HomeMy WebLinkAboutR-2006-094 Yakima Urban Area Comprehensive Plan Capital Facilities Element AmendmentRESOLUTION NO. R - 2006 - 94
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the Six-year Transportation
Improvement Program (STIP) for the period of 2007 through 2012.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year
Transportation Program for the construction or repair of streets in the City of Yakima for
the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and
applicable Federal law, and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the 6 -Year STIP,
as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the
Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year STIP,
and
WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -
Year Transportation Improvement Plan for the period of 2007 to 2012 to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated
and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and
WHEREAS, public hearings have been held by the Yakima City Council on the 6 -
Year Transportation Improvement Plan on Tuesday, June 6, 2006, and again on June 27,
2006, with proper public notice as required by RCW 35.77.010
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Plan for the period of 2007 through 2012
for the City of Yakima shall be incorporated as an amendment to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 27th day of June, 2006.
ATTEST:
'%--- -,Z /Zm-fir-c%(d_.
City Clerk
David Edler, Mayor
Washington State Department of Transportation
Six Year Transportation Improvement Program
Agency: Yakima _ — From 2007 to 2012
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
City No.: 1485 MPOIRTPO: YVCOG _ Amend Date: Resolution No.. R-2006-93
5
1
oE
a'
z
2
Project Identification
A. Federal Aid No. 8. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
-
3
c
�
oa
E~
N
2'
J
>•
D
7
)
ro
0_
15
8
Phase
Start
(mm/dd/yyyy)
9
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal State
Fund Cost by Fund
Code Phase Code
State
Funds
10 11 12
13
Local Total
Funds I}i Funds
14 15
Expenditure Schedule
(Local Agency)
1st
2nd
16 17
3rd
18
4th
Thru
6th
19
Federally Funded
Projects Only
Envir
Type
R/W
Required
Date
(MM'YY)
20 21
14 1
7 2
16
17
3
4
Railroad Grade Separation -'B' St - Lincoln Ave
BNSF Tracks/I St
from N 1st Sl to N 1st Ave
Construct Grade Separations and adjacent roadway ieconstruclon
Front SI Rehabilitation
BNSF Track/Street
from Yakima Ave to 'D' St
Realignment of Front Street. curb, gutter and sidewalk reconstruction with
tustouc district renovation including A St rebuild
W Nob Hill Blvd - S 681h Ave to S 80th Ave
W Nob Hill Blvd
from S 68th Ave to' S 80th Ave
Reconstruct io minor arterial standards
River Road Realignment
River Road
from' N 16th Ave to Frurtvale Blvd
Widening, curb, gutter. sidewalk reconstruction irrigation relocation
Report Date. June 27, 2006
01
06
07
08
01
12
06
04
03
01
04
03
02
S 03
S
73
G
0
W
S
P
0
T
W
S
C
W
0
P
11 C
G
P
T
S
W
PE
RW
CN
ALL
1/1/2007 STP(U) 7500 AIP
3/1/2007 STP(U) 3000
6/1/2007 STP(U) 7000 AIP
1/1/2006 AIP
Totals
PE I 3/1/2006
RW I 3/1/2007
CN I 6/1/2007
Totals
PE 4/1/2007
RW 6/1/2007
CN 1/1/2008
Totals
RW I 9/1/2006
CN 1/1/2007
Totals
12851 10001 9785
1 3000
70001 i 14000
5001 500
50001 4785
30001
30001 11000
500
17500 8785 1000 27285 11000 16285
1 1 OTHERI 1491 371 1861 1861 1
1 OTHER1 771 19, 96 96;
1 OTHERI 17021 426! 2128 2128 i
1928 482 2410 2410
AIPI 551 3701 425 425' 1
AIPI 2161 1441 360 3601 I
AIPI 5551 3701 925 I 9251
Page 1
826 884 1710 785 925
AIPI 2721 681 340 3401 I
AIPI 11841 14961 26801 2680 1
1456 1564 3020 3020
EA
EA
EA
CE
Yes
3/01/07
I Yes
03/01/07
Yes
04/01/06
Yes
01/01/06
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1,485 MPOIRTPO: YVCOG
U o E
if Z
2
00 5
00 6
00
00
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
3
YVT Barn Rehabilitation & Museum
3rd Ave
from. 3rd Ave to Pine St
Car Sam, Museum Restoration and Pathway
Transit Operating Expenditures
Various Funding Areas
from- N/A to N/A
[Supplemental Funding for Transit Service Operating Expenses
7
8
YVT Museum & Barn Rehabilitation
S 3rd Ave
from to
Mina car barn and museum restoration including property purchase
03 P
c
et 0
Et
ro- 7
7
N/A G
C
S
T
I P
12 S N/A
22
23
24
31
03 S
Street Asset Amenities
Route Maintenance, Repair and improvements
from to
Maintenance of Sholte•s Benches and Sgnage throughout our Route
System
Report Date: June 27 2006
22
31
S
N/A
C
G
0
P
s
T
c
.c
U
d
0
0
Phase
Start
(mr /ddtyyyy)
8 9
PE
CN
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date: Resolution No.: R-2006-93
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal
Fund
Code
19 -
Federal
Cost by
Phase
1
'1/1/2007 STP(E) 18
6/1/2007 STP(E) 1816
Totals 1834
CN I 1/1/2007 1 5307 16001
To1a15
PE 6/1/2007
RW 6/12007
CN 6/12007
Totals
ALL' 1/1/2007
Totals
STP(E)
STP(E)
STP(E)
Page 2
1600
205
255
State State Local Total
Fund Funds Funds Funds
Code
Federally Funded
Expenditure Schedule Projects Only
(Local Agency)
1st 2nd 3rd
12 13 14 15 16 17 18
496 �---
32 50
272 20881
304 2138
16001 32001 32001
1600 3200 3200
j 36 36
1 205 2051
1 255 2551
4th
Thru
6th
19
Envir.
Type
RM/
Required
Date
(MM/YY)
20 21
1 50 EA
2088
2138
496 496
501 50T sol
50 50 50
No
CE
No
E
CE
Yes
06/01/07
No
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co._ _
City No.: 1485 MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006
Amend Date:
Adoption Date: 6/27/2006
Resolution No.. R-2006-93
`u )
c U
u_
o`_ E
d Z
00 9
14
00
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
3
William 0 Douglas Trail
6th Ave Pathway & Bridge Decking
from to
Build pathway and install decking on Neches River bodge
N 16th Ave - Signal @ River Rd
IN 16th Ave
from N 16th Ave
Install new signal
to River Rd
William O. Douglas Hediage Trails
Bridge Restoration & Trailhead
from to.
Trailhead restoration. right of way acquisition partner with the William 0
Douglas Foundation, including restoration of bridge cleaning, rust removal
-- and -- - -- ----- -- - ---
12
Transit Service to Selah & WSDOTComplex (Union Gap)
Demonstration Transit Project Expansion
from to'
1 wo year demonstration protect continues to provide the City of Selah and
Ole WSUOT campus in Oman Gap with weekday bus service through June
i an ani 7 -- - --- -
Report Date. June 27 2006
32
08
06
10
O
P
S
W
T
12 S N/A W
T
P
S
32 S
13
10
22 S
31
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal State
Fund Cost by Fund State Local
Code Phase Code I Funds Funds
10 11 12 1 13 14
PE 1/1/2007 STP(E)
CN 1/1/2008 . STP(E)
--
Totals___
PE 1/1/2007 1 STP(U) I
RW 4/1/2007 STP(U) 1
CN 1/1/2007 1 STP(U) 1
Totals
G PE 1/1/2007
RW 1/1/2007
CN 1/1/2007
S
T
W
571
2711
Total
Funds
15
Expenditure Schedule
(Local Agency)
1st 2nd
16 17
57 571
271 271'
328 328 328
27! 31 30 301
40. 61 46
332' 361 368 3681
399
STP(E) --- 651-----_ ..
