HomeMy WebLinkAboutR-2007-031 2007 - 2012 Six-Year Transportation Improvement Plan (STIP) AmendmentRESOLUTION NO. R-2007-31 A RESOLUTION to amend the Six-year Transportation Improvement Program (STIP) for the period of 2007 through 2012 to include projects affecting the City's Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year Transportation Program for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the adopted 6 -Year STIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year STIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 - Year Transportation Improvement Plan for the period of 2007 to 2012 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, a public hearing has been held by the Yakima City Council on amending the 6 -Year Transportation Improvement Plan on Tuesday, March 20, 2007, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2007 through 2012 for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation Improvement Plan attached. ADOPTED BY THE CITY COUNCIL this 20th day of March, 2007. ATTEST: City Clerk David Edler, Mayor % Agency: Yakima Co. No.: 39 City No.. 1485 Washington State Department of Transportation Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Functional 11 Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Project Costs in Thousands of Dollars Expenditure Schedule Ocal Agency) — _ Federally Funded Projects Only oi o Y 5 Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code Funds Funds Funds Envir Type RAN Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6ih 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 2 3 14 17 1 Yakima Railroad Grade Separations - Phase 2 Lincoln Ave. & Martin Luther King J. Blvd. from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstructor, including realignment of Front Street. 01 06 07 08 P 0.2 T P G G W S PE RW CN 6/1/2007 3/1/2007 4/1/2008 STP(U) STP(U) STP(U) 5500 3000 7000 AIP OTHER AIP 1285 7500 1000 7785 3000 14500 3000 4785 3000 3000 11500, EA Yes 3/01/07 Totals 15500 8785 1000 25285 9000 16285 2 Yakima Railroad Grade Separations - Phase 1 Lincoln Ave. & Martin Luther King Jr Blvd. from. Yakima Ave to: 'D' St Relocate utilities to accomodate profiles of Lincoln Ave and MLK 81vd and resurface portions of Front Street and 'A Street 01 12 06 S 0.3 p 0 T W S CN 1 6/1/2007 I STP(U) 1 20001 OTHER 1 1 20001 20001 EA Yes 03/01/07 Totals 2000 2000 2000 16 3 W Nob Hill Blvd - S 68th Ave to S 80th Ave W Nob Hill Blvd from: S 68th Ave to' S 80th Ave Reconstruct to minor arterial standards 04 03 S 73 c W 0 P T 5 PE RW CN 4/1/2007 6/1/2007 '1/1/2008 AIP I 55 AIP 216 AIP I 555 370 144 370 425 360 925 4251 I 3601 925 1 EA Yes 04/01/06 Totals 826 884 1710 785 925 17 4 River Road Realignment River Road from: N 16th Ave to: Fruitvale Blvd Widening, curb, gutter, sidewalk. reconstruction, irrigation relocation 01 04 03 SCN 11 c G P TS W RW 9/1/2006 1/1/2007 AIPI AIPI 2721 11841 681 3401 3401 14961 26801 26801 CE Yes 01/01/06 Totals 1456 1564 3020 3020 Report Date: March 14, 2007 Page 1 Supersedes previous editions NI/ Agency. Yakima Washington State Department of Transportation Co. No.. 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 LL 4,13 .° g a Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes I Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (Mwyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 YVT Barn Rehabilitation & Museum 3rd Ave from: 3rd Ave to: Pine St Car Barn, Museum Restoration and Pathway 03 P N/A G C S T W P PE CN 1/1/2007 6/1/2007 STP(E) STP(E) 18 1816 32 272 50 2088 50 2088 EA No Totals 1834 304 2138 2138 00 6 Transit Operating Expenditures Various Funding Areas from: N/A to. N/A Supplemental Funding for Transit Service Operating Expenses 12 22 23 24 31 S N/A CN 1 1/1/2007 1 5307 1 16001 1 1 16001 32001 32001 CE No Totals 1600 1600 3200 3200 00 7 YVT Museum &Barn Rehabilitation S 3rd Ave from: to: Minor car barn and museum restoration including property purchase 03 S c C' 0 P S T PE RW CN 6/1/2007 6/1/2007 6/1/2007 STP(E) STP(E) STP(E) 36 205 255 1 1 361 36 1 205 205 1 1 255 255 CE Yes 06/01/07 Totals 496 496 496 00 8 Street Asset Amenities Route Maintenance, Repair and Improvements from: to Maintenance of Shelters. Benches and Signage throughout our Route System 22 31 S N/A ALL Totals 1/1/2007 1 1 1 1 1 501 501 501 1 CE No 50 50 50 Report Date. March 14, 2007 Page 2 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.. 