HomeMy WebLinkAboutR-2006-093 2007 - 2012 Six-Year Transportation Improvement Program (TIP)RESOLUTION NO. R - 2006 -a93 A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of 2007 through 2012 for the construction of streets and arterials streets in the City of Yakima and amending the Metropolitan Transportation Plan. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City of Yakima, all as contemplated and required by State and Federal law, and WHEREAS, after public hearings on the matter, held at regular meetings of the Yakima City Council on June 6, 2006, and on June 27, 2006, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year Transportation Improvement Program for the period of 2007 through 2012 for the construction of streets and arterial streets in the City of Yakima, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2007 through 2012, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Metropolitan Transportation Plan along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 27th day of June, 2006 David Edler, Mayor ATTEST: City Clerk Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Report Date: June 27, 2006 Page 1 Supersedes previous editions Priority Number Project Identification A. Federal Aid No. B. Bridge No. Improvement I Types) o) Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Fund Source Information o N C. Project Title Federal Funding (Local R/W c 0 D. Street1Road Name or Number ,r)0 Phase Start Federal Fund Federal Cost by State Fund State Local Total 4th Thru Envir Required Date d E. Beginning MP or road - Ending MP or road o 2 Funds Funds Funds 1st 2nd 3rd Type (M>7 F Describe Work to be Done (mm/dd yyyy) Code Phase Code 6th 1 __--_ 3 5 8 9 10 11 12 13 14 15 16 1 17 18 19 20 21 14 1 01 P 0 2 T PE 1/1/2007 STP(U) 7500 3000 AIP 1285 1000 9785 3000 50001 47851 3000 1 EA Railroad Grade Separation -'B' St - Lincoln Ave 06 P RW CN 3/1/2007 6/1/2007 1 STP(U) STP(U) 7000 AIP 7000 14000 t 30001 110001 Yes BNSF Tracks/I St 07 G ALL 1/1/2006 AIP 500' 500 1 5001 from N 1st St to N 1st Ave 08 0 1 3/01/07 Construct Grade Separations and adjacent roadway ieconstructon W --- - -- -- - ------ — _-- S_ Totals 17500 8785 1000 27285 11000 16285 - -- --_ _ -----�-- _--_ �_EA-- 17 2 01 S 03 p PEI 3/1/2006 I 1 1 OTHERI 1491 371 186 19, 96 1861 I 96; Front St Rehabilitation 12 0 RW 1 3/1/2007OTHER, 771 I Yes IBNSF Track/Street from- Yakima Ave to. 'D' St 06 T W CN 6/1/2007 OTHERI 17021 426, 2128 2128 , 03/01/07 Realignment of Front Street, curb. gutter and sidewalk reconstruction with S -- - -- - -- - ---- ----- - --- ---- --- 1928 482 2410 historic distnc( renovation including A SI rebuild Totals 2410 16 3— --_ -- - -- 04 S 73 C PE 4/1/2007 AIPI 551 3701 425 AIPI 2161 1441 360 425' I 3601 1 EA W Nob Hill Blvd - 5 68th Ave to S 80th Ave 03 W RW CN 6/1/2007 1/1/2008 AIPI 5551 3701 925 I 9251 Yes W Nob Hill Blvd from: S 68th Ave to S 80th Ave P 04/01/06 Reconstruct to minor arsenal standards T - - 826 884 1710 785 925 S Totals 17 4 ---- 01 S 11 C RW 9/1/2006 I 1/1/2007 AIP1 2721 681 340[ 3401 AIP1 118411496 26801 2680, 1 1 CE River Road Realignment 04 G CN Yes River Road 03 P from* N 16th Ave to' Fruitvale Blvd T 101/01/06 Widening, curb, gutter, sidewalk, reconstruction irrigation relocation S -- -- - - ----- -- W Totals 1456 1564 3020 3020 Report Date: June 27, 2006 Page 1 Supersedes previous editions Washington State Department of Transportation Agency: 'Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program/ From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 Project Identification A. Federal Aid No. B. Bridge No. o H C. Project Title 131 3 E D. Street/Road Name or Number 0 Z E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 t m o Of v n c mm 0 01 U a; in —1—� r 1— 7 6 7 m L Phase v Start (mMdd/yyyy) 8 9 Project Costs to Thousands of Dollars Fund Source Information r - Federal Funding Federal Fund Code 10 Federal Cost by Phase State Fund Code State Local Funds I Funds 11 12 13 14 Total Funds 15 Federally Funded Expenditure Schedule Projects Only (Local Agency) 1st 16 4th 2nd 3rd 1 Thru 6th 17 18 19 Envir Type Required Date (MM/YY) 20 21 00 5 YVT Barn Rehabilitation & Museum '3rd Ave from: 3rd Ave to Pine St Car Barn Museum Restoration and Pathway 03 P 00 6 12 S 22 23 24 31 00 00 Transit Operating Expenditures Various Funding Areas from' N/A to. N/A Supplemental Funding for Transit Service Operating Expenses 7 03 YVT Museum & Barn Rehabilitation S 3rd Ave from: to: Minor car barn and museum restoration Including property purchase 8 N/A G C S T W I P N/A 0 P S T Street Asset Amenities Route Maintenance, Repair and Improvements from. to. Maintenance of Shelters. Benches and Sig gage throughout our Route System 22 31 S N/A PE 1/1/2007 CN 6/1/2007 STP(E) 18 STP(E) 1816 32 50 272 2088 Totals 1834 304 2138 CN 1 1/1/2007 1 5307 16001 16001 32001 32001 Totals PE 6/1/2007 RW 6/1/2007 CN 6/1/2007 STP(E) STP(E) STP(E) Totals ALL I 1/1/2007 Totals 1600 1600 3200 3200 --- 36 - 36 361 205 1 205 2051 255 1 255 2551 50 2088 2138 496 496 496 501 50 P 501 I CE Report Date: June 27, 2006 Page 2 EA No CE No CE 50 50 50 Yes 06/01/07 No Supersedes previous editions Washington State Department of Transportation Agency: Co. No.. City No.: Yakima -- 39 Co. Name: Yakima Co. 