HomeMy WebLinkAboutR-2006-094 Yakima Urban Area Comprehensive Plan Capital Facilities Element AmendmentRESOLUTION NO. R - 2006 - 94 A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (STIP) for the period of 2007 through 2012. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year Transportation Program for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the 6 -Year STIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year STIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 - Year Transportation Improvement Plan for the period of 2007 to 2012 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, public hearings have been held by the Yakima City Council on the 6 - Year Transportation Improvement Plan on Tuesday, June 6, 2006, and again on June 27, 2006, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2007 through 2012 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 27th day of June, 2006. ATTEST: '%--- -,Z /Zm-fir-c%(d_. City Clerk David Edler, Mayor Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima _ — From 2007 to 2012 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 City No.: 1485 MPOIRTPO: YVCOG _ Amend Date: Resolution No.. R-2006-93 5 1 oE a' z 2 Project Identification A. Federal Aid No. 8. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done - 3 c � oa E~ N 2' J >• D 7 ) ro 0_ 15 8 Phase Start (mm/dd/yyyy) 9 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Federal State Fund Cost by Fund Code Phase Code State Funds 10 11 12 13 Local Total Funds I}i Funds 14 15 Expenditure Schedule (Local Agency) 1st 2nd 16 17 3rd 18 4th Thru 6th 19 Federally Funded Projects Only Envir Type R/W Required Date (MM'YY) 20 21 14 1 7 2 16 17 3 4 Railroad Grade Separation -'B' St - Lincoln Ave BNSF Tracks/I St from N 1st Sl to N 1st Ave Construct Grade Separations and adjacent roadway ieconstruclon Front SI Rehabilitation BNSF Track/Street from Yakima Ave to 'D' St Realignment of Front Street. curb, gutter and sidewalk reconstruction with tustouc district renovation including A St rebuild W Nob Hill Blvd - S 681h Ave to S 80th Ave W Nob Hill Blvd from S 68th Ave to' S 80th Ave Reconstruct io minor arterial standards River Road Realignment River Road from' N 16th Ave to Frurtvale Blvd Widening, curb, gutter. sidewalk reconstruction irrigation relocation Report Date. June 27, 2006 01 06 07 08 01 12 06 04 03 01 04 03 02 S 03 S 73 G 0 W S P 0 T W S C W 0 P 11 C G P T S W PE RW CN ALL 1/1/2007 STP(U) 7500 AIP 3/1/2007 STP(U) 3000 6/1/2007 STP(U) 7000 AIP 1/1/2006 AIP Totals PE I 3/1/2006 RW I 3/1/2007 CN I 6/1/2007 Totals PE 4/1/2007 RW 6/1/2007 CN 1/1/2008 Totals RW I 9/1/2006 CN 1/1/2007 Totals 12851 10001 9785 1 3000 70001 i 14000 5001 500 50001 4785 30001 30001 11000 500 17500 8785 1000 27285 11000 16285 1 1 OTHERI 1491 371 1861 1861 1 1 OTHER1 771 19, 96 96; 1 OTHERI 17021 426! 2128 2128 i 1928 482 2410 2410 AIPI 551 3701 425 425' 1 AIPI 2161 1441 360 3601 I AIPI 5551 3701 925 I 9251 Page 1 826 884 1710 785 925 AIPI 2721 681 340 3401 I AIPI 11841 14961 26801 2680 1 1456 1564 3020 3020 EA EA EA CE Yes 3/01/07 I Yes 03/01/07 Yes 04/01/06 Yes 01/01/06 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1,485 MPOIRTPO: YVCOG U o E if Z 2 00 5 00 6 00 00 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done 3 YVT Barn Rehabilitation & Museum 3rd Ave from. 3rd Ave to Pine St Car Sam, Museum Restoration and Pathway Transit Operating Expenditures Various Funding Areas from- N/A to N/A [Supplemental Funding for Transit Service Operating Expenses 7 8 YVT Museum & Barn Rehabilitation S 3rd Ave from to Mina car barn and museum restoration including property purchase 03 P c et 0 Et ro- 7 7 N/A G C S T I P 12 S N/A 22 23 24 31 03 S Street Asset Amenities Route Maintenance, Repair and improvements from to Maintenance of Sholte•s Benches and Sgnage throughout our Route System Report Date: June 27 2006 22 31 S N/A C G 0 P s T c .c U d 0 0 Phase Start (mr /ddtyyyy) 8 9 PE CN Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Fund Code 19 - Federal Cost by Phase 1 '1/1/2007 STP(E) 18 6/1/2007 STP(E) 1816 Totals 1834 CN I 1/1/2007 1 5307 16001 To1a15 PE 6/1/2007 RW 6/12007 CN 6/12007 Totals ALL' 1/1/2007 Totals STP(E) STP(E) STP(E) Page 2 1600 205 255 State State Local Total Fund Funds Funds Funds Code Federally Funded Expenditure Schedule Projects Only (Local Agency) 1st 2nd 3rd 12 13 14 15 16 17 18 496 �--- 32 50 272 20881 304 2138 16001 32001 32001 1600 3200 3200 j 36 36 1 205 2051 1 255 2551 4th Thru 6th 19 Envir. Type RM/ Required Date (MM/YY) 20 21 1 50 EA 2088 2138 496 496 501 50T sol 50 50 50 No CE No E CE Yes 06/01/07 No Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co._ _ City No.: 1485 MPOIRTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.. R-2006-93 `u ) c U u_ o`_ E d Z 00 9 14 00 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 William 0 Douglas Trail 6th Ave Pathway & Bridge Decking from to Build pathway and install decking on Neches River bodge N 16th Ave - Signal @ River Rd IN 16th Ave from N 16th Ave Install new signal to River Rd William O. Douglas Hediage Trails Bridge Restoration & Trailhead from to. Trailhead restoration. right of way acquisition partner with the William 0 Douglas Foundation, including restoration of bridge cleaning, rust removal -- and -- - -- ----- -- - --- 12 Transit Service to Selah & WSDOTComplex (Union Gap) Demonstration Transit Project Expansion from to' 1 wo year demonstration protect continues to provide the City of Selah and Ole WSUOT campus in Oman Gap with weekday bus service through June i an ani 7 -- - --- - Report Date. June 27 2006 32 08 06 10 O P S W T 12 S N/A W T P S 32 S 13 10 22 S 31 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Federal State Fund Cost by Fund State Local Code Phase Code I Funds Funds 10 11 12 1 13 14 PE 1/1/2007 STP(E) CN 1/1/2008 . STP(E) -- Totals___ PE 1/1/2007 1 STP(U) I RW 4/1/2007 STP(U) 1 CN 1/1/2007 1 STP(U) 1 Totals G PE 1/1/2007 RW 1/1/2007 CN 1/1/2007 S T W 571 2711 Total Funds 15 Expenditure Schedule (Local Agency) 1st 2nd 16 17 57 571 271 271' 328 328 328 27! 