1485 Co. Name' Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date. 6/27/2006 Amend Date: Resolution No.: R-2006-93 y i •_'''_..g o Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure cao enc Schedule ( H Y) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 17 18 19 20 21 00 9 William 0 Douglas Trail 6th Ave Pathway & Bridge Decking from: to: Build pathway and Install decking on Nachos River bridge 32 08 06 S 1.0 O P S W PE CN 1/1/2007 1/1/2008 STP(E) STP(E) 57 271 57 271 57 271 CE No Totals 328 328 328 14 10 N 16th Ave - Signal @ River Rd N 16th Ave from: N 16th Ave to: River Rd Install new signal 12 S N/A w T P S PE RW CN 1/1/2007 4/1/2007 1/1/2007 STP(U) STP(U) STP(U) 27 40 332 1 1 3 6 36 30 46 368 30 368 1 46 I CE Yes 04/01/07 Totals 399 45 444 398 46 11 William 0. Douglas Hertiage Trails Bridge Restoration & Trailhead from: to: Trailhead restoration, right of way acquisition partner with the William 0. Douglas Foundation, including restoration of bridge , cleaning, rust removal 32 13 10 S G 0 P S T W PE RW CN 1/1/2007 1/1/2007 1/1/2007 STP(E) STP(E) STP(E) 65 150 285 1 1 1 65 1 1 1 150 285 651 1 1501 1 2851 CE Yes 01/01/07 Totals 500 500 500 00 12 Transit Service to Selah & WSDOTComplex (Union Gap) Demonstration Transit Project Expansion from: 90. Two year demonstration project continues to provide the City of Selah and the WSDOT campus m Union Gap with weekday bus service through June nn,nm 22 31 S ALL I 1/1/2007 I CMAQ 1 631 1 171 701 701 No Totals 63 7 70 70 Report Date. March 14 2007 Page 3 Supersedes previous editions VI/ Agency: Yakima Washington State Department of Transportation Co. No.: 39 Co Name: Yakima Co City No.. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 1 `o 0 = ° E a z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. StreetlRoad Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement I Type(s) 1 _ Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure enc Schedule xpen (Local Agency) y) Federally Funded Projects Only Project Phase Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type R/W Required Date ( Date Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 13 West Side Transit Center Placement Acquire Property to Expand Operations from: to: Recent Annexations Mandate Transit Expansion to These Areas 12 23 21 P N/A PE 1/15/2007 OTHER 100 600 700 500 200 No Totals 100 600 700 500 200 16 14 W Lincoln Ave Sidewalks W Lincoln Ave from: N 18th Ave to: N 29th Ave Sidewalks on the Northside 12 S .5 T P W S PE RW CN 1/1/2007 1/1/2007 1/1/2007 PSMPj 61 41 tot 10 10 PSMPj 61 41 10! 173 PSMPj 741 991 173 1 1 1 CE Yes 04/01/07 Totals 86 107 193 193 14 15 SR12 - N 40th Ave SR12 - N 40th Ave from. N 40th Ave to SR12 Widen intersection and on-ramp, Interceptor crossing 03 04 S N/A p O T W S PE RW CN 1/1/2007 1/1/2007 1/1/2007 PSMP OTHER OTHER 3201 801 400 2601 1401 400 19201 1001 2020 4001 1 4001 1 20201 1 CE EA Yes 01/01/06 Yes 01/01/07 Totals 2500 320 2820 2820 2241 1 3401 1 5001 13761 14 16 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to. S 68th Ave Widen, curb, gutter sidewalk, lighting, drainage 04 P 77 p C G O S T PE RW CN 1/1/2007 6/1/2007 10/1/2007 STP(U) STP(U) 207 300 TPP 1 171 22--4-1 1 401 340 16831 1931 1876 Totals 507 1683 250 2440 1064 1376 Report Date: March 14, 2007 Page 4 Supersedes previous editions Washington State Department of Transportation Agency: Co. No.: City No.: Yakima 39 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 o N