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 4 m 0_ U Project Costs in Thousands of Dollars Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding 1 T Federal Fund Code Federal Cost by Phase 8 9 10 State Fund Code State Local Funds Funds 11 1 12 13 14 1 571 Total Funds 15 Expenditure Schedule (Local Agency) 1st I 2nd 3rd 16 17 18 4th Thru 6th 19 Federally Funded Projects Only R/W Required Envir Date Tyne (MM/VY) 20 21 00 9 William 0 Douglas Trail 6th Ave Pathway & Bridge Decking from to Build pathway and install decking on Naches River bridge 14 10 00 N 16th Ave - Signal @ River Rd N 16th Ave from. N 16th Ave Install new signal to. River Rd 11 William 0 Douglas Hertiage Trails Bridge Restoration & Trailhead from. t0: Trailhead restoration, right of way acquisition partner with the William 0 Douglas Foundation, including restoration of bridge , cleaning, rust removal and namLna _-----._---- - — 12 32 08 06 10 0 P S W T 12 S N/A 32 S 13 10 22 Transit Service to Selah & WSDOTComplex (Union Gap) 31 Demonstration Transit Project Expansion from. to. Two year demonstration project continues to provide the City of Selah and the WSDOT campus in Union Gap with weekday bus service through June --Ian_max __— .-_ _ Report Date. June 27, 2006 S W T P S G 0 P S T W PE 1/1/2007 STP(E) CN 1/1/2008 STP(E) Totals 2711 328 PE 1/1/2007 STP(U) 1 271 RW 4/1/2007 i STP(U) 40, CN 1/1/2007 1 STP(U) 1 332' Totals PE 1/1/2007 STP(E) RW 1/1/2007 STP(E) CN 1/1/2007 STP(E) 57 271 57! 271' 328 328 31 30 61 46 361 368 301 1 461 3681 399 45 444 398 46 65 150 285 Totals 1 65 651 1 1 150 1501 1 1 285 2851 1 500 500 500 ALL I 1/1/2007 1 CMAC) 631 1 71 701----701--- Totals 63 7 70 70 Page 3 CE No CE ' Yes i 04/01/07 CE Yes 01/01/07 No Supersedes previous editions -I, Agency: Yakima Co. No.: City No.: 1485 Washington State Department of Transportation 39 Co. Name: MPOIRTPO: Yakima Co YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date' 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.. R-2006-93 Project Identification A. Federal Aid No. o C. Project Title � o E D. Street/Road Name or Number ri n- Z E. Beginning MP or road - Ending MP or road F Describe Work to be Done B. Bridge No. 1 i 2 3 w 0 re co i Project Phase Phase Start (mm/cid/yyyy) 9 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal 1 i ederal State Fund Cost by Fund Code Phase Code 10 11 12 State Funds 13 Local Funds 14 Total Funds 15 Expenditure Schedule (Local! Agency) 1st 16 2nd 17 3rd 4th Thru 6th 18 1 19 Federally Funded Projects Only RNV Required Envir Date Type (MM/YY) 20 21 00 13 West Side Transit Center Placement Acquire Property to Expand Operations from to Recent Annexations Mandate Transit Expansion to These Areas 16 14 W Lincoln Ave Sidewalks W Lincoln Ave from. N 18th Ave :Sidewalks on the Northside to N 29th Ave 14 15 ISR12-N40thAve SR12 - N 40th Ave ;from: N 40th Ave to SR12 Widen intersection and onaamp. Interceptor crossing 14 16 Nob Hill Blvd Nob Hill Blvd 1 from. S 52nd Ave to. S 68th Ave Widen, curb. gutter sidewalk. lighting. drainage 12 23 21 P 12 S 03 S 04 N/A 5 T P W S N/A i 04 P .77 P 0 T S P c G 0 s T PE 1/1512007 Totals PE 1/1/2007 RW 1/1/2007 CN 1 1/1/2007 Totals PE 1/1/2007 RW 1/1/2007 CN 1/1/2007 Totals PE 1/1/2007 RW 6/1/2007 CN 10/1/2007 Totals STP(U) STP(U) OTHER 100 600 700 PSMP1 PSMP, PSMPI 500 200 100 600 700 500 200 61 6, 74, 41 4, 991 86 107 PSMPI 3201 801 OTHER I 2601 1401 j OTHER I 19201 1001 10 10 173 101 10; 1731 193 193 400 4001 400 4001 1 2020 20201 1 Report Date June 27, 2006 Page 4 207 2500 320 2820 2820 171 300i 1 401 TPPI 16831 1931 507 224 340 1876 2241 3401 5001 13761 1683 250 2440 1064 1376 No CE Yes 04/01/07 CE Yes EA 01/01/06 Yes 01/01/07 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 U o Q E co a' Z 2 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 J rn 0 7 8 Project Costs in Thousands of Dollars Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding Federal Federal State Fund Cost by Fund Code Phase Code 9 10 11 12 State Funds 13 Local Funds Total Funds 14 15 Expenditure Schedule (Local Agency) 1st 2nd 16 17 3rd 4th Thru 6th Federally Funded Projects Only R/W Required Envir Date Type (MM/YY) 18 19 0 21 00 17 Annual Signal Upgrades Local Selection from N/A Upgrade signals to N/A 00 18 Various Overlay Projects/Selected on Local Priority N/A from N/A to N/A 00 17 19 Storm DrainsNegetation Local Selection from. City Wide City Wide 20 Reconstruction Rudkin Rd Rudkin Rd from E Viola Ave to: to Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 01 N/A N/A T 32 P N/A 03 06 P W S 76 W T P PE 8/1/2007 CMAQ CN 8/1/2007 STP(S) CN 8/1/2007 CMAQ 501 50 100 1501 AIPI 200 350 300 300 Totals 500 CN 7/1/2007 1 STP(U) 1731 Totals PE j 1/1/2007 CN 1 1/1/2007 Totals_ PE 1__ 1/1/2008 CN 1/1/2009 Totals 100 350 300 200 50 750 100 650 271 2.,,o -r-2001 1 173 27 200 200 STP(C) STP(C) Report Date. June 27, 2006 Page 5 87 750 80 80 801 1 7201 720 7201 800 800 800 1 221 1091 1 1091 TPPI 7501 841 1584 1 1 1584 837 750 106 1693 109 1584 CE A EA CE No No No No Supersedes previous editions Washington State Department of Transportation Agetc:y: Yakima Co. No.: 39 City No. 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 E~ 0, 0/) N rn J 3 0 0 V 27 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to. Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course curb, gutter, storm acp 9' 22 Longfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mall Blvd to. J/ Washington Ave New roadway construction and reconstruction. 