which significantly reduces the level of Upgrade signal by installing mast arm structures. service. Also,the signals hang from wires and the controller cabinet needs to be updated. Yakima County received a FEMA grant to make improvements to Shaw Creek. As part of the Replace existing two-lane bridge over Wide improvements,this bridge needs to be Hollow Creek with three-lane bridge.The City's 80th Avenue Bridge Widening (Wide improved,which is a City bridge. The FEMA 16 7 involvement is only to pass through of ano DOE $100,000 $0 Hollow Creek) grant pays for 75%of the project cost. We Ecology grant in conjunction with the County's applied for and received a grant from the flood plain management project. Department of Ecology to pay for the remaining 25%. Yakima County received a FEMA grant to make improvements to Shaw Creek. As part of the Replace existing two-lane bridge over Wide improvements,this bridge needs to be Wide Hollow Road Bridge Widening (Wide Hollow Creek with three lane bridge.The City's improved,which is a City bridge. The FEMA 17 7 Hollow Creek) involvement is only to pass through of an grant pays for 75%of the project cost. We DOE $100,000 $0 Ecology grant in conjunction with the County's applied for and received a grant from the flood plain management project. Department of Ecology to pay for the remaining 25%. This intersection functions poorly. As the Reconstruct and widen 16th Avenue and Tieton roadway paved width does not provide enough Drive by adding left-turn lanes for all 18 3,4 16th Ave/Tieton Dr Intersection Improvements area for left-turn lanes,the signal operates in movements at the intersection. Upgrade the split-phase,which significantly lowers the level traffic signal. of service. Replace the bridge on E.Yakima Avenue that There are questions about the structural 19 1, 2 Yakima Ave Bridge Replacement(18th St) crosses over 18th Street. integrity of this bridge. As growth continues in the West Valley area, Improve the 64th Avenue and Ahtanum Road this intersection functions worse and worse. 64th Ave/Ahtanum Rd Intersection intersection by constructing a westbound right- Installing a signal at this intersection will 20 7 Improvements turn lane on Ahtanum and installing a traffic improve the function of the intersection and CMAQ $497,375 $77,625 signal. reduce the amount of pollution emitted by idling vehicles. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required This section of 16th Avenue is designated as a principal arterial. Principal arterials should 16th Ave Sidewalk Improvements Washington Install 7-foot sidewalk on the west side of 16th 21 3 have sidewalk on both sides of the road. It is Avenue to Nob Hill Boulevard Avenue. also in close prowimity to YVCC and McClure Elementary. This project will make various pedestrian safety improvements in the vicinity of McClure Improves safety for students walking and biking 22 3 McClure ES Safety Improvements Elementary School,such as,constructing to and from the schools. SRTS $270,000 $0 sidewalk,ADA ramps and improving crosswalks. This project will make various padestrian safety improvements in the vicinity of McKinley Elementary School,such as, replacing Improves safety for students walking and biking 23 4 McKinley ES Safety Improvements SRTS $480,000 $0 delapitated sidewalk,constructing ADA ramps, to and from the schools. and installing a HAWK pedestrian crossing system. Construct a roundabout where the westbound A roundabout would improve the functionality ramps intersect with N. 16th Avenue.Add two- SR 12/16th Ave Interchange Improvements and and operation of this interchange. The existing 24 5 way cycle track on west side of bridge and Trail Improvements configuration is not very safe for cyclists and corresponding intersection improvements to pedestrians accessing the greenway. complete trail. An additonal