STP(E) 150
STP(E) 285
Totals500
ALL I 1/1/2007 I CMAC)_ . 631 I I
Totals
Page 3
63
3rd
18
461 1
1 1
45 444 398 46
65{ 651 1
1 150 1501
1 285 2851 1
500 500
701 701
7 70 70
4th
Thru
6th
19.
Federally Funded
Projects Only
RNV
Required
Envir Date
Type (M/WYY)
20 1 21
CE
No
CE Yes
CE
104/01/07
Yes
01/01/07
L
No
Supersedes previous editions
Washington State Department of Transportation
Agency' Yakima
Co. No.:
City No.:
39
1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date:
Resolution No.. R-2006-93
Ts
J°
S o
u.
1
."1C.
g E
D
li Z
2
Project Identification
8. Bride No.
A. Federal Aid No. 9
Project Title
1 D. Street/Road Name or Number
E. BeginningMP or road - Ending MP or road
g
F. Describe Work to be Done
1
Improvement
Type(s)
sX
2
to
fothILen9th
------
—-Project
o
v
u
B
D
7
ProjeCtCosts
in Thousands of
Fund Source
Dollars
_
Expenditure
1st
16
(Local Agency)
2nd
17
Schedule
__
3rd
18
4th
Thru
6th
19
Federally
Projects
— —
Enver
Type
20
Funded
Only
- -- -
R/W
Required
Date
(MM/YY)
21
v
c
Il
G
A
0
a
8
Phase
Start
(mrNddyyyy)
--. —.
Fedieral Funding
Federal
Fund
Co de
Information
—.-- -- --- --
ederal State
I Cost by Fund
I Phase Code
i 11 12
--
State
Funds
Local
Funds
14
Total
Funds
�15
3 —
5
9
10
13
00
i
� 13
14
15
16
;West Sale Transit Center Placement
Acquire Property to Expand Operations
from to
Recent Annexations Mandate Transit Expansion to These Areas
'--- ---- ---- ----
W Lincoln Ave Sidewalks
W Lincoln Ave
from: N 1801 Ave to N 2901 Ave
Sidewalks on the Northside
SR12-N40th Ave
SR12 - N 40th Ave
from N 4001 Ave to 0R12
Widen Intersection and on-ramp, Interceplm. crossing
12
23
21
12
03
04
04
P
S
1 S
N/A
5
N/A
T
P
W
S
p
O
T
w
S
p
I
G
0
S
T
PE
TO0aIS
PE
F1W
CN
_ __
Totals
PE
RW
CN
_-----
Tot
PE
RW
CN
Totals
1/15/2007
1/1/2007
1/1/2007
I 1/1/2007
._
1/12007
112007
1/1/2007
1
I
1
I OTHER
1 PSMPI
, PSMP,
PSMPI
_
PSMPI'-_
OTHER 1
I
1 OTHERI
100
100
61
6,
74.
_. _.
86
3201
2601
19201
2500
1
16831
1683
600
600
41
4,
991
107
801
1401
1001
-
320
171
401340
1931
-
250
700
700
10
10
173
193
400
400
2020
500
500
101
10,
1731
193
4001
400!
20201
2820
34011
5001
1064
200
200
--
— - ______
I
1
13761
1376
1
-
CE
CE
EA
No
_ _
Yes ,
04/01/07
Yes
01/01/06
16
14
14 1
- _
31S
1/1/2007
6/12007
10/12007
_- —. ---_
STP(U)
STP(U)
---
2071
3001 1
TPP
507
2820
Nob Hill 8ivd i
Nob Hill Blvd
from. 5 52nd Ave to 5 68th Ave
Widen, curb, gutter sidewalk. lighting, drainage
p
.77
1876
2440
Yes
01/01/07
Report Date June 27, 2006
Rage 4
Supersedes previous editions
ViWashington State Department of Transportation
Aggency• Yakima
Co. No.: 39 Co. Name: Yakima Co.__
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date: Resolution No.: R-2006-93
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Annual Signal Upgrades
Local Selection
from N/A
!Upgrade signals
3
to N/A
01
Total Length
N/A
00 18 07 p N/A
Various Overlay Projects/Selected on Local Priority
N/A
from N/A to N/A
00
17
19
20
Storm DrainsNegetation
Local Selection
from City Wide
City Wide
to
Reconstruction Rudkin Rd
Rudkin Rd
from E Viola Ave to Rainier Place
Reconstruct, excavate ballast, lop course, curb, gutter sidewalk
Panner with City of Union Gap, additional sewer force main
Report Date. June 27, 2006
32
03
06
p N/A
P
0
W
S
76 W
T
P
co0
w
0
8
PE
CN
CN
Project Costs in Thousands of Dollars
Phase
Start
mmrdd/yyyy)
9
Fund Source Information
Federal Funding
Federal Federal
Fund Cost by
Code Phase
10
8/1/2007 CMAQ
8/1/2007 STP(S)
8/1/2007 CMAQ
State
Fund
Code
12
State
Funds
13
Local
Funds
14
Total
Funds
15
50 50 100
150 AIP 200 350
300 300
Expenditure Schedule
(Local Agency)
1st
16
100
2nd
17
350
300
Totals 500 200 50 750 100 650
CN ' 7/1/2007 I STP(U) 1 1731 271 2001 2001 I
Totals
PE 1 1/1/2007
CN 1/1/2007
Totals_
PE 1/1/2008
CN I 1/1/2009
Totals
STP(C)
STP(C)
Page 5
173 27 200 200
87
750
80 801 801
7201 720 7201
3rd
18
4th
Thru
6th
19
Federally Funded
Projects Only
RNV
Required
Envir Date
Type (MM/VY)
800 800 800
1 221 1091 1 1091
TPPI 7501 841 1584 1 1 15841
837 750 106 1693 109 1584
20 21
CE
EA
EA
CE
No
No
No
No
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.:
City No.. 1485
39 Co. Name: Yakima Co_
MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date:
Resolution No.: R-2006-93
Functional 1
Class 1
Priority
I Number
Project Identification
A. Federal Aid No. B. Bridge No-
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - EndingMP or road
g 9
F Describe Work to be Done
aImprovement
Type(s) 11
„
9
u)3
w
v
o
o
=
ou i Project Phase i
Phase
Start
(mnvddyyyy)
9
Project Costs in Thousands of Dollars
expenditure
1st
Schedule
(Local Agency)
2nd 3rd
17 18
Federally
Projects
Envir
Type
20
Funded
Only
Fund
Federal Funding
Source
State
Fund
Code
Information
Total
Funds
State
Funds
Local
Funds
RAN
Required
Date
(MM YY)
21
Federal
Fund
Code
Federal
Cost b r
)
Phase
4th
Thru
6th
19
3
5
6
7
10
11
12
13
14
15
16
16 III
21
03
p
76
C
PE
9/1/2008
STP(S)
97
TPP
18
6
121
121
CE
1
E Mead Ave Reconstruction
06
G
CN 4/1/2008 STP 1373
TPP
163
55 1591
1591
No
E Mead Ave
from Rudkin Rd to Fair Ave
0
P
Partner with City of Union Gap, reconstruct excavate ballast, lop course.