3 -lane w/turn, curb, gutter. sidewalks Partner wdh City of Union Gap, waterloop with development L 14 16 03 06 P 01 P 03 23 04 E Nob Hill Blvd & 5 18th St E Nob Hill Blvd from: S 18th Sl to: E Nob Hill Blvd Widen south leg for double LT horn west bound Nob Hill, (Tie to WSDOT Project) possible curb, gutter and sidewalk 24 Roadway City Wide Shoulder Improvements City Wide from: to City Wide shoulder improvements PM10 abatement Report Date: June 27, 2006 01 P 6 7 76 C G 0 P T 50 p S W T 0 C S W T 01 P Pr Phase Start (mm/dd/yyyy) 9 PE 9/1/2008 CN 4/1/2008 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Fund Code 10 Federal Cost by Phase 11 State Fund Code State Funds Local Total Funds Funds STP(S) 97 STP 1373 Totals: 1470 PE 1 1/1/2008 1 CN 1112009 1 Totals. PE 1/1/2007 1 STP(U) RW 3/1/2007 STP(U) CN 1/1/2008 STP(U) 12 13 14 Expenditure Schedule (Local Agency) 1st 2nd 3rd 15 16 17 18 TPP 18 6 121 TPP 163 55 1591 121 1 15911 181 61 1712 121 1591 j---- 1 1061 _-- 106 1061 11831 1183) 1183, 1289 1289 106 1183 13'1 1 21 15 18 1 1 21 20 200 1 1 351 235 151 201 1 2351 Tol:als 231 39 270 35 235 N/A s CN 1 7/1/2007 I CMAQ 1 4001 1 541 454541 Totals 400 54 454 454 Page 6 4th Thru 6th 19 Federally Funded Projects Only RNV Required Envir Date Type (MM/YY) 20 21 CE No CE No CE Yes 01/01/07 CE No Supersedes previous editions Washington State Department of Transportation A'gency. Yakima Co. No.: 39 City No. 1485 Co. Name: Yakima Co. MPO/RTPO• YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 y c i -1 . a ` E .;73--_ a z 1 2 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. StreeURoad Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done a I Improvement Type(s) N Status rn Total Length Utility Codes 1 y a. a ° Phase Start (mm/dcyyyy) Project Costs T In Thousands Fund of Dollars Expenditure (Local Agency) Schedule 3rd Federally Funded Projects Only Source Information State State Fund Code Funds Federal Funding Local Funds Total Funds Envir Type 20 R VV Required Date (MM/YY) 21 Federal Fund Code Federal Cost by Phase 1st -, 2nd 4th Thru 6th 3 7 8 9 10 11 12 13 14 15 16 17 18 19 14 , 25 31 S N/A O PE 8/1/2007 STP(U) 72 11 83 83 CE E Nob Hill Blvd & Fair Ave 03 C Yes E Nob Hill Blvd 04 from. E Nob Hill Blvd to Fair Ave P T - - ----- 10/01/07 Intersection widening & new signal, curb, gutter and sidewalk, street lighting, W -- --- -' --' '----'--- -- --- Totals 72 11 83 stormwater I 83 i 17 26 04 P AIP 1041 161 120 1201 I 350; EA i _-_ --� --_ 1 3 0 PE 1/1/2007 1 S 80th Ave - Tielon Dr to Zier Rd C RW CN 1/1/2008 6/1/2008 , AIP 3031 471 AIP' 1323' 2071 350 1530 I 15301 Yes S 80th Ave P , from: Tieton Dr to Zier Rd T 01/01/08 Major widening. curb gutter. sidewalk i W -- 1730 270 2000 120 1880 S Totals 71 291 ---_-291 - -- - - ---_ ---- ---__--05 22 ( 17 27 S 15 c PE 1/1/2007 1 STP(E) STP(E) 75 201 , 95 951 1 CE !Der Rd - S 75th Ave to S 72nd Ave 06 1 S CN 6/1/2007 1 Yes Zier Rd from S 75th Ave to. S 72nd Ave T 03/01/07 ,Minor widening, curb, gutter and sidewalk 1 i - Totals 97---------_,27 124 - 124 _ 17 28... 05 I P PE STP(C) 216 1 341 250 250 320 EA _ - —�� - — 1.0 w 1/1/2010 1 1 1 1 Englewood Ave - N 40th Ave to N 56th Ave 06 1 S RW CN 6/1/2010 1/1/2011 STP(C) STP(C) 277 1867 1 1 431 2701 320 2137 1 1 2137 Yes Englewood Ave T from N 40th Ave to: N 56th Ave ; P 04/01/10 Widen roadway curb gutter, sidewalk 0 -- ' - "'- "- — --- - - .. —' C Totals 2360 347 2707 2707 Report Date. June 27, 2006 Page 7 Supersedes previous editions fir® Waslhington State Department of Transportation Agency: Yakima Co- No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No. R-2006-93 17 aE 0- Z 29 Project Identification A. Federal Aid No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done B. Bridge No. 3 05 Englewood Ave - N 24th Ave to N 16th Ave 06 Englewood Ave from: N 16th Ave Widen, curb, gutter and sidewalk 00 30 00 31 Pedestrian Bridge Pedestrian Bridge from: N 10th St to- N 24111 Ave ater and sewer lines to Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power handicap accessible. fights Gravel Road B S - Various Areas from: City Wide to: PM -10 Abatement Street Sweeper Acquisition 16 32 Powerhouse Rd 8 Englewood Ave Powerhouse Rd from. Powerhouse Rd 1o. Englewood Ave Inlersection. realignment. curb. gutter sidewalk, Safety Flashing Signal, possible roundabout 14 r 25 T 32 P 07 12 P 0 N/A S N/A T P 0 S C w Qt m r a Phase Start (m'mr/dcl/yyyy) a 8 9 Project Costs in Thousands of Dollars Fund Source Information Federal Funding Federal Federal Fund Cost by Code Phase PE 1/1/2008 RW 1/1/2009 CN 6/1/2010 10 STP(U) STP(U) STP(U) 11 173 259 2365 Totals 2797 PE 1/1/2009 ' STP(E) 1 2001 CN 3/1/2010 STP(E) 25001 Totals CN 4/1/2007 CN 1 6/1/2007 CMAQ 2700 155 State Fund Code 12 State Funds 13 Local Total Funds Funds 14 15 27 200 41 300 193 2558 Expenditure Schedule (Local Agency) 1st 2nd 3rd 4th Thru 6th Federally Funded Projects Only R/w _. Required Envir Date Type (MA4/y/) 16 17 18 19 20 21 200 300 2558 261 3058 200 300 2558 271 2271 2271 3271 28271 j 2827 354 3054 227 2827 2001 200 1 1 301 185 Totals_ PE 1 5/1/2007 STP(S) RW 9/1/2007 STP(S) CN 10/1/2008 STP(S) Totals Repoli Date June 27, 2006 Page 8 155 1001 501 50 1851 1 230 385 285 50 50 20 400 400 1 31 23 231 1 1 541 454 4541 1 1 581 458 4581 1 820 115 935 935 A CE CE CE Yes 01/01/09 No No Yes 09/01/20 Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: a 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Adoption Date: 6/27/2006 Resolution No.. R-2006-93 o ti Priority Number Project Identification A. Federal Aid No. B. Bridge No.d C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done ^ a = o n `c.1- E 4 cr. Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase g. co m 3 Fund Source Information Federal Fundin g State Fund Code 12 State Funds 13 Local Funds 14 Total Funds 15 - Envir Type --- RM/ Required Date (M» Federal Fund Code 10 Federal Cost by Phase 11 1st 16 2nd 17 3rd 4[h Thru 6th 1 2 3 6 7 8 ' 9 18 19 20 21 14 33 12 P N/A p PE 1 1/1/2010 STP(S) 20 3 23 23 CE S 48th Ave & Summitview Ave Signalization T RW i 6/1/2010 STP(S) 20 1 3 23 23 Yes CN 1 8/1/2011 STP(S) 440 64 504 504 S 48th Ave from- S 48th Ave to. Summitview Ave 1 06/01/11 Signalization- Totals 480 -- - 70 550 550 16 34 12 p N/A p PE 1 4/1/2007 1 1 i I 101 101 101 1 CE S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to W Washington Ave T CN , 6/1/2007 1 I I 1701 1701 170, iI No Signal Upgrades _ - -- -___ i Totals PE' 1/1/2007 STP(S) 10 180 101 180 180 201 201 1 --- t 14 35 S 16th Ave & W Washington Ave Signal 12 P N/A p T CN 1 6/1/2007 STP(S) 60 1 601 1201 1201 1 CE No S 16th Ave from: S 16th Ave to W Washington Ave Included in Union Gap's Valley Mall Blvd project -- Totals 70 70 140 140 14 36 ----- - - -- 12 P 2.5 p PE1/1/2008 I6/1/2008 STP(S) 43 1 1 1 1 71 151 50 1 1 50 1 1 100 CE W Nob Hill Blvd Sidewalks T RW 1 STP(S) 85 100 Yes W Nob Hill Blvd from' S 16th Ave to S 6th St W S CN 3/1/2009 STP(S) 255 1 1 451 300 1 1 300 09/01/08 Install missing sidewalks on southside of Nob 401 - - -- - ----- -- - -- -- - - 1 Totals 383 67 450 150 300 Report Date: June 27, 2006 Page 9 Supersedes previous editions .wo Washington State Department of Transportation IVA Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.' 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 16 38 Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done 3 Beech Sl Pedestrian Connection Beech St from Fair Ave to Chalmers/Riverside Construct pedestrian pathway under 0582 to Greenway W Lincoln Ave Sidewalks W Lincoln Ave from. N 56th Ave to' N 29th Ave Sidewalks, meters and fire hydrants replacement or relocation 14 39 16 40 W Lincoln Ave & St Realignment W Lincoln Ave from. W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks curb. gutter. lights m E m on ti E 4 06 32 Project Costs in Thousands of Dollars m Fund Source Information ca •0 0 T 61 t Federal Funding o. Phase e Start Fund 2 (rrrm/dd/yyyy) Code 8 9 10 PE 1/1/2009 STP(S) 45 RW 6/1/2009 STP(S) 150 CN 1/1/20101, STP(S) 400 p 10 12 P120 01 12 P .5 P T P T S W School Safety Projects Various Locations - Citywide from to Crossing dashers, scdewaiks. signing. other features L 12 P W T S P 0 G N/A W Federal Federal Cost by Phase 11 State Fund Code Total:3 PEI 1/1/2009 RW 6/1/2009 CN 1 1/1/2010 STP(S) STP(S) STP(S) Totals_ PE 1/1/2008 I STP(E) 55/! 1/1/2009 STP(E) CN 1/1/2010 STP(E) 12 State Local Funds Funds 13 14 Total Funds Expenditure Schedule (Local Agency) 1st 2nd 15 6 51 20 170 54 454 16 17 3rd 18 51 4th Thru 6th 19 170 454 595 80 675 51 624 3-- 41 6: 40 1 40 681 12, 80 80 454t 70. 524 I 524 556 --- 88 644 --- 337 831 1429 Totals PE 1/1/2007 CN 1/1/2007 Totals 2597 Report Date' June 27, 2006 Page 10 53! 390 1291 960 2231 1652 390 644 960 1650 405 3002 390 2610 PSMP1 10i 21 12[ 121 PSMP1 190' 381 2281 1901 200 40 240 202 Federally Funded Projects Only R/W Required Envir Date Type (MM/YY) 20 21 CE Yes 09/01/09 CE CE CE Yes 09/01/10 Yes 09/01/10 No Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 o H 0U 1 oE Q- Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done - _ 3 c dN on H E Total Length 57 6 0 u N 0 8 Project Costs in Thousands of Dollars Phase Start (mm/dd/yyyy) 9 Fund Source Information Federal Funding T Federal Federal Fund Cost by Code Phase 10 11 State Fund Code 12 State Local Total Funds Funds Funds Expenditure Schedule (Local Agency) 13 14 15 1st 2nd 16 3rd 17 18 4th Thru 6th 19 Federally Funded Projects Only Envir Type R/W Required Date (MM/YY) 20 21 14 41 E Nob Hilt Blvd Reconstruction E Nob Hill Blvd. from S 6th Street to' S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements. curb, gutter, sidewalks, replacement or relocation of meters 03 04 06 85 C G 0 P S T 17 42 01 P N/A W S 72nd Avenue 8 W Washington Avenue 12 S S 72nd Ave 06 T from S 72nd Ave 1o. W Washington Ave P 'Intersection improvement. possible roundabout 0 14 16 43 44 4579 S 1st St - E Washington Ave. Intersection Improvement S 1st St. from S 1st St to. E Washington Ave Realign Intersection, upgrade traffic signal _ 4562 -_. — Tieton Or - S 5th Ave Intersection Protect Tieton Drive from 5th Ave Intersection to. Replace traffic signal with roundabout Report Date: June 27, 2006 12 12 p N/A P P W S T 0 PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(C) STP(C) STP(C) Totals PEI 1/1/2008 I STP(C) RW 1/1/2009 1 STP(C) CN 1 1/1/2010 STP(C) Totals PE 6/1/2007 I STP 433 865 5190 6488 87i 87 518 67 500 500 135 1000 1000 810 6000 6000 1012 7500 1 131 - 100 131 100 821 600 EA Yes __ -- -- 7500 --_ I 1 I 100 CE I 100 600 692 108 800 200i 301 2301 2301 800 Totals 200 30 230 230 N/A p ALL! 4/4/2008 STP(U) 3001 WSDOT1 3001 1 60-0-1 6001 W T 0 S Totals 300 300 600 600 Page 11 EA j 1/1/09 Yes 1/1/2008 Yes 06/01/07 I J CE No Supersedes previous editions Washington State Department oil Transportation Fr Agency* Yakima Co. No.. 39Co. Name: Yakima Co 1485 MPOIRTPO: YVCOG I Project Identification A. Federal Aid No. City No.. B. Bridge No. C. Project Title tj ° E D. Street/Road Name or Number a z 1 E. Beginning MP or road - Ending MP or road F Describe Work to be Done 1 2 3 0 a`I 5 6 171 45 14 46 4587 S 48th Ave Reconstruction S 48th Avenue from Summilview Ave to Nob Hill Blvd Widen. curb. gutter, sidewalk. lighting, drainage South 72nd Ave 8 Mead Ave Intersection South 72nd Ave from South 72nd Ave to Mead Ave New Intersection. signals, curb, gutter and sidewalk 08 47 !Yakima Ave. Historic District Pedestrian Improvement from' 7th Avenue to 9th St/A Sl .Install historical lighting, sidewalk modifications and other improvements. 