ti Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road 9 9 9 F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Fundin 9 State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 17 Annual Signal Upgrades Local Selection from: N/A to' N/A Upgrade signals 01 P N/A PE CN CN 8/1/2007 8/1/2007 8/1/2007 CMAQ STP(S) CMAQ 50 150 300 AIP 200 50 100 350 300 100 350 300 CE No Totals 500 200 50 750 100 650 00 18 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 p N/A w S CN I 7/1/2007 I STP(U) 1 1731 I I 271 2001 2001 1 1 EA No Totals 173 27 200 200 00 19 Storm DrainsNegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2007 1/1/2007 I I 80 1 80 I 801 I 7201 72017201 EA No Totals 800 800 800 17 20 Reconstruction Rudkin Rd Rudkin Rd from: E Viola Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 p .76 PE CN 1/1/2008 1/1/2009 STP(C) STP(C) i 87 750 1 1 221 109 TPP 1 7501 841 1584 1 1091 I 1 1584 CE No Totals 837 750 106 1693 109 1584 Report Date: March 14, 2007 Page 5 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No. 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date 6/27/2006 Amend Date: Resolution No.: R-2006-93 oN j E LL Project Identification A. Federal Aid No. B. Bridge No. ...4), C. Project Title ° g D. Street/Road Name or Number 0 z E. Beginning MP or road - EndingMP or road g 9 , F Describe Work to be Done G E v r Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MMiYY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 21 'E Mead Ave Reconstruction E Mead Ave from' Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, ,curb, gutter, storm, acp 03 06 P 76 C G 0 P S T PE CN 9/1/2008 4/1/2008 STP(S) STP 97 1373 TPP TPP 18 163 6 55 121 1591 121 1591 CE No Totals 1470 181 61 1712 121 1591 19 22 Longfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from. Valley Mall Blvd to: W Washington Ave New roadway construction and reconstruction, 3 -lane w/turn, curb, gutter. sidewalks - Partner with City of Union Gap, waterloop with development 03 01P 50 p S W T 0 PE CN 1/1/2008 1/1/2009 1061 106 1 11831 1183 1061 1 1 1183 CE No Totals 1289 1289 106 1183 14 23 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill, (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 c S W T PE RW CN 1/1/2007 3/1/2007 1/1/2008 STP(U) STP(U) STP(U) 13 18 200 1 1 21 15 1 1 21 20 1 1 351 235 15 20 1 1 2351 CE Yes 01/01/07 Totals 231 39 270 35 235 16 24 Roadway City Wide Shoulder Improvements City Wide from- to. City Wide shoulder improvements, PM10 abatement. 01 P N/A s CN 1 7/1/2007 1 CMAQ 1 40011 541 4541 4541 1 1CE No - — Totals 400 54 454 454 Report Date: March 14, 2007 Page 6 Supersedes previous editions Washington State Department of Transportation AFF -Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co MPO/RTPO: WCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 o 1 19 ° E a z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes I Project Costs in Thousands of Dollars Expenditure (LocalSchedule Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RNV Required Date (MMYY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 25 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 S N/A O C P T W PE 8/1/2007 STP(U) 72 11 83 83 CE Yes 10/01/07 Totals 72 11 83 83 17 26 S 80th Ave - Tieton Dr to Zier Rd • S 80th Ave from: Tieton Dr to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 O C P T W S PE RW CN 1/1/2007 1/1/2008 6/1/2008 AIP AIP AIP 1041 16 3031 47 13231 207 1201 1201 I 350 1 3501 1530 15301 EA Yes 01/01/08 Totals 1730 270 2000 120 1880 17 27 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from. S 75th Ave to' S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 c S T P PE CN 1/1/2007 6/1/2007 STP(E) 1 22 STP(E) 1 75 1 I 71 291 291 1 1 I 201 951 951 1 CE Yes 03/01/07 Totals 97 27 124 124 17 28 Englewood Ave: N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to. N 56th Ave Widen roadway, curb, gutter sidewalk 05 06 P 1.0 �cnl-000 PE RW CN 1/1/2010 6/1/2010 1/1/2011 STP(C) STP(C) STP(C) 216 277 18672701 I 341 250 431 320 1 2137 I 1 I I 1 I 250 320 2137 EA Yes 04/01/10 Totals 2360 347 2707 2707 Report Date: March 14, 2007 Page 7 Supersedes previous editions 741Washington State Department of Transportation Agency' Yakima Co. No.: 39 Co. Name: Yakima Co City No. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 ou, F, ILI 6: 1 Project Identification B. No. A. Federal Aid No. Bridge` ._T. 9 C. Project Title o D. Street/Road Name or Number n- Z E. Beginning MP or road - EndingMP or road 9 9 F Describe Work to be Done „� o a ar E w , 3 a o m ci Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mn/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W R Date (MM/YY) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th , 2 3 4 5 ! 6 7 8 9 10 11 12 13 14 15 16 17 18 L 19 20 21 17 29 , Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from N 16th Ave to: N 24th Ave Widen. curb. gutter and sidewalk, water and sewer Ines - 05 06 P 2 O W S PE RW CN 1/1/2008 1/1/2009 6/1/2010 STP(U) STP(U) STP(U) 173 259 2365 27 41 193 200 300 2558 200 300 2558 EA Yes 01/01/09 Totals 2797 261 3058 200 300 2558 00 30 ' ;Pedestrian Bridge Pedestrian Bridge i, from' N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, (power handicap accessible, lights 14 32 p 25 T P 0 PE CN 1/1/2009 3/1/2010 STP(E) STP(E) 200 2500- 271 327; 2271 2827 - 1 227 1 2827- CE No Totals 2700 354 3054 227 2827 00 31 iGravel Road B.S.T ;Various Areas i from' City Wide to: !PM -10 Abatement Street Sweeper Acquisition 07 S N/A S CN CN 4/1/2007 6/1/2007 CMAQ 155 I 2001 200 1 301 185 1001 50 50 1851 1 CE No Totals 155 230 385 285 50 50 16 32 ;Powerhouse Rd & Englewood Ave .Powerhouse Rd from Powerhouse Rd to: Englewood Ave 'Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, i possible roundabout 12 P N/A T P O S C W PE RW CN 5/1/2007 0/1/2007 10/1/2008 STP(S) STP(S) STP(S) 20 400 400 1 31 23 1 541 454 581 458 231 1 4541 1 458; 1 CE Yes 09/01/20 Totals 820 115 935 935 Report Date: March 14, 2007 Page 8 Supersedes previous editions 17.1 Agency: Yakima Co. No.: 39 City No.: 1485 Washington State Department of Transportation Co. Name' Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 Nm o N o ,....-.15,C. ° E i z Project Identification A. Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done c E v 'o a a - E a to Eh d w t° Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (m,n/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RNV Required q Date (Mwyy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 33 S 48th Ave & Summitview Ave Signahzation S 48th Ave from. S 48th Ave to. Summltview Ave Signalization 12 P N/A p T PE RW CN 1/1/2010 1 STP(S) 5/1/2010 STP(S) 13/1/2011 STP(S) 20 20 440 3 3 64 23 23 504 23 23 504 CE Yes 06/01/11 Totals 480 70 550 550 16 34 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to' W Washington Ave Signal Upgrades 12 P170 N/A p T PE CN 4/1/2007'I 6/1/2007 101 10 170 101 1 170 1 CE No Totals 180 180 180 14 35 S 16th Ave & W Washington Ave Signal S 16th Ave from: S 16th Ave to. W Washington Ave Included in Union Gap's Valley Mall Blvd protect 12 P N/A p T PE CN 1/1/2007 6/1/2007 I STP(S) STP(S) 10' 60 1 101 1 601 20 120 201 1201 CE No Totals 70 70 140 140 14 36 W Nob Hill Blvd SidewalksT W Nob Hill Blvd from: S 16th Ave to S 6th St. Install missing sidewalks on southside of Nob Hill 12 p 2.5 p W S PE RW CN 1/1/2008 STP(S) 6/1/2008 STP(S) 3/1/2009 STP(S) 43 85 255 1 1 71 501 1 1 50 1 1 151 1001 1 100 1 1 451 300 1 300 CE Yes 09/01/08 Totals 383 67 450 150 300 Report Date: March 14, 2007 Page 9 Supersedes previous editions Washington State Department of Transportation -' Agency' Yakima Co. No.: 39 Co. Name. Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 g N f5 2o LL Priority Number Project Identification A. Federal Aid No. B. Bridge No. v 1::.2: C. Project Title ; a D. StreeURoad Name or Number a� E. Beginning MP or road - EndingMP'or road E 9 g F Describe Work to be Done Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddiyyyy) Fund Source Information Federal Funding I State Fund Code State Funds Local Funds Total Funds Envir Type y R/W Required q Date (Mti1/1 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 37 Beech St Pedestrian Connection Beech St from' Fair Ave to: Chalmers/Riverside Construct pedestrian pathway under SR82 to Greenway 06 32 P 1.0 p T PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(S) STP(S) STP(S) 45 150 400 6 20 54 51 170 454 51 170 454 CE Yes 09/01/09 Totals 595 80 675 51 624 16 38 12 W Lincoln Ave Sidewalks W Lincoln Ave from: N 56th Ave to: N 29th Ave Sidewalks, meters and fire hydrants replacement or relocation P 2.0 p T S W PE RW CN 1/1/2009 5/1/2009 1/1/2010 STP(S) STP(S) STP(S) 34i 68 454 61 40 121 80 701 524 1 1 1 1 1 1 40 80 524 CE Yes 09/01/10 Totals 556 88 644 644 14 39 W Lincoln Ave &'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights 01 12 P .5 W T S P 0 G PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(E) STP(E) STP(E) 3371 831' 1429! 1 53 129 1 223 390 960 1652 1 1 390 960 1650 CE Yes 09/01/10 Totals 2597 405 3002 390 2610 16 40 School Safety Projects Various Locations - Citywide from. to: Crossing flashers, sidewalks, signing, other features 12 L_ P N/A 1/t/ PE CN 1/1/2007 1/1/2007 1 PSMPI 101 21 12 i PSMP ] 1901 381 228 121 1 190 1 I I CE No Totals 200 40 240 202 Report Date March 14, 2007 Page 10 Supersedes previous editions Washington State Department of Transportation V"""71 Agency: Yakima Co. No.. 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Ti o 2 U Pr Numberty I Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure (Local 1st Schedule Agency) Federally Funded Projects Only t a m ° a Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (M yy) Federal Fund Code Federal Cost by Phase 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 41 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters 03 04 06 P .85 c G O P S T PE RW CN /1/2008 i STP(C) 1/1/2009 STP(C) 1/1/2010 1 STP(C) 433 865 5190 67 135 810 500 1000 6000 500 1000 6000 EA Yes 1/1/09 Totals 6488 1012 7500 7500 17 42 ,atuetranis - S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 01 12 06 P N/A w S T P 0 PE RW CN 1/1/2008 1/1/2009 1/1/2010 I STP(C) STP(C) STP(C) 87 87 518 1 131 100 1 131 100 821 600 I 100 100 600 CE Yes 1/1/2008 Totals 692 108 800 800 14 43 4579 S 1st St. - E. Washington Ave. Intersection Improvement S 1st St. from: S 1st St. to. E Washington Ave. Realign intersection, upgrade traffic signal 12 P N/A p W S T O PE I 6/1/2007 1 STP 1 2001 1 1 301 2301 2301 EA Yes 06/01/07 Totals 200 30 230 230 16 44 4562 Tieton Dr - S 5th Ave. Intersection Project • Tieton Drive from- 5th Ave. Intersection to Replace traffic signal with roundabout 12 p N/A p W T 0 S ALL Totals I 4/4/2008 STP(U) 1 3001 WSDOT [ 3001 1 6001 6001 1 CE No 300 300 600 600 Report Date: March 14, 2007 Page 11 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.. 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title E o a D. Street/Road Name or Number a~ E. Beginning MP or road - Ending MP or road E F Describe Work to be Done Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddyyyy) Fund Source Information Federal Funding State Funds Local Funds Total Funds Envir Type R/W Required Date (MWYY) Federal Fund Code Federal State Cost by 1 Fund Phase Code 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 45 4587 03 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hill Blvd. Widen, curb, gutter, sidewalk, lighting, drainage P 1.00 p T W S O ALL 4/1/2007 STP 18001 243 2043 50 1993 EA No Totals 1800 243 2043 50 1993 14 46 03 South 72nd Ave & Mead Ave Intersection 12 South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk P N/A O P S T W PE CN 1/1/2007 6/1/2007 STP(U) STP(U) 41; 1 71 48 3041 1 48; 352 481 1 352; 1 CE No Totals 345 55 400 400 08 47 j 06 Yakima Ave. Historic