S
- -
-
- ----- --
Curb, gutter storm acp
--�-
T
Totals 1470
181
61 1712
121
1591
19
22
01
P
1 50 p
PEI 1/12008 ! i
1
1061 1061
1061
1
CE
iLongfiber Rd - Phase 2 (3 -Phases)
Longfiber Rd
from: Valley Mali Blvd to W Washington Ave
03
S
W
T
CN i 1/12009 1
!
11831 1183
i
1183,
No
New roadwaycnsiruction and reconstruction. 3•Iane w/lurn curb, gutter,
0
1289
sidewalks Partner win Cdy of Unon Gap, waterioop with development 1
Totals
1289
106
1183
14 I
23
04
p
1
C
PE
1/1/2007 --
STP(U)
131
I
I
21
15
15
CE
E Nob Hill Blvd & S 18th SI
01
S
RW
CN
3/1/2007
1/1/2008
STP(U)
STP(U)
18
200
1
1
1
1
21 20
351 235
201
1
I
235j
Yes
E Nob Hill Blvd
from: S 18th St lo' 0 Nob Hill Blvd
W
T
01/01/07
Widen south leg for double LT from west bound Nob H111, (Tie to WSOOT
--- _--- -. _--
------ ----- --
---------
—
--
Prolect) possible curb, gutter and sidewalk
TOtalS
231
39 270 35
235
16
24
01
P
N/A
s 1
CN I 7/12007 I CMAQ 1
4001 1
1
541 454E 4541
1
1CE
Roadway City Wide Shoulder Improvements
No
City Wide
from, to,
Gly Wide shoulder improvements. PMIO abatement
-
-
_ 1_ ____
__ ___ _ __ . _ .. _ __ -.
__
__� __ !
totals 400
54
454 454_L
Report Date: June 27, 2006
Page 6
Supersedes previous editions
Washington State Department of Transportation
Agency' Yakima
Co. No.: 39
City No.. 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006
Amend Date:
Adoption Date: 6/27/2006
Resolution No.: R-2006-93
1 : Project Identification
B. Bridge No.
A. Federal Aid No. 9e
Utility Codes
w
_
Project Costs in Thousands
Fund
—
`Federal
of Dollars
Source Information
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
i
i
State
--
R/W
Requi
_
C. Project Titte
cn Statui
a) Total Ler
.c
a.
Funding
Federal
1
4th
o § I D. Street/Road Name or NumberPhase
Federal
1 Stale
Local
Total
Envir
Date
LL
0- Z E. Beginning MP or road - Ending MP or road
d
2
Start
(mm/ddyyyy)
Fund
Code
Cost by
Phase
Fund
Code Funds
Funds
Funds
1st
2nd
3rd
Thru
6th
Type
(MWyy)
F Describe Work to be Done
a
_ __—_
I
'
–
1
2 — — 3 —
8
— 9
—
10
11
12 13
14
15
16
17 j
18
19
20
21
14 ; 25 31 i
S N/A
O
PE
8/1/2007
STP(U)
72
11
83
83
I
CE
6 Nob Hill Blvd 8 Fair Ave 03
C
Yes
E Nob Hill Blvd 04
from E Nob Hill Blvd to Fair Ave
P
T
10/01/07
Intersection widening & new signal. curb, gutter and sidewalk, street lrgnbng ,
W
--- - -- - - --- --` '—_. --____ -
stormwater
I
Totals 72 11 83 83
17
26
04
P
13
0
PE
1/1/2007 ' AIP 1041 161 120
1/1/2008 i AIP 3031 471 350
1201 I
i 350;
EA
Yes
S 80th Ave - Tielon Dr to Zier Rd
C
RW
CN 1 6/1/2008 , AIP 1323! 2071 1530
1 15301
S 80th Ave
P
Irom: Tieton Dr to. Zier Rd
T
----'!--
01/01/08
-Ma1or widening, curb, gutter, sidewalk
W
-- -- '-
- - ----
--
-----
-
-- --
05
S 15
S
C
Totals___1730
STP(E)
22
75
270 2000 _ 120 --
1
1 201 951 951 1
I
CE
Ler Rd - S 75th Ave to S 72nd Ave
06 I
S
CN
6/1/2007 1
Yes
Zier Rd
T
from S 75th Ave to. S 72nd Ave
I
P
- ----'- -27
03/01/07
Minor widening, curb, gutter and sidewalk
jI
----
----
-
97
—'
124
124
__
__ --
— '-- "--- --. .. .—
__I
--- --
--
_Totals
PE
1/1/2010
STP(C)
216
1 ---1
341 250
1
1
250
EA
17
28 '
05
p 1.0
w
6/12010
STP(C)
277
1 431 320
1 1
320
Yes
Englewood Ave - N 40th Ave to N 56th Ave
06
S
RW
CN
1/1/2011
STP(C)
1867
1 2701 2137
1 1
2137
Englewood Ave
from N 40th Ave to N 56th Ave
T
P
04/01/10
Widen roadway curb, gutter, sidewalk
0
-- - -
C
Totals_ - -, -___2360 347 _-2707--v_-- -,
- 2707
Report Date June 27, 2006
Page 7
Supersedes previous editions
Ink!
Wi" Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO!RTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date:
Resolution No.: R-2006-93
To
cU
IL
OE
L-2
2
17 'I 29
00 30
00 31
16
32
Project Identification
A. Federal Aid No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
8. Bridge No.
3
Englewood Ave - N 241h Ave to N 16t0 Ave
'Englewood Ave
from- N 16111 Ave 10 N 24th Ave
Widen. curb, gutter and sidewalk, wafer ars' sewer lines
Pedestrian Bridge
Pedestrian Bridge
from: N 101h St to- Yakima Greenway
Construct pedestrian bodge from Gateway area to Yakima Greenway.
power, handicap accessible. lights
Gravel Road B.S.T
Various Areas
from: City Wide to:
PM -10 Abatement Street Sweeper Acquisition
Powerhouse Rd b Englewood Ave
Powerhouse Rd
from. Powerhouse Rd to E nglewood Ave
Intersection, realignment. curb, gutter sdewalk. Safely Flashing Signal.