1 pedestrian corridor 00 1 48 I !William 0 Douglas Pathway from Pule SI to Cowiche Canyon Pathway improvements and signage. to Cowiche Canyon 03 P 100 1 03 P N/A 12 06 I S 12 1 40 1 1 14 j P N/A 32 I 0 U 7 7 P T W S 0 0 P s T w P W S T 0 s P W i Project Phase Phase Start (rnm/dd/yyyy) 9 Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: Project Costs in Thousands of Dollars Fund Source Information Federal Funding Adoption Date: 6/27/2006 Resolution No. R-2006-93 Federal—I-Federal State State Local Total Fund Cost by Fund Funds Funds Funds Code Phase Code 10 11 12 13 14 15 Federally Funded Expenditure Schedule Projects Only (Local Agency) 1st 2nd 3rd 16 { 17 18 50 1993 ALL 4/1/2007 STP 1800 To tal:5 1800 PE I 1/1/2007 1 STP(U) I 41! CN I 6/1/2007 ( STP(U) 304, Total_ PE 1/112007 CN 1/1/2007 2431 2043 243 2043yy 50 1993 I 71 48 481 I 48 352 352 345 55 400 400 OTHER 8701 I 870 8701 1 OTHER( 65001 1 6500 40001 25001 Totals PE 1/1/2007 CN 7/1/2007 STP(E) STP(E) 7370 7370 4370 2500 81 --'-- 1 --- 1 ---�1 101 1001 1 101 1 871 1 131 100 Totals 95 Report. Date June 27, 2006 Page 12 15 110 110 4th Thru 6th 19 Envir Type 20 EA R/W Required Date (MM/YY) 21 No CE No CE CE No No Supersedes previous editions II/ Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.. 1485 MPO/RTPO: YVCOG_ _ Washington State Department of Transportation Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 T. o y = 9 -3 - ° E u. a Z Project Identification B. Bridge No. A. Federal Aid No. 9 C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done i 1 a 1 m a a r I a,- E I 4 1, N 5 rn Total Length v i Utility Codes Project Costs in Thousands of Source Dollars Expenditure (Local Agency) 2nd 17 Schedule Federally Funded Projects Only o m a d o 2 T Phase Start (mm/dd yyyy) 9 Fund Information Federal Funding State Code 12 State Funds Local Funds Total Funds Envir Type 20 R/W Required q Date (Mhvyy) 21 Federal Fund Code Federal Cost byFund Phase 1 1st 3rd 18 4th Thru 6th 1 2 1 3 8 10 11 13 14 15 16 1 19 17 49 16 50 14 51 _-- i ._--- 14 1 52 S 66th Avenue ,S 66th Ave from' Scenic Drive to Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 03 05 12 12 I - 12 P P 1 , P- I p __-- 76 W T S P PE CN --- Totals 1/1/2007 7/1/2007 -- -- - -' 1/1/2008 6/1/2008 1 7/1/2009 STP(E) STP(E) --- -- " 1 STP(S) STP(S) 1 STP(S) 18 870 " _-- - 888 1 1301 I 303' 1 865 ------ 1298 1 1001 50 432 582 - -"' --- - ! 4 130 ------- 134 201 471 1 1351 ' - 202 I 131 1 71 1 681 22 1000 --- 1022 150I 350 1000; I 221 10001 -- 1022 1 1501 3501 150 350 1 1 i 1000 '- 1000 CE CE - Yes 1/1/2008 Yes 1/1/2009 Yes 1/1/2008 66th Ave & Summitview Intersection N. 66th Avenue & Summitview from: N 66th Ave. to' Summitview Ave. Widen for let/ turn lanes, intersection improvements, curb, gutter, handicap ramps and fighting 20 N/A G G P S T W W S T P 0 PE 1 RW CN - - --- --- Totals ------ STP(U) STP STP(U) 1 1500 _._ 113 57 500 1131 571 5001 _ ------ -- _-- -- --- - 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to. Summitview Signal upgrade, radius improvements, turn lane extension PE RW CN 1/1/2008 1/1/2008 6/6/2008 Totals 88 670 670 -- ---- ---- 85 85 131 273 - -- - --- ----- 40th Avenue and Englewood 40th Avenue from. 40th Avenue to. Englewood Replace trafficsignal poles, upgrade controller N/A W T S P pc PE RW CN — Totals 1/1/2008 1/1/2008 1/1/2009 - STP STP STP - - - _-_-- --- 75 50 115 -- -- 240 1 1 101 1 71 1 161 33 85 55 131 273 � 1 1 --- 1 CE ____ Yes 1/1/2008 - -__ Report Date June 27, 2006 Page 13 Supersedes previous editions 7® Washington State Department of Transportation Agency: Co. No.: City No.: Yakima 39 Co. Name: Yakima Co 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 Report Date' June 27, 2006 Page 14 Supersedes previous editions Ni Priority NLimhar 1 Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. m Total Length Utility Codes Fund Source Information Expenditure Schedule (Local Agency) Projects Only C. Project73 Title m= mFunding Project Phas Federal --- RNV c c D. StreeURoad Name or Nurnber o,i- on Phase Federal I Federal State State Local Total 4th Envir Required Date li E. Beginning MP or road - EndingMP or road E Start Fund I Cost by Fund Funds Funds Funds 1st 2rid 3rd Thru Type (MM/YY) F. Describe Work to be Done rnm/dd/ ( yyyy) Code Phase t Code 6th _ 11 15 16 19 20 21 3 4 5 6 7 8 9 10 i 11 12 13 14 17 18 00 53 12 P N/A w PE 1/1/2009 STP 1 100 l 14 7 114 57 114 57 CE , 16th Avenue and Frudvale Blvd T RW CN 6/1/2008 1/1/2008 STP 50 STP 2501 34, 284 284 Yes 16th Avenue from' 16th Avenue to. Fruitvale Blvd S P - - 1 1/1/2008 Replace traffic signal poles. radius improvements ADA ramps , 0 — -- — -- - - - — 400 Totals 55 455 455 14 54 12 P 1 N/A w PE I 1/1/2008 I STP 251 1 41 2911 29 113 113 CE 1st Street and iStreet 1st Street from: 1st Street to I Street -r S P CN 1 1/1/2009 � STP 100, l l 131 No Replace and upgrade traffic signal egulpnent ------ - - - - - -- --. - 125 L — Totals 17 142 1501 800 l i 800 142 55 ,25 6/1/2009 14 01 p w PE STP(U) i 650 1 1 ( 1 5001 3000 I 1 3000 CE Mead Ave. Railroad Grade Separation T RW CN 1/1/2009 1/1/2010 STP(U) 1 2500 STP(U) , 5200 1 1 8001 6000 1 1 6000 Yes Mead Ave from: Presson Place to. Maryland S P 1/1/2010 Construct railroad overpass induding all utilities O -- -- - ------ 1450 9800 6000 Totals 8350 3800 16. 