District Pedestrian Improvement 12 from' 7th Avenue to: 9th St/A St Install historical lighting. sidewalk modifications and other improvements, pedestrian corridor - S 140 p W S T PE CN 1/1/2007 1/1/2007 1 OTHER 8701 , OTHER 1 65001 870 1 6500 8701 40001 25001 CE No Totals 7370 7370 4870 2500 00 48 ' 14 William 0. Douglas Pathway 32 from. Pine St to' Cowiche Canyon Pathway improvements and signage, to Cowiche Canyon P N/A O S P W PE CN 1/1/2007 7/1/2007 STP(E) STP(E) 8 87 1 1 21 131 101 10] 1001 1001 I 1 CE No Totals 95 15 110 110 Report Date. March 14, 2007 Page 12 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Functional Class Priority N' Number Project Identification A. Federal Aid No. B. Bridge No. Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only . Fund Source Information Federal Funding R/W C. Project Title = D. Street/Road Name or Number a Phase Federal Federal State 4th Required Start Fund Cost by Fund State Local Total Envir Date E. Beginning MP or road - Ending MP or road o 2 Funds Funds Funds 1st 2nd 3rd Thru Type (M y) F Describe Work to be Done (mm/dd/yyyy) Code Phase Code 6th 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 49 04 P 76 W PE 1/1/2007 %/1/2007 STP(E) 18 4 130 22 1000 22 1000 S 66th Avenue 03 T CN STP(E) 870 Yes S 66th Ave from: Scenic Drive to: Summitview S P 1/1/2008 Widen roadway curb, gutter, sidewalk and utilities 0 Totals 888 134 1022 1022 16 50 05 P .20 C' PE 1/1/2008 STP(S) 130 1 201 1501 1501 CE 66th Ave. & Summitview Intersection 12 Of,/1/2008 PE RW STP(S) 303 1 1 471 350 1 1 350 Yes N. 66th Avenue & Summitview from. N. 66th Ave. to: Summitview Ave. P S CN 7/1/2009 STP(S) 865 1 1351 10001 1 1000 1/1/2009 Widen for left turn lanes, intersection improvements, curb, gutter, handicap T Totals 1298 202 1500 150 350 1000 ramps and lighting W 14 51 12 P N/A w PE 1/1/2008 STP(U) 100 1 1 131 113 7 57 1131 1 571 CE 40th Avenue and Summitview Signal Upgrade S RW CN 1/1/2008 6/6/2008 STP STP(U) 50 432 1 1 681 500 5001 Yes 40th Avenue from: 40th Avenue to: Summitview T P 1/1/2008 Signal upgrade, radius improvements, turn lane extension O Totals 582 88 670 670 14 52 12 P N/A W PE 1/1/2008 STP 75 1 101 851 1 1 1 1 85 57 CE 40th Avenue and Englewood T RW CN 1/1/2008 1/1/2009 STP STP 50 115 1 1 71 57 161 131 1 1 131 Yes 40th Avenue from: 40th Avenue to: Englewood Replace traffic signal poles, upgrade controller S P o 1/1/2008 Totals 240 33 273 273 Report Date. March 14, 2007 Page 13 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No. City No. 39 Co. Name. Yakima Co 1485 MPOIRTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 -"="1";°-.) i a z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 9 F Describe Work to be Done Improvement L Type(s) rn Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mr✓dd/yyyy) Fund Source Information Federal Funding 1 State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MMY1� Federal Fund Code Federal ' Cost by li Phase 1st 2nd 3rd 4th Thru 6th 1 2 T 3 4 5 6 7 8 9 10 11 r 12 13 14 15 16 17 18 19 20 21 00 53 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to' Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps 12 P N/A w T S P 0 PE RW CN '11/2009 6/1/2008 1/1/2008 STP STP STP 100 50; 250 14 7 34 114 57 284 114 57 284 CE Yes 1/1/2008 Totals 400 55 455 455 14 54 1st Street and f Street 1st Street from' 1st Street to: I Street Replace and upgrade traffic signal equipment 12 P N/A w T S 0 PE CN 1/1/2008 'i/1/2009 STP 1 25; STP 1 100; 1 1 41 291 1 1 29 131 1131 113 CE No Totals 125 17 142 142 14 55 Mead Ave. Railroad Grade Separation Mead Ave. from Presson Place to. Maryland Construct railroad overpass including all utilities 01 p .25 W T S p O PE RW CN 6/1/2009 1/1/2009 1/1/2010 STP(U) STP(U) STP(U) 6501 2500 5200 1 1 1 1501 8001 5001 30001 8001 60001 1 800 1 3000 1 6000 CE Yes 1/1/2010 Totals 8350 1450 9800 3800 6000 16 56 Washington Ave. Railroad Grade Separation Washington Ave. from. Longfibre Road to: Railroad grade overpass including all utilities 01 p .25 0 P S T W PE RW CN 6/1/2009 1/1/2009 1/1/2010 STP(U) STP(U) STP(U) 650 2500 5200 1 1 150 1 1 500 800 8001 1 1 800 30001 1 1 3000 60001 60001 CE Yes 1/1/2009 Totals 8350 1450 9800 9800 Report Date: March 14, 2007 Page 14 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.. 