possible roundabout
05 P 2
14
32
07
12
p 25
P
, 0
S N/A S
O
W
S
P
A L__
N/A
T
P
0
S
C
w
Project Costs In Thousands of Dollars
5
A
0
15 Phase
at Start
a
• (m ovdd/yyyy)
8 9
PE 1/1/2008
RW 1 1/1/2009
CN 5/1/2010
Totals
PE 1/1/2009
CN 3/1/2010
'Totals
CN 4/1/2007
CN 1 0/1/2007
Fund Source Information
Federal Funding
Federal
Fund
Code
10
Federal
Cost by
Phase
11
STP(U) 173
STP(U) 259
STP(U) 2365
2797
STP(E) 2001
STP(E) 1 2500,
CMAQ
Totals _
PE 1 5/1/2007 STP(S)
F2W 1 9/1/2007 STP(S)
CN 10/1/2008 STP(S)
Totals
Report Date June 27, 2006 Page 8
2700
155
State
Fund
Code
12
Stale
Funds
13
155
20
400 1
400 1
Local
Funds
14
Total
Funds
15
27 200
41 300
193 2558
261 3058
271 2271
3271 2827
Expenditure Schedule
(Local Agency)
1st
16
2nd
17
200
3rd
18
300
41h
Thru
6th
19
2558
200 300 2558
2271
2827
354 3054 227 2827
2001 2001 1001 501 50
301 185 1051 1
230 385 285 50 50
1 31 23 231 1
1 541 454 4541 1
1 581 458 4581 1
820 115 935 935
Federally Funded
Projects Only
Required
Envir Date
Type (MM/VY)
20 21
EA
CE
CE
CE
Yes
01/01/09
No
No
Yes
09/01/20
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date:
Resolution No.: R-2006-93
o
N j Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
A Improvement
Type(s)
In Status
I
ca Total Length
1
Utility Codes
°J
m
a
u
o
a
_
Phase
Start
( mrr✓dd/yyyy)
Project Costs in Thousands
of
Source
Dollars
Expenditure Schedule
A enc
(LocalAgency)
Federally Funded
Projects Only
Fund
Information
Federal Funding
Slate
Fund
Code
12
State
Funds
Local
Funds
Total
Funds
16
Envir
Type
RI1N
Required
Date
(MBVYy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
16
2nd
17
3rd
18
4th
Thru
6th
- __
3
7
8 9
10
11
13
14
19
20
21
14
16
14
33
34
35
36
S 48th Ave 8 Summdwew Ave Signalizalion
S 48th Ave
from S 48th Ave to Summilview Ave
Signal¢ation
S 3rd Ave 8 W Washington Ave Signal
.S 3rd Ave
from' S 3rd Ave to W Washington Ave
Signal Upgrades
S 16th Ave 8 W Washington Ave Signal
S 16th Ave
from: S 16th Ave to W Washington Ave
Include9 in Union Gap's Valley Mali Blvd protect
12
12
12
p
p
P
N/A
N/A
N/A
p
T
p
T
p
T
PE j 1/1/2010
RW 6/1/2010
C14 I 8/1/2011
Totals
PEI 4/1/2007
CN 6/1/2007
._
Totals
PE ' 1/1/2007
CN 6/1/2007
STP(S)
STP(S)
STP(S)
-
I
_ _ _._
STP(S) -
STP(S)
20
20
440
480
1
- _
10
60
-
i1
1
_ ._._.
-- -
.__
3
3
64
70
101
1701
_ _
180
-
101
60
23
23
504
550
101
1701
180
201
120
-
101
170,
180
201
120
-
,
_
....... ..
-
23
23
504
550
I
I
CE
CE
CE
. Yes
106/01 /11
No
No
Totals
PE 1
RW
CN
Totals
_
70
70
140
50
100
300
450
140
1
1
._
14
— - -_--_ --
W Nob Hill Blvd Sidewalks
W Nob Hill Blvd
from. S 16th Ave to S 615 St
Install missing sidewalks on southside of Nob Hill
-___ _ ._ _
12
_ _
P
.
2.5
...1
p
T
W
S
_- __
1/1/2008
6/1/2008
3/1/2009
-_—
STP(S)
STP(S)
STP(S)
-__
43
85
255
383
1 1
1
1 1
- -
.__ _-._ _
71
151
451
- --
67
1 50
1 1 W
1
150
_.
300
300
_-
CE
Yes
09/01/08
Report Date: June 27, 2006
Page 9
Supersedes previous editions
."7® Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPOIRTPO: YVCOG
o E
aZ
Project Identification
A. Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to bo Done
3
o a o to
m o 0
U
S'. a'3i 3 i
I- j
7 8
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date: Resolution No.. R-2006-93
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding T
Phase Federal — Federal Stale
Start Fund Cost by Fund
(mmMcvyyyy) Code Phase Code
9 .t_-- 1,0 11 12 13 14
State Local
Funds Funds
Total
Funds
Expenditure Schedule
(Local Agency)
1st
15
16
2nd
17
3rd
18
Federally Funded
Projects Only
4th Envir
Thru Type
6th
-19- —20--
R/W
Required
Date
(MM/YY)
21
001 37
Beech SI Pedestrian Connection
Beech St
from. Fair Ave to Chalmers/Riverside
Construct pedestrian pathway under 51382 to Greenway
16, 38
W Lincoln Ave Sidewalks
11 W Lincoln Ave
1 from N 56th Ave to. N 29th Ave
Sidewalks meters and Ire hydrants replacement or relocation
14
16
39
40
W Lincoln Ave 8'8' St Realignment
W Lincoln Ave
from W 5th Ave to Custer 5t
Realignment of W Lincoln Ave, sKlewalks, curb, gutter, lights
School Safety Projects
Various Locations - Citywide
from to
Crossing flashers sidewalks, sgnrng, other features
Report Date June 27, 2006
06 P 10
32
12
01
12
12
p I 20
P
p PE 1/1/2009 STP(S)
RW 6/1/2009 STP(S)
CN 1/1/2010 STP(S)
P
T
S
W
5 W
T
S
P
0
G
N/A W
45
150
400
Totals 595
PE 1/1/2009 1 STP(S) 1 341
RW i 6/1/2009 STP(S) 681
CN I 1/1/2010 1 STP(S) 4541
Totals,
PE 1/1/2008
RW 1/1/2009
CN 1/1/2010
Totals,_
PE 1/1/2007
CN 1/1/2007
Totals
STP(E)
STP(E)
STP(E)
Page 10
6 51
20 170
54 454
80 675
6! 40
12 80
70, 524
556 88 644
337 531 390
831 1 1291 960
1429 I 2231 1652
51
51
1
-_— 1 — 1 390
I I
170
454
624
40
80
524
644
960
1650
2597 405 3002 390 2610
------PSMP1 101 21 --- 12 121 -
PSMPI 190! 381 228 1901
200 40 240 202
CE
CE
CE
CE
Yes
09/01/09
Yes
09/01/10
Yes
09/01/10
No
Supersedes previous editions
17/
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO!RTPO' YVCOG_
Washington State Department of Transportation
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date: Resolution No.: R-2006-93
o N
00
i U
4E
aZ
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
3
E+
>m
o n
T
E~
N
Total Length
—I 6
0
7
a i Project Phase
Phase
Start
(mm/dd/yyyy)
9
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal State
Fund Cost by Fund
Code Phase Code
10 11 12
Stale Local
Funds Funds
13 14
Total
Funds
15
Expenditure Schedule
(Local Agency)
1st
16
2nd
17
3rd
4th
Thru
6th
18 19
Federally Funded
Projects Only
Envir
Type
RNJ
Required
Date
(MM/YY)
20 21
14 41
17 42
14
16
43
44
E Nob Hill Blvd Reconstruction
E Nob Hill Blvd
from S 6th Street 10' S 18th Street
l Major roaoway widening and reconstruction l0 5 lanes with intersection
I improvements curb, gutter sidewalks, replacement or relocation of meters
5 72nd Avenue & W Washington Avenue
S 72nd Ave
from S 72nd Ave to: W Washington Ave
Intersection improvement, possible roundabout
4579
S 10 St -E Washington Ave Intersection Improvement
S 1st St
from S 1st St to- E Washington Ave.
Realign Intersection, upgrade traffic signal
4562
Tieton Dr - S 5th Ave Intersection Project
Tieton Drive
from 51h Ave Intersection to.