eastbound lane west of the Realign intersection,widen E.Washington intersection would greatly improve the 25 3 1st St/Washington Ave Intersection Avenue to accommodate an additional lane, functionality of this intersection. The signal Improvements replace curb,gutter and sidewalk,and install a heads are hanging from wires,which can be new traffic signalization system. problematic in high winds. Improve the Washington Avenue and Longfiber Road intersection by constructing an eastboung With the new development that is occuring on 26 3 Washington Ave/Longfiber Rd Intersection left-turn lane on Washington and a northbound Longfiber Road,the number of vehicles driving Improvements left-turn lane on Longfiber, install or replace on Longfiber has increased, resulting for the curb,gutter,sidewalk,street lighting,storm need of a traffic signal at this location. drainage and safety flashing signal. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required Reconstruct and widen roadway to five lanes Nob Hill Blvd. is a primary priciple arterial that Nob Hill Blvd Widening 6th p gutter, connects to 182 that needs to be updated to 27 2 Street to 18th Street with intersection improvements,curb, p sidewalk, street lighting and drainage system. the City's standards,which include a two-way left-turn lane,sidewalks and bike lanes. 40th Ave/Summitview Ave Intersection Improve the intersection by constructing larger Marking improvements to this busy 28 6, 7 corner radii, lengthening the turn lanes,and intersection would helpit too erate and Improvements pp upgrading the traffic signal system. fuction better. This intersection is serously outdated with the Improve the intersection by constructing larger 16th Ave/Fruitvale Blvd Intersection signal heads hanging from wires,small corner 29 1, 5 curb radii, installing ADA ramps,and upgrading radii,and no ADA ramps. Making the proposed Improvements the traffic signal system. improvements would greatly increase the operation and function of this intersection. This section of Mead Avenue is classified as a Partner with Union Gap to reconstruct E. Mead minior arterial and needs to be updated as 30 2 Mead Ave Reconstruction(Rudkin-Fair) Avenue, install curb,gutter,sidewalk and storm such. The existing pavement is in poor drainage system. condition and there is no center turn lane, curb,gutter or sidewalk. Although 48th Avenue is classified as a Reconstruct and widen 48th Avenue, install collector arterial, it does not meet City 48th Avenue Widening and Reconstruction 31 6, 7 curb,gutter,sidewalk,street lighting and standards for such a roadway. The existing Summitview Ave.to Nob Hill Blvd. drainage system. pavement is in poor condition and there is no center turn lane,curb,gutter or sidewalk. The intersection is skewed, making it difficult Realign intersection, install curb,gutter, Powerhouse Rd/Englewood Ave Intersection for the 4-way stopped condition to function 32 5 Improvements sidewalk and safety flashing signal. Possibly well. It is also difficult for pedestrians and construct a roundabout. cyclists to cross. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required Realign W. Lincoln Avenue, install curb,gutter, sidewalks,street lighting,drainage. East-west bicycle access to Lincoln/MLK couplet is The entrance/exit of the City's main one-way 33 1 Lincoln Ave&MLK Blvd Realignment awkward with existing on-way/two-way couplet at this location does not function well. transition along Pierce Ave. Explore changes to couplet terminous(6th Ave?)to improve both vehicle and bike mobility Improve the intersections of N.34th Avenue At times,this intersection can be dangerous. It 34 5 34th Ave and Fruitvale Blvd Intersection and 34th and Fruitvale Boulevard and N.34th Avenue has experienced a serious accident within the HSIP $911,608 $101,290 Ave and River Road Intersection