56 01 P .25 0 PE 6/1/2009 STP(U) I 650 1 1 1501 800 5001 3000 1 1 1 800 1 3000 CE Washington Ave. Railroad Grade Separation P RW CN 1/1/2009 1/1/2010 STP(U) 2500 STP(U) 5200 1 1 8001 6000 1 6000 Yes Washington Ave. from. Longfibre Road to. S T 1/1/2009 Railroad grade overpass including all utilities >N --- - - - - - L — 1 Totals 8350 1450 9800 9800 Report Date' June 27, 2006 Page 14 Supersedes previous editions Washington State Department of Transportation Agency' Yakima Co. Name: Yakima Co MPO/RTPO: YVCOG Co. No.: 39 City No.: 1485 Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.. R-2006-93 1 ,'13 .4 a z 2 Project Identification J A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done m E n ai- E 4 rn 9 y o =- o 6 v T Project Costs in Thousands of Dollars Expenditure (Local 1st 16 Agency) 1 2nd 17 Schedule _ 3rd 18 4th Thru 6th Federally Funded Projects Only a v . T Phase Start (mmkicY yy) Fund Source Information Total Funds 15 Federal Funding Federal 1 Fund Code 10 State Fund Code State Funds Local Funds 14 Envir Type R/W Required Date (MMN70 Federal Cost by Phase - _. - - 3 7 8 9 11 12 13 19 20 21 16 16 17 57 -� 1 58 59 Citywide Pathway Connections Yakimam from to Cowiche Canyon, Powerhouse Rd, east side canal paths, Greenway including Naches Rail Spur, signage and amenities - - - "- - - - -- --- - - -- -- -- -- --- E. 'Fr St Extension E "H" St. from. 1st St. to Yakima River Construct road including water, sewer, curb, gutter and sidewalk for future development - - - -PE N. 9th St. Extension N. 9th St. from: R St to: Yakima Ave. Construct road Including water, sewer, curb, gutter, sidewalk for future development 01 - 018 08 P - P p P 4a 1 1 13 N/ 0 P S T W O P S T O P S T W 0 S T W PE RW CN Totals PE RW CN Totals RW CN -- Totals PE CN Totals 6/1/2009 1/1/2009 1/1/2010 - 1/1/2009 i 1/1/2011 I 6/1/2012 1/112010 1/1/2011 6/1/2011 STP(U) STP(U) STP(U) STP(U) STP(U) STP(U) I STP(C) STP(U) 1 STP(U) - --- -- 1 STP(U) I STP(U) 200 600 1500 -- - - 2300 1 17301 1730 95151 12975 554 ' 4325 6228 - - 30 70 250 350 2701 270' 1485, 2025 ! 861 1 6751 1 7721 1533 230 670 1750 2650 2000 2000 11000 I 230 230 I 670 1750 2420 1 2000 2000 11000 CE CE CE CE Yes 1/1/2009 Yes 1/1/2011 Yes 1/1/2010 1 1 1 15000 - j � 1 1 15000 - 640 5000 7200 640 5000 7000 12640 - --- 1/1/2010 6/1/2010 -- 11107 1 -- - 12840 280 850 -- 1130 250 7501 1000_ -- 1 _ — 1 301 1 1001 - 130 280 850 _ 1130 1 1 - - - No 1 _ 00 60 --A YVT Pathway YVT Right of Way from to Development pathway ti West Valley area including 50th Ave Wide Hollow Ahlanum Including all utilities and signage 03 32 Report Date: June 27, 2006 Page 15 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co.'No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Amend Date: — Adoption Date: 6/27/2006 Resolution No.. R-2006-93 Project Identification A. Federal Aid No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 B. Bridge No. Project Costs in Thousands of Dollars E IP 1 Fund Source Information o p y o t Federal Funding .5 a Phase Federal Federal F 5 d, Start Fund Cost by 2 (mm/dd/yyyy) Code Phase 4 5 341h Ave & River Rd Improvements Fruitvale Blvd. from- 34th Ave to River Rd Intersection improvements including lumination, sewer water, curb. water and sidewalks 1--- — 17 62 16 00 63 64 Englewood Ave Englewood Ave from: 24th Ave to 40th Ave Reconstruct roadway. widen, cub, gutter and sidewalks Sewer. water lines and street lights Frontage Road & "H" St. Loop N. 8th St. from: "H" St to 1-82 Construct new roadway, water, sewer, cutb, gutter sidewalk and lighting for future development and Terrace Heights connection, Citywide Alleys from Pave alleys throughout the city to 01 12 P 01 P 05 12 01 07 P N/A 7 0 P S T W 8 9 10 11 State Fund Code 12 State Funds 13 Local Funds 14 Total Funds 15 Expenditure Schedule (Local .Agency) 15t 2nd 16 17 3rd 4th Thru 6th Federally Funded Projects Only Required Envir Date Type (MANvy) 18 19 20 21 1.o 1 0 P � S T 1/V 13 C G 0 P S T .5 G P VV T PE 1/1/2009 STP(U) CN 6/1/2009 I STP(U) Totals PE1/1/2008 1 STP(U) RW 6/1/2009 STP(U) CN 1/1/2010 STP(U) 50 450i 500 1731 1 2593 2365: 4 54 60 510 64 564 271 200 41 300 1931 2558 Totals - "—-- 2797 261 3058 PE 1/1/2008 STP(U) 216 I 1 341 250 RW 6/1/2008 I STP(U) 277 I 431 320 CN 1/1/2009 I STP(U) 1867 1 1 2701 2137 Totals CN I 6/1/2007 1 Totals 54 510 564 2001 300; 500 2501-- _-__ 3201 2137 CE 2558 2558 2360 347 2707 570 2137 Report Date: June 27, 2006 Page 16 601 601 201 201 201 60 60 20 20 20 No CE Yes CE CE 1/1/2009 Yes 1/1/2008 No Supersedes previous editions 1// Agency: Yakima_ _ Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Washington State Department of Transportation Six Year Transportation Improvement Program From 2007 to 2012 Hearing Date: 6/6/2006 Adoption Date. 6/27/2006 Amend Date: Resolution No.: R-2006-93 ll T N of 0- Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done 3 rn m Total Length m U 7 N 0 U N O 8 Project Costs in Thousands of Dollars Phase Start mm/dd/yyyy) Fund Source Information Federal Funding Federal Federal Fund Cost by Code Phase 9 10 11 State Fund Code 12 State Funds 13 Local Funds 14 Total Funds 15 Expenditure Schedule (Local Agency) 1st 2nd 16 17 3rd 8 4th Thru 6th 19 Federally Funded Projects Only Envir Type 20 R/W Required Date (MM/YY) 21 4 65 Nob Hill Corridor Nob Hill from 1-82 to S 161h Ave, Widen roadway, sidewalk curb, gutter, lighting 14 66 1 1401h Ave Corridor 1 140th Ave. from SR -12 to' Washington Ave Widen roadway, curb, gutter sidewalks, lighting 14 14 67 68 16th Ave. Corridor 16th Ave. from SR -12 to Xya3hington Ave.Nalley Mall Widen roadway, curb, gutter sidewalk, lighting 03 04 P P 27 32 35 G 0 P S T C O G S w 04 S. 1st St/Main St Corridor S 1st St./Main St. from Nob Hill Blvd to Barker Mill Bridge Joint project with Union Gap to siden roadway, curb, gutter, sidewalk, lighting 2.0 C G 0 P S T C G 0 S PE 1/1/2008 STP(U) 100 141 114 114 Totals 100 14 114 114 PE 1/1/2009 1 STP(U) 1001 1 14 1141 1 1 I 114 Totals PE 1 1/1/2010 1 STP(U) 100 14 114 114 1001 - --- 141 1141 I 114 Totals 100 PEI 1/1/2010 I STP(U) 1 1001 Totals Report Date June 27, 2006 Page 17 CE C- E 14 114 114 CE 114 100 14 114 114 CE Supersedes previous editions I\, ®/r"'f Washington State Department of Transportation Agency: Yakima Co. No.: 33 Co. Narne: Yakima Co. City No.: 1485 MPO/RTF'O: 'YVCOG Six Year Transportation Improvement Program From 2007 to 20112 Hearing Date: 6/6/2006 Adoption Date: 6/27/2006 Amend Date: Resolution No.: R-2006-93 _ oe LL ` .8 S' E ' 0• Z Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Narne or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement I Typo(e) Pp.. .