Replace traffic signal with roundabout
Report Date. June 27 2006
03
04
06
P
01 P
12
06
12
12
85
N/A
N/A
p N/A
C
G
0
P
S
T
W
S
T
P
0
P
W
T
0
PE 1/1/2008
RW 1/1/2009
CN 1/1/2010
Totals
PEI 1/12008 I STP(C) 1 87i
RW I 1/1/2009 I STP(C) I 87
CN 1 1/1/2010 1 STP(C) 1 518
STP(C) 433,
STP(C) 865
STP(C) 5190
6488
Totals
PEI 6/12007
STP
692
2001
67 500
135 1000
810 6000
1012 7500
131 100
131 100
821 600
1
108 800
—30 ._2301-- - 2301
Totals 200 30 230 230
p ALLI 4/4/2008 I STP(U) I 3001 WSDOTI 3001 1 60-01 6001
W
T
0
Totals 300 300 600 600
Page 11
500 EA
1000 Yes
6000
7500
100
100
600
800
CE
' 1/1/09
Yes
1/1/2008
EA
Yes
06/01/07
CE
No
Supersedes previous editions
Washington State Department o) Transportation
Agenc.y: 'Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Healing Date: 6/6/2006 Adoption Date: 6/27/2006
Resolution No.. R-2006-93
Amend Date:
Project Identification
A. Federal Aid No. B. Bridge No.
eN t_1"I C. Project Title
6, § I D. Street/Road Name or Number
LL - Z 1 E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
1 2 I 3
17 45 4587
S 48th Ave Reconstruction
14 46
S 48th Avenue
from Summdwew Ave to Nob Hill Blvd
Widen. curb. gutter sidewalk. lighting. drainage
South 72nd Ave & Mead Ave Intersection
South 72nd Ave
from South 72nd Ave to Mead Ave
New intersection, signals. curb. gutter and sidewalk
08 47
'Yakima Ave. Historic District Pedestrian Improvement
from' 716 Avenue to. 9th SVA St
.Install Nslorkial lighting. sidewalk modifications and other improvements,
I pedestnan corridor
00 48 I
;William 0 Douglas Pathway
from Pine SI to C:owiche Canyon
Pathway improvements and signage, to Cowiche Canyon
mm
o °
E
3
rn
0
U
5 6 7
03 P 100 p
W
S
0
I i
03 P N/A 0
12 P
S
T
W
06 S 140
12
14 P N/A
32
- L - 1
P
W
S
T
0
S
P
W
m
r
a
u
d
0
8
ALL
Phase
Start
(mrr✓dd/yyyy)
9
4/1/2007
Totals
PEI 1/1/2007
CN 1 6/1/2007
Totals
PE 1/1/2007
CN 1/1/2007
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal 7 Federal State
Fund 1 Cost by Fund
Code Phase Code
10 11 12 13
State
Funds
STP
Local Total
Funds Funds
14 15
Expenditure Schedule
(Local Agency)
Ir 1h
1st t 2nd 3rd Thn
6th
16 17 18 19
1800 243 2043 50 19931
1800
I STP(U) 1 411
S1f(U) 304,
Totals
PE 1/1/2007
CN 7/1/2007
'Totals
STP(E)
STP(E)
243 2043 50 1993
71 48I 481
48 352 352
345 55 400 400
OTHER! 8701 870 870! 1
OTHER i 65001 1 6500 4000! 25001
Report Dale. June 27, 2006 Page 12
87
95
7370 7370 4870 2500
21 10 101
1 131 100 1001
15 110 110
Federally Funded
Projects Only
R/W'
Required
Envir Dale
Type (MMM')
20 21
EA
No
CE
No
CE
CE
No
No
Supersedes previous editions
r//
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG__
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date: Resolution No.: R-2006-93
u 1
s=
3c U 1
LL
1
w
f
,:§,. E
o Z
2
Project Identification i_
A. Federal Aid No. B. Bridge No. ( o
C. Project Title d
j I d a
D. Street/Road Name or Number I o.�
E. Beginning MP or road - MP or road E
9 9 Ending
F. Describe Work to be Done
I
°
9
co
5
3
„
^�
J
:p.,,
-
6
v I Utility Codes
w
a
t
s
5
o. 2
8
__ —Project
Phase
Stan
(mMdd/yyyy)
9
Costs In Thousands of
Fund Source
Dollars
Expenditure
(Local
Agency)
-
2nd
17
Schedule
3rd
18
4th
Thru
6th
X19
Federally Funded
Projects Only
—
Information
_ _
Federal Funding
Federal
Fund
Code
10
Federal
Cost by
Phase
11
State
Fund
Code
12
State
Funds
Local
Funds
Total
Funds
Envir
Type
20
R/W
Required
Date
(MMM/)
21
1
1st I
16 1
3 4 I
13
14
15
17
16
14
14 1
49
50
51
52
04
S 66th Avenue 03
S 66th Ave
from' Scenic Drive to Summitwew
-Widen roadway. curb. gutter sidewalk and utilities
-- --_- �_-- - —
p
P
, P
I
-.
P
i
---
76
20 -
N/A
W
T
S
P
O
_G-
0
P
S
WTota
W
S
T
P
0
PE
CN
Totals
-PE
PE
RW
CN
1/1/2007
7/1/2007
1 1/1/2008
1
1 6/1/2008
1 7/1/2009
-
STP(E)
STP(E)
STP(S)
STP(S)
1 STP(S)
-- --- —
STP(U)
STP
STP(U)
'--' -
18
870
888
130'
1
303
865
1298
100
50
432
582
75
50
115
240
-
---
1
1
---
1
1
4
130
134
_
1 201
1 471
1 1351
--
202
131----
7�
1 681
22
1000
1022
150
1
350
1000
-- '—
1500
113
57
500
221
1000'
1022
1
,
-
1131
571
5001
1501
350;
,
150 350
I
1
1
1000
- '
1000
I
—
CE
CE
Yes
1/1/2008
Yes
1/1/2009
Yes
1/1/2008
05
'66th Ave 8 Summ4view Intersection 12
N. 66th Avenue & Summitview
I from: N 661h Ave to- Summltview Ave
Widen for lett turn lanes, intersection improvements, curb, gutter, handicap
p
ramps and lighting
_ -- _ 12
1
40th Avenue and SummiNiew Signal Upgrade
40th Avenue
from: 40th Avenue to Summltview'
1
Signal upgrade, radius improvements, tum lane extension I
L
PE
RW
CN
-----
Totals
PE
RW
CN
-
Totals
Is
1/1/2008
1/1/2008
6/6/2008
----
88 670
670
1
1
-
1
1
.--
85
57
131
- 273
1 --. --- -..