Improvements and River Road by constructing roundabouts at last five years,and therefore qualified for an each intersection. HSIP grant. The City applied and was selected. Remove existing traffic signal and construct a A roundabout at this intersection would allow 35 4 Tieton Dr/5th Ave Intersection Improvements roundabout, remove and replace curb,gutter, it to function and operate at a better level of sidewalk, street lighting and drainage service. Install historic lighting,sidewalk modifications 36 4 Yakima Downtown Future Initiatives, Phase 5 and other improvements. Exact improvement This project would entice further development area(s)to be determined. in the downtown area Widen south leg for double left turn from Making the proposed improvements at this 37 2 Nob Hill Blvd/18th St Intersection Improvements westbound Nob Hill, install curb,gutter, intersection would allow it to operate and sidewalk, upgrade traffic signal system. function at a better level of service. 48th Ave/Summitview Ave Intersection Install traffic signal at the intersection of Making left-hand turns at this intersection 38 6, 7 would be easier and the intersection would Improvements Summitview Avenue and 48th Avenue. function at a better level of service. 72nd Ave/Washington Ave Intersection Improve intersection by installing a traffic As more development occurs near this location, 39 7 installin intersection controls would allow it to Improvements signal system or roundabout. g operate at a better level of service. The traffic signal need to be longer and the 40 5, 6 40th Ave/Englewood Ave Intersection Replace traffic signal poles and upgrade upgraded controller would allow additional Improvements controller. movements. Nob Hill Blvd Sidewalk Improvements Construct sidewalk in locations where it doesn't As a principle arterial,and with the number of 41 2,4 business along Nob Hill,sidewalks should be 16th Avenue to 6th Street exist on the south side of Nob Hill. installed. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required 42 1, 2 Yakima Ave/Fair Ave Intersection Improvements Install traffic signal at the intersection of Yakima Avenue and Fair Avenue. 3rd Ave/Washington Ave Intersection 43 3 Upgrade the traffic signalization system Improvements Construct a new two-lane roadway and widen This project would provide an additional access 75th Ave Connection portions of existing roadway, install curb, 44 7 to the West Valley Middle School and West Mead Avenue to Nob Hill Boulevard gutter,sidewalk,street lighting and storm Valley Jr. High School. drainage system. Reconstruct and widen roadway to three lanes, This section of 66th Avenue is classified as a 66th Ave Widening 45 6 install curb,gutter,sidewalk,storm drainage collector arterial and should be updated to Summitview Avenue to Scenic Drive system and utilities. current City stnadards as such. Reconstruct roadway, install curb,gutter, The pavement along this stretch of Rudkin Rudkin Rd Reconstruction Viola sidewalk and storm drainage. Partner with 46 2 Road is in poor condition and the road does not to Ranier Union Gap to install additional sewer force have curb,gutter and sidewalk. main. This section of Englewood does not have curb, Widen roadway to three lanes, install curb, Englewood Ave Widening gutter and sidewalk. During heavy rain storms, 47 5, 6 40th Avenue to 56th Avenue gutter,sidewalk,street lighting and storm some properties are flooded since there is no drainage system. curb and gutter. Widen roadway to three lanes, install curb, This section of Englewood is classified as a Englewood Ave Widening 16th collector arterial. As such, it should have a 48 5, 6 gutter,sidewalk,street lighting and storm Avenue to 24th Avenue center turn lane,as well as, curb,gutter and drainage system,water and sewer lines. sidewalk. This section of 80th Avenue is classified as