31 30 301 40. 61 46 332' 361 368 3681 399 STP(E) --- 651-----_ .. STP(E) 150 STP(E) 285 Totals500 ALL I 1/1/2007 I CMAC)_ . 631 I I Totals Page 3 63 3rd 18 461 1 1 1 45 444 398 46 65{ 651 1 1 150 1501 1 285 2851 1 500 500 701 701 7 70 70 4th Thru 6th 19. Federally Funded Projects Only RNV Required Envir Date Type (M/WYY) 20 1 21 CE No CE Yes CE 104/01/07 Yes 01/01/07 L No Supersedes previous editions Washington State Department of Transportation Agency' Yakima Co. No.: City No.: 39 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 Ts J° S o u. 1 ."1C. g E D li Z 2 Project Identification 8. Bride No. A. Federal Aid No. 9 Project Title 1 D. Street/Road Name or Number E. BeginningMP or road - Ending MP or road g F. Describe Work to be Done 1 Improvement Type(s) sX 2 to fothILen9th ------ —-Project o v u B D 7 ProjeCtCosts in Thousands of Fund Source Dollars _ Expenditure 1st 16 (Local Agency) 2nd 17 Schedule __ 3rd 18 4th Thru 6th 19 Federally Projects — — Enver Type 20 Funded Only - -- - R/W Required Date (MM/YY) 21 v c Il G A 0 a 8 Phase Start (mrNddyyyy) --. —. Fedieral Funding Federal Fund Co de Information —.-- -- --- -- ederal State I Cost by Fund I Phase Code i 11 12 -- State Funds Local Funds 14 Total Funds �15 3 — 5 9 10 13 00 i � 13 14 15 16 ;West Sale Transit Center Placement Acquire Property to Expand Operations from to Recent Annexations Mandate Transit Expansion to These Areas '--- ---- ---- ---- W Lincoln Ave Sidewalks W Lincoln Ave from: N 1801 Ave to N 2901 Ave Sidewalks on the Northside SR12-N40th Ave SR12 - N 40th Ave from N 4001 Ave to 0R12 Widen Intersection and on-ramp, Interceplm. crossing 12 23 21 12 03 04 04 P S 1 S N/A 5 N/A T P W S p O T w S p I G 0 S T PE TO0aIS PE F1W CN _ __ Totals PE RW CN _----- Tot PE RW CN Totals 1/15/2007 1/1/2007 1/1/2007 I 1/1/2007 ._ 1/12007 112007 1/1/2007 1 I 1 I OTHER 1 PSMPI , PSMP, PSMPI _ PSMPI'-_ OTHER 1 I 1 OTHERI 100 100 61 6, 74. _. _. 86 3201 2601 19201 2500 1 16831 1683 600 600 41 4, 991 107 801 1401 1001 - 320 171 401340 1931 - 250 700 700 10 10 173 193 400 400 2020 500 500 101 10, 1731 193 4001 400! 20201 2820 34011 5001 1064 200 200 -- — - ______ I 1 13761 1376 1 - CE CE EA No _ _ Yes , 04/01/07 Yes 01/01/06 16 14 14 1 - _ 31S 1/1/2007 6/12007 10/12007 _- —. ---_ STP(U) STP(U) --- 2071 3001 1 TPP 507 2820 Nob Hill 8ivd i Nob Hill Blvd from. 5 52nd Ave to 5 68th Ave Widen, curb, gutter sidewalk. lighting, drainage p .77 1876 2440 Yes 01/01/07 Report Date June 27, 2006 Rage 4 Supersedes previous editions ViWashington State Department of Transportation Aggency• Yakima Co. No.: 39 Co. Name: Yakima Co.__ City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Annual Signal Upgrades Local Selection from N/A !Upgrade signals 3 to N/A 01 Total Length N/A 00 18 07 p N/A Various Overlay Projects/Selected on Local Priority N/A from N/A to N/A 00 17 19 20 Storm DrainsNegetation Local Selection from City Wide City Wide to Reconstruction Rudkin Rd Rudkin Rd from E Viola Ave to Rainier Place Reconstruct, excavate ballast, lop course, curb, gutter sidewalk Panner with City of Union Gap, additional sewer force main Report Date. June 27, 2006 32 03 06 p N/A P 0 W S 76 W T P co0 w 0 8 PE CN CN Project Costs in Thousands of Dollars Phase Start mmrdd/yyyy) 9 Fund Source Information Federal Funding Federal Federal Fund Cost by Code Phase 10 8/1/2007 CMAQ 8/1/2007 STP(S) 8/1/2007 CMAQ State Fund Code 12 State Funds 13 Local Funds 14 Total Funds 15 50 50 100 150 AIP 200 350 300 300 Expenditure Schedule (Local Agency) 1st 16 100 2nd 17 350 300 Totals 500 200 50 750 100 650 CN ' 7/1/2007 I STP(U) 1 1731 271 2001 2001 I Totals PE 1 1/1/2007 CN 1/1/2007 Totals_ PE 1/1/2008 CN I 1/1/2009 Totals STP(C) STP(C) Page 5 173 27 200 200 87 750 80 801 801 7201 720 7201 3rd 18 4th Thru 6th 19 Federally Funded Projects Only RNV Required Envir Date Type (MM/VY) 800 800 800 1 221 1091 1 1091 TPPI 7501 841 1584 1 1 15841 837 750 106 1693 109 1584 20 21 CE EA EA CE No No No No Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: City No.. 1485 39 Co. Name: Yakima Co_ MPOIRTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Functional 1 Class 1 Priority I Number Project Identification A. Federal Aid No. B. Bridge No- C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g 9 F Describe Work to be Done aImprovement Type(s) 11 „ 9 u)3 w v o o = ou i Project Phase i Phase Start (mnvddyyyy) 9 Project Costs in Thousands of Dollars expenditure 1st Schedule (Local Agency) 2nd 3rd 17 18 Federally Projects Envir Type 20 Funded Only Fund Federal Funding Source State Fund Code Information Total Funds State Funds Local Funds RAN Required Date (MM YY) 21 Federal Fund Code Federal Cost b r ) Phase 4th Thru 6th 19 3 5 6 7 10 11 12 13 14 15 16 16 III 21 03 p 76 C PE 9/1/2008 STP(S) 97 TPP 18 6 121 121 CE 1 E Mead Ave Reconstruction 06 G CN 4/1/2008 STP 1373 TPP 163 55 1591 1591 No E Mead Ave from Rudkin Rd to Fair Ave 0 P Partner with City of Union Gap, reconstruct excavate ballast, lop course. S - - - - ----- -- Curb, gutter storm acp --�- T Totals 1470 181 61 1712 121 1591 19 22 01 P 1 50 p PEI 1/12008 ! i 1 1061 1061 1061 1 CE iLongfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mali Blvd to W Washington Ave 03 S W T CN i 1/12009 1 ! 