1485 Co. Name: MPO/RTPO: Yakima Co YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 o y 12 3 U Priority I Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding(Local State Fund Code State Funds Local Total Funds Funds Envir Type R/W Required Date (M � Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 57 Citywide Pathway Connections Yakima from. to: Cowiche Canyon, Powerhouse Rd, east side canal paths, Greenway including Neches Rail Spur, signage and amenities 01 P 4 ° 0 P S T W PE RW CN 6/1/2009 1/1/2009 1/1/2010 STP(U) STP(U) STP(U) 200 600 1500 301 230 70 670 250 1750 230 670 1750 CE Yes 1/1/2009 Totals 2300 350 2650 230 2420 16 58 E. 'H" St. Extension E. "H" St. from 1st St. to: Yakima River Construct road including water, sewer, curb, gutter and sidewalk for future development 01 08 P 11 O P S T W PE RW CN 1/1/2009 1/1/2011 6/1/2012 STP(U) STP(U) STP(U) 1730 1730 9515 1 270, 2000 1 1 1j 270 2000 1 1 14851 110001 1 2000 2000 11000 CE Yes 1/1/2011 Totals 12975 2025 15000 15000 17 59 N. 9th St. Extension N. 9th St. from: R St. to: Yakima Ave. Construct road including water, sewer curb, gutter, sidewalk for future development. P 13 O P S T W PE RW CN 1/1/2010 1/1/2011 6/1/2011 STP(C) STP(U) STP(U) 554 4325 6228 1 1 861 640 1 1 1 1 6751 5000 1 1 7721 70001 1 640 5000 7200 CE Yes 1/1/2010 Totals 11107 1533 12640 12840 00 60 YVT Pathway YVT Right of Way from. to: Development pathway in West Valley area including 50th Ave, Wide Hollow, Ahtanum including all utilities and signage 03 32 P N/A O P S T W PE CN 1/1/2010 6/1/2010 STP(U) STP(U) 250 750 1 1 1 1 301 2801 1 1 lool 8501 1 1 280 850 CE No Totals i000 130 1130 1130 Report Date: March 14, 2007 Page 15 Supersedes previous editions Washington State Department of Transportation Agency• Yakima Co. No. 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO• YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 g F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure (Local Agency) 2nd Schedule Federally Funded Projects Only Project Phase Phase Start (mn✓dd/yyyy) Fund Source Information Federal Funding g State Code State Funds Local Funds Total Funds Envir Type yP R/W Required Date (M� Federal Fund Code Federal Cost byFund Phase 1st 4th 3rd ! Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Ili 19 20 21 17 I 61 lFruitvale 34th Ave & River Rd Improvements Blvd. from: 34th Ave. to: River Rd. Intersection improvements Including lumination, sewer, water, curb, water and sidewalks 01 12 P N/A O P S T W PE CN 1/1/2009 6/1/2009 STP(U) STP(U) 50 450 4 60 54 510 54, 5101 CE No Totals 500 64 564 564 17 1 62 j Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway. widen, curb, gutter and sidewalks. Sewer. water fines and street lights. 01 05 12 P 1.0 0 P S T W PE RW CN 1/1/2008 6/1/2009 1/1/2010 STP(U) STP(U) STP(U) 173 259 2365 1 1 271 200 411 300 1931 2558 1 2001 1 3001 2558 CE Yes 1/1/2009 Totals 2797 261 3058 500 2558 16 63 Frontage Road & "H" St Loop - N. 8th St. from' "H" St. to: 1-82 Construct new roadway, water sewer, cutb, gutter sidewalk and lighting for future development and Terrace Heights connection 01 P 1.3 0 C' O P S T PE RW CN 1/1/2008 6/1/2008 1/1/2009 STP(U) STP(U) STP(U) 216 277 1867 341 250 1 431 320 1 2701 2137 2501 3201 1 21371 CE Yes 1/1/2008 Totals 2360 347 2707 570 2137 00 64 Citywide Alleys from: to Pave alleys throughout the city 07 P .5 G P S W T CN 1 6/1/2007 1 1 1 1 601 601 201 201 201 CE No Totals 60 60 20 20 20 Report Date March 14, 2007 Page 16 Supersedes previous editions 11,71 Agency. Yakima Washington State Department of Transportation Co. No.. 