a Widen roadway to three lanes, install curb, 80th Avenue Reconstruction and Widening collector arterial. As such, it should have a 49 6, 7 gutter,sidewalk,street lighting and storm center turn lane,as well as, curb,gutter and Tieton Drive to Zier Road drainage system. sidewalk. Reconstruct and widen roadway to three lanes, install curb,gutter,sidewalk,street lighting and This section of Englewood is classified as a 50 5 Englewood Ave Widening 24th storm drainage system. Install sewer and water collector arterial. As such, it should have a Avenue to 40th Avenue lines.Add roadway treatments between 32nd center turn lane,as well as, curb,gutter and Ave to 34th Ave to create low stress bicycle sidewalk. connection between bike corridors. District Grant/Funding Grant/Funding Match Priority No(s) Project Name Project Description Need for Project Type Amount Secured Required Construct curb,gutter,sidewalk and storm 88th Ave Reconstruction This section of 88th Avenue is classified as a 51 6 drainage system on the east side of 88th collector arterial. It should have curb,gutter Tieton Drive to Summitview Avenue Avenue. and sidewalks to meet City standards. This section of 64th Avenue is classified as a Widen roadway to three lanes, install curb, 64th Ave Widening Washington collector arterial. As such, it should have a 52 7 gutter,sidewalk,street lighting and storm Ave.to Nob Hill Blvd. center turn lane,as well as, curb,gutter and drainage system. sidewalk. 53 1 1-82/Lincoln Ave Interchange Improvements Reconstruct/extend off-ramp from existing 1-82 offramp for Lincoln Avenue to E. 'G'Street. Reconstruct the existing trolley rail and Due to the poor condition of the trolley rails, 54 1, 5 6th Avenue Rehabilitation(Walnut-River) impacted roadway,grind and overlay the the pavement of this section of 6th Avenue is in remaining width of 6th Avenue. very poor condition. 55 16th Ave Study(SR 12 Washington) Study to determine strategies for improving the 16th Avenue corridor 56 40th Ave Study(SR 12 Washington) Study to determine strategies for improving the 40th Avenue corridor. 57 Nob Hill Blvd Study(1-82-16th) Study to determine strategies for improving the Nob Hill Boulevard corridor. Corridor study to determine the best location North/South Connector to West Valley(Ahtanum- 58 for a north/south limited access route in West Summitview) Valley. City and County joint project. 1st St/Main St Corridor Study(Nob Hill-Barker Joint project with Union Gap. Study to 59 Mill) determine strategies for improving the 1st Street/Main Street corridor. List of Washington Cities that have Established TBD's Year TBD Jurisdiction Established Funding Source Aberdeen 2012 0.13%sales tax Airway Heights 2013 0.20%sales tax Anacortes 2014 $20 vehicle license fee Arlington 2013 0.20%sales tax Bainbridge Island 2012 $20 vehicle license fee Battle Ground 2014 $20 vehicle license fee Bellingham 2010 0.20%sales tax Black Diamond 2015 $20 vehicle license fee Bremerton 2009 $20 vehicle license fee Buckley 2012 $20 vehicle license fee Burien 2009 $10 vehicle license fee Carbonado 2012 $20 vehicle license fee Castle Rock 2012 0.20%sales tax Centralia 2014 0.20%sales tax Clarkston 2014 0.20%sales tax-replaced a $20 vehicle license fee Covington 2013 $20 vehicle license fee Dayton 2014 0.20%sales tax Des Moines 2008 $40 vehicle license fee (nonvoted) DuPont 2013 $20 vehicle license fee East Wenatchee 2012 $20 vehicle license fee Eatonville 2012 $20 vehicle license fee Edgewood 2013 $20 vehicle license fee Edmonds 2008 $20 vehicle license fee Electric City 2012 $20 vehicle license fee Ellensburg 2015 0.20%sales tax Elmer City 2015 $20 vehicle license fee Enumclaw 2013 $20 vehicle license fee, 0.10%sales tax Everett 2014 $20 vehicle license fee Ferndale 2011 0.20%sales tax Fife 2015 $20 vehicle license fee Friday Harbor 2014 0.20%sales tax Grandview 