11831 1183 i 1183, No New roadwaycnsiruction and reconstruction. 3•Iane w/lurn curb, gutter, 0 1289 sidewalks Partner win Cdy of Unon Gap, waterioop with development 1 Totals 1289 106 1183 14 I 23 04 p 1 C PE 1/1/2007 -- STP(U) 131 I I 21 15 15 CE E Nob Hill Blvd & S 18th SI 01 S RW CN 3/1/2007 1/1/2008 STP(U) STP(U) 18 200 1 1 1 1 21 20 351 235 201 1 I 235j Yes E Nob Hill Blvd from: S 18th St lo' 0 Nob Hill Blvd W T 01/01/07 Widen south leg for double LT from west bound Nob H111, (Tie to WSOOT --- _--- -. _-- ------ ----- -- --------- — -- Prolect) possible curb, gutter and sidewalk TOtalS 231 39 270 35 235 16 24 01 P N/A s 1 CN I 7/12007 I CMAQ 1 4001 1 1 541 454E 4541 1 1CE Roadway City Wide Shoulder Improvements No City Wide from, to, Gly Wide shoulder improvements. PMIO abatement - - _ 1_ ____ __ ___ _ __ . _ .. _ __ -. __ __� __ ! totals 400 54 454 454_L Report Date: June 27, 2006 Page 6 Supersedes previous editions Washington State Department of Transportation Agency' Yakima Co. No.: 39 City No.. 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.: R-2006-93 1 : Project Identification B. Bridge No. A. Federal Aid No. 9e Utility Codes w _ Project Costs in Thousands Fund — `Federal of Dollars Source Information Expenditure Schedule (Local Agency) Federally Funded Projects Only i i State -- R/W Requi _ C. Project Titte cn Statui a) Total Ler .c a. Funding Federal 1 4th o § I D. Street/Road Name or NumberPhase Federal 1 Stale Local Total Envir Date LL 0- Z E. Beginning MP or road - Ending MP or road d 2 Start (mm/ddyyyy) Fund Code Cost by Phase Fund Code Funds Funds Funds 1st 2nd 3rd Thru 6th Type (MWyy) F Describe Work to be Done a _ __—_ I ' – 1 2 — — 3 — 8 — 9 — 10 11 12 13 14 15 16 17 j 18 19 20 21 14 ; 25 31 i S N/A O PE 8/1/2007 STP(U) 72 11 83 83 I CE 6 Nob Hill Blvd 8 Fair Ave 03 C Yes E Nob Hill Blvd 04 from E Nob Hill Blvd to Fair Ave P T 10/01/07 Intersection widening & new signal. curb, gutter and sidewalk, street lrgnbng , W --- - -- - - --- --` '—_. --____ - stormwater I Totals 72 11 83 83 17 26 04 P 13 0 PE 1/1/2007 ' AIP 1041 161 120 1/1/2008 i AIP 3031 471 350 1201 I i 350; EA Yes S 80th Ave - Tielon Dr to Zier Rd C RW CN 1 6/1/2008 , AIP 1323! 2071 1530 1 15301 S 80th Ave P Irom: Tieton Dr to. Zier Rd T ----'!-- 01/01/08 -Ma1or widening, curb, gutter, sidewalk W -- -- '- - - ---- -- ----- - -- -- 05 S 15 S C Totals___1730 STP(E) 22 75 270 2000 _ 120 -- 1 1 201 951 951 1 I CE Ler Rd - S 75th Ave to S 72nd Ave 06 I S CN 6/1/2007 1 Yes Zier Rd T from S 75th Ave to. S 72nd Ave I P - ----'- -27 03/01/07 Minor widening, curb, gutter and sidewalk jI ---- ---- - 97 —' 124 124 __ __ -- — '-- "--- --. .. .— __I --- -- -- _Totals PE 1/1/2010 STP(C) 216 1 ---1 341 250 1 1 250 EA 17 28 ' 05 p 1.0 w 6/12010 STP(C) 277 1 431 320 1 1 320 Yes Englewood Ave - N 40th Ave to N 56th Ave 06 S RW CN 1/1/2011 STP(C) 1867 1 2701 2137 1 1 2137 Englewood Ave from N 40th Ave to N 56th Ave T P 04/01/10 Widen roadway curb, gutter, sidewalk 0 -- - - C Totals_ - -, -___2360 347 _-2707--v_-- -, - 2707 Report Date June 27, 2006 Page 7 Supersedes previous editions Ink! Wi" Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO!RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 To cU IL OE L-2 2 17 'I 29 00 30 00 31 16 32 Project Identification A. Federal Aid No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 8. Bridge No. 3 Englewood Ave - N 241h Ave to N 16t0 Ave 'Englewood Ave from- N 16111 Ave 10 N 24th Ave Widen. curb, gutter and sidewalk, wafer ars' sewer lines Pedestrian Bridge Pedestrian Bridge from: N 101h St to- Yakima Greenway Construct pedestrian bodge from Gateway area to Yakima Greenway. power, handicap accessible. lights Gravel Road B.S.T Various Areas from: City Wide to: PM -10 Abatement Street Sweeper Acquisition Powerhouse Rd b Englewood Ave Powerhouse Rd from. Powerhouse Rd to E nglewood Ave Intersection, realignment. curb, gutter sdewalk. Safely Flashing Signal. possible roundabout 05 P 2 14 32 07 12 p 25 P , 0 S N/A S O W S P A L__ N/A T P 0 S C w Project Costs In Thousands of Dollars 5 A 0 15 Phase at Start a • (m ovdd/yyyy) 8 9 PE 1/1/2008 RW 1 1/1/2009 CN 5/1/2010 Totals PE 1/1/2009 CN 3/1/2010 'Totals CN 4/1/2007 CN 1 0/1/2007 Fund Source Information Federal Funding Federal Fund Code 10 Federal Cost by Phase 11 STP(U) 173 STP(U) 259 STP(U) 2365 2797 STP(E) 2001 STP(E) 1 2500, CMAQ Totals _ PE 1 5/1/2007 STP(S) F2W 1 9/1/2007 STP(S) CN 10/1/2008 STP(S) Totals Report Date June 27, 2006 Page 8 2700 155 State Fund Code 12 Stale Funds 13 155 20 400 1 400 1 Local Funds 14 Total Funds 15 27 200 41 300 193 2558 261 3058 271 2271 3271 2827 Expenditure Schedule (Local Agency) 1st 16 2nd 17 200 3rd 18 300 41h Thru 6th 19 2558 200 300 2558 2271 2827 354 3054 227 2827 2001 2001 1001 501 50 301 185 1051 1 230 385 285 50 50 1 31 23 231 1 1 541 454 4541 1 1 581 458 4581 1 820 115 935 935 Federally Funded Projects Only Required Envir Date Type (MM/VY) 20 21 EA CE CE CE Yes 01/01/09 No