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 c 12 .2 i - .° E n- z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 9 F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 65 Nob Hill Corridor Nob Hill from. 1-82 to: S 16th Ave. Widen roadway sidewalk, curb, gutter, lighting 03 04 P 1 2.7 c G 0 P S T PE 1/1/2008 STP(U) 100 14 114 114 CE Totals 100 14 114 114 14 1 66 40th Ave. Corridor 40th Ave. from: SR -12 to. Washington Ave. Widen roadway, curb, gutter, sidewalks, lighting 04 P P--- 3.2 3.5 0 0 G P S W 0 G O P S T PEI 1/1/2009 I STP(U) 1 1001 1 1 141 1141 1 114 CE CE Totals PE 1 1/1/2010 1 STP(U) 100 1 1001 1 14 1 141 114 1141 114 114 14 67 16th Ave. Corridor 16th Ave. from: SR -12 to: Va3hington Ave.Nalley Mall Widen roadway, curb, gutter, sidewalk, lighting Totals 100 14 114 114 14 68 S. 1st St/Main St Corridor S 1st St./Main St. from: Nob Hill Blvd. to: Barker Mill Bridge Joint project with Union Gap to siden roadway, curb, gutter sidewalk, lighting 04 P 2.0 0 G O P S T PE 1 1/1/2010 1 STP(U) 1 1001 1 1 141 1141 1 1 1 114 CE Totals 100 14 114 114 Report Date March 14, 2007 Page 17 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.. 1485 Co. Name: MPO/RTPO: Yakima Co. YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 o u, U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g 9 F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mrn/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/Y Y) Federal Fund Code Federal Cost byFund Phase 1st 2nd ( 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 69 W Yakima North/South Connector to West Valley Unknown road from: North - South to: in West Valley City & County joint project to build/extend roadways. p 6.0 c G 0 P S T PE 1/1/2010 100 100 100 CE Totals 100 100 100 70 16th Avenue Realignment 16th Avenue Realignment from: Ahtanum Road to: Washington Avenue Realign 16th Avenue out of the runway safety area of the Yakima Air Terminal. Includes FAA funds 01 08 P 1.0 C G P T PE RW CN 6/1/2007 11/1/2007 4/1/2008 1 4001 400 4001 400 1 32001 3200 4001 I 1001 3001 1 3200 EIS Yes 11/2007 Totals 4000 4000 500 3500 Report Date: March 14, 2007 Grand Totals for Yakima 49667 26067 12740 88474 33739 26711 5526 22458 Page 18 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7 For Meeting of: March 20, 2007 ITEM TITLE: Hold Public Hearing and consider resolution to Amend the Six-year Transportation Improvement Program (STIP) by adding two projects to the STIP. SUBMITTED BY: lilliam R. Cook, Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Michael Morales, Deputy Director CED 575-3533 Brett Sheffield, Chief Engineer 576-6797 SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportations Improvement Plan (STIP) for the 2007-2012 planning years. The City of Yakima has identified a need to amend the current Six Year Program for the construction of arterial streets in the City of Yakima by 1) dividing the Yakima Railroad Grade Separations into two phases, and 2) adding a project to realign 16th Avenue in the vicinity of the airport. The two phases of the Yakima Railroad Grade Separations are: Phase 1 - utility relocation to accommodate profile modifications of Lincoln Avenue and MLK Boulevard and resurfacing portions of Front Street and 'A' Street, and Phase 2 - construct grade separations and adjacent roadway reconstruction. See priorities No. 1 and 2. The project to realign 16th Avenue is necessitated by the FAA's requirement to remove 16th Avenue from the Runway Safety Area of the Yakima Air Terminal. Funding for this project includes $1,000,000 from a SIED loan and $3,000,000 from the Federal Aviation Administration. See priority No. 70 Resolution X Ordinances Other (Specify) Amended STIP Contract Mail to (name and address) : Phone: Funding Source: APPROVED FOR SUBMITTAL: 41 1 _ City Manager STAFF RECOMMENDATION: Adopt resolution amending the STIP BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2007-31