_ - ____--- --
12
40th Avenue and Englewood i
40th Avenue
from. 40th Avenue to. Englewood
Replace traffic signal poles, upgrade controller
N/A
-
w
T
S
P
0
--
1/1/2008
1/1/2008
1/1/2009
-
--
STP
STP
STP
_-- ---
1
1
1
--
101
1 1611
-. 33
851
57
131)
.---273----
CE
-
Yes
1/1/2008
Report Date June 27 2006
Page 13
Supersedes previous editions
''; Washington State Department of Transportation
Agency'
Co. No.:
City No.:
Yakima .-- — –
39 Co. Name: Yakima Co
MPO/RTPO: YVCOG
1485
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006
Amend Date:
Adoption Date: 6/27/2006
Resolution No.: R-2006-93
--.–_
Ti
w
.2 til
u 2
5 9Phase
LL
Priority
Number
— Project Identification .�
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
A I Improvement I
Type(s)
co
5
0,
`
3
o
6
o
v°
–
i Project Phase I f
Project Costs in Thousands of Dollars
Expenditure
(Local Agency)
2nd
17
Schedule
3rd
4th
Thru
6th
19
Federally
Projects
Funded
Only
RAN
Required
Date
(Mhv11j
21
Start
(r ,Vddyyyy)
9
Fund Source Information
Local
Funds
—
Total
Funds
15
Federal Fundin g
State
Fund
Code
State
Funds
Envir
Type
20
Federal
Fund
Code
10
Federal
Cost by
Phase
11
1 sl
16
3
7
12
13
14
18
001
I
14
14
16
53
54
55
56
161h Avenue and Frurtvale Blvd
16th Avenue
from 16th Avenue to Frullvale Blvd
Replace tralflc sgnal poles, radius improvements, ADA ramps
12
12
—
01
01
P
__-P
F
P
N/A
1 N/A
10
W
T
S
P
, 0
w
T
S
P
w
T
–
P
Q
0
P
S
T
PE
RW
CN
_
Totali
PE
CN
----
Totals
PE
RW
CN
--
Totals
PE
RW
CN
Totals
1/1/2009
6/1/2008
1/1/2008
_ -_ _
1 1/1/2008
s 1/1/2009
STP
STP
STP
_
1– STP
i STP
- ---.
STP(U) I
STP(U) 1
STP(U)
STP(U) 1
5TP(U)
STP(U) t
1
100
50,
250
400
251
100
-----
125
650
2500
5200
-
8350
650
2500
5200
8350
- -.---
I
1
-
1
1
I
1
-- - -
1
1
1
14
7
34,
55
41
131
-- - -
17
1501
5001
8001
-
1450
114
57
284
455
291
113
--_
142
800
3000
6000
- --------
9800
800
3000
6000
9800
114
57
284
455
I
1
1
1
-
1
1
1
1
1
-----
1
1
800
3000
'---
3800
800
3000
6000
9800
29
113
142
6000
CE
CE
CE
CE
Yes
11/1/2008
No
Yes
1/1/2010
Yes
1/1/2009
1st Street and 1 Street
1st Street
from. 1st Street to 1 Street
Replace and upgrade tratl/c signal equipment
---
Mead Ave. Railroad Grade Separation
Mead Ave
from: Presson Place to Maryland
Construct railroad overpass inducing all utiatles
6/1/2009
1/1/2009
1/1/2010
--- -- ----
6/1/2009
1/1(2009
1/1/2010
25
.25
6000
Washington Ave Railroad Grade Separation
Washington Ave.
horn. longhbre Road to
Railroad grade overpass mcludmg all ut,6aes
1 1
1 1
1 1
-
1501
5001
8001
1450
Report Date June 27, 2006
Page 14
Supersedes previous editions
Washington State Department of Transportation
Agency. Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date 6/6/2006
Amend Date:
Adoption Date: 6/27/2006
Resolution No.: R-2006-93
v
oE
2
6 57
16 58
17
00
59
60
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
3
Citywide Pathway Connections
Yakima
from to
Cowiche Canyon, Powerhouse Rd, east side canal paths. Greenway
including Naches Rall Spur, signage and amenities
E 'H" St Extension
E "H" Sl
from 1st Sl to Yakima River
Construct road including water, sewer curb. gullet and sidewalk for future
development
N 9th St Extension
N 9th St.
from. R St to Yakima Ave
Construct road including water, sewer, curb, gutter, sidewalk for future
development— _
'NT Pathway
YVT Right of Way
from to
Development pathway in West Valley area including 50111 Ave Wide Hollow.
Ahtanum including 011 utilities and signage
Report Date. June 27, 2006
40
01 P 11
08
p 13
03 P
32
N/A
7
0
T
W
0
P
T
W
0
P
S
T
W
Phase
Start
2 (mm/dd/yyyy)
8 9
PE 6/1/2009
RW 1112009
CN 1/1/2010
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal State
Fund 1 Cost by Fund
Code Phase Code
10 11
STP(U) 200
STP(U) 600
STP(U) 1500
Totals
PE 1 1/12009 STP(U)
RW i 1/1/2011 STP(U)
CN 1 6/1/2012 STP(U)
Totals
PE 1/1/2010 : STP(C)
RW 1/12011 STP(U)
CN 6/1/2011 STP(U)
Totals
O PE 1/12010 i STP(U)
CN 6/1/2010 STP(U)
S
T
W
Totals
Page 15
2300
17301
1730
95151
State
Funds
12
Local
Funds
13 14
Total
Funds
15
30 230
70 670
250 1750
350 2650
2701 2000
270 2000
1485. 11000
Expenditure Schedule
(Local Agency)
- 4th
1st 2nd 3rd Thru
6th
16 17 18 19 —
12975 2025 15000
554 -- j - --861 640 1
4325 1 I 6751 5000 1
6228 1 1 772 I 7000'-_
230
670
1750
230 2420
2000
2000
11000
15000
640
5000
7200
11107 1533 12640 12840
250 1 1 301 280 1 1 280
7501 1 1 1001 8501 1 1 850
1000 _ _— --. _ 130 1130
1130
Federally Funded
Projects Only
RNV
Required
Envir Date
Type (MM/YY)
20 21
CE
Yes
1/1/2009
CE
Yes
CE
CE
1/1/2011
Yes
1/1/2010
No
Supersedes previous editions
..let.
Washington State Department of Transportation
Agency Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPOIRTPO: YVCOG
nl
O y
c
u_
17
17
2.^ p)
9E
a"
Z
2
61
Project Identification
A. Federal Aid No. B. Bridge No.
C Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
3
34th Ave & Rrver Rd Improvements 12
Fruitvale Blvd.
from 34)8 Ave to River Rd
Interseclron improvements mdudmg Iummaton. sewer water, curb, water
and sidewalks
62
Englewood Ave
Englewood Ave
from: 24th Ave to 4018 Ave
Reconstruct roadway. widen curt. gutter and sidewalks Sewer. water lanes
and street 'tights
16 63
00
64
Frontage Road &'H" St Loop
N. 8th St.
from. 'H" St to 1-82
Construct new roadway, wafer, sewer cutb, gutter. sidewalk and hghting for
future development and Terrace Heights ounnectron
Citywide Alleys
from to
Pave alleys throughout the Oly
01 P I 10
05
12
01 P
07
P
13
5
0
D
7
0
P
s
T
w
0
P
s
T
w
C
G
0
P
s
T
G
P
S
w
T
N
L
15 ^
Phase Federal
w Start Fund
o (mm4kyyyy) Code
o_
8 9 10
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006
Amend Date:
Project Costs In Thousands of Dollars
Fund Source Information
Federal Funding
Federal Stale
Cost by Fund
Phase Code
11 12
PE 1/1/2009 ! STP(U) 50
CN 6/1/2009 STP(U) 4501
Totals 500
PE ' 1/1/2008 STP(U) 1 1731 1
RW 6/1/2009 , STP(U) 1 2591
CN 1/1/2010 STP(U) 1 2365:
Total;
PE 1/1/2008
RW 6/1/2008
CN 1/1/2009
STP(U)
STP(U)
STP(U)
Slate
Funds
13
Adoption Date: 6/27/2006
Resolution No.: R-2006-93
Expenditure Schedule
(Local Agency)
Local Total
Funds Funds 1si
14 15 16
2nd 3rd
17 18
4th
Thru
6th
19
Federally Funded
Projects Only
-- R—
Required
Envir Dale
Type (MM/yy)
20 21
4 54
60 510
64 564
271 200
41, 300
1931 2558
2797 261 3058
216
277
1867
1 341 250
1 431 320
1 2701 2137
Totals 2360 347 2707
CN 1 6/1/2007 1 1 ( 1 1 601 601 201 201 201
__2001
300
2558
54
510
564
CE
No
CE
500
1 2501
I 3201
1 2137
570 2137
Totals
Report Date June 27, 2006 Page 16
60 60 20 20 20
2558
Yes
1/1/2009
CE
Yes
1/1/2008
CE
No
Supersedes previous editions
1171
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485 MPOIRTPO: YVCOG
Washington State Department of Transportation
Six Year Transportation Improvement Program
From 2007 to 2012
Hearing Date: 6/6/2006
Amend Date:
Adoption Date: 6/27/2006
Resolution No.: R-2006-93
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
3
m
0
J
1-
6
7
w
a.