No Yes 09/01/20 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 o N j Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done A Improvement Type(s) In Status I ca Total Length 1 Utility Codes °J m a u o a _ Phase Start ( mrr✓dd/yyyy) Project Costs in Thousands of Source Dollars Expenditure Schedule A enc (LocalAgency) Federally Funded Projects Only Fund Information Federal Funding Slate Fund Code 12 State Funds Local Funds Total Funds 16 Envir Type RI1N Required Date (MBVYy) Federal Fund Code Federal Cost by Phase 1st 16 2nd 17 3rd 18 4th Thru 6th - __ 3 7 8 9 10 11 13 14 19 20 21 14 16 14 33 34 35 36 S 48th Ave 8 Summdwew Ave Signalizalion S 48th Ave from S 48th Ave to Summilview Ave Signal¢ation S 3rd Ave 8 W Washington Ave Signal .S 3rd Ave from' S 3rd Ave to W Washington Ave Signal Upgrades S 16th Ave 8 W Washington Ave Signal S 16th Ave from: S 16th Ave to W Washington Ave Include9 in Union Gap's Valley Mali Blvd protect 12 12 12 p p P N/A N/A N/A p T p T p T PE j 1/1/2010 RW 6/1/2010 C14 I 8/1/2011 Totals PEI 4/1/2007 CN 6/1/2007 ._ Totals PE ' 1/1/2007 CN 6/1/2007 STP(S) STP(S) STP(S) - I _ _ _._ STP(S) - STP(S) 20 20 440 480 1 - _ 10 60 - i1 1 _ ._._. -- - .__ 3 3 64 70 101 1701 _ _ 180 - 101 60 23 23 504 550 101 1701 180 201 120 - 101 170, 180 201 120 - , _ ....... .. - 23 23 504 550 I I CE CE CE . Yes 106/01 /11 No No Totals PE 1 RW CN Totals _ 70 70 140 50 100 300 450 140 1 1 ._ 14 — - -_--_ -- W Nob Hill Blvd Sidewalks W Nob Hill Blvd from. S 16th Ave to S 615 St Install missing sidewalks on southside of Nob Hill -___ _ ._ _ 12 _ _ P . 2.5 ...1 p T W S _- __ 1/1/2008 6/1/2008 3/1/2009 -_— STP(S) STP(S) STP(S) -__ 43 85 255 383 1 1 1 1 1 - - .__ _-._ _ 71 151 451 - -- 67 1 50 1 1 W 1 150 _. 300 300 _- CE Yes 09/01/08 Report Date: June 27, 2006 Page 9 Supersedes previous editions ."7® Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPOIRTPO: YVCOG o E aZ Project Identification A. Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to bo Done 3 o a o to m o 0 U S'. a'3i 3 i I- j 7 8 Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 Project Costs in Thousands of Dollars Fund Source Information Federal Funding T Phase Federal — Federal Stale Start Fund Cost by Fund (mmMcvyyyy) Code Phase Code 9 .t_-- 1,0 11 12 13 14 State Local Funds Funds Total Funds Expenditure Schedule (Local Agency) 1st 15 16 2nd 17 3rd 18 Federally Funded Projects Only 4th Envir Thru Type 6th -19- —20-- R/W Required Date (MM/YY) 21 001 37 Beech SI Pedestrian Connection Beech St from. Fair Ave to Chalmers/Riverside Construct pedestrian pathway under 51382 to Greenway 16, 38 W Lincoln Ave Sidewalks 11 W Lincoln Ave 1 from N 56th Ave to. N 29th Ave Sidewalks meters and Ire hydrants replacement or relocation 14 16 39 40 W Lincoln Ave 8'8' St Realignment W Lincoln Ave from W 5th Ave to Custer 5t Realignment of W Lincoln Ave, sKlewalks, curb, gutter, lights School Safety Projects Various Locations - Citywide from to Crossing flashers sidewalks, sgnrng, other features Report Date June 27, 2006 06 P 10 32 12 01 12 12 p I 20 P p PE 1/1/2009 STP(S) RW 6/1/2009 STP(S) CN 1/1/2010 STP(S) P T S W 5 W T S P 0 G N/A W 45 150 400 Totals 595 PE 1/1/2009 1 STP(S) 1 341 RW i 6/1/2009 STP(S) 681 CN I 1/1/2010 1 STP(S) 4541 Totals, PE 1/1/2008 RW 1/1/2009 CN 1/1/2010 Totals,_ PE 1/1/2007 CN 1/1/2007 Totals STP(E) STP(E) STP(E) Page 10 6 51 20 170 54 454 80 675 6! 40 12 80 70, 524 556 88 644 337 531 390 831 1 1291 960 1429 I 2231 1652 51 51 1 -_— 1 — 1 390 I I 170 454 624 40 80 524 644 960 1650 2597 405 3002 390 2610 ------PSMP1 101 21 --- 12 121 - PSMPI 190! 381 228 1901 200 40 240 202 CE CE CE CE Yes 09/01/09 Yes 09/01/10 Yes 09/01/10 No Supersedes previous editions 17/ Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO!RTPO' YVCOG_ Washington State Department of Transportation Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 o N 00 i U 4E aZ Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 E+ >m o n T E~ N Total Length —I 6 0 7 a i Project Phase Phase Start (mm/dd/yyyy) 9 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Federal State Fund Cost by Fund Code Phase Code 10 11 12 Stale Local Funds Funds 13 14 Total Funds 15 Expenditure Schedule (Local Agency) 1st 16 2nd 17 3rd 4th Thru 6th 18 19 Federally Funded Projects Only Envir Type RNJ Required Date (MM/YY) 20 21 14 41 17 42 14 16 43 44 E Nob Hill Blvd Reconstruction E Nob Hill Blvd from S 6th Street 10' S 18th Street l Major roaoway widening and reconstruction l0 5 lanes with intersection I improvements curb, gutter sidewalks, replacement or relocation of meters 5 72nd Avenue & W Washington Avenue S 72nd Ave from S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 4579 S 10 St -E Washington Ave Intersection Improvement S 1st St from S 1st St to- E Washington Ave. Realign Intersection, upgrade traffic signal 4562 Tieton Dr - S 5th Ave Intersection Project Tieton Drive from 51h Ave Intersection to. Replace traffic signal with roundabout Report Date. June 27 2006 03 04 06 P 01 P 12 06 12 12 85 N/A N/A p N/A C G 0 P S T W S T P 0 P W T 0 PE 1/1/2008 RW 1/1/2009 CN 1/1/2010 Totals PEI 1/12008 I STP(C) 1 87i RW I 1/1/2009 I STP(C) I 87 CN 1 1/1/2010 1 STP(C) 1 518 STP(C) 433, STP(C) 865 STP(C) 5190 6488 Totals PEI 6/12007 STP 692 2001 67 500 135 1000 810 6000 1012 7500 131 100 131 100 821 600 1 108 800 —30 ._2301-- - 2301 Totals 200 30 230 230 p ALLI 4/4/2008 I STP(U) I 3001 WSDOTI 3001 1 60-01 6001 W T 0 