^ rnRequired Total Length iii ii •Phase °i Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only m t m 'o ti Start (mMdd/yyyy) Source Information Federal Funding(Local State Fund Code State Local Funds Funds Total Funds Envir Type RNV Date (MMrtiN) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 11 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 139 ' ;City _! W Yakima North/South Connector to West Valley Unknown road from North - South to in West Valley 8 County tont protect to bundrextend roadways ,__ __ _ p 6 0 C 63 0 P S IT PE Totals 1/12010 I 100 100 100 CE 100 100 100 Repot Date June 27, 2006 Grand Totals. for Yakima 104112 28095 22072 154279 38919 27916 22427 6501 Page 18 City of Yakima Priority Bike and Pedestrian Improvement Projects, 2007-2012 Proiect FAID From Annual Sidewalk Repair and Installation Program Bike Route Upgrade Annual ADA Ramp Improvements CBD Pedestrian Connectors 16th Ave Pedestrain Crossing N 8th St Pedestrian Crossing 4555 4684 16th Ave & Nob Hill Intersection 4555 Lincoln Ave Sidewalks, Lane Reduction 6th St Sidewalks, lane reduction, bike facility Greenway Path Connector Canal Path Extension Nob Hill Blvd Beech St - 18th St Connector S 32nd Ave Summitview Ave 80th Avenue Powerhouse Road Mead Ave Zier Rd Englewood Ave 16th Ave 40th Ave W. 0 Douglas Pathway Pedestrian Bridge Bonnie Doone Convention Center 4648 29th Ave 4637 Nob Hill Blvd Fruitvale Blvd McGiness Park 4566 1st Ave Fair Ave To WCC 56th Ave Lincoln Ave Yakima Greenway Naches Ave 12th Ave 18th St 4581 Tieton Dr Nob Hill Blvd 4596 7th Ave 40th Ave 4719 Tieton Dr Zier Rd 4660 Lincoln Ave 40th Ave 4570 Rudkin Rd 1st St 4179 72nd Ave 80th Ave 4652 16th Ave 66th Ave 4555 SR 12 Washington Ave 4583 SR 12 Washington Ave Davis HS Greenway; W. Powerhouse Rd Fair Ave Yakima Greenway City of Yakima Bicycle and Pedestrian Advisory Committee, June, 2006 Description Upgrade damaged sidewalks, install new sidewalks, selected on annual basis for safety, connectivity, transit routes, school areas Upgrade lane markings and signage. Annual program, locations selected based on condition, safety Upgrade of ramps to ADA standards at Arterial Street intersections, selected on annual basis, transit routes, school areas Improve pedestrian conditions in CBD 2,000 Install in -pavement flasher or similar system 50 Est Cost 50001 Length (mil 200 50 200 Install in -pavement flasher or similar system Improve pedestrian conditions and safety Resurface and Restripe from 4- lanes to 3 -lanes with Bike Lane, missing sidewalks Resurface and Restripe from 2- lanes to 3 -lanes with shared Bike Lane, replace or install missing sidewalks, ADA ramps Intersection improvement and pathway extension Cover open irrigation canal with bike/ped pathway Missing sidewalks on south side of Principal Arterial Missing sidewalks and safety improvements under 1-82. Connects Sarge Hubbard Park/Greenway to Kiwanis Park Missing sidewalks on Collector Arterial Missing sidewalks on south side of Principal Arterial Sidewalks, shared bike lane Sidewalks, shared bike lane Missing sidewalks, bike lane improvement Missing sidewalks, shared bike lane Missing sidewalks, shared bike lane Missing sidewalks, bike lane improvement Missing sidewalks, bike lane improvement In cooperation with private foundation,Yakima County and others. Pathway along N 6th Ave, improve Greenway connection, trolley bridge, 40th Ave to 750 Powerhouse Rd path connection 50 100 750 920 300 1 0.92 0.15 500 0.63 2,125 0.73 195 221 350 550 550 420 250 2,400 2,700 2,400 0.43 0.49 0.75 1.2 1.2 0.94 0.5 3.2 3.6 3.2 Construct pedestrian bridge over 1-82 from Gateway area to Yakima Greenway 2,497 0.1 TOTAL 20,528 9. Appendices A. Six Year Form Instructions Heading Agency County Number City Number MPO/RTPO Hearing Date Adoption Date Resolution Number Amendment Date Column Number Enter name of the sponsoring agency. Enter the OFM assigned number (see LAG Appendix 21.44). Enter the OFM assigned number (see LAG Appendix 21.45). Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Enter the date of the public hearing. Enter the date this program was adopted by council or commission. Enter Legislative Authority resolution number (if applicable.) Enter the date this program was amended by council or commission. 