U
8
Phase
Start
(mm/ddtyyyy)
9
Project Costs in Thousands of Dollars
Fund Source Information
Federal Funding
Federal Federal
Fund Cost by
Code Phase
10 11
State
Fund
Code
12
State
Funds
13
Local Total
Funds Funds
14 1 15
Expenditure Schedule
(Local Agency)
1st
2nd
16
17
3rd
18
14
5
Nob Nlil Corridor
Nob Hill
from 1-82 to S 16th Ave
Widen roadway, sidewalk curb. gutter lighting
14 66
140th Ave Corridor
140th Ave
from SR -12 to Washington Ave
Widen roadway. curb, gutter. sidewalks. lighting
14
14
67
68
16th Ave. Corridor
16th Ave.
from SR -12 to LS{apington Ave Nalley Mall
Widen roadway, curb, gutter sidewalk. lighting
S 1st SUMain St Corridor
S 1st St./Main St.
from Nob Hill Blvd to Barker Mill Bridge
Joint protect with Union Gap to siden roadway, curb gutter, sidewalk.
lighting
Report Date June 27, 2006
03 P
04
04 P
04
P
P
27 C
G
0
P
T
32 C
0
G
P
S
w
35 c
G
0
P
S
T
20 C
G
0
S
PE 1/1/2008 STP(U) 100
Totals
14 i 114
4th
Thru
6th
19
114
100 14 114 114
PE 1/1/2009 I STP(U) I 1001
Totals 100
PE 1/1/2010 I STP(U) I 1001
Totals
PE 1 1/1/2010
1 14 1141
114
--
14 114 114
141 1141 � 1 114
100 14 114 114
-S.TP--(U) 1-- 1001 141 1141 I I 1 114
Totals 100
Page 17
14 114 114
Federally Funded
Projects Only
RNV
Required
Envir Date
Type (MMNy)
20 21
CE
CE
CE
CE
Supersedes previous editions
Ink
Washington State Department of Transportation
Agency: Yakima
Co. No.; 39 Co. Name: Yakima Co
City No,. 1485 MPO/RTPO: 1NCoG
Project identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
1 2 3
I
14 69 p 60 c PE 1/1/2010
IW Yakima North/South Connector to West Valley h;
Unknown road 0
' from North - South !o in West Valley
;City R County pmt protect to bund/extetd roadways S _
- — — — I r Tol;ats
Six Year Transportation Improvement Program
From 2007 to 20112
(Hearing Date: 6/6/2006 Adoption Date: 6/27/2006
Amend Date: Resolution No.: R-2006-93
■
or
E
c
J
0
ti
Project Costs In Thousands of Dollars
c m
CI
u t
aI Phase
5 .2. I Start
I(mnv446mol
a
Fund Source Information
Federal Funding
Federal I Federal
Fund Cost by
Code Phase
State
Fund
Code
State Local
Funds Funds
4 5 6 7 8 9 10 11 12 13 I 14
Total
Funds
15
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
1st 2nd 3rd
16 17 18
4th
Thru
6th
19
R/1N
Required
Envir Date
Type (Mhv'YY)
20 21
[-Grand 'Totals for Yakima
100 100
100
100 100
100
104112 28095 22072 154279 38919 27916 22427 65017
Report Date: June 27, 2006 Page 18
CE
City of Yakima Priority Bike and Pedestrian Improvement Projects, 2007-2012
Prosect FAID From
Annual Sidewalk Repair and
Installation Program
Bike Route Upgrade
Annual ADA Ramp Improvements
CBD Pedestrian Connectors
16th Ave Pedestrain Crossing 4555
N 8th St Pedestrian Crossing 4684
16th Ave & Nob HAI Intersection 4555
Lincoln Ave Sidewalks, Lane
Reduction
6th St Sidewalks, lane reduction,
bike facility
Greenway Path Connector
Canal Path Extension
Nob Hill Blvd
Beech St - 18th St Connector
S 32nd Ave
Summitvlew Ave
80th Avenue
Powerhouse Road
Mead Ave
Zier Rd
Englewood Ave
16th Ave
40th Ave
W. 0 Douglas Pathway
Pedestrian Bridge
Est Cost
TQ Description (000) Length (mi)
Upgrade damaged sidewalks, install new sidewalks, selected on annual basis 200
for safety, connectivity, transit routes, school areas
Upgrade lane markings and signage. Annual program, locations selected
based on condition, safety
Upgrade of ramps to ADA standards at Arterial Street intersections, selected
on annual basis, transit routes, school areas
Improve pedestrian conditions in CBD 2,000
Install in -pavement flasher or similar system 50
Bonnie Doone YVCC
Convention
Center
4648 29th Ave 58th Ave
4637 Nob Hill Blvd Lincoln Ave
Fruitvale Blvd Yakima Greenway
McGiness Park Neches Ave
4566 1st Ave 12th Ave
Fair Ave 18th St
4581 Tieton Dr Nob Hill Blvd
4596 7th Ave 40th Ave
4719 Tieton Dr Zier Rd
4660 Lincoln Ave 40th Ave
4570 Rudkin Rd 1st St
4179 72nd Ave 80th Ave
4652 16th Ave 86th Ave
4555 SR 12 Washington Ave
4583 SR 12 Washington Ave
Davis HS Greenway; W.
Powerhouse Rd
Fair Ave Yakima Greenway
City of Yakima Bicycle and Pedestrian Advisory Committee, June, 2006
50
200
Install in -pavement flasher or similar system
Improve pedestrian conditions and safety
Resurface and Restripe from 4- lanes to 3 -lanes with Bike Lane, missing
sidewalks
Resurface and Restripe from 2- lanes to 3 -lanes with shared Bike Lane,
replace or install missing sidewalks, ADA ramps
Intersection improvement and pathway extension
50
100
750 1
920 0.92
300
0.15
Cover open irrigation canal with bike/ped pathway 500 0.63
Missing sidewalks on south side of Principal Arterial 2,125 0.73
Missing sidewalks and safety Improvements under 1-82. Connects Serge
Hubbard ParWGreenway to Kiwanis Park
Missing sidewalks on Collector Arterial 221 0.49
Missing sidewalks on south side of Principal Arterial 350 0.75
Sidewalks, shared bike lane 550 1.2
Sidewalks, shared bike lane 550 1.2
Missing sidewalks, bike lane improvement 420 0.94
Missing sidewalks, shared bike lane 250 0.5
Missing sidewalks, shared bike lane 2,400 3.2
Missing sidewalks, bike lane improvement 2,700 3.6
Missing sidewalks, bike lane improvement 2,400 3.2
In cooperation with private foundation,Yakima County and others. Pathway
along N 6th Ave, improve Greenway connection, trolley bridge, 40th Ave to 750
Powerhouse Rd path connection
195
0.43
Construct pedestrian bridge over 1-82 from Gateway area to Yakima Greenway 2,497
TOTAL
20,528
0.1
9. Appendices
A. Six Year Form Instructions
Heading
Agency
County Number
City Number
MPO/RTPO
Hearing Date
Adoption Date
Resolution Number
Amendment Date
Column Number
Enter name of the sponsoring agency.