Totals 300 300 600 600 Page 11 500 EA 1000 Yes 6000 7500 100 100 600 800 CE ' 1/1/09 Yes 1/1/2008 EA Yes 06/01/07 CE No Supersedes previous editions Washington State Department o) Transportation Agenc.y: 'Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Healing Date: 6/6/2006 Adoption Date: 6/27/2006 Resolution No.. R-2006-93 Amend Date: Project Identification A. Federal Aid No. B. Bridge No. eN t_1"I C. Project Title 6, § I D. Street/Road Name or Number LL - Z 1 E. Beginning MP or road - Ending MP or road F Describe Work to be Done 1 2 I 3 17 45 4587 S 48th Ave Reconstruction 14 46 S 48th Avenue from Summdwew Ave to Nob Hill Blvd Widen. curb. gutter sidewalk. lighting. drainage South 72nd Ave & Mead Ave Intersection South 72nd Ave from South 72nd Ave to Mead Ave New intersection, signals. curb. gutter and sidewalk 08 47 'Yakima Ave. Historic District Pedestrian Improvement from' 716 Avenue to. 9th SVA St .Install Nslorkial lighting. sidewalk modifications and other improvements, I pedestnan corridor 00 48 I ;William 0 Douglas Pathway from Pine SI to C:owiche Canyon Pathway improvements and signage, to Cowiche Canyon mm o ° E 3 rn 0 U 5 6 7 03 P 100 p W S 0 I i 03 P N/A 0 12 P S T W 06 S 140 12 14 P N/A 32 - L - 1 P W S T 0 S P W m r a u d 0 8 ALL Phase Start (mrr✓dd/yyyy) 9 4/1/2007 Totals PEI 1/1/2007 CN 1 6/1/2007 Totals PE 1/1/2007 CN 1/1/2007 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal 7 Federal State Fund 1 Cost by Fund Code Phase Code 10 11 12 13 State Funds STP Local Total Funds Funds 14 15 Expenditure Schedule (Local Agency) Ir 1h 1st t 2nd 3rd Thn 6th 16 17 18 19 1800 243 2043 50 19931 1800 I STP(U) 1 411 S1f(U) 304, Totals PE 1/1/2007 CN 7/1/2007 'Totals STP(E) STP(E) 243 2043 50 1993 71 48I 481 48 352 352 345 55 400 400 OTHER! 8701 870 870! 1 OTHER i 65001 1 6500 4000! 25001 Report Dale. June 27, 2006 Page 12 87 95 7370 7370 4870 2500 21 10 101 1 131 100 1001 15 110 110 Federally Funded Projects Only R/W' Required Envir Dale Type (MMM') 20 21 EA No CE No CE CE No No Supersedes previous editions r// Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG__ Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 u 1 s= 3c U 1 LL 1 w f ,:§,. E o Z 2 Project Identification i_ A. Federal Aid No. B. Bridge No. ( o C. Project Title d j I d a D. Street/Road Name or Number I o.� E. Beginning MP or road - MP or road E 9 9 Ending F. Describe Work to be Done I ° 9 co 5 3 „ ^� J :p.,, - 6 v I Utility Codes w a t s 5 o. 2 8 __ —Project Phase Stan (mMdd/yyyy) 9 Costs In Thousands of Fund Source Dollars Expenditure (Local Agency) - 2nd 17 Schedule 3rd 18 4th Thru 6th X19 Federally Funded Projects Only — Information _ _ Federal Funding Federal Fund Code 10 Federal Cost by Phase 11 State Fund Code 12 State Funds Local Funds Total Funds Envir Type 20 R/W Required Date (MMM/) 21 1 1st I 16 1 3 4 I 13 14 15 17 16 14 14 1 49 50 51 52 04 S 66th Avenue 03 S 66th Ave from' Scenic Drive to Summitwew -Widen roadway. curb. gutter sidewalk and utilities -- --_- �_-- - — p P , P I -. P i --- 76 20 - N/A W T S P O _G- 0 P S WTota W S T P 0 PE CN Totals -PE PE RW CN 1/1/2007 7/1/2007 1 1/1/2008 1 1 6/1/2008 1 7/1/2009 - STP(E) STP(E) STP(S) STP(S) 1 STP(S) -- --- — STP(U) STP STP(U) '--' - 18 870 888 130' 1 303 865 1298 100 50 432 582 75 50 115 240 - --- 1 1 --- 1 1 4 130 134 _ 1 201 1 471 1 1351 -- 202 131---- 7� 1 681 22 1000 1022 150 1 350 1000 -- '— 1500 113 57 500 221 1000' 1022 1 , - 1131 571 5001 1501 350; , 150 350 I 1 1 1000 - ' 1000 I — CE CE Yes 1/1/2008 Yes 1/1/2009 Yes 1/1/2008 05 '66th Ave 8 Summ4view Intersection 12 N. 66th Avenue & Summitview I from: N 661h Ave to- Summltview Ave Widen for lett turn lanes, intersection improvements, curb, gutter, handicap p ramps and lighting _ -- _ 12 1 40th Avenue and SummiNiew Signal Upgrade 40th Avenue from: 40th Avenue to Summltview' 1 Signal upgrade, radius improvements, tum lane extension I L PE RW CN ----- Totals PE RW CN - Totals Is 1/1/2008 1/1/2008 6/6/2008 ---- 88 670 670 1 1 - 1 1 .-- 85 57 131 - 273 1 --. --- -.. _ - ____--- -- 12 40th Avenue and Englewood i 40th Avenue from. 40th Avenue to. Englewood Replace traffic signal poles, upgrade controller N/A - w T S P 0 -- 1/1/2008 1/1/2008 1/1/2009 - -- STP STP STP _-- --- 1 1 1 -- 101 1 1611 -. 33 851 57 131) .---273---- CE - Yes 1/1/2008 Report Date June 27 2006 Page 13 Supersedes previous editions ''; Washington State Department of Transportation Agency' Co. No.: City No.: Yakima .-- — – 39 Co. Name: Yakima Co MPO/RTPO: YVCOG 1485 Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.: R-2006-93 --.–_ Ti w .2 til u 2 5 9Phase LL Priority Number — Project Identification .� A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done A I Improvement I Type(s) co 5 0, ` 3 o 6 o v° – i Project Phase I f Project Costs in Thousands of Dollars Expenditure (Local Agency) 2nd 17 Schedule 3rd 4th Thru 6th 19 Federally Projects Funded Only RAN Required Date (Mhv11j 21 Start (r ,Vddyyyy) 9 Fund Source Information Local Funds — Total Funds 15 Federal Fundin g State Fund Code State Funds Envir Type 20 Federal Fund Code 10 Federal Cost by Phase 11 1 sl 16 3 7 12 13 14 18 001 I 14 14 16 53 54 55 56 161h Avenue and Frurtvale Blvd 16th Avenue from 16th Avenue to Frullvale Blvd Replace tralflc sgnal poles, radius improvements, ADA ramps 12 12 — 01 01 P __-P F P N/A 1 N/A 10 W T S P , 0 w T S P w T – P Q 0 P S T PE RW CN _ Totali PE CN ---- Totals PE RW CN -- Totals PE RW CN Totals 1/1/2009 6/1/2008 1/1/2008 _ -_ _ 1 1/1/2008 s 1/1/2009 STP STP STP _ 1– STP i STP - ---. STP(U) I STP(U) 1 STP(U) STP(U) 1 5TP(U) STP(U) t 1 100 50, 250 400 251 100 ----- 125 650 2500 5200 - 8350 650 2500 5200 8350 - -.