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Rural (Under 5000 pop.) 01 - Interstate 02 - Principal Arterials 06 - Minor Arterials 07 - Major Collector 08 - Minor Collector 09 - Local Access 1. Priority Numbers. (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. Description 00- No Classification Urban (Over 5000 pop.) 11- Interstate 12- Freeways & Expressways 14- Other Principal Arterials 16- Minor Arterial 17- Collector 19- Local Access Enter local agency number identifying agency project priority 3. Improvement Type Codes. Enter the appropriate federal code number. Description 07 - Resurfacing 08 - New Bridge Construction 09- Bridge Replacement 01- New construction on new alignment 02- Relocation Project 03- Reconstruction 04- Major Widening 05- Minor Widening 06- Other Enhancements 10 - Bridge Rehabilitation 11 - Minor Bridge Rehabilitation 12 - Safety/Traffic Operation/TSM 13 - Environmentally Related 25 14 - Bridge Program -Special 21 - Transit Capital Project 22- Transit Operational 23 - Transit Planning 24 - Transit Training/Admin 31- Non Capital Improvement 32 - Non Motor Vehicle Project 5. Funding Status. Enter the funding status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV O - Other S - Sewer (other than agency -owned) W - Water G - Gas P - Power T - Telephone 8. Project Phase. Select the appropriate phase code of the project. PE - Preliminary Engineering only (or Planning) RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways Block Grant (HUD) 5309(NS) - New Starts CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly/Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase regardless of when the funds will be spent. 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. 26 CAPP - County Arterial Preservation Program CHAP - City Hardship Assistance Program TPP - Transportation Partnershis Program AIP - Arterial Improvement Program PSMP - Pedestrian Safety & Mobility Program PTST - Public Transportation Systems Progra PWTF RAP SCP - Public Works Trust - Rural Arterial Program - Small City Program WSDOT - WSDOT funding OTHER - All other unidentified state funding 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP Too" program.) 16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS EA CE - Environmental Impact Statement - Environmental Assessment - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required" for Federally funded projects only.) 27 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7 For Meeting of June 27, 2006 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six-year Transportation Improvement Program (STIP) for years 2007 to 2012, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMITTED BY: Department of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: Brett Sheffield, P.E., Acting City Engineer, 576-6797. SUMMARY EXPLANATION: See Attached. Resolutions X Ordinance Contract _Other (Specify) STIP; Bike/Ped Committee Project List Funding Source APPROVED FOR SUBMITTAL: (//e, ! ' - j /1zi`7 City Manager STAFF RECOMMENDATION: 1) Hold the Public Hearing to consider adoption of Resolution approving the STIP and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities Element. 2) Adopt the plan. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: A) Resolution adopted. RESOLUTION NO. R-2006-93 (STIP) B) Resolution adopted. RESOLUTION NO. R-2006-94 (CFE) Six-year Transportation Improvement Program (continued) SUMMARY EXPLANATION: Attached is the 2007-2012 Six -Year TIP. Several projects have been added to the STIP following the June 6, 2006 meeting. Project #64, paving alleys within the City was added as requested at the last Council Meeting, and project #57, Citywide Pathway Connections does include the eastside pathway that was discussed at the June 6, 2006 meeting. Other projects that have been added are: • #50. No. 66th Avenue & Summitview Intersection Widening • #58. "H" St. Extension (1' St. to Terrace Hts. connector to match County at center of new bridge over river) • #59. No. 9th Street Extension (sawmill area) • #65. Nob Hill Corridor I-82 to 16th Avenue (Transaction Committee) • #66. 40th Avenue Corridor SR -12 to Washington Avenue (Transaction Committee) • #67. 16th Avenue Corridor SR -12 to Washington Avenue / Valley Mall Blvd. (Transaction Committee) • #68. So. 1s` Street, Nob Hill Blvd to Barker Mill Bridge, Union Gap (Transaction Committee) • #69. West Yakima, North-South Connector Road; West Valley (Transaction Committee) Project rankings are determined by reviewing data supplied by the City's Street and Traffic Division integrating particular needs of the City. Projects that were deleted from the 2006-2011 TIP as they were completed or funds were obligated include: • Washington Avenue Roadway widening, 52nd Avenue to 72nd Avenue • Nob Hill Blvd. and 6th Street Signal • Street Asset Amenities — Transit Route Maintenance, Repair & Improvements • No. 8th Street and No. 6th Street Signal Flashers at "B" Street & Lincoln Avenue • Capture of 2002 unobligated 5307 Funds • Washington Avenue Median Removal, 24th Avenue to 1,000 feet east • E. Mead and S. 1'` Street Signal and Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP listing will be finalized at today's hearing and sent to Yakima Valley Conference of Governments, (YVCOG) after approval. City and County staff, together with the Council Intergovernmental Committee, are working toward common standards and coordinated planning for public projects that impact both the city and surrounding county areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning process between the City and County. A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2007 — 2012 includes sixteen (16) funded projects and locally identified activities. Funding for the remainder of the projects will continue to be sought. 2 — June 22, 2006 On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior Transportation Equity Act of 1998 for the 21' Century (TEA -21) and previous Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds or by the State of Washington for approved State -funding agencies. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. All Transaction Committee projects within the city limits are listed in the TIP with at least preliminary engineering needs identified. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Plan for 2007 to 2012. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act.