2011 $20 vehicle license fee Granite Falls 2015 $20 vehicle license fee Kalama 2012 $20 vehicle license fee Kelso 2012 $20 vehicle license fee Kenmore 2012 $20 vehicle license fee Kittitas 2012 $20 vehicle license fee Lake Forest Park 2008 $40 vehicle license fee Lakewood 2012 $20 vehicle license fee Leavenworth 2010 0.20%sales tax Lynden 2012 0.20%sales tax Lynnwood 2010 $40 vehicle license fee, 0.1%sales tax List of Washington Cities that have Established TBD's Year TBD Jurisdiction Established Funding Source Mabton 2011 $20 vehicle license fee Maple Valley 2012 $20 vehicle license fee Marysville 2013 0.20%sales tax Mattawa 2015 0.20%sales tax Mercer Island 2014 $20 vehicle license fee Monroe 2012 0.20%sales tax Mountlake Terrace 2011 $20 vehicle license fee Mount Vernon 2016 0.2%sales tax Normandy Park 2013 $20 vehicle license fee North Bend 2011 0.20%sales tax Olympia 2008 $40 vehicle license fee Orting 2011 $20 vehicle license fee Othello 2012 0.20%sales tax Port Orchard 2015 $20 vehicle license fee Prosser 2009 $20 vehicle license fee Ridgefield 2008 Unfunded -0.2%sales tax repealed in 2012 Roy 2014 $20 vehicle license fee Royal City 2012 $20 vehicle license fee Seattle 2010 $80 vehicle license fee, 0.10%sales tax Sedro-Woolley 2014 $20 vehicle license fee Sequim 2008 0.20%sales tax Shelton 2015 0.20%sales tax Shoreline 2009 $20 vehicle license fee Snohomish 2010 0.20%sales tax Snoqualmie 2010 $20 vehicle license fee Soap Lake 2013 $20 vehicle license fee Spokane 2011 $20 vehicle license fee Stanwood 2012 0.20%sales tax Tacoma 2012 $20 vehicle license fee, 0.10%sales tax Toppenish 2012 $20 vehicle license fee Tumwater 2014 0.20%sales tax Twisp 2016 0.20%sales tax University Place 2009 $20 vehicle license fee Vancouver 2015 $20 vehicle license fee Waitsburg 2012 0.10%sales tax Walla Walla 2011 0.20%sales tax Wapato 2012 $20 vehicle license fee Wenatchee 2011 $20 vehicle license fee Wilkeson 2014 $20 vehicle license fee Zillah 2011 $20 vehicle license fee Eastern Washiington Cities Original 2012 Transportation Benefit District Proposed 5-Year Project List Street From To Sq Ft Treatment Cost/ Total Cost Maint. SF Year Year 1 3rd St Arlington Beech 95000 Mill & Overlay $3.42 $324,900.00 2013 Lincoln Av 56th Ave 66th Ave 68880 Mill & Overlay $3.42 $235,569.60 2013 Yakima Av 12th Ave 16th Ave 81200 CIR $4.87 $395,444.00 2013 $955,913.60 Year 2 D St 1st St 5th Ave 122200 CIR $4.87 $595,114.00 2014 25th Av Englewood Castlevale 31050 Mill & Overlay $3.42 $106,191.00 2014 Lincoln Av 40th Ave 46th Ave 77000 CIR $4.87 $374,990.00 2014 $1,076,295.00 Year 3 Pecks Canyon Rd Scenic Dr City Limit 4620 Mill & Overlay $3.42 $15,800.40 2015 Viola Av 1st St Fair Ave 35100 Mill & Overlay $3.42 $120,042.00 2015 24th Av Washington Mead 122500 CIR $4.87 $596,575.00 2015 G St 3rd St 6th St 38400 Mill & Overlay $3.42 $131,328.00 2014 G St 1st St 3rd St 22400 Mill & Overlay $3.42 $76,608.00 2015 Walnut St 3rd Ave 5th Ave 36400 CIR $4.87 $177,268.00 2015 $1,117,621.40 Year 4 6th St Yakima Pacific 220000 Mill & Overlay $3.42 $752,400.00 2016 Scenic Dr 4202 4615 53406 Mill & Overlay $3.42 $182,648.52 2016 Scenic Scenic Walnut St 1st St 3rd St 36400 CIR $4.87 $177,268.00 2016 $1,112,316.52 Year 5 3rd Av Yakima Walnut 68000 CIR $4.87 $331,160.00 2017 Lincoln Av 24th Ave 32nd Ave 109000 CIR $4.87 $530,830.00 2017 $861,990.00 Unfunded 24th Av Mead Nob Hill 127400 CIR $4.87 $620,438.00 Walnut St 5th Ave 7th Ave 36400 CIR $4.87 $177,268.00 Pierce Av Summitview Lincoln 40000 Mill & Overlay $3.42 $136,800.00 Fruitvale Blvd 2100 3000 256000 HIR $7.73 $1,978,880.00 Fruitvale Fruitvale Fruitvale Blvd 3000 4000 276000 HIR $7.73 $2,133,480.00 Fruitvale Fruitvale $5,046,866.00 D Street is not an arterial but is critical for emergency response. Highlighted locations were resurfaced in the 2013 & 2014 Citywide Street Resurfacing projects