--- I 1 - 1 1 I 1 -- - - 1 1 1 14 7 34, 55 41 131 -- - - 17 1501 5001 8001 - 1450 114 57 284 455 291 113 --_ 142 800 3000 6000 - -------- 9800 800 3000 6000 9800 114 57 284 455 I 1 1 1 - 1 1 1 1 1 ----- 1 1 800 3000 '--- 3800 800 3000 6000 9800 29 113 142 6000 CE CE CE CE Yes 11/1/2008 No Yes 1/1/2010 Yes 1/1/2009 1st Street and 1 Street 1st Street from. 1st Street to 1 Street Replace and upgrade tratl/c signal equipment --- Mead Ave. Railroad Grade Separation Mead Ave from: Presson Place to Maryland Construct railroad overpass inducing all utiatles 6/1/2009 1/1/2009 1/1/2010 --- -- ---- 6/1/2009 1/1(2009 1/1/2010 25 .25 6000 Washington Ave Railroad Grade Separation Washington Ave. horn. longhbre Road to Railroad grade overpass mcludmg all ut,6aes 1 1 1 1 1 1 - 1501 5001 8001 1450 Report Date June 27, 2006 Page 14 Supersedes previous editions Washington State Department of Transportation Agency. Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPOIRTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.: R-2006-93 v oE 2 6 57 16 58 17 00 59 60 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done 3 Citywide Pathway Connections Yakima from to Cowiche Canyon, Powerhouse Rd, east side canal paths. Greenway including Naches Rall Spur, signage and amenities E 'H" St Extension E "H" Sl from 1st Sl to Yakima River Construct road including water, sewer curb. gullet and sidewalk for future development N 9th St Extension N 9th St. from. R St to Yakima Ave Construct road including water, sewer, curb, gutter, sidewalk for future development— _ 'NT Pathway YVT Right of Way from to Development pathway in West Valley area including 50111 Ave Wide Hollow. Ahtanum including 011 utilities and signage Report Date. June 27, 2006 40 01 P 11 08 p 13 03 P 32 N/A 7 0 T W 0 P T W 0 P S T W Phase Start 2 (mm/dd/yyyy) 8 9 PE 6/1/2009 RW 1112009 CN 1/1/2010 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Federal State Fund 1 Cost by Fund Code Phase Code 10 11 STP(U) 200 STP(U) 600 STP(U) 1500 Totals PE 1 1/12009 STP(U) RW i 1/1/2011 STP(U) CN 1 6/1/2012 STP(U) Totals PE 1/1/2010 : STP(C) RW 1/12011 STP(U) CN 6/1/2011 STP(U) Totals O PE 1/12010 i STP(U) CN 6/1/2010 STP(U) S T W Totals Page 15 2300 17301 1730 95151 State Funds 12 Local Funds 13 14 Total Funds 15 30 230 70 670 250 1750 350 2650 2701 2000 270 2000 1485. 11000 Expenditure Schedule (Local Agency) - 4th 1st 2nd 3rd Thru 6th 16 17 18 19 — 12975 2025 15000 554 -- j - --861 640 1 4325 1 I 6751 5000 1 6228 1 1 772 I 7000'-_ 230 670 1750 230 2420 2000 2000 11000 15000 640 5000 7200 11107 1533 12640 12840 250 1 1 301 280 1 1 280 7501 1 1 1001 8501 1 1 850 1000 _ _— --. _ 130 1130 1130 Federally Funded Projects Only RNV Required Envir Date Type (MM/YY) 20 21 CE Yes 1/1/2009 CE Yes CE CE 1/1/2011 Yes 1/1/2010 No Supersedes previous editions ..let. Washington State Department of Transportation Agency Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPOIRTPO: YVCOG nl O y c u_ 17 17 2.^ p) 9E a" Z 2 61 Project Identification A. Federal Aid No. B. Bridge No. C Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done 3 34th Ave & Rrver Rd Improvements 12 Fruitvale Blvd. from 34)8 Ave to River Rd Interseclron improvements mdudmg Iummaton. sewer water, curb, water and sidewalks 62 Englewood Ave Englewood Ave from: 24th Ave to 4018 Ave Reconstruct roadway. widen curt. gutter and sidewalks Sewer. water lanes and street 'tights 16 63 00 64 Frontage Road &'H" St Loop N. 8th St. from. 'H" St to 1-82 Construct new roadway, wafer, sewer cutb, gutter. sidewalk and hghting for future development and Terrace Heights ounnectron Citywide Alleys from to Pave alleys throughout the Oly 01 P I 10 05 12 01 P 07 P 13 5 0 D 7 0 P s T w 0 P s T w C G 0 P s T G P S w T N L 15 ^ Phase Federal w Start Fund o (mm4kyyyy) Code o_ 8 9 10 Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Project Costs In Thousands of Dollars Fund Source Information Federal Funding Federal Stale Cost by Fund Phase Code 11 12 PE 1/1/2009 ! STP(U) 50 CN 6/1/2009 STP(U) 4501 Totals 500 PE ' 1/1/2008 STP(U) 1 1731 1 RW 6/1/2009 , STP(U) 1 2591 CN 1/1/2010 STP(U) 1 2365: Total; PE 1/1/2008 RW 6/1/2008 CN 1/1/2009 STP(U) STP(U) STP(U) Slate Funds 13 Adoption Date: 6/27/2006 Resolution No.: R-2006-93 Expenditure Schedule (Local Agency) Local Total Funds Funds 1si 14 15 16 2nd 3rd 17 18 4th Thru 6th 19 Federally Funded Projects Only -- R— Required Envir Dale Type (MM/yy) 20 21 4 54 60 510 64 564 271 200 41, 300 1931 2558 2797 261 3058 216 277 1867 1 341 250 1 431 320 1 2701 2137 Totals 2360 347 2707 CN 1 6/1/2007 1 1 ( 1 1 601 601 201 201 201 __2001 300 2558 54 510 564 CE No CE 500 1 2501 I 3201 1 2137 570 2137 Totals Report Date June 27, 2006 Page 16 60 60 20 20 20 2558 Yes 1/1/2009 CE Yes 1/1/2008 CE No Supersedes previous editions 1171 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPOIRTPO: YVCOG Washington State Department of Transportation Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.: R-2006-93 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 m 0 J 1- 6 7 w a. U 8 Phase Start (mm/ddtyyyy) 9 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Federal Fund Cost by Code Phase 10 11 State Fund Code 12 State