Enter the OFM assigned number (see LAG Appendix 21.44).
Enter the OFM assigned number (see LAG Appendix 21.45).
Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Enter the date of the public hearing.
Enter the date this program was adopted by council or commission.
Enter Legislative Authority resolution number (if applicable.)
Enter the date this program was amended by council or commission.
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
approved by FHWA.)
Rural (Under 5000 pop.)
01 - Interstate
02 - Principal Arterials
06 - Minor Arterials
07 - Major Collector
08 - Minor Collector
09 - Local Access
1. Priority Numbers.
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number; (e) Beginning and Ending Termini (mile post or street names); and (f)
Describe the Work to be Completed.
Description
00- No Classification
Urban (Over 5000 pop.)
11- Interstate
12- Freeways & Expressways
14- Other Principal Arterials
16- Minor Arterial
17- Collector
19- Local Access
Enter local agency number identifying agency project priority
3. Improvement Type Codes. Enter the appropriate federal code number.
Description
07 - Resurfacing
08 - New Bridge Construction
09- Bridge Replacement
01- New construction on
new alignment
02- Relocation
Project
03- Reconstruction
04- Major Widening
05- Minor Widening
06- Other Enhancements
10 - Bridge Rehabilitation
11 - Minor Bridge Rehabilitation
12 - Safety/Traffic Operation/TSM
13 - Environmentally Related
25
14 - Bridge Program -Special
21 - Transit Capital Project
22- Transit Operational
23 - Transit Planning
24 - Transit Training/Admin.
31- Non Capital Improvement
32 - Non Motor Vehicle Project
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C - Cable TV
0 - Other
S - Sewer (other than agency -owned)
W - Water
G - Gas
P - Power
T - Telephone
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
FTA Discretionary for Capital Expenditures
BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas
BR - Bridge Replacement or Rehab. 5309(Bus)- Bus
CDBG - Community Development 5309(FG) - Fixed Guideways
Block Grant (HUD) 5309(NS) - New Starts
CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly/Disabled
DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas
Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program
Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program
DOD - Dept. of Defense STP(E) - STP Transportation Enhancements
IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR
IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected
NHS - National Highway System STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
CAPP - County Arterial Preservation Program PWTF - Public Works Trust
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnershis Program SCP - Small City Program
AIP - Arterial Improvement Program WSDOT - WSDOT funding
PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding
PTST - Public Transportation Systems Progra
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP
Too" program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required" for Federally funded projects only.)
27
BUSINESS OF '1'11L CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7
For Meeting of June 27, 2006
IThM TITLE: Public Hearing to consider:
A) Adoption of the Six-year Transportation Improvement Program (STIP) for
years 2007 to 2012, and to amend the Metropolitan Transportation Plan; and
B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted Six-year Transportation Improvement
Program (STIP).
SUBMIT1'hD BY: Department of Community and Economic Development -
William Cook, Director
CONTACT PERSON/TELEPHONE: Brett Sheffield, P.E., Acting City Engineer, 576-6797.
SUMMARY EXPLANATION:
See Attached.
Resolutions X Ordinance Contract _._Other (Specify) SHP; Bike/Ped Committee Project List
Funding Source
APPROVED FOR SUBMITTAL: Cl , Ac/`7
City Manager
STAFF RECOMMENDATION:
1) Hold the Public Hearing to consider adoption of Resolution approving the S1'1P and amending the
regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element.
2) Adopt the plan.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION:
A) Resolution adopted. RESOLUTION NO. R-2006-93 (STIP)
B) Resolution adopted. RESOLUTION NO. R-2006-94 (CFE)
Six-year Transportation Improvement Program (continued)
SUMMARY EXPLANATION: Attached is the 2007-2012 Six -Year TIP. Several projects have been
added to the STIP following the June 6, 2006 meeting. Project #64, paving alleys within the City was
added as-r-equested-at-the last Council Meeting; and project #57, Citywide Pathway Connections does -
include the eastside pathway that was discussed at the June 6, 2006 meeting. Other projects that have
been added are.
• #50. No. 66th Avenue & Summitview Intersection Widening
• #58. "H" St. Extension (1'` St. to Terrace Hts. connector to match County at center of new bridge over river)
• #59. No. 9th Street Extension (sawmill area)
• #65. Nob Hill Corridor I-82 to 16th Avenue (Transaction Committee)
• #66. 40th Avenue Corridor SR -12 to Washington Avenue (Transaction Committee)
• #67. 16th Avenue Corridor SR -12 to Washington Avenue / Valley Mali Blvd. (Transaction Committee)
• #68. So. 1s` Street, Nob Hill Blvd to Barker Mill Bridge, Union Gap (Transaction Committee)
• #69. West Yakima, North-South Connector Road; West Valley (Transaction Committee)
Protect rankings are determined by reviewing data supplied by the City's Street and Traffic Division and
integrating particular needs of the City. _ - -
Projects that were deleted from the 2006-2011 TIP as they were completed or funds were obligated include:
• Washington Avenue Roadway widening, 52nd Avenue to 72nd Avenue
• Nob Hill Blvd. and 6th Street Signal
• Street Asset Amenities - Transit Route Maintenance, Repair & Improvements
e No. 8th Street and No. 6th Street Signal Flashers at "B" Street & Lincoln Avenue
• Capture of 2002 unobligated 5307 Funds
• Washington Avenue Median Removal, 24th Avenue to 1,000 feet east
• E. Mead and S. 1'` Street Simi
Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP
listing will be finalized at today's hearing and sent to Yakima Valley Conference of Governments,
(YVCOG) after approval.
City and County staff, together with the Council intergovernmental Committee, are working toward
common standards and coordinated planning for public projects that impact both the city and
surrounding county areas. Agreement on these issues will be the first step toward the goal of a
seamless transportation planning process between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue or federal
revenue will be used.
The plan for 2007 - 2012 includes sixteen (16) funded projects and locally identified activities. Funding for the
remainder of the projects will continue to be sought.
2 — June 2Z 2006
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21' Century (TEA -21) and previous Intermodal
Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which
certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan
Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each
designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide
Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation
projects.
Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for
approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (>i IA) to
utilize federal funds or by the State of Washington for approved State -funding agencies. The Sl'IP is a
prioritized program of transportation projects, compiled from local and regional plans, along with the
Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally significant. These
projects have been identified through the planning process as the highest priority for the available funding to the
state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional planning processes.
Long range transportation planning is a part of the comprehensive land use planning carried out by local
governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are
required to develop and adopt a six-year transportation program. All local agencies are required to hold at least
one public hearing during the development of the six-year transportation program. All Transaction Committee
projects within the city limits are listed in the TIP with at least preliminary engineering needs identified.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to
incorporate the adopted Six-year Transportation Plan for 2007 to 2012. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as
required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is
not subject to the "once a year" change required under the laws of the Growth Management Act.