Loading...
HomeMy WebLinkAbout02/21/2017 06C Capitol Theatre Carpeting; Project Completion xs .1 �5 .may s n. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.C. For Meeting of: February 21, 2017 ITEM TITLE: Project Completion and Contract Acceptance for Standard Paint& Flooring, LLC - Project-Capitol Theater Carpeting (Standard Motion V-B-Accept the project and approve) SUBMITTED BY: Bob Desgrosellier 509.575.6228 SUMMARY EXPLANATION: A final payment of$3,062.05 is recommended for Standard Paint& Flooring, LLC for replacing 789 SY of the existing patterned carpet with a patterned Durkan 42 oz cut pile carpet with attached cushion Duralon II. Carpeting was replaced in the Lower Level, including the Robertson Room, both sides of the Lobby and the entire Mezzanine. Final inspection for this project was made and the recommendation is that the project be accepted. This Council action is to accept the project and approve the final construction costs. Project Manager: Bob Desgrosellier Contractor: Standard Paint& Flooring, LLC Contract Awarded: 2/9/2016 Contract Cost: $66,262.76 Retainage Due: $3,062.05 The above total contract cost is for construction only and does not include engineering and other costs. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: i City Manager STAFF RECOMMENDATION: Accept Project BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type D Final 2/Z2017 Cheer Memo Capitol Th. Carpeting Summer 2016 Carpet & placement: $ 56,985.00 Perf Bond: $ 2,50000 extra hours, conc floor prep: $ 752.00 concrete floor materials: $ 1,004.00 SubTotal: $ 61 241.00 ‘NSSTx: $ 5,021.76 Total: $ 66 262.76 all final costs