Funds 13 Local Total Funds Funds 14 1 15 Expenditure Schedule (Local Agency) 1st 2nd 16 17 3rd 18 14 5 Nob Nlil Corridor Nob Hill from 1-82 to S 16th Ave Widen roadway, sidewalk curb. gutter lighting 14 66 140th Ave Corridor 140th Ave from SR -12 to Washington Ave Widen roadway. curb, gutter. sidewalks. lighting 14 14 67 68 16th Ave. Corridor 16th Ave. from SR -12 to LS{apington Ave Nalley Mall Widen roadway, curb, gutter sidewalk. lighting S 1st SUMain St Corridor S 1st St./Main St. from Nob Hill Blvd to Barker Mill Bridge Joint protect with Union Gap to siden roadway, curb gutter, sidewalk. lighting Report Date June 27, 2006 03 P 04 04 P 04 P P 27 C G 0 P T 32 C 0 G P S w 35 c G 0 P S T 20 C G 0 S PE 1/1/2008 STP(U) 100 Totals 14 i 114 4th Thru 6th 19 114 100 14 114 114 PE 1/1/2009 I STP(U) I 1001 Totals 100 PE 1/1/2010 I STP(U) I 1001 Totals PE 1 1/1/2010 1 14 1141 114 -- 14 114 114 141 1141 � 1 114 100 14 114 114 -S.TP--(U) 1-- 1001 141 1141 I I 1 114 Totals 100 Page 17 14 114 114 Federally Funded Projects Only RNV Required Envir Date Type (MMNy) 20 21 CE CE CE CE Supersedes previous editions Ink Washington State Department of Transportation Agency: Yakima Co. No.; 39 Co. Name: Yakima Co City No,. 1485 MPO/RTPO: 1NCoG Project identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 1 2 3 I 14 69 p 60 c PE 1/1/2010 IW Yakima North/South Connector to West Valley h; Unknown road 0 ' from North - South !o in West Valley ;City R County pmt protect to bund/extetd roadways S _ - — — — I r Tol;ats Six Year Transportation Improvement Program From 2007 to 20112 (Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 ■ or E c J 0 ti Project Costs In Thousands of Dollars c m CI u t aI Phase 5 .2. I Start I(mnv446mol a Fund Source Information Federal Funding Federal I Federal Fund Cost by Code Phase State Fund Code State Local Funds Funds 4 5 6 7 8 9 10 11 12 13 I 14 Total Funds 15 Expenditure Schedule (Local Agency) Federally Funded Projects Only 1st 2nd 3rd 16 17 18 4th Thru 6th 19 R/1N Required Envir Date Type (Mhv'YY) 20 21 [-Grand 'Totals for Yakima 100 100 100 100 100 100 104112 28095 22072 154279 38919 27916 22427 65017 Report Date: June 27, 2006 Page 18 CE City of Yakima Priority Bike and Pedestrian Improvement Projects, 2007-2012 Prosect FAID From Annual Sidewalk Repair and Installation Program Bike Route Upgrade Annual ADA Ramp Improvements CBD Pedestrian Connectors 16th Ave Pedestrain Crossing 4555 N 8th St Pedestrian Crossing 4684 16th Ave & Nob HAI Intersection 4555 Lincoln Ave Sidewalks, Lane Reduction 6th St Sidewalks, lane reduction, bike facility Greenway Path Connector Canal Path Extension Nob Hill Blvd Beech St - 18th St Connector S 32nd Ave Summitvlew Ave 80th Avenue Powerhouse Road Mead Ave Zier Rd Englewood Ave 16th Ave 40th Ave W. 0 Douglas Pathway Pedestrian Bridge Est Cost TQ Description (000) Length (mi) Upgrade damaged sidewalks, install new sidewalks, selected on annual basis 200 for safety, connectivity, transit routes, school areas Upgrade lane markings and signage. Annual program, locations selected based on condition, safety Upgrade of ramps to ADA standards at Arterial Street intersections, selected on annual basis, transit routes, school areas Improve pedestrian conditions in CBD 2,000 Install in -pavement flasher or similar system 50 Bonnie Doone YVCC Convention Center 4648 29th Ave 58th Ave 4637 Nob Hill Blvd Lincoln Ave Fruitvale Blvd Yakima Greenway McGiness Park Neches Ave 4566 1st Ave 12th Ave Fair Ave 18th St 4581 Tieton Dr Nob Hill Blvd 4596 7th Ave 40th Ave 4719 Tieton Dr Zier Rd 4660 Lincoln Ave 40th Ave 4570 Rudkin Rd 1st St 4179 72nd Ave 80th Ave 4652 16th Ave 86th Ave 4555 SR 12 Washington Ave 4583 SR 12 Washington Ave Davis HS Greenway; W. Powerhouse Rd Fair Ave Yakima Greenway City of Yakima Bicycle and Pedestrian Advisory Committee, June, 2006 50 200 Install in -pavement flasher or similar system Improve pedestrian conditions and safety Resurface and Restripe from 4- lanes to 3 -lanes with Bike Lane, missing sidewalks Resurface and Restripe from 2- lanes to 3 -lanes with shared Bike Lane, replace or install missing sidewalks, ADA ramps Intersection improvement and pathway extension 50 100 750 1 920 0.92 300 0.15 Cover open irrigation canal with bike/ped pathway 500 0.63 Missing sidewalks on south side of Principal Arterial 2,125 0.73 Missing sidewalks and safety Improvements under 1-82. Connects Serge Hubbard ParWGreenway to Kiwanis Park Missing sidewalks on Collector Arterial 221 0.49 Missing sidewalks on south side of Principal Arterial 350 0.75 Sidewalks, shared bike lane 550 1.2 Sidewalks, shared bike lane 550 1.2 Missing sidewalks, bike lane improvement 420 0.94 Missing sidewalks, shared bike lane 250 0.5 Missing sidewalks, shared bike lane 2,400 3.2 Missing sidewalks, bike lane improvement 2,700 3.6 Missing sidewalks, bike lane improvement 2,400 3.2 In cooperation with private foundation,Yakima County and others. Pathway along N 6th Ave, improve Greenway connection, trolley bridge, 40th Ave to 750 Powerhouse Rd path connection 195 0.43 Construct pedestrian bridge over 1-82 from Gateway area to Yakima Greenway 2,497 TOTAL 20,528 0.1 9. Appendices A. Six Year Form Instructions Heading Agency County Number City Number MPO/RTPO Hearing Date Adoption Date Resolution Number Amendment Date Column Number Enter name of the sponsoring agency. Enter the OFM assigned number (see LAG Appendix 21.44). Enter the OFM assigned number (see LAG Appendix 21.45). Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Enter the date of the public hearing. Enter the date this program was adopted by council or commission. Enter Legislative Authority resolution number (if applicable.) Enter the date this program was amended by council or commission. 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Rural (Under 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access 1. Priority Numbers. (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. Description 00- No Classification Urban (Over 5000 pop.) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial 17- Collector 19- Local Access Enter local agency number identifying agency project priority 3. Improvement Type Codes. Enter the appropriate federal code number. Description 07 - Resurfacing 08 - New Bridge Construction 09- Bridge Replacement 01- New construction on new alignment 02- Relocation Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06- Other Enhancements 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety/Traffic Operation/TSM 13 - Environmentally Related 25 14 - Bridge Program -Special 21 - Transit Capital Project 22- Transit Operational 23 - Transit Planning 24 - Transit Training/Admin. 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV 0 - Other S - Sewer (other than agency -owned) W - Water G - Gas P - Power T - Telephone 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly/Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program SCP - Small City Program AIP - Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP Too" program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required" for Federally funded projects only.) 27 BUSINESS OF '1'11L CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7 For Meeting of June 27, 2006 IThM TITLE: Public Hearing to consider: A) Adoption of the Six-year Transportation Improvement Program (STIP) for years 2007 to 2012, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMIT1'hD BY: Department of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: Brett Sheffield, P.E., Acting City Engineer, 576-6797. SUMMARY EXPLANATION: See Attached. Resolutions X Ordinance Contract _._Other (Specify) SHP; Bike/Ped Committee Project List Funding Source APPROVED FOR SUBMITTAL: Cl , Ac/`7 City Manager STAFF RECOMMENDATION: 1) Hold the Public Hearing to consider adoption of Resolution approving the S1'1P and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2) Adopt the plan. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: A) Resolution adopted. RESOLUTION NO. R-2006-93 (STIP) B) Resolution adopted. RESOLUTION NO. R-2006-94 (CFE) Six-year Transportation Improvement Program (continued) SUMMARY EXPLANATION: Attached is the 2007-2012 Six -Year TIP. Several projects have been added to the STIP following the June 6, 2006 meeting. Project #64, paving alleys within the City was added as-r-equested-at-the last Council Meeting; and project #57, Citywide Pathway Connections does - include the eastside pathway that was discussed at the June 6, 2006 meeting. Other projects that have been added are. • #50. No. 66th Avenue & Summitview Intersection Widening • #58. "H" St. Extension (1'` St. to Terrace Hts. connector to match County at center of new bridge over river) • #59. No. 9th Street Extension (sawmill area) • #65. Nob Hill Corridor I-82 to 16th Avenue (Transaction Committee) • #66. 40th Avenue Corridor SR -12 to Washington Avenue (Transaction Committee) • #67. 16th Avenue Corridor SR -12 to Washington Avenue / Valley Mali Blvd. (Transaction Committee) • #68. So. 1s` Street, Nob Hill Blvd to Barker Mill Bridge, Union Gap (Transaction Committee) • #69. West Yakima, North-South Connector Road; West Valley (Transaction Committee) Protect rankings are determined by reviewing data supplied by the City's Street and Traffic Division and integrating particular needs of the City. _ - - Projects that were deleted from the 2006-2011 TIP as they were completed or funds were obligated include: • Washington Avenue Roadway widening, 52nd Avenue to 72nd Avenue • Nob Hill Blvd. and 6th Street Signal • Street Asset Amenities - Transit Route Maintenance, Repair & Improvements e No. 8th Street and No. 6th Street Signal Flashers at "B" Street & Lincoln Avenue • Capture of 2002 unobligated 5307 Funds • Washington Avenue Median Removal, 24th Avenue to 1,000 feet east • E. Mead and S. 1'` Street Simi Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP listing will be finalized at today's hearing and sent to Yakima Valley Conference of Governments, (YVCOG) after approval. City and County staff, together with the Council intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2007 - 2012 includes sixteen (16) funded projects and locally identified activities. Funding for the remainder of the projects will continue to be sought. 2 — June 2Z 2006 On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21' Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (>i IA) to utilize federal funds or by the State of Washington for approved State -funding agencies. The Sl'IP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. All Transaction Committee projects within the city limits are listed in the TIP with at least preliminary engineering